defensas ribereñas
DESCRIPTION
hidraulicaTRANSCRIPT
-
Clase 03
EROSIN EN ROS Y DEFENSAS RIBEREAS Fuente: MINAG-INRENA-DGASING RAMN OCHOA ACUA
ING- MAXIMO M GUTIERREZ BERNAOLA Tacna, 28 de Mayo del 2012 CURSO : OBRAS HIDRAULICAS 5TO AO EAP INGCIVIL UNJBG
-
HIDRULICA FLUVIAL Ancho estableAltunn
-
DESCRIPCIN DE PARMETROS Y UNIDADES
ANCHO DE ENCAUSAMIENTO
ANCHO DE ENCAUZAMIENTO EN CAUCES NATURALES
AE-roa-V1
RIO :SAN JUAN - Ro ChicoDEPARTAMENTO :ICA
SECTOR :LarnPROVINCIA :CHINCHA
PROGRESIVA :15+600DISTRITO :LARN
ALTUNINBLENCHPETTIS
TRQSnKmABFbFsBB
Aosm3/sadimmmm
100012000.020.046160.72.04154.331.20.2153.58153.81
50010000.020.046160.72.04140.881.20.2140.20140.41
2008200.020.046160.72.04127.571.20.2126.96127.14
1007500.020.046160.72.04122.011.20.2121.42121.59
507000.020.046160.72.04117.871.20.2117.30117.47
106000.020.046160.72.04109.131.20.2108.60108.76
54800.020.046160.72.0497.611.20.297.1397.28
ANCHO ADOPTADO =150m.
DESCRIPCIN DE PARMETROS Y UNIDADES
ALTUNINBLENCHPETTIS
BAncho de la superficie libre de agua (m)QCaudal (m3/s)QCaudal (m3/s)
ACoeficienteFbFactor de fondo
QCaudal (m3/s)0.8Para material fino
SPendiente1.2Para material grueso
nCoeficiente de rugosidad de ManningFsFactor de orilla
KCoeficiente que depende de la resistencia de las orillas0.1Para materiales sueltos
3 a 4Material de cauce muy resistente0.2Para materiales ligeramente cohesivos
16 a 20Material facilmente erosionable0.3Para materiales cohesivos
8 a 12Material aluvial
10En los problemas de ingeniera
mExponente
0.5Para ros de montaa
0.7Para cauces arenosos
1.0Para cauces aluviales
ANCHO DE ENCAUZAMIENTO EN CAUCES NATURALES
AE-roa-V1
RIO :SAN JUAN - Ro ChicoDEPARTAMENTO :ICA
SECTOR :LarnPROVINCIA :CHINCHA
PROGRESIVA :15+600DISTRITO :LARN
ALTUNINBLENCHPETTIS
TRQSnKmABFbFsBB
Aosm3/sadimmmm
100012000.020.046160.72.04154.331.20.2153.58153.81
50010000.020.046160.72.04140.881.20.2140.20140.41
2008200.020.046160.72.04127.571.20.2126.96127.14
1007500.020.046160.72.04122.011.20.2121.42121.59
507000.020.046160.72.04117.871.20.2117.30117.47
106000.020.046160.72.04109.131.20.2108.60108.76
54800.020.046160.72.0497.611.20.297.1397.28
ANCHO ADOPTADO =150m.
ALTUNIN
BAncho de la superficie libre de agua (m)
ACoeficiente
QCaudal (m3/s)
SPendiente
nCoeficiente de rugosidad de Manning
KCoeficiente que depende de la resistencia de las orillas
3 a 4Material de cauce muy resistente
16 a 20Material facilmente erosionable
8 a 12Material aluvial
10En los problemas de ingeniera
mExponente
0.5Para ros de montaa
0.7Para cauces arenosos
1.0Para cauces aluviales
MBD00043358.unknown
MBD000576A1.unknown
MBD000572FF.unknown
MBD0000AE01.unknown
MBD0003F636.unknown
MBD0000AE00.unknown
ANCHO DE ENCAUSAMIENTO
ANCHO DE ENCAUZAMIENTO EN CAUCES NATURALES
AE-roa-V1
RIO :SAN JUAN - Ro ChicoDEPARTAMENTO :ICA
SECTOR :LarnPROVINCIA :CHINCHA
PROGRESIVA :15+600DISTRITO :LARN
ALTUNINBLENCHPETTIS
TRQSnKmABFbFsBB
Aosm3/sadimmmm
100012000.020.046160.72.04154.331.20.2153.58153.81
50010000.020.046160.72.04140.881.20.2140.20140.41
2008200.020.046160.72.04127.571.20.2126.96127.14
1007500.020.046160.72.04122.011.20.2121.42121.59
507000.020.046160.72.04117.871.20.2117.30117.47
106000.020.046160.72.04109.131.20.2108.60108.76
54800.020.046160.72.0497.611.20.297.1397.28
ANCHO ADOPTADO =150m.
DESCRIPCIN DE PARMETROS Y UNIDADES
ALTUNINBLENCHPETTIS
BAncho de la superficie libre de agua (m)QCaudal (m3/s)QCaudal (m3/s)
ACoeficienteFbFactor de fondo
QCaudal (m3/s)0.8Para material fino
SPendiente1.2Para material grueso
nCoeficiente de rugosidad de ManningFsFactor de orilla
KCoeficiente que depende de la resistencia de las orillas0.1Para materiales sueltos
3 a 4Material de cauce muy resistente0.2Para materiales ligeramente cohesivos
16 a 20Material facilmente erosionable0.3Para materiales cohesivos
8 a 12Material aluvial
10En los problemas de ingeniera
mExponente
0.5Para ros de montaa
0.7Para cauces arenosos
1.0Para cauces aluviales
ANCHO DE ENCAUZAMIENTO EN CAUCES NATURALES
AE-roa-V1
RIO :SAN JUAN - Ro ChicoDEPARTAMENTO :ICA
SECTOR :LarnPROVINCIA :CHINCHA
PROGRESIVA :15+600DISTRITO :LARN
ALTUNINBLENCHPETTIS
TRQSnKmABFbFsBB
Aosm3/sadimmmm
100012000.020.046160.72.04154.331.20.2153.58153.81
50010000.020.046160.72.04140.881.20.2140.20140.41
2008200.020.046160.72.04127.571.20.2126.96127.14
1007500.020.046160.72.04122.011.20.2121.42121.59
507000.020.046160.72.04117.871.20.2117.30117.47
106000.020.046160.72.04109.131.20.2108.60108.76
54800.020.046160.72.0497.611.20.297.1397.28
ANCHO ADOPTADO =150m.
ALTUNIN
BAncho de la superficie libre de agua (m)
ACoeficiente
QCaudal (m3/s)
SPendiente
nCoeficiente de rugosidad de Manning
KCoeficiente que depende de la resistencia de las orillas
3 a 4Material de cauce muy resistente
16 a 20Material facilmente erosionable
8 a 12Material aluvial
10En los problemas de ingeniera
mExponente
0.5Para ros de montaa
0.7Para cauces arenosos
1.0Para cauces aluviales
MBD00043358.unknown
MBD000576A1.unknown
MBD000572FF.unknown
MBD0000AE01.unknown
MBD0003F636.unknown
MBD0000AE00.unknown
-
HIDRULICA FLUVIALAncho estableTeora del rgimen BlenchC T T y Co
-
DESCRIPCIN DE PARMETROS Y UNIDADES
ANCHO DE ENCAUSAMIENTO
ANCHO DE ENCAUZAMIENTO EN CAUCES NATURALES
AE-roa-V1
RIO :SAN JUAN - Ro ChicoDEPARTAMENTO :ICA
SECTOR :LarnPROVINCIA :CHINCHA
PROGRESIVA :15+600DISTRITO :LARN
ALTUNINBLENCHPETTIS
TRQSnKmABFbFsBB
Aosm3/sadimmmm
100012000.020.046160.72.04154.331.20.2153.58153.81
50010000.020.046160.72.04140.881.20.2140.20140.41
2008200.020.046160.72.04127.571.20.2126.96127.14
1007500.020.046160.72.04122.011.20.2121.42121.59
507000.020.046160.72.04117.871.20.2117.30117.47
106000.020.046160.72.04109.131.20.2108.60108.76
54800.020.046160.72.0497.611.20.297.1397.28
ANCHO ADOPTADO =150m.
DESCRIPCIN DE PARMETROS Y UNIDADES
ALTUNINBLENCHPETTIS
BAncho de la superficie libre de agua (m)QCaudal (m3/s)QCaudal (m3/s)
ACoeficienteFbFactor de fondo
QCaudal (m3/s)0.8Para material fino
SPendiente1.2Para material grueso
nCoeficiente de rugosidad de ManningFsFactor de orilla
KCoeficiente que depende de la resistencia de las orillas0.1Para materiales sueltos
3 a 4Material de cauce muy resistente0.2Para materiales ligeramente cohesivos
16 a 20Material facilmente erosionable0.3Para materiales cohesivos
8 a 12Material aluvial
10En los problemas de ingeniera
mExponente
0.5Para ros de montaa
0.7Para cauces arenosos
1.0Para cauces aluviales
ANCHO DE ENCAUZAMIENTO EN CAUCES NATURALES
AE-roa-V1
RIO :SAN JUAN - Ro ChicoDEPARTAMENTO :ICA
SECTOR :LarnPROVINCIA :CHINCHA
PROGRESIVA :15+600DISTRITO :LARN
ALTUNINBLENCHPETTIS
TRQSnKmABFbFsBB
Aosm3/sadimmmm
100012000.020.046160.72.04154.331.20.2153.58153.81
50010000.020.046160.72.04140.881.20.2140.20140.41
2008200.020.046160.72.04127.571.20.2126.96127.14
1007500.020.046160.72.04122.011.20.2121.42121.59
507000.020.046160.72.04117.871.20.2117.30117.47
106000.020.046160.72.04109.131.20.2108.60108.76
54800.020.046160.72.0497.611.20.297.1397.28
ANCHO ADOPTADO =150m.
ALTUNIN
BAncho de la superficie libre de agua (m)
ACoeficiente
QCaudal (m3/s)
SPendiente
nCoeficiente de rugosidad de Manning
KCoeficiente que depende de la resistencia de las orillas
3 a 4Material de cauce muy resistente
16 a 20Material facilmente erosionable
8 a 12Material aluvial
10En los problemas de ingeniera
mExponente
0.5Para ros de montaa
0.7Para cauces arenosos
1.0Para cauces aluviales
MBD00043358.unknown
MBD000576A1.unknown
MBD000572FF.unknown
MBD0000AE01.unknown
MBD0003F636.unknown
MBD0000AE00.unknown
-
HIDRULICA FLUVIALAncho establePettitB = Ancho estable, m.Q = Caudal, m3/s
-
ANCHO DE ENCAUSAMIENTO
ANCHO DE ENCAUZAMIENTO EN CAUCES NATURALES
AE-roa-V1
RIO :SAN JUAN - Ro ChicoDEPARTAMENTO :ICA
SECTOR :LarnPROVINCIA :CHINCHA
PROGRESIVA :15+600DISTRITO :LARN
ALTUNINBLENCHPETTIS
TRQSnKmABFbFsBB
Aosm3/sadimmmm
100012000.020.046160.72.04154.331.20.2153.58153.81
50010000.020.046160.72.04140.881.20.2140.20140.41
2008200.020.046160.72.04127.571.20.2126.96127.14
1007500.020.046160.72.04122.011.20.2121.42121.59
507000.020.046160.72.04117.871.20.2117.30117.47
106000.020.046160.72.04109.131.20.2108.60108.76
54800.020.046160.72.0497.611.20.297.1397.28
ANCHO ADOPTADO =150m.
DESCRIPCIN DE PARMETROS Y UNIDADES
ALTUNINBLENCHPETTIS
BAncho de la superficie libre de agua (m)QCaudal (m3/s)QCaudal (m3/s)
ACoeficienteFbFactor de fondo
QCaudal (m3/s)0.8Para material fino
SPendiente1.2Para material grueso
nCoeficiente de rugosidad de ManningFsFactor de orilla
KCoeficiente que depende de la resistencia de las orillas0.1Para materiales sueltos
3 a 4Material de cauce muy resistente0.2Para materiales ligeramente cohesivos
16 a 20Material facilmente erosionable0.3Para materiales cohesivos
8 a 12Material aluvial
10En los problemas de ingeniera
mExponente
0.5Para ros de montaa
0.7Para cauces arenosos
1.0Para cauces aluviales
ANCHO DE ENCAUZAMIENTO EN CAUCES NATURALES
AE-roa-V1
RIO :SAN JUAN - Ro ChicoDEPARTAMENTO :ICA
SECTOR :LarnPROVINCIA :CHINCHA
PROGRESIVA :15+600DISTRITO :LARN
ALTUNINBLENCHPETTIS
TRQSnKmABFbFsBB
Aosm3/sadimmmm
100012000.020.046160.72.04154.331.20.2153.58153.81
50010000.020.046160.72.04140.881.20.2140.20140.41
2008200.020.046160.72.04127.571.20.2126.96127.14
1007500.020.046160.72.04122.011.20.2121.42121.59
507000.020.046160.72.04117.871.20.2117.30117.47
106000.020.046160.72.04109.131.20.2108.60108.76
54800.020.046160.72.0497.611.20.297.1397.28
ANCHO ADOPTADO =150m.
MBD0003F636.unknown
MBD000572FF.unknown
MBD000576A1.unknown
MBD00043358.unknown
-
HIDRULICA FLUVIAL Socavacin.Socavacin general.Socavacin transversalSocavacin en curvasSocavacin localSocavacin al pie de pilas de puentesSocavacin al pie de espigones y estribosC T T y Co
-
HIDRULICA FLUVIALSocavacin Socavacin general.Socavacin general para suelos homogneos.Suelos granulares, no cohesivosMtodo LISCHTVAN - LEVEDIEV
-
PROFUNDIDAD DE SOCAVACIN
-
SOCAVACIN-SUELOS GRANULARES
CUADRO NCJ-3
PROFUNDIDAD DE SOCAVACIN GENERAL PARA SUELOS GRANULARES
PROYECTO:00-MatrizRIO :HUAURASECTOR :BOCATOMA MATRIZ
CAUDALPeriodoTiranteAnchoCoef. deCoefDimetroFactorTirante en laCoeficienteSocavacinProfundidad
DEL RIOde retornomedio-A/Beefectivocontraccinf(TR)medioProgresivaAlfageneralde socav.
