1 de 142 VALUACIONES TRAMITADAS CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA FECHA TRAMITE MONTO BRUTO MONTO NETO CT-0168 4/17/2012 38,834,951.46 38,834,951.46 966,094.31 2.49 17,337,031.90 431,292.11 4 5/25/2012 AC 17,337,031.90 0.00 17,337,031.90 CT-0168 7/4/2013 1 69,561.88 31,054.41 38,507.47 CT-0168 7/3/2013 2 111,822.63 49,920.82 61,901.81 CT-0168 7/3/2013 3 143,919.76 64,249.90 79,669.86 CT-0168 7/3/2013 4 640,790.04 286,066.98 354,723.06 CT-0178 5/10/2012 2,500,000.00 2,500,000.00 0.00 1,116,071.43 AC 5/23/2012 AC 1,116,071.43 0.00 1,116,071.43 CT-0181 CONSORCIO VENECA, C.A. 5/9/2012 1,200,000.00 542,094.72 542,094.72 100.00 535,714.27 535,714.27 1 5/18/2012 AC 535,714.27 0.00 535,714.27 CT-0181 CONSORCIO VENECA, C.A. 6/10/2013 1 542,094.72 535,714.27 6,380.45 CT-0183 CONSORCIO VENECA, C.A. 5/9/2012 5,400,000.00 5,400,000.00 526,400.00 9.75 2,410,714.29 235,000.00 1 5/18/2012 AC 2,410,714.29 0.00 2,410,714.29 CT-0183 CONSORCIO VENECA, C.A. 12/28/2012 1 526,400.00 235,000.00 291,400.00 CT-0256 8/6/2012 48,543,689.32 48,543,689.32 5,454,048.36 11.24 21,671,289.88 2,434,843.03 3 8/30/2012 AC 21,671,289.88 0.00 21,671,289.88 CT-0256 4/11/2013 1 1,711,379.50 764,008.71 947,370.79 CT-0256 4/11/2013 2 1,415,758.89 632,035.22 783,723.67 CT-0256 7/9/2012 3 2,326,909.97 1,038,799.10 1,288,110.87 CT-0258 8/9/2012 48,543,689.32 48,543,689.29 42,948,506.17 88.47 21,671,289.88 19,173,440.27 7 8/30/2012 AC 21,671,289.88 0.00 21,671,289.88 CT-0258 12/7/2012 1 13,701,360.75 6,116,678.91 7,584,681.84 CT-0258 2/28/2013 2 8,349,340.09 3,727,383.97 4,621,956.12 CT-0258 3/22/2013 3 1,467,651.18 655,201.42 812,449.76 CT-0258 3/22/2013 4 1,330,876.83 594,141.44 736,735.39 CT-0258 4/4/2013 5 5,408,128.95 2,414,343.28 2,993,785.67 CT-0258 6/4/2013 6 2,997,308.80 1,338,084.29 1,659,224.51 CT-0258 6/6/2013 7 2,591,132.60 1,156,755.63 1,434,376.97 CT-0258 7/26/2013 8 6,060,890.77 2,705,754.81 3,355,135.96 CT-0258 7/26/2013 9 1,041,816.20 465,096.52 576,719.68 CT-0386 11/12/2012 37,329,823.00 37,329,823.00 0.00 16,665,099.56 AC 31/11/2012 AC 16,665,099.56 0.00 16,665,099.56 FECHA FIRMA DEL CONTRATO MONTO ORIGINAL DEL CONTRATO MONTO MODIFICADO DEL CONTRATO RELACIONADO EN EJECUCION DE OBRAS % DE AVANCE ANTICIPO CONTRACTUAL CONCEDIDO AMORTIZACION ANTICIPO CONTRACTUAL No. DE VAL. REL. AMORTIZACION ANTICIPO CONTRACTUAL BARINESA DE VILIDAD Y CONSTRUCCIONES, S.A. (BARVIALSA) REHABILITACION CARRETERA LO01, TRAMO BARINAS - MERIDA, ETAPA I. ESTADOS BARINAS Y MERIDA CONSTRUCCIONES, S.A. TRAMO BARINAS - MERIDA, ETAPA I. CONSTRUCCIONES, S.A. TRAMO BARINAS - MERIDA, ETAPA I. CONSTRUCCIONES, S.A. TRAMO BARINAS - MERIDA, ETAPA I. CONSTRUCCIONES, S.A. TRAMO BARINAS - MERIDA, ETAPA I. INVERSIONES CHARA TUY, C.A. DEMOLICION DE PUENTE COLAPSADO Y COSNTRUCCION DEL PUENTE PIROVEN EN CARRETERA LO11, (LA RAIZA), MUNICIPIO INDEPENDENCIA DEL ESTADO MIRANDA CONSTRUCCION DE ESTRIBOS PARA INSTALACION DE PUENTE DE GUERRA, PUENTE CHAPARRAL, CARRETERA L011 (LA RAIZA), MUNICIPIO INDEPENDENCIA, ESTADO MIRANDA PUENTE CHAPARRAL, CARRETERA L011 DEMOLICION DE PUENTE COLAPSADO Y COSNTRUCCION DEL PUENTE LA DAMATERA EN CARRETERA LO11, (LA RAIZA), MUNICIPIO INDEPENDENCIA DEL ESTADO MIRANDA DAMATERA EN CARRETERA LO11, (LA RAIZA), MUNICIPIO INDEPENDENCIA VIALIDAD Y CONSTRUCCIONES SUCRE, S.A. AMPLIACION DE LA CARRETERA LO02, SABANETA -PUERTO NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO (II ETAPA). ESTADO BARINAS CONSTRUCCIONES SUCRE, SABANETA -PUERTO NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO (II CONSTRUCCIONES SUCRE, SABANETA -PUERTO NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO (II CONSTRUCCIONES SUCRE, SABANETA -PUERTO NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO (II COVIALCA (CONSTRUCCIONES Y VIALIDADES, C.A.) AMPLIACION DE LA CARRETERA LO02, SABANETA -PUERTO NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. ESTADO BARINAS (CONSTRUCCIONES Y SABANETA -PUERTO NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. (CONSTRUCCIONES Y SABANETA -PUERTO NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. (CONSTRUCCIONES Y SABANETA -PUERTO NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. (CONSTRUCCIONES Y SABANETA -PUERTO NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. (CONSTRUCCIONES Y SABANETA -PUERTO NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. (CONSTRUCCIONES Y SABANETA -PUERTO NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. (CONSTRUCCIONES Y SABANETA -PUERTO NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. (CONSTRUCCIONES Y SABANETA -PUERTO NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. (CONSTRUCCIONES Y SABANETA -PUERTO NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. VIALIDAD Y CONSTRUCCIONES SUCRE, S.A. REHABILITACION DE LA TO13, TRAMO DOS CAMINOS (PROG. 139+000) BASE AEREA (PROG. 185+000), ESTADO GUARICO

Upload: choco145

Post on 21-Oct-2015

183 views

Category:

