PRESUPUESTO CONTRATADO S/. 1,839,508.90 Incluye IGV JULIO-2012 CONTRATISTA : CONSORCIO GORETTI VALORIZACION : No. 02 - JULIO DEL 2012 (1.0) VALORIZACION BRUTA: (VB) = (V) + (R) - (D) = ### ### S/. 0.00 S/. 0.00 (2.0) AMORTIZACION DE ADELANTOS: (A) = S/. 64,650.35 S/. 64,650.35 S/. 0.00 (3.0) VALORIZACION NETA: (VN) = (VB) - (A) ### (4.0) IMPUESTO IGV (18%) = 18% * (VN) S/. 46,548.25 (5.0) MONTO A PAGAR AL CONTRATISTA S/. 305,149.66 "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA INSTITUCION EDUCATIVA MARIA GORETTI - AA.HH. MARIA GORETTI - CASTILLA- PIURA" (1.1) VALORIZACIÓN DEL PERIODO: (V) (1.2) REAJUSTES: (R) (1.3) DEDUCCIÓN DE REAJUSTES: (D) (2.1) POR ADELANTO DIRECTO (2.2) POR ADELANTO PARA MATERIALES

Upload: antonio-aparicio

Post on 09-Nov-2015

216 views

Category:

Documents


0 download

DESCRIPTION

VALORIZACIÓN A PRESENTAR A ENTIDAD

TRANSCRIPT

GORETTI_VALORIZACION 01 JUNIO 2012

ACERO AULA PRIMARIASUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA - PIURA"AULA PRIMARIA (ADOSADA)05.00.00 OBRAS DE CONCRETO ARMADO05.01.03 ACERO PARA ZAPATASELEMENTON ELEM.CANTIDADLONGITUD1/4"3/8"1/2"Z11221.5033.00Z2251.3013.002100.6012.00Z3241.108.80280.508.00Z41201.3026.00TOTAL LONGITUD0.000.00100.80PESO POR M0.250.561.27TOTAL KG POR DIMETRO0.000.00128.02TOTAL METRADO128.0205.03.03 ACERO PARA VIGAS DE CIMENTACINELEMENTON ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"VC149.0036.00129.0018.001461.8082.80TOTAL LONGITUD0.00100.800.0036.00PESO POR M0.250.561.271.56TOTAL KG POR DIMETRO0.0056.450.0056.16TOTAL METRADO112.6105.04.03 ACERO PARA SOBRECIMIENTOSELEMENTON ELEM.CANTIDADLONGITUD1/4"3/8"1/2"CORTE 1-11312.0636.181301.2036.001121.1013.20CORTE 2-2138.6025.801291.2034.80CORTE 3-3139.0027.001301.2036.00TOTAL LONGITUD0.00208.980.00PESO POR M0.250.561.27TOTAL KG POR DIMETRO0.00117.030.00TOTAL METRADO117.0305.05.03 ACERO PARA COLUMNASELEMENTON ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"C12124.75114.002401.70136.002401.60128.00C2284.7576.002761.30197.60C3164.7528.501381.3049.40C4244.7538.002361.0072.00TOTAL LONGITUD0.00583.000.00256.50PESO POR M0.250.561.001.56TOTAL KG POR DIMETRO0.00326.480.00400.14726.6205.06.03 ACERO PARA COLUMNAS DE CONFINAMIENTOELEMENTON ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"C5441.8028.80440.7011.20C4442.8044.80440.7011.20TOTAL LONGITUD22.4073.600.000.00PESO POR M0.250.561.001.56TOTAL KG POR DIMETRO5.6041.220.000.0046.8205.07.03 ACERO PARA VIGASEJEN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"3/4"VIGA V-101129.0018.00136.3018.90124.509.001212.6025.20122.204.40113.003.001451.8081.001181.4025.20VIGA V-A1412.4049.601681.3088.40VIGA V-B148.3033.201411.3053.30148.6034.401421.3054.60VIGA V-C148.1532.601430.8034.40TOTAL LONGITUD34.40194.60121.60210.204.40PESO POR M0.250.561.001.562.25TOTAL KG POR DIMETRO8.60108.98121.60327.919.90567.0905.08.03 ACERO PARA VIGAS DE CONFINAMIENTOEJEN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"FACHADA PRINC.123.306.601190.305.70122.605.201140.304.20FACHADA POST.123.707.401180.305.40123.807.601200.306.00TOTAL LONGITUD21.3026.800.000.00PESO POR M0.250.561.001.56TOTAL KG POR DIMETRO5.3315.010.000.0020.3405.09.03 ACERO PARA LOSA ALIGERADAELEMENTON ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"AULAS INIC.1208.20164.001201.0521.001202.3046.00178.0056.00171.057.35172.3016.10TEMPERATURA330.00TOTAL LONGITUD330.00248.3562.100.00PESO POR M0.250.561.001.56TOTAL KG POR DIMETRO82.50139.0862.100.00283.68

AULAINICSUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA - PIURA"AULAS INICIAL + SS.HH02.00.00 TRABAJOS PRELIMINARES02.27.00 TRAZO, NIVELACIN Y REPLANTEOAMBIENTEABCANTIDADAREA (M2)AULAS + SS.HH20.927.652320.08320.0803.00.00 MOVIMIENTO DE TIERRAS03.01.00 EXCAVACIN DE ZANJAS PARA CIMIENTOS Y ZAPATASTIPOCANTIDADAHB/LVOLUMEN (M3)ZAPATA42.401.502.4023.0441.400.501.407.84EJES A,C,F y H41.600.507.9150.6240.601.407.9118.98EJES 19 y 1741.600.504.4028.1640.601.404.4010.56VC11.300.754.856.3110.301.004.851.46SECCIN B'-B'31.600.502.1710.4230.601.402.173.91SECCIN E-E10.400.604.201.68162.9803.03.00 RELLENO Y COMPACTAC. C/ HORMIGN PARA FONDO DE ZAPATAS Y CIMIENTOSAMBIENTECANTIDADAB/LHAREA (M2)ZAPATA21.401.400.401.57EJES J y P20.607.910.403.80EJES 8 y 1120.606.400.403.07VC20.306.650.401.60SECCIN B'-B'30.603.170.402.28SECCIN E-E10.400.204.200.3412.6603.04.00 RELLENO DE ZANJAS CON MATERIAL PROPIOTIPOCANTIDADA/AREAB/LHVOLUMEN (M3)PARA ZAPATASZAPATA43.800.507.6045.5351.0022.14PARA CIMIENTOSEJES A,C,F y H41.450.507.9145.88EJES 19 y 1741.450.504.4025.52VC11.000.754.853.6411.301.004.856.31SECCIN B'-B'31.450.502.174.72111.0903.05.00 RELLENO CON MATERIAL PROPIO HASTA NIVEL DE SUBRASANTETIPOCANTIDADA/AREAB/LHVOLUMEN (M3)AULA + SS.HH1144.910.13519.5619.5603.07.00 RELLENO Y COMPACTACIN CON AFIRMADO PARA FALSOS PISOS, e= 0.15 mAMBIENTEABCANTIDADAREA (M2)AULAS8.257.152117.98SS.HH3.827.05126.93144.9103.09.00 ACARREO DE MATERIAL EXCEDENTE03.10.00 ELIMINACIN DE MATERIAL EXCEDENTEPARTIDAVOLUMEN (M3)FACT. ESPONJ.VOLUMEN (M3)METRADO DE EXCAVACIN162.98METRADO DE RELLENO256.00-93.021.20-111.6204.00.00 OBRAS DE CONCRETO SIMPLE04.01.00 SOLADO PARA ZAPATAS Y VIGAS DE CIMENTACIN, E= 0.10MTIPOCANTIDADLBREA (M2)ZAPATA41.401.407.84VC20.306.653.9911.8304.02.01 CIMIENTOS CORRIDOS 1:10 + 30% P.G.TIPOCANTIDADA/AREAB/LHVOLUMEN (M3)EJES A y H20.601.007.859.42EJES C y F20.801.007.8512.56EJES 19 y 1740.601.004.6311.11SECCION B'-B'30.603.171.005.71SECCIN E-E10.404.200.400.6739.4704.04.00 FALSO PISOAMBIENTEABCANTIDADAREA (M2)ID. NIVELAC. INT. Y APISONADO144.91144.9105.00.00 OBRAS DE CONCRETO ARMADO05.01.01 ZAPATAS- CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABHVOLUMEN (M3)ZAPATAS41.401.400.503.923.9205.01.02 ZAPATAS- ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROHREA (M2)ZAPATAS45.600.5011.2011.2005.03.01 VIGAS DE CIMENTACIN - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADALHVOLUMEN (M3)VC40.300.606.654.794.7905.03.02 VIGAS DE CIMENTACIN - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROLREA (M2)VC20.606.657.987.9805.04.01 SOBRECIMIENTOS- CONCRETO F'C= 175 KG/CM2TIPOCANTIDADAHLVOLUMEN (M3)EJES A,C,F y H40.151.006.904.14EJES 17 y 1940.151.007.124.27SECCIN B'-B'30.151.003.921.7610.1705.04.02 SOBRECIMIENTOS-ENCOFRADO Y DESENCOFRADOTIPOCANTIDADN VECESHLREA (M2)EJES A,C,F y H421.006.9055.20EJES 17 y 19421.007.1256.96SECCIN B'-B'321.003.9223.52135.6805.05.01 COLUMNAS - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABHVOLUMEN (M3)C140.250.403.501.40C240.600.253.301.9840.300.253.300.99C340.150.253.700.56C440.330.403.501.856.7805.05.02 COLUMNAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERIMETROHAREA (M2)C141.153.5016.10C242.203.3029.04C340.503.707.40C441.313.5018.3470.8805.06.01 COLUMNAS DE CONFINAMIENTO - CONCRETO F'C= 175 KG/CM2TIPOCANTIDADABHVOLUMEN (M3)C480.150.251.900.57C480.150.251.000.30C440.150.252.800.421.2905.06.02 COLUMNAS DE CONFINAMIENTO - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERIMETROHAREA (M2)C480.501.907.6010.151.900.29C480.501.004.00C440.652.807.2819.1705.07.01 VIGAS - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABLVOLUMEN (M3)VIGA V-10120.250.607.652.30VIGA V-A40.250.407.853.14VIGA V-B40.250.207.651.53VIGA V-A (SS.HH)20.250.403.820.76VIGA V-B (SS.HH)10.250.203.820.19VIGA V-CH20.150.203.820.238.1505.07.02 VIGAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROLREA (M2)VIGA V-10111.107.157.87VIGA V-A20.857.8513.35VIGA V-B20.207.653.06VIGA V-A (SS.HH)20.853.826.49VIGA V-B (SS.HH)10.253.820.96VIGA V-CH20.153.801.1432.8705.08.01 VIGAS DE CONFINAMIENTO - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABLVOLUMEN (M3)FACHADA PRINC.20.150.102.460.0720.150.103.550.11FACHADA POST.40.150.103.550.210.3905.08.02 VIGAS DE CONFINAMIENTO - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROLREA (M2)FACHADA PRINC.20.202.460.9820.203.551.42FACHADA POST.40.203.552.845.2405.09.01 LOSA ALIGERADA - CONCRETO F'C= 210 KG/CM2AMBIENTEABFACTORCANTIDADVOLUMEN (M3)AULAS8.057.150.0875210.07SS.HH3.946.600.087512.2812.3505.09.02 LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADOAMBIENTEABCANTIDADVOLUMEN (M3)AULAS8.057.152115.12SS.HH3.946.60126.00141.1205.09.03 LOSA ALIGERADA - LADRILLO HUECOAMBIENTEABFACTORCANTIDADVOLUMEN (M3)AULAS8.057.158.331479.45SS.HH3.946.608.331216.61696.06

ACEROAULAINICSUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA - PIURA"AULA INICIAL + SS.HH - ACERO05.00.00 OBRAS DE CONCRETO ARMADO05.01.03 ACERO PARA ZAPATASELEMENTON ELEM.CANTIDADLONGITUD1/4"3/8"1/2"ZAPATAS2201.3052.00TOTAL LONGITUD0.000.0052.00PESO POR M0.250.561.00TOTAL KG POR DIMETRO0.000.0052.00TOTAL METRADO52.0005.03.03 ACERO PARA VIGAS DE CIMENTACINELEMENTON ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"VC248.1565.202401.80144.00228.1532.60TOTAL LONGITUD0.00176.600.0065.20PESO POR M0.250.561.271.56TOTAL KG POR DIMETRO0.0098.900.00101.71TOTAL METRADO200.6105.04.03 ACERO PARA SOBRECIMIENTOSELEMENTON ELEM.CANTIDADLONGITUD1/4"3/8"1/2"EJES 17 y 19449.00144.004301.40168.00EJES A,C,F y H448.15130.404281.40156.80SECCIN B'-B'344.7056.403161.4067.20TOTAL LONGITUD0.00722.800.00PESO POR M0.250.561.27TOTAL KG POR DIMETRO0.00404.770.00TOTAL METRADO404.7705.05.03 ACERO PARA COLUMNASELEMENTON ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"C1465.40129.604401.30208.00C24105.40108.004421.70285.604421.80302.40C3845.4043.208360.70201.60C4465.40129.604401.45232.00TOTAL LONGITUD0.001229.6043.20367.20PESO POR M0.250.561.001.56TOTAL KG POR DIMETRO0.00688.5843.20572.831304.6105.06.03 ACERO PARA COLUMNAS DE CONFINAMIENTOELEMENTON ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"C4842.7086.408150.7084.00C4841.8057.608120.7067.20C4443.3052.808150.7084.00TOTAL LONGITUD235.20196.800.000.00PESO POR M0.250.561.001.56TOTAL KG POR DIMETRO58.80110.210.000.00169.0105.07.03 ACERO PARA VIGASEJEN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"3/4"VIGA V-101248.1565.20225.4521.80222.309.20222.309.202421.80151.20VA448.85141.604501.30260.00260VB447.60121.604400.80128.00VA (SS.HH)244.5036.002251.3065.00VB (SS.HH)144.5018.001220.8017.60V-CH224.5018.00224.5018.002220.6026.40TOTAL LONGITUD172.00494.20193.60507.00PESO POR M0.250.561.001.56TOTAL KG POR DIMETRO43.00276.75193.60790.92TOTAL METRADO1304.2705.08.03 ACERO PARA VIGAS DE CONFINAMIENTOEJEN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"VC222.6010.402130.256.50VC623.6543.806190.2528.50TOTAL LONGITUD35.0054.200.000.00PESO POR M0.250.561.001.56TOTAL KG POR DIMETRO8.7530.350.000.0039.1005.09.03 ACERO PARA LOSA ALIGERADAELEMENTON ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"AULAS + SS.HH2188.45304.202361.0575.604182.30165.601174.3073.10TEMPERATURA565.00TOTAL LONGITUD565.00618.500.000.00PESO POR M0.250.561.001.56TOTAL KG POR DIMETRO141.25346.360.000.00487.61

PATIOINICIALSUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA - PIURA"PATIO INICIAL02.27.00 TRAZO, NIVELACIN Y REPLANTEOELEMENTOREA (M2)PLATAFORMADEL PLANO144.41144.4103.00.00 MOVIMIENTO DE TIERRAS03.01.00 EXCAVACIN DE ZANJAS PARA SARDINELESTIPOCANTIDADabLVOLUMEN (M3)EN LADO CURVO10.150.1514.650.330.3303.02.00 CORTE A NIVEL DE SUBRASANTE MANUALTIPOCANTIDADAREAHVOLUMEN (M3)PLATAFORMA1156.050.1015.6115.6103.08.00 BASE DE AFIRMADO PARA LOSA DE CONCRETOTIPOREA (M2)PLATAFORMADEL PLANO156.05156.0503.09.00 ACARREO DE MATERIAL EXCEDENTE03.10.00 ELIMINACIN DE MATERIAL EXCEDENTEPARTIDAVOLUMEN (M3)FACT. ESPONJ.VOLUMEN (M3)METRADO DE EXCAVACIN15.94METRADO DE RELLENO0.0015.941.2019.13

ACEROCERCOSUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA - PIURA"CERCO INICIAL - ACERO05.00.00 OBRAS DE CONCRETO ARMADO05.04.03 ACERO PARA SOBRECIMIENTOSELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"TRAMO 21420.5082.001960.8076.80TOTAL LONGITUD76.8082.000.00PESO POR M0.250.561.27TOTAL KG POR DIMETRO19.2045.920.00TOTAL METRADO65.1205.05.03 ACERO PARA COLUMNASELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"TRAMO 1442.3036.804100.7028.00TRAMO 2844.20134.408220.70123.20TRAMO 3742.3064.407100.7049.00164.5027.001221.3028.60TOTAL LONGITUD228.80235.600.00PESO POR M0.250.561.00TOTAL KG POR DIMETRO57.20131.940.00TOTAL METRADO189.1405.07.03 ACERO PARA VIGASEJEMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"TRAMO 1147.1028.401360.6021.60TRAMO 21420.5082.001960.6057.60TRAMO 3149.7038.801510.6030.60141.004.00160.603.60TOTAL LONGITUD113.40153.200.00PESO POR M0.250.561.27TOTAL KG POR DIMETRO28.3585.790.00TOTAL METRADO114.14

CERCOSUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA - PIURA"CERCO INICIAL02.27.00 TRAZO, NIVELACIN Y REPLANTEOELEMENTOLACANTIDADAREA (M2)TRAMO 16.760.5016.76TRAMO 220.770.60120.77TRAMO 37.630.5017.6335.1603.00.00 MOVIMIENTO DE TIERRAS03.01.00 EXCAVACIN DE ZANJA PARA CIMIENTOSTRAMOBHLCANTIDADVOLUMEN (M3)TRAMO 10.501.206.7614.06TRAMO 20.601.4020.77117.45TRAMO 30.501.207.6314.5826.0903.03.00 RELLENO CON MATERIAL DE PRSTAMO HORMIGN E= 0.40 mELEMENTOBHLCANTIDADVOLUMEN (M3)TRAMO 10.500.406.7611.35TRAMO 20.600.4020.7714.98TRAMO 30.500.407.6311.537.8603.04.00 RELLENO COMPACTADO DE ZANJAS CON MATERIAL PROPIOELEMENTOBHLCANTIDADVOLUMEN (M3)TRAMO 10.350.206.7610.47TRAMO 20.450.2020.7711.87TRAMO 30.350.207.6310.532.8703.09.00 ACARREO DE MATERIAL DE EXCAVACIONES03.10.00 ELIMINACIN DE MATERIAL EXCEDENTE Dp= 5 kmELEMENTOMETRADODIFERENCIAFACT, ESPONJ.VOLUMEN (M3)EXCXAVACIN26.09RELLENO2.8723.221.2027.8627.8604.00.00 OBRAS DE CONCRETO SIMPLE04.01.00 SOLADO MEZCLA 1:12 PARA COLUMNASELEMENTOABCANTIDADAREA (M2)TRAMO 10.500.6020.600.501.0010.50TRAMO 20.500.6061.800.501.0010.50TRAMO 30.500.6030.900.501.0010.504.8004.02.01 CIMIENTO CORRIDO CONCRETO 1:10 + 30 % P.G.ELEMENTOBHLCANTIDADVOLUMEN (M3)TRAMO 10.500.606.7612.03TRAMO 20.600.8020.7719.97TRAMO 30.500.607.6312.2914.2904.03.01 SOBRECIMIENTO - CONCRETO 1:8 + 25% P.M.ELEMENTOBHLCANTIDADVOLUMEN (M3)TRAMO 10.150.406.9510.42TRAMO 30.150.406.9510.420.8404.03.02 SOBRECIMIENTO REFORZADO ENCOFRADO Y DESENCOFRADOELEMENTOHLCANTIDADAREA (M2)TRAMO 10.406.9525.56TRAMO 30.406.9525.5611.1205.00.00 OBRAS DE CONCRETO ARMADO05.04.01 SOBRECIMIENTO REFORZADO CONCRETO F'c= 175 kg/cm2ELEMENTOBHLCANTIDADVOLUMEN (M3)TRAMO 20.150.4020.7711.251.2505.04.02 SOBRECIMIENTO REFORZADO ENCOFRADO Y DESENCOFRADOELEMENTOHLCANTIDADAREA (M2)TRAMO 20.4020.77216.6216.6205.05.02 COLUMNAS CONCRETO F'c= 175 kg/cm2 - CERCOELEMENTOBTHCANTIDADVOLUMEN (M3)TRAMO 10.150.250.7040.11TRAMO 20.150.252.5080.75TRAMO 30.150.300.7040.130.150.552.7010.221.2105.05.03 COLUMNAS ENCOFRADO Y DESENCOFRADOELEMENTOPERIMETROHCANTIDADAREA (M2)TRAMO 10.500.7041.40TRAMO 20.652.5023.250.502.5067.50TRAMO 30.500.7041.401.252.7013.3816.9305.07.02 VIGAS CONCRETO F'c= 175 kg/cm2ELEMENTOABLCANTIDADVOLUMEN (M3)TRAMO 10.150.206.9510.21TRAMO 20.150.2020.7710.62TRAMO 30.150.206.9510.211.0405.07.03 VIGAS ENCOFRADO Y DESENCOFRADOELEMENTOHLCANTIDADAREA (M2)TRAMO 10.206.9522.78TRAMO 20.2020.7728.31TRAMO 30.206.9522.7813.87

PATIOSUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA - PIURA"TECHADO PATIO DE FORMACIN02.27.00 TRAZO, NIVELACIN Y REPLANTEOTIPOCANTIDADABREA (M2)PLATAFORMA116.0033.00528.00528.00ESTRUCTURAS03.00.00 MOVIMIENTO DE TIERRAS03.01.00 EXCAVACIN DE ZANJAS PARA ZAPATASTIPOCANTIDADABHVOLUMEN (M3)Z1140.601.202.0020.1620.1603.03.00 RELLENO CON HORMIGN PARA CIMIENTOSTIPOCANTIDADABHVOLUMEN (M3)Z1140.601.200.404.034.0303.04.00 RELLENO CON MATERIAL PROPIOTIPOCANTIDADABHVOLUMEN (M3)Z1140.601.200.909.079.0703.05.00 RELLENO CON MATERIAL PROPIO HASTA NIVELES DE SUBRASANTETIPOCANTIDADAREAHVOLUMEN (M3)PATIO1703.290.1070.3370.3303.08.00 RELLENO CON AFIRMADO PARA LOSA. E= 0.20 mTIPOCANTIDADABAREA (M2)LOSA119.7035.70703.29703.2903.09.00 ACARREO DE MATERIAL EXCEDENTE03.10.00 ELIMINACIN DE MATERIAL EXCEDENTEPARTIDAVOLUMEN (M3)FACT. ESPONJ.VOLUMEN (M3)METRADO DE EXCAVACIN22.67METRADO DE RELLENO C/MAT. PROPIO79.40-56.731.20-68.08-68.0803.11.00 EXCAVACIN DE ZANJAS PARA SARDINELESTIPOCANTIDADABLVOLUMEN (M3)20.150.1520.000.9020.150.1535.701.612.5104.00.00 OBRAS DE CONCRETO SIMPLE04.01.00 SOLADO DE CONCRETO PARA ZAPATASTIPOCANTIDADABAREA (M2)Z1140.801.2013.4413.4405.00.00 OBRAS DE CONCRETO ARMADO05.01.01 ZAPATAS - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABHVOLUMEN (M3)Z1140.801.200.506.726.7205.01.02 ZAPATAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERIMETROHVOLUMEN (M3)Z1144.000.5028.0028.00ZAPATAS - ACEROTIPON ELEMENTOSCANTIDADLKILOS (KG)ACERO1461.1092.40148.000.7078.40170.8005.02.01 COLUMNAS - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABHVOLUMEN (M3)COLUMNA140.300.505.8012.18140.300.650.300.82140.300.800.301.0114.0105.01.02 COLUMNAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERIMETROHVOLUMEN (M3)COLUMNA141.605.80129.92141.900.307.98142.200.309.24147.14COLUMNAS - ACEROTIPON ELEMENTOSCANTIDADLKG/MLKILOS (KG)ACERO1468.301.561087.631448.301.00464.8014461.600.56577.02MNSULA1432.301.56150.701431.801.0075.601422.200.5634.501411.900.5614.902405.1506.00.00 ESTRUCTURAS METALICAS06.02.00 TIJERAL TIPO ARCOTIPOCANTIDADLUNIDAD (UND)TIJERAL716.00112.00112.0006.03.00 VIGUETA METLICA CON FIERRO LISOTIPOCANTIDADLLONGITUD (M)VIGUETA731.90223.30223.3006.04.00 APOYO FIJO DE TIJERALTIPOCANTIDADUNIDAD (UND)APOYO FIJO77.007.0006.05.00 APOYO MVIL DE TIJERALTIPOCANTIDADUNIDAD (UND)APOYO MVIL77.007.0006.06.00 ARRIOSTRE DE TIJERAL D= 1/2"TIPOCANTIDADUNIDAD (UND)TIRANTE169.40150.40150.4006.07.00 TIRANTE DE TIJERAL, D= 5/8"TIPOCANTIDADLLONGITUD (M)TIRANTE716.00112.00112.0006.08.00 PNDOLAS D= 1/2"TIPOCANTIDADUNIDAD (UND)CENTRAL72.6018.20INTERMEDIAS141.9226.8845.0806.09.00 ARRIOSTRE DE VIGUETAS, D= 3/8"TIPOCANTIDADLLONGITUD (M)485.60268.80268.8006.12.00 COBERTURA CON CALAMINONTIPOCANTIDADALAREA (M2)COBERTURA117.6033.00580.80580.8006.14.00 CANALETA DE EVACUACIN PLUVIALTIPOCANTIDADLLONGITUD (M)CANALETA231.9063.8063.8006.15.00 DRENAJE PLUVIALTIPOCANTIDADCANTIDAD (U)44.004.00

PABAULASUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA - PIURA"PABELLN AULAS PRIMARIA02.27.00 TRAZO Y REPLANTEOAMBIENTEABCANTIDADAREA (M2)AULAS15.857.902250.43250.43ESTRUCTURAS03.00.00 MOVIMIENTO DE TIERRAS03.01.00 EXCAVACIN DE ZANJAS PARA CIMIENTOS CORRIDOS Y VIGA DE CIMENTACINTIPOCANTIDADA/AREAHLVOLUMEN (M3)1-121.801.009.0032.4020.801.009.0014.401'-1'21.801.009.0032.4020.801.009.0014.404-422.201.009.0039.6021.201.009.0021.602-222.201.0013.0057.2021.201.0014.0033.603-322.401.0013.0062.4021.401.0014.0039.20VC41.302.006.4033.28380.4803.04.00 DENSIFICACIN DE FONDO DE CIMENTACIN HASTA 0.60 M DE PROFUNDIDADTIPOCANTIDADA/AREAB/LLVOLUMEN (M3)CC-160.606.1822.25CC-221.2031.5075.60V-C40.305.186.22104.0703.05.00 RELLENO COMPACTADO CON HORMIGN P/FONDO DE CIMIENTOSAMBIENTEAHCANTIDADLVOLUMEN (M3)1-10.800.4029.005.761'-1'0.800.4029.005.764-41.200.4029.008.642-21.200.40213.9413.383-31.400.40213.9415.61VC0.300.4046.853.2952.4403.03.00 RELLENO DE ZANJAS CON HORMIGNTIPOCANTIDADA/AREAHLVOLUMEN (M3)1-120.800.409.0014.401'-1'20.800.409.0014.404-421.200.409.0021.602-221.200.4013.0031.203-321.400.4013.0036.40VC40.300.406.407.68125.6803.04.00 RELLENO DE ZANJAS CON MATERIAL PROPIOTIPOCANTIDADAHLVOLUMEN (M3)1-121.651.009.0029.701'-1'21.651.009.0029.704-441.901.009.0068.402-222.051.0013.0053.303-322.251.0013.0058.50VC41.000.606.4025.6041.301.406.4033.28298.4803.05.00 RELLENO CON MATERIAL PROPIO HASTA ALCANZAR NIVELES DE SUBRASANTETIPOCANTIDADAREAHVOLUMEN (M3)AULAS1231.030.13531.1931.1903.07.00 RELLENO Y COMPACTACIN CON MATERIAL DE AFIRMADO. E= 0.15 MAMBIENTEABCANTIDADAREA (M2)AULAS15.307.552231.03231.0303.09.00 ACARREO DE MATERIAL EXCEDENTE Dp= 80 m03.10.00 ELIMINACIN DE MATERIAL EXCEDENTEPARTIDAVOLUMEN (M3)FACT. ESPONJ.VOLUMEN (M3)METRADO DE EXCAVACIN380.48METRADO DE RELLENO298.4882.001.2098.4004.00.00 OBRAS DE CONCRETO SIMPLE04.01.00 SOLADO PARA CIMIENTOS CORRIDOS Y VIGAS DE CIMENTACINTIPOAACANTIDADLREA (M2)1-10.8029.0014.401'-1'0.8029.0014.404-41.2029.0021.602-21.20213.9433.463-31.40213.9439.03VC0.3046.858.22131.1104.03.01 SOBRECIMIENTOS - CONCRETO 1:8 + 25% P.M.EJESAHLN VECESVOLUMEN (M3)EJE 60.150.506.6521.00EJE 90.150.506.6521.00EJE 120.150.506.6521.000.150.503.9520.59EJES A y C0.150.5013.2043.967.5504.03.02 SOBRECIMIENTOS - ENCOFRADO Y DESENCOFRADOAMBIENTECANTIDADHLN VECESREA (M2)EJE 620.506.65213.30EJE 920.506.65213.30EJE 1220.506.65213.3020.503.9513.95EJES A y C40.5013.20252.8096.6504.04.00 FALSO PISOAMBIENTEABCANTIDADAREA (M2)AULAS15.307.552231.03231.0305.00.00 OBRAS DE CONCRETO ARMADO05.02.01 CIMIENTO CORRIDO - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADALHVOLUMEN (M3)CC-120.809.000.507.2020.257.901.003.95CC-1'20.809.000.507.2020.257.901.003.95CC-421.209.000.5010.8020.257.901.003.9520.154.851.001.46CC-221.2013.940.5016.7320.2513.941.006.97CC-321.4013.940.5019.5220.2513.941.006.9788.7005.03.01 VIGAS DE CIMENTACIN - CONCRETO F'C= 210 KG/CM2AMBIENTECANTIDADAHLVOLUMEN (M3)V-C40.300.606.404.6140.300.100.460.064.6705.03.02 VIGAS DE CIMENTACIN - ENCOFRADO Y DESENCOFRADOAMBIENTECANTIDADHLN VECESREA (M2)V-C40.606.4027.6840.100.4620.097.7705.05.01 COLUMNAS - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABHVOLUMEN (M3)C1EJES 6,12,15 y 2180.250.407.105.6880.150.257.102.13C2EJES 7,10.16.1980.600.256.708.0480.300.256.704.02C3EJES 9,12,17,2140.500.257.103.5540.250.257.101.78C4EJE A1,A3,A4,A1060.250.407.104.2660.250.407.104.2633.7205.05.02 COLUMNAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROHAREA (M2)C1EJES 6,12,15 y 2181.607.1090.88C2EJES 7,10.16.1982.206.70117.92C3EJES 9,12,17,2182.007.10113.60C4EJE A1,A3,A4,A1041.307.10322.4005.06.01 COLUMNAS DE CONFINAMIENTO - CONCRETO F'C= 175 KG/CM2TIPOCANTIDADABHVOLUMEN (M3)FACHADA PRINCIPALC5320.150.251.301.56FACHADA POSTERIORC5320.150.251.672.00FACHADAS LATERALESC5480.150.252.955.31PARAPETOC5120.150.250.900.419.2805.06.02 COLUMNAS DE CONFINAMIENTO - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROHAREA (M2)FACHADA PRINCIPALC5320.501.3020.80FACHADA POSTERIORC5320.501.6726.72FACHADAS LATERALESC5480.502.9570.80PARAPETO0.00C5120.500.905.40123.7205.07.01 VIGAS - CONCRETOTIPOCANTIDADABLVOLUMEN (M3)PRIMERA PLANTAEJES A y C40.250.4014.505.80EJES 6,12,15 y 2140.250.4010.004.00EJES 7,10,16 y 1940.300.6010.007.20EJES 9 y 1720.250.4010.002.00VS20.150.2014.500.87SEGUNDA PLANTAEJES A y C40.250.4014.505.80EJES 6,12,15 y 2140.250.4010.004.00EJES 7,10,16 y 1940.300.6010.007.20EJES 9 y 1720.250.4010.002.00VS10.150.2014.500.4439.3105.07.02 VIGAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROLAREA (M2)PRIMERA PLANTAEJES A y C40.4015.8525.3640.4514.5026.10EJES 6,12,15 y 2140.6010.0024.0040.258.808.80EJES 7,10,16 y 1940.307.408.8880.407.9025.28VS20.1514.504.3520.2015.856.34SEGUNDA PLANTAEJES A y C40.4015.8525.3640.4514.5026.10EJES 6,12,15 y 2140.6010.0024.0040.258.808.80EJES 7,10,16 y 1940.307.408.8880.407.9025.28VS20.1514.504.3520.2015.856.34258.2205.08.01 VIGAS DE CONFINAMIENTO - CONCRETO F'C= 175 KG/CM2TIPOCANTIDADABLVOLUMEN (M3)FACHADA PRINCIPAL80.150.102.700.3280.150.101.600.19FACHADA POSTERIOR160.150.102.700.65FACHADAS LATERALES120.150.206.602.38PARAPETO20.150.102.100.0620.150.1015.850.484.0805.08.02 VIGAS DE CONFINAMIENTO - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROLAREA (M2)FACHADA PRINCIPAL80.202.704.3280.201.602.56FACHADA POSTERIOR160.202.708.64FACHADAS LATERALES120.406.6031.68PARAPETO20.202.100.8420.2015.856.3454.3805.09.01 LOSA ALIGERADA - CONCRETO F'C= 210 KG/CM2AMBIENTEFACTORABN VECESVOLUMEN (M3)AULAS 1ra. PLANTA0.087514.609.35223.89AULA 2da. PLANTA0.087514.609.35223.8947.7805.09.02 LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADOAMBIENTEABN VECESREA (M2)AULAS 1ra. PLANTA14.609.352273.02AULA 2da. PLANTA14.609.352273.02546.0405.09.03 LOSA ALIGERADA - LADRILLO HUECOAMBIENTEFACTORABN VECESUNIDAD (UND)AULAS 1ra. PLANTA8.3314.609.3522274.26AULA 2da. PLANTA8.3314.609.3522274.264548.52

