90
Cargo Cuota IMSS I.S.R.P. Guarderia INFONAVIT S.A.R. $47.91 $17,499.13 $71.87 $718.65 $18,289.64 $6,175.27 $182.90 $174.99 $914.48 $365.79 Aluminero $62.91 $22,977.88 $94.37 $943.65 $24,015.89 $8,108.67 $240.16 $229.78 $1,200.79 $480.32 $64.21 $23,452.70 $96.32 $963.15 $24,512.17 $8,276.23 $245.12 $234.53 $1,225.61 $490.24 Ayudante A $52.25 $19,084.31 $78.38 $783.75 $19,946.44 $6,734.67 $199.46 $190.84 $997.32 $398.93 Ayudante B $47.91 $17,499.13 $71.87 $718.65 $18,289.64 $6,175.27 $182.90 $174.99 $914.48 $365.79 Azulejero $59.83 $21,852.91 $89.75 $897.45 $22,840.10 $7,711.68 $228.40 $218.53 $1,142.01 $456.80 Barretero $60.40 $22,061.10 $90.60 $906.00 $23,057.70 $7,785.14 $230.58 $220.61 $1,152.89 $461.15 Bombero $57.63 $21,049.36 $86.45 $864.45 $22,000.25 $7,428.11 $220.00 $210.49 $1,100.01 $440.01 $64.21 $23,452.70 $96.32 $963.15 $24,512.17 $8,276.23 $245.12 $234.53 $1,225.61 $490.24 $47.70 $17,422.43 $71.55 $715.50 $18,209.48 $6,148.20 $182.09 $174.22 $910.47 $364.19 Cadenero $47.90 $17,495.48 $71.85 $718.50 $18,285.83 $6,173.98 $182.86 $174.95 $914.29 $365.72 $59.98 $21,907.70 $89.97 $899.70 $22,897.37 $7,731.01 $228.97 $219.08 $1,144.87 $457.95 $56.85 $20,764.46 $85.28 $852.75 $21,702.49 $7,327.57 $217.02 $207.64 $1,085.12 $434.05 $56.85 $20,764.46 $85.28 $852.75 $21,702.49 $7,327.57 $217.02 $207.64 $1,085.12 $434.05 $60.56 $22,119.54 $90.84 $908.40 $23,118.78 $7,805.77 $231.19 $221.20 $1,155.94 $462.38 $59.83 $21,852.91 $89.75 $897.45 $22,840.10 $7,711.68 $228.40 $218.53 $1,142.01 $456.80 Fierrero $58.88 $21,505.92 $88.32 $883.20 $22,477.44 $7,589.23 $224.77 $215.06 $1,123.87 $449.55 Herrero $58.88 $21,505.92 $88.32 $883.20 $22,477.44 $7,589.23 $224.77 $215.06 $1,123.87 $449.55 $58.88 $21,505.92 $88.32 $883.20 $22,477.44 $7,589.23 $224.77 $215.06 $1,123.87 $449.55 Maestro $125.56 $45,860.79 $188.34 $1,883.40 $47,932.53 $16,183.82 $479.33 $458.61 $2,396.63 $958.65 $56.85 $20,764.46 $85.28 $852.75 $21,702.49 $7,327.57 $217.02 $207.64 $1,085.12 $434.05 Mecánico $56.85 $20,764.46 $85.28 $852.75 $21,702.49 $7,327.57 $217.02 $207.64 $1,085.12 $434.05 $58.88 $21,505.92 $88.32 $883.20 $22,477.44 $7,589.23 $224.77 $215.06 $1,123.87 $449.55 $47.70 $17,422.43 $71.55 $715.50 $18,209.48 $6,148.20 $182.09 $174.22 $910.47 $364.19 $61.13 $22,327.73 $91.70 $916.95 $23,336.38 $7,879.24 $233.36 $223.28 $1,166.82 $466.73 $72.31 $26,411.23 $108.47 $1,084.65 $27,604.34 $9,320.26 $276.04 $264.11 $1,380.22 $552.09 $63.40 $23,156.85 $95.10 $951.00 $24,202.95 $8,171.82 $242.03 $231.57 $1,210.15 $484.06 $70.54 $25,764.74 $105.81 $1,058.10 $26,928.65 $9,092.12 $269.29 $257.65 $1,346.43 $538.57 Operador $47.70 $17,422.43 $71.55 $715.50 $18,209.48 $6,148.20 $182.09 $174.22 $910.47 $364.19 $43.42 $15,859.16 $65.13 $651.30 $16,575.59 $5,596.54 $165.76 $158.59 $828.78 $331.51 $64.79 $23,664.55 $97.19 $971.85 $24,733.58 $8,350.98 $247.34 $236.65 $1,236.68 $494.67 $58.10 $21,221.03 $87.15 $871.50 $22,179.68 $7,488.69 $221.80 $212.21 $1,108.98 $443.59 Peon $41.90 $15,303.98 $62.85 $628.50 $15,995.33 $5,400.62 $159.95 $153.04 $799.77 $319.91 Pintor $58.31 $21,297.73 $87.47 $874.65 $22,259.84 $7,515.76 $222.60 $212.98 $1,112.99 $445.20 Plomero $58.62 $21,410.96 $87.93 $879.30 $22,378.19 $7,555.71 $223.78 $214.11 $1,118.91 $447.56 Poblador $62.28 $22,747.77 $93.42 $934.20 $23,775.39 $8,027.46 $237.75 $227.48 $1,188.77 $475.51 $49.95 $18,244.24 $74.93 $749.25 $19,068.41 $6,438.21 $190.68 $182.44 $953.42 $381.37 $98.49 $35,973.47 $147.74 $1,477.35 $37,598.56 $12,694.68 $375.99 $359.73 $1,879.93 $751.97 $106.33 $38,837.03 $159.50 $1,594.95 $40,591.48 $13,705.20 $405.91 $388.37 $2,029.57 $811.83 Soldador $60.35 $22,042.84 $90.53 $905.25 $23,038.61 $7,778.70 $230.39 $220.43 $1,151.93 $460.77 $97.18 $35,495.00 $145.77 $1,457.70 $37,098.47 $12,525.83 $370.98 $354.95 $1,854.92 $741.97 $47.91 $17,499.13 $71.87 $718.65 $18,289.64 $6,175.27 $182.90 $174.99 $914.48 $365.79 Tornillero $62.49 $22,824.47 $93.74 $937.35 $23,855.56 $8,054.53 $238.56 $228.24 $1,192.78 $477.11 $69.65 $25,439.66 $104.48 $1,044.75 $26,588.89 $8,977.41 $265.89 $254.40 $1,329.44 $531.78 $61.13 $22,327.73 $91.70 $916.95 $23,336.38 $7,879.24 $233.36 $223.28 $1,166.82 $466.73 Velador $53.97 $19,712.54 $80.96 $809.55 $20,603.05 $6,956.36 $206.03 $197.13 $1,030.15 $412.06 Vidriero $58.88 $21,505.92 $88.32 $883.20 $22,477.44 $7,589.23 $224.77 $215.06 $1,123.87 $449.55 Salario Base Percepcion Total Prima Vacacional Gratificac ion Total Devengado a Aux. de Topografo Cabo de oficiales Cabo de peones Carpintero de Banco Carpintero Obra Negra de materiales Chofer de Camion ta Jefe de Almacen a Mecanico montador de equipo Montador de equipo Oficial Albañil electrico "C" Especializ ado Plomero "C" Operador de Equipo de Maquinaria "A" de Maquinaria "B" o te de terraceria e de tuberia soldada Soldador Calificado Tomador de Tiempo Tubero de primera Tubero de segunda

Upload: zarina-ml

Post on 06-Nov-2015

215 views

Category:

Documents


0 download

DESCRIPTION

Documento en Excel que cuantifica los salarios de trabajadores de la construcción, útil para costear un proyecto arquitectónico.

TRANSCRIPT

SalariosCargoSalario BasePercepcion TotalPrima VacacionalGratificacionTotal DevengadoCuota IMSSI.S.R.P.GuarderiaINFONAVITS.A.R.Suma TotalSalario RealAlmacenista$47.91$17,499.13$71.87$718.65$18,289.64$6,175.27$182.90$174.99$914.48$365.79$26,103.07$91.19Aluminero$62.91$22,977.88$94.37$943.65$24,015.89$8,108.67$240.16$229.78$1,200.79$480.32$34,275.61$119.74Aux. de Topografo$64.21$23,452.70$96.32$963.15$24,512.17$8,276.23$245.12$234.53$1,225.61$490.24$34,983.89$122.21Ayudante A$52.25$19,084.31$78.38$783.75$19,946.44$6,734.67$199.46$190.84$997.32$398.93$28,467.66$99.45Ayudante B$47.91$17,499.13$71.87$718.65$18,289.64$6,175.27$182.90$174.99$914.48$365.79$26,103.07$91.19Azulejero$59.83$21,852.91$89.75$897.45$22,840.10$7,711.68$228.40$218.53$1,142.01$456.80$32,597.51$113.88Barretero$60.40$22,061.10$90.60$906.00$23,057.70$7,785.14$230.58$220.61$1,152.89$461.15$32,908.07$114.96Bombero$57.63$21,049.36$86.45$864.45$22,000.25$7,428.11$220.00$210.49$1,100.01$440.01$31,398.88$109.69Cabo de oficiales$64.21$23,452.70$96.32$963.15$24,512.17$8,276.23$245.12$234.53$1,225.61$490.24$34,983.89$122.21Cabo de peones$47.70$17,422.43$71.55$715.50$18,209.48$6,148.20$182.09$174.22$910.47$364.19$25,988.66$90.79Cadenero$47.90$17,495.48$71.85$718.50$18,285.83$6,173.98$182.86$174.95$914.29$365.72$26,097.63$91.17Carpintero de Banco$59.98$21,907.70$89.97$899.70$22,897.37$7,731.01$228.97$219.08$1,144.87$457.95$32,679.24$114.16Carpintero Obra Negra$56.85$20,764.46$85.28$852.75$21,702.49$7,327.57$217.02$207.64$1,085.12$434.05$30,973.90$108.21Checador de materiales$56.85$20,764.46$85.28$852.75$21,702.49$7,327.57$217.02$207.64$1,085.12$434.05$30,973.90$108.21Chofer de Camion$60.56$22,119.54$90.84$908.40$23,118.78$7,805.77$231.19$221.20$1,155.94$462.38$32,995.24$115.27Electricista$59.83$21,852.91$89.75$897.45$22,840.10$7,711.68$228.40$218.53$1,142.01$456.80$32,597.51$113.88Fierrero$58.88$21,505.92$88.32$883.20$22,477.44$7,589.23$224.77$215.06$1,123.87$449.55$32,079.92$112.07Herrero$58.88$21,505.92$88.32$883.20$22,477.44$7,589.23$224.77$215.06$1,123.87$449.55$32,079.92$112.07Jefe de Almacen$58.88$21,505.92$88.32$883.20$22,477.44$7,589.23$224.77$215.06$1,123.87$449.55$32,079.92$112.07Maestro$125.56$45,860.79$188.34$1,883.40$47,932.53$16,183.82$479.33$458.61$2,396.63$958.65$68,409.56$238.99Maniobrista$56.85$20,764.46$85.28$852.75$21,702.49$7,327.57$217.02$207.64$1,085.12$434.05$30,973.90$108.21Mecnico$56.85$20,764.46$85.28$852.75$21,702.49$7,327.57$217.02$207.64$1,085.12$434.05$30,973.90$108.21Mecanico montador de equipo$58.88$21,505.92$88.32$883.20$22,477.44$7,589.23$224.77$215.06$1,123.87$449.55$32,079.92$112.07Montador de equipo$47.70$17,422.43$71.55$715.50$18,209.48$6,148.20$182.09$174.22$910.47$364.19$25,988.66$90.79Oficial Albail$61.13$22,327.73$91.70$916.95$23,336.38$7,879.24$233.36$223.28$1,166.82$466.73$33,305.80$116.35Oficial electrico "C"$72.31$26,411.23$108.47$1,084.65$27,604.34$9,320.26$276.04$264.11$1,380.22$552.09$39,397.06$137.63Oficial Especializado$63.40$23,156.85$95.10$951.00$24,202.95$8,171.82$242.03$231.57$1,210.15$484.06$34,542.58$120.67Oficial Plomero "C"$70.54$25,764.74$105.81$1,058.10$26,928.65$9,092.12$269.29$257.65$1,346.43$538.57$38,432.70$134.26Operador$47.70$17,422.43$71.55$715.50$18,209.48$6,148.20$182.09$174.22$910.47$364.19$25,988.66$90.79Operador de Equipo$43.42$15,859.16$65.13$651.30$16,575.59$5,596.54$165.76$158.59$828.78$331.51$23,656.76$82.64Operador de Maquinaria "A"$64.79$23,664.55$97.19$971.85$24,733.58$8,350.98$247.34$236.65$1,236.68$494.67$35,299.90$123.32Operador de Maquinaria "B"$58.10$21,221.03$87.15$871.50$22,179.68$7,488.69$221.80$212.21$1,108.98$443.59$31,654.95$110.58Peon$41.90$15,303.98$62.85$628.50$15,995.33$5,400.62$159.95$153.04$799.77$319.91$22,828.61$79.75Pintor$58.31$21,297.73$87.47$874.65$22,259.84$7,515.76$222.60$212.98$1,112.99$445.20$31,769.36$110.98Plomero$58.62$21,410.96$87.93$879.30$22,378.19$7,555.71$223.78$214.11$1,118.91$447.56$31,938.26$111.57Poblador$62.28$22,747.77$93.42$934.20$23,775.39$8,027.46$237.75$227.48$1,188.77$475.51$33,932.36$118.54Rastrillero$49.95$18,244.24$74.93$749.25$19,068.41$6,438.21$190.68$182.44$953.42$381.37$27,214.54$95.07Sobreestante de terraceria$98.49$35,973.47$147.74$1,477.35$37,598.56$12,694.68$375.99$359.73$1,879.93$751.97$53,660.86$187.46Sobrestante de tuberia soldada$106.33$38,837.03$159.50$1,594.95$40,591.48$13,705.20$405.91$388.37$2,029.57$811.83$57,932.37$202.38Soldador$60.35$22,042.84$90.53$905.25$23,038.61$7,778.70$230.39$220.43$1,151.93$460.77$32,880.83$114.87Soldador Calificado$97.18$35,495.00$145.77$1,457.70$37,098.47$12,525.83$370.98$354.95$1,854.92$741.97$52,947.13$184.97Tomador de Tiempo$47.91$17,499.13$71.87$718.65$18,289.64$6,175.27$182.90$174.99$914.48$365.79$26,103.07$91.19Tornillero$62.49$22,824.47$93.74$937.35$23,855.56$8,054.53$238.56$228.24$1,192.78$477.11$34,046.78$118.94Tubero de primera$69.65$25,439.66$104.48$1,044.75$26,588.89$8,977.41$265.89$254.40$1,329.44$531.78$37,947.80$132.57Tubero de segunda$61.13$22,327.73$91.70$916.95$23,336.38$7,879.24$233.36$223.28$1,166.82$466.73$33,305.80$116.35Velador$53.97$19,712.54$80.96$809.55$20,603.05$6,956.36$206.03$197.13$1,030.15$412.06$29,404.78$102.72Vidriero$58.88$21,505.92$88.32$883.20$22,477.44$7,589.23$224.77$215.06$1,123.87$449.55$32,079.92$112.07Yesero$56.64$20,687.76$84.96$849.60$21,622.32$7,300.51$216.22$206.88$1,081.12$432.45$30,859.49$107.81

