    History

    Prior to 1992, nodownhole processing wasperformed except thatrelated to conventional

    artificial lift of wells.

    By 2002, there wereapproximately 50downhole water

    separation/injectioninstallations andapproximately 60downhole gas/liquid

    separation installations.

  • 8/10/2019 Presentation 10-22-2014.pptx

    4/16

  • 8/10/2019 Presentation 10-22-2014.pptx

    5/16

    Methods Downhole Gas

    Separator

    The first attempt to correct inefficient downhole

    gas separation should be to set the pump

    below the fluid entry zone if feasible. This is

    the most efficient method of downhole gasseparation.

    However, if the pump is set above the fluid

    entry zone, a gas separator should be used

    that offers an efficient gas/liquid separation

    chamber with low dip tube friction loss which

    results in complete pump fillage if sufficient

    liquid inflow into the wellbore is available.

  • 8/10/2019 Presentation 10-22-2014.pptx

    6/16

    Methods Downhole Gas

    Separator

    A gas separator is still anintake with special featuresto keep free gas from

    entering the pump. Static gas separators use

    reverse direction of fluid tocause more gas to move upthe annulus allowing fluid to

    pump. Dynamic gas separator can

    distinguished into 3 internalsections: pressure increase

    chamber, separationchamber, and by pass.

  • 8/10/2019 Presentation 10-22-2014.pptx

    7/16

    Methods Gas Separator

    (cont.)

  • 8/10/2019 Presentation 10-22-2014.pptx

    8/16

    Variable Speed Drives (VSD) -

    1

    Used as surface control package in all wellswith high volumes of gas

    Advantage

    Have the ability to control and manage startupand operations in gassy environments

    keep the well producing longer through gasslugging flows

    Combining the downhole monitoring systemand the VSD is a highly effective method ofoperating ESP's in gassy environments

    Allows for automatic control of production rate

    and fluid level

  • 8/10/2019 Presentation 10-22-2014.pptx

    9/16

    Variable Speed Drives (VSD) -

    2

  • 8/10/2019 Presentation 10-22-2014.pptx

    10/16

    Variable Speed Drives (VSD) -

    3

  • 8/10/2019 Presentation 10-22-2014.pptx

    11/16

    Design

    Maximum gas/water ratio

    (Rm) is a key parameter.

    Rm depends on the typeand geometrical structure

    of separator obtained by

    lab experiments or CFD

    study.

  • 8/10/2019 Presentation 10-22-2014.pptx

    12/16

    Advantages

    Benefits of using downhole gas separator: Extend run time

    Increase mean time between failures

    Low NPSH impeller and blender XGC reduce gas

    interference High-volume XGVS separator

    Minimize pump downtime and restarts

    Provide optimization of production rates

    VSD: Flexibility

    Optimization well production

    Starting characteristics

    Energy saving

  • 8/10/2019 Presentation 10-22-2014.pptx

    13/16

    Disadvantages

    Gas separator:

    Apa?

    VSD:

    Electrical disturbance

    Power operating requirements

    Personnel required for operationHigh initial cost

  • 8/10/2019 Presentation 10-22-2014.pptx

    14/16

    Improvements

    The first is metering of

    the quality and volume of

    the injectant stream.

    These must be knownfor:

    reservoir management

    well surveillance

    prevention of formation

    damage.

  • 8/10/2019 Presentation 10-22-2014.pptx

    15/16

    Improvements

    Downhole separator for

    gas reinjection or for

    artificial lift are likely to be

    proven feasible.

    Extend the lives of

    existing mature wells

    Improve the economics ofnew wells in deep water

    and in remote satellite

    areas