valorizaciÓn enero val n° 12
DESCRIPTION
valorizaiones de obraTRANSCRIPT
-
S10
CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO FECHADOPresupuesto MEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINAL LA MARINA, PROVINCIA DE PADRE ABAD - UCAYALI
Cliente GOBIERNO REGIONAL DE UCAYALI Lugar UCAYALI - PADRE ABAD - PADRE ABAD
Item Descripcin Und. Metrado Precio S/. Parcial S/.
01 MEJORAMIENTO DE CALLES01.01 OBRAS PROVISIONALES01.01.01 ALQUILER DE ALMACEN MES 6.00 1,000.00 6,000.00
01.01.02 REUBICACION DE POSTES DE LUZ und 10.00 498.62 4,986.20
01.01.03 REUBICACION DE POSTES DE TELEFONO und 6.00 498.62 2,991.72
01.01.04 DEMOLICION DE VEREDAS EXISTENTES m3 1,400.00 13.35 18,690.00
01.01.05 NIVELACION DE BUZONES EN GENERAL und 24.00 300.96 7,223.04
01.01.06 und 25.00 900.96 22,524.00
01.01.07 MOVILIZACION Y DESMOVILIZACION DE EQUIPO PESADO hm 1.00 5,696.00 5,696.00
01.02 TRABAJOS PRELIMINARES01.02.01 TRAZO, NIVELES Y REPLANTEO m2 20,328.29 1.14 23,174.25
01.02.02 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS GLB 1.00 12,000.00 12,000.00
01.02.03 CARTEL DE IDENTIFICACION DE LA OBRA 8.50 x 3.60M und 1.00 1,861.32 1,861.32
01.02.04 LIMPIEZA DE TERRENO MANUAL m2 20,328.29 0.43 8,741.16
01.03 MOVIMIENTO DE TIERRAS01.03.01 CORTE DE MATERIAL A NIVEL DE SUB-RASANTE m3 7,173.08 4.14 29,696.55
01.03.02 CORTE DE TERRENO CON EQUIPO EN ZONA DE MATERIAL ORGANICO m3 85.61 5.79 495.68
01.03.03 CORTE SUPERFICIAL MANUAL HASTA 0.15 MT EN VEREDA Y MARTILLO m3 476.23 30.87 14,701.22
01.03.04 EXCAVACION MANUAL PARA CANALETAS EN TERRENO COMPACTO M3 1,661.91 43.21 71,811.13
01.03.05 m3 123.27 43.21 5,326.50
01.03.06 m3 5,758.86 45.25 260,588.42
01.03.07 COMPACTACION Y CONFORMACION DE SUB-RASANTE m2 12,217.48 3.88 47,403.82
01.03.08 RELLENO COMPACTADO CON MATERIAL PROPIO - MARTILLO m3 585.43 56.76 33,229.01
01.03.09 ELIMINACION DE MATERIAL EXCEDENTE m3 14,001.35 10.47 146,594.13
02 PAVIMENTOS02.01 BASE DE 0.20M02.01.01 BASE DE 0.20 M. m2 12,217.48 9.47 115,699.54
02.02 OBRAS DE CONCRETO02.02.01 ENCOFRADO Y DESENCOFRADO LOSA DE CONCRETO m2 2,026.43 24.69 50,032.56
02.02.02 PAVIMENTO DE CONCRETO F'C= 210 KG/CM2 E=0.20 M m2 12,217.48 65.52 800,489.29
02.02.03 ACERO CORRUGADO (BASTONES EN JUNTAS) kg 1,397.11 5.04 7,041.43
02.02.04 ACERO LISO (BASTONES EN JUNTAS) - TRANVERSALES kg 5,621.84 6.27 35,248.94
NIVELACION DE BUZONES, REPARACION DE TUBERIAS DE AGUA Y DESAGUE, NIVELACION DE CAJAS DE REJISTRO.
EXCAVACION MANUAL PARA UA DE CONCRETO EN TERRENO COMPACTO
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO, PARA NIVELAR SUB RASANTE
-
02.02.05 UA DE CONCRETO F'C= 210 KG/CM2 EN LOSA m3 102.73 330.95 33,998.49
02.03 JUNTAS02.03.01 JUNTA DE CONSTRUCCION CON TEKNOPORT m 513.65 5.60 2,876.44
02.03.02 JUNTA DE CONTRACCION (E=1" H=2") m 2,054.58 3.87 7,951.22
02.03.03 JUNTA DE DILATACION (E=1" H=8") m 1,027.29 4.91 5,043.99
02.03.04 JUNTA LONGITUDINAL (E=1" H=8") m 1,712.15 4.34 7,430.73
02.04 CURADO Y LIMPIEZA DE LOSA - VEREDA02.04.01 TENDIDO DE ARROCERA Y CURADO m2 16,120.37 1.21 19,505.65
03 OBRAS DE DRENAJE03.01 TRABAJOS PRELIMINARES03.01.01 TRAZO, NIVELACION Y REPLANTEO EN CANALETAS ML 3,164.83 0.67 2,120.44
03.02 OBRAS DE CONCRETO ARMADO03.02.01 m3 1,383.58 328.99 455,183.98
03.02.02 ENCOFRADO Y DESENCOFRADO DE CANALETAS M2 9,840.37 26.79 263,623.51
03.02.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 kg 64,559.21 5.31 342,809.41
03.02.04 WATER STOP NEOPRENE 6" EN CANALETAS M 636.64 37.74 24,026.79
03.02.05 und 478.00 77.33 36,963.74
03.02.06 REJILLA METALICA CON MARCO 0.60x0.80 EN CANALETA GLB 253.00 300.00 75,900.00
04 MURO DE CONTENSION04.01 TRABAJOS PRELIMINARES04.01.01 TRAZO NIVEL Y REPLANTEO m2 529.60 1.73 916.21
04.02 MOVIMIENTO DE TIERRAS04.02.01 EXCAVACION MANUAL PARA CIMIENTO MURO m3 571.45 86.42 49,384.71
04.02.02 RELLENO CON MATERIAL PROPIO - MURO DE CONTENCION m3 441.93 21.63 9,558.95
04.02.03 m3 161.91 64.33 10,415.67
04.03 OBRAS DE CONCRETO SIMPLE04.03.01 SOLADO DE CONCRETO E=0.10 M m2 529.60 20.19 10,692.62
04.04 OBRAS DE CONCRETO ARMADO04.04.01 CONCRETO FC=210 KG/CM2 - EN MURO DE CONTENCION m3 302.42 333.61 100,890.34
04.04.02 ENCOFRADO Y DESENCOFRADO DE MURO DE CONSTENCION m2 1,408.76 30.27 42,643.17
04.04.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 kg 14,005.62 5.31 74,369.84
04.04.04 TUBOS DE PVC D=3" C-7.5 SAP PARA LLORADORES m 184.50 21.52 3,970.44
04.05 JUNTAS04.06 JUNTA DE CONSTRUCCION CON TEKNOPORT m 140.88 5.60 788.93
05 VEREDAS Y MARTILLOS DE CONCRETO05.01 M2 515.39 47.86 24,666.57
05.02 CONCRETO F'C=140 KG/CM2VEREDAS E=0.10 m m2 3,387.50 41.33 140,005.38
05.03 CONCRETO F'C= 140 KG/CM2 EN UAS DE VEREDAS m3 53.17 317.54 16,883.60
05.04 RAMPA DE ACCESOS DE CONCRETO EN VEREDAS. m2 259.30 38.45 9,970.09
05.05 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 426.52 17.68 7,540.87
05.06 JUNTAS DE DILATACION EN VEREDA E = 5 MM H=4" m 426.52 6.02 2,567.65
05.07 JUNTAS DE CONSTRUCCION EN VEREDA E = 1" m 2,843.49 4.94 14,046.84
06 SEALIZACION06.01 PINTURA TRAFICO EN LINEAS CONTINUAS EN PAVIMENTO M 342.43 20.70 7,088.30
06.02 PINTURA DE SIMBOLOS Y LETRAS EN PAVIMENTO m2 932.45 20.70 19,301.72
06.03 PINTURA EN SARDINEL DE CANALETA m 318.32 7.81 2,486.08
06.04 SEALES PREVENTIVAS INCLUIDO POSTES DE SOPORTE und 20.00 378.85 7,577.00
06.05 SEALES REGLAMENTARIAS INCLUIDO POSTES DE SOPORTE und 20.00 523.95 10,479.00
07 VARIOS
CONCRETO F'C=210 KG/CM2 EN LOSA FONDO , MUROS Y TECHO DE CANALETAS
TAPAS DE CONCRETO PARA INSPECCION Y LIMPIEZA 0.60X0.60, F'c=210 kg/cm2
ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MANUAL CON VOLQUETE
CONCRETO F'C= 175 KG/CM2 BRUADO EN VEREDAS DE MARTILLO E = 0.15 m.
-
07.01 LIMPIEZA FINAL DE OBRA GLB 1.00 5,000.00 5,000.00
08 PLAN DE MANEJO AMBIENTAL08.01 NORMATIVIDAD AMBIENTAL08.01.01 APLICACION DE NORMAS DE COMPORTAMIENTO mes 1.00 400.00 400.00
08.01.02 SEGUIMIENTO Y CUMPLIMIENTO A LAS PAUTAS SOCIO AMBIENTALES mes 1.00 500.00 500.00
08.02 PLAN DE FORESTACION Y REVEGETACION08.02.01 COMO ORNAMENTACIN08.02.01.01 ARBOLES ORNAMENTALES08.02.01.01.01 TRAZO, REPLANTEO Y LIMPIEZA DE TERRENO m2 1,820.52 1.05 1,911.55
08.02.01.01.02 ADQUISICION Y TRANSPORTE DE PLANTONES ORNAMENTALES. und 50.00 16.05 802.50
08.02.01.01.03 PLANTADO DE PLANTONES ORNAMENTALES und 50.00 9.20 460.00
08.02.01.02 GRAS08.02.01.02.01 TRAZO, REPLANTEO Y LIMPIEZA DE TERRENO m2 1,820.52 1.05 1,911.55
08.02.01.02.02 ADQUISICION Y TRANSPORTE DE PLANTONES DE GRASS SACO/15M2 und 100.00 16.35 1,635.00
08.02.01.02.03 PLANTADO DE GRASS AMERICANO m2 1,820.52 2.65 4,824.38
08.03 MANEJO DE CANTERA08.03.01 GLB 1.00 800.00 800.00
08.03.02 mes 1.50 912.00 1,368.00
08.04 SEALIZACION08.04.01 und 5.00 186.51 932.55
08.04.02 und 10.00 87.59 875.90
08.05 MANEJO DE CAMPAMENTO08.05.01 ADECUACION DE ALMACEN, OFICINAS, COMEDOR Y OTROS GLB 1.00 1,689.36 1,689.36
08.05.02 RECOLECTORES DE RESIDUOS SOLIDOS TIPO BASCULANTE METALICO und 2.00 383.73 767.46
08.05.03 INSTALACION DE LETRINA PORTATIL (FIBRA DE VIDRIO) und 2.00 1,847.45 3,694.90
08.05.04 IMPLEMENTACION DE BOTIQUIN und 1.00 445.00 445.00
08.06 EDUCACION AMBIENTAL08.06.01 CHARLAS AL PERSONAL DE OBRA und 3.00 466.75 1,400.25
08.06.02 CHARLAS A LA COMUNIDAD und 2.00 466.75 933.50
08.06.03 POLOS DE ALGODON CON LOGOTIPO AMBIENTAL und 100.00 18.00 1,800.00
08.06.04 und 100.00 3.50 350.00
08.07 PROGRAMA DE SEGURIDAD Y CONTINGENCIA EN OBRA08.07.01 INSTALACION DE CINTAS DE SEGURIDAD ALREDEDOR DE LA OBRA ML 2,500.00 0.32 800.00
08.07.02 PROGRAMA DE CONTINGENCIAS DURANTE LA EJECUCION DE LA OBRA GLB 1.00 1,300.00 1,300.00
08.08 PROGRAMA DE ABANDONO DE OBRA08.08.01 RESTAURACION DEL AREA DE CAMPAMENTO Y REVEGETACION m2 200.00 2.06 412.00
08.08.02 CIERRE DE CANTERAS m2 500.00 1.45 725.00
08.08.03 CIERRE DE BOTADEROS m2 550.00 1.29 709.50
08.09 PARTICIPACION CIUDADANA
MANEJO DEL AREA DE CANTERA DE AGREGADOS Y MATERIAL DE RELLENO
CONTROL DE POLVO EN MOVIMIENTO DE TIERRA Y TRASALADO A BOTADEROS
LETREROS DE SEALIZACION AMBIENTAL DE 1.00x0.50 M. C/PLANCHA METALICA e=1/40, BASTIDORES DE MADERA TORNILLO DE 1"X1.1/2"
LETREROS DE SEALIZACION AMBIENTAL DE 0.50x0.30 M. C/PLANCHA METALICA e=1/40, BASTIDORES DE MADERA TORNILLO DE 1"X1.1/2"
AFICHES AMBIENTALES DE 1.00x0.70 M. CON CARTULINA DUPLEX SEGUN MODELO
-
08.09.01 und 1.00 87.25 87.25
COSTO DIRECTO 3,612,459.93GASTOS GENERALES (13%) 469,619.79UTILIDAD (12..9999995%) 469,619.77TOTAL PRESUPUESTO 4,551,699.49
AVANCE PARCIAL
AVANCE ACUMULADO
S10
CRONOGRAMA DE EJECUCION DE OBRA VALORIZADOPresupuesto MEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINAL LA MARINA, PROVINCIA DE PADRE ABAD - UCAYALI
Cliente GOBIERNO REGIONAL DE UCAYALI Lugar UCAYALI - PADRE ABAD - PADRE ABAD
Item Descripcin Und. Metrado Precio S/. Parcial S/.
01 MEJORAMIENTO DE CALLES01.01 OBRAS PROVISIONALES01.01.01 ALQUILER DE ALMACEN MES 6.00 1,000.00 6,000.00
01.01.02 REUBICACION DE POSTES DE LUZ und 10.00 498.62 4,986.20
01.01.03 REUBICACION DE POSTES DE TELEFONO und 6.00 498.62 2,991.72
01.01.04 DEMOLICION DE VEREDAS EXISTENTES m3 1,400.00 13.35 18,690.00
01.01.05 NIVELACION DE BUZONES EN GENERAL und 24.00 300.96 7,223.04
01.01.06 und 25.00 900.96 22,524.00
01.01.07 MOVILIZACION Y DESMOVILIZACION DE EQUIPO PESADO hm 1.00 5,696.00 5,696.00
01.02 TRABAJOS PRELIMINARES01.02.01 TRAZO, NIVELES Y REPLANTEO m2 20,328.29 1.14 23,174.25
01.02.02 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS GLB 1.00 12,000.00 12,000.00
01.02.03 CARTEL DE IDENTIFICACION DE LA OBRA 8.50 x 3.60M und 1.00 1,861.32 1,861.32
01.02.04 LIMPIEZA DE TERRENO MANUAL m2 20,328.29 0.43 8,741.16
01.03 MOVIMIENTO DE TIERRAS01.03.01 CORTE DE MATERIAL A NIVEL DE SUB-RASANTE m3 7,173.08 4.14 29,696.55
01.03.02 CORTE DE TERRENO CON EQUIPO EN ZONA DE MATERIAL ORGANICO m3 85.61 5.79 495.68
01.03.03 CORTE SUPERFICIAL MANUAL HASTA 0.15 MT EN VEREDA Y MARTILLO m3 476.23 30.87 14,701.22
01.03.04 EXCAVACION MANUAL PARA CANALETAS EN TERRENO COMPACTO M3 1,661.91 43.21 71,811.13
01.03.05 m3 123.27 43.21 5,326.50
FORMACION DEL COMITE DE MANTENIMIENTO DE LA INFRAESTRUCTURA Y EQUIPOS
NIVELACION DE BUZONES, REPARACION DE TUBERIAS DE AGUA Y DESAGUE, NIVELACION DE CAJAS DE REJISTRO.
