EFIAG CONSTRUCTORA. PLANILLA Nº1 OBRA:EDIFICIO POSEIDON FISCALIZADOR: RUBRO: Acero de refuerzo f'y = 4200 Kg/cm2 UNIDAD: kg Mc f peso TIPO Dimensiones Long. Long. Peso kg/m varillas a b c d g f Corte Desarrollo Kg 1,502 12 0.888 80.00 7.90 1.80 0.50 0.20 10.40 832.00 738.82 1,503 12 0.888 80.00 Z 7.90 0.30 0.20 8.40 672.00 596.74 1,504 10 0.617 82.00 I 18.00 18.00 1,476.00 910.69 INC.Traslape 1,505 12 0.888 9.00 I 18.00 18.00 162.00 143.86 INC.Traslape 1,506 16 1.578 32.00 C 7.90 0.30 0.20 8.40 268.80 424.17 1,507 10 0.617 256.00 O 0.34 0.24 0.34 0.24 0.12 0.12 1.40 358.40 221.13 1,508 14 1.208 8.00 I 18.00 18.00 144.00 173.95 INC.Traslape 1,509 10 0.617 75.00 O 0.34 0.24 0.34 0.24 0.05 0.05 1.26 94.50 58.31 3,267.67 Kg. 1,301 12 0.888 31.00 C 9.25 1.50 0.15 10.90 337.90 300.06 1,302 12 0.888 31.00 C 9.25 0.80 0.15 10.20 316.20 280.79 1,303 10 0.617 48.00 I 6.80 6.80 326.40 201.39 1,304 12 0.888 9.00 I 15.00 15.00 135.00 119.88 INC.Traslape 1,305 12 0.888 40.00 C 7.90 1.50 0.15 9.55 382.00 339.22 1,306 12 0.888 40.00 C 7.90 0.80 0.15 8.85 354.00 314.35 1,307 10 0.617 82.00 I 15.00 15.00 1,230.00 758.91 INC.Traslape 1,308 14 1.208 16.00 C 7.90 0.40 0.15 8.45 135.20 163.32 1,309 12 0.888 8.00 C 7.90 0.40 0.15 8.45 67.60 60.03 1,310 10 0.617 128.00 O 0.34 0.24 0.34 0.24 0.12 0.12 1.40 179.20 110.57 1310 A 10 0.617 128.00 O 0.24 0.14 0.24 0.14 0.12 0.12 1.00 128.00 78.98 1,311 14 1.208 8.00 I 15.00 15.00 120.00 144.96 INC.Traslape 1,312 10 0.617 70.00 O 0.24 0.14 0.24 0.14 0.10 0.10 0.96 67.20 41.46 2,913.92 Kg. 1,201 12 0.888 85.00 C 2.95 1.50 0.15 4.60 391.00 347.21 1,202 12 0.888 85.00 C 2.95 0.80 0.15 3.90 331.50 294.37 1,203 10 0.617 28.00 I 18.00 18.00 504.00 310.97 INC.Traslape 1,204 12 0.888 8.00 I 18.00 18.00 144.00 127.87 INC.Traslape 1,205 12 0.888 6.00 I 18.00 18.00 108.00 95.90 INC.Traslape 1,206 10 0.617 85.00 C 0.24 0.34 0.24 0.24 0.07 0.07 1.20 102.00 62.93 1,239.25 Kg. 601 32 6.313 30.00 L 9.10 0.90 10.00 300.00 1,893.90 VIGA 2,3,4 602 32 6.313 30.00 L 7.10 0.90 8.00 240.00 1,515.12 VIGA 2,3,4 603 32 6.313 30.00 L 6.00 6.00 180.00 1,136.34 VIGA 2,3,4 604 32 6.313 68.00 L 9.40 0.60 10.00 680.00 4,292.84 VIGA 2,3,4 605 32 6.313 68.00 L 7.40 0.60 8.00 544.00 3,434.27 VIGA 2,3,4 606 20 2.466 16.00 I 15.00 15.00 240.00 591.84 INC.Traslape 607 10 0.617 1,654.00 O 1.40 0.90 1.40 0.90 0.12 0.12 4.84 8,005.36 4,939.31 608 10 0.617 590.00 O 2.10 0.60 2.10 0.60 0.12 0.12 5.64 3,327.60 2,053.13 609 10 0.617 928.00 O 2.30 0.60 2.10 0.60 0.12 0.12 5.84 5,419.52 3,343.84 610 32 6.313 10.00 L 11.10 0.90 12.00 120.00 757.56 611 32 6.313 10.00 I 12.00 *8,0ML 12.00 120.00 757.56 612 32 6.313 10.00 I 4.00 4.00 40.00 252.52 613 32 6.313 24.00 L 11.40 0.60 12.00 288.00 1,818.14 614 32 6.313 8.00 I 8.00 *6,0ML 8.00 64.00 404.03 615 32 6.313 16.00 I 4.00 4.00 64.00 404.03 616 25 3.853 10.00 L 11.10 0.90 12.00 120.00 462.36 617 25 3.853 10.00 L 11.40 0.60 *8,0ML 12.00 120.00 462.36 618 25 3.853 20.00 L 11.40 0.60 12.00 240.00 924.72 619 25 3.853 20.00 I 8.00 *6,0ML 8.00 160.00 616.48 620 20 2.466 16.00 I 18.00 18.00 288.00 710.21 INC.Traslape 621 20 2.466 16.00 I 18.00 18.00 288.00 710.21 INC.Traslape 622 20 2.466 14.00 I 18.00 18.00 252.00 621.43 INC.Traslape 32,102.20 Kg. ANCLAJE EN MURO D 25 3.853 175.00 L 4.60 0.40 5.00 875.00 3,371.38 Pared Derecha I 25 3.853 92.00 L 3.60 0.40 4.00 368.00 1,417.90 Pared Izquierda P 25 3.853 57.00 L 4.60 0.40 5.00 285.00 1,098.11 Pared Posterior 5,887.39 Kg. 860.34 CISTERNA kg 46,270.77 ANEXOS CONSTRUCTORA EFIAG CONTRATISTA: EFIAG. CONSTRUCTORA CIMENTACION −6.15 MURO#8 HASTA 16ML "C" Sub Total= MURO#6 HASTA 14ML Sub Total= MURO#5 HASTA 17ML Sub Total= VIGAS DE LA PLATAFORMA −6,15(2,3,4)TERMINADAY(L,M)HASTA 17ML VIGA (L) 17ML. VIGA (L) 17ML. VIGA (L) 17ML. VIGA (L) 17ML. VIGA (L) 17ML. VIGA (L) 17ML. VIGA (M) 17ML. VIGA (M) 17ML. VIGA (M) 17ML. VIGA (M) 17ML. Sub Total= Sub Total= Tipo C Tipo I Tipo L Tipo O Tipo o´

