actas parciales de obra de la feria et 4.xls

30
CONTRATO No. FECHA VENCIMIENTO 170 - 2013 11-Jun-11 3.00 11-Sep-11 CONDICIONES CONTRACTUALES VIGENTES CONDICIONES ACTUALIZADAS ITEM DE PAGO UND CANTIDAD PRECIO UNITARIO VALOR PARCIAL CANTIDAD VALOR Localización y Replanteo Urbanismo M2 7,670.00 2,950.00 22,626,500.00 7,670.00 22,626,500.00 Campamento 9 Mt2 incluye provisionales UND 1.00 1,500,000.00 1,500,000.00 1.00 1,500,000.00 Encerramiento Tela Verde de Polipropileno ML 50.00 14,839.00 741,950.00 50.00 741,950.00 Demolición de Mamposteria Temosa En Zoga M2 42.00 25,045.00 1,051,890.00 42.00 1,051,890.00 M2 187.00 36,100.00 6,750,700.00 187.00 6,750,700.00 Demolición de cimiento enterrado ML 10.00 54,409.00 544,090.00 10.00 544,090.00 M2 187.00 40,300.00 7,536,100.00 187.00 7,536,100.00 M3 26.00 56,183.00 1,460,758.00 26.00 1,460,758.00 Demolición pisos varios M2 33.0 8,107.00 267,531.00 33.00 267,531.00 *Desmonte de porton metalico UND 1.00 101,023.00 101,023.00 1.00 101,023.00 Sumidero prefabricado SL=100 UND 10.0 865,364.00 8,653,640.00 10.00 8,653,640.00 Sumidero prefabricado Sl=400 UND 4.00 2,179,893.00 8,719,572.00 4.00 8,719,572.00 ML 140.0 285,750.00 40,005,000.00 140.00 40,005,000.00 Nivelación Pozo de Inspeccion D=1.20 UND 2.00 $ 241,368.00 482,736.00 2.00 482,736.00 UND 2.00 1,585,547.00 3,171,094.00 2.00 3,171,094.00 *Excavación manual en terreno conglomerado ML 40.00 13,539.00 541,560.00 40.00 541,560.00 UND 14.00 428,653.00 6,001,142.00 14.00 6,001,142.00 *conformacion y compactacion de sub rasante M2 518.00 2,943.00 1,524,474.00 518.00 1,524,474.00 M3 104.00 89,032.00 9,259,328.00 104.00 9,259,328.00 *Imprimación asfaltica M2 518.00 4,397.00 2,277,646.00 518.00 2,277,646.00 *Capa De Rodadura Asfaltica MDC-2 E=0.07 m M3 36.00 461,183.00 16,602,588.00 36.00 16,602,588.00 M3 26.00 533,100.00 13,860,600.00 26.00 13,860,600.00 CONTRATISTA: AURELIO GUTIERREZ CASTILLO FECHA DE INICIACION PLAZO (MESES) INTERVENTOR: CONECTA INGENERIA Y PROYECTOS LTDA. CONSTRUCCIÓN DE OBRAS DE CONSTRUCCIÓN DE URBANIS GLOBAL FIJO DEL PROYECTO PASEO LA FERIA IV ETA MUNICIPIO DE BUCARAMA Demolición de mochetas en ladrillo temosa h=2,5 *Demolicion de capa asfaltica existente incluye retiro de escombros Demolición De Estructuras o Pisos En Concreto Reforzado Suministro e Instalación de tubería novafort 10" *Construccion de Pozo de Inspeccion D=1.20 , H=2.0 m Suministro e instalación de valvula de charnela de 10" incluye reparación de pozo *Suministro Y Aplicacion De Base Granular Compactada Para Parqueadero E=0.3 m *Suministro y Aplicación de Concreto Asfaltico tipo rodadura de espesor final 0.05 MTS.

Upload: l-carlos-bedoya

Post on 25-Dec-2015

219 views

Category:

Documents


2 download

TRANSCRIPT

CONTRATO No. VALOR

170 - 2013 11-Jun-11 3.00 11-Sep-11 386,942,774.32

CONDICIONES CONTRACTUALES VIGENTESCONDICIONES ACTUALIZADAS OBRA EJECUTADA PRESENTE ACTA

ITEM DE PAGO UND CANTIDAD PRECIO UNITARIO VALOR PARCIALCANTIDAD VALOR CANTIDAD

Localización y Replanteo Urbanismo M2 7,670.00 2,950.00 22,626,500.00 7,670.00 22,626,500.00 3,068.00

Campamento 9 Mt2 incluye provisionales UND 1.00 1,500,000.00 1,500,000.00 1.00 1,500,000.00 1.00

Encerramiento Tela Verde de Polipropileno ML 50.00 14,839.00 741,950.00 50.00 741,950.00 50.00

Demolición de Mamposteria Temosa En Zoga M2 42.00 25,045.00 1,051,890.00 42.00 1,051,890.00 21.00

Demolición de mochetas en ladrillo temosa h=2,5 M2 187.00 36,100.00 6,750,700.00 187.00 6,750,700.00 56.10

Demolición de cimiento enterrado ML 10.00 54,409.00 544,090.00 10.00 544,090.00 0.00

M2 187.00 40,300.00 7,536,100.00 187.00 7,536,100.00 0.00

M3 26.00 56,183.00 1,460,758.00 26.00 1,460,758.00 0.00

Demolición pisos varios M2 33.0 8,107.00 267,531.00 33.00 267,531.00 0.00

*Desmonte de porton metalico UND 1.00 101,023.00 101,023.00 1.00 101,023.00 0.00

Sumidero prefabricado SL=100 UND 10.0 865,364.00 8,653,640.00 10.00 8,653,640.00 0.00

Sumidero prefabricado Sl=400 UND 4.00 2,179,893.00 8,719,572.00 4.00 8,719,572.00 0.00

Suministro e Instalación de tubería novafort 10" ML 140.0 285,750.00 40,005,000.00 140.00 40,005,000.00 0.00

Nivelación Pozo de Inspeccion D=1.20 UND 2.00 $ 241,368.00 482,736.00 2.00 482,736.00 0.00

UND 2.00 1,585,547.00 3,171,094.00 2.00 3,171,094.00 0.00

*Excavación manual en terreno conglomerado ML 40.00 13,539.00 541,560.00 40.00 541,560.00 0.00

UND 14.00 428,653.00 6,001,142.00 14.00 6,001,142.00 0.00

*conformacion y compactacion de sub rasante M2 518.00 2,943.00 1,524,474.00 518.00 1,524,474.00 0.00

M3 104.00 89,032.00 9,259,328.00 104.00 9,259,328.00 0.00

*Imprimación asfaltica M2 518.00 4,397.00 2,277,646.00 518.00 2,277,646.00 0.00

*Capa De Rodadura Asfaltica MDC-2 E=0.07 m M3 36.00 461,183.00 16,602,588.00 36.00 16,602,588.00 0.00

M3 26.00 533,100.00 13,860,600.00 26.00 13,860,600.00 0.00

CONTRATISTA: AURELIO GUTIERREZ CASTILLO

FECHA DE INICIACION

PLAZO (MESES)

FECHA VENCIMIENTO

INTERVENTOR: CONECTA INGENERIA Y PROYECTOS LTDA.