EXCAVACION MANUAL PARA UA DE CONCRETO EN TERRENO COMPACTO
-
01.03.06 m3 5,758.86 45.25 260,588.42
01.03.07 COMPACTACION Y CONFORMACION DE SUB-RASANTE m2 12,217.48 3.88 47,403.82
01.03.08 RELLENO COMPACTADO CON MATERIAL PROPIO - MARTILLO m3 585.43 56.76 33,229.01
01.03.09 ELIMINACION DE MATERIAL EXCEDENTE m3 14,001.35 10.47 146,594.13
02 PAVIMENTOS02.01 BASE DE 0.20M02.01.01 BASE DE 0.20 M. m2 12,217.48 9.47 115,699.54
02.02 OBRAS DE CONCRETO02.02.01 ENCOFRADO Y DESENCOFRADO LOSA DE CONCRETO m2 2,026.43 24.69 50,032.56
02.02.02 PAVIMENTO DE CONCRETO F'C= 210 KG/CM2 E=0.20 M m2 12,217.48 65.52 800,489.29
02.02.03 ACERO CORRUGADO (BASTONES EN JUNTAS) kg 1,397.11 5.04 7,041.43
02.02.04 ACERO LISO (BASTONES EN JUNTAS) - TRANVERSALES kg 5,621.84 6.27 35,248.94
02.02.05 UA DE CONCRETO F'C= 210 KG/CM2 EN LOSA m3 102.73 330.95 33,998.49
02.03 JUNTAS02.03.01 JUNTA DE CONSTRUCCION CON TEKNOPORT m 513.65 5.60 2,876.44
02.03.02 JUNTA DE CONTRACCION (E=1" H=2") m 2,054.58 3.87 7,951.22
02.03.03 JUNTA DE DILATACION (E=1" H=8") m 1,027.29 4.91 5,043.99
02.03.04 JUNTA LONGITUDINAL (E=1" H=8") m 1,712.15 4.34 7,430.73
02.04 CURADO Y LIMPIEZA DE LOSA - VEREDA02.04.01 TENDIDO DE ARROCERA Y CURADO m2 16,120.37 1.21 19,505.65
03 OBRAS DE DRENAJE03.01 TRABAJOS PRELIMINARES03.01.01 TRAZO, NIVELACION Y REPLANTEO EN CANALETAS ML 3,164.83 0.67 2,120.44
03.02 OBRAS DE CONCRETO ARMADO03.02.01 m3 1,383.58 328.99 455,183.98
03.02.02 ENCOFRADO Y DESENCOFRADO DE CANALETAS M2 9,840.37 26.79 263,623.51
03.02.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 kg 64,559.21 5.31 342,809.41
03.02.04 WATER STOP NEOPRENE 6" EN CANALETAS M 636.64 37.74 24,026.79
03.02.05 und 478.00 77.33 36,963.74
03.02.06 REJILLA METALICA CON MARCO 0.60x0.80 EN CANALETA GLB 253.00 300.00 75,900.00
04 MURO DE CONTENSION04.01 TRABAJOS PRELIMINARES04.01.01 TRAZO NIVEL Y REPLANTEO m2 529.60 1.73 916.21
04.02 MOVIMIENTO DE TIERRAS04.02.01 EXCAVACION MANUAL PARA CIMIENTO MURO m3 571.45 86.42 49,384.71
04.02.02 RELLENO CON MATERIAL PROPIO - MURO DE CONTENCION m3 441.93 21.63 9,558.95
04.02.03 m3 161.91 64.33 10,415.67
04.03 OBRAS DE CONCRETO SIMPLE04.03.01 SOLADO DE CONCRETO E=0.10 M m2 529.60 20.19 10,692.62
04.04 OBRAS DE CONCRETO ARMADO04.04.01 CONCRETO FC=210 KG/CM2 - EN MURO DE CONTENCION m3 302.42 333.61 100,890.34
04.04.02 ENCOFRADO Y DESENCOFRADO DE MURO DE CONSTENCION m2 1,408.76 30.27 42,643.17
04.04.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 kg 14,005.62 5.31 74,369.84
04.04.04 TUBOS DE PVC D=3" C-7.5 SAP PARA LLORADORES m 184.50 21.52 3,970.44
04.05 JUNTAS04.06 JUNTA DE CONSTRUCCION CON TEKNOPORT m 140.88 5.60 788.93
05 VEREDAS Y MARTILLOS DE CONCRETO05.01 M2 515.39 47.86 24,666.57
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO, PARA NIVELAR SUB RASANTE
CONCRETO F'C=210 KG/CM2 EN LOSA FONDO , MUROS Y TECHO DE CANALETAS
TAPAS DE CONCRETO PARA INSPECCION Y LIMPIEZA 0.60X0.60, F'c=210 kg/cm2
ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MANUAL CON VOLQUETE
CONCRETO F'C= 175 KG/CM2 BRUADO EN VEREDAS DE MARTILLO E = 0.15 m.
-
05.02 CONCRETO F'C=140 KG/CM2VEREDAS E=0.10 m m2 3,387.50 41.33 140,005.38
05.03 CONCRETO F'C= 140 KG/CM2 EN UAS DE VEREDAS m3 53.17 317.54 16,883.60
05.04 RAMPA DE ACCESOS DE CONCRETO EN VEREDAS. m2 259.30 38.45 9,970.09
05.05 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 426.52 17.68 7,540.87
05.06 JUNTAS DE DILATACION EN VEREDA E = 5 MM H=4" m 426.52 6.02 2,567.65
05.07 JUNTAS DE CONSTRUCCION EN VEREDA E = 1" m 2,843.49 4.94 14,046.84
06 SEALIZACION06.01 PINTURA TRAFICO EN LINEAS CONTINUAS EN PAVIMENTO M 342.43 20.70 7,088.30
06.02 PINTURA DE SIMBOLOS Y LETRAS EN PAVIMENTO m2 932.45 20.70 19,301.72
06.03 PINTURA EN SARDINEL DE CANALETA m 318.32 7.81 2,486.08
06.04 SEALES PREVENTIVAS INCLUIDO POSTES DE SOPORTE und 20.00 378.85 7,577.00
06.05 SEALES REGLAMENTARIAS INCLUIDO POSTES DE SOPORTE und 20.00 523.95 10,479.00
07 VARIOS07.01 LIMPIEZA FINAL DE OBRA GLB 1.00 5,000.00 5,000.00
08 PLAN DE MANEJO AMBIENTAL08.01 NORMATIVIDAD AMBIENTAL08.01.01 APLICACION DE NORMAS DE COMPORTAMIENTO mes 1.00 400.00 400.00
08.01.02 SEGUIMIENTO Y CUMPLIMIENTO A LAS PAUTAS SOCIO AMBIENTALES mes 1.00 500.00 500.00
08.02 PLAN DE FORESTACION Y REVEGETACION08.02.01 COMO ORNAMENTACIN08.02.01.01 ARBOLES ORNAMENTALES08.02.01.01.01 TRAZO, REPLANTEO Y LIMPIEZA DE TERRENO m2 1,820.52 1.05 1,911.55
08.02.01.01.02 ADQUISICION Y TRANSPORTE DE PLANTONES ORNAMENTALES. und 50.00 16.05 802.50
08.02.01.01.03 PLANTADO DE PLANTONES ORNAMENTALES und 50.00 9.20 460.00
08.02.01.02 GRAS08.02.01.02.01 TRAZO, REPLANTEO Y LIMPIEZA DE TERRENO m2 1,820.52 1.05 1,911.55
08.02.01.02.02 ADQUISICION Y TRANSPORTE DE PLANTONES DE GRASS SACO/15M2 und 100.00 16.35 1,635.00
08.02.01.02.03 PLANTADO DE GRASS AMERICANO m2 1,820.52 2.65 4,824.38
08.03 MANEJO DE CANTERA08.03.01 GLB 1.00 800.00 800.00
08.03.02 mes 1.50 912.00 1,368.00
08.04 SEALIZACION08.04.01 und 5.00 186.51 932.55
08.04.02 und 10.00 87.59 875.90
08.05 MANEJO DE CAMPAMENTO08.05.01 ADECUACION DE ALMACEN, OFICINAS, COMEDOR Y OTROS GLB 1.00 1,689.36 1,689.36
08.05.02 RECOLECTORES DE RESIDUOS SOLIDOS TIPO BASCULANTE METALICO und 2.00 383.73 767.46
08.05.03 INSTALACION DE LETRINA PORTATIL (FIBRA DE VIDRIO) und 2.00 1,847.45 3,694.90
08.05.04 IMPLEMENTACION DE BOTIQUIN und 1.00 445.00 445.00
08.06 EDUCACION AMBIENTAL08.06.01 CHARLAS AL PERSONAL DE OBRA und 3.00 466.75 1,400.25
08.06.02 CHARLAS A LA COMUNIDAD und 2.00 466.75 933.50
08.06.03 POLOS DE ALGODON CON LOGOTIPO AMBIENTAL und 100.00 18.00 1,800.00
MANEJO DEL AREA DE CANTERA DE AGREGADOS Y MATERIAL DE RELLENO
CONTROL DE POLVO EN MOVIMIENTO DE TIERRA Y TRASALADO A BOTADEROS
LETREROS DE SEALIZACION AMBIENTAL DE 1.00x0.50 M. C/PLANCHA METALICA e=1/40, BASTIDORES DE MADERA TORNILLO DE 1"X1.1/2"
LETREROS DE SEALIZACION AMBIENTAL DE 0.50x0.30 M. C/PLANCHA METALICA e=1/40, BASTIDORES DE MADERA TORNILLO DE 1"X1.1/2"
-
08.06.04 und 100.00 3.50 350.00
08.07 PROGRAMA DE SEGURIDAD Y CONTINGENCIA EN OBRA08.07.01 INSTALACION DE CINTAS DE SEGURIDAD ALREDEDOR DE LA OBRA ML 2,500.00 0.32 800.00
08.07.02 PROGRAMA DE CONTINGENCIAS DURANTE LA EJECUCION DE LA OBRA GLB 1.00 1,300.00 1,300.00
08.08 PROGRAMA DE ABANDONO DE OBRA08.08.01 RESTAURACION DEL AREA DE CAMPAMENTO Y REVEGETACION m2 200.00 2.06 412.00
08.08.02 CIERRE DE CANTERAS m2 500.00 1.45 725.00
08.08.03 CIERRE DE BOTADEROS m2 550.00 1.29 709.50
08.09 PARTICIPACION CIUDADANA08.09.01 und 1.00 87.25 87.25
COSTO DIRECTO 3,612,459.93GASTOS GENERALES (13%) 469,619.79UTILIDAD (12.9999995%) 469,619.77TOTAL PRESUPUESTO 4,551,699.49
AVANCE PARCIAL
AVANCE ACUMULADO
AFICHES AMBIENTALES DE 1.00x0.70 M. CON CARTULINA DUPLEX SEGUN MODELO
FORMACION DEL COMITE DE MANTENIMIENTO DE LA INFRAESTRUCTURA Y EQUIPOS
-
1CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO FECHADOMEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINAL LA MARINA, PROVINCIA DE PADRE ABAD - UCAYALI
4 5 6 7 8 9 10 11
1,500.00 1,500.00 1,500.00 1,500.00
930.66 930.66
2,185.29 2,185.29 2,185.29 2,185.29
-
1,500.00 1,500.00 1,500.00 1,500.00 3,115.95 3,115.95 2,185.29 2,185.29
1
CRONOGRAMA DE EJECUCION DE OBRA VALORIZADOMEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINAL LA MARINA, PROVINCIA DE PADRE ABAD - UCAYALI
1 2 3 4 5 6 7 8
-
13,341.38
928.84 928.84 928.84 928.84 928.84 928.84 928.84
-
1,417.66 1,417.66 1,417.66 1,417.66 1,417.66
3,860.34 3,860.34
382.31 382.31 382.31 382.31 382.31
802.50
460.00
382.31 382.31 382.31 382.31 382.31
1,635.00
482.44
-
137.33 137.33 137.34
241.67 241.67 241.66
13,341.38 3,111.12 3,248.45 3,248.45 3,248.46 3,352.79 7,468.35 5,973.28
-
SETIEMBRE 201412 13 14 15 16 17 18 19
1,158.71 1,158.71 1,158.71 1,158.71 1,158.71 1,158.71 1,158.71 1,158.71
-
1,158.71 1,158.71 1,158.71 1,158.71 1,158.71 1,158.71 1,158.71 1,158.71
May-159 10 11 12 13 14 15 16
-
928.84 928.84 928.84 928.84 928.84 928.84 928.84 928.84
-
3,860.34 3,860.34 3,860.36
621.52 621.52 621.52 621.52
1,894.25
482.44 482.44 482.44 482.44 482.44 482.44 482.44 482.44
-
236.50 236.50 236.50
5,508.12 5,508.12 5,508.14 2,032.80 2,032.80 2,032.80 2,032.80 3,305.53
-
20 21 22 23 24 25 26 27
1,158.71 1,158.71 1,158.71 1,158.71 1,158.71 1,158.71 1,158.71 1,158.71
-
1,158.71 1,158.71 1,158.71 1,158.71 1,158.71 1,158.71 1,158.71 1,158.71
17 18 19 20 21 22 23 24
-
928.84 928.84 928.84 928.84 928.84 928.85
-
1,894.25 1,894.25 1,894.25
2,619.75 2,619.75 2,619.75 2,619.75
714.29
482.42
-
3,305.51 2,823.09 2,823.09 3,548.59 3,548.59 3,548.60 2,619.75 714.29
-
28 29 30 1 2 3 4 5
5,696.00
1,158.71 1,158.71 1,158.71 1,158.76
-
916.21
3,292.31 3,292.31 3,292.31
-
400.00
500.00
1,689.36
383.73
-
1,158.71 1,158.71 1,158.71 1,558.76 7,112.21 3,292.31 4,981.67 3,676.04
38,617.97
5,020.345,020.34
48,658.65
1.07
1.07
25 26 27 28 29 30 31
-
714.29 714.29 714.29 714.29 714.29 714.26
-
714.29 714.29 714.29 714.29 714.29 714.26 0.00
98,170.61
12,762.1812,762.16
123,694.95
2.72
99.99
-
6 7 8 9 10 11 12 13
-
3,292.31 3,292.31 3,292.31 3,292.31 3,292.31 3,292.31 3,292.31 3,292.31
-
800.00
456.00 456.00
932.55
875.90
383.73
1,847.45 1,847.45
445.00
30.77 30.77 30.77
-
3,676.04 5,139.76 5,139.76 4,669.86 4,168.21 4,123.08 3,779.08 3,779.08
-
98,170.61 3,612,459.93
12,762.18 469,619.80
12,762.16 469,619.76
123,694.95 4,551,699.49
-
Oct-1414 15 16 17 18 19 20 21
-
3,292.31 3,292.31 3,292.31 3,292.37
2,673.16 2,673.16 2,673.16 2,673.14
3,718.49
-
456.00
30.77 30.77 30.77 30.77 30.77 30.77 30.77 30.77
-
3,779.08 3,323.08 3,323.08 3,323.14 2,703.93 2,703.93 2,703.93 6,422.40
-
22 23 24 25 26 27 28 29
-
5,044.52 5,044.52 5,044.52 5,044.52 5,044.52
2,132.16 2,132.16 2,132.16 2,132.16 2,132.16 2,132.16 2,132.16
3,718.49 3,718.49 3,718.49 3,718.49 3,718.49 3,718.49 3,718.49 3,718.49
-
30.77 30.77 30.77 30.77 30.77 30.77 30.77 30.77
-
3,749.26 5,881.42 5,881.42 10,925.94 10,925.94 10,925.94 10,925.94 10,925.94
-
30 31 1 2 3 4 5 6
-
5,044.52 5,044.52 5,044.52 5,044.52 5,044.52 5,044.52 5,044.52 5,044.52
2,132.16 2,132.16 2,132.16 2,132.16 2,132.16 2,132.16 2,132.16 2,132.16
3,718.49 3,718.49 3,718.49 3,718.49 3,718.49 3,718.49 3,718.49 3,718.49
-
30.77 30.77 30.77 30.77 30.77 30.77 30.75
1,300.00
-
10,925.94 10,925.94 10,925.94 10,925.94 10,925.94 10,925.94 12,225.92 10,895.17
175,372.1122,798.3722,798.37
220,968.85
4.85
5.92
-
7 8 9 10 11 12 13 14
-
2,120.44
796.58
5,044.52 5,044.52 5,044.52 5,044.52 5,044.52 5,044.52 5,044.46
2,132.16 2,132.16 2,132.16 2,132.16 2,132.13
3,718.49 3,718.49 3,718.53
1,985.22 1,985.22
-
466.75 466.75 466.75
311.17 311.17 311.16
180.00 180.00
-
87.25
10,982.42 11,361.92 11,361.96 7,954.60 7,487.82 7,340.90 7,209.68 3,097.02
-
Nov-1415 16 17 18 19 20 21 22
1,662.07 1,662.07 1,662.06
1,495.86 1,495.86
1,557.50 1,557.50 1,557.50
1,595.80 1,595.80 1,595.80 1,595.80 1,595.80 1,595.80 1,595.80 1,595.80
-
7,617.99 7,617.99 7,617.99
796.58 796.58 796.58 796.58 796.58 796.58 796.58 796.58
157.79 157.79 157.79 157.79 157.77
-
180.00 180.00 180.00 180.00 180.00 180.00 180.00 180.00
-
4,392.24 4,392.24 4,392.23 4,226.03 4,226.01 11,747.87 11,747.87 11,747.87
-
23 24 25 26 27 28 29 30
1,557.50 1,557.50 1,557.50 1,557.50 1,557.50 1,557.50 1,557.50 1,557.50
1,595.80 1,595.80 1,595.80 1,595.80 1,595.80 1,595.80 1,595.80 1,595.80
-
10,115.20
5,858.30 5,858.30 5,858.30 5,858.30 5,858.30 5,858.30
7,617.99 7,617.99 7,617.99 7,617.99 7,617.99 7,617.99 7,617.99 7,617.99
533.93 533.93 533.93 533.93 533.93 533.93
796.58 796.58 796.57
1,735.95 1,735.95 1,735.95 1,735.95 1,735.95
-
35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00
