ENTIDAD : GERENCIA SUB REGIONAL DE CUTERVO INSPECTOR : ING. YSIDRO DIAZ ALARCON CONTRATISTA : CONSORCIO DEL NORTE MONTOS VALORIZADOS PROGRAMADOS MONTOS VALORIZADOS EJECUTAD MONTOS (Inc/ IGV) PORCENTAJES MONTOS (Inc/ IGV) MES PARCIAL ACUMUL. PARCIAL ACUMUL. MES PARCIAL ACUMUL. S/. S/. % % S/. S/. Jan-14 164443.39 164443.39 4.27 4.27 Jan-14 0.00 0.00 Feb-14 743653.84 908097.23 19.31 23.58 Feb-14 75760.48 75760.48 Mar-14 446309.84 1354407.07 11.59 35.17 Mar-14 505748.32 581508.80 Apr-14 1065548.31 2419955.38 27.67 62.84 Apr-14 0.00 581508.80 May-14 169639.81 2589595.19 4.40 67.24 May-14 0.00 581508.80 Jun-14 587665.98 3177261.17 15.26 82.50 Jun-14 0.00 581508.80 Jul-14 673872.13 3851133.30 17.50 100.00 Jul-14 0.00 581508.80 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA L DE SOCOTA - CUTERVO - CAJAMARCA Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 0 500,000 1,000,000 1,500,000 2,000,000 2,500,000 3,000,000 3,500,000 4,000,000 4,500,000 164443.39 908097.23 1354407.07 2419955.38 2589595.19 3177261.17 0.00 75760.48 581508.80 581508.80 581508.80 581508.80 GRAFICO DE AVANCE FINANCIERO PROGRAMADO VS EJECUTADO ACUMULADO PROGRAMADO EJECUTADO PLAZO DE EJECUCION (MESES) AVANCE MENSUAL ACUMULADO (S/.)

Upload: fredy-mendoza-santamaria

Post on 14-Dec-2015

13 views

Category:

Documents


3 download

DESCRIPTION

Valorización de obra Cutervo

TRANSCRIPT

Page 1: Valorización la Rioja Marzo 2014

ENTIDAD : GERENCIA SUB REGIONAL DE CUTERVOINSPECTOR : ING. YSIDRO DIAZ ALARCON CONTRATISTA : CONSORCIO DEL NORTE

MONTOS VALORIZADOS PROGRAMADOS MONTOS VALORIZADOS EJECUTADOS

MONTOS (Inc/ IGV) PORCENTAJES MONTOS (Inc/ IGV) PORCENTAJES

MES PARCIAL ACUMUL. PARCIAL ACUMUL. MES PARCIAL ACUMUL. PARCIAL ACUMUL.

S/. S/. % % S/. S/. % %

Jan-14 164443.39 164443.39 4.27 4.27 Jan-14 0.00 0.00 0.00 0.00

Feb-14 743653.84 908097.23 19.31 23.58 Feb-14 75760.48 75760.48 1.97 1.97

Mar-14 446309.84 1354407.07 11.59 35.17 Mar-14 505748.32 581508.80 13.13 15.10

Apr-14 1065548.31 2419955.38 27.67 62.84 Apr-14 0.00 581508.80 0.00 15.10

May-14 169639.81 2589595.19 4.40 67.24 May-14 0.00 581508.80 0.00 15.10

Jun-14 587665.98 3177261.17 15.26 82.50 Jun-14 0.00 581508.80 0.00 15.10

Jul-14 673872.13 3851133.30 17.50 100.00 Jul-14 0.00 581508.80 0.00 15.10

"AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOTA - CUTERVO - CAJAMARCA

Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-140

500,000

1,000,000

1,500,000

2,000,000

2,500,000

3,000,000

3,500,000

4,000,000

4,500,000

164443.39

908097.23

1354407.07

2419955.382589595.19

3177261.17

3851133.30

0.00 75760.48

581508.80 581508.80 581508.80 581508.80 581508.80

GRAFICO DE AVANCE FINANCIEROPROGRAMADO VS EJECUTADO ACUMULADO

PROGRAMADO

EJECUTADO

PLAZO DE EJECUCION (MESES)

AV

AN

CE

ME

NS

UA

L A

CU

MU

LA

DO

(S

/.)

Page 2: Valorización la Rioja Marzo 2014

ENTIDAD : GERENCIA SUB REGIONAL DE CUTERVOINSPECTOR : ING. YSIDRO DIAZ ALARCON CONTRATISTA : CONSORCIO DEL NORTE

TOTAL 3,851,133.30 TOTAL 581,508.80

Page 3: Valorización la Rioja Marzo 2014

ENTIDAD : GERENCIA SUB REGIONAL DE CUTERVOINSPECTOR : ING. YSIDRO DIAZ ALARCON CONTRATISTA : CONSORCIO DEL NORTE

MONTOS VALORIZADOS PROGRAMADOS MONTOS VALORIZADOS EJECUTADOS

MONTOS (Inc/ IGV) PORCENTAJES MONTOS (Inc/ IGV) PORCENTAJESMES PARCIAL ACUMUL. PARCIAL ACUMUL. MES PARCIAL ACUMUL. PARCIAL ACUMUL.

S/. S/. % % S/. S/. % %Jan-14 164443.39 164443.39 4.27% 4.27 Jan-14 0.00 0.00 0.00% 0.00%Feb-14 743653.84 908097.23 19.31% 23.58 Feb-14 75,760.48 75,760.48 1.97 1.97Mar-14 446309.84 1354407.07 11.59% 35.17 Mar-14 505,748.32 581,508.80 13.13 15.10Apr-14 1065548.31 2419955.38 27.67% 62.84 Apr-14 0.00 581,508.80 0.00 15.10May-14 169639.81 2589595.19 4.40% 67.24 May-14 0.00 581,508.80 0.00 15.10Jun-14 587665.98 3177261.17 15.26% 82.50 Jun-14 0.00 581,508.80 0.00 15.10

"AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOTA - CUTERVO - CAJAMARCA

Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14

0

20

40

60

80

100

120

4.27

23.58

35.17

62.8467.24

82.50

100.00

0.00% 1.97

15.10 15.10 15.10 15.10 15.10

GRAFICO DE AVANCE DE OBRAPROGRAMADO VS EJECUTADO ACUMULADO

PROGRAMADO

EJECUTADO

PLAZO DE EJECUCION (MESES)

AV

AN

CE

ME

NS

UA

L A

CU

MU

LA

DO

(S

/.)

Page 4: Valorización la Rioja Marzo 2014

ENTIDAD : GERENCIA SUB REGIONAL DE CUTERVOINSPECTOR : ING. YSIDRO DIAZ ALARCON CONTRATISTA : CONSORCIO DEL NORTE

Jul-14 673872.13 3851133.30 17.50% 100.00 Jul-14 0.00 581,508.80 0.00 15.10TOTAL 3,851,133.30 100.00% TOTAL 581,508.80 15.10

Page 5: Valorización la Rioja Marzo 2014

ENTIDAD : GERENCIA SUB REGIONAL DE CUTERVOINSPECTOR : ING. YSIDRO DIAZ ALARCON CONTRATISTA : CONSORCIO DEL NORTE

MONTOS VALORIZADOS PROGRAMADOS MONTOS VALORIZADOS EJECUTADOS

MONTOS (Inc/ IGV) PORCENTAJES MONTOS (Inc/ IGV) PORCENTAJES

MES PARCIAL ACUMUL. PARCIAL ACUMUL. MES PARCIAL ACUMUL. PARCIAL ACUMUL.

S/. S/. % % S/. S/. % %

Jan-14 48909.39 48909.39 1.27 1.27 Jan-14 0.00 0.00 0.00 0.00

Feb-14 169449.87 218359.26 4.40 5.67 Feb-14 75760.48 75760.48 1.97 1.97

Mar-14 507964.48 726323.74 13.19 18.86 Mar-14 505748.32 581508.80 13.13 15.10

Apr-14 666631.17 1392954.91 17.31 36.17 Apr-14 0.00 0.00 0.00 0.00

May-14 965479.12 2358434.03 25.07 61.24 May-14 0.00 0.00 0.00 0.00

Jun-14 780239.61 3138673.64 20.26 81.50 Jun-14 0.00 0.00 0.00 0.00

Jul-14 712459.66 3851133.30 18.50 100.00 Jul-14 0.00 0.00 0.00 0.00

"AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOTA - CUTERVO - CAJAMARCA

Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-140

500,000

1,000,000

1,500,000

2,000,000

2,500,000

3,000,000

3,500,000

4,000,000

4,500,000

48909.39218359.26

726323.74

1392954.91

2358434.03

3138673.64

3851133.30

0.00 75760.48

581508.80

GRAFICO DE AVANCE FINANCIEROPROGRAMADO VS EJECUTADO ACUMULADO MES DE MARZO 2014

PROGRAMADO

EJECUTADO

PLAZO DE EJECUCION (MESES)

AV

AN

CE

ME

NS

UA

L A

CU

MU

LA

DO

(S

/.)

Page 6: Valorización la Rioja Marzo 2014

ENTIDAD : GERENCIA SUB REGIONAL DE CUTERVOINSPECTOR : ING. YSIDRO DIAZ ALARCON CONTRATISTA : CONSORCIO DEL NORTE

TOTAL 3,851,133.30 TOTAL 581,508.80

Page 7: Valorización la Rioja Marzo 2014

ENTIDAD : GERENCIA SUB REGIONAL DE CUTERVOINSPECTOR : ING. YSIDRO DIAZ ALARCON CONTRATISTA : CONSORCIO DEL NORTE

MONTOS VALORIZADOS PROGRAMADOS MONTOS VALORIZADOS EJECUTADOS

MONTOS (Inc/ IGV) PORCENTAJES MONTOS (Inc/ IGV) PORCENTAJESMES PARCIAL ACUMUL. PARCIAL ACUMUL. MES PARCIAL ACUMUL. PARCIAL ACUMUL.

S/. S/. % % S/. S/. % %Jan-14 48,909.39 48,909.39 1.27% 1.27 Jan-14 0.00 0.00 0.00% 0.00%Feb-14 169,449.87 218,359.26 4.40% 5.67 Feb-14 75,760.48 75,760.48 1.97 1.97Mar-14 507,964.48 726,323.74 13.19% 18.86 Mar-14 505,748.32 581,508.80 13.13 15.10Apr-14 666,631.17 1,392,954.91 17.31% 36.17 Apr-14 0.00 0.00 0.00 0.00May-14 965,479.12 2,358,434.03 25.07% 61.24 May-14 0.00 0.00 0.00 0.00Jun-14 780,239.61 3,138,673.64 20.26% 81.50 Jun-14 0.00 0.00 0.00 0.00

"AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOTA - CUTERVO - CAJAMARCA

Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14

0

20

40

60

80

100

120

1.275.67

18.86

36.17

61.24

81.50

100.00

0.00% 1.97

15.10

GRAFICO DE AVANCE DE OBRAPROGRAMADO VS EJECUTADO ACUMULADO MES DE MARZO 2014

PROGRAMADO

EJECUTADO

PLAZO DE EJECUCION (MESES)

AV

AN

CE

ME

NS

UA

L A

CU

MU

LA

DO

(S

/.)

Page 8: Valorización la Rioja Marzo 2014

ENTIDAD : GERENCIA SUB REGIONAL DE CUTERVOINSPECTOR : ING. YSIDRO DIAZ ALARCON CONTRATISTA : CONSORCIO DEL NORTE

Jul-14 712,459.66 3,851,133.30 18.50% 100.00 Jul-14 0.00 0.00 0.00 0.00TOTAL 3,851,133.30 100.00% TOTAL 581,508.80 15.10

Page 9: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC Modalidad de Ejecucion: SUMA ALZADA

PROYECTO Plazo de Ejecucion: 180 DIAS CALENDARIOS

Valor Referencial S/. 3,851,133

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO Monto Ofertado S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA Fecha Base 12/10/2012

CONTRATISTA : Consorcio del Norte Factor de Relacion 1.00000

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS

CONTROL GENERAL DE VALORIZACIONES: MES DE MARZO 2014DE ACUERDO A ACTA DE CONCILIACION EXTRAJUDICIAL N°01 DEL 27/03/2014

ITEM CONCEPTO PARCIAL TOTAL

1.0.0 Valorización Contractual1.0.1. Valorización Contractual 428,600.27

1.1.0 Reintegros 1.1.1 Reajuste reconocido 34,588.04 1.2.0 Reintegros de Reajuste1.2.1 Reintegros de Reajuste Valorizaciones 0.00 1.3.0 VALORIZACION1.3.1 MONTO DE VALORIZADO SIN IGV 463,188.31

TOTAL MONTO BRUTO (A) 463,188.31 2.0.0 DESCUENTOS

2.1.0 Amortización del Adelanto Directo2.1.1 Amortización del Adelanto Directo

2.2.0 Amortización Adelanto de Materiales 85,720.05 101,149.66 2.2.1 Amortización del Adelanto de Materiales

2.3.0 Deducción que no corresponde Adelanto Directo2.3.1 Deducción que no corresponde Adelanto Directo

2.4.0 Deducción que no corresponde Adelanto Materiales2.4.1 Deducción que no corresponde Adelanto Materiales

2.5.0 Retencion 10% fiel cumplimiento2.5.1 Retencion 10% fiel cumplimiento 0.00

TOTAL DESCUENTOS (B) 85,720.05

TOTAL NETO ( A-B) 377,468.26

TOTAL A CANCELAR AL CONTRATISTA SIN IGV 377,468.26 I.G.V. 18.00% 67,944.29

TOTAL A CANCELAR AL CONTRATISTA 445,412.55 Son: Cuatrocientos Ochenta y Seis mil doscientos veinte y seis con 43/100 NUEVOS SOL

Amortizacion de el adelanto Materiales Solicitado a la entidad sin IGV 171,440.11 Amortizacion de el adelanto Materiales Solicitado a la entidad con IGV 202,299.33 Total a Cancelar por parte de la Entidad Valorizacion N°03 Mes de Marzo sin IGV 291,748.20 Total a Cancelar por parte de la Entidad Valorizacion N°03 Mes de Marzo con IGV 344,262.88

0302006 "Ampliacion, Mejoramiento del Servixcio Educativo de la I.E Manuel Pardo y Lavalle C.P Pampa La Rioja, Distrito de Socota - Cutervo - Cajamarca

Por Solicitud se le pide a la entidad la Amortizacion del 40% del porcentaje de la carta Fianza de adelanto de Materiales para la Valorizacion respectiva, Ya que hay paralizacion de Obra y modificacion de Exp Tecnico y debemos de amortizar las fianzas

Page 10: Valorización la Rioja Marzo 2014

ADJUDICACION : LICITACION PUBLICA N° 001-2011-MDC

PROYECTO

ENTIDAD : MUNICIPALIDAD DISTRITAL DE CUMBA

UBICACIÓN : CUMBA-UTCUBAMBA-AMAZONAS

CONTRATISTA : CONSORCIO AMAZONAS

SUPERVISOR : INGº LUIS MIGUEL ROJAS CASTILLO

MONTO CONTRATADO : S/. 1,126,889.00 Inc/IGV S/. 954,990.68 Sin/IGV

CALCULO DE REINTEGROSVALORIZACION Nº 02

DEL 01 de NOVIEMBRE AL 30 DE NOVIEMBRE DEL 2011

MES

VAL. PROGRAMADO EJECUTADO Nº

MES ACUMUL,%

MES ACUMUL.ACUMUL.

Oct-11 Nº 01 40, 867.36 40, 867.36 4.28% 410,261.32 410,261.32

410,261.32

RESUMEN :Reajuste Total Reconocido 0.00

Reajuste Reconocido en la Valorización Nº01 0.00

Reajuste Reconocido en la Valorización Nº02 0.00

Reajuste Reconocido en la Valorización Nº03 0.00

Reajuste Reconocido en la Valorización Nº04 0.00

Reajuste Reconocido en la Valorización Nº05 0.00

Reajuste Reconocido en la Valorización Nº06 0.00

Reajuste Reconocido en la Valorización Nº07 0.00

: CONSTRUCCION MEJORAMIENTO, REHABILITACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO LOCALIDAD CUMBA, UTCUBAMBA, AMAZONAS

Page 11: Valorización la Rioja Marzo 2014

CALCULO DE REINTEGROSVALORIZACION Nº 02

DEL 01 de NOVIEMBRE AL 30 DE NOVIEMBRE DEL 2011

EJECUTADO

K-1

REAJUSTES % PROGRAMADO EJECUTADO

RECONOCIDOACUMUL. MES ACUMUL. MES ACUMUL.

42.96% 0.00 0.00 0.00

0.00

: CONSTRUCCION MEJORAMIENTO, REHABILITACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO

Page 12: Valorización la Rioja Marzo 2014
Page 13: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC Modalidad de Ejecucion: SUMA ALZADA

PROYECTO Plazo de Ejecucion: 180 DIAS CALENDARIOS

Valor Referencial S/. 3,851,133

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO Monto Ofertado S/. 3,851,133UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA Fecha Base 12/10/2012CONTRATISTA : CONSORCIO DEL NORTE Factor de Relacio 1.00000RESIDENTE : : ING. CIVIL ALBERTO GUERRERO FOWKS

CONTROL DE VALORIZACIONES EJECUTADAS VS. PROGRAMADASDE ACUERDO A ACTA DE CONCILIACION EXTRAJUDICIAL N°01 DEL 27/03/2014

Cuadro N°01 De Ejecucion de proyecto

MES VAL N°

PROGRAMADO EJECUTADO

Feb-14 Nº 01 727, 855.79 727, 855.79 18.90% , 0.00 , 0.00 0.00% 0.00%

Mar-14 Nº 02 626, 551.28 1354, 407.07 16.27% 75, 760.48 75, 760.48 1.97% 12.09%

Apr-14 Nº 03 1065, 548.31 2419, 955.38 27.67% 505, 748.32 581, 508.80 15.10% 47.46%

May-14 Nº 04 169, 639.81 2589, 595.19 4.40%

Jun-14 Nº 05 587, 665.98 3177, 261.17 15.26%

Jul-14 Nº 06 673, 872.13 3851, 133.30 17.50%

3,851,133.30 581,508.80

Cuadro N°02 De Ejecucion de proyecto Reformulado de acuerdo al inicio de 24 de enero del 2014

MES VAL N°

Programado Reformulado a el Inicio Ejecutado

Jan-14 Nº 01 164, 443.39 164, 443.39 4.27% , 0.00 , 0.00 0.00% 0.00%

Feb-14 Nº 02 743, 653.84 743, 653.84 19.31% 75, 760.48 75, 760.48 1.97% 10.19%

Mar-14 Nº 03 446, 309.84 1189, 963.68 11.59% 505, 748.32 581, 508.80 15.10% 113.32%

Apr-14 Nº 04 1065, 548.31 2255, 511.99 27.67%

May-14 Nº 05 169, 639.81 2425, 151.80 4.40%

Jun-14 Nº 06 587, 665.98 3012, 817.78 15.26%

Jul-14 Nº 07 673, 872.13 3686, 689.91 17.50%

3,851,133.30 100.00 581,508.80

3'851, 133.30 ', 0.00

Cuadro N°03 De Ejecucion de proyecto Reformulado de acuerdo alo real con modificaciones al proyecto original, Acta de Conciliacion

MES VAL N°

Programado Reformulado a el Inicio Ejecutado

Avance Mensual

Jan-14 Nº 01 48, 909.39 48, 909.39 1.27% 1.27% , 0.00 , 0.00 0.00% 0.00% 0.00%

Feb-14 Nº 05 169, 449.87 218, 359.26 4.40% 5.67% 75, 760.48 75, 760.48 1.97% 1.97% 34.70%

Mar-14 Nº 03 507, 964.48 726, 323.74 13.19% 18.86% 505, 748.32 581, 508.80 13.13% 15.10% 80.06%

Apr-14 Nº 02 666, 631.17 1392, 954.91 17.31% 36.17%

May-14 Nº 04 965, 479.12 2358, 434.03 25.07% 61.24%

Jun-14 Nº 06 780, 239.61 3138, 673.64 20.26% 81.50%

Jul-14 Nº 07 712, 459.66 3851, 133.30 18.50% 100.00%

3,851,133.30 100.00 100.00 581,508.80 657,269.28 15.10 17.07 1.15

3'851, 133.30 ', 0.00

0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOT - CUTERVO - CAJAMARCA

% EJEC./ PROG.

Avance Mensual

Avance Acumulado

Porcentaje de Avance

Avance Mensual

Avance Acumulado

Porcentaje de Avance

% EJEC./ PROG.

Avance Mensual

Avance Acumulado

Porcentaje de Avance

Avance Mensual

Avance Acumulado

Porcentaje de Avance

% EJEC./ PROG.

Avance Acumulado

Porcentaje de Avance

Porcentaje Acumulado

Avance Mensual

Avance Acumulado

Porcentaje de Avance

Porcentaje Acumulado

* La Ejecucion del mes de Enero del 2014 programado comprende a los dias 25,26,27,28,29,30,31, que corresponde a 18.90/31*7=4.27%, pero no se ejecuta por mal estado climatico

* Con ligero retraso que se regularizara cuando se apruebe la ampliacion de plazo N°01 Y Se elabore nuevo cronograma de ejecucion de Obra, Se sustentara lluvias desde el 25/01/2013 hasta el 03 de marzo fecha de la paralizacion de Obra, Deacuerdo a Conciliacion Extrajudicial

* La Ejecucion del mes de Febrero 2014 programada seria los 24 dias que queda de enero 18.90%-4.27%=14.63% + 35.17%/30*4=4.68%, total de = 19.31%, continua el pesimo estado climatico impidiendo el acceso para dejar materiales, asi mismos la ejecucion de la nueva rasante, impide que podamos hacer excavacion para la cimentacion, y la falta de una ruta afirmada imposibilitan que se lleguen los materiales a obra.

