  • 8/17/2019 NPSI - Presentation2

    1/11

    ENERGY IS HERE126 MW solar portfolio - Negros Occidental (

    S"garla

  • 8/17/2019 NPSI - Presentation2

    2/11

    #$%E of &ON#EN#

    1' ro)ect Snaps*ot

      Introduction  Site Locations

    2' ro)ect +e,elopent  Project Development  Site Pictures

    .' #ec*nical ac/age

      Soil & Flood Studies  Layout and Topo studies

      Energy Yield Analysis0' &oercial ac/age  Development Fee Proposal

  • 8/17/2019 NPSI - Presentation2

    3/11

    ro)ect Snaps*otIntroduction 1!

      "ne site #it$ % adjacent land o#ners up to 1' $ectares t$at $ave (een secured in )egr

      Ser,ice &ontract recei,ed loc/ed 33*a4 E&& perit o5tained

      reliinar 7acilit St"d Grid recei,ed

      Grid Ipact St"d 8 Sste Ipact St"d cond"cted and preliinar res"lts

      P* Po#er plant to (e connected to t$e )+,P -. /* or 1%0 /* or capacity a(ove 2 -3 45p

      )o rig$t o #ay needed6 Direct access to -. /* transmission line on site 7nort$ east plots8

      All sites $ave DA9 ,ertiicate o E:emption andor )otice o )on;,overage

      )on irrigated land< to date used or sugar cane plantation

      All sites $ave proper land titles

      Topograp$y< Flood and Soil studies $ave (een conducted and all sites are solar

      Landlords and local L+=>s are very supportive o t$e project

  • 8/17/2019 NPSI - Presentation2

    4/11

    ro)ect Snaps*otIntroduction !!

     Land lease option terms $ave (een agreed ;

     !yr lease ? Lease contract rene#a(le

     Average P@P / per $ectare per annum e:cluding ta:es

     13B escalation every years

     Landlords are prominent local (usinessmenpolitician #it$

    good standing in society

      Su(station and Transmission lines $ave adeCuate capacityor all solar plants 7site appro:6 16/m direct line rom t$e

    )+,P su(station or (y road

    '6/m8

      ,lean SP* set up or t$e project  )o coconut trees

     E:pansion sites $ave (een id

     Discussions #it$ )+,P at loc

     All local L+= permits o(tained

     +ood Site Access or ,onstructio

    access #it$ lig$t 4anila ; acolod

      Initial plant layout desig

     Local construction contr

  • 8/17/2019 NPSI - Presentation2

    5/11

    Sites locations

  • 8/17/2019 NPSI - Presentation2

    6/11

    ro)ect +e,elopentSite Pictures

  • 8/17/2019 NPSI - Presentation2

    7/11

    #ec*nical ac/ageSite layout & Topograp$ical studies

     ,urrently planned #it$ 3 45p< design on

     -./* transmission line s$o#n in red on ea

     ju#i conducted e:tensive site selection and

    construction ready rom engineering perspe

     Topograp$ical & $ydrological studies

     Availa(ility o local la(or and construc

  • 8/17/2019 NPSI - Presentation2

    8/11

    #ec*nical ac/ageSoil & Flood Studies

     Flood and Soil studi

    conducted

     T$ere is no lo

     Soil conditions

     Initial scre# pile solu

  • 8/17/2019 NPSI - Presentation2

    9/11

    #ec*nical ac/ageEnergy Yield Analysis

     T

    carrie

    sim

    an

    da

     A

    ye

    sim

  • 8/17/2019 NPSI - Presentation2

    10/11

    ro)ect +e,elopent in artners*ip :it* )":i aE;&% #ec*nic

    ey Person  Ms Maricel Monfort

      Ma)orit s*are*older in Negros H Solar ( ro)ect

    S=!

      S"ccessf"l and proinent 5"siness:oen

    resident in acolod

      =aried 5"siness interests in propert? land?

    agric"lt"re? *ospitals and :ater reso"rces

      =er strong local net:or/ and relations*ips

      S"pported 5 an e@perienced tea of de,elopers

    and tec*nical specialists? incl land? legal? Anance?

    reg"lator? etc

      )":i - inorit in ro)

      7o"nded in 1BB

      )":i $G *eadC"arter in

      Rene:a5le Energ sp

    1?333 eploees (:o

    D .?233 MW in Wind? So

      In,estent ,ol"e (since 1BB6

      Geran? Fapan?

  • 8/17/2019 NPSI - Presentation2

    11/11

    &oercial ac/age - +e,elopent 7

    E:ecutive Summary ; Payment and 4ilestS"ar roposal E@pansion

    #otal MWp 93 MWp

    Scenarios $SE &$SE

    %and lease (9 ear lease rental "pfront!