-
11,602.87 11,602.87 17,995.09 18,934.47 18,934.47 18,934.47 18,934.47 29,049.67
336,481.91
43,742.6543,742.65
423,967.21
9.31
15.23
-
1 2 3 4 5 6 7 8
1,557.50
1,444.61 1,444.61 1,444.61 1,444.61 1,444.60
4,504.80 4,504.80
1,595.80 1,595.80 1,595.80 1,595.80 1,595.80 1,595.80 1,595.80 1,595.80
-
10,115.20 10,115.20 10,115.20 10,115.20 10,115.20 10,115.20 10,115.20 10,115.20
5,858.30 5,858.30 5,858.30 5,858.30 5,858.30 5,858.30 5,858.30 5,858.30
7,617.99 7,617.99 7,617.99 7,617.99 7,617.99 7,617.99 7,617.99 7,617.99
533.93 533.93 533.93 533.93 533.93 533.93 533.93 533.93
1,735.92
-
35.00 35.00
-
29,049.64 27,200.83 27,165.83 27,165.83 27,165.83 27,165.82 30,226.02 30,226.02
-
Dec-149 10 11 12 13 14 15 16
4,504.80 4,504.80 4,504.80
1,595.80 1,595.80 1,595.80 1,595.80 1,595.80 1,595.80 1,595.80 1,595.80
-
10,115.20 10,115.20 10,115.20 10,115.20 10,115.20 10,115.20 10,115.20 10,115.20
5,858.30 5,858.30 5,858.30 5,858.30 5,858.30 5,858.30 5,858.30 5,858.30
7,617.99 7,617.99 7,617.99 7,617.99 7,617.99 7,617.99 7,617.99 7,617.99
533.93 533.93 533.93 533.93 533.93 533.93 533.93 533.93
-
30,226.02 30,226.02 30,226.02 25,721.22 25,721.22 25,721.22 25,721.22 25,721.22
-
17 18 19 20 21 22 23 24
1,595.80 1,595.80 1,595.80 1,595.80 1,595.80 1,595.80 1,595.80 1,595.80
-
10,115.20 10,115.20 10,115.20 10,115.20 10,115.20 10,115.20 10,115.20 10,115.20
5,858.30 5,858.30 5,858.30 5,858.30 5,858.30 5,858.30 5,858.30 5,858.30
7,617.99 7,617.99 7,617.99 7,617.99 7,617.99 7,617.99 7,617.99 7,617.99
533.93 533.93 533.93 533.93 533.93 533.93 533.93 533.93
-
25,721.22 25,721.22 25,721.22 25,721.22 25,721.22 25,721.22 25,721.22 25,721.22
-
25 26 27 28 29 30 31 1
1,595.80 1,595.80 1,595.80 1,595.80 1,595.93
-
10,115.20 10,115.20 10,115.20 10,115.20 10,115.20 10,115.20 10,115.20 10,115.20
5,858.30 5,858.30 5,858.30 5,858.30 5,858.30 5,858.30 5,858.30 5,858.30
7,617.99 7,617.99 7,617.99 7,617.99 7,617.99 7,617.99 7,617.99 7,617.99
533.93 533.93 533.93 533.93 533.93 533.93 533.93 533.93
-
25,721.22 25,721.22 25,721.22 25,721.22 25,721.35 24,125.42 24,125.42 24,125.42
827,276.81
107,545.99107,545.98
1,042,368.78
22.90
38.13
-
2 3 4 5 6 7 8 9
-
10,115.20 10,115.20 10,115.20 10,115.20 10,115.20 10,115.20 10,115.20 10,115.20
5,858.30 5,858.30 5,858.30 5,858.30 5,858.30 5,858.30 5,858.31
7,617.99 7,617.85
533.93 533.93 533.93 533.93 533.93 533.93 533.87
-
24,125.42 24,125.28 16,507.43 16,507.43 16,507.43 16,507.43 16,507.38 10,115.20
-
Jan-1510 11 12 13 14 15 16 17
2,400.00 2,400.00 2,400.00 2,400.00 2,400.00
1,649.81
980.08 980.08 980.08 980.08 980.08 980.08
-
10,115.20 10,115.20 10,115.20 10,115.18
3,696.37 3,696.37 3,696.37 3,696.37 3,696.37 3,696.37 3,696.37
7,590.00 7,590.00 7,590.00 7,590.00 7,590.00 7,590.00 7,590.00
-
10,115.20 21,401.57 24,781.65 24,781.63 14,666.45 14,666.45 14,666.45 13,916.26
-
18 19 20 21 22 23 24 25
1,649.81 1,649.81 1,649.81 1,649.81 1,649.81 1,649.81 1,649.81 1,649.81
980.08 980.08 980.08 980.08 980.08 980.08 980.08 980.08
-
3,696.37 3,696.37 3,696.41
7,590.00 7,590.00 7,590.00
-
13,916.26 13,916.26 13,916.30 2,629.89 2,629.89 2,629.89 2,629.89 2,629.89
-
26 27 28 29 30 31 1 2
1,649.81 1,649.81 1,649.81 1,649.81 1,649.81 1,649.81 1,649.81 1,649.81
980.10
2,769.08 2,769.08 2,769.08 2,769.08 2,769.08 2,769.08 2,769.08
-
2,629.91 4,418.89 4,418.89 4,418.89 4,418.89 4,418.89 4,418.89 4,418.89
383,646.71
49,874.0749,874.07
483,394.85
10.62
48.75
-
3 4 5 6 7 8 9 10
1,649.78
495.68
443.88
32,573.55 32,573.55 32,573.55 32,573.55
2,769.08 2,769.08 2,769.08 2,769.08 2,769.13
-
251.36 251.36
-
4,418.86 2,769.08 2,769.08 3,264.76 35,342.68 32,573.55 32,824.91 33,268.79
-
Feb-1511 12 13 14 15 16 17 18
443.88 443.88 443.88 443.88 443.88 443.88 443.88 443.88
32,573.55 32,573.55 32,573.55 32,573.57
5,925.48 5,925.48 5,925.48 5,925.48
20,942.02 20,942.02 20,942.02 20,942.02
-
4,666.85 4,666.85 4,666.85 4,666.85 4,666.85 4,666.85 4,666.85 4,666.85
251.36 251.36 251.36 251.36 251.36 251.36 251.36 251.36
-
37,935.64 37,935.64 37,935.64 37,935.66 32,229.59 32,229.59 32,229.59 32,229.59
-
19 20 21 22 23 24 25 26
443.88 443.88 443.82
5,925.48 5,925.48 5,925.48 5,925.46
20,942.02 20,942.02 20,942.01
11,569.95 11,569.95 11,569.95 11,569.95
-
4,666.85 4,666.85 4,666.85 4,666.85 4,666.85 4,666.85 4,666.85 4,666.85
251.36 251.36 251.36 251.36 251.36 251.36 251.36 251.36
-
32,229.59 32,229.59 32,229.52 10,843.67 16,488.16 16,488.16 16,488.16 16,488.16
-
27 28 1 2 3 4 5 6
11,569.95 11,569.95 11,569.95 11,569.95 11,569.95 11,569.99
893.44 893.44 893.44
13,341.49 13,341.49 13,341.49 13,341.49
140.83 140.83
704.98 704.98
-
679.97 679.97
57.53 57.53
159.02 159.02
100.88 100.88
148.61 148.61
4,666.85 4,666.85 4,666.85 4,666.85 4,666.85 4,666.85 4,666.85 4,666.85
251.36 251.36 251.36 251.36 251.36 251.36 251.36 251.36
-
16,488.16 16,488.16 16,488.16 16,488.16 29,829.65 30,723.13 21,144.96 21,144.96
643,191.76
83,614.9383,614.93
810,421.62
17.80
66.55
-
7 8 9 10 11 12 13 14
893.44 893.44 893.44 893.44 893.44 893.44 893.44 893.44
13,341.49 13,341.49 13,341.49 13,341.49 13,341.49 13,341.49 13,341.49 13,341.49
140.83 140.83 140.83 140.83 140.83 140.83 140.83 140.83
704.98 704.98 704.98 704.98 704.98 704.98 704.98 704.98
-
679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97
57.53 57.53 57.53 57.53 57.53 57.53 57.53 57.53
159.02 159.02 159.02 159.02 159.02 159.02 159.02 159.02
100.88 100.88 100.88 100.88 100.88 100.88 100.88 100.88
148.61 148.61 148.61 148.61 148.61 148.61 148.61 148.61
4,933.31 4,933.31
4,666.85 4,666.85 4,666.85 4,666.85 4,666.85 4,666.73
3,376.72 3,376.72
251.36 251.36 251.36 251.43
-
21,144.96 21,144.96 21,144.96 21,145.03 20,893.60 20,893.48 24,536.78 24,536.78
-
Mar-1515 16 17 18 19 20 21 22
893.44 893.44 893.44 893.44 893.44 893.44 893.44 893.44
13,341.49 13,341.49 13,341.49 13,341.49 13,341.49 13,341.49 13,341.49 13,341.49
140.83 140.83 140.83 140.83 140.83 140.83 140.83 140.83
704.98 704.98 704.98 704.98 704.98 704.98 704.98 704.98
-
679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97
57.53 57.53 57.53 57.53 57.53 57.53 57.53 57.53
159.02 159.02 159.02 159.02 159.02 159.02 159.02 159.02
100.88 100.88 100.88 100.88 100.88 100.88 100.88 100.88
148.61 148.61 148.61 148.61 148.61 148.61 148.61 148.61
4,933.31 4,933.31 4,933.33
3,376.72 3,376.72 3,376.72
830.84 830.84 830.84 830.84 830.84
213.97 213.97 213.97 213.97 213.97
1,170.57 1,170.57 1,170.57 1,170.57 1,170.57
-
24,536.78 24,536.78 24,536.80 18,442.13 18,442.13 18,442.13 18,442.13 18,442.13
-
23 24 25 26 27 28 29 30
893.44 893.44 893.44 893.44 893.44 893.44 893.44 893.44
13,341.49 13,341.49 13,341.49 13,341.49 13,341.49 13,341.49 13,341.49 13,341.49
140.83 140.83 140.83 140.83 140.83 140.83 140.83 140.83
704.98 704.98 704.98 704.98 704.98 704.98 704.98 704.98
-
679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97
57.53 57.53 57.53 57.53 57.53 57.53 57.53 57.53
159.02 159.02 159.02 159.02 159.02 159.02 159.02 159.02
100.88 100.88 100.88 100.88 100.88 100.88 100.88 100.88
148.61 148.61 148.61 148.61 148.61 148.61 148.61 148.61
830.84 830.84 830.84 830.84 830.84 830.84 830.85
213.97 213.97 213.97 213.97 213.97 213.97 213.98
1,170.57 1,170.57 1,170.57 1,170.57 1,170.57 1,170.57 1,170.57
-
18,442.13 18,442.13 18,442.13 18,442.13 18,442.13 18,442.13 18,442.15 16,226.75
-
31 1 2 3 4 5 6 7
893.44 893.44 893.44 893.44 893.44 893.44 893.44 893.44
13,341.49 13,341.49 13,341.49 13,341.49 13,341.49 13,341.49 13,341.49 13,341.49
140.83 140.83 140.83 140.83 140.83 140.83 140.83 140.83
704.98 704.98 704.98 704.98 704.98 704.98 704.98 704.98
-
679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97
57.53 57.53 57.53 57.53 57.53 57.53 57.53 57.53
159.02 159.02 159.02 159.02 159.02 159.02 159.02 159.02
100.88 100.88 100.88 100.88 100.88 100.88 100.88 100.88
148.61 148.61 148.61 148.61 148.61 148.61 148.61 148.61
-
16,226.75 16,226.75 16,226.75 16,226.75 16,226.75 16,226.75 16,226.75 16,226.75
638,629.01
83,021.7783,021.77
804,672.55
17.68
84.23
-
Apr-158 9 10 11 12 13 14 15
893.44 893.44 893.44 893.44 893.44 893.44 893.44 893.44
13,341.49 13,341.49 13,341.49 13,341.49 13,341.49 13,341.49 13,341.49 13,341.49
140.83 140.83 140.83 140.83 140.83 140.83 140.83 140.83
704.98 704.98 704.98 704.98 704.98 704.98 704.98 704.98
-
679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97
57.53 57.53 57.53 57.53 57.53 57.53 57.53 57.53
159.02 159.02 159.02 159.02 159.02 159.02 159.02 159.02
100.88 100.88 100.88 100.88 100.88 100.88 100.88 100.88
148.61 148.61 148.61 148.61 148.61 148.61 148.61 148.61
-
16,226.75 16,226.75 16,226.75 16,226.75 16,226.75 16,226.75 16,226.75 16,226.75
-
16 17 18 19 20 21 22 23
893.44 893.44 893.44 893.44 893.44 893.44 893.44 893.44
13,341.49 13,341.49 13,341.49 13,341.49 13,341.49 13,341.49 13,341.49 13,341.49
140.83 140.83 140.83 140.83 140.83 140.83 140.83 140.76
704.98 704.98 704.98 704.98 704.98 704.98 704.98 704.92
-
679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.96
57.53 57.53 57.53 57.53 57.53 57.53 57.53 57.47
159.02 159.02 159.02 159.02 159.02 159.02 159.02 159.24
100.88 100.88 100.88 100.88 100.88 100.88 100.88 100.87
148.61 148.61 148.61 148.61 148.61 148.61 148.61 148.84
-
16,226.75 16,226.75 16,226.75 16,226.75 16,226.75 16,226.75 16,226.75 16,226.99
-
24 25 26 27 28 29 30 31
893.44 893.44 893.44 893.44 893.36
13,341.49 13,341.49 13,341.49 13,341.49 13,341.49 13,341.49 13,341.49
-
14,234.93 14,234.93 14,234.93 14,234.93 14,234.85 13,341.49 13,341.49 0.00
471,073.04
61,239.5061,239.49
593,552.03
13.04
97.27
-
3,514,289.32456,857.62456,857.60
4,428,004.54
-
OBRA
PROPIETARIO SUB REGION DE PADRE ABADCONTRATISTA CONSORCIO LA MARINAINSPECCION ING. CIRILO ALEJANDRO CIELO GARAY NUEVO MONTO DE CONTRATO S/. 5,140,385.73MONTO CONTRACTUAL S/. 4,551,699.49 AD. DIRECTO S/. 910,339.90 Fecha 03/09/14 CP N 750AD. DE MATERIALES S/. 1,820,679.80 Fecha 03/09/14 CP N 749
RESUMEN DE VALORIZACION N 12 - ENERO 2016
CONCEPTO
1.00.- VALORIZACION DE OBRA1.01 Valorizacin Mensual 4,400,599.63 19,175.61 4,419,775.24 96.68% 131,924.251.02 Reajuste por for. Pol. 60,113.23 0.00 60,113.23 0.001.03 Deducc. Reaj. Adel. Directo 3,099.32 0.00 3,099.32 0.001.04 Deduccin Reaj. Adel. Materiales 0.00 0.00 0.00 0.001.05 Reintegro Valoriz. Anterior 0.00 0.00 0.00 0.001.06 Reconocimiento Mayores Gastos Generales 0.00 0.00 0.00 0.001.07 Adicional de Obra N01 103,695.93 0.00 103,695.93 100.00%1.08 Adicional de Obra N02 292,866.96 0.00 292,866.96 97.16%1.09 Deductivo de Obra N01 -80,507.64 0.00 -80,507.64 100.00%
TOTAL VALORIZACION BRUTA (VB) 4,561,309.47 19,175.61 4,580,485.08 131,924.25
2.00.- AMORTIZACIONES 2.01 Por Adelanto directo 910,339.90 910,339.90 100.00% 0.002.02 Por Adelanto para Materiales 1,820,679.80 1,820,679.80 100.00% 0.00
TOTAL AMORTIZACIONES (A) 2,731,019.70 0.00 2,731,019.70 0.00
3.00.- VALORIZACION NETA (VN) 1,830,289.77 19,175.61 1,849,465.38 131,924.25
4.00.- FACTURACION- VALORIZACION NETA (VN) 1,830,289.77 19,175.61 1,849,465.38 131,924.25- I.G.V. (00% VN)
TOTAL A FACTURAR 1,830,289.77 19,175.61 1,849,465.38 131,924.25
RESUMEN
- TOTAL A FACTURAR 1,830,289.77 19,175.61 1,849,465.38 131,924.25- MULTA ATRASO EN EJEC. OBRA 0.00 0.00 0.00 0.00
TOTAL A CANCELAR AL CONTRATISTA 1,830,289.77 19,175.61 1,849,465.38 131,924.25
AVANCE REAL ACUMULADO 97.10%AVANCE PROGRAMADO ACUMULADO 97.10%
"MEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINA LA MARINA - PROVINCIA DE PADRE ABAD - REGION DE UCAYALI"
VAL. ACUMULADO
ANTERIORVALORIZACION
ACTUALVAL.