Upload: miguel-palma

Post on 23-Oct-2015

21 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Acero en Rampa y Columnetas

EFIAG CONSTRUCTORA.PLANILLA Nº1

OBRA:EDIFICIO POSEIDON

FISCALIZADOR:RUBRO: Acero de refuerzo f'y = 4200 Kg/cm2UNIDAD: kg

Mc fpeso n°

TIPODimensiones Long. Long. Peso

kg/m varillas a b c d g f Corte Desarrollo Kg

1,502 12 0.888 80.00 7.90 1.80 0.50 0.20 10.40 832.00 738.82

1,503 12 0.888 80.00 Z 7.90 0.30 0.20 8.40 672.00 596.74

1,504 10 0.617 82.00 I 18.00 18.00 1,476.00 910.69 INC.Traslape1,505 12 0.888 9.00 I 18.00 18.00 162.00 143.86 INC.Traslape1,506 16 1.578 32.00 C 7.90 0.30 0.20 8.40 268.80 424.17

1,507 10 0.617 256.00 O 0.34 0.24 0.34 0.24 0.12 0.12 1.40 358.40 221.13

1,508 14 1.208 8.00 I 18.00 18.00 144.00 173.95 INC.Traslape1,509 10 0.617 75.00 O 0.34 0.24 0.34 0.24 0.05 0.05 1.26 94.50 58.31

3,267.67 Kg.