CONSTRUCCIÓN DE OBRAS DE CONSTRUCCIÓN DE URBANISMO PARA LAS VIVIENDAS A PRECIO GLOBAL FIJO DEL PROYECTO PASEO LA FERIA IV ETAPA -

PROPIEDAD HORIZONTAL DEL MUNICIPIO DE BUCARAMANGA

*Demolicion de capa asfaltica existente incluye retiro de escombros

Demolición De Estructuras o Pisos En Concreto Reforzado

*Construccion de Pozo de Inspeccion D=1.20 , H=2.0 m

Suministro e instalación de valvula de charnela de 10" incluye reparación de pozo

*Suministro Y Aplicacion De Base Granular Compactada Para Parqueadero E=0.3 m

*Suministro y Aplicación de Concreto Asfaltico tipo rodadura de espesor final 0.05 MTS.

*Conformación de andenes M2 1,150.00 4,287.00 4,930,050.00 1,150.00 4,930,050.00 0.00

M2 1,150.00 44,840.00 51,566,000.00 1,150.00 51,566,000.00 0.00

Rampas Incluye Conformacion M2 6.00 47,113.00 282,678.00 6.00 282,678.00 0.00

*Canaleta en concreto de 2500 psi ML 260.00 38,108.00 9,908,080.00 260.00 9,908,080.00 0.00

M2 81.00 54,842.00 4,442,202.00 81.00 4,442,202.00 0.00

ML 23.00 81,136.00 1,866,128.00 23.00 1,866,128.00 0.00

M3 1.00 311,121.00 311,121.00 1.00 311,121.00 0.00

M3 3.00 85,032.00 255,096.00 3.00 255,096.00 0.00

ML 7.00 188,339.00 1,318,373.00 7.00 1,318,373.00 0.00

*Excavación manual en terreno conglomerado M3 10.00 22,566.00 225,660.00 10.00 225,660.00 0.00

*Suministro y siembra de prado San AgustinM2

211.00 4,842.00 1,021,662.00 211.00 1,021,662.00 0.00M2

*Conformación zonas verdes M2 211.00 3,777.00 796,947.00 211.00 796,947.00 0.00

*Desyerbe de plantas rastreras M2 211.00 1,295.00 273,245.00 211.00 273,245.00 0.00

*Seto en Cayeno Nieve H=1 mtr. UND 50.00 11,648.00 582,400.00 50.00 582,400.00 0.00

Arborización - Especie Caballero de la Noche. UND 8.00 26,716.00 213,728.00 8.00 213,728.00 0.00

*Arborización - Especie Jazmin UND 6.00 26,716.00 160,296.00 6.00 160,296.00 0.00

*Arborización - Especie Francesina UND 16.00 21,716.00 347,456.00 16.00 347,456.00 0.00

*Arborizacion -Especie Penitente UND 17.00 26,716.00 454,172.00 17.00 454,172.00 0.00

*Retiro de sobrantes Al Botadero Autorizado M3 42.00 24,362.00 1,023,204.00 42.00 1,023,204.00 0.00

ML 70.00 140,516.83 9,836,178.33 70.00 9,836,178.33 0.00

ML 70.00 60,161.00 4,211,270.00 70.00 4,211,270.00 0.00

Cajas registro de 0.6m x 0.6 m. UND 6.00 247,782.14 1,486,692.86 6.00 1,486,692.86 0.00

ML 50.00 36,670.57 1,833,528.57 50.00 1,833,528.57 0.00

Cajas registro de 0.3m x 0.3 m. UND 56.00 19,321.50 1,082,004.00 56.00 1,082,004.00 0.00

UND 1.00 22,849,480.00 22,849,480.00 1.00 22,849,480.00 0.00

Certificacion Aumento de potencia de subestacion II UND 1.00 6,604,360.00 6,604,360.00 1.00 6,604,360.00 0.00

*Anden en concreto de 2500 psi, a la vista acabado escobiado y ratoniado, incluye malla de refuerzo

E=0.08

*Plazoleta en concreto a la vista e=0.08 con acabado rayado 40x40

Sardinel prefabricado 50x80x20 cm. (incluye suministro, instalación, mortero de pega y sello de

arena)*Concreto normal f`c= 140 kg/cm2 solados y

limpieza E= 0.05 mtrs

*Sub-base garnular compactada para espacio publico

*Anden en losa prefabricada de concreto lisa, guia y demarcacion visual B=1.2 x l=2.00 mtrs.

Red electrica de distribucion subterranea circuito 1, 3 x #1/0 + 1 x #2, + 1 x #4 Desnudo Cu, circuitos 1-III

y 2-III Instalacion de tubo para redes subtarreneas generales de distribucion incluye canalizacion,

excavacion y retiro de materiales

Instalacion de ductos para acometidas generales por apartamento.

Subestacion de 150 kVA Paud Mounted 13200 /220-127 Voltios

ML 80.00 62,161.00 4,972,880.00 80.00 4,972,880.00 0.00

Cajas registro de 0.6m x 0.6 m. UND 5.00 247,782.14 1,238,910.71 5.00 1,238,910.71 0.00

ML 80.00 38,670.57 3,093,645.71 80.00 3,093,645.71 0.00

Cajas registro de 0.3m x 0.3 m. UND 8.00 19,321.50 154,572.00 8.00 154,572.00 0.00

Costo Directo Ejecutado 291,021,942.18 291,021,942.18 Costo Directo

ADMINISTRACION 22% 64,024,827.28 64,024,827.28 ADMINISTRACION 22%

IMPREVISTO 4% 11,640,877.69 11,640,877.69 IMPREVISTO 4%

UTILIDAD 6% 17,461,316.53 17,461,316.53 UTILIDAD 6%

IVA. 16% SOBRE UTILIDAD 2,793,810.64 384,148,963.68 Subtotal

Valor total del contrato 386,942,774.32 2,793,810.64 IVA

Valor total Acta

SON: .

Teodoro Durongo ING JORGE

Presidente Junta Directiva Interventor Residente

Instalacion de tubo para redes subtarreneas generales de distribucion incluye canalizacion,

excavacion y retiro de materiales

Instalacion de ductos para acometidas generales por apartamento.

VALOR ACUMULADO

CONTRATO DE OBRA

ACTA SEMANAL

386,942,774.32 ACTA No. SEMANA 1SEMANA DEL

AL

FECHA:

OBRA EJECUTADA PRESENTE ACTA OBRA EJECUTADA ACUMULADA

VALOR CANTIDAD VALOR

9,050,600.00 3,068.00 9,050,600.00

1,500,000.00 1.00 1,500,000.00

741,950.00 50.00 741,950.00

525,945.00 21.00 525,945.00

2,025,210.00 56.10 2,025,210.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

CONSTRUCCIÓN DE OBRAS DE CONSTRUCCIÓN DE URBANISMO PARA LAS VIVIENDAS A PRECIO GLOBAL FIJO DEL PROYECTO PASEO LA FERIA IV ETAPA -

PROPIEDAD HORIZONTAL DEL MUNICIPIO DE BUCARAMANGA

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

13,843,705.00 Acumulado 13,843,705.00

3,045,615.10 ADMINISTRACION 3,045,615.10

553,748.20 IMPREVISTO 553,748.20

830,622.30 UTILIDAD 830,622.30

18,273,690.6 Subtotal 16,889,320.10

132,899.57 IVA 24,364.92

18,406,590.17 16,913,685.02

Saldo Contrato 370,029,089.30

SON: .