Documents


2 download

TRANSCRIPT

1 de 7104/17/2023

17:30:29

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

CT-0168 4/17/2012 38,834,951.46 38,834,951.46 966,094.31 2.49 17,337,031.90 431,292.11 4 5/25/2012 AC 17,337,031.90 0.00 17,337,031.90 17,871,834.10

CT-0168 7/4/2013 1 69,561.88 31,054.41 38,507.47CT-0168 7/3/2013 2 111,822.63 49,920.82 61,901.81CT-0168 7/3/2013 3 143,919.76 64,249.90 79,669.86CT-0168 7/3/2013 4 640,790.04 286,066.98 354,723.06

CT-0178 5/10/2012 2,500,000.00 2,500,000.00 0.00 1,116,071.43 AC 5/23/2012 AC 1,116,071.43 0.00 1,116,071.43 1,116,071.43

CT-0181 5/9/2012 1,200,000.00 542,094.72 542,094.72 100.00 535,714.27 535,714.27 1 5/18/2012 AC 535,714.27 0.00 535,714.27 542,094.72

CT-0181 6/10/2013 1 542,094.72 535,714.27 6,380.45

CT-0183 5/9/2012 5,400,000.00 5,400,000.00 526,400.00 9.75 2,410,714.29 235,000.00 1 5/18/2012 AC 2,410,714.29 0.00 2,410,714.29 2,702,114.29

CT-0183 12/28/2012 1 526,400.00 235,000.00 291,400.00

CT-0256 8/6/2012 48,543,689.32 48,543,689.32 5,454,048.36 11.24 21,671,289.88 2,434,843.03 3 8/30/2012 AC 21,671,289.88 0.00 21,671,289.88 24,690,495.21

CT-0256 4/11/2013 1 1,711,379.50 764,008.71 947,370.79CT-0256 4/11/2013 2 1,415,758.89 632,035.22 783,723.67CT-0256 7/9/2012 3 2,326,909.97 1,038,799.10 1,288,110.87

CT-0258 8/9/2012 48,543,689.32 48,543,689.29 42,948,506.17 88.47 21,671,289.88 19,173,440.27 7 8/30/2012 AC 21,671,289.88 0.00 21,671,289.88 45,446,355.78

CT-0258 12/7/2012 1 13,701,360.75 6,116,678.91 7,584,681.84CT-0258 2/28/2013 2 8,349,340.09 3,727,383.97 4,621,956.12CT-0258 3/22/2013 3 1,467,651.18 655,201.42 812,449.76CT-0258 3/22/2013 4 1,330,876.83 594,141.44 736,735.39CT-0258 4/4/2013 5 5,408,128.95 2,414,343.28 2,993,785.67CT-0258 6/4/2013 6 2,997,308.80 1,338,084.29 1,659,224.51CT-0258 6/6/2013 7 2,591,132.60 1,156,755.63 1,434,376.97CT-0258 7/26/2013 8 6,060,890.77 2,705,754.81 3,355,135.96CT-0258 7/26/2013 9 1,041,816.20 465,096.52 576,719.68

CT-0386 11/12/2012 37,329,823.00 37,329,823.00 0.00 16,665,099.56 AC 31/11/2012 AC 16,665,099.56 0.00 16,665,099.56 16,665,099.56

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

BARINESA DE VILIDAD Y CONSTRUCCIONES, S.A.

(BARVIALSA)

REHABILITACION CARRETERA LO01, TRAMO BARINAS - MERIDA,

ETAPA I. ESTADOS BARINAS Y MERIDA

BARINESA DE VILIDAD Y CONSTRUCCIONES, S.A.

(BARVIALSA)

REHABILITACION CARRETERA LO01, TRAMO BARINAS - MERIDA,

ETAPA I. ESTADOS BARINAS Y MERIDA

BARINESA DE VILIDAD Y CONSTRUCCIONES, S.A.

(BARVIALSA)

REHABILITACION CARRETERA LO01, TRAMO BARINAS - MERIDA,

ETAPA I. ESTADOS BARINAS Y MERIDA

BARINESA DE VILIDAD Y CONSTRUCCIONES, S.A.

(BARVIALSA)

REHABILITACION CARRETERA LO01, TRAMO BARINAS - MERIDA,

ETAPA I. ESTADOS BARINAS Y MERIDA

BARINESA DE VILIDAD Y CONSTRUCCIONES, S.A.

(BARVIALSA)

REHABILITACION CARRETERA LO01, TRAMO BARINAS - MERIDA,

ETAPA I. ESTADOS BARINAS Y MERIDA

INVERSIONES CHARA TUY, C.A.

DEMOLICION DE PUENTE COLAPSADO Y COSNTRUCCION DEL PUENTE PIROVEN EN CARRETERA

LO11, (LA RAIZA), MUNICIPIO INDEPENDENCIA DEL ESTADO

MIRANDA

CONSORCIO VENECA, C.A.

CONSTRUCCION DE ESTRIBOS PARA INSTALACION DE PUENTE DE

GUERRA, PUENTE CHAPARRAL, CARRETERA L011 (LA RAIZA), MUNICIPIO INDEPENDENCIA,

ESTADO MIRANDA

CONSORCIO VENECA, C.A.

CONSTRUCCION DE ESTRIBOS PARA INSTALACION DE PUENTE DE

GUERRA, PUENTE CHAPARRAL, CARRETERA L011 (LA RAIZA), MUNICIPIO INDEPENDENCIA,

ESTADO MIRANDA

CONSORCIO VENECA, C.A.

DEMOLICION DE PUENTE COLAPSADO Y COSNTRUCCION DEL

PUENTE LA DAMATERA EN CARRETERA LO11, (LA RAIZA),

MUNICIPIO INDEPENDENCIA DEL ESTADO MIRANDA

CONSORCIO VENECA, C.A.

DEMOLICION DE PUENTE COLAPSADO Y COSNTRUCCION DEL

PUENTE LA DAMATERA EN CARRETERA LO11, (LA RAIZA),

MUNICIPIO INDEPENDENCIA DEL ESTADO MIRANDA

VIALIDAD Y CONSTRUCCIONES

SUCRE, S.A.

AMPLIACION DE LA CARRETERA LO02, SABANETA -PUERTO

NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO (II ETAPA). ESTADO

BARINAS

VIALIDAD Y CONSTRUCCIONES

SUCRE, S.A.

AMPLIACION DE LA CARRETERA LO02, SABANETA -PUERTO

NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO (II ETAPA). ESTADO

BARINAS

VIALIDAD Y CONSTRUCCIONES

SUCRE, S.A.

AMPLIACION DE LA CARRETERA LO02, SABANETA -PUERTO

NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO (II ETAPA). ESTADO

BARINAS

VIALIDAD Y CONSTRUCCIONES

SUCRE, S.A.