ACUMULADO ACTUAL
% DE AVANCE TOTAL
SALDO POR VALORIZAR
-
Item Descripcin ACTUAL
METRADO MONTO %
01 MEJORAMIENTO DE CALLES01.01 OBRAS PROVISIONALES01.01.01 ALQUILER DE ALMACEN 0.60 600.00 10.00
01.01.07 MOVILIZACION Y DESMOVILIZACION DE EQUIPO PESADO 0.20 1,139.20 20.00
01.02 TRABAJOS PRELIMINARES 0.0001.02.02 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS 0.20 2,400.00 20.00
01.03 MOVIMIENTO DE TIERRAS 0.0001.03.03 CORTE SUPERFICIAL MANUAL HASTA 0.15 MT EN VEREDA Y MARTILLO
150.00 4,630.50 31.50
01.03.06
900.00 40,725.00 15.63
03.02 OBRAS DE CONCRETO ARMADO 0.0003.02.01
134.54 44,262.31 9.72
03.02.02 ENCOFRADO Y DESENCOFRADO DE CANALETAS 1,023.52 27,420.10 10.40
03.02.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 1,508.20 8,008.54 2.34
03.02.04 WATER STOP NEOPRENE 6" EN CANALETAS 144.79 5,464.37 22.74
03.02.05
150.00 11,599.50 31.38
03.02.06 REJILLA METALICA CON MARCO 0.60x0.80 EN CANALETA 150.00 45,000.00 59.29
06 SEALIZACION 0.0006.04 SEALES PREVENTIVAS INCLUIDO POSTES DE SOPORTE 20.00 7,577.00 100.00
08.04 SEALIZACION 0.0008.04.01
1.50 279.77 30.00
08.04.02
3.00 262.77 30.00
08.05 MANEJO DE CAMPAMENTO 0.0008.06 EDUCACION AMBIENTAL 0.0008.06.01 CHARLAS AL PERSONAL DE OBRA 0.90 420.08 30.00
1,961,868.13 199,789.14255,042.86 25,972.59255,042.76 25,972.58
2,471,953.75 251,734.31
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO, PARA NIVELAR SUB RASANTE
CONCRETO F'C=210 KG/CM2 EN LOSA FONDO , MUROS Y TECHO DE CANALETAS
TAPAS DE CONCRETO PARA INSPECCION Y LIMPIEZA 0.60X0.60, F'c=210 kg/cm2
LETREROS DE SEALIZACION AMBIENTAL DE 1.00x0.50 M. C/PLANCHA METALICA e=1/40, BASTIDORES DE MADERA TORNILLO DE 1"X1.1/2"
LETREROS DE SEALIZACION AMBIENTAL DE 0.50x0.30 M. C/PLANCHA METALICA e=1/40, BASTIDORES DE MADERA TORNILLO DE 1"X1.1/2"
-
###
-
HOJA DE METRADOS - VALORIZACION N 06PROPIETARIO: GOBIERNO REGIONAL DE UCAYALI
OBRA :
FECHA : SETIEMBRE DEL 2013
PARTIDA DESCRIPCION UND
01 MEJORAMIENTO DE CALLES01.01 OBRAS PROVISIONALES01.01 ALQUILER DE ALMACEN MES01.06 MOVILIZACION Y DESMOVILIZACION DE EQUIPO PESADO HM
01.02 TRABAJOS PRELIMINARES
01.02.02 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS gbl01.02.03 CARTEL DE IDENTIFICACIN DE OBRA 8.50 X 3.60 MT. und.
01.03 MOVIMIENTO DE TIERRAS
01.03.03 CORTE SUPERFICIAL HASTA 0.10 m. MANUAL EN VEREDA Y MARTILLO M3MARTILLO
CALLE 22 lado derechoCALLE 23 lado derecho
lado ezquierdoAV. SAN PEDROlado derecho (Calle 20-calle 17)
lado ezquierdo (Calle 20-calle 17)lado ezquierdo (Calle 17-Jr. Vargas Guerra)lado ezquierdo (Pje. Vargas Guerra-Jr. Vargas Guerra)lado ezquierdo (Jr. Vargas Guerra-Av. San Pedro)lado ezquierdo (Jr. Vargas Guerra-Pje. San Pedro)lado ezquierdo (Pje. San Pedro-Jr. Garcilazo de la Vega)lado ezquierdo (Jr. Garcilazo de la Vega)lado derecho (Calle 17-calle 18)lado derecho (Calle 18-Pje. Vargas Guerra)lado derecho (Calle 18-Calle 22)lado derecho (Calle 22-Jr. Garcilazo de la Vega)lado derecho (Calle 22-Jr. Garcilazo de la Vega)
01.03.06 RELLENO CONPACTADO CON MATERIAL PRESTAMO, PARA NIVELAR SUB RASANTE m3.CALLE 23 Ver Metrado de ExplanacionesAV. SAN PEDROVer Metrado de Explanaciones
Ver Metrado de ExplanacionesJR. GARCILAZOVer Metrado de Explanaciones
03 OBRAS DE DRENAJE
03.02 CONCRETO ARMADO03.02.01 CONCRETO F'C=210 KG/CM2 EN LOSA FONDO , MUROS Y TECHO DE CANALETAS M3
CANALETAS
MEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINAL LA MARINA PADRE ABAD UCAYALI
-
CALLE 20 lado derechoCRUCE DE CALLESLosa de FondoMurosLosa de Techo
lado ezquierdoCRUCE DE CALLESLosa de FondoMurosLosa de Techo
BORDE DE PAVIMENTOLosa de FondoMuro Interior
Muro Exterior
CALLE 23 lado derechoCRUCE DE CALLESLosa de FondoMurosLosa de Techo
BORDE DE PAVIMENTOLosa de FondoMuro Interior
Muro Exterior
Losa de TechoDescontando area tapa registroDescontando area rejilla
lado ezquierdoCRUCE DE CALLESLosa de FondoMurosLosa de Techo
BORDE DE PAVIMENTOLosa de FondoMuro Interior
Muro Exterior
Losa de TechoDescontando area tapa registroDescontando area rejilla
-
JR. GARCILAZO DE LA lado derecho CRUCE DE CALLESLosa de FondoMurosLosa de Techo
lado ezquierdo CRUCE DE CALLESLosa de FondoMurosLosa de Techo
03.02.02 ENCOFRADO Y DESENCOFRADO DE CANALETAS m2CANALETAS
CALLE 20 lado derechoCRUCE DE CALLESMuros ext.Muros int.Losa de Techo
lado ezquierdoCRUCE DE CALLESMuros ext.Muros int.Losa de Techo
BORDE DE PAVIMENTO
Muro Interior
Muro Exterior
Losa de TechoDescontando area tapa registroDescontando area rejilla
CALLE 23 lado derechoCRUCE DE CALLESMuros ext.Muros int.Losa de Techo
BORDE DE PAVIMENTO
Muro Interior
Muro Exterior
-
Losa de TechoDescontando area tapa registroDescontando area rejilla
JR. GARCILAZO DE LA lado derecho CRUCE DE CALLESMuros ext.Muros int.Losa de Techo
BORDE DE PAVIMENTO
Muro Interior
Muro Exterior
Losa de TechoDescontando area tapa registroDescontando area rejilla
03.02.03 ACERO DE REFUERZO FY=4200 KG/CM2 kgCANALETAS
CALLE 20 lado derechoCRUCE DE CALLESLosa y muros
Acero 3/8" Longitudinal Acero 3/8" Transversales
Losa de TechoAcero 3/8" Longitudinal
Acero 3/8" Transversales
CALLE 23 lado derechoCRUCE DE CALLESLosa y muros
Acero 3/8" Longitudinal Acero 3/8" Transversales
Losa de TechoAcero 3/8" Longitudinal
Acero 3/8" Transversales
JR. GARCILAZO DE LA lado derecho CRUCE DE CALLESLosa y muros
Acero 3/8" Longitudinal Acero 3/8" Transversales
-
Losa de TechoAcero 3/8" Longitudinal
Acero 3/8" Transversales
lado ezquierdo CRUCE DE CALLESLosa y muros
Acero 3/8" Longitudinal Acero 3/8" Transversales
Losa de TechoAcero 3/8" Longitudinal
Acero 3/8" Transversales
03.02.04 WATER STOP NEOFRENO 6"x4MM EN CANALETAS mlCALLE 20 lado derecho 164.50
lado ezquierdo 166.00CALLE 23 lado derecho 66.00
lado ezquierdo 52.00AV. SAN PEDRO lado derecho (Cal 81.00
lado ezquierdo (C 107.00JR. GARCILAZO DE LA Jr. Garcilazo de 87.50
724.00
03.02.05 TAPAS DE CONCRETO PARA INSPECCION Y LIMPIEZA 0.60X0.60, F'c=210 kg/cm2 UND
CALLE 20CALLE 23AV. SAN PEDROJR. GARCILAZO DE LA VEGA
03.02.06 REJILLA METALICA CON MARCO 0.60x0.80 EN CANALETA UND
CALLE 20CALLE 22CALLE 23AV. SAN PEDROJR. GARCILAZO DE LA VEGA
06 SEALIZACION
06.04 SEALES PREVENTIVAS INCLUIDO POSTES DE SOPORTE UND
08.00 PLAN DE MANEJO AMBIENTAL08.04 SEALIZACION08.04.01 LETREROS DE SEALIZACION AMBIENTAL DE 1.00x0.50 M. C/PLANCHA METALICA UND
08.04.02 LETREROS DE SEALIZACION AMBIENTAL DE 0.50x0.30 M. C/PLANCHA METALICA UND
08.06 EDUCACION AMBIENTAL08.06.01 CHARLAS AL PERSONAL DE OBRA UND
-
HOJA DE METRADOS - VALORIZACION N 06
CANT.MEDIDAS
PARCIAL TOTALLARGO ANCHO ALTURA
0.60 0.60 0.600.20 1.00 1.00
1.00 1.00 1.001.00 1.00 1.00
150.00 150.00
1.00 23.65 1.20 0.10 2.841.00 37.24 1.20 0.10 4.471.00 37.30 1.20 0.10 4.481.00 106.00 1.20 0.10 12.721.00 105.50 1.20 0.10 12.661.00 216.31 1.20 0.10 25.961.00 18.40 1.20 0.10 2.211.00 7.20 1.20 0.10 0.861.00 133.65 1.20 0.10 16.041.00 33.45 1.00 0.10 3.351.00 72.75 1.20 0.10 8.731.00 67.70 1.20 0.10 8.121.00 121.34 1.20 0.10 14.561.00 100.00 1.20 0.10 12.001.00 90.00 1.00 0.10 9.001.00 100.00 1.20 0.10 12.00
900.001.00 69.07 69.071.00 93.53 93.531.00 703.37 703.371.00 34.03 34.03
134.54
MEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINAL LA MARINA PADRE ABAD UCAYALI
-
1.00 43.00 0.80 0.15 5.162.00 43.00 0.20 0.55 9.461.00 43.00 0.80 0.15 5.16
1.00 41.35 0.80 0.15 4.962.00 41.35 0.20 0.55 9.101.00 41.35 0.80 0.15 4.96
1.00 124.65 0.75 0.15 14.021.00 124.65 0.15 0.55 10.281.00 124.65 0.10 0.30 3.741.00 124.65 0.20 0.55 13.71
1.00 28.76 0.80 0.15 3.452.00 28.76 0.20 0.55 6.331.00 28.76 0.80 0.15 3.45
1.00 37.24 0.75 0.15 4.191.00 37.24 0.15 0.55 3.071.00 37.24 0.10 0.30 1.121.00 37.24 0.20 0.55 4.101.00 37.24 0.10 0.15 0.561.00 37.24 0.55 0.15 3.076.00 -0.60 0.55 0.15 -0.304.00 -0.80 0.55 0.15 -0.26
1.00 14.70 0.80 0.15 1.762.00 14.70 0.20 0.55 3.231.00 14.70 0.80 0.15 1.76
1.00 37.30 0.75 0.15 4.201.00 37.30 0.15 0.55 3.081.00 37.30 0.10 0.30 1.121.00 37.30 0.20 0.55 4.101.00 37.30 0.10 0.15 0.561.00 37.30 0.55 0.15 3.086.00 -0.60 0.55 0.15 -0.304.00 -0.80 0.55 0.15 -0.26
-
1.00 3.25 0.80 0.15 0.392.00 3.25 0.20 0.55 0.721.00 3.25 0.80 0.15 0.39
1.00 3.00 0.80 0.15 0.362.00 3.00 0.20 0.55 0.661.00 3.00 0.80 0.15 0.36
1,023.52
2.00 43.00 0.70 60.202.00 43.00 0.55 47.302.00 43.00 0.15 12.90
2.00 41.35 0.70 57.892.00 41.35 0.55 45.492.00 41.35 0.15 12.41
1.00 124.65 0.55 68.561.00 124.65 0.30 37.401.00 124.65 0.15 18.701.00 124.65 1.00 124.651.00 124.65 0.85 105.951.00 124.65 0.15 18.7022.00 -0.60 0.15 -1.9812.00 -0.80 0.15 -1.44
2.00 28.76 0.70 40.262.00 28.76 0.55 31.642.00 28.76 0.15 8.63
1.00 37.24 0.55 20.481.00 37.24 0.30 11.171.00 37.24 0.15 5.591.00 37.24 1.00 37.24
-
1.00 37.24 0.85 31.651.00 37.24 0.15 5.596.00 -0.60 0.15 -0.544.00 -0.80 0.15 -0.48