VIECCO

Residente Contratista

Valor acumulado facturado

CONTRATO No. VALOR VALOR ACUMULADO

170 - 2013 11-Jun-11 3.00 11-Sep-11 386,942,774.32 386,942,774.32

CONDICIONES CONTRACTUALES VIGENTESCONDICIONES ACTUALIZADAS OBRA EJECUTADA PRESENTE ACTA

ITEM DE PAGO UND CANTIDAD PRECIO UNITARIO VALOR PARCIAL CANTIDAD VALOR CANTIDAD VALOR

Localización y Replanteo Urbanismo M2 7,670.00 2,950.00 22,626,500.00 7,670.00 22,626,500.00 4,602.00 13,575,900.00

Campamento 9 Mt2 incluye provisionales UND 1.00 1,500,000.00 1,500,000.00 1.00 1,500,000.00 0.00 0.00

Encerramiento Tela Verde de Polipropileno ML 50.00 14,839.00 741,950.00 50.00 741,950.00 0.00 0.00

Demolición de Mamposteria Temosa En Zoga M2 42.00 25,045.00 1,051,890.00 42.00 1,051,890.00 21.00 525,945.00

Demolición de mochetas en ladrillo temosa h=2,5 M2 187.00 36,100.00 6,750,700.00 187.00 6,750,700.00 74.80 2,700,280.00

Demolición de cimiento enterrado ML 10.00 54,409.00 544,090.00 10.00 544,090.00 10.00 544,090.00

M2 187.00 40,300.00 7,536,100.00 187.00 7,536,100.00 37.40 1,507,220.00

M3 26.00 56,183.00 1,460,758.00 26.00 1,460,758.00 15.60 876,454.80

Demolición pisos varios M2 33.0 8,107.00 267,531.00 33.00 267,531.00 0.00 0.00

*Desmonte de porton metalico UND 1.00 101,023.00 101,023.00 1.00 101,023.00 0.00 0.00

Sumidero prefabricado SL=100 UND 10.0 865,364.00 8,653,640.00 10.00 8,653,640.00 0.00 0.00

Sumidero prefabricado Sl=400 UND 4.00 2,179,893.00 8,719,572.00 4.00 8,719,572.00 0.00 0.00

Suministro e Instalación de tubería novafort 10" ML 140.0 285,750.00 40,005,000.00 140.00 40,005,000.00 0.00 0.00

Nivelación Pozo de Inspeccion D=1.20 UND2.00 241,368.00 482,736.00 2.00 482,736.00 0.00 0.00

*Construccion de Pozo de Inspeccion D=1.20 , H=2.0 m UND 2.00 1,585,547.00 3,171,094.00 2.00 3,171,094.00 0.00 0.00

*Excavación manual en terreno conglomerado ML 40.00 13,539.00 541,560.00 40.00 541,560.00 0.00 0.00

UND 14.00 428,653.00 6,001,142.00 14.00 6,001,142.00 0.00 0.00

*conformacion y compactacion de sub rasante M2 518.00 2,943.00 1,524,474.00 518.00 1,524,474.00 0.00 0.00

M3 104.00 89,032.00 9,259,328.00 104.00 9,259,328.00 0.00 0.00

*Imprimación asfaltica M2 518.00 4,397.00 2,277,646.00 518.00 2,277,646.00 0.00 0.00

CONTRATISTA: AURELIO GUTIERREZ CASTILLO

FECHA DE INICIACION

PLAZO (MESES)

FECHA VENCIMIENTO

INTERVENTOR: CONECTA INGENERIA Y PROYECTOS LTDA.

CONSTRUCCIÓN DE OBRAS DE CONSTRUCCIÓN DE URBANISMO PARA LAS VIVIENDAS A PRECIO GLOBAL FIJO DEL PROYECTO PASEO LA FERIA IV ETAPA -

PROPIEDAD HORIZONTAL DEL MUNICIPIO DE BUCARAMANGA

*Demolicion de capa asfaltica existente incluye retiro de escombros

Demolición De Estructuras o Pisos En Concreto Reforzado

Suministro e instalación de valvula de charnela de 10" incluye reparación de pozo

*Suministro Y Aplicacion De Base Granular Compactada Para Parqueadero E=0.3 m

*Capa De Rodadura Asfaltica MDC-2 E=0.07 m M3 36.00 461,183.00 16,602,588.00 36.00 16,602,588.00 0.00 0.00

M3 26.00 533,100.00 13,860,600.00 26.00 13,860,600.00 0.00 0.00

*Conformación de andenes M2 1,150.00 4,287.00 4,930,050.00 1,150.00 4,930,050.00 0.00 0.00

M2 1,150.00 44,840.00 51,566,000.00 1,150.00 51,566,000.00 0.00 0.00

Rampas Incluye Conformacion M2 6.00 47,113.00 282,678.00 6.00 282,678.00 0.00 0.00

*Canaleta en concreto de 2500 psi ML 260.00 38,108.00 9,908,080.00 260.00 9,908,080.00 0.00 0.00

M2 81.00 54,842.00 4,442,202.00 81.00 4,442,202.00 0.00 0.00

ML 23.00 81,136.00 1,866,128.00 23.00 1,866,128.00 0.00 0.00

M3 1.00 311,121.00 311,121.00 1.00 311,121.00 0.00 0.00

*Sub-base garnular compactada para espacio publico M3 3.00 85,032.00 255,096.00 3.00 255,096.00 0.00 0.00

ML 7.00 188,339.00 1,318,373.00 7.00 1,318,373.00 0.00 0.00

*Excavación manual en terreno conglomerado M3 10.00 22,566.00 225,660.00 10.00 225,660.00 0.00 0.00

*Suministro y siembra de prado San AgustinM2

211.00 4,842.00 1,021,662.00 211.00 1,021,662.00 0.00 0.00M2

*Conformación zonas verdes M2 211.00 3,777.00 796,947.00 211.00 796,947.00 0.00 0.00

*Desyerbe de plantas rastreras M2 211.00 1,295.00 273,245.00 211.00 273,245.00 0.00 0.00

*Seto en Cayeno Nieve H=1 mtr. UND 50.00 11,648.00 582,400.00 50.00 582,400.00 0.00 0.00

Arborización - Especie Caballero de la Noche. UND 8.00 26,716.00 213,728.00 8.00 213,728.00 0.00 0.00

*Arborización - Especie Jazmin UND 6.00 26,716.00 160,296.00 6.00 160,296.00 0.00 0.00

*Arborización - Especie Francesina UND 16.00 21,716.00 347,456.00 16.00 347,456.00 0.00 0.00

*Arborizacion -Especie Penitente UND 17.00 26,716.00 454,172.00 17.00 454,172.00 0.00 0.00

*Retiro de sobrantes Al Botadero Autorizado M3 42.00 24,362.00 1,023,204.00 42.00 1,023,204.00 0.00 0.00

ML 70.00 140,516.83 9,836,178.33 70.00 9,836,178.33 0.00 0.00

ML 70.00 60,161.00 4,211,270.00 70.00 4,211,270.00 0.00 0.00

Cajas registro de 0.6m x 0.6 m. UND 6.00 247,782.14 1,486,692.86 6.00 1,486,692.86 0.00 0.00

ML 50.00 36,670.57 1,833,528.57 50.00 1,833,528.57 0.00 0.00

Cajas registro de 0.3m x 0.3 m. UND 56.00 19,321.50 1,082,004.00 56.00 1,082,004.00 0.00 0.00

*Suministro y Aplicación de Concreto Asfaltico tipo rodadura de espesor final 0.05 MTS.

