proyecto final de simulacion

52
UNIVERSIDAD AUTONOMA GABRIEL RENE MORENO FACULTAD DE CIENCIAS EXACTAS Y TECNOLOGIA INGENIERÍA PETROLERA TEMA DEL PROYECTO: APLICACIÓN BOAST 98 A UN YACIMIENTO MODELO APLICANDO DIFERENTES METODOS DE PRODUCCION INTEGRANTES: - ARZE GUZMAN JHIMY DAVID - CALLAPA CALIZAYA JORGE LUIS - GABRIEL MACHAIS HAGIO ERWIN -GALARZA ASCUI LUIS RODOLFO -LAIME MARTINEZ ROSSEMBERT -GUTIERREZ VILARROEL RODRIGO

Upload: luis-r-galarza-ascui

Post on 27-Dec-2015

67 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Proyecto Final de Simulacion

UNIVERSIDAD AUTONOMA GABRIEL RENE MORENO

FACULTAD DE CIENCIAS EXACTAS Y TECNOLOGIA

INGENIERÍA PETROLERA

TEMA DEL PROYECTO:

APLICACIÓN BOAST 98 A UN YACIMIENTO MODELO APLICANDO DIFERENTES METODOS DE

PRODUCCION

INTEGRANTES:

- ARZE GUZMAN JHIMY DAVID

-CALLAPA CALIZAYA JORGE LUIS

-GABRIEL MACHAIS HAGIO ERWIN

-GALARZA ASCUI LUIS RODOLFO

-LAIME MARTINEZ ROSSEMBERT

-GUTIERREZ VILARROEL RODRIGO

Page 2: Proyecto Final de Simulacion

- PEDRAZA CALLAU MIGUEL ABAD

INTRODUCCION

Cada día se descubren nuevos yacimientos, y surge la necesidad de caracterizar las complejidades de ellos de forma más representativa, lo que impulsa el avance de tecnologías de simulación, para poder tener más exactitud en la resolución de problemas, ahorro en el tiempo computacional, lo que representa un menor costo económico.La tecnología de simulación, permite inferir el comportamiento de los yacimientos en un tiempo dado a través de un modelo, y así poder observar los mejores escenarios de producción, aún antes de empezar la explotación de los yacimientos.Con el desarrollo del presente proyecto se plantea realizar un estudio de simulación numérica de un modelo que se entrego en clase, con el cual realizaremos la simulacion utilizando el sotware BOAST 98. Dicho estudio se basará en la integración de los datos geológicos, petrofísicos, depresiones y de producción de la mencionada arena.

Page 3: Proyecto Final de Simulacion

1.- ASPECTOS GENERALES DEL PROYECTO

Planteamiento del problema

Para el Área Mayor de recobro se requiere desarrollar un plan de explotación con el fin de incrementar la producción del campo que conforman el área (ya sea por primaria, desarrolo de campo o inyeccioin de agua), para así poder obtener el mayor recobro de las reservas recuperables.

Como parte de la respuesta a esta necesidad se planteo el estudio de simulación numérica del yacimiento

Objetivo general

Dar a conocer diferentes escenarios de produccion para incrementar las reservas recuperables.

Demostrar las diferentes formas de recuperacion.

Objetivos específicos

Probar diferentes casos de recuperacion de HC en el yacimiento.

Realizar una Evaluación Económica de los distintos escenarios de recuperacion.

Justificación y alcance

El alcance de este Trabajo consta de la simulación numérica del Campo modelo entregado en clase, la cual consta de:

Selección de datos, digitalización, simulación estática y dinámica, predicción de los mejores escenarios de producción y evaluación económica. La importancia de este trabajo es que permitirá hacer un estudio, por medio de la simulación, de los mejores escenarios posibles para así poder obtener una mejor producción, recobro y una evaluación económica más favorable.

Page 4: Proyecto Final de Simulacion

2.-MARCO TEÓRICO

Simulación de yacimientos

La ingeniería de yacimientos siempre ha tenido como objetivo principal la estimación del posible comportamiento de los yacimientos explotados. A través del tiempo el propósito sigue siendo el mismo, pero existen diferentes técnicas para llevar a cabo este pronóstico, las cuales son: curvas de declinación, métodos de predicción analíticos, modelos físicos y estadísticos. La combinación de estos métodos ha sido utilizada hasta llegar a la simulación numérica de yacimientos.

La simulación de yacimientos es un proceso que permite reproducir el comportamiento de un yacimiento real a través de un modelo numérico el cual es usado para cuantificar e interpretar los fenómenos físicos con la habilidad de extrapolar éstos para estimar un comportamiento futuro y aproximado del yacimiento bajo uno o varios esquemas de explotación. Este modelo deberá ser capaz de reproducir el comportamiento de producción, de presión del yacimiento, validar el petróleo original en sitio (POES) y el gas original en sitio (GOES), para garantizar la validez de los resultados.

La simulación de yacimientos está relacionada con la construcción y operación de un modelo estático y dinámico capaz de reproducir el comportamiento real del yacimiento.

Modelo estático

El modelo estático está compuesto por la integración de los modelos geológico, estructural, estratigráfico, sedimentológico, petrofísico, conformando así las características del yacimiento, utilizando herramientas/técnicas especializadas y pericias claves para integrar datos provenientes de diferentes disciplinas, realizando interpretaciones, modelado, predicción y visualización de volúmenes en tres dimensiones.

Page 5: Proyecto Final de Simulacion

Estructura del modelo entregado en clase.Modelo dinámicoEl modelo dinámico del yacimiento permitirá simular el flujo de fluidos y la caída de presión a lo largo del yacimiento. Una vez completada la fase de construcción del modelo estático, se procede a la elaboración del modelo dinámico, el cual está constituido por: la integración de datos sísmicos, registros de pozos, y los resultados de las pruebas transientes de presión y producción.

La evaluación de diferentes escenarios de explotación se realiza mediante un simulador de yacimientos para definir un plan óptimo de operación del yacimiento.

Los simuladores de yacimientos juegan un papel importante en la formulación de los planes iniciales de desarrollo, ajuste histórico y optimización de la producción futura por medio de la planificación, y diseño de proyectos de recuperación de petróleo.En la creación del modelo dinámico se siguen los siguientes pasos:

1. Revisión del objetivo y alcance del proyecto.2. Selección del simulador.3. Incorporación de información y datos validados.4. Construcción del modelo.5. Inicialización y cotejo histórico.6. Predicción.7. Actualización del modelo.

Una vez construido el modelo del yacimiento, se procede a evaluar los diferentes escenarios. El primer caso a predecir es el esquema actual o caso base. Con la finalidad de mejorar el esquema de explotación, se debe realizar un estudio de sensibilidades al caso base, variando condiciones de producción, perforando pozos adicionales, y evaluando la factibilidad de implementar otros procesos de recuperación con la finalidad de aumentar el recobro.

Page 6: Proyecto Final de Simulacion

El modelo siempre se puede mejorar, al actualizarlo con nueva información, lo que representa la última etapa del proceso de simulación. Se debe mantener un seguimiento de la respuesta del modelo y verificar si el yacimiento se esta comportando según las predicciones derivadas del mismo. En caso de que los resultados no concuerden con los datos reales, es necesario determinar las razones de la desviación y corregir el modelo.

Simulador

Un simulador de yacimientos está conformado, de tal forma que realice dos cálculos principales:

Cálculos de Inicialización: se refiere a las condiciones iniciales del yacimiento. Cálculos a medida que avanza el tiempo: este permite saber cómo es el

comportamiento del yacimiento en distintos momentos de su historia, pasado y futuro.

El simulador está dividido en 3 etapas principales:

Inicialización: su principal objetivo es el cálculo del POES. Cotejo Histórico: su principal resultado es una descripción acertada y confiable

del yacimiento. Predicciones: permite obtener los mejores escenarios de explotación.