* Solo se ha ejecutado la partida de Movimiento de Tierras, debido a factores climaticos, los fletes corresponden a el transporte de la maquinaria y su provision tambien, comprenden un poco de material puesto en cancha, no se ha podido ejecutar normalmente la partida de flete terrestre, y las demas partidas ligadas a la ejecucion, aun no se pueden iniciar por modificacion a la rasante (Volumen de Corte llegara a 20,000.00 m3 mas), incluida eliminacion de material.

Page 14: Valorización la Rioja Marzo 2014

* Esperamos el tiempo mejore, para reanudar el transporte y la entidad termine el afirmado de acceso a la obra, esperamos definir sobre la nueva rasante.

Page 15: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

VALOR REFERENCIAL S/. 3,851,133

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO MONTO OFERTADO S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA FECHA BASE 12/10/2012

CONTRATISTA : CONSORCIO DEL NORTE FACTOR DE RELACION 1.00000

RESIDENTE : : ING. CIVIL ALBERTO GUERRERO FOWKS

CONTROL GENERAL DE VALORIZACIONES: MES DE MARZO 2014DE ACUERDO A ACTA DE CONCILIACION EXTRAJUDICIAL N°01 DEL 27/03/2014

PERIODO VALORIZADO VAL. MONTO

REAJUSTES REINTEGROAMORT. ADELANTOS DEDUCCIONES VALORIZ. IGV NETO A

Nº BRUTO DIRECTO MATERIALES DIRECTO MATERIALES NETA 18.00% PAGARMES DE ENERO 2014 01 0 0.000 0.00 0.00 0.00 0.00 0.00 0.00MES DE FEBRERO 2014 02 64,203.80 1.081 5,181.25 0.00 12,840.76 56,544.29 10,177.97 66,722.26MES DE MARZO 2014 03 428,600.27 1.081 34,588.04 0.00 85,720.05 377,468.26 67,944.29 445,412.54

492,804.07 2.161 39,769.29 0.00 98,560.81 0.00 0.00 434,012.54 78,122.26 512,134.80

0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOT - CUTERVO - CAJAMARCA

Page 16: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

VALOR REFERENCIAL S/. 3,851,133

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO MONTO OFERTADO S/. 3,851,133UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA FECHA BASE 12/10/2012CONTRATISTA : CONSORCIO DEL NORTE FACTOR DE RELACION 1.00000RESIDENTE : : ING. CIVIL ALBERTO GUERRERO FOWKS

CALCULO DEL FACTOR DE REAJUSTE " K " FORMULA POLINOMICA N°01

MONTO DE LA OFERTA S/. 3,851,133.30

FECHA BASE : 12/10/2012

AREA GEOGRAFICA : 1

K = 0.314*(Mr/Mo)+0.100*(Cr/Co)+0.354*(Ar/Ao)+0.188*(Mr/Mo)

INDICE DESCRIPCION SIMBOLO COEFIC.MARZO 2014.

(DIC. 2012) INDICE COEF.

47 MANO DE OBRA INC. LEYES SOCIAL M 0.314 100.00% 470.79 498.1 0.332

21 CEMENTO PORTLAND TIPO I M1 0.100 100.00% 442.70 460.44 0.104

3 ACERO DE CONSTRUCCION CORRU A 0.398 100.00% 422.58 474.67 0.447

48 MAQUINARIA Y EQUIPO NACIONAL M 0.188 100.00% 323.01 339.09 0.197

1.000 K OCT.'11 1.081

0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOT - CUTERVO - CAJAMARCA

INCIDENCIA

INDICE BASE

Page 17: Valorización la Rioja Marzo 2014

Para la valorización Nº 03 Se ha trabajado con el indice del mes de Febrero del 2014

Page 18: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

VALOR REFERENCIAL S/. 3,851,133

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO MONTO OFERTADO S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA FECHA BASE 12/10/2012

CONTRATISTA : CONSORCIO DEL NORTE FACTOR DE RELACION 1.00000

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS

INSPECTOR : ING. CIVIL YSIDRO DIAZ ALARCON

VALORIZACION Nº 03(METRADOS REALMENTE EJECUTADOS)EJECUCION DE OBRA DE ACUERDO A EL ACTA DE CONCILIACION EXTRAJUDICIAL N°01

PARTIDA DESCRIPCION UNDMETRADOS EJECUTADOS

ANTERIOR ACTUAL ACUMULA

MODULO I

1 TRABAJOS PRELIMINARES

01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40X3.60 M und 1.00 0.00 0.00 0.00 0 1.00

01.02 LIMPIEZA DE TERRENO MANUAL m2 547.82 0.00 547.82 547.82 100 0.00

01.03 TRAZO Y REPLANTEO m2 547.82 0.00 547.82 547.82 100 0.00

2 MOVIMIENTO DE TIERRAS

02.01 EXCAVACIONES

02.01.01 EXCAVACION DE ZANJAS Y ZAPATAS RT<2.00 KG/CM2 H=2.00 M. m3 444.97 0.00 0.00 0.00 0 444.97

02.02 CORTES

02.02.01 CORTE DE TERRENO HASTA 15 CM. m3 73.84 0.00 73.84 73.84 100 0.00

02.03 RELLENOS

02.03.01 RELLENO CON MATERIAL PROPIO m3 115.25 0.00 0.00 0.00 0 115.25

02.03.02 RELLENO MANUAL CON MATERIAL DE PRESTAMO m3 74.15 0.00 0.00 0.00 0 74.15

02.04 NIVELACION INTERIOR Y APISONADO m2 399.39 0.00 0.00 0.00 0 399.39

02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 524.63 0.00 88.61 88.61 16.8896 436.02

3 OBRAS DE CONCRETO SIMPLE 0.00

03.01 SOLADOS PARA CIMIENTOS CORRIDOS E=4" 1.12 CEM/HORM. m2 295.03 0.00 0.00 0.00 0 295.03

03.02 CONCRETO EN CIMIENTOS CORRIDOS CON Cº CICLOPEO m3 5.52 0.00 0.00 0.00 0 5.52

03.03 CONCRETO EN SOBRECIMIENTO F'C= 175 KG/CM2 m3 6.11 0.00 0.00 0.00 0 6.11

03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 86.26 0.00 0.00 0.00 0 86.26

03.05 FALSO PISO MEZCLA 1:8 E=4" m2 399.39 0.00 0.00 0.00 0 399.39

4 OBRAS DE CONCRETO ARMADO

04.01 CIMIENTOS REFORZADOS

04.01.01 CIMIENTOS REFORZADOS FC=210 KG/CM2 m3 170.18 0.00 0.00 0.00 0 170.18

04.01.02 ACERO CORRUGADO DE GRADO 60 kg 3,463.00 0.00 1,503.57 1503.57 43.418 1,959.43

04.02 VIGAS DE CIMENTACIÓN

04.02.01 VIGAS DE CIMENTACION CONCRETO F'C= 210 KG/CM2 m3 58.37 0.00 0.00 0.00 0 58.37

04.02.02 VIGAS DE CIMENTACION ENCOFRADO Y DESENCOFRADO m2 389.16 0.00 0.00 0.00 0 389.16

04.02.03 VIGAS DE CIMENTACION ACERO CORRUGADO DE GRADO 60 kg 8,523.41 0.00 0.00 0.00 0 8,523.41

04.03 COLUMNAS

04.03.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 89.19 0.00 0.00 0.00 0 89.19

04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 843.52 0.00 0.00 0.00 0 843.52

04.03.03 ACERO CORRUGADO DE GRADO 60 kg 15,212.74 0.00 6,605.07 6605.07 43.418 8,607.67

04.04 VIGAS

04.04.01 CONCRETO EN VIGAS F'C 210 KG/CM2. m3 102.32 0.00 0.00 0.00 0 102.32

04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 821.68 0.00 0.00 0.00 0 821.68

04.04.03 ACERO CORRUGADO DE GRADO 60 kg 14,042.95 0.00 6,097.17 6097.17 43.418 7,945.78

04.05 LOSAS ALIGERADAS

04.05.01 CONCRETO F'C 210 KG./CM2 EN LOSAS ALIGERADAS m3 80.57 0.00 0.00 0.00 0 80.57

04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 920.85 0.00 0.00 0.00 0 920.85

04.05.03 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 4,171.65 0.00 0.00 0.00 0 4,171.65

04.05.04 ACERO CORRUGADO DE GRADO 60 kg 4,653.93 0.00 2,020.64 2020.64 43.418 2,633.29

04.06 ESCALERA

04.06.01 CONCRETO EN ESCALERAS F'C=210 KG/CM2 m3 6.09 0.00 0.00 0.00 0 6.09

04.06.02 ENCOFRADO Y DESENCOFRADO DE ESCALERAS m2 29.05 0.00 0.00 0.00 0 29.05

04.06.03 ACERO CORRUGADO DE GRADO 60 kg 575.43 0.00 249.84 249.84 43.418 325.59

5 MUROS Y TABIQUES DE ALBAÑILERIA

05.01 MURO DE SOGA LADRILLO KING-KONG TIPO IV (24 X 13 X 9) J=1.5 CM m2 382.87 0.00 96.34 96.34 25.1613 286.53

05.02MURO DE CABEZA LADRILLO KING-KONG TIPO IV (24 X 13 X 9) J=1.5 CM m2 260.33 0.00 58.18 58.18 22.3496 202.15

05.03 MURO DE CANTO LADRILLO KING-KONG TIPO IV (24 X 13 X 9) J=1.5 CM m2 17.55 0.00 3.60 3.60 20.489 13.95

6 REVOQUES ENLUCIDOS Y MOLDURAS

0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOTA - CUTERVO - CAJAMARCA

METRADO BASE

% Avance

SALDOS METRADO

Page 19: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

VALOR REFERENCIAL S/. 3,851,133

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO MONTO OFERTADO S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA FECHA BASE 12/10/2012

CONTRATISTA : CONSORCIO DEL NORTE FACTOR DE RELACION 1.00000

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS

INSPECTOR : ING. CIVIL YSIDRO DIAZ ALARCON

VALORIZACION Nº 03(METRADOS REALMENTE EJECUTADOS)EJECUCION DE OBRA DE ACUERDO A EL ACTA DE CONCILIACION EXTRAJUDICIAL N°01

PARTIDA DESCRIPCION UNDMETRADOS EJECUTADOS

ANTERIOR ACTUAL ACUMULA

0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOTA - CUTERVO - CAJAMARCA

METRADO BASE

% Avance

SALDOS METRADO

06.01 TARRAJEO EN MUROS INTERIORES ACABADO CON CEMENTO - ARENA m2 836.40 0.00 0.00 0.00 0 836.40

06.02 TARRAJEO EN MUROS EXTERIORES ACABADO CON CEMENTO - ARENA m2 408.53 0.00 0.00 0.00 0 408.53

06.03 TARRAJEO DE COLUMNAS CON CEMENTO-ARENA m2 556.35 0.00 0.00 0.00 0 556.35

06.04 TARRAJEO DE VIGAS CON CEMENTO-ARENA m2 686.93 0.00 0.00 0.00 0 686.93

06.05 VESTIDURA DE DERRAMES m 184.56 0.00 0.00 0.00 0 184.56

7 CIELORRASOS

07.01 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA m2 539.57 0.00 0.00 0.00 0 539.57

07.02 FALSO CIELO DE PLACA DE FIBROCEMENTO 4 MM m2 347.02 0.00 0.00 0.00 0 347.02

8 PISOS Y PAVIMENTOS

08.01 CONTRAPISO DE 2" m2 423.92 0.00 0.00 0.00 0 423.92

08.02 PISO FROTACHADO Y BRUÑADO (BRUÑAS 1X1 CM) m2 780.79 0.00 0.00 0.00 0 780.79

08.03 PISO DE CERAMICO GRESS DE 30X30 CM. EN BAÑOS m2 92.80 0.00 0.00 0.00 0 92.80

9 CONTRAZOCALOS

09.01 CONTRAZOCALO CEMENTO PULIDO Y BRUÑADO H = 15 CM m 277.80 0.00 0.00 0.00 0 277.80

09.02 CONTRAZOCALO DE CERAMICO GRESS H=0.15 M. m 73.90 0.00 0.00 0.00 0 73.90

10 ZOCALOS

10.01 ENCHAPE DE CERAMICA COLOR BLANCO 20X20 CM. m2 17.40 0.00 0.00 0.00 0 17.40

11 COBERTURA

11.01 COBERTURA DE TEJA ANDINA 0.72 X 1.14 m2 622.20 0.00 0.00 0.00 0 622.20

12 CARPINTERIA DE MADERA

12.01 PUERTA DE MADERA MACHIEMBRADA und 14.00 0.00 0.00 0.00 0 14.00

13 CARPINTERIA METALICA

13.01 BARANDA METALICA TUBO CIRCULAR FG m 57.05 0.00 0.00 0.00 0 57.05

13.02 PANEL DE TUBO METALICO CUADRADO DE 2" X 2" m2 13.70 0.00 0.00 0.00 0 13.70

13.03 CANTONERA PLANCHA ESTRIADA 2"x2"x3/16" m 40.00 0.00 0.00 0.00 0 40.00

14 CERRAJERIA

14.01 BISAGRA ALUMINIZADA CAPUCHINA DE 3" X 3" pza 56.00 0.00 0.00 0.00 0 56.00

14.02 CERRADURA PARA PUERTA PRINCIPAL PESADA pza 10.00 0.00 0.00 0.00 0 10.00

14.03 CERRADURA PARA PUERTA INTERIOR pza 4.00 0.00 0.00 0.00 0 4.00

15 VIDRIOS, CRISTALES Y SIMILARES

15.01 CRISTAL TEMPLADO 8 MM PERFILERIA DE ALUMINIO m2 160.00 0.00 0.00 0.00 0 160.00

16 PINTURA

16.01 PINTADO DE CIELO RASO C/LATEX m2 539.57 0.00 0.00 0.00 0 539.57

16.02 PINTADO DE MURO INTERIOR C/ PINTURA LATEX m2 836.40 0.00 0.00 0.00 0 836.40

16.03 PINTURA LATEX EN MUROS EXTERIORES 2 MANOS m2 408.53 0.00 0.00 0.00 0 408.53

16.04 PINTURA LATEX EN COLUMNAS m2 556.35 0.00 0.00 0.00 0 556.35

16.05 PINTURA LATEX EN VIGAS m2 686.93 0.00 0.00 0.00 0 686.93

16.06 PINTURA LATEX DERRAME m2 184.56 0.00 0.00 0.00 0 184.56

16.07 PINTURA EN PUERTAS C/BARNIZ 2 MANOS m2 26.40 0.00 0.00 0.00 0 26.40

17 VARIOS

17.01 BRUÑADO m 717.14 0.00 0.00 0.00 0 717.14

18 INSTALACIONES ELECTRICAS

18.01 SALIDA PARA CENTROS DE LUZ (TECHO) pto 76.00 0.00 0.00 0.00 0 76.00

18.02 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC pto 18.00 0.00 0.00 0.00 0 18.00

18.03 SALIDA PARA INTERRUPTOR pto 22.00 0.00 0.00 0.00 0 22.00

18.04 SALIDA PARA INTERNET - TELEFONO pto 12.00 0.00 0.00 0.00 0 12.00

18.05 SALIDA PARA TV pto 9.00 0.00 0.00 0.00 0 9.00

18.06 TABLERO ELECTRICO TD - 1 und 1.00 0.00 0.00 0.00 0 1.00

18.07 TABLERO ELECTRICO TD - 3 und 1.00 0.00 0.00 0.00 0 1.00

18.08 CAJA CENTRAL DE TV VIDEO und 1.00 0.00 0.00 0.00 0 1.00

18.09 CAJA CENTRAL DE TELEFONO und 1.00 0.00 0.00 0.00 0 1.00

18.10 CAJA CUADRADA DE PASE DE FºGº CON TAPA und 4.00 0.00 0.00 0.00 0 4.00

Page 20: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

VALOR REFERENCIAL S/. 3,851,133

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO MONTO OFERTADO S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA FECHA BASE 12/10/2012

CONTRATISTA : CONSORCIO DEL NORTE FACTOR DE RELACION 1.00000

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS

INSPECTOR : ING. CIVIL YSIDRO DIAZ ALARCON

VALORIZACION Nº 03(METRADOS REALMENTE EJECUTADOS)EJECUCION DE OBRA DE ACUERDO A EL ACTA DE CONCILIACION EXTRAJUDICIAL N°01

PARTIDA DESCRIPCION UNDMETRADOS EJECUTADOS

ANTERIOR ACTUAL ACUMULA

0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOTA - CUTERVO - CAJAMARCA

METRADO BASE

% Avance

SALDOS METRADO

18.11 LUMINARIA CON 02 FLUORESCENTES LINEALES INC. PANTALLA und 40.00 0.00 0.00 0.00 0 40.00

18.12 LUMINARIA EMPOTRADO EN TECHO CON 02 LUMINARIAS und 34.00 0.00 0.00 0.00 0 34.00

18.13 LUMINARIA ADOSADA CON 01 LAMPARA FLUORESCENTE und 2.00 0.00 0.00 0.00 0 2.00

18.14 SUMINISTRO Y TENDIDO DE CABLE ELECTRICO TW AWG-Nº. 12 -4.00 MM2. m 773.71 0.00 0.00 0.00 0 773.71

18.15 SUMINISTRO Y TENDIDO DE CABLE ELECTRICO TW AWG-Nº 14 -2.5 MM2. m 346.11 0.00 0.00 0.00 0 346.11

18.16 CABLE PARA TELEFONO m 52.98 0.00 0.00 0.00 0 52.98

18.17 CABLE ESTRUCTURADO PARA INTERNET m 160.92 0.00 0.00 0.00 0 160.92

18.18 CABLE COAXIAL PARA TELEVISIÓN m 181.40 0.00 0.00 0.00 0 181.40

19 INSTALACIONES SANITARIAS

19.01 SISTEMA DE DESAGUE PLUVIAL

19.01.01 TUBERIA DE DRENAJE PVC SAL 4" m 79.20 0.00 0.00 0.00 0 79.20

19.01.02 SUMIDERO CON REJILLA ROSCADO und 12.00 0.00 0.00 0.00 0 12.00

19.01.03 CANALETA RECTA m 102.90 0.00 0.00 0.00 0 102.90

19.01.04 CODO PVC SAL 4"X90° pza 24.00 0.00 0.00 0.00 0 24.00

19.02 SISTEMA DE DESAGUE

19.02.01 SALIDAS DE PVC SAL PARA DESAGUE DE 2" pto 28.00 0.00 0.00 0.00 0 28.00

19.02.02 SALIDAS DE PVC SAL PARA DESAGUE DE 4" pto 17.00 0.00 0.00 0.00 0 17.00

19.02.03 SALIDA DE MONTANTE Y/O VENTILACION DE PVC 4" pto 6.00 0.00 0.00 0.00 0 6.00

19.02.04 TUBERIA DE PVC SAL 2" m 48.18 0.00 0.00 0.00 0 48.18

19.02.05 TUBERIA DE PVC SAL 4" m 210.68 0.00 0.00 0.00 0 210.68

19.02.06 MONTANTE Y/O VENTILACION DE PVC 2" m 40.20 0.00 0.00 0.00 0 40.20

19.02.07 CAJA DE REGISTRO DE 30X60 pza 9.00 0.00 0.00 0.00 0 9.00

19.03 SISTEMA DE AGUA FRIA

19.03.01 URINARIOS pza 4.00 0.00 0.00 0.00 0 4.00

19.03.02 OVALINES pza 14.00 0.00 0.00 0.00 0 14.00

19.03.03 LAVATORIO INC. ACCESORIOS pza 2.00 0.00 0.00 0.00 0 2.00

19.03.04 INODOROS pza 14.00 0.00 0.00 0.00 0 14.00

19.03.05 SALIDA DE AGUA FRIA PVC 1/2" pto 38.00 0.00 0.00 0.00 0 38.00

19.03.06 TUBERIA DE AGUA FRIA PVC 1/2" m 116.38 0.00 0.00 0.00 0 116.38

20 FLETE TERRETRE

20.01 FLETE TERRESTRE kg 522,924.76 0.00 50,000.00 50000.00 9.56161 472,924.76

MODULO II

1 TRABAJOS PRELIMINARES

01.01 LIMPIEZA DE TERRENO MANUAL m2 455.29 0.00 455.29 455.29 100 0.00

01.02 TRAZO Y REPLANTEO m2 455.29 0.00 455.29 455.29 100 0.00

2 MOVIMIENTO DE TIERRAS

02.01 EXCAVACIONES

02.01.01 EXCAVACION DE ZANJAS Y ZAPATAS RT<2.00 KG/CM2 H=2.00 M. m3 383.69 0.00 0.00 0.00 0 383.69

02.01.02 EXCAVACION MASIVA A MAQUINA EN TERRENO NORMAL"C"/RETRO .5Y3 m3 6,198.45 1,500.00 4,698.45 6198.45 100 0.00

02.02 CORTES

02.02.01 CORTE DE TERRENO HASTA 15 CM. m3 58.61 0.00 58.61 58.61 100 0.00

02.03 RELLENOS

02.03.01 RELLENO CON MATERIAL PROPIO m3 99.34 0.00 0.00 0.00 0 99.34

02.03.02 RELLENO MANUAL CON MATERIAL DE PRESTAMO m3 122.18 0.00 0.00 0.00 0 122.18

02.04 NIVELACION INTERIOR Y APISONADO m2 319.12 0.00 0.00 0.00 0 319.12

02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 8,444.94 1,800.00 6,644.94 8444.94 100 0.00