1,301 12 0.888 31.00 C 9.25 1.50 0.15 10.90 337.90 300.06

1,302 12 0.888 31.00 C 9.25 0.80 0.15 10.20 316.20 280.79

1,303 10 0.617 48.00 I 6.80 6.80 326.40 201.39

1,304 12 0.888 9.00 I 15.00 15.00 135.00 119.88 INC.Traslape1,305 12 0.888 40.00 C 7.90 1.50 0.15 9.55 382.00 339.22

1,306 12 0.888 40.00 C 7.90 0.80 0.15 8.85 354.00 314.35

1,307 10 0.617 82.00 I 15.00 15.00 1,230.00 758.91 INC.Traslape1,308 14 1.208 16.00 C 7.90 0.40 0.15 8.45 135.20 163.32

1,309 12 0.888 8.00 C 7.90 0.40 0.15 8.45 67.60 60.03

1,310 10 0.617 128.00 O 0.34 0.24 0.34 0.24 0.12 0.12 1.40 179.20 110.57

1310 A 10 0.617 128.00 O 0.24 0.14 0.24 0.14 0.12 0.12 1.00 128.00 78.98

1,311 14 1.208 8.00 I 15.00 15.00 120.00 144.96 INC.Traslape1,312 10 0.617 70.00 O 0.24 0.14 0.24 0.14 0.10 0.10 0.96 67.20 41.46

2,913.92 Kg.

1,201 12 0.888 85.00 C 2.95 1.50 0.15 4.60 391.00 347.21

1,202 12 0.888 85.00 C 2.95 0.80 0.15 3.90 331.50 294.37

1,203 10 0.617 28.00 I 18.00 18.00 504.00 310.97 INC.Traslape1,204 12 0.888 8.00 I 18.00 18.00 144.00 127.87 INC.Traslape1,205 12 0.888 6.00 I 18.00 18.00 108.00 95.90 INC.Traslape1,206 10 0.617 85.00 C 0.24 0.34 0.24 0.24 0.07 0.07 1.20 102.00 62.93

1,239.25 Kg.

601 32 6.313 30.00 L 9.10 0.90 10.00 300.00 1,893.90 VIGA 2,3,4602 32 6.313 30.00 L 7.10 0.90 8.00 240.00 1,515.12 VIGA 2,3,4603 32 6.313 30.00 L 6.00 6.00 180.00 1,136.34 VIGA 2,3,4604 32 6.313 68.00 L 9.40 0.60 10.00 680.00 4,292.84 VIGA 2,3,4605 32 6.313 68.00 L 7.40 0.60 8.00 544.00 3,434.27 VIGA 2,3,4606 20 2.466 16.00 I 15.00 15.00 240.00 591.84 INC.Traslape607 10 0.617 1,654.00 O 1.40 0.90 1.40 0.90 0.12 0.12 4.84 8,005.36 4,939.31

608 10 0.617 590.00 O 2.10 0.60 2.10 0.60 0.12 0.12 5.64 3,327.60 2,053.13

609 10 0.617 928.00 O 2.30 0.60 2.10 0.60 0.12 0.12 5.84 5,419.52 3,343.84

610 32 6.313 10.00 L 11.10 0.90 12.00 120.00 757.56

611 32 6.313 10.00 I 12.00 *8,0ML 12.00 120.00 757.56

612 32 6.313 10.00 I 4.00 4.00 40.00 252.52

613 32 6.313 24.00 L 11.40 0.60 12.00 288.00 1,818.14

614 32 6.313 8.00 I 8.00 *6,0ML 8.00 64.00 404.03

615 32 6.313 16.00 I 4.00 4.00 64.00 404.03

616 25 3.853 10.00 L 11.10 0.90 12.00 120.00 462.36

617 25 3.853 10.00 L 11.40 0.60 *8,0ML 12.00 120.00 462.36

618 25 3.853 20.00 L 11.40 0.60 12.00 240.00 924.72

619 25 3.853 20.00 I 8.00 *6,0ML 8.00 160.00 616.48

620 20 2.466 16.00 I 18.00 18.00 288.00 710.21 INC.Traslape621 20 2.466 16.00 I 18.00 18.00 288.00 710.21 INC.Traslape622 20 2.466 14.00 I 18.00 18.00 252.00 621.43 INC.Traslape

32,102.20 Kg.

