sistema control mix · 2015. 12. 4. · 04/02/14, que abarca los rubros previamente detallados....

82
Jr. Bajada Balta 169, Oficina 702 Miraflores - Lima 18 Teléfonos: 2430414, Celular : 998133533, e-mail : [email protected] Rev.06 1 SISTEMA CONTROL MIX EXPEDIENTE TÉCNICO 2015

Upload: others

Post on 20-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

  • Jr. Bajada Balta 169, Oficina 702 – Miraflores - Lima 18 Teléfonos: 2430414, Celular : 998133533, e-mail : [email protected] Rev.06

    1

    SISTEMA CONTROL MIX

    EXPEDIENTE TÉCNICO

    2015

    mailto:[email protected]

  • Jr. Bajada Balta 169, Oficina 702 – Miraflores - Lima 18 Teléfonos: 2430414, Celular : 998133533, e-mail : [email protected] Rev.06

    2

    SISTEMA CONTROL MIX

    EXPEDIENTE TÉCNICO

    1. DESCRIPCIÓN GENERAL

    A. El Sistema Control Mix está constituido por un círculo de calidad de 6 etapas para garantizar : 1) el muestreo, 2) moldeo, 3) transporte a laboratorio, 4) curado, 5) ensayo en compresión y 6) remisión de resultados de ensayos en cumplimiento de las normas estándar aplicables.

    B. Las normas estándar en su última versión bajo las cuales se ha configurado el

    Sistema Control Mix son :

    ASTM C31/C31M-15 "Standard Practice for Making and Curing Concrete Test Specimens in the Field".

    ASTM C39/C39M-15 "Standard Test Method for Compressive Strength of

    Cylindrical Concrete Specimens". ASTM C172/C172M-14a"Standard Practice for Sampling Freshly Mixed

    Concrete". ASTM C470/C470M-15 "Standard Specification for Molds for Forming Concrete

    Test Cylinders Vertically". ASTM C511-13 "Standard Specification for Mixing Rooms, Moist Cabinets, Moist

    Rooms, and Water Storage Tanks Used in the Testing of Hydraulic Cements and Concretes".

    ASTM C1231/1231M-14 "Standard Practice for Use of Unbonded Caps in

    Determination of Compressive Strength of Hardened Concrete Cylinders" ASTM C1077-15 “Standard Practice for Agencies Testing Concrete and Concrete

    Aggregates for Use in Construction and Criteria for Testing Agency Evaluation”

    C. Las normas peruanas NTP están basadas en las normas ASTM detalladas, sin embargo, se ha decidido emplear la fuente original dado que corresponden a las versiones revisadas y actualizadas regularmente, y nuestra Norma E 060-2009 define su empleo en vez de las Normas NTP para el caso particular del muestreo y ensayo de concreto. (Acápites 5.6.3.1 y 5.6.3.2)

    2. DETALLES TÉCNICOS DEL SISTEMA CONTROL MIX 2.1 ETAPA 1 : MUESTREO DEL CONCRETO FRESCO EN OBRA

    A. El muestreo del concreto en obra en conformidad con el Sistema Control Mix es ejecutado por personal designado por el cliente, previa capacitación, evaluación y certificación a cargo de especialistas de Control Mix Express (CME).

    B. En el Anexo I se adjuntan los documentos que habilitan al suscrito, la Ing. Mercedes

    Neyra y la Ing. Mariella Durand como instructores certificados para la capacitación en las Normas ASTM incluidas en el Código ACI-318 y los Técnicos Richard Lino, Fortunato Villanueva, Edgard Saavedra y Luis Lavado, responsables de las capacitaciones prácticas del personal en obra.

    mailto:[email protected]

  • Jr. Bajada Balta 169, Oficina 702 – Miraflores - Lima 18 Teléfonos: 2430414, Celular : 998133533, e-mail : [email protected] Rev.06

    3

    C. La capacitación que imparte CME está basada en el Programa de Certificación para Técnicos de Control de Concreto Grado I del American Concrete Institute - ACI, en los aspectos de muestreo, moldeo de testigos en campo, determinación del asentamiento (slump) y medición de temperatura del concreto fresco conforme a las Normas ASTM aplicables.

    D. Al personal que aprueba la evaluación teórica y práctica que considera el Programa

    de Capacitación se le asigna un código de certificación, siendo el único personal reconocido por el Sistema Control Mix como habilitado para el muestreo y moldeo de los testigos en obra, no recibiéndose ningún testigo que no haya sido muestreado y moldeado por dicho personal calificado, en cumplimiento de las Normas ASTM C31. En el Anexo I se adjunta un ejemplo de Certificado.

    2.2 ETAPA 2 : MOLDEO DE TESTIGOS DE CONCRETO

    A. Luego de ser efectuado el muestreo del concreto fresco, por parte del personal certificado del cliente, en la oportunidad y frecuencia que éste considere conveniente según la norma ASTM C 31, este personal procede al moldeo de los testigos cilíndricos.

    B. El Sistema Control Mix considera el suministro y empleo de módulos para testigos

    constituidos por una caja de madera para protección y traslado de testigos de diseño original de CME, 6 moldes cilíndricos plásticos de 4" de diámetro x 8"de altura, varilla compactadora, martillo de goma y regla enrasadora previstos por la norma ASTM C31.

    C. Los moldes plásticos han sido fabricados para CME cumpliendo los requisitos y

    tolerancias de la Norma ASTM C470 y constan adicionalmente de una tapa también de plástico de ajuste hermético, para garantizar el mantenimiento de la humedad del testigo luego de moldeado y enrasado.

    D. Efectuado el moldeo de los testigos en condición estándar controlada, el personal

    certificado coloca cuidadosamente los moldes con tapa dentro de la caja de madera, que tiene la doble función de proteger los testigos de golpes o maltratos durante las 48 horas previas a su traslado al laboratorio y proveer aislamiento térmico para asegurar que los testigos se mantengan dentro del rango de temperatura de 16ºC a 27ºC, o curado inicial a ser garantizado en el periodo indicado, en cumplimiento de ASTM C31 para que no se afecte la resistencia a 28 días.

    E. El personal responsable del moldeo de los testigos tiene a su cargo la generación de

    la orden de servicio para CME con todos los detalles relativos al tipo de concreto, procedencia, fechas de ensayo, etc. que deberán figurar en el certificado de ensayos correspondiente y que adjuntará a cada módulo de testigos, incluyéndose en el Anexo II el formato correspondiente.

    2.3 ETAPA 3 : TRANSPORTE DE MÓDULOS CON TESTIGOS AL LABORATORIO

    A. El transporte al laboratorio es efectuado por personal técnico de CME en unidades móviles con anaqueles especialmente acondicionados para el traslado de los módulos de madera con los testigos, a fin de garantizar que no sufran golpes ni daños.

    mailto:[email protected]

  • Jr. Bajada Balta 169, Oficina 702 – Miraflores - Lima 18 Teléfonos: 2430414, Celular : 998133533, e-mail : [email protected] Rev.06

    4

    B. En conformidad con ASTM C31, el transporte se efectúa no antes de 8 horas de producido el fraguado final del concreto, ni después de 48 horas de haberse moldeado los testigos, no debiendo durar el traslado más de 4 horas.

    2.4 ETAPA 4 : CURADO EN CONDICIONES CONTROLADAS

    A. Los testigos son trasladados al Laboratorio de CME en Villa El Salvador donde se ingresa y registra cada módulo con su orden de servicio correspondiente en la base de datos del software original patentado que forma parte del Sistema Control Mix.

    B. El software registra también la ubicación matricial única que tendrán los testigos en

    los anaqueles de las cámaras de curado, emitiendo etiquetas con códigos de barras para su identificación.

    C. Los testigos se desmoldan y de inmediato se le colocan sus etiquetas de

    identificación, colocándose en grupos de 3 en cajas plásticas de diseño especial numeradas, para su almacenaje ordenado en los anaqueles de los cuartos de curado.

    D. Se cuenta con cajas numeradas de color rojo donde se depositan los testigos a

    ensayarse a edad temprana (normalmente a 7 días o la edad que requiera el cliente ) y también con cajas de color azul para almacenar los testigos a probarse a 28 días o mayor edad si lo requiere el cliente, de tal forma de eliminar cualquier posibilidad de confusión en almacenaje e identificación de los testigos.

    E. En un periodo máximo de 30 minutos luego de ser desmoldados, etiquetados y

    colocados en sus cajas plásticas, los testigos se trasladan a su ubicación programada en las cámaras de curado.

    F. Las cámaras de curado cumplen con los requisitos de la Norma ASTM C511 y

    cuentan con un sistema de circuito cerrado de aspersores aéreos de neblina y un tanque de agua con bomba recirculante y control de temperatura para garantizar el mantenimiento de la humedad superficial permanente y la temperatura en el rango de 21ºC a 25ºC previsto en ASTM C31.

    2.5 ETAPA 5 : ENSAYO EN COMPRESIÓN DE LOS TESTIGOS

    A. El software del Sistema Control Mix emite diariamente un reporte de los testigos programados para ser ensayados en la fecha, con su ubicación matricial en las cámaras de curado, a fin de que sean trasladados al laboratorio de ensayos.

    B. Los testigos se trasladan en sus cajas de curado al laboratorio de ensayos para

    mantener su condición de humedad hasta el momento de ser probados.

    C. Se cuenta con cuatro prensas británicas Marca JV Tech, Nº de Serie 0481313 y Nº Serie 0431138, Serie 0501503, Serie 14001438 digitales, totalmente automatizadas, controladas por el software del Sistema Control Mix y con certificados de calibración vigentes emitidos por la empresa Celda EIRL, empleando celda de calibración trazable al NIST (United States National Institute of Standards & Technology) en conformidad con la Norma ASTM E74-13a, adjuntándose una copia de los certificados en el Anexo III.

    mailto:[email protected]

  • Jr. Bajada Balta 169, Oficina 702 – Miraflores - Lima 18 Teléfonos: 2430414, Celular : 998133533, e-mail : [email protected] Rev.06

    5

    D. Como elemento de distribución de carga en el ensayo de compresión se emplean cabezales de acero y pads de neopreno en conformidad con la Norma ASTM C1231.

    E. Luego de colocado el testigo en su posición de ensayo en la prensa, se procede a

    escanear el código de barras para su reconocimiento por el software, y la comprobación de que procede el ensayo programado, con lo que el técnico autoriza a través de la computadora el inicio de la prueba que se efectúa automáticamente sin intervención de ningún personal, con la velocidad de carga programada previamente dentro del rango de 0.20 Mpa/seg a 0.30 Mpa/seg establecido en ASTM C39.