AMPLIACION DE LA CARRETERA LO02, SABANETA -PUERTO

NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO (II ETAPA). ESTADO

BARINASCOVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

AMPLIACION DE LA CARRETERA LO02, SABANETA -PUERTO

NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. ESTADO BARINAS

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

AMPLIACION DE LA CARRETERA LO02, SABANETA -PUERTO

NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. ESTADO BARINAS

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

AMPLIACION DE LA CARRETERA LO02, SABANETA -PUERTO

NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. ESTADO BARINAS

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

AMPLIACION DE LA CARRETERA LO02, SABANETA -PUERTO

NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. ESTADO BARINAS

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

AMPLIACION DE LA CARRETERA LO02, SABANETA -PUERTO

NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. ESTADO BARINAS

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

AMPLIACION DE LA CARRETERA LO02, SABANETA -PUERTO

NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. ESTADO BARINAS

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

AMPLIACION DE LA CARRETERA LO02, SABANETA -PUERTO

NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. ESTADO BARINAS

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

AMPLIACION DE LA CARRETERA LO02, SABANETA -PUERTO

NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. ESTADO BARINAS

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

AMPLIACION DE LA CARRETERA LO02, SABANETA -PUERTO

NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. ESTADO BARINAS

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

AMPLIACION DE LA CARRETERA LO02, SABANETA -PUERTO

NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. ESTADO BARINAS

VIALIDAD Y CONSTRUCCIONES

SUCRE, S.A.

REHABILITACION DE LA TO13, TRAMO DOS CAMINOS (PROG.

139+000) BASE AEREA (PROG. 185+000), ESTADO GUARICO

 

2 de 7104/17/2023

17:30:29

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CT-0387 11/12/2012 29,126,213.59 29,126,213.58 27,508,138.79 94.44 13,002,773.93 12,280,419.11 2 11/22/2012 AC 13,002,773.93 0.00 13,002,773.93 28,230,493.61

CT-0387 1 13,158,864.49 5,874,493.08 7,284,371.41CT-0387 2 14,349,274.30 6,405,926.03 7,943,348.27

CT-0393 11/15/2012 57,766,989.97 57,766,989.97 14,507,190.86 25.11 25,788,834.81 6,476,424.51 4 11/28/2012 AC 25,788,834.81 0.00 25,788,834.81 33,819,601.16

CT-0393 5/2/2013 1 576,917.07 257,552.27 319,364.80CT-0393 5/2/2013 2 1,491,112.15 665,675.07 825,437.08CT-0393 5/2/2013 3 7,813,275.98 3,488,069.64 4,325,206.34CT-0393 8/7/2013 4 4,625,885.66 2,065,127.53 2,560,758.13

CT-0396 11/15/2012 8,577,609.29 8,577,609.29 1,760,672.31 20.53 3,829,289.86 786,014.43 1 AC 3,829,289.86 0.00 3,829,289.86 4,803,947.74

CT-0396 1/16/2013 1 1,760,672.31 786,014.43 974,657.88

CT-0400 11/15/2012 25,137,241.76 25,137,241.75 22,850,799.95 90.90 11,221,982.93 10,201,249.99 2 11/23/2012 AC 11,221,982.93 11,221,982.93 23,871,532.89

CT-0400 1 5,949,969.79 2,656,236.52 3,293,733.27CT-0400 2/5/2012 2 16,900,830.16 7,545,013.47 9,355,816.69

CT-0403 11/28/2012 2,497,150.08 2,497,150.08 0.00 1,114,799.15 AC 11/30/2012 AC 1,114,799.15 0.00 1,114,799.15 1,114,799.15

CT-0412 12/3/2012 33,980,582.00 33,980,582.00 17,817,798.35 52.44 16,169,902.68 7,954,374.27 4 12/7/2012 AC 16,169,902.68 0.00 16,169,902.68 26,033,326.76

CT-0412 4/4/2013 1 7,579,768.85 3,383,825.38 4,195,943.47CT-0412 4/4/2013 2 2,501,778.04 1,116,865.20 1,384,912.84CT-0412 5/27/2013 3 335,104.15 149,600.07 185,504.08CT-0412 5/30/2013 4 7,401,147.31 3,304,083.62 4,097,063.69

CT-0426 12/3/2012 114,905,544.31 114,905,543.89 23,476,513.14 20.43 51,297,118.00 10,480,586.23 3 12/3/2012 AC 51,297,118.00 0.00 51,297,118.00 64,293,044.91

CT-0426 6/10/2013 1 1,717,534.78 766,756.60 950,778.18CT-0426 7/15/2013 2 17,965,126.16 8,020,145.61 9,944,980.55CT-0426 7/31/2013 3 3,793,852.20 1,693,684.02 2,100,168.18

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA TO13 TRAMO DOS CAMINOS (PROG

139+000), BASE AEREA (PROG 185+000), ESTADO GUARICO

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA TO13 TRAMO DOS CAMINOS (PROG

139+000), BASE AEREA (PROG 185+000), ESTADO GUARICO

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA TO13 TRAMO DOS CAMINOS (PROG

139+000), BASE AEREA (PROG 185+000), ESTADO GUARICO

INGENIERIA Y CONSTRUCCIONES DE

VENEZUELA (I.C.V.)

CULMINACION DE LA AVENIDA RIBEREÑA, TRAMO REDOMA

INDUSTRIAL - PUNTA GORDA, MUNICIPIO BARINAS. ESTADO

BARINAS

INGENIERIA Y CONSTRUCCIONES DE

VENEZUELA (I.C.V.)

CULMINACION DE LA AVENIDA RIBEREÑA, TRAMO REDOMA

INDUSTRIAL - PUNTA GORDA, MUNICIPIO BARINAS. ESTADO

BARINAS

INGENIERIA Y CONSTRUCCIONES DE

VENEZUELA (I.C.V.)

CULMINACION DE LA AVENIDA RIBEREÑA, TRAMO REDOMA

INDUSTRIAL - PUNTA GORDA, MUNICIPIO BARINAS. ESTADO

BARINAS

INGENIERIA Y CONSTRUCCIONES DE

VENEZUELA (I.C.V.)

CULMINACION DE LA AVENIDA RIBEREÑA, TRAMO REDOMA

INDUSTRIAL - PUNTA GORDA, MUNICIPIO BARINAS. ESTADO

BARINAS

INGENIERIA Y CONSTRUCCIONES DE

VENEZUELA (I.C.V.)

CULMINACION DE LA AVENIDA RIBEREÑA, TRAMO REDOMA

INDUSTRIAL - PUNTA GORDA, MUNICIPIO BARINAS. ESTADO

BARINAS

PILOTES PERFORADOS, C.A. (PILPERCA)

CULMINACION DE LA AUTOPISTA ANTONIO JOSE DE SUCRE, CUMANA

- LIMITE DEL ESTADO ANZOATEGUI, MUNICIPIO SUCRE.

ESTADO SUCRE

PILOTES PERFORADOS, C.A. (PILPERCA)

CULMINACION DE LA AUTOPISTA ANTONIO JOSE DE SUCRE, CUMANA

- LIMITE DEL ESTADO ANZOATEGUI, MUNICIPIO SUCRE.