Cuadrillas

Cuadrilla No. (1 peon)1Cuadrilla No. (6 peon)6Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalPeonJor.1$79.75$79.75PeonJor.6$79.75$478.50

Mando IntermediosMando IntermediosCabo de PeonesJor.0.05000$90.79$4.54Cabo de PeonesJor.0.30000$90.79$27.24MaestroJor.0.01667$238.99$3.98MaestroJor.0.10000$238.99$23.90Sub-Total$88.27Sub-Total$529.64Dep. Herramienta Menor%4%$88.27$3.53Dep. Herramienta Menor%4%$529.64$21.19Total$91.80Total$550.82

Cuadrilla No. (2 peon)2Cuadrilla No. (7 peon)7Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalPeonJor.2$79.75$159.50PeonJor.7$79.75$558.25$0.00$0.00$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.10000$90.79$9.08Cabo de PeonesJor.0.35000$90.79$31.78MaestroJor.0.03333$238.99$7.97MaestroJor.0.11667$238.99$27.88Sub-Total$176.55Sub-Total$617.91Dep. Herramienta Menor%4%$176.55$7.06Dep. Herramienta Menor%4%$617.91$24.72Total$183.61Total$642.63

Cuadrilla No. (3 peon)3Cuadrilla No. (8 peon)8Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalPeonJor.3$79.75$239.25PeonJor.8$79.75$638.00

Mando IntermediosMando IntermediosCabo de PeonesJor.0.15000$90.79$13.62Cabo de PeonesJor.0.40000$90.79$36.32MaestroJor.0.05000$238.99$11.95MaestroJor.0.13333$238.99$31.86Sub-Total$264.82Sub-Total$706.19Dep. Herramienta Menor%4%$264.82$10.59Dep. Herramienta Menor%4%$706.19$28.25Total$275.41Total$734.43

Cuadrilla No. (4 peon)4Cuadrilla No. 9 (1 ayudante "B")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalPeonJor.4$79.75$319.00Ayudante "B"Jor.1$91.19$91.19

Mando IntermediosMando IntermediosCabo de PeonesJor.0.20000$90.79$18.16Cabo de PeonesJor.0.05000$90.79$4.54MaestroJor.0.06667$238.99$15.93MaestroJor.0.01667$238.99$3.98Sub-Total$353.09Sub-Total$99.71Dep. Herramienta Menor%4%$353.09$14.12Dep. Herramienta Menor%4%$99.71$3.99Total$367.22Total$103.70

Cuadrilla No. (5 peon)5Cuadrilla No.10 ( 1 ayudante "A")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalPeonJor.5$79.75$398.75Ayudante "A"Jor.1$99.45$99.45

Mando IntermediosMando IntermediosCabo de PeonesJor.0.25000$90.79$22.70Cabo de PeonesJor.0.05000$90.79$4.54MaestroJor.0.08333$238.99$19.92MaestroJor.0.01667$238.99$3.98Sub-Total$441.37Sub-Total$107.97Dep. Herramienta Menor%4%$441.37$17.65Dep. Herramienta Menor%4%$107.97$4.32Total$459.02Total$112.29

Cuadrilla No. 11(Azulejero+Ayud"B")Cuadrilla No.16 (Of. Alb+4ayd "B")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAzulejeroJor.1$113.88$113.88Ayudante "B"Jor.4$91.19$364.76Ayudante "B"Jor.1$91.19$91.19Oficial AlbailJor.1$116.35$116.35$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.10000$90.79$9.08Cabo de PeonesJor.0.25000$90.79$22.70MaestroJor.0.03333$238.99$7.97MaestroJor.0.08333$238.99$19.92Sub-Total$222.11Sub-Total$523.72Dep. Herramienta Menor%4%$222.11$8.88Dep. Herramienta Menor%4%$523.72$20.95Total$231.00Total$544.67

Cuadrilla No. 12(oficial alb+ peon)Cuadrilla No.17 (Of. Albail+5peon)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalPeonJor.1$79.75$79.75PeonJor.5$79.75$398.75Oficial AlbailJor.1$116.35$116.35Oficial AlbailJor.1$116.35$116.35$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.10000$90.79$9.08Cabo de PeonesJor.0.30000$90.79$27.24MaestroJor.0.03333$238.99$7.97MaestroJor.0.10000$238.99$23.90Sub-Total$213.15Sub-Total$566.24Dep. Herramienta Menor%4%$213.15$8.53Dep. Herramienta Menor%4%$566.24$22.65Total$221.67Total$588.89

Cuadrilla No.13 (Of. Alb+2 peon)Cuadrilla No.18 (Of.Alb+ Ayud "B")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalPeonJor.2$79.75$159.50Ayudante "B"Jor.1$91.19$91.19Ofical albailJor.1$116.35$116.35Oficial AlbailJor.1$116.35$116.35$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.15000$90.79$13.62Cabo de PeonesJor.0.10000$90.79$9.08MaestroJor.0.05000$238.99$11.95MaestroJor.0.03333$238.99$7.97Sub-Total$301.42Sub-Total$224.59Dep. Herramienta Menor%4%$301.42$12.06Dep. Herramienta Menor%4%$224.59$8.98Total$313.48Total$233.57

Cuadrilla No. 14(OfAlb+3 peon)Cuadrilla No.19 (Of. Esp+ayud "B")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalPeonJor.3$79.75$239.25Ayudante "B"Jor.1$91.19$91.19Ofical albailJor.1$116.35$116.35Oficial EspecializadoJor.1$120.67$120.67$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.20000$90.79$18.16Cabo de PeonesJor.0.10000$90.79$9.08MaestroJor.0.06667$238.99$15.93MaestroJor.0.03333$238.99$7.97Sub-Total$389.69Sub-Total$228.91Dep. Herramienta Menor%4%$389.69$15.59Dep. Herramienta Menor%4%$228.91$9.16Total$405.28Total$238.06

Cuadrilla No. 15(OfAlb+4 peon)Cuadrilla No.20 (2Of. Esp+2ayud "B")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalPeonJor.4$79.75$319.00Ayudante "B"Jor.2$91.19$182.38Ofical albailJor.1$116.35$116.35Oficial EspecializadoJor.2$120.67$241.35$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.25000$90.79$22.70Cabo de PeonesJor.0.20000$90.79$18.16MaestroJor.0.08333$238.99$19.92MaestroJor.0.06667$238.99$15.93Sub-Total$477.97Sub-Total$457.82Dep. Herramienta Menor%4%$477.97$19.12Dep. Herramienta Menor%4%$457.82$18.31Total$497.09Total$476.13

Cuadrilla No. 21(Carp.Ob.Neg+Ayud"B")Cuadrilla No.26 (Pintor+ayud "B")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalCarpintero de Obra NegraJor.1$108.21$108.21Ayudante "B"Jor.1$91.19$91.19Ayudante "B"Jor.1$91.19$91.19PintorJor.1$110.98$110.98$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.10000$90.79$9.08Cabo de PeonesJor.0.10000$90.79$9.08MaestroJor.0.03333$238.99$7.97MaestroJor.0.03333$238.99$7.97Sub-Total$216.44Sub-Total$219.22Dep. Herramienta Menor%4%$216.44$8.66Dep. Herramienta Menor%4%$219.22$8.77Total$225.10Total$227.99

Cuadrilla No. 22(Carp Banco+ Ayud "A")Cuadrilla No.27 (Herrero+ Ayud"B")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAyudante "A"Jor.1$99.45$99.45Ayudante "B"Jor.1$91.19$91.19Carpintero de BancoJor.1$114.16$114.16HerreroJor.1$112.07$112.07$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.10000$90.79$9.08$0.00MaestroJor.0.03333$238.99$7.97MaestroJor.0.03333$238.99$7.97Sub-Total$230.66Sub-Total$211.23Dep. Herramienta Menor%4%$230.66$9.23Dep. Herramienta Menor%4%$211.23$8.45Total$239.89Total$219.67

Cuadrilla No.23 (Fierrero+Ayud "B")Cuadrilla No.28 (Herrero+ Ayud"A")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAyudante "B"Jor.1$91.19$91.19Ayudante "A"Jor.1$99.45$99.45FierreroJor.1$112.07$112.07HerreroJor.1$112.07$112.07$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.10000$90.79$9.08$0.00MaestroJor.0.03333$238.99$7.97MaestroJor.0.03333$238.99$7.97Sub-Total$220.30Sub-Total$219.49Dep. Herramienta Menor%4%$220.30$8.81Dep. Herramienta Menor%4%$219.49$8.78Total$229.12Total$228.27

Cuadrilla No. 24(Fierrero+2Ayud "B")Cuadrilla No.29 (Soldador+ayud "B")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAyudante "B"Jor.2$91.19$182.38Ayudante "B"Jor.1$91.19$91.19FierreroJor.1$112.07$112.07SoldadorJor.1$114.87$114.87$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.15000$90.79$13.62$0.00MaestroJor.0.05000$238.99$11.95MaestroJor.0.03333$238.99$7.97Sub-Total$320.02Sub-Total$214.02Dep. Herramienta Menor%4%$320.02$12.80Dep. Herramienta Menor%4%$214.02$8.56Total$332.82Total$222.58

Cuadrilla No. 25(yesero+ ayud "B")Cuadrilla No.30 (Sold.Calif+ayud "A")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAyudante "B"Jor.1$91.19$91.19Ayudante "A"Jor.1$99.45$99.45YeseroJor.1$107.81$107.81Saldador CalificadoJor.1$184.97$184.97$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.10000$90.79$9.08Cabo de PeonesJor.0.10000$90.79$9.08MaestroJor.0.03333$238.99$7.97MaestroJor.0.05000$238.99$11.95Sub-Total$216.04Sub-Total$305.45Dep. Herramienta Menor%4%$216.04$8.64Dep. Herramienta Menor%4%$305.45$12.22Total$224.68Total$317.66