3 OBRAS DE CONCRETO SIMPLE

03.01 SOLADOS PARA CIMIENTOS CORRIDOS E=4" 1.12 CEM/HORM. m2 255.88 0.00 0.00 0.00 0 255.88

03.02 CONCRETO EN SOBRECIMIENTO F'C= 175 KG/CM2 m3 11.21 0.00 0.00 0.00 0 11.21

03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 77.81 0.00 0.00 0.00 0 77.81

03.04 FALSO PISO MEZCLA 1:8 E=4" m2 319.12 0.00 0.00 0.00 0 319.12

4 OBRAS DE CONCRETO ARMADO

Page 21: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

VALOR REFERENCIAL S/. 3,851,133

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO MONTO OFERTADO S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA FECHA BASE 12/10/2012

CONTRATISTA : CONSORCIO DEL NORTE FACTOR DE RELACION 1.00000

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS

INSPECTOR : ING. CIVIL YSIDRO DIAZ ALARCON

VALORIZACION Nº 03(METRADOS REALMENTE EJECUTADOS)EJECUCION DE OBRA DE ACUERDO A EL ACTA DE CONCILIACION EXTRAJUDICIAL N°01

PARTIDA DESCRIPCION UNDMETRADOS EJECUTADOS

ANTERIOR ACTUAL ACUMULA

0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOTA - CUTERVO - CAJAMARCA

METRADO BASE

% Avance

SALDOS METRADO

04.01 CIMIENTOS REFORZADOS

04.01.01 CIMIENTOS REFORZADOS FC=210 KG/CM2 m3 149.91 0.00 0.00 0.00 0 149.91

04.01.02 ACERO CORRUGADO DE GRADO 60 kg 3,032.15 0.00 1,316.50 1316.50 43.418 1,715.65

04.02 VIGAS DE CIMENTACIÓN

04.02.01 VIGAS DE CIMENTACION CONCRETO F'C= 210 KG/CM2 m3 50.75 0.00 0.00 0.00 0 50.75

04.02.02 VIGAS DE CIMENTACION ENCOFRADO Y DESENCOFRADO m2 336.51 0.00 0.00 0.00 0 336.51

04.02.03 VIGAS DE CIMENTACION ACERO CORRUGADO DE GRADO 60 kg 7,589.11 0.00 0.00 0.00 0 7,589.11

04.03 COLUMNAS

04.03.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 68.16 0.00 0.00 0.00 0 68.16

04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 717.08 0.00 0.00 0.00 0 717.08

04.03.03 ACERO CORRUGADO DE GRADO 60 kg 12,883.07 0.00 5,593.57 5593.57 43.418 7,289.50

04.04 VIGAS

04.04.01 CONCRETO EN VIGAS F'C 210 KG/CM2. m3 86.50 0.00 0.00 0.00 0 86.50

04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 730.81 0.00 0.00 0.00 0 730.81

04.04.03 ACERO CORRUGADO DE GRADO 60 kg 11,500.05 0.00 4,993.09 4993.09 43.418 6,506.96

04.05 LOSAS ALIGERADAS

04.05.01 CONCRETO F'C 210 KG./CM2 EN LOSAS ALIGERADAS m3 65.53 0.00 0.00 0.00 0 65.53

04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 748.90 0.00 0.00 0.00 0 748.90

04.05.03 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 6,240.79 0.00 0.00 0.00 0 6,240.79

04.05.04 ACERO CORRUGADO DE GRADO 60 kg 3,805.06 0.00 1,652.08 1652.08 43.418 2,152.98

04.06 ESCALERA

04.06.01 CONCRETO EN ESCALERAS F'C=210 KG/CM2 m3 6.09 0.00 0.00 0.00 0 6.09

04.06.02 ENCOFRADO Y DESENCOFRADO DE ESCALERAS m2 29.05 0.00 0.00 0.00 0 29.05

04.06.03 ACERO CORRUGADO DE GRADO 60 kg 575.43 0.00 249.84 249.84 43.418 325.59

5 MUROS Y TABIQUES DE ALBAÑILERIA

05.01 MURO DE SOGA LADRILLO KING-KONG TIPO IV (24 X 13 X 9) J=1.5 CM m2 317.46 0.00 79.88 79.88 25.1613 237.58

05.02 MURO DE CABEZA LADRILLO KING-KONG TIPO IV (24 X 13 X 9) J=1.5 CM m2 177.46 0.00 39.66 39.66 22.3496 137.80

05.03 MURO DE DRYWALL m2 15.12 0.00 0.00 0.00 0 15.12

6 REVOQUES ENLUCIDOS Y MOLDURAS

06.01 TARRAJEO EN MUROS INTERIORES ACABADO CON CEMENTO - ARENA m2 840.63 0.00 0.00 0.00 0 840.63

06.02 TARRAJEO EN MUROS EXTERIORES ACABADO CON CEMENTO - ARENA m2 588.53 0.00 0.00 0.00 0 588.53

06.03 TARRAJEO DE COLUMNAS CON CEMENTO-ARENA m2 530.91 0.00 0.00 0.00 0 530.91

06.04 TARRAJEO DE VIGAS CON CEMENTO-ARENA m2 574.63 0.00 0.00 0.00 0 574.63

06.05 VESTIDURA DE DERRAMES m 154.65 0.00 0.00 0.00 0 154.65

7 CIELORRASOS

07.01 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA m2 459.21 0.00 0.00 0.00 0 459.21

07.02 FALSO CIELO DE PLACA DE FIBROCEMENTO 4 MM m2 281.89 0.00 0.00 0.00 0 281.89

8 PISOS Y PAVIMENTOS

08.01 CONTRAPISO 2" m2 372.93 0.00 0.00 0.00 0 372.93

08.02 PISO DE CEMENTO PULIDO m2 585.94 0.00 0.00 0.00 0 585.94

08.03 PISO DE CERAMICO GRESS 30X30 CM. m2 50.01 0.00 0.00 0.00 0 50.01

08.04 PISO DE CERAMICO ANTIDESLIZANTE COLOR GRIS 40X40 CM. m2 78.55 0.00 0.00 0.00 0 78.55

9 CONTRAZOCALOS

09.01 CONTRAZOCALO CEMENTO H = 15 CM m 198.36 0.00 0.00 0.00 0 198.36

09.02 CONTRAZOCALO DE CERAMICO GRESS H=0.15 M. m 57.22 0.00 0.00 0.00 0 57.22

09.03m 34.80 0.00 0.00 0.00 0 34.80

10 COBERTURA

10.01 COBERTURA DE TEJA ANDINA 0.72 X 1.14 m2 345.21 0.00 0.00 0.00 0 345.21

11 CARPINTERIA DE MADERA 0.00 0.00

11.01 PUERTA DE MADERA MACHIEMBRADA und 7.00 0.00 0.00 0.00 0 7.00

12 CARPINTERIA METALICA

CONTRAZOCALO DE CERAMICO ANTIDESLIZANTE COLOR GRIS 40X40 CM. H=0.15 M.

Page 22: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

VALOR REFERENCIAL S/. 3,851,133

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO MONTO OFERTADO S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA FECHA BASE 12/10/2012

CONTRATISTA : CONSORCIO DEL NORTE FACTOR DE RELACION 1.00000

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS

INSPECTOR : ING. CIVIL YSIDRO DIAZ ALARCON

VALORIZACION Nº 03(METRADOS REALMENTE EJECUTADOS)EJECUCION DE OBRA DE ACUERDO A EL ACTA DE CONCILIACION EXTRAJUDICIAL N°01

PARTIDA DESCRIPCION UNDMETRADOS EJECUTADOS

ANTERIOR ACTUAL ACUMULA

0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOTA - CUTERVO - CAJAMARCA

METRADO BASE

% Avance

SALDOS METRADO

12.01 BARANDA METALICA TUBO CIRCULAR FG m 44.20 0.00 0.00 0.00 0 44.20

12.02 PANEL DE TUBO METALICO CUADRADO DE 2" X 2" m2 13.70 0.00 0.00 0.00 0 13.70

12.03 CANTONERA PLANCHA ESTRIADA 2"x2"x3/16" m 40.00 0.00 0.00 0.00 0 40.00

13 CERRAJERIA

13.01 BISAGRA ALUMINIZADA CAPUCHINA DE 3" X 3" pza 64.00 0.00 0.00 0.00 0 64.00

13.02 CERRADURA PARA PUERTA PRINCIPAL PESADA pza 10.00 0.00 0.00 0.00 0 10.00

13.03 CERRADURA PARA PUERTA INTERIOR pza 6.00 0.00 0.00 0.00 0 6.00

14 VIDRIOS, CRISTALES Y SIMILARES

14.01 CRISTAL TEMPLADO 8 MM PERFILERIA DE ALUMINIO m2 131.50 0.00 0.00 0.00 0 131.50

15 PINTURA

15.01 PINTADO DE CIELO RASO C/LATEX m2 459.21 0.00 0.00 0.00 0 459.21

15.02 PINTADO DE MURO INTERIOR C/ PINTURA LATEX m2 840.63 0.00 0.00 0.00 0 840.63

15.03 PINTURA LATEX EN MUROS EXTERIORES 2 MANOS m2 588.53 0.00 0.00 0.00 0 588.53

15.04 PINTURA LATEX EN COLUMNAS m2 530.91 0.00 0.00 0.00 0 530.91

15.05 PINTURA LATEX EN VIGAS m2 574.63 0.00 0.00 0.00 0 574.63

15.06 PINTURA LATEX DERRAME m2 154.65 0.00 0.00 0.00 0 154.65

15.07 PINTURA EN PUERTAS C/BARNIZ 2 MANOS m2 39.60 0.00 0.00 0.00 0 39.60

16 BRUÑADO

16.01 BRUÑADO m 299.83 0.00 0.00 0.00 0 299.83

17 INSTALACIONES ELECTRICAS

17.01 SALIDA PARA CENTROS DE LUZ (TECHO) pto 65.00 0.00 0.00 0.00 0 65.00

17.02 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC pto 43.00 0.00 0.00 0.00 0 43.00

17.03 SALIDA PARA INTERRUPTOR pto 18.00 0.00 0.00 0.00 0 18.00

17.04 SALIDA PARA INTERNET - TELEFONO pto 53.00 0.00 0.00 0.00 0 53.00

17.05 SALIDA PARA TV pto 5.00 0.00 0.00 0.00 0 5.00

17.06 TABLERO ELECTRICO GENERAL TG und 1.00 0.00 0.00 0.00 0 1.00

17.07 TABLERO ELECTRICO TD - 1 und 1.00 0.00 0.00 0.00 0 1.00

17.08 CAJA CENTRAL DE TV VIDEO und 1.00 0.00 0.00 0.00 0 1.00

17.09 CAJA CENTRAL DE TELEFONO und 1.00 0.00 0.00 0.00 0 1.00

17.10 CAJA CUADRADA DE PASE DE FºGº CON TAPA und 2.00 0.00 0.00 0.00 0 2.00

17.11 LUMINARIA CON 02 FLUORESCENTES LINEALES INC. PANTALLA und 44.00 0.00 0.00 0.00 0 44.00

17.12 LUMINARIA EMPOTRADO EN TECHO CON 02 LUMINARIAS und 99.00 0.00 0.00 0.00 0 99.00

17.13 LUMINARIA ADOSADA CON 01 LAMPARA FLUORESCENTE und 10.00 0.00 0.00 0.00 0 10.00

17.14 SUMINISTRO Y TENDIDO DE CABLE ELECTRICO TW AWG-Nº. 12 -4.00 MM2. m 403.62 0.00 0.00 0.00 0 403.62

17.15 SUMINISTRO Y TENDIDO DE CABLE ELECTRICO TW AWG-Nº 14 -2.5 MM2. m 640.03 0.00 0.00 0.00 0 640.03

17.16 CABLE PARA TELEFONO m 38.83 0.00 0.00 0.00 0 38.83

17.17 CABLE ESTRUCTURADO PARA INTERNET m 110.86 0.00 0.00 0.00 0 110.86

17.18 CABLE COAXIAL PARA TELEVISIÓN m 74.57 0.00 0.00 0.00 0 74.57

18 INSTALACIONES SANITARIAS

18.01 SISTEMA DE DESAGUE PLUVIAL

18.01.01 TUBERIA DE DRENAJE PVC SAL 4" m 79.20 0.00 0.00 0.00 0 79.20

18.01.02 SUMIDERO CON REJILLA ROSCADO und 12.00 0.00 0.00 0.00 0 12.00

18.01.03 CANALETA RECTA m 102.90 0.00 0.00 0.00 0 102.90

18.01.04 CODO PVC SAL 4"X90° pza 24.00 0.00 0.00 0.00 0 24.00

18.02 SISTEMA DE DESAGUE

18.02.01 SALIDAS DE PVC SAL PARA DESAGUE DE 2" pto 15.00 0.00 0.00 0.00 0 15.00

18.02.02 SALIDAS DE PVC SAL PARA DESAGUE DE 4" pto 4.00 0.00 0.00 0.00 0 4.00

18.02.03 TUBERIA DE PVC SAL 2" m 53.30 0.00 0.00 0.00 0 53.30

18.02.04 TUBERIA DE PVC SAL 4" m 34.83 0.00 0.00 0.00 0 34.83

18.02.05 MONTANTE Y/O VENTILACION DE PVC 4" m 21.00 0.00 0.00 0.00 0 21.00

18.03 SISTEMA DE AGUA FRIA

18.03.01 URINARIOS pza 2.00 0.00 0.00 0.00 0 2.00

Page 23: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

VALOR REFERENCIAL S/. 3,851,133

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO MONTO OFERTADO S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA FECHA BASE 12/10/2012

CONTRATISTA : CONSORCIO DEL NORTE FACTOR DE RELACION 1.00000

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS

INSPECTOR : ING. CIVIL YSIDRO DIAZ ALARCON

VALORIZACION Nº 03(METRADOS REALMENTE EJECUTADOS)EJECUCION DE OBRA DE ACUERDO A EL ACTA DE CONCILIACION EXTRAJUDICIAL N°01

PARTIDA DESCRIPCION UNDMETRADOS EJECUTADOS

ANTERIOR ACTUAL ACUMULA

0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOTA - CUTERVO - CAJAMARCA

METRADO BASE

% Avance

SALDOS METRADO

18.03.02 OVALINES pza 4.00 0.00 0.00 0.00 0 4.00

18.03.03 INODOROS pza 4.00 0.00 0.00 0.00 0 4.00

18.03.04 SALIDA DE AGUA FRIA PVC 1/2" pto 27.00 0.00 0.00 0.00 0 27.00

18.03.05 TUBERIA DE AGUA FRIA PVC 1/2" m 97.88 0.00 0.00 0.00 0 97.88

19 FLETE TERRETRE

19.01 FLETE TERRESTRE kg 457,379.96 0.00 0.00 0.00 0 457,379.96

LOSA DEPORTIVA

1 TRABAJOS PRELIMINARES

01.01 LIMPIEZA DE TERRENO MANUAL M2 540.00 0.00 540.00 540.00 100 0.00

01.02 TRAZO Y REPLANTEO M2 540.00 0.00 540.00 540.00 100 0.00

2 MOVIMIENTO DE TIERRAS

02.01 CORTES

2.01.01 CORTE DE TERRENO HASTA 15 M3 162.00 0.00 162.00 162.00 100 0.00

02.02 RELLENOS

02.02.01 RELLENO MANUAL CON MATERIAL DE PRESTAMO M3 81.00 0.00 0.00 0.00 0 81.00

02.03 NIVELACION INTERIOR Y APISONADO M2 540.00 0.00 0.00 0.00 0 540.00

02.04 ELIMINACION DE MATERIAL EXCEDENTE M3 421.20 0.00 0.00 0.00 0 421.20

3 OBRAS DE CONCRETO SIMPLE

03.01 CONCRETO EN LOSAS F'C=175 KG/CM2 M3 74.15 0.00 0.00 0.00 0 74.15

03.02 ENCOFRADO Y DESENCOFRADO DE LOSAS M2 39.75 0.00 0.00 0.00 0 39.75

4 PISOS Y PAVIMENTOS

04.01 PISO FROTACHADO Y BRUÑADO (BRUÑAS 1X1 CM) M2 540.00 0.00 0.00 0.00 0 540.00

5 PINTURA

05.01 PINTURA DE MARCACION DE LOSA DEPORTIVA M 350.00 0.00 0.00 0.00 0 350.00

6 VARIOS

06.01 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1" M 312.00 0.00 0.00 0.00 0 312.00

06.02 ARCOS Y TABLERO FULBITO - BASQUET UND 2.00 0.00 0.00 0.00 0 2.00

06.03 ADQUISICION DE NET Y PARANTES DE VOLEY und 1.00 140.00 UND 1.00 0.00 0.00 0.00 0 1.00

7 INSTALACIONES ELECTRICAS

07.01 MEDIDOR und 1.00 707.36 UND 1.00 0.00 0.00 0.00 0 1.00

07.02 POZO-CONEXION A TIERRA EN SISTEMA C/EQ.BOMBEO,ALUMB,TOMACORR UND 1.00 0.00 0.00 0.00 0 1.00

07.03 REFLECTOR JOSFEL RSP 125w, HG, C/SEG UND 6.00 0.00 0.00 0.00 0 6.00

07.04 POSTE Co.A.C. 7x 70x 90x195x242 und 4.00 685.18 UND 4.00 0.00 0.00 0.00 0 4.00

07.05 SALIDA PARA CENTROS DE LUZ (TECHO) PTO 2.00 0.00 0.00 0.00 0 2.00

07.06 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC PTO 2.00 0.00 0.00 0.00 0 2.00

07.07 SUMINISTRO Y TENDIDO DE CABLE ELECTRICO NYY 2-1 X 16 MM2. M 80.20 0.00 0.00 0.00 0 80.20

07.08 SUMINISTRO Y TENDIDO DE CABLE ELECTRICO NYY 2-1 X 10 MM2. M 154.00 0.00 0.00 0.00 0 154.00

07.09 SUMINISTRO Y TENDIDO DE CABLE ELECTRICO TW AWG-Nº. 12 -4.00 MM2. M 7.10 0.00 0.00 0.00 0 7.10

8 FLETE TERRETRE

08.01 FLETE TERRESTRE KG 4,917.29 0.00 0.00 0.00 0 4,917.29

CERCO PERIMÉTRICO

1 TRABAJOS PRELIMINARES

01.01 LIMPIEZA DE TERRENO MANUAL m2 76.28 m2 76.28 0.00 76.28 76.28 100 0.00

01.02 TRAZO Y REPLANTEO m2 76.28 m2 76.28 0.00 76.28 76.28 100 0.00

2 MOVIMIENTO DE TIERRAS

02.01 EXCAVACIONES

02.01.01 EXCAVACION DE ZANJAS Y ZAPATAS RT<2 KG/CM2 H=2.00 M. m3 68.65 m3 68.65 0.00 0.00 0.00 0 68.65

02.02 RELLENOS

02.02.01 RELLENO COMPACTADO CON MATERIAL PROPIO m3 7.63 m3 7.6 0.00 0.00 0.00 0 7.63

02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 79.33 m3 79 0.00 0.00 0.00 0 79.33

3 OBRAS DE CONCRETO SIMPLE

Page 24: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

VALOR REFERENCIAL S/. 3,851,133

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO MONTO OFERTADO S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA FECHA BASE 12/10/2012

CONTRATISTA : CONSORCIO DEL NORTE FACTOR DE RELACION 1.00000

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS

INSPECTOR : ING. CIVIL YSIDRO DIAZ ALARCON

VALORIZACION Nº 03(METRADOS REALMENTE EJECUTADOS)EJECUCION DE OBRA DE ACUERDO A EL ACTA DE CONCILIACION EXTRAJUDICIAL N°01

PARTIDA DESCRIPCION UNDMETRADOS EJECUTADOS

ANTERIOR ACTUAL ACUMULA

0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOTA - CUTERVO - CAJAMARCA

METRADO BASE

% Avance

SALDOS METRADO

03.01 SOLADOS PARA CIMIENTOS CORRIDOS E=4" 1.12 CEM/HORM. m2 68.65 m2 68.65 0.00 0.00 0.00 0 68.65

4 OBRAS DE CONCRETO ARMADO

04.01 SOBRECIMIENTO REFORZADO

01.01.01 SOBRECIMEINTO ARMADO F'C 175 KG/CM2. m3 34.41 m3 34.41 0.00 0.00 0.00 0 34.41

04.01.02 SOBRECIMIENTO ARMADO ENCOFRADO Y DESENCOFRADO m2 203.90 m2 203.79 0.00 0.00 0.00 0 203.79

04.01.03 SOBRECIMIENTO REFORZADO ACERO CORRUGADO GRADO 60 kg 682.79 kg 682.79 0.00 170.70 170.70 25 512.09

04.02 COLUMNAS

04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 8.65 m3 8.65 0.00 0.00 0.00 0 8.65

04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 138.46 m2 138.46 0.00 0.00 0.00 0 138.46

