ws#2 presentation (draft 9-30-10)

37
Public Workshop #2 Public Workshop #2 Oc tob er 20 10

Upload: kmeyer5279

Post on 10-Apr-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 1/37

Public Workshop #2Public Workshop #2Octob er 20 10

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 2/37

2

Meeting AgendaMeeting Agenda

1. Background

2. Corridor Design 101

3. Opportunities and Constraints

4. Workshop

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 3/37

Project BackgroundProject Background

YouTube Video

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 4/37

Draft Purpose StatementDraft Purpose Statement

The pu r pose o f t h i s p r o j ect i s t o…

Address corridor congestion and safety problems.

Serve future north-south traffic.Serve expected population growth in the area.

– Damascus,

– Happy Valley,– Pleasant Valley Plan Area and

– Gresham,

Serve the growing demand for regional travel.

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 5/37

Project Goals & ObjectivesProject Goals & Objectives

Cor r ido r A l ign m en t Goa ls  

1. Improve mobility for:

– Through traffic– Local community,

– Freight movement.

2. Minimize impacts to:

– Environmental resources,

– Cultural resources, and

– Social

3. Provide flexibility for:– Changing socio-economic conditions,

– Development opportunities.

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 6/37

Goals & Objectives (cont.)Goals & Objectives (cont.)

St r eet scape Goals  

4. Provide a unique, aesthetically pleasing design thatpreserves rural character.

5. Integrate “green streets” design with the natural features.

6. Improve safety for all users.

7. Support healthy and walkable communities.

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 7/37

Goals & Objectives (cont.)Goals & Objectives (cont.)

Land Use & Transpor t a t i on I n t eg r a t i on Goal s  

8. Protect the long-term function of the corridor.

9. Ensure that the corridor plan supports local economicdevelopment.

I m p lem en t at i on Go al s  

10. Ensure effective project implementation by selecting aplan that is fundable and can be built in phases.

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 8/37

Project ProcessProject Process

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 9/37

9

Alternatives Development ProcessAlternatives Development Process

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 10/37

10

Alternatives Development (Continued)Alternatives Development (Continued)

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 11/37

Corridor Design 101Corridor Design 101

Roadw ay Des ign Bas ics:  

Horizontal Alignment

Vertical Alignment

Roadway Cross Sections

Intersection Treatments

Intersection Spacing

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 12/37

Horizontal Alignment DesignHorizontal Alignment Design

Maximum degree of curve based on speed

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 13/37

Vertical AlignmentVertical Alignment

Maximum Roadway Grades:

8% for arterials,

12% for collector/local roadways

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 14/37

Roadway Profile DesignRoadway Profile Design

Sight distancerequirements

Vertical curve design

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 15/37

Roadway Cross SectionsRoadway Cross Sections

Design lane width requirements• Travel lane – 11-12’

• Center turn lane – 12-14’• Bike lanes - 6’ both sides

• Sidewalks – 6-8’

• Landscape Strip – 5-7’

Source: City of Happy Valley TSP

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 16/37

Roadway Cross SectionsRoadway Cross Sections

Source: City of Happy Valley TSP

Typical 3-Lane Arterial

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 17/37

Other Streetscape FeaturesOther Streetscape Features

Drainage Considerations

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 18/37

Other Streetscape FeaturesOther Streetscape Features

Retaining wall to minimizeimpacts

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 19/37

Example Cross SectionsExample Cross Sections

Photos to be added

– 172nd Ave (south)

– Sunnyside Rd

– Kruse Way – Others…

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 20/37

Intersection TreatmentsIntersection Treatments

Roundabouts

TrafficSignals

Stop Sign Control

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 21/37

Intersection SpacingIntersection Spacing

Minimum Intersection Spacing

–  Arterial & Collectors Intersections – 1,000 ft

– Local Street Intersections – 500 ft

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 22/37

Opportunities and ConstraintsOpportunities and Constraints

Stakeholder Interviews

Existing Conditions

Projected Future Conditions

Other Planned Transportation Improvements

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 23/37

23

Stakeholder Interview SummaryStakeholder Interview Summary

Key t hem es:  

Respect Property Rights

Preserve Rural Character

Reduce Congestion

Improve Safety

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 24/37

24

Existing Conditions Analysis Completed:Existing Conditions Analysis Completed:

Existing Transportation Conditions

Future Transportation Conditions

InfrastructureNatural Resources

Historical and Cultural Resources

Hazardous Materials

Socio Economic and Land Use

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 25/37

25

Existing Transportation Conditions AnalysisExisting Transportation Conditions Analysis

Current traffic volumes:

– 172nd Avenue: 8,500 vehicles per day (Near Hemrick Rd)

– Foster Road : 7,500 vehicles per day (Near Cheldelin Rd)

– SE Sunnyside Road: 9,000 vehicles per day (Near 172nd Ave)

All study intersections operate acceptably except

Foster Road/172nd Avenue (LOS F)

Intersection crash rates are within normal levels

No bike or sidewalk facilities

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 26/37

Existing Cross SectionExisting Cross Section

172nd Avenue

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 27/37

Existing Cross SectionExisting Cross Section

190th Avenue

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 28/37

Existing TopographyExisting Topography

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 29/37

29

Natural ResourcesNatural Resources

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 30/37

30

Historical and Cultural ResourcesHistorical and Cultural Resources

10 historical resources within the PSA eligible for NationalRegister of Historic Places

– Generally located along Foster Rd

No archaeological sites have been recorded within the PSA

The PSA has a low to moderate likelihood of containing

archaeological sites

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 31/37

31

Future Transportation Conditions AnalysisFuture Transportation Conditions Analysis

2035 Projections in Project Study Area:

– Households forecast to grow by more than 300%

– Jobs forecast to grow by 1,200%

– Virtually all study area intersections will fail during peakhours

2035 Projected ADT

– 16,000 veh/day (south of Foster Rd)

– 25,000 veh/day (north of Sunnyside Rd)

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 32/37

32

Future Transportation Conditions AnalysisFuture Transportation Conditions Analysis

– 172nd and 190th Avenue roadway cross-sectionswill require 3 to 5 lanes:

– 5 Lanes at South End– 3 Lanes at North End

– Ten intersections would require roundabouts or

traffic signals under current road network

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 33/37

33

Planned Transportation NetworkPlanned Transportation Network

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 34/37

Planned Transportation Network (north)Planned Transportation Network (north)

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 35/37

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 36/37

Future Land UseFuture Land Use

   T   O    B   E

    U   P   D

  A    T   E

   D

8/8/2019 WS#2 Presentation (Draft 9-30-10)

http://slidepdf.com/reader/full/ws2-presentation-draft-9-30-10 37/37

37

Lets Create Some Corridor Design Concepts…Lets Create Some Corridor Design Concepts…

–  Add image of design tool and base map