ACEROAULASUSTENTO DE METRADOS (OK)PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA - PIURA"ACERO PABELLN AULAS PRIMARIA05.02.03 CIMIENTOS CORRIDOSELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"AULASCORTE 1-1249.0072.00249.0072.002460.7064.40249.0072.002342.50170.00CORTE 1'-1'249.0072.00249.0072.002460.7064.40249.0072.002342.50170.00CORTE 4-4249.0072.00249.0072.002461.10101.20249.0072.002342.50170.00ZONA ESCALERA249.0072.00249.0072.00249.0072.002342.50170.002242.30110.40CORTE 2-22417.25138.002617.15205.802461.10101.202417.25138.002342.50170.00CORTE 3-32417.25138.002617.15205.802461.30119.602417.25138.002342.50170.00TOTAL LONGITUD0.001694.401714.40PESO POR M0.250.561.00TOTAL KG POR DIMETRO0.00948.861714.40TOTAL METRADO2663.2605.03.03 VIGA DE CIMENTACINELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"V-C469.00216.00429.0072.004421.80302.40TOTAL LONGITUD0.00374.400.00216.00PESO POR M0.250.561.001.56TOTAL KG POR DIMETRO0.00209.660.00336.96TOTAL METRADO546.6205.05.03 COLUMNASELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"C1889.00576.008641.30665.600.008641.30665.60C28129.00864.008641.70870.408641.60819.20C34109.00360.004641.50384.004641.50384.00C4669.00324.006641.30499.20TOTAL LONGITUD0.004288.000.002124.00PESO POR M0.250.561.001.00TOTAL KG POR DIMETRO0.002401.280.002124.00TOTAL METRADO4525.2805.06.03 COLUMNAS DE CONFINAMIENTOELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"1ra. Y 2da. PlantaFachada Principal1641.80115.201690.70100.801642.20140.801690.70100.80Fachada Posterior1642.60166.4016110.70123.201642.20140.8016110.70123.20Fachadas laterales24410.20979.2024170.70285.602441.70163.2024180.70302.40Parapeto1241.5072.001280.7067.20TOTAL LONGITUD1103.201777.600.000.00PESO POR M0.250.561.001.00TOTAL KG POR DIMETRO275.80995.460.000.00TOTAL METRADO1271.2605.07.03 VIGASELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"3/4"1RA. PLANTAVIGA V-1014416.65266.404241.30124.80VIGA V-1024416.65266.404241.30124.80VIGA V-103448.50136.00424.9039.20423.8030.40422.7021.604571.80410.40VIGA V-104448.50136.00422.2518.00413.1012.404641.30332.80VIGA V-105258.5085.00222.259.00222.259.00223.1012.40211.603.202641.30166.40VIGA V-1062416.45131.602480.6057.602DA. PLANTAVIGA V-2014416.65266.404241.30124.80VIGA V-2024416.65266.40266.404241.30124.804601.80432.00VIGA V-2034416.65266.40412.259.00412.259.00423.8030.40422.7021.604571.80410.40VIGA V-204448.50136.004641.30332.80VIGA V-205448.50136.00422.2518.00413.1012.40411.606.402641.30166.40VIGA V-1062416.45131.602480.6057.60TOTAL LONGITUD115.202750.40333.801925.20493.60PESO POR M0.250.561.001.001.00TOTAL KG POR DIMETRO28.801540.22333.801925.20493.60TOTAL METRADO4321.6205.08.03 VIGAS DE CONFINAMIENTOELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"3/4"Fachada Principal823.2051.20822.1033.608170.4054.408110.4035.20Fachada Posterior1623.20102.4016170.40108.80Fachadas Laterales4847.701478.4048400.601152.00Parapeto222.409.602216.5066.002120.409.602920.4073.60TOTAL LONGITUD1344.001830.800.000.000.00PESO POR M0.250.561.001.001.00TOTAL KG POR DIMETRO336.001025.250.000.000.00TOTAL METRADO1361.2505.09.03 LOSA ALIGERADAELEMENTOM2N ELEM.CANTIDADLONGITUD1/4"3/8"1/2"1RA. PLANTAAULA24216.00768.002441.0096.002462.70388.80TEMPERATURA1092.002DA. PLANTAAULA24216.00768.002441.0096.002462.70388.80TEMPERATURA1092.00TOTAL LONGITUD2184.001728.00777.60PESO POR M0.250.561.00TOTAL KG POR DIMETRO546.00967.68777.60TOTAL METRADO2291.28

ESCALERASUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA - PIURA"ESCALERA02.27.00 TRAZO, NIVELACIN Y REPLANTEOELEMENTOABDSCTOSAREA (M2)ESCALERA4.754.85023.0423.04ESTRUCTURAS03.00.00 MOVIMIENTO DE TIERRAS03.01.00 EXCAVACIN DE ZANJAS PARA CIMIENTOS Y ZAPATASTIPOCANTIDADABH/LVOLUMEN (M3)CORTE B-B11.602.670.562.3911.601.030.560.92CORTE C-C11.602.030.571.855.1603.02.00 CORTE DE TERRENO HASTA NIVELES DE SUBRASANTETIPOCANTIDADAREAHVOLUMEN (M3)ZONA ESCALERA119.400.5650.566.146.1403.03.00 RELLENO COMPACTADO CON HORMIGNAMBIENTECANTIDADAB/LHAREA (M2)B-B10.603.670.400.8811.002.130.400.85C-C10.252.130.400.211.9403.04.00 RELLENO DE ZANJAS CON MATERIAL PROPIOTIPOCANTIDADAREALHVOLUMEN (M3)B-B11.452.670.563.8711.451.030.560.84C-C11.452.030.571.686.3903.06.00 NIVELACIN INTERIOR Y APISONADOAMBIENTECANTIDADABAREA (M2)ZONA ESCALERA14.451.757.7922.152.7011.6119.4003.09.00 ACARREO DE MATERIAL EXCEDENTE03.10.00 ELIMINACIN DE MATERIAL EXCEDENTEPARTIDAVOLUMEN (M3)DIFERENCIAFACT. ESPONJ.VOLUMEN (M3)METRADO DE EXCAVACIN11.30METRADO DE RELLENO6.394.911.205.895.8904.00.00 OBRAS DE CONCRETO SIMPLE04.01.00 SOLADO PARA COLUMNASAMBIENTEABLAREA (M2)PARA C741.200.602.882.8804.02.01 CIMIENTOS- CONCRETO 1:10 + 25% P.M.TIPOCANTIDADABLVOLUMEN (M3)B-B10.600.803.671.7610.600.802.131.02C-C10.600.802.131.023.8005.00.00 OBRAS DE CONCRETO ARMADO05.04.01 SOBRECIMIENTOS REFORZADOS - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADAHLVOLUMEN (M3)De muro posterior10.151.074.250.68De muro delantero10.151.072.000.32De muro central10.250.382.050.191.1905.04.02 SOBRECIMIENTOS REFORZADOS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADN VECESHLAREA (M2)De muro posterior121.074.259.10De muro delantero121.072.004.28De muro central120.382.051.5414.9205.05.01 COLUMNAS - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABHVOLUMEN (M3)C740.250.256.701.68C810.150.252.500.0910.150.254.200.16C920.250.406.701.343.2705.05.02 COLUMNAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROHAREA (M2)C740.456.7012.06C810.652.501.6310.654.202.73C920.656.708.7125.1305.07.01 VIGAS - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABLVOLUMEN (M3)VE-110.150.404.250.26VE-210.250.404.250.43V-A20.250.404.850.9720.250.602.100.63V-B30.250.204.250.64VS10.150.204.250.133.0605.07.02 VIGAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROLAREA (M2)VE-110.754.253.19VE-210.504.252.13V-A20.604.855.8220.852.103.57V-B20.254.252.1310.454.251.91VS10.354.251.4920.2405.09.01 LOSA ALIGERADA - CONCRETO F'C= 210 KG/CM2ELEMENTOFACTORENCOFRADOVOLUMEN (M3)LOSA TECHO0.087525.712.252.2505.09.02 LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADOELEMENTOFACTORABREA (M2)LOSA TECHO4.256.0525.7125.7105.09.03 LOSA ALIGERADA - LADRILLO HUECOELEMENTOFACTORENCOFRADOBUNIDAD (UND)LOSA TECHO8.3325.71214.16214.4605.10.01 ESCALERA - CONCRETO F'C= 210 KG/CM2ELEMENTOABLCANTIDADVOLUMEN (M3)GRADAS0.150.172.10201.07LOSA6.890.152.1024.34DESCANSO1.900.204.4511.69PASADIZO2.10.204.4511.878.9705.10.02 ESCALERA - ENCOFRADO Y DESENCOFRADOAMBIENTEABCANTIDADREA (M2)GRADAS0.172.10200.36FONDO6.892.10214.47DESCANSO1.754.4517.79LATERALES6.890.2021.3824.00

ACEROESCALERASUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA - PIURA"ESCALERA - ACERO04.04.03 ACERO SOBRECIMIENTOSELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"SOBRECIMIENTOSB-B246.0048.00245.5044.00244.6036.802226.00264.00B-B145.2521.001181.5027.00142.9011.60191.5013.50C-C142.6510.601121.0012.00TOTAL LONGITUD12.0083.700.00PESO POR M0.250.561.00TOTAL KG POR DIMETRO3.0046.870.00TOTAL METRADO49.8704.05.03 ACERO COLUMNASELEMENTOSECCINN ELEMENTOSCANTIDADLONGITUD1/4"3/8"1/2"5/8"COLUMNA C7449.00144.004281.00112.00COLUMNA C8143.6014.401200.9018.00145.7022.801270.9024.30COLUMNA C9269.00108.002281.3072.80TOTAL LONGITUD0.00227.1037.20252.00PESO POR M0.250.561.001.56TOTAL KG POR DIMETRO0.00127.1837.20393.12TOTAL METRADO557.5004.07.03 ACERO VIGASELEMENTON ELEMENTOSCANTIDADLONGITUD1/4"3/8"1/2"5/8"V-E3 - V-A227.3529.40222.008.00225.0520.20223.0012.002161.7054.402291.3075.40V-B344.8558.203240.8057.60V-E1144.8519.401241.0024.00VE-2154.8524.251241.2028.80VS144.8519.401240.6014.40VS (Muro central)143.9015.601200.60TOTAL LONGITUD96.00205.60159.450.00PESO POR M0.250.561.001.56TOTAL KG POR DIMETRO24.00115.14159.450.00TOTAL METRADO298.591/2"04.09.04 ACERO LOSA ALIGERADAELEMENTOM2N ELEMENTOSCANTIDADLONGITUD1/4"3/8"1/2"LOSA1164.6574.40121.102.20TEMPERATURA103.000.00TOTAL LONGITUD103.0076.600.000.00PESO POR M0.250.561.001.56TOTAL KG POR DIMETRO25.7542.900.000.00TOTAL METRADO68.6505.10.04 ACERO ESCALERAELEMENTOM2N ELEMENTOSCANTIDADLONGITUD1/4"3/8"1/2"LOSA TRAMO 11114.2546.751112.0022.00161.106.60161.056.301113.0033.00DESCANSO1112.9031.901112.9031.901184.7585.50TRAMO 21114.6050.601112.0022.001113.0033.001112.8531.35PASADIZO1112.4026.401113.0033.001184.7585.50TOTAL LONGITUD0.00545.800.000.00PESO POR M0.250.561.001.56TOTAL KG POR DIMETRO0.00305.650.000.00TOTAL METRADO305.65

AULAINICIAL1SUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA - PIURA"AULA INICIAL02.27.00 TRAZO Y REPLANTEOAMBIENTEABDSCTOSAREA (M2)AULA8.557.65065.4165.4103.00.00 MOVIMIENTO DE TIERRAS03.01.00 EXCAVACIN DE ZANJAS PARA CIMIENTOS Y ZAPATASTIPOCANTIDADAHB/LVOLUMEN (M3)ZAPATA22.401.502.4011.5221.400.501.403.92EJES J y P21.600.507.9125.3120.601.407.919.49EJES 8 y 1121.600.504.4014.0820.601.404.405.28VC11.300.754.856.3110.301.004.851.4677.3703.02.00 CORTE DE TERRENO HASTA NIVELES DE SUBRASANTETIPOCANTIDADAREAHB/LVOLUMEN (M3)AULA12.401.502.405.7621.400.501.403.92EJES J y P21.600.507.9125.3103.03.00 RELLENO COMPACTADO CON HORMIGN PARA CIMIENTOSAMBIENTEABHLVOLUMEN (M3)ZAPATA21.400.401.401.57EJES J y P20.600.407.913.80EJES 8 y 1120.600.406.403.07VC10.300.406.650.809.2403.04.00 RELLENO DE ZANJAS CON MATERIAL PROPIOTIPOCANTIDADAREA/AHLVOLUMEN (M3)ZAPATA23.800.503.8025.5351.0011.07EJES J y P21.450.507.9111.47EJES 8 y 1121.450.504.406.38VC11.000.754.853.6411.301.004.856.3132.7203.06.00 NIVELACIN INTERIOR Y APISONADO03.08.00 RELLENO COMPACTADO CON AFIRMADO PARA FALSO PISO, e= 0.15 mAMBIENTEABDSCTOSAREA (M2)AULA8.257.15058.9958.9903.10.00 ACARREO DE MATERIAL EXCEDENTE03.11.00 ELIMINACIN DE MATERIAL EXCEDENTEPARTIDAVOLUMEN (M3)FACT. ESPONJ.VOLUMEN (M3)METRADO DE EXCAVACIN102.68METRADO DE RELLENO32.7269.961.2083.9504.00.00 OBRAS DE CONCRETO SIMPLE04.01.00 SOLADO PARA ZAPATASAMBIENTECANTIDADABAREA (M2)ZAPATA21.401.403.92VC10.306.652.005.9204.02.01 CIMIENTOS- CONCRETO 1:8 + 25% P.M.TIPOCANTIDADABLVOLUMEN (M3)EJES J y P20.601.007.859.42EJES 8 y 1120.601.004.635.5614.9804.04.00 FALSO PISOAMBIENTEABDSCTOSAREA (M2)AULA8.257.15058.9958.9905.00.00 OBRAS DE CONCRETO ARMADO05.01.01 ZAPATAS - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABLVOLUMEN (M3)ZAPATAS21.401.400.501.961.9605.01.02 ZAPATAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADAHAREA (M2)ZAPATAS25.600.505.605.6005.03.01 VIGA DE CIMENTACIN - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABLVOLUMEN (M3)VC10.300.606.651.201.2005.03.02 VIGA DE CIMENTACIN - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADAHAREA (M2)VC10.606.653.993.9905.04.01 SOBRECIMIENTOS REFORZADOS - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABLVOLUMEN (M3)EJES J y P20.150.806.901.66EJES 8 y 1120.150.807.121.713.3705.04.02 SOBRECIMIENTOS REFORZADOS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADN VECESHLAREA (M2)EJES J y P220.806.9022.08EJES 8 y 11220.807.1222.7844.8605.05.01 COLUMNAS - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABHVOLUMEN (M3)C140.250.403.501.40C220.600.253.300.9920.300.253.300.50C320.150.253.500.263.1505.05.02 COLUMNAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROHAREA (M2)C141.153.5016.10C221.903.3012.54C320.503.503.5032.1405.06.01 COLUMNAS DE CONFINAMIENTO - CONCRETO F'C= 175 KG/CM2TIPOCANTIDADABHVOLUMEN (M3)C440.150.251.900.29C440.150.251.000.150.4405.06.02 COLUMNAS DE CONFINAMIENTO - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROHAREA (M2)C440.501.903.8010.151.900.29C440.501.002.006.0905.07.01 VIGAS - CONCRETO F'C= 210 KG/CM2ELEMENTOCANTIDADAHLVOLUMEN (M3)VIGA V-10110.250.607.651.15VIGA V-A20.250.407.851.57VIGA V-B20.250.207.650.773.4905.07.02 VIGAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROLAREA (M2)VIGA V-10111.107.157.87VIGA V-A20.857.8513.35VIGA V-B20.207.653.0624.2805.08.01 VIGAS DE CONFINAMIENTO - CONCRETO F'C= 175 KG/CM2ELEMENTOCANTIDADAHLVOLUMEN (M3)FACHADA PRINC.10.150.102.460.0410.150.103.550.05FACHADA POST.20.150.103.550.110.2005.08.02 VIGAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROLAREA (M2)FACHADA PRINC.10.202.460.4910.203.550.71FACHADA POST.20.203.551.422.6205.09.01 LOSA ALIGERADA - CONCRETO F'C= 210 KG/CM2AMBIENTEFACTORENCOFRADOVOLUMEN (M3)AULA0.087557.565.045.0405.09.02 LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADOAMBIENTEFACTORABREA (M2)AULA8.057.1557.5657.5605.09.03 LOSA ALIGERADA - LADRILLO HUECOAMBIENTEFACTORENCOFRADOBUNIDAD (UND)AULA8.3357.56479.47207.00