Cuadrilla No. 31(1 Aluminero)Cuadrilla No.36 (Plomero+2ayud "A")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAlumineroJor.1$119.74$119.74Ayudante "A"Jor.2$99.45$198.90$0.00PlomeroJor.1$111.57$111.57$0.00$0.00$0.00$0.00Mando IntermediosMando Intermedios$0.00Cabo de OficialesJor.0.15000$122.21$18.33MaestroJor.0.05000$238.99$11.95MaestroJor.0.07500$238.99$17.92Sub-Total$131.69Sub-Total$346.73Dep. Herramienta Menor%4%$131.69$5.27Dep. Herramienta Menor%4%$346.73$13.87Total$136.96Total$360.60

Cuadrilla No. 32(Alum.+ Ayud "A")Cuadrilla No.37 (Electric+ Ayud"A")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAyudante "A"Jor.1$99.45$99.45Ayudante "A"Jor.1$99.45$99.45AlumineroJor.1$119.74$119.74ElectricistaJor.1$113.88$113.88$0.00$0.00$0.00$0.00Mando IntermediosMando Intermedios$0.00Cabo de OficialesJor.0.10000$122.21$12.22MaestroJor.0.10000$238.99$23.90MaestroJor.0.05000$238.99$11.95Sub-Total$243.09Sub-Total$237.50Dep. Herramienta Menor%4%$243.09$9.72Dep. Herramienta Menor%4%$237.50$9.50Total$252.81Total$247.00

Cuadrilla No.33 (Vidriero+Ayud "B")Cuadrilla No.38(Electric+ 2Ayud"A")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAyudante "B"Jor.1$91.19$91.19Ayudante "A"Jor.2$99.45$198.90VidrieroJor.1$112.07$112.07ElectricistaJor.1$113.88$113.88$0.00$0.00$0.00$0.00Mando IntermediosMando Intermedios$0.00Cabo de OficialesJor.0.15000$122.21$18.33MaestroJor.0.10000$238.99$23.90MaestroJor.0.07500$238.99$17.92Sub-Total$227.16Sub-Total$349.03Dep. Herramienta Menor%4%$227.16$9.09Dep. Herramienta Menor%4%$349.03$13.96Total$236.24Total$363.00

Cuadrilla No. 34(Vidriero+Ayud "A")Cuadrilla No.39 (Operador Equipo)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAyudante "A"Jor.1$99.45$99.45Operador de EquipoJor.1$82.64$82.64VidrieroJor.1$112.07$112.07$0.00$0.00$0.00$0.00$0.00Mando IntermediosMando Intermedios$0.00Cabo de OficialesJor.0.05000$122.21$6.11MaestroJor.0.10000$238.99$23.90MaestroJor.0.01667$238.99$3.98Sub-Total$235.42Sub-Total$92.74Dep. Herramienta Menor%4%$235.42$9.42Dep. Herramienta Menor%4%$92.74$3.71Total$244.84Total$96.45

Cuadrilla No. 35(Plomero+ ayud "A")Cuadrilla No.40 (Op. Equipo+ peon)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAyudante "A"Jor.1$99.45$99.45Operador de EquipoJor.1$82.64$82.64PlomeroJor.1$111.57$111.57PeonJor.1$79.75$79.75$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de OficialesJor.0.10000$122.21$12.22Cabo de OficialesJor.0.10000$122.21$12.22MaestroJor.0.05000$238.99$11.95MaestroJor.0.03333$238.99$7.97Sub-Total$235.20Sub-Total$182.58Dep. Herramienta Menor%4%$235.20$9.41Dep. Herramienta Menor%4%$182.58$7.30Total$244.60Total$189.89

Cuadrilla No. 41(Op. Equipo+2peones)Cuadrilla No.46 (Chofer Camio+peon)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalOperador de EquipoJor.1$82.64$82.64PeonJor.1$79.75$79.75PeonJor.2$79.75$159.50Chofer de CamionJor.1$115.27$115.27$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de OficialesJor.0.15000$122.21$18.33Sobrestante de TerraceriasJor.0.10000$187.46$18.75MaestroJor.0.05000$238.99$11.95MaestroJor.0.03333$238.99$7.97Sub-Total$272.43Sub-Total$221.73Dep. Herramienta Menor%4%$272.43$10.90Dep. Herramienta Menor%4%$221.73$8.87Total$283.32Total$230.60

Cuadrilla No. 42(Op. Equ + 3 peon)Cuadrilla No.47 (Chofer Camion+ Ayud"B")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalOperador de EquipoJor.1$82.64$82.64Ayudante "B"Jor.1$91.19$91.19PeonJor.3$79.75$239.25Chofer de CamionJor.1$115.27$115.27$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de OficialesJor.0.20000$122.21$24.44Sobrestante de TerraceriasJor.0.10000$187.46$18.75MaestroJor.0.06667$238.99$15.93MaestroJor.0.03333$238.99$7.97Sub-Total$362.27Sub-Total$233.17Dep. Herramienta Menor%4%$362.27$14.49Dep. Herramienta Menor%4%$233.17$9.33Total$376.76Total$242.50

Cuadrilla No.43 (Op.Equ+4peon)Cuadrilla No.48(Aux. Topografo+ 4Ayud"A")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalOperador de EquipoJor.1$82.64$82.64Ayudante "A"Jor.4$99.45$397.80PeonJor.4$79.75$319.00Aux. TopografoJor.1$122.21$122.21$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de OficialesJor.0.25000$122.21$30.55$0.00MaestroJor.0.08333$238.99$19.92$0.00Sub-Total$452.12Sub-Total$520.02Dep. Herramienta Menor%4%$452.12$18.08Dep. Herramienta Menor%4%$520.02$20.80Total$470.20Total$540.82

Cuadrilla No. 44(Op.Maq"B"+Ayud"B")Cuadrilla No.49 (2 Of. Albail+ 4 peones)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAyudante "B"Jor.1$91.19$91.19PeonesJor.4$79.75$319.00Op. Maquinaria "B"Jor.1$110.58$110.58Oficial. AlbailJor.2$116.35$232.70$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosSobrestante de TerraceriasJor.0.10000$187.46$18.75Cabo de OficialesJor.0.30000$122.21$36.66MaestroJor.0.03333$238.99$7.97MaestroJor.0.10000$238.99$23.90Sub-Total$228.49Sub-Total$612.27Dep. Herramienta Menor%4%$228.49$9.14Dep. Herramienta Menor%4%$612.27$24.49Total$237.63Total$636.76

Cuadrilla No. 45(Op.Maq"A"+ayud "A")Cuadrilla No.50 (2Oficial Albail+ 9peon)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAyudante "A"Jor.1$99.45$99.45Oficial. AlbailJor.2$116.35$232.70Operador de Maquinaria "A"Jor.1$123.32$123.32PeonJor.9$79.75$717.76$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosSobrestante de TerraceriasJor.0.10000$187.46$18.75Cabo de OficialesJor.0.55000$122.21$67.22MaestroJor.0.03333$238.99$7.97MaestroJor.0.18333$238.99$43.81Sub-Total$249.48Sub-Total$1,061.49Dep. Herramienta Menor%4%$249.48$9.98Dep. Herramienta Menor%4%$1,061.49$42.46Total$259.46Total$1,103.95

Cuadrilla No. 51(2Oficial Albail+5peones)Cuadrilla No.56 (9 peon)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalOficial. AlbailJor.2$116.35$232.70PeonJor.9$79.75$717.76PeonJor.5$79.75$398.75$0.00$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de OficialesJor.0.35000$122.21$42.78Cabo de PeonesJor.0.45000$90.79$40.86MaestroJor.0.11667$238.99$27.88MaestroJor.0.15000$238.99$35.85Sub-Total$702.11Sub-Total$794.46Dep. Herramienta Menor%4%$702.11$28.08Dep. Herramienta Menor%4%$794.46$31.78Total$730.20Total$826.24

Cuadrilla No. 52(2 Oficial Albail + 10 peon)Cuadrilla No.57 (Poblador + Ayud"A")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalOficial. AlbailJor.2$116.35$232.70Ayudante "A"Jor.1$99.45$99.45PeonJor.10$79.75$797.51PobladorJor.1$118.54$118.54$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de OficialesJor.0.60000$122.21$73.33Cabo de OficialesJor.0.10000$122.21$12.22MaestroJor.0.20000$238.99$47.80MaestroJor.0.03333$238.99$7.97Sub-Total$1,151.34Sub-Total$238.18Dep. Herramienta Menor%4%$1,151.34$46.05Dep. Herramienta Menor%4%$238.18$9.53Total$1,197.39Total$247.71

Cuadrilla No.53 (Plomero + Ayudante "B"+ Peon)Cuadrilla No.58(Oficial Albail+ 1Ayud"B"+ 7 Peon)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalPlomeroJor.1$111.57$111.57Ayudante "B"Jor.1$91.19$91.19PeonJor.1$79.75$79.75Oficial AlbailJor.1$116.35$116.35Ayudante "B"Jor.1$91.19$91.19PeonJor.7$79.75$558.25$0.00$0.00Mando IntermediosMando IntermediosCabo de OficialesJor.0.15000$122.21$18.33Cabo de OficialesJor.0.45000$122.21$55.00MaestroJor.0.05000$238.99$11.95MaestroJor.0.15000$238.99$35.85Sub-Total$312.80Sub-Total$856.64Dep. Herramienta Menor%4%$312.80$12.51Dep. Herramienta Menor%4%$856.64$34.27Total$325.31Total$890.91

Cuadrilla No. 54(Oficial Electrico "C"+Ayud"B" + Peon)Cuadrilla No.59 (Oficial Albail+ 1Ayud"B"+ 3 Peon)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAyudante "B"Jor.1$91.19$91.19Ayudante "B"Jor.1$91.19$91.19Oficial Electrico "C"Jor.1$137.63$137.63Oficial AlbailJor.1$116.35$116.35PeonJor.1$79.75$79.75PeonJor.3$79.75$239.25$0.00$0.00Mando IntermediosMando IntermediosCabo de OficialesJor.0.15000$122.21$18.33Cabo de OficialesJor.0.25000$122.21$30.55MaestroJor.0.05000$238.99$11.95MaestroJor.0.08333$238.99$19.92Sub-Total$338.85Sub-Total$497.26Dep. Herramienta Menor%4%$338.85$13.55Dep. Herramienta Menor%4%$497.26$19.89Total$352.41Total$517.15

Cuadrilla No. 55(10 Peon)Cuadrilla No.60 (Oficial Albail+ Ayudante "A" + peon)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalPeonJor.10$79.75$797.51Oficial. AlbailJor.1$116.35$116.35$0.00PeonJor.1$79.75$79.75$0.00Ayudante "A"Jor.1$99.45$99.45$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.50000$90.79$45.40Cabo de OficialesJor.0.15000$122.21$18.33MaestroJor.0.16667$238.99$39.83MaestroJor.0.05000$238.99$11.95Sub-Total$882.73Sub-Total$325.83Dep. Herramienta Menor%4%$882.73$35.31Dep. Herramienta Menor%4%$325.83$13.03Total$918.04Total$338.87

Cuadrilla No. 61(Oficial Albail +Tubero 2da.+2peones)Cuadrilla No.66 (Tubero 1ra+ 2Tubero 2da + 4 peon)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalOficial. AlbailJor.1$116.35$116.35PeonJor.4$79.75$319.00PeonJor.2$79.75$159.50Tubero de segundaJor.2$116.35$232.70Tubero de segundaJor.1$116.35$116.35Tubero de primeraJor.1$132.57$132.57$0.00$0.00Mando IntermediosMando IntermediosCabo de OficialesJor.0.20000$122.21$24.44Cabo de OficialesJor.0.35000$122.21$42.78MaestroJor.0.06667$238.99$15.93MaestroJor.0.11667$238.99$27.88Sub-Total$432.58Sub-Total$754.93Dep. Herramienta Menor%4%$432.58$17.30Dep. Herramienta Menor%4%$754.93$30.20Total$449.88Total$785.13

Cuadrilla No. 62(Oficial Albail +Tubero 1ra.+2peones)Cuadrilla No.67 (Tubero 1ra+ 2Tubero 2da + 6 peon)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalOficial. AlbailJor.1$116.35$116.35PeonJor.6$79.75$478.50PeonJor.2$79.75$159.50Tubero de segundaJor.2$116.35$232.70Tubero de primeraJor.1$132.57$132.57Tubero de primeraJor.1$132.57$132.57$0.00$0.00Mando IntermediosMando IntermediosCabo de OficialesJor.0.20000$122.21$24.44Cabo de OficialesJor.0.45000$122.21$55.00MaestroJor.0.06667$238.99$15.93MaestroJor.0.15000$238.99$35.85Sub-Total$448.80Sub-Total$934.62Dep. Herramienta Menor%4%$448.80$17.95Dep. Herramienta Menor%4%$934.62$37.38Total$466.75Total$972.01