ESTADO SUCRE

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA TO02, TRAMO LIMITE MUNICIPAL JUAN GERMAN ROSCIO ORTIZ (PROG

125+140) - DOS CAMINOS (PROG 125+000), ESTADO GUARICO

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA TO02, TRAMO LIMITE MUNICIPAL JUAN GERMAN ROSCIO ORTIZ (PROG

125+140) - DOS CAMINOS (PROG 125+000), ESTADO GUARICO

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA TO02, TRAMO LIMITE MUNICIPAL JUAN GERMAN ROSCIO ORTIZ (PROG

125+140) - DOS CAMINOS (PROG 125+000), ESTADO GUARICO

CONSTRUCCIONES Y PROYECTOS VALLE

ALTO, C.A.

CONSTRUCCION DEL PUENTE PLATANILLAL, VIA TO02, ETAPA III

(ULTIMA), MUNICIPIO ATURES. ESTADO AMAZONAS

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

PAVIMENTACION DE CALLES, PARROQUIA DEL MUNICIPIO

ARISMENDI. ESTADO BARINAS

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

PAVIMENTACION DE CALLES, PARROQUIA DEL MUNICIPIO

ARISMENDI. ESTADO BARINASCOVIALCA

(CONSTRUCCIONES Y VIALIDADES, C.A.)

PAVIMENTACION DE CALLES, PARROQUIA DEL MUNICIPIO

ARISMENDI. ESTADO BARINASCOVIALCA

(CONSTRUCCIONES Y VIALIDADES, C.A.)

PAVIMENTACION DE CALLES, PARROQUIA DEL MUNICIPIO

ARISMENDI. ESTADO BARINASCOVIALCA

(CONSTRUCCIONES Y VIALIDADES, C.A.)

PAVIMENTACION DE CALLES, PARROQUIA DEL MUNICIPIO

ARISMENDI. ESTADO BARINAS

PILOTES PERFORADOS, C.A. (PILPERCA)

CONSTRUCCION DEL PUENTE SOBRE EL RIO ANARE, ESTADO

BARINAS

PILOTES PERFORADOS, C.A. (PILPERCA)

CONSTRUCCION DEL PUENTE SOBRE EL RIO ANARE, ESTADO

BARINASPILOTES PERFORADOS, C.A. (PILPERCA)

CONSTRUCCION DEL PUENTE SOBRE EL RIO ANARE, ESTADO

BARINASPILOTES PERFORADOS, C.A. (PILPERCA)

CONSTRUCCION DEL PUENTE SOBRE EL RIO ANARE, ESTADO

BARINAS

3 de 7104/17/2023

17:30:29

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CT-0427 12/11/2012 25,871,153.00 25,871,109.19 21,179,246.18 81.86 11,549,621.88 9,455,020.62 1 12/12/2012 AC 11,549,621.88 0.00 11,549,621.88 23,273,847.44

CT-0427 2/20/2013 1 21,179,246.18 9,455,020.62 11,724,225.56

CT-0430 12/7/2012 16,310,677.99 16,310,677.99 0.00 7,281,552.68 AC 12/17/2012 AC 7,281,552.68 0.00 7,281,552.68 7,281,552.68

CT-0431 12/21/2012 14,283,659.76 14,283,659.76 0.00 6,376,633.82 AC 12/26/2012 AC 6,376,633.82 0.00 6,376,633.82 6,376,633.82

5/9/2012 561,777.95 561,777.95 250,883.38 44.66 260,082.39 116,149.72 1 6/25/2012 AC 260,082.39 0.00 260,082.39 394,816.05

11/6/2012 1 250,883.38 116,149.72 134,733.66

5/9/2012 1,033,974.77 1,033,974.77 2,012.32 0.19 478,692.03 931.63 1 6/26/2012 AC 478,692.03 0.00 478,692.03 479,772.72

5/9/2012 8/6/2012 1 2,012.32 931.63 1,080.6919 512,404,727.57 511,746,778.01 179,790,398.84 229,778,495.37 80,561,460.19 35.00 2,106,337.00 409,568,894.21 80,561,460.19 329,006,353.33 329,007,434.02

CV-0001 TALLER CHAMA, C.A. 3/26/2012 30,299,352.73 54,571,197.41 43,473,190.90 79.66 24,362,141.71 19,407,674.54 7 AC 13,526,496.76 0.00 13,526,496.76 48,427,658.07

AC2 10,835,644.95 0.00 10,835,644.95CV-0001 TALLER CHAMA, C.A. 1 7,128,727.12 3,182,467.47 3,946,259.65CV-0001 TALLER CHAMA, C.A. 2 1,124,858.58 502,169.01 622,689.57CV-0001 TALLER CHAMA, C.A. 3 5,851,206.66 2,612,145.83 3,239,060.83CV-0001 TALLER CHAMA, C.A. 4 1,777,079.77 793,339.19 983,740.58CV-0001 TALLER CHAMA, C.A. 5 858,821.66 383,402.53 475,419.13CV-0001 TALLER CHAMA, C.A. 6 1,230,960.58 549,535.98 681,424.60CV-0001 TALLER CHAMA, C.A. 3/12/2013 7 12,287,909.61 5,485,673.94 6,802,235.67CV-0001 TALLER CHAMA, C.A. 4/22/2013 8 13,213,626.92 5,898,940.59 7,314,686.33

CV-0002 3/22/2012 2,499,389.79 2,499,358.17 2,499,358.18 100.00 1,115,799.01 1,115,799.01 1 AC 1,115,799.01 0.00 1,115,799.01 2,499,358.18

CV-0002 3/22/2012 1 2,499,358.18 1,115,799.01 1,383,559.17

VENEZOLANA DE TRANSPORTES Y

CONSTRUCCIONES (VTC), C.A.

RAHABILITACION DEL TRAMO: CIUDAD BOLIVIA - MAPORAL,

ESTADO BARINAS

VENEZOLANA DE TRANSPORTES Y

CONSTRUCCIONES (VTC), C.A.

RAHABILITACION DEL TRAMO: CIUDAD BOLIVIA - MAPORAL,

ESTADO BARINAS

CONSTRUCCIONES E INVERSIONES COINCA,

C.A.

PROLONGACION AVENIDA CASANOVA GODOY (TRAMO UBA -

SAMAN DE GUERE), MUNICIPIO MARIÑO, ESTADO ARAGUA

CONSTRUCCIONES E INVERSIONES COINCA,

C.A.

CULMINACION DE LA AVENIDA INTERCOMUNAL BATALLA DE

TAGUANES, TRAMO: INTERSECCION CALLE MIRANDA.

