REPORTE MENSUAL ESTRUMETAL S.A. REPORTE ACUMULADO DE OBRAS EN TONELADAS JULIO 2012 Fabricado Mes Pintado Mes Cali hh KG/HH Bgta hh KG/HH Cali hh KG/HH OBRA No. TOTALES OBRAS CONTRATADAS 663,331 42,289 16 52,156 6,281 8 659,673 8,935 74 1006 COMPUERTAS COYAIMA 0.0 0.0 0.0 201035 VIGAS HIDROSOGAMOSO 0.0 0.0 0.0 201111 TERMINAL SAMECO 0.0 0.0 0.0 201124 BODEGA INCAUCA 1,542.5 111.5 13.8 0.0 -0.6 201126 EDIFICIO ACCION 7,867.1 1,077.0 7.3 0.0 4,420.7 280.0 15.8 201127 EDIFICIO VISTAMAR 12,752.8 1,391.0 9.2 0.0 9,181.5 132.0 69.6 201140 PANELMET CARTAGENA -2,284.6 0.0 -2,244.6 201141 PLANTA ESTRUMETAL - CARTAGENA 0 0 0.0 0 201147 EDIFICIO LOTUS 0.0 0.0 0.0 201153 FACHADA CAPITAL TOWER 0 0 0.0 201158 DECORCERAMICA 0.0 0.0 0.0 201162 PLANTA SCHLUMBERGER 9,696.7 713.0 13.6 46,119.0 6,258.5 7.4 53,987.4 56.0 964.1 201163 BODEGA ALCATEK -0.7 0.0 -746.5 201166 VIDRIO ANDINO - CONTEIN 6,590.2 287.0 23.0 6,036.0 22.0 274.4 11,608.0 56.0 207.3 201167 ADICIONALES OLMUE 0.0 0.0 0.0 201168 SOPORTE DE LIMPIEZA ED. G - CC CALIMA 0 0 0.0 201169 VIGAS TRANSFORMADOR -HIDROSOGAMOSO 0.0 341.5 0.0 0.0 0.0 201200 PROYECTOS 2012 0 0 0.0 201205 HOTEL COSMOS 40,174.8 2,948.0 13.6 0.0 8,477.5 502.5 16.9 201206 CERREJON FASE I GL 293,906.2 16,227.0 18.1 1.0 334,393.7 4,263.5 78.4 201207 ADICIONALES II - CLINICA DE OCCIDENTE 0.0 0.0 0.0 201208 OXY GL 231,556.3 12,797.0 18.1 0.0 169,472.6 2,906.7 58.3 201209 REFOR. VIGAS PUENTE GRUA - RIMAX GL -1,969.7 69.5 -28.3 0.0 -1,999.2 0.0 201212 ADICIONALES II - C.C. CALIMA 0.0 0.0 0.0 201215 PUENTE CRA 1 CALLE 70 0.0 0.0 0.0 201216 ADICIONALES ALCATEK 0.0 0.0 0.0 201111-A PUENTES TERMINAL SAMECO 54,116.0 5,446.0 9.9 0.0 63,739.0 522.5 122.0 201217 NUEVA CALDERA - LA CABAÑA - FAB 0.0 0.0 0.0 201218 ADICIONALES PANELMET 9,257.8 522.0 17.7 0.0 9,257.8 216.0 42.9

Upload: dicam2103

Post on 27-Oct-2014

42 views

Category:

Documents


4 download

DESCRIPTION

prodccion metalmecanica

TRANSCRIPT

Page 1: Copia de kg hh (2)

REPORTE MENSUALESTRUMETAL S.A.REPORTE ACUMULADO DE OBRAS EN TONELADJULIO 2012

Fabricado Mes Pintado Mes

Cali hh KG/HH Bgta hh KG/HH Cali hh KG/HH Bgta

OBRA No. TOTALES OBRAS CONTRATADAS 663,331 42,289 16 52,156 6,281 8 659,673 8,935 74 271006 COMPUERTAS COYAIMA 0.0 0.0 0.0 0.0

201035 VIGAS HIDROSOGAMOSO 0.0 0.0 0.0 0.0201111 TERMINAL SAMECO 0.0 0.0 0.0 0.0201124 BODEGA INCAUCA 1,542.5 111.5 13.8 0.0 -0.6 0.0201126 EDIFICIO ACCION 7,867.1 1,077.0 7.3 0.0 4,420.7 280.0 15.8 0.0201127 EDIFICIO VISTAMAR 12,752.8 1,391.0 9.2 0.0 9,181.5 132.0 69.6 0.0201140 PANELMET CARTAGENA -2,284.6 0.0 -2,244.6 0.0201141 PLANTA ESTRUMETAL - CARTAGENA 0 0 0.0 0 0.0201147 EDIFICIO LOTUS 0.0 0.0 0.0 0.0201153 FACHADA CAPITAL TOWER 0 0 0.0 0.0201158 DECORCERAMICA 0.0 0.0 0.0 0.0201162 PLANTA SCHLUMBERGER 9,696.7 713.0 13.6 46,119.0 6,258.5 7.4 53,987.4 56.0 964.1 23.3201163 BODEGA ALCATEK -0.7 0.0 -746.5 0.0201166 VIDRIO ANDINO - CONTEIN 6,590.2 287.0 23.0 6,036.0 22.0 274.4 11,608.0 56.0 207.3 3.6201167 ADICIONALES OLMUE 0.0 0.0 0.0 0.0201168 SOPORTE DE LIMPIEZA ED. G - CC CALIMA 0 0 0.0 0.0201169 VIGAS TRANSFORMADOR -HIDROSOGAMOSO 0.0 341.5 0.0 0.0 0.0 0.0201200 PROYECTOS 2012 0 0 0.0 0.0201205 HOTEL COSMOS 40,174.8 2,948.0 13.6 0.0 8,477.5 502.5 16.9 0.0201206 CERREJON FASE I GL 293,906.2 16,227.0 18.1 1.0 334,393.7 4,263.5 78.4 0.0201207 ADICIONALES II - CLINICA DE OCCIDENTE 0.0 0.0 0.0 0.0201208 OXY GL 231,556.3 12,797.0 18.1 0.0 169,472.6 2,906.7 58.3 0.0201209 REFOR. VIGAS PUENTE GRUA - RIMAX GL -1,969.7 69.5 -28.3 0.0 -1,999.2 0.0 0.0201212 ADICIONALES II - C.C. CALIMA 0.0 0.0 0.0 0.0201215 PUENTE CRA 1 CALLE 70 0.0 0.0 0.0 0.0201216 ADICIONALES ALCATEK 0.0 0.0 0.0 0.0