Page 7: Proyecto Final de Simulacion

Etapas de un simulador

MECANISMOS DE PRODUCCIÓN PRIMARIA Y SECUNDARIA

Mecanismo de producción primaria

Gas en Solución

El primer mecanismo de empuje primario es por gas en solución. Cuando la presión del yacimiento está por encima de la presión de burbuja, permite que el gas que esté disuelto en el petróleo se expanda, por lo que a medida que la presión vaya declinando se producirá una expansión del petróleo con el gas disuelto, lo que provocará que el fluido sea empujado hacia los pozos productores.

Empuje por Agua

Este mecanismo se produce cuando la presión del yacimiento empieza a declinar, lo que crea un diferencial de presión por el contacto agua petróleo, esto permite que el acuífero invada al yacimiento de petróleo, ocasionando una intrusión de agua, lo cual ayuda a mantener la presión del yacimiento y hace un desplazamiento inmiscible del petróleo en la parte invadida.Capa de Gas

El empuje producto por la capa de gas, se debe a una declinación de la presión, la cual origina la expansión de la capa de gas. Este tipo de mecanismo se da en algunos yacimientos donde la presión inicial del yacimiento es igual o menor a la presión de burbuja, por lo tanto el gas en el yacimiento no sólo se encuentra disuelto en él, sino que hay una capa de gas inicial.

Por Segregación Gravitacional

Este mecanismo se da cuando el gas libre se mueve hacia el tope del yacimiento a medida que se produce el petróleo. El petróleo se va a la base del yacimiento debido a la permeabilidad vertical, la cual debe ser alta y así permite que las fuerzas gravitacionales sean mayores a las fuerzas viscosas dentro del yacimiento.

Por Compactación

La expulsión de líquido o gas del yacimiento, causa una reducción en la presión de los fluidos dentro de los poros, y consecuentemente un incremento en la presión de los granos. Este incremento de presión entre los granos causará que el yacimiento se compacte y esto, a su vez, conduce a una subsidencia en la superficie del terreno. El factor que regula el grado de compactación es la compresibilidad de los poros (Cf).Todos los yacimientos conllevan un elemento del empuje por compactación, que resulta del agotamiento de la presión.

Page 8: Proyecto Final de Simulacion

Mecanismo de producción secundaria

Estos métodos se usan para poder aumentar la energía inicial que posee el yacimiento y en consecuencia aumentar el recobro del mismo.

Los métodos convencionales son:

Inyección de Agua Inyección de Gas

Se han utilizado otros métodos de recobro los cuales no resultan rentables y por eso aun en día los métodos de recobro principales son los antes mencionados.

Inyección de agua

Este método consiste en inyectar agua en la estructura más profunda del yacimiento con el objeto de incrementar la producción de petróleo; esto es posible porque, al inyectar agua, la presión del yacimiento se mantiene constante y en algunos casos aumenta. También, el agua permite el desplazamiento del crudo y así aumenta la recuperación. La ventaja de la inyección de agua es que permite una buena eficiencia de desplazamiento.

Inyección de gas

Esto consiste en inyectar gas en el yacimiento. El gas no sólo desplaza al petróleo sino que también reduce su viscosidad, con lo que el crudo fluye más rápido a una presión dada.

Evaluación económica

El proyecto es un conjunto de antecedentes que permite predecir o estimar las ventajas y desventajas económicas. El objetivo básico de un proyecto es la evaluación económica, que permite calificarlo como rentable o no rentable. Los criterios básicos para que se dé un proyecto se explican a continuación:

Interés: es lo que se paga por el uso del dinero que se toma en préstamo.

Ingresos: definidos por el volumen de producción y por los precios de venta de los bienes y servicios que se produzcan.

Page 9: Proyecto Final de Simulacion

Costo de capital: es la tasa de rendimiento que debe obtener la empresa sobre sus inversiones para que su valor en el mercado permanezca inalterado, teniendo en cuenta que este costo es también la tasa de descuento de las utilidades empresariales futuras. Es por ello, que el administrador de las finanzas empresariales debe proveerse de las herramientas necesarias para tomar las decisiones sobre las inversiones a realizar y por ende las que más le convengan a la organización.

Valor presente neto (VPN): se refiere al valor en el presente de una cantidad de dinero futura o pagos dada a una tasa de interés. Esto se refiere a la equivalencia de valor de un flujo futuro en la actualidad, ya que existe la devaluación de dinero, el valor en la actualidad de un dinero no es en número lo mismo en el futuro, por tal motivo se calcula en los proyectos el valor presente neto para así poder saber la rentabilidad del mismo.

Tasa interna de retorno (TIR): aquella tasa que hace el valor presente de los ingresos igual al valor presente de los egresos, al descontarlos al periodo cero.Equivale a decir que es la tasa que hace el valor presente neto igual a cero.

Período de recuperación (PR): Es el tiempo que se debe emplear para poder recuperar la inversión sin tomar en cuenta los intereses. La inversión se podrá recuperar en el año en el cual los ingresos acumulados superan a la inversión hecha inicialmente.

Tipos de SimuladoresExisten diferentes tipos de simuladores especializados en áreas específicas, los más comunes son:Petróleo Negro ComposicionalTérmicoEn nuestro caso utilizaremos el BOAST 98, que sirve para yacimiento de petroleo negro.Petróleo Negro: en este tipo de simulación se definen dos tipos de componentes dehidrocarburos: Petróleo y Gas; es decir, la fase gaseosa estará compuesta por un solocomponente, en este caso el gas y en la fase liquida de hidrocarburo se tendrá comocomponente al petróleo y al gas disuelto en él. En este simulador, las propiedades deestos componentes solo varían con la presión, debido a que se asume que el procesoes isotérmico.Simulador Composicional: se utilizan cuando los hidrocarburos cambian suspropiedades con la variación de la temperatura y la presión; aplica para petróleos muylivianos, volátiles y condensados.Térmico: los métodos de recuperación térmica son utilizados para petróleos muypesados donde la temperatura puede variar. Estos tipos de simuladores permitenestudiar los procesos de inyección de vapor, inyección de fluido calientes o gas.

Page 10: Proyecto Final de Simulacion

DESCRIPCIÓN DEL ÁREA DE LA ESTRUCTURA DEL MODELO ENTREGADO EN CLASES

FUNDAMENTOS GEOLÓGICOS:MODELO ESTRUCTURAL

El Área de la estructura esta conformado por un conjuntode fallas alrededor de la estructura.

Se puede decir que estas fallas son considerados trampas estructurales por los hidrocarburos en sus procesos migratorios

CONSTRUCCIÓN DEL MODELO ESTÁTICO.

Page 11: Proyecto Final de Simulacion

VISTA EN PLANTA DE TOPE DE LA ARENA

ELABORACIÓN DE LAS GRILLA DEL MAPA ESTTRUCTURAL

La construcción del modelo estático se realizó en diferentes secciones de GRID,del simulador BOAST 98, como se indicará a continuación:

DESARROLLO DEL PROYECTO:

Page 12: Proyecto Final de Simulacion

CASO BASE : PRODUCCION POR PRIMARIA

En esta etapa producimos con 3 pozos durante los primeros 4 periodos anuales.

Posteriormente incrementamos 2 pozos mas con los cuales tendremos mayor recuperacion, hasta 35 periodos anuales.

