a&n - draft presentation v2

Upload: sowmya-haran

Post on 06-Apr-2018

225 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/3/2019 A&N - Draft Presentation V2

    1/34

    Draft PresentationPresented by a consortium of:

    Voyants Solutions Pvt. Ltd & Alchemy Urban SystemsPvt. Ltd

  • 8/3/2019 A&N - Draft Presentation V2

    2/34

  • 8/3/2019 A&N - Draft Presentation V2

    3/34

    Scope of the draft presentation

    Revised population projection

    Draft development plan

    Broad infrastructure requirements and costing Phasing and implementation strategy

  • 8/3/2019 A&N - Draft Presentation V2

    4/34

  • 8/3/2019 A&N - Draft Presentation V2

    5/34

    The scope of the draft report includes:

    Formulation of sectoral vision and strategies

    Culminating the sectoral strategies into developmental

    strategies for the delineated region

    Based on the developmental strategies and potential of theregion, projecting the population for the project horizon year

    2036

    Estimating the broad infrastructure requirements and costing

    and phasing for the same Strategizing the institutional framework and implementation

    strategy

  • 8/3/2019 A&N - Draft Presentation V2

    6/34

    The population projections have beenearlier covered under the Interim Stageof the Twin City Development Plan butit is observed that with theimplementation of the proposedgrowth strategies, the growth patterns

    of different towns/villages would bedifferent in the future and thereforethe population projections have beenrevised.

  • 8/3/2019 A&N - Draft Presentation V2

    7/34

    Anand UrbanAgglomeration

    Nadiad Municipal Area

    The towns Chaklasi,

    Karamsad & Mogri villagehave been analyzed

    separately

    Villages around Anand and

    Villages around Nadiad Villages on the eastern side

    of the expressway

  • 8/3/2019 A&N - Draft Presentation V2

    8/34

    Past Population Trends of the Overall Planning Area

    Influence of Proposed Growth Pattern on Projections

    Population projections have been carried out using thefollowing methods :

    Arithmetic increase

    Incremental increase

    Geometric increase

    Exponential, Logarithmic and Graphical methods

    Natural increase and migration method

  • 8/3/2019 A&N - Draft Presentation V2

    9/34

    Name of the settlement Projected Population2011 2021 2031 2041

    Anand (M) 201255 275719 330863 343843

    Karamsad(M) 39089 53552 66940 73329

    VitthalUdyognagar(INA) 6072 8259 9910 10720

    VallabhVidyanagar (M) 36429 42986 48144 50033

    Bakrol (V) 33945 48542 65531 72678Mogri (V) 3810 4496 5170 5472

    Villages around Anand 54898 63682 73234 78535

    Nadiad (M) 214133 241971 263748 271545

    Chaklasi (M) 40433 44476 48479 50381

    Villages around Nadiad 61503 67653 73065 75579

    Villages on the Eastern Side of

    Expressway 47811 49724 51215 51725

    TOTAL PROJECTED POPULATION 739378 901060 1036299 1083840

    Growth Rates within the Delineated Area

  • 8/3/2019 A&N - Draft Presentation V2

    10/34

    Land suitability analysis

    Disaster zoning and vulnerability

    Sectoral vision

    Growth strategy & vision

    Development Scenario Construction

    Concept Draft Development PlanDraft Development Plan

    Infrastructure estimation, costing &

    phasing

    Implementation strategy

  • 8/3/2019 A&N - Draft Presentation V2

    11/34

    Methodology for landsuitability analysis

    Parameters for analysis

    Project area divided into agrid of 1km x 1km

    Various parameters were

    mapped and overlayed

    Scoring of the various grids Individual parameters are

    assigned multiplying factors

    High rank for a grid implied

    greater suitability for urbandevelopment.

    Macro parameters: Number of Agricultural

    Workers

    Existing un-irrigated

    agricultural land

    Micro parameters:

    Accessibility

    Existing environmental

    features

    Existing settlement

  • 8/3/2019 A&N - Draft Presentation V2

    12/34

    The darker areas depictareas that need to

    safeguarded, whereas

    the light areas depict

    areas which are pro-

    development

  • 8/3/2019 A&N - Draft Presentation V2

    13/34

  • 8/3/2019 A&N - Draft Presentation V2

    14/34

    SR.

    NO.