ESTADO COJEDES

CT-SERV-0014-12

FUNDACION LABORATORIO

NACIONAL DE VIALIDAD (FUNDALANAVIAL)

SERVICIOS PROFESIONALES DE ASEGURAMIENTO Y CONTROL DE

CALIDAD TECNICA - ADMINISTRATIVA DE LA OBRA:

REHABILITACION POR BACHEO DE LA TO05, TRAMO BARINAS - SAN

CRISTOBAL, ESTADO BARINAS. (CV-0151)

CT-SERV-0014-12

FUNDACION LABORATORIO

NACIONAL DE VIALIDAD (FUNDALANAVIAL)

SERVICIOS PROFESIONALES DE ASEGURAMIENTO Y CONTROL DE

CALIDAD TECNICA - ADMINISTRATIVA DE LA OBRA:

REHABILITACION POR BACHEO DE LA TO05, TRAMO BARINAS - SAN

CRISTOBAL, ESTADO BARINAS. (CV-0151)CT-SERV-0015-

12

FUNDACION LABORATORIO

NACIONAL DE VIALIDAD (FUNDALANAVIAL)

SERVICIOS PROFESIONALES DE ASEGURAMIENTO Y CONTROL DE

CALIDAD TECNICA - ADMINISTRATIVA DE LA OBRA:

REHABILITACION DE LA CARRETERA LO01, TRAMO

BARINAS - MERIDA, ETAPA I (CT-0168)CT-SERV-0015-

12

FUNDACION LABORATORIO

NACIONAL DE VIALIDAD (FUNDALANAVIAL)

SERVICIOS PROFESIONALES DE ASEGURAMIENTO Y CONTROL DE

CALIDAD TECNICA - ADMINISTRATIVA DE LA OBRA:

REHABILITACION DE LA CARRETERA LO01, TRAMO

BARINAS - MERIDA, ETAPA I (CT-0168)

REHABILITACION DEL TRAMO LA FRIA- LA GRITA, ESTADO TACHIRA

REHABILITACION DEL TRAMO LA FRIA- LA GRITA, ESTADO TACHIRAREHABILITACION DEL TRAMO LA FRIA- LA GRITA, ESTADO TACHIRAREHABILITACION DEL TRAMO LA FRIA- LA GRITA, ESTADO TACHIRAREHABILITACION DEL TRAMO LA FRIA- LA GRITA, ESTADO TACHIRAREHABILITACION DEL TRAMO LA FRIA- LA GRITA, ESTADO TACHIRAREHABILITACION DEL TRAMO LA FRIA- LA GRITA, ESTADO TACHIRAREHABILITACION DEL TRAMO LA FRIA- LA GRITA, ESTADO TACHIRAREHABILITACION DEL TRAMO LA FRIA- LA GRITA, ESTADO TACHIRA

OSMAR CONSTRUCCIONES Y

MANTENIMIENTO, C.A.

CONSTRUCCION DE PROTECCION HIDRAULICAS DE LAS BASES DEL

PUENTE ARAGUITA, TO12, ACCESO A LA AUTOPISTA GRAN MARISCAL DE AYACUCHO, ESTADO MIRANDA

OSMAR CONSTRUCCIONES Y

MANTENIMIENTO, C.A.

CONSTRUCCION DE PROTECCION HIDRAULICAS DE LAS BASES DEL

PUENTE ARAGUITA, TO12, ACCESO A LA AUTOPISTA GRAN MARISCAL DE AYACUCHO, ESTADO MIRANDA

4 de 7104/17/2023

17:30:29

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0003 3/22/2012 19,997,054.36 19,996,953.08 19,996,953.07 100.00 8,927,256.41 8,927,256.41 3 AC 8,927,256.41 0.00 8,927,256.41 19,996,953.07

CV-0003 8/21/2012 1 9,963,854.90 4,448,149.51 5,515,705.39CV-0003 3/22/2013 2 1,347,757.08 601,677.27 746,079.81CV-0003 7/3/2013 3 8,685,341.09 3,877,429.63 4,807,911.46

CV-0004 3/26/2012 899,999.99 885,167.80 885,167.81 100.00 401,785.71 401,785.71 2 AC 401,785.71 0.00 401,785.71 885,167.81

CV-0004 9/7/2012 1 716,871.23 320,031.80 396,839.43CV-0004 12/12/2012 2 168,296.58 81,753.91 86,542.67

CV-0005 CONSORCIO VENEVIAL 3/30/2012 77,503,247.00 77,503,246.98 71,242,961.43 91.92 34,599,663.84 31,804,893.52 8 AC 34,599,663.84 0.00 34,599,663.84 74,037,731.75

CV-0005 CONSORCIO VENEVIAL 9/14/2012 1 11,631,275.71 5,192,533.80 6,438,741.91CV-0005 CONSORCIO VENEVIAL 9/24/2012 2 7,482,118.20 3,340,231.34 4,141,886.86CV-0005 CONSORCIO VENEVIAL 10/11/2012 3 5,841,333.76 2,607,738.29 3,233,595.47CV-0005 CONSORCIO VENEVIAL 10/11/2012 4 7,443,320.98 3,322,911.15 4,120,409.83CV-0005 CONSORCIO VENEVIAL 11/9/2012 5 9,194,796.07 4,104,819.68 5,089,976.39CV-0005 CONSORCIO VENEVIAL 4/4/2013 6 5,347,888.29 2,387,450.13 2,960,438.16CV-0005 CONSORCIO VENEVIAL 4/4/2013 7 6,346,140.02 2,833,098.23 3,513,041.79CV-0005 CONSORCIO VENEVIAL 4/4/2013 8 17,956,088.40 8,016,110.90 9,939,977.50

CV-0006 4/24/2012 1,400,000.00 1,399,999.80 1,399,999.80 100.00 700,000.00 700,000.00 3 AC 700,000.00 0.00 700,000.00 1,399,999.80

CV-0006 10/10/2013 1 746,818.43 373,409.22 373,409.21CV-0006 2/26/2013 2 336,986.90 168,493.45 168,493.45CV-0006 5/20/2012 3 316,194.47 158,097.33 158,097.14

CV-0007 4/16/2012 10,310,089.16 10,310,088.99 10,310,088.99 100.00 4,602,718.38 4,602,718.38 2 AC 4,602,718.38 0.00 4,602,718.38 10,310,088.99

CV-0007 1 9,860,504.56 4,402,010.97 5,458,493.59CV-0007 2 449,584.43 200,707.41 248,877.02

CV-0008 3/27/2012 77,669,902.91 232,869,902.90 195,405,685.28 83.91 103,959,778.08 87,234,380.94 7 AC 34,674,063.80 0.00 34,674,063.80 212,131,082.42

CV-0008 7/19/2012 AE 69,285,714.28 0.00 69,285,714.28CV-0008 6/15/2012 1 34,621,833.78 15,456,175.80 19,165,657.98CV-0008 9/5/2012 2 108,597,960.23 48,481,232.25 60,116,727.98CV-0008 12/4/2012 3 22,485,048.12 10,037,967.91 12,447,080.21CV-0008 4/23/2013 4 16,696,195.28 7,453,358.61 9,242,836.67CV-0008 5/3/2013 5 7,890,174.30 3,522,399.24 4,367,775.06CV-0008 5/3/2013 6 271,288.30 121,110.85 150,177.45CV-0008 5/18/2013 7 4,843,185.27 2,162,136.28 2,681,048.99

OSMAR CONSTRUCCIONES Y

MANTENIMIENTO, C.A.