Los resultados obtenidos por el simulador (graficos) fueron los siguientes:

PRODUCCION DE PETROLEO VS TIEMPO

0 2000 4000 6000 8000 10000 12000 140000

5000

10000

15000

20000

25000

30000

Series2Series4

tiempo (dias)

prod

uccio

n oi

l(bbl

)

Page 13: Proyecto Final de Simulacion

PRODUCCION ACUMULADA VERSUS TIEMPO

0 2000 4000 6000 8000 10000 12000 140000

5000

10000

15000

20000

25000

30000

35000

Series2Series4

PRESION VERSUS TIEMPO

0 2000 4000 6000 8000 10000 12000 140000

1000

2000

3000

4000

5000

Chart Title

Series2 Series4

Page 14: Proyecto Final de Simulacion

CASO 2: DESARROLLO DE CAMPO

En esta etapa vamos a implementar 5 pozos mas a partir del decimo periodo anual, con esta inversion se espera obtener mayor produccion de HC. Los resultados y comportamiento que se obtubieron fueron:

PRODUCCION DE PETROLEO VS TIEMPO

Page 15: Proyecto Final de Simulacion

PRODUCCION ACUMULADA VERSUS TIEMPO

PRESION VERSUS TIEMPO

Page 16: Proyecto Final de Simulacion

CASO 3: Inyeccion de agua

En este caso vamos a implementar 10 pozos inyectores de agua con el objetivo de incrementar mas la produccion. Los resultados y el comportamiento que se obtubieron fueron:

PRESION DE LOS FRENTE DE INVACION EN EL MOMENTO DE LA INYECCION

Produccion oil vs Tiempo

Page 17: Proyecto Final de Simulacion

Produccion acumulada vs tiempo

Presion de reservorio vs Tiempo

Page 18: Proyecto Final de Simulacion

Inyeccion de agua

ANALISIS ECONOMICO DE LOS DISTINTOS CASOS

CASO 1: PRODUCCION PRIMARIAColumna1 Columna2 Columna3gas naturalPRODUCCION= 1,8 $/MPCTRANSPORTE= 1,5 $/MPCPRECIOS DE VENTA 4,85 $/MPCPETROLEOPRODUCCION= 2,5 $/BblTRANSPORTE= 1,5 $/BblPRECIOS DE VENTA 27 $/Bblimpuestos y regalias 50%FD 0,12inversion total $ 69,1075 MM$Costo de perforacion 4200 $/mcosto de terminacion 1,1 MM$/pozonumero total de pozos 5 profundidad 2557,5 m

Page 19: Proyecto Final de Simulacion

Estudios G&G 4 MM$Facilidades de produccion 5 MM$numero total de pozos productores 5 0bras civiles,camino y planchada 180 M$/pozo

PERIODO AÑO POZOS

ANUAL ANUALPRODUCCION DE

LA

produccion PRODUCCION

produccion PRODUCCION VENTA DEL GAS

Qo(Bblpd) Qo(MBPA) QG(MPCD) QG(MMPCA) MMPCA0 2012 0 0 0 0 0 01 2013 3 11704 4271,96 11242 4103,33 3898,16352 2014 3 27150 9909,75 26080 9519,2 9043,243 2015 3 27127 9901,355 26057 9510,805 9035,264754 2016 5 27097 9890,405 26028 9500,22 9025,2095 2017 5 23503 8578,595 22576 8240,24 7828,2286 2018 5 11738 4284,37 11328 4134,72 3927,9847 2019 5 6098 2225,77 5917 2159,705 2051,719758 2020 5 1675 611,375 1698 619,77 588,78159 2021 5 1170 427,05 1190 434,35 412,6325

10 2022 5 878 320,47 948 346,02 328,71911 2023 5 716 261,34 1114 406,61 386,279512 2024 5 659 240,535 1042 380,33 361,313513 2025 5 614 224,11 1401 511,365 485,7967514 2026 5 601 219,365 1215 443,475 421,3012515 2027 5 597 217,905 1245 454,425 431,7037516 2028 5 594 216,81 1203 439,095 417,1402517 2029 5 592 216,08 1170 427,05 405,697518 2030 5 590 215,35 1212 442,38 420,26119 2031 5 585 213,525 1373 501,145 476,0877520 2032 5 589 214,985 1052 383,98 364,78121 2033 5 585 213,525 1209 441,285 419,2207522 2034 5 583 212,795 1222 446,03 423,728523 2035 5 583 212,795 1132 413,18 392,52124 2036 5 583 212,795 1107 404,055 383,8522525 2037 5 581 212,065 1110 405,15 384,892526 2038 5 578 210,97 1253 457,345 434,4777527 2039 5 580 211,7 1055 385,075 365,8212528 2040 5 578 210,97 1169 426,685 405,35075

Page 20: Proyecto Final de Simulacion

29 2041 5 575 209,875 1246 454,79 432,050530 2042 5 577 210,605 1069 390,185 370,6757531 2043 5 577 210,605 1037 378,505 359,5797532 2044 5 573 209,145 1198 437,27 415,406533 2045 5 574 209,51 1097 400,405 380,3847534 2046 5 573 209,145 1124 410,26 389,74735 2047 5 571 208,415 1156 421,94 400,843

152948 162275

COSTO DE PRODUCCION (MM$) COSTO DE TRASPORTE (MM$) COSTO TOTAL (MM$)

0 0 017,6965943 12,25518525 29,9517796

41,052207 28,429485 69,48169241,01686405 28,40492963 69,4217937

40,9713887 28,373421 69,344809735,5372979 24,6102345 60,147532417,7812962 12,318531 30,09982729,25752055 6,416234625 15,6737552

2,5882442 1,80023475 4,388478951,8103635 1,25952375 3,069887251,3928692 0,9737835 2,36665271,3486531 0,97142925 2,320082351,2517018 0,90277275 2,15447455

1,43470915 1,064860125 2,499569281,30675475 0,960999375 2,267754131,32182925 0,974413125 2,296242381,29287745 0,950925375 2,24380283

1,2704555 0,93266625 2,203121751,2948448 0,9534165 2,2482613

1,39077045 1,034419125 2,425189581,1940683 0,869649 2,0637173

1,28840985 0,949118625 2,237528481,2946988 0,95478525 2,249484051,2385253 0,907974 2,1464993

1,22292155 0,894970875 2,117892431,222969 0,89543625 2,11840525

1,30948495 0,968171625 2,27765658

Page 21: Proyecto Final de Simulacion

1,18772825 0,866281875 2,054010131,25705635 0,924481125 2,18153748

1,3023784 0,96288825 2,265266651,19372885 0,871921125 2,065649981,17375605 0,855277125 2,02903318

1,2705942 0,93682725 2,207421451,20846755 0,884842125 2,09330968

1,2244071 0,898338 2,12274511,2425549 0,913887 2,1564419

Page 22: Proyecto Final de Simulacion

ANALISIS DEL CASH FLOW REGALIAS

COSTO BRUTO (MM$)

COSTO TOTAL (MM$)

IMPUESTOS INVERSIONES (MM$)

FLUJO DE CAJA

(MM$)

VAN 12% (MM$)

VAN ACUMULADO 12% (MM$)