    SECTOR VISION

    1 Sprawl development

    within the delineated

    region

    Create harmonious development

    Retain the identity as an environmentally sound

    habitat

    Enhancing the vibrant character of the delineated

    regionProvide paramount quality of life.

    2 Transportation and

    connectivity

    development

    Provide an integrated network of roads with clear

    hierarchy to improve connectivity within the

    delineated region

    Facilitate the ease of movement for through traffic

    as well as the local traffic

    Adequately integrating existing roads and

    development, while safeguarding ecologically

    sensitive areas

    Provide a framework for planned urban extension

  • 8/3/2019 A&N - Draft Presentation V2

    15/34

    SR.

    NO.

    SECTOR VISION

    3 Economic

    development

    Establish a sustainable economic development

    mechanisms based on strategic partnerships within

    the delineated region capitalizing on the local

    potential and skill-set .

    4 Tourism

    development

    Promote and further augment the several forms of

    prevalent tourism modes such as educational, medical

    and religious tourism integrated with high-end

    tourism infrastructure development

    5 Health and

    Educational Facility

    Development

    Promote state supported education and health

    facilities with private initiatives to bringing in more

    investment in Social Infrastructure facilities to cater all

    sects of people across the region.

  • 8/3/2019 A&N - Draft Presentation V2

    16/34

    SR.

    NO.

    SECTOR VISION

    6 Water supply Facilitate access to safe drinking water to all the

    citizens

    7 Sanitation and Solid

    Waste ManagementFacility Development

    Facilitate community driven safe and hygienic

    sanitation facilities in Anand

    Nadiad region

    8 Slums and EWS

    housing demand

    Ensure safe and serviced residential facilities to the

    slum and houseless population through proactive

    slum rehabilitation and policy initiatives

  • 8/3/2019 A&N - Draft Presentation V2

    17/34

    SR.

    NO.

    SECTOR VISION

    9 Water Bodies,

    Environment &

    Recreation

    Protect the environment in terms of land, water and

    air

    Home based non-polluting industries to be

    developed in stipulated areas within the urbanized

    zoneOther Industrial areas to be located away from

    urbanized zone with requisite buffers

  • 8/3/2019 A&N - Draft Presentation V2

    18/34

    TO PROMOTE THE DEVELOPMENT OF ANAND NADIAD

    TWIN CITY WHICH OFFERS DIVERSIFIED ECONOMIC

    OPPORTUNITIES AND SOCIAL FACILITIES IN AN INCLUSIVE

    MANNER WITH PLANNED AND SUSTAINABLE URBAN

    DEVELOPMENT MANAGED BY AN ABLE ADMINISTRATION

    Ribb d l t l

  • 8/3/2019 A&N - Draft Presentation V2

    19/34

    Scenario-1: No interventionscenario

    Ribbon development along

    the transport corridors

  • 8/3/2019 A&N - Draft Presentation V2

    20/34

    Scenario-2: Land zoningoption 1

    Urban agricultural pocket

    Urban agricultural strips

    cutting across the city

    Buffered industrialdevelopment in the

    south west

  • 8/3/2019 A&N - Draft Presentation V2

    21/34

    Scenario-3: Land zoningoption 2

    Urban agricultural pocket

    Mixed use development

    on the E-W corridor to

    spur development inthat direction

    Loop/ring roads to

    improves E-W

    connectivity

    Industrial development

    in the south west

  • 8/3/2019 A&N - Draft Presentation V2

    22/34

    To create a city that integratesthe existing towns of Anand

    and Nadiad along with the rural

    hinterland and existing villages

    The idea is to considerdeveloping an urban area that

    is well provided in terms of

    facilities, sustainable as a

    habitat and convenient in terms

    of its layout and connectivity;

  • 8/3/2019 A&N - Draft Presentation V2

    23/34

    Provide adequate connectivity toallow for easy movement

    Provide connectivity along the

    high capacity routes;

    Develop public transport in orderto encourage transition from

    private wheels to public wheels

    Land Use zoning and road network

    to support road-based publictransport system in order for the

    system to function efficiently;

  • 8/3/2019 A&N - Draft Presentation V2

    24/34

    A green system to be developedto connect these existing water

    bodies and channels.

    The lowest density farmtype

    residential areas have beendesigned as an extension to

    these green space systems.

  • 8/3/2019 A&N - Draft Presentation V2

    25/34

    The area to the East of theExpressway which is presently

    cut off from the rest of the

    development to the west is

    retained as agricultural. Thus the expressway acts as a

    feature to preserve/conserve

    the existing agricultural lands on

    its eastern side.