ACEROAULAINICIAL1SUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA - PIURA"AULA INICIAL-ACERO05.01.03 ACERO ZAPATASELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"ZAPATAS2201.3052.00TOTAL LONGITUD0.0052.000.00PESO POR M0.250.561.00TOTAL KG POR DIMETRO0.0029.120.00TOTAL METRADO29.1205.03.03 ACERO VIGA DE CIMENTACINELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"VC148.1532.601401.8072.00128.1516.30TOTAL LONGITUD0.0088.300.0032.60PESO POR M0.250.561.001.56TOTAL KG POR DIMETRO0.0049.450.0050.86TOTAL METRADO100.3105.04.03 ACERO EN SOBRECIMIENTOSELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"EJES 8 y 11249.0072.002301.4084.00EJES J y P248.1565.202281.4078.40TOTAL LONGITUD0.00299.600.00PESO POR M0.250.561.00TOTAL KG POR DIMETRO0.00167.780.00TOTAL METRADO167.7805.05.03 ACERO EN COLUMNASELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"C1465.40129.604401.30208.00C22105.40108.002421.70142.802421.80151.20C3245.4043.202360.7050.40TOTAL LONGITUD0.00552.4043.20237.60PESO POR M0.250.561.001.56TOTAL KG POR DIMETRO0.00309.3443.20370.66TOTAL METRADO723.2005.06.03 ACERO EN COLUMNETASELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"C4442.7043.204150.7042.00C4441.8028.804120.7033.60TOTAL LONGITUD75.6072.000.000.00PESO POR M0.250.561.001.56TOTAL KG POR DIMETRO18.9040.320.000.00TOTAL METRADO59.2205.07.03 ACERO EN VIGASELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"VIGA V-101148.1532.60125.4510.90122.304.60122.304.601421.8075.60VA248.8570.802501.30130.00130VB247.6060.802400.8064.00TOTAL LONGITUD64.00205.6060.80253.50PESO POR M0.250.561.001.56TOTAL KG POR DIMETRO16.00115.1460.80395.46TOTAL METRADO587.4005.08.03 ACERO EN VIGAS DE CONFINAMIENTOELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"VC122.605.201130.253.25VC323.6521.903190.2514.25TOTAL LONGITUD17.5027.100.000.00PESO POR M0.250.561.001.56TOTAL KG POR DIMETRO4.3815.180.000.00TOTAL METRADO19.5605.09.03 ACERO EN LOSA ALIGERADAELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"AULA1188.45152.101361.0537.801182.3041.40TEMPERATURA230.50TOTAL LONGITUD230.50231.300.00PESO POR M0.250.561.00TOTAL KG POR DIMETRO57.63129.530.00TOTAL METRADO187.16

ACEROCISTERNASUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA - PIURA"ACERO - CISTERNA05.05.03 ACERO EN COLUMNASELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"C1447.50120.00427.5060.004521.00208.00TOTAL LONGITUD0.00208.00180.000.00PESO POR M0.250.561.001.56TOTAL KG POR DIMETRO0.00116.48180.000.00TOTAL METRADO296.4805.07.03 ACERO EN VIGASELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"VA242.8022.40242.0016.002150.9027.002101.0020.00VB422.8022.40422.0016.004150.900.904100.900.90TOTAL LONGITUD1.8047.0038.400.00PESO POR M0.250.561.001.56TOTAL KG POR DIMETRO0.4526.3238.400.00TOTAL METRADO65.1705.11.03 ACERO EN CISTERNAELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"TAPA1162.8044.801241.9045.60VIGA SUPERIOR148.1032.401501.0050.00PAREDES2163.0096.002183.00108.002188.10291.602146.00168.00FONDO281.1017.60281.2019.20281.4022.40281.3521.601132.0026.00VIGA DE FONDO148.1032.401501.0050.00TOTAL LONGITUD0.00466.40559.200.00PESO POR M0.250.561.001.56TOTAL KG POR DIMETRO0.00261.18559.200.00TOTAL METRADO820.3805.12.03 ACERO EN LOSA MACIZAELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"SUPERIOR1342.4081.60INFERIOR1342.4081.60TOTAL LONGITUD0.00163.200.00PESO POR M0.250.561.00TOTAL KG POR DIMETRO0.0091.390.00TOTAL METRADO91.39

CISTERNASUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA - PIURA"CISTERNA02.27.00 TRAZO Y REPLANTEOAMBIENTEABDSCTOSAREA (M2)CISTERNA2.301.5003.453.4503.00.00 MOVIMIENTO DE TIERRAS03.01.00 EXCAVACIN DE ZANJAS PARA CISTERNA Y CIMENTACIN DE TANQUE ELEVADOTIPOCANTIDADABHVOLUMEN (M3)CISTERNA13.302.502.7022.2822.2803.03.00 RELLENO COMPACTADO CON HORMIGN PARA FONDO DE CISTERNAN VECESBHH/LVOLUMEN (M3)13.302.500.403.3020.3850.251.500.293.5903.04.00 RELLENO DE ZANJAS CON MATERIAL PROPIOCANTIDADAREAHVOLUMEN (M3)14.8002.7012.9612.9603.09.00 ACARREO DE MATERIAL EXCEDENTE03.10.00 ELIMINACIN DE MATERIAL EXCEDENTEPARTIDAVOLUMEN (M3)FACT. ESPONJ.VOLUMEN (M3)METRADO DE EXCAVACIN22.28METRADO DE RELLENO12.969.321.2011.1804.00.00 OBRAS DE CONCRETO SIMPLE04.01.00 SOLADO PARA FONDO DE CISTERNAAMBIENTECANTIDADABAREA (M2)12.301.503.453.4505.00.00 OBRAS DE CONCRETO ARMADO05.05.01 COLUMNAS - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABHVOLUMEN (M3)C140.250.254.411.1040.250.102.250.2340.150.102.250.141.4705.05.02 COLUMNAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROHAREA (M2)C141.004.4117.6440.602.255.4023.0405.07.01 VIGAS - CONCRETO F'C= 210 KG/CM2ELEMENTOCANTIDADABLVOLUMEN (M3)V-A20.250.202.000.2020.250.201.200.12V-B20.250.202.500.2520.250.202.000.200.770.7705.07.02 VIGAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROLAREA (M2)V-A20.652.002.6020.651.201.56V-B20.252.001.0020.252.001.006.1605.11.01 CISTERNA - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABHVOLUMEN (M3)FONDO20.650.650.400.3420.3950.151.500.1820.350.151.500.1610.6250.151.500.14VIGA INF20.100.201.500.0620.100.202.000.08PAREDES20.151.502.050.9220.152.002.051.23VIGA SUP.20.100.201.500.0620.100.202.000.08TAPA12.301.500.150.523.7705.11.02 CISTERNA - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADN VECESLHAREA (M2)FONDO212.600.402.08211.810.150.54211.500.150.45VIGA INF.210.201.500.60210.202.000.80PAREDES211.502.056.15211.501.905.70212.302.059.43212.301.908.74VIGA SUP.210.301.500.90210.302.001.20TAPA212.300.150.69211.500.150.45212.001.204.8042.5305.12.01 LOSA DE APOYO DE TANQUE ELEVADO - CONCRETO F'C= 210 KG/CM2AMBIENTECANTIDADABHVOLUMEN (M3)LOSA12.502.500.21.251.2505.12.02 LOSA DE APOYO TANQUE ELEVADO - ENCOFRADO Y DESENCOFRADOAMBIENTEFACTORAHREA (M2)LOSA12.502.506.2542.500.202.008.25

SSHHPROFSUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA - PIURA"BAOS PROFESORES02.27.00 TRAZO Y REPLANTEOAMBIENTEABDSCTOSAREA (M2)SS.HH2.901.8005.225.2203.00.00 MOVIMIENTO DE TIERRAS03.01.00 EXCAVACIN DE ZANJAS PARA CIMIENTOS Y ZAPATASTIPOCANTIDADABLVOLUMEN (M3)EJES A y B21.600.503.3510.7220.601.403.354.02EJES 1 y 221.600.501.153.6820.601.402.152.5821.0003.03.00 RELLENO COMPACTADO CON HORMIGN PARA CIMIENTOSAMBIENTEABHLVOLUMEN (M3)EJES A y B20.600.403.351.61EJES 1 y 220.600.402.151.032.6403.04.00 RELLENO DE ZANJAS CON MATERIAL PROPIOTIPOCANTIDADABLVOLUMEN (M3)EJES A y B21.450.503.359.72EJES 1 y 221.450.501.153.3413.0603.07.00 RELLENO COMPACTADO CON AFIRMADO PARA FALSO PISO, e=0.15 mAMBIENTEABDSCTOSAREA (M2)2.601.5003.903.9003.09.00 ACARREO DE MATERIAL EXCEDENTE03.10.00 ELIMINACIN DE MATERIAL EXCEDENTEPARTIDAVOLUMEN (M3)FACT. ESPONJ.VOLUMEN (M3)METRADO DE EXCAVACIN21.00METRADO DE RELLENO13.067.941.209.5304.00.00 OBRAS DE CONCRETO SIMPLE04.01.00 SOLADO PARA COLUMNASAMBIENTECANTIDADABAREA (M2)SOLADO40.600.601.441.4404.02.01 CIMIENTOS- CONCRETO 1:10 + 30% P.M.TIPOCANTIDADABLVOLUMEN (M3)EJES A y B20.601.003.354.02EJES 1 y 220.601.002.152.586.6004.04.00 FALSO PISOAMBIENTEABDSCTOSAREA (M2)2.601.5003.903.9005.00.00 OBRAS DE CONCRETO ARMADO05.04.01 SOBRECIMIENTOS REFORZADOS - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABLVOLUMEN (M3)EJE A y B20.150.802.400.58EJES 1 y 220.150.801.500.360.9405.04.02 SOBRECIMIENTOS REFORZADOS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADN VECESHLAREA (M2)EJES A y B210.802.904.64210.802.403.84EJES 1 Y 2210.801.802.88EJE 1210.801.502.4013.7605.05.01 COLUMNAS - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABHVOLUMEN (M3)C140.150.253.700.560.5605.05.02 COLUMNAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROHAREA (M2)EJE AC130.503.705.55C110.653.702.417.9605.07.01 VIGAS - CONCRETO F'C= 210 KG/CM2ELEMENTOCANTIDADABLVOLUMEN (M3)EJES A y B20.150.202.900.17EJES 1 Y 220.150.201.500.090.2605.07.02 VIGAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROLAREA (M2)EJES A y B20.202.901.16EJES 1 y 220.201.800.7210.151.000.152.0305.09.01 LOSA ALIGERADA - CONCRETO F'C= 210 KG/CM2AMBIENTEFACTORENCOFRADOVOLUMEN (M3)SS.HH.0.08753.900.340.3405.09.02 LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADOAMBIENTEFACTORABREA (M2)SS.HH.2.601.503.903.9005.09.03 LOSA ALIGERADA - LADRILLO HUECOAMBIENTEFACTORENCOFRADOBUNIDAD (UND)SS.HH.8.333.9032.4932.49

ACEROSSHHPROFSUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA - PIURA"ACERO - SERVICIOS HIGINICOS05.04.03 ACERO EN SOBRECIMIENTOSELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"EJES A y B233.4020.401121.4016.80EJES 1 y 2232.3013.80171.409.80TOTAL LONGITUD0.0060.800.00PESO POR M0.250.561.00TOTAL KG POR DIMETRO0.0034.050.00TOTAL METRADO34.0505.05.03 ACERO EN COLUMNASELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"C1445.0080.004250.7070.00TOTAL LONGITUD70.000.0080.00PESO POR M0.250.561.00TOTAL KG POR DIMETRO17.500.0080.00TOTAL METRADO97.5005.07.03 ACERO EN VIGASELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"EJES A y B243.4027.202160.6019.20EJES 1 y 2242.3018.402130.6015.60TOTAL LONGITUD34.800.0045.60PESO POR M0.250.561.00TOTAL KG POR DIMETRO8.700.0045.60TOTAL METRADO54.3005.09.03 ACERO EN LOSA ALIGERADAELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"SS.HH171.7011.90120.651.30TEMPERATURA8.20TOTAL LONGITUD8.2013.200.00PESO POR M0.250.561.00TOTAL KG POR DIMETRO2.057.390.00TOTAL METRADO9.44

SSHHPRIMARIASUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA - PIURA"SS.HH PRIMARIA02.27.00 TRAZO Y REPLANTEOAMBIENTEABDSCTOSAREA (M2)SS.HH8.168.10066.0666.0603.00.00 MOVIMIENTO DE TIERRAS03.01.00 EXCAVACIN DE ZANJAS PARA CIMIENTOS Y ZAPATASTIPOCANTIDADABLVOLUMEN (M3)EJE A11.600.508.4513.5210.601.408.455.07EJE E11.600.508.7614.0210.601.408.765.26EJE C11.800.505.129.2210.801.405.124.10EJE 111.600.506.3510.1610.601.406.353.81EJE 411.600.505.408.6410.601.405.403.24EJE 511.600.501.201.9210.601.401.200.7211.600.500.951.5210.601.400.950.57P/MURETES30.400.601.271.5250.400.600.931.8650.400.600.260.5220.400.600.520.4286.0903.03.00 RELLENO COMPACTADO CON HORMIGN PARA CIMIENTOSAMBIENTEABHLVOLUMEN (M3)EJE A10.600.408.452.03EJE E10.600.408.762.10EJE C10.800.406.121.96EJE 110.600.407.351.76EJE 410.600.405.401.30EJE 510.600.401.100.2610.600.400.850.20ENTRE A y C20.600.400.700.34P/MURETES30.400.201.770.4250.400.201.430.5750.400.200.260.1020.400.200.520.0811.1203.04.00 RELLENO DE ZANJAS CON MATERIAL PROPIOTIPOCANTIDADABLVOLUMEN (M3)EJE A11.450.508.4512.25EJE E11.450.508.7612.70EJE C11.650.506.1210.10EJE 111.450.507.3510.66EJE 411.450.505.407.83EJE 511.450.501.101.6011.450.500.851.2356.3703.04.00 RELLENO C/MAT. PROPIO HASTA NIVELES DE SUBRASANTETIPOCANTIDADAREAHVOLUMEN (M3)SS.HH158.980.052.952.9503.07.00 RELLENO COMPACTADO CON AFIRMADO PARA FALSO PISO, e=0.15 mAMBIENTEABDSCTOSAREA (M2)7.717.65058.9858.9803.09.00 ACARREO DE MATERIAL EXCEDENTE03.10.00 ELIMINACIN DE MATERIAL EXCEDENTEPARTIDAVOLUMEN (M3)FACT. ESPONJ.VOLUMEN (M3)METRADO DE EXCAVACIN86.09METRADO DE RELLENO59.3226.771.2032.1204.00.00 OBRAS DE CONCRETO SIMPLE04.01.00 SOLADO PARA COLUMNASAMBIENTECANTIDADABAREA (M2)SOLADO180.600.606.486.4804.02.01 CIMIENTOS- CONCRETO 1:10 + 30% P.M.TIPOCANTIDADABLVOLUMEN (M3)EJE A10.601.008.455.07EJE E10.601.008.765.26EJE C10.801.006.124.90EJE 110.601.007.354.41EJE 410.601.005.403.24EJE 510.601.001.100.6610.601.000.850.51ENTRE A y C20.601.000.700.84P/MURETES30.400.401.770.8550.400.401.431.1450.400.400.260.2120.400.400.520.1727.2604.04.00 FALSO PISOAMBIENTEAREAAREA (M2)58.9858.9858.9805.00.00 OBRAS DE CONCRETO ARMADO05.04.01 SOBRECIMIENTOS REFORZADOS - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABLVOLUMEN (M3)EJE A10.150.907.300.99EJE E10.150.907.010.95EJE C10.150.905.860.79EJE 110.150.907.601.03EJE 410.150.904.150.56EJE 510.150.902.650.364.6805.04.02 SOBRECIMIENTOS REFORZADOS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADN VECESHLAREA (M2)EJE A120.907.3013.14EJE E120.907.0112.62EJE C120.905.8610.55EJE 1120.907.6013.68EJE 4120.904.157.47EJE 5120.902.654.7749.9905.05.01 COLUMNAS - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABHVOLUMEN (M3)C1110.150.254.751.96C130.150.254.250.48C120.150.253.550.27C210.150.454.250.29C310.150.504.250.3210.150.254.250.163.4805.05.02 COLUMNAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROHAREA (M2)C110.354.751.6610.354.251.49100.504.7523.7520.504.254.2520.653.554.62C210.954.254.04C311.654.257.0146.8205.07.01 VIGAS - CONCRETO F'C= 210 KG/CM2ELEMENTOCANTIDADABLVOLUMEN (M3)EJE A10.250.208.010.40EJE E10.250.208.300.42EJE C10.250.206.110.31EJE 110.250.208.050.40EJE 410.250.555.150.71EJE 510.250.207.600.38VB10.250.307.600.57VC20.250.551.150.323.5105.07.02 VIGAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROLAREA (M2)EJE A10.458.013.60EJE E10.458.303.74EJE C10.256.111.53EJE 110.458.053.62EJE 410.955.154.89EJE 510.457.603.42VB10.657.604.94VC20.951.152.1927.9305.09.01 LOSA ALIGERADA - CONCRETO F'C= 210 KG/CM2AMBIENTEFACTORENCOFRADOVOLUMEN (M3)SS.HH.0.087556.264.924.9205.09.02 LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADOAMBIENTEFACTORABREA (M2)SS.HH.7.667.3556.2656.2605.09.03 LOSA ALIGERADA - LADRILLO HUECOAMBIENTEFACTORENCOFRADOBUNIDAD (UND)SS.HH.8.3356.26468.65468.65

ACEROSSHHPRIMSUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA - PIURA"ACERO - SERVICIOS HIGINICOS PRIMARIA05.04.03 ACERO EN SOBRECIMIENTOSELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"EJE A148.5034.001291.4040.60EJE C147.1028.401251.4035.00EJE E148.8035.201331.4046.20EJE 1148.6534.601321.4044.80EJE 4145.5022.001181.4025.20EJE 5142.058.20141.807.201111.4015.40241.6513.20281.4022.40TOTAL LONGITUD0.00412.400.00PESO POR M0.250.561.00TOTAL KG POR DIMETRO0.00230.940.00TOTAL METRADO230.9405.05.03 ACERO EN COLUMNASELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"C11146.35279.4011400.70308.00C1345.8670.273350.7073.50C1244.9039.202300.7042.00C2165.8635.161351.0035.00C31115.8564.351351.2042.001351.0035.00TOTAL LONGITUD535.5064.35424.03PESO POR M0.250.561.00TOTAL KG POR DIMETRO133.8836.04424.03TOTAL METRADO593.9505.07.03 ACERO EN VIGASELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"EJE A148.2032.801490.8039.20EJE C148.2533.001520.8041.60EJE E148.5034.001540.8043.20EJE 1148.3533.401560.8044.80EJE 3148.3033.201300.8024.00148.301441.0044.00EJE 4145.2020.80145.2020.801301.5045.00EJE 5148.3033.201440.8035.20VC241.9015.202100.8016.00TOTAL LONGITUD333.0020.80235.60PESO POR M0.250.561.00TOTAL KG POR DIMETRO83.2511.65235.60TOTAL METRADO330.5005.09.03 ACERO EN LOSA ALIGERADAELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"SS.HH1198.00152.001191.1020.901191.0019.001192.1039.90TEMPERATURA225225.00TOTAL LONGITUD225.00231.800.00PESO POR M0.250.561.00TOTAL KG POR DIMETRO56.25129.810.00TOTAL METRADO186.06

VEREDASSUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA - PIURA"CONSTRUCCIN DE VEREDAS02.00.00 TRABAJOS PRELIMINARES02.27.00 TRAZO, NIVELACIN Y REPLANTEOELEMENTOCANTIDADACANTIDAD (UND)VEREDASAREA DE AFIRMADO301.71LONGITUD DE SARD.76.370.1511.46313.1703.00.00 MOVIMIENTO DE TIERRAS03.02.00 EXCAVACIN A NIVEL DE SUBRASANTE MANUALAMBIENTE/LUGARAREAHCANTIDADDSCTOS.VOLUMEN (M3)DEL METRADO DEAFIRMADO301.710.1130.1730.1703.06.00 NIVELACIN INTERIOR Y APISONADOELEMENTOCANTIDADAREACANTIDAD (UND)NIVELACIN1301.71301.71301.7103.09.00 RELLENO Y COMPACTACIN CON MATERIAL DE AFIRMADO, E= 0.15 MAMBIENTE/LUGARABCANTIDADDSCTOS.AREA (M2)INGRESO3.559.78134.728.873.00126.6117.702.13137.70PABELLON AULAS2.0836.51175.94BAOS PRIMARIA2.087.92116.471.944.6218.960.641.6811.08ACCESO A INICIAL2.902.0615.972.805.50115.402.032.2014.472.959.75128.76CON LADO CURVODEL PLANO24.88SS.HH INICIAL3.971.33210.56INGRESO A INICIAL1.841.8013.31EN AULA AIRE LIBRE3.821.8016.88301.7103.09.00 ACARREO DE MATERIEL EXCEDENTE03.10.00 ELIMINACIN DE MATERIAL EXCEDENTEAMBIENTE/LUGAREXCAVACIONFACTORVOLUMEN (M3)EXCAVACIM31.571.2037.8837.8803.11.00 EXCAVACIN PARA SARDINELESAMBIENTE/LUGARAREALCANTIDADDSCTOS.VOLUMEN (M3)INGRESO0.0159.7820.290.0152.4910.040.0152.5120.080.0153.2710.050.01517.8510.27ACCESO A INICIAL0.0153.1010.050.0155.5010.080.0154.5310.070.01516.5410.250.0157.0010.110.0153.8020.1176.371.40*

Res Total"MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA INSTITUCION EDUCATIVA MARIA GORETTI - AA.HH. MARIA GORETTI - CASTILLA- PIURA"PRESUPUESTO CONTRATADO1839508.903Incluye IGVJULIO-2012PLAZO DE EJECUCION: 240 DIAS CALENDARIOCONTRATISTA: CONSORCIO GORETTIVALORIZACION : No. 02 - JULIO DEL 2012(1.0) VALORIZACION BRUTA: (VB) = (V) + (R) - (D) =323251.76(1.1) VALORIZACIN DEL PERIODO: (V)323251.756226(1.2) REAJUSTES: (R)0(1.3) DEDUCCIN DE REAJUSTES: (D)0(2.0) AMORTIZACION DE ADELANTOS: (A) =64650.35(2.1) POR ADELANTO DIRECTO64650.3512578524(2.2) POR ADELANTO PARA MATERIALES0(3.0) VALORIZACION NETA: (VN) = (VB) - (A)258601.41(4.0) IMPUESTO IGV (18%) = 18% * (VN)46548.2538(5.0) MONTO A PAGAR AL CONTRATISTA305149.6638

ReajustesCALCULO DE REINTEGROS Y DEDUCCIONES"MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA INSTITUCION EDUCATIVA MARIA GORETTI - AA.HH. MARIA GORETTI - CASTILLA- PIURA"LUGAR:CASTILLA - PIURA - PIURAPRESUPUESTO CONTRATADO:1839508.90336(Inc. I.G.V)SUB TOTALIGVTOTALFECHAPRESUPUESTO CONTRATADO1558905.85280603.0531839508.903Jul-12ADELANTO DIRECTO 01311781.17006101756120.6106109831367901.7806727/4/12Ka =1.000Ka Formula 1 (FEB -12) =1.000TOTAL DE ADELANTO DIRECTO311781.17006101756120.6106109831367901.780672D=VxA/C*(Kr/Ka-1)A=AxV/CVALORIZACIONESAVANCE PROGRAMADO SUB TOTAL (1)AVANCE EJECUTADO SUB TOTAL (2)Kr (3)MES (r)REAJUSTE PROGRAM. (1)*(3) V*(K-1)REAJUSTE EJECUTADO (2)*(3) V*(K-1)REAJUSTE RECONOCIDO (4)DEDUCCION ADEL DIR. 01 (5)REINTEGRO DEL MES (7)VALORIZACION (2+7)AMORTIZACION ADELANTO DIRECTONo.MESFORMULA 1ESTJUL-12230,732.06219,820.991.000JUL-120.000.000.000.000.00219,820.9943,964.20ARQJUL-1213,012.4236,275.071.000JUL-120.000.000.000.000.0036,275.077,255.01SANJUL-123,017.33181.201.000JUL-120.000.000.000.000.00181.2036.24ELEJUL-1210,661.0514,660.231.000JUL-120.000.000.000.000.0014,660.232,932.05MOBJUL-1228,644.8452,314.261.000JUL-120.000.000.000.000.0052,314.2610,462.85TOTAL ACUM.286,067.70323,251.760.000.000.000.000.00323,251.7664,650.35113.00%RELACION ENTRE LO PROGRAMADO Y LO EJECUTADO

FormulaCALCULO DEL FACTOR DE REAJUSTEOBRA"MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA INSTITUCION EDUCATIVA MARIA GORETTI - AA.HH. MARIA GORETTI - CASTILLA- PIURA"LUGAR: CASTILLA - PIURA - PIURAPRESUPUESTO CONTRATADO S/. : 1839,508.90 (Inc. I.G.V)FECHA BASE: FEBRERO 2012FECHA : JULIO DEL 2,012VALORIZACION : No. 02FORMULA 1k=0.319*(Mr/Mo)+0.096*(Cr/Co)+0.156*(Ar/Ao)+0.063*(MHMr/MHMo)+0.111*(ADr/ADo)+0.088*(Mr/Mo)+0.167*(Ir/Io)JUNIO 2012JULIO 2012ABRIL 2011MAYO 2011MONOMIOSIMB.IND.DESCRIPCIONCOEF.%Io Feb - 12KaIrKrIrKrIrKrIrKr1M47MANO DE OBRA INC. LEYES SOCIALES0.319100.00%448.250.319448.250.319448.250.3190.000000.000002C21CEMENTO PORTLAND TIPO I0.096100.00%415.900.096418.260.097418.260.0960.000000.000003A3ACERO DE CONSTRUCCION CORRUGADO0.156100.00%517.800.156498.410.150498.410.1560.000000.00000448MAQUINARIA Y EQUIPO NACIONAL0.06325.40%328.230.016329.220.016329.220.0160.000000.00000MHM49MAQUINARIA Y EQUIPO IMPORTADO38.10%234.940.024234.590.024234.590.02438HORMIGON36.51%408.970.023418.030.024418.030.0235AD5AGREGADO GRUESO0.11164.87%426.440.072433.490.073433.490.0720.000000.0000030DOLAR ( GENERAL PONDERADO)35.14%354.430.039357.900.039357.900.0395M43MADERA NACIONAL PARA ENCOF. Y CARPINT.0.088100.00%605.380.088613.840.089613.840.0880.000000.000006I39AL CONSUMIDOR0.167100.00%372.300.167377.300.169377.300.1670.000000.00000K=1.000K=1.000K=1.0000.000000.00000Nota el Ik Vigente es el de Septiembre, publicado el 19 de Octubre del 2011