0 0 0 69,11 -69,11 -69,1075 -69,1075

134,249013 29,9517796 54,86932124 49,4344,1320644

5 -24,97543555

311,422964 69,481692 127,281997 114,6691,4056720

3 66,43023649

311,157619 69,4217937 127,1738799 114,5681,5429299

4 147,9731664

310,8131987 69,3448097 127,0331783 114,4472,7256451

6 220,6988116

269,5889708 60,1475324 110,1842509 99,2656,3211938

1 277,0200054

134,7287124 30,0998272 55,0458252 49,5825,1203212

8 302,1403267

70,04663079 15,6737552 28,60708077 25,7711,6551370

8 313,7954638

19,36271528 4,38847895 7,881122888 7,092,86478955

2 316,6602533

13,53161763 3,06988725 5,506285063 4,961,78698325

8 318,4472366

10,24697715 2,3666527 4,149705075 3,731,20115959

5 319,6483962

8,929635575 2,32008235 3,493388538 3,120,89582288

4 320,544219

8,246815475 2,15447455 3,220634988 2,870,73709538

8 321,2813144

8,407084238 2,49956928 3,138681994 2,770,63454505

3 321,9158595

7,966166063 2,26775413 3,022083656 2,680,54762979

1 322,46348937,977198188 2,29624238 3,014185969 2,67 0,48720888 322,9506982

7,877000213 2,24380283 2,987574731 2,650,43155836

4 323,3822565

7,801792875 2,20312175 2,968230188 2,630,38310883

7 323,7653654

7,85271585 2,2482613 2,972941425 2,630,34220088

8 324,1075662

8,074200588 2,42518958 3,002681169 2,650,30725682

9 324,4148231

7,57378285 2,0637173 2,917242425 2,590,26878958

6 324,6836127

7,798395638 2,23752848 2,950079194 2,610,24165352

1 324,9252662

7,800548225 2,24948405 2,945488863 2,610,21533128

5 325,1405975

7,64919185 2,1464993 2,916621925 2,590,19082086

5 325,3314183

7,607148413 2,11789243 2,908603331 2,580,17001882

5 325,5014372

7,592483625 2,11840525 2,900805563 2,570,15136841

5 325,65280560,13614541

Page 23: Proyecto Final de Simulacion

20% (MM$)

50% (MM$) 80% (MM$)

83.5% (MM$)

90% (MM$)

120% (MM$)

140% (MM$)

160% (MM$)

180% (MM$)

-69,1075 -69,1075 -69,1075 -69,1075 -69,1075 -69,1075 -69,1075 -69,1075 -69,107541,1899268 32,95194146 27,4599512 26,9361919 26,0146906 22,4672328 20,5949634 19,0107355 17,652825879,6244965 50,95967778 35,3886651 34,0515632 31,761572 23,6899329 19,9061241 16,9614312 14,624907566,2974221 33,94428014 19,6436806 18,5409582 16,7024268 10,7590107 8,28717777 6,51808975 5,2187475255,1867335 22,60448605 10,9010832 10,0928867 8,78102613 4,88504929 3,44917084 2,50418426 1,8617765239,8892375 13,07090535 5,25290371 4,77069467 4,00861143 1,92596576 1,24653867 0,83540145 0,5767290216,6052665 4,352970974 1,45780117 1,29872414 1,05392989 0,43731789 0,25945729 0,16050673 0,102892847,19076047 1,50801177 0,42085841 0,3677825 0,28824935 0,1032963 0,05617782 0,03207969 0,019095781,64963149 0,276762237 0,06436605 0,05517576 0,04176458 0,01292574 0,00644387 0,00339664 0,00187747

0,9603985 0,128902505 0,02498217 0,02100671 0,01535678 0,00410467 0,00187578 0,00091269 0,000468450,60251586 0,064694647 0,01044855 0,00861827 0,00608478 0,0014046 0,00058839 0,00026427 0,000125950,41939833 0,036026042 0,00484867 0,00392305 0,00267504 0,0005333 0,00020478 8,4901E-05 3,7574E-050,32208093 0,022133233 0,00248239 0,00197019 0,00129747 0,00022339 7,8633E-05 3,0093E-05 1,2366E-050,25878587 0,014226904 0,0013297 0,00103521 0,00065842 9,7904E-05 3,159E-05 1,1159E-05 4,2584E-060,20845002 0,009167729 0,00071404 0,0005453 0,00033496 4,3015E-05 1,2723E-05 4,1487E-06 1,47E-060,17308795 0,006089991 0,00039527 0,0002961 0,00017566 1,9483E-05 5,2822E-06 1,59E-06 5,2314E-070,14309615 0,004027799 0,00021786 0,00016009 9,1721E-05 8,7855E-06 2,1835E-06 6,0667E-07 1,8535E-070,11856251 0,00266979 0,00012034 8,6739E-05 4,7997E-05 3,9705E-06 9,0456E-07 2,32E-07 6,5818E-080,09884236 0,001780586 6,6881E-05 4,7289E-05 2,5272E-05 1,8055E-06 3,7705E-07 8,9266E-08 2,3516E-080,08283241 0,001193741 3,7365E-05 2,5915E-05 1,3376E-05 8,253E-07 1,5799E-07 3,4526E-08 8,4458E-090,06763134 0,000779736 2,0339E-05 1,3837E-05 6,8976E-06 3,6755E-07 6,4498E-08 1,3011E-08 2,9554E-090,05674994 0,000523426 1,1378E-05 7,593E-06 3,6555E-06 1,6823E-07 2,706E-08 5,0388E-09 1,0628E-09

0,0471972 0,000348254 6,3082E-06 4,1296E-06 1,9201E-06 7,6314E-08 1,1253E-08 1,9341E-09 3,7881E-100,03903658 0,000230431 3,4783E-06 2,2336E-06 1,003E-06 3,4429E-08 4,6535E-09 7,3833E-10 1,3428E-100,03246233 0,000153299 1,9284E-06 1,2147E-06 5,268E-07 1,5617E-08 1,9349E-09 2,8338E-10 4,7856E-110,02697458 0,000101907 1,0683E-06 6,6006E-07 2,7647E-07 7,0781E-09 8,0391E-10 1,0868E-10 1,7043E-110,02264432 6,84382E-05 5,9784E-07 3,6235E-07 1,4658E-07 3,241E-09 3,3743E-10 4,2108E-11 6,1314E-120,01861635 4,50116E-05 3,2767E-07 1,9481E-07 7,611E-08 1,4534E-09 1,387E-10 1,5977E-11 2,1603E-120,01561479 3,02034E-05 1,8322E-07 1,0686E-07 4,0319E-08 6,6493E-10 5,817E-11 6,1852E-12 7,7658E-130,01303579 2,01719E-05 1,0197E-07 5,8337E-08 2,1259E-08 3,0279E-10 2,4281E-11 2,3832E-12 2,7785E-130,01073539 1,32898E-05 5,5986E-08 3,1418E-08 1,1057E-08 1,3601E-10 9,9981E-12 9,0585E-13 9,8065E-140,00892181 8,83574E-06 3,1019E-08 1,7075E-08 5,8038E-09 6,1655E-11 4,1545E-12 3,4745E-13 3,4928E-140,00748994 5,93414E-06 1,736E-08 9,374E-09 3,0772E-09 2,8233E-11 1,7439E-12 1,3463E-13 1,2567E-140,00619804 3,92847E-06 9,5773E-09 5,0728E-09 1,6083E-09 1,2743E-11 7,2155E-13 5,1418E-14 4,4568E-150,00516876 2,62087E-06 5,3246E-09 2,7664E-09 8,4708E-10 5,7967E-12 3,0086E-13 1,979E-14 1,5929E-15

Page 24: Proyecto Final de Simulacion

0,00430545 1,7465E-06 2,9568E-09 1,507E-09 4,4564E-10 2,6337E-12 1,2531E-13 7,6084E-15 5,6863E-16

242,296808 90,85478596 31,5274985 27,0442225 19,5715469-

4,82032627-

15,2986453 -23,080365-

29,0479967

Page 25: Proyecto Final de Simulacion

RUI4,80012458

8

ANALISIS ECONOMICO EL CASO 2 “DESARROLLO DE CAMPO”

Columna1 Columna2 Columna3gas naturalPRODUCCION= 1,8 $/MPCTRANSPORTE= 1,5 $/MPCPRECIOS DE VENTA 4,85 $/MPC

PETROLEOPRODUCCION= 2,5 $/BblTRANSPORTE= 1,5 $/BblPRECIOS DE VENTA 27 $/Bbl

impuestos y regalias 50%FD 0,12

inversion total $ 129,215 MM$Costo de perforacion 4200 $/mcosto de terminacion 1,1 MM$/pozonumero total de pozos 10 profundidad 2557,5 mEstudios G&G 4 MM$Facilidades de produccion 5 MM$numero total de pozos productores 10 Obras civiles,camino y planchada 180 M$/pozo