Cuadrilla No.63 (Oficial Albail +Tubero 1ra.+4peones)Cuadrilla No.68(Tornillero + 4 Rastrillero+ 5 Peon)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalOficial. AlbailJor.1$116.35$116.35TornilleroJor.1$118.94$118.94PeonJor.4$79.75$319.00RastrilleroJor.4$95.07$380.29Tubero de primeraJor.1$132.57$132.57PeonJor.5$79.75$398.75$0.00$0.00Mando IntermediosMando IntermediosCabo de OficialesJor.0.30000$122.21$36.66Cabo de OficialesJor.0.50000$122.21$61.11MaestroJor.0.10000$238.99$23.90MaestroJor.0.16667$238.99$39.83Sub-Total$628.49Sub-Total$998.92Dep. Herramienta Menor%4%$628.49$25.14Dep. Herramienta Menor%4%$998.92$39.96Total$653.63Total$1,038.88

Cuadrilla No. 64(Oficial Albail +Tubero 1ra.+7peones)Cuadrilla No.69 (4Oficial Albail+ 4Ayud"B")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalOficial. AlbailJor.1$116.35$116.35Ayudante "B"Jor.4$91.19$364.76PeonJor.7$79.75$558.25Oficial AlbailJor.4$116.35$465.41Tubero de primeraJor.1$132.57$132.57$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de OficialesJor.0.45000$122.21$55.00Cabo de OficialesJor.0.40000$122.21$48.89MaestroJor.0.15000$238.99$35.85MaestroJor.0.13333$238.99$31.86Sub-Total$898.02Sub-Total$910.92Dep. Herramienta Menor%4%$898.02$35.92Dep. Herramienta Menor%4%$910.92$36.44Total$933.94Total$947.35

Cuadrilla No. 65(Oficial Albail +Tubero 1ra.+9peones)Cuadrilla No.70 (Montador de Equipo + Ayudante "B" )Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalOficial. AlbailJor.1$116.35$116.35Montador de EquipoJor.1$90.79$90.79PeonJor.9$79.75$717.76Ayudante "B"Jor.1$91.19$91.19Tubero de primeraJor.1$132.57$132.57$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.55000$90.79$49.93Cabo de OficialesJor.0.10000$122.21$12.22MaestroJor.0.18333$238.99$43.81MaestroJor.0.03333$238.99$7.97Sub-Total$1,060.42Sub-Total$202.17Dep. Herramienta Menor%4%$1,060.42$42.42Dep. Herramienta Menor%4%$202.17$8.09Total$1,102.84Total$210.25

Cuadrilla No. 71(Montador de Equipo + Ayudante "B"+ Peon)Mano de obraUnidadCantidadSalario RealImp. TotalMontador de EquipoJor.1$90.79$90.79Ayudante "B"Jor.1$91.19$91.19PeonJor.1$79.75$79.75$0.00Mando IntermediosCabo de OficialesJor.0.15000$122.21$18.33MaestroJor.0.05000$238.99$11.95Sub-Total$292.01Dep. Herramienta Menor%4%$292.01$11.68Total$303.69

Cuadrilla No. 72(Barretero + Ayudante "A")Mano de obraUnidadCantidadSalario RealImp. TotalBarreteroJor.1$114.96$114.96Ayudante "A"Jor.1$99.45$99.45$0.00$0.00Mando IntermediosCabo de OficialesJor.0.10000$122.21$12.22MaestroJor.0.03333$238.99$7.97Sub-Total$234.60Dep. Herramienta Menor%4%$234.60$9.38Total$243.98

Precios de Mat.MATERIALES Y OTROS

CONCEPTOPRECIO UNITARIO UNIDADCemento gris$1,740.00Toncemento Blaco$3,360.00TonCemento Crest$3,450.00TonYeso$1,000.00TonGrano de Marmol (marmolina)$700.00TonSIKALITE$14.00kgArena #5$220.00M3Arena #4$195.00M3Agua$11.00M3Grava 3/4$195.00M3

Gasolina Magna$5.89LtGasolina Premium$6.60LtDiesel$4.88LtLubricante$26.00LtTaza de Interes39.72%

Alambre recocido # 16$8.00kg.Clavo 3/4", 2 1/2", y 4"$11.00kg.Malla electrosoldada 6-6/10-10$18.50kg.Alambron 1/4" (2) F'y= 3000 Kg/cm2$6,500.00ton.Varilla 5/16" (2.5)$6,000.00ton.Varilla 3/8" (3)$5,940.00ton.Varilla 1/2" (4)$5,920.00ton.Varilla 5/8" (5)$5,890.00ton.Varilla 3/4" (6)$5,850.00ton.Varilla 1" (8)$5,820.00ton.Varilla 1 1/4" (10)$5,790.00ton.Varilla 1 1/2" (12)$5,760.00ton.

Equipo

DESCRIPCION: CAMION PETROLIZADORA,MARCA FORD ,MODELO 48-826,INCLUYE EQUIPO CON PETROLIZADORA SEAMANN-GUNISSON

precio de (Pa)=745800horas trabajadas (Ha)=1680Cambio(T)=200adquisicional aode lubricanteequipo(Ea)=0potencia(j)=122.8lubricante(aL)=0.00358adicionalvalor de (Vn)=13800potencia(Hp)=61.400precio del(Pl)=26llantasdel equipolubricantevalor(Va)=724000salario (So)CUA=47244.3tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=149160combustible(c) =0.1514prima anual(S)=0.01rescatede segurovida economica(Ve)=8400precio de (Pc)=5.89factor de (Q)=0.8de maquinariacombustiblemantenimientovida economica(Hv)=1800capacidad de(C) =7factor de (Fo)=0.5de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=68.43CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i103.22fijosSeguro =(13000 -11700) + 2(s+ha)=2.60Mantenimiento =0.868.43=54.75SUMA =229.00

cargos por combustible0.227165.8954.75cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)6.625consumocargos por llantasvn /hv07.67SUMA =69.04

cargos por so/ha *286.5SUMA =41.63operacincosto total hora equipo TOTAL 339.67

DESCRIPCION: REVOLVEDORA PARA CONCRETO MARCA MIPSA DE UN SACO DE CAPACIDAD MOTOR REVOLVEDORA DE GASOLINA MARCA KOHLER ,MODELO K-181 DE 8 H.P.

precio de (Pa)=13000horas trabajadas (Ha)=1400Cambio(T)=50adquisicional aode lubricanteequipo(Ea)=0potencia(j)=8lubricante(aL)=0.00307adicionalvalor de (Vn)=0potencia(Hp)=6.000precio del(Pl)=26llantasdel equipolubricantevalor(Va)=13000salario (So)CUA =3996.448tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=11700combustible(c) =0.2271prima anual(S)=0.01rescatede segurovida economica(Ve)=4200precio de (Pc)=5.89factor de (Q)=0.9de maquinariacombustiblemantenimientovida economica(Hv)=0capacidad de(C) =1factor de (Fo)=0.75de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=0.31CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i3.50fijosSeguro =(13000 -11700) + 2(s+ha)=0.09Mantenimiento =0.868.43=0.28SUMA =4.18

cargos por combustible0.227165.898.03cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)0.999consumocargos por llantasvn /hv00.00SUMA =9.02

cargos por so/ha *286.5SUMA =19.72operacincosto total hora equipo TOTAL 32.92

DESCRIPCION: VIBRADOR DE AGUJA PARA CONCRETO MARCA MECSA MODELO K-8 MOTOR DE GASOLINA KOHLER K-181 ,8 H.P. 3600 RPM

precio de (Pa)=9900horas trabajadas (Ha)=1475Cambio(T)=50adquisicional aode lubricanteequipo(Ea)=0potencia(j)=4lubricante(aL)=0.00307adicionalvalor de (Vn)=0potencial(Hp)=3.000precio del(Pl)=26llantasdel equipolubricantevalor(Va)=9900salario (So)CUA=9105.336tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=8910combustible(c) =0.2271prima anual(S)=0.01rescatede segurovida economica(Ve)=4425precio de (Pc)=5.89factor de (Q)=0.9de maquinariacombustiblemantenimientovida economica(Hv)=0capacidad de(C) =1.7factor de (Fo)=0.75de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=0.22CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i2.53fijosSeguro =(13000 -11700) + 2(s+ha)=0.06Mantenimiento =0.868.43=0.20SUMA =3.02

cargos por combustible0.227165.894.01cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)1.123consumocargos por llantasvn /hv00.00SUMA =5.14

cargos por so/ha *286.5SUMA =20.44operacincosto total hora equipo TOTAL 28.60

DESCRIPCION: MALACATE MARCA MECSA ,MODELO M -1000 1 TONELADA DE CAPACIDAD MOTOR DE GASOLINA WISCONSIN S14D-R DE 14 H.P. 3600 RPM.

precio de (Pa)=6900horas trabajadas (Ha)=1600Cambio(T)=50adquisicional aode lubricanteequipo(Ea)=0potencia(j)=12.5lubricante(aL)=0.00307adicionalvalor de (Vn)=0potencial(Hp)=9.380precio del(Pl)=26llantasdel equipolubricantevalor(Va)=6900salario (So)CUA=3996.448tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=6210combustible(c) =0.2271prima anual(S)=0.01rescatede segurovida economica(Ve)=4800precio de (Pc)=5.89factor de (Q)=0.8de maquinariacombustiblemantenimientovida economica(Hv)=0capacidad de(C) =2.7factor de (Fo)=0.75de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=0.14CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i1.63fijosSeguro =(13000 -11700) + 2(s+ha)=0.04Mantenimiento =0.868.43=0.12SUMA =1.93

cargos por combustible0.227165.8912.55cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)2.153consumocargos por llantasvn /hv00.00SUMA =14.70

cargos por so/ha *286.5SUMA =17.26operacincosto total hora equipo TOTAL 33.88

DESCRIPCION: PLUMA PARA MALACATE DE 1 TONELADA DE CAPACIDAD COMPLETA

precio de (Pa)=5300horas trabajadas (Ha)=1600Cambio(T)=0adquisicional aode lubricanteequipo(Ea)=0potencia(j)=0lubricante(aL)=0.00307adicionalvalor de (Vn)=0potencial(Hp)=0.000precio del(Pl)=0llantasdel equipolubricantevalor(Va)=5300salario (So)CUA=9105.336tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=0combustible(c) =0prima anual(S)=0.01rescatede segurovida economica(Ve)=8000precio de (Pc)=0factor de (Q)=1de maquinariacombustiblemantenimientovida economica(Hv)=0capacidad de(C) =0factor de (Fo)=0.75de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=0.66CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i0.66fijosSeguro =(13000 -11700) + 2(s+ha)=0.02Mantenimiento =0.868.43=0.66SUMA =2.00

cargos por combustible0.227165.890.00cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)0.000consumocargos por llantasvn /hv00.00SUMA =0.00

cargos por so/ha *286.5SUMA =18.85operacincosto total hora equipo TOTAL 20.84

DESCRIPCION: CAMION DE VOLTEO MARCA FORD ,MOTOR DIESEL DE 170 H.P. ,8M3 DE CAPACIDAD

precio de (Pa)=489000horas trabajadas (Ha)=1700Cambio(T)=200adquisicional aode lubricanteequipo(Ea)=0potencia(j)=122.8lubricante(aL)=0.00358adicionalvalor de (Vn)=13800potencial(Hp)=61.400precio del(Pl)=26llantasdel equipolubricantevalor(Va)=474800salario (So)CUA=46230.599tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=97800combustible(c) =0.1514prima anual(S)=0.01rescatede segurovida economica(Ve)=8500precio de (Pc)=4.88factor de (Q)=0.8de maquinariacombustiblemantenimientovida economica(Hv)=1800capacidad de(C) =6.6factor de (Fo)=0.5de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=44.35CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i66.89fijosSeguro =(13000 -11700) + 2(s+ha)=1.68Mantenimiento =0.868.43=35.48SUMA =148.41

cargos por combustible0.227164.8845.36cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)6.573consumocargos por llantasvn /hv07.67SUMA =59.60

cargos por so/ha *286.5SUMA =38.83operacincosto total hora equipo TOTAL 246.85

DESCRIPCION: CAMION PIPA MARCA FORD ,MOTOR DIESEL DE 170 H.P.INCLUYE TANQUE DE 10000 LITROS DE CAPACIDAD.

