indicadores del valor ganado (spi, cpi)

Upload: israel-lopez

Post on 20-Jul-2015

530 views

Category:

Documents


0 download

TRANSCRIPT

Proyecto: Fecha Inicio: Fecha Fin: Nmero de das: Horas del Proyecto (BAC): Horas Presupuestadas del Proyecto (BAC):

6/23/2008 7/31/200838

350 79,250.00

Semana

Fecha

PV

Datos a introducir EV

AC

Indicadores SPI CPI

1 2 3 4 5

6/30/2008 7/7/2008 7/14/2008 7/21/2008 7/28/2008

7,500.00 11,250.00 21,250.00 40,250.00 79,250.00

3,750.00 10,000.00 19,000.00 39,000.00 75,000.00

7,500.00 12,000.00 26,000.00 47,000.00 80,000.00

0.50 0.89 0.89 0.97 0.95

0.50 0.83 0.73 0.83 0.94

50,000.00

10,000.00 EV PV AC

20,000.00

30,000.00

40,000.00

60,000.00

70,000.00

80,000.00

90,000.00

0.00 6/30/20087/2/2008

7/4/2008 7/6/2008 7/8/2008 7/10/2008 7/12/2008 7/14/2008 7/16/20087/18/2008

7/20/2008 7/22/2008 7/24/2008 7/26/20087/28/2008