Page 26: Proyecto Final de Simulacion

PERIODO AÑO POZOS

ANUAL ANUALPRODUCCION DE

LA INGRESO BRUTO

produccion PRODUCCION

produccion PRODUCCION VENTA DEL GAS

Qo(Bblpd) Qo(MBPA) QG(MPCD) QG(MMPCA) MMPCA M$0 2012 0 0 0 0 0 0 01 2013 3 27148 9909,02 26078 9518,47 9042,5465 311399,8912 2014 3 34403 12557,095 33047 12062,155 11459,04725 394617,9443 2015 3 17052 6223,98 16448 6003,52 5703,344 195708,6784 2016 5 7113 2596,245 6874 2509,01 2383,5595 81658,87865 2017 5 2501 912,865 2408 878,92 834,974 28696,97896 2018 5 1898 692,77 2171 792,415 752,79425 22355,84217 2019 5 1640 598,6 2101 766,865 728,52175 19695,5305

Page 27: Proyecto Final de Simulacion

8 2020 5 1440 525,6 1930 704,45 669,2275 17436,95349 2021 5 1306 476,69 2053 749,345 711,87775 16323,2371

10 2022 10 1250 456,25 2110 770,15 731,6425 15867,216111 2023 10 1199 437,635 2219 809,935 769,43825 15547,920512 2024 10 1169 426,685 2312 843,88 801,686 15408,672113 2025 10 1152 420,48 2372 865,78 822,491 15342,041414 2026 10 1149 419,385 2322 847,53 805,1535 15228,389515 2027 10 1140 416,1 2423 884,395 840,17525 15309,5516 2028 10 1135 414,275 2412 880,38 836,361 15241,775917 2029 10 1134 413,91 2226 812,49 771,8655 14919,117718 2030 10 1131 412,815 2197 801,905 761,80975 14840,782319 2031 10 1127 411,355 2181 796,065 756,26175 14774,454520 2032 10 1125 410,625 2083 760,295 722,28025 14589,934221 2033 10 1119 408,435 2150 784,75 745,5125 14643,480622 2034 10 1116 407,34 2057 750,805 713,26475 14457,51423 2035 10 1113 406,245 2094 764,31 726,0945 14490,173324 2036 10 1109 404,785 2105 768,325 729,90875 14469,252425 2037 10 1107 404,055 2028 740,22 703,209 14320,048726 2038 10 1105 403,325 1976 721,24 685,178 14212,888327 2039 10 1103 402,595 1946 710,29 674,7755 14142,726228 2040 10 1098 400,77 2036 743,14 705,983 14244,807629 2041 10 1095 399,675 2018 736,57 699,7415 14184,971330 2042 10 1093 398,945 1990 726,35 690,0325 14118,172631 2043 10 1089 397,485 2014 735,11 698,3545 14119,114332 2044 10 1083 395,295 2160 788,4 748,98 14305,51833 2045 10 1085 396,025 1928 703,72 668,534 13935,064934 2046 10 1081 394,565 1970 719,05 683,0975 13966,277935 2047 10 1079 393,835 1932 705,18 669,921 13882,6619

COSTO DE PRODUCCION

(MM$)

COSTO DE TRASPORTE

(MM$)

COSTO TOTAL (MM$)

0 0 0

41,0491337 28,42734975 69,4764835

52,01902255 36,02421338 88,0432359

25,8259692 17,890986 43,7169552

10,7810196 7,46970675 18,2507264

Page 28: Proyecto Final de Simulacion

3,7851157 2,6217585 6,4068742

3,08695465 2,168346375 5,25530103

2,80783915 1,990682625 4,79852178

2,5186095 1,79224125 4,31085075

2,47310495 1,782851625 4,25595658

2,4575815 1,78183875 4,23942025

2,47907635 1,810609875 4,28968623

2,5097473 1,8425565 4,3523038

2,5316838 1,8644565 4,3961403

2,4977388 1,83680775 4,33454655

2,55256545 1,884412875 4,43697833

2,5411373 1,875954 4,4170913

2,4241329 1,77866325 4,20279615

2,40329505 1,761937125 4,16523218

2,38965865 1,751425125 4,14108378

2,32666695 1,699357875 4,02602483

2,36301 1,73092125 4,09393125

2,30222655 1,680907125 3,98313368

2,3225826 1,69850925 4,02109185

2,32579825 1,702040625 4,02783888

2,2759137 1,660896 3,9368097

2,2416329 1,6327545 3,8743874

2,2210834 1,61605575 3,83713915

2,2726944 1,6601295 3,9328239

2,2587222 1,64912475 3,90784695

Page 29: Proyecto Final de Simulacion

2,239421 1,63346625 3,87288725

2,2507506 1,64375925 3,89450985

2,3364015 1,7164125 4,052814

2,1934237 1,5968385 3,7902622

2,215988 1,61649375 3,83248175

2,1904453 1,595634 3,7860793

COSTO BRUTO (MM$)

COSTO TOTAL (MM$)

IMPUESTOS INVERSIONES (MM$)

FLUJO DE CAJA

(MM$)

VAN 12% (MM$)

VAN ACUMULADO 12% (MM$)

0 0 0 129,22 -129,22 -129,215 -129,215

311,3998905 69,4764835 127,2725955 114,65 102,366796 -26,84820396

394,6179442 88,0432359 161,2847587 145,29 115,8242582 88,97605427

195,7086784 43,7169552 79,9633532 72,03 51,26837105 140,2444253

81,65887858 18,2507264 33,35973254 30,05 19,09631394 159,3407393

28,6969789 6,4068742 11,72673095 10,56 5,993941953 165,3346812

22,35584211 5,25530103 9,009574681 8,09 4,099135382 169,4338166

19,69553049 4,79852178 7,857082619 7,04 3,184505045 172,6183216

17,43695338 4,31085075 6,926235438 6,20 2,504022373 175,122344

16,32323709 4,25595658 6,378766919 5,69 2,051335029 177,173679

15,86721613 4,23942025 6,151769313 5,48 1,763133996 178,936813

15,54792051 4,28968623 5,963350381 5,29 1,522152597 180,4589656

15,4086721 4,3523038 5,86177955 5,19 1,33332155 181,7922872

15,34204135 4,3961403 5,806564175 5,14 1,177803366 182,9700906

Page 30: Proyecto Final de Simulacion

15,22838948 4,33454655 5,777386988 5,12 1,046928255 184,0170188

15,30954996 4,43697833 5,770362106 5,10 0,932154606 184,9491734

15,24177585 4,4170913 5,744933925 5,08 0,828617364 185,7777908

14,91911768 4,20279615 5,680895588 5,04 0,733381292 186,5111721

14,84078229 4,16523218 5,658454019 5,02 0,65242112 187,1635932

14,77445449 4,14108378 5,635802119 5,00 0,580251582 187,7438448

14,58993421 4,02602483 5,595609231 4,97 0,515047605 188,2588924

14,64348063 4,09393125 5,590819063 4,96 0,458978152 188,7178705

14,45751404 3,98313368 5,547849894 4,93 0,407140846 189,1250114

14,49017333 4,02109185 5,546577413 4,92 0,363221512 189,4882329

14,46925244 4,02783888 5,532585594 4,91 0,323403912 189,8116368

14,32004865 3,9368097 5,499128325 4,88 0,287299537 190,0989363

14,2128883 3,8743874 5,47368965 4,86 0,255503825 190,3544402

14,14272618 3,83713915 5,455307338 4,85 0,227446978 190,5818871

14,24480755 3,9328239 5,462274275 4,85 0,20305378 190,7849409

14,18497128 3,90784695 5,443360888 4,83 0,180701907 190,9656428

14,11817263 3,87288725 5,425620063 4,82 0,160870422 191,1265132

14,11911433 3,89450985 5,415797913 4,81 0,143310696 191,2698239

14,305518 4,052814 5,4363465 4,82 0,128156899 191,3979808

13,9350649 3,7902622 5,37069395 4,77 0,113422068 191,5114029

13,96627788 3,83248175 5,366645188 4,77 0,101122112 191,612525

13,88266185 3,7860793 5,345696925 4,75 0,089979543 191,7025046

Page 31: Proyecto Final de Simulacion

129,22 399,54 191,7025046

20% (MM$)