precio de (Pa)=469000horas trabajadas (Ha)=1700Cambio(T)=200adquisicional aode lubricanteequipo(Ea)=0potencia(j)=122.8lubricante(aL)=0.00358adicionalvalor de (Vn)=13800potencial(Hp)=61.400precio del(Pl)=26llantasdel equipolubricantevalor(Va)=455400salario (So)CUA=46230.599tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=93800combustible(c) =0.1514prima anual(S)=0.01rescatede segurovida economica(Ve)=8500precio de (Pc)=4.88factor de (Q)=0.8de maquinariacombustiblemantenimientovida economica(Hv)=1800capacidad de(C) =7.5factor de (Fo)=0.5de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=42.54CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i64.16fijosSeguro =(13000 -11700) + 2(s+ha)=1.62Mantenimiento =0.868.43=34.03SUMA =142.35

cargos por combustible0.227164.8845.36cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)6.690consumocargos por llantasvn /hv07.67SUMA =59.72

cargos por so/ha *286.5SUMA =38.83operacincosto total hora equipo TOTAL 240.90

DESCRIPCION: MOTONIVELADORA CATERPILLAR ,MODELO 120 B ,MONTADO SOBRE BASTIDOR DE LLANTAS ,MOTOR DIESEL DE 125 H.P.

precio de (Pa)=1367800horas trabajadas (Ha)=2000Cambio(T)=200adquisicional aode lubricanteequipo(Ea)=0potencia(j)=125lubricante(aL)=0.00358adicionalvalor de (Vn)=135000potencial(Hp)=93.750precio del(Pl)=26llantasdel equipolubricantevalor(Va)=1282300salario (So)CUA=45252.673tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=205100combustible(c) =0.1514prima anual(S)=0.01rescatede segurovida economica(Ve)=10000precio de (Pc)=4.88factor de (Q)=0.8de maquinariacombustiblemantenimientovida economica(Hv)=1000capacidad de(C) =27factor de (Fo)=0.75de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=107.72CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i147.70fijosSeguro =(13000 -11700) + 2(s+ha)=3.72Mantenimiento =0.868.43=86.18SUMA =345.31

cargos por combustible0.227164.8869.27cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)12.236consumocargos por llantasvn /hv0135.00SUMA =216.50

cargos por so/ha *286.5SUMA =36.16operacincosto total hora equipo TOTAL 597.98

DESCRIPCION: APLANADORA MARCA COPACTO - HUMBER MODELO CT - 1014 DE 10 A 14 TONELADAS,DE RODILLOS ,MOTOR DE 73 H.P.

precio de (Pa)=643700horas trabajadas (Ha)=2000Cambio(T)=200adquisicional aode lubricanteequipo(Ea)=0potencia(j)=73lubricante(aL)=0.00307adicionalvalor de (Vn)=0potencial(Hp)=54.750precio del(Pl)=26llantasdel equipolubricantevalor(Va)=643700salario (So)CUA=45252.673tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=128750combustible(c) =0.1514prima anual(S)=0.01rescatede segurovida economica(Ve)=10000precio de (Pc)=5.89factor de (Q)=0.8de maquinariacombustiblemantenimientovida economica(Hv)=0capacidad de(C) =12factor de (Fo)=0.75de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=51.50CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i76.70fijosSeguro =(13000 -11700) + 2(s+ha)=1.93Mantenimiento =0.868.43=41.20SUMA =171.33

cargos por combustible0.227165.8948.82cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)5.930consumocargos por llantasvn /hv00.00SUMA =54.75

cargos por so/ha *286.5SUMA =36.16operacincosto total hora equipo TOTAL 262.24

DESCRIPCION: PAVIMENTADORA BARBER GREEN MODELO BG -220 ,MOTOR JOHN DEERE ,78 HP. REGLA MAESTRA 2.44 M. ANCHO BASICO 3.05

precio de (Pa)=1282300horas trabajadas (Ha)=1500Cambio(T)=200adquisicional aode lubricanteequipo(Ea)=0potencia(j)=81lubricante(aL)=0.00307adicionalvalor de (Vn)=0potencial(Hp)=60.750precio del(Pl)=26llantasdel equipolubricantevalor(Va)=1282300salario (So)CUA=45252.673tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=256400combustible(c) =0.1514prima anual(S)=0.01rescatede segurovida economica(Ve)=6000precio de (Pc)=5.89factor de (Q)=0.8de maquinariacombustiblemantenimientovida economica(Hv)=0capacidad de(C) =19factor de (Fo)=0.75de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=170.98CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i203.72fijosSeguro =(13000 -11700) + 2(s+ha)=5.13Mantenimiento =0.868.43=136.79SUMA =516.62

cargos por combustible0.227165.8954.17cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)7.319consumocargos por llantasvn /hv00.00SUMA =61.49

cargos por so/ha *286.5SUMA =48.22operacincosto total hora equipo TOTAL 626.33

DESCRIPCION: RETROEXCAVADORA HIDRAULICA CASE MODELO 580 H, MOTOR DIESEL PERKINS 4,236 ,73 HP. ,2200 RPM

precio de (Pa)=554100horas trabajadas (Ha)=2000Cambio(T)=200adquisicional aode lubricanteequipo(Ea)=0potencia(j)=73lubricante(aL)=0.00307adicionalvalor de (Vn)=27800potencia(Hp)=54.750precio del(Pl)=26llantasdel equipolubricantevalor(Va)=527700salario (So)CUA=44239.431tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=110800combustible(c) =0.1514prima anual(S)=0.01rescatede segurovida economica(Ve)=14000precio de (Pc)=4.88factor de (Q)=0.8de maquinariacombustiblemantenimientovida economica(Hv)=1000capacidad de(C) =8factor de (Fo)=0.75de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=29.78CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i63.40fijosSeguro =(13000 -11700) + 2(s+ha)=1.60Mantenimiento =0.868.43=23.82SUMA =118.60

cargos por combustible0.227164.8840.45cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)5.410consumocargos por llantasvn /hv027.80SUMA =73.66

cargos por so/ha *286.5SUMA =34.27operacincosto total hora equipo TOTAL 226.53

DESCRIPCION:NIVEL NATIONAL ,MODELO DUMPY(EQUIPO PARA MEDICION )

precio de (Pa)=8300horas trabajadas (Ha)=1400Cambio(T)=0adquisicional aode lubricanteequipo(Ea)=0potencia(j)=0lubricante(aL)=0.00307adicionalvalor de (Vn)=0potencia(Hp)=0.000precio del(Pl)=0llantasdel equipolubricantevalor(Va)=8300salario (So)CUA=48540.815tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=1660combustible(c) =0prima anual(S)=0.01rescatede segurovida economica(Ve)=14000precio de (Pc)=0factor de (Q)=0.8de maquinariacombustiblemantenimientovida economica(Hv)=0capacidad de(C) =0factor de (Fo)=0.9de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=0.47CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i1.41fijosSeguro =(13000 -11700) + 2(s+ha)=0.04Mantenimiento =0.868.43=0.38SUMA =2.30

cargos por combustible0.2271600.00cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)0.000consumocargos por llantasvn /hv00.00SUMA =0.00

cargos por so/ha *286.5SUMA =110.58operacincosto total hora equipo TOTAL 112.88

DESCRIPCION: TRANSITO NATIONAL K-E ,CHS (EQUIPO PARA MEDICION )

precio de (Pa)=17800horas trabajadas (Ha)=1400Cambio(T)=0adquisicional aode lubricanteequipo(Ea)=0potencia(j)=0lubricante(aL)=0.00307adicionalvalor de (Vn)=0potencia(Hp)=0.000precio del(Pl)=0llantasdel equipolubricantevalor(Va)=17800salario (So)CUA=48540.815tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=3560combustible(c) =0prima anual(S)=0.01rescatede segurovida economica(Ve)=14000precio de (Pc)=0factor de (Q)=0.8de maquinariacombustiblemantenimientovida economica(Hv)=0capacidad de(C) =0factor de (Fo)=0.9de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=1.02CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i3.03fijosSeguro =(13000 -11700) + 2(s+ha)=0.08Mantenimiento =0.868.43=0.81SUMA =4.94

cargos por combustible0.227165.890.00cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)0.000consumocargos por llantasvn /hv00.00SUMA =0.00

cargos por so/ha *286.5SUMA =110.58operacincosto total hora equipo TOTAL 115.51

DESCRIPCION: CARRETILLA DE VOLTEO BUGGY ,MODELO JPR -175 , 160 LITROS DE CAPACIDAD , MONTADA SOBRE NEUMATICOS

precio de (Pa)=2580horas trabajadas (Ha)=2000Cambio(T)=0adquisicional aode lubricanteequipo(Ea)=0potencia(j)=0lubricante(aL)=0.00307adicionalvalor de (Vn)=520potencia(Hp)=0.000precio del(Pl)=0llantasdel equipolubricantevalor(Va)=2060salario (So)CUA=191.805tasa de interes(i)=0.3972inicialde operacinanualvalor de (Vr)=0combustible(c) =0prima anual(S)=0.01rescatede segurovida economica(Ve)=2000precio de (Pc)=0factor de (Q)=1de maquinariacombustiblemantenimientovida economica(Hv)=1000capacidad de(C) =0factor de (Fo)=0.75de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=1.03CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i0.20fijosSeguro =(13000 -11700) + 2(s+ha)=0.01Mantenimiento =0.868.43=1.03SUMA =2.27

cargos por combustible0.2271600.00cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)0.000consumocargos por llantasvn /hv00.52SUMA =0.52

cargos por so/ha *286.5SUMA =13.14operacincosto total hora equipo TOTAL 13.14

MorterosMortero cemento-arena 1:2Mortero cemento-arena 1:6Mano de obra Unid. Cant. P.U.ImporteMano de obra Unid. Cant. P.U.ImporteCemento gris(0.605+5%)Ton.0.63525$1,740.00$1,105.34Cemento gris(0.298+5%)Ton.0.31290$1,740.00$544.45Arena #5(1.004+10%)m31.10440$220.00$242.97Arena #4(1.184+10%)m31.30240$195.00$253.97Agua (0.276+20%)m30.3312$11.00$3.64Agua(0.259+20%)m30.3108$11.00$3.42

SUB-TOTAL$1,351.95SUB-TOTAL$801.83Mano de obra y equipoMano de obra y equipo

SUB-TOTALSUB-TOTALTOTAL$1,351.95TOTAL$801.83

Mortero cemento-arena 1:3Mortero cemento-arena 1:7Mano de obra Unid. Cant. P.U.ImporteMano de obra Unid. Cant. P.U.ImporteCemento gris(0.496+5%)Ton.0.52080$1,740.00$906.19Cemento gris(0.248+5%)Ton.0.26040$1,740.00$453.10Arena #4(1.104+10%)m31.21440$195.00$236.81Arena #4(1.265+10%)m31.39150$195.00$271.34Agua (0.271+20%)m30.3252$11.00$3.58Agua(0.252+20%)m30.3024$11.00$3.33

SUB-TOTAL$1,146.58SUB-TOTAL$727.76Mano de obra y equipoMano de obra y equipo

SUB-TOTALSUB-TOTALTOTAL$1,146.58TOTAL$727.76

Mortero cemento-arena 1:4Mortero cemento-arena 1:8Mano de obra Unid. Cant. P.U.ImporteMano de obra Unid. Cant. P.U.ImporteCemento gris(0.421+5%)Ton.0.44205$1,740.00$769.17Cemento gris(0.209+5%)Ton.0.21945$1,740.00$381.84Arena #4(1.129+10%)m31.24190$195.00$242.17Arena #4(1.305+10%)m31.43550$195.00$279.92Agua (0.268+20%)m30.3216$11.00$3.54Agua(0.247+20%)m30.2964$11.00$3.26

SUB-TOTAL$1,014.88SUB-TOTAL$665.03Mano de obra y equipoMano de obra y equipo

SUB-TOTALSUB-TOTALTOTAL$1,014.88TOTAL$665.03

Mortero cemento-arena 1:5Mortero yeso-aguaMano de obra Unid. Cant. P.U.ImporteMano de obra Unid. Cant. P.U.ImporteCemento gris(0.351+5%)Ton.0.36855$1,740.00$641.28Yeso(0.682+5%)Ton.0.71610$1,000.00$716.10Arena #4(1.154+10%)m31.26940$195.00$247.53Agua(0.451+20%)m30.54120$11.00$5.95Agua (0.261+20%)m30.3132$11.00$3.45

SUB-TOTAL$892.26SUB-TOTAL$722.05Mano de obra y equipoMano de obra y equipo

SUB-TOTALSUB-TOTALTOTAL$892.26TOTAL$722.05

Mortero yeso-arena-aguaLechada cemento gris-aguaMano de obra Unid. Cant. P.U.ImporteMano de obra Unid. Cant. P.U.ImporteYeso(0.433+5%)Ton.0.45465$1,000.00$454.65Cemento gris(1.305+5%)Ton.1.37025$1,740.00$2,384.24Arena #5(0.539+10%)m30.59290$220.00$130.44Agua(0.988+20%)m31.18560$11.00$13.04Agua (0.290+20%)m30.348$11.00$3.83