04.02.03 ACERO CORRUGADO GRADO 60 kg 1,128.66 kg 1128.66 0.00 490.04 490.04 43.418 638.62

04.03 VIGAS

04.03.01 CONCRETO EN VIGAS F'C 210 KG/CM2. m3 3.31 m3 3.31 0.00 0.00 0.00 0 3.31

04.03.02 ENCOFRADO Y DESENCOFRADO m2 45.34 m2 45.34 0.00 0.00 0.00 0 45.34

04.03.03 ACERO CORRUGADO GRADO 60 kg 198.08 kg 198.08 0.00 86.00 86.00 43.418 112.08

5 MUROS Y TABIQUES DE ALBAÑILERIA

05.01 m2 349.87 0.00 0.00 0.00 0 349.87

6 REVOQUES ENLUCIDOS Y MOLDURAS

06.01 TARRAJEO EN MUROS EXTERIORES CON CEMENTO-ARENA m2 855.59 m2 855.59 0.00 0.00 0.00 0 855.59

06.02 TARRAJEO DE COLUMNAS CON CEMENTO-ARENA m2 103.17 m2 103.17 0.00 0.00 0.00 0 103.17

06.03 TARRAJEO DE VIGAS CON CEMENTO-ARENA m2 44.63 m2 44.63 0.00 0.00 0.00 0 44.63

7 COBERTURA

07.01 COBERTURA TEJA ARTESANAL m 116.27 m 116.27 0.00 0.00 0.00 0 116.27

8 PINTURA

08.01 PINTURA LATEX EN MUROS EXTERIORES 2 MANOS m2 855.59 m2 855.59 0.00 0.00 0.00 0 855.59

08.02 PINTURA LATEX EN COLUMNAS m2 103.17 m2 103.17 0.00 0.00 0.00 0 103.17

08.03 PINTURA LATEX EN VIGAS m2 44.63 m2 44.63 0.00 0.00 0.00 0 44.63

9 VARIOS

09.01 BRUÑADO m 483.24 m 483.24 0.00 0.00 0.00 0 483.24

10 FLETE TERRETRE

10.01 FLETE TERRESTRE kg 104,316.61 kg 104316.61 25,000.00 25,000.00 50000.00 47.931 54,316.61

PORTICOS DE INGRESO

1 TRABAJOS PRELIMINARES

01.01 LIMPIEZA DE TERRENO MANUAL m2 24.31 m2 24.31 0.00 24.31 24.31 100 0.00

01.02 TRAZO Y REPLANTEO m2 24.31 m2 24.31 0.00 24.31 24.31 100 0.00

2 MOVIMIENTO DE TIERRAS

02.01 EXCAVACIONES

02.01.01 EXCAVACION DE ZANJAS Y ZAPATAS RT<2.00 KG/CM2 H=2.00 M. m3 32.26 m3 32.26 0.00 0.00 0.00 0 32.26

02.02 CORTES

02.02.01 CORTE DE TERRENO HASTA 15 CM. m3 2.73 m3 2.73 0.00 2.73 2.73 100 0.00

02.03 RELLENOS

02.03.01 RELLENO CON MATERIAL PROPIO m3 4.95 m3 4.95 0.00 0.00 0.00 0 4.95

02.03.02 RELLENO MANUAL CON MATERIAL DE PRESTAMO m3 4.53 m3 4.53 0.00 0.00 0.00 0 4.53

02.04 NIVELACION INTERIOR Y APISONADO m2 49.99 m2 49.99 0.00 0.00 0.00 0 49.99

02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 39.05 m3 39.05 0.00 0.00 0.00 0 39.05

3 OBRAS DE CONCRETO SIMPLE

03.01 SOLADOS PARA CIMIENTOS CORRIDOS E=4" 1.12 CEM/HORM. m2 23.04 m2 23.04 0.00 0.00 0.00 0 23.04

4 OBRAS DE CONCRETO ARMADO

04.01 CIMIENTOS REFORZADOS

04.01.01 CIMIENTOS REFORZADOS FC=210 KG/CM2 m3 20.74 m3 20.74 0.00 0.00 0.00 0 20.74

04.01.02 ACERO CORRUGADO DE GRADO 60 kg 213.84 kg 213.84 0.00 92.85 92.85 43.418 120.99

04.02 COLUMNAS

MURO DE SOGA LADRILLO ARTESANAL DE ARCILLA CON CEMENTO - ARENA J=1.5 m2 349.87 CM

Page 25: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

VALOR REFERENCIAL S/. 3,851,133

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO MONTO OFERTADO S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA FECHA BASE 12/10/2012

CONTRATISTA : CONSORCIO DEL NORTE FACTOR DE RELACION 1.00000

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS

INSPECTOR : ING. CIVIL YSIDRO DIAZ ALARCON

VALORIZACION Nº 03(METRADOS REALMENTE EJECUTADOS)EJECUCION DE OBRA DE ACUERDO A EL ACTA DE CONCILIACION EXTRAJUDICIAL N°01

PARTIDA DESCRIPCION UNDMETRADOS EJECUTADOS

ANTERIOR ACTUAL ACUMULA

0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOTA - CUTERVO - CAJAMARCA

METRADO BASE

% Avance

SALDOS METRADO

04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 8.51 m3 8.51 0.00 0.00 0.00 0 8.51

04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 62.69 m2 62.69 0.00 0.00 0.00 0 62.69

04.02.03 ACERO CORRUGADO DE GRADO 60 kg 1,330.76 kg 1,330.76 0.00 577.79 577.79 43.418 752.97

04.03 VIGAS

04.03.01 CONCRETO EN VIGAS F'C 210 KG/CM2. m3 2.37 m3 2.37 0.00 0.00 0.00 0 2.37

04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 19.31 m2 19.31 0.00 0.00 0.00 0 19.31

04.03.03 ACERO CORRUGADO DE GRADO 60 kg 708.86 kg 708.86 0.00 307.77 307.77 43.418 401.09

04.04 LOSAS ALIGERADAS

04.04.01 CONCRETO F'C 210 KG./CM2 EN LOSAS ALIGERADAS m3 0.39 m3 0.39 0.00 0.00 0.00 0 0.39

04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 4.40 m2 4.40 0.00 0.00 0.00 0 4.40

04.04.03 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 146. Und. 146.67 0.00 0.00 0.00 0 146.67

04.04.04 ACERO CORRUGADO DE GRADO 60 kg 80.01 kg 80.01 0.00 34.74 34.74 43.418 45.27

5 MUROS Y TABIQUES DE ALBAÑILERIA

05.01 MURO DE SOGA LADRILLO KING-KONG TIPO IV (24 X 13 X 9) J=1.5 CM m2 2.06 m2 2.06 0.00 0.00 0.00 0 2.06

6 REVOQUES ENLUCIDOS Y MOLDURAS

06.01 TARRAJEO EN MUROS EXTERIORES ACABADO CON CEMENTO - ARENA m2 4.1 m2 4.12 0.00 0.00 0.00 0 4.12

06.02 TARRAJEO DE COLUMNAS CON CEMENTO-ARENA m2 64.61 m2 64.61 0.00 0.00 0.00 0 64.61

06.03 TARRAJEO DE VIGAS CON CEMENTO-ARENA m2 19.43 m2 19.43 0.00 0.00 0.00 0 19.43

7 CIELORRASOS

07.01 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA m2 4.40 m2 4.40 0.00 0.00 0.00 0 4.40

8 CARPINTERIA METALICA

08.01 PUERTA DE INGRESO m2 21.94 m2 21.94 0.00 0.00 0.00 0 21.94

9 PINTURA

09.03 PINTURA LATEX EN MUROS EXTERIORES 2 MANOS m2 4.12 m2 4.12 0.00 0.00 0.00 0 4.12

09.04 PINTURA LATEX EN COLUMNAS m2 64.61 m2 64.61 0.00 0.00 0.00 0 64.61

09.05 PINTURA LATEX EN VIGAS m2 19.43 m2 19.43 0.00 0.00 0.00 0 19.43

10 FLETE TERRETRE

10.01 FLETE TERRESTRE kg 15,367.58 kg 15,367.58 0.00 0.00 0.00 0 15,367.58

ESCENARIO

1 TRABAJOS PRELIMINARES

01.01 LIMPIEZA DE TERRENO MANUAL m2 64.72 0.00 0.00 0.00 0 64.72

01.02 TRAZO Y REPLANTEO m2 64.72 0.00 0.00 0.00 0 64.72

2 MOVIMIENTO DE TIERRAS

02.01 EXCAVACIONES

02.01.01 EXCAVACION DE ZANJAS Y ZAPATAS RT<2 KG/CM2 H=2.00 M. m3 m3 16.39 0.00 0.00 0.00 0 16.39

02.02 CORTES

02.02.01 CORTE DE TERRENO HASTA 15 CM. m3 11.90 0.00 0.00 0.00 0 11.90

02.03 RELLENOS

02.03.01 RELLENO CON MATERIAL PROPIO m3 02.47 0.00 0.00 0.00 0 2.47

02.03.02 RELLENO MANUAL CON MATERIAL DE PRESTAMO m3 41.41 0.00 0.00 0.00 0 41.41

02.03.03 NIVELACION INTERIOR Y APISONADO m2 54.83 0.00 0.00 0.00 0 54.83

02.03.04 ELIMINACION DE MATERIAL EXCEDENTE m3 33.56 0.00 0.00 0.00 0 33.56

3 OBRAS DE CONCRETO SIMPLE

03.01 SOLADOS PARA CIMIENTOS CORRIDOS E=4" 1.12 CEM/HORM. m2 18.22 0.00 0.00 0.00 0 18.22

03.02 CONCRETO EN CIMIENTO CORRIDOS F'C=175 KG/CM2 m3 11.04 0.00 0.00 0.00 0 11.04

4 OBRAS DE CONCRETO ARMADO

04.01 MUROS REFORZADOS

04.01.01 CONCRETO EN PLACAS FC=210 KG/CM2 m3 6.79 0.00 0.00 0.00 0 6.79

04.01.02 ENCOFRADO Y DESENCOFRADO m2 97.65 0.00 0.00 0.00 0 97.65

04.01.03 ACERO CORRUGADO DE GRADO 60 kg kg 357.62 0.00 155.27 155.27 43.418 202.35

04.02 VIGAS

04.02.01 CONCRETO EN VIGAS F'C 210 KG/CM2. m3 1.36 0.00 0.00 0.00 0 1.36

Page 26: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

VALOR REFERENCIAL S/. 3,851,133

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO MONTO OFERTADO S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA FECHA BASE 12/10/2012

CONTRATISTA : CONSORCIO DEL NORTE FACTOR DE RELACION 1.00000

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS

INSPECTOR : ING. CIVIL YSIDRO DIAZ ALARCON

VALORIZACION Nº 03(METRADOS REALMENTE EJECUTADOS)EJECUCION DE OBRA DE ACUERDO A EL ACTA DE CONCILIACION EXTRAJUDICIAL N°01

PARTIDA DESCRIPCION UNDMETRADOS EJECUTADOS

ANTERIOR ACTUAL ACUMULA

0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOTA - CUTERVO - CAJAMARCA

METRADO BASE

% Avance

SALDOS METRADO

04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 85.74 0.00 0.00 0.00 0 85.74

04.02.03 ACERO CORRUGADO DE GRADO 60 kg 143.63 0.00 62.36 62.36 43.418 81.27

04.03 LOSA MACIZA

04.04 CONCRETO F'C 210 KG/CM2 m3 17.65 0.00 0.00 0.00 0 17.65

04.05 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 85.74 0.00 0.00 0.00 0 85.74

04.06 ACERO CORRUGADO DE GRADO 60 kg 380.82 0.00 165.34 165.34 43.418 215.48

5 REVOQUES ENLUCIDOS Y MOLDURA

05.01 TARRAJEO EN MUROS EXTERIORES ACABADO CON CEMENTO - ARENA m2 42.82 0.00 0.00 0.00 0 42.82

05.02 TARRAJEO DE VIGAS CON CEMENTO-ARENA m2 5.06 0.00 0.00 0.00 0 5.06

05.03 TARRAJEO DE LOSAS m2 46.54 0.00 0.00 0.00 0 46.54

6 PISOS Y PAVIMENTOS

06.01 CONTRAPISO 2" m2 39.91 0.00 0.00 0.00 0 39.91

7 CARPINTERIA METALICA

07.01 POSTE PARA ASTA DE BANDERA 2.00 0.00 0.00 0.00 0 2.00

8 PINTURA

08.01 PINTURA LATEX EN MUROS EXTERIORES 2 MANOS m2 42.82 0.00 0.00 0.00 0 42.82

08.02 PINTURA LATEX EN VIGAS m2 5.06 0.00 0.00 0.00 0 5.06

9 VARIOS

09.01 BRUÑADO 69.23 0.00 0.00 0.00 0 69.23

10 FLETE TERRETRE

10.01 FLETE TERRESTRE kg 19,317.33 0.00 0.00 0.00 0 19,317.33

VEREDAS

1 TRABAJOS PRELIMINARES

01.01 LIMPIEZA DE TERRENO MANUAL m2 906.38 m2 906.38 0.00 906.38 906.38 100 0.00

01.02 TRAZO Y REPLANTEO m2 906.38 m2 906.38 0.00 906.38 906.38 100 0.00

2 MOVIMIENTO DE TIERRAS

02.01 EXCAVACIONES

02.01.01 EXCAVACION DE ZANJAS m3 4.23 m3 4.23 0.00 0.00 0.00 0 4.23

02.02 CORTES

02.02.01 CORTE DE TERRENO HASTA 15 CM. m3 1,800.67 m3 1,800.67 0.00 1,800.67 1800.67 100 0.00

02.03 RELLENOS

02.03.01 RELLENO MANUAL CON MATERIAL DE PRESTAMO m3 157.56 m3 157.56 0.00 0.00 0.00 0 157.56

02.04 NIVELACION INTERIOR Y APISONADO m2 900.34 m2 900.34 0.00 0.00 0.00 0 900.34

02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 707.76 m3 707.76 0.00 0.00 0.00 0 707.76

3 OBRAS DE CONCRETO SIMPLE

03.01 CONCRETO EN VEREDAS F'C=175 KG/CM2. m3 126.62 m3 126.62 0.00 0.00 0.00 0 126.62

03.02 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 111.62 m2 111.62 0.00 0.00 0.00 0 111.62

03.03 CANALETA DE EVACUACION PLUVIAL FC=140 KG/CM2 m 165.94 m 165.94 0.00 0.00 0.00 0 165.94

4 PISOS Y PAVIMENTOS

04.01 PISO FROTACHADO Y BRUÑADO (BRUÑAS 1X1 CM) m2 392.28 m2 392.28 0.00 0.00 0.00 0 392.28

04.02 PISO DE CEMENTO PULIDO m2 508.06 m2 508.06 0.00 0.00 0.00 0 508.06

5 CARPINTERIA METALICA

05.01 REJILLA METALICA PARA CANALETA DE AGUAS PLUVIALES und 165.94 und 165.94 0.00 0.00 0.00 0 165.94

6 VARIOS

06.01 BRUÑADO m 199.36 m 199.36 0.00 0.00 0.00 0 199.36

06.02 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1" m 422.18 m 422.18 0.00 0.00 0.00 0 422.18

7 FLETE TERRETRE

07.01 FLETE TERRESTRE kg 63,141.23 kg 63,141.23 0.00 0.00 0.00 0 63,141.23

TANQUE SEPTICO

1 TANQUE SEPTICO Y POZO DE PERCOLACION

01.01 TRABAJOS PRELIMINARES

01.01.01 LIMPIEZA DE TERRENO MANUAL m2 19.95 0.43 m2 19.95 0.00 19.95 19.95 100 0.00

Page 27: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

VALOR REFERENCIAL S/. 3,851,133

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO MONTO OFERTADO S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA FECHA BASE 12/10/2012

CONTRATISTA : CONSORCIO DEL NORTE FACTOR DE RELACION 1.00000

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS

INSPECTOR : ING. CIVIL YSIDRO DIAZ ALARCON

VALORIZACION Nº 03(METRADOS REALMENTE EJECUTADOS)EJECUCION DE OBRA DE ACUERDO A EL ACTA DE CONCILIACION EXTRAJUDICIAL N°01

PARTIDA DESCRIPCION UNDMETRADOS EJECUTADOS

ANTERIOR ACTUAL ACUMULA

0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOTA - CUTERVO - CAJAMARCA

METRADO BASE

% Avance

SALDOS METRADO

01.01.02 TRAZO Y REPLANTEO m2 19.95 1.66 m2 19.95 0.00 19.95 19.95 100 0.00

01.02 MOVIMIENTO DE TIERRAS

01.02.01 EXCAVACIONES

01.02.01.01 EXCAVACION DE ZANJAS Y ZAPATAS RT<2.00 KG/CM2 H=2.00 M. m3 43.24 9.50 m3 43.24 0.00 0.00 0.00 0 43.24

01.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 56.21 20.10 m3 56.21 0.00 0.00 0.00 0 56.21

01.02.03 FILTROS

01.02.03.01 FILTRO DE GRAVA m3 8.89 59.62 m3 8.89 0.00 0.00 0.00 0 8.89

01.03 OBRAS DE CONCRETO ARMADO

01.03.01 CONCRETO F'C 210 KG./CM2 m3 7.70 414.62 m3 7.7 0.00 0.00 0.00 0 7.70

01.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 38.80 40.63 m2 38.8 0.00 0.00 0.00 0 38.80

01.03.03 ACERO CORRUGADO DE GRADO 60 kg 356.32 4.33 kg 356.32 0.00 154.71 154.71 43.418 201.61

01.04 MUROS Y TABIQUES DE ALBAÑILERIA

01.04.01 MURO DE SOGA LADRILLO KING-KONG TIPO IV (24 X 13 X 9) J=1.5 CM m2 21.21 4 m2 21.21 0.00 0.00 0.00 0 21.21

2 FLETE TERRETRE 0.00 #DIV/0! 0.00

02.01 FLETE TERRESTRE kg 7826.67 0.00 0.00 0.00 0 7,826.67

EQUIPAMIENTO

1 MOBILIARIO AULAS

01.01 CONFECCION DE CARPETAS UNIPERSONALES und 136.00 0.00 0.00 0.00 0 136.00

01.02 CONFECCION DE PUPITRE PARA PROFESOR und 5 0.00 0.00 0.00 0 5.00

01.03 ESTANTES METALICOS und 5 0.00 0.00 0.00 0 5.00

01.04 PIZARRAS ACRILICAS DE 3.60 X 1.30 C/BASTIDOR DE MADERA und 5 0.00 0.00 0.00 0 5.00

2 MOBILIARIO PARA LABORATORIO

02.01 BANCOS DE PLASTICO APILABLES und 48.00 0.00 0.00 0.00 0 48.00

02.02 PIZARRAS ACRILICAS DE 3.60 X 1.30 C/BASTIDOR DE MADERA und 1.00 0.00 0.00 0.00 0 1.00

02.03 CONFECCION DE PUPITRE PARA PROFESOR und 1.00 0.00 0.00 0.00 0 1.00

02.04 ESTANTES METALICOS und 5.00 0.00 0.00 0.00 0 5.00

02.05 ADQUISICION DE MATERIALES PARA LABORATORIO glb 1.00 0.00 0.00 0.00 0 1.00

02.06 ADQUISICION DE EQUIPOS PARA CIENCIAS glb 1.00 0.00 0.00 0.00 0 1.00

02.07 ADQUISICION DE EQUIPOS BIOLOGIA Y QUIMICA glb 1.00 0.00 0.00 0.00 0 1.00

02.08 ADQUISICION DE EQUIPOS PARA ELECTRICIDAD glb 1.00 0.00 0.00 0.00 0 1.00

3 MOBILIARIO PARA BIBLIOTECA

03.01 ADQUISICION DE MESAS PARA 8 PERSONAS und 8.00 0.00 0.00 0.00 0 8.00

03.02 ADQUISICION DE SILLAS INDIVIDUALES APILABLES und 48.00 0.00 0.00 0.00 0 48.00

03.03 ESTANTES METALICOS und 6.00 0.00 0.00 0.00 0 6.00

03.04 ADQUISICION DE SET DE MATERIALES Y UTILES DE OFICINA glb 2.00 0.00 0.00 0.00 0 2.00

4 MOBILIARIO PARA SALA DE COMPUTO

04.01 CONFECCION DE MESA BIPERSONAL P/SALA DE COMPUTO und 24.00 0.00 0.00 0.00 0 24.00

04.02 ADQUISICION DE SILLAS INDIVIDUALES APILABLES und 18.00 0.00 0.00 0.00 0 18.00

04.03 PIZARRAS ACRILICAS DE 3.60 X 1.30 C/BASTIDOR DE MADERA und 1.00 0.00 0.00 0.00 0 1.00

04.04 CONFECCION DE PUPITRE PARA PROFESOR und 1.00 0.00 0.00 0.00 0 1.00

04.05 ESTANTES METALICOS und 10.00 0.00 0.00 0.00 0 10.00

04.06 ADQUISICION DE MAQUINAS DE COMPUTO und 30.00 0.00 0.00 0.00 0 30.00

04.07 ADQUISICIÓN DE PROYECTORES MULTIMEDIA und 2.00 0.00 0.00 0.00 0 2.00

5 MOBILIARIO PARA SALA DE PROFESORES

05.01 CONFECCION DE PUPITRE PARA PROFESOR und 4.00 0.00 0.00 0.00 0 4.00

05.02 PIZARRAS ACRILICAS DE 3.60 X 1.30 C/BASTIDOR DE MADERA und 1.00 0.00 0.00 0.00 0 1.00

05.03 ESTANTES METALICOS und 2.00 0.00 0.00 0.00 0 2.00

6 EQUIPAMIENTO GENERAL

06.01 ADQUISICION DE EQUIPOS GENERALES und 1.00 0.00 0 1.00

7 FLETE TERRETRE

07.01 TRANSPORTE DE MOBILIARIO Y EQUIPO blb 1.00 0.00 0.00 0.00 0 1.00

Page 28: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO 0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOT - CUTERVO - CAJAMARCA PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO VALOR REFERENCIAL S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA MONTO OFERTADO S/. 3,851,133