RESTITUCION DE LA PLATAFORMA VIAL DE ACCESO AL PUENTE

ARAGUITA - AGUAS ARRIBA, PROG. 66+320, SECTOR ARAGUITA, TO12.

ESTADO MIRANDAOSMAR

CONSTRUCCIONES Y MANTENIMIENTO, C.A.

RESTITUCION DE LA PLATAFORMA VIAL DE ACCESO AL PUENTE

ARAGUITA - AGUAS ARRIBA, PROG. 66+320, SECTOR ARAGUITA, TO12.

ESTADO MIRANDA

OSMAR CONSTRUCCIONES Y

MANTENIMIENTO, C.A.

RESTITUCION DE LA PLATAFORMA VIAL DE ACCESO AL PUENTE

ARAGUITA - AGUAS ARRIBA, PROG. 66+320, SECTOR ARAGUITA, TO12.

ESTADO MIRANDA

OSMAR CONSTRUCCIONES Y

MANTENIMIENTO, C.A.

RESTITUCION DE LA PLATAFORMA VIAL DE ACCESO AL PUENTE

ARAGUITA - AGUAS ARRIBA, PROG. 66+320, SECTOR ARAGUITA, TO12.

ESTADO MIRANDA

CONSTRUCCIONES ROALE, C.A.

SUSTITUCION DE ALCANTARILLAS METALICAS POR TUBULARES DE

CONCRETO EN LA VIA TO16, TRAMO KM. 90, PROG. 87+100,

MUNICPIO FREITES, ANACO, ESTADO ANZOATEGUI.

CONSTRUCCIONES ROALE, C.A.

SUSTITUCION DE ALCANTARILLAS METALICAS POR TUBULARES DE

CONCRETO EN LA VIA TO16, TRAMO KM. 90, PROG. 87+100,

MUNICPIO FREITES, ANACO, ESTADO ANZOATEGUI.

CONSTRUCCIONES ROALE, C.A.

SUSTITUCION DE ALCANTARILLAS METALICAS POR TUBULARES DE

CONCRETO EN LA VIA TO16, TRAMO KM. 90, PROG. 87+100,

MUNICPIO FREITES, ANACO, ESTADO ANZOATEGUI.REHABILITACION DE LA TO09,

DISTRIBUIDOR METROPOLITANO, CAUCAGUA, PISTA SUR, ESTADO

MIRANDAREHABILITACION DE LA TO09,

DISTRIBUIDOR METROPOLITANO, CAUCAGUA, PISTA SUR, ESTADO

MIRANDA

REHABILITACION DE LA TO09, DISTRIBUIDOR METROPOLITANO, CAUCAGUA, PISTA SUR, ESTADO

MIRANDA

REHABILITACION DE LA TO09, DISTRIBUIDOR METROPOLITANO, CAUCAGUA, PISTA SUR, ESTADO

MIRANDA

REHABILITACION DE LA TO09, DISTRIBUIDOR METROPOLITANO, CAUCAGUA, PISTA SUR, ESTADO

MIRANDA

REHABILITACION DE LA TO09, DISTRIBUIDOR METROPOLITANO, CAUCAGUA, PISTA SUR, ESTADO

MIRANDA

REHABILITACION DE LA TO09, DISTRIBUIDOR METROPOLITANO, CAUCAGUA, PISTA SUR, ESTADO

MIRANDA

REHABILITACION DE LA TO09, DISTRIBUIDOR METROPOLITANO, CAUCAGUA, PISTA SUR, ESTADO

MIRANDA

REHABILITACION DE LA TO09, DISTRIBUIDOR METROPOLITANO, CAUCAGUA, PISTA SUR, ESTADO

MIRANDA

ASOCIACION COOPERATIVA

HAINAMIOSA, R.L.

CONSTRUCCION DE RECALCE DE PILOTINES EN ESTRIBO Y

CANALIZACION DE PUENTE PEONIAS, TRAMO CARUPANO -

CARIACO, PROG. 533+920, ESTADO SUCREASOCIACION

COOPERATIVA HAINAMIOSA, R.L.

CONSTRUCCION DE RECALCE DE PILOTINES EN ESTRIBO Y

CANALIZACION DE PUENTE PEONIAS, TRAMO CARUPANO -

CARIACO, PROG. 533+920, ESTADO SUCRE

ASOCIACION COOPERATIVA

HAINAMIOSA, R.L.

CONSTRUCCION DE RECALCE DE PILOTINES EN ESTRIBO Y

CANALIZACION DE PUENTE PEONIAS, TRAMO CARUPANO -

CARIACO, PROG. 533+920, ESTADO SUCRE

ASOCIACION COOPERATIVA

HAINAMIOSA, R.L.

CONSTRUCCION DE RECALCE DE PILOTINES EN ESTRIBO Y

CANALIZACION DE PUENTE PEONIAS, TRAMO CARUPANO -

CARIACO, PROG. 533+920, ESTADO SUCRECONSTRUCCIONES Y

VIALIDADES, C.A. (COVIALCA)

REHABILITACION Y MANTENIMIENTO DEL TRAMO VIAL

CHARALLAVE - SANTA TERESA, PROG. 2+500 HASTA PROG. 5+750, PISTA SUR, ESTADO

MIRANDACONSTRUCCIONES Y VIALIDADES, C.A.

(COVIALCA)

REHABILITACION Y MANTENIMIENTO DEL TRAMO VIAL

CHARALLAVE - SANTA TERESA, PROG. 2+500 HASTA PROG. 5+750, PISTA SUR, ESTADO

MIRANDA

CONSTRUCCIONES Y VIALIDADES, C.A.

(COVIALCA)

REHABILITACION Y MANTENIMIENTO DEL TRAMO VIAL

CHARALLAVE - SANTA TERESA, PROG. 2+500 HASTA PROG. 5+750, PISTA SUR, ESTADO

MIRANDAZAGO MAQUINARIAS,

C.A.

DISTRIBUIDOR DE ACCESO A LA CIUDAD SOCIALISTA CARIBIA,

DESDE LA AUTOPISTA CARACAS - LA GUAIRA. ESTADO VARGAS

ZAGO MAQUINARIAS, C.A.

DISTRIBUIDOR DE ACCESO A LA CIUDAD SOCIALISTA CARIBIA,

DESDE LA AUTOPISTA CARACAS - LA GUAIRA. ESTADO VARGAS

ZAGO MAQUINARIAS, C.A.

DISTRIBUIDOR DE ACCESO A LA CIUDAD SOCIALISTA CARIBIA,

DESDE LA AUTOPISTA CARACAS - LA GUAIRA. ESTADO VARGAS

ZAGO MAQUINARIAS, C.A.

DISTRIBUIDOR DE ACCESO A LA CIUDAD SOCIALISTA CARIBIA,

DESDE LA AUTOPISTA CARACAS - LA GUAIRA. ESTADO VARGAS

ZAGO MAQUINARIAS, C.A.