SUB-TOTAL$588.92SUB-TOTAL$2,397.28Mano de obra y equipoMano de obra y equipo

SUB-TOTALSUB-TOTALTOTAL$588.92TOTAL$2,397.28

Pasta cemento blanco-cemento crest-marmolinaLechada cemento blanco-aguaMano de obra Unid. Cant. P.U.ImporteMano de obra Unid. Cant. P.U.ImporteCemento blanco(0.322+5%)Ton.0.33810$3,360.00$1,136.02Cemento blanco(1.305+5%)Ton.1.37025$3,360.00$4,604.04Cemento crest(0.107+5%)Ton.0.11235$3,450.00$387.61Agua(0.988+20%)m31.18560$11.00$13.04Marmolina(1.194+10%)Ton.1.3134$700.00$919.38Agua(0.507+20%)m30.6084$11.00$6.69SUB-TOTAL$2,449.70SUB-TOTAL$4,617.08Mano de obra y equipoMano de obra y equipo

SUB-TOTALSUB-TOTALTOTAL$2,449.70TOTAL$4,617.08

Pasta cemento gris-aguaMano de obra Unid. Cant. P.U.ImporteCemento gris(2.008+5%)Ton.2.10840$1,740.00$3,668.62Agua(0.953+20%)m31.1436$11.00$12.58

SUB-TOTAL$3,681.20Mano de obra y equipo

SUB-TOTALTOTAL$3,681.20

Pasta cemento blanco-aguaMano de obra Unid. Cant. P.U.ImporteCemento blanco(2.008+5%)Ton.2.10840$3,360.00$7,084.22Agua(0.953+20%)m31.1436$11.00$12.58

SUB-TOTAL$7,096.80Mano de obra y equipo

SUB-TOTALTOTAL$7,096.80

Conc. resist. norm

Concreto fc=100 kg/cm2, con resistencia normal Concreto fc=200 kg/cm2, con resistencia normalmx.3/4", fabricado en obra c/revolvedora 1 saco. mx. 3/4", fabricado en obra c/revolvedora 1 sacoMaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteCemento gris(0.267+5%)Ton.0.28$1,740.00$487.81Cemento gris(0.359+5%)Ton0.38$1,740.00$655.89Arena #4(0.509+10%)m30.56$195.00$109.18Arena #4(0.498+10%)m30.55$195.00$106.82Grava #3/4(0.616+10%)m30.68$195.00$132.13Grava 3/4"(0.603+10%)m30.66$195.00$129.34Agua (0.217+20%)m30.26$11.00$2.86Agua(0.202+20%)m30.24$11.00$2.67

SUB-TOTAL$731.99SUB-TOTAL$894.72Mano de obra y equipoMano de obra y equipoCuadrilla No. 4 (1/13)Jor.0.07692$367.22$28.25Cuadrilla No. 4 (1/13)Jor0.07692$367.22$28.25Revolvedora (8/13)Hr.0.61538$32.92$20.26Revolvedora (8/13)Hr0.61538$32.92$20.26SUB-TOTAL$48.51SUB-TOTAL$48.51TOTAL$780.49TOTAL$943.23

Concreto fc=125 kg/cm2, con resistencia normalConcreto fc=225 kg/cm2, con resistencia normalmx.3/4", fabricado en obra c/revolvedora 1 saco. mx.3/4", fabricado en obra c/revolvedora 1 saco. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteCemento gris(0.293+5%)Ton0.31$1,740.00$535.31Cemento gris(0.380+5%)Ton0.40$1,740.00$694.26Arena #4(0.506+10%)m30.56$195.00$108.54Arena #4(0.500+10%)m30.55$195.00$107.25Grava #3/4(0.613+10%)m30.67$195.00$131.49Grava #3/4(0.600+10%)m30.66$195.00$128.70Agua (0.214+20%)m30.26$11.00$2.82Agua (0.198+20%)m30.24$11.00$2.61

SUB-TOTAL$778.16SUB-TOTAL$932.82Mano de obra y equipoMano de obra y equipoCuadrilla No. 4 (1/13)Jor.0.07692$367.22$28.25Cuadrilla No. 4 (1/13)Jor.0.07692$367.22$28.25Revolvedora (8/13)Hr.0.61538$32.92$20.26Revolvedora (8/13)Hr.0.61538$32.92$20.26SUB-TOTAL$48.51SUB-TOTAL$48.51TOTAL$826.67TOTAL$981.33

Concreto fc=150 kg/cm2, con resistencia normalConcreto fc=250 kg/cm2, con resistencia normalmx.3/4", fabricado en obra c/revolvedora 1 saco. mx.3/4", fabricado en obra c/revolvedora 1 saco. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteCemento gris(0.318+5%)Ton0.33$1,740.00$580.99Cemento gris(0.401+5%)Ton0.42$1,740.00$732.63Arena #4(0.503+10%)m30.55$195.00$107.89Arena #4(0.502+10%)m30.55$195.00$107.68Grava #3/4(0.610+10%)m30.67$195.00$130.85Grava #3/4(0.598+10%)m30.66$195.00$128.27Agua (0.211+20%)m30.25$11.00$2.79Agua (0.195+20%)m30.23$11.00$2.57

SUB-TOTAL$822.51SUB-TOTAL$971.15Mano de obra y equipoMano de obra y equipoCuadrilla No. 4 (1/13)Jor.0.07692$367.22$28.25Cuadrilla No. 4 (1/13)Jor.0.07692$367.22$28.25Revolvedora (8/13)Hr.0.61538$32.92$20.26Revolvedora (8/13)Hr.0.61538$32.92$20.26SUB-TOTAL$48.51SUB-TOTAL$48.51TOTAL$871.02TOTAL$1,019.66

Concreto fc=175 kg/cm2, con resistencia normalConcreto fc=275 kg/cm2, con resistencia normalmx.3/4", fabricado en obra c/revolvedora 1 saco. mx.3/4", fabricado en obra c/revolvedora 1 saco. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteCemento gris(0.338+5%)Ton0.35$1,740.00$617.53Cemento gris(0.416+5%)Ton0.44$1,740.00$760.03Arena #4(0.500+10%)m30.55$195.00$107.25Arena #4(0.504+10%)m30.55$195.00$108.11Grava #3/4(0.606+10%)m30.67$195.00$129.99Grava #3/4(0.606+10%)m30.67$195.00$129.99Agua (0.206+20%)m30.25$11.00$2.72Agua (0.195+20%)m30.23$11.00$2.57

SUB-TOTAL$857.48SUB-TOTAL$1,000.70Mano de obra y equipoMano de obra y equipoCuadrilla No. 4 (1/13)Jor.0.07692$367.22$28.25Cuadrilla No. 4 (1/13)Jor.0.07692$367.22$28.25Revolvedora (8/13)Hr.0.61538$32.92$20.26Revolvedora (8/13)Hr.0.61538$32.92$20.26SUB-TOTAL$48.51SUB-TOTAL$48.51TOTAL$905.99TOTAL$1,049.21

Concreto fc=300 kg/cm2, con resistencia normalmx.3/4", fabricado en obra c/revolvedora 1 saco. MaterialUnid. Cant. P.U.ImporteCemento gris(0.431+5%)Ton0.45$1,740.00$787.44Arena #4(0.507+10%)m30.56$195.00$108.75Grava #3/4(0.614+10%)m30.68$195.00$131.70Agua (0.196+20%)m30.24$11.00$2.59

SUB-TOTAL$1,030.48Mano de obra y equipoCuadrilla No. 4 (1/13)Jor.0.07692$367.22$28.25Revolvedora (8/13)Hr.0.61538$32.92$20.26SUB-TOTAL$48.51TOTAL$1,078.99

Conc. Imp

Concreto fc=100 kg/cm2, con Imp. integral agr. Concreto fc=200 kg/cm2, con Imp. integral, agr.mx.3/4", fabricado en obra c/revolvedora 1 saco. mx. 3/4", fabricado en obra c/revolvedora 1 sacoMaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteCemento gris(0.267+5%)Ton0.28$1,740.00$487.81Cemento gris(0.359+5%)Ton0.38$1,740.00$655.89Arena #4(0.509+10%)m30.56$195.00$109.18Arena #4(0.498+10%)m30.55$195.00$106.82Grava #3/4(0.616+10%)m30.68$195.00$132.13Grava 3/4"(0.603+10%)m30.66$195.00$129.34Agua (0.217+20%)m30.26$11.00$2.86Agua(0.202+20%)m30.24$11.00$2.67Sikalite(3.204+5%)kg3.36$14.00$47.10Sikalite(4.308+5%)kg4.52$14.00$63.33SUB-TOTAL$779.08SUB-TOTAL$958.05Mano de obra y equipoMano de obra y equipoCuadrilla No. 4 (1/13)Jor0.07692$367.22$28.25Cuadrilla No. 4 (1/13)Jor0.07692$367.22$28.25Revolvedora (8/13)Hr0.61538$32.92$20.26Revolvedora (8/13)Hr0.61538$32.92$20.26SUB-TOTAL$48.51SUB-TOTAL$48.51TOTAL$827.59TOTAL$1,006.56

Concreto fc=125 kg/cm2, con Imp. Integral, agr. Concreto fc=225 kg/cm2, con Imp. Integral, agr. mx.3/4", fabricado en obra c/revolvedora 1 saco. mx.3/4", fabricado en obra c/revolvedora 1 saco. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteCemento gris(0.293+5%)Ton0.31$1,740.00$535.31Cemento gris(0.380+5%)Ton0.40$1,740.00$694.26Arena #4(0.506+10%)m30.56$195.00$108.54Arena #4(0.500+10%)m30.55$195.00$107.25Grava #3/4(0.613+10%)m30.67$195.00$131.49Grava #3/4(0.600+10%)m30.66$195.00$128.70Agua (0.214+20%)m30.26$11.00$2.82Agua (0.198+20%)m30.24$11.00$2.61Sikalite(3.516+5%)kg3.69$14.00$51.69Sikalite(4.560+5%)kg4.79$14.00$67.03SUB-TOTAL$829.85SUB-TOTAL$999.86Mano de obra y equipoMano de obra y equipoCuadrilla No. 4 (1/13)Jor0.07692$367.22$28.25Cuadrilla No. 4 (1/13)Jor0.07692$367.22$28.25Revolvedora (8/13)Hr0.61538$32.92$20.26Revolvedora (8/13)Hr0.61538$32.92$20.26SUB-TOTAL$48.51SUB-TOTAL$48.51TOTAL$878.36TOTAL$1,048.36

Concreto fc=150 kg/cm2, con Imp. Integral, agr. Concreto fc=250 kg/cm2, con Imp. Integral, agr. mx.3/4", fabricado en obra c/revolvedora 1 saco. mx.3/4", fabricado en obra c/revolvedora 1 saco. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteCemento gris(0.318+5%)Ton0.33$1,740.00$580.99Cemento gris(0.401+5%)Ton0.42$1,740.00$732.63Arena #4(0.503+10%)m30.55$195.00$107.89Arena #4(0.502+10%)m30.55$195.00$107.68Grava #3/4(0.610+10%)m30.67$195.00$130.85Grava #3/4(0.598+10%)m30.66$195.00$128.27Agua (0.211+20%)m30.25$11.00$2.79Agua (0.195+20%)m30.23$11.00$2.57Sikalite(3.816+5%)kg4.01$14.00$56.10Sikalite(4.812+5%)kg5.05$14.00$70.74SUB-TOTAL$878.60SUB-TOTAL$1,041.89Mano de obra y equipoMano de obra y equipoCuadrilla No. 4 (1/13)Jor0.07692$367.22$28.25Cuadrilla No. 4 (1/13)Jor0.07692$367.22$28.25Revolvedora (8/13)Hr0.61538$32.92$20.26Revolvedora (8/13)Hr0.61538$32.92$20.26SUB-TOTAL$48.51SUB-TOTAL$48.51TOTAL$927.11TOTAL$1,090.40