201111-A PUENTES TERMINAL SAMECO 54,116.0 5,446.0 9.9 0.0 63,739.0 522.5 122.0 0.0201217 NUEVA CALDERA - LA CABAÑA - FAB 0.0 0.0 0.0 0.0201218 ADICIONALES PANELMET 9,257.8 522.0 17.7 0.0 9,257.8 216.0 42.9 0.0

Page 2: Copia de kg hh (2)

201219 HOGARES CLARET 125.2 358.0 0.3 0.0 125.2 0.0 0.0

Page 3: Copia de kg hh (2)

Pintado Mes

hh KG/HH

0

Page 4: Copia de kg hh (2)
Page 5: Copia de kg hh (2)

REPORTE MENSUALESTRUMETAL S.A.REPORTE ACUMULADO DE OBRAS EN TONELADagosto 2012

Fabricado Mes Pintado Mes

Cali hh KG/HH Bgta hh KG/HH Cali hh KG/HH Bgta

OBRA No. TOTALES OBRAS CONTRATADAS 683,301 43,439 16 69,798 7,329 10 504,200 8,520 59 61,1641006 COMPUERTAS COYAIMA

201035 VIGAS HIDROSOGAMOSO 10.0 0.0201111 TERMINAL SAMECO -1,300.0 104.0 -12.5 -1,300.0 8.0 -162.5201117 SOPORTE AA. LA 14 VALLE DEL LILI 2.0 0.0201119 CUBIERTA SAN MARCOS

201124 BODEGA INCAUCA 3,900.0 381.5 10.2 5,100.0 337.0 15.1201126 EDIFICIO ACCION 8,700.0 283.5 30.7 9,500.0 248.0 38.3201127 EDIFICIO VISTAMAR 13,000.0 868.0 15.0 16,700.0 304.5 54.8201140 PANELMET CARTAGENA

201141 PLANTA ESTRUMETAL - CARTAGENA

201147 EDIFICIO LOTUS

201153 FACHADA CAPITAL TOWER

201158 DECORCERAMICA 27,900.0 1,667.5 16.7 10,300.0 113.5 90.7201162 PLANTA SCHLUMBERGER 23,600.0 2,633.5 9.0 59,000.0 6,286.0 9.4 30,400.0 120.0 253.3 54,000.0201163 BODEGA ALCATEK 400.0 #DIV/0! 400.0 #DIV/0!201166 VIDRIO ANDINO - CONTEIN 5,498.0 822.0 6.7 5,564.0201167 ADICIONALES OLMUE

201168 SOPORTE DE LIMPIEZA ED. G - CC CALIMA

201169 VIGAS TRANSFORMADOR -HIDROSOGAMOSO 19,400.0 187.5 103.5201200 PROYECTOS 2012

201201 PLANTA COLOMBINA - FASE II ZF 9.0 0.0201205 HOTEL COSMOS 50,900.0 2,836.5 17.9 52,900.0 984.5 53.7201206 CERREJON FASE I GL 167,100.0 9,434.5 17.7 5,300.0 221.0 24.0 137,500.0 2,121.5 64.8201207 ADICIONALES II - CLINICA DE OCCIDENTE

201208 OXY GL 315,600.0 20,973.5 15.0 186,000.0 3,170.0 58.7201209 REFOR. VIGAS PUENTE GRUA - RIMAX GL

201212 ADICIONALES II - C.C. CALIMA 100.0 8.0 12.5201215 PUENTE CRA 1 CALLE 70

201216 ADICIONALES ALCATEK

Page 6: Copia de kg hh (2)

201111-A PUENTES TERMINAL SAMECO 19,300.0 2,962.5 6.5 40,100.0 892.0 45.0201217 NUEVA CALDERA - LA CABAÑA - FAB 21,500.0 446.5 48.2 13,800.0 64.0 215.6201218 ADICIONALES PANELMET 32.0 0.0201219 HOGARES CLARET 6,600.0 462.5 14.3 2,800.0 157.0 17.8201222 ADICIONALES SCHLUMBERGER 6,601.0 136.0 48.5 1,600.0

201111A ADICIONALES SAMECO 31.5 0.0 233.0 0.0

Page 7: Copia de kg hh (2)

Pintado Mes

hh KG/HH

822

545.0 99.1

277.0 20.1

Page 8: Copia de kg hh (2)
Page 9: Copia de kg hh (2)

80,000.0

7,392.010.823

4000304.0

13.15789474