  • 8/3/2019 A&N - Draft Presentation V2

    26/34

  • 8/3/2019 A&N - Draft Presentation V2

    27/34

    DraftDevelopmentPlan

  • 8/3/2019 A&N - Draft Presentation V2

    28/34

  • 8/3/2019 A&N - Draft Presentation V2

    29/34

    Water supply

    Demand (MLD)

    2011 2021 2031 2036

    99.82 121.64 139.9 146.32

    Source augmentation = 100.00MLD

    Network length

    estimation =

    530Km

    TOTAL COST = 284.63 Cr.

    Sewerage network

    sewerage generated in MLD:

    2011 2021 2031 2036

    79.85 97.31 111.92 117.05

    Treatment facility requirements = 72.00 MLD

    Network length estimation

    TOTAL COST = 286.44 Cr.

    Storm water drainageLength covered storm water drains = 270 kms

    TOTAL COST = 44.55 Cr.

    Solid waste managementWaste generated in tonnes per day2011 2021 2031 2036

    184.84 225.27 259.07 270.96

    TOTAL COST = 57.42 Cr.

    Road development and

    public transport

    Broad new road development = 322 km

    TOTAL COST = 1742.88 Cr.

    Micro level infrastructure TOTAL COST = 278.04 Cr.

    ITEM COSTPhysical Infrastructure 2693.95

    Social Infrastructure 2963.07

    TOTAL 5657.02

    THIS COST SHALL BE SPENT IN 3 PHASES OVER THE NEXT 25 YEARSSr. No PHASES Total Area (ha)

    100%

    Saleable land (ha)

    15%

    unit cost /ha

    (Cr)

    Total cost

    (Cr)

    1 Phase 1 9211 1381.65 12.9 17823.29

    2 Phase 2 4951 742.65 12.9 9580.19

    3 Phase 3 11367 1705.05 12.9 21995.154 TOTAL 25529 3829.35 12.9 49398.62

    The amount required can be financed through sale of land bankscreated via TP Schemes

  • 8/3/2019 A&N - Draft Presentation V2

    30/34

  • 8/3/2019 A&N - Draft Presentation V2

    31/34

    PHASE-1 PHASE-2 PHASE-3

    S

    TAGE-1

    Notification of the area as

    an Area Development

    Authority.

    Constitute an area

    development authority

    Review of DP in 2021 Review of DP in 2031

    STA

    GE-2 Preparation of DP and proposal

    of TP Schemes for Phase-1

    Proposal of TP Schemes for Phase-

    2

    Proposal of TP Schemes for

    Phase-3

    STAGE-3

    Action Plan for Infrastructure &

    Development projects

    Action Plan for Infrastructure &

    Development projects

    Action Plan for Infrastructure &

    Development Projects

    Provision of infrastructure

    facilities in areas where

    development has already

    taken place

    Project formulation for new

    Physical and Social

    infrastructure

    Project formulation for new

    projects to complimenturbanization.

    Strategies for O&M

    Recommendations for policy

    initiatives

    Project formulation,

    Development &

    Implementation strategies for

    new development.

    Projects for improving existing

    infrastructure and to develop

    additional infrastructure

    facilities, civic amenities and

    utilities. Preparation of DPR for each

    development Projects &

    Infrastructure Projects.

    Strategies for O&M

    Recommendations for policy

    initiatives

    Project formulation,

    Development &

    Implementation strategies

    for new development.

    Independent projects for

    improving existing

    infrastructure and to

    develop additional

    infrastructure facilities, civicamenities and utilities.

    Preparation of DPR for each

    development Projects &

    Infrastructure Projects.

    Strategies for O&M

    Recommendations for policy

    initiatives

  • 8/3/2019 A&N - Draft Presentation V2

    32/34

  • 8/3/2019 A&N - Draft Presentation V2

    33/34

    Considering the current growth pattern, interdependency andsocio-cultural identity of Anand - Nadiad and the neighboringvillages, it is envisaged that the project area has to bedeclared a Special Planning Area for an efficient andsustainable development of the region.

    Under the Gujarat Town Planning Act 1976 , a region withinthe state can be declared as Development Area for purposeof securing planned development.

    The Area Development Authority would be the apex bodyfor planning and co-ordination of development activities inthe delineated area.

  • 8/3/2019 A&N - Draft Presentation V2

    34/34