QmaxTRdmBeubDmXdoadsgPsoc
m3/saosm.m.AdimAdimmm.Adimm.m.m.m.
4002000.84500.991.0310.000.3400.83010.8063.782.95
4002000.84500.991.035.000.3650.83010.8064.253.42
4002000.84500.991.031.000.4000.83010.8065.664.83
CUADRO NCJ-4
CARACTERISTICAS HIDRULICAS Y GEOMTRICAS
PROYECTO:00-Matriz
dm-A/BeTIPOPROGRESIVAC. GEOMTRICASCARACTERISTICAS HIDRULICASC. AUXILIARES
dmSECC.DesdeHastaBbHZeQyVESnARN FblKXYb-mefH
m.KmKmmmmadimmm3/smm/smm/mm2madimm
0.75ST-10+000.000+050.002.200.800.701.000.100.600.471.000.520.005000.0160.600.280.550.23-0.120.830.450.370.59
0.19ST-20+000,000+000,000.600.600.500.000.050.600.195.271.610.001500.0150.110.123.860.310.212.000.531.060.24
1.80RIO-SUPESECTOR BOCATOMA86.0080.001.502.000.05400.001.722.782.120.010000.050143.821.640.69-0.220.000.476.182.922.15
0.83RIO-SUPESECTOR BOCATOMA80.0080.001.500.000.05400.000.836.032.680.060000.05066.380.812.110.6723.842.004.789.561.04
NOTA 1:CELDA OBJETIVO:KValor de la matriz en la columna T, fila correspondiente al tipo de seccin clculada, valor numrico de K en Columnas Auxiliares
VALOR DE LA CELDA OBJETIVO:MAX0 (Cero)
ESTIMAR - CAMBIANDO LAS CELDAS:yValor de la matriz en la columna K, valor numrico de "y" en C. Hidralicas
RESTRICCIONES :
REFERENCIA DE LA CELDA:KValor de la matriz en la columna T, valor numrico de K en C. Auxiliares
OPEREADOR LGICO:
-
BOCAL-SOCAVACIN
CUADRO NCJ-3
PROFUNDIDAD DE SOCAVACIN GENERAL PARA SUELOS FINOS, COHESIVOS
PROYECTO:00 - MATRIZRIO :Selva 1SECTOR :PUEBLO NUEVO
CAUDALPeriodoTiranteAnchoCoef. deCoefPesoFactorTirante en laCoeficienteSocavacinProfundidad
DEL RIOde retornomedio-A/Beefectivocontraccinf(TR)especficoProgresivaAlfageneralde socav.
QmaxTRdmBeubXdoadsgpsoc
m3/saosm.m.AdimAdimkgf/m3Adimm.m.m.m.
802001.2250.991.0301.800.290.642.3850.930.29
802001.2250.991.031.520.330.642.3851.090.45
802001.2250.991.031.20.390.642.3851.330.69
802001.2250.991.0310.440.642.3851.520.88
CUADRO NCJ-4
CARACTERISTICAS HIDRULICAS Y GEOMTRICAS
PROYECTO:0
dm-A/BeTIPOPROGRESIVAC. GEOMTRICASCARACTERISTICAS HIDRULICASC. AUXILIARES
dmSECC.DesdeHastaBbHZeQyVESnARN FblKXYb-mefH
m.KmKmmmmadimmm3/smm/smm/mm2madimm
0.47ST-10+000.000+050.000.800.800.750.000.100.600.471.590.600.005000.0160.380.220.740.280.002.000.430.870.59
0.19ST-20+000,000+000,000.600.600.500.000.050.000.190.000.190.001500.0150.110.120.000.31-0.032.000.000.000.24
0.84RIO-SUPESECTOR BOCATOMA58.0055.001.501.000.0580.000.831.730.980.010000.05046.200.810.610.670.000.833.783.131.03
0.84RIO-SUPESECTOR BOCATOMA53.0050.001.501.000.0580.000.831.901.010.012000.05042.170.810.670.670.000.833.663.031.04
NOTA 1:CELDA OBJETIVO:KValor de la matriz en la columna T, fila correspondiente al tipo de seccin clculada, valor numrico de K en Columnas Auxiliares
VALOR DE LA CELDA OBJETIVO:MAX0 (Cero)
ESTIMAR - CAMBIANDO LAS CELDAS:yValor de la matriz en la columna K, valor numrico de "y" en C. Hidralicas
RESTRICCIONES :
REFERENCIA DE LA CELDA:KValor de la matriz en la columna T, valor numrico de K en C. Auxiliares
OPEREADOR LGICO:
-
BOCAL-SOCAVACIN
CUADRO NCJ-3
PROFUNDIDAD DE SOCAVACIN GENERAL PARA SUELOS FINOS, COHESIVOS
PROYECTO:00 - MATRIZRIO :Selva 1SECTOR :PUEBLO NUEVO
CAUDALPeriodoTiranteAnchoCoef. deCoefPesoFactorTirante en laCoeficienteSocavacinProfundidad
DEL RIOde retornomedio-A/Beefectivocontraccinf(TR)especficoProgresivaAlfageneralde socav.
QmaxTRdmBeubXdoadsgpsoc
m3/saosm.m.AdimAdimkgf/m3Adimm.m.m.m.
802001.2250.991.0301.800.290.642.3850.930.29
802001.2250.991.031.520.330.642.3851.090.45
802001.2250.991.031.20.390.642.3851.330.69
802001.2250.991.0310.440.642.3851.520.88
CUADRO NCJ-4
CARACTERISTICAS HIDRULICAS Y GEOMTRICAS
PROYECTO:0
dm-A/BeTIPOPROGRESIVAC. GEOMTRICASCARACTERISTICAS HIDRULICASC. AUXILIARES
dmSECC.DesdeHastaBbHZeQyVESnARN FblKXYb-mefH
m.KmKmmmmadimmm3/smm/smm/mm2madimm
0.47ST-10+000.000+050.000.800.800.750.000.100.600.471.590.600.005000.0160.380.220.740.280.002.000.430.870.59
0.19ST-20+000,000+000,000.600.600.500.000.050.000.190.000.190.001500.0150.110.120.000.31-0.032.000.000.000.24
0.84RIO-SUPESECTOR BOCATOMA58.0055.001.501.000.0580.000.831.730.980.010000.05046.200.810.610.670.000.833.783.131.03
0.84RIO-SUPESECTOR BOCATOMA53.0050.001.501.000.0580.000.831.901.010.012000.05042.170.810.670.670.000.833.663.031.04
NOTA 1:CELDA OBJETIVO:KValor de la matriz en la columna T, fila correspondiente al tipo de seccin clculada, valor numrico de K en Columnas Auxiliares
VALOR DE LA CELDA OBJETIVO:MAX0 (Cero)
ESTIMAR - CAMBIANDO LAS CELDAS:yValor de la matriz en la columna K, valor numrico de "y" en C. Hidralicas
RESTRICCIONES :
REFERENCIA DE LA CELDA:KValor de la matriz en la columna T, valor numrico de K en C. Auxiliares
OPEREADOR LGICO:
-
BOCAL-SOCAVACIN
CUADRO NCJ-3
PROFUNDIDAD DE SOCAVACIN GENERAL PARA SUELOS FINOS, COHESIVOS
PROYECTO:00 - MATRIZRIO :Selva 1SECTOR :PUEBLO NUEVO
CAUDALPeriodoTiranteAnchoCoef. deCoefPesoFactorTirante en laCoeficienteSocavacinProfundidad
DEL RIOde retornomedio-A/Beefectivocontraccinf(TR)especficoProgresivaAlfageneralde socav.
QmaxTRdmBeubXdoadsgpsoc
m3/saosm.m.AdimAdimkgf/m3Adimm.m.m.m.
802001.2250.991.0301.800.290.642.3850.930.29
802001.2250.991.031.520.330.642.3851.090.45
802001.2250.991.031.20.390.642.3851.330.69
802001.2250.991.0310.440.642.3851.520.88
CUADRO NCJ-4
CARACTERISTICAS HIDRULICAS Y GEOMTRICAS
PROYECTO:0
dm-A/BeTIPOPROGRESIVAC. GEOMTRICASCARACTERISTICAS HIDRULICASC. AUXILIARES
dmSECC.DesdeHastaBbHZeQyVESnARN FblKXYb-mefH
m.KmKmmmmadimmm3/smm/smm/mm2madimm
0.47ST-10+000.000+050.000.800.800.750.000.100.600.471.590.600.005000.0160.380.220.740.280.002.000.430.870.59
0.19ST-20+000,000+000,000.600.600.500.000.050.000.190.000.190.001500.0150.110.120.000.31-0.032.000.000.000.24
0.84RIO-SUPESECTOR BOCATOMA58.0055.001.501.000.0580.000.831.730.980.010000.05046.200.810.610.670.000.833.783.131.03
0.84RIO-SUPESECTOR BOCATOMA53.0050.001.501.000.0580.000.831.901.010.012000.05042.170.810.670.670.000.833.663.031.04
NOTA 1:CELDA OBJETIVO:KValor de la matriz en la columna T, fila correspondiente al tipo de seccin clculada, valor numrico de K en Columnas Auxiliares
VALOR DE LA CELDA OBJETIVO:MAX0 (Cero)
ESTIMAR - CAMBIANDO LAS CELDAS:yValor de la matriz en la columna K, valor numrico de "y" en C. Hidralicas
RESTRICCIONES :
REFERENCIA DE LA CELDA:KValor de la matriz en la columna T, valor numrico de K en C. Auxiliares
OPEREADOR LGICO:
-
SOCAVACIN-SUELOS GRANULARES
CUADRO NCJ-3
PROFUNDIDAD DE SOCAVACIN GENERAL PARA SUELOS GRANULARES
PROYECTO:00-MatrizRIO :HUAURASECTOR :BOCATOMA MATRIZ
CAUDALPeriodoTiranteAnchoCoef. deCoefDimetroFactorTirante en laCoeficienteSocavacinProfundidad
DEL RIOde retornomedio-A/Beefectivocontraccinf(TR)medioProgresivaAlfageneralde socav.
QmaxTRdmBeubDmXdoadsgPsoc
m3/saosm.m.AdimAdimmm.Adimm.m.m.m.
4002000.84500.991.0310.000.3400.83010.8063.782.95
4002000.84500.991.035.000.3650.83010.8064.253.42
4002000.84500.991.031.000.4000.83010.8065.664.83
4002000.84500.991.030.500.4100.83010.8066.415.58
CUADRO NCJ-4
CARACTERISTICAS HIDRULICAS Y GEOMTRICAS
PROYECTO:00-Matriz
dm-A/BeTIPOPROGRESIVAC. GEOMTRICASCARACTERISTICAS HIDRULICASC. AUXILIARES
dmSECC.DesdeHastaBbHZeQyVESnARN FblKXYb-mefH
m.KmKmmmmadimmm3/smm/smm/mm2madimm
0.75ST-10+000.000+050.002.200.800.701.000.100.600.471.000.520.005000.0160.600.280.550.23-0.120.830.450.370.59
0.19ST-20+000,000+000,000.600.600.500.000.050.600.195.271.610.001500.0150.110.123.860.310.212.000.531.060.24
1.80RIO-SUPESECTOR BOCATOMA86.0080.001.502.000.05400.001.722.782.120.010000.050143.821.640.69-0.220.000.476.182.922.15
0.83RIO-SUPESECTOR BOCATOMA80.0080.001.500.000.05400.000.836.032.680.060000.05066.380.812.110.6723.842.004.789.561.04
NOTA 1:CELDA OBJETIVO:KValor de la matriz en la columna T, fila correspondiente al tipo de seccin clculada, valor numrico de K en Columnas Auxiliares
VALOR DE LA CELDA OBJETIVO:MAX0 (Cero)
ESTIMAR - CAMBIANDO LAS CELDAS:yValor de la matriz en la columna K, valor numrico de "y" en C. Hidralicas
RESTRICCIONES :
REFERENCIA DE LA CELDA:KValor de la matriz en la columna T, valor numrico de K en C. Auxiliares
OPEREADOR LGICO:
-
HIDRULICA FLUVIALSocavacinSocavacin general.Socavacin general para suelos homogneos.Suelos finos, cohesivosMtodo LISCHTVAN - LEVEDIEV
-
BOCAL-SOCAVACIN
CUADRO NCJ-3
PROFUNDIDAD DE SOCAVACIN GENERAL PARA SUELOS FINOS, COHESIVOS
PROYECTO:00 - MATRIZRIO :Selva 1SECTOR :PUEBLO NUEVO
CAUDALPeriodoTiranteAnchoCoef. deCoefPesoFactorTirante en laCoeficienteSocavacinProfundidad
DEL RIOde retornomedio-A/Beefectivocontraccinf(TR)especficoProgresivaAlfageneralde socav.
QmaxTRdmBeubXdoadsgpsoc
m3/saosm.m.AdimAdimkgf/m3Adimm.m.m.m.
802001.2250.991.0301.800.290.642.3850.930.29
802001.2250.991.031.520.330.642.3851.090.45
802001.2250.991.031.20.390.642.3851.330.69
802001.2250.991.0310.440.642.3851.520.88
CUADRO NCJ-4
CARACTERISTICAS HIDRULICAS Y GEOMTRICAS
PROYECTO:0
dm-A/BeTIPOPROGRESIVAC. GEOMTRICASCARACTERISTICAS HIDRULICASC. AUXILIARES
dmSECC.DesdeHastaBbHZeQyVESnARN FblKXYb-mefH
m.KmKmmmmadimmm3/smm/smm/mm2madimm
0.47ST-10+000.000+050.000.800.800.750.000.100.600.471.590.600.005000.0160.380.220.740.280.002.000.430.870.59
0.19ST-20+000,000+000,000.600.600.500.000.050.000.190.000.190.001500.0150.110.120.000.31-0.032.000.000.000.24
0.84RIO-SUPESECTOR BOCATOMA58.0055.001.501.000.0580.000.831.730.980.010000.05046.200.810.610.670.000.833.783.131.03
0.84RIO-SUPESECTOR BOCATOMA53.0050.001.501.000.0580.000.831.901.010.012000.05042.170.810.670.670.000.833.663.031.04
NOTA 1:CELDA OBJETIVO:KValor de la matriz en la columna T, fila correspondiente al tipo de seccin clculada, valor numrico de K en Columnas Auxiliares
VALOR DE LA CELDA OBJETIVO:MAX0 (Cero)
ESTIMAR - CAMBIANDO LAS CELDAS:yValor de la matriz en la columna K, valor numrico de "y" en C. Hidralicas
RESTRICCIONES :
REFERENCIA DE LA CELDA:KValor de la matriz en la columna T, valor numrico de K en C. Auxiliares
OPEREADOR LGICO:
-
BOCAL-SOCAVACIN
CUADRO NCJ-3
PROFUNDIDAD DE SOCAVACIN GENERAL PARA SUELOS FINOS, COHESIVOS
PROYECTO:00 - MATRIZRIO :Selva 1SECTOR :PUEBLO NUEVO
CAUDALPeriodoTiranteAnchoCoef. deCoefPesoFactorTirante en laCoeficienteSocavacinProfundidad
DEL RIOde retornomedio-A/Beefectivocontraccinf(TR)especficoProgresivaAlfageneralde socav.