*Anden en concreto de 2500 psi, a la vista acabado escobiado y ratoniado, incluye malla de refuerzo

E=0.08

*Plazoleta en concreto a la vista e=0.08 con acabado rayado 40x40

Sardinel prefabricado 50x80x20 cm. (incluye suministro, instalación, mortero de pega y sello de

arena)*Concreto normal f`c= 140 kg/cm2 solados y limpieza

E= 0.05 mtrs

*Anden en losa prefabricada de concreto lisa, guia y demarcacion visual B=1.2 x l=2.00 mtrs.

Red electrica de distribucion subterranea circuito 1, 3 x #1/0 + 1 x #2, + 1 x #4 Desnudo Cu, circuitos 1-III y 2-

III Instalacion de tubo para redes subtarreneas generales de distribucion incluye canalizacion, excavacion y retiro

de materiales

Instalacion de ductos para acometidas generales por apartamento.

UND 1.00 22,849,480.00 22,849,480.00 1.00 22,849,480.00 0.00 0.00

Certificacion Aumento de potencia de subestacion II UND 1.00 6,604,360.00 6,604,360.00 1.00 6,604,360.00 0.00 0.00

ML 80.00 62,161.00 4,972,880.00 80.00 4,972,880.00 0.00 0.00

Cajas registro de 0.6m x 0.6 m. UND 5.00 247,782.14 1,238,910.71 5.00 1,238,910.71 0.00 0.00

ML 80.00 38,670.57 3,093,645.71 80.00 3,093,645.71 0.00 0.00

Cajas registro de 0.3m x 0.3 m. UND 8.00 19,321.50 154,572.00 8.00 154,572.00 0.00 0.00

Costo Directo Ejecutado 291,021,942.18 291,021,942.18 Costo Directo 19,729,889.80

AIU 32% 93,127,021.50 93,127,021.50 AIU 32% 6,313,564.74

IVA. 16% SOBRE UTILIDAD 2,793,810.64 2,328,175.54 Subtotal 26,043,454.54

Valor total del contrato 386,942,774.32 894,019.41 IVA 60,610.22

Valor total Acta 26,104,064.76

SON: .

Teodoro Durongo JORGE

Presidente Junta Directiva Interventor Residente

Subestacion de 150 kVA Paud Mounted 13200 /220-127 Voltios

Instalacion de tubo para redes subtarreneas generales de distribucion incluye canalizacion, excavacion y retiro

de materiales

Instalacion de ductos para acometidas generales por apartamento.

CONTRATO DE OBRA

ACTA SEMANAL

ACTA No. SEMANA 2SEMANA DEL

AL

FECHA:

OBRA EJECUTADA ACUMULADA

CANTIDAD ACOMULADA VALOR

7,670.00 22,626,500.00

1.00 1,500,000.00

50.00 741,950.00

42.00 1,051,890.00

130.90 4,725,490.00

10.00 544,090.00

37.40 1,507,220.00

15.60 876,454.80

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

Acumulado 33,573,594.80

AIU 32% 10,743,550.34

Subtotal 44,317,145.14

IVA 103,138.08

44,420,283.22

Saldo Contrato 342,522,491.10

SON: .

VIECCO

Contratista

Valor acumulado facturado

CONTRATO No. VALOR VALOR ACUMULADO

170 - 2013 11-Jun-11 3.00 11-Sep-11 386,942,774.32 386,942,774.32

CONDICIONES CONTRACTUALES VIGENTESCONDICIONES ACTUALIZADAS OBRA EJECUTADA PRESENTE ACTA

ITEM DE PAGO UND CANTIDAD PRECIO UNITARIO VALOR PARCIAL CANTIDAD VALOR CANTIDAD VALOR

Localización y Replanteo Urbanismo M2 7,670.00 2,950.00 22,626,500.00 7,670.00 22,626,500.00 0.00 0.00

Campamento 9 Mt2 incluye provisionales UND 1.00 1,500,000.00 1,500,000.00 1.00 1,500,000.00 0.00 0.00

Encerramiento Tela Verde de Polipropileno ML 50.00 14,839.00 741,950.00 50.00 741,950.00 0.00 0.00

Demolición de Mamposteria Temosa En Zoga M2 42.00 25,045.00 1,051,890.00 42.00 1,051,890.00 0.00 0.00

Demolición de mochetas en ladrillo temosa h=2,5 M2 187.00 36,100.00 6,750,700.00 187.00 6,750,700.00 56.10 2,025,210.00

Demolición de cimiento enterrado ML 10.00 54,409.00 544,090.00 10.00 544,090.00 0.00 0.00

M2 187.00 40,300.00 7,536,100.00 187.00 7,536,100.00 130.90 5,275,270.00

M3 26.00 56,183.00 1,460,758.00 26.00 1,460,758.00 10.40 584,303.20

Demolición pisos varios M2 33.0 8,107.00 267,531.00 33.00 267,531.00 33.00 267,531.00

*Desmonte de porton metalico UND 1.00 101,023.00 101,023.00 1.00 101,023.00 1.00 101,023.00

Sumidero prefabricado SL=100 UND 10.0 865,364.00 8,653,640.00 10.00 8,653,640.00 1.00 865,364.00

Sumidero prefabricado Sl=400 UND 4.00 2,179,893.00 8,719,572.00 4.00 8,719,572.00 1.20 2,615,871.60

Suministro e Instalación de tubería novafort 10" ML 140.0 285,750.00 40,005,000.00 140.00 40,005,000.00 56.00 16,002,000.00

Nivelación Pozo de Inspeccion D=1.20 UND2.00 241,368.00 482,736.00 2.00 482,736.00 0.00 0.00

*Construccion de Pozo de Inspeccion D=1.20 , H=2.0 m UND 2.00 1,585,547.00 3,171,094.00 2.00 3,171,094.00 0.00 0.00

*Excavación manual en terreno conglomerado ML 40.00 13,539.00 541,560.00 40.00 541,560.00 40.00 541,560.00

UND 14.00 428,653.00 6,001,142.00 14.00 6,001,142.00 0.00 0.00

*conformacion y compactacion de sub rasante M2 518.00 2,943.00 1,524,474.00 518.00 1,524,474.00 0.00 0.00

M3 104.00 89,032.00 9,259,328.00 104.00 9,259,328.00 0.00 0.00

*Imprimación asfaltica M2 518.00 4,397.00 2,277,646.00 518.00 2,277,646.00 0.00 0.00

CONTRATISTA: AURELIO GUTIERREZ CASTILLO

FECHA DE INICIACION

PLAZO (MESES)

FECHA VENCIMIENTO

INTERVENTOR: CONECTA INGENERIA Y PROYECTOS LTDA.