CONTRATISTA : CONSORCIO DEL NORTE FECHA BASE 12/10/2012

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS FACTOR DE RELACION 1.00000

VALORIZACION CONTRACTUAL N°0301 DE MARZO AL 31 DE MARZO (Deacuerdo a Paralizacion de Obra, Aceptada por Conciliacion Extra Judicial N°01)

PARTIDA DESCRIPCION UND METRADO PRESUPUESTO BASE AVANCESALDOS

P.U. PARCIAL ANTERIOR ACTUAL ACUMULADO

(S/.) (S/.) Metrado Parcial Metrado Parcial Metrado Parcial % Metrado Parcial %

MODULO I 1,029,243.52 0.00 0.00 0.00 0.00 0.00 100.00

1 TRABAJOS PRELIMINARES 2022.02 0.00 0.00 0.00 0.00 0.00 100.00

01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40X3.60 M und 1.00 877.08 877.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 877.08 100.00

01.02 LIMPIEZA DE TERRENO MANUAL m2 547.82 0.43 235.56 0.00 0.00 547.82 235.56 547.82 235.56 100.00 0.00 0.00 0.00

01.03 TRAZO Y REPLANTEO m2 547.82 1.66 909.38 0.00 0.00 547.82 909.38 547.82 909.38 100.00 0.00 0.00 0.00

2 MOVIMIENTO DE TIERRAS 20699.57 0.00 0.00 0.00 0.00 0.00 100.00

02.01 EXCAVACIONES 4227.22 0.00 0.00 0.00 0.00 0.00 100.00

02.01.01 EXCAVACION DE ZANJAS Y ZAPATAS RT<2.00 KG/CM2 H=2.00 M. m3 444.97 9.50 4,227.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 444.97 4,227.22 100.00

02.02 CORTES 420.89 0.00 0.00 0.00 0.00 0.00 100.00

02.02.01 CORTE DE TERRENO HASTA 15 CM. m3 73.84 5.70 420.89 0.00 0.00 73.84 420.89 73.84 420.89 100.00 0.00 0.00 0.00

02.03 RELLENOS 5,138.97 0.00 0.00 0.00 0.00 0.00 100.00

02.03.01 RELLENO CON MATERIAL PROPIO m3 115.25 10.87 1252.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 115.25 1,252.77 100.00

02.03.02 RELLENO MANUAL CON MATERIAL DE PRESTAMO m3 74.15 52.41 3886.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 74.15 3,886.20 100.00

02.04 NIVELACION INTERIOR Y APISONADO m2 399.39 0.92 367.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 399.39 367.44 100.00

02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 524.63 20.10 10545.06 0.00 0.00 88.61 1,781.02 88.61 1,781.02 16.89 436.02 8,764.04 83.11

3 OBRAS DE CONCRETO SIMPLE 21630.00 0.00 0.00 0.00 0.00 0.00 100.00

03.01 SOLADOS PARA CIMIENTOS CORRIDOS E=4" 1.12 CEM/HORM. m2 295.03 20.43 6,027.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 295.03 6,027.46 100.00

03.02 CONCRETO EN CIMIENTOS CORRIDOS CON Cº CICLOPEO m3 5.52 195.03 1076.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.52 1,076.57 100.00

03.03 CONCRETO EN SOBRECIMIENTO F'C= 175 KG/CM2 m3 6.11 412.25 2518.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.11 2,518.85 100.00

03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 86.26 27.89 2,405.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 86.26 2,405.79 100.00

03.05 FALSO PISO MEZCLA 1:8 E=4" m2 399.39 24.04 9601.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 399.39 9,601.34 100.00

4 OBRAS DE CONCRETO ARMADO 567,978.96 0.00 0.00 0.00 0.00 0.00 100.00

04.01 CIMIENTOS REFORZADOS 83,880.25 0.00 0.00 0.00 0.00 0.00 100.00

04.01.01 CIMIENTOS REFORZADOS FC=210 KG/CM2 m3 170.18 404.78 68,885.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 170.18 68,885.46 100.00

04.01.02 ACERO CORRUGADO DE GRADO 60 kg 3,463.00 4.33 14,994.79 0.00 0.00 1,503.57 6,510.44 1,503.57 6,510.44 43.42 1,959.43 8,484.35 56.58

04.02 VIGAS DE CIMENTACIÓN 74,274.00 0.00 0.00 0.00 0.00 0.00 100.00

04.02.01 VIGAS DE CIMENTACION CONCRETO F'C= 210 KG/CM2 m3 58.37 411.77 24,035.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58.37 24,035.01 100.00

04.02.02 VIGAS DE CIMENTACION ENCOFRADO Y DESENCOFRADO m2 389.16 34.26 13,332.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 389.16 13,332.62 100.00

04.02.03 VIGAS DE CIMENTACION ACERO CORRUGADO DE GRADO 60 kg 8,523.41 4.33 36,906.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,523.41 36,906.37 100.00

04.03 COLUMNAS 145478.96 0.00 0.00 0.00 0.00 0.00 100.00

04.03.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 89.19 452.22 40333.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 89.19 40,333.50 100.00

Page 29: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO 0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOT - CUTERVO - CAJAMARCA PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO VALOR REFERENCIAL S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA MONTO OFERTADO S/. 3,851,133

CONTRATISTA : CONSORCIO DEL NORTE FECHA BASE 12/10/2012

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS FACTOR DE RELACION 1.00000

VALORIZACION CONTRACTUAL N°0301 DE MARZO AL 31 DE MARZO (Deacuerdo a Paralizacion de Obra, Aceptada por Conciliacion Extra Judicial N°01)

PARTIDA DESCRIPCION UND METRADO PRESUPUESTO BASE AVANCESALDOS

P.U. PARCIAL ANTERIOR ACTUAL ACUMULADO

(S/.) (S/.) Metrado Parcial Metrado Parcial Metrado Parcial % Metrado Parcial %

04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 843.52 46.56 39,274.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 843.52 39,274.29 100.00

04.03.03 ACERO CORRUGADO DE GRADO 60 kg 15,212.74 4.33 65871.16 0.00 0.00 6,605.07 28,599.95 6,605.07 28,599.95 43.42 8,607.67 37,271.21 56.58

04.04 VIGAS 150,118.89 0.00 0.00 0.00 0.00 0.00 100.00

04.04.01 CONCRETO EN VIGAS F'C 210 KG/CM2. m3 102.32 438.75 44,892.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 102.32 44,892.90 100.00

04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 821.68 54.06 44,420.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 821.68 44,420.02 100.00

04.04.03 ACERO CORRUGADO DE GRADO 60 kg 14,042.95 4.33 60,805.97 0.00 0.00 6,097.17 26,400.75 6,097.17 26,400.75 43.42 7,945.78 34,405.23 56.58

04.05 LOSAS ALIGERADAS 107,825.05 0.00 0.00 0.00 0.00 0.00 100.00

04.05.01 CONCRETO F'C 210 KG./CM2 EN LOSAS ALIGERADAS m3 80.57 414.62 33,405.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 80.57 33,405.93 100.00

04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 920.85 40.63 37,414.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 920.85 37,414.14 100.00

04.05.03 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 4,171.65 4.04 16,853.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,171.65 16,853.47 100.00

04.05.04 ACERO CORRUGADO DE GRADO 60 kg 4,653.93 4.33 20,151.52 0.00 0.00 2,020.64 8,749.39 2,020.64 8,749.39 43.42 2,633.29 11,402.13 56.58

04.06 ESCALERA 6,401.80 0.00 0.00 0.00 0.00 0.00 100.00

04.06.01 CONCRETO EN ESCALERAS F'C=210 KG/CM2 m3 6.09 445.92 2,715.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.09 2,715.65 100.00

04.06.02 ENCOFRADO Y DESENCOFRADO DE ESCALERAS m2 29.05 41.12 1,194.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 29.05 1,194.54 100.00

04.06.03 ACERO CORRUGADO DE GRADO 60 kg 575.43 4.33 2,491.61 0.00 0.00 249.84 1,081.81 249.84 1,081.81 43.42 325.59 1,409.80 56.58

5 MUROS Y TABIQUES DE ALBAÑILERIA 37,194.90 0.00 0.00 0.00 0.00 0.00 100.00

05.01 MURO DE SOGA LADRILLO KING-KONG TIPO IV (24 X 13 X 9) J=1.5 CM m2 382.87 40.30 15,429.66 0.00 0.00 96.34 3,882.30 96.34 3,882.30 25.16 286.53 11,547.36 74.84

05.02 m2 260.33 80.27 20,896.69 0.00 0.00 58.18 4,670.32 58.18 4,670.32 22.35 202.15 16,226.37 77.65

05.03 MURO DE CANTO LADRILLO KING-KONG TIPO IV (24 X 13 X 9) J=1.5 CM m2 17.55 49.49 868.55 0.00 0.00 3.60 177.96 3.60 177.96 20.49 13.95 690.59 79.51

6 REVOQUES ENLUCIDOS Y MOLDURAS 42,324.01 0.00 0.00 0.00 0.00 0.00 100.00

06.01 TARRAJEO EN MUROS INTERIORES ACABADO CON CEMENTO - ARENA m2 836.40 12.30 10,287.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 836.40 10,287.72 100.00

06.02 m2 408.53 20.96 8,562.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 408.53 8,562.79 100.00

06.03 TARRAJEO DE COLUMNAS CON CEMENTO-ARENA m2 556.35 15.86 8,823.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 556.35 8,823.71 100.00

06.04 TARRAJEO DE VIGAS CON CEMENTO-ARENA m2 686.93 18.14 12,460.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 686.93 12,460.91 100.00

06.05 VESTIDURA DE DERRAMES m 184.56 11.86 2,188.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 184.56 2,188.88 100.00

7 CIELORRASOS 29,950.21 0.00 0.00 0.00 0.00 0.00 100.00

07.01 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA m2 539.57 30.38 16,392.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 539.57 16,392.14 100.00

MURO DE CABEZA LADRILLO KING-KONG TIPO IV (24 X 13 X 9) J=1.5 CM

TARRAJEO EN MUROS EXTERIORES ACABADO CON CEMENTO - ARENA

Page 30: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO 0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOT - CUTERVO - CAJAMARCA PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO VALOR REFERENCIAL S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA MONTO OFERTADO S/. 3,851,133

CONTRATISTA : CONSORCIO DEL NORTE FECHA BASE 12/10/2012

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS FACTOR DE RELACION 1.00000

VALORIZACION CONTRACTUAL N°0301 DE MARZO AL 31 DE MARZO (Deacuerdo a Paralizacion de Obra, Aceptada por Conciliacion Extra Judicial N°01)

PARTIDA DESCRIPCION UND METRADO PRESUPUESTO BASE AVANCESALDOS

P.U. PARCIAL ANTERIOR ACTUAL ACUMULADO

(S/.) (S/.) Metrado Parcial Metrado Parcial Metrado Parcial % Metrado Parcial %

07.02 FALSO CIELO DE PLACA DE FIBROCEMENTO 4 MM m2 347.02 39.07 13,558.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 347.02 13,558.07 100.00

8 PISOS Y PAVIMENTOS 38,437.74 0.00 0.00 0.00 0.00 0.00 100.00

08.01 CONTRAPISO DE 2" m2 423.92 22.50 9,538.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 423.92 9,538.20 100.00

08.02 PISO FROTACHADO Y BRUÑADO (BRUÑAS 1X1 CM) m2 780.79 26.85 20,964.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 780.79 20,964.21 100.00

08.03 PISO DE CERAMICO GRESS DE 30X30 CM. EN BAÑOS m2 92.80 85.51 7,935.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 92.80 7,935.33 100.00

9 CONTRAZOCALOS 2,584.98 0.00 0.00 0.00 0.00 0.00 100.00

09.01 CONTRAZOCALO CEMENTO PULIDO Y BRUÑADO H = 15 CM m 277.80 6.23 1,730.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 277.80 1,730.69 100.00

09.02 CONTRAZOCALO DE CERAMICO GRESS H=0.15 M. m 73.90 11.56 854.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 73.90 854.28 100.00

10 ZOCALOS 1,072.36 0.00 0.00 0.00 0.00 0.00 100.00

10.01 ENCHAPE DE CERAMICA COLOR BLANCO 20X20 CM. m2 17.40 61.63 1,072.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.40 1,072.36 100.00

11 COBERTURA 45,196.61 0.00 0.00 0.00 0.00 0.00 100.00

11.01 COBERTURA DE TEJA ANDINA 0.72 X 1.14 m2 622.20 72.64 45,196.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 622.20 45,196.61 100.00

12 CARPINTERIA DE MADERA 7,700.00 0.00 0.00 0.00 0.00 0.00 100.00

12.01 PUERTA DE MADERA MACHIEMBRADA und 14.00 550.00 7,700.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.00 7,700.00 100.00

13 CARPINTERIA METALICA 13,603.39 0.00 0.00 0.00 0.00 0.00 100.00

13.01 BARANDA METALICA TUBO CIRCULAR FG m 57.05 92.70 5,288.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 57.05 5,288.54 100.00

13.02 PANEL DE TUBO METALICO CUADRADO DE 2" X 2" m2 13.70 459.42 6,294.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.70 6,294.05 100.00

13.03 CANTONERA PLANCHA ESTRIADA 2"x2"x3/16" m 40.00 50.52 2,020.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.00 2,020.80 100.00

14 CERRAJERIA 1,715.84 0.00 0.00 0.00 0.00 0.00 100.00

14.01 BISAGRA ALUMINIZADA CAPUCHINA DE 3" X 3" pza 56.00 10.37 580.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.00 580.72 100.00

14.02 CERRADURA PARA PUERTA PRINCIPAL PESADA pza 10.00 81.08 810.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 810.80 100.00

14.03 CERRADURA PARA PUERTA INTERIOR pza 4.00 81.08 324.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 324.32 100.00

15 VIDRIOS, CRISTALES Y SIMILARES 34,292.80 0.00 0.00 0.00 0.00 0.00 100.00

15.01 CRISTAL TEMPLADO 8 MM PERFILERIA DE ALUMINIO m2 160.00 214.33 34,292.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 160.00 34,292.80 100.00

16 PINTURA 22,983.80 0.00 0.00 0.00 0.00 0.00 100.00

16.01 PINTADO DE CIELO RASO C/LATEX m2 539.57 7.10 3,830.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 539.57 3,830.95 100.00

16.02 PINTADO DE MURO INTERIOR C/ PINTURA LATEX m2 836.40 5.70 4,767.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 836.40 4,767.48 100.00

16.03 PINTURA LATEX EN MUROS EXTERIORES 2 MANOS m2 408.53 5.70 2,328.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 408.53 2,328.62 100.00

16.04 PINTURA LATEX EN COLUMNAS m2 556.35 8.14 4,528.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 556.35 4,528.69 100.00

16.05 PINTURA LATEX EN VIGAS m2 686.93 8.36 5,742.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 686.93 5,742.73 100.00

16.06 PINTURA LATEX DERRAME m2 184.56 8.14 1,502.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 184.56 1,502.32 100.00

Page 31: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO 0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOT - CUTERVO - CAJAMARCA PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO VALOR REFERENCIAL S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA MONTO OFERTADO S/. 3,851,133

CONTRATISTA : CONSORCIO DEL NORTE FECHA BASE 12/10/2012

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS FACTOR DE RELACION 1.00000

VALORIZACION CONTRACTUAL N°0301 DE MARZO AL 31 DE MARZO (Deacuerdo a Paralizacion de Obra, Aceptada por Conciliacion Extra Judicial N°01)

PARTIDA DESCRIPCION UND METRADO PRESUPUESTO BASE AVANCESALDOS

P.U. PARCIAL ANTERIOR ACTUAL ACUMULADO

(S/.) (S/.) Metrado Parcial Metrado Parcial Metrado Parcial % Metrado Parcial %

16.07 PINTURA EN PUERTAS C/BARNIZ 2 MANOS m2 26.40 10.72 283.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26.40 283.01 100.00

17 VARIOS 695.63 0.00 0.00 0.00 0.00 0.00 100.00

17.01 BRUÑADO m 717.14 0.97 695.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 717.14 695.63 100.00

18 INSTALACIONES ELECTRICAS 18,859.27 0.00 0.00 0.00 0.00 0.00 100.00

18.01 SALIDA PARA CENTROS DE LUZ (TECHO) pto 76.00 50.79 3,860.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 76.00 3,860.04 100.00

18.02 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC pto 18.00 51.79 932.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.00 932.22 100.00

18.03 SALIDA PARA INTERRUPTOR pto 22.00 51.79 1,139.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.00 1,139.38 100.00

18.04 SALIDA PARA INTERNET - TELEFONO pto 12.00 54.01 648.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 648.12 100.00

18.05 SALIDA PARA TV pto 9.00 68.41 615.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 615.69 100.00

18.06 TABLERO ELECTRICO TD - 1 und 1.00 410.10 410.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 410.10 100.00

18.07 TABLERO ELECTRICO TD - 3 und 1.00 410.10 410.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 410.10 100.00

18.08 CAJA CENTRAL DE TV VIDEO und 1.00 500.00 500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 500.00 100.00

18.09 CAJA CENTRAL DE TELEFONO und 1.00 600.00 600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 600.00 100.00

18.10 CAJA CUADRADA DE PASE DE FºGº CON TAPA und 4.00 4.50 18.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 18.00 100.00

18.11 LUMINARIA CON 02 FLUORESCENTES LINEALES INC. PANTALLA und 40.00 62.30 2,492.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.00 2,492.00 100.00

18.12 LUMINARIA EMPOTRADO EN TECHO CON 02 LUMINARIAS und 34.00 62.30 2,118.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34.00 2,118.20 100.00

18.13 LUMINARIA ADOSADA CON 01 LAMPARA FLUORESCENTE und 2.00 62.30 124.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 124.60 100.00

18.14 m 773.71 3.92 3,032.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 773.71 3,032.94 100.00

18.15 m 346.11 3.29 1,138.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 346.11 1,138.70 100.00

18.16 CABLE PARA TELEFONO m 52.98 1.58 83.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 52.98 83.71 100.00

18.17 CABLE ESTRUCTURADO PARA INTERNET m 160.92 3.15 506.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 160.92 506.90 100.00

18.18 CABLE COAXIAL PARA TELEVISIÓN m 181.40 1.26 228.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 181.40 228.56 100.00

19 INSTALACIONES SANITARIAS 31,404.23 0.00 0.00 0.00 0.00 0.00 100.00

19.01 SISTEMA DE DESAGUE PLUVIAL 8,988.67 0.00 0.00 0.00 0.00 0.00 100.00

19.01.01 TUBERIA DE DRENAJE PVC SAL 4" m 79.20 19.85 1,572.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 79.20 1,572.12 100.00

19.01.02 SUMIDERO CON REJILLA ROSCADO und 12.00 23.90 286.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 286.80 100.00

19.01.03 CANALETA RECTA m 102.90 65.54 6,744.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 102.90 6,744.07 100.00

19.01.04 CODO PVC SAL 4"X90° pza 24.00 16.07 385.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.00 385.68 100.00

19.02 SISTEMA DE DESAGUE 7,139.87 0.00 0.00 0.00 0.00 0.00 100.00

19.02.01 SALIDAS DE PVC SAL PARA DESAGUE DE 2" pto 28.00 37.61 1,053.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.00 1,053.08 100.00

SUMINISTRO Y TENDIDO DE CABLE ELECTRICO TW AWG-Nº. 12 -4.00 MM2.

SUMINISTRO Y TENDIDO DE CABLE ELECTRICO TW AWG-Nº 14 -2.5 MM2.