QmaxTRdmBeubXdoadsgpsoc
m3/saosm.m.AdimAdimkgf/m3Adimm.m.m.m.
802001.2250.991.0301.800.290.642.3850.930.29
802001.2250.991.031.520.330.642.3851.090.45
802001.2250.991.031.20.390.642.3851.330.69
802001.2250.991.0310.440.642.3851.520.88
CUADRO NCJ-4
CARACTERISTICAS HIDRULICAS Y GEOMTRICAS
PROYECTO:0
dm-A/BeTIPOPROGRESIVAC. GEOMTRICASCARACTERISTICAS HIDRULICASC. AUXILIARES
dmSECC.DesdeHastaBbHZeQyVESnARN FblKXYb-mefH
m.KmKmmmmadimmm3/smm/smm/mm2madimm
0.47ST-10+000.000+050.000.800.800.750.000.100.600.471.590.600.005000.0160.380.220.740.280.002.000.430.870.59
0.19ST-20+000,000+000,000.600.600.500.000.050.000.190.000.190.001500.0150.110.120.000.31-0.032.000.000.000.24
0.84RIO-SUPESECTOR BOCATOMA58.0055.001.501.000.0580.000.831.730.980.010000.05046.200.810.610.670.000.833.783.131.03
0.84RIO-SUPESECTOR BOCATOMA53.0050.001.501.000.0580.000.831.901.010.012000.05042.170.810.670.670.000.833.663.031.04
NOTA 1:CELDA OBJETIVO:KValor de la matriz en la columna T, fila correspondiente al tipo de seccin clculada, valor numrico de K en Columnas Auxiliares
VALOR DE LA CELDA OBJETIVO:MAX0 (Cero)
ESTIMAR - CAMBIANDO LAS CELDAS:yValor de la matriz en la columna K, valor numrico de "y" en C. Hidralicas
RESTRICCIONES :
REFERENCIA DE LA CELDA:KValor de la matriz en la columna T, valor numrico de K en C. Auxiliares
OPEREADOR LGICO:
-
HIDRULICA FLUVIALSocavacinSocavacin generalSocavacin general para suelos heterogneos.Suelo conformado por finos, arenas, gravasSe requiere seccin geolgica del cauceEl clculo se efecta por tramosSe aplica la frmula de socavacin correspondiente, segn tipo de materialEl ds calculado deber estar dentro del estrato correspondiente
-
SOCAVACIN GENERAL
OKREVISADO Y CORREGIDO 5 FEB 2,000
REFERENCIA:A.2.11. HIDRULICA FLUVIAL - HIDROTECNIA - MANUAL DE DISEO DE OBRAS CIVILES
COMISIN FEDERAL DE ELECTRICIDAD - INSTITUTO DE INVESTIGACIONES ELCTRICAS - MEXICO
CLCULO DESARROLLADO CON INFORMACIN DEL EJEMPLO III.6 - Pag. A.III-2.11.40
PROFUNDIDAD DE SOCAVACIN GENERAL
PROYECTO:EJEMPLO III.6 - Pag. A.III-2.11.40RIO :SECTOR :SECCIN:0+XXX
ElevacinElevacin delElevacin delCAUDALPeriodoTiranteAnchoCoef. deCoef BetaEstratos del perfil del sueloTirante en laCoef.Socavacin GeneralProfundidad
Progresivade la superficiefondo del rofondo del roDEL RIOde retornomedio-A/Beefectivocontraccinf(TR)ArenasGravasCohesivoProgresivaAlfaArenasGravasChesivoSocavacinde socavacinProgresiva
PUNTOde la seccinde aguasin socavacincon socavacinQmaxTRdmBeubDmXDmXgsXdoadsgdsgdsgbuscadapsocde la seccin
msnmmsnmmsnmm3/saosm.m.AdimAdimmm.Adimmm.Adimkgf/m3Adimm.m.m.m.m.m.m.
A.1-2.11.80A.1-2.11.81A.-2.11.82A.-2.11.82A.-2.11.82AIII-2.11.43
P10000+130.50130.50129.7120001004.51400.9751.0000.4000.4102.6000.3801.700.300.5001.1950.7880.5360.4310.7880.2880+000
P20015+130.50129.00127.6120001004.51400.9751.0000.4000.4102.6000.3801.700.301.5001.1952.8892.0221.7652.8891.3890+015
P30040+130.50128.60126.6820001004.51400.9751.0000.4000.4102.6000.3801.700.301.9001.1953.8202.6902.3893.8201.9200+040
P40055+130.50127.30123.4320001004.51400.9751.0000.4000.4102.6000.3801.700.303.2001.1957.0745.0494.6617.0743.8740+055
P50065+130.50125.40121.6420001004.51400.9751.0000.4000.4102.6000.3801.700.305.1001.19512.2738.8658.4728.8653.7650+065
P60080+130.50125.30121.4220001004.51400.9751.0000.4000.4102.6000.3801.700.305.2001.19512.5589.0758.6869.0753.8750+080
P70095+130.50125.90122.6720001004.51400.9751.0000.4000.4102.6000.3801.700.304.6001.19510.8647.8267.4237.8263.2260+095
P80120+130.50125.00120.7920001004.51400.9751.0000.4000.4102.6000.3801.700.305.5001.19513.4189.7119.3349.7114.2110+120
P90140+130.50125.10121.0020001004.51400.9751.0000.4000.4102.6000.3801.700.305.4001.19513.1319.4999.1179.4994.0990+140
P100160+130.50128.70126.9220001004.51400.9751.0000.4000.4102.6000.3801.700.301.8001.1953.5842.5202.2293.5841.7840+160
P110170+130.50129.20128.0620001004.51400.9751.0000.4000.4102.6000.3801.700.301.3001.1952.4391.7011.4692.4391.1390+170
NOTA:El valor de la socavacin buscada debe corresponder
a la altura de socavacin que se encuentre dentro del estrato.
Es necesario verificar sta condicin para determinar
la profundidad de socavacin.
El perfil estratigrfico del lecho del cauce
debe ser determinado en el estudio geolgico
Los resultados mostrados en el cuadro corresponden
al perfil estratigrfico de la figura A.III-2.11.45
SOCAVACIN GENERAL
000
000
000
000
000
000
000
000
000
000
000
SUP DE AGUA
LECHO DE RO
LECHO SOCAVADO
DISTANCIA
ELEVACIN
SECCIN 0+XXX - SOCAVACIN GENERAL
SOC GENERAL-SUELO HETEROGEO
OKREVISADO Y CORREGIDO 5 FEB 2,000
REFERENCIA:A.2.11. HIDRULICA FLUVIAL - HIDROTECNIA - MANUAL DE DISEO DE OBRAS CIVILES
COMISIN FEDERAL DE ELECTRICIDAD - INSTITUTO DE INVESTIGACIONES ELCTRICAS - MEXICO
CLCULO DESARROLLADO CON INFORMACIN DEL EJEMPLO III.6 - Pag. A.III-2.11.40
PROFUNDIDAD DE SOCAVACIN GENERAL PARA SUELO UNIFORME CONFORMADO POR GRAVAS
PROYECTO:EJEMPLO III.6 - Pag. A.III-2.11.40RIO :SECTOR :SECCIN :0+200
ElevacinElevacin delElevacin delCAUDALPeriodoTiranteAnchoCoef. deCoef BetaEstrato del perfil del sueloTirante en laCoef.SocavacinProf de
Progresivade la superficiefondo del rofondo del roDEL RIOde retornomedio-A/Beefectivocontraccinf(TR)GravaProgresivaAlfaGeneralsocavacinProgresiva
PUNTOde la seccinde aguasin erosincon erosinQmaxTRdmBeubDmXdoadsgpsocde la seccin
msnmmsnmmsnmm3/saosm.m.AdimAdimmm.Adimm.m.m.m.
A.1-2.11.80A.1-2.11.81A.-2.11.82
P10000+130.50130.50129.9620001004.51400.9751.0002.6000.3800.5001.1950.5360.0360000+
P20015+130.50129.00128.4820001004.51400.9751.0002.6000.3801.5001.1952.0220.5220015+
P30040+130.50128.60127.8120001004.51400.9751.0002.6000.3801.9001.1952.6900.7900040+
P40055+130.50127.30125.4520001004.51400.9751.0002.6000.3803.2001.1955.0491.8490055+
P50065+130.50125.40121.6420001004.51400.9751.0002.6000.3805.1001.1958.8653.7650065+
P60080+130.50125.30121.4220001004.51400.9751.0002.6000.3805.2001.1959.0753.8750080+
P70095+130.50125.90122.6720001004.51400.9751.0002.6000.3804.6001.1957.8263.2260095+
P80120+130.50125.00120.7920001004.51400.9751.0002.6000.3805.5001.1959.7114.2110120+
P90140+130.50125.10121.0020001004.51400.9751.0002.6000.3805.4001.1959.4994.0990140+
P100160+130.50128.70127.9820001004.51400.9751.0002.6000.3801.8001.1952.5200.7200160+
P110170+130.50129.20128.8020001004.51400.9751.0002.6000.3801.3001.1951.7010.4010170+
SOC GENERAL-SUELO HETEROGEO
SUP DE AGUA
LECHO DE RO
LECHO SOCAVADO
DISTANCIA
ELEVACIN
SECCIN 0+200 - SOCAVACIN GENERAL
SOC GENERAL-SUELO HETEROGENEO-2
OKREVISADO Y CORREGIDO 5 FEB 2,000
REFERENCIA:A.2.11. HIDRULICA FLUVIAL - HIDROTECNIA - MANUAL DE DISEO DE OBRAS CIVILES
COMISIN FEDERAL DE ELECTRICIDAD - INSTITUTO DE INVESTIGACIONES ELCTRICAS - MEXICO
CLCULO DESARROLLADO CON INFORMACIN DEL EJEMPLO III.6 - Pag. A.III-2.11.40
PROFUNDIDAD DE SOCAVACIN GENERALPROFUNDIDAD DE SOCAVACIN GENERAL
PARA CAUCE CON MATERIAL HETEROGNEOPARA CAUCE CON MATERIAL HETEROGNEO
PROYECTO:EJEMPLO III.6 - Pag. A.III-2.11.40PROYECTO:EJEMPLO III.6 - Pag. A.III-2.11.40
RIO :XXXSECTOR :YYYYSECCIN :0+200RIO :XXXSECTOR :YYYYSECCIN :0+200
ElevacinElevacin delElevacin delCAUDALPeriodoTiranteAnchoCoef. deCoef BetaEstrato del perfil del sueloTirante en laCoef.SocavacinProf de
Progresivade la superficiefondo del rofondo del roDEL RIOde retornomedio-A/Beefectivocontraccinf(TR)GravaProgresivaAlfaGeneralsocavacinProgresivafx
PUNTOde la seccinde aguasin erosincon erosinQmaxTRdmBePUNTOubDmXdoadsgpsocde la seccinConcatenar
msnmmsnmmsnmm3/saosm.m.AdimAdimmm.Adimm.m.m.m.
A.1-2.11.80A.1-2.11.81A.-2.11.82
PL
P10000+130.50130.50129.9620001004.5140P10.9751.0002.6000.3800.5001.1950.5360.0360000+0,130.5
P20015+130.50129.00128.4820001004.5140P20.9751.0002.6000.3801.5001.1952.0220.5220015+15,129
P30040+130.50128.60127.8120001004.5140P30.9751.0002.6000.3801.9001.1952.6900.7900040+40,128.6
P40055+130.50127.30125.4520001004.5140P40.9751.0002.6000.3803.2001.1955.0491.8490055+55,127.3
P50065+130.50125.40121.6420001004.5140P50.9751.0002.6000.3805.1001.1958.8653.7650065+65,125.4
P60080+130.50125.30121.4220001004.5140P60.9751.0002.6000.3805.2001.1959.0753.8750080+80,125.3
P70095+130.50125.90122.6720001004.5140P70.9751.0002.6000.3804.6001.1957.8263.2260095+95,125.9
P80120+130.50125.00120.7920001004.5140P80.9751.0002.6000.3805.5001.1959.7114.2110120+120,125
P90140+130.50125.10121.0020001004.5140P90.9751.0002.6000.3805.4001.1959.4994.0990140+140,125.1
P100160+130.50128.70127.9820001004.5140P100.9751.0002.6000.3801.8001.1952.5200.7200160+160,128.7
P110170+130.50129.20128.8020001004.5140P110.9751.0002.6000.3801.3001.1951.7010.4010170+170,129.2
PROFUNDIDAD DE SOCAVACIN GENERALPROFUNDIDAD DE SOCAVACIN GENERAL
PARA CAUCE CON MATERIAL HETEROGNEOPARA CAUCE CON MATERIAL HETEROGNEO
PROYECTO:PROYECTO:EJEMPLO III.6 - Pag. A.III-2.11.40
RIO :SECTOR :SECCIN :RIO :SECTOR :SECCIN :
ElevacinElevacin delElevacin delCAUDALPeriodoTiranteAnchoCoef. deCoef BetaEstrato del perfil del sueloTirante en laCoef.SocavacinProf de
Progresivade la superficiefondo del rofondo del roDEL RIOde retornomedio-A/Beefectivocontraccinf(TR)GravaProgresivaAlfaGeneralsocavacinProgresivafx
PUNTOde la seccinde aguasin erosincon erosinQmaxTRdmBePUNTOubDmXdoadsgpsocde la seccinConcatenar
msnmmsnmmsnmm3/saosm.m.AdimAdimmm.Adimm.m.m.m.