CONSTRUCCIÓN DE OBRAS DE CONSTRUCCIÓN DE URBANISMO PARA LAS VIVIENDAS A PRECIO GLOBAL FIJO DEL PROYECTO PASEO LA FERIA IV ETAPA -

PROPIEDAD HORIZONTAL DEL MUNICIPIO DE BUCARAMANGA

*Demolicion de capa asfaltica existente incluye retiro de escombros

Demolición De Estructuras o Pisos En Concreto Reforzado

Suministro e instalación de valvula de charnela de 10" incluye reparación de pozo

*Suministro Y Aplicacion De Base Granular Compactada Para Parqueadero E=0.3 m

*Capa De Rodadura Asfaltica MDC-2 E=0.07 m M3 36.00 461,183.00 16,602,588.00 36.00 16,602,588.00 0.00 0.00

M3 26.00 533,100.00 13,860,600.00 26.00 13,860,600.00 0.00 0.00

*Conformación de andenes M2 1,150.00 4,287.00 4,930,050.00 1,150.00 4,930,050.00 0.00 0.00

M2 1,150.00 44,840.00 51,566,000.00 1,150.00 51,566,000.00 0.00 0.00

Rampas Incluye Conformacion M2 6.00 47,113.00 282,678.00 6.00 282,678.00 0.00 0.00

*Canaleta en concreto de 2500 psi ML 260.00 38,108.00 9,908,080.00 260.00 9,908,080.00 0.00 0.00

M2 81.00 54,842.00 4,442,202.00 81.00 4,442,202.00 0.00 0.00

ML 23.00 81,136.00 1,866,128.00 23.00 1,866,128.00 0.00 0.00

M3 1.00 311,121.00 311,121.00 1.00 311,121.00 0.00 0.00

*Sub-base garnular compactada para espacio publico M3 3.00 85,032.00 255,096.00 3.00 255,096.00 0.00 0.00

ML 7.00 188,339.00 1,318,373.00 7.00 1,318,373.00 0.00 0.00

*Excavación manual en terreno conglomerado M3 10.00 22,566.00 225,660.00 10.00 225,660.00 0.00 0.00

*Suministro y siembra de prado San AgustinM2

211.00 4,842.00 1,021,662.00 211.00 1,021,662.00 0.00 0.00M2

*Conformación zonas verdes M2 211.00 3,777.00 796,947.00 211.00 796,947.00 0.00 0.00

*Desyerbe de plantas rastreras M2 211.00 1,295.00 273,245.00 211.00 273,245.00 0.00 0.00

*Seto en Cayeno Nieve H=1 mtr. UND 50.00 11,648.00 582,400.00 50.00 582,400.00 0.00 0.00

Arborización - Especie Caballero de la Noche. UND 8.00 26,716.00 213,728.00 8.00 213,728.00 0.00 0.00

*Arborización - Especie Jazmin UND 6.00 26,716.00 160,296.00 6.00 160,296.00 0.00 0.00

*Arborización - Especie Francesina UND 16.00 21,716.00 347,456.00 16.00 347,456.00 0.00 0.00

*Arborizacion -Especie Penitente UND 17.00 26,716.00 454,172.00 17.00 454,172.00 0.00 0.00

*Retiro de sobrantes Al Botadero Autorizado M3 42.00 24,362.00 1,023,204.00 42.00 1,023,204.00 0.00 0.00

ML 70.00 140,516.83 9,836,178.33 70.00 9,836,178.33 0.00 0.00

ML 70.00 60,161.00 4,211,270.00 70.00 4,211,270.00 0.00 0.00

Cajas registro de 0.6m x 0.6 m. UND 6.00 247,782.14 1,486,692.86 6.00 1,486,692.86 0.00 0.00

ML 50.00 36,670.57 1,833,528.57 50.00 1,833,528.57 0.00 0.00

Cajas registro de 0.3m x 0.3 m. UND 56.00 19,321.50 1,082,004.00 56.00 1,082,004.00 0.00 0.00

UND 1.00 22,849,480.00 22,849,480.00 1.00 22,849,480.00 0.00 0.00

*Suministro y Aplicación de Concreto Asfaltico tipo rodadura de espesor final 0.05 MTS.

*Anden en concreto de 2500 psi, a la vista acabado escobiado y ratoniado, incluye malla de refuerzo E=0.08

*Plazoleta en concreto a la vista e=0.08 con acabado rayado 40x40

Sardinel prefabricado 50x80x20 cm. (incluye suministro, instalación, mortero de pega y sello de arena)

*Concreto normal f`c= 140 kg/cm2 solados y limpieza E= 0.05 mtrs

*Anden en losa prefabricada de concreto lisa, guia y demarcacion visual B=1.2 x l=2.00 mtrs.

Red electrica de distribucion subterranea circuito 1, 3 x #1/0 + 1 x #2, + 1 x #4 Desnudo Cu, circuitos 1-III y 2-III Instalacion de tubo para redes subtarreneas generales de distribucion incluye canalizacion, excavacion y retiro

de materiales

Instalacion de ductos para acometidas generales por apartamento.

Subestacion de 150 kVA Paud Mounted 13200 /220-127 Voltios

UND 1.00 22,849,480.00 22,849,480.00 1.00 22,849,480.00 0.00 0.00

Certificacion Aumento de potencia de subestacion II UND 1.00 6,604,360.00 6,604,360.00 1.00 6,604,360.00 0.00 0.00

ML 80.00 62,161.00 4,972,880.00 80.00 4,972,880.00 24.00 1,491,864.00

Cajas registro de 0.6m x 0.6 m. UND 5.00 247,782.14 1,238,910.71 5.00 1,238,910.71 0.00 0.00

ML 80.00 38,670.57 3,093,645.71 80.00 3,093,645.71 0.00 0.00

Cajas registro de 0.3m x 0.3 m. UND 8.00 19,321.50 154,572.00 8.00 154,572.00 0.00 0.00

Costo Directo Ejecutado 291,021,942.18 291,021,942.18 Costo Directo 29,769,996.80

AIU 32% 93,127,021.50 93,127,021.50 AIU 32% 9,526,398.98

IVA. 16% SOBRE UTILIDAD 2,793,810.64 2,328,175.54 Subtotal 39,296,395.78

Valor total del contrato 386,942,774.32 386,477,139.22 IVA 91,453.43

Valor total Acta 39,387,849.21

SON: .

Teodoro Durongo ING LEAL

Presidente Junta Directiva Interventor Residente

Subestacion de 150 kVA Paud Mounted 13200 /220-127 Voltios

Instalacion de tubo para redes subtarreneas generales de distribucion incluye canalizacion, excavacion y retiro

de materiales

Instalacion de ductos para acometidas generales por apartamento.

CONTRATO DE OBRA

ACTA SEMANAL

ACTA No.SEMANA 3

SEMANA DEL

AL

FECHA:

OBRA EJECUTADA ACUMULADA

CANTIDAD ACOMULADA VALOR

7,670.00 22,626,500.00

1.00 1,500,000.00

50.00 741,950.00

42.00 1,051,890.00

187.00 6,750,700.00

10.00 544,090.00

168.30 6,782,490.00

26.00 1,460,758.00

33.00 267,531.00

1.00 101,023.00

1.00 865,364.00

1.20 2,615,871.60

56.00 16,002,000.00

0.00 0.00

0.00 0.00

40.00 541,560.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

24.00 1,491,864.00

0.00 0.00

0.00 0.00

0.00 0.00

Acumulado 63,343,591.60

AIU 20,269,949.31

Subtotal 83,613,540.91

IVA 194,591.51

83,808,132.43

Saldo Contrato 303,134,641.90

SON: .

