    Number Name CMMI PA with Goal or Practice Comment

    4.0 Project Integration Management

    4.1 Develop Project Charter Not Addressed

    4.1.1 Inputs

    4.1.1.1 Contract (when applicable)

    4.1.1.2 Project Statement of Work

    All GP 2.3/2.5

    OEI

    All GP 2.1/2.2/3.2

    OPD All

    4.1.2 Tools and Techniques

    4.1.2.1 Project Selection Methods Not Addressed

    4.1.2.2 Project Management Methodology PP/PMC/IPM/QPM GP 2.2

    PP/PMC/IPM/QPM GP 2.3

    OEI SP 1.2

    CM SP 1.2

    4.1.2.4 Expert Judgment

    4.1.3 Outputs

    4.1.3.1 Project Charter Not Addressed

    4.2 Develop Preliminary Project Scope Statement RD SG 1

    4.2.1 Inputs

    4.2.1.1 Project Charter Not Addressed

    4.2.1.2 Project Statement of Work

    All GP 2.3/2.5

    OEI

    All GP 2.1/2.2/3.2

    OPD All

    4.2.2 Tools and TechniquesPP/PMC/IPM/QPM/RD GP 2.2

    RD SG 1

    PP/PMC/IPM/QPM GP 2.3

    OEI SP 1.2

    CM SP 1.2

    RD SG 1

    RD GP 2.3

    4.2.3 Outputs

    RD SG 1

    PP SP 1.1

    QPM SP 1.1

    REQM SP 1.1

    PP SG 1/2/3

    IPM SP 1.1/1.2/1.3

    4.3.1 Inputs

    RD SG 1

    PP SP 1.1

    QPM SP 1.1

    REQM SP 1.1

    All GP 2.2

    OPD SG 1

    All GP 2.3/2.5

    OEI

    PMBOK to CMMI

    Project Management Processes

    Enterprise Environmental Factors

    4.2.1.4 Organizational Process Assets

    4.2.2.1 Project Management Methodology

    Preliminary Project Scope Statement

    4.3.1.2

    4.2.3.1 Preliminary Project Scope Statement

    4.3 Develop Project Management PlanIn PMBOK All plans are

    combined into project plan

    4.3.1.1

    4.1.2.3 Project Management Information System

    Project Management Information System

    4.2.2.3 Expert Judgment

    4.2.2.2

    Enterprise Environmental Factors4.1.1.3

    4.3.1.3

    Enterprise Environmental Factors4.2.1.3

    4.1.1.4 Organizational Process Assets

  • 7/31/2019 PMBoKxCMMI

    2/28

    All GP 2.1/2.2/3.2

    OPD All

    4.3.2 Tools and Techniques

    PP/PMC/IPM/QPM GP 2.2

    PP SG 1/2/3

    IPM SP 1.1/1.2/1.3

    PP/PMC/IPM/QPM GP 2.3

    OEI SP 1.2

    CM SP 1.2

    PP GP 2.3

    PP SG 1/2/3

    IPM SP 1.1/1.2/1.3

    4.3.3 Outputs

    PP SP 2.7

    IPM SP 1.3

    PMC SG 1/2

    IPM SP 1.4

    TS SG 3

    4.4.1 Inputs

    PP SP 2.7

    IPM SP 1.3

    4.4.1.2 Approved Corrective Action PMC SP 2.2

    4.4.1.3 Approved Preventive Action RSKM SP 3.1

    REQM SP 1.3

    PMC SP 2.2

    4.4.1.5 Approved Defect Repair PMC SP 2.2

    4.4.1.6 Validated Defect Repair PMC SP 2.3

    4.4.1.7 Administrative Closure Procedure Not Addressed

    4.4.2 Tools and Techniques

    PP/PMC/IPM/QPM/TS GP 2.2

    PMC SG 1/2

    IPM SP 1.4

    TS SG 3

    PP/PMC/IPM/QPM GP 2.3

    OEI SP 1.2

    CM SP 1.2

    4.4.3 Outputs

    All GP 2.6

    TS SG 3

    CM SP 1.3

    PI SP 3.4

    4.4.3.2 Requested Changes PMC SP 2.1

    4.4.3.3 Implemented change request PMC SP 2.3

    4.4.3.4 Implemented corrective actions PMC SP 2.3

    4.4.3.5 Implemented preventive actions RSKM SP 3.2

    4.4.3.6 Implemented defect repair PMC SP 2.3

    PMC SP 1.6/1.7

    MA SP 2.4

    PMC SG 1/2

    IPM SP 1.4

    4.5.1 Inputs

    PP SP 2.7

    IPM SP 1.3

    4.4.2.2Project Management Information System

    (PMIS)

    Project Management Plan

    4.4.1.4 Approved Change Requests

    4.4.1.1

    4.4.2.1 Project Management Methodology

    Project Management Information System

    (PMIS)

    4.4.3.7 Work Performance Information

    4.5 Monitor and Control Project Work

    4.5.1.1

    4.3.2.3 Expert Judgment

    4.4.3.1 Deliverables

    4.4 Direct and Manage Project Execution

    Project Management Plan

    4.3.3.1 Project Management Plan

    4.3.2.1 Project Management Methodology

    4.3.2.2

    4.3.1.4 Organizational Process Assets

  • 7/31/2019 PMBoKxCMMI

    3/28

    PMC SP 1.6/1.7

    MA SP 2.4

    4.5.1.3 Rejected Change Requests PMC SP 2.3

    4.5.2 Tools and Techniques

    PP/PMC/IPM/QPM GP 2.2

    PMC SG 1/2IPM SP 1.4

    PP/PMC/IPM/QPM GP 2.3

    OEI SP 1.2

    CM SP 1.2

    4.5.2.3 Earned Value Technique MA SP 1.2

    PMC GP 2.3

    PMC SG 1/2

    IPM SP 1.4

    4.5.3 Outputs

    4.5.3.1 Recommended Corrective Actions PMC SP 2.2

    4.5.3.2 Recommended Preventive Actions RSKM SP 3.1

    4.5.3.3 Forecasts QPM SP 2.3

    4.5.3.4 Recommended Defect Repair PMC SP 2.2

    4.5.3.5 Requested Changes PMC SP 2.1

    4.6 Integrated Change Control PMC SG 2

    4.6.1 Inputs

    PP SP 2.7

    IPM SP 1.3

    4.6.1.2 Requested Changes PMC SP 2.1

    PMC SP 1.6/1.7

    MA SP 2.4

    4.6.1.4 Recommended Preventive Actions RSKM SP 3.1

    4.6.1.5 Recommended Corrective ActionsPMC SP 2.2

    4.6.1.6 Recommended Defect Repair PMC SP 2.2

    All GP 2.6

    TS SG 3

    CM SP 1.3

    PI SP 3.4

    4.6.2 Tools and Techniques

    PP/PMC/IPM/QPM GP 2.2

    PMC SG 2

    PP/PMC/IPM/QPM GP 2.3

    OEI SP 1.2

    CM SP 1.2

    PMC GP 2.3PMC SG 2

    4.6.3 Outputs

    REQM SP 1.3

    PMC SP 2.2

    4.6.3.2 Rejected Change Requests PMC SP 2.3

    PP SP 2.7

    IPM SP 1.3

    PP SG 1/2/3

    RD SG 1/2

    QPM SP 1.1

    REQM SP 1.3

    4.6.3.5 Approved Corrective Actions PMC SP 2.2

    Project Management Methodology

    Approved Change Requests

    Project Management Information System

    4.6.3.4 Project Scope Statement (Updates)

    4.6.2.3 Expert Judgment

    4.6.3.1

    4.6.3.3 Project Management Plan (Updates)

    4.6.2.2Project Management Information System

    (PMIS)