CAL. VAL. OBRAOBRA:"MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA INSTITUCION EDUCATIVA MARIA GORETTI - AA.HH. MARIA GORETTI - CASTILLA- PIURA"CONTRATISTA:CONSORCIO GORETTIMODALIDAD:A SUMA ALZADAPARTIDASDESCRIPCIONCALENDARIO VALORIZADO DE OBRAPresupuestoCosto UnitarioPrimer MesSegundo MesTercer MesCuarto MesUnd.MetradoPrecio S/.Parcial S/.Mano de obraMaterialesEquiposPrecio S/.1era S2da S3era S4ta S5ta S6ta S7ma S8va S9na S10ma S11va S12va S13va S14va S15va S16va S17va SPRESUPUESTO ESTRUCTURAS01OBRAS PROVISIONALES0.0001.01CARTEL PARA LA OBRA DE 7.20 X 3.60Mund1.001,506.971,506.97851.04630.4025.531,506.971,506.971,506.97OK01.02ALQUILER DE LOCAL PARA OFICINAS, ALMACN Y GUARDIANAmes6.00200.001,200.00200.00200.0070.5970.5970.5970.5970.5970.5970.5970.5970.5970.5970.5970.5970.5970.5970.5970.5970.591,200.00OK01.03INSTALACION PROVISIONAL PARA DEPOSITO DE AGUAund1.00677.75677.75454.00223.75677.75677.75677.75OK01.04AGUA PARA LA CONSTRUCCIONGLB1.002,000.002,000.002,000.002,000.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.002,000.00OK01.05SERVICIOS HIGIENICOS EN OBRAGLB1.00300.00300.00300.00300.0075.0075.0075.0075.00300.00OK02TRABAJOS PRELIMINARES0.00OK02.01DESMONTAJE DE PUERTAS DE FIERROund7.0022.22155.5421.570.6522.22155.54155.54OK02.02DESMONTAJE DE PUERTAS DE MADERAund6.007.4044.407.180.227.4044.4044.40OK02.03DESMONTAJE DEVENTANAS Y SOBREVENTANAS DE FIERROund22.0022.22488.8421.570.6522.22488.84488.84OK02.04DESMONTAJE DEVENTANAS DE MADERAund5.007.4037.007.180.227.4037.0037.00OK02.05DESMONTAJE DE COBERTURA DE ETERNIT Y ESTRUCTURA DE TECHOm2186.146.651,237.836.460.196.651,237.831,237.83OK02.06DESMONTAJE DE COBERTURA DE CALAMINA Y ESTRUCTURA DE TECHOm2234.704.00938.803.880.124.00938.80938.80OK02.07DESMONTAJE DE TABIQUES DE CARTNm290.001.25112.501.210.041.25112.50112.50OK02.08DEMOLICION DE SARDINEL PERIMETRAL DE AULAS PROVISIONALESm70.101.2789.031.210.061.2789.0389.03OK02.09RETIRO DE LADRILLOS DE PISOS DE AULASm2209.311.66347.451.610.051.66347.45347.45OK02.10DESMONTAJE DE APARATOS SANITARIOSund5.0015.5177.5515.5115.5177.5577.55OK02.11DEMOLICION DE MUROS DE CANTO, MANUALm214.7012.47183.3112.110.3612.4791.6691.66183.31OK02.12DEMOLICION DE MUROS DE SOGA, MANUALm2314.119.983,134.829.690.299.981,567.411,567.413,134.82OK02.13DEMOLICION DE MUROS DE LADRILLO-CABEZA,m266.2512.47826.1412.110.3612.47413.07413.07826.14OK02.14DEMOLICION DE COLUMNAS DE CONCRETOm37.84199.571,564.63193.765.81199.57469.391,095.241,564.63OK02.15DEMOLICION DE VIGAS DE CONCRETOm36.4112.4779.9312.110.3612.4723.9855.9579.93OK02.16EXCAVACION DE ZANJAS PARA DEMOLICIN DE CIMIENTACIONm320.8124.95519.2124.220.7324.95519.21519.21OK02.17DEMOLICION DE SOBRECIMIENTOS DE CONCRETOm31.95124.73243.22121.103.63124.73243.22243.22OK02.18DEMOLICION DE CIMIENTOS CORRIDOSm316.9199.791,687.4596.882.9199.791,687.451,687.45OK02.19ACARREO DE MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)m3237.8616.633,955.6116.150.4816.631,318.541,318.541,318.543,955.61OK02.20ELIMINACION MATERIAL EXCEDENTE DE DEMOLICIONES, Dp= 5 KMm3237.8612.793,042.230.8211.9712.793,042.233,042.23OK02.21DESMONTAJE DE TABIQUES DE CALAMINA CON SU COBERTURAm229.676.65197.316.460.196.65197.31197.31OK02.22TALA DE RBOLESund4.006.6526.606.460.196.6526.6026.60OK02.23DEMOLICION DE BEBEDERO CORRIDOm24.9712.4761.9812.110.3612.4761.9861.98OK02.24DEMOLICION DE URINARIO CORRIDOm23.5212.4743.8912.110.3612.4743.8943.89OK02.25DESMONTAJE DE SISTEMA ELCTRICOGLB1.00155.10155.10155.10155.10155.10155.10OK02.26MOVILIZACION Y DESMOVILIZACION DE EQUIPOGLB1.00300.00300.00300.00300.00150.00150.00300.00OK02.27TRAZO NIVEL Y REPLANTEOm21,848.902.464,548.290.911.250.302.462,274.151,364.49909.654,548.29OK03MOVIMIENTO DE TIERRAS0.00OK03.01EXCAVACION DE ZANJAS PARA CIMIENTACIONm3868.5126.4522,972.0924.221.500.7326.455,743.025,743.023,445.813,445.812,297.212,297.2222,972.09OK03.02CORTE TERRENO NATURAL A NIVEL DE SUBRASANTEm388.0719.391,707.6819.380.0119.39426.92426.92256.15256.15170.77170.771,707.68OK03.03RELLENO CON MATERIAL DE PRESTAMO HORMIGONm3186.3599.0518,457.9730.1552.0016.9099.054,614.494,614.492,768.702,768.701,845.801,845.7918,457.97OK03.04RELLENO COMPACTADO DE ZANJAS CON MATERIAL PROPIOm3599.6616.639,972.3516.150.4816.633,988.942,991.712,991.709,972.35OK03.05RELLENO COMPACTADO A NIVEL DE SUBRASANTEm3124.0338.454,768.9525.1213.3338.451,669.131,430.69953.79715.344,768.95OK03.06NIVELACION INTERIOR APISONADO MANUALm2324.772.07672.271.840.170.062.07201.68201.68268.91672.27OK03.07RELLENO Y COMPACTACIN CON MATERIAL DE AFIRAMDO, E= 0.15 Mm2889.8513.6212,119.766.725.631.2713.622,423.952,423.953,635.933,635.9312,119.76OK03.08RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO AFIRMADO e=0.20mm2859.3419.4716,731.3510.077.501.9019.477,529.119,202.2416,731.35OK03.09ACARREO DE MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)m3171.5616.632,853.0416.150.4816.63713.26713.26427.96427.96285.30285.302,853.04OK03.10ELIMINACION MATERIAL EXCEDENTE, Dp= 5 KMm3171.5612.792,194.250.8211.9712.791,097.131,097.132,194.25OK03.11EXCAVACION DE ZANJAS PARA SARDINELESm34.2424.95105.7924.220.7324.9526.4526.4526.4526.45105.79OK04OBRAS CONCRETO SIMPLE0.00OK04.01SOLADO 1:12 e=0.10m2191.2322.564,314.1511.728.492.3522.562,157.081,294.25862.824,314.15OK04.02CIMIENTOS CORRIDOS0.00OK04.02.01CIMIENTOS CORRIDOS 1:10 +30% P.Gm3119.84145.6017,448.7032.52108.254.83145.606,979.485,234.615,234.6117,448.70OK04.03SOBRECIMIENTOS0.00OK04.03.01CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. ANCHO=0.15 MTm38.39279.822,347.69123.86120.2435.72279.82469.54469.54352.15469.54586.922,347.69OK04.03.02ENCOFRADO Y DESENCOF. SOBRECIMIENTOm2107.7737.694,061.8515.9921.220.4837.69812.37812.37609.28812.371,015.464,061.85OK04.04FALSO PISO MEZCLA 1:8 E= 10cmm2588.1426.1615,385.7410.4615.260.4426.163,077.153,077.154,615.724,615.7215,385.74OK05OBRAS DE CONCRETO ARMADO0.00OK05.01ZAPATAS0.00OK05.01.01CONCRETO F'C=210 KG/CM2,. PARA ZAPATASm316.56316.975,249.0249.54253.1414.29316.971,749.671,749.671,749.675,249.02OK05.01.02ENCOFRADO Y DESENCOFRADO PARA ZAPATASm258.6037.722,210.3915.4521.810.4637.72729.43729.43751.532,210.39OK05.01.03ACERO FY=4200 kg/cm2 PARA ZAPATASkg379.944.161,580.550.933.200.034.16521.58521.58537.391,580.55OK05.02CIMIENTOS CORRIDOS0.00OK05.02.01CONCRETO EN CIMIENTOS CORRIDOS F'C= 210 KG/CM2m388.70294.4226,115.0545.24235.0214.16294.427,834.5218,280.5326,115.05OK05.02.02ACERO EN CIMIENTO CORRIDO GRADO 60kg2,663.264.1611,079.160.933.200.034.163,323.757,755.4111,079.16OK05.03VIGAS DE CIMENTACION0.00OK05.03.01CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2m311.88335.113,981.1161.93255.3217.86335.112,269.23875.84836.043,981.11OK05.03.02ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACIONm223.9165.111,556.7830.9033.280.9365.11887.36342.49326.931,556.78OK05.03.03ACERO EN VIGA DE CIMENTACION GRADO 60kg960.154.163,994.220.933.200.034.162,276.71878.73838.783,994.22OK05.04SOBRECIMIENTOS ARMADOS0.00OK05.04.01CONCRETO F'C=210 KG/CM2. PARA SOBRECIMIENTOm324.33389.629,479.45111.45258.8319.34389.622,843.841,895.892,369.862,369.869,479.45OK05.04.02ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOm2312.2938.1611,916.9916.5521.110.5038.163,575.102,383.402,979.252,979.2411,916.99OK05.04.03ACERO FY=4200 kg/cm2 PARA SOBRECIMIENTOkg1,069.564.164,449.370.933.200.034.161,334.81889.871,112.341,112.354,449.37OK05.05COLUMNAS0.00OK05.05.01CONCRETO F'C=210 KG/CM2. PARA COLUMNAS.m369.84425.9529,748.35143.24246.4136.30425.955,205.965,205.962,231.132,231.1314,279.20594.9729,748.35OK05.05.02ENCOFRADO Y DESENCOFRADO NORMAL DE COLUMNASm2711.2355.2039,259.9028.0226.340.8455.206,870.486,870.482,944.492,944.4918,844.76785.2039,259.90OK05.05.03ACERO FY=4200 kg/cm2 PARA COLUMNASkg11,230.294.1646,718.010.933.200.034.1611,445.914,905.393,503.853,503.8522,424.65934.3646,718.01OK05.06COLUMNAS DE CONFINAMIENTO0.00OK05.06.01CONCRETO F'C=175 KG/CM2. PARA COLUMNETASm312.64375.474,745.94119.36225.8730.24375.471,186.49949.192,610.264,745.94OK05.06.02ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNETASm2177.1146.078,159.4623.3522.020.7046.072,039.871,631.894,487.708,159.46OK05.06.03ACERO FY=4200 kg/cm2 PARA COLUMNETASkg1,735.454.167,219.470.933.200.034.161,804.871,443.892,887.791,082.927,219.47OK05.07VIGAS0.00OK05.07.01CONCRETO F'C=210 KG/CM2. PARA VIGASm364.85403.1426,143.63143.24227.9032.00403.149,150.275,228.735,228.736,222.18313.7226,143.63OK05.07.02ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS.m2414.5461.6725,564.6831.1329.610.9361.674,473.824,473.825,112.945,112.946,084.38306.7825,564.68OK05.07.03ACERO FY=4200 kg/cm2 PARA VIGASkg7,643.084.1631,795.210.933.200.034.164,769.284,769.288,902.668,203.164,769.29381.5431,795.21OK05.08VIGAS DE CONFINAMIENTO0.00OK05.08.01CONCRETO F'C=175KG/CM2 VIGA CONFINAMIENTOm35.16375.471,937.43119.36225.8730.24375.47484.36367.491,085.581,937.43OK05.08.02ENCOFRADO Y DESENCOFRADO NORMAL EN VIGA DE CONFINAMIENTOm269.2147.233,268.7922.0824.490.6647.23817.20653.761,797.833,268.79OK05.08.03ACERO GRADO 60 EN VIGA DE CONFINAMIENTOkg1,440.254.165,991.440.933.200.034.161,497.861,198.293,295.295,991.44OK05.09LOSAS ALIGERADAS0.00OK05.09.01CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2m379.89323.8125,869.1866.13242.9014.78323.819,054.215,173.845,173.846,467.2925,869.18OK05.09.02ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADASm2913.0341.8738,228.5719.5022.3741.876,690.006,690.007,645.717,645.719,557.1538,228.57OK05.09.03LADRILLO HUECO DE ARCILLA 15 X 30 X 30 CM PARA TECHO ALIGERADOund6,853.902.3215,901.050.741.582.322,385.162,385.164,452.294,293.282,385.1615,901.05OK05.09.04ACERO GRADO 60 EN LOSAS ALIGERADASkg3,513.884.1614,617.740.933.200.034.162,192.662,192.664,092.973,946.792,192.6614,617.74OK05.10ESCALERAS0.00OK05.10.01CONCRETO EN ESCALERAS F'C=210 KG/CM2m38.97392.503,520.73119.36242.9030.24392.503,520.733,520.73OK05.10.02ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERASm224.0053.851,292.4019.3133.960.5853.85258.481,033.921,292.40OK05.10.03ACERO GRADO 60 EN ESCALERASkg305.654.161,271.500.933.200.034.16254.301,017.201,271.50OK05.11CISTERNA SUBTERRANEA0.00OK05.11.01CONCRETO EN CISTERNA SUBTERRANEA F'C=210 KG/CM2m33.77426.861,609.26143.24255.3228.30426.861,609.261,609.26OK05.11.02ENCOFRADO Y DESENCOFRADO NORMAL EN CISTERNA SUBTERRANEAm242.5343.791,862.3921.1422.020.6343.791,396.79465.601,862.39OK05.11.03ACERO GRADO 60 EN CISTERNA SUBTERRANEAkg820.384.163,412.780.933.200.034.162,900.86511.923,412.78OK05.12LOSAS MACIZA - APOYO PARA TANQUE ELEVADO0.00OK05.12.01CONCRETO EN LOSAS MACIZAS F'C=210 KG/CM2m31.25337.92422.4071.62252.1514.15337.92422.40422.40OK05.12.02ENCOFRADO Y DESENCOFRADO NORMAL DE LOSAS MACIZASm28.2557.19471.8221.4435.110.6457.19471.82471.82OK05.12.03ACERO GRADO 60 EN LOSAS MACIZASkg91.394.16380.180.933.200.034.16380.18380.18OK06ESTRUCTURA METALICA0.00OK06.01TIJERAL METALICO PATIO DE FORMACINm112.0080.048,964.4827.6245.796.6380.044,482.244,482.248,964.48OK06.02VIGUETAS METALICAS PATIO DE FORMACINm223.3047.4010,584.4222.1021.843.4647.403,175.333,175.334,233.7610,584.42OK06.03APOYO FIJOund7.00112.59788.1343.1354.1715.29112.59394.07394.07788.13OK06.04APOYO MOVILund7.00112.59788.1343.1354.1715.29112.59394.07394.07788.13OK06.05ARRIOSTRES DE TIJERALES D= 1/2"m150.408.621,296.453.684.600.348.621,296.451,296.45OK06.06TIRANTES DE TIJERALES D= 5/8"m112.0011.071,239.843.686.980.4111.071,239.841,239.84OK06.07PENDOLAS DE 1/2"m45.089.64434.573.685.380.589.64434.57434.57OK06.08ARRIOSTRES DE VIGUETAS D= 3/8"m268.8035.979,668.7427.625.772.5835.973,384.066,284.689,668.74OK06.09COBERTURA CON CALAMINON CU-6 0.5MMm2580.8045.2326,269.583.6841.440.1145.2321,015.665,253.9226,269.58OK06.10CANALETA METLICA PARA EVACUACIN PLUVIALm63.8081.375,191.4111.0470.000.3381.375,191.415,191.41OK06.11DRENAJE PLUVIALund4.00141.05564.2027.62112.600.83141.05564.20564.20OK07VARIOS0.00OK07.01REUBICACIN DE ASTA DE BANDERA (INC. DEMOLICIN DE LOSA)GLB1.0052.6752.6751.141.5352.6752.6752.67OK07.02SISTEMA EPXICO PARA PEGAR CONCRETO NUEVO A ANTIGUOGLB1.00224.14224.144.14220.00224.14224.14224.14OKPRESUPUESTO ARQUITECTURA0.00OK01MUROS Y TABIQUES DE ALBAILERIA0.00OK01.01MURO DE LADRILLO KK TIPO IV CANTO M:1:1:4 E=1.5 cmM256.9450.732,888.5721.5728.510.6550.732,888.572,888.57OK01.02MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4 E=1.5 cmM2708.9963.4945,013.7823.4839.310.7063.4911,253.4511,253.4522,506.8845,013.78OK02REVOQUES, ENLUCIDOS Y MOLDURAS0.00OK02.01TARRAJEO PRIMARIO MEZCLA 1:5 e= 2cmM2183.4317.573,222.8710.796.460.3217.571,128.00483.431,611.443,222.87OK02.02TARRAJEO EN MUROS0.00OK02.02.01ARRAJEO DE MUROS INTERIORES Y EXTERIORES MEZCLA 1:5 E =1.5M21,720.2818.5631,928.4011.506.710.3518.566,385.689,578.527,982.107,982.1031,928.40OK02.02.02TARRAJEO RAYADO EN MUROS DE MESADA C:A 1:5M213.5517.20233.0610.796.090.3217.20233.06233.06OK02.02.03TARRAJEO FROTACHADO EN MURETE H=0.20M308.0410.863,345.313.207.560.1010.861,672.661,672.663,345.31OK02.03TARRAJEO DE COLUMNAS0.00OK02.03.01TARRAJEO EN SUPERFICIE COLUMNAS C.A. 1:5 E=1:5M2313.6629.019,099.2821.576.790.6529.011,819.862,729.782,274.822,274.829,099.28OK02.04TARRAJEO DE VIGAS0.00OK02.04.01TARRAJEO DE VIGAS C:A 1:5 E=1.5CMM2188.8342.398,004.5026.5415.050.8042.391,200.681,600.901,200.682,001.132,001.118,004.50OK02.05VESTIDURAS DE DERRAMES0.00OK02.05.01VESTIDURA DE DERRAMES (1:5) a=0.05mM87.9113.961,227.2211.502.110.3513.96245.44368.17306.81306.801,227.22OK02.05.02VESTIDURA DE DERRAMES (1:5) a=0.10mM95.4410.511,003.078.501.750.2610.51200.61300.92250.77250.771,003.07OK02.05.03VESTIDURA DE DERRAMES (1:5) a=0.15mM550.7114.808,150.5112.322.110.3714.801,630.102,445.152,037.632,037.638,150.51OK02.05.04VESTIDURA DE DERRAMES CON BORDES BOLEADOS 1:2 PARA DESNIVELM51.6014.44745.1012.761.300.3814.44149.02223.53186.28186.27745.10OK02.05.05TARRAJEO CON IMPERMEABILIZANTE EN CISTERNAM248.9424.811,214.2015.998.340.4824.811,214.201,214.20OK02.06BRUAS0.00OK02.06.01BRUAS SEGUN DETALLE 1cm x 1cmM719.295.373,862.595.210.165.371,351.91579.38965.65965.653,862.59OK02.07ESCALERA0.00OK02.07.01REVESTIMIENTO PULIDO EN PASO Y CONTRAPASOM51.6025.571,319.4121.573.350.6525.571,319.411,319.41OK02.07.02TARRAJEO EN FONDO DE ESCALERAM15.4627.89431.1821.575.670.6527.89431.18431.18OK03CIELORRASO0.00OK03.01CIELO RASO CON MEZCLA C:A 1:5M2795.4333.0326,273.0517.2515.260.5233.033,940.965,254.613,940.966,568.266,568.2626,273.05OK04PISOS Y PAVIMENTOS0.00OK04.01CONTRAPISOS E=20mmM267.9414.43980.378.514.861.0614.43343.13637.24980.37OK04.02PISO DE CEMENTO PULIDO Y BRUADO CON ENDURECEDORM2795.1228.5422,692.7212.7113.212.6228.549,077.099,077.094,538.5422,692.72OK04.03PISO CERAMICO ANTIDESLIZANTE0.00OK04.03.01PISO DE CERMICA DE ALTO TRNSITO PEI IV DE 30X30CMM267.9448.613,302.5614.3833.800.4348.611,155.902,146.663,302.56OK04.03.02CERAMICO 30cm x 30cm EN MESA DE CONCRETO SHM213.5556.02759.0721.5733.800.6556.02759.07759.07OK04.04PATIOS Y VEREDAS0.00OK04.04.01VEREDAS DE CONCRETO DE 140KG/CM2M2343.9645.4015,615.7818.2125.042.1545.405,205.265,205.265,205.2615,615.78OK04.04.02LOSA Y PATIOS DE CONCRETO F'C=140KG/CM2 FROTACHADA Y BRUADA e=6"M2974.9856.9655,534.8618.2136.602.1556.9627,767.4327,767.4355,534.86OK04.04.03ENCOFRADO Y DESENCOFRADO DE VEREDAM2379.7228.7310,909.3611.5816.800.3528.733,636.453,636.453,636.4510,909.36OK04.04.04CURADO QUIMICO DE LOSAM2865.272.221,920.900.541.630.052.22960.45960.451,920.90OK04.05RAMPAS0.00OK04.05.01RAMPA DE CONCRETO F'C=140 kg/cm2 e=4'' BRUADO SEGUN DISEOM24.2833.23142.2220.299.183.7633.23142.22142.22OK04.05.02ENCOFRADO Y DESENCOFRADO DE RAMPAM21.8127.3349.4710.2216.800.3127.3349.4749.47OK04.06SARDINEL0.00OK04.06.01SARDINEL DE CONCRETO F'c=140 Kg/cm2 PARA RAMPAS (Inc. Acabado 1:2)M89.7622.662,033.969.1611.701.8022.662,033.962,033.96OK05CONTRAZOCALOS0.00OK05.01CONTRAZOCALOS TARRAJEADO H=10CMM485.987.363,576.816.500.660.207.361,430.721,430.72715.373,576.81OK05.02CONTRAZOCALOS DE TARRAJEADO H=30CMM128.539.741,251.889.010.460.279.74500.75500.75250.381,251.88OK06ZOCALOS0.00OK06.01ZOCALO DE CERAMICA 30 X 30M2183.4355.7110,218.8921.5733.490.6555.715,109.455,109.4510,218.89OK07CUBIERTAS0.00OK07.01COBERTURA DE MORTERO DE CEMENTO CON IMPERMEABILIZANTEM2685.9818.1812,471.126.8411.130.2118.181,870.672,494.223,741.344,364.8912,471.12OK07.02CANALETA A MEDIA CAA DE MORTERO EN TECHOS e=0.05 m.M275.3414.483,986.9210.213.960.3114.48598.04797.381,196.081,395.423,986.92OK07.03GARGOLASund22.00129.542,849.88112.0812.824.64129.54427.48569.98854.96997.462,849.88OK08CARPINTERIA DE MADERA0.00OK08.01PUERTAS0.00OK08.01.01PUERTA APANELADAS CON MARCO DE CEDROM215.75286.574,513.48144.85137.374.35286.572,256.742,256.744,513.48OK08.01.02PUERTA APANELADA CON MARCOS DE CEDRO Y SOBRE LUZ DE FIERROM240.66400.0416,265.63128.03268.173.84400.048,132.828,132.8216,265.63OK08.01.03PUERTA CONTRAPLACADAM28.40286.572,407.19144.85137.374.35286.571,203.601,203.602,407.19OK08.01.04PUERTA EN CUBICULO DE INODOROSM213.46202.352,723.6377.25122.782.32202.351,361.821,361.822,723.63OK08.02VARIOS, MADERA0.00OK08.02.01TICERO DE MADERA TORNILLO (L=3.00M) BARNIZADOund40.00189.747,589.6024.82164.180.74189.743,794.803,794.807,589.60OK09CARPINTERIA METALICA0.00OK09.01VENTANAS0.00OK09.01.01VENTANA DE FIERRO (BAJA)M2162.19123.0219,952.6149.8668.174.99123.029,976.319,976.3119,952.61OK09.01.02VENTANA DE FIERRO (ALTA)M2111.9190.1210,085.3319.9568.172.0090.125,042.675,042.6710,085.33OK09.02PUERTAS0.00OK09.02.01PUERTA METALICAM23.36176.21592.0757.9486.8931.38176.21296.04296.04592.07OK09.03OTROS METAL0.00OK09.03.01PASAMANOS DE TUBO DE FN 1 1/2"M15.6095.251,485.9038.6344.2212.4095.25742.95742.951,485.90OK09.03.02CERCO METALICO CON TUBO DE FIERRO Y MALLA COCADAM216.04298.094,781.36108.94156.4732.68298.091,673.483,107.884,781.36OK09.03.03PUERTA METALICA CON TUBO DE FIERRO Y MALLA COCADAM22.95160.55473.6245.44100.0215.09160.55473.62473.62OK09.03.04PLANCHA ESTRIADA METALICA PARA BORDE DE ESCALERAM258.04145.868,465.7138.6399.507.73145.868,465.718,465.71OK10CERRAJERIA0.00OK10.01CERRADURAS0.00OK10.01.01CERRADURA P/PUERTA PRINCIPAL DE SOBRE PONER 2 GOLPES LLAVE EXTERNAund19.0068.201,295.8015.5152.220.4768.20647.90647.901,295.80OK10.01.02PICAPORTE DE SOBREPONER 3"und8.0019.28154.2415.513.300.4719.2877.1277.12154.24OK10.01.03BISAGRA DE ACERO 3 1/2" x 3 1/2"und33.002.9898.341.241.700.042.9849.1749.1798.34OK11VIDRIOS CRISTALES Y SIMILARES0.00OK11.01VIDRIOS SEMIDOBLE INCOLOROP21,194.026.347,570.092.074.210.066.343,785.053,785.057,570.09OK11.02VIDRIO CATEDRAL INCOLOROP21,037.494.404,564.960.833.550.024.402,282.482,282.484,564.96OK12PINTURA0.00OK12.01PINTURA LTEX INTERIORES Y EXTERIORESM21,852.347.4713,836.984.312.730.437.474,612.334,612.334,612.3313,836.98OK12.02PINTURA LATEX EN VIGAS Y COLUMNASM2502.497.994,014.904.792.660.547.992,007.452,007.454,014.90OK12.03PINTURA LATEX EN CIELORRASOM2795.437.656,085.044.932.230.497.652,028.352,028.352,028.356,085.04OK12.04PINTURA LTEX EN CONTRAZCALOS INTERIORES H=0.10mM543.984.472,431.591.582.810.084.471,215.801,215.802,431.59OK12.05PINTURA LTEX EN CONTRAZCALOS EXTERIORES H=0.30mM159.922.74438.181.720.930.092.74219.09219.09438.18OK12.06PINTURA DE CARPINTERA METLICA C/ANTICORR. Y ESMALTEM351.1012.134,258.846.255.570.3112.132,129.422,129.424,258.84OK12.07PINTURA DE CARPINTERA DE MADERA CON BARNIZ MARINOM263.8516.711,066.9311.045.340.3316.71533.47533.471,066.93OK13VARIOS0.00OK13.01LIMPIEZA PERMANENTE Y FINAL DE LA OBRAglb1.002,250.002,250.00500.001,750.002,250.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00250.002,250.00OK13.02ELABORACION Y PINTADO DE PIZARRA DE CONCRETOglb48.00186.378,945.76127.9354.603.84186.378,945.768,945.76OK13.03RELLENO DE JUNTA CON ARENA Y ASFALTO 1M213.905.951,272.711.774.130.055.951,272.711,272.71OK13.04RELLENO DE JUNTA CON ARENA Y ASFALTO 1/2M201.875.951,201.131.774.130.055.951,201.131,201.13OK13.05JUNTAS DE DILATACION DE E=1" CON TECNOPOR y SELLADOR ELASTOMRICOM115.6020.722,395.235.9314.610.1820.72598.81479.051,317.372,395.23OK13.06URINARIO CORRIDO SEGUN DISEO REV.C/MAYOLICA 0.30 x 0.30M2.00160.40320.8069.0189.322.07160.40320.80320.80OK13.07MUROS DE PANELES DRYWALL (ROCA DE YESO STANDAR)M225.8655.991,447.9014.4941.070.4355.99723.95723.951,447.90OK13.08SEMBRIO DE GRASS POR ESQUEJES O MECHONESM2219.0013.833,028.774.099.620.1213.833,028.773,028.77OK13.09SEMBRIO DE ARBOLESund4.0011.0644.240.5810.460.0211.0644.2444.24OK13.10COLOCACION DE ARENA TAMIZADAM323.5916.63392.3016.150.4816.63392.30392.30OK13.11ASTA DE BANDERAund1.001,158.021,158.02533.20607.7617.061,158.021,158.021,158.02OK13.12DESMONTAJE Y MONTAJE DE JUEGOSund5.00103.49517.45100.483.01103.49181.11336.34517.45OK13.13PICADO DE PISOS Y MUROSM2390.9338.2514,953.0736.431.8238.257,476.547,476.5414,953.07OKPRESUPUESTO INST. SANITARIAS0.00OK1TRBAJOS PRELIMINARES0.00OK01.01TRAZO DE NIVELES Y REPLANTEOm243.601.51367.840.690.220.601.51367.84367.84OK2SISTEMA DE DESAGUE0.00OK02.01SALIDAS DE PVC SAP PARA DESAGUE 4"pto26.0051.601,341.6036.8313.671.1051.60335.40335.40335.40335.401,341.60OK02.02SALIDA DE DESAGUE EN PVC - SAP 2"pto26.0055.181,434.6836.8316.511.8455.18358.67358.67358.67358.671,434.68OK02.03SALIDAS PVC SAP VENTILACION DE 2"pto9.0050.61455.4936.8312.681.1050.61113.87113.87113.87113.87455.49OK02.04TUBERIA Y ACCE. DE REBOSE Y LIMPIEZA TANQUE ELEVADOGLB1.00864.33864.33110.48750.543.31864.33864.33864.33OK02.05EXCAVACION DE ZANJA, TUBERIA 2 - 4", H PROMD. 0.9m92.6010.67988.0410.360.3110.67988.04988.04OK02.06RELLENO Y COMPACTACION DE ZANJASm339.3625.01984.3918.841.105.0725.01984.39984.39OK02.07SUMINISTRO E INST. DE TUBERIA 4" PVC SAPm80.606.51524.714.421.960.136.51524.71524.71OK02.08SUMINISTRO E INST. TUBERIA PVC SAP 2"m12.006.1473.683.682.350.116.1473.6873.68OK02.09PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUEm92.602.63243.542.130.440.062.63243.54243.54OK02.10SUMINS. E INSTAL.SUMIDERO DE BRONCE DE 2"und8.009.6977.526.203.300.199.6977.5277.52OK02.11SUMIN. E INSTL. REGISTROS DE BRONCE DE 4"und13.0016.85219.058.278.330.2516.85219.05219.05OK02.12CAJA REG. PREFABC. 30X60 INC MARCO/TAPAund10.00153.331,533.3057.5194.091.73153.331,533.301,533.30OK3SISTEMA DE AGUA0.00OK03.01SALIDA DE AGUA FRIApto34.0060.802,067.2043.1316.381.2960.80516.80516.80516.80516.802,067.20OK03.02EXCAVACION DE ZANJAS PARA TUBERIA 0.4x0.5m151.006.24942.246.060.186.24942.24942.24OK03.03RELLENO Y COMPACTACION DE ZANJASm330.2325.01756.0518.841.105.0725.01756.05756.05OK03.04SUMINISTRO E INST.DE TUBERIA P.V. C. 7.5 DE 2"m31.008.57265.674.424.158.57265.67265.67OK03.05SUMI. E INST DE TUBERIA PVC DE 1 1/2" CLASE 7.5m36.007.43267.484.422.880.137.43267.48267.48OK03.06SUMINISTRO E INST. DE TUB. AGUA 1" PVC C. 7.5m84.006.38535.923.682.520.186.38535.92535.92OK03.07PRUEBA HIDRAULICA PARA TUBERIA DE AGUAm151.004.71711.212.211.151.354.71711.21711.21OK03.08ACCESORIOS RED DE DISTRIBUCION DE AGUAGLB1.001,361.891,361.89220.961,134.306.631,361.891,361.891,361.89OK03.09VALVULA DE INTERRUPCION ESFERICA DE 1"und4.0079.85319.4020.6858.550.6279.85319.40319.40OK03.10VALVULA DE INTERRUPCION ESFERICA DE 2"und3.00187.66562.9824.82162.100.74187.66562.98562.98OK03.11CAJA DE VALVULAS, BY PASS, DE 0.4 X 0.5 X 0.5und2.00246.41492.82158.9282.724.77246.41492.82492.82OK4APARATOS SANITARIOS0.00OK04.01INODORO TANQUE BAJO BLANCO, INC PAPELERAund9.00167.631,508.6711.63156.00167.631,508.671,508.67OK04.02LAVATORIO DE LOSA BLANCAund2.0034.0068.0034.0034.0068.0068.00OK04.03LAVATORIOS DE LOSA BLANCO TIPO OVALIN INC. ACCpza8.00155.001,240.00155.00155.001,240.001,240.00OK04.04INODORO TIPO BABY, INC PAPELERAund4.00284.431,137.7211.63272.80284.431,137.721,137.72OK04.05URINARIO DE LOSA BCO TIPO PICO INC ACCund4.00133.40533.60133.40133.40533.60533.60OK04.06COLOCACION DE APARATOS SANITARIOSund27.0056.341,521.1855.241.1056.341,521.181,521.18OK04.07ACCESORIOS Y TUBERIA DE AGUA EN CISTERNAGLB1.00477.19477.19220.96249.606.63477.19477.19477.19OK5VARIOS0.00OK05.01CONEXION DOMICIL. A RED DE AGUA EXTERIORund1.00841.37841.37578.92262.45841.37841.37841.37OK05.02TANQUE DE PVC DE 2500 LTS. INC ACCES. E INSTAL.und1.00956.85956.85110.48840.855.52956.85956.85956.85OK05.03CONEXION A RED PUBLICA DE DESAGUEund1.001,113.571,113.57835.84252.6525.081,113.571,113.571,113.57OK05.04ELIMINACION DE MATERIAL EXCEDENTE, Dp=5 KM.m321.537.55162.550.537.027.55162.55162.55OK05.05PICADO / TARRAJEO DE MURO S,H, EXISTGLB1.0082.1182.1155.2424.112.7682.1182.1182.11OK05.06SELLADO DE CAJAS DE REGISTRO EXISTENTEm30.41253.97104.1388.17165.80253.97104.13104.13OKPRESUPUESTO INST. ELECTRICAS0.00OK01INSTALACIONES ELECTRICAS0.00OK01.01CENTROS DE LUZ, TOMACORRIENTES, TELEFONIA DATA0.00OK01.01.01SALIDA CENTRO DE ALUMBRADO EN TECHO LOSA ALIGERADAPTO89.0084.507,520.5021.0262.850.6384.501,316.091,316.091,504.101,504.101,880.127,520.50OK01.01.02SALIDA CENTRO DE ALUMBRADO EN PAREDPTO7.0092.96650.7224.5367.690.7492.96113.88113.88130.14130.14162.68650.72OK01.01.04SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRAPTO79.00104.158,227.8524.5378.880.74104.152,056.962,056.962,056.962,056.968,227.85OK01.01.05SALIDA PARA CARGAS ESPECIALESPTO1.00182.74182.7436.80144.841.10182.7445.6945.6945.6945.69182.74OK01.01.06PICADO Y RESANE DE PISO, PARED O TECHO P/INSTAL TUB PVC-PML68.0017.271,174.3615.741.060.4717.27293.59293.59293.59293.591,174.36OK01.01.07SALIDA PARA TELEFONIA Y DATAPTO10.00126.501,265.0058.8865.851.77126.50316.25316.25316.25316.251,265.00OK01.02PUESTA TIERRA TIPO VARILLA0.00OK01.02.01PUESTA A TIERRA TIPO VARILLAund4.00732.212,928.84156.60570.914.70732.212,928.842,928.84OK01.03ARTEFACTOS DE ALUMBRADO - ACCESORIOS - SOPORTES0.00OK01.03.01ARTEF FLUORES RECTO 2/36W C/EQUIP D ARRANQUE Y BALAST SIM. BE. JOSFELund54.00117.606,350.4028.4789.13117.603,175.203,175.206,350.40OK01.03.02ARTEF FLUORESC CIRCULAR 1x32 W C/SOPORT REFLECT Y EQ D ARRANQund2.0086.60173.2028.4758.1386.60173.20173.20OK01.03.03LAMP. AHORRADORA 20 W C/REJILLA ALAM. GALV. SIM. JOSFEL WS-150 Rund33.0050.371,662.2112.6437.7350.37831.11831.111,662.21OK01.03.04BRAQUET-REFLECT C/LAMP 2 x 18 W AHORRAD DIF POLICARB SIM A JOSFEL RSP-2und1.0080.7780.7712.6468.1380.7780.7780.77OK01.03.05BRAQUETE PARED CON LAMP AHORRADORA 1x20 Wund6.0060.37362.2214.2446.1360.37362.22362.22OK01.04ILUMINACION VEREDAS CIRCULACION, PATIO FORMACIN0.00OK01.04.01FAROLA TP. HONGO LPRA 70 W MOD PFH 1x70 W EN POSTE CAC 6 mjgo13.00557.567,248.2846.40509.771.39557.567,248.287,248.28OK01.04.02REFLECTOR C/LAMP VAP SOD 70 W SIMIL LUXIODPZA6.00378.322,269.9270.10306.122.10378.322,269.922,269.92OK01.04.03KIT EMPALMES PARA CABLES ELECTRICOS NYY (16/6)und13.0052.07676.9133.7718.3052.07676.91676.91OK01.05ALIMENTADORES CABLES0.00OK01.05.01EXCAVACION ZANJA DE 0.60 x 1.00 m MANUAL P/TENDIDO DE CABLE NYYM3120.0023.062,767.2022.390.6723.062,767.202,767.20OK01.05.02RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE 0.20 M.M3120.0016.111,933.2015.640.4716.111,933.201,933.20OK01.05.03CAJA BUZON DE CONCRETO FC 3/8" C/TAPA, EMPARRILLADund3.00220.67662.0182.66135.532.48220.67662.01662.01OK01.05.04ALIMENTADOR CABLE DE ENERGIA - NYY 3 - 1 x 25 + 1 x 16 mm2M21.0057.361,204.564.9452.4257.361,204.561,204.56OK01.05.05ALIMENTADOR CABLE DE ENERGIA - NYY 3 - 1 x 10 + 1 x 6 mm2M113.0032.263,645.384.9427.3232.263,645.383,645.38OK01.05.06ALIMENTADOR CABLE DE ENERGIA - NYY 2 - 1 x 16 + 1 x 10 mm2M42.0032.311,357.024.9427.3732.311,357.021,357.02OK01.05.07ALIMENTADOR CABLE DE ENERGIA - NYY 2 -1 x 10 + 1 x 6 mm2M40.0023.98959.202.9621.0223.98959.20959.20OK01.05.08ALIMENTADOR CABLE DE ENERGIA - NYY 2 -1 x 6 + 1 x 6 mm2M278.0025.026,955.562.9622.0625.026,955.566,955.56OK01.05.09ALIMENTADOR CABLE DE ENERGIA - NYY 2 - 1 x 6 mm2M15.0019.97299.552.9617.0119.97299.55299.55OK01.06TABLEROS0.00OK01.06.01TABLERO GENERAL 380 V, TRIFASICO (T G)Cjt1.001,380.081,380.08135.081,245.001380.081,380.081,380.08OK01.06.02TABLERO TD - 01 220 V, MONOFASICOCjt1.001,089.081,089.08135.08954.001089.081,089.081,089.08OK01.06.03TABLERO TD - 02 220 V, MONOFASICOCjt1.00933.08933.08135.08798.00933.08933.08933.08OK01.06.04TABLERO TD - 03 220 V, MONOFASICOCjt1.001,482.081,482.08135.081,347.001482.081,482.081,482.08OK01.06.05TABLERO TD - 04 380 V, TRIFASICOCjt1.001,228.081,228.08135.081,093.001228.081,228.081,228.08OK01.06.06TABLERO TD - 05 380 V, TRIFASICOCjt1.001,715.081,715.08135.081,580.001715.081,715.081,715.08OK01.06.07MURETE PARA TABLERO DE DISTRIBUCIONund4.00367.081,468.32171.72190.215.15367.081,468.321,468.32OK01.08INSTALACIONES ELECTRICAS REUTILIZABLES0.00OK01.08.01REINSTAL CABLE DE TOMACORRIENT C/LINEA TIERRA EN AULAS 3 Y 4M150.003.85577.500.912.943.85577.50577.50OK01.09DESMONTAJE DE INSTALACIONES ELCTRICAS NO REUTILIZABLES0.00OK01.09.01DESMONTAJ DE TABL GENERAL EXIST EN Z. ADMINISTRglb1.00144.61144.6196.6148.00144.61144.61144.61OK01.09.02DESMONT DE ALIMENTAD Y SUB TABLER DISTRIB EXIST EN AULA 3glb1.00160.78160.78112.7848.00160.78160.78160.78OK01.09.03DESMONT DE INSTALAC ELECTR Y CIRCUIT D ALAMBRADO DE AULAS A DERRUIRglb1.00347.16347.16251.1696.00347.16347.16347.16OK01.09.04DESMONTAJ DE INSTALAC ACOMETIDA AEREA MEDIDOR EXISTENTEglb1.00173.58173.58125.5848.00173.58173.58173.58OK01.10PRUEBAS Y PUESTA EN SERVICIO0.00OK01.10.01PRUEBAS DE PUESTA A TIERRA, AISLAMIENTO Y CONTINUIDADglb1.00424.70424.70218.16206.54424.70424.70424.70OK01.10.02PRUEBAS DE ENCENDIDO DE LUMINARIASglb1.00209.18209.18129.1880.00209.18209.18209.18OK01.10.03PUESTA EN SERVICO DE LAS INSTALACIONES ELECTRICAS INTERIORESglb1.00394.14394.14234.14160.00394.14394.14394.14OK01.11SISTEMA DE MEDICION EN BAJA TENSION0.00OK01.11.01INSTALAC DE SISTEMA DE MEDICION EN BAJA TENSIONglb1.001,400.001,400.001,400.001400.001,400.001,400.00OK01.12TRANSPORTE DE MATERIALES0.00OK01.12.01TRANSPORTE DE MATERIALES A I.E. MARIA GORETTIglb1.001,550.001,550.001,550.001550.001,550.001,550.00OKCOSTO DIRECTO1,214,699.4651,215.0981,426.7169,435.3098,478.90100,421.48104,776.4680,118.66103,460.4231,215.8276,687.7058,974.82110,524.7684,075.4364,781.0350,513.3125,113.5823,479.981,214,699.460.00Gastos Generales (10.00%)121,469.955,121.518,142.676,943.539,847.8910,042.1510,477.658,011.8710,346.043,121.587,668.775,897.4811,052.488,407.546,478.105,051.332,511.362,348.00121,469.950.00UTILIDAD (10.00%)121,469.955,121.518,142.676,943.539,847.8910,042.1510,477.658,011.8710,346.043,121.587,668.775,897.4811,052.488,407.546,478.105,051.332,511.362,348.00121,469.950.00SUB TOTAL1,457,639.3561,458.1197,712.0683,322.37118,174.68120,505.77125,731.7596,142.40124,152.5037,458.9992,025.2470,769.78132,629.71100,890.5177,737.2460,615.9730,136.3028,175.981,457,639.350.00IGV(18.00%)262,375.0811,062.4617,588.1714,998.0321,271.4421,691.0422,631.7217,305.6322,347.456,742.6216,564.5412,738.5623,873.3518,160.2913,992.7010,910.885,424.535,071.68262,375.080.00TOTAL SUB PRESUPUESTO1,720,014.4472,520.57115,300.2398,320.39139,446.12142,196.81148,363.47113,448.03146,499.9544,201.61108,589.7883,508.34156,503.06119,050.8091,729.9471,526.8535,560.8333,247.651,720,014.440.00