    F. Conseguida la rotura del testigo y registrada la carga máxima el técnico registra el

    tipo de falla según ASTM C39 y autoriza que el software grabe la información, con lo que se calcula el esfuerzo máximo sobre la base del diámetro del testigo ingresado previamente al sistema y el área correspondiente de la sección.

    2.6 ETAPA 6 : EMISIÓN Y ENVÍO DEL CERTIFICADO DE ENSAYOS

    A. Cada vez que se completa la rotura de un grupo de 3 testigos de 4" x 8", (cuyo promedio es considerado por ACI 318 como representativo de la resistencia en compresión de la muestra), el software procede a generar y emitir en formato pdf, el certificado o reporte correspondiente acorde con el acápite 9. de ASTM C39, avalado con la firma de Ingeniero Civil Colegiado Especialista, Responsable Técnico, tal como lo consideran los dispositivos legales vigentes.

    B. El certificado generado y emitido como se menciona anteriormente es almacenado

    en una base de datos de uso y acceso exclusivo del cliente, a quién el software le envía de inmediato un correo electrónico a las casillas que haya declarado previamente, con el aviso de la disponibilidad del certificado de ensayos y un enlace para que proceda a descargarlo en formato pdf e imprimirlo a voluntad.

    C. En el Anexo IV se incluye un formato de certificado de ensayos.

    D. Por razones de seguridad informática y resguardo, toda la información registrada y

    generada por el software es almacenada simultáneamente en un servidor residente en las Oficinas de CME en Miraflores, un segundo servidor en el Laboratorio en Villa El Salvador y un tercer servidor dedicado alojado en un servicio por internet contratado en Alemania.

    E. Se adjunta como documento gráfico en el Anexo V el link de descarga del video

    ilustrativo de los procesos del Sistema Control Mix, y en el website www.controlmixexpress.com se puede acceder a un demo de los servicios mencionados.

    3. SISTEMA DE GESTIÓN ISO 9001:2008

    A. El Sistema Control Mix cuenta con certificación ISO 9001:2008 Nº PE14/175309 emitida por SGS United Kingdom Ltd Systems & Services Certification con fecha 04/02/14, que abarca los rubros previamente detallados. (Ver Anexo IX)

    mailto:[email protected]

  • Jr. Bajada Balta 169, Oficina 702 – Miraflores - Lima 18 Teléfonos: 2430414, Celular : 998133533, e-mail : [email protected] Rev.06

    6

    4. SERVICIOS COMPLEMENTARIOS DE CONTROL MIX EXPRESS S.A.C.

    A. CME pone a disposición gratuita para uso exclusivo de sus clientes el Módulo Informático Control Data que evalúa según ACI-318 la estadística generada.

    B. Como servicios complementarios Control Mix Express SAC realiza extracción,

    recorte y ensayos de núcleos de concreto con brocas diamantinas de 2", 3" y 4" de diámetro en conformidad con la norma ASTM C 42

    C. Se cuenta con 2 perforadoras diamantinas marca Hilti Modelo DD-150 U y una sierra

    circular con disco diamantado de 20" para acondicionar los testigos dentro de los parámetros de geometría, planitud y verticalidad establecidos por ASTM C 42 y ASTM C 39.

    D. También provee de servicio de monitoreo de ubicación de acero de refuerzo con

    equipo Proceq Profometer PM-600. E. Se proporciona adicionalmente el servicio de determinación de Número de Rebote

    Comparativo en estructuras de concreto (esclerometría) con equipo Forney acorde con la norma ASTM C 805.

    5. RESPONSABLES TÉCNICOS

    A. El responsable técnico del Sistema Control Mix Express y Gerente General es el Ing. Enrique Pasquel Carbajal con Registro del Colegio de Ingenieros del Perú Nº 19480.

    B. La responsable Técnica del Área de Laboratorio y Soporte Técnico es la Ingeniera

    Mercedes Neyra Palomino con Registro del Colegio de Ingenieros del Perú Nº 154020.

    C. En el Anexo VI se adjunta el Resumen de Hoja de vida del Responsable Técnico que

    avala la experiencia mínima de 5 años en el ensayo de materiales de construcción requerida por ASTM C1077 para dirigir empresas de control de calidad de concreto.

    D. En el Anexo VII se incluyen copias de las normas ASTM mencionadas previamente. E. En el Anexo VIII se puede apreciar un detalle de los clientes atendidos por nuestra

    empresa. Lima, 12 de Noviembre del 2015

    Responsable Técnico Gerente General Control Mix Express S.A.C.

    mailto:[email protected]

  • Jr. Bajada Balta 169, Oficina 702 – Miraflores - Lima 18 Teléfonos: 2430414, Celular : 998133533, e-mail : [email protected] Rev.06

    7

    ANEXO I Documento Instructor Certificado ASTM

    Documento de Técnicos de Capacitación CME de Campo

    y Ejemplo de Certificado de Capacitación

    mailto:[email protected]

  • oPtroEoL'gI

    ]g. o =@{ = EE-A Y tn I! r E[B E ZEI :E Bib H ;9R U E'b2 I 'Ego E trP5 P .qUCt {= = tr'= E g8FoE'(E(J

    a-l+r.E

    .99tn

    C'T?-II

    .=GLF

    I

    G?-orI,ooollroL.EdI

    GIII

    tr?-IoF

    Fl

    2oFz/rrlH2

  • ___________________________________________ Instructor

    Ing. CIP Enrique Pasquel Carbajal

    Control Mix Express S.A.C. certifica que el Señor :

    CERTIFICADO DE CAPACITACIÓNCERTIFICADO DE CAPACITACIÓNCERTIFICADO DE CAPACITACIÓNCERTIFICADO DE CAPACITACIÓN

    Juan Juan Juan Juan Ernesto Ernesto Ernesto Ernesto PéPéPéPérez Canalesrez Canalesrez Canalesrez Canales Ha aprobado el "Programa de Capacitación Teórico-Práctico para Muestreo y Moldeo de Testigos de Concreto en Obra", en conformidad con las normas ASTM C 172 y ASTM C 31, por lo que está acreditado para la ejecución de estas labores dentro del Sistema Control Mix® con el Código Nº 101

    ______________________ Fecha

    17 /09/2012

  • Jr. Bajada Balta 169, Oficina 702 – Miraflores - Lima 18 Teléfonos: 2430414, Celular : 998133533, e-mail : [email protected] Rev.06

    8

    ANEXO II Formato de Orden de Servicio

    mailto:[email protected]

  • Jr. Bajada Balta 169, Oficina 702 – Miraflores - Lima 18 Teléfonos: 2430414, Celular : 998133533, e-mail : [email protected] Rev.06

    9

    ANEXO III Certificados de Calibración de Prensas

    mailto:[email protected]

  • Jr. Bajada Balta 169, Oficina 702 – Miraflores - Lima 18 Teléfonos: 2430414, Celular : 998133533, e-mail : [email protected] Rev.06

    10

    ANEXO IV Formato de Certificado de Ensayos

    mailto:[email protected]

  • CONTROL MIX EXPRESS S.A.C.Bajada Balta 169, Oficina 702, Miraflores - Lima 18

    Central telefónica: 243-0414, email: [email protected]://www.controlmixexpress.com

    CERTIFICADO Nº CME-F0315-0040

    EMPRESA JE CONSTRUCCIONES GENERALES S.A. Nº ORDEN 21965

    OBRA Edificio de Oficinas SWISS TOWER GUIA CAMION A5N-842

    OBRA DIR. Av. Benavides 1930 - Miraflores PROBETERO CME-003

    ESTRUCTURA Losa aligerada maciza sot.1

    f'c(kg/cm²) 350

    FECHA/HORAMOLDEO

    06/01/201516:00

    FECHA/HORARECOJO

    07/01/201512:08

    FECHA/HORAENSAYO

    03/02/201509:45

    EDAD ENSAYO(HORAS) 666

    RESULTADOS DE ENSAYO DE RESISTENCIA EN COMPRESIÓNDE TESTIGOS CILÍNDRICOS DE CONCRETO

    (Norma de Ensayo ASTM C39/C39M-12)

    Código Testigo Edad Ensayo Diámetro Promedio Área Sección Carga Máxima Esfuerzo Compresión Esfuerzo Compresión Tipo Falla(días) (mm) (mm²) (kN) (Mpa) (kg/cm²) (*)

    A5N-842-1 3 101.0 8011.9 230 28.7 293 2

    A5N-842-2 3 101.0 8011.9 226 28.2 288 1

    A5N-842-3 3 101.0 8011.9 221 27.6 281 4

    Promedio 28.2 287

    Código Testigo Edad Ensayo Diámetro Promedio Área Sección Carga Máxima Esfuerzo Compresión Esfuerzo Compresión Tipo Falla(días) (mm) (mm²) (kN) (Mpa) (kg/cm²) (*)

    A5N-842-4 28 101.0 8011.9 362 45.2 461 2

    A5N-842-5 28 101.0 8011.9 368 45.9 468 1

    A5N-842-6 28 101.0 8011.9 350 43.7 446 1

    Promedio 44.9 458

    NOTAS:

    1) El muestreo, moldeo y custodia in-situ de los testigos hasta el recojo, ha sido efectuado bajo responsabilidad del cliente por su personal, que ha sidocapacitado y certificado por CME según las normas ASTM C172/C172M-10 y ASTM C31/C31M-12.

    2) El curado de los testigos ha sido efectuado en cámaras acondicionadas con humedad y temperatura controladas en conformidad con la Norma ASTMC511-13, manteniendo las condiciones de curado estandarizadas establecidas por la Norma ASTM C31/C31M-12 hasta el momento de su ensayo.

    3) Los ensayos se realizaron en una prensa automatizada marca VJ TECH Modelo VJT6000-2A Nº Serie 0481313 de 2000 kN de capacidad con certificadode calibración trazable, aplicando una velocidad de carga de 2.0 kN/s en conformidad con la Norma ASTM C39/C39M-12.

    4) Como elementos de distribución de carga en los extremos de los testigos se usaron pads de neopreno en conformidad con la Norma ASTMC1231/C1231M-13.

    5) El curado inicial, curado final y edad de ensayo cumplieron las tolerancias en tiempo definidas en los acápites 10.1.2 y 10.1.3.1 de ASTM C31/C31M-12y el acápite 7.3 de ASTM C39/C39M-12a.