VIECCO

Contratista

Valor acumulado facturado

CONTRATO No. VALOR

170 - 2013 11-Jun-11 3.00 11-Sep-11 $ 386,942,774.32

CONDICIONES CONTRACTUALES VIGENTESCONDICIONES ACTUALIZADAS OBRA EJECUTADA PRESENTE ACTA

ITEM DE PAGO UND CANTIDAD PRECIO UNITARIO VALOR PARCIAL CANTIDAD VALOR CANTIDAD

Localización y Replanteo Urbanismo M2 7,670.00 2,950.00 22,626,500.00 7,670.00 22,626,500.00 0.00

Campamento 9 Mt2 incluye provisionales UND 1.00 1,500,000.00 1,500,000.00 1.00 1,500,000.00 0.00

Encerramiento Tela Verde de Polipropileno ML 50.00 14,839.00 741,950.00 50.00 741,950.00 0.00

Demolición de Mamposteria Temosa En Zoga M2 42.00 25,045.00 1,051,890.00 42.00 1,051,890.00 0.00

Demolición de mochetas en ladrillo temosa h=2,5 M2 187.00 36,100.00 6,750,700.00 187.00 6,750,700.00 0.00

Demolición de cimiento enterrado ML 10.00 54,409.00 544,090.00 10.00 544,090.00 0.00

M2 187.00 40,300.00 7,536,100.00 187.00 7,536,100.00 0.00

Demolición De Estructuras o Pisos En Concreto Reforzado M3 26.00 56,183.00 1,460,758.00 26.00 1,460,758.00 0.00

Demolición pisos varios M2 33.0 8,107.00 267,531.00 33.00 267,531.00 0.00

*Desmonte de porton metalico UND 1.00 101,023.00 101,023.00 1.00 101,023.00 0.00

Sumidero prefabricado SL=100 UND 10.0 865,364.00 8,653,640.00 10.00 8,653,640.00 6.00

Sumidero prefabricado Sl=400 UND 4.00 2,179,893.00 8,719,572.00 4.00 8,719,572.00 0.00

Suministro e Instalación de tubería novafort 10" ML 140.0 285,750.00 40,005,000.00 140.00 40,005,000.00 84.00

Nivelación Pozo de Inspeccion D=1.20 UND2.00 241,368.00 482,736.00 2.00 482,736.00 2.00

*Construccion de Pozo de Inspeccion D=1.20 , H=2.0 m UND 2.00 1,585,547.00 3,171,094.00 2.00 3,171,094.00 0.60

*Excavación manual en terreno conglomerado ML 40.00 13,539.00 541,560.00 40.00 541,560.00 0.00

UND 14.00 428,653.00 6,001,142.00 14.00 6,001,142.00 2.80

*conformacion y compactacion de sub rasante M2 518.00 2,943.00 1,524,474.00 518.00 1,524,474.00 51.80

M3 104.00 89,032.00 9,259,328.00 104.00 9,259,328.00 0.00

*Imprimación asfaltica M2 518.00 4,397.00 2,277,646.00 518.00 2,277,646.00 0.00

CONTRATISTA: AURELIO GUTIERREZ CASTILLO

FECHA DE INICIACION

PLAZO (MESES)

FECHA VENCIMIENTO

INTERVENTOR: CONECTA INGENERIA Y PROYECTOS LTDA.

CONSTRUCCIÓN DE OBRAS DE CONSTRUCCIÓN DE URBANISMO PARA LAS VIVIENDAS A PRECIO GLOBAL FIJO DEL PROYECTO PASEO LA FERIA IV ETAPA -

PROPIEDAD HORIZONTAL DEL MUNICIPIO DE BUCARAMANGA

*Demolicion de capa asfaltica existente incluye retiro de escombros

Suministro e instalación de valvula de charnela de 10" incluye reparación de pozo

*Suministro Y Aplicacion De Base Granular Compactada Para Parqueadero E=0.3 m

*Capa De Rodadura Asfaltica MDC-2 E=0.07 m M3 36.00 461,183.00 16,602,588.00 36.00 16,602,588.00 0.00

M3 26.00 533,100.00 13,860,600.00 26.00 13,860,600.00 0.00

*Conformación de andenes M2 1,150.00 4,287.00 4,930,050.00 1,150.00 4,930,050.00 0.00

M2 1,150.00 44,840.00 51,566,000.00 1,150.00 51,566,000.00 0.00

Rampas Incluye Conformacion M2 6.00 47,113.00 282,678.00 6.00 282,678.00 0.00

*Canaleta en concreto de 2500 psi ML 260.00 38,108.00 9,908,080.00 260.00 9,908,080.00 0.00

M2 81.00 54,842.00 4,442,202.00 81.00 4,442,202.00 0.00

ML 23.00 81,136.00 1,866,128.00 23.00 1,866,128.00 0.00

M3 1.00 311,121.00 311,121.00 1.00 311,121.00 0.00

*Sub-base garnular compactada para espacio publico M3 3.00 85,032.00 255,096.00 3.00 255,096.00 0.00

ML 7.00 188,339.00 1,318,373.00 7.00 1,318,373.00 0.00

*Excavación manual en terreno conglomerado M3 10.00 22,566.00 225,660.00 10.00 225,660.00 0.00

*Suministro y siembra de prado San AgustinM2

211.00 4,842.00 1,021,662.00 211.00 1,021,662.00 0.00M2

*Conformación zonas verdes M2 211.00 3,777.00 796,947.00 211.00 796,947.00 0.00

*Desyerbe de plantas rastreras M2 211.00 1,295.00 273,245.00 211.00 273,245.00 0.00

*Seto en Cayeno Nieve H=1 mtr. UND 50.00 11,648.00 582,400.00 50.00 582,400.00 0.00

Arborización - Especie Caballero de la Noche. UND 8.00 26,716.00 213,728.00 8.00 213,728.00 0.00

*Arborización - Especie Jazmin UND 6.00 26,716.00 160,296.00 6.00 160,296.00 0.00

*Arborización - Especie Francesina UND 16.00 21,716.00 347,456.00 16.00 347,456.00 0.00

*Arborizacion -Especie Penitente UND 17.00 26,716.00 454,172.00 17.00 454,172.00 0.00

*Retiro de sobrantes Al Botadero Autorizado M3 42.00 24,362.00 1,023,204.00 42.00 1,023,204.00 0.00

ML 70.00 140,516.83 9,836,178.33 70.00 9,836,178.33 0.00

ML 70.00 60,161.00 4,211,270.00 70.00 4,211,270.00 0.00

Cajas registro de 0.6m x 0.6 m. UND 6.00 247,782.14 1,486,692.86 6.00 1,486,692.86 0.00

ML 50.00 36,670.57 1,833,528.57 50.00 1,833,528.57 0.00

Cajas registro de 0.3m x 0.3 m. UND 56.00 19,321.50 1,082,004.00 56.00 1,082,004.00 0.00

UND 1.00 22,849,480.00 22,849,480.00 1.00 22,849,480.00 0.00

*Suministro y Aplicación de Concreto Asfaltico tipo rodadura de espesor final 0.05 MTS.

*Anden en concreto de 2500 psi, a la vista acabado escobiado y ratoniado, incluye malla de refuerzo E=0.08

*Plazoleta en concreto a la vista e=0.08 con acabado rayado 40x40

Sardinel prefabricado 50x80x20 cm. (incluye suministro, instalación, mortero de pega y sello de arena)

*Concreto normal f`c= 140 kg/cm2 solados y limpieza E= 0.05 mtrs

*Anden en losa prefabricada de concreto lisa, guia y demarcacion visual B=1.2 x l=2.00 mtrs.

Red electrica de distribucion subterranea circuito 1, 3 x #1/0 + 1 x #2, + 1 x #4 Desnudo Cu, circuitos 1-III y 2-III

Instalacion de tubo para redes subtarreneas generales de distribucion incluye canalizacion, excavacion y retiro de

materiales

Instalacion de ductos para acometidas generales por apartamento.