DISTRIBUIDOR DE ACCESO A LA CIUDAD SOCIALISTA CARIBIA,

DESDE LA AUTOPISTA CARACAS - LA GUAIRA. ESTADO VARGAS

ZAGO MAQUINARIAS, C.A.

DISTRIBUIDOR DE ACCESO A LA CIUDAD SOCIALISTA CARIBIA,

DESDE LA AUTOPISTA CARACAS - LA GUAIRA. ESTADO VARGAS

ZAGO MAQUINARIAS, C.A.

DISTRIBUIDOR DE ACCESO A LA CIUDAD SOCIALISTA CARIBIA,

DESDE LA AUTOPISTA CARACAS - LA GUAIRA. ESTADO VARGAS

ZAGO MAQUINARIAS, C.A.

DISTRIBUIDOR DE ACCESO A LA CIUDAD SOCIALISTA CARIBIA,

DESDE LA AUTOPISTA CARACAS - LA GUAIRA. ESTADO VARGAS

ZAGO MAQUINARIAS, C.A.

DISTRIBUIDOR DE ACCESO A LA CIUDAD SOCIALISTA CARIBIA,

DESDE LA AUTOPISTA CARACAS - LA GUAIRA. ESTADO VARGAS

5 de 7104/17/2023

17:30:29

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0009 6/29/2012 74,869,229.56 74,869,229.54 74,869,229.53 100.00 33,423,763.20 33,423,763.20 3 AC 33,423,763.20 0.00 33,423,763.20 74,869,229.53

CV-0009 12/13/2012 1 37,313,662.60 16,657,885.09 20,655,777.51CV-0009 3/14/2013 2 27,805,139.00 12,413,008.48 15,392,130.52CV-0009 3 9,750,427.93 4,352,869.63 5,397,558.30

CV-0010 4/20/2012 14,595,782.01 14,595,781.98 14,595,782.01 100.00 6,515,974.11 6,515,974.11 3 AC 6,515,974.11 0.00 6,515,974.11 14,595,782.01

CV-0010 1 5,976,417.03 2,668,043.32 3,308,373.71CV-0010 12/13/2012 2 6,486,538.09 2,895,775.94 3,590,762.15CV-0010 4/18/2013 3 2,132,826.89 952,154.85 1,180,672.04

CONSTRUCCIONES HER-BROSS, C.A.

REHABILITACION LO09 CON EMPALME TO15, TRAMO SAN

DIEGO DE CABRUTICA - MAPIRE, ETAPA I, PROGRESIVAS DESDE LA 51+000 HASTA 108+093, ESTADO

ANZOATEGUI.

CONSTRUCCIONES HER-BROSS, C.A.

REHABILITACION LO09 CON EMPALME TO15, TRAMO SAN DIEGO DE CABRUTI - MAPIRE,

ETAPA I, PROGRESIVAS DESDE LA 108+093 HASTA LA 138+000,

ESTADO ANZOATEGUI.

CONSTRUCCIONES HER-BROSS, C.A.

REHABILITACION LO09 CON EMPALME TO15, TRAMO SAN DIEGO DE CABRUTI - MAPIRE,

ETAPA I, PROGRESIVAS DESDE LA 108+093 HASTA LA 138+000,

ESTADO ANZOATEGUI.

CONSTRUCCIONES HER-BROSS, C.A.

REHABILITACION LO09 CON EMPALME TO15, TRAMO SAN DIEGO DE CABRUTI - MAPIRE,

ETAPA I, PROGRESIVAS DESDE LA 108+093 HASTA LA 138+000,

ESTADO ANZOATEGUI.

CONSTRUCCIONES HER-BROSS, C.A.

REHABILITACION DEL TRAMO SANTA BARBARA - AGUASAY,

CAMPOMAR. ESTADO MONAGAS

CONSTRUCCIONES HER-BROSS, C.A.

REHABILITACION DEL TRAMO SANTA BARBARA - AGUASAY,

CAMPOMAR. ESTADO MONAGASCONSTRUCCIONES HER-BROSS, C.A.

REHABILITACION DEL TRAMO SANTA BARBARA - AGUASAY,

CAMPOMAR. ESTADO MONAGASCONSTRUCCIONES HER-BROSS, C.A.

REHABILITACION DEL TRAMO SANTA BARBARA - AGUASAY,

CAMPOMAR. ESTADO MONAGAS

6 de 7104/17/2023

17:30:29

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0011 4/16/2012 28,403,582.58 28,403,582.57 28,403,582.58 100.00 12,680,170.80 12,680,170.80 5 AC 12,680,170.80 0.00 12,680,170.80 28,403,582.58

CV-0011 8/20/2012 1 2,252,542.35 1,005,599.27 1,246,943.08CV-0011 8/20/2012 2 11,043,893.11 4,930,309.43 6,113,583.68CV-0011 11/7/2012 3 8,539,814.36 3,812,417.13 4,727,397.23CV-0011 12/7/2012 4 2,844,871.29 1,270,031.83 1,574,839.46CV-0011 5/28/2013 5 3,722,461.47 1,661,813.14 2,060,648.33

CV-0012 7/6/2012 49,051,678.36 49,051,678.07 26,948,359.24 54.94 21,898,070.70 12,030,517.53 5 AC 21,898,070.70 0.00 21,898,070.70 36,815,912.41

CV-0012 11/30/2012 1 8,141,254.56 3,634,488.65 4,506,765.91CV-0012 2/25/2013 2 2,078,017.93 927,686.58 1,150,331.35CV-0012 4/11/2013 3 8,321,795.59 3,715,087.32 4,606,708.27CV-0012 5/9/2013 4 4,550,564.46 2,031,501.99 2,519,062.47CV-0012 5/23/2013 5 3,856,726.70 1,721,752.99 2,134,973.71

CV-0013 7/18/2012 13,999,778.22 13,999,778.22 10,010,120.37 71.50 6,249,900.89 4,468,803.75 7 AC 6,249,900.99 0.00 6,249,900.99 11,791,217.61

CV-0013 11/1/2012 1 1,263,109.94 563,888.37 699,221.57CV-0013 11/7/2012 2 390,123.15 174,162.12 215,961.03CV-0013 12/5/2012 3 3,381,080.10 1,509,410.76 1,871,669.34CV-0013 4/17/2013 4 143,099.21 63,883.58 79,215.63CV-0013 4/17/2013 5 246,490.62 110,040.46 136,450.16CV-0013 4/23/2013 6 2,854,265.30 1,274,225.58 1,580,039.72CV-0013 5/30/2013 7 1,731,952.05 773,192.88 958,759.17

CV-0014 4/3/2012 36,893,202.99 36,893,202.99 36,893,202.98 100.00 16,470,179.91 16,470,179.91 5 AC 16,470,179.91 0.00 16,470,179.91 36,893,202.98

CV-0014 8/17/2012 1 17,086,033.19 7,627,693.39 9,458,339.80CV-0014 2 7,870,915.18 3,513,801.42 4,357,113.76CV-0014 9/24/2012 3 5,665,596.13 2,529,283.99 3,136,312.14CV-0014 10/29/2012 4 5,566,473.01 2,485,032.60 3,081,440.41CV-0014 4/22/2013 5 704,185.47 314,368.51 389,816.96

CV-0015 4/3/2012 16,654,380.58 16,654,380.58 16,654,380.58 100.00 7,434,991.33 7,435,264.33 3 AC 7,434,991.33 0.00 7,434,991.33 16,654,107.58

CV-0015 8/17/2012 1 1,968,900.90 878,973.62 1,089,927.28CV-0015 8/17/2012 2 11,331,634.15 5,058,765.25 6,272,868.90CV-0015 11/23/2012 3 3,353,845.53 1,497,525.46 1,856,320.07

CONSTRUCCIONES Y VIALIDADES, C.A.