    (*) Los gráficos correspondientes a los tipos de falla establecidos por la Norma ASTM C39/C39M-12a pueden descargarse de nuestrowebsite : http://www.controlmixexpress.com/tipo_fallas

    Constructora A Team S.A.C. 35678

    Edificio Lima Siglo XXI A5N-842

    Av. Los Almendros Rojos 125 - Ate

    Columnas entre ejes A y B

  • Jr. Bajada Balta 169, Oficina 702 – Miraflores - Lima 18 Teléfonos: 2430414, Celular : 998133533, e-mail : [email protected] Rev.06

    11

    ANEXO V Video Sistema Control Mix

    Enlace : https://www.youtube.com/watch?v=j13oyQQpN1A

    Demo Sistema Control Mix

    Enlace : http://www.controlmixexpress.com/interno_demo/home.php

    mailto:[email protected]

  • Jr. Bajada Balta 169, Oficina 702 – Miraflores - Lima 18 Teléfonos: 2430414, Celular : 998133533, e-mail : [email protected] Rev.06

    12

    ANEXO VI Resumen Hoja de Vida del

    Responsable Técnico de Control Mix Express SAC

    mailto:[email protected]

  • Jr. Bajada Balta 169 – Oficina 702 - Miraflores - Lima 18 Teléfono : 243-0414, Celular : 998133533, e-mail : [email protected]

    RESUMEN HOJA DE VIDA

    DATOS PERSONALES .-

    ♦ Nombre : Enrique Néstor Pasquel Carbajal ♦ Fecha de nacimiento : 27 de Febrero de 1952 ♦ Lugar : Lima ♦ Nacionalidad : Peruano ♦ Domicilio : Batallón Callao Norte 105 Dpto. 402 – Surco ♦ Teléfono : 2751307 ♦ Oficina : Bajada Balta 169 Oficina 702 - Miraflores ♦ Teléfono : 2430414 ♦ Celular : 998133533 ♦ E-mail : [email protected] ♦ RUC : 10102721531

    FORMACION PROFESIONAL .- ♦ Ing. Civil, Pontificia Universidad Católica del Perú – PUCP- Promoción 1975 ♦ Especialización en investigación experimental en concreto en la Universidad

    Tecnológica de Delft - Holanda. ♦ Cursos de especialización en tecnología de concreto y procesos constructivos

    especiales en USA, Colombia, Argentina, Brasil y Suiza. ACTIVIDADES ACADEMICAS.- ♦ Ex Jefe Laboratorio de Ensayo de Materiales PUCP ♦ Ex Jefe Laboratorio Estructuras Antisísmicas PUCP ♦ Profesor en la especialidad de Tecnología del Concreto en la Universidad Católica del

    Perú 1997 a la fecha ♦ Profesor en la especialidad de Tecnología del Concreto en la Universidad Peruana de

    Ciencias Aplicadas 2005 a la fecha. ♦ Profesor en la Escuela de Posgrado PUCP, 2005 a la fecha ♦ Profesor en la Escuela de Postgrado UPC, 2006 a la fecha. ♦ Profesor en CENTRUM - PUCP en la Maestría de Gestión y Dirección de Empresas

    Constructoras e Inmobiliarias, 2012 -2013. ACTIVIDADES PROFESIONALES.- Participación durante los últimos 35 años como Ingeniero especialista de Impresit del Pacífico (Grupo IMPREGILO) o Consultor privado en los principales proyectos de Aeropuertos, Muelles, Irrigaciones, Puentes, Carreteras etc. desarrollados en nuestro país, destacando entre otros : Reactor Nuclear Huarangal (Lima), Muelle Conchán (Lima), Aeropuerto de Juliaca (Puno), Carretera Pomata-Yunguyo (Puno), Rehabilitación Aeropuerto de Piura, Irrigación Ilpa (Puno), Ampliación embalse y Túnel Corani (Cochabamba-Bolivia), Bocatoma Proyecto de Irrigación Chavimochic (La Libertad), Túnel Proyecto Chavimochic (La Libertad), Proyecto Integral de Irrigación Majes

  • Jr. Bajada Balta 169 – Oficina 702 - Miraflores - Lima 18 Teléfono : 243-0414, Celular : 998133533, e-mail : [email protected]

    (Arequipa), Tunel Jachacuesta Proyecto Pasto Grande (Moquegua), Proyecto de Irrigación Pampa Baja-Majes (Arequipa), Rehabilitación Carretera Panamericana Sur Tramo Puente Haway - Acceso Microondas (Arequipa), Represa Lagunillas (Puno), Rehabilitación Carretera Panamericana Norte Tramo Límite Regional-Empalme Ruta 1N (Lambayeque), Nuevo Aeropuerto de Cochabamba (Bolivia), Bocatoma Cabana-Mañazo (Juliaca – Puno), Puente Aguaytía (Aguaytía), Proyecto Vilavilani (Tacna), Proyecto Pasto Grande (Moquegua), Proyecto Carretera Transoceánica Tramo 3 (Madre de Dios), Proyecto Cerro Corona (Cajamarca), Proyecto Central Termoeléctrica Ilo (Moquegua), Rehabilitación Aeropuerto del Cusco (Cusco) JJcamet, Proyecto Tren Eléctrico (Lima) Odebrecht, Proyecto Estación Central (Lima), GyM, Proyecto Edificio Capital (Lima), Proyecto Morococha (Junín), Proyecto Ampliación Cementos Lima (Lima), Proyecto Ampliación Cemento Andino (Junín), Proyecto Fuerabambas (Apurimac), Proyecto Melchorita (Pisco), Proyecto Muelle Sur (Callao), Proyecto de Vivienda Masiva La Pólvora (Lima), Proyecto Quitaracsa (Lambayeque), Proyecto Rehabilitación Aeropuerto Jorge Chávez – LAP (Callao), Proyecto Edificio Alto Caral (Lima), Proyecto Central Termoeléctrica Chilca (Lima), Proyecto Nueva Planta Tratamiento de Efluentes ALICORP (Lima). Proyecto Carretera Intereoceánica Tramo 1 – Puerto Maldonado- CONIRSA, Proyecto Hotel Decamerón Punta Sal – Tumbes, JJCAMET, Proyecto Hidroeléctrico Quitaracsa- La Libertad, JJCAMET, Proyecto I.E. San José de Chiclayo, COSAPI, Proyecto Carretera Callejón de Huaylas-Chacas-San Luis, Odebrecht Perú, Proyecto Línea Amarilla, Lima , Constructora OAS Ltda., Proyecto Ciudad Verde, Paz Centenario, Proyecto Real Plaza Pucallpa, InRetail, Proyecto Real Plaza Chiclayo, InRetail, Proyecto Mina Inmaculada, Grupo Hochschild, Proyecto Clínica Delgado, Constructora San José, Proyecto Morococha, JJ Camet, Proyecto Ampliación Central Hidroeléctrica Machupicchu, Graña y Montero, Proyecto Almacenes Inkafarma, Sigral, Proyecto Lima Tower, Inmobiliari, Nueva Fábrica Cementos Pacasmayo en Piura, Proyecto Real Plaza Cusco, Proyecto Real Plaza Chiclayo, Proyecto Olmos-Presa Limón – Odebrecht, Proyecto Mina Andaychagua- SVS-Volcan, Proyecto Carretera Red Vial 4 – OHL, Proyecto Mina Toquepala – JJCamet, Proyecto Unidad Minera Cerro Lindo – COSAPI. ♦ Ex Gerente de Investigación & Desarrollo de Unión de Concreteras S.A. - UNICON ♦ Ex Director Ejecutivo del Centro de Investigación Tecnológica del Cemento y el

    Concreto – CITEDEC. ♦ Consultor de Distribuidora Norte Pacasmayo – DINO (Concreto Premezclado

    Cementos Pacasmayo S.A.)) ♦ Consultor de Mixercon S.A. (Concreto Premezclado) ♦ Consultor de Supermix – (Concreto Premezclado Cementos Yura S.A.) ♦ Consultor de Minera Panamá S.A. – Cobre Panama Project ♦ Director Ejecutivo de Pasquel Consultores – Especialistas en concreto. ♦ Gerente General de Control Mix Express SAC – Ensayos en Concreto ACTIVIDADES INSTITUCIONALES.- ♦ Miembro del American Concrete Institute (ACI) – 1993 a la fecha ♦ Miembro del American Society for Testing and Materials (ASTM) – 1993 a la fecha ♦ Miembro del Consejo Directivo del Colegio de Ingenieros del Perú – Consejo Nacional

    – 2004-2005 ♦ Presidente del Capítulo Peruano del ACI (2001 – 2005) ♦ Miembro del Consejo Directivo del ACI-PERU desde 2005 a la fecha

  • Jr. Bajada Balta 169 – Oficina 702 - Miraflores - Lima 18 Teléfono : 243-0414, Celular : 998133533, e-mail : [email protected]

    ♦ Miembro del Comité Técnico INDECOPI de Normalización de Agregados, Hormigón(Concreto), Hormigón Armado y Hormigón Pretensado

    ♦ Miembro del Comité Técnico de la Norma NTE E.060 Concreto Armado.♦ Miembro del Comité ACI 318 WA - International Workshop - Concrete in the Americas♦ Miembro del Comité ACI 318 0L International Liasson♦ Miembro del Comité ACI 318 0S Spanish Translation Task Group♦ Miembro del Comité ACI 318 Structural Concrete Building Code♦ Miembro del Comité ASTM C 09 Concrete and Concrete Aggregates♦ Líder del Grupo de Trabajo 01 de ASTM para traducción de normas de concreto en el

    Código ACI 318.♦ Instructor Certificado ASTM para dictado de Cursos en Latinoamérica♦ Conferencista Nacional e Internacional en temas de su especialidad.♦ Conferencista invitado evento Argos 360º - Colombia 2013 y 2014

    PUBLICACIONES.-

    ♦ Autor del Libro “Tópicos de Tecnología del Concreto” y coautor de 5 libros sobre Tecnologíadel Concreto, Supervisión de Obras y Procesos Especiales. Ha publicado alrededor de 70artículos y trabajos de investigación en revistas especializadas del Perú y el extranjero.

