ws 2 presentation

35
Public Workshop #2 Public Workshop #2 Oc tob er 2 0 10

Upload: kmeyer5279

Post on 10-Apr-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 1/35

Public Workshop #2Public Workshop #2Octob er 2 0 10

Page 2: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 2/35

2

Meeting AgendaMeeting Agenda

Why are we here?

Corridor Design 101

 Alignments and Streetscapes

Opportunities and ConstraintsFuture Plans

Workshop – 2 topics

 Alignments and Streetscapes

Page 3: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 3/35

Why here? Why now?Why here? Why now?

(See Project YouTube Video)

Page 4: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 4/35

Pu r po se o f Th is Pr o j ect  Pu r p ose o f Th is Pr o j ect  

Address corridor congestion and safety problems

Serve future north-south traffic

Serve expected population growth in the area– Damascus

– Happy Valley 

– Pleasant Valley Plan area

– Gresham

Serve the growing demand for regional travel

Page 5: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 5/35

Cor r ido r A l ign m ent Goa ls  Cor r ido r A l ign m ent Goa ls  

Improve mobility for:Through traffic

Local community 

Freight traffic

Minimize impacts to:

Environmental resourcesCultural resources

Social

Provide flexibility for:

Changing socio-economic conditions

Development opportunities

Page 6: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 6/35

St r eet scape Goals  St r eet scape Goals  

Provide an aesthetically pleasing design. . .

That supports the character of the adjoining land

uses

That preserves rural character

Integrate “green streets” design with the naturalfeatures

Improve safety for all users

Support healthy and walkable communities

Page 7: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 7/35

Project ProcessProject Process

WE ARE HERE

Page 8: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 8/35

8

Alternatives Development ProcessAlternatives Development Process

Page 9: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 9/35

Corridor Design 101Corridor Design 101

Roadw ay Design Basics  

Horizontal alignment

Vertical alignment

Roadway cross-sections

Intersection treatments

Intersection spacing

Page 10: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 10/35

Horizontal AlignmentHorizontal Alignment

Maximum degree of curve based on speed

Page 11: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 11/35

Vertical AlignmentVertical Alignment

Maximum Roadway Grades

8% for arterial

roadways12% for collector/local roadways

Page 12: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 12/35

Roadway ProfileRoadway Profile

Sight distancerequirements

Vertical curve design

Page 13: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 13/35

Roadway Cross-SectionsRoadway Cross-Sections

Lane width requirements• Travel lane – 11-12 feet

• Center turn lane – 12-14 feet

• Bike lanes – 6 feet on both sides

• Sidewalks – 6-8 feet

• Landscape strip – 5-7 feet

Source: City of Happy Valley TSP

Page 14: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 14/35

Roadway Cross SectionsRoadway Cross Sections

Source: City of Happy Valley TSP

Typical 3-lane arterial roadway

Page 15: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 15/35

Other Streetscape FeaturesOther Streetscape Features

Drainage considerations

Page 16: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 16/35

Other Streetscape FeaturesOther Streetscape Features

Retaining wall to minimizeimpacts

Page 17: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 17/35

Streetscape ExamplesStreetscape Examples

SE 172nd Avenue (South of Sunnyside)

Page 18: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 18/35

Streetscape ExamplesStreetscape Examples

SW Walker Road

Page 19: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 19/35

Streetscape ExamplesStreetscape Examples

SW Kruse Way 

Page 20: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 20/35

Intersection OptionsIntersection Options

Roundabouts

Trafficsignals

Stop signs

Page 21: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 21/35

Intersection SpacingIntersection Spacing

Minimum Intersection Spacing

–  Arterial & collectors intersections – 1,000 feet

– Local street intersections – 500 feet

Page 22: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 22/35

Corridor Opportunities and ConstraintsCorridor Opportunities and Constraints

Discussed in

– Stakeholder interviews

– Memos on existing conditions

– Memos on projected future conditions

23

Page 23: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 23/35

23

Future Transportation Conditions -- 2035Future Transportation Conditions -- 2035

Projections in Project Study Area

– Households grow by more than 300%

– Jobs grow by 1,200%– Virtually all intersections fail during peak hours

Projected Average Daily Traffic (ADT)

– 16,000 vehicles/day (south of Foster Rd)

– 25,000 vehicles/day (north of Sunnyside Rd)

24

Page 24: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 24/35

Existing Transportation ConditionsExisting Transportation Conditions

Traffic volumes– 172nd Avenue: 8,500 vehicles /day (near Hemrick Rd)

– Foster Road : 7,500 vehicles /day (near Cheldelin Rd)

– SE Sunnyside Road: 9,000 vehicles /day (near 172nd Ave)

All intersections operate acceptably except Foster

Road/172nd Avenue (LOS F)

Intersection crash rates are within normal levels

There are no bike lanes or sidewalks

Page 25: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 25/35

TopographyTopography

26

Page 26: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 26/35

Natural ResourcesNatural Resources

E i i C S i

Page 27: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 27/35

Existing Cross-SectionExisting Cross-Section

172nd Avenue

E i i C S iE i ti C S ti

Page 28: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 28/35

Existing Cross-SectionExisting Cross-Section

190th Avenue

29

Oth O t iti d C t i tOth O t iti d C t i t

Page 29: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 29/35

Other Opportunities and ConstraintsOther Opportunities and Constraints

10 historical resources eligible for National Register of Historic Places

– Generally located along Foster Rd

No recorded archaeological sites

F t Pl f C idF t Pl f C id30

Page 30: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 30/35

Future Plans for CorridorFuture Plans for Corridor

Regional Transportation System Plan

Local Transportation System Plans

Local Comprehensive Plans

31

Planned T anspo tation Net o kPlanned Transportation Network

Page 31: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 31/35

Planned Transportation NetworkPlanned Transportation Network

Planned Transportation Network (north)Planned Transportation Network (north)

Page 32: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 32/35

Planned Transportation Network (north)Planned Transportation Network (north)

Planned Transportation Network (south)Planned Transportation Network (south)

Page 33: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 33/35

Planned Transportation Network (south)Planned Transportation Network (south)

Future Land UseFuture Land Use

Page 34: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 34/35

Future Land UseFuture Land Use

35

Now Let’s Create Some Corridor Design ConceptsNow Let’s Create Some Corridor Design Concepts

Page 35: WS 2 Presentation

8/8/2019 WS 2 Presentation

http://slidepdf.com/reader/full/ws-2-presentation 35/35

Now Let s Create Some Corridor Design Concepts…Now Let s Create Some Corridor Design Concepts…