A.1-2.11.80A.1-2.11.81A.-2.11.82
P10130.5130.5129.9620001004.5140P10.97512.60.380.51.1950.5360.03600,130.5
P215130.5129.0128.4820001004.5140P20.97512.60.381.51.1952.0220.5221515,129
P340130.5128.6127.8120001004.5140P30.97512.60.381.91.1952.6900.7904040,128.6
P455130.5127.3125.4520001004.5140P40.97512.60.383.21.1955.0491.8495555,127.3
P565130.5125.4121.6420001004.5140P50.97512.60.385.11.1958.8653.7656565,125.4
P680130.5125.3121.4220001004.5140P60.97512.60.385.21.1959.0753.8758080,125.3
P795130.5125.9122.6720001004.5140P70.97512.60.384.61.1957.8263.2269595,125.9
P8120130.5125.0120.7920001004.5140P80.97512.60.385.51.1959.7114.211120120,125
P9140130.5125.1121.0020001004.5140P90.97512.60.385.41.1959.4994.099140140,125.1
P10160130.5128.7127.9820001004.5140P100.97512.60.381.81.1952.5200.720160160,128.7
P11170130.5129.2128.8020001004.5140P110.97512.60.381.31.1951.7010.401170170,129.2
PROFUNDIDAD DE LAS FRONTERAS DE LOS DIFERENTES ESTRATOS
TOMADOS DESDE EL NIVEL DEL AGUA
PUNTOESTACINdoESTRATO 1ESTRATO 2ESTRATO 3
SUPERIORINFERIORSUPERIORINFERIORSUPERIORINFERIORPL
P10130.50.07.87.813050,1305
P215129.01.57.57.5129015,1290
P340128.61.97.17.1128640,1286
P455127.33.26.96.9127355,1273
P565125.45.16.76.7125465,1254
P680125.35.26.56.56.76.7125380,1253
P795125.94.66.26.26.86.8125995,1259
P8120125.05.55.85.87.37.313.51250120,1250
P9140125.15.45.55.57.67.6141251140,1251
P10160128.71.85.15.188161287160,1287
P11170129.21.3558.28.2161292170,1292
ELEVACIONES DE LAS FRONTERAS DE LOS DIFERENTES ESTRATOS
(ESCALA EN EJE Y = 10 X)
WSE130.5
ESTRATO 1ESTRATO 2ESTRATO 3
PUNTOESTACINdoESTRATO 1ESTRATO 2ESTRATO 3SUPERIORINFERIORSUPERIORINFERIORSUPERIORINFERIOR
SUPERIORINFERIORSUPERIORINFERIORSUPERIORINFERIORPLPLPLPLPLPL
P1013051305122713051305122713050,12270,13050,13050,12270,1305
P215129012901230130513051230130515,123015,130515,130515,123015,1305
P340128612861234130513051234130540,123440,130540,130540,123440,1305
P455127312731236130513051236130555,123655,130555,130555,123655,1305
P565125412541238130513051238130565,123865,130565,130565,123865,1305
P680125312531240124012381238130580,124080,124080,123880,123880,1305
P795125912591243124312371237130595,124395,124395,123795,123795,1305
P81201250125012471247123212321170120,1247120,1247120,1232120,1232120,1170
P91401251125112501250122912291165140,1250140,1250140,1229140,1229140,1165
P101601287128712541254122512251145160,1254160,1254160,1225160,1225160,1145
P111701292129212551255122312231145170,1255170,1255170,1223170,1223170,1145
SOC GENERAL-SUELO HETEROGENEO-2
SUP DE AGUA
LECHO DE RO
LECHO SOCAVADO
DISTANCIA
ELEVACIN
SECCIN 0+200 - SOCAVACIN GENERAL
CUADROS
COEFICIENTE DE CONTRACCIN - u
Vel MediaLONGITUD LIBRE ENTRE DOS PILAS (CLARO)
m/s10 m.13 m.16 m.18 m.21 m.25 m.30 m.42 m.52 m.63 m.106 m.124 m.200 m.
4.000.850.890.910.920.930.940.950.960.970.980.990.990.99
COEFICIENTE BETA
TRCOEFICIENTE BETA
Aos
10.77
20.82
50.86
100.90
200.94
500.97
1001.00
5001.05
10001.07
VALORES DE X PARA SUELOS CHOSIVOS (Gs) Y N0 COHESIVOS (Dm)
GsXGsXDmXDmX
kgf/m3kgf/m3mm.mm.
0.800.521.200.390.050.4340.000.30
0.830.511.240.380.150.4260.000.29
0.860.501.280.370.500.4190.000.28
0.880.491.340.361.000.40140.000.27
0.900.481.400.351.500.39190.000.26
0.930.471.460.342.500.38250.000.25
0.960.461.520.334.000.37310.000.24
0.980.451.580.326.000.36370.000.23
1.000.441.640.318.000.35450.000.22
1.040.431.710.3010.000.34570.000.21
1.080.421.800.2915.000.33750.000.20
1.120.411.890.2820.000.321000.000.19
1.160.402.000.2725.000.31
-
SOCAVACIN GENERAL
OKREVISADO Y CORREGIDO 5 FEB 2,000
REFERENCIA:A.2.11. HIDRULICA FLUVIAL - HIDROTECNIA - MANUAL DE DISEO DE OBRAS CIVILES
COMISIN FEDERAL DE ELECTRICIDAD - INSTITUTO DE INVESTIGACIONES ELCTRICAS - MEXICO
CLCULO DESARROLLADO CON INFORMACIN DEL EJEMPLO III.6 - Pag. A.III-2.11.40
PROFUNDIDAD DE SOCAVACIN GENERAL
PROYECTO:EJEMPLO III.6 - Pag. A.III-2.11.40RIO :SECTOR :SECCIN:0+XXX
ElevacinElevacin delElevacin delCAUDALPeriodoTiranteAnchoCoef. deCoef BetaEstratos del perfil del sueloTirante en laCoef.Socavacin GeneralProfundidad
Progresivade la superficiefondo del rofondo del roDEL RIOde retornomedio-A/Beefectivocontraccinf(TR)ArenasGravasCohesivoProgresivaAlfaArenasGravasChesivoSocavacinde socavacinProgresiva
PUNTOde la seccinde aguasin socavacincon socavacinQmaxTRdmBeubDmXDmXgsXdoadsgdsgdsgbuscadapsocde la seccin
msnmmsnmmsnmm3/saosm.m.AdimAdimmm.Adimmm.Adimkgf/m3Adimm.m.m.m.m.m.m.
A.1-2.11.80A.1-2.11.81A.-2.11.82A.-2.11.82A.-2.11.82AIII-2.11.43
P10000+130.50130.50129.7120001004.51400.9751.0000.4000.4102.6000.3801.700.300.5001.1950.7880.5360.4310.7880.2880+000
P20015+130.50129.00127.6120001004.51400.9751.0000.4000.4102.6000.3801.700.301.5001.1952.8892.0221.7652.8891.3890+015
P30040+130.50128.60126.6820001004.51400.9751.0000.4000.4102.6000.3801.700.301.9001.1953.8202.6902.3893.8201.9200+040
P40055+130.50127.30123.4320001004.51400.9751.0000.4000.4102.6000.3801.700.303.2001.1957.0745.0494.6617.0743.8740+055
P50065+130.50125.40121.6420001004.51400.9751.0000.4000.4102.6000.3801.700.305.1001.19512.2738.8658.4728.8653.7650+065
P60080+130.50125.30121.4220001004.51400.9751.0000.4000.4102.6000.3801.700.305.2001.19512.5589.0758.6869.0753.8750+080
P70095+130.50125.90122.6720001004.51400.9751.0000.4000.4102.6000.3801.700.304.6001.19510.8647.8267.4237.8263.2260+095
P80120+130.50125.00120.7920001004.51400.9751.0000.4000.4102.6000.3801.700.305.5001.19513.4189.7119.3349.7114.2110+120
P90140+130.50125.10121.0020001004.51400.9751.0000.4000.4102.6000.3801.700.305.4001.19513.1319.4999.1179.4994.0990+140
P100160+130.50128.70126.9220001004.51400.9751.0000.4000.4102.6000.3801.700.301.8001.1953.5842.5202.2293.5841.7840+160
P110170+130.50129.20128.0620001004.51400.9751.0000.4000.4102.6000.3801.700.301.3001.1952.4391.7011.4692.4391.1390+170
NOTA:El valor de la socavacin buscada debe corresponder
a la altura de socavacin que se encuentre dentro del estrato.
Es necesario verificar sta condicin para determinar
la profundidad de socavacin.
El perfil estratigrfico del lecho del cauce
debe ser determinado en el estudio geolgico
Los resultados mostrados en el cuadro corresponden
al perfil estratigrfico de la figura A.III-2.11.45
SOCAVACIN GENERAL
000
000
000
000
000
000
000
000
000
000
000
SUP DE AGUA
LECHO DE RO
LECHO SOCAVADO
DISTANCIA
ELEVACIN
SECCIN 0+XXX - SOCAVACIN GENERAL
SOC GENERAL-SUELO HETEROGEO
OKREVISADO Y CORREGIDO 5 FEB 2,000
REFERENCIA:A.2.11. HIDRULICA FLUVIAL - HIDROTECNIA - MANUAL DE DISEO DE OBRAS CIVILES
COMISIN FEDERAL DE ELECTRICIDAD - INSTITUTO DE INVESTIGACIONES ELCTRICAS - MEXICO
CLCULO DESARROLLADO CON INFORMACIN DEL EJEMPLO III.6 - Pag. A.III-2.11.40
PROFUNDIDAD DE SOCAVACIN GENERAL PARA SUELO UNIFORME CONFORMADO POR GRAVAS
PROYECTO:EJEMPLO III.6 - Pag. A.III-2.11.40RIO :SECTOR :SECCIN :0+200
ElevacinElevacin delElevacin delCAUDALPeriodoTiranteAnchoCoef. deCoef BetaEstrato del perfil del sueloTirante en laCoef.SocavacinProf de
Progresivade la superficiefondo del rofondo del roDEL RIOde retornomedio-A/Beefectivocontraccinf(TR)GravaProgresivaAlfaGeneralsocavacinProgresiva
PUNTOde la seccinde aguasin erosincon erosinQmaxTRdmBeubDmXdoadsgpsocde la seccin
msnmmsnmmsnmm3/saosm.m.AdimAdimmm.Adimm.m.m.m.
A.1-2.11.80A.1-2.11.81A.-2.11.82
P10000+130.50130.50129.9620001004.51400.9751.0002.6000.3800.5001.1950.5360.0360000+
P20015+130.50129.00128.4820001004.51400.9751.0002.6000.3801.5001.1952.0220.5220015+
P30040+130.50128.60127.8120001004.51400.9751.0002.6000.3801.9001.1952.6900.7900040+
P40055+130.50127.30125.4520001004.51400.9751.0002.6000.3803.2001.1955.0491.8490055+
P50065+130.50125.40121.6420001004.51400.9751.0002.6000.3805.1001.1958.8653.7650065+
P60080+130.50125.30121.4220001004.51400.9751.0002.6000.3805.2001.1959.0753.8750080+
P70095+130.50125.90122.6720001004.51400.9751.0002.6000.3804.6001.1957.8263.2260095+
P80120+130.50125.00120.7920001004.51400.9751.0002.6000.3805.5001.1959.7114.2110120+
P90140+130.50125.10121.0020001004.51400.9751.0002.6000.3805.4001.1959.4994.0990140+
P100160+130.50128.70127.9820001004.51400.9751.0002.6000.3801.8001.1952.5200.7200160+
P110170+130.50129.20128.8020001004.51400.9751.0002.6000.3801.3001.1951.7010.4010170+
SOC GENERAL-SUELO HETEROGEO
SUP DE AGUA
LECHO DE RO
LECHO SOCAVADO
DISTANCIA
ELEVACIN
SECCIN 0+200 - SOCAVACIN GENERAL
SOC GENERAL-SUELO HETEROGENEO-2
OKREVISADO Y CORREGIDO 5 FEB 2,000
REFERENCIA:A.2.11. HIDRULICA FLUVIAL - HIDROTECNIA - MANUAL DE DISEO DE OBRAS CIVILES
COMISIN FEDERAL DE ELECTRICIDAD - INSTITUTO DE INVESTIGACIONES ELCTRICAS - MEXICO
CLCULO DESARROLLADO CON INFORMACIN DEL EJEMPLO III.6 - Pag. A.III-2.11.40
PROFUNDIDAD DE SOCAVACIN GENERALPROFUNDIDAD DE SOCAVACIN GENERAL
PARA CAUCE CON MATERIAL HETEROGNEOPARA CAUCE CON MATERIAL HETEROGNEO
PROYECTO:EJEMPLO III.6 - Pag. A.III-2.11.40PROYECTO:EJEMPLO III.6 - Pag. A.III-2.11.40
RIO :XXXSECTOR :YYYYSECCIN :0+200RIO :XXXSECTOR :YYYYSECCIN :0+200
ElevacinElevacin delElevacin delCAUDALPeriodoTiranteAnchoCoef. deCoef BetaEstrato del perfil del sueloTirante en laCoef.SocavacinProf de
Progresivade la superficiefondo del rofondo del roDEL RIOde retornomedio-A/Beefectivocontraccinf(TR)GravaProgresivaAlfaGeneralsocavacinProgresivafx
PUNTOde la seccinde aguasin erosincon erosinQmaxTRdmBePUNTOubDmXdoadsgpsocde la seccinConcatenar
msnmmsnmmsnmm3/saosm.m.AdimAdimmm.Adimm.m.m.m.
