02.05.03. CUADRO RESUMEN DE GASTOS EN MAQUINARIA Y/O EQUIPO ACUMULADO OBRA : MANTENIMIENTO DE VIAS CALLE EL SIGLO ENTIDAD EJECUTORA : MUNICIPALIDAD PROVINCIAL MARISCAL NIETO MODALIDAD DE EJECUCION : ADMINISTRACION DIRECTA PERIODO MAYO - JUNIO 2007 ITEM DESCRIPCION UND. PROGRAMADO EJECUTADO P. U. CANTIDAD PARCIAL P. U. CANTIDAD PARCIAL 1.00 TEODOLITO HE 10.00 171.64 1,716.40 - - - 2.00 CAMION VOLQUETE 6*4 330 HP 10 m3 HM 114.47 20.94 2,397.00 - - - 3.00 COMPRESORA NEUMATICA 87 HP 250-330 PCM HM 60.00 41.19 2,471.40 - - - 4.00 COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP HM 12.00 34.53 414.36 - - - 5.00 RODILLO NEUMATICO AUTOP 81-100HP 5.5-20 ton HM 103.46 54.93 5,683.06 - - - 6.00 CARGADOR SOBRE LLANTAS 160-195 HP 3.5 yd3 HM 187.26 0.29 54.31 - - - 7.00 COCINA DE ASFALTO 320 gl HM 44.08 21.64 953.89 - - - 8.00 NIVEL TOPOGRAFICO HE 4.05 171.64 695.14 - - - 9.00 PLANTA DE ASFALTO EN FRIO HM 84.32 0.16 13.49 - - - 10.00 GRUPO ELECTROGENO HM 40.50 0.16 6.48 - - - 11.00 CARGADOR FRONTAL FR-10B HM - - - 89.89 4.50 404.51 12.00 CARGADOR FRONTAL 938-G HM - - - 125.16 3.50 438.06 13.00 COCINA DE ASFALTO HM - - - 32.68 6.00 196.08 14.00 VOLQUETE DE 10 M3 HM - - - 9.00 - - 15.00 COMPACTADORA TIPOPLANCHA DE 4HP DIA - - - 5.00 - - TOTAL = 14,391.85 TOTAL 1,038.65 NOTA; PORCENTAJE 100.00% PORCENTAJE 7.22% SE UTILIZO, MAQUINARIA DE APOYO DEL TALLER MUNICIPAL Y SUB GERENCIA DE SERVICIOS A LA CIUDAD DE LA M.P.M.N. (NO SE VALORIZA)

Upload: christian-valdivia-caceres

Post on 13-Apr-2016

3 views

Category:

Documents


1 download

DESCRIPTION

EJEMPLO CUADRO DE MAQUINARIA

TRANSCRIPT

02.05.03. CUADRO RESUMEN DE GASTOS EN MAQUINARIA Y/O EQUIPO ACUMULADO

OBRA : MANTENIMIENTO DE VIAS CALLE EL SIGLO

ENTIDAD EJECUTORA : MUNICIPALIDAD PROVINCIAL MARISCAL NIETO

MODALIDAD DE EJECUCION : ADMINISTRACION DIRECTA PERIODO MAYO - JUNIO 2007

ITEM DESCRIPCION UND.PROGRAMADO EJECUTADO

P. U. CANTIDAD PARCIAL P. U. CANTIDAD PARCIAL 1.00 TEODOLITO HE 10.00 171.64 1,716.40 - - -

2.00 CAMION VOLQUETE 6*4 330 HP 10 m3 HM 114.47 20.94 2,397.00 - - -

3.00 COMPRESORA NEUMATICA 87 HP 250-330 PCM HM 60.00 41.19 2,471.40 - - -

4.00 COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP HM 12.00 34.53 414.36 - - -

5.00 RODILLO NEUMATICO AUTOP 81-100HP 5.5-20 ton HM 103.46 54.93 5,683.06 - - -

6.00 CARGADOR SOBRE LLANTAS 160-195 HP 3.5 yd3 HM 187.26 0.29 54.31 - - -

7.00 COCINA DE ASFALTO 320 gl HM 44.08 21.64 953.89 - - -

8.00 NIVEL TOPOGRAFICO HE 4.05 171.64 695.14 - - -

9.00 PLANTA DE ASFALTO EN FRIO HM 84.32 0.16 13.49 - - -

10.00 GRUPO ELECTROGENO HM 40.50 0.16 6.48 - - -

11.00 CARGADOR FRONTAL FR-10B HM - - - 89.89 4.50 404.51

12.00 CARGADOR FRONTAL 938-G HM - - - 125.16 3.50 438.06

13.00 COCINA DE ASFALTO HM - - - 32.68 6.00 196.08

14.00 VOLQUETE DE 10 M3 HM - - - 9.00 - -

15.00 COMPACTADORA TIPOPLANCHA DE 4HP DIA - - - 5.00 - -

TOTAL = 14,391.85 TOTAL 1,038.65

NOTA; PORCENTAJE 100.00% PORCENTAJE 7.22%SE UTILIZO, MAQUINARIA DE APOYO DEL TALLER MUNICIPAL Y SUB GERENCIA DE SERVICIOS A LA CIUDAD DE LA M.P.M.N. (NO SE VALORIZA)

02.05.03,01. CUADRO RESUMEN DE GASTOS EN HERRAMIENTAS MANUALES

OBRA : MANTENIMIENTO DE VIAS CALLE EL SIGLO

ENTIDAD EJECUTORA : MUNICIPALIDAD PROVINCIAL MARISCAL NIETO

MODALIDAD DE EJECUCION : ADMINISTRACION DIRECTA PERIODO MAYO - JUNIO 2007

ITEM DESCRIPCION UND.PROGRAMADO EJECUTADO

P. U. CANTIDAD PARCIAL P. U. CANTIDAD PARCIAL 1.00 GALONERA DE PLASTICO - - - 8.50 3.00 25.50 2.00 EMBUDO GRANDE - - - 60.00 1.00 60.00 3.00 LAMPAS TRAMONTINA UND - - - 10.00 - - 4.00 PICOS TRAMONTINA UND - - - 10.00 - - 5.00 ESCOBAS DE PAJA UNI - - - 15.00 - -

- - - - - - - -

(3% de la M.de Obra) TOTAL = 535.75 TOTAL 85.50 NOTA;

PORCENTAJE 100.00% PORCENTAJE 15.96%SE UTILIZO, HERAMIENTAS DE APOYO DE LA OBRA MANT. DE VIAS CALLE MARIANO LINO URQUIETA .(SE DEVOLVIO; NO SE VALORIZA)