    PREMIOS Y DISTINCIONES.-

    ♦ Distinción Pontificia Universidad Católica del Perú – Departamento de Ingeniería“Destacada Labor Académica”- Periodo Académico 2001-1

    ♦ Premio “Exalumno Distinguido Asociación de Egresados y Graduados de la PontificiaUniversidad Católica del Perú” - 2004

    ♦ Premio Universidad Peruana de Ciencias Aplicadas – UPC al mejor Profesor PeriodoAcadémico 2006-1

    ♦ Distinción Fellow ACI International – “In Recognition of Oustanding Contributions to theAmerican Concrete Institute and to Concrete Technology” - 2006

    ♦ Medalla Henry C. Turner – ACI International “For Notable Achievement in the ConcreteIndustry” - 2007

    ♦ Premio “Chapter Activities” ACI International – “ For Oustanding Leadership, Promotion andGrowth of the ACI Peru Chapter” - 2007

    ♦ Medalla Miembro Distinguido – Colegio de Ingenieros del Perú Consejo Departamentalde Lima – 2007

    ♦ Orden de la Ingeniería Peruana – Colegio de Ingenieros del Perú – Consejo Nacional -2012

    ♦ Distinción " Honorary Member" ACI International - 2014

    IDIOMAS.-

    ♦ Inglés Avanzado♦ Italiano Intermedio

    Lima, Enero 2015

  • Jr. Bajada Balta 169, Oficina 702 – Miraflores - Lima 18 Teléfonos: 2430414, Celular : 998133533, e-mail : [email protected] Rev.06

    13

    ANEXO VII Copias de Normas ASTM empleadas por el

    Sistema Control Mix Express

    mailto:[email protected]

  • Designation: C31/C31M − 15

    Standard Practice forMaking and Curing Concrete Test Specimens in the Field 1

    This standard is issued under the fixed designation C31/C31M; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (´) indicates an editorial change since the last revision or reapproval.

    This standard has been approved for use by agencies of the U.S. Department of Defense.

    1. Scope*

    1.1 This practice covers procedures for making and curingcylinder and beam specimens from representative samples offresh concrete for a construction project.

    1.2 The concrete used to make the molded specimens shallbe sampled after all on-site adjustments have been made to themixture proportions, including the addition of mix water andadmixtures. This practice is not satisfactory for making speci-mens from concrete not having measurable slump or requiringother sizes or shapes of specimens.

    1.3 The values stated in either SI units or inch-pound unitsare to be regarded separately as standard. The values stated ineach system may not be exact equivalents; therefore, eachsystem shall be used independently of the other. Combiningvalues from the two systems may result in non-conformancewith the standard.

    1.4 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.(Warning—Freshhydraulic cementitious mixtures are caustic and may causechemical burns to exposed skin and tissue upon prolongedexposure.2)

    1.5 The text of this standard references notes which provideexplanatory material. These notes shall not be considered asrequirements of the standard.

    2. Referenced Documents

    2.1 ASTM Standards:3

    C125 Terminology Relating to Concrete and Concrete Ag-gregates

    C138/C138M Test Method for Density (Unit Weight), Yield,and Air Content (Gravimetric) of Concrete

    C143/C143M Test Method for Slump of Hydraulic-CementConcrete

    C172/C172M Practice for Sampling Freshly Mixed Con-crete

    C173/C173M Test Method for Air Content of Freshly MixedConcrete by the Volumetric Method

    C231/C231M Test Method for Air Content of Freshly MixedConcrete by the Pressure Method

    C330/C330M Specification for Lightweight Aggregates forStructural Concrete

    C403/C403M Test Method for Time of Setting of ConcreteMixtures by Penetration Resistance

    C470/C470M Specification for Molds for Forming ConcreteTest Cylinders Vertically

    C511 Specification for Mixing Rooms, Moist Cabinets,Moist Rooms, and Water Storage Tanks Used in theTesting of Hydraulic Cements and Concretes

    C617/C617M Practice for Capping Cylindrical ConcreteSpecimens

    C1064/C1064M Test Method for Temperature of FreshlyMixed Hydraulic-Cement Concrete

    C1077 Practice for Agencies Testing Concrete and ConcreteAggregates for Use in Construction and Criteria forTesting Agency Evaluation

    2.2 American Concrete Institute Publication:4

    309R Guide for Consolidation of Concrete

    3. Terminology

    3.1 For definitions of terms used in this practice, refer toTerminology C125.

    4. Significance and Use

    4.1 This practice provides standardized requirements formaking, curing, protecting, and transporting concrete testspecimens under field conditions.

    1 This practice is under the jurisdiction of ASTM Committee C09 on Concreteand Concrete Aggregates and is the direct responsibility of Subcommittee C09.61on Testing for Strength.

    Current edition approved July 1, 2015. Published August 2015. Originallyapproved in 1920. Last previous edition approved in 2012 as C31/C31M–12. DOI:10.1520/C0031_C0031M-15.

    2 See Section on Safety Precautions, Manual of Aggregate and Concrete Testing,Annual Book of ASTM Standards, Vol. 04.02.

    3 For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at [email protected]. For Annual Book of ASTMStandardsvolume information, refer to the standard’s Document Summary page onthe ASTM website.

    4 Available from American Concrete Institute (ACI), P.O. Box 9094, FarmingtonHills, MI 48333-9094, http://www.aci-int.org.

    *A Summary of Changes section appears at the end of this standard

    Copyright © ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States

    1

    Copyright by ASTM Int'l (all rights reserved); Thu Sep 3 13:46:31 EDT 2015Downloaded/printed byEnrique Pasquel () pursuant to License Agreement. No further reproductions authorized.

    http://dx.doi.org/10.1520/C0125http://dx.doi.org/10.1520/C0125http://dx.doi.org/10.1520/C0138_C0138Mhttp://dx.doi.org/10.1520/C0138_C0138Mhttp://dx.doi.org/10.1520/C0143_C0143Mhttp://dx.doi.org/10.1520/C0143_C0143Mhttp://dx.doi.org/10.1520/C0172_C0172Mhttp://dx.doi.org/10.1520/C0172_C0172Mhttp://dx.doi.org/10.1520/C0173_C0173Mhttp://dx.doi.org/10.1520/C0173_C0173Mhttp://dx.doi.org/10.1520/C0231_C0231Mhttp://dx.doi.org/10.1520/C0231_C0231Mhttp://dx.doi.org/10.1520/C0330_C0330Mhttp://dx.doi.org/10.1520/C0330_C0330Mhttp://dx.doi.org/10.1520/C0403_C0403Mhttp://dx.doi.org/10.1520/C0403_C0403Mhttp://dx.doi.org/10.1520/C0470_C0470Mhttp://dx.doi.org/10.1520/C0470_C0470Mhttp://dx.doi.org/10.1520/C0511http://dx.doi.org/10.1520/C0511http://dx.doi.org/10.1520/C0511http://dx.doi.org/10.1520/C0617_C0617Mhttp://dx.doi.org/10.1520/C0617_C0617Mhttp://dx.doi.org/10.1520/C1064_C1064Mhttp://dx.doi.org/10.1520/C1064_C1064Mhttp://dx.doi.org/10.1520/C1077http://dx.doi.org/10.1520/C1077http://dx.doi.org/10.1520/C1077http://www.astm.org/COMMIT/COMMITTEE/C09.htmhttp://www.astm.org/COMMIT/SUBCOMMIT/C0961.htm

  • 4.2 If the specimens are made and standard cured, asstipulated herein, the resulting strength test data when thespecimens are tested are able to be used for the followingpurposes:

    4.2.1 Acceptance testing for specified strength,4.2.2 Checking adequacy of mixture proportions for

    strength, and4.2.3 Quality control.

    4.3 If the specimens are made and field cured, as stipulatedherein, the resulting strength test data when the specimens aretested are able to be used for the following purposes:

    4.3.1 Determination of whether a structure is capable ofbeing put in service,

    4.3.2 Comparison with test results of standard cured speci-mens or with test results from various in-place test methods,

    4.3.3 Adequacy of curing and protection of concrete in thestructure, or

    4.3.4 Form or shoring removal time requirements.

    5. Apparatus

    5.1 Molds, General—Molds for specimens or fasteningsthereto in contact with the concrete shall be made of steel, castiron, or other nonabsorbent material, nonreactive with concretecontaining portland or other hydraulic cements. Molds shallhold their dimensions and shape under all conditions of use.Molds shall be watertight during use as judged by their abilityto hold water poured into them. Provisions for tests of waterleakage are given in the Test Methods for Elongation,Absorption, and Water Leakage section of Specification C470/C470M. A suitable sealant, such as heavy grease, modelingclay, or microcrystalline wax shall be used where necessary toprevent leakage through the joints. Positive means shall beprovided to hold base plates firmly to the molds. Reusablemolds shall be lightly coated with mineral oil or a suitablenonreactive form release material before use.

    5.2 Cylinder Molds—Molds for casting concrete test speci-mens shall conform to the requirements of SpecificationC470/C470M.

    5.3 Beam Molds—Beam molds shall be of the shape anddimensions required to produce the specimens stipulated in 6.2.The inside surfaces of the molds shall be smooth. The sides,bottom, and ends shall be at right angles to each other and shallbe straight and true and free of warpage. Maximum variationfrom the nominal cross section shall not exceed 3 mm [1⁄8 in.]for molds with depth or breadth of 150 mm [6 in.] or more.Molds shall produce specimens at least as long but not morethan 2 mm [1⁄16 in.] shorter than the required length in 6.2.

    5.4 Tamping Rod—A round, smooth, straight, steel rod witha diameter conforming to the requirements in Table 1. Thelength of the tamping rod shall be at least 100 mm [4 in.]greater than the depth of the mold in which rodding is beingperformed, but not greater than 600 mm [24 in.] in overalllength (see Note 1). The rod shall have the tamping end or bothends rounded to a hemispherical tip of the same diameter as therod.

    NOTE 1—A rod length of 400 mm [16 in.] to 600 mm [24 in.] meets therequirements of the following: Practice C31/C31M, Test Method C138/

    C138M, Test Method C143/C143M, Test Method C173/C173M, and TestMethod C231/C231M.

    5.5 Vibrators—Internal vibrators shall be used. The vibratorfrequency shall be at least 9000 vibrations per minute [150 Hz]while the vibrator is operating in the concrete. The diameter ofa round vibrator shall be no more than one-fourth the diameterof the cylinder mold or one-fourth the width of the beam mold.Other shaped vibrators shall have a perimeter equivalent to thecircumference of an appropriate round vibrator. The combinedlength of the vibrator shaft and vibrating element shall exceedthe depth of the section being vibrated by at least 75 mm [3in.]. The vibrator frequency shall be checked periodically witha vibrating-reed tachometer or other suitable device.

    NOTE 2—For information on size and frequency of various vibratorsand a method to periodically check vibrator frequency see ACI 309R.

    5.6 Mallet—A mallet with a rubber or rawhide head weigh-ing 0.6 6 0.2 kg [1.25 6 0.50 lb] shall be used.

    5.7 Placement Tools—of a size large enough so each amountof concrete obtained from the sampling receptacle is represen-tative and small enough so concrete is not spilled duringplacement in the mold. For placing concrete in a cylinder mold,the acceptable tool is a scoop. For placing concrete in a beammold, either a shovel or scoop is permitted.