2.00 3.25 0.70 4.552.00 3.25 0.55 3.582.00 3.25 0.15 0.98
1.00 72.75 0.55 40.011.00 72.75 0.30 21.831.00 72.75 0.15 10.911.00 72.75 1.00 72.751.00 72.75 0.85 61.841.00 72.75 0.15 10.9112.00 -0.60 0.15 -1.086.00 -0.80 0.15 -0.72
1,508.20
11.00 43.00 Cof. = 0.58 274.34286.67 1.95 Cof. = 0.58 324.22
5.00 43.00 Cof. = 0.58 124.70286.67 0.65 Cof. = 0.58 108.07
11.00 28.76 Cof. = 0.58 183.49191.73 1.95 Cof. = 0.58 216.85
5.00 28.76 Cof. = 0.58 83.40191.73 0.65 Cof. = 0.58 72.28
11.00 3.25 Cof. = 0.58 20.7421.67 1.95 Cof. = 0.58 24.51
-
5.00 3.25 Cof. = 0.58 9.4321.67 0.65 Cof. = 0.58 8.17
11.00 3.00 Cof. = 0.58 19.1420.00 1.95 Cof. = 0.58 22.62
5.00 3.00 Cof. = 0.58 8.7020.00 0.65 Cof. = 0.58 7.54
144.791.00 13.71 2.40 32.901.00 13.83 2.40 33.191.00 5.50 2.40 13.201.00 4.33 2.40 10.391.00 6.75 2.40 16.201.00 8.92 2.40 21.411.00 7.29 2.40 17.50
150.00
43 43.0012 12.0071 71.0024 24.00
150.00
24.00 24.0018.00 18.008.00 8.0088.00 88.0012.00 12.00
20.001.00 20.00 20.00
1.00 1.50 1.50 1.50
1.00 3.00 3.00 3.00
1.00 0.90 0.90 0.90
-
VALORIZACION N 12 - ENERO 2016
Obra
Contratista CONSORCIO LA MARINA RESIDENTE: ING. CIRILO ALEJANDRO CIELO GARAY PLAZO EJECUCION: 270 DIAS
Cliente SUB REGION DE PADRE ABAD Distrito PADRE ABAD FECHA P.BASE JUNIO 2014 PERIODO : 01/05/2015 AL 31/09/2015Lugar JJVV LA MARINA CONTRATO: 002-2014-GRU-P-GSRPA-A MONTO CONTRATO : 4,551,699.49
Item Descripcin Unidad Metrado Precio Parcial ANTERIOR ACTUAL ACUMULADO SALDO
METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01 MEJORAMIENTO DE CALLES01.01 OBRAS PROVISIONALES01.01.01 ALQUILER DE ALMACEN MES 6.00 1,000.00 6,000.00 6.00 6,000.00 100.00 6.00 6,000.00 100.00 0.00 0.00 0.0001.01.02 REUBICACION DE POSTES DE LUZ und 10.00 498.62 4,986.20 10.00 4,986.20 100.00 10.00 4,986.20 100.00 0.00 0.00 0.0001.01.03 REUBICACION DE POSTES DE TELEFONO und 6.00 498.62 2,991.72 6.00 2,991.72 100.00 6.00 2,991.72 100.00 0.00 0.0001.01.04 DEMOLICION DE VEREDAS EXISTENTES m3 1,400.00 13.35 18,690.00 1,400.00 18,690.00 100.00 1,400.00 18,690.00 100.00 0.00 0.0001.01.05 NIVELACION DE BUZONES EN GENERAL und 24.00 300.96 7,223.04 24.00 7,223.04 100.00 24.00 7,223.04 100.00 0.00 0.0001.01.06 und 25.00 900.96 22,524.00
25.00 22,524.00 100.00 25.00 22,524.00 100.00 0.00 0.0001.01.07 MOVILIZACION Y DESMOVILIZACION DE EQUIPO PESADO hm 1.00 5,696.00 5,696.00 1.00 5,696.00 100.00 1.00 5,696.00 100.00 0.00 0.0001.02 TRABAJOS PRELIMINARES 0.00 0.00 0.00 0.00 0.0001.02.01 TRAZO, NIVELES Y REPLANTEO m2 20,328.29 1.14 23,174.25 20,328.29 23,174.25 100.00 20,328.29 23,174.25 100.00 0.00 0.0001.02.02 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS GLB 1.00 12,000.00 12,000.00 1.00 12,000.00 100.00 1.00 12,000.00 100.00 0.0001.02.03 CARTEL DE IDENTIFICACION DE LA OBRA 8.50 x 3.60M und 1.00 1,861.32 1,861.32 1.00 1,861.32 100.00 1.00 1,861.32 100.00 0.00 0.0001.02.04 LIMPIEZA DE TERRENO MANUAL m2 20,328.29 0.43 8,741.16 20,328.29 8,741.16 100.00 20,328.29 8,741.16 100.00 0.0001.03 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.0001.03.01 CORTE DE MATERIAL A NIVEL DE SUB-RASANTE m3 7,173.08 4.14 29,696.55 7,173.08 29,696.55 100.00 7,173.08 29,696.55 100.0001.03.02 CORTE DE TERRENO CON EQUIPO EN ZONA DE MATERIAL ORGANICO m3 85.61 5.79 495.68
85.61 495.68 100.00 85.61 495.68 100.00 0.00 0.0001.03.03 CORTE SUPERFICIAL MANUAL HASTA 0.15 MT EN VEREDA Y MARTILLO m3 476.23 30.87 14,701.22
476.23 14,701.22 100.00 476.23 14,701.22 100.00 0.00 0.0001.03.04 EXCAVACION MANUAL PARA CANALETAS EN TERRENO COMPACTO M3 1,661.91 43.21 71,811.13
1,661.91 71,811.13 100.00 1,661.91 71,811.13 100.00 0.00 0.0001.03.05 EXCAVACION MANUAL PARA UA DE CONCRETO EN TERRENO COMPACTO m3 123.27 43.21 5,326.50
123.27 5,326.50 100.00 123.27 5,326.50 100.00 0.00 0.0001.03.06 m3 5,758.86 45.25 260,588.42
5,758.86 260,588.42 100.00 5,758.86 260,588.42 100.00 0.00 0.0001.03.07 COMPACTACION Y CONFORMACION DE SUB-RASANTE m2 12,217.48 3.88 47,403.82 12,217.48 47,403.82 100.00 12,217.48 47,403.82 100.00 0.00 0.0001.03.08 RELLENO COMPACTADO CON MATERIAL PROPIO - MARTILLO m3 585.43 56.76 33,229.01 585.43 33,229.01 100.00 585.43 33,229.01 100.00 0.00 0.0001.03.09 ELIMINACION DE MATERIAL EXCEDENTE m3 14,001.35 10.47 146,594.13 14,001.35 146,594.14 100.00 14,001.35 146,594.14 100.00 0.00 0.0002 PAVIMENTOS 0.00 0.00 0.00 0.00 0.0002.01 BASE DE 0.20M 0.00 0.00 0.00 0.00 0.0002.01.01 BASE DE 0.20 M. m2 12,217.48 9.47 115,699.54 12,217.48 115,699.54 100.00 12,217.48 115,699.54 100.00 0.00 0.00 0.00 DEDUCTIVO 12,217.4802.02 OBRAS DE CONCRETO 0.00 0.00 0.00 0.00 0.00 0.00 0.0002.02.01 ENCOFRADO Y DESENCOFRADO LOSA DE CONCRETO m2 2,026.43 24.69 50,032.56 1,938.83 47,869.71 95.68 53.20 1,313.51 2.63 1,992.03 49,183.22 98.30 34.40 849.34 34.40 24.69 849.34 1,992.0302.02.02 PAVIMENTO DE CONCRETO F'C= 210 KG/CM2 E=0.20 M m2 12,217.48 65.52 800,489.29 11,593.06 759,577.29 94.89 180.32 11,814.95 1.62 11,790.48 772,512.25 96.51 427.00 27,977.04 427.00 65.52 27977.04 11,773.3802.02.03 ACERO CORRUGADO (BASTONES EN JUNTAS) kg 1,397.11 5.04 7,041.43 1,360.39 6,856.37 97.37 20.40 102.82 1.46 1,380.79 6,959.18 98.83 16.32 82.25 16.32 5.04 82.25 1,380.7902.02.04 ACERO LISO (BASTONES EN JUNTAS) - TRANVERSALES kg 5,621.84 6.27 35,248.94 5,477.37 34,343.11 97.43 78.80 494.08 1.40 5,556.17 34,837.19 98.83 65.67 411.75 65.67 6.27 411.75 5,556.1702.02.05 UA DE CONCRETO F'C= 210 KG/CM2 EN LOSA m3 102.73 330.95 33,998.49 100.66 33,313.43 97.99 0.87 287.93 0.85 101.53 33,601.35 98.83 1.20 397.14 1.20 330.95 397.14 101.5302.03 JUNTAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0002.03.01 JUNTA DE CONSTRUCCION CON TEKNOPORT m 513.65 5.60 2,876.44 495.15 2,772.84 96.40 12.50 70.00 2.43 507.65 2,842.84 98.83 6.00 33.60 6.00 5.60 33.60 507.6502.03.02 JUNTA DE CONTRACCION (E=1" H=2") m 2,054.58 3.87 7,951.22 2,001.13 7,744.37 97.40 29.45 113.97 1.43 2,030.58 7,858.34 98.83 24.00 92.88 24.00 3.87 92.88 2,030.5802.03.03 JUNTA DE DILATACION (E=1" H=8") m 1,027.29 4.91 5,043.99 995.79 4,889.33 96.93 19.50 95.75 1.90 1,015.29 4,985.08 98.83 12.00 58.91 12.00 4.91 58.92 1,015.2902.03.04 JUNTA LONGITUDINAL (E=1" H=8") m 1,712.15 4.34 7,430.73 1,667.15 7,235.43 97.37 25.00 108.50 1.46 1,692.15 7,343.93 98.83 20.00 86.80 20.00 4.34 86.80 1,692.1502.04 CURADO Y LIMPIEZA DE LOSA - VEREDA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0002.04.01 TENDIDO DE ARROCERA Y CURADO m2 16,120.37 1.21 19,505.65 15,495.95 18,750.10 96.13 137.97 166.94 0.86 15,633.92 18,917.05 96.98 486.45 588.60 486.45 1.21 588.60 15,633.9203 OBRAS DE DRENAJE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0003.01 TRABAJOS PRELIMINARES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0003.01.01 TRAZO, NIVELACION Y REPLANTEO EN CANALETAS ML 3,164.83 0.67 2,120.44 3,164.83 2,120.44 100.00 3,164.83 2,120.44 100.00 0.00 0.00 0.00 3,164.8303.02 OBRAS DE CONCRETO ARMADO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0003.02.01 m3 1,383.58 328.99 455,183.98 1,379.73 453,917.37 99.72 1,379.73 453,917.37 99.72 3.85 1,266.61 1,379.7303.02.02 ENCOFRADO Y DESENCOFRADO DE CANALETAS M2 9,840.37 26.79 263,623.51 8,608.32 230,616.89 87.48 8,608.32 230,616.89 87.48 1,232.05 33,006.62 8,608.3203.02.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 kg 64,559.21 5.31 342,809.41 57,877.59 307,330.00 89.65 57,877.59 307,330.00 89.65 6,681.62 35,479.41 57,877.5903.02.04 WATER STOP NEOPRENE 6" EN CANALETAS M 636.64 37.74 24,026.79 550.50 20,775.87 86.47 550.50 20,775.87 86.47 86.14 3,250.92 550.5003.02.05 und 478.00 77.33 36,963.74
478.00 36,963.74 100.00 478.00 36,963.74 100.00 0.00 0.00 0.00 478.0003.02.06 REJILLA METALICA CON MARCO 0.60x0.80 EN CANALETA GLB 253.00 300.00 75,900.00 253.00 75,900.00 100.00 253.00 75,900.00 100.00 0.00 0.00 0.00 253.0004 MURO DE CONTENCION 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0004.01 TRABAJOS PRELIMINARES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0004.01.01 TRAZO NIVEL Y REPLANTEO m2 529.60 1.73 916.21 529.60 916.21 100.00 529.60 916.21 100.00 0.00 0.00 0.00 529.6004.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00 0.00 0.0004.02.01 EXCAVACION MANUAL PARA CIMIENTO MURO m3 571.45 86.42 49,384.71 571.45 49,384.71 100.00 571.45 49,384.71 100.00 0.00 0.00 0.00 571.4504.02.02 RELLENO CON MATERIAL PROPIO - MURO DE CONTENCION m3 441.93 21.63 9,558.95 441.93 9,558.95 100.00 441.93 9,558.95 100.00 0.00 0.00 0.00 441.93
"MEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINA LA MARINA - PROVINCIA DE PADRE ABAD - REGION DE UCAYALI"
NIVELACION DE BUZONES, REPARACION DE TUBERIAS DE AGUA Y DESAGUE, NIVELACION DE CAJAS DE REJISTRO.