    4.6.1.3 Work Performance Information

    4.6.1.7 Deliverables

    4.6.2.1

    4.6.1.1 Project Management Plan

    4.5.2.1 Project Management Methodology

    4.5.2.2

    4.5.2.4 Expert Judgment

    4.5.1.2 Work Performance Information

  • 7/31/2019 PMBoKxCMMI

    4/28

    4.6.3.6 Approved Preventive Actions RSKM SP 3.1

    4.6.3.7 Approved Defect Repair PMC SP 2.2

    4.6.3.8 Validated Defect Repair PMC SP 2.3

    All GP 2.6

    TS SG 3

    CM SP 1.3PI SP 3.4

    4.7 Close Project Not Addressed

    4.7.1 Inputs

    PP SP 2.7

    IPM SP 1.3

    SAM SP 1.3/2.2/2.3

    ISM SP 2.3

    All GP 2.3/2.5

    OEI

    All GP 2.1/2.2/3.2

    OPD All

    PMC SP 1.6/1.7

    MA SP 2.4

    All GP 2.6

    TS SG 3

    CM SP 1.3

    PI SP 3.4

    4.7.2 Tools and Techniques

    4.7.2.1 Project Management Methodology PP/PMC/IPM/QPM GP 2.2

    PP/PMC/IPM/QPM GP 2.3

    OEI SP 1.2

    CM SP 1.2

    4.7.2.3 Expert Judgment

    4.7.3 Outputs

    4.7.3.1 Administrative Closure Procedure Not Addressed

    4.7.3.2 Contract Closure Procedure Not Addressed

    4.7.3.3 Final Product, Service, or Result PI SP 3.4

    All GP 2.1/2.2/3.2

    OPD All

    5.0 Project Scope Management

    PP SG 1

    RD SG 1/2

    5.1.1 Inputs

    All GP 2.3/2.5

    OEIAll GP 2.1/2.2/3.2

    OPD All

    5.1.1.3 Project Charter Not Addressed

    RD SG 1

    PP SP 1.1

    QPM SP 1.1

    REQM SP 1.1

    PP SP 2.7

    IPM SP 1.3

    5.1.2 Tools and Techniques

    PP/RD GP 2.3

    PP SG 1

    Deliverables

    Preliminary Project Scope Statement

    Contract Documentation

    5.1.2.1 Expert Judgment

    5.1.1.5 Project Management Plan

    5.1 Scope Planning

    5.1.1.2 Organizational Process Assets

    5.1.1.4

    4.7.1.2

    4.7.3.4 Organizational Process Assets (Updates)

    4.7.1.5 Work Performance Information

    4.7.1.6

    4.7.2.2 Project Management Information System

    4.6.3.9 Deliverables

    4.7.1.1 Project Management Plan

    Enterprise Environmental Factors5.1.1.1

    Enterprise Environmental Factors4.7.1.3

    4.7.1.4 Organizational Process Assets

  • 7/31/2019 PMBoKxCMMI

    5/28

    RD SG 1/2

    PP/RD GP 2.3

    PP SG 1

    RD SG 1/2

    5.1.3 Outputs

    PP/RD/IPM GP 2.2PP SP 2.7

    IPM SP 1.1/1.3

    PP SG 1/2/3

    RD SG 1/2

    TS SG 1

    5.2.1 Inputs

    All GP 2.1/2.2/3.2

    OPD All

    5.2.1.2 Project Charter Not Addressed

    RD SG 1

    PP SP 1.1

    QPM SP 1.1REQM SP 1.1

    PP/RD/IPM GP 2.2

    PP SP 2.7

    IPM SP 1.1/1.3

    REQM SP 1.3

    PMC SP 2.2

    5.2.2 Tools and Techniques

    PP SP 1.2

    TS SP 1.1

    RD SP 3.3/3.4

    PP SP 3.2

    TS SP 1.1

    DAR SP 1.3

    PP/RD/TS GP 2.3

    PP SG 1/2/3

    RD SG 1/2

    TS SG 1

    5.2.2.4 Stakeholder Analysis RD SP 1.1

    5.2.3 Outputs

    PP SG 1/2/3

    RD SG 1/2

    QPM SP 1.1

    REQM SP 1.3

    5.2.3.2 Requested Changes PMC SP 2.1

    PP/RD/IPM GP 2.2

    PP SP 2.7

    IPM SP 1.1/1.3

    PP SP 1.1/2.4

    IPM SP 1.3

    5.3.1 Inputs

    All GP 2.1/2.2/3.2

    OPD All

    PP SG 1/2/3

    RD SG 1/2

    QPM SP 1.1

    Project Scope Management Plan

    Alternatives Identification

    Organizational Process Assets

    Templates, Forms, Standards

    5.3.1.2 Project Scope Statement

    5.2.3.3 Project Scope Management Plan (Updates)

    5.3 Create WBS

    5.3.1.1

    5.2.3.1 Project scope statement

    5.2.2.1 Product Analysis

    5.2.2.2

    5.2.2.3 Expert Judgment

    5.2.1.5 Approved Change Requests

    5.2.1.1 Organizational Process Assets

    5.2.1.3 Preliminary Project Scope Statement

    5.2.1.4

    5.2 Scope Definition

    5.1.2.2

    5.1.3.1 Project Scope Management Plan

  • 7/31/2019 PMBoKxCMMI

    6/28

    REQM SP 1.3

    PP/RD/IPM GP 2.2

    PP SP 2.7

    IPM SP 1.1/1.3

    REQM SP 1.3

    PMC SP 2.2

    5.3.2 Tools and Techniques

    PP GP 2.3

    PP SP 1.1/2.4

    5.3.2.2 Decomposition PP SP 1.1/2.4

    5.3.3 Outputs

    PP SG 1/2/3

    RD SG 1/2

    QPM SP 1.1

    REQM SP 1.3

    5.3.3.2 Work Breakdown Structure PP SP 1.1/2.4

    5.3.3.3 WBS Dictionary PP SP 2.4

    PP SP 2.7

    CM SG 1/2

    PP/RD/IPM GP 2.2

    PP SP 2.7

    IPM SP 1.1/1.3

    5.3.3.6 Requested Changes PMC SP 2.1

    IPM SP 3.1

    PI SP 3.1

    VER SP 3.1

    VAL SP 2.1

    5.4.1 Inputs

    PP SG 1/2/3

    RD SG 1/2

    QPM SP 1.1

    REQM SP 1.3

    5.4.1.2 Work Breakdown Structure (WBS) Dictionary PP SP 2.4

    PP/RD/IPM GP 2.2

    PP SP 2.7

    IPM SP 1.1/1.3

    All GP 2.6

    TS SG 3

    CM SP 1.3

    PI SP 3.4

    5.4.2 Tools and Techniques

    PI SP 3.1

    VER SP 2.2/3.1

    PPQA SP 1.2

    5.4.3 Outputs

    5.4.3.1 Accepted Deliverables Not Addressed

    5.4.3.2 Requested Changes PMC SP 2.1

    5.4.3.3 Recommended Corrective Actions PMC SP 2.2

    REQM SP 1.3

    CM SG 2

    5.5.1 Inputs

    PP SG 1/2/3

    Approved Change Requests

    Project Scope Management Plan (Updates)

    Project Scope Management Plan

    5.5 Scope Control

    5.4.2.1 Inspection

    5.4.1.1 Project Scope Statement

    5.4.1.3

    5.4.1.4 Deliverables

    5.4 Scope Verification

    5.3.3.4 Scope Baseline

    5.3.3.5

    5.3.3.1 Project Scope Statement (Updates)

    5.3.1.3 Project Scope Management Plan

    5.3.1.4

    5.3.2.1 Work Breakdown Structure Templates

  • 7/31/2019 PMBoKxCMMI

    7/28

    RD SG 1/2

    QPM SP 1.1

    REQM SP 1.3

    5.5.1.2 Work Breakdown Structure (WBS) PP SP 1.1/2.4

    5.5.1.3 WBS Dictionary PP SP 2.4

    PP/RD/IPM GP 2.2PP SP 2.7

    IPM SP 1.1/1.3

    PMC SP 1.6/1.7

    MA SP 2.4

    REQM SP 1.3

    PMC SP 2.2

    PMC SP 1.6/1.7

    MA SP 2.4

    5.5.2 Tools and Techniques

    REQM SP 1.3

    CM SP 1.2

    PMC SG 2PMC GP 2.8

    QPM SP 2.2

    MA SP 2.2

    REQM SP 1.3

    PP SP 2.7

    5.5.2.4 Configuration Management System CM SP 1.2

    5.5.3 Outputs

    PP SG 1/2/3

    RD SG 1/2

    QPM SP 1.1

    REQM SP 1.3

    5.5.3.2 Work Breakdown Structure (Updates) PP SP 1.1/2.4

    5.5.3.3 WBS Dictionary (Updates) PP SP 2.4

    PP SP 2.7

    REQM SP 1.3

    CM SG 2

    5.5.3.5 Requested Changes PMC SP 2.1

    5.5.3.6 Recommended Corrective Action PMC SP 2.2

    All GP 2.1/2.2/3.2

    OPD All

    PP SP 2.7

    IPM SP 1.3

    6.0 Project Time Management6.1 Activity Definition PP SP 1.2

    6.1.1 Inputs

    All GP 2.3/2.5

    OEI

    All GP 2.1/2.2/3.2

    OPD All

    PP SG 1/2/3

    RD SG 1/2

    QPM SP 1.1

    REQM SP 1.3

    6.1.1.4 Work Breakdown Structure (WBS) PP SP 1.1/2.4

    6.1.1.5 WBS Dictionary PP SP 2.4

    Project Scope Statement (Updates)

    Organizational Process Assets (Updates)