Concreto fc=175 kg/cm2, con Imp. Integral, agr. Concreto fc=275 kg/cm2, con Imp. Integral, agr. mx.3/4", fabricado en obra c/revolvedora 1 saco. mx.3/4", fabricado en obra c/revolvedora 1 saco. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteCemento gris(0.338+5%)Ton0.35$1,740.00$617.53Cemento gris(0.416+5%)Ton0.44$1,740.00$760.03Arena #4(0.500+10%)m30.55$195.00$107.25Arena #4(0.504+10%)m30.55$195.00$108.11Grava #3/4(0.606+10%)m30.67$195.00$129.99Grava #3/4(0.606+10%)m30.67$195.00$129.99Agua (0.206+20%)m30.25$11.00$2.72Agua (0.195+20%)m30.23$11.00$2.57Sikalite(4.056+5%)kg4.26$14.00$59.62Sikalite(4.992+5%)kg5.24$14.00$73.38SUB-TOTAL$917.11SUB-TOTAL$1,074.08Mano de obra y equipoMano de obra y equipoCuadrilla No. 4 (1/13)Jor0.07692$367.22$28.25Cuadrilla No. 4 (1/13)Jor0.07692$367.22$28.25Revolvedora (8/13)Hr0.61538$32.92$20.26Revolvedora (8/13)Hr0.61538$32.92$20.26SUB-TOTAL$48.51SUB-TOTAL$48.51TOTAL$965.61TOTAL$1,122.59

Concreto fc=300 kg/cm2, con Imp. Integral, agr. mx.3/4", fabricado en obra c/revolvedora 1 saco. MaterialUnid. Cant. P.U.ImporteCemento gris(0.431+5%)Ton0.45$1,740.00$787.44Arena #4(0.507+10%)m30.56$195.00$108.75Grava #3/4(0.614+10%)m30.68$195.00$131.70Agua (0.196+20%)m30.24$11.00$2.59Sikalite(5.172+5%)kg5.43$14.00$76.03SUB-TOTAL$1,106.51Mano de obra y equipoCuadrilla No. 4 (1/13)Jor0.07692$367.22$28.25Revolvedora (8/13)Hr0.61538$32.92$20.26SUB-TOTAL$48.51TOTAL$1,155.02

Conc. Norm. Cim

COLADO DECOLADO DEConcreto fc=100 kg/cm2, con resistencia normal con agr.Concreto fc=200 kg/cm2, con resistencia normal con agr.mx.3/4", vaciado con carretillas y botes en elems. de cim. mx.3/4", vaciado con carretillas y botes en elems. de cim. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=100kg/cm2(1.00+5%)m31.05$780.49$819.52Conc.fc=200kg/cm2(1.00+5%)m31.05$943.23$990.39Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$830.08SUB-TOTAL$1,000.95Mano de obra y equipoMano de obra y equipoCuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Vibrador (4/8)Hr.0.50000$28.60$14.30Vibrador (4/8)Hr.0.50000$28.60$14.30SUB-TOTAL$115.47SUB-TOTAL$115.47TOTAL$945.55TOTAL$1,116.42

COLADO DECOLADO DEConcreto fc=125 kg/cm2, con resistencia normal con agr.Concreto fc=225 kg/cm2, con resistencia normal con agr.mx.3/4", vaciado con carretillas y botes en elems. de cim. mx.3/4", vaciado con carretillas y botes en elems. de cim. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=125kg/cm2(1.00+5%)m31.05$826.67$868.00Conc.fc=225kg/cm2(1.00+5%)m31.05$981.33$1,030.40Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$878.56SUB-TOTAL$1,040.96Mano de obra y equipoMano de obra y equipoCuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Vibrador (4/8)Hr.0.50000$28.60$14.30Vibrador (4/8)Hr.0.50000$28.60$14.30SUB-TOTAL$115.47SUB-TOTAL$115.47TOTAL$994.03TOTAL$1,156.43

COLADO DECOLADO DEConcreto fc=150 kg/cm2, con resistencia normal con agr.Concreto fc=250 kg/cm2, con resistencia normal con agr.mx.3/4", vaciado con carretillas y botes en elems. de cim. mx.3/4", vaciado con carretillas y botes en elems. de cim. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=150kg/cm2(1.00+5%)m31.05$871.02$914.57Conc.fc=250kg/cm2(1.00+5%)m31.05$1,019.66$1,070.64Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$925.13SUB-TOTAL$1,081.20Mano de obra y equipoMano de obra y equipoCuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Vibrador (4/8)Hr.0.50000$28.60$14.30Vibrador (4/8)Hr.0.50000$28.60$14.30SUB-TOTAL$115.47SUB-TOTAL$115.47TOTAL$1,040.60TOTAL$1,196.67

COLADO DECOLADO DEConcreto fc=175 kg/cm2, con resistencia normal con agr.Concreto fc=275 kg/cm2, con resistencia normal con agr.mx.3/4", vaciado con carretillas y botes en elems. de cim. mx.3/4", vaciado con carretillas y botes en elems. de cim. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=175kg/cm2(1.00+5%)m31.05$905.99$951.29Conc.fc=275kg/cm2(1.00+5%)m31.05$1,049.21$1,101.67Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$961.85SUB-TOTAL$1,112.23Mano de obra y equipoMano de obra y equipoCuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Vibrador (4/8)Hr.0.50000$28.60$14.30Vibrador (4/8)Hr.0.50000$28.60$14.30SUB-TOTAL$115.47SUB-TOTAL$115.47TOTAL$1,077.32TOTAL$1,227.70

COLADO DEConcreto fc=300 kg/cm2, con resistencia normal con agr.mx.3/4", vaciado con carretillas y botes en elems. de cim. MaterialUnid. Cant. P.U.ImporteConc.fc=300kg/cm2(1.00+5%)m31.05$1,078.99$1,132.94Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$1,143.50Mano de obra y equipoCuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Vibrador (4/8)Hr.0.50000$28.60$14.30SUB-TOTAL$115.47TOTAL$1,258.97

Conc. Imp. CimColado de Concreto con Impermeabilizacion Integral en elementos de Cimentacion

Colado de Concreto fc=100 kg/cm2, con Imp. integral en elem. De CimentacionColado de Concreto fc=200 kg/cm2, con Imp. integral en elem. De CimentacionAgregado mx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado Agregado mx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=100kg/cm2(1.00+5%)m31.05$827.59$868.97Conc.fc=200kg/cm2(1.00+5%)m31.05$1,006.56$1,056.89Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$879.53SUB-TOTAL$1,067.45Mano de obra y equipoMano de obra y equipoCuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Vibrador (4/8)Hr.0.50000$28.60$14.30Vibrador (4/8)Hr.0.50000$28.60$14.30SUB-TOTAL$115.47SUB-TOTAL$115.47TOTAL$995.00TOTAL$1,182.92

Colado de Concreto fc=125 kg/cm2, con Imp. integral en elem. De CimentacionColado de Concreto fc=225 kg/cm2, con Imp. integral en elem. De CimentacionAgregado mx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado Agregado mx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=125kg/cm2(1.00+5%)m31.05$878.36$922.27Conc.fc=225kg/cm2(1.00+5%)m31.05$1,048.36$1,100.78Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$932.83SUB-TOTAL$1,111.34Mano de obra y equipoMano de obra y equipoCuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Vibrador (4/8)Hr.0.50000$28.60$14.30Vibrador (4/8)Hr.0.50000$28.60$14.30SUB-TOTAL$115.47SUB-TOTAL$115.47TOTAL$1,048.30TOTAL$1,226.81

Colado de Concreto fc=150 kg/cm2, con Imp. integral en elem. De CimentacionColado de Concreto fc=250 kg/cm2, con Imp. integral en elem. De CimentacionAgregado mx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado Agregado mx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=150kg/cm2(1.00+5%)m31.05$927.11$973.47Conc.fc=250kg/cm2(1.00+5%)m31.05$1,090.40$1,144.92Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$984.03SUB-TOTAL$1,155.48Mano de obra y equipoMano de obra y equipoCuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Vibrador (4/8)Hr.0.50000$28.60$14.30Vibrador (4/8)Hr.0.50000$28.60$14.30SUB-TOTAL$115.47SUB-TOTAL$115.47TOTAL$1,099.50TOTAL$1,270.95

Colado de Concreto fc=175 kg/cm2, con Imp. integral en elem. De CimentacionColado de Concreto fc=275 kg/cm2, con Imp. integral en elem. De CimentacionAgregado mx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado Agregado mx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=175kg/cm2(1.00+5%)m31.05$965.61$1,013.90Conc.fc=275kg/cm2(1.00+5%)m31.05$1,122.59$1,178.72Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$1,024.46SUB-TOTAL$1,189.28Mano de obra y equipoMano de obra y equipoCuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Vibrador (4/8)Hr.0.50000$28.60$14.30Vibrador (4/8)Hr.0.50000$28.60$14.30SUB-TOTAL$115.47SUB-TOTAL$115.47TOTAL$1,139.92TOTAL$1,304.75

Colado de Concreto fc=300 kg/cm2, con Imp. integral en elem. De CimentacionAgregado mx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado MaterialUnid. Cant. P.U.ImporteConc.fc=300kg/cm2(1.00+5%)m31.05$1,155.02$1,212.77Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$1,223.33Mano de obra y equipoCuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Vibrador (4/8)Hr.0.50000$28.60$14.30SUB-TOTAL$115.47TOTAL$1,338.80

Conc. Norm. Estruc

COLADO DECOLADO DEConcreto fc=100 kg/cm2, con Resistencia normal, agr. Concreto fc=200 kg/cm2, con Resistencia normal, agr. mx.3/4", vaciado con carretillas y botes en elems. estructural. mx.3/4", vaciado con carretillas y botes en elems. estructural. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=100kg/cm2(1.00+5%)m31.05$780.49$819.52Conc.fc=200kg/cm2(1.00+5%)m31.05$943.23$990.39Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$830.08SUB-TOTAL$1,000.95Mano de obra y equipoMano de obra y equipoCuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Vibrador (4/5)Hr.0.8000$28.60$22.88Vibrador (4/5)Hr.0.8000$28.60$22.88SUB-TOTAL$265.24SUB-TOTAL$265.24TOTAL$1,095.32TOTAL$1,266.20

COLADO DECOLADO DEConcreto fc=125 kg/cm2, con Resistencia normal, agr. Concreto fc=225 kg/cm2, con Resistencia normal, agr. mx.3/4", vaciado con carretillas y botes en elems. estructural. mx.3/4", vaciado con carretillas y botes en elems. estructural. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=125kg/cm2(1.00+5%)m31.05$826.67$868.00Conc.fc=225kg/cm2(1.00+5%)m31.05$981.33$1,030.40Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$878.56SUB-TOTAL$1,040.96Mano de obra y equipoMano de obra y equipoCuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Vibrador (4/5)Hr.0.8000$28.60$22.88Vibrador (4/5)Hr.0.8000$28.60$22.88SUB-TOTAL$265.24SUB-TOTAL$265.24TOTAL$1,143.81TOTAL$1,306.20

COLADO DECOLADO DEConcreto fc=150 kg/cm2, con Resistencia normal, agr. Concreto fc=250 kg/cm2, con Resistencia normal, agr. mx.3/4", vaciado con carretillas y botes en elems. estructural. mx.3/4", vaciado con carretillas y botes en elems. estructural. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=150kg/cm2(1.00+5%)m31.05$871.02$914.57Conc.fc=250kg/cm2(1.00+5%)m31.05$1,019.66$1,070.64Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$925.13SUB-TOTAL$1,081.20Mano de obra y equipoMano de obra y equipoCuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Vibrador (4/5)Hr.0.8000$28.60$22.88Vibrador (4/5)Hr.0.8000$28.60$22.88SUB-TOTAL$265.24SUB-TOTAL$265.24TOTAL$1,190.37TOTAL$1,346.45

COLADO DECOLADO DEConcreto fc=175 kg/cm2, con Resistencia normal, agr. Concreto fc=275 kg/cm2, con Resistencia normal, agr. mx.3/4", vaciado con carretillas y botes en elems. estructural. mx.3/4", vaciado con carretillas y botes en elems. estructural. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=175kg/cm2(1.00+5%)m31.05$905.99$951.29Conc.fc=275kg/cm2(1.00+5%)m31.05$1,049.21$1,101.67Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$961.85SUB-TOTAL$1,112.23Mano de obra y equipoMano de obra y equipoCuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Vibrador (4/5)Hr.0.8000$28.60$22.88Vibrador (4/5)Hr.0.8000$28.60$22.88SUB-TOTAL$265.24SUB-TOTAL$265.24TOTAL$1,227.10TOTAL$1,377.47

COLADO DEConcreto fc=300 kg/cm2, con Resistencia normal, agr. mx.3/4", vaciado con carretillas y botes en elems. estructural. MaterialUnid. Cant. P.U.ImporteConc.fc=300kg/cm2(1.00+5%)m31.05$1,078.99$1,132.94Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$1,143.50Mano de obra y equipoCuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Vibrador (4/5)Hr.0.8000$28.60$22.88SUB-TOTAL$265.24TOTAL$1,408.74