Page 32: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO 0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOT - CUTERVO - CAJAMARCA PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO VALOR REFERENCIAL S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA MONTO OFERTADO S/. 3,851,133

CONTRATISTA : CONSORCIO DEL NORTE FECHA BASE 12/10/2012

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS FACTOR DE RELACION 1.00000

VALORIZACION CONTRACTUAL N°0301 DE MARZO AL 31 DE MARZO (Deacuerdo a Paralizacion de Obra, Aceptada por Conciliacion Extra Judicial N°01)

PARTIDA DESCRIPCION UND METRADO PRESUPUESTO BASE AVANCESALDOS

P.U. PARCIAL ANTERIOR ACTUAL ACUMULADO

(S/.) (S/.) Metrado Parcial Metrado Parcial Metrado Parcial % Metrado Parcial %

19.02.02 SALIDAS DE PVC SAL PARA DESAGUE DE 4" pto 17.00 44.64 758.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.00 758.88 100.00

19.02.03 SALIDA DE MONTANTE Y/O VENTILACION DE PVC 4" pto 6.00 39.07 234.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 234.42 100.00

19.02.04 TUBERIA DE PVC SAL 2" m 48.18 11.16 537.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 48.18 537.69 100.00

19.02.05 TUBERIA DE PVC SAL 4" m 210.68 12.21 2,572.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 210.68 2,572.40 100.00

19.02.06 MONTANTE Y/O VENTILACION DE PVC 2" m 40.20 11.16 448.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.20 448.63 100.00

19.02.07 CAJA DE REGISTRO DE 30X60 pza 9.00 170.53 1,534.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 1,534.77 100.00

19.03 SISTEMA DE AGUA FRIA 15,275.69 0.00 0.00 0.00 0.00 0.00 100.00

19.03.01 URINARIOS pza 4.00 283.98 1,135.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 1,135.92 100.00

19.03.02 OVALINES pza 14.00 353.98 4,955.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.00 4,955.72 100.00

19.03.03 LAVATORIO INC. ACCESORIOS pza 2.00 276.99 553.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 553.98 100.00

19.03.04 INODOROS pza 14.00 400.96 5,613.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.00 5,613.44 100.00

19.03.05 SALIDA DE AGUA FRIA PVC 1/2" pto 38.00 50.29 1,911.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38.00 1,911.02 100.00

19.03.06 TUBERIA DE AGUA FRIA PVC 1/2" m 116.38 9.50 1,105.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 116.38 1,105.61 100.00

20 FLETE TERRETRE 88,897.21 0.00 0.00 0.00 0.00 0.00 100.00

20.01 FLETE TERRESTRE kg 522,924.76 0.17 88,897.21 0.00 0.00 50,000.00 8,500.00 50,000.00 8,500.00 9.56 472,924.76 80,397.21 90.44

MODULO II 1,094,998.64 0.00 0.00 0.00 0.00 0.00 100.00

1 TRABAJOS PRELIMINARES 951.56 0.00 0.00 0.00 0.00 0.00 100.00

01.01 LIMPIEZA DE TERRENO MANUAL m2 455.29 0.43 195.77 0.00 0.00 455.29 195.77 455.29 195.77 100.00 0.00 0.00 0.00

01.02 TRAZO Y REPLANTEO m2 455.29 1.66 755.78 0.00 0.00 455.29 755.78 455.29 755.78 100.00 0.00 0.00 0.00

2 MOVIMIENTO DE TIERRAS 239,268.85 0.00 0.00 0.00 0.00 0.00 100.00

02.01 EXCAVACIONES 61,414.61 0.00 0.00 0.00 0.00 0.00 100.00

02.01.01 EXCAVACION DE ZANJAS Y ZAPATAS RT<2.00 KG/CM2 H=2.00 M. m3 383.69 9.50 3,645.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 383.69 3,645.06 100.00

02.01.02 m3 6,198.45 9.32 57,769.55 1,500.00 13,980.00 4,698.45 43,789.55 6,198.45 57,769.55 100.00 0.00 0.00 0.00

02.02 CORTES 334.08 0.00 0.00 0.00 0.00 0.00 100.00

02.02.01 CORTE DE TERRENO HASTA 15 CM. m3 58.61 5.70 334.08 0.00 0.00 58.61 334.08 58.61 334.08 100.00 0.00 0.00 0.00

02.03 RELLENOS 7,483.28 0.00 0.00 0.00 0.00 0.00 100.00

02.03.01 RELLENO CON MATERIAL PROPIO m3 99.34 10.87 1,079.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 99.34 1,079.83 100.00

02.03.02 RELLENO MANUAL CON MATERIAL DE PRESTAMO m3 122.18 52.41 6,403.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 122.18 6,403.45 100.00

02.04 NIVELACION INTERIOR Y APISONADO m2 319.12 0.92 293.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 319.12 293.59 100.00

02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 8,444.94 20.10 169,743.29 1,800.00 36,180.00 6,644.94 133,563.29 8,444.94 169,743.29 100.00 0.00 0.00 0.00

EXCAVACION MASIVA A MAQUINA EN TERRENO NORMAL"C"/RETRO .5Y3

Page 33: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO 0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOT - CUTERVO - CAJAMARCA PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO VALOR REFERENCIAL S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA MONTO OFERTADO S/. 3,851,133

CONTRATISTA : CONSORCIO DEL NORTE FECHA BASE 12/10/2012

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS FACTOR DE RELACION 1.00000

VALORIZACION CONTRACTUAL N°0301 DE MARZO AL 31 DE MARZO (Deacuerdo a Paralizacion de Obra, Aceptada por Conciliacion Extra Judicial N°01)

PARTIDA DESCRIPCION UND METRADO PRESUPUESTO BASE AVANCESALDOS

P.U. PARCIAL ANTERIOR ACTUAL ACUMULADO

(S/.) (S/.) Metrado Parcial Metrado Parcial Metrado Parcial % Metrado Parcial %

3 OBRAS DE CONCRETO SIMPLE 19,690.72 0.00 0.00 0.00 0.00 0.00 100.00

03.01 SOLADOS PARA CIMIENTOS CORRIDOS E=4" 1.12 CEM/HORM. m2 255.88 20.43 5,227.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 255.88 5,227.63 100.00

03.02 CONCRETO EN SOBRECIMIENTO F'C= 175 KG/CM2 m3 11.21 412.25 4,621.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.21 4,621.32 100.00

03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 77.81 27.89 2,170.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 77.81 2,170.12 100.00

03.04 FALSO PISO MEZCLA 1:8 E=4" m2 319.12 24.04 7,671.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 319.12 7,671.64 100.00

4 OBRAS DE CONCRETO ARMADO 492,034.08 0.00 0.00 0.00 0.00 0.00 100.00

04.01 CIMIENTOS REFORZADOS 73,809.78 0.00 0.00 0.00 0.00 0.00 100.00

04.01.01 CIMIENTOS REFORZADOS FC=210 KG/CM2 m3 149.91 404.78 60,680.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 149.91 60,680.57 100.00

04.01.02 ACERO CORRUGADO DE GRADO 60 kg 3,032.15 4.33 13,129.21 0.00 0.00 1,316.50 5,700.44 1,316.50 5,700.44 43.42 1,715.65 7,428.77 56.58

04.02 VIGAS DE CIMENTACIÓN 65,287.01 0.00 0.00 0.00 0.00 0.00 100.00

04.02.01 VIGAS DE CIMENTACION CONCRETO F'C= 210 KG/CM2 m3 50.75 411.77 20,897.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.75 20,897.33 100.00

04.02.02 VIGAS DE CIMENTACION ENCOFRADO Y DESENCOFRADO m2 336.51 34.26 11,528.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 336.51 11,528.83 100.00

04.02.03 VIGAS DE CIMENTACION ACERO CORRUGADO DE GRADO 60 kg 7,589.11 4.33 32,860.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,589.11 32,860.85 100.00

04.03 COLUMNAS 119,994.25 0.00 0.00 0.00 0.00 0.00 100.00

04.03.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 68.16 452.22 30,823.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 68.16 30,823.32 100.00

04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 717.08 46.56 33,387.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 717.08 33,387.24 100.00

04.03.03 ACERO CORRUGADO DE GRADO 60 kg 12,883.07 4.33 55,783.69 0.00 0.00 5,593.57 24,220.17 5,593.57 24,220.17 43.42 7,289.50 31,563.52 56.58

04.04 VIGAS 127,254.68 0.00 0.00 0.00 0.00 0.00 100.00

04.04.01 CONCRETO EN VIGAS F'C 210 KG/CM2. m3 86.50 438.75 37,951.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 86.50 37,951.88 100.00

04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 730.81 54.06 39,507.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 730.81 39,507.59 100.00

04.04.03 ACERO CORRUGADO DE GRADO 60 kg 11,500.05 4.33 49,795.22 0.00 0.00 4,993.09 21,620.09 4,993.09 21,620.09 43.42 6,506.96 28,175.12 56.58

04.05 LOSAS ALIGERADAS 99,286.56 0.00 0.00 0.00 0.00 0.00 100.00

04.05.01 CONCRETO F'C 210 KG./CM2 EN LOSAS ALIGERADAS m3 65.53 414.62 27,170.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 65.53 27,170.05 100.00

04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 748.90 40.63 30,427.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 748.90 30,427.81 100.00

04.05.03 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 6,240.79 4.04 25,212.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,240.79 25,212.79 100.00

04.05.04 ACERO CORRUGADO DE GRADO 60 kg 3,805.06 4.33 16,475.91 0.00 0.00 1,652.08 7,153.51 1,652.08 7,153.51 43.42 2,152.98 9,322.40 56.58

04.06 ESCALERA 6,401.80 0.00 0.00 0.00 0.00 0.00 100.00

04.06.01 CONCRETO EN ESCALERAS F'C=210 KG/CM2 m3 6.09 445.92 2,715.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.09 2,715.65 100.00

04.06.02 ENCOFRADO Y DESENCOFRADO DE ESCALERAS m2 29.05 41.12 1,194.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 29.05 1,194.54 100.00

04.06.03 ACERO CORRUGADO DE GRADO 60 kg 575.43 4.33 2,491.61 0.00 0.00 249.84 1,081.81 249.84 1,081.81 43.42 325.59 1,409.80 56.58

Page 34: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO 0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOT - CUTERVO - CAJAMARCA PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO VALOR REFERENCIAL S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA MONTO OFERTADO S/. 3,851,133

CONTRATISTA : CONSORCIO DEL NORTE FECHA BASE 12/10/2012

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS FACTOR DE RELACION 1.00000

VALORIZACION CONTRACTUAL N°0301 DE MARZO AL 31 DE MARZO (Deacuerdo a Paralizacion de Obra, Aceptada por Conciliacion Extra Judicial N°01)

PARTIDA DESCRIPCION UND METRADO PRESUPUESTO BASE AVANCESALDOS

P.U. PARCIAL ANTERIOR ACTUAL ACUMULADO

(S/.) (S/.) Metrado Parcial Metrado Parcial Metrado Parcial % Metrado Parcial %

5 MUROS Y TABIQUES DE ALBAÑILERIA 30,005.20 0.00 0.00 0.00 0.00 0.00 100.00

05.01 MURO DE SOGA LADRILLO KING-KONG TIPO IV (24 X 13 X 9) J=1.5 CM m2 317.46 40.30 12,793.64 0.00 0.00 79.88 3,219.04 79.88 3,219.04 25.16 237.58 9,574.59 74.84

05.02 MURO DE CABEZA LADRILLO KING-KONG TIPO IV (24 X 13 X 9) J=1.5 CM m2 177.46 80.27 14,244.71 0.00 0.00 39.66 3,183.63 39.66 3,183.63 22.35 137.80 11,061.08 77.65

05.03 MURO DE DRYWALL m2 15.12 196.22 2,966.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.12 2,966.85 100.00

6 REVOQUES ENLUCIDOS Y MOLDURAS 43,353.51 0.00 0.00 0.00 0.00 0.00 100.00

06.01 TARRAJEO EN MUROS INTERIORES ACABADO CON CEMENTO - ARENA m2 840.63 12.30 10,339.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 840.63 10,339.75 100.00

06.02 TARRAJEO EN MUROS EXTERIORES ACABADO CON CEMENTO - ARENA m2 588.53 20.96 12,335.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 588.53 12,335.59 100.00

06.03 TARRAJEO DE COLUMNAS CON CEMENTO-ARENA m2 530.91 15.86 8,420.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 530.91 8,420.23 100.00

06.04 TARRAJEO DE VIGAS CON CEMENTO-ARENA m2 574.63 18.14 10,423.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 574.63 10,423.79 100.00

06.05 VESTIDURA DE DERRAMES m 154.65 11.86 1,834.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 154.65 1,834.15 100.00

7 CIELORRASOS 24,964.24 0.00 0.00 0.00 0.00 0.00 100.00

07.01 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA m2 459.21 30.38 13,950.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 459.21 13,950.80 100.00

07.02 FALSO CIELO DE PLACA DE FIBROCEMENTO 4 MM m2 281.89 39.07 11,013.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 281.89 11,013.44 100.00

8 PISOS Y PAVIMENTOS 27,709.65 0.00 0.00 0.00 0.00 0.00 100.00

08.01 CONTRAPISO 2" m2 372.93 24.90 9,285.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 372.93 9,285.96 100.00

08.02 PISO DE CEMENTO PULIDO m2 585.94 20.39 11,947.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 585.94 11,947.32 100.00

08.03 PISO DE CERAMICO GRESS 30X30 CM. m2 50.01 51.47 2,574.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.01 2,574.01 100.00

08.04 PISO DE CERAMICO ANTIDESLIZANTE COLOR GRIS 40X40 CM. m2 78.55 49.68 3,902.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 78.55 3,902.36 100.00

9 CONTRAZOCALOS 2,317.98 0.00 0.00 0.00 0.00 0.00 100.00

09.01 CONTRAZOCALO CEMENTO H = 15 CM m 198.36 6.23 1,235.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 198.36 1,235.78 100.00

09.02 CONTRAZOCALO DE CERAMICO GRESS H=0.15 M. m 57.22 11.56 661.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 57.22 661.46 100.00

09.03 m 34.80 12.09 420.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34.80 420.73 100.00

10 COBERTURA 25,076.05 0.00 0.00 0.00 0.00 0.00 100.00

10.01 COBERTURA DE TEJA ANDINA 0.72 X 1.14 m2 345.21 72.64 25,076.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 345.21 25,076.05 100.00

11 CARPINTERIA DE MADERA 3,850.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00

11.01 PUERTA DE MADERA MACHIEMBRADA und 7.00 550.00 3,850.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 3,850.00 100.00

12 CARPINTERIA METALICA 12,412.19 0.00 0.00 0.00 0.00 0.00 100.00

12.01 BARANDA METALICA TUBO CIRCULAR FG m 44.20 92.70 4,097.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 44.20 4,097.34 100.00

CONTRAZOCALO DE CERAMICO ANTIDESLIZANTE COLOR GRIS 40X40 CM. H=0.15 M.

Page 35: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO 0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOT - CUTERVO - CAJAMARCA PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO VALOR REFERENCIAL S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA MONTO OFERTADO S/. 3,851,133

CONTRATISTA : CONSORCIO DEL NORTE FECHA BASE 12/10/2012

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS FACTOR DE RELACION 1.00000

VALORIZACION CONTRACTUAL N°0301 DE MARZO AL 31 DE MARZO (Deacuerdo a Paralizacion de Obra, Aceptada por Conciliacion Extra Judicial N°01)

PARTIDA DESCRIPCION UND METRADO PRESUPUESTO BASE AVANCESALDOS

P.U. PARCIAL ANTERIOR ACTUAL ACUMULADO

(S/.) (S/.) Metrado Parcial Metrado Parcial Metrado Parcial % Metrado Parcial %

12.02 PANEL DE TUBO METALICO CUADRADO DE 2" X 2" m2 13.70 459.42 6,294.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.70 6,294.05 100.00

12.03 CANTONERA PLANCHA ESTRIADA 2"x2"x3/16" m 40.00 50.52 2,020.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.00 2,020.80 100.00

13 CERRAJERIA 1,960.96 0.00 0.00 0.00 0.00 0.00 100.00

13.01 BISAGRA ALUMINIZADA CAPUCHINA DE 3" X 3" pza 64.00 10.37 663.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 64.00 663.68 100.00

13.02 CERRADURA PARA PUERTA PRINCIPAL PESADA pza 10.00 81.08 810.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 810.80 100.00

13.03 CERRADURA PARA PUERTA INTERIOR pza 6.00 81.08 486.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 486.48 100.00

14 VIDRIOS, CRISTALES Y SIMILARES 28,184.40 0.00 0.00 0.00 0.00 0.00 100.00

14.01 CRISTAL TEMPLADO 8 MM PERFILERIA DE ALUMINIO m2 131.50 214.33 28,184.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 131.50 28,184.40 100.00

15 PINTURA 22,215.48 0.00 0.00 0.00 0.00 0.00 100.00

15.01 PINTADO DE CIELO RASO C/LATEX m2 459.21 7.10 3,260.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 459.21 3,260.39 100.00

15.02 PINTADO DE MURO INTERIOR C/ PINTURA LATEX m2 840.63 5.70 4,791.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 840.63 4,791.59 100.00

15.03 PINTURA LATEX EN MUROS EXTERIORES 2 MANOS m2 588.53 5.70 3,354.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 588.53 3,354.62 100.00

15.04 PINTURA LATEX EN COLUMNAS m2 530.91 8.14 4,321.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 530.91 4,321.61 100.00

15.05 PINTURA LATEX EN VIGAS m2 574.63 8.36 4,803.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 574.63 4,803.91 100.00

15.06 PINTURA LATEX DERRAME m2 154.65 8.14 1,258.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 154.65 1,258.85 100.00

15.07 PINTURA EN PUERTAS C/BARNIZ 2 MANOS m2 39.60 10.72 424.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.60 424.51 100.00

16 BRUÑADO 290.84 0.00 0.00 0.00 0.00 0.00 100.00

16.01 BRUÑADO m 299.83 0.97 290.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 299.83 290.84 100.00

17 INSTALACIONES ELECTRICAS 26,108.02 0.00 0.00 0.00 0.00 0.00 100.00

17.01 SALIDA PARA CENTROS DE LUZ (TECHO) pto 65.00 50.79 3,301.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 65.00 3,301.35 100.00

17.02 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC pto 43.00 51.79 2,226.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 43.00 2,226.97 100.00

17.03 SALIDA PARA INTERRUPTOR pto 18.00 51.79 932.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.00 932.22 100.00

17.04 SALIDA PARA INTERNET - TELEFONO pto 53.00 54.01 2,862.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 53.00 2,862.53 100.00

17.05 SALIDA PARA TV pto 5.00 68.41 342.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 342.05 100.00

17.06 TABLERO ELECTRICO GENERAL TG und 1.00 1,199.49 1,199.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,199.49 100.00

17.07 TABLERO ELECTRICO TD - 1 und 1.00 410.10 410.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 410.10 100.00

17.08 CAJA CENTRAL DE TV VIDEO und 1.00 500.00 500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 500.00 100.00

17.09 CAJA CENTRAL DE TELEFONO und 1.00 600.00 600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 600.00 100.00

17.10 CAJA CUADRADA DE PASE DE FºGº CON TAPA und 2.00 4.50 9.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 9.00 100.00

17.11 LUMINARIA CON 02 FLUORESCENTES LINEALES INC. PANTALLA und 44.00 62.30 2,741.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 44.00 2,741.20 100.00

17.12 LUMINARIA EMPOTRADO EN TECHO CON 02 LUMINARIAS und 99.00 62.30 6,167.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 99.00 6,167.70 100.00

Page 36: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO 0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOT - CUTERVO - CAJAMARCA PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO VALOR REFERENCIAL S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA MONTO OFERTADO S/. 3,851,133

CONTRATISTA : CONSORCIO DEL NORTE FECHA BASE 12/10/2012

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS FACTOR DE RELACION 1.00000

VALORIZACION CONTRACTUAL N°0301 DE MARZO AL 31 DE MARZO (Deacuerdo a Paralizacion de Obra, Aceptada por Conciliacion Extra Judicial N°01)

PARTIDA DESCRIPCION UND METRADO PRESUPUESTO BASE AVANCESALDOS

P.U. PARCIAL ANTERIOR ACTUAL ACUMULADO

(S/.) (S/.) Metrado Parcial Metrado Parcial Metrado Parcial % Metrado Parcial %

17.13 LUMINARIA ADOSADA CON 01 LAMPARA FLUORESCENTE und 10.00 62.30 623.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 623.00 100.00

17.14 m 403.62 3.92 1,582.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 403.62 1,582.19 100.00

17.15 m 640.03 3.29 2,105.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 640.03 2,105.70 100.00

17.16 CABLE PARA TELEFONO m 38.83 1.58 61.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38.83 61.35 100.00

17.17 CABLE ESTRUCTURADO PARA INTERNET m 110.86 3.15 349.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 110.86 349.21 100.00

17.18 CABLE COAXIAL PARA TELEVISIÓN m 74.57 1.26 93.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 74.57 93.96 100.00

18 INSTALACIONES SANITARIAS 16,850.33 0.00 0.00 0.00 0.00 0.00 100.00

18.01 SISTEMA DE DESAGUE PLUVIAL 8,988.67 0.00 0.00 0.00 0.00 0.00 100.00

18.01.01 TUBERIA DE DRENAJE PVC SAL 4" m 79.20 19.85 1,572.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 79.20 1,572.12 100.00

18.01.02 SUMIDERO CON REJILLA ROSCADO und 12.00 23.90 286.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 286.80 100.00

18.01.03 CANALETA RECTA m 102.90 65.54 6,744.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 102.90 6,744.07 100.00

18.01.04 CODO PVC SAL 4"X90° pza 24.00 16.07 385.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.00 385.68 100.00

18.02 SISTEMA DE DESAGUE 1,986.25 0.00 0.00 0.00 0.00 0.00 100.00

18.02.01 SALIDAS DE PVC SAL PARA DESAGUE DE 2" pto 15.00 37.61 564.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 564.15 100.00

18.02.02 SALIDAS DE PVC SAL PARA DESAGUE DE 4" pto 4.00 44.64 178.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 178.56 100.00

18.02.03 TUBERIA DE PVC SAL 2" m 53.30 11.16 594.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 53.30 594.83 100.00

18.02.04 TUBERIA DE PVC SAL 4" m 34.83 12.21 425.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34.83 425.27 100.00

18.02.05 MONTANTE Y/O VENTILACION DE PVC 4" m 21.00 10.64 223.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.00 223.44 100.00

18.03 SISTEMA DE AGUA FRIA 5,875.41 0.00 0.00 0.00 0.00 0.00 100.00

18.03.01 URINARIOS pza 2.00 283.98 567.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 567.96 100.00

18.03.02 OVALINES pza 4.00 353.98 1,415.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 1,415.92 100.00

18.03.03 INODOROS pza 4.00 400.96 1,603.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 1,603.84 100.00

18.03.04 SALIDA DE AGUA FRIA PVC 1/2" pto 27.00 50.29 1,357.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 27.00 1,357.83 100.00

18.03.05 TUBERIA DE AGUA FRIA PVC 1/2" m 97.88 9.50 929.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 97.88 929.86 100.00

19 FLETE TERRETRE 77,754.59 0.00 0.00 0.00 0.00 0.00 100.00

19.01 FLETE TERRESTRE kg 457,379.96 0.17 77,754.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 457,379.96 77,754.59 100.00

LOSA DEPORTIVA 74,349.39 0.00 0.00 0.00 0.00 0.00 100.00

1 TRABAJOS PRELIMINARES 1,128.60 0.00 0.00 0.00 0.00 0.00 100.00

01.01 LIMPIEZA DE TERRENO MANUAL M2 540.00 0.43 232.20 0.00 0.00 540.00 232.20 540.00 232.20 100.00 0.00 0.00 0.00

01.02 TRAZO Y REPLANTEO M2 540.00 1.66 896.40 0.00 0.00 540.00 896.40 540.00 896.40 100.00 0.00 0.00 0.00

SUMINISTRO Y TENDIDO DE CABLE ELECTRICO TW AWG-Nº. 12 -4.00 MM2.