    5.8 Finishing Tools—a handheld float or a trowel.

    5.9 Slump Apparatus—The apparatus for measurement ofslump shall conform to the requirements of Test MethodC143/C143M.

    5.10 Sampling Receptacle—The receptacle shall be a suit-able heavy gauge metal pan, wheelbarrow, or flat, cleannonabsorbent board of sufficient capacity to allow easy remix-ing of the entire sample with a shovel or trowel.

    5.11 Air Content Apparatus—The apparatus for measuringair content shall conform to the requirements of Test MethodsC173/C173M or C231/C231M.

    5.12 Temperature Measuring Devices—The temperaturemeasuring devices shall conform to the applicable require-ments of Test Method C1064/C1064M.

    6. Testing Requirements

    6.1 Cylindrical Specimens—Compressive or splitting tensilestrength specimens shall be cylinders cast and allowed to set inan upright position. The number and size of cylinders cast shallbe as directed by the specifier of the tests. In addition, thelength shall be twice the diameter and the cylinder diametershall be at least 3 times the nominal maximum size of thecoarse aggregate. When the nominal maximum size of thecoarse aggregate exceeds 50 mm [2 in.], the concrete sampleshall be treated by wet sieving through a 50-mm (2-in.) sieve

    TABLE 1 Tamping Rod Diameter Requirements

    Diameter of Cylinderor Width of Beam

    mm [in.]

    Diameter or Rodmm [in.]

  • as described in Practice C172/C172M. For acceptance testingfor specified compressive strength, cylinders shall be 150 by300 mm [6 by 12 in.] or 100 by 200 mm [4 by 8 in.] (Note 3).

    NOTE 3—When molds in SI units are required and not available,equivalent inch-pound unit size mold should be permitted.

    6.2 Beam Specimens—Flexural strength specimens shall bebeams of concrete cast and hardened in the horizontal position.The number of beams cast shall be as directed by the specifierof the tests. The length shall be at least 50 mm [2 in.] greaterthan three times the depth as tested. The ratio of width to depthas molded shall not exceed 1.5. The standard beam shall be 150by 150 mm [6 by 6 in.] in cross section, and shall be used forconcrete with nominal maximum size coarse aggregate up to50 mm [2 in.]. When the nominal maximum size of the coarseaggregate exceeds 50 mm [2 in.], the smaller cross sectionaldimension of the beam shall be at least three times the nominalmaximum size of the coarse aggregate. Unless required byproject specifications, beams made in the field shall not have awidth or depth of less than 150 mm [6 in.].

    6.3 Field Technicians—The field technicians making andcuring specimens for acceptance testing shall meet the person-nel qualification requirements of Practice C1077.

    7. Sampling Concrete

    7.1 The samples used to fabricate test specimens under thisstandard shall be obtained in accordance with Practice C172/C172M unless an alternative procedure has been approved.

    7.2 Record the identification of the sample with respect tothe location of the concrete represented and the time of casting.

    8. Slump, Air Content, and Temperature

    8.1 Slump—Measure and record the slump of each batch ofconcrete from which specimens are made immediately afterremixing in the receptacle, as required in Test Method C143/C143M.

    8.2 Air Content—Determine and record the air content inaccordance with either Test Method C173/C173M or TestMethod C231/C231M. The concrete used in performing the aircontent test shall not be used in fabricating test specimens.

    8.3 Temperature—Determine and record the temperature inaccordance with Test Method C1064/C1064M.

    NOTE 4—Some specifications may require the measurement of the unitweight of concrete. The volume of concrete produced per batch may bedesired on some projects. Also, additional information on the air contentmeasurements may be desired. Test Method C138/C138M is used tomeasure the unit weight, yield, and gravimetric air content of freshlymixed concrete.

    9. Molding Specimens

    9.1 Place of Molding—Mold specimens promptly on alevel, rigid surface, free of vibration and other disturbances, ata place as near as practicable to the location where they are tobe stored.

    9.2 Casting Cylinders—Select the proper tamping rod from5.4 and Table 1 or the proper vibrator from 5.5. Determine themethod of consolidation from Table 2, unless another method

    is specified. If the method of consolidation is rodding, deter-mine molding requirements from Table 3. If the method ofconsolidation is vibration, determine molding requirementsfrom Table 4. Select a scoop of the size described in 5.7. Whileplacing the concrete in the mold, move the scoop around theperimeter of the mold opening to ensure an even distribution ofthe concrete with minimal segregation. Each layer of concreteshall be consolidated as required. In placing the final layer, addan amount of concrete that will fill the mold after consolida-tion.

    9.3 Casting Beams—Select the proper tamping rod from 5.4and Table 1 or proper vibrator from 5.5. Determine the methodof consolidation from Table 2, unless another method isspecified. If the method of consolidation is rodding, determinethe molding requirements from Table 3. If the method ofconsolidation is vibration, determine the molding requirementsfrom Table 4. Determine the number of roddings per layer, onefor each 14 cm2 [2 in.2 ] of the top surface area of the beam.Select a placement tool as described in 5.7. Using the scoop orshovel, place the concrete in the mold to the height required foreach layer. Place the concrete so that it is uniformly distributedwithin each layer with minimal segregation. Each layer shall be

    TABLE 2 Method of Consolidation Requirements

    Slump mm [in.] Method of Consolidation

    $ 25 [1] rodding or vibration< 25 [1] vibration

    TABLE 3 Molding Requirements by Rodding

    Specimen Typeand Size

    Number of Layers ofApproximately Equal Depth

    Number ofRoddingsper Layer

    Cylinders:Diameter, mm [in.]

    100 [4] 2 25150 [6] 3 25225 [9] 4 50

    Beams:Width, mm [in.]150 [6] to 200 [8] 2 see 9.3

    >200 [8] 3 or more equal depths,each not to exceed

    150 mm [6 in.].

    see 9.3

    TABLE 4 Molding Requirements by Vibration

    Specimen Typeand Size

    Number ofLayers

    Number ofVibrator

    Insertionsper Layer

    Approximate Depth ofLayer, mm [in.]

    Cylinders:Diameter, mm [in.]

    100 [4] 2 1 one-half depth of specimen150 [6] 2 2 one-half depth of specimen225 [9] 2 4 one-half depth of specimen

    Beams:Width, mm [in.]

    150 [6] to 200 [8] 1 see 9.4.2 depth of specimenover 200 [8] 2 or more see 9.4.2 200 [8] as near as

    practicable

    C31/C31M − 15

    3

    Copyright by ASTM Int'l (all rights reserved); Thu Sep 3 13:46:31 EDT 2015Downloaded/printed byEnrique Pasquel () pursuant to License Agreement. No further reproductions authorized.

  • consolidated as required. In placing the final layer, add anamount of concrete that will fill the mold after consolidation.

    9.4 Consolidation—The methods of consolidation for thispractice are rodding or internal vibration.

    9.4.1 Rodding—Place the concrete in the mold in therequired number of layers of approximately equal volume. Rodeach layer uniformly over the cross section with the roundedend of the rod using the required number of strokes. Rod thebottom layer throughout its depth. In rodding this layer, usecare not to damage the bottom of the mold. For each upperlayer, allow the rod to penetrate through the layer being roddedand into the layer below approximately 25 mm [1 in.]. Aftereach layer is rodded, tap the outsides of the mold lightly 10 to15 times with the mallet to close any holes left by rodding andto release any large air bubbles that may have been trapped.Use an open hand to tap cylinder molds that are susceptible todenting or other permanent distortion if tapped with a mallet.After tapping, spade each layer of the concrete along the sidesand ends of beam molds with a trowel or other suitable tool.Underfilled molds shall be adjusted with representative con-crete during consolidation of the top layer. Overfilled moldsshall have excess concrete removed.

    9.4.2 Vibration—Maintain a uniform duration of vibrationfor the particular kind of concrete, vibrator, and specimen moldinvolved. The duration of vibration required will depend uponthe workability of the concrete and the effectiveness of thevibrator. Usually sufficient vibration has been applied as soonas the surface of the concrete has become relatively smooth andlarge air bubbles cease to break through the top surface.Continue vibration only long enough to achieve proper con-solidation of the concrete (see Note 5). Fill the molds andvibrate in the required number of approximately equal layers.Place all the concrete for each layer in the mold before startingvibration of that layer. In compacting the specimen, insert thevibrator slowly and do not allow it to rest on the bottom orsides of the mold. Slowly withdraw the vibrator so that no largeair pockets are left in the specimen. When placing the finallayer, avoid overfilling by more than 6 mm [1⁄4 in.].

    NOTE 5—Generally, no more than 5 s of vibration should be required foreach insertion to adequately consolidate concrete with a slump greaterthan 75 mm [3 in.]. Longer times may be required for lower slumpconcrete, but the vibration time should rarely have to exceed 10 s perinsertion.

    9.4.2.1 Cylinders—The number of insertions of the vibratorper layer is given in Table 4. When more than one insertion perlayer is required distribute the insertion uniformly within eachlayer. Allow the vibrator to penetrate through the layer beingvibrated, and into the layer below, about 25 mm [1 in.]. Aftereach layer is vibrated, tap the outsides of the mold at least 10times with the mallet, to close holes that remain and to releaseentrapped air voids. Use an open hand to tap molds that aresusceptible to denting or other permanent distortion if tappedwith a mallet.

    9.4.2.2 Beams—Insert the vibrator at intervals not exceed-ing 150 mm [6 in.] along the center line of the long dimensionof the specimen. For specimens wider than 150 mm [6 in.], usealternating insertions along two lines. Allow the shaft of thevibrator to penetrate into the bottom layer about 25 mm [1 in.].

    After each layer is vibrated, tap the outsides of the moldsharply at least 10 times with the mallet to close holes left byvibrating and to release entrapped air voids.

    9.5 Finishing—Perform all finishing with the minimummanipulation necessary to produce a flat even surface that islevel with the rim or edge of the mold and that has nodepressions or projections larger than 3.3 mm [1⁄8 in.].

    9.5.1 Cylinders—After consolidation, finish the top surfacesby striking them off with the tamping rod where the consis-tency of the concrete permits or with a handheld float or trowel.If desired, cap the top surface of freshly made cylinders with athin layer of stiff portland cement paste which is permitted toharden and cure with the specimen. See section on CappingMaterials of Practice C617/C617M.

    9.5.2 Beams—After consolidation of the concrete, use ahandheld float or trowel to strike off the top surface to therequired tolerance to produce a flat, even surface.

    9.6 Identification—Mark the specimens to positively iden-tify them and the concrete they represent. Use a method thatwill not alter the top surface of the concrete. Do not mark theremovable caps. Upon removal of the molds, mark the testspecimens to retain their identities.

    10. Curing

    10.1 Standard Curing—Standard curing is the curingmethod used when the specimens are made and cured for thepurposes stated in 4.2.