50% (MM$) 80% (MM$)

83.5% (MM$)

90% (MM$)

120% (MM$)

140% (MM$)

160% (MM$)

180% (MM$)

-129,215 -129,215 -129,215 -129,215 -129,215 -129,215 -129,215 -129,215 -129,215

95,54234376,4338743

8 63,694895362,480006

3 60,3425324 52,1140053 47,7711715 44,096466 40,9467184

100,895798 64,5733109 44,84257743,148274

8 40,2465234 30,0185846 25,2239496 21,4925961 18,5318813

41,683084521,3417392

6 12,350543611,657230

4 10,5012932 6,76449756 5,21038556 4,09810935 3,28117575

14,49094315,93549030

9 2,862408522,6501921

4 2,30572354 1,28271718 0,90568395 0,65754919 0,48886564

4,245182991,39106156

4 0,55903644 0,5077177 0,42661355 0,2049695 0,13266197 0,08890699 0,06137797

2,709648280,71031803

8 0,237884070,2119258

8 0,17198034 0,07136156 0,04233825 0,0261915 0,01679006

1,964714170,41203042

5 0,114990130,1004883

3 0,07875768 0,0282234 0,01534933 0,00876506 0,005217491,44189096 0,24190916 0,05626034 0,0482274 0,0365051 0,01129798 0,00563239 0,0029689 0,00164104

1,102472040,14797129

3 0,028677830,0241142

7 0,01762854 0,00471188 0,00215327 0,0010477 0,00053775

0,884408860,09496267

8 0,0153370,0126504

2 0,00893161 0,00206176 0,00086368 0,00038791 0,00018488

0,712627760,06121425

8 0,00823870,0066659

1 0,00454534 0,00090616 0,00034796 0,00014426 6,3844E-05

0,58260770,04003649

6 0,004490360,0035638

4 0,00234697 0,00040409 0,00014224 5,4434E-05 2,2369E-05

0,48034236 0,0264071 0,002468110,0019214

9 0,00122211 0,00018172 5,8636E-05 2,0714E-05 7,9041E-06

0,398503180,01752635

5 0,001365070,0010424

7 0,00064035 8,2234E-05 2,4323E-05 7,9313E-06 2,8103E-06

0,331161320,01165170

3 0,000756260,0005665

2 0,00033609 3,7275E-05 1,0106E-05 3,042E-06 1,0009E-06

0,27475301 0,00773361 0,000418290,0003073

7 0,00017611 1,6869E-05 4,1924E-06 1,1648E-06 3,5589E-07

0,226962980,00511075

2 0,000230360,0001660

4 9,1881E-05 7,6006E-06 1,7316E-06 4,4411E-07 1,2599E-070,18844733 0,00339476 0,00012751 9,0158E-05 4,8182E-05 3,4423E-06 7,1887E-07 1,7019E-07 4,4834E-08

Page 32: Proyecto Final de Simulacion

5

0,156428210,00225436

8 7,0564E-05 4,8941E-05 2,526E-05 1,5586E-06 2,9836E-07 6,5203E-08 1,595E-080,12959341 0,00149411 3,8972E-05 2,6515E-05 1,3217E-05 7,0429E-07 1,2359E-07 2,4931E-08 5,663E-09

0,107786490,00099415

5 2,161E-05 1,4422E-05 6,943E-06 3,1952E-07 5,1397E-08 9,5704E-09 2,0186E-09

0,089238810,00065846

6 1,1927E-05 7,8081E-06 3,6305E-06 1,4429E-07 2,1276E-08 3,657E-09 7,1625E-10

0,074304890,00043861

9 6,6209E-06 4,2516E-06 1,9092E-06 6,5534E-08 8,8578E-09 1,4054E-09 2,5559E-100,06174871 0,0002916 3,6681E-06 2,3105E-06 1,0021E-06 2,9705E-08 3,6805E-09 5,3904E-10 9,103E-11

0,051198160,00019342

1 2,0276E-06 1,2528E-06 5,2474E-07 1,3434E-08 1,5258E-09 2,0628E-10 3,2347E-11

0,042496540,00012843

8 1,122E-06 6,8003E-07 2,7509E-07 6,0824E-09 6,3325E-10 7,9024E-11 1,1507E-110,035308 8,53695E-05 6,2145E-07 3,6948E-07 1,4435E-07 2,7565E-09 2,6307E-10 3,0303E-11 4,0973E-12

0,02941988 5,69063E-05 3,4521E-07 2,0133E-07 7,5965E-08 1,2528E-09 1,096E-10 1,1654E-11 1,4632E-120,02443595 3,78128E-05 1,9115E-07 1,0936E-07 3,985E-08 5,6758E-10 4,5516E-11 4,4674E-12 5,2084E-13

0,0203039 2,5135E-05 1,0589E-07 5,942E-08 2,0913E-08 2,5724E-10 1,8909E-11 1,7132E-12 1,8547E-130,0168818 1,67189E-05 5,8693E-08 3,2309E-08 1,0982E-08 1,1666E-10 7,8612E-12 6,5745E-13 6,609E-14

0,01409025 1,11634E-05 3,2659E-08 1,7635E-08 5,789E-09 5,3112E-11 3,2806E-12 2,5326E-13 2,3641E-140,01163888 7,37702E-06 1,7985E-08 9,5258E-09 3,0201E-09 2,393E-11 1,3549E-12 9,6554E-14 8,3691E-150,00968493 4,91084E-06 9,9769E-09 5,1836E-09 1,5872E-09 1,0861E-11 5,6374E-13 3,7082E-14 2,9846E-150,00804324 3,26273E-06 5,5238E-09 2,8152E-09 8,3253E-10 4,9202E-12 2,3409E-13 1,4214E-14 1,0623E-15

139,82349442,2474448

8-

4,43413722

-8,3597415

6-

15,0690505-

38,7109271-

49,9042201-

58,7417791-

65,8805112

Page 33: Proyecto Final de Simulacion
Page 34: Proyecto Final de Simulacion
Page 35: Proyecto Final de Simulacion

CASO 3 “INYECCION DE AGUA”

Columna1 Columna2 Columna3gas naturalPRODUCCION= 1.8 $/MPCTRANSPORTE= 1.5 $/MPCPRECIOS DE VENTA 4.85 $/MPC