ANCLAJE EN MURO D 25 3.853 175.00 L 4.60 0.40 5.00 875.00 3,371.38 Pared DerechaI 25 3.853 92.00 L 3.60 0.40 4.00 368.00 1,417.90 Pared IzquierdaP 25 3.853 57.00 L 4.60 0.40 5.00 285.00 1,098.11 Pared Posterior

5,887.39 Kg.860.34 CISTERNA

kg 46,270.77

ANEXOS CONSTRUCTORA EFIAG

CONTRATISTA: EFIAG. CONSTRUCTORA

CIMENTACION −6.15MURO#8 HASTA 16ML

"C"

Sub Total=

MURO#6 HASTA 14ML

Sub Total=

MURO#5 HASTA 17ML

Sub Total=

VIGAS DE LA PLATAFORMA −6,15(2,3,4)TERMINADAY(L,M)HASTA 17ML

VIGA (L) 17ML.VIGA (L) 17ML.VIGA (L) 17ML.VIGA (L) 17ML.VIGA (L) 17ML.VIGA (L) 17ML.VIGA (M) 17ML.VIGA (M) 17ML.VIGA (M) 17ML.VIGA (M) 17ML.

Sub Total=

Sub Total=

Tipo C Tipo I Tipo LTipo O

Tipo o´

Page 2: Acero en Rampa y Columnetas

CONTRATISTA

ANEXOS

FISCALIZADOR

Page 3: Acero en Rampa y Columnetas

EFIAG CONSTRUCTORA.PLANILLA Nº2

OBRA:EDIFICIO POSEIDON

FISCALIZADOR:RUBRO: Acero de refuerzo f'y = 4200 Kg/cm2UNIDAD: kg

Mc fpeso n°

TIPODimensiones Long. Long. Peso

kg/m varillas a b c d g f Corte Desarrollo Kg

CISTERNAVIGAS

a 12 0.888 16.00 C 8.30 0.10 0.10 8.50 136.00 120.77

b 12 0.888 6.00 C 8.90 0.10 0.10 9.10 54.60 48.48

d 12 0.888 12.00 C 8.30 0.10 0.10 8.50 102.00 90.58

x 10 0.617 200.00 O 0.14 0.14 0.14 0.14 0.07 0.07 0.70 140.00 86.38 Estribo (14x14)y 10 0.617 54.00 O 0.14 0.24 0.14 0.24 0.07 0.07 0.90 48.60 29.99 Estribo (14x24)z 10 0.617 112.00 O 0.14 0.34 0.14 0.34 0.07 0.07 1.10 123.20 76.01 Estribo (14x34)

452.21 Kg.ARMADO DE LA LOSA

10 12 0.888 14.00 C 8.90 0.10 0.10 9.10 127.40 113.13

11 12 0.888 15.00 C 8.30 0.10 0.10 8.50 127.50 113.22

12 12 0.888 14.00 C 1.00 0.10 0.10 1.20 16.80 14.92 Refuerzo (1/4L)13 12 0.888 14.00 C 2.00 0.10 0.10 2.20 30.80 27.35 Refuerzo (1/4L)14 12 0.888 14.00 C 2.00 0.10 0.10 2.20 30.80 27.35 Refuerzo (1/4L)15 12 0.888 14.00 C 1.00 0.10 0.10 1.20 16.80 14.92 Refuerzo (1/4L)16 12 0.888 15.00 C 2.20 0.10 0.10 2.40 36.00 31.97 Refuerzo (1/4L)17 12 0.888 15.00 C 2.30 0.10 0.10 2.50 37.50 33.30 Refuerzo (1/4L)18 12 0.888 15.00 C 2.20 0.10 0.10 2.40 36.00 31.97 Refuerzo (1/4L)