A.1-2.11.80A.1-2.11.81A.-2.11.82
PL
P10000+130.50130.50129.9620001004.5140P10.9751.0002.6000.3800.5001.1950.5360.0360000+0,130.5
P20015+130.50129.00128.4820001004.5140P20.9751.0002.6000.3801.5001.1952.0220.5220015+15,129
P30040+130.50128.60127.8120001004.5140P30.9751.0002.6000.3801.9001.1952.6900.7900040+40,128.6
P40055+130.50127.30125.4520001004.5140P40.9751.0002.6000.3803.2001.1955.0491.8490055+55,127.3
P50065+130.50125.40121.6420001004.5140P50.9751.0002.6000.3805.1001.1958.8653.7650065+65,125.4
P60080+130.50125.30121.4220001004.5140P60.9751.0002.6000.3805.2001.1959.0753.8750080+80,125.3
P70095+130.50125.90122.6720001004.5140P70.9751.0002.6000.3804.6001.1957.8263.2260095+95,125.9
P80120+130.50125.00120.7920001004.5140P80.9751.0002.6000.3805.5001.1959.7114.2110120+120,125
P90140+130.50125.10121.0020001004.5140P90.9751.0002.6000.3805.4001.1959.4994.0990140+140,125.1
P100160+130.50128.70127.9820001004.5140P100.9751.0002.6000.3801.8001.1952.5200.7200160+160,128.7
P110170+130.50129.20128.8020001004.5140P110.9751.0002.6000.3801.3001.1951.7010.4010170+170,129.2
PROFUNDIDAD DE SOCAVACIN GENERALPROFUNDIDAD DE SOCAVACIN GENERAL
PARA CAUCE CON MATERIAL HETEROGNEOPARA CAUCE CON MATERIAL HETEROGNEO
PROYECTO:PROYECTO:
RIO :SECTOR :SECCIN :RIO :SECTOR :SECCIN :
ElevacinElevacin delElevacin delCAUDALPeriodoTiranteAnchoCoef. deCoef BetaEstrato del perfil del sueloTirante en laCoef.SocavacinProf de
Progresivade la superficiefondo del rofondo del roDEL RIOde retornomedio-A/Beefectivocontraccinf(TR)GravaProgresivaAlfaGeneralsocavacinProgresivafx
PUNTOde la seccinde aguasin erosincon erosinQmaxTRdmBePUNTOubDmXdoadsgpsocde la seccinConcatenar
msnmmsnmmsnmm3/saosm.m.AdimAdimmm.Adimm.m.m.m.
A.1-2.11.80A.1-2.11.81A.-2.11.82
P10130.5130.5129.9620001004.5140P10.97512.60.380.51.1950.5360.03600,130.5
P215130.5129.0128.4820001004.5140P20.97512.60.381.51.1952.0220.5221515,129
P340130.5128.6127.8120001004.5140P30.97512.60.381.91.1952.6900.7904040,128.6
P455130.5127.3125.4520001004.5140P40.97512.60.383.21.1955.0491.8495555,127.3
P565130.5125.4121.6420001004.5140P50.97512.60.385.11.1958.8653.7656565,125.4
P680130.5125.3121.4220001004.5140P60.97512.60.385.21.1959.0753.8758080,125.3
P795130.5125.9122.6720001004.5140P70.97512.60.384.61.1957.8263.2269595,125.9
P8120130.5125.0120.7920001004.5140P80.97512.60.385.51.1959.7114.211120120,125
P9140130.5125.1121.0020001004.5140P90.97512.60.385.41.1959.4994.099140140,125.1
P10160130.5128.7127.9820001004.5140P100.97512.60.381.81.1952.5200.720160160,128.7
P11170130.5129.2128.8020001004.5140P110.97512.60.381.31.1951.7010.401170170,129.2
PROFUNDIDAD DE LAS FRONTERAS DE LOS DIFERENTES ESTRATOS
TOMADOS DESDE EL NIVEL DEL AGUA
PUNTOESTACINdoESTRATO 1ESTRATO 2ESTRATO 3
SUPERIORINFERIORSUPERIORINFERIORSUPERIORINFERIORPL
P10130.50.07.87.813050,1305
P215129.01.57.57.5129015,1290
P340128.61.97.17.1128640,1286
P455127.33.26.96.9127355,1273
P565125.45.16.76.7125465,1254
P680125.35.26.56.56.76.7125380,1253
P795125.94.66.26.26.86.8125995,1259
P8120125.05.55.85.87.37.313.51250120,1250
P9140125.15.45.55.57.67.6141251140,1251
P10160128.71.85.15.188161287160,1287
P11170129.21.3558.28.2161292170,1292
ELEVACIONES DE LAS FRONTERAS DE LOS DIFERENTES ESTRATOS
(ESCALA EN EJE Y = 10 X)
WSE130.5
ESTRATO 1ESTRATO 2ESTRATO 3
PUNTOESTACINdoESTRATO 1ESTRATO 2ESTRATO 3SUPERIORINFERIORSUPERIORINFERIORSUPERIORINFERIOR
SUPERIORINFERIORSUPERIORINFERIORSUPERIORINFERIORPLPLPLPLPLPL
P1013051305122713051305122713050,12270,13050,13050,12270,1305
P215129012901230130513051230130515,123015,130515,130515,123015,1305
P340128612861234130513051234130540,123440,130540,130540,123440,1305
P455127312731236130513051236130555,123655,130555,130555,123655,1305
P565125412541238130513051238130565,123865,130565,130565,123865,1305
P680125312531240124012381238130580,124080,124080,123880,123880,1305
P795125912591243124312371237130595,124395,124395,123795,123795,1305
P81201250125012471247123212321170120,1247120,1247120,1232120,1232120,1170
P91401251125112501250122912291165140,1250140,1250140,1229140,1229140,1165
P101601287128712541254122512251145160,1254160,1254160,1225160,1225160,1145
P111701292129212551255122312231145170,1255170,1255170,1223170,1223170,1145
SOC GENERAL-SUELO HETEROGENEO-2
SUP DE AGUA
LECHO DE RO
LECHO SOCAVADO
DISTANCIA
ELEVACIN
SECCIN 0+200 - SOCAVACIN GENERAL
CUADROS
COEFICIENTE DE CONTRACCIN - u
Vel MediaLONGITUD LIBRE ENTRE DOS PILAS (CLARO)
m/s10 m.13 m.16 m.18 m.21 m.25 m.30 m.42 m.52 m.63 m.106 m.124 m.200 m.
4.000.850.890.910.920.930.940.950.960.970.980.990.990.99
COEFICIENTE BETA
TRCOEFICIENTE BETA
Aos
10.77
20.82
50.86
100.90
200.94
500.97
1001.00
5001.05
10001.07
VALORES DE X PARA SUELOS CHOSIVOS (Gs) Y N0 COHESIVOS (Dm)
GsXGsXDmXDmX
kgf/m3kgf/m3mm.mm.
0.800.521.200.390.050.4340.000.30
0.830.511.240.380.150.4260.000.29
0.860.501.280.370.500.4190.000.28
0.880.491.340.361.000.40140.000.27
0.900.481.400.351.500.39190.000.26
0.930.471.460.342.500.38250.000.25
0.960.461.520.334.000.37310.000.24
0.980.451.580.326.000.36370.000.23
1.000.441.640.318.000.35450.000.22
1.040.431.710.3010.000.34570.000.21
1.080.421.800.2915.000.33750.000.20
1.120.411.890.2820.000.321000.000.19
1.160.402.000.2725.000.31
-
Grfico1
130.5130.5129.9635129893
130.5129128.4779466455
130.5128.6127.8098224354
130.5127.3125.4509866037
130.5125.4121.6350689744
130.5125.3121.4247134675
130.5125.9122.6737417973
130.5125120.7886446522
130.5125.1121.0014889025
130.5128.7127.9798746959
130.5129.2128.7988807761
SUP DE AGUA
LECHO DE RO
LECHO SOCAVADO
DISTANCIA
ELEVACIN
SECCIN 0+200 - SOCAVACIN GENERAL
SOCAVACIN GENERAL
OKREVISADO Y CORREGIDO 5 FEB 2,000
REFERENCIA:A.2.11. HIDRULICA FLUVIAL - HIDROTECNIA - MANUAL DE DISEO DE OBRAS CIVILES
COMISIN FEDERAL DE ELECTRICIDAD - INSTITUTO DE INVESTIGACIONES ELCTRICAS - MEXICO
CLCULO DESARROLLADO CON INFORMACIN DEL EJEMPLO III.6 - Pag. A.III-2.11.40
PROFUNDIDAD DE SOCAVACIN GENERAL
PROYECTO:EJEMPLO III.6 - Pag. A.III-2.11.40RIO :SECTOR :SECCIN:0+XXX
ElevacinElevacin delElevacin delCAUDALPeriodoTiranteAnchoCoef. deCoef BetaEstratos del perfil del sueloTirante en laCoef.Socavacin GeneralProfundidad
Progresivade la superficiefondo del rofondo del roDEL RIOde retornomedio-A/Beefectivocontraccinf(TR)ArenasGravasCohesivoProgresivaAlfaArenasGravasChesivoSocavacinde socavacinProgresiva
PUNTOde la seccinde aguasin socavacincon socavacinQmaxTRdmBeubDmXDmXgsXdoadsgdsgdsgbuscadapsocde la seccin
msnmmsnmmsnmm3/saosm.m.AdimAdimmm.Adimmm.Adimkgf/m3Adimm.m.m.m.m.m.m.
A.1-2.11.80A.1-2.11.81A.-2.11.82A.-2.11.82A.-2.11.82AIII-2.11.43
P10000+130.50130.50129.7120001004.51400.9751.0000.4000.4102.6000.3801.700.300.5001.1950.7880.5360.4310.7880.2880+000
P20015+130.50129.00127.6120001004.51400.9751.0000.4000.4102.6000.3801.700.301.5001.1952.8892.0221.7652.8891.3890+015
P30040+130.50128.60126.6820001004.51400.9751.0000.4000.4102.6000.3801.700.301.9001.1953.8202.6902.3893.8201.9200+040
P40055+130.50127.30123.4320001004.51400.9751.0000.4000.4102.6000.3801.700.303.2001.1957.0745.0494.6617.0743.8740+055
P50065+130.50125.40121.6420001004.51400.9751.0000.4000.4102.6000.3801.700.305.1001.19512.2738.8658.4728.8653.7650+065
P60080+130.50125.30121.4220001004.51400.9751.0000.4000.4102.6000.3801.700.305.2001.19512.5589.0758.6869.0753.8750+080
P70095+130.50125.90122.6720001004.51400.9751.0000.4000.4102.6000.3801.700.304.6001.19510.8647.8267.4237.8263.2260+095
P80120+130.50125.00120.7920001004.51400.9751.0000.4000.4102.6000.3801.700.305.5001.19513.4189.7119.3349.7114.2110+120
P90140+130.50125.10121.0020001004.51400.9751.0000.4000.4102.6000.3801.700.305.4001.19513.1319.4999.1179.4994.0990+140
P100160+130.50128.70126.9220001004.51400.9751.0000.4000.4102.6000.3801.700.301.8001.1953.5842.5202.2293.5841.7840+160
P110170+130.50129.20128.0620001004.51400.9751.0000.4000.4102.6000.3801.700.301.3001.1952.4391.7011.4692.4391.1390+170
NOTA:El valor de la socavacin buscada debe corresponder
a la altura de socavacin que se encuentre dentro del estrato.
Es necesario verificar sta condicin para determinar
la profundidad de socavacin.
El perfil estratigrfico del lecho del cauce
debe ser determinado en el estudio geolgico
Los resultados mostrados en el cuadro corresponden
al perfil estratigrfico de la figura A.III-2.11.45
SOCAVACIN GENERAL
000
000
000
000
000
000
000
000
000
000
000
SUP DE AGUA
LECHO DE RO
LECHO SOCAVADO
DISTANCIA
ELEVACIN
SECCIN 0+XXX - SOCAVACIN GENERAL
SOC GENERAL-PARA SUELO GRAVOSO
OKREVISADO Y CORREGIDO 5 FEB 2,000
REFERENCIA:A.2.11. HIDRULICA FLUVIAL - HIDROTECNIA - MANUAL DE DISEO DE OBRAS CIVILES
COMISIN FEDERAL DE ELECTRICIDAD - INSTITUTO DE INVESTIGACIONES ELCTRICAS - MEXICO
CLCULO DESARROLLADO CON INFORMACIN DEL EJEMPLO III.6 - Pag. A.III-2.11.40
PROFUNDIDAD DE SOCAVACIN GENERAL PARA SUELO UNIFORME CONFORMADO POR GRAVAS
PROYECTO:EJEMPLO III.6 - Pag. A.III-2.11.40RIO :SECTOR :SECCIN :0+200
ElevacinElevacin delElevacin delCAUDALPeriodoTiranteAnchoCoef. deCoef BetaEstrato del perfil del sueloTirante en laCoef.SocavacinProf de
Progresivade la superficiefondo del rofondo del roDEL RIOde retornomedio-A/Beefectivocontraccinf(TR)GravaProgresivaAlfaGeneralsocavacinProgresiva
PUNTOde la seccinde aguasin erosincon erosinQmaxTRdmBeubDmXdoadsgpsocde la seccin
msnmmsnmmsnmm3/saosm.m.AdimAdimmm.Adimm.m.m.m.