SUMINISTRO Y TENDIDO DE CABLE ELECTRICO TW AWG-Nº 14 -2.5 MM2.

Page 37: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO 0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOT - CUTERVO - CAJAMARCA PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO VALOR REFERENCIAL S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA MONTO OFERTADO S/. 3,851,133

CONTRATISTA : CONSORCIO DEL NORTE FECHA BASE 12/10/2012

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS FACTOR DE RELACION 1.00000

VALORIZACION CONTRACTUAL N°0301 DE MARZO AL 31 DE MARZO (Deacuerdo a Paralizacion de Obra, Aceptada por Conciliacion Extra Judicial N°01)

PARTIDA DESCRIPCION UND METRADO PRESUPUESTO BASE AVANCESALDOS

P.U. PARCIAL ANTERIOR ACTUAL ACUMULADO

(S/.) (S/.) Metrado Parcial Metrado Parcial Metrado Parcial % Metrado Parcial %

2 MOVIMIENTO DE TIERRAS 11,279.36 0.00 0.00 0.00 0.00 0.00 100.00

02.01 CORTES 981.72 0.00 0.00 0.00 0.00 0.00 100.00

2.01.01 CORTE DE TERRENO HASTA 15 M3 162.00 6.06 981.72 0.00 0.00 162.00 981.72 162.00 981.72 100.00 0.00 0.00 0.00

02.02 RELLENOS 10297.64 0.00 0.00 0.00 0.00 0.00 100.00

02.02.01 RELLENO MANUAL CON MATERIAL DE PRESTAMO M3 81.00 52.41 4,245.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 81.00 4,245.21 100.00

02.03 NIVELACION INTERIOR Y APISONADO M2 540.00 0.92 496.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 540.00 496.80 100.00

02.04 ELIMINACION DE MATERIAL EXCEDENTE M3 421.20 13.19 5,555.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 421.20 5,555.63 100.00

3 OBRAS DE CONCRETO SIMPLE 31772.86 0.00 0.00 0.00 0.00 0.00 100.00

03.01 CONCRETO EN LOSAS F'C=175 KG/CM2 M3 74.15 421.52 31,255.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 74.15 31,255.71 100.00

03.02 ENCOFRADO Y DESENCOFRADO DE LOSAS M2 39.75 13.01 517.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.75 517.15 100.00

4 PISOS Y PAVIMENTOS 14,499.00 0.00 0.00 0.00 0.00 0.00 100.00

04.01 PISO FROTACHADO Y BRUÑADO (BRUÑAS 1X1 CM) M2 540.00 26.85 14,499.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 540.00 14,499.00 100.00

5 PINTURA 532.00 0.00 0.00 0.00 0.00 0.00 100.00

05.01 PINTURA DE MARCACION DE LOSA DEPORTIVA M 350.00 1.52 532.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 350.00 532.00 100.00

6 VARIOS 3,353.68 0.00 0.00 0.00 0.00 0.00 100.00

06.01 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1" M 312.00 3.89 1213.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 312.00 1,213.68 100.00

06.02 ARCOS Y TABLERO FULBITO - BASQUET UND 2.00 1,000.00 2,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 2,000.00 100.00

06.03 ADQUISICION DE NET Y PARANTES DE VOLEY und 1.00 140.00 UND 1.00 140.00 140.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 140.00 100.00

7 INSTALACIONES ELECTRICAS 10,947.96 0.00 0.00 0.00 0.00 0.00 100.00

07.01 MEDIDOR und 1.00 707.36 UND 1.00 707.36 707.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 707.36 100.00

07.02 UND 1.00 667.90 667.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 667.90 100.00

07.03 REFLECTOR JOSFEL RSP 125w, HG, C/SEG UND 6.00 443.28 2659.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 2,659.68 100.00

07.04 POSTE Co.A.C. 7x 70x 90x195x242 und 4.00 685.18 UND 4.00 685.18 2,740.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 2,740.72 100.00

07.05 SALIDA PARA CENTROS DE LUZ (TECHO) PTO 2.00 50.79 101.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 101.58 100.00

07.06 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC PTO 2.00 51.79 103.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 103.58 100.00

07.07 SUMINISTRO Y TENDIDO DE CABLE ELECTRICO NYY 2-1 X 16 MM2. M 80.20 20.45 1640.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 80.20 1,640.09 100.00

07.08 SUMINISTRO Y TENDIDO DE CABLE ELECTRICO NYY 2-1 X 10 MM2. M 154.00 14.93 2,299.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 154.00 2,299.22 100.00

07.09 M 7.10 3.92 27.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.10 27.83 100.00

8 FLETE TERRETRE 835.94 0.00 0.00 0.00 0.00 0.00 100.00

08.01 FLETE TERRESTRE KG 4,917.29 0.17 835.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,917.29 835.94 100.00

POZO-CONEXION A TIERRA EN SISTEMA C/EQ.BOMBEO,ALUMB,TOMACORR

SUMINISTRO Y TENDIDO DE CABLE ELECTRICO TW AWG-Nº. 12 -4.00 MM2.

Page 38: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO 0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOT - CUTERVO - CAJAMARCA PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO VALOR REFERENCIAL S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA MONTO OFERTADO S/. 3,851,133

CONTRATISTA : CONSORCIO DEL NORTE FECHA BASE 12/10/2012

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS FACTOR DE RELACION 1.00000

VALORIZACION CONTRACTUAL N°0301 DE MARZO AL 31 DE MARZO (Deacuerdo a Paralizacion de Obra, Aceptada por Conciliacion Extra Judicial N°01)

PARTIDA DESCRIPCION UND METRADO PRESUPUESTO BASE AVANCESALDOS

P.U. PARCIAL ANTERIOR ACTUAL ACUMULADO

(S/.) (S/.) Metrado Parcial Metrado Parcial Metrado Parcial % Metrado Parcial %

CERCO PERIMÉTRICO 111,885.20 0.00 0.00 0.00 0.00 0.00 100.00

1 TRABAJOS PRELIMINARES 159.43 0.00 0.00 0.00 0.00 0.00 100.00

01.01 LIMPIEZA DE TERRENO MANUAL m2 76.28 m2 76.28 0.43 32.80 0.00 0.00 76.28 32.80 76.28 32.80 100.00 0.00 0.00 0.00

01.02 TRAZO Y REPLANTEO m2 76.28 m2 76.28 1.66 126.62 0.00 0.00 76.28 126.62 76.28 126.62 100.00 0.00 0.00 0.00

2 MOVIMIENTO DE TIERRAS 1781.48 0.00 0.00 0.00 0.00 0.00 100.00

02.01 EXCAVACIONES 652.18 0.00 0.00 0.00 0.00 0.00 100.00

02.01.01 EXCAVACION DE ZANJAS Y ZAPATAS RT<2 KG/CM2 H=2.00 M. m3 68.65 m3 68.65 9.50 652.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 68.65 652.18 100.00

02.02 RELLENOS 1,129.30 0.00 0.00 0.00 0.00 0.00 100.00

02.02.01 RELLENO COMPACTADO CON MATERIAL PROPIO m3 7.63 m3 7.63 10.87 82.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.63 82.94 100.00

02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 79.33 m3 79.33 13.19 1,046.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 79.33 1,046.36 100.00

3 OBRAS DE CONCRETO SIMPLE 1,402.52 0.00 0.00 0.00 0.00 0.00 100.00

03.01 SOLADOS PARA CIMIENTOS CORRIDOS E=4" 1.12 CEM/HORM. m2 68.65 m2 68.65 20.43 1,402.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 68.65 1,402.52 100.00

4 OBRAS DE CONCRETO ARMADO 47,199.53 0.00 0.00 0.00 0.00 0.00 100.00

04.01 SOBRECIMIENTO REFORZADO 27,193.00 0.00 0.00 0.00 0.00 0.00 100.00

01.01.01 SOBRECIMEINTO ARMADO F'C 175 KG/CM2. m3 34.41 m3 34.41 384.18 13,219.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34.41 13,219.63 100.00

04.01.02 SOBRECIMIENTO ARMADO ENCOFRADO Y DESENCOFRADO m2 203.90 m2 203.79 54.06 11,016.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 203.79 11,016.89 100.00

04.01.03 kg 682.79 4.33 2,956.48 0.00 0.00 170.70 739.12 170.70 739.12 25.00 512.09 2,217.36 75.00

04.02 COLUMNAS 15,245.50 0.00 0.00 0.00 0.00 0.00 100.00

04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 8.65 m3 8.65 452.22 3,911.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.65 3,911.70 100.00

04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 138.46 m2 138.46 46.56 6,446.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 138.46 6,446.70 100.00

04.02.03 ACERO CORRUGADO GRADO 60 kg 1,128.66 kg 1128.66 4.33 4,887.10 0.00 0.00 490.04 2,121.88 490.04 2,121.88 43.42 638.62 2,765.22 56.58

04.03 VIGAS 4,761.03 0.00 0.00 0.00 0.00 0.00 100.00

04.03.01 CONCRETO EN VIGAS F'C 210 KG/CM2. m3 3.31 m3 3.31 438.75 1,452.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.31 1,452.26 100.00

04.03.02 ENCOFRADO Y DESENCOFRADO m2 45.34 m2 45.34 54.06 2,451.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 45.34 2,451.08 100.00

04.03.03 ACERO CORRUGADO GRADO 60 kg 198.08 kg 198.08 4.33 857.69 0.00 0.00 86.00 372.39 86.00 372.39 43.42 112.08 485.30 56.58

5 MUROS Y TABIQUES DE ALBAÑILERIA 19,442.28 0.00 0.00 0.00 0.00 0.00 100.00

05.01 m2 349.87 55.57 19,442.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 349.87 19,442.28 100.00

SOBRECIMIENTO REFORZADO ACERO CORRUGADO GRADO 60 kg 682.79

MURO DE SOGA LADRILLO ARTESANAL DE ARCILLA CON CEMENTO - ARENA J=1.5 m2 349.87 CM

Page 39: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO 0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOT - CUTERVO - CAJAMARCA PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO VALOR REFERENCIAL S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA MONTO OFERTADO S/. 3,851,133

CONTRATISTA : CONSORCIO DEL NORTE FECHA BASE 12/10/2012

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS FACTOR DE RELACION 1.00000

VALORIZACION CONTRACTUAL N°0301 DE MARZO AL 31 DE MARZO (Deacuerdo a Paralizacion de Obra, Aceptada por Conciliacion Extra Judicial N°01)

PARTIDA DESCRIPCION UND METRADO PRESUPUESTO BASE AVANCESALDOS

P.U. PARCIAL ANTERIOR ACTUAL ACUMULADO

(S/.) (S/.) Metrado Parcial Metrado Parcial Metrado Parcial % Metrado Parcial %

6 REVOQUES ENLUCIDOS Y MOLDURAS 12,969.62 0.00 0.00 0.00 0.00 0.00 100.00

06.01 TARRAJEO EN MUROS EXTERIORES CON CEMENTO-ARENA m2 855.59 m2 855.59 12.3 10,523.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 855.59 10,523.76 100.00

06.02 TARRAJEO DE COLUMNAS CON CEMENTO-ARENA m2 103.17 m2 103.17 15.86 1,636.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 103.17 1,636.28 100.00

06.03 TARRAJEO DE VIGAS CON CEMENTO-ARENA m2 44.63 m2 44.63 18.14 809.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 44.63 809.59 100.00

7 COBERTURA 4,638.01 0.00 0.00 0.00 0.00 0.00 100.00

07.01 COBERTURA TEJA ARTESANAL m 116.27 m 116.27 39.89 4638.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 116.27 4,638.01 100.00

8 PINTURA 6089.77 0.00 0.00 0.00 0.00 0.00 100.00

08.01 PINTURA LATEX EN MUROS EXTERIORES 2 MANOS m2 855.59 m2 855.59 5.7 4,876.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 855.59 4,876.86 100.00

08.02 PINTURA LATEX EN COLUMNAS m2 103.17 m2 103.17 8.14 839.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 103.17 839.80 100.00

08.03 PINTURA LATEX EN VIGAS m2 44.63 m2 44.63 8.36 373.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 44.63 373.11 100.00

9 VARIOS 468.74 0.00 0.00 0.00 0.00 0.00 100.00

09.01 BRUÑADO m 483.24 m 483.24 0.97 468.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 483.24 468.74 100.00

10 FLETE TERRETRE 17,733.82 0.00 0.00 0.00 0.00 0.00 100.00

10.01 FLETE TERRESTRE kg 104,316.61 kg 104316.61 0.17 17,733.82 25,000.00 4,250.00 25,000.00 4,250.00 50,000.00 8,500.00 47.93 54,316.61 9,233.82 52.07

PORTICOS DE INGRESO 39,312.18 0.00 0.00 0.00 0.00 0.00 100.00

1 TRABAJOS PRELIMINARES 50.81 0.00 0.00 0.00 0.00 0.00 100.00

01.01 LIMPIEZA DE TERRENO MANUAL m2 24.31 m2 24.31 0.43 10.45 0.00 0.00 24.31 10.45 24.31 10.45 100.00 0.00 0.00 0.00

01.02 TRAZO Y REPLANTEO m2 24.31 m2 24.31 1.66 40.35 0.00 0.00 24.31 40.35 24.31 40.35 100.00 0.00 0.00 0.00

2 MOVIMIENTO DE TIERRAS 1,444.15 0.00 0.00 0.00 0.00 0.00 100.00

02.01 EXCAVACIONES 306.47 0.00 0.00 0.00 0.00 0.00 100.00

02.01.01 EXCAVACION DE ZANJAS Y ZAPATAS RT<2.00 KG/CM2 H=2.00 M. m3 32.26 m3 32.26 9.50 306.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.26 306.47 100.00

02.02 CORTES 15.56 0.00 0.00 0.00 0.00 0.00 100.00

02.02.01 CORTE DE TERRENO HASTA 15 CM. m3 2.73 m3 2.73 5.70 15.56 0.00 0.00 2.73 15.56 2.73 15.56 100.00 0.00 0.00 0.00

02.03 RELLENOS 291.22 0.00 0.00 0.00 0.00 0.00 100.00

02.03.01 RELLENO CON MATERIAL PROPIO m3 4.95 m3 4.95 10.87 53.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.95 53.81 100.00

02.03.02 RELLENO MANUAL CON MATERIAL DE PRESTAMO m3 4.53 m3 4.53 52.41 237.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.53 237.42 100.00

02.04 NIVELACION INTERIOR Y APISONADO m2 49.99 m2 49.99 0.92 45.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.99 45.99 100.00

02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 39.05 m3 39.05 20.10 784.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.05 784.91 100.00

3 OBRAS DE CONCRETO SIMPLE 470.71 0.00 0.00 0.00 0.00 0.00 100.00

03.01 SOLADOS PARA CIMIENTOS CORRIDOS E=4" 1.12 CEM/HORM. m2 23.04 m2 23.04 20.43 470.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.04 470.71 100.00

Page 40: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO 0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOT - CUTERVO - CAJAMARCA PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO VALOR REFERENCIAL S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA MONTO OFERTADO S/. 3,851,133

CONTRATISTA : CONSORCIO DEL NORTE FECHA BASE 12/10/2012

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS FACTOR DE RELACION 1.00000

VALORIZACION CONTRACTUAL N°0301 DE MARZO AL 31 DE MARZO (Deacuerdo a Paralizacion de Obra, Aceptada por Conciliacion Extra Judicial N°01)

PARTIDA DESCRIPCION UND METRADO PRESUPUESTO BASE AVANCESALDOS

P.U. PARCIAL ANTERIOR ACTUAL ACUMULADO

(S/.) (S/.) Metrado Parcial Metrado Parcial Metrado Parcial % Metrado Parcial %

4 OBRAS DE CONCRETO ARMADO 28,283.06 0.00 0.00 0.00 0.00 0.00 100.00

04.01 CIMIENTOS REFORZADOS 9,321.06 0.00 0.00 0.00 0.00 0.00 100.00

04.01.01 CIMIENTOS REFORZADOS FC=210 KG/CM2 m3 20.74 m3 20.74 404.78 8,395.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.74 8,395.14 100.00

04.01.02 ACERO CORRUGADO DE GRADO 60 kg 213.84 kg 213.84 4.33 925.93 0.00 0.00 92.85 402.02 92.85 402.02 43.42 120.99 523.91 56.58

04.02 COLUMNAS 12,529.43 0.00 0.00 0.00 0.00 0.00 100.00

04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 8.51 m3 8.51 452.22 3,848.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.51 3,848.39 100.00

04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 62.69 m2 62.69 46.56 2,918.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 62.69 2,918.85 100.00

04.02.03 ACERO CORRUGADO DE GRADO 60 kg 1,330.76 kg 1,330.76 4.33 5,762.19 0.00 0.00 577.79 2,501.83 577.79 2,501.83 43.42 752.97 3,260.36 56.58

04.03 VIGAS 5,153.10 0.00 0.00 0.00 0.00 0.00 100.00

04.03.01 CONCRETO EN VIGAS F'C 210 KG/CM2. m3 2.37 m3 2.37 438.75 1,039.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.37 1,039.84 100.00

04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 19.31 m2 19.31 54.06 1,043.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.31 1,043.90 100.00

04.03.03 ACERO CORRUGADO DE GRADO 60 kg 708.86 kg 708.86 4.33 3,069.36 0.00 0.00 307.77 1,332.66 307.77 1,332.66 43.42 401.09 1,736.71 56.58

04.04 LOSAS ALIGERADAS 1,279.46 0.00 0.00 0.00 0.00 0.00 100.00

04.04.01 CONCRETO F'C 210 KG./CM2 EN LOSAS ALIGERADAS m3 0.39 m3 0.39 414.62 161.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.39 161.70 100.00

04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 4. m2 4.40 40.63 178.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.40 178.77 100.00

04.04.03 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO unUnd. 146.67 4.04 592.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 146.67 592.55 100.00

04.04.04 ACERO CORRUGADO DE GRADO 60 kg 80.01 kg 80.01 4.33 346.44 0.00 0.00 34.74 150.42 34.74 150.42 43.42 45.27 196.02 56.58

5 MUROS Y TABIQUES DE ALBAÑILERIA 83.02 0.00 0.00 0.00 0.00 0.00 100.00

05.01 MURO DE SOGA LADRILLO KING-KONG TIPO IV (24 X 13 X 9) J=1.5 CM m2 m2 2.06 40.30 83.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.06 83.02 100.00

6 REVOQUES ENLUCIDOS Y MOLDURAS 1,463.53 0.00 0.00 0.00 0.00 0.00 100.00

06.01 TARRAJEO EN MUROS EXTERIORES ACABADO CON CEMENTO - ARENA m m2 4.12 20.96 86.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.12 86.36 100.00

06.02 TARRAJEO DE COLUMNAS CON CEMENTO-ARENA m2 64.61 m2 64.61 15.86 1,024.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 64.61 1,024.71 100.00

06.03 TARRAJEO DE VIGAS CON CEMENTO-ARENA m2 19.43 m2 19.43 18.14 352.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.43 352.46 100.00

7 CIELORRASOS 133.67 0.00 0.00 0.00 0.00 0.00 100.00

07.01 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA m2 4.40 m2 4.40 30.38 133.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.40 133.67 100.00

8 CARPINTERIA METALICA 4,058.90 0.00 0.00 0.00 0.00 0.00 100.00

08.01 PUERTA DE INGRESO m2 21.94 m2 21.94 185.00 4,058.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.94 4,058.90 100.00

9 PINTURA 711.84 0.00 0.00 0.00 0.00 0.00 100.00

09.03 PINTURA LATEX EN MUROS EXTERIORES 2 MANOS m2 4.12 m2 4.12 5.70 23.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.12 23.48 100.00

09.04 PINTURA LATEX EN COLUMNAS m2 64.61 m2 64.61 8.14 525.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 64.61 525.93 100.00

09.05 PINTURA LATEX EN VIGAS m2 19.43 m2 19.43 8.36 162.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.43 162.43 100.00

Page 41: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO 0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOT - CUTERVO - CAJAMARCA PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO VALOR REFERENCIAL S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA MONTO OFERTADO S/. 3,851,133

CONTRATISTA : CONSORCIO DEL NORTE FECHA BASE 12/10/2012

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS FACTOR DE RELACION 1.00000

VALORIZACION CONTRACTUAL N°0301 DE MARZO AL 31 DE MARZO (Deacuerdo a Paralizacion de Obra, Aceptada por Conciliacion Extra Judicial N°01)

PARTIDA DESCRIPCION UND METRADO PRESUPUESTO BASE AVANCESALDOS

P.U. PARCIAL ANTERIOR ACTUAL ACUMULADO

(S/.) (S/.) Metrado Parcial Metrado Parcial Metrado Parcial % Metrado Parcial %

10 FLETE TERRETRE 2,612.49 0.00 0.00 0.00 0.00 0.00 100.00

10.01 FLETE TERRESTRE kg 15,367.58 kg 15,367.58 0.17 2,612.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15,367.58 2,612.49 100.00

ESCENARIO 42,918.69 0.00 0.00 0.00 0.00 0.00 100.00

1 TRABAJOS PRELIMINARES 135.26 0.00 0.00 0.00 0.00 0.00 100.00

01.01 LIMPIEZA DE TERRENO MANUAL m2 64.72 0.43 27.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 64.72 27.83 100.00

