SUNGAI SELANGOR WATER SUPPLY SCHEME
PHASE 3 (SSP3)
SPLASH Welcomes Workshop Delegates, NAHRIM and LUAS
03 December 2008
Rasa WTPBadong WTP SSP1 WTP
The views expressed in this paper/presentation are the views of the author and do not necessarily reflect the views or policies of theAsian Development Bank (ADB), or its Board of Governors, or the governments they represent. ADB does not guarantee the accuracy
of the data included in this paper and accepts no responsibility for any consequence of their use. Terminology used may notnecessarily be consistent with ADB official terms.
8/6/2019 SWMA 2c Presentation
http://slidepdf.com/reader/full/swma-2c-presentation 2/10
WATER SUPPLY STRUCTURE IN SELANGOR
SPAN REGULATOR
PNSB (43%)
Plant Capacity – 1900 MLDSPLASH (45%)
Plant Capacity – 2000 MLD
ABASS (12%)
Plant Capacity – 545MLDSUPPLIER
SYABASDISTRIBUTORTotal Capacity: 4476 MLD (‘08)
CONSUMERS
Surplus Capacity: ~15%
8/6/2019 SWMA 2c Presentation
http://slidepdf.com/reader/full/swma-2c-presentation 3/10
PERAK
SUNGAI SELANGORThe Gap
Bukit Fraser
RIVER BASINSungai
Selangor DamCatchment
Area
Sg. Kerling
Sg. Beletak
Sg. SelangorDam
Sg. Tinggi Dam
Sg. Luit
Balancing
PAHANG
Rasa
Sg. KerlingSg. Buloh
Sg. Batang Kali
Rasa IntakeReservoir
Treatment
Plant
SELANGOR
KualaSelangor
Sg. Selangor
S . Serendah
.
Sg. LiamSg.
SembahBatang Intake
SerendahSg. Selangor
Sg. Rawang
Sg. Garing
Batu Arang
Treatment PlantBt. Badong
Area ofArea of SgSg. Selangor River Basin = 1960 km. Selangor River Basin = 1960 km22
Area of Water CatchmentArea of Water Catchment = 197 km= 197 km22
Batu CavesSg. Kundang
Bkt TadunBalancingReservoirKuang
Bt. Matang Pagar
Length ofLength of SgSg. Selangor. Selangor = 110 km= 110 km
SgSg. Selangor Dam Inundation Area = 6 km. Selangor Dam Inundation Area = 6 km22 /6/6 hechec..
SgSg.. TinggiTinggi Dam Inundation Area = 8 kmDam Inundation Area = 8 km22 /8/8 hechec..
8/6/2019 SWMA 2c Presentation
http://slidepdf.com/reader/full/swma-2c-presentation 4/10
Major Treatment Plants Within Sungai Selangor
River Basin
Treatment Plant Design Capacity Production
SSP1 (SPLASH) 950 700
SSP3 (SPLASH) 800 630asa
Rantau Panjang 37.5 42
TOTAL: 2987.5 2364
* Sg. Selangor supplies 67% of Klang Valley water demand
8/6/2019 SWMA 2c Presentation
http://slidepdf.com/reader/full/swma-2c-presentation 5/10
Operational Issues/Challenges
Protection of resource and water-related facilities against pollution threats by
human activities (uncontrolled development, recreational, farming, aquaculture,
ega se emen , encroac men
• Sufficient Quantity of Raw Water
• Unpredictable weather pattern
Prolonged Drought – Supply problem
Prolonged wet season - Flood
• Compliance:
- reate water qua ty- Treatment Plant Effluent discharge quality (DOE)
- 300MLD residual flow requirement during dry season (DOE
‘ ’
8/6/2019 SWMA 2c Presentation
http://slidepdf.com/reader/full/swma-2c-presentation 6/10
PERAKSUNGAI SELANGOR RIVERBASIN - Landuse The Gap
Bukit Fraser
Legend
Orang Asli village
Factory Open Dumping
Aquaculture
KKB
Sg. SelangorDam
Sg. Tinggi
Dam Sg. Luit
Pig Abattoir
Cow Abattoir
IWK
Landfill
Pig Farm
Vegetable farm
Sg. Rinting
Rasa
Batang Kali
Rasa
Bukit Tagar Landfill
Sungai TinggiRPS
KualaSelangor
Bestari
SSP1,2,3 WTPRantau
Panjang WTPKawasan Perindustrian
Serendah
BatuArang
Sg.Garing
Jaya
Bt. Badong TIP TOP Meat
Bukit Tadun BR
Kundang Open Dumping
Perindustrian Rawang
Kuang
8/6/2019 SWMA 2c Presentation
http://slidepdf.com/reader/full/swma-2c-presentation 7/10
SUNGAI SELANGOR RIVER BASIN ENVIRONMENTAL
MONITORING AND POLLUTION MAPPING
Legend:SP – Sampling station
8/6/2019 SWMA 2c Presentation
http://slidepdf.com/reader/full/swma-2c-presentation 8/10
Potable Water Supply/Demand Management In
Rasa Treatment
Plant
Consumers in
Northern Selangor
Sg SelangorSSP1
CONSUMERS
IN
THE KLANG
am
SSP2
VALLEYSg Tinggi
Dam
SSP3
8/6/2019 SWMA 2c Presentation
http://slidepdf.com/reader/full/swma-2c-presentation 9/10
8/6/2019 SWMA 2c Presentation
http://slidepdf.com/reader/full/swma-2c-presentation 10/10
UTILIZATION OF TREATED WATER IN SELANGOR
WATER
CONCESSION-NAIRES
Production 3850 MLD
Billed 2375 MLD (63%)
NRW 1395 MLD (37%)
Consumers in Selangor
Population ~ 7.1 million
~ 1.48 mil account
1140 MLD 1235 MLD
DOMESTIC - 85% by account
48% by consumption
NON-DOMESTIC - 15% by account
52% by consumption