A.1-2.11.80A.1-2.11.81A.-2.11.82
P10000+130.50130.50129.9620001004.51400.9751.0002.6000.3800.5001.1950.5360.0360000+
P20015+130.50129.00128.4820001004.51400.9751.0002.6000.3801.5001.1952.0220.5220015+
P30040+130.50128.60127.8120001004.51400.9751.0002.6000.3801.9001.1952.6900.7900040+
P40055+130.50127.30125.4520001004.51400.9751.0002.6000.3803.2001.1955.0491.8490055+
P50065+130.50125.40121.6420001004.51400.9751.0002.6000.3805.1001.1958.8653.7650065+
P60080+130.50125.30121.4220001004.51400.9751.0002.6000.3805.2001.1959.0753.8750080+
P70095+130.50125.90122.6720001004.51400.9751.0002.6000.3804.6001.1957.8263.2260095+
P80120+130.50125.00120.7920001004.51400.9751.0002.6000.3805.5001.1959.7114.2110120+
P90140+130.50125.10121.0020001004.51400.9751.0002.6000.3805.4001.1959.4994.0990140+
P100160+130.50128.70127.9820001004.51400.9751.0002.6000.3801.8001.1952.5200.7200160+
P110170+130.50129.20128.8020001004.51400.9751.0002.6000.3801.3001.1951.7010.4010170+
SOC GENERAL-PARA SUELO GRAVOSO
000
000
000
000
000
000
000
000
000
000
000
SUP DE AGUA
LECHO DE RO
LECHO SOCAVADO
DISTANCIA
ELEVACIN
SECCIN 0+200 - SOCAVACIN GENERAL
SOC GENERAL-PARA SUELO GRAV-2
OKREVISADO Y CORREGIDO 5 FEB 2,000
REFERENCIA:A.2.11. HIDRULICA FLUVIAL - HIDROTECNIA - MANUAL DE DISEO DE OBRAS CIVILES
COMISIN FEDERAL DE ELECTRICIDAD - INSTITUTO DE INVESTIGACIONES ELCTRICAS - MEXICO
CLCULO DESARROLLADO CON INFORMACIN DEL EJEMPLO III.6 - Pag. A.III-2.11.40
PROFUNDIDAD DE SOCAVACIN GENERALPROFUNDIDAD DE SOCAVACIN GENERAL
PARA CAUCE CON MATERIAL HETEROGNEOPARA CAUCE CON MATERIAL HETEROGNEO
PROYECTO:EJEMPLO III.6 - Pag. A.III-2.11.40PROYECTO:EJEMPLO III.6 - Pag. A.III-2.11.40
RIO :XXXSECTOR :YYYYSECCIN :0+200RIO :XXXSECTOR :YYYYSECCIN :0+200
ElevacinElevacin delElevacin delCAUDALPeriodoTiranteAnchoCoef. deCoef BetaEstrato del perfil del sueloTirante en laCoef.SocavacinProf de
Progresivade la superficiefondo del rofondo del roDEL RIOde retornomedio-A/Beefectivocontraccinf(TR)GravaProgresivaAlfaGeneralsocavacinProgresiva
PUNTOde la seccinde aguasin erosincon erosinQmaxTRdmBePUNTOubDmXdoadsgpsocde la seccin
msnmmsnmmsnmm3/saosm.m.AdimAdimmm.Adimm.m.m.m.
A.1-2.11.80A.1-2.11.81A.-2.11.82
P10000+130.50130.50129.9620001004.5140P10.9751.0002.6000.3800.5001.1950.5360.0360000+
P20015+130.50129.00128.4820001004.5140P20.9751.0002.6000.3801.5001.1952.0220.5220015+
P30040+130.50128.60127.8120001004.5140P30.9751.0002.6000.3801.9001.1952.6900.7900040+
P40055+130.50127.30125.4520001004.5140P40.9751.0002.6000.3803.2001.1955.0491.8490055+
P50065+130.50125.40121.6420001004.5140P50.9751.0002.6000.3805.1001.1958.8653.7650065+
P60080+130.50125.30121.4220001004.5140P60.9751.0002.6000.3805.2001.1959.0753.8750080+
P70095+130.50125.90122.6720001004.5140P70.9751.0002.6000.3804.6001.1957.8263.2260095+
P80120+130.50125.00120.7920001004.5140P80.9751.0002.6000.3805.5001.1959.7114.2110120+
P90140+130.50125.10121.0020001004.5140P90.9751.0002.6000.3805.4001.1959.4994.0990140+
P100160+130.50128.70127.9820001004.5140P100.9751.0002.6000.3801.8001.1952.5200.7200160+
P110170+130.50129.20128.8020001004.5140P110.9751.0002.6000.3801.3001.1951.7010.4010170+
PROFUNDIDAD DE SOCAVACIN GENERALPROFUNDIDAD DE SOCAVACIN GENERAL
PARA CAUCE CON MATERIAL HETEROGNEOPARA CAUCE CON MATERIAL HETEROGNEO
PROYECTO:EJEMPLO III.6 - Pag. A.III-2.11.40PROYECTO:EJEMPLO III.6 - Pag. A.III-2.11.40
RIO :SECTOR :SECCIN :RIO :SECTOR :SECCIN :
ElevacinElevacin delElevacin delCAUDALPeriodoTiranteAnchoCoef. deCoef BetaEstrato del perfil del sueloTirante en laCoef.SocavacinProf de
Progresivade la superficiefondo del rofondo del roDEL RIOde retornomedio-A/Beefectivocontraccinf(TR)GravaProgresivaAlfaGeneralsocavacinProgresiva
PUNTOde la seccinde aguasin erosincon erosinQmaxTRdmBePUNTOubDmXdoadsgpsocde la seccin
msnmmsnmmsnmm3/saosm.m.AdimAdimmm.Adimm.m.m.m.
A.1-2.11.80A.1-2.11.81A.-2.11.82
P10130.5130.5129.963512989320001004.5140P10.97512.60.380.51.19456509710.53648701070.03648701070
P215130.5129128.477946645520001004.5140P20.97512.60.381.51.19456509712.02205335450.522053354515
P340130.5128.6127.809822435420001004.5140P30.97512.60.381.91.19456509712.69017756460.790177564640
P455130.5127.3125.450986603720001004.5140P40.97512.60.383.21.19456509715.04901339631.849013396355
P565130.5125.4121.635068974420001004.5140P50.97512.60.385.11.19456509718.86493102563.764931025665
P680130.5125.3121.424713467520001004.5140P60.97512.60.385.21.19456509719.07528653253.875286532580
P795130.5125.9122.673741797320001004.5140P70.97512.60.384.61.19456509717.82625820273.226258202795
P8120130.5125120.788644652220001004.5140P80.97512.60.385.51.19456509719.71135534784.2113553478120
P9140130.5125.1121.001488902520001004.5140P90.97512.60.385.41.19456509719.49851109754.0985110975140
P10160130.5128.7127.979874695920001004.5140P100.97512.60.381.81.19456509712.52012530410.7201253041160
P11170130.5129.2128.798880776120001004.5140P110.97512.60.381.31.19456509711.70111922390.4011192239170
SOC GENERAL-PARA SUELO GRAV-2
SUP DE AGUA
LECHO DE RO
LECHO SOCAVADO
DISTANCIA
ELEVACIN
SECCIN 0+200 - SOCAVACIN GENERAL
-
HIDRULICA FLUVIAL SocavacinSocavacin transversal.Se clcula en base a Socavacin general, tomando en cuenta reducciones en el rea efectiva.Formula de Straub, vlido para suelos granulares homogneosC T T y Co
-
B1, d1B2,d2d1d2
-
HIDRULICA FLUVIAL SocavacinSocavacin en curvasErosin y socavacin por efecto de curvatura.Se puede calcular como socavacin general con informacin de la seccin en el tramo en curva, se tiene mayores profundidades en el lado exterior de la curva.
-
EROSIN EN CURVA, RO RMAC PUENTE LA CANTUTA
-
HIDRULICA FLUVIAL Socavacin en curvas.Erosin y socavacin por efecto de curvatura.En funcin de radio de curvatura r, y ancho superior del ro B.C T T y CoDmax=e*drSocavacin
Hoja1
r/Binfinito65432
e1.271.481.842.22.573
-
SocavacinHIDRULICA FLUVIALSocavacin localSocavacin al pie de pilas de puentes
-
Socavacin al pie de la pila del puente la Cantuta
-
SocavacinHIDRULICA FLUVIALSocavacin localSocavacin al pie de pilas de puentes
Metodo de clculo:
MAZA-SANCHEZ
-
Socavacin localSocavacin al pie de espigones y estribos
Metodo de clculo
ARTAMONOVHIDRULICA FLUVIALSocavacin
-
Socavacin localSocavacin al pie de espigones y estribosMtodo de artomonov:HIDRULICA FLUVIALSocavacin
-
StProfundidad mxima de socavacinPaCoeficiente que depende del ngulo del espignPqCoeficiente que depende de los gastosQ1Gasto torico a traves del estriboQGasto total del roPk Coficiente que depende del taluddoTirante aguas arriba del estribo, sin socavacin
Hoja1
a306090120150
0.840.9411.071.19
Q1/Q0.10.20.30.40.50.60.70.8
Pq22.653.223.453.673.874.064.2
Talud k00.511.523
Pk10.910.850.830.610.5
-
HIDRULICA FLUVIAL Enrocado.Forma.Debe ser descartado el uso de rocas redondeadas o subredondeadasDebe ser predominantemente angularDebe ser aproximadamente un bloque cbico y no chato y elongado
-
HIDRULICA FLUVIAL Enrocado.Tamao y peso.
Hoja1
FRMULA DE LA CALIFORNIA DIVISIN OF HIGHWAYS
gVfqW
Tm/m3Tm/m3m/sKgTmlb
2.213.84526.5651974.9641.9754354.050
1 pound =0.45359237Kg
WDs
lbpcfftm
4354.05137.343.931.20
DsW
ftpcflbTm
3.93137.344354.051.975
Peso especfico de las partculas, Kg/cm3, Tm/m3
gPeso especfico del fluido, Kg/cm3, Tm/m4
VVelocidad media, m/sDsDimetro de volumen esfrico equivalente
fAngulo de reposo del material
qngulo del talud respecto a la horizontal1 pound =0.45359237Kg
WPeso, Kg1 cubic foot =0.028316847m3
28316.847cm3
1 gr/cm3 =62.42796058lb/ft3
MBD0000F20A.unknown
MBD0007865E.unknown
-
Hoja1
FRMULA DE LA CALIFORNIA DIVISIN OF HIGHWAYS
gVfqW
Tm/m3Tm/m3m/sKgTmlb
2.213.84526.5651974.9641.9754354.050
1 pound =0.45359237Kg
WDs
lbpcfftm
4354.05137.343.931.20
DsW
ftpcflbTm
3.93137.344354.051.975
Peso especfico de las partculas, Kg/cm3, Tm/m3
gPeso especfico del fluido, Kg/cm3, Tm/m4
VVelocidad media, m/sDsDimetro de volumen esfrico equivalente
fAngulo de reposo del material
qngulo del talud respecto a la horizontal1 pound =0.45359237Kg
WPeso, Kg1 cubic foot =0.028316847m3
28316.847cm3
1 gr/cm3 =62.42796058lb/ft3
MBD0000F20A.unknown
MBD0007865E.unknown
Hoja1
FRMULA DE LA CALIFORNIA DIVISIN OF HIGHWAYS
gVfqW
Tm/m3Tm/m3m/sKgTmlb
2.213.84526.5651974.9641.9754354.050
1 pound =0.45359237Kg
WDs
lbpcfftm
4354.05137.343.931.20
DsW
ftpcflbTm
3.93137.344354.051.975
Peso especfico de las partculas, Kg/cm3, Tm/m3
gPeso especfico del fluido, Kg/cm3, Tm/m4
VVelocidad media, m/sDsDimetro de volumen esfrico equivalente
fAngulo de reposo del material
qngulo del talud respecto a la horizontal1 pound =0.45359237Kg
WPeso, Kg1 cubic foot =0.028316847m3
28316.847cm3
1 gr/cm3 =62.42796058lb/ft3
FRMULA DE LA CALIFORNIA DIVISIN OF HIGHWAYS
gVfqW
Tm/m3Tm/m3m/sKgTmlb
2.213.84526.5651974.9641.9754354.050
MBD0000F20A.unknown
MBD0007865E.unknown
-
Hoja1
FORMULA DE R. A. LOPARDO
Vhggfqd
m/smm/cm2Tm/m3Tm/m3
3222.214526.5651.761
MBD000A69F1.unknown
Hoja1
FORMULA DE R. A. LOPARDO
Vhggfqd
m/smm/cm2Tm/m3Tm/m3
3222.214526.5651.761
FORMULA DE R. A. LOPARDO
Vhggfqd
m/smm/cm2Tm/m3Tm/m3
3222.214526.5651.761
MBD000A69F1.unknown
Hoja1
FORMULA DE R. A. LOPARDO
Vhggfqd
m/smm/cm2Tm/m3Tm/m3
3222.214526.5651.761
FORMULA DE R. A. LOPARDO
Vhggfqd
m/smm/cm2Tm/m3Tm/m3
3222.214526.5651.761
d =Dimetro de partcula uniformes, m
V =Velocidad media del flujo, m/s
q =ngulo del talud respecto a la horizontal
f =ngulo de reposo del material
h =Profundidad del escurrimiento, m
Peso especfico de las partculas, Tm/m3
g =Peso especfico de;fluido, Tm/m3
MBD000A69F1.unknown
-
RELACION PESOTAMAO DE ROCA
Hoja1
PESO Y TAMAO DE ROCA
WDsWDs
lbpcfftmKgKg/cm3mft
2485.661604.291.311127.4768844766603.3010.82
DsWDsW
ftpcflbTmmKg/cm3Tmlb
5.426050002.275.4260500011.02
1 pound =0.45359237Kgfalta corregir
1 cubic foot =0.028316847m3
28316.847cm3
Ds =Dimetro de volumen esfrico equivalente, ft
W =Peso de roca, lb
gs =Peso especfico de la roca, lb/ft3
MBD0002ACDC.unknown
MBD00036C7D.unknown
Hoja1
PESO Y TAMAO DE ROCA
WDsWDs
lbpcfftmKgKg/cm3mft
2485.66604.291.311127.4768844766603.3010.82
DsWDsW
ftpcflbTmmKg/cm3Tmlb
5.426050002.275.4260500011.02
1 pound =0.45359237Kgfalta corregir
1 cubic foot =0.028316847m3
28316.847cm3
Ds =Dimetro de volumen esfrico equivalente, ft
W =Peso de roca, lb
gs =Peso especfico de la roca, lb/ft3
MBD0002ACDC.unknown
MBD00036C7D.unknown
-
HIDRULICA FLUVIAL Enrocado.Gradacin.La roca debe estar razonablemente bien graduada dentro de la capa de proteccin proyectada
Hoja1
GRADACIN DE LA ROCA
PorcentajeDimetro de la roca, m
100D60
80>D40
GRADACIN DE LA ROCA
PorcentajeDimetro de la roca, m
1000.6
80>0.4
Dcalculado=1.00m
-
HIDRULICA FLUVIAL Enrocado.EspesorNo debe ser menor que el dimetro esfrico equivalente del lmite superior W100 1.5 veces que el lmite inferior W50.No debe ser menor que 30 cm.El espesor debe incrementarse en 50 % en el tramo de roca sumergida.C T T y Co
-
HIDRULICA FLUVIAL Enrocado.Proteccin de pie taln uaEl pie del enrocado est sujeto a mayores fuerzas erosivas respecto a otras reas del revestimiento. Se puede aplicar los siguientes criterios:
-
HIDRULICA FLUVIAL Cuando la excavacin del taln es hecha en seco, se extiende el revestimiento a una distancia equivalente a la socavacin de diseo.Cuando la excavacin del taln es hecha en medio saturadoEl espesor b no debe ser menor que el espesor TEl ancho de la base c no debe ser menor que ab y/o c debe incrementarse para mayor seguridad contra la socavacinVER SIGUIENTE GRFICO:
-
`PROTECCIN DE TALN DE ENROCADO
-
ANLISIS HIDRODINMICO DEL RO EN EL TRAMO DE ESTUDIO.Sin proyectoTrazo de ejes.Secciones transversales.Perfil hidrulico.