PETROLEOPRODUCCION= 2.5 $/BblTRANSPORTE= 1.5 $/BblPRECIOS DE VENTA 27 $/Bbl

impuestos y regalias 50%FD 0.12

inversion total $ 253.43 MM$Costo de perforacion 4200 $/mcosto de terminacion 1.1 MM$/pozonumero total de pozos 20 profundidad 2557.5 mEstudios G&G 4 MM$Facilidades de produccion 5 MM$numero total de pozos productores 20 Obras civiles,camino y planchada 180 M$/pozopozos inyectores 10

facilidades de inyeccion 400 M$/pozo

Page 36: Proyecto Final de Simulacion

PERIODO AÑO POZOS

ANUAL ANUALPRODUCCION

DE LA INGRESO BRUTO

produccion PRODUCCION

produccion PRODUCCION VENTA DEL GAS

Qo(Bblpd) Qo(MBPA) QG(MPCD) QG(MMPCA) MMPCA M$0 2012 0 0 0 0 0 0 01 2013 3 26391 9632.715 25774 9407.51 8937.1345 303428.4072 2014 3 41129 15012.085 40353 14728.845 13992.40275 473189.4483 2015 3 7183 2621.795 7992 2917.08 2771.226 84228.91114 2016 5 5837 2130.505 6323 2307.895 2192.50025 68157.26125 2017 5 5179 1890.335 5501 2007.865 1907.47175 60290.2836 2018 5 4778 1743.97 4973 1815.145 1724.38775 55450.47067 2019 5 4542 1657.83 4644 1695.06 1610.307 52571.3998 2020 5 4473 1632.645 4499 1642.135 1560.02825 51647.5529 2021 5 4392 1603.08 4358 1590.67 1511.1365 50612.172

10 2022 5 4277 1561.105 4194 1530.81 1454.2695 49203.042111 2023 5 4119 1503.435 3997 1458.905 1385.95975 47314.649812 2024 5 4041 1474.965 3882 1416.93 1346.0835 46352.5613 2025 5 3946 1440.29 3755 1370.575 1302.04625 45202.754314 2026 5 3649 1331.885 3454 1260.71 1197.6745 41769.616315 2027 5 3477 1269.105 3276 1195.74 1135.953 39775.207116 2028 5 3418 1247.57 3206 1170.19 1111.6805 39076.040417 2029 5 3385 1235.525 3161 1153.765 1096.07675 38675.147218 2030 5 3402 1241.73 3163 1154.495 1096.77025 38846.045719 2031 5 3406 1243.19 3153 1150.845 1093.30275 38868.648320 2032 5 3414 1246.11 3147 1148.655 1091.22225 38937.397921 2033 5 2859 1043.535 2659 970.535 922.00825 32647.18522 2034 5 2859 1043.535 2659 970.535 922.00825 32647.18523 2035 5 2859 1043.535 2660 970.9 922.355 32648.866824 2036 5 3011 1099.015 2792 1019.08 968.126 34368.816125 2037 5 3102 1132.23 2865 1045.725 993.43875 35388.387926 2038 5 3158 1152.67 2907 1061.055 1008.00225 36010.900927 2039 5 3249 1185.885 2975 1085.875 1031.58125 37022.064128 2040 5 3331 1215.815 3037 1108.505 1053.07975 37934.441829 2041 5 3297 1203.405 2995 1093.175 1038.51625 37528.738830 2042 5 3238 1181.87 2933 1070.545 1017.01775 36843.026131 2043 5 3179 1160.335 2879 1050.835 998.29325 36170.767332 2044 5 3182 1161.43 2882 1051.93 999.3335 36205.377533 2045 5 3102 1132.23 2810 1025.65 974.3675 35295.892434 2046 5 3052 1113.98 2759 1007.035 956.68325 34717.373835 2047 5 3006 1097.19 2714 990.61 941.0795 34188.3656

190922 185331

Page 37: Proyecto Final de Simulacion

COSTO DE PRODUCCION (MM$) COSTO DE TRASPORTE (MM$) COSTO TOTAL (MM$)

0 0 040.1686296 27.85477425 68.0234039

62.71653745 43.50673163 106.22326911.5426943 8.0895315 19.63222589.27276295 6.484507875 15.75727088.15928665 5.696710125 13.85599687.46382295 5.202536625 12.6663596

7.0431276 4.9022055 11.94533316.88966335 4.789009875 11.6786732

6.7277457 4.67132475 11.39907056.5204476 4.52306175 11.0435094

6.25331505 4.334092125 10.58740726.1103628 4.23157275 10.3419356

5.94440825 4.113504375 10.05791265.4855266 3.79433925 9.279865855.2174779 3.607587 8.82506495.1199499 3.53887575 8.65882565

5.06175065 3.497402625 8.559153285.07851145 3.507750375 8.586261835.07591995 3.504739125 8.580659085.07947505 3.505998375 8.585473434.26845235 2.948314875 7.216767234.26845235 2.948314875 7.21676723

4.2690765 2.948835 7.21791154.4901643 3.1007115 7.5908758

4.61876475 3.188503125 7.807267884.69607905 3.241008375 7.937087434.82155875 3.326199375 8.147758134.93508105 3.403342125 8.338423184.87784175 3.362881875 8.240723634.78530695 3.298331625 8.083638584.69776535 3.237942375 7.93570773

4.7023753 3.24114525 7.943520554.5844365 3.15989625 7.74433275

4.50697985 3.105994875 7.612974734.4369181 3.05740425 7.49432235

Page 38: Proyecto Final de Simulacion

COSTO BRUTO (MM$)

COSTO TOTAL (MM$)

IMPUESTOS INVERSIONES (MM$)

FLUJO DE CAJA (MM$)

VAN 12% (MM$)

VAN ACUMULADO 12% (MM$)

Page 39: Proyecto Final de Simulacion

0 0 0 253.43 -253.43 -253.43 -253.43

303.4284073 68.0234039 123.8594294 111.55 99.59426256 -153.8357374

473.1894483 106.223269 193.0879925 173.88 138.6146259 -15.22111155

84.2289111 19.6322258 34.02492405 30.57 21.7603758 6.539264246

68.15726121 15.7572708 27.59412273 24.81 15.76457735 22.30384159

60.29028299 13.8559968 24.44843137 21.99 12.47536448 34.77920608

55.45047059 12.6663596 22.52269867 20.26 10.26506205 45.04426813

52.57139895 11.9453331 21.38349398 19.24 8.704362289 53.74863042

51.64755201 11.6786732 21.03476613 18.93 7.647170539 61.39580096

50.61217203 11.3990705 20.63476126 18.58 6.699535764 68.09533672

49.20304208 11.0435094 20.07845929 18.08 5.821621736 73.91695846

47.31464979 10.5874072 19.32323277 17.40 5.003236946 78.9201954

46.35255998 10.3419356 18.94470724 17.07 4.38039588 83.30059128

45.20275431 10.0579126 18.48787278 16.66 3.817347359 87.11793864

41.76961633 9.27986585 17.09046891 15.40 3.150998108 90.26893675

39.77520705 8.8250649 16.28001653 14.67 2.680177104 92.94911385

39.07604043 8.65882565 15.99914446 14.42 2.35189959 95.30101344

38.67514724 8.55915328 15.84017099 14.28 2.079192828 97.38020627

38.84604571 8.58626183 15.91527248 14.34 1.865354384 99.24556065

38.86864834 8.58065908 15.92958504 14.36 1.667108035 100.9126687

38.93739791 8.58547343 15.96270058 14.39 1.491684294 102.404353

32.64718501 7.21676723 13.37527763 12.06 1.115819092 103.5201721

32.64718501 7.21676723 13.37527763 12.06 0.996267046 104.5164391

32.64886675 7.2179115 13.37559838 12.06 0.88954014 105.4059793

34.3688161 7.5908758 14.08369655 12.69 0.836323479 106.2423027

35.38838794 7.80726788 14.50569084 13.08 0.769139981 107.0114427

36.01090091 7.93708743 14.76444208 13.31 0.699018959 107.7104617

37.02206406 8.14775813 15.18483266 13.69 0.641948408 108.3524101

37.93444179 8.33842318 15.56387877 14.03 0.58751542 108.9399255

37.52873881 8.24072363 15.40148753 13.89 0.519123879 109.4590494

36.84302609 8.08363858 15.12318142 13.64 0.455148249 109.9141976

36.17076726 7.93570773 14.84744126 13.39 0.398974021 110.3131717

36.20537748 7.94352055 14.86154349 13.40 0.356564606 110.6697363

35.29589238 7.74433275 14.48804994 13.06 0.310359557 110.9800958

34.71737376 7.61297473 14.25269201 12.85 0.272613931 111.2527098

34.18836558 7.49432235 14.03677854 12.66 0.239722649 111.4924324

253.43 553.29 111.49

20% (MM$) 50% (MM$) 80% (MM$) 83.5% (MM$) 90% (MM$) 120% (MM$) 140% (MM$) 160% (MM$) 180% (MM$)