    Approved Change Requests

    6.1.1.3 Project Scope Statement

    5.5.3.4 Scope Baseline (Updates)

    5.5.3.7

    5.5.3.8 Project Management Plan (Updates)

    5.5.3.1

    5.5.2.1 Change Control System

    5.5.2.2 Variance Analysis

    5.5.2.3 Replanning

    5.5.1.7 Work Performance Information

    5.5.1.4 Project Scope Management Plan

    5.5.1.5 Performance Reports

    5.5.1.6

    5.5.1.1 Project Scope Statement

    Enterprise Environmental Factors6.1.1.1

    6.1.1.2 Organizational Process Assets

  • 7/31/2019 PMBoKxCMMI

    8/28

    PP SP 2.7

    IPM SP 1.3

    6.1.2 Tools and Techniques

    6.1.2.1 Decomposition PP SP 1.1/2.4

    PP GP 2.3

    PP SP 1.2PP SP 1.2

    PP GP 2.2

    PP GP 2.3

    PP SP 1.2

    PP SP 1.2

    PP GP 2.2

    6.1.3 Outputs

    6.1.3.1 Activity List PP SP 1.1/2.4

    6.1.3.2 Activity Attributes PP SP 1.2

    6.1.3.3 Milestone List PP SP 2.1

    6.1.3.4 Requested Changes PMC SP 2.1

    6.2 Activity Sequencing PP SG 1

    6.2.1 Inputs

    PP SG 1/2/3

    RD SG 1/2

    QPM SP 1.1

    REQM SP 1.3

    6.2.1.2 Activity List PP SP 1.1/2.4

    6.2.1.3 Activity Attributes PP SP 1.2

    6.2.1.4 Milestone List PP SP 2.1

    REQM SP 1.3

    PMC SP 2.2

    6.2.2 Tools and TechniquesPP SP 2.1

    PP GP 2.2

    PP SP 2.1

    PP GP 2.2

    PP GP 2.3

    PP SP 2.1

    PP SP 2.1

    PP GP 2.2

    PP SP 2.1

    PP GP 2.2

    6.2.3 Outputs

    6.2.3.1 Project Schedule Network Diagrams PP SP 2.1

    6.2.3.2 Activity List (Updates) PP SP 1.1/2.4

    6.2.3.3 Activity Attributes (Updates) PP SP 1.2

    6.2.3.4 Requested Changes PMC SP 2.1

    6.3 Activity Resource Planning PP SP 2.4

    6.3.1 Inputs

    All GP 2.3/2.5

    OEI

    All GP 2.1/2.2/3.2

    OPD All

    6.3.1.3 Activity list PP SP 1.1/2.4

    6.3.1.4 Activity attributes PP SP 1.2

    Arrow Diagramming Method (ADM)

    Applying Leads and Lags

    Project Management Plan

    6.2.2.4 Dependency Determination

    6.2.2.5

    6.3.1.2 Organizational process assets

    6.2.2.3 Schedule Network Templates

    6.2.1.5 Approved Change Requests

    6.2.2.1 Precedence Diagramming Method (PDM)

    6.2.2.2

    Project Scope Statement

    6.1.2.3 Rolling Wave Planning

    6.1.2.4

    6.1.2.5 Planning Component

    Expert Judgment

    6.1.2.2 Templates

    6.1.1.6

    Enterprise Environmental Factors6.3.1.1

    6.2.1.1

  • 7/31/2019 PMBoKxCMMI

    9/28

    PP SP 2.4

    PP SP 2.5

    IT SP 1.3

    PP SP 2.7

    IPM SP 1.3

    6.3.2 Tools and TechniquesPP GP 2.3

    PP SP 2.4

    PP SP 3.2

    TS SP 1.1

    DAR SP 1.3

    6.3.2.3 Published estimating data IPM SP 1.2

    PP SP 2.4

    PP GP 2.3

    PP SP 2.4

    PP GP 2.2

    6.3.3 Outputs

    6.3.3.1 Activity Resource Requirements PP SP 2.4

    6.3.3.2 Activity Attributes (Updates) PP SP 1.2

    6.3.3.3 Resource breakdown structure PP SP 2.4

    PP SP 2.4/2.5

    IPM SP 1.2

    IT SP 1.3

    6.3.3.5 Requested Changes PMC SP 2.1

    6.4 Activity Duration Estimating PP SP 1.4

    6.4.1 Inputs

    All GP 2.3/2.5

    OEI

    All GP 2.1/2.2/3.2

    OPD All

    PP SG 1/2/3

    RD SG 1/2

    QPM SP 1.1

    REQM SP 1.3

    6.4.1.4 Activity List PP SP 1.1/2.4

    6.4.1.5 Activity Attributes PP SP 1.2

    6.4.1.6 Activity Resource Requirements PP SP 1.2

    PP SP 2.4/2.5

    IPM SP 1.2

    IT SP 1.3

    Project Management Plan PP SP 2.7/1.4-Risk Register IPM SP 1.3

    -Activity Cost Estimates RSKM SP 2.2

    6.4.2 Tools and Techniques

    PP GP 2.3

    PP SP 1.4

    6.4.2.2 Analogous Estimating IPM SP 1.2

    PP SP 1.4

    PP GP 2.2

    PP SP 1.4

    PP GP 2.2

    PP SP 1.4

    PP GP 2.2

    Resource Calendars (updates)

    Three-Point Estimates

    Alternatives analysis

    6.4.2.3 Parametric Estimating

    6.4.2.4

    6.4.1.7 Resource Calendars

    6.4.1.8

    6.4.2.5 Reserve Analysis

    6.4.2.1 Expert Judgment

    6.4.1.3 Project Scope Statement

    6.3.2.5 Bottom-up Estimating

    6.3.3.4

    6.4.1.2

    6.3.2.4 Project Management Software

    6.3.1.6 Project management plan

    6.3.2.1 Expert Judgment

    6.3.2.2

    6.3.1.5 Resource availability

    Enterprise Environmental Factors6.4.1.1

    Organizational Process Assets

  • 7/31/2019 PMBoKxCMMI

    10/28

    6.4.3 Outputs

    6.4.3.1 Activity Duration Estimates PP SP 1.4

    6.4.3.2 Activity Attributes (Updates) PP SP 1.2

    6.5 Schedule Development PP SP 2.1

    6.5.1 Inputs

    All GP 2.1/2.2/3.2OPD All

    PP SG 1/2/3

    RD SG 1/2

    QPM SP 1.1

    REQM SP 1.3

    6.5.1.3 Activity List PP SP 1.1/2.4

    6.5.1.4 Activity Attributes PP SP 1.2

    6.5.1.5 Project Schedule Network Diagrams PP SP 2.1

    PP SP 2.4/2.5

    IPM SP 1.2

    IT SP 1.3

    6.5.1.8 Activity Duration Estimates PP SP 1.4

    Project Management Plan PP SP 2.7

    -Risk Register IPM SP 1.3

    RSKM SP 2.2

    6.5.2 Tools and Techniques

    PP SP 2.1

    PP GP 2.2

    PP SP 2.1

    PP GP 2.2

    PP SP 2.1

    PP GP 2.2

    PP SP 2.1

    PP GP 2.2

    PP SP 2.1

    PP GP 2.2

    PP SP 2.1

    PP GP 2.2

    PP SP 2.4

    PP GP 2.3

    PP SP 2.1

    PP GP 2.2

    PP SP 2.1

    PP GP 2.2

    PP SP 2.1PP GP 2.2

    6.5.3 Outputs

    6.5.3.1 Project Schedule PP SP 2.1

    6.5.3.2 Schedule model data PP SP 2.1

    PP SP 2.1

    CM SG 1/2

    6.5.3.4 Resource Requirement (Updates) PP SP 2.4

    6.5.3.5 Activity attributes (Updates) PP SP 1.2

    6.5.3.6 Project calendar (updates) PP SP 2.1

    6.5.3.7 Requested Changes PMC SP 2.1

    Project management plan (updates)

    - Schedule Management Plan (updates)