-
ANLISIS HIDRODINMICO DEL RO EN EL TRAMO DE ESTUDIO.Con proyecto, evaluacin de alternativas y seleccin del proyecto.Formulacin de alternativasTrazo de ejes.Secciones transversales.Perfil hidrulico.Seleccin del proyecto
-
ANLISIS HIDRODINMICO DEL RO EN EL TRAMO DE ESTUDIO.Aplicacin del HEC-RAS.Sin proyectoEvaluacin de alternativas y seleccin del proyectoCon proyecto
-
MUROS DE ENCAUSAMIENTO DE CONCRETO SIMPLE. Generalidades.Tipos.Cargas.Pre dimensionamiento.Anlisis de estabilidad.Condiciones de estabilidad.Factores de seguridad.Diseo.
-
MURO DE DOBLE CARA INCLINADA-S
EJEMPLOS DE CLCULO PARA VERIFICACIN :
PAGINA 159 DE LA PUBLICACIN "ACI - CIMENTACIONES DE CONCRETO ARMADO EN EDIFICACIONES"
OK
MURO DE GRAVEDAD - ANALISIS DE ESTABILIDAD
CORTE :SECCIN 3-3
PROYECTO :PUBLICACIN ACI PAG-159
ESTRUCTURA:7.5 VERIFICACIN DE ESTABILIDAD Pag 159-160, Aumentar B=2.70, Volado derecho=1.75
XYANALISIS PARA UN METRO DE LONGITUD
P100
P200.5DATOS
P30.250.51.80Kg/m3
P40.553.52.40Kg/m3
P50.853.532.00
P61.850.518.43
P720.5Angulo del empuje con la Normal Z =18.43
P8200.00
0.60
ALTURA TOTAL3.50mResistencia del suelo =3.00Kg/cm2
H - FUND segn diseo0.00mCoef empuje activo Ka (Coulomb) =0.437Factor divisor Coulomb3.006
H - FUND asumido (*)0.00mCoef empuje activo Ka (Rankine-1) =0.307Ka=cos d * ((cos d -Raz(cos2d-cos2f))/(c0s d + raz(cos2d - cos2f))0.307
SECCIN RECTANGULARCoef empuje pasivo Kp (Rankine-2) =3.255Ka=cos d * ((cos d+Raz(cos2d-cos2f))/(cos d - raz(cos2d - cos2f))
BASE2.00m
ALTURA0.50mRESULTADOS
SECCIN TRAPEZOIDALEmpuje activo - Coulomb =4.814Tm.
BASE MENOR0.30mEmpuje activo - Rankine 1 =3.388Tm.
TALUD IZQUIERDO0.100Empuje pasivo - Rankine 2 =0.000Tm.
BASE MAYOR1.60mPeso del muro =9.240Tm.
ALTURA3.00mPeso del relleno =3.51Tm.
Base Triangulo Izquierdo0.30mEmpuje verical (Rankine) =2.033Tm.2.889Coulomb
Base Triangulo Derecho1.00mEmpuje horizontal (Rankine) =2.710Tm.3.852Coulomb
VOLADOSFriccin del solado con el terreno =7.650Tm.
IZQUIERDA0.25mF.S.D.C. =3.273Rankine2.436Coulomb
DERECHA0.15mF.S.V.C. =5.915Rankine4.470Coulomb
Presin mxima =0.638Kg/cm2(Peso del muro+el relleno)/Area de la zapata
AREA DE MURO3.850m2Xa =1.051mXa=(Mr-Ma)/Peso total
AREA DE RELLENO1.950m2Exentricidad e =-0.051me=1/2 de la basa- Xa
CG muroXcg =0.937mPunto donde actua el empuje:B / 6 =0.333m
Ycg =1.214mBrazo en eje X =1.617Reacciones del terreno :0.540Kg/cm2
CG rellenoXcg =1.925mBrazo en eje Y =1.1670.735Kg/cm2
Ycg =1.615mANLISIS
F.S.D.C.=3.273F.S.D.>1.50OK
(*)PARA EL CASO DE MUROS EN CAUCES NATURALES SUJETAS A SOCAVACINF.S.V.C=5.915F.S.V.>2.00OK
STA ALTURA PUEDE SER DESPRECIABLE E IGUAL A CEROB/6=0.333> e=-0.051OKCae dentro del tercio central de la base
0.540< Resist. del suelo=3.00OK
Coeficiente de Empuje Activo, segn Rankine:
fKa
250.406
260.390
270.376
280.361
290.347
300.333
310.320
320.307
330.295
340.283
350.271
360.260
370.249
380.238
390.228
400.217
410.208
420.198
430.189
440.180
450.172
MURO DE GRAVEDAD - ANALISIS DE ESTABILIDAD
CORTE :SECCIN 3-3
PROYECTO :PUBLICACIN ACI PAG-159
ESTRUCTURA:7.5 VERIFICACIN DE ESTABILIDAD Pag 159-160, Aumentar B=2.70, Volado derecho=1.75
XYANALISIS PARA UN METRO DE LONGITUD
P100
P200.5DATOS
P30.250.51.80Kg/m3
P40.553.52.40Kg/m3
P50.853.532.00
P61.850.518.43
P720.5Angulo del empuje con la Normal Z =18.43
P8200.00
0.60
ALTURA TOTAL3.50mResistencia del suelo =3.00Kg/cm2
H - FUND segn diseo0.00mCoef empuje activo Ka (Coulomb) =0.437
H - FUND asumido (*)0.00mCoef empuje activo Ka (Rankine-1) =0.307
SECCIN RECTANGULARCoef empuje pasivo Kp (Rankine-2) =3.255
BASE2.00m
ALTURA0.50mRESULTADOS
SECCIN TRAPEZOIDALEmpuje activo - Coulomb =4.814Tm.
BASE MENOR0.30mEmpuje activo - Rankine 1 =3.388Tm.
TALUD IZQUIERDO0.100Empuje pasivo - Rankine 2 =0.000Tm.
BASE MAYOR1.60mPeso del muro =9.240Tm.
ALTURA3.00mPeso del relleno =3.51Tm.
Base Triangulo Izquierdo0.30mEmpuje verical (Rankine) =2.033Tm.
Base Triangulo Derecho1.00mEmpuje horizontal (Rankine) =2.710Tm.
VOLADOSFriccin del solado con el terreno =7.650Tm.
IZQUIERDA0.25mF.S.D.C. =3.273Rankine
DERECHA0.15mF.S.V.C. =5.915Rankine
Presin mxima =0.638Kg/cm2
AREA DE MURO3.850m2Xa =1.051m
AREA DE RELLENO1.950m2Exentricidad e =-0.051m
CG muroXcg =0.937mPunto donde actua el empuje:B / 6 =0.333m
Ycg =1.214mBrazo en eje X =1.617Reacciones del terreno :0.540Kg/cm2
CG rellenoXcg =1.925mBrazo en eje Y =1.1670.735Kg/cm2
Ycg =1.615mANLISIS
F.S.D.C.=3.273F.S.D.>1.50OK
(*)PARA EL CASO DE MUROS EN CAUCES NATURALES SUJETAS A SOCAVACINF.S.V.C=5.915F.S.V.>2.00OK
STA ALTURA PUEDE SER DESPRECIABLE E IGUAL A CEROB/6=0.333> e=-0.051OK
0.540< Resist. del suelo=3.00OK
MURO DE DOBLE CARA INCLINADA-S
X
Y
MURO DE CONTENCIN
MURO DE DOBLE CARA INCLINAD-A
X
Y
MURO DE CONTENCIN
EJEMPLOS DE CLCULO PARA VERIFICACIN :
PAGINA 159 DE LA PUBLICACIN "ACI - CIMENTACIONES DE CONCRETO ARMADO EN EDIFICACIONES"
OK
MURO DE GRAVEDAD - ANALISIS DE ESTABILIDAD
CORTE :SECCIN 3-3
PROYECTO :PUBLICACIN ACI PAG-159
ESTRUCTURA:7.5 VERIFICACIN DE ESTABILIDAD Pag 159-160, Aumentar B=2.70, Volado derecho=1.75
XYANALISIS PARA UN METRO DE LONGITUD
P100
P200.5DATOS
P30.50.51.80Kg/m3
P40.755.52.40Kg/m3
P50.955.532.00
P610.50.57
P72.70.5Angulo del empuje con la Normal Z =0.57
P82.700.00
0.60
ALTURA TOTAL5.50mResistencia del suelo =3.00Kg/cm2
H - FUND segn diseo0.00mCoef empuje activo Ka (Coulomb) =0.309Factor divisor Coulomb2.354
H - FUND asumido (*)0.00mCoef empuje activo Ka (Rankine-1) =0.307Ka=cos d * ((cos d -Raz(cos2d-cos2f))/(c0s d + raz(cos2d - cos2f))0.307
SECCIN RECTANGULARCoef empuje pasivo Kp (Rankine-2) =3.255Ka=cos d * ((cos d+Raz(cos2d-cos2f))/(cos d - raz(cos2d - cos2f))
BASE2.70m
ALTURA0.50mRESULTADOS
SECCIN TRAPEZOIDALEmpuje activo - Coulomb =8.425Tm.
BASE MENOR0.20mEmpuje activo - Rankine 1 =8.365Tm.
TALUD IZQUIERDO0.050Empuje pasivo - Rankine 2 =0.000Tm.
BASE MAYOR0.50mPeso del muro =7.440Tm.
ALTURA5.00mPeso del relleno =15.525Tm.
Base Triangulo Izquierdo0.25mEmpuje verical (Rankine) =0.167Tm.0.168Coulomb
Base Triangulo Derecho0.05mEmpuje horizontal (Rankine) =8.363Tm.8.423Coulomb
VOLADOSFriccin del solado con el terreno =13.779Tm.
IZQUIERDA0.50mF.S.D.C. =1.660Rankine1.648Coulomb
DERECHA1.70mF.S.V.C. =2.399Rankine2.382Coulomb
Presin mxima =0.851Kg/cm2(Peso del muro+el relleno)/Area de la zapata
AREA DE MURO3.100m2Xa =0.927mXa=(Mr-Ma)/Peso total
AREA DE RELLENO8.625m2Exentricidad e =0.423me=1/2 de la basa- Xa
CG muroXcg =1.035mPunto donde actua el empuje:B / 6 =0.450m
Ycg =1.589mBrazo en eje X =2.117Reacciones del terreno :1.650Kg/cm2
CG rellenoXcg =1.850mBrazo en eje Y =1.8330.051Kg/cm2
Ycg =2.988mANLISIS
F.S.D.C.=1.660F.S.D.>1.50OK
(*)PARA EL CASO DE MUROS EN CAUCES NATURALES SUJETAS A SOCAVACINF.S.V.C=2.399F.S.V.>1.75OK
STA ALTURA PUEDE SER DESPRECIABLE E IGUAL A CEROB/6=0.450> e=0.423OKCae dentro del tercio central de la base
1.650< Resist. del suelo=3.00OK
Coeficiente de Empuje Activo, segn Rankine:
fKa
250.406
260.390
270.376
280.361
290.347
300.333
310.320
320.307
330.295
340.283
350.271
360.260
370.249
380.238
390.228
400.217
410.208
420.198
430.189
440.180
450.172
MURO DE GRAVEDAD - ANALISIS DE ESTABILIDAD
CORTE :SECCIN 3-3
PROYECTO :PUBLICACIN ACI PAG-159
ESTRUCTURA:7.5 VERIFICACIN DE ESTABILIDAD Pag 159-160, Aumentar B=2.70, Volado derecho=1.75
XYANALISIS PARA UN METRO DE LONGITUD
P100
P200.5DATOS
P30.50.51.90Kg/m3
P40.755.52.40Kg/m3
P50.955.532.00
P610.50.57
P72.70.5Angulo del empuje con la Normal Z =0.57
P82.700.00
0.60
ALTURA TOTAL5.50mResistencia del suelo =3.00Kg/cm2
H - FUND segn diseo0.00mCoef empuje activo Ka (Coulomb) =0.309
H - FUND asumido (*)0.00mCoef empuje activo Ka (Rankine-1) =0.307
SECCIN RECTANGULARCoef empuje pasivo Kp (Rankine-2) =3.255
BASE2.70m
ALTURA0.50mRESULTADOS
SECCIN TRAPEZOIDALEmpuje activo - Coulomb =8.893Tm.
BASE MENOR0.20mEmpuje activo - Rankine 1 =8.830Tm.
TALUD IZQUIERDO0.050Empuje pasivo - Rankine 2 =0.000Tm.
BASE MAYOR0.50mPeso del muro =7.440Tm.
ALTURA5.00mPeso del relleno =16.3875Tm.
Base Triangulo Izquierdo0.25mEmpuje verical (Rankine) =0.177Tm.
Base Triangulo Derecho0.05mEmpuje horizontal (Rankine) =8.828Tm.
VOLADOSFriccin del solado con el terreno =14.297Tm.