408.13 Kg.

kg 860.34

ANEXOS CONSTRUCTORA EFIAG

CONTRATISTA FISCALIZADOR

CONTRATISTA: EFIAG. CONSTRUCTORA

Sub Total=

Sub Total=

Tipo C Tipo I Tipo LTipo O

Tipo o´

Page 4: Acero en Rampa y Columnetas

EFIAG CONSTRUCTORA.PLANILLA Nº 8

OBRA:EDIFICIO POSEIDON

FISCALIZADOR: Arq. Mario PazmiñoRUBRO: Acero de refuerzo f'y = 4200 Kg/cm2UNIDAD:kg

Mc fpeso n°

TIPODimensiones Long. Long.

kg/m varillas a b c d g f Corte Desarrollo

ACERO EN RAMPA DESDE NIVEL +0,36 HASTA NIVEL +1,504000 A 12 0.888 57.00 L 0.50 0.70 1.20 68.40

4000 B 12 0.888 23.00 L 0.34 0.30 0.64 14.72

4,000 12 0.888 15.00 L 0.55 1.25 1.80 27.00

4,001 10 0.617 30.00 O 0.14 0.13 0.14 0.13 0.05 0.05 0.64 19.20

4001 A 10 0.617 12.00 O 0.10 0.15 0.10 0.15 0.05 0.05 0.60 7.20

4,002 12 0.888 1.00 I 28.24 28.24

4,003 10 0.617 65.00 C 0.06 0.06 0.09 0.21 13.65

4,004 12 0.888 9.00 L 0.90 0.50 1.40 12.60

4,005 12 0.888 7.00 L 0.60 0.40 1.00 7.00

ACERO EN COLUMNETAS DE CERRAMIENTO EN NIVEL + 1,505,000 10 0.617 84.00 I 1.10 1.10 92.405,001 5 0.154 105.00 O 0.15 0.10 0.15 0.10 0.04 0.04 0.54 56.70

ACERO EN VIGAS CON LUCES MAYORES A 6Mts. NIVEL + 7,506,000 10 0.617 302.00 I 1.20 1.20 362.40

ACERO EN VIGAS CON LUCES MAYORES A 6Mts. NIVEL + 10,506,001 10 0.617 302.00 I 1.20 1.20 362.40

VALOR DE ESTA PLANILLA

EFIAG CONSTRUCTORA Arq. MARIO PAZMIÑO

CONTRATISTA FISCALIZACION

CONTRATISTA: EFIAG. CONSTRUCTORA

Sub Total

Sub Total

Page 5: Acero en Rampa y Columnetas

EFIAG CONSTRUCTORA.PLANILLA Nº 8

OBRA:EDIFICIO POSEIDON

Long. Peso UBICACIÓN DEL ACERO

Desarrollo Kg

ACERO EN RAMPA DESDE NIVEL +0,36 HASTA NIVEL +1,5068.40 60.74 MURO14.72 13.07 MURO27.00 23.98 VIGAS 5.92

19.20 11.85 ESTRIBOS EN VIGAS7.20 4.44 ESTRIBOS EN COLUMNAS

28.24 25.08 RIOSTRAS13.65 8.42 VINCHAS EN RIOSTRAS12.60 11.19 CHICOTES PARA ANCLAR MALLA7.00 6.22 CHICOTES PARA ANCLAR MALLA

164.99 Kg. A PlanillarACERO EN COLUMNETAS DE CERRAMIENTO EN NIVEL + 1,50 Ubicación del Acero

92.40 57.01 ACERO VERTICAL EN COLUMNAS 56.70 8.73 ESTRIBOS EN COLUMNAS

65.74 Kg. A PlanillarACERO EN VIGAS CON LUCES MAYORES A 6Mts. NIVEL + 7,50 Ubicación del Acero

362.40 223.60 REFUERZO EN LOSA223.60 Kg. A Planillar

ACERO EN VIGAS CON LUCES MAYORES A 6Mts. NIVEL + 10,50 Ubicación del Acero362.40 223.60 REFUERZO EN LOSA

223.60 Kg. A Planillar

VALOR DE ESTA PLANILLA 677.93 Kg.

Arq. MARIO PAZMIÑO

FISCALIZACION

Sub Total=

Sub Total=