RELACION DE DMEs CON TOPSOIL REGISTRA PROGRESIVAS INICIAL FINAL 1 DME 94+400 10.52 2 DME 155+300 4073.74 3 DME 156+700 2197.40 4 DME 155+300 118.38 5 DME152+900 5086.03 6 DME152+900 123.13 7 DME 160+000 5397.10 8 DME 146+500 55.65 9 DME 137+600 1598.48 10 DME 141+700 3000.93 11 DME 131+500 1771.00 12 DME 01A 60+400 12507.30 13 DME 107+200 1623.125 LONGITUD  (m) DESBROCE DE TOPSOIL (m3) CORTE DE MAT. COMUN (m3)

Upload: jose-belito-belito-mancha

Post on 20-Feb-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Relacion Dme Ts

7/24/2019 Relacion Dme Ts

http://slidepdf.com/reader/full/relacion-dme-ts 1/2

RELACION DE DMEs CON TOPSOIL REGISTRA

PROGRESIVAS

INICIAL FINAL

1 DME 94+400 10.52

2 DME 155+300 4073.74

3 DME 156+700 2197.40

4 DME 155+300 118.38

5 DME152+900 5086.03

6 DME152+900 123.13

7 DME 160+000 5397.10

8 DME 146+500 55.65

9 DME 137+600 1598.48

10 DME 141+700 3000.93

11 DME 131+500 1771.00

12 DME 01A 60+400 12507.3013 DME 107+200 1623.125

LONGITUD (m)

DESBROCE DETOPSOIL

(m3)

CORTE DEMAT. COMUN

(m3)

Page 2: Relacion Dme Ts

7/24/2019 Relacion Dme Ts

http://slidepdf.com/reader/full/relacion-dme-ts 2/2

O

ROCA FIJA(m3)

TERRAPLEN(m3)