    Schedule Compression

    Critical chain method

    Schedule baseline

    Project Scope Statement

    6.5.2.10 Schedule model

    6.5.3.8

    PP SP 2.7/2.1

    Resource Leveling

    6.5.2.6

    6.5.3.3

    6.5.2.8 Applying calendars

    6.5.2.9 Adjusting leads and lags

    6.5.2.2 Critical path method

    6.5.2.7 Project Management Software

    6.5.2.4 What-if scenario analysis

    6.5.2.5

    6.5.1.2

    6.5.1.7 Resource calendars

    6.5.2.1 Schedule network analysis

    6.5.2.3

    6.5.1.9

    6.5.1.1 Organizational Process Assets

  • 7/31/2019 PMBoKxCMMI

    11/28

    PMC SG 2

    PMC SP 1.1

    6.6.1 Inputs

    6.6.1.1 Schedule Management Plan PP SP 2.7/2.1

    PP SP 2.1

    CM SG 2PMC SP 1.6/1.7

    MA SP 2.4

    REQM SP 1.3

    PMC SP 2.2

    6.6.2 Tools and Techniques

    PMC SP 1.6/1.7

    All GP 2.10

    MA SP 2.4

    PP SP 2.1

    PMC SG 2

    MA SG 2

    QPM SG 2

    PP SP 2.4

    PP GP 2.3

    PMC GP 2.8

    QPM SP 2.2

    MA SP 2.2

    PMC SP 1.1

    PMC GP 2.2

    6.6.3 Outputs

    6.6.3.1 Schedule model data (updates) PP SP 2.1

    PP SP 2.1

    CM SG 2

    MA SG 2

    SAM SP 2.2

    ISM SP 2.1/2.2

    RSKM SP 3.2

    QPM SG 2

    6.6.3.4 Requested Changes PMC SP 2.1

    6.6.3.5 Recommended Corrective Actions PMC SP 2.2

    All GP 2.1/2.2/3.2

    OPD All

    6.6.3.7 Activity List (Updates) PP SP 1.1/2.4

    6.6.3.8 Activity attributes (Updates) PP SP 1.2

    PP SP 2.7IPM SP 1.3

    7.0 Project Cost Management

    7.1 Cost Estimating PP SP 1.4

    7.1.1 Inputs

    All GP 2.3/2.5

    OEI

    All GP 2.1/2.2/3.2

    OPD All

    PP SG 1/2/3

    RD SG 1/2

    QPM SP 1.1

    REQM SP 1.3

    Schedule Baseline

    Performance Measurement

    Schedule comparison bar charts

    7.1.1.3 Project Scope Statement

    6.6.3.6 Organizational process assets (Updates)

    7.1.1.2

    6.6.3.3 Performance measurements

    6.6.3.2 Schedule baseline (Updates)

    Organizational Process Assets

    6.6.3.9 Project management plan (updates)

    6.6.2.6

    6.6.2.2 Schedule Change Control System

    6.6.2.4 Project Management Software

    6.6.2.5 Variance Analysis

    Schedule Control

    6.6.1.2

    6.6.2.3

    6.6.1.4 Approved Change Requests

    6.6.2.1 Progress reporting

    6.6.1.3 Performance Reports

    6.6

    Enterprise Environmental Factors7.1.1.1

  • 7/31/2019 PMBoKxCMMI

    12/28

    7.1.1.4 Work Breakdown Structure (WBS) PP SP 1.1/2.4

    7.1.1.5 WBS Dictionary PP SP 2.4

    Project Management Plan PP SP 2.7/2.1/2.5

    -Schedule Management Plan IPM SP 1.3/4.3

    -Staffing Management Plan RSKM SP 2.2

    -Risk RegisterIT SP 1.2/1.3

    7.1.2 Tools and Techniques

    7.1.2.1 Analogous Estimating IPM SP 1.2

    PP SP 1.4

    PP GP 2.2

    PP SP 1.4

    PP GP 2.2

    PP SP 1.4

    PP GP 2.2

    PP GP 2.3

    PP SP 2.4

    PP SP 1.4

    PP GP 2.2

    PP SP 1.4

    PP GP 2.2

    PP SP 1.4

    PP GP 2.2

    7.1.3 Outputs

    7.1.3.1 Activity Cost Estimates PP SP 1.4

    7.1.3.2 Activity Cost Estimate Supporting Detail PP SP 1.4

    7.1.3.3 Requested Changes PMC SP 2.1

    7.1.3.4 Cost Management Plan (Updates) PP SP 2.1/2.7

    7.2 Cost Budgeting PP SP 2.1

    7.2.1 Inputs

    PP SG 1/2/3

    RD SG 1/2

    QPM SP 1.1

    REQM SP 1.3

    7.2.1.2 Work Breakdown Structure (WBS) PP SP 1.1/2.4

    7.2.1.3 WBS Dictionary PP SP 2.4

    7.2.1.4 Activity Cost Estimates PP SP 1.4

    7.2.1.5 Activity Cost Estimate Supporting Detail PP SP 1.4

    7.2.1.6 Project Schedule PP SP 2.1

    PP SP 2.4/2.5

    IPM SP 1.2

    IT SP 1.3SAM SP 1.3

    ISM SP 2.3

    7.2.1.9 Cost Management Plan PP SP 2.1/2.7

    7.2.2 Tools and Techniques

    PP SP 2.1

    PP GP 2.2

    PP SP 2.1

    PP GP 2.2

    PP SP 2.1

    PP GP 2.2

    PP SP 2.1

    PP GP 2.2

    Parametric Estimating

    Contract

    7.2.2.2 Reserve Analysis

    7.2.2.3 Parametric Estimating

    7.2.2.4 Funding Limit Reconciliation

    7.2.2.1 Cost Aggregation

    7.2.1.7

    7.2.1.8

    Resource Calendars

    Project Scope Statement

    7.1.2.6 Vendor Bid Analysis

    7.1.2.7 Reserve Analysis

    7.1.2.8

    7.2.1.1

    Cost of Quality

    7.1.2.5 Project Management Software

    7.1.2.2 Determine Resource Cost Rates

    7.1.2.3

    7.1.2.4

    Bottom-up Estimating

    7.1.1.6

  • 7/31/2019 PMBoKxCMMI

    13/28

    7.2.3 Outputs

    PP SP 2.1

    CM SG 1/2

    7.2.3.2 Project Funding Requirements PP SP 2.1

    7.2.3.3 Cost Management Plan (Updates) PP SP 2.1/2.7

    7.2.3.4 Requested Changes PMC SP 2.1PMC SG 2

    PMC SP 1.1

    7.3.1 Inputs

    PP SP 2.1

    CM SG 1/2

    7.3.1.2 Project Funding Requirements PP SP 2.1

    PMC SP 1.6/1.7

    MA SP 2.4

    PMC SP 1.6/1.7

    MA SP 2.4

    REQM SP 1.3

    PMC SP 2.2

    PP SP 2.7

    IPM SP 1.3

    7.3.2 Tools and Techniques

    PP SP 2.1

    PMC SG 2

    MA SG 2

    QPM SG 2

    7.3.2.3 Forecasting QPM SP 2.3

    All GP 2.10

    PMC SP 1.6/1.7

    PP GP 2.3

    PP SP 2.4

    7.3.2.6 Variance Management PMC GP 2.8

    7.3.3 Outputs

    7.3.3.1 Cost Estimates (Updates) PP SP 1.4

    PP SP 2.1

    CM SG 2

    MA SG 2

    SAM SP 2.2

    ISM SP 2.1/2.2

    RSKM SP 3.2

    QPM SG 2

    7.3.3.4 Forecasted Completion QPM SP 2.37.3.3.5 Requested Changes PMC SP 2.1

    7.3.3.6 Recommended Corrective Actions PMC SP 2.2

    All GP 2.1/2.2/3.2

    OPD All

    PP SP 2.7

    IPM SP 1.3

    8.0 Project Quality Management

    PPQA GP 2.1

    All GP 2.2

    8.1.1 Inputs

    All GP 2.3/2.5

    OEI

    Performance Reports

    Performance Measurements

    7.3.3.8 Project Management Plan (Updates)

    8.1 Quality Planning

    7.3.3.7 Organizational Process Assets (Updates)

    7.3.2.5 Project Management Software

    7.3.3.2

    7.3.3.3

    Cost Baseline (Updates)

    Performance Measurement

    7.3.1.5 Approved Change Requests

    7.3.1.6 Project Management Plan

    7.3.2.1

    7.3.2.2

    Cost Change Control System

    7.3.1.4 Work Performance Information

    7.3 Cost Control

    7.3.1.1

    7.3.1.3

    Cost Baseline

    Cost Baseline7.2.3.1

    Enterprise Environmental Factors8.1.1.1

    7.3.2.4 Project Performance Reviews

  • 7/31/2019 PMBoKxCMMI

    14/28

    All GP 2.1/2.2/3.2

    OPD All

    PP SG 1/2/3

    RD SG 1/2

    QPM SP 1.1

    REQM SP 1.3

    PP SP 2.7

    IPM SP 1.3

    8.1.2 Tools and Techniques

    QPM SP 2.2

    ISM SP 1.1

    TS SP 1.3

    OPF SP 1.2

    OEI SP 1.2

    QPM SP 1.4

    8.1.2.3 Design of Experiments QPM SP 2.2

    8.1.2.4 Cost of Quality PPQA GP 2.2

    8.1.2.5 Additional quality planning tools PPQA GP 2.3

    8.1.3 Outputs

    PPQA GP 2.2

    PP SP 2.7

    MA SP 1.2

    QPM SP 1.1/2.1

    PPQA SP 2.1/2.2

    8.1.3.3 Quality Checklists PPQA GP 2.3

    OPF SP 2.1

    OID SP 2.1

    CAP SP 2.1

    QPM SP 1.2

    CM SG 1/2

    PP SP 2.7

    IPM SP 1.3

    8.2 Perform Quality Assurance PPQA SG 1

    8.2.1 Inputs

    PPQA GP 2.2

    PP SP 2.7

    MA SP 1.2

    QPM SP 1.1/2.1

    PPQA SP 2.1/2.2

    OPF SP 2.1

    OID SP 2.1

    CAR SP 2.1

    PMC SP 1.6/1.7

    MA SP 2.4

    REQM SP 1.3

    PMC SP 2.2

    8.2.1.6 Quality Control Measurements PPQA SP 2.2

    8.2.1.7 Implemented Change Requests PMC SP 2.3

    8.2.1.8 Implemented Corrective Actions PMC SP 2.3

    8.2.1.9 Implemented Defect Repair PMC SP 2.3

    8.2.1.10 Implemented Preventive Actions RSKM SP 3.2

    8.2.2 Tools and Techniques

    PPQA GP 2.3/2.2

    Work Performance Information

    Project Management Plan (Updates)