Subestacion de 150 kVA Paud Mounted 13200 /220-127 Voltios

UND 1.00 22,849,480.00 22,849,480.00 1.00 22,849,480.00 0.00

Certificacion Aumento de potencia de subestacion II UND 1.00 6,604,360.00 6,604,360.00 1.00 6,604,360.00 0.00

ML 80.00 62,161.00 4,972,880.00 80.00 4,972,880.00 56.00

Cajas registro de 0.6m x 0.6 m. UND 5.00 247,782.14 1,238,910.71 5.00 1,238,910.71 5.00

ML 80.00 38,670.57 3,093,645.71 80.00 3,093,645.71 8.00

Cajas registro de 0.3m x 0.3 m. UND 8.00 19,321.50 154,572.00 8.00 154,572.00 0.00

Costo Directo Ejecutado 291,021,942.18 291,021,942.18 Costo Directo

AIU 32% 93,127,021.50 9,312,702,149.76 AIU 32%

IVA. 16% SOBRE UTILIDAD 2,793,810.64 2,328,175.54 Subtotal

Valor total del contrato 386,942,774.32 2,793,810.64 IVA

Valor total Acta

SON: .

Teodoro Durongo ING JORGE

Presidente Junta Directiva Interventor Residente

Subestacion de 150 kVA Paud Mounted 13200 /220-127 Voltios

Instalacion de tubo para redes subtarreneas generales de distribucion incluye canalizacion, excavacion y retiro de

materiales

Instalacion de ductos para acometidas generales por apartamento.

VALOR ACUMULADO

CONTRATO DE OBRA

ACTA SEMANAL

386,942,774.32 ACTA No. SEMANA 4

SEMANA DEL

AL

FECHA:

OBRA EJECUTADA PRESENTE ACTA OBRA EJECUTADA ACUMULADA

VALORCANTIDAD ACOMULADA VALOR

0.00 7,670.00 22,626,500.00

0.00 1.00 1,500,000.00

0.00 50.00 741,950.00

0.00 42.00 1,051,890.00

0.00 187.00 6,750,700.00

0.00 10.00 544,090.00

0.00 168.30 6,782,490.00

0.00 26.00 1,460,758.00

0.00 33.00 267,531.00

0.00 1.00 101,023.00

5,192,184.00 7.00 6,057,548.00

0.00 1.20 2,615,871.60

24,003,000.00 140.00 40,005,000.00

482,736.00 2.00 482,736.00

951,328.20 0.60 951,328.20

0.00 40.00 541,560.00

1,200,228.40 2.80 1,200,228.40

152,447.40 51.80 152,447.40

0.00 0.00 0.00

0.00 0.00 0.00

CONSTRUCCIÓN DE OBRAS DE CONSTRUCCIÓN DE URBANISMO PARA LAS VIVIENDAS A PRECIO GLOBAL FIJO DEL PROYECTO PASEO LA FERIA IV ETAPA -

PROPIEDAD HORIZONTAL DEL MUNICIPIO DE BUCARAMANGA

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

3,481,016.00 80.00 4,972,880.00

1,238,910.71 5.00 1,238,910.71

309,364.57 8.00 309,364.57

0.00 0.00 0.00

37,011,215.29 Acumulado 100,354,806.89

11,843,588.89 AIU 32,113,538.20

48,854,804.18 Subtotal 132,468,345.09

113,698.45 IVA 256,908.31

48,968,502.63 132,725,253.39

Saldo Contrato 254,217,520.93

SON: .

VIECCO

Residente Contratista

Valor acumulado facturado

CONTRATO No. FECHA DE INICIACION PLAZO (MESES) FECHA VENCIMIENTO VALOR VALOR ACUMULADO

170 - 2013 11-Jun-11 3.00 11-Sep-11 $ 386,942,774.32 386,942,774.32

CONDICIONES CONTRACTUALES VIGENTESCONDICIONES ACTUALIZADAS OBRA EJECUTADA PRESENTE ACTA

ITEM DE PAGO UND CANTIDAD PRECIO UNITARIO VALOR PARCIAL CANTIDAD VALOR CANTIDAD VALOR

Localización y Replanteo Urbanismo M2 7,670.00 2,950.00 22,626,500.00 7,670.00 22,626,500.00 0.00 0.00

Campamento 9 Mt2 incluye provisionales UND 1.00 1,500,000.00 1,500,000.00 1.00 1,500,000.00 0.00 0.00

Encerramiento Tela Verde de Polipropileno ML 50.00 14,839.00 741,950.00 50.00 741,950.00 0.00 0.00

Demolición de Mamposteria Temosa En Zoga M2 42.00 25,045.00 1,051,890.00 42.00 1,051,890.00 0.00 0.00

Demolición de mochetas en ladrillo temosa h=2,5 M2 187.00 36,100.00 6,750,700.00 187.00 6,750,700.00 0.00 0.00

Demolición de cimiento enterrado ML 10.00 54,409.00 544,090.00 10.00 544,090.00 0.00 0.00

M2 187.00 40,300.00 7,536,100.00 187.00 7,536,100.00 0.00 0.00

M3 26.00 56,183.00 1,460,758.00 26.00 1,460,758.00 10.40 584,303.20

Demolición pisos varios M2 33.0 8,107.00 267,531.00 33.00 267,531.00 0.00 0.00

*Desmonte de porton metalico UND 1.00 101,023.00 101,023.00 1.00 101,023.00 0.00 0.00

Sumidero prefabricado SL=100 UND 10.0 865,364.00 8,653,640.00 10.00 8,653,640.00 0.00 0.00

Sumidero prefabricado Sl=400 UND 4.00 2,179,893.00 8,719,572.00 4.00 8,719,572.00 1.20 2,615,871.60

Suministro e Instalación de tubería novafort 10" ML 140.0 285,750.00 40,005,000.00 140.00 40,005,000.00 0.00 0.00

Nivelación Pozo de Inspeccion D=1.20 UND2.00 241,368.00 482,736.00 2.00 482,736.00 0.00 0.00

UND 2.00 1,585,547.00 3,171,094.00 2.00 3,171,094.00 0.00 0.00

*Excavación manual en terreno conglomerado ML 40.00 13,539.00 541,560.00 40.00 541,560.00 0.00 0.00

UND 14.00 428,653.00 6,001,142.00 14.00 6,001,142.00 9.80 4,200,799.40

*conformacion y compactacion de sub rasante M2 518.00 2,943.00 1,524,474.00 518.00 1,524,474.00 362.60 1,067,131.80

M3 104.00 89,032.00 9,259,328.00 104.00 9,259,328.00 31.20 2,777,798.40

CONTRATISTA: AURELIO GUTIERREZ CASTILLO

INTERVENTOR: CONECTA INGENERIA Y PROYECTOS LTDA.