IZQUIERDA0.50mF.S.D.C. =1.631Rankine
DERECHA1.70mF.S.V.C. =2.372Rankine
Presin mxima =0.883Kg/cm2
AREA DE MURO3.100m2Xa =0.925m
AREA DE RELLENO8.625m2Exentricidad e =0.425m
CG muroXcg =1.035mPunto donde actua el empuje:B / 6 =0.450m
Ycg =1.589mBrazo en eje X =2.117Reacciones del terreno :1.715Kg/cm2
CG rellenoXcg =1.850mBrazo en eje Y =1.8330.050Kg/cm2
Ycg =2.988mANLISIS
F.S.D.C.=1.631F.S.D.>1.50OK
(*)PARA EL CASO DE MUROS EN CAUCES NATURALES SUJETAS A SOCAVACINF.S.V.C=2.372F.S.V.>1.75OK
STA ALTURA PUEDE SER DESPRECIABLE E IGUAL A CEROB/6=0.450> e=0.425OK
1.715< Resist. del suelo=3.00OK
X
Y
MURO DE CONTENCIN
0
0.5
0.5
5.5
5.5
0.5
0.5
0
X
Y
MURO DE CONTENCIN
-
MUROS DE ENCAUSAMIENTO DE CONCRETO ARMADO. Generalidades.Tipos.Cargas.Pre dimensionamiento.Anlisis de estabilidad.Condiciones de estabilidad.Factores de seguridad.Diseo.
-
MURO DE DOBLE CARA INCLINADA
EJEMPLOS DE CLCULO PARA VERIFICACIN :
PAGINA 159 DE LA PUBLICACIN "ACI - CIMENTACIONES DE CONCRETO ARMADO EN EDIFICACIONES"
OK
MURO DE GRAVEDAD - ANALISIS DE ESTABILIDAD
CORTE :SECCIN 3-3
PROYECTO :PUBLICACIN ACI PAG-159
ESTRUCTURA:7.5 VERIFICACIN DE ESTABILIDAD Pag 159-160, Aumentar B=2.70, Volado derecho=1.75
XYANALISIS PARA UN METRO DE LONGITUD
P100
P200.5DATOS
P30.50.51.90Kg/m3
P40.755.52.40Kg/m3
P50.955.532.00
P610.50.57
P72.70.5Angulo del empuje con la Normal Z =0.57
P82.700.00
0.60
ALTURA TOTAL5.50mResistencia del suelo =3.00Kg/cm2
H - FUND segn diseo0.00mCoef empuje activo Ka (Coulomb) =0.309Factor divisor Coulomb2.354
H - FUND asumido (*)0.00mCoef empuje activo Ka (Rankine-1) =0.307Ka=cos d * ((cos d -Raz(cos2d-cos2f))/(c0s d + raz(cos2d - cos2f))0.307
SECCIN RECTANGULARCoef empuje pasivo Kp (Rankine-2) =3.255Ka=cos d * ((cos d+Raz(cos2d-cos2f))/(cos d - raz(cos2d - cos2f))
BASE2.70m
ALTURA0.50mRESULTADOS
SECCIN TRAPEZOIDALEmpuje activo - Coulomb =8.893Tm.
BASE MENOR0.20mEmpuje activo - Rankine 1 =8.830Tm.
TALUD IZQUIERDO0.050Empuje pasivo - Rankine 2 =0.000Tm.
BASE MAYOR0.50mPeso del muro =7.440Tm.
ALTURA5.00mPeso del relleno =16.3875Tm.
Base Triangulo Izquierdo0.25mEmpuje verical (Rankine) =0.177Tm.0.178Coulomb
Base Triangulo Derecho0.05mEmpuje horizontal (Rankine) =8.828Tm.8.891Coulomb
VOLADOSFriccin del solado con el terreno =14.297Tm.
IZQUIERDA0.50mF.S.D.C. =1.631Rankine1.620Coulomb
DERECHA1.70mF.S.V.C. =2.372Rankine2.356Coulomb
Presin mxima =0.883Kg/cm2(Peso del muro+el relleno)/Area de la zapata
AREA DE MURO3.100m2Xa =0.925mXa=(Mr-Ma)/Peso total
AREA DE RELLENO8.625m2Exentricidad e =0.425me=1/2 de la basa- Xa
CG muroXcg =1.035mPunto donde actua el empuje:B / 6 =0.450m
Ycg =1.589mBrazo en eje X =2.117Reacciones del terreno :1.715Kg/cm2
CG rellenoXcg =1.850mBrazo en eje Y =1.8330.050Kg/cm2
Ycg =2.988mANLISIS
F.S.D.C.=1.631F.S.D.>1.50OK
(*)PARA EL CASO DE MUROS EN CAUCES NATURALES SUJETAS A SOCAVACINF.S.V.C=2.372F.S.V.>1.75OK
STA ALTURA PUEDE SER DESPRECIABLE E IGUAL A CEROB/6=0.450> e=0.425OKCae dentro del tercio central de la base
1.715< Resist. del suelo=3.00OK
Coeficiente de Empuje Activo, segn Rankine:
fKa
250.406
260.390
270.376
280.361
290.347
300.333
310.320
320.307
330.295
340.283
350.271
360.260
370.249
380.238
390.228
400.217
410.208
420.198
430.189
440.180
450.172
MURO DE GRAVEDAD - ANALISIS DE ESTABILIDAD
CORTE :SECCIN 3-3
PROYECTO :PUBLICACIN ACI PAG-159
ESTRUCTURA:7.5 VERIFICACIN DE ESTABILIDAD Pag 159-160, Aumentar B=2.70, Volado derecho=1.75
XYANALISIS PARA UN METRO DE LONGITUD
P100
P200.5DATOS
P30.50.51.90Kg/m3
P40.755.52.40Kg/m3
P50.955.532.00
P610.50.57
P72.70.5Angulo del empuje con la Normal Z =0.57
P82.700.00
0.60
ALTURA TOTAL5.50mResistencia del suelo =3.00Kg/cm2
H - FUND segn diseo0.00mCoef empuje activo Ka (Coulomb) =0.309
H - FUND asumido (*)0.00mCoef empuje activo Ka (Rankine-1) =0.307
SECCIN RECTANGULARCoef empuje pasivo Kp (Rankine-2) =3.255
BASE2.70m
ALTURA0.50mRESULTADOS
SECCIN TRAPEZOIDALEmpuje activo - Coulomb =8.893Tm.
BASE MENOR0.20mEmpuje activo - Rankine 1 =8.830Tm.
TALUD IZQUIERDO0.050Empuje pasivo - Rankine 2 =0.000Tm.
BASE MAYOR0.50mPeso del muro =7.440Tm.
ALTURA5.00mPeso del relleno =16.3875Tm.
Base Triangulo Izquierdo0.25mEmpuje verical (Rankine) =0.177Tm.
Base Triangulo Derecho0.05mEmpuje horizontal (Rankine) =8.828Tm.
VOLADOSFriccin del solado con el terreno =14.297Tm.
IZQUIERDA0.50mF.S.D.C. =1.631Rankine
DERECHA1.70mF.S.V.C. =2.372Rankine
Presin mxima =0.883Kg/cm2
AREA DE MURO3.100m2Xa =0.925m
AREA DE RELLENO8.625m2Exentricidad e =0.425m
CG muroXcg =1.035mPunto donde actua el empuje:B / 6 =0.450m
Ycg =1.589mBrazo en eje X =2.117Reacciones del terreno :1.715Kg/cm2
CG rellenoXcg =1.850mBrazo en eje Y =1.8330.050Kg/cm2
Ycg =2.988mANLISIS
F.S.D.C.=1.631F.S.D.>1.50OK
(*)PARA EL CASO DE MUROS EN CAUCES NATURALES SUJETAS A SOCAVACINF.S.V.C=2.372F.S.V.>1.75OK
STA ALTURA PUEDE SER DESPRECIABLE E IGUAL A CEROB/6=0.450> e=0.425OK
1.715< Resist. del suelo=3.00OK
MURO DE DOBLE CARA INCLINADA
X
Y
MURO DE CONTENCIN
X
Y
MURO DE CONTENCIN
-
DIQUES DE TIERRA CON ENROCADOGeneralidades.Tipos.Zonificacin de la seccin del dique.Proteccin del talud interior y pie de dique.Diseo.
-
DIQUE DE TIERRA CON ENROCADO
-
DIQUE DE TIERRA CON ENROCADO, EN CONSTRUCCIN
-
DIQUE DE TIERRA CON ENROCADO, EN CONSTRUCCIN
-
DIQUE DE TIERRA CON ENROCADO
-
DIQUES DE TIERRA PROTEGIDO CON LOSAS DE CONCRETO. Generalidades.Tipos.Zonificacin de la seccin del dique.Proteccin del talud interior y pie de dique.Diseo
-
Dique de tierra protegido con concreto armado
-
ESPIGONES DE ENROCADO Elementos de diseo.Ubicacin en planta.Longitud.Separacin.Pendiente de la corona.Orientacin.Permeabilidad del espign, material de construccin.Socavacin.
-
ESPIGNES DE ENROCADO
-
ESPIGN DE PIEDRA MEDIANA
- ESPIGONES DE ENROCADO Elementos de diseo.Ubicacin en planta.Trazar eje de ro.Trazar eje de extremos de los espigones, considerando que: d
-
UBICACIN EN PLANTA
-
UBICACIN EN PLANTA
- ESPIGONES DE ENROCADO Elementos de diseo.Longitud.Longitud totalLTot=Longitud trabajo, Lt + Longitud empotramiento anclaje, Led
-
ESPIGONES DE ENROCADO Elementos de diseo.Separacin.En tramos rectos
Lt, Longitud de trabajoLto, Longitud proyectada
Sheet1
SEPARACIN DE ESPIGONES EN TRAMOS RECTOS
SEPARACIN DE ESPIGONES EN TRAMOS RECTOS
ALtSpSpSp recomendable
f(Lto)f(Lt)EmpotradoNo empotradoNGULO DE ORIENTACIN, ASEPARACIN, Sp
90 a 70(5.1 a 6.3)*Lt, (5.2 a 6.4)*Lto
601.15 Lto5.7 a 6.95.0 a 6.06 Lt5 Lt60(5 a 6)*Lt, (5.7 a 6.9)*Lto
701.05 Lto5.4 a 6.65.1 a 6.36.3 Lt5 Lt
90Lto5.1 a 6.35.1 a 6.36.3 Lt5 Lt
Sheet1
SEPARACIN DE ESPIGONES EN TRAMOS RECTOS
SEPARACIN DE ESPIGONES EN TRAMOS RECTOS
ALtSpSpSp recomendable
f(Lto)f(Lt)EmpotradoNo empotradoNGULO DE ORIENTACIN, ASEPARACIN, Sp
90 a 70(5.1 a 6.3)*Lt, (5.2 a 6.4)*Lto
601.15 Lto5.7 a 6.95.0 a 6.06 Lt5 Lt60(5 a 6)*Lt, (5.7 a 6.9)*Lto
701.05 Lto5.4 a 6.65.1 a 6.36.3 Lt5 Lt
90Lto5.1 a 6.35.1 a 6.36.3 Lt5 Lt
-
ESPIGONES DE ENROCADO Elementos de diseo.Separacin.En tramos curvosDeterminar grficamenteEn curvas simples considerarSp=(2.5 a 4)*LtLt, Longitud de trabajo
-
ELEMENTOS DE DISE0
-
ELEMENTOS DE DISE0Sp=(2.5 a 4)*LtLt, Longitud de trabajo
-
ESPIGONES DE ENROCADO Elementos de diseo.Pendiente de la corona.Los espigones con pendientes de la corona hacia el centro del cauce mayores a 0.1, favorecen mejor el depsito de sedimentos y son ms econmicos.Rango de pendientes de corona recomendables, 0.05 a 0.25
-
Pendiente de la corona
-
ESPIGONES DE ENROCADO Elementos de diseo.Orientacin.Puede ser: Normal al eje del ro, hacia aguas arriba y hacia aguas abajo.La orientacin se mide por el ngulo formado hacia aguas abajo por el eje del espign y el eje del ro, en tramos rectos, y con la tangente a la orilla en el punto de arranque, en tramos curvos.En tramos rectos y curvas simples se recomienda un ngulo de 70En curvas compuestas con radio de curvatura menoers de 2.5B, el ngulo debe ser menor de 70C T T y Co
-
ESPIGONES DE ENROCADO Elementos de diseo.Permeabilidad del espign, material de construccin.La permeabilidad depende del tipo de material de construccin.El enrocado constituye un excelente material de construccin.Es recomendable analizar cuidadosamente el tipo de material a emplearse.
-
ESPIGONES DE ENROCADO Elementos de diseo.Socavacin.El espign para brindar una proteccin satisfactoria debe ser estable a travs del tiempo, por tantoSe debe considerar en el diseo la proteccin del espign contra la socavacin, principalmente en el extremo de mayor contacto con las lneas de corriente de mayor erodabilidad.El tamao de roca y gradacin debe ser similar al considerado para la ua del dique transversal con enrocado.
-
Colchn antisocavante en espign de cestos de malla metlica
-
ESPIGONES DE ENROCADODiseo.Trazo en tramos curvos.Trazo en tramos rectos.DimensionamientoSecciones transversales.Perfil
-
PRESENTACIN DE LA INGENIERA DEL PROYECTO.Memoria descriptiva.Planos.
-
PRESENTACIN DE LA INGENIERA DEL PROYECTO.Clculos justificativos.Programacin de obra.
-
PRESENTACIN DE LA INGENIERA DEL PROYECTO.Especificaciones tcnicas.Planilla de metrados.Costos, presupuesto, frmula polinmica.Requerimientos de equipo, materiales, mano de obra.
-
PROCESOS CONSTRUCTIVOS.Recepcin y entrega de terrenoApertura de cuaderno de obraInstalacin de campamento
-
PROCESOS CONSTRUCTIVOS. Trazo y replanteo.Movilizacin y desmovilizacin de maquinaria.Limpieza y preparacin del terreno.Cortes y fijacin de niveles de fundacin.
-
PROCESOS CONSTRUCTIVOS.Construccin de estructuras proyectadas de acuerdo a diseo.Movimiento de tierrasMovimiento de rocasElementos de concretoEntrega y recepcin de obra.Liquidacin de obra.
-
BIBLIOGRAFASUAREZ DAZ, JAIMEMANUAL DE INGENIERA PARA EL CONTROL DE LA EROSINUIS UNIVERSIDAD INDUSTRIAL DE SANTANDER COLOMBIACOMISIN FEDERAL DE ELECTRICIDAD INSTITUTO DE INVESTIGACIONES ELCTRICASHIDRULICA FLUVIALMEXICOALVARADO MONTERO LINCOLNPROTECCIN DE TALUDES CON ENROCADOSTERCER COLOQUIO NACIONAL SOCIEDAD CHILENA DE INGENIERA HIDRULICA
-
**