ResuValorRESUMEN DE VALORIZACION N 02, DE OBRA PRINCIPAL. JULIO DEL 2012OBRA"MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA INSTITUCION EDUCATIVA MARIA GORETTI - AA.HH. MARIA GORETTI - CASTILLA- PIURA"LUGAR: CASTILLA - PIURA - PIURAPRESUPUESTO CONTRATADO1839508.90336(Inc. I.G.V)ORDENDESCRIPCIONPRESUPUESTOACUMULADO ANTERIORPRESENTE VALORIZACIONACUMULADO ACTUALSALDO POR VALORIZAR% EJECUTADO DE SUBPRESUPUESTO% SUBPRESUPUESTO TOTAL DEL PRESUPUESTO TOTAL% EJECUTADO PRESUPUESTO TOTAL001ESTRUCTURAS783,585.8043,133.15219,820.99262,954.14520,631.6633.56%50.27%16.87%002ARQUITECTURA551,205.930.0036,275.0736,275.07514,930.856.58%35.36%2.33%003INSTALACIONES ELECTRICAS93,941.160.0014,660.2314,660.2379,280.93004INSTALACIONES SANITARIAS32,565.570.00181.20181.2032,384.37005MOBILIARIO97,607.400.0052,314.2652,314.2645,293.15TOTAL OBRA1,558,905.8643,133.15323,251.76366,384.911,192,520.96EXPEDIENTE TECNICO0.000.000.000.000.000.00%0.00%0.00%SUB TOTAL1,558,905.8543,133.15323,251.76366,384.911,192,520.9685.62%0.00%IGV 18%280,603.057,763.9758,185.3265,949.28214,653.77TOTAL PRESUPUESTO1,839,508.9050,897.12381,437.08432,334.191,407,174.73AVANCE %2.77%20.74%23.50%76.50%100.00%