    Benchmarking

    Process Improvement Plan

    8.1.3.6

    8.2.1.5 Approved Change Requests

    8.2.1.2 Quality Metrics

    8.2.1.3

    8.2.1.4

    8.2.1.1 Quality Management Plan

    8.1.3.2 Quality Metrics

    8.1.3.4 Process Improvement Plan

    8.1.3.5 Quality Baseline

    8.1.3.1 Quality Management Plan

    8.1.1.4 Project Management Plan

    8.1.2.1

    8.1.2.2

    Cost-Benefit Analysis

    Project Scope Statement

    8.1.1.2

    8.1.1.3

    Organizational Process Assets

  • 7/31/2019 PMBoKxCMMI

    15/28

    PPQA SG 1

    8.2.2.2 Quality Audits PPQA SG 1

    CAR SP 1.2

    OID SP 1.2

    8.2.2.4 Quality Control Tools and Techniques See 8.3.2 See 8.3.2

    8.2.3 Outputs8.2.3.1 Requested Changes PMC SP 2.1

    8.2.3.2 Recommended corrective actions PMC SP 2.2

    All GP 2.1/2.2/3.2

    OPD All

    PP SP 2.7

    IPM SP 1.3

    PPQA SG 2

    PMC SG 2

    8.3.1 Input

    PPQA GP 2.2

    PP SP 2.7

    MA SP 1.2

    QPM SP 1.1/2.1

    PPQA SP 2.1/2.2

    8.3.1.3 Quality Checklists PPQA GP 2.2

    All GP 2.1/2.2/3.2

    OPD All

    PMC SP 1.6/1.7

    MA SP 2.4

    REQM SP 1.3

    PMC SP 2.2

    All GP 2.6

    TS SG 3

    CM SP 1.3

    PI SP 3.4

    8.3.2 Tools and Techniques

    CAR GP 2.3

    PMC SG 2

    QPM GP 2.3

    PMC SG 2

    OPD GP 2.3

    PMC SG 2

    CAR GP 2.3

    PMC SG 2

    CAR GP 2.3PMC SG 2

    QPM GP 2.3

    PMC SG 2

    CAR GP 2.3

    PMC SG 2

    QPM GP 2.2

    QPM SP 2.2

    PPQA SP 1.2

    PI SP 3.1

    VER SP 2.2/3.1

    VAL SP 2.1

    8.3.2.10 Defect Repair Review PMC SP 2.3

    Organizational process assets (Updates)

    Inspection

    Pareto chart

    8.3.2.7 Scatter Diagram

    8.3.2.8 Statistical Sampling

    8.3.2.9

    8.3.2.4

    Cause and Effect Diagram8.3.2.1

    8.3.2.3 Flowcharting

    Deliverables

    8.3.2.6 Run Chart

    8.3.2.2

    8.2.3.3

    8.3.1.5 Work Performance Information

    8.3.1.1 Quality Management Plan

    8.3.2.5

    Histogram

    8.3.1.4

    8.2.3.4

    Quality Metrics

    Organizational Process Assets

    8.3 Perform Quality Control

    Project management plan (updates)

    8.3.1.6 Approved Change Requests

    8.3.1.7

    . . .

    8.2.2.3 Process Analysis

    8.3.1.2

    Control Charts

  • 7/31/2019 PMBoKxCMMI

    16/28

    8.3.3 Outputs

    8.3.3.1 Quality Control Measurements PPQA SP 2.2

    8.3.3.2 Validated Defect Repair PMC SP 2.3

    QPM SP 1.1

    CM SG 2

    8.3.3.4 Recommended Corrective Action PMC SP 2.28.3.3.5 Recommended Preventive Actions RSKM SP 3.1

    8.3.3.6 Requested Changes PMC SP 2.1

    8.3.3.7 Recommended Defect Repair PMC SP 2.2

    All GP 2.1/2.2/3.2

    OPD All

    8.3.3.9 Validated Deliverables VAL SP 2.2

    PP SP 2.7

    IPM SP 1.3

    9.0 Project Human Resource Management

    All GP 2.3/2.4

    PP SP 2.6

    IPM SG 4

    IT SG 1/2

    9.1.1 Inputs

    All GP 2.3/2.5

    OEI

    All GP 2.1/2.2/3.2

    OPD All

    Project Management Plan PP SP 2.7/1.4

    -Activity Resource Requirements IPM SP 1.3

    9.1.2 Tools and Techniques

    IPM SG 4

    IT SP 2.3

    9.1.2.2 Networking IT SP 2.5

    9.1.2.3 Organizational Theory IPM SP 4.1

    9.1.3 Outputs

    All GP 2.4

    PP SP 2.6

    IPM SP 4.2/4.3

    IT SP 2.3

    PP SP 2.6

    IPM SP 4.1

    PP SP 2.7

    IPM SP 4.3

    IT SP 1.2/1.3IPM SP 4.3

    IT SP 1.3

    9.2.1 Inputs

    All GP 2.3/2.5

    OEI

    All GP 2.1/2.2/3.2

    OPD All

    All GP 2.4

    PP SP 2.6

    IPM SP 4.2/4.3

    IT SP 2.3

    PP SP 2.6

    Organizational Process Assets

    Enterprise Environmental Factors

    Staffing Management Plan

    9.2.1.2

    9.2.1.3 Roles and Responsibilities

    8.3.3.8 Organization Process Assets (Updates)

    Roles and Responsibilities

    9.2 Acquire Project Team

    9.1 Human Resource Planning

    8.3.3.10 Project Management Plan (Updates)

    8.3.3.3 Quality Baseline (Updates)

    9.1.3.2 Project Organization Charts

    9.1.2.1 Organization charts and Position Descriptions

    9.1.3.1

    Enterprise Environmental Factors9.1.1.1

    9.1.1.3

    9.1.1.2

    9.2.1.1

    Organizational Process Assets

    9.1.3.3

  • 7/31/2019 PMBoKxCMMI

    17/28

    IPM SP 4.1

    PP SP 2.7

    IPM SP 4.3

    9.2.2 Tools and Techniques

    IPM SP 4.3

    IT SP 1.3IPM/IT GP 2.2

    IPM SP 4.3

    IT SP 1.3

    IPM/IT GP 2.2

    IPM SP 4.3

    IT SP 1.3

    IPM/IT GP 2.2

    IPM SP 4.3

    IT SP 1.3

    IPM/IT GP 2.2

    9.2.3 Outputs

    All GP 2.4PP SP 2.6

    IPM SP 4.3

    IT SP 1.3

    PP SP 2.4

    PP SP 2.5

    IT SP 1.3

    PP SP 2.7

    IPM SP 4.3

    IT SP 1.2/1.3

    PP SP 2.5

    IT SG 2

    IPM SG 4

    9.3.1 Inputs

    All GP 2.4

    PP SP 2.6

    IPM SP 4.3

    IT SP 1.3

    PP SP 2.5/2.7

    IPM SP 4.3

    IT SP 1.2/1.3

    PP SP 2.4

    PP SP 2.5

    IT SP 1.3

    9.3.2 Tools and Techniques

    OEI GP 2.5

    OEI SG 2

    OEI SP 1.3

    PP SP 2.5

    OEI SP 1.3

    IT SP 1.2

    OT GP 2.5

    9.3.2.3 Team-Building Activities IT SG 2

    IT SP 2.4

    IPM SP 4.3

    OEI SG 2

    Training

    Negotiations

    Project Staff Assignments

    Staffing Management Plan

    9.3.2.2

    9.3.2.4 Ground Rules

    9.3.1.1 Project Staff Assignments

    9.3.1.2

    9.3.2.1 General Management Skills

    9.2.3.1

    9.2.3.2 Resource Availability

    9.3.1.3 Resource Availability

    9.3 Develop Project Team

    9.2.2.1 Preassignment

    9.2.2.2

    9.2.3.3 Staffing Management Plan (Updates)

    9.2.2.4 Virtual Teams

    9.2.2.3 Acquisition

    9.2.1.5 Staffing Management Plan

    . . .