    10.1.1 Storage—If specimens cannot be molded at the placewhere they will receive initial curing, immediately afterfinishing move the specimens to an initial curing place forstorage. The supporting surface on which specimens are storedshall be level to within 20 mm per m [1⁄4 in. per ft]. If cylindersin the single use molds are moved, lift and support thecylinders from the bottom of the molds with a large trowel orsimilar device. If the top surface is marred during movement toplace of initial storage, immediately refinish.

    10.1.2 Initial Curing—Immediately after molding andfinishing, the specimens shall be stored for a period up to 48 hin a temperature range from 16 and 27 °C [60 and 80 °F] andin an environment preventing moisture loss from the speci-mens. For concrete mixtures with a specified strength of 40MPa [6000 psi] or greater, the initial curing temperature shallbe between 20 and 26 °C [68 and 78 °F]. Various proceduresare capable of being used during the initial curing period tomaintain the specified moisture and temperature conditions. Anappropriate procedure or combination of procedures shall beused (Note 6). Shield all specimens from the direct sunlightand, if used, radiant heating devices. The storage temperatureshall be controlled by use of heating and cooling devices, asnecessary. Record the temperature using a maximum-minimumthermometer. If cardboard molds are used, protect the outsidesurface of the molds from contact with wet burlap or othersources of water.

    NOTE 6—A satisfactory moisture environment can be created during theinitial curing of the specimens by one or more of the followingprocedures: (1) immediately immerse molded specimens with plastic lidsin water saturated with calcium hydroxide, (2) store in properly con-structed wooden boxes or structures, (3) place in damp sand pits, (4) cover

    C31/C31M − 15

    4

    Copyright by ASTM Int'l (all rights reserved); Thu Sep 3 13:46:31 EDT 2015Downloaded/printed byEnrique Pasquel () pursuant to License Agreement. No further reproductions authorized.

  • with removable plastic lids, (5) place inside plastic bags, or (6) cover withplastic sheets or nonabsorbent plates if provisions are made to avoiddrying and damp burlap is used inside the enclosure, but the burlap isprevented from contacting the concrete surfaces. A satisfactory tempera-ture environment can be controlled during the initial curing of thespecimens by one or more of the following procedures: (1) use ofventilation, (2) use of ice, (3) use of thermostatically controlled heating orcooling devices, or (4) use of heating methods such as stoves or lightbulbs. Other suitable methods may be used provided the requirementslimiting specimen storage temperature and moisture loss are met. Forconcrete mixtures with a specified strength of 40 MPa [6000 psi] orgreater, heat generated during the early ages may raise the temperatureabove the required storage temperature. Immersion in water saturated withcalcium hydroxide may be the easiest method to maintain the requiredstorage temperature. When specimens are to be immersed in watersaturated with calcium hydroxide, specimens in cardboard molds or othermolds that expand when immersed in water should not be used. Early-agestrength test results may be lower when stored at 16 °C [60 °F] and higherwhen stored at 27 °C [80 °F]. On the other hand, at later ages, test resultsmay be lower for higher initial storage temperatures.

    10.1.3 Final Curing:10.1.3.1 Cylinders—Upon completion of initial curing and

    within 30 min after removing the molds, cure specimens withfree water maintained on their surfaces at all times at atemperature of 23.0 6 2.0 °C [73.5 6 3.5 °F] using waterstorage tanks or moist rooms complying with the requirementsof Specification C511, except when capping with sulfur mortarcapping compound and immediately prior to testing. Whencapping with sulfur mortar capping compound, the ends of thecylinder shall be dry enough to preclude the formation of steamor foam pockets under or in cap larger than 6 mm [1⁄4 in.] asdescribed in Practice C617/C617M. For a period not to exceed3 h immediately prior to test, standard curing temperature isnot required provided free moisture is maintained on thecylinders and ambient temperature is between 20 and 30 °C [68and 86 °F].

    10.1.3.2 Beams—Beams are to be cured the same as cylin-ders (see 10.1.3.1) except that they shall be stored in watersaturated with calcium hydroxide at 23.0 6 2.0 °C [73.5 6 3.5°F] at least 20 h prior to testing. Drying of the surfaces of thebeam shall be prevented between removal from water storageand completion of testing.

    NOTE 7—Relatively small amounts of surface drying of flexuralspecimens can induce tensile stresses in the extreme fibers that willmarkedly reduce the indicated flexural strength.

    10.2 Field Curing—Field curing is the curing method usedfor the specimens made and cured as stated in 4.3.

    10.2.1 Cylinders—Store cylinders in or on the structure asnear to the point of deposit of the concrete represented aspossible. Protect all surfaces of the cylinders from the elementsin as near as possible the same way as the formed work.Provide the cylinders with the same temperature and moistureenvironment as the structural work. Test the specimens in themoisture condition resulting from the specified curing treat-ment. To meet these conditions, specimens made for thepurpose of determining when a structure is capable of being putin service shall be removed from the molds at the time ofremoval of form work.

    10.2.2 Beams—As nearly as practicable, cure beams in thesame manner as the concrete in the structure. At the end of

    48 6 4 h after molding, take the molded specimens to thestorage location and remove from the molds. Store specimensrepresenting pavements of slabs on grade by placing them onthe ground as molded, with their top surfaces up. Bank thesides and ends of the specimens with earth or sand that shall bekept damp, leaving the top surfaces exposed to the specifiedcuring treatment. Store specimens representing structure con-crete as near the point in the structure they represent aspossible, and afford them the same temperature protection andmoisture environment as the structure. At the end of the curingperiod leave the specimens in place exposed to the weather inthe same manner as the structure. Remove all beam specimensfrom field storage and store in water saturated with calciumhydroxide at 23.0 6 2.0 °C [73.5 6 3.5 °F] for 24 6 4 himmediately before time of testing to ensure uniform moisturecondition from specimen to specimen. Observe the precautionsgiven in 10.1.3.2 to guard against drying between time ofremoval from curing to testing.

    10.3 Structural Lightweight Concrete Curing—Cure struc-tural lightweight concrete cylinders in accordance with Speci-fication C330/C330M.

    11. Transportation of Specimens to Laboratory

    11.1 Prior to transporting, cure and protect specimens asrequired in Section 10. Specimens shall not be transported untilat least 8 h after final set. (See Note 8). During transporting,protect the specimens with suitable cushioning material toprevent damage from jarring. During cold weather, protect thespecimens from freezing with suitable insulation material.Prevent moisture loss during transportation by wrapping thespecimens in plastic, wet burlap, by surrounding them with wetsand, or tight fitting plastic caps on plastic molds. Transporta-tion time shall not exceed 4 h.

    NOTE 8—Setting time may be measured by Test Method C403/C403M.

    12. Report

    12.1 Report the following information to the laboratory thatwill test the specimens:

    12.1.1 Identification number,12.1.2 Location of concrete represented by the samples,12.1.3 Date, time and name of individual molding

    specimens,12.1.4 Slump, air content, and concrete temperature, test

    results and results of any other tests on the fresh concrete andany deviations from referenced standard test methods, and

    12.1.5 Curing method. For standard curing method, reportthe initial curing method with maximum and minimum tem-peratures and final curing method. For field curing method,report the location where stored, manner of protection from theelements, temperature and moisture environment, and time ofremoval from molds.

    13. Keywords

    13.1 beams; casting samples; concrete; curing; cylinders;testing

    C31/C31M − 15

    5

    Copyright by ASTM Int'l (all rights reserved); Thu Sep 3 13:46:31 EDT 2015Downloaded/printed byEnrique Pasquel () pursuant to License Agreement. No further reproductions authorized.

  • SUMMARY OF CHANGES

    Committee C09 has identified the location of selected changes to this practice since the last issue,C31/C31M–12, that may impact the use of this practice. (Approved July 1, 2015)

    (1) Revised 9.4.1 and 9.4.2.1. (2) The order of units was reversed, placing SI units first.

    ASTM International takes no position respecting the validity of any patent rights asserted in connection with any item mentionedin this standard. Users of this standard are expressly advised that determination of the validity of any such patent rights, and the riskof infringement of such rights, are entirely their own responsibility.

    This standard is subject to revision at any time by the responsible technical committee and must be reviewed every five years andif not revised, either reapproved or withdrawn. Your comments are invited either for revision of this standard or for additional standardsand should be addressed to ASTM International Headquarters. Your comments will receive careful consideration at a meeting of theresponsible technical committee, which you may attend. If you feel that your comments have not received a fair hearing you shouldmake your views known to the ASTM Committee on Standards, at the address shown below.

    This standard is copyrighted by ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959,United States. Individual reprints (single or multiple copies) of this standard may be obtained by contacting ASTM at the aboveaddress or at 610-832-9585 (phone), 610-832-9555 (fax), or [email protected] (e-mail); or through the ASTM website(www.astm.org). Permission rights to photocopy the standard may also be secured from the Copyright Clearance Center, 222Rosewood Drive, Danvers, MA 01923, Tel: (978) 646-2600; http://www.copyright.com/

    C31/C31M − 15

    6

    Copyright by ASTM Int'l (all rights reserved); Thu Sep 3 13:46:31 EDT 2015Downloaded/printed byEnrique Pasquel () pursuant to License Agreement. No further reproductions authorized.

  • Designation: C39/C39M − 15

    Standard Test Method forCompressive Strength of Cylindrical Concrete Specimens 1

    This standard is issued under the fixed designation C39/C39M; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (´) indicates an editorial change since the last revision or reapproval.

    This standard has been approved for use by agencies of the U.S. Department of Defense.

    1. Scope*

    1.1 This test method covers determination of compressivestrength of cylindrical concrete specimens such as moldedcylinders and drilled cores. It is limited to concrete having adensity in excess of 800 kg/m3 [50 lb/ft3].

    1.2 The values stated in either SI units or inch-pound unitsare to be regarded separately as standard. The inch-pound unitsare shown in brackets. The values stated in each system maynot be exact equivalents; therefore, each system shall be usedindependently of the other. Combining values from the twosystems may result in non-conformance with the standard.

    1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.(Warning—Meansshould be provided to contain concrete fragments duringsudden rupture of specimens. Tendency for sudden ruptureincreases with increasing concrete strength and it is more likelywhen the testing machine is relatively flexible. The safetyprecautions given in the Manual of Aggregate and ConcreteTesting are recommended.)

    1.4 The text of this standard references notes which provideexplanatory material. These notes shall not be considered asrequirements of the standard.