-253.43 -253.43 -253.43 -253.43 -253.43 -253.43 -253.43 -253.43 -253.43

92.9546451 74.36371604 61.9697634 60.7877788 58.7081969 50.7025337 46.4773225 42.9021439 39.837705

Page 40: Proyecto Final de Simulacion

120.748741 77.2791941 53.666107 51.6384224 48.1657027 35.9252452 30.1871852 25.7216253 22.1783401

17.6919915 9.05829963 5.24207154 4.94780134 4.4571747 2.87112709 2.21149893 1.7394038 1.39266405

11.9627062 4.899924475 2.3630037 2.18781275 1.90344362 1.05892134 0.74766914 0.54282649 0.40357318

8.83562196 2.895256605 1.16353869 1.05672751 0.88792309 0.42660894 0.27611319 0.18504469 0.12774773

6.785506 1.778779684 0.59570972 0.53070515 0.43067346 0.17870374 0.10602353 0.06558879 0.04204569

5.37024866 1.126222771 0.31430811 0.27466963 0.21527218 0.07714439 0.04195507 0.02395795 0.01426123

4.40346946 0.738779582 0.17181652 0.14728428 0.11148493 0.03450353 0.01720105 0.00906689 0.00501165

3.60060682 0.483265266 0.09366005 0.07875575 0.05757375 0.01538873 0.00703244 0.00342174 0.00175624

2.9201943 0.313553476 0.05064064 0.04176991 0.02949091 0.00680765 0.00285175 0.00128083 0.00061044

2.34237063 0.201208105 0.02708019 0.02191051 0.01494031 0.00297852 0.00114374 0.00047418 0.00020985

1.91405618 0.131532939 0.01475229 0.01170838 0.00771057 0.00132757 0.0004673 0.00017883 7.3491E-05

1.55682493 0.085587355 0.00799933 0.00622769 0.00396095 0.00058898 0.00019004 6.7134E-05 2.5618E-05

1.19939716 0.052750045 0.00410852 0.00313758 0.0019273 0.0002475 7.3205E-05 2.3871E-05 8.4584E-06

0.95217142 0.033501554 0.00217443 0.00162889 0.00096634 0.00010718 2.9058E-05 8.7465E-06 2.8778E-06

0.77984304 0.02195063 0.00118726 0.00087243 0.00049986 4.7879E-05 1.1899E-05 3.3062E-06 1.0101E-06

0.64345765 0.014489378 0.00065308 0.00047075 0.00026049 2.1548E-05 4.9092E-06 1.2591E-06 3.572E-07

0.53879472 0.009706063 0.00036457 0.00025777 0.00013776 9.8419E-06 2.0553E-06 4.8659E-07 1.2819E-07

0.44943046 0.006476975 0.00020273 0.00014061 7.2575E-05 4.4779E-06 8.5722E-07 1.8733E-07 4.5825E-08

0.37532928 0.004327252 0.00011287 7.6792E-05 3.8279E-05 2.0398E-06 3.5794E-07 7.2206E-08 1.6401E-08

0.2620391 0.002416884 5.2535E-05 3.506E-05 1.6879E-05 7.7678E-07 1.2495E-07 2.3267E-08 4.9074E-09

0.21836592 0.001611256 2.9186E-05 1.9106E-05 8.8837E-06 3.5308E-07 5.2062E-08 8.9487E-09 1.7527E-09

0.18197487 0.00107419 1.6215E-05 1.0412E-05 4.6757E-06 1.6049E-07 2.1693E-08 3.4419E-09 6.2596E-10

0.15968235 0.000754079 9.4856E-06 5.975E-06 2.5913E-06 7.6818E-08 9.5178E-09 1.3939E-09 2.354E-10

0.13706444 0.000517815 5.428E-06 3.3539E-06 1.4048E-06 3.5966E-08 4.0848E-09 5.5223E-10 8.6597E-11

0.11626397 0.000351386 3.0695E-06 1.8605E-06 7.526E-07 1.6641E-08 1.7325E-09 2.162E-10 3.1481E-11

0.09965362 0.000240948 1.754E-06 1.0428E-06 4.0742E-07 7.7799E-09 7.4248E-10 8.5528E-11 1.1564E-11

0.08512341 0.000164653 9.9884E-07 5.8252E-07 2.198E-07 3.6248E-09 3.1711E-10 3.3719E-11 4.2335E-12

0.07020007 0.000108629 5.4915E-07 3.1416E-07 1.1448E-07 1.6306E-09 1.3076E-10 1.2834E-11 1.4963E-12

0.05744552 7.11141E-05 2.9958E-07 1.6812E-07 5.9168E-08 7.278E-10 5.35E-11 4.8472E-12 5.2475E-13

0.04699858 4.65451E-05 1.634E-07 8.9947E-08 3.0573E-08 3.2479E-10 2.1885E-11 1.8303E-12 1.8399E-13

0.03920262 3.10595E-05 9.0865E-08 4.9064E-08 1.6106E-08 1.4777E-10 9.1276E-12 7.0464E-13 6.5775E-14

0.03184775 2.01859E-05 4.9212E-08 2.6066E-08 8.264E-09 6.548E-11 3.7076E-12 2.642E-13 2.29E-14

0.02610949 1.32391E-05 2.6896E-08 1.3974E-08 4.279E-09 2.9281E-11 1.5198E-12 9.9969E-14 8.0461E-15

0.02142872 8.69252E-06 1.4716E-08 7.5003E-09 2.218E-09 1.3108E-11 6.2366E-13 3.7868E-14 2.8301E-15

34.1488066 -79.9240474 -127.740625 -131.691763 -138.432513 -162.127679 -173.353224 -182.234882 -189.425963

RUI 1.2

Page 41: Proyecto Final de Simulacion

0 20 40 60 80 100 120 140 160 180 200

-300.00

-200.00

-100.00

0.00

100.00

200.00

300.00

400.00

500.00

600.00

Series2

TIR=30%

Page 42: Proyecto Final de Simulacion

0 1 2 3 4 5 6 7 8 9 10 110

2

4

6

8

10

12

MAXIMA UTILIDAD DEL PROYECTO=

111.49MM$TIEMPO DE PAGO

=3.3

Page 43: Proyecto Final de Simulacion

CONCLUSIONES

En este trabajo realizado, queda claro que aplicar el método de recuperación secundaria “Inyección de Agua” no es satisfactorio ya que para aumentar la presión del reservorio, se necesita inyectar altos caudales de agua resultando no muy factible el proyecto en cuanto la inversión requerida, que se demostró en el análisis económico correspondiente.

En cuanto al caso de desarrollo del campo en el que adiciona 5 pozos mas, no se obtuvo un factor de recuperación considerable debido a que solo se recupero un 2.7% adicional al recuperado en el primer caso de análisis.

De acuerdo con nuestro análisis económico y nuestros resultados obtenidos en la simulación de los tres casos aplicados, la mejor opción para la extracción de HC es por recuperación primaria “CASO BASE”.

CASOS Ni(MMBBL)

Np(MBBL)

FR(%)

RUI TIR(%)

CASO BASE 418 30444 7.3 4.8 110

DESARROLLO 418 41630 10 1.48 80

INYECCION DE AGUA

418 60805 14.5 1.2 30