  • 7/31/2019 PMBoKxCMMI

    18/28

    9.3.2.5 Co-location IPM SP 4.1

    9.3.2.6 Recognition and Rewards OEI SP 2.2

    9.3.3 Outputs

    OEI SP 2.3

    IPM SP 4.3

    IT SP 2.2IT SG 2

    OEI SG 2

    9.4.1 Inputs

    All GP 2.1/2.2/3.2

    OPD All

    All GP 2.4

    PP SP 2.6

    IPM SP 4.3

    IT SP 1.3

    All GP 2.4

    PP SP 2.6

    IPM SP 4.2/4.3IT SP 2.3

    PP SP 2.6

    IPM SP 4.1

    PP SP 2.7

    IPM SP 4.3

    IT SP 1.2/1.3

    OEI SP 2.3

    IPM SP 4.3

    IT SP 2.2

    PMC SP 1.6/1.7

    MA SP 2.4

    PMC SP 1.6/1.7

    MA SP 2.4

    9.4.2 Tools and Techniques

    All GP 2.7

    IT SP 2.5

    IT SG 2

    OEI SG 2

    IT/OEI GP 2.2

    IPM SP 2.2/2.3

    IT SP 2.2

    OEI SG 2

    9.4.2.4 Issue Log PMC SP 2.1

    9.4.3 Outputs

    9.4.3.1 Requested Changes PMC SP 2.1

    9.4.3.2 Recommended Corrective Actions PMC SP 2.2

    9.4.3.3 Recommended Preventive Actions RSKM SP 3.1

    All GP 2.1/2.2/3.2

    OPD All

    PP SP 2.7

    IPM SP 1.3

    10.0 Project Communications Management

    PP SP 2.6

    IT SP 2.3/2.4

    10.1.1 Inputs

    Project Staff Assignments

    Staffing Management Plan

    9.4.3.5

    10.1 Communications Planning

    Project Management Plan (Updates)

    9.4.2.1 Observation and Conversation

    9.4.2.2

    9.4.3.4 Organizational Process Assets (Updates)

    Project Performance Appraisals

    9.4.1.5

    9.4.1.6 Team Performance Assessment

    9.4.2.3 Conflict Management

    9.4.1.8 Performance Reports

    9.4.1.1 Organizational Process Assets

    9.4.1.2

    9.4.1.7 Work Performance Information

    9.4.1.4 Project Organization Charts

    9.4.1.3 Roles and Responsibilities

    9.4 Manage Project Team

    9.3.3.1 Team Performance Assessment

  • 7/31/2019 PMBoKxCMMI

    19/28

    All GP 2.3/2.5

    OEI

    All GP 2.1/2.2/3.2

    OPD All

    PP SG 1/2/3

    RD SG 1/2

    QPM SP 1.1

    REQM SP 1.3

    Project Management Plan RD SP 1.1

    - Constraints PP SP 2.7

    - Assumptions IPM SP 1.3

    10.1.2 Tools and Techniques

    PP SP 2.6

    All GP 2.7

    MA SP 1.1

    IPM GP 2.3

    IPM SG 2

    OEI SP 1.2IT SP 2.5

    10.1.3 Outputs

    All GP 2.7

    PP SP 2.6/2.7

    MA SP 1.4

    IPM SG 2

    IT SP 2.5

    All GP 2.10

    PMC SP 1.6/1.7

    MA SP 2.4

    IT SP 2.5

    10.2.1 Inputs

    PP SP 2.6/2.7

    MA SP 1.4

    IPM SG 2

    IT SP 2.5

    10.2.2 Tools and Techniques

    OEI SP 1.3/2.1

    IT SP 1.2/1.3/2.4

    All GP 2.6

    PP SP 2.3

    OEI SP 1.2

    PMC SP 1.6/1.7

    MA SP 2.4

    IT SP 2.5

    All GP 3.2

    OPF SP 2.4

    IPM SP 1.5

    10.2.3 Outputs

    All GP 2.1/2.2/3.2

    OPD All

    10.2.3.2 Requested Changes PMC SP 2.1

    MA SG 2

    PMC SP 1.6/1.7

    SAM SP 2.2

    Information Distribution

    Information Gathering and Retrieval Systems

    10.2.3.1 Organizational Process Assets (Updates)

    10.2.2.4 Lessons Learned Process

    10.2.2.1 Communications Skills

    10.2.2.2

    10.2.2.3 Information Distribution Methods

    10.2.1.1 Communications Management Plan

    10.1.2.2 Communications Technology

    10.1.3.1 Communications Management Plan

    10.2

    Communications Requirements Analysis

    10.1.1.3 Project Scope Statement

    10.1.1.4

    10.1.1.1 Enterprise Environmental Factors

    10.1.1.2 Organizational Process Assets

    10.1.2.1

  • 7/31/2019 PMBoKxCMMI

    20/28

    QPM SP 2.2/2.3/2.4

    ISM SP 2.1/2.2

    RSKM SP 3.2

    10.3.1 Inputs

    PMC SP 1.6/1.7

    MA SP 2.4

    MA SG 2

    SAM SP 2.2

    ISM SP 2.1/2.2

    RSKM SP 3.2

    QPM SG 2

    10.3.1.3 Forecasted Completion QPM SP 2.3

    10.3.1.4 Quality Control Measurements PPQA SP 2.2

    Project Management Plan PP SP 2.7

    - Performance Measurement Baseline IPM SP 1.3

    MA SG 2

    QPM SG 2

    CM SG 2REQM SP 1.3

    PMC SP 2.2

    All GP 2.6

    TS SG 3

    CM SP 1.3

    PI SP 3.4

    10.3.2 Tools and Techniques

    PMC/MA/IT GP 2.3

    PMC SP 1.6/1.7

    MA SP 2.4

    OEI SP 1.2

    IT SP 2.5

    All GP 2.6

    OPD SP 1.4

    MA SP 2.3

    All GP 2.10

    PMC SP 1.6/1.7

    MA SG 1

    QPM SP 2.1

    MA/QPM GP 2.3

    MA SG 1

    QPM SP 2.1

    MA/QPM GP 2.3

    10.3.3 Outputs

    All GP 2.10

    PMC SP 1.6/1.7

    MA SP 2.4

    10.3.3.2 Forecasts QPM SP 2.3

    10.3.3.3 Requested Changes PMC SP 2.1

    10.3.3.4 Recommended Corrective Actions PMC SP 2.2

    All GP 2.1/2.2/3.2

    OPD All

    All GP 2.7

    PMC SP 1.5

    IPM SG 2

    Organizational Process Assets (Updates)

    Work Performance Information

    Information Presentation Tools

    10.3.3.1 Performance Reports

    10.3.3.5

    10.3.2.1

    10.3.2.2Performance Information Gathering and

    Compilation

    10.4 Manage Stakeholders

    10.3.2.5 Cost Reporting Systems

    10.3.1.5

    10.3.1.6 Approved Change Requests

    10.3.2.4 Time Reporting Systems

    10.3.1.7 Deliverables

    10.3.1.2 Performance Measurements

    .