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO, PARA NIVELAR SUB RASANTE
CONCRETO F'C=210 KG/CM2 EN LOSA FONDO , MUROS Y TECHO DE CANALETAS
TAPAS DE CONCRETO PARA INSPECCION Y LIMPIEZA 0.60X0.60, F'c=210 kg/cm2
-
Item Descripcin Unidad Metrado Precio Parcial ANTERIOR ACTUAL ACUMULADO SALDO
METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
04.02.03 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MANUAL CON VOLQUETE m3 161.91 64.33 10,415.67161.91 10,415.67 100.00 161.91 10,415.67 100.00 0.00 0.00 0.00 161.91
04.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 0.00 0.00 0.00 0.0004.03.01 SOLADO DE CONCRETO E=0.10 M m2 529.60 20.19 10,692.62 529.60 10,692.62 100.00 529.60 10,692.62 100.00 0.00 0.00 0.00 529.6004.04 OBRAS DE CONCRETO ARMADO 0.00 0.00 0.00 0.00 0.00 0.00 0.0004.04.01 CONCRETO FC=210 KG/CM2 - EN MURO DE CONTENCION m3 302.42 333.61 100,890.34 302.42 100,890.34 100.00 302.42 100,890.34 100.00 0.00 0.00 0.00 302.4204.04.02 ENCOFRADO Y DESENCOFRADO DE MURO DE CONSTENCION m2 1,408.76 30.27 42,643.17 1,408.76 42,643.17 100.00 1,408.76 42,643.17 100.00 0.00 0.00 0.00 1,408.7604.04.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 kg 14,005.62 5.31 74,369.84 14,005.62 74,369.84 100.00 14,005.62 74,369.84 100.00 0.00 0.00 0.00 14,005.6204.04.04 TUBOS DE PVC D=3" C-7.5 SAP PARA LLORADORES m 184.50 21.52 3,970.44 184.50 3,970.44 100.00 184.50 3,970.44 100.00 0.00 0.00 0.00 184.5004.05 JUNTAS 0.00 0.00 0.00 0.00 0.00 0.00 0.0004.06 JUNTA DE CONSTRUCCION CON TEKNOPORT m 140.88 5.60 788.93 140.88 788.93 100.00 140.88 788.93 100.00 0.00 0.00 140.8805 VEREDAS Y MARTILLOS DE CONCRETO 0.00 0.00 0.00 0.00 0.00 0.00 0.0005.01 CONCRETO F'C= 175 KG/CM2 BRUADO EN VEREDAS DE MARTILLO E = 0.15 m. M2 515.39 47.86 24,666.57
515.39 24,666.57 100.00 515.39 24,666.57 100.00 0.00 0.00 0.00 515.3905.02 CONCRETO F'C=140 KG/CM2VEREDAS E=0.10 m m2 3,387.50 41.33 140,005.38 3,387.50 140,005.38 100.00 3,387.50 140,005.38 100.00 0.00 0.00 0.00 3,387.5005.03 CONCRETO F'C= 140 KG/CM2 EN UAS DE VEREDAS m3 53.17 317.54 16,883.60 53.17 16,883.60 100.00 53.17 16,883.60 100.00 0.00 0.00 53.1705.04 RAMPA DE ACCESOS DE CONCRETO EN VEREDAS. m2 259.30 38.45 9,970.09 259.30 9,970.09 100.00 259.30 9,970.09 100.00 0.00 0.00 259.3005.05 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 426.52 17.68 7,540.87 426.52 7,540.87 100.00 426.52 7,540.87 100.00 0.00 0.00 0.00 426.5205.06 JUNTAS DE DILATACION EN VEREDA E = 5 MM H=4" m 426.52 6.02 2,567.65 426.52 2,567.65 100.00 426.52 2,567.65 100.00 0.00 0.00 0.00 426.5205.07 JUNTAS DE CONSTRUCCION EN VEREDA E = 1" m 2,843.49 4.94 14,046.84 2,843.49 14,046.84 100.00 2,843.49 14,046.84 100.00 0.00 0.00 0.00 2,843.4906 SEALIZACION 0.00 0.00 0.00 0.00 0.00 0.00 0.0006.01 PINTURA TRAFICO EN LINEAS CONTINUAS EN PAVIMENTO M 342.43 20.70 7,088.30 330.00 6,831.00 96.37 12.43 257.30 3.63 342.43 7,088.30 100.00 0.00 0.00 0.00 342.4306.02 PINTURA DE SIMBOLOS Y LETRAS EN PAVIMENTO m2 932.45 20.70 19,301.72 920.00 19,044.00 98.66 12.45 257.72 1.34 932.45 19,301.72 100.00 0.00 0.00 0.00 932.4506.03 PINTURA EN SARDINEL DE CANALETA m 318.32 7.81 2,486.08 301.00 2,350.81 94.56 17.32 135.27 5.44 318.32 2,486.08 100.00 0.00 0.00 0.00 318.3206.04 SEALES PREVENTIVAS INCLUIDO POSTES DE SOPORTE und 20.00 378.85 7,577.00 20.00 7,577.00 100.00 20.00 7,577.00 100.00 0.00 0.00 20.0006.05 SEALES REGLAMENTARIAS INCLUIDO POSTES DE SOPORTE und 20.00 523.95 10,479.00 20.00 10,479.00 100.00 20.00 10,479.00 100.00 0.00 0.00 20.0007 VARIOS 0.00 0.00 0.00 0.00 0.00 0.00 0.0007.01 LIMPIEZA FINAL DE OBRA GLB 1.00 5,000.00 5,000.00 1.00 5,000.00 100.00 1.00 5,000.00 100.00 0.00 0.00 1.0008 PLAN DE MANEJO AMBIENTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.0008.01 NORMATIVIDAD AMBIENTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.0008.01.01 APLICACION DE NORMAS DE COMPORTAMIENTO mes 1.00 400.00 400.00 1.00 400.00 100.00 1.00 400.00 100.00 0.00 0.00 1.0008.01.02 SEGUIMIENTO Y CUMPLIMIENTO A LAS PAUTAS SOCIO AMBIENTALES
mes 1.00 500.00 500.00 1.00 500.00 100.00 1.00 500.00 100.00 0.00 0.00 1.0008.02 PLAN DE FORESTACION Y REVEGETACION 0.00 0.00 0.00 0.00 0.00 0.00 0.0008.02.01 COMO ORNAMENTACIN 0.00 0.00 0.00 0.00 0.00 0.00 0.0008.02.01.01 ARBOLES ORNAMENTALES 0.00 0.00 0.00 0.00 0.00 0.00 0.0008.02.01.01.01 TRAZO, REPLANTEO Y LIMPIEZA DE TERRENO m2 1,820.52 1.05 1,911.55 1,820.52 1,911.55 100.00 1,820.52 1,911.55 100.00 0.00 0.00 1,820.5208.02.01.01.02 ADQUISICION Y TRANSPORTE DE PLANTONES ORNAMENTALES. und 50.00 16.05 802.50
50.00 802.50 100.00 50.00 802.50 100.00 0.00 0.00 50.0008.02.01.01.03 PLANTADO DE PLANTONES ORNAMENTALES und 50.00 9.20 460.00 50.00 460.00 100.00 50.00 460.00 100.00 0.00 0.00 50.0008.02.01.02 GRAS 0.00 0.00 0.00 0.00 0.00 0.00 0.0008.02.01.02.01 TRAZO, REPLANTEO Y LIMPIEZA DE TERRENO m2 1,820.52 1.05 1,911.55 1,820.52 1,911.55 100.00 1,820.52 1,911.55 100.00 0.00 0.00 1,820.5208.02.01.02.02 ADQUISICION Y TRANSPORTE DE PLANTONES DE GRASS SACO/15M2 und 100.00 16.35 1,635.00
100.00 1,635.00 100.00 100.00 1,635.00 100.00 0.00 0.00 100.0008.02.01.02.03 PLANTADO DE GRASS AMERICANO m2 1,820.52 2.65 4,824.38 1,820.52 4,824.38 100.00 1,820.52 4,824.38 100.00 0.00 0.00 1,820.5208.03 MANEJO DE CANTERA 0.00 0.00 0.00 0.00 0.00 0.00 0.0008.03.01 MANEJO DEL AREA DE CANTERA DE AGREGADOS Y MATERIAL DE RELLENO GLB 1.00 800.00 800.00
1.00 800.00 100.00 1.00 800.00 100.00 0.00 0.00 1.0008.03.02 CONTROL DE POLVO EN MOVIMIENTO DE TIERRA Y TRASALADO A BOTADEROS mes 1.50 912.00 1,368.00
1.50 1,368.00 100.00 1.50 1,368.00 100.00 0.00 0.00 1.5008.04 SEALIZACION 0.00 0.00 0.00 0.00 0.00 0.00 0.0008.04.01 und 5.00 186.51 932.55
5.00 932.55 100.00 5.00 932.55 100.00 0.00 0.00 5.0008.04.02 und 10.00 87.59 875.90
10.00 875.90 100.00 10.00 875.90 100.00 0.00 0.00 10.0008.05 MANEJO DE CAMPAMENTO 0.00 0.00 0.00 0.00 0.00 0.00 0.0008.05.01 ADECUACION DE ALMACEN, OFICINAS, COMEDOR Y OTROS GLB 1.00 1,689.36 1,689.36 1.00 1,689.36 100.00 1.00 1,689.36 100.00 0.00 0.00 1.0008.05.02 RECOLECTORES DE RESIDUOS SOLIDOS TIPO BASCULANTE METALICO und 2.00 383.73 767.46
2.00 767.46 100.00 2.00 767.46 100.00 0.00 0.00 2.0008.05.03 INSTALACION DE LETRINA PORTATIL (FIBRA DE VIDRIO) und 2.00 1,847.45 3,694.90 2.00 3,694.90 100.00 2.00 3,694.90 100.00 0.00 2.0008.05.04 IMPLEMENTACION DE BOTIQUIN und 1.00 445.00 445.00 1.00 445.00 100.00 1.00 445.00 100.00 0.00 0.00 1.0008.06 EDUCACION AMBIENTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.0008.06.01 CHARLAS AL PERSONAL DE OBRA und 3.00 466.75 1,400.25 3.00 1,400.25 100.00 3.00 1,400.25 100.00 0.00 0.00 3.0008.06.02 CHARLAS A LA COMUNIDAD und 2.00 466.75 933.50 2.00 933.50 100.00 2.00 933.50 100.00 0.00 2.0008.06.03 POLOS DE ALGODON CON LOGOTIPO AMBIENTAL und 100.00 18.00 1,800.00 100.00 1,800.00 100.00 100.00 1,800.00 100.00 0.00 100.0008.06.04 und 100.00 3.50 350.00
100.00 350.00 100.00 100.00 350.00 100.00 0.00 0.00 100.0008.07 PROGRAMA DE SEGURIDAD Y CONTINGENCIA EN OBRA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0008.07.01 INSTALACION DE CINTAS DE SEGURIDAD ALREDEDOR DE LA OBRA ML 2,500.00 0.32 800.00 2,500.00 800.00 100.00 2,500.00 800.00 100.00 0.00 0.00 0.00 2,500.0008.07.02 PROGRAMA DE CONTINGENCIAS DURANTE LA EJECUCION DE LA OBRA GLB 1.00 1,300.00 1,300.00
1.00 1,300.00 100.00 1.00 1,300.00 100.00 0.00 0.00 0.00 1.0008.08 PROGRAMA DE ABANDONO DE OBRA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0008.08.01 RESTAURACION DEL AREA DE CAMPAMENTO Y REVEGETACION m2 200.00 2.06 412.00 200.00 412.00 100.00 200.00 412.00 100.00 0.00 200.0008.08.02 CIERRE DE CANTERAS m2 500.00 1.45 725.00 500.00 725.00 100.00 500.00 725.00 100.00 0.00 0.00 0.00 500.0008.08.03 CIERRE DE BOTADEROS m2 550.00 1.29 709.50 550.00 709.50 100.00 550.00 709.50 100.00 0.00 0.00 0.00 550.0008.09 PARTICIPACION CIUDADANA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
LETREROS DE SEALIZACION AMBIENTAL DE 1.00x0.50 M. C/PLANCHA METALICA e=1/40, BASTIDORES DE MADERA TORNILLO DE 1"X1.1/2"
LETREROS DE SEALIZACION AMBIENTAL DE 0.50x0.30 M. C/PLANCHA METALICA e=1/40, BASTIDORES DE MADERA TORNILLO DE 1"X1.1/2"
AFICHES AMBIENTALES DE 1.00x0.70 M. CON CARTULINA DUPLEX SEGUN MODELO
-
Item Descripcin Unidad Metrado Precio Parcial ANTERIOR ACTUAL ACUMULADO SALDO
METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
08.09.01 und 1.00 87.25 87.251.00 87.25 100.00 1.00 87.25 100.00 0.00 0.00 0.00 1.00
0.00 0.000.00 0.00
COSTO DIRECTO 3,612,459.93 3,492,539.33 15,218.74 3,507,758.07 0.00 104,701.86GASTOS GENERALES (13.000000%) 469,619.79 454,030.11 1,978.44 456,008.55 0.00 13,611.24UTILIDAD (12.99999950%) 469,619.77 454,030.10 1,978.44 456,008.54 0.00 13,611.24TOTAL PRESUPUESTO 4,551,699.49 4,400,599.54 19,175.61 4,419,775.15 0.00 131,924.34
0.00 0.00AVANCE PARCIAL 96.68% 0.42% 97.10% 2.90%
4,419,775.15
FORMACION DEL COMITE DE MANTENIMIENTO DE LA INFRAESTRUCTURA Y EQUIPOS
-
OBRA
PROPIETARIO SUB REGION DE PADRE ABADCONTRATISTA CONSORCIO LA MARINASUPERVISOR ING. CIRILO ALEJANDRO CIELO GARAYMONTO CONTRACTUAL S/. 4,551,699.49 ADELANTO DIRECTO S/. 910,339.90 9/3/2014ADELANTO MATERIALES S/. 1,820,679.80 9/3/2014
FECHA BASE 01/06/2014
C A L C U L O D E K
K = 0.242*(Mr/Mo) + 0.297*(CMr/CMo) + 0.139*(HHr/HHo) + 0.143*(AIr/AIo) + 0.179*(DMr/Dmo)
Simbolo Elemento Representativo Cdigo Coef. % Ind. Base Sep-14 Oct-14 Nov-14 Dec-14Monomio No. Inc. Jun-14 Indice K Indice K Indice K Indice K Indice K Indice K
M MANO DE OBRA 47 0.242 100.000% 498.10 523.70 523.70 523.70 523.700.25444 0.25444 0.25444 0.25444
CM MADERA PARA ENCOFRADO Y CARPINTERIA 43 0.297 11.785% 797.19 795.70 795.70 795.70 791.51CEMENTO PORTLAND TIPO I 21 88.215% 354.74 354.74 0.29693 354.74 0.29693 354.74 0.29693 375.64 0.31219
HH HERRAMIENTA MANUAL 37 0.139 7.914% 293.39 293.19 293.19 293.19 291.93HORMIGON 38 92.086% 844.07 847.66 0.13954 847.66 0.13954 847.66 0.13954 854.11 0.14047
AI INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.143 11.888% 400.98 402.72 402.72 402.72 404.55ACERO DE CONSTRUCCION CORRUGADO 3 88.112% 451.86 459.19 0.14512 459.19 0.14512 459.19 0.14512 491.87 0.15431
DM MAQUINA Y EQUIPO IMPORTADO 48 0.179 86.592% 338.46 337.96 337.96 337.96 343.61DLAR (GENERAL PONDERADO) 30 13.408% 387.37 386.98 0.17875 386.98 0.17875 386.98 0.17875 403.12 0.18233
C O E F I C I E N T E D E R E A J U S T E K = 1.000 1.015 1.015 1.015 1.044
NOTA : LOS INDICES UNIFICADOS CORRESPONDE AL MES DE DICIEMBRE DEL 2,014
"MEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINA LA MARINA - PROVINCIA
DE PADRE ABAD - REGION DE UCAYALI"
-
OBRA"MEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINA LA MARINA - PROVINCIA DE PADRE ABAD - REGION DE UCAYALI"
PROPIETARIO SUB REGION DE PADRE ABADCONTRATISTA CONSORCIO LA MARINAINSPECCION: ING. CIRILO ALEJANDRO CIELO GARAYMONTO CONTRACTUAL S/. 4,551,699.49 ADELANTO DIRECTO S/. 910,339.90 ADELANTO MATERIALES S/. 1,820,679.80
FECHA BASE 01/06/14
CALCULO DE REAJUSTES
VALORIZACION AVANCE PROGRAMADO AVANCE REAL COEFICIENTE REINTEGRO PROGRAMADO REINTEGRO REAL REINTEGRO RECONOCIDO% MENSUAL % ACUMULADO % MENSUAL % ACUMULADO DE REAJUSTE MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO
# MES MENSUAL A ACUMULADO MENSUAL B ACUMULADO K ( C = A * ( K - 1 ) ) ( C = B * ( K - 1 ) )
VALORIZACION N 01 Setiembre 2014 #REF! #REF! #REF! #REF! 9.14% 416,210.84 9.14% 416,210.84 1.015 #REF! #REF! 6,243.16 6,243.16 6,243.16 6,243.16
VALORIZACION N 02 Octubre2014 #REF! #REF! #REF! #REF! 8.99% 409,372.08 18.13% 825,582.92 1.015 #REF! #REF! 6,140.58 12,383.74 6,140.58 12,383.74
VALORIZACION N 03 Noviembre 2014 #REF! #REF! #REF! #REF! 19.57% 890,871.10 37.70% 1,716,454.02 1.015 #REF! #REF! 13,363.07 25,746.81 13,363.07 25,746.81
VALORIZACION N 04 Diciembre 2014 #REF! #REF! #REF! #REF! 4.26% 193,890.09 41.96% 1,910,344.11 1.015 #REF! #REF! 2,908.35 28,655.16 2,908.35 28,655.16
VALORIZACION N 05 Enero 2015 #REF! #REF! #REF! #REF! 0.42% 19,175.61 42.38% 1,929,519.72
VALORIZACION N 06 Febrero 2015 #REF! #REF! #REF! #REF!
