CRONOGRAMA DE AVANCE DE OBRA VALORIZADO OBRA :INSTALACION CANAL DE RIEGO CAÑARIACO-CHICHAGUA-NARANJA,DISTRITO POMAHUACA FECHA : 8/8/2013 COSTO DIRECTO TOTAL 1,502,291.88 DESCRIPCIÓN UNIDAD CANTIDAD PARCIAL 1° MES 2° MES 3° MES 4ta Sem. CANAL RIEGO 01 OBRAS PROVISIONALES GLB 1.00 6,600.00 6600.00 02 BOCATOMA QUEBRADA GLB 1.00 103,141.68 20628.34 30942.50 51570.84 06 LINEA CONDUCCION GLB 1.00 880,557.89 88055.79 88055.79 09 RESERVORIO TIERRA C/ GEOMENBRANA MGLB 1.00 368,736.10 73747.22 73747.22 73747.22 73747.22 73747.22 15 TOMAS PARCELARIAS GLB 1.00 45,035.45 9007.09 9007.09 16 VARIOS GLB 1.00 98,220.76 ### ### ### 19,644.15 19,644.15 COSTO DIRECTO 1502291.88 168674.14 362894.32 248262.93 GASTOS GENERALES(8%) GLB 120183.35 13493.93 29031.55 19861.03 UTILIDAD (7%) GLB 105160.43 11807.19 25402.60 17378.41 IGV ( 18% ) GLB 310974.42 34915.55 75119.12 51390.43 SUPERVISION GLB 34552.71 3879.51 8346.57 5710.05 IGV ( 18% ) 0.00 737.11 1585.85 PRESUPUESTO TOTAL 2,073,162.79 233507.41 502380.01 PROGRAMADO 168674.14 362894.32 248262.93 EJECUTADO 0.00 0.00 PROGRAMADO 168674.14 531568.46 248262.93 EJECUTADO 0.00 0.00 PROGRAMADO 11.23% 24.16% 16.53% EJECUTADO 0.00 0.00 PROGRAMADO 11.23% 35.38% 51.91% EJECUTADO 0.00 0.00 0.00 Sem. Sem. Sem. Sem. Sem. Sem. Sem. Sem. Sem. Sem. AVANCE MENSUAL S/. AVANCE ACUMULADO S/. AVANCE MENSUAL ( %) AVANCE ACUMULADO (%)

Upload: jorge-arrascue

Post on 19-Nov-2015

3 views

Category:

Documents


2 download

DESCRIPTION

cronograma

TRANSCRIPT

cronograma CRONOGRAMA DE AVANCE DE OBRA VALORIZADOOBRA :INSTALACION CANAL DE RIEGO CAARIACO-CHICHAGUA-NARANJA,DISTRITO POMAHUACAFECHA :8/8/13COSTO DIRECTO TOTAL1,502,291.88NDESCRIPCINUNIDADCANTIDADPARCIALDuracin (das)1 MES2 MES3 MES4 MES5 MES1ra Sem.2da Sem.3ra Sem.4ta Sem.1ra Sem.2da Sem.3ra Sem.4ta Sem.1ra Sem.2da Sem.3ra Sem.4ta Sem.1ra Sem.2da Sem.3ra Sem.4ta Sem.1ra Sem.2da Sem.3ra Sem.4ta Sem.CANAL RIEGO01OBRAS PROVISIONALESGLB1.006,600.006600.006600.004719.61143,966.0665420.726054,975.4013743.8501735.28181,458.2202BOCATOMA QUEBRADAGLB1.00103,141.6820628.3430942.5051570.84103141.688308.93706,982.303491.15015033.103412,632.866316.43051907.692943,619.910010904.977500003Cmara Rompe Presin T - 6UND0.000.000.000.003439.47542,349.85587.46256411.95744,380.651095.1638405.91017,063.79882.9737504Cmara Rompe Presin T - 7UND0.000.000.000.000.00535.5000450.001487.50001,250.0078.12506LINEA CONDUCCIONGLB1.00880,557.8988055.7988055.79176111.58176111.58176111.58176111.58880557.8909RESERVORIO TIERRA C/ GEOMENBRANAMGLB1.00368,736.1073747.2273747.2273747.2273747.2273747.22368736.1015TOMAS PARCELARIASGLB1.0045,035.459007.099007.099007.099007.099007.0945035.4516VARIOSGLB1.0098,220.7619,644.1519,644.1519,644.1519,644.1519,644.15SANEAMIENTO01LetrinasGLB1.000.000.00COSTO DIRECTO1502291.88168674.14362894.32248262.93722460.491502291.88GASTOS GENERALES(8%)GLB120183.3513493.9329031.5519861.0357796.84120183.351622475.23UTILIDAD (7%)-0.07GLB105160.4311807.1925402.6017378.4150572.23105160.43IGV ( 18% )GLB310974.4234915.5575119.1251390.43149549.32310974.42SUPERVISIONGLB34552.713879.518346.575710.0516616.5934552.71IGV ( 18% )0.00737.111585.852322.95PRESUPUESTO TOTAL2,073,162.79233507.41502380.01735887.43AVANCE MENSUAL S/.PROGRAMADO168674.14362894.32248262.93722460.49EJECUTADO0.000.00AVANCE ACUMULADO S/.PROGRAMADO168674.14531568.46248262.93722460.49EJECUTADO0.000.000.0000AVANCE MENSUAL ( %)PROGRAMADO11.23%24.16%16.53%48.09%EJECUTADO0.000.00AVANCE ACUMULADO (%)PROGRAMADO11.23%35.38%51.91%100.00%EJECUTADO0.000.000.000.000.11227787240.24156046290.16525612190000000.0550853740.00599556590.48090554280.0059955659000000.055

ADQUISICION MATERIALES CRONOGRAMA DE ADQUISICIN DE INSUMOSOBRA :INSTALACION CANAL DE RIEGO CAARIACO-CHICHAGUA-NARANJA,DISTRITO POMAHUACAUBICACIN:DISTRITO :POMAHUACAPROVINCIA :JAENDEPARTAMENTO :CAJAMARCAFECHA:August-13RUBROTOTAL PRESUPUESTO /DURACIN DE OBRA: 120 DIAS1 MES2 MES3 MES4 MESESMATERIALES927,862.51104,178.43224,134.90153,334.96446,214.22927,862.511,502,291.88MANO DE OBRA527,485.7959,224.98127,419.7187,170.26253,670.84527,485.79EQUIPOS Y HERRAMIENTAS46,943.585,270.7311,339.717,757.7122,575.4346,943.581,502,291.88- 0COSTO DIRECTO1,502,291.88168,674.14362,894.32248,262.93722,460.491,502,291.88FILA A INGRESARG.G8.00%120,183.3513,493.9329,031.5519,861.0357,796.84120,183.35UTILIDAD7.00%105,160.4311,807.1925,402.6017,378.4150,572.23IGV18.00%310,974.4234,915.5575,119.1251,390.43149,549.32SUPERVISION 3.5%2.00%34,552.713,879.518,346.575,710.0516,616.5934,552.720.00COSTO TOTAL2,073,162.79232,770.32500,794.16342,602.85996,995.472,073,162.80NO BORRAR0.1122778720.2415604630.1652561220.480905543MO94,995.65MAT250,977.98VIENE DE HOJA DE PRESUPUESTOEQUI27,622.341(1.0000000)HERR3,427.10377023.07-0.125000.2372778720.3665604630.2902561220.6059055430.1250000000.1250000000.1250000000.125000000