Conc. Imp. Estruc

COLADO DECOLADO DEConcreto fc=100 kg/cm2, con Impermea. Integral, agr. Concreto fc=200 kg/cm2, con Impermea. Integral, agr.mx.3/4", vaciado con carretillas y botes en elems. estructural. mx.3/4", vaciado con carretillas y botes en elems. estructural. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=100kg/cm2(1.00+5%)m31.05$827.59$868.97Conc.fc=200kg/cm2(1.00+5%)m31.05$1,006.56$1,056.89Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$879.53SUB-TOTAL$1,067.45Mano de obra y equipoMano de obra y equipoCuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Vibrador (4/5)Hr.0.8000$28.60$22.88Vibrador (4/5)Hr.0.8000$28.60$22.88SUB-TOTAL$265.24SUB-TOTAL$265.24TOTAL$1,144.78TOTAL$1,332.69

COLADO DECOLADO DEConcreto fc=125 kg/cm2, con Impermea. Integral, agr. Concreto fc=225 kg/cm2, con Impermea. Integral, agr.mx.3/4", vaciado con carretillas y botes en elems. estructural. mx.3/4", vaciado con carretillas y botes en elems. estructural. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=125kg/cm2(1.00+5%)m31.05$878.36$922.27Conc.fc=225kg/cm2(1.00+5%)m31.05$1,048.36$1,100.78Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$932.83SUB-TOTAL$1,111.34Mano de obra y equipoMano de obra y equipoCuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Vibrador (4/5)Hr.0.8000$28.60$22.88Vibrador (4/5)Hr.0.8000$28.60$22.88SUB-TOTAL$265.24SUB-TOTAL$265.24TOTAL$1,198.08TOTAL$1,376.59

COLADO DECOLADO DEConcreto fc=150 kg/cm2, con Impermea. Integral, agr.Concreto fc=250 kg/cm2, con Impermea. Integral, agr. mx.3/4", vaciado con carretillas y botes en elems. estructural. mx.3/4", vaciado con carretillas y botes en elems. estructural. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=150kg/cm2(1.00+5%)m31.05$927.11$973.47Conc.fc=250kg/cm2(1.00+5%)m31.05$1,090.40$1,144.92Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$984.03SUB-TOTAL$1,155.48Mano de obra y equipoMano de obra y equipoCuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Vibrador (4/5)Hr.0.8000$28.60$22.88Vibrador (4/5)Hr.0.8000$28.60$22.88SUB-TOTAL$265.24SUB-TOTAL$265.24TOTAL$1,249.27TOTAL$1,420.72

COLADO DECOLADO DEConcreto fc=175 kg/cm2, con Impermea. Integral, agr.Concreto fc=275 kg/cm2, con Impermea. Integral, agr.mx.3/4", vaciado con carretillas y botes en elems. estructural. mx.3/4", vaciado con carretillas y botes en elems. estructural. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=175kg/cm2(1.00+5%)m31.05$965.61$1,013.90Conc.fc=275kg/cm2(1.00+5%)m31.05$1,122.59$1,178.72Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$1,024.46SUB-TOTAL$1,189.28Mano de obra y equipoMano de obra y equipoCuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Vibrador (4/5)Hr.0.8000$28.60$22.88Vibrador (4/5)Hr.0.8000$28.60$22.88SUB-TOTAL$265.24SUB-TOTAL$265.24TOTAL$1,289.70TOTAL$1,454.53

COLADO DEConcreto fc=300 kg/cm2, con Impermea. Integral, agr.mx.3/4", vaciado con carretillas y botes en elems. estructural. MaterialUnid. Cant. P.U.ImporteConc.fc=300kg/cm2(1.00+5%)m31.05$1,155.02$1,212.77Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$1,223.33Mano de obra y equipoCuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Vibrador (4/5)Hr.0.8000$28.60$22.88SUB-TOTAL$265.24TOTAL$1,488.57

Acero Cim.

Habilitado y armado de acero de refuerzo en elementos deHabilitado y armado de acero de refuerzo en elementos decimentacion alambron 1/4" (2) fy =3000 kg/cm2cimentacion varilla 1/2" (4) fy =4200 kg/cm2MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteAlambron 1/4"no.2(1.00+4%)m31.04$6,500.00$6,760.00varilla 1/2"no.4(1.00+6%)m31.06$5,920.00$6,275.20alambre recocido (43+7%)m346.01$8.00$368.08alambre recocido (18+7%)m319.26$8.00$154.08

SUB-TOTAL$7,128.08SUB-TOTAL$6,429.28Mano de obra y equipoMano de obra y equipoCuadrilla No 24 (1/0.15)Jor.6.6667$332.82$2,218.78Cuadrilla No 24 (1/0.20)Jor.5.00000$332.82$1,664.10

SUB-TOTAL$2,218.78SUB-TOTAL$1,664.10TOTAL$9,346.86TOTAL$8,093.38

Habilitado y armado de acero de refuerzo en elementos deHabilitado y armado de acero de refuerzo en elementos decimentacion varilla 5/16" (2.5) fy =4200 kg/cm2cimentacion varilla 5/8" (5) fy =4200 kg/cm2MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.Importevarilla 5/16"no.2.5(1.00+5%)m31.05$6,000.00$6,300.00varilla 5/8"no.5(1.00+6%)m31.06$5,890.00$6,243.40alambre recocido (28kg+7%)m329.96$8.00$239.68alambre recocido (16+7%)m317.12$8.00$136.96

SUB-TOTAL$6,539.68SUB-TOTAL$6,380.36Mano de obra y equipoMano de obra y equipoCuadrilla No 24 (1/0.17)Jor.5.88235$332.82$1,957.76Cuadrilla No 24 (1/0.22)Jor.4.54545$332.82$1,512.82

SUB-TOTAL$1,957.76SUB-TOTAL$1,512.82TOTAL$8,497.44TOTAL$7,893.18

Habilitado y armado de acero de refuerzo en elementos deHabilitado y armado de acero de refuerzo en elementos decimentacion varilla 3/8" (3) fy =4200 kg/cm2cimentacion varilla 3/4" (6) fy =4200 kg/cm2MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.Importevarilla 3/8"no.3(1.00+6%)m31.06$5,940.00$6,296.40varilla 3/4"no.6(1.00+6%)m31.06$5,850.00$6,201.00alambre recocido (22+7%)m323.54$8.00$188.32alambre recocido (10+7%)m310.70$8.00$85.60

SUB-TOTAL$6,484.72SUB-TOTAL$6,286.60Mano de obra y equipoMano de obra y equipoCuadrilla No 24 (1/0.18)Jor.5.55556$332.82$1,849.00Cuadrilla No 24 (1/0.24)Jor.4.16667$332.82$1,386.75

SUB-TOTAL$1,849.00SUB-TOTAL$1,386.75TOTAL$8,333.72TOTAL$7,673.35

Habilitado y armado de acero de refuerzo en elementos deHabilitado y armado de acero de refuerzo en elementos decimentacion varilla 1" (8) fy =4200 kg/cm2cimentacion varilla 1 1/2" (12) fy =4200 kg/cm2MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.Importevarlla 1"no.8(1.00+7%)m31.07$5,820.00$6,227.40varlla 1 1/2 "no.12(1.00+7%)m31.07$5,760.00$6,163.20alambre recocido (15+7%)m316.05$8.00$128.40alambre recocido (14+7%)m314.98$8.00$119.84

SUB-TOTAL$6,355.80SUB-TOTAL$6,283.04Mano de obra y equipoMano de obra y equipoCuadrilla No 24 (1/0.26)Jor.3.84615$332.82$1,280.08Cuadrilla No 24 (1/0.30)Jor.3.33333$332.82$1,109.40

SUB-TOTAL$1,280.08SUB-TOTAL$1,109.40TOTAL$7,635.88TOTAL$7,392.44

Habilitado y armado de acero de refuerzo en elementos decimentacion varilla 1 1/4" (10) fy =4200 kg/cm2MaterialUnid. Cant. P.U.Importevarlla 1 1/4" no.10(1.00+7%)m31.07$5,790.00$6,195.30alambre recocido (14+7%)m314.98$8.00$119.84

SUB-TOTAL$6,315.14Mano de obra y equipoCuadrilla No 24 (1/0.28)Jor.3.57143$332.82$1,188.64

SUB-TOTAL$1,188.64TOTAL$7,503.78

Acero Estruc.

Habilitado y armado de acero de refuerzo en elementos deHabilitado y armado de acero de refuerzo en elementos deestructurales alambron 1/4" (2) fy =3000 kg/cm2estructurales varilla 1/2" (4) fy =4200 kg/cm2MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteAlambron 1/4"no.2(1.00+4%)m31.04$6,500.00$6,760.00varilla 1/2"no.4(1.00+6%)m31.06$5,920.00$6,275.20alambre recocido (43+7%)m346.01$8.00$368.08alambre recocido (18+7%)m319.26$8.00$154.08

SUB-TOTAL$7,128.08SUB-TOTAL$6,429.28Mano de obra y equipoMano de obra y equipoCuadrilla No 24 (1/0.12)Jor.8.33333$332.82$2,773.48Cuadrilla No 24 (1/0.18)Jor.5.55556$332.82$1,848.99

SUB-TOTAL$2,773.48SUB-TOTAL$1,848.99TOTAL$9,901.56TOTAL$8,278.27

Habilitado y armado de acero de refuerzo en elementos deHabilitado y armado de acero de refuerzo en elementos deestructurales varilla 5/16" (2.5) fy =4200 kg/cm2estructurales varilla 5/8" (5) fy =4200 kg/cm2MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.Importevarilla 5/16"no.2.5(1.00+5%)m31.05$6,000.00$6,300.00varilla 5/8"no.5(1.00+6%)m31.06$5,890.00$6,243.40alambre recocido (28kg+7%)m329.96$8.00$239.68alambre recocido (16+7%)m317.12$8.00$136.96

SUB-TOTAL$6,539.68SUB-TOTAL$6,380.36Mano de obra y equipoMano de obra y equipoCuadrilla No 24 (1/0.14)Jor.7.14286$332.82$2,377.27Cuadrilla No 24 (1/0.20)Jor.5.00000$332.82$1,664.09

SUB-TOTAL$2,377.27SUB-TOTAL$1,664.09TOTAL$8,916.95TOTAL$8,044.45

Habilitado y armado de acero de refuerzo en elementos deHabilitado y armado de acero de refuerzo en elementos deestructurales varilla 3/8" (3) fy =4200 kg/cm2estructurales varilla 3/4" (6) fy =4200 kg/cm2MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.Importevarilla 3/8"no.3(1.00+6%)m31.06$5,940.00$6,296.40varilla 3/4"no.6(1.00+6%)m31.06$5,850.00$6,201.00alambre recocido (22+7%)m323.54$8.00$188.32alambre recocido (10+7%)m310.70$8.00$85.60

SUB-TOTAL$6,484.72SUB-TOTAL$6,286.60Mano de obra y equipoMano de obra y equipoCuadrilla No 24 (1/0.16)Jor.6.25000$332.82$2,080.11Cuadrilla No 24 (1/0.22)Jor.4.54545$332.82$1,512.81

SUB-TOTAL$2,080.11SUB-TOTAL$1,512.81TOTAL$8,564.83TOTAL$7,799.41

Habilitado y armado de acero de refuerzo en elementos deHabilitado y armado de acero de refuerzo en elementos deestructurales varilla 1" (8) fy =4200 kg/cm2estructurales varilla 1 1/2" (12) fy =4200 kg/cm2MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.Importevarlla 1"no.8(1.00+7%)m31.07$5,820.00$6,227.40varlla 1 1/2 "no.12(1.00+7%)m31.07$5,760.00$6,163.20alambre recocido (15+7%)m316.05$8.00$128.40alambre recocido (14+7%)m314.98$8.00$119.84

SUB-TOTAL$6,355.80SUB-TOTAL$6,283.04Mano de obra y equipoMano de obra y equipoCuadrilla No 24 (1/0.24)Jor.4.16667$332.82$1,386.74Cuadrilla No 24 (1/0.28)Jor.3.57143$332.82$1,188.63

SUB-TOTAL$1,386.74SUB-TOTAL$1,188.63TOTAL$7,742.54TOTAL$7,471.67

Habilitado y armado de acero de refuerzo en elementos deestructurales varilla 1 1/4" (10) fy =4200 kg/cm2MaterialUnid. Cant. P.U.Importevarlla 1 1/4" no.10(1.00+7%)m31.07$5,790.00$6,195.30alambre recocido (14+7%)m314.98$8.00$119.84

SUB-TOTAL$6,315.14Mano de obra y equipoCuadrilla No 24 (1/0.26)Jor.3.84615$332.82$1,280.07

SUB-TOTAL$1,280.07TOTAL$7,595.21