TVA -SNP1
Sequoyah SGRP / U2R18 Outage
Sequoyah Nuclear PlantD. Alan DayRadiation Protection Manager
TVA -SNP
Sequoyah Nuclear, TVA
2
TVA -SNP3
SQN Overview• Two Units (1200 MWe each) • Westinghouse 4 loop Ice Condenser PWR• Unit 1 began commercial operation 7/1/81, licensed
through 2020• Unit 2 began commercial operation 6/1/82, licensed
through 2021• NRC license extension under review for 2040 and 2041
SQN/WBN Typical Non Ice CondenserPrimary Containment Volume 1.2M ft3 vs. 2.0 M ft3
TVA -SNP4
SGRP Project Overview• Manufacturer – Doosan (South Korea)• Designer – Westinghouse (Chattanooga, TN)• Installer - SGT• SGs delivered to TVA in November 2010• U2R18 Outage duration = 93.3 days• Passage through the Containment roof• Large Mammoet crane• 24 heavy lifts• Construct OSGSF• Demob and restoration
SQN/WBN Typical Non Ice CondenserPrimary Containment Volume 1.2M ft3 vs. 2.0 M ft3
TVA -SNP
TVA -SNP
TVA -SNP7
Construction of SG Storage Facility
TVA -SNP8
OSGSF
TVA -SNP9
Annulus Work
TVA -SNP10
Erection of PTC Mammoet Crane
TVA -SNP11
Building Containment Super Structure
Dept. NameTVA-SQN12
Dome Concrete Cutting by Hydro-Demolition
Dept. NameTVA-SQN
Dome concrete removal 20’ x 45’ section
Dept. NameTVA-SQN
Steel Containment Vessel (SCV) liner removal
Dept. NameTVA-SQN
Enclosure Plug removal
Dept. NameTVA-SQN16
Old Steam Generator Removal
Dept. NameTVA-SQN17
Old Steam Generator Transport to OSGSF Storage Facility
Dept. NameTVA-SQN18
New Generator readied for heavy lift installation
Dept. NameTVA-SQN19
New SG heavy lift into Containment
Dept. NameTVA-SQN20
Enclosure Plug re-installation
TVA -SNP
Top of Containment - looking in
21
Dept. NameTVA-SQN22
Steel Containment Vessel (SCV) liner re-installation
Dept. NameTVA-SQN23
Ready for Dome Concrete
Mechanical rebar splices
Dept. NameTVA-SQN
DomeConcrete complete
Dept. NameTVA-SQN
Last Steam Generator being placed in OSGSF storage facility
TVA -SNP26
New Decon Building
TVA -SNP27
SGRP Stats and Lessons Learned
• Dose: 156.569 Rem Goal: 158 Rem BOP: 64.661 Rem Goal: 66 Rem Total: 221.230 Rem Goal: 224 Rem• PCEs: 5 Goal: 65 BOP: 17 Total: 22 (0.24 PCEs/day)• No HRA/LHRA Violations• Lessons Learned or Concerns
– RP resources (staffing, experience, training)– Open Containment (environment challenges)– Radiography (inefficiency and SCV liner event)– RAM Control
TVA -SNP
Dose Reduction Initiatives
• Sufficient number of staff-augmented RP personnel to coach and monitor
• Extensive mockup training• Pipe End Decon (decon of RCS piping cuts to
lower dose and contamination levels)• Temporary shielding (tons)• Integrated water plan • Lighted ropes• Remote cameras, temp, fire protection, etc. • Station ALARA Committee involvement
28
TVA -SNP
PCE Reduction Initiatives
• Sufficient number of staff-augmented RP personnel to coach and monitor
• Use of OREX disposables• Down draft SOPs• HEPA Vac usage• Pipe End Decon• Equipment surveyed prior to shipment to SQN• Aggressive mop/vacuum regimen• Aggressive trash removal
29
TVA -SNP
RP Business Plan Initiatives
• Remove high source term old SGs• Install permanent SG Primary Platforms• Install Refuel Bridge shielded mats• Raise Zinc Injection rate to 10 ppb (2 cycles)• Ultrasonic Fuel Cleaning (next 2 cycles)• Decon and vacuum Fuel Transfer Canal
30
TVA -SNP
The End… Questions?
31