    10.3.1.1

    10.3.2.3 Status Review Meetings

  • 7/31/2019 PMBoKxCMMI

    21/28

    10.4.1 Inputs

    PP SP 2.6/2.7

    MA SP 1.4

    IPM SG 2

    IT SP 2.5

    All GP 2.1/2.2/3.2

    OPD All

    10.4.2 Tools and Techniques

    IPM GP 2.3

    IPM SG 2

    IT SP 2.5

    10.4.2.2 Issue Logs PMC SG 2

    10.4.3 Outputs

    IPM SP 2.3

    PMC SP 2.3

    REQM SP 1.3

    PMC SP 2.2

    10.4.3.3 Approved Corrective Actions PMC SP 2.2

    All GP 2.1/2.2/3.2

    OPD All

    PP SP 2.7

    IPM SP 1.3

    11.0 Project Risk Management

    In PMBOK risk is an

    uncertainty and can be

    positive or negative

    11.1 Risk Management Planning RSKM SG 1

    11.1.1 Inputs

    All GP 2.3/2.5

    OEI

    All GP 2.1/2.2/3.2OPD All

    PP SG 1/2/3

    RD SG 1/2

    QPM SP 1.1

    REQM SP 1.3

    PP SP 2.7

    IPM SP 1.3

    11.1.2 Tools and Techniques

    11.1.2.1 Planning Meetings and Analysis RSKM GP 2.7

    11.1.3 Outputs

    RSKM SG 1

    PP SP 2.7

    IPM SP 1.3

    PP SP 2.2

    RSKM SP 2.1

    11.2.1 Inputs

    All GP 2.3/2.5

    OEI

    All GP 2.1/2.2/3.2

    OPD All

    PP SG 1/2/3

    RD SG 1/2

    QPM SP 1.1

    Organizational Process Assets

    10.4.3.1 Resolved Issues

    Risk Management Plan11.1.3.1

    11.2 Risk Identification

    11.2.1.3 Project Scope Statement

    10.4.3.5 Project Management Plan (Updates)

    11.1.1.2

    11.1.1.4 Project Management Plan

    Organizational Process Assets

    10.4.1.2

    10.4.2.1 Communications Methods

    11.1.1.3 Project Scope Statement

    10.4.3.4 Organizational Process Assets (Updates)

    10.4.3.2 Approved Change Requests

    10.4.1.1 Communications Management Plan

    Enterprise Environmental Factors11.2.1.1

    11.2.1.2 Organizational Process Assets

    11.1.1.1 Enterprise Environmental Factors

  • 7/31/2019 PMBoKxCMMI

    22/28

    REQM SP 1.3

    RSKM SG 1

    PP SP 2.7

    IPM SP 1.3

    PP SP 2.7

    IPM SP 1.3

    11.2.2 Tools and Techniques

    RSKM SP 2.1

    PP SP 2.2

    RSKM/PP GP 2.2

    RSKM SP 2.1

    PP SP 2.2

    RSKM/PP GP 2.2

    RSKM SP 2.1

    PP SP 2.2

    RSKM/PP GP 2.2

    RSKM SP 2.1

    PP SP 2.2RSKM/PP GP 2.2

    RSKM SP 2.1

    PP SP 2.2

    RSKM/PP GP 2.2

    11.2.3 Outputs

    PP SP 2.2

    QPM SP 1.4

    RSKM SP 2.1

    11.3 Qualitative Risk Analysis RSKM SP 2.2

    11.3.1 Inputs

    All GP 2.1/2.2/3.2

    OPD All

    PP SG 1/2/3

    RD SG 1/2

    QPM SP 1.1

    REQM SP 1.3

    RSKM SG 1

    PP SP 2.7

    IPM SP 1.3

    PP SP 2.2

    RSKM SP 2.1

    QPM SP 1.4

    11.3.2 Tools and Techniques

    11.3.2.1 Risk Probability and Impact Assessment RSKM SP 2.2

    11.3.2.2 Probability and Impact Matrix RSKM SP 2.2

    RSKM SP 2.2

    RSKM GP 2.2

    11.3.2.4 Risk Categorization RSKM SP 2.2

    RSKM SP 2.2

    RSKM GP 2.2

    11.3.3 Outputs

    PP SP 2.2

    RSKM SP 2.1

    11.4 Quantitative Risk Analysis RSKM SP 2.2

    11.4.1 Inputs

    Project Management Plan

    Checklists Analysis

    11.3.2.5 Risk Urgency Assessment

    11.3.3.1 Risk Register (Updates)

    Organizational Process Assets

    11.3.1.2

    11.3.2.3 Risk Data Quality Assessment

    11.3.1.4 Risk Register

    Project Scope Statement

    11.2.2.4 Assumptions Analysis

    11.3.1.3 Risk Management Plan

    11.2.3.1 Risk Register

    11.3.1.1

    11.2.1.4

    11.2.1.5

    11.2.2.5 Diagramming Techniques

    11.2.2.2 Information-Gathering Techniques

    11.2.2.3

    11.2.2.1 Documentation Reviews

    Risk Management Plan

  • 7/31/2019 PMBoKxCMMI

    23/28

    All GP 2.1/2.2/3.2

    OPD All

    PP SG 1/2/3

    RD SG 1/2

    QPM SP 1.1

    REQM SP 1.3

    RSKM SG 1

    PP SP 2.7

    IPM SP 1.3

    PP SP 2.2

    RSKM SP 2.1

    QPM SP 1.4

    Project Management Plan PP SP 2.7/2.1

    - Project Schedule Management Plan IPM SP 1.3

    - Project Cost Management Plan

    11.4.2 Tools and Techniques

    RSKM SP 2.2

    RSKM GP 2.2RSKM SP 2.2

    RSKM GP 2.2

    11.4.3 Outputs

    PP SP 2.2

    RSKM SP 2.1

    11.5 Risk Response Planning RSKM SP 3.1

    11.5.1 Inputs

    RSKM SG 1

    PP SP 2.7

    IPM SP 1.3

    PP SP 2.2

    RSKM SP 2.1

    QPM SP 1.4

    11.5.2 Tools and Techniques

    RSKM SP 3.1

    RSKM GP 2.2

    RSKM SP 3.1

    RSKM GP 2.2

    RSKM SP 3.1

    RSKM GP 2.2

    RSKM SP 3.1

    RSKM GP 2.2

    11.5.3 Outputs

    PP SP 2.2

    RSKM SP 2.1

    PP SP 2.7

    IPM SP 1.3

    SAM SP 1.3

    ISM SP 2.3

    PMC SP 1.3

    RSKM SP 3.2

    11.6.1 Inputs

    RSKM SG 1

    PP SP 2.7

    IPM SP 1.3

    Risk Register (Updates)

    Strategies for Negative Risk or Threats

    Project Management Plan (Updates)