VALORIZACION N 07 Marzo 2015 #REF! #REF! #REF! #REF!
VALORIZACION N 08 Abril 2015 #REF! #REF! #REF! #REF!
VALORIZACION N 09 Mayo2015 #REF! #REF! #REF! #REF!
REINTEGRO ACUMULADO VAL. CONTRACTUALES S/. 28,655.16
9.14 REINTEGRO PRESENTE VALORIZACIN
RESUMEN DE LAS VALORIZACIONES TRAMITADAS
VAL 1 VAL 2 VAL 3 VAL 4 VAL 5 VAL 6
COSTO DIRECTO 337,746.29 332,196.78 722,923.04 157,337.71 211,875.17 1,762,078.990GASTOS GENERALES (13%) 43,907.02 43,185.58 93,980.00 20,453.90 27,543.77UTILIDAD (10.2318025%) 34,557.53 33,989.72 73,968.06 16,098.48 21,678.65TOTAL PRESUPUESTO 416,210.84 409,372.08 890,871.10 193,890.09 261,097.59 2,171,441.70
AVANCE PARCIAL % 9.35% 9.20% 20.01% 4.36% 5.87%AVANCE ACUMULADO % 9.35% 18.55% 38.56% 42.92% 48.79%
-
OK? 18.55% 38.56% 42.92% 48.79%
-
OBRA
PROPIETARIO SUB REGION DE PADRE ABADCONTRATISTA CONSORCIO LA MARINAINSPECCION: ING. CIRILO ALEJANDRO CIELO GARAYMONTO CONTRACTUAL S/. 4,551,699.49 ADELANTO DIRECTO S/. 910,339.90
FECHA BASE 01/06/2014
AMORTIZACION DEL ADELANTO EN EFECTIVO
Saldo Monto Contractual a la S/. 4,551,699.49 fecha de entrega del A.D.
% del Adelanto Directo 20.00%
VALORIZACION AVANCE REAL AMORTIZ. ADELANTO DIRECTO SALDOPOR # % MENSUAL MENSUAL % ACUM. ACUMULADO MENSUAL ACUMULADO AMORTIZAR
VALORIZACION N 01 Setiembre 2014 9.14% 416,210.84 9.14% 416,210.84 83,242.17 83,242.17 827,097.73VALORIZACION N 02 Octubre2014 8.99% 409,372.08 18.13% 825,582.92 81,874.42 165,116.59 745,223.31VALORIZACION N 03 Noviembre 2014 19.57% 890,871.10 37.70% 1,716,454.02 178,174.22 343,290.81 567,049.09VALORIZACION N 04 Diciembre 2014 4.26% 193,890.09 41.96% 1,910,344.11 38,778.02 382,068.83 528,271.07VALORIZACION N 05 Enero 2015 5.74% 261,097.59 47.70% 2,171,441.70 52,219.52 434,288.35 476,051.55VALORIZACION N 06 Febrero 2015 0.42% 19,175.61 48.12% 2,190,617.31 3,835.12 438,123.47 472,216.43VALORIZACION N 07 Marzo 2015VALORIZACION N 08 Abril 2015VALORIZACION N 09 Mayo2015
AMORTIZACION ACUMULADA ADELANTO DIRECTO S/. 438,123.47
AMORTIZACION PRESENTE VALORIZACIN S/. 3,835.12
"MEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINA LA MARINA - PROVINCIA DE PADRE ABAD - REGION DE UCAYALI"
-
OBRA
PROPIETARIO SUB REGION DE PADRE ABADCONTRATISTA CONSORCIO LA MARINAINSPECCION: ING. CIRILO ALEJANDRO CIELO GARAYMONTO CONTRACTUAL S/. 4,551,699.49 ADELANTO DIRECTO S/. 910,339.90
FECHA BASE 41,791.00
DEDUCCION DE REINTEGRO QUE NO CORRESPONDEPOR ADELANTO DIRECTO
Frmula General (D.S. N 06-86-VC)
Donde :D = Deduccin de reajuste que no corresponde
A.D. = Adelanto Directo otorgadoC = Monto del Contrato PrincipalV = Valorizacin ejecutada, incluye Factor de RelacinK = Coeficiente de reajuste de la valorizacinKa = Coeficiente de reajuste del mes en que se otorg el Adelanto Directo
VALORIZACIONAVANCE REAL
Ka K DEDUCCION(Sin IGV)
# % MENSUAL MENSUAL % ACUM. ACUMULADO MENSUAL ACUMULADO
VALORIZACION N 01 Setiembre 2014 9.35% 416,210.84 9.35% 416,210.84 1.015 1.015 0.00 0.00VALORIZACION N 02 Octubre2014 9.20% 409,372.08 18.55% 825,582.92 1.015 1.015 0.00 0.00VALORIZACION N 03 Noviembre 2014 20.01% 890,871.10 38.56% 1,716,454.02 1.015 1.015 0.00 0.00VALORIZACION N 04 Diciembre 2014 4.36% 193,890.09 42.92% 1,910,344.11 1.015 1.044 1,107.94 1,107.94VALORIZACION N 05 Enero 2015 5.87% 261,097.59 48.79% 2,171,441.70 1.015 1.044 1,491.99 2,599.93VALORIZACION N 06 Febrero 2015VALORIZACION N 07 Marzo 2015VALORIZACION N 08 Abril 2015VALORIZACION N 09 Mayo2015
DEDUCCION ACUMULADA VAL. CONTRACTUALES 2,599.93
"MEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINA LA MARINA - PROVINCIA DE PADRE ABAD - REGION DE UCAYALI"
-
DEDUCCION PRESENTE VALORIZACIN 1,491.99
-
OBRA
PROPIETARIO SUB REGION DE PADRE ABADCONTRATISTA CONSORCIO LA MARINAINSPECCION ING. CIRILO ALEJANDRO CIELO GARAYMONTO CONTRACTUAL S/. 4,551,699.49 ADELANTO DIRECTO S/. 910,339.90 11/19/2013ADELANTO DE MATERIALES S/. 1,820,679.80 9/3/2014
FECHA BASE 01/06/14
AMORTIZACION DEL ADELANTO DE MATERIALES
Saldo Monto Contractual a la S/. 4,551,699.49 fecha de entrega del A.M. 9/3/2014
% del Adelanto de Materiales 40.00%
VALORIZACION AVANCE REALSALDOPOR
# MES % MENSUAL MENSUAL % ACUM. ACUMULADO MENSUAL ACUMULADO AMORTIZAR
VALOR. N 01 Setiembre 2014 9.14% 416,210.84 9.14% 416,210.84 166,484.34 166,484.34 1,654,195.46VALOR. N 02 Octubre 2014 8.99% 409,372.08 18.13% 825,582.92 163,748.83 330,233.17 1,490,446.63VALOR. N 03 Noviembre 2014 19.57% 890,871.10 37.70% 1,716,454.02 356,348.44 686,581.61 1,134,098.19VALOR. N 04 Diciembre 2014 4.26% 193,890.09 41.96% 1,910,344.11 77,556.04 764,137.65 1,056,542.15VALOR. N 05 Enero 2015 5.74% 261,097.59 47.70% 2,171,441.70 104,439.04 868,576.69 952,103.11VALOR. N 05 Febrero 2015 0.42% 19,175.61 48.12% 2,190,617.31 7,670.24 876,246.93 944,432.87
AMORTIZACION ACUMULADA ADELANTO DE MATERIALES S/. 876,246.93
AMORTIZACION PRESENTE VALORIZACIN S/. 7,670.24
"MEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINA LA MARINA - PROVINCIA DE
PADRE ABAD - REGION DE UCAYALI"
AMORTIZ. ADELANTO DE MATERIALES
-
VALORIZACION N 03 - NOVIEMBRE 2014
Obra
Contratista CONSORCIO LA MARINA SUPERVISOR:
Cliente SUB REGION DE PADRE ABAD FECHA P.BASE
Lugar JJVV LA MARINA CONTRATO:
Item Descripcin Parcial METRADOS MENSUALESPPTO. UND PRECIO
01 MEJORAMIENTO DE CALLES01.01 OBRAS PROVISIONALES01.01.01 ALQUILER DE ALMACEN 6,000.00 6.00 MES 1,000.00
01.01.02 REUBICACION DE POSTES DE LUZ 4,986.20 10.00 und 498.62
01.01.03 REUBICACION DE POSTES DE TELEFONO 2,991.72 6.00 und 498.62
01.01.04 DEMOLICION DE VEREDAS EXISTENTES 18,690.00 1,400.00 m3 13.35
01.01.05 NIVELACION DE BUZONES EN GENERAL 7,223.04 24.00 und 300.96
01.01.06 22,524.00 25.00 und 900.96
01.01.07 MOVILIZACION Y DESMOVILIZACION DE EQUIPO PESADO 5,696.00 1.00 hm 5,696.00
01.02 TRABAJOS PRELIMINARES
01.02.01 TRAZO, NIVELES Y REPLANTEO 23,174.25 20,328.29 m2 1.14
01.02.02 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS 12,000.00 1.00 GLB 12,000.00
01.02.03 CARTEL DE IDENTIFICACION DE LA OBRA 8.50 x 3.60M 1,861.32 1.00 und 1,861.32
01.02.04 LIMPIEZA DE TERRENO MANUAL 8,741.16 20,328.29 m2 0.43
01.03 MOVIMIENTO DE TIERRAS
01.03.01 CORTE DE MATERIAL A NIVEL DE SUB-RASANTE 29,696.55 7,173.08 m3 4.14
01.03.02 CORTE DE TERRENO CON EQUIPO EN ZONA DE MATERIAL ORGANICO 495.68 85.61 m3 5.79
01.03.03 CORTE SUPERFICIAL MANUAL HASTA 0.15 MT EN VEREDA Y MARTILLO 14,701.22 476.23 m3 30.87
01.03.04 EXCAVACION MANUAL PARA CANALETAS EN TERRENO COMPACTO 71,811.13 1,661.91 M3 43.21
01.03.05 EXCAVACION MANUAL PARA UA DE CONCRETO EN TERRENO COMPACTO 5,326.50 123.27 m3 43.21
01.03.06 260,588.42 5,758.86 m3 45.25
01.03.07 COMPACTACION Y CONFORMACION DE SUB-RASANTE 47,403.82 12,217.48 m2 3.88
01.03.08 RELLENO COMPACTADO CON MATERIAL PROPIO - MARTILLO 33,229.01 585.43 m3 56.76
01.03.09 ELIMINACION DE MATERIAL EXCEDENTE 146,594.13 14,001.35 m3 10.47
02 PAVIMENTOS
02.01 BASE DE 0.20M
02.01.01 BASE DE 0.20 M. 115,699.54 12,217.48 m2 9.47
02.02 OBRAS DE CONCRETO
02.02.01 ENCOFRADO Y DESENCOFRADO LOSA DE CONCRETO 50,032.56 2,026.43 m2 24.69
02.02.02 PAVIMENTO DE CONCRETO F'C= 210 KG/CM2 E=0.20 M 800,489.29 12,217.48 m2 65.52
02.02.03 ACERO CORRUGADO (BASTONES EN JUNTAS) 7,041.43 1,397.11 kg 5.04
02.02.04 ACERO LISO (BASTONES EN JUNTAS) - TRANVERSALES 35,248.94 5,621.84 kg 6.27
02.02.05 UA DE CONCRETO F'C= 210 KG/CM2 EN LOSA 33,998.49 102.73 m3 330.95
02.03 JUNTAS
02.03.01 JUNTA DE CONSTRUCCION CON TEKNOPORT 2,876.44 513.65 m 5.60
02.03.02 JUNTA DE CONTRACCION (E=1" H=2") 7,951.22 2,054.58 m 3.87
"MEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINA LA MARINA - PROVINCIA DE PADRE ABAD - REGION DE UCAYALI"
NIVELACION DE BUZONES, REPARACION DE TUBERIAS DE AGUA Y DESAGUE, NIVELACION DE CAJAS DE REJISTRO.