    2. Referenced Documents

    2.1 ASTM Standards:2

    C31/C31M Practice for Making and Curing Concrete TestSpecimens in the Field

    C42/C42M Test Method for Obtaining and Testing DrilledCores and Sawed Beams of Concrete

    C192/C192M Practice for Making and Curing Concrete TestSpecimens in the Laboratory

    C617/C617M Practice for Capping Cylindrical ConcreteSpecimens

    C670 Practice for Preparing Precision and Bias Statementsfor Test Methods for Construction Materials

    C873/C873M Test Method for Compressive Strength ofConcrete Cylinders Cast in Place in Cylindrical Molds

    C1077 Practice for Agencies Testing Concrete and ConcreteAggregates for Use in Construction and Criteria forTesting Agency Evaluation

    C1231/C1231M Practice for Use of Unbonded Caps inDetermination of Compressive Strength of Hardened Con-crete Cylinders

    E4 Practices for Force Verification of Testing MachinesE74 Practice of Calibration of Force-Measuring Instruments

    for Verifying the Force Indication of Testing MachinesManual of Aggregate and Concrete Testing

    3. Summary of Test Method

    3.1 This test method consists of applying a compressiveaxial load to molded cylinders or cores at a rate which is withina prescribed range until failure occurs. The compressivestrength of the specimen is calculated by dividing the maxi-mum load attained during the test by the cross-sectional area ofthe specimen.

    4. Significance and Use

    4.1 Care must be exercised in the interpretation of thesignificance of compressive strength determinations by this testmethod since strength is not a fundamental or intrinsic propertyof concrete made from given materials. Values obtained willdepend on the size and shape of the specimen, batching, mixingprocedures, the methods of sampling, molding, and fabricationand the age, temperature, and moisture conditions duringcuring.

    4.2 This test method is used to determine compressivestrength of cylindrical specimens prepared and cured in accor-dance with Practices C31/C31M, C192/C192M, C617/C617M,and C1231/C1231M and Test Methods C42/C42M and C873/C873M.

    1 This test method is under the jurisdiction of ASTM Committee C09 onConcrete and Concrete Aggregates and is the direct responsibility of SubcommitteeC09.61 on Testing for Strength.

    Current edition approved March 15, 2015. Published May 2015. Originallyapproved in 1921. Last previous edition approved in 2014 as C39/C39M – 14a.DOI: 10.1520/C0039_C0039M-15.

    2 For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at [email protected]. For Annual Book of ASTMStandardsvolume information, refer to the standard’s Document Summary page onthe ASTM website.

    *A Summary of Changes section appears at the end of this standard

    Copyright © ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States

    1Copyright by ASTM Int'l (all rights reserved); Tue May 12 19:36:57 EDT 2015Downloaded/printed byEnrique Pasquel () pursuant to License Agreement. No further reproductions authorized.

    http://dx.doi.org/10.1520/C0031_C0031Mhttp://dx.doi.org/10.1520/C0031_C0031Mhttp://dx.doi.org/10.1520/C0042_C0042Mhttp://dx.doi.org/10.1520/C0042_C0042Mhttp://dx.doi.org/10.1520/C0192_C0192Mhttp://dx.doi.org/10.1520/C0192_C0192Mhttp://dx.doi.org/10.1520/C0617_C0617Mhttp://dx.doi.org/10.1520/C0617_C0617Mhttp://dx.doi.org/10.1520/C0670http://dx.doi.org/10.1520/C0670http://dx.doi.org/10.1520/C0873_C0873Mhttp://dx.doi.org/10.1520/C0873_C0873Mhttp://dx.doi.org/10.1520/C1077http://dx.doi.org/10.1520/C1077http://dx.doi.org/10.1520/C1077http://dx.doi.org/10.1520/C1231_C1231Mhttp://dx.doi.org/10.1520/C1231_C1231Mhttp://dx.doi.org/10.1520/C1231_C1231Mhttp://dx.doi.org/10.1520/E0004http://dx.doi.org/10.1520/E0074http://dx.doi.org/10.1520/E0074http://www.astm.org/COMMIT/COMMITTEE/C09.htmhttp://www.astm.org/COMMIT/SUBCOMMIT/C0961.htm

  • 4.3 The results of this test method are used as a basis forquality control of concrete proportioning, mixing, and placingoperations; determination of compliance with specifications;control for evaluating effectiveness of admixtures; and similaruses.

    4.4 The individual who tests concrete cylinders for accep-tance testing shall meet the concrete laboratory technicianrequirements of Practice C1077, including an examinationrequiring performance demonstration that is evaluated by anindependent examiner.

    NOTE 1—Certification equivalent to the minimum guidelines for ACIConcrete Laboratory Technician, Level I or ACI Concrete StrengthTesting Technician will satisfy this requirement.

    5. Apparatus

    5.1 Testing Machine—The testing machine shall be of a typehaving sufficient capacity and capable of providing the rates ofloading prescribed in 7.5.

    5.1.1 Verify the accuracy of the testing machine in accor-dance with Practices E4, except that the verified loading rangeshall be as required in 5.3. Verification is required:

    5.1.1.1 Within 13 months of the last calibration,5.1.1.2 On original installation or immediately after

    relocation,5.1.1.3 Immediately after making repairs or adjustments

    that affect the operation of the force applying system or thevalues displayed on the load indicating system, except for zeroadjustments that compensate for the mass of bearing blocks orspecimen, or both, or

    5.1.1.4 Whenever there is reason to suspect the accuracy ofthe indicated loads.

    5.1.2 Design—The design of the machine must include thefollowing features:

    5.1.2.1 The machine must be power operated and mustapply the load continuously rather than intermittently, andwithout shock. If it has only one loading rate (meeting therequirements of 7.5), it must be provided with a supplementalmeans for loading at a rate suitable for verification. Thissupplemental means of loading may be power or hand oper-ated.

    5.1.2.2 The space provided for test specimens shall be largeenough to accommodate, in a readable position, an elasticcalibration device which is of sufficient capacity to cover thepotential loading range of the testing machine and whichcomplies with the requirements of Practice E74.

    NOTE 2—The types of elastic calibration devices most generallyavailable and most commonly used for this purpose are the circularproving ring or load cell.

    5.1.3 Accuracy—The accuracy of the testing machine shallbe in accordance with the following provisions:

    5.1.3.1 The percentage of error for the loads within theproposed range of use of the testing machine shall not exceed61.0 % of the indicated load.

    5.1.3.2 The accuracy of the testing machine shall be verifiedby applying five test loads in four approximately equalincrements in ascending order. The difference between any twosuccessive test loads shall not exceed one third of the differ-ence between the maximum and minimum test loads.

    5.1.3.3 The test load as indicated by the testing machine andthe applied load computed from the readings of the verificationdevice shall be recorded at each test point. Calculate the error,E, and the percentage of error, Ep, for each point from thesedata as follows:

    E 5 A 2 B (1)

    Ep 5 100~A 2 B!/B

    where:A = load, kN [lbf] indicated by the machine being verified,

    andB = applied load, kN [lbf] as determined by the calibrating

    device.

    5.1.3.4 The report on the verification of a testing machineshall state within what loading range it was found to conformto specification requirements rather than reporting a blanketacceptance or rejection. In no case shall the loading range bestated as including loads below the value which is 100 timesthe smallest change of load estimable on the load-indicatingmechanism of the testing machine or loads within that portionof the range below 10 % of the maximum range capacity.

    5.1.3.5 In no case shall the loading range be stated asincluding loads outside the range of loads applied during theverification test.

    5.1.3.6 The indicated load of a testing machine shall not becorrected either by calculation or by the use of a calibrationdiagram to obtain values within the required permissiblevariation.

    5.2 The testing machine shall be equipped with two steelbearing blocks with hardened faces (Note 3), one of which is aspherically seated block that will bear on the upper surface ofthe specimen, and the other a solid block on which thespecimen shall rest. Bearing faces of the blocks shall have aminimum dimension at least 3 % greater than the diameter ofthe specimen to be tested. Except for the concentric circlesdescribed below, the bearing faces shall not depart from a planeby more than 0.02 mm [0.001 in.] in any 150 mm [6 in.] ofblocks 150 mm [6 in.] in diameter or larger, or by more than0.02 mm [0.001 in.] in the diameter of any smaller block; andnew blocks shall be manufactured within one half of thistolerance. When the diameter of the bearing face of thespherically seated block exceeds the diameter of the specimenby more than 13 mm [0.5 in.], concentric circles not more than0.8 mm [0.03 in.] deep and not more than 1 mm [0.04 in.] wideshall be inscribed to facilitate proper centering.

    NOTE 3—It is desirable that the bearing faces of blocks used forcompression testing of concrete have a Rockwell hardness of not less than55 HRC.

    5.2.1 Bottom bearing blocks shall conform to the followingrequirements:

    5.2.1.1 The bottom bearing block is specified for the pur-pose of providing a readily machinable surface for mainte-nance of the specified surface conditions (Note 4). The top andbottom surfaces shall be parallel to each other. If the testingmachine is so designed that the platen itself is readily main-tained in the specified surface condition, a bottom block is notrequired. Its least horizontal dimension shall be at least 3 %

    C39/C39M − 15

    2Copyright by ASTM Int'l (all rights reserved); Tue May 12 19:36:57 EDT 2015Downloaded/printed byEnrique Pasquel () pursuant to License Agreement. No further reproductions authorized.

  • greater than the diameter of the specimen to be tested.Concentric circles as described in 5.2 are optional on thebottom block.

    NOTE 4—The block may be fastened to the platen of the testingmachine.

    5.2.1.2 Final centering must be made with reference to theupper spherical block. When the lower bearing block is used toassist in centering the specimen, the center of the concentricrings, when provided, or the center of the block itself must bedirectly below the center of the spherical head. Provision shallbe made on the platen of the machine to assure such a position.

    5.2.1.3 The bottom bearing block shall be at least 25 mm [1in.] thick when new, and at least 22.5 mm [0.9 in.] thick afterany resurfacing operations.

    5.2.2 The spherically seated bearing block shall conform tothe following requirements:

    5.2.2.1 The maximum diameter of the bearing face of thesuspended spherically seated block shall not exceed the valuesgiven below:

    Diameter of Maximum DiameterTest Specimens, of Bearing Face,

    mm [in.] mm [in.]

    50 [2] 105 [4]75 [3] 130 [5]100 [4] 165 [6.5]150 [6] 255 [10]200 [8] 280 [11]

    NOTE 5—Square bearing faces are permissible, provided the diameter ofthe largest possible inscribed circle does not exceed the above diameter.

    5.2.2.2 The center of the sphere shall coincide with thesurface of the bearing face within a tolerance of 65 % of theradius of the sphere. The diameter of the sphere shall be at least75 % of the diameter of the specimen to be tested.

    5.2.2.3 The ball and the socket shall be designed so that thesteel in the contact area does not permanently deform whenloaded to the capacity of the testing machine.