ESTRUCTSUB PRESUPUESTO N 01 - ESTRUCTURASMETRADO DEL PROYECTOMETRADO ACUMULADOOBRA:"MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA INSTITUCION EDUCATIVA MARIA GORETTI - AA.HH. MARIA GORETTI - CASTILLA- PIURA"CONTRATISTA:CONSORCIO GORETTIMODALIDAD:A SUMA ALZADAItemDescripcinPRESUPUESTOAVANCESACUMULADO ANTERIORACTUALACUMULADOSALDO POR VALORIZARUnd.METPRECIOPARCIALMET.MONTO%MET.MONTO%MET.MONTO%MET.MONTO%JUNIOJULIOAGOSTOSETIEMBRE01OBRAS PROVISIONALES01.01CARTEL PARA LA OBRA DE 7.20 X 3.60Mund1.001,506.971,506.971.001506.97100.00%0.000.000.00%1.001506.97100.00%0.000.000.00%01.02ALQUILER DE LOCAL PARA OFICINAS, ALMACN Y GUARDIANAmes6.00200.001,200.001.50300.0025.00%1.50300.0025.00%3.00600.0050.00%3.00600.0050.00%01.03INSTALACION PROVISIONAL PARA DEPOSITO DE AGUAund1.00677.75677.750.25169.4425.00%0.25169.4425.00%0.50338.8850.00%0.50338.8850.00%01.04AGUA PARA LA CONSTRUCCIONGLB1.002,000.002,000.000.25500.0025.00%0.25500.0025.00%0.501000.0050.00%0.501000.0050.00%01.05SERVICIOS HIGIENICOS EN OBRAGLB1.00300.00300.000.2575.0025.00%0.2575.0025.00%0.50150.0050.00%0.50150.0050.00%02TRABAJOS PRELIMINARES02.01DESMONTAJE DE PUERTAS DE FIERROund7.0022.22155.547.00155.54100.00%0.000.000.00%7.00155.54100.00%0.000.000.00%02.02DESMONTAJE DE PUERTAS DE MADERAund6.007.4044.406.0044.40100.00%0.000.000.00%6.0044.40100.00%0.000.000.00%02.03DESMONTAJE DEVENTANAS Y SOBREVENTANAS DE FIERROund22.0022.22488.8422.00488.84100.00%0.000.000.00%22.00488.84100.00%0.000.000.00%02.04DESMONTAJE DEVENTANAS DE MADERAund5.007.4037.005.0037.00100.00%0.000.000.00%5.0037.00100.00%0.000.000.00%02.05DESMONTAJE DE COBERTURA DE ETERNIT Y ESTRUCTURA DE TECHOm2186.146.651,237.83186.141237.83100.00%0.000.000.00%186.141237.83100.00%0.000.000.00%02.06DESMONTAJE DE COBERTURA DE CALAMINA Y ESTRUCTURA DE TECHOm2234.704.00938.80234.70938.80100.00%0.000.000.00%234.70938.80100.00%0.000.000.00%02.07DESMONTAJE DE TABIQUES DE CARTNm290.001.25112.5090.00112.50100.00%0.000.000.00%90.00112.50100.00%0.000.000.00%02.08DEMOLICION DE SARDINEL PERIMETRAL DE AULAS PROVISIONALESm70.101.2789.0370.1089.03100.00%0.000.000.00%70.1089.03100.00%0.000.000.00%02.09RETIRO DE LADRILLOS DE PISOS DE AULASm2209.311.66347.45209.31347.45100.00%0.000.000.00%209.31347.45100.00%0.000.000.00%02.10DESMONTAJE DE APARATOS SANITARIOSund5.0015.5177.555.0077.55100.00%0.000.000.00%5.0077.55100.00%0.000.000.00%02.11DEMOLICION DE MUROS DE CANTO, MANUALm214.7012.47183.3114.70183.31100.00%0.000.000.00%14.70183.31100.00%0.000.000.00%02.12DEMOLICION DE MUROS DE SOGA, MANUALm2314.119.983,134.82206.072056.5865.60%108.041078.2434.40%314.113134.82100.00%0.000.000.00%02.13DEMOLICION DE MUROS DE LADRILLO-CABEZA,m266.2512.47826.1457.32714.7886.52%8.93111.3613.48%66.25826.14100.00%0.000.000.00%02.14DEMOLICION DE COLUMNAS DE CONCRETOm37.84199.571,564.635.711139.5472.83%2.13425.0827.17%7.841564.63100.00%0.000.000.00%02.15DEMOLICION DE VIGAS DE CONCRETOm36.4112.4779.934.2553.0066.30%2.1626.9433.70%6.4179.93100.00%0.000.000.00%02.16EXCAVACION DE ZANJAS PARA DEMOLICIN DE CIMIENTACIONm320.8124.95519.210.000.000.00%20.81519.21100.00%20.81519.21100.00%0.000.000.00%02.17DEMOLICION DE SOBRECIMIENTOS DE CONCRETOm31.95124.73243.220.000.000.00%1.95243.22100.00%1.95243.22100.00%0.000.000.00%02.18DEMOLICION DE CIMIENTOS CORRIDOSm316.9199.791,687.450.000.000.00%16.911687.45100.00%16.911687.45100.00%0.000.000.00%02.19ACARREO DE MATERIAL EXCEDENTE HASTA 30.00 MT (