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO, PARA NIVELAR SUB RASANTE
-
02.03.03 JUNTA DE DILATACION (E=1" H=8") 5,043.99 1,027.29 m 4.91
02.03.04 JUNTA LONGITUDINAL (E=1" H=8") 7,430.73 1,712.15 m 4.34
02.04 CURADO Y LIMPIEZA DE LOSA - VEREDA
02.04.01 TENDIDO DE ARROCERA Y CURADO 19,505.65 16,120.37 m2 1.21
03 OBRAS DE DRENAJE
03.01 TRABAJOS PRELIMINARES
03.01.01 TRAZO, NIVELACION Y REPLANTEO EN CANALETAS 2,120.44 3,164.83 ML 0.67
03.02 OBRAS DE CONCRETO ARMADO
03.02.01 455,183.98 1,383.58 m3 328.99
03.02.02 ENCOFRADO Y DESENCOFRADO DE CANALETAS 263,623.51 9,840.37 M2 26.79
03.02.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 342,809.41 64,559.21 kg 5.31
03.02.04 WATER STOP NEOPRENE 6" EN CANALETAS 24,026.79 636.64 M 37.74
03.02.05 36,963.74 478.00 und 77.33
03.02.06 REJILLA METALICA CON MARCO 0.60x0.80 EN CANALETA 75,900.00 253.00 GLB 300.00
04 MURO DE CONTENSION
04.01 TRABAJOS PRELIMINARES
04.01.01 TRAZO NIVEL Y REPLANTEO 916.21 529.60 m2 1.73
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION MANUAL PARA CIMIENTO MURO 49,384.71 571.45 m3 86.42
04.02.02 RELLENO CON MATERIAL PROPIO - MURO DE CONTENCION 9,558.95 441.93 m3 21.63
04.02.03 10,415.67 161.91 m3 64.33
04.03 OBRAS DE CONCRETO SIMPLE
04.03.01 SOLADO DE CONCRETO E=0.10 M 10,692.62 529.60 m2 20.19
04.04 OBRAS DE CONCRETO ARMADO
04.04.01 CONCRETO FC=210 KG/CM2 - EN MURO DE CONTENCION 100,890.34 302.42 m3 333.61
04.04.02 ENCOFRADO Y DESENCOFRADO DE MURO DE CONSTENCION 42,643.17 1,408.76 m2 30.27
04.04.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 74,369.84 14,005.62 kg 5.31
04.04.04 TUBOS DE PVC D=3" C-7.5 SAP PARA LLORADORES 3,970.44 184.50 m 21.52
04.05 JUNTAS
04.06 JUNTA DE CONSTRUCCION CON TEKNOPORT 788.93 140.88 m 5.60
05 VEREDAS Y MARTILLOS DE CONCRETO
05.01 24,666.57 515.39 M2 47.86
05.02 CONCRETO F'C=140 KG/CM2VEREDAS E=0.10 m 140,005.38 3,387.50 m2 41.33
05.03 CONCRETO F'C= 140 KG/CM2 EN UAS DE VEREDAS 16,883.60 53.17 m3 317.54
05.04 RAMPA DE ACCESOS DE CONCRETO EN VEREDAS. 9,970.09 259.30 m2 38.45
05.05 ENCOFRADO Y DESENCOFRADO DE VEREDAS 7,540.87 426.52 m2 17.68
05.06 JUNTAS DE DILATACION EN VEREDA E = 5 MM H=4" 2,567.65 426.52 m 6.02
05.07 JUNTAS DE CONSTRUCCION EN VEREDA E = 1" 14,046.84 2,843.49 m 4.94
06 SEALIZACION
06.01 PINTURA TRAFICO EN LINEAS CONTINUAS EN PAVIMENTO 7,088.30 342.43 M 20.70
06.02 PINTURA DE SIMBOLOS Y LETRAS EN PAVIMENTO 19,301.72 932.45 m2 20.70
06.03 PINTURA EN SARDINEL DE CANALETA 2,486.08 318.32 m 7.81
06.04 SEALES PREVENTIVAS INCLUIDO POSTES DE SOPORTE 7,577.00 20.00 und 378.85
06.05 SEALES REGLAMENTARIAS INCLUIDO POSTES DE SOPORTE 10,479.00 20.00 und 523.95
07 VARIOS
07.01 LIMPIEZA FINAL DE OBRA 5,000.00 1.00 GLB 5,000.00
08 PLAN DE MANEJO AMBIENTAL
08.01 NORMATIVIDAD AMBIENTAL
08.01.01 APLICACION DE NORMAS DE COMPORTAMIENTO 400.00 1.00 mes 400.00
CONCRETO F'C=210 KG/CM2 EN LOSA FONDO , MUROS Y TECHO DE CANALETAS
TAPAS DE CONCRETO PARA INSPECCION Y LIMPIEZA 0.60X0.60, F'c=210 kg/cm2
ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MANUAL CON VOLQUETE
CONCRETO F'C= 175 KG/CM2 BRUADO EN VEREDAS DE MARTILLO E = 0.15 m.
-
08.01.02 SEGUIMIENTO Y CUMPLIMIENTO A LAS PAUTAS SOCIO AMBIENTALES 500.00 1.00 mes 500.00
08.02 PLAN DE FORESTACION Y REVEGETACION
08.02.01 COMO ORNAMENTACIN
08.02.01.01 ARBOLES ORNAMENTALES
08.02.01.01. TRAZO, REPLANTEO Y LIMPIEZA DE TERRENO 1,911.55 1,820.52 m2 1.05
08.02.01.01. ADQUISICION Y TRANSPORTE DE PLANTONES ORNAMENTALES. 802.50 50.00 und 16.05
08.02.01.01. PLANTADO DE PLANTONES ORNAMENTALES 460.00 50.00 und 9.20
08.02.01.02 GRAS
08.02.01.02. TRAZO, REPLANTEO Y LIMPIEZA DE TERRENO 1,911.55 1,820.52 m2 1.05
08.02.01.02. ADQUISICION Y TRANSPORTE DE PLANTONES DE GRASS SACO/15M2 1,635.00 100.00 und 16.35
08.02.01.02. PLANTADO DE GRASS AMERICANO 4,824.38 1,820.52 m2 2.65
08.03 MANEJO DE CANTERA
08.03.01 MANEJO DEL AREA DE CANTERA DE AGREGADOS Y MATERIAL DE RELLENO 800.00 1.00 GLB 800.00
08.03.02 1,368.00 1.50 mes 912.00
08.04 SEALIZACION
08.04.01 932.55 5.00 und 186.51
08.04.02 875.90 10.00 und 87.59
08.05 MANEJO DE CAMPAMENTO
08.05.01 ADECUACION DE ALMACEN, OFICINAS, COMEDOR Y OTROS 1,689.36 1.00 GLB 1,689.36
08.05.02 RECOLECTORES DE RESIDUOS SOLIDOS TIPO BASCULANTE METALICO 767.46 2.00 und 383.73
08.05.03 INSTALACION DE LETRINA PORTATIL (FIBRA DE VIDRIO) 3,694.90 2.00 und 1,847.45
08.05.04 IMPLEMENTACION DE BOTIQUIN 445.00 1.00 und 445.00
08.06 EDUCACION AMBIENTAL
08.06.01 CHARLAS AL PERSONAL DE OBRA 1,400.25 3.00 und 466.75
08.06.02 CHARLAS A LA COMUNIDAD 933.50 2.00 und 466.75
08.06.03 POLOS DE ALGODON CON LOGOTIPO AMBIENTAL 1,800.00 100.00 und 18.00
08.06.04 350.00 100.00 und 3.50
08.07 PROGRAMA DE SEGURIDAD Y CONTINGENCIA EN OBRA
08.07.01 INSTALACION DE CINTAS DE SEGURIDAD ALREDEDOR DE LA OBRA 800.00 2,500.00 ML 0.32
08.07.02 PROGRAMA DE CONTINGENCIAS DURANTE LA EJECUCION DE LA OBRA 1,300.00 1.00 GLB 1,300.00
08.08 PROGRAMA DE ABANDONO DE OBRA
08.08.01 RESTAURACION DEL AREA DE CAMPAMENTO Y REVEGETACION 412.00 200.00 m2 2.06
08.08.02 CIERRE DE CANTERAS 725.00 500.00 m2 1.45
08.08.03 CIERRE DE BOTADEROS 709.50 550.00 m2 1.29
08.09 PARTICIPACION CIUDADANA
08.09.01 87.25 1.00 und 87.25
COSTO DIRECTO 3,612,459.93GASTOS GENERALES (13%) 469,619.79UTILIDAD (10.2318025%) 369,619.77TOTAL PRESUPUESTO 4,451,699.49
CONTROL DE POLVO EN MOVIMIENTO DE TIERRA Y TRASALADO A BOTADEROS
LETREROS DE SEALIZACION AMBIENTAL DE 1.00x0.50 M. C/PLANCHA METALICA e=1/40, BASTIDORES DE MADERA TORNILLO DE 1"X1.1/2"
LETREROS DE SEALIZACION AMBIENTAL DE 0.50x0.30 M. C/PLANCHA METALICA e=1/40, BASTIDORES DE MADERA TORNILLO DE 1"X1.1/2"
AFICHES AMBIENTALES DE 1.00x0.70 M. CON CARTULINA DUPLEX SEGUN MODELO
FORMACION DEL COMITE DE MANTENIMIENTO DE LA INFRAESTRUCTURA Y EQUIPOS
-
AVANCE PARCIAL 100.00%
Existe 4 decimos de diferencia menos en los metradosal final se corregira de a cuerdo a las val ptdasm ejm
por lo q desde ah varia toda la columna en decimos,
RESUMEN DE LAS VALORIZACIONES TRAMITADAS
DESCRIPCION
COSTO DIRECTO
GASTOS GENERALES (13%)
UTILIDAD (10.2318025%)
TOTAL PRESUPUESTO
AVANCE PARCIAL %
AVANCE ACUMULADO %
OK?
no es .95 sino .99 en el Cdirecto del acumulado actual
-
METRADOS MENSUALES TOTAL VALORIZADOV-1 SET14 V-2 OCT14 V-3 NOV14 V-4 DIC14 V-5 ENE15 V-6 FEB15 V-7 MAR15 METRADO
1.00 1.00 0.50 0.50 0.60 3.6010.00 10.006.00 6.00
850.00 550.00 1,400.000.00
25.00 25.000.50 0.50
20,328.29 20,328.290.10 0.10 0.10 0.40 0.70
0.0020,328.29 20,328.29
1,531.37 1,105.49 3,157.00 5,793.86
85.61 85.61
247.47 247.47
396.22 845.62 223.48 1,465.32
0.00
3,142.88 1,480.00 4,622.884,029.64 5,760.00 9,789.64
0.00495.27 6,991.59 3,876.00 11,362.86
6,478.00 6,478.00
0.000.000.000.000.00
0.000.00
-
0.000.00
0.00
754.70 1,684.63 359.00 2,798.33
326.55 524.33 162.05 1,012.932,280.66 3,651.40 1,324.11 7,256.17
15,309.18 26,850.44 10,997.25 53,156.87154.47 232.44 386.91
0.000.00
529.60 529.60
571.45 571.45441.93 441.93
161.91 161.91
529.60 529.60
302.42 302.421,408.76 1,408.76
14,005.62 14,005.62184.50 184.50
140.88 140.88
0.000.000.000.000.000.000.00
0.000.000.000.000.00
0.00
0.00
-
0.00
0.00
0.000.00
0.00
0.000.00
0.50 0.20 0.70
1.00 0.20 1.20
2.00 1.50 3.50
5.00 2.00 7.00
1.00 1.00
0.002.00 2.001.00 1.00
1.00 1.10 2.101.00 0.40 1.40
70.00 70.00
0.00
1,500.00 500.00 2,000.00
0.50 0.20 0.70
0.000.000.00
0.00
-
PPTO actualExiste 4 decimos de diferencia menos en los metrados COSTO DIRECTO 3,612,459.93 1,762,078.95
al final se corregira de a cuerdo a las val ptdasm ejm GASTOS GENERALES (13%) 469,619.79 229,070.26UTILIDAD (10.2318025%) 369,619.77 180,292.44
por lo q desde ah varia toda la columna en decimos, TOTAL PRESUPUESTO 4,451,699.49 2,171,441.65
RESUMEN DE LAS VALORIZACIONES TRAMITADAS
VAL 1 VAL 2 VAL 3 VAL 4 VAL 5 VAL 6
337,746.29 332,196.78 722,923.04 157,337.71 211,875.17
43,907.02 43,185.58 93,980.00 20,453.90 27,543.77
34,557.53 33,989.72 73,968.06 16,098.48 21,678.65
416,210.84 409,372.08 890,871.10 193,890.09 261,097.59
9.35% 9.20% 20.01% 4.36% 5.87%
9.35% 18.55% 38.56% 42.92% 48.79%
18.55% 38.56% 42.92% 48.79%
no es .95 sino .99 en el Cdirecto del acumulado actual
-
TOTAL VALORIZADO SALDO X VALORIZARCOSTO % METRADO COSTO %
3,600.00 60.00 2.40 2,400.00 40.00 3,000.004,986.20 100.00 0.00 0.00 0.00 4,986.202,991.72 100.00 0.00 0.00 0.00 2,991.72
18,690.00 100.00 0.00 0.00 0.00 18,690.000.00 0.00 24.00 7,223.04 100.00 0.00
22,524.00 100.00 0.00 0.00 0.00 22,524.002,848.00 50.00 0.50 2,848.00 50.00 2,848.00
23,174.25 100.00 0.00 0.00 0.00 23,174.258,400.00 70.00 0.30 3,600.00 30.00 3,600.00
0.00 0.00 1.00 1,861.32 100.00 0.008,741.16 100.00 0.00 0.00 0.00 8,741.16
23,986.58 80.77 1,379.22 5,709.97 19.23 10,916.60
495.68 100.00 0.00 0.00 0.00 495.68
7,639.40 51.96 228.76 7,061.82 48.04 7,639.40
63,316.48 88.17 196.59 8,494.65 11.83 63,316.48
0.00 0.00 123.27 5,326.50 100.00 0.00
### 80.27 1,135.98 51,403.10 19.73 142,215.3237,983.80 80.13 2,427.84 9,420.02 19.87 15,635.00
0.00 0.00 585.43 33,229.01 100.00 0.00### 81.16 2,638.49 27,624.99 18.84 78,387.43
0.000.00
61,346.66 53.02 5,739.48 54,352.88 46.98 0.000.00
0.00 0.00 2,026.43 50,032.56 100.00 0.000.00 0.00 12,217.48 800,489.29 100.00 0.000.00 0.00 1,397.11 7,041.43 100.00 0.000.00 0.00 5,621.84 35,248.94 100.00 0.000.00 0.00 102.73 33,998.49 100.00 0.00
0.000.00 0.00 513.65 2,876.44 100.00 0.000.00 0.00 2,054.58 7,951.22 100.00 0.00
-
0.00 0.00 1,027.29 5,043.99 100.00 0.000.00 0.00 1,712.15 7,430.73 100.00 0.00
0.000.00 0.00 16,120.37 19,505.65 100.00 0.00
0.000.00
1,874.88 88.42 366.50 245.56 11.58 1,634.350.00
### 73.21 370.65 121,940.14 26.79 333,243.84### 73.74 2,584.20 69,230.72 26.26 194,392.80### 82.34 11,402.34 60,546.43 17.66 282,262.99
14,601.98 60.77 249.73 9,424.81 39.23 14,601.99
0.00 0.00 478.00 36,963.74 100.00 0.000.00 0.00 253.00 75,900.00 100.00 0.00
0.000.00
916.21 100.00 0.00 0.00 0.00 916.210.00
49,384.71 100.00 0.00 0.00 0.00 49,384.719,558.95 100.00 0.00 0.00 0.00 9,558.95
10,415.67 100.00 0.00 0.00 0.00 10,415.670.00
10,692.62 100.00 0.00 0.00 0.00 10,692.620.00
### 100.00 0.00 0.00 0.00 100,890.3442,643.17 100.00 0.00 0.00 0.00 42,643.1774,369.84 100.00 0.00 0.00 0.00 74,369.84
3,970.44 100.00 0.00 0.00 0.00 3,970.440.00
788.93 100.00 0.00 0.00 0.00 788.930.00
0.00 0.00 515.39 24