    11.6.1.1 Risk Management Plan

    11.5.3.3 Risk-Related Contractual Agreements

    11.5.2.4 Contingent Response Strategy

    11.5.3.1 Risk Register (Updates)

    11.5.3.2

    11.5.2.3 Strategy for Both Threats and Opportunities

    11.5.1.2 Risk Register

    11.5.2.1

    11.5.2.2 Strategies for Positive Risks or Opportunities

    11.5.1.1 Risk Management Plan

    11.4.2.1Data Gathering and Representation

    Techniques

    11.4.2.2Quantitative Risk Analysis and Modeling

    Techniques

    11.4.3.1

    11.4.1.5

    11.4.1.2 Project Scope Statement

    11.4.1.3

    11.4.1.4 Risk Register

    Risk Management Plan

    11.4.1.1 Organizational Process Assets

    11.6 Risk Monitoring and Control

  • 7/31/2019 PMBoKxCMMI

    24/28

    PP SP 2.2

    RSKM SP 2.1

    QPM SP 1.4

    REQM SP 1.3

    PMC SP 2.2

    PMC SP 1.6/1.7

    MA SP 2.4

    PMC SP 1.6/1.7

    MA SP 2.4

    11.6.2 Tools and Techniques

    RSKM SP 3.2

    RSKM GP 2.2

    RSKM SP 3.2

    RSKM GP 2.2

    MA SG 2

    QPM SG 2

    MA SG 2

    QPM SG 2RSKM SP 3.2

    RSKM GP 2.2

    All GP 2.10

    PMC SP 1.6/1.7

    11.6.3 Outputs

    PP SP 2.2

    RSKM SP 2.1

    11.6.3.2 Requested Changes PMC SP 2.1

    11.6.3.3 Recommended Corrective Actions PMC SP 2.2

    11.6.3.4 Recommended Preventive Actions RSKM SP 3.1

    All GP 2.1/2.2/3.2

    OPD All

    PP SP 2.7

    IPM SP 1.3

    12.0 Project Procurement ManagementIn PMBOK this covers both

    buyer & seller

    TS SP 2.4

    SAM SP 1.1

    12.1.1 Inputs

    All GP 2.3/2.5

    OEI

    All GP 2.1/2.2/3.2

    OPD All

    PP SG 1/2/3

    RD SG 1/2

    QPM SP 1.1

    REQM SP 1.3

    12.1.1.4 Work Breakdown Structure PP SP 1.1/2.4

    12.1.1.5 WBS Dictionary PP SP 2.4

    Project Management Plan PP SP 2.7/2.1/1.4/2.4

    - Risk Register IPM SP 1.3

    - Risk-Related Contractual Agreements SAM SP 1.3

    - Resource Requirements ISM SP 2.3

    - Project Schedule RSKM SP 2.2

    - Activity Cost Estimates

    Risk Register

    Risk Audits

    Reserve Analysis

    12.1.1.3 Project Scope Statement

    12.1.1.6

    11.6.3.6 Project Management Plan (Updates)

    12.1 Plan Purchases and Acquisitions

    12.1.1.2 Organizational Process Assets

    11.6.3.5 Organizational Process Assets (Updates)

    11.6.2.4 Technical Performance Measurement

    11.6.2.5

    11.6.3.1 Risk Register (Updates)

    11.6.2.3 Variance and Trend Analysis

    11.6.1.5 Performance Reports

    11.6.2.1 Risk Reassessment

    11.6.2.2

    11.6.1.4 Work Performance Information

    11.6.1.2

    11.6.1.3 Approved Change Requests

    12.1.1.1 Enterprise Environmental Factors

    Status Meetings11.6.2.6

  • 7/31/2019 PMBoKxCMMI

    25/28

    - Cost Baseline

    12.1.2 Tools and Techniques

    12.1.2.1 Make-or-Buy Analysis TS SP 2.4

    SAM SP 1.1

    SAM GP 2.3

    12.1.2.3 Contract Types SAM SP 1.112.1.3 Outputs

    TS SP 2.4

    PP SP 2.7

    SAM SP 1.1

    ISM SG 1

    SAM SP 1.3

    ISM SP 2.3

    12.1.3.3 Make-or-Buy Decisions TS SP 2.4

    12.1.3.4 Requested Changes PMC SP 2.1

    12.2 Plan Contracting SAM SP 1.2

    12.2.1 Inputs

    TS SP 2.4

    SAM SP 1.1

    ISM SG 1

    SAM SP 1.3

    ISM SP 2.3

    12.2.1.3 Make-or Buy Decisions TS SP 2.4

    Project Management Plan PP SP 2.7/1.4/2.1/2.4

    - Risk Register IPM SP 1.3

    - Risk-Related Contractual Agreements SAM SP 1.3

    - Resource Requirements ISM SP 2.3

    - Project Schedule RSKM SP 2.2

    - Activity Cost Estimates

    - Cost Baseline

    12.2.2 Tools and Techniques

    SAM SP 1.2

    SAM GP 2.3

    SAM SP 1.2

    SAM GP 2.3

    12.2.3 Outputs

    12.2.3.1 Procurement Documents SAM SP 1.2

    12.2.3.2 Evaluation Criteria SAM SP 1.2

    SAM SP 1.3

    ISM SP 2.3

    12.3 Request Seller Responses Not Addressed12.3.1 Inputs

    All GP 2.1/2.2/3.2

    OPD All

    TS SP 2.4

    PP SP 2.7

    SAM SP 1.1

    ISM SG 1

    12.3.1.3 Procurement Documents SAM SP 1.2

    12.3.2 Tools and Techniques

    12.3.2.1 Bidder Conferences

    12.3.2.2 Advertising

    ISM SP 1.1/1.2

    Contract Statement(s) of Work (SOW)

    Procurement Management Plan

    Contract Statement of Work (Updates)

    12.2.2.2 Expert Judgment

    12.2.3.3

    12.3.1.2 Procurement Management Plan

    Expert Judgment

    12.1.3.2

    12.2.1.4

    12.3.1.1 Organizational Process Assets

    12.2.2.1 Standard Forms

    12.2.1.2 Contract Statement(s) of Work (SOW)

    12.2.1.1 Procurement Management Plan

    12.1.2.2

    12.1.3.1

  • 7/31/2019 PMBoKxCMMI

    26/28

    SAM SP 1.2

    12.3.3 Outputs

    ISM SP 1.1/1.2

    SAM SP 1.2

    12.3.3.2 Procurement Document Package SAM SP 1.2

    12.3.3.3 Proposals SAM SP 1.212.4 Select Sellers SAM SP 1.2/1.3

    12.4.1 Inputs

    All GP 2.1/2.2/3.2

    OPD All

    TS SP 2.4

    PP SP 2.7

    SAM SP 1.1

    ISM SG 1

    12.4.1.3 Evaluation Criteria SAM SP 1.2

    12.4.1.4 Procurement Document Package SAM SP 1.2

    12.4.1.5 Proposals SAM SP 1.2

    ISM SP 1.2

    SAM SP 1.2

    Project Management Plan PP SP 2.7

    - Risk Register IPM SP 1.3

    - Risk-Related Contractual Agreements SAM SP 1.3

    ISM SP 2.3

    RSKM SP 2.2

    12.4.2 Tools and Techniques

    SAM SP 1.2

    SAM GP 2.2

    SAM SP 1.2

    SAM GP 2.3

    SAM SP 1.2

    SAM GP 2.2

    SAM SP 1.3

    SAM GP 2.2

    SAM SP 1.2

    SAM GP 2.3

    SAM SP 1.2

    SAM GP 2.3

    SAM SP 1.2

    SAM GP 2.2

    12.4.3 Outputs

    12.4.3.1 Selected Sellers SAM SP 1.2SAM SP 1.3

    ISM SP 2.3

    SAM SP 1.3

    ISM SP 2.3

    PP SP 2.4

    PP SP 2.5

    IT SP 1.3

    TS SP 2.4

    PP SP 2.7

    SAM SP 1.1

    ISM SG 1

    12.4.3.6 Requested Changes PMC SP 2.1

    Contract

    Procurement Management Plan (Updates)

    12.4.2.1 Weighting System

    Screening System

    12.4.1.7

    Qualified Sellers List

    12.4.1.6

    12.4.1.2

    Qualified Sellers List

    Procurement Management Plan

    Proposal Evaluation Techniques

    12.4.3.2

    12.4.3.4 Resource Availability

    12.4.3.5

    12.4.2.4 Contract Negotiation

    12.4.3.3 Contract Management Plan

    12.4.2.6 Expert Judgment

    12.4.2.7

    12.3.3.1

    12.4.2.5 Seller Rating Systems

    12.4.2.2 Independent Estimates

    12.4.2.3

    12.4.1.1 Organizational Process Assets

    . . .

  • 7/31/2019 PMBoKxCMMI

    27/28

    SAM SG 2

    ISM SG 2

    12.5.1 Inputs

    SAM SP 1.3

    ISM SP 2.3

    SAM SP 1.3ISM SP 2.3

    12.5.1.3 Selected Sellers SAM SP 1.3

    PMC SP 1.6/1.7

    MA SP 2.4

    SAM SP 2.2

    ISM SP 2.1/2.2

    REQM SP 1.3

    PMC SP 2.2

    ISM SP 2.3

    PMC SP 1.6/1.7

    MA SP 2.4

    SAM SP 2.2ISM SP 2.1/2.2

    12.5.2 Tools and Techniques

    SAM SP 1.3

    ISM SP 2.3

    PMC SG 2

    12.5.2.2 Buyer-Conducted Performance Review SAM SP 2.2

    SAM SP 2.3

    ISM SP 2.1/2.2

    All GP 2.10

    PMC SP 1.6/1.7

    MA SP 2.4

    SAM SP 2.2

    ISM SP 2.1/2.2

    12.5.2.5 Payment System Not Addressed

    12.5.2.6 Claims Administration Not Addressed

    SAM SG 2

    ISM SG 2

    SAM/ISM GP 2.3

    SAM SG 2

    ISM SG 2

    SAM/ISM GP 2.3

    12.5.3 Outputs

    SAM SP 1.3/2.2/2.3

    ISM SP 2.3

    PMC SP 2.1

    ISM SP 2.3

    12.5.3.3 Recommended Corrective Actions PMC SP 2.2

    All GP 2.1/2.2/3.2

    OPD All

    Project Management Plan (Updates) PP SP 2.7

    - Procurement Management Plan IPM SP 1.3

    - Contract Management Plan SAM SP 1.1/1.3

    ISM SG 1/SP 2.3

    TS SP 2.4

    12.6 Contract Closure Not Addressed

    Requested Changes

    Approved Change Requests

    Inspections and Audits

    12.5.3.5

    Contract Documentation

    12.5.3.2

    12.5.2.4 Performance Reporting

    12.5.3.4 Organizational Process Assets (Updates)

    12.5.2.8 Information Technology

    12.5.3.1

    Performance Reports

    12.5.1.5

    12.5.2.7 Records Management System

    12.5.2.1 Contract Change Control System

    12.5.2.3

    12.5 Contract Administration

    12.5.1.6 Work Performance Information

    12.5.1.2 Contract Management Plan

    12.5.1.4

    12.5.1.1 Contract

  • 7/31/2019 PMBoKxCMMI

    28/28

    12.6.1 Inputs

    TS SP 2.4

    SAM SP 1.1

    ISM SG 1

    SAM SP 1.3

    ISM SP 2.3

    SAM SP 1.3/2.2/2.3

    ISM SP 2.3

    12.6.1.4 Contract Closure Procedure Not Addressed

    12.6.2 Tools and Techniques

    SAM SP 2.3

    ISM SP 2.1/2.2

    SAM SG 2

    ISM SG 2

    SAM/ISM GP 2.3

    12.6.3 Outputs

    12.6.3.1 Closed Contracts Not Addressed

    All GP 2.1/2.2/3.2

    OPD All

    Contract Documentation

    12.6.3.2 Organizational Process Assets (Updates)

    12.6.1.1 Procurement Management Plan

    12.6.2.1 Procurement Audits

    12.6.2.2 Records Management System

    12.6.1.2 Contract Management Plan

    12.6.1.3