01.02 TRAZO Y REPLANTEO m2 64.72 1.66 107.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 64.72 107.44 100.00

2 MOVIMIENTO DE TIERRAS 3,145.68 0.00 0.00 0.00 0.00 0.00 100.00

02.01 EXCAVACIONES 155.71 0.00 0.00 0.00 0.00 0.00 100.00

02.01.01 EXCAVACION DE ZANJAS Y ZAPATAS RT<2 KG/CM2 H=2.00 M. m3 m3 16.39 9.50 155.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.39 155.71 100.00

02.02 CORTES 67.83 0.00 0.00 0.00 0.00 0.00 100.00

02.02.01 CORTE DE TERRENO HASTA 15 CM. m3 11.90 5.70 67.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.90 67.83 100.00

02.03 RELLENOS 2,922.15 0.00 0.00 0.00 0.00 0.00 100.00

02.03.01 RELLENO CON MATERIAL PROPIO m3 02.47 10.87 26.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.47 26.85 100.00

02.03.02 RELLENO MANUAL CON MATERIAL DE PRESTAMO m3 41.41 52.41 2,170.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.41 2,170.30 100.00

02.03.03 NIVELACION INTERIOR Y APISONADO m2 54.83 0.92 50.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 54.83 50.44 100.00

02.03.04 ELIMINACION DE MATERIAL EXCEDENTE m3 33.56 20.10 674.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33.56 674.56 100.00

3 OBRAS DE CONCRETO SIMPLE 4,710.84 0.00 0.00 0.00 0.00 0.00 100.00

03.01 SOLADOS PARA CIMIENTOS CORRIDOS E=4" 1.12 CEM/HORM. m2 18.22 20.43 372.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.22 372.23 100.00

03.02 CONCRETO EN CIMIENTO CORRIDOS F'C=175 KG/CM2 m3 11.04 392.99 4,338.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.04 4,338.61 100.00

4 OBRAS DE CONCRETO ARMADO 26,398.12 0.00 0.00 0.00 0.00 0.00 100.00

04.01 MUROS REFORZADOS 7,185.34 0.00 0.00 0.00 0.00 0.00 100.00

04.01.01 CONCRETO EN PLACAS FC=210 KG/CM2 m3 6.79 410.95 2,790.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.79 2,790.35 100.00

04.01.02 ENCOFRADO Y DESENCOFRADO m2 97.65 29.15 2,846.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 97.65 2,846.50 100.00

04.01.03 ACERO CORRUGADO DE GRADO 60 kg kg 357.62 4.33 1,548.49 0.00 0.00 155.27 672.33 155.27 672.33 43.42 202.35 876.17 56.58

04.02 VIGAS 5,853.72 0.00 0.00 0.00 0.00 0.00 100.00

04.02.01 CONCRETO EN VIGAS F'C 210 KG/CM2. m3 1.36 438.75 596.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.36 596.70 100.00

04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 85.74 54.06 4,635.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 85.74 4,635.10 100.00

04.02.03 ACERO CORRUGADO DE GRADO 60 kg 143.63 4.33 621.92 0.00 0.00 62.36 270.02 62.36 270.02 43.42 81.27 351.89 56.58

04.03 LOSA MACIZA 0.00 0.00 0.00 0.00 0.00 0.00 100.00

04.04 CONCRETO F'C 210 KG/CM2 m3 17.65 400.85 7,075.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.65 7,075.00 100.00

04.05 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 85.74 54.06 4,635.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 85.74 4,635.10 100.00

Page 42: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO 0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOT - CUTERVO - CAJAMARCA PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO VALOR REFERENCIAL S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA MONTO OFERTADO S/. 3,851,133

CONTRATISTA : CONSORCIO DEL NORTE FECHA BASE 12/10/2012

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS FACTOR DE RELACION 1.00000

VALORIZACION CONTRACTUAL N°0301 DE MARZO AL 31 DE MARZO (Deacuerdo a Paralizacion de Obra, Aceptada por Conciliacion Extra Judicial N°01)

PARTIDA DESCRIPCION UND METRADO PRESUPUESTO BASE AVANCESALDOS

P.U. PARCIAL ANTERIOR ACTUAL ACUMULADO

(S/.) (S/.) Metrado Parcial Metrado Parcial Metrado Parcial % Metrado Parcial %

04.06 ACERO CORRUGADO DE GRADO 60 kg 380.82 4.33 1,648.95 0.00 0.00 165.34 715.94 165.34 715.94 43.42 215.48 933.01 56.58

5 REVOQUES ENLUCIDOS Y MOLDURA 1,727.42 0.00 0.00 0.00 0.00 0.00 100.00

05.01 TARRAJEO EN MUROS EXTERIORES ACABADO CON CEMENTO - ARENA m2 42.82 20.96 897.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.82 897.51 100.00

05.02 TARRAJEO DE VIGAS CON CEMENTO-ARENA m2 5.06 18.14 91.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.06 91.79 100.00

05.03 TARRAJEO DE LOSAS m2 46.54 15.86 738.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 46.54 738.12 100.00

6 PISOS Y PAVIMENTOS 993.76 0.00 0.00 0.00 0.00 0.00 100.00

06.01 CONTRAPISO 2" m2 39.91 24.90 993.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.91 993.76 100.00

7 CARPINTERIA METALICA 2,170.12 0.00 0.00 0.00 0.00 0.00 100.00

07.01 POSTE PARA ASTA DE BANDERA 2.00 1085.06 2,170.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 2,170.12 100.00

8 PINTURA 286.38 0.00 0.00 0.00 0.00 0.00 100.00

08.01 PINTURA LATEX EN MUROS EXTERIORES 2 MANOS m2 42.82 5.70 244.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.82 244.07 100.00

08.02 PINTURA LATEX EN VIGAS m2 5.06 8.36 42.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.06 42.30 100.00

9 VARIOS 67.15 0.00 0.00 0.00 0.00 0.00 100.00

09.01 BRUÑADO 69.23 0.97 67.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 69.23 67.15 100.00

10 FLETE TERRETRE 3283.95 0.00 0.00 0.00 0.00 0.00 100.00

10.01 FLETE TERRESTRE kg 19,317.33 0.17 3,283.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19,317.33 3,283.95 100.00

VEREDAS 142,350.93 0.00 0.00 0.00 0.00 0.00 100.00

1 TRABAJOS PRELIMINARES 1894.33 0.00 0.00 0.00 0.00 0.00 100.00

01.01 LIMPIEZA DE TERRENO MANUAL m2 906.38 m2 906.38 0.43 389.74 0.00 0.00 906.38 389.74 906.38 389.74 100.00 0.00 0.00 0.00

01.02 TRAZO Y REPLANTEO m2 906.38 m2 906.38 1.66 1504.59 0.00 0.00 906.38 1,504.59 906.38 1,504.59 100.00 0.00 0.00 0.00

2 MOVIMIENTO DE TIERRAS 31,368.90 0.00 0.00 0.00 0.00 0.00 100.00

02.01 EXCAVACIONES 43.91 0.00 0.00 0.00 0.00 0.00 100.00

02.01.01 EXCAVACION DE ZANJAS m3 4.23 m3 4.23 10.38 43.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.23 43.91 100.00

02.02 CORTES 8,012.98 0.00 0.00 0.00 0.00 0.00 100.00

02.02.01 CORTE DE TERRENO HASTA 15 CM. m3 1,800.67 m3 1,800.67 4.45 8,012.98 0.00 0.00 1,800.67 8,012.98 1,800.67 8,012.98 100.00 0.00 0.00 0.00

02.03 RELLENOS 8257.72 0.00 0.00 0.00 0.00 0.00 100.00

02.03.01 RELLENO MANUAL CON MATERIAL DE PRESTAMO m3 157.56 m3 157.56 52.41 8257.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 157.56 8,257.72 100.00

02.04 NIVELACION INTERIOR Y APISONADO m2 900.34 m2 900.34 0.92 828.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 900.34 828.31 100.00

02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 707.76 m3 707.76 20.1 14225.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 707.76 14,225.98 100.00

3 OBRAS DE CONCRETO SIMPLE 59,031.97 0.00 0.00 0.00 0.00 0.00 100.00

03.01 CONCRETO EN VEREDAS F'C=175 KG/CM2. m3 126.62 m3 126.62 397.92 50,384.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 126.62 50,384.63 100.00

Page 43: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO 0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOT - CUTERVO - CAJAMARCA PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO VALOR REFERENCIAL S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA MONTO OFERTADO S/. 3,851,133

CONTRATISTA : CONSORCIO DEL NORTE FECHA BASE 12/10/2012

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS FACTOR DE RELACION 1.00000

VALORIZACION CONTRACTUAL N°0301 DE MARZO AL 31 DE MARZO (Deacuerdo a Paralizacion de Obra, Aceptada por Conciliacion Extra Judicial N°01)

PARTIDA DESCRIPCION UND METRADO PRESUPUESTO BASE AVANCESALDOS

P.U. PARCIAL ANTERIOR ACTUAL ACUMULADO

(S/.) (S/.) Metrado Parcial Metrado Parcial Metrado Parcial % Metrado Parcial %

03.02 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 111.62 m2 111.62 13.01 1,452.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 111.62 1,452.18 100.00

03.03 CANALETA DE EVACUACION PLUVIAL FC=140 KG/CM2 m 165.94 m 165.94 43.36 7,195.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 165.94 7,195.16 100.00

4 PISOS Y PAVIMENTOS 20,892.06 0.00 0.00 0.00 0.00 0.00 100.00

04.01 PISO FROTACHADO Y BRUÑADO (BRUÑAS 1X1 CM) m2 392.28 m2 392.28 26.85 10,532.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 392.28 10,532.72 100.00

04.02 PISO DE CEMENTO PULIDO m2 508.06 m2 508.06 20.39 10,359.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 508.06 10,359.34 100.00

5 CARPINTERIA METALICA 16,594.00 0.00 0.00 0.00 0.00 0.00 100.00

05.01 REJILLA METALICA PARA CANALETA DE AGUAS PLUVIALES und 165.94 und 165.94 100 16,594.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 165.94 16,594.00 100.00

6 VARIOS 1,835.66 0.00 0.00 0.00 0.00 0.00 100.00

06.01 BRUÑADO m 199.36 m 199.36 0.97 193.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 199.36 193.38 100.00

06.02 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1" m 422. m 422.18 3.89 1642.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 422.18 1,642.28 100.00

7 FLETE TERRETRE 10,734.01 0.00 0.00 0.00 0.00 0.00 100.00

07.01 FLETE TERRESTRE kg 63,141.23 kg 63,141.23 0.17 10,734.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 63,141.23 10,734.01 100.00

TANQUE SEPTICO 12,470.05 0.00 0.00 0.00 0.00 0.00 100.00

1 TANQUE SEPTICO Y POZO DE PERCOLACION 11,139.52 0.00 0.00 0.00 0.00 0.00 100.00

01.01 TRABAJOS PRELIMINARES 41.70 0.00 0.00 0.00 0.00 0.00 100.00

01.01.01 LIMPIEZA DE TERRENO MANUAL m2 19.95 0.43 m2 19.95 0.43 8.58 0.00 0.00 19.95 8.58 19.95 8.58 100.00 0.00 0.00 0.00

01.01.02 TRAZO Y REPLANTEO m2 19.95 1.66 m2 19.95 1.66 33.12 0.00 0.00 19.95 33.12 19.95 33.12 100.00 0.00 0.00 0.00

01.02 MOVIMIENTO DE TIERRAS 2,070.62 0.00 0.00 0.00 0.00 0.00 100.00

01.02.01 EXCAVACIONES 410.78 0.00 0.00 0.00 0.00 0.00 100.00

01.02.01.01 EXCAVACION DE ZANJAS Y ZAPATAS RT<2.00 KG/CM2 H=2.00 M. m3 43.24 m3 43.24 9.5 410.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 43.24 410.78 100.00

01.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 56.21 20.10 m3 56.21 20.1 1,129.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.21 1,129.82 100.00

01.02.03 FILTROS 530.02 0.00 0.00 0.00 0.00 0.00 100.00

01.02.03.01 FILTRO DE GRAVA m3 8.89 59.62 m3 8.89 59.62 530.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.89 530.02 100.00

01.03 OBRAS DE CONCRETO ARMADO 6,311.88 0.00 0.00 0.00 0.00 0.00 100.00

01.03.01 CONCRETO F'C 210 KG./CM2 m3 7.70 414.62 m3 7.7 414.62 3,192.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.70 3,192.57 100.00

01.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 38.80 40.63 m2 38.8 40.63 1,576.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38.80 1,576.44 100.00

01.03.03 ACERO CORRUGADO DE GRADO 60 kg 356.32 4.33 kg 356.32 4.33 1,542.87 0.00 0.00 154.71 669.88 154.71 669.88 43.42 201.61 872.98 56.58

01.04 MUROS Y TABIQUES DE ALBAÑILERIA 854.76 0.00 0.00 0.00 0.00 0.00 100.00

01.04.01 MURO DE SOGA LADRILLO KING-KONG TIPO IV (24 X 13 X 9) J=1.5 CM m2 2 m2 21.21 40.3 854.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.21 854.76 100.00

2 FLETE TERRETRE 1,330.53 0.00 0.00 0.00 0.00 0.00 100.00

Page 44: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO 0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOT - CUTERVO - CAJAMARCA PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO VALOR REFERENCIAL S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA MONTO OFERTADO S/. 3,851,133

CONTRATISTA : CONSORCIO DEL NORTE FECHA BASE 12/10/2012

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS FACTOR DE RELACION 1.00000

VALORIZACION CONTRACTUAL N°0301 DE MARZO AL 31 DE MARZO (Deacuerdo a Paralizacion de Obra, Aceptada por Conciliacion Extra Judicial N°01)

PARTIDA DESCRIPCION UND METRADO PRESUPUESTO BASE AVANCESALDOS

P.U. PARCIAL ANTERIOR ACTUAL ACUMULADO

(S/.) (S/.) Metrado Parcial Metrado Parcial Metrado Parcial % Metrado Parcial %

02.01 FLETE TERRESTRE kg 7826.67 0.17 1,330.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,826.67 1,330.53 100.00

EQUIPAMIENTO 220,150.00 0.00 0.00 0.00 0.00 0.00 100.00

1 MOBILIARIO AULAS 11,910.00 0.00 0.00 0.00 0.00 0.00 100.00

01.01 CONFECCION DE CARPETAS UNIPERSONALES und 136.00 60.00 8,160.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 136.00 8,160.00 100.00

01.02 CONFECCION DE PUPITRE PARA PROFESOR und 5 200 1,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 1,000.00 100.00

01.03 ESTANTES METALICOS und 5 350 1,750.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 1,750.00 100.00

01.04 PIZARRAS ACRILICAS DE 3.60 X 1.30 C/BASTIDOR DE MADERA und 5 200 1,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 1,000.00 100.00

2 MOBILIARIO PARA LABORATORIO 68,830.00 0.00 0.00 0.00 0.00 0.00 100.00

02.01 BANCOS DE PLASTICO APILABLES und 48.00 35 1,680.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 48.00 1,680.00 100.00

02.02 PIZARRAS ACRILICAS DE 3.60 X 1.30 C/BASTIDOR DE MADERA und 1.00 200.00 200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 200.00 100.00

02.03 CONFECCION DE PUPITRE PARA PROFESOR und 1.00 200 200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 200.00 100.00

02.04 ESTANTES METALICOS und 5.00 350.00 1,750.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 1,750.00 100.00

02.05 ADQUISICION DE MATERIALES PARA LABORATORIO glb 1.00 5000 5,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 5,000.00 100.00

02.06 ADQUISICION DE EQUIPOS PARA CIENCIAS glb 1.00 20000.00 20,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 20,000.00 100.00

02.07 ADQUISICION DE EQUIPOS BIOLOGIA Y QUIMICA glb 1.00 20000.00 20,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 20,000.00 100.00

02.08 ADQUISICION DE EQUIPOS PARA ELECTRICIDAD glb 1.00 20000.00 20,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 20,000.00 100.00

3 MOBILIARIO PARA BIBLIOTECA 8,420.00 0.00 0.00 0.00 0.00 0.00 100.00

03.01 ADQUISICION DE MESAS PARA 8 PERSONAS und 8.00 350.00 2,800.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 2,800.00 100.00

03.02 ADQUISICION DE SILLAS INDIVIDUALES APILABLES und 48.00 65.00 3,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 48.00 3,120.00 100.00

03.03 ESTANTES METALICOS und 6.00 350.00 2,100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 2,100.00 100.00

03.04 ADQUISICION DE SET DE MATERIALES Y UTILES DE OFICINA glb 2.00 200.00 400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 400.00 100.00

4 MOBILIARIO PARA SALA DE COMPUTO 100,070.00 0.00 0.00 0.00 0.00 0.00 100.00

04.01 CONFECCION DE MESA BIPERSONAL P/SALA DE COMPUTO und 24.00 250.00 6,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.00 6,000.00 100.00

04.02 ADQUISICION DE SILLAS INDIVIDUALES APILABLES und 18.00 65.00 1,170.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.00 1,170.00 100.00

04.03 PIZARRAS ACRILICAS DE 3.60 X 1.30 C/BASTIDOR DE MADERA und 1.00 200.00 200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 200.00 100.00

04.04 CONFECCION DE PUPITRE PARA PROFESOR und 1.00 200.00 200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 200.00 100.00

04.05 ESTANTES METALICOS und 10.00 350.00 3,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 3,500.00 100.00

04.06 ADQUISICION DE MAQUINAS DE COMPUTO und 30.00 2750.00 82,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.00 82,500.00 100.00

04.07 ADQUISICIÓN DE PROYECTORES MULTIMEDIA und 2.00 3250.00 6,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 6,500.00 100.00

5 MOBILIARIO PARA SALA DE PROFESORES 1700.00 0.00 0.00 0.00 0.00 0.00 100.00

05.01 CONFECCION DE PUPITRE PARA PROFESOR und 4.00 200.00 800.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 800.00 100.00

Page 45: Valorización la Rioja Marzo 2014

LICITACION PUBLICAN°03-2013-GR-CAJ-GSRC MODALIDAD DE EJECUCION : SUMA ALZADA

PROYECTO 0302006 "AMPLIACION, MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E MANUEL PARDO Y LA VALLE, C.P PAMPA LA RIOJA, DISTRITO DE SOCOT - CUTERVO - CAJAMARCA PLAZO DE EJECUCION : 180 DIAS CALENDARIOS

ENTIDAD GERENCIA SUB-REGIONAL DE CUTERVO VALOR REFERENCIAL S/. 3,851,133

UBICACIÓN : CAJAMARCA - CUTERVO - SOCOTA MONTO OFERTADO S/. 3,851,133

CONTRATISTA : CONSORCIO DEL NORTE FECHA BASE 12/10/2012

RESIDENTE : ING. CIVIL ALBERTO GUERRERO FOWKS FACTOR DE RELACION 1.00000

VALORIZACION CONTRACTUAL N°0301 DE MARZO AL 31 DE MARZO (Deacuerdo a Paralizacion de Obra, Aceptada por Conciliacion Extra Judicial N°01)

PARTIDA DESCRIPCION UND METRADO PRESUPUESTO BASE AVANCESALDOS

P.U. PARCIAL ANTERIOR ACTUAL ACUMULADO

(S/.) (S/.) Metrado Parcial Metrado Parcial Metrado Parcial % Metrado Parcial %

05.02 PIZARRAS ACRILICAS DE 3.60 X 1.30 C/BASTIDOR DE MADERA und 1.00 200.00 200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 200.00 100.00

05.03 ESTANTES METALICOS und 2.00 350.00 700.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 700.00 100.00

6 EQUIPAMIENTO GENERAL 26,220.00 0.00 0.00 0.00 0.00 0.00 100.00

06.01 ADQUISICION DE EQUIPOS GENERALES und 1.00 26,220.00 26,220.00 0.00 0.00 0.00 0.00 0.00 1.00 26,220.00 100.00

7 FLETE TERRETRE 3,000.00 0.00 0.00 0.00 0.00 0.00 100.00

07.01 TRANSPORTE DE MOBILIARIO Y EQUIPO blb 1.00 3,000.00 3,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 3,000.00 100.00

COSTO DIRECTO 2,766,355.97 2,765,823.97 54,410.00 363,220.57 417,630.57 2,348,193.41GASTOS GENERALES 10% 276,635.60 276,582.40 5,441.00 36,322.06 41,763.06 234,819.34

UTILIDAD 8% 221,308.48 221,265.92 4,352.80 29,057.65 33,410.45 187,855.47

============================ =========== =========== =========== =========== ===========

SUB TOTAL 3,264,300.04 3,263,672.28 64,203.80 428,600.27 492,804.07 2,770,868.22

IGV (18%) 587574.01 587,461.01 11,556.68 77,148.05 88,704.73 498,756.28

============================ =========== =========== =========== =========== ===========

VALOR REFERENCIAL CONTRATADO 3851874.05 3,851,133.30 75,760.48 505,748.32 581,508.80 3,269,624.50

PORCENTAJE DE AVANCE 1.97 13.13 15.10 84.90

Page 46: Valorización la Rioja Marzo 2014

modulo I 1029243.52modulo II 1094998.63losa deportiva 74349.40cerco perimetrico 111891.14 111885.2 5.94 153156.592portico de ingreso 39312.17escenario 42918.58vereda 142350.93tanque septico y pozo 9278.96 10609.49 1330.53 1336.47equipamiento 220150.00

2764493.33 2765817.92 -1324.59