CONSTRUCCIÓN DE OBRAS DE CONSTRUCCIÓN DE URBANISMO PARA LAS VIVIENDAS A PRECIO GLOBAL FIJO DEL PROYECTO PASEO LA FERIA IV ETAPA -

PROPIEDAD HORIZONTAL DEL MUNICIPIO DE BUCARAMANGA

*Demolicion de capa asfaltica existente incluye retiro de escombros

Demolición De Estructuras o Pisos En Concreto Reforzado

*Construccion de Pozo de Inspeccion D=1.20 , H=2.0 m

Suministro e instalación de valvula de charnela de 10" incluye reparación de pozo

*Suministro Y Aplicacion De Base Granular Compactada Para Parqueadero E=0.3 m

M3 104.00 89,032.00 9,259,328.00 104.00 9,259,328.00 31.20 2,777,798.40

*Imprimación asfaltica M2 518.00 4,397.00 2,277,646.00 518.00 2,277,646.00 0.00 0.00

*Capa De Rodadura Asfaltica MDC-2 E=0.07 m M3 36.00 461,183.00 16,602,588.00 36.00 16,602,588.00 0.00 0.00

M3 26.00 533,100.00 13,860,600.00 26.00 13,860,600.00 0.00 0.00

*Conformación de andenes M2 1,150.00 4,287.00 4,930,050.00 1,150.00 4,930,050.00 0.00 0.00

M2 1,150.00 44,840.00 51,566,000.00 1,150.00 51,566,000.00 0.00 0.00

Rampas Incluye Conformacion M2 6.00 47,113.00 282,678.00 6.00 282,678.00 0.00 0.00

*Canaleta en concreto de 2500 psi ML 260.00 38,108.00 9,908,080.00 260.00 9,908,080.00 0.00 0.00

M2 81.00 54,842.00 4,442,202.00 81.00 4,442,202.00 0.00 0.00

ML 23.00 81,136.00 1,866,128.00 23.00 1,866,128.00 0.00 0.00

M3 1.00 311,121.00 311,121.00 1.00 311,121.00 0.00 0.00

M3 3.00 85,032.00 255,096.00 3.00 255,096.00 0.00 0.00

ML 7.00 188,339.00 1,318,373.00 7.00 1,318,373.00 0.00 0.00

*Excavación manual en terreno conglomerado M3 10.00 22,566.00 225,660.00 10.00 225,660.00 0.00 0.00

*Suministro y siembra de prado San AgustinM2

211.00 4,842.00 1,021,662.00 211.00 1,021,662.00 0.00 0.00M2

*Conformación zonas verdes M2 211.00 3,777.00 796,947.00 211.00 796,947.00 0.00 0.00

*Desyerbe de plantas rastreras M2 211.00 1,295.00 273,245.00 211.00 273,245.00 0.00 0.00

*Seto en Cayeno Nieve H=1 mtr. UND 50.00 11,648.00 582,400.00 50.00 582,400.00 0.00 0.00

Arborización - Especie Caballero de la Noche. UND 8.00 26,716.00 213,728.00 8.00 213,728.00 0.00 0.00

*Arborización - Especie Jazmin UND 6.00 26,716.00 160,296.00 6.00 160,296.00 0.00 0.00

*Arborización - Especie Francesina UND 16.00 21,716.00 347,456.00 16.00 347,456.00 0.00 0.00

*Arborizacion -Especie Penitente UND 17.00 26,716.00 454,172.00 17.00 454,172.00 0.00 0.00

*Retiro de sobrantes Al Botadero Autorizado M3 42.00 24,362.00 1,023,204.00 42.00 1,023,204.00 0.00 0.00

ML 70.00 140,516.83 9,836,178.33 70.00 9,836,178.33 0.00 0.00

ML 70.00 60,161.00 4,211,270.00 70.00 4,211,270.00 0.00 0.00

Cajas registro de 0.6m x 0.6 m. UND 6.00 247,782.14 1,486,692.86 6.00 1,486,692.86 0.00 0.00

ML 50.00 36,670.57 1,833,528.57 50.00 1,833,528.57 0.00 0.00

*Suministro Y Aplicacion De Base Granular Compactada Para Parqueadero E=0.3 m

*Suministro y Aplicación de Concreto Asfaltico tipo rodadura de espesor final 0.05 MTS.

*Anden en concreto de 2500 psi, a la vista acabado escobiado y ratoniado, incluye malla de

refuerzo E=0.08

*Plazoleta en concreto a la vista e=0.08 con acabado rayado 40x40

Sardinel prefabricado 50x80x20 cm. (incluye suministro, instalación, mortero de pega y sello de

arena)*Concreto normal f`c= 140 kg/cm2 solados y

limpieza E= 0.05 mtrs

*Sub-base garnular compactada para espacio publico

*Anden en losa prefabricada de concreto lisa, guia y demarcacion visual B=1.2 x l=2.00 mtrs.

Red electrica de distribucion subterranea circuito 1, 3 x #1/0 + 1 x #2, + 1 x #4 Desnudo Cu, circuitos

1-III y 2-III Instalacion de tubo para redes subtarreneas generales de distribucion incluye canalizacion,

excavacion y retiro de materiales

Instalacion de ductos para acometidas generales por apartamento.

ML 50.00 36,670.57 1,833,528.57 50.00 1,833,528.57 0.00 0.00

Cajas registro de 0.3m x 0.3 m. UND 56.00 19,321.50 1,082,004.00 56.00 1,082,004.00 0.00 0.00

UND 1.00 22,849,480.00 22,849,480.00 1.00 22,849,480.00 0.00 0.00

UND 1.00 6,604,360.00 6,604,360.00 1.00 6,604,360.00 0.00 0.00

ML 80.00 62,161.00 4,972,880.00 80.00 4,972,880.00 0.00 0.00

Cajas registro de 0.6m x 0.6 m. UND 5.00 247,782.14 1,238,910.71 5.00 1,238,910.71 0.00 0.00

ML 80.00 38,670.57 3,093,645.71 80.00 3,093,645.71 40.00 1,546,822.86

Cajas registro de 0.3m x 0.3 m. UND 8.00 19,321.50 154,572.00 8.00 154,572.00 4.80 92,743.20

Costo Directo Ejecutado 291,021,942.18 291,021,942.18 Costo Directo 12,885,470.46

AIU 32% 93,127,021.50 93,127,021.50 AIU 32% 4,123,350.55

IVA. 16% SOBRE UTILIDAD 2,793,810.64 2,328,175.54 Subtotal 17,008,821.00

Valor total del contrato 386,942,774.32 2,793,810.64 IVA 39,584.17

Valor total Acta 17,048,405.17

SON: .

Teodoro Durongo ING JORGE

Presidente Junta Directiva Interventor Residente

Instalacion de ductos para acometidas generales por apartamento.

Subestacion de 150 kVA Paud Mounted 13200 /220-127 Voltios

Certificacion Aumento de potencia de subestacion II

Instalacion de tubo para redes subtarreneas generales de distribucion incluye canalizacion,

excavacion y retiro de materiales

Instalacion de ductos para acometidas generales por apartamento.

CONTRATO DE OBRA

ACTA SEMANAL

ACTA No. SEMANA 5

SEMANA DEL

AL

FECHA:

OBRA EJECUTADA ACUMULADA

CANTIDAD ACOMULADA VALOR

7,670.00 22,626,500.00

1.00 1,500,000.00

50.00 741,950.00

42.00 1,051,890.00

187.00 6,750,700.00

10.00 544,090.00

168.30 6,782,490.00

26.00 1,460,758.00

33.00 267,531.00

1.00 101,023.00

7.00 6,057,548.00

1.20 2,615,871.60

140.00 40,005,000.00

2.00 482,736.00

0.60 951,328.20

40.00 541,560.00

12.60 5,401,027.80

414.40 1,219,579.20

31.20 2,777,798.40

31.20 2,777,798.40

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

80.00 4,972,880.00

5.00 1,238,910.71

48.00 1,856,187.43

4.80 92,743.20

Acumulado 110,040,102.54

AIU 32% 35,212,832.81

Subtotal 145,252,935.36

IVA 338,043.20

145,590,978.55

Saldo Contrato 241,351,795.77

SON: .

VIECCO

Contratista

Valor acumulado facturado