    NOTE 6—The preferred contact area is in the form of a ring (describedas “preferred bearing area”) as shown on Fig. 1.

    5.2.2.4 At least every six months, or as specified by themanufacturer of the testing machine, clean and lubricate thecurved surfaces of the socket and of the spherical portion of themachine. The lubricant shall be a petroleum-type oil such asconventional motor oil or as specified by the manufacturer ofthe testing machine.

    NOTE 7—To ensure uniform seating, the spherically seated head isdesigned to tilt freely as it comes into contact with the top of the specimen.After contact, further rotation is undesirable. Friction between the socketand the spherical portion of the head provides restraint against furtherrotation during loading. Petroleum-type oil such as conventional motor oilhas been shown to permit the necessary friction to develop. Pressure-typegreases can reduce the desired friction and permit undesired rotation of thespherical head and should not be used unless recommended by themanufacturer of the testing machine.

    5.2.2.5 If the radius of the sphere is smaller than the radiusof the largest specimen to be tested, the portion of the bearingface extending beyond the sphere shall have a thickness notless than the difference between the radius of the sphere and

    radius of the specimen. The least dimension of the bearing faceshall be at least as great as the diameter of the sphere (see Fig.1).

    5.2.2.6 The movable portion of the bearing block shall beheld closely in the spherical seat, but the design shall be suchthat the bearing face can be rotated freely and tilted at least 4°in any direction.

    5.2.2.7 If the ball portion of the upper bearing block is atwo-piece design composed of a spherical portion and abearing plate, a mechanical means shall be provided to ensurethat the spherical portion is fixed and centered on the bearingplate.

    5.3 Load Indication:5.3.1 If the load of a compression machine used in concrete

    testing is registered on a dial, the dial shall be provided with agraduated scale that is readable to at least the nearest 0.1 % ofthe full scale load (Note 8). The dial shall be readable within1 % of the indicated load at any given load level within theloading range. In no case shall the loading range of a dial beconsidered to include loads below the value that is 100 timesthe smallest change of load that can be read on the scale. Thescale shall be provided with a graduation line equal to zero andso numbered. The dial pointer shall be of sufficient length toreach the graduation marks; the width of the end of the pointershall not exceed the clear distance between the smallestgraduations. Each dial shall be equipped with a zero adjust-ment located outside the dialcase and easily accessible from thefront of the machine while observing the zero mark and dialpointer. Each dial shall be equipped with a suitable device thatat all times, until reset, will indicate to within 1 % accuracy themaximum load applied to the specimen.

    NOTE 8—Readability is considered to be 0.5 mm [0.02 in.] along the arcdescribed by the end of the pointer. Also, one half of a scale interval isreadable with reasonable certainty when the spacing on the load indicatingmechanism is between 1 mm [0.04 in.] and 2 mm [0.06 in.]. When thespacing is between 2 and 3 mm [0.06 and 0.12 in.], one third of a scaleinterval is readable with reasonable certainty. When the spacing is 3 mm

    NOTE 1—Provision shall be made for holding the ball in the socket andfor holding the entire unit in the testing machine.

    FIG. 1 Schematic Sketch of a Typical Spherical Bearing Block

    C39/C39M − 15

    3Copyright by ASTM Int'l (all rights reserved); Tue May 12 19:36:57 EDT 2015Downloaded/printed byEnrique Pasquel () pursuant to License Agreement. No further reproductions authorized.

  • [0.12 in.] or more, one fourth of a scale interval is readable withreasonable certainty.

    5.3.2 If the testing machine load is indicated in digital form,the numerical display must be large enough to be easily read.The numerical increment must be equal to or less than 0.10 %of the full scale load of a given loading range. In no case shallthe verified loading range include loads less than the minimumnumerical increment multiplied by 100. The accuracy of theindicated load must be within 1.0 % for any value displayedwithin the verified loading range. Provision must be made foradjusting to indicate true zero at zero load. There shall beprovided a maximum load indicator that at all times until resetwill indicate within 1 % system accuracy the maximum loadapplied to the specimen.

    5.4 Documentation of the calibration and maintenance ofthe testing machine shall be in accordance with PracticeC1077.

    6. Specimens

    6.1 Specimens shall not be tested if any individual diameterof a cylinder differs from any other diameter of the samecylinder by more than 2 %.

    NOTE 9—This may occur when single use molds are damaged ordeformed during shipment, when flexible single use molds are deformedduring molding, or when a core drill deflects or shifts during drilling.

    6.2 Prior to testing, neither end of test specimens shalldepart from perpendicularity to the axis by more than 0.5°(approximately equivalent to 1 mm in 100 mm [0.12 in. in 12in.]). The ends of compression test specimens that are not planewithin 0.050 mm [0.002 in.] shall be sawed or ground to meetthat tolerance, or capped in accordance with either PracticeC617/C617M or, when permitted, Practice C1231/C1231M.The diameter used for calculating the cross-sectional area ofthe test specimen shall be determined to the nearest 0.25 mm[0.01 in.] by averaging two diameters measured at right anglesto each other at about midheight of the specimen.

    6.3 The number of individual cylinders measured for deter-mination of average diameter is not prohibited from beingreduced to one for each ten specimens or three specimens perday, whichever is greater, if all cylinders are known to havebeen made from a single lot of reusable or single-use moldswhich consistently produce specimens with average diameterswithin a range of 0.5 mm [0.02 in.]. When the averagediameters do not fall within the range of 0.5 mm [0.02 in.] orwhen the cylinders are not made from a single lot of molds,each cylinder tested must be measured and the value used incalculation of the unit compressive strength of that specimen.When the diameters are measured at the reduced frequency, thecross-sectional areas of all cylinders tested on that day shall becomputed from the average of the diameters of the three ormore cylinders representing the group tested that day.

    6.4 If the purchaser of the testing services requests measure-ment of density of test specimens, determine the mass ofspecimens before capping. Remove any surface moisture witha towel and measure the mass of the specimen using a balanceor scale that is accurate to within 0.3 % of the mass beingmeasured. Measure the length of the specimen to the nearest 1

    mm [0.05 in.] at three locations spaced evenly around thecircumference. Compute the average length and record to thenearest 1 mm [0.05 in.]. Alternatively, determine the cylinderdensity by weighing the cylinder in air and then submergedunder water at 23.0 6 2.0 °C [73.5 6 3.5 °F], and computingthe volume according to 8.3.1.

    6.5 When density determination is not required and thelength to diameter ratio is less than 1.8 or more than 2.2,measure the length of the specimen to the nearest 0.05 D.

    7. Procedure

    7.1 Compression tests of moist-cured specimens shall bemade as soon as practicable after removal from moist storage.

    7.2 Test specimens shall be kept moist by any convenientmethod during the period between removal from moist storageand testing. They shall be tested in the moist condition.

    7.3 All test specimens for a given test age shall be brokenwithin the permissible time tolerances prescribed as follows:

    Test Age Permissible Tolerance

    24 h ±0.5 h or 2.1 %3 days 2 h or 2.8 %7 days 6 h or 3.6 %

    28 days 20 h or 3.0 %90 days 2 days 2.2 %

    7.4 Placing the Specimen—Place the plain (lower) bearingblock, with its hardened face up, on the table or platen of thetesting machine directly under the spherically seated (upper)bearing block. Wipe clean the bearing faces of the upper andlower bearing blocks and of the test specimen and place the testspecimen on the lower bearing block. If using unbonded caps,wipe clean the bearing surfaces of the retaining ring or ringsand center the unbonded cap or caps on the cylinder. Carefullyalign the axis of the specimen with the center of thrust of thespherically seated block.

    7.4.1 Zero Verification and Block Seating—Prior to testingthe specimen, verify that the load indicator is set to zero. Incases where the indicator is not properly set to zero, adjust theindicator (Note 10). After placing the specimen in the machinebut prior to applying the load on the specimen, tilt the movableportion of the spherically seated block gently by hand so thatthe bearing face appears to be parallel to the top of the testspecimen.

    NOTE 10—The technique used to verify and adjust load indicator to zerowill vary depending on the machine manufacturer. Consult your owner’smanual or compression machine calibrator for the proper technique.

    7.4.2 Verification of Alignment When Using UnbondedCaps—If using unbonded caps, verify the alignment of thespecimen after application of load, but before reaching 10 % ofthe anticipated specimen strength. Check to see that the axis ofthe cylinder does not depart from vertical by more than 0.5°(Note 11) and that the ends of the cylinder are centered withinthe retaining rings. If the cylinder alignment does not meetthese requirements, release the load, and carefully recenter thespecimen. Reapply load and recheck specimen centering andalignment. A pause in load application to check cylinderalignment is permissible.

    NOTE 11—An angle of 0.5° is equal to a slope of approximately 1 mm

    C39/C39M − 15

    4Copyright by ASTM Int'l (all rights reserved); Tue May 12 19:36:57 EDT 2015Downloaded/printed byEnrique Pasquel () pursuant to License Agreement. No further reproductions authorized.

  • in 100 mm [1⁄8 inches in 12 inches]

    7.5 Rate of Loading—Apply the load continuously andwithout shock.

    7.5.1 The load shall be applied at a rate of movement (platento crosshead measurement) corresponding to a stress rate onthe specimen of 0.25 6 0.05 MPa/s [35 6 7 psi/s] (see Note12). The designated rate of movement shall be maintained atleast during the latter half of the anticipated loading phase.

    NOTE 12—For a screw-driven or displacement-controlled testingmachine, preliminary testing will be necessary to establish the requiredrate of movement to achieve the specified stress rate. The required rate ofmovement will depend on the size of the test specimen, the elasticmodulus of the concrete, and the stiffness of the testing machine.

    7.5.2 During application of the first half of the anticipatedloading phase, a higher rate of loading shall be permitted. Thehigher loading rate shall be applied in a controlled manner sothat the specimen is not subjected to shock loading.

    7.5.3 Make no adjustment in the rate of movement (platen tocrosshead) as the ultimate load is being approached and thestress rate decreases due to cracking in the specimen.

    7.6 Apply the compressive load until the load indicatorshows that the load is decreasing steadily and the specimendisplays a well-defined fracture pattern (Types 1 to 4 in Fig. 2).For a testing machine equipped with a specimen break detector,

    automatic shut-off of the testing machine is prohibited until theload has dropped to a value that is less than 95 % of the peakload. When testing with unbonded caps, a corner fracturesimilar to a Type 5 or 6 pattern shown in Fig. 2 may occurbefore the ultimate capacity of the specimen has been attained.Continue compressing the specimen until the user is certainthat the ultimate capacity has been attained. Record themaximum load