(COVIALCA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION Y MANTENIMIENTO DEL TRAMO VIAL

CHARALLAVE - SANTA TERESA. ESTADO MIRANDA

CONSTRUCCIONES Y VIALIDADES, C.A.

(COVIALCA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION Y MANTENIMIENTO DEL TRAMO VIAL

CHARALLAVE - SANTA TERESA. ESTADO MIRANDA

CONSTRUCCIONES Y VIALIDADES, C.A.

(COVIALCA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION Y MANTENIMIENTO DEL TRAMO VIAL

CHARALLAVE - SANTA TERESA. ESTADO MIRANDA

CONSTRUCCIONES Y VIALIDADES, C.A.

(COVIALCA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION Y MANTENIMIENTO DEL TRAMO VIAL

CHARALLAVE - SANTA TERESA. ESTADO MIRANDA

CONSTRUCCIONES Y VIALIDADES, C.A.

(COVIALCA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION Y MANTENIMIENTO DEL TRAMO VIAL

CHARALLAVE - SANTA TERESA. ESTADO MIRANDA

CONSTRUCCIONES Y VIALIDADES, C.A.

(COVIALCA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION Y MANTENIMIENTO DEL TRAMO VIAL

CHARALLAVE - SANTA TERESA. ESTADO MIRANDASUMINISTROS DE

MATERIALES ELECTRICOS ORIENTE,

C.A. (SUMECA ORIENTE, C.A.)

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO TO01

SISTEMA DE ALUMBRADO Y RED DE ELECTRICIDAD EN LOS TRAMOS MAITANA - OCAMPO PROG 29+000 A 48+000 Y LOMAS DE NIQUEL -

TEJERIAS PROG. 54+000 A 62+000 ESTADO MIRANDA.

SUMINISTROS DE MATERIALES

ELECTRICOS ORIENTE, C.A. (SUMECA ORIENTE,

C.A.)

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO TO01

SISTEMA DE ALUMBRADO Y RED DE ELECTRICIDAD EN LOS TRAMOS MAITANA - OCAMPO PROG 29+000 A 48+000 Y LOMAS DE NIQUEL -

TEJERIAS PROG. 54+000 A 62+000 ESTADO MIRANDA.

SUMINISTROS DE MATERIALES

ELECTRICOS ORIENTE, C.A. (SUMECA ORIENTE,

C.A.)

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO TO01

SISTEMA DE ALUMBRADO Y RED DE ELECTRICIDAD EN LOS TRAMOS MAITANA - OCAMPO PROG 29+000 A 48+000 Y LOMAS DE NIQUEL -

TEJERIAS PROG. 54+000 A 62+000 ESTADO MIRANDA.

SUMINISTROS DE MATERIALES

ELECTRICOS ORIENTE, C.A. (SUMECA ORIENTE,

C.A.)

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO TO01

SISTEMA DE ALUMBRADO Y RED DE ELECTRICIDAD EN LOS TRAMOS MAITANA - OCAMPO PROG 29+000 A 48+000 Y LOMAS DE NIQUEL -

TEJERIAS PROG. 54+000 A 62+000 ESTADO MIRANDA.

SUMINISTROS DE MATERIALES

ELECTRICOS ORIENTE, C.A. (SUMECA ORIENTE,

C.A.)

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO TO01

SISTEMA DE ALUMBRADO Y RED DE ELECTRICIDAD EN LOS TRAMOS MAITANA - OCAMPO PROG 29+000 A 48+000 Y LOMAS DE NIQUEL -

TEJERIAS PROG. 54+000 A 62+000 ESTADO MIRANDA.

SUMINISTROS DE MATERIALES

ELECTRICOS ORIENTE, C.A. (SUMECA ORIENTE,

C.A.)

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO TO01

SISTEMA DE ALUMBRADO Y RED DE ELECTRICIDAD EN LOS TRAMOS MAITANA - OCAMPO PROG 29+000 A 48+000 Y LOMAS DE NIQUEL -

TEJERIAS PROG. 54+000 A 62+000 ESTADO MIRANDA.

INVERSIONES COFLAN, C.A.

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO TO01,

BACHEO MAYOR ENTRE EL KM. 85 AL KM.100, LA ENCRUCIJADA,

ESTADO ARAGUA EN SU PISTA SUR

INVERSIONES COFLAN, C.A.

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO TO01,

BACHEO MAYOR ENTRE EL KM. 85 AL KM.100, LA ENCRUCIJADA,

ESTADO ARAGUA EN SU PISTA SUR

INVERSIONES COFLAN, C.A.

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO TO01,

BACHEO MAYOR ENTRE EL KM. 85 AL KM.100, LA ENCRUCIJADA,

ESTADO ARAGUA EN SU PISTA SUR

INVERSIONES COFLAN, C.A.

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO TO01,

BACHEO MAYOR ENTRE EL KM. 85 AL KM.100, LA ENCRUCIJADA,

ESTADO ARAGUA EN SU PISTA SUR

INVERSIONES COFLAN, C.A.

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO TO01,

BACHEO MAYOR ENTRE EL KM. 85 AL KM.100, LA ENCRUCIJADA,

ESTADO ARAGUA EN SU PISTA SUR

INVERSIONES COFLAN, C.A.

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO TO01,

BACHEO MAYOR ENTRE EL KM. 85 AL KM.100, LA ENCRUCIJADA,

ESTADO ARAGUA EN SU PISTA SUR

INVERSIONES COFLAN, C.A.

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO TO01,

BACHEO MAYOR ENTRE EL KM. 85 AL KM.100, LA ENCRUCIJADA,

ESTADO ARAGUA EN SU PISTA SUR

INVERSIONES COFLAN, C.A.

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO TO01,

BACHEO MAYOR ENTRE EL KM. 85 AL KM.100, LA ENCRUCIJADA,

ESTADO ARAGUA EN SU PISTA SUR

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA TO13, TRAMO DOS CAMINOS (PROG.

139+000) - SECTOR LA FE (PROG. 60+000), ESTADO GUARICO

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA TO13, TRAMO DOS CAMINOS (PROG.

139+000) - SECTOR LA FE (PROG. 60+000), ESTADO GUARICO

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA TO13, TRAMO DOS CAMINOS (PROG.

139+000) - SECTOR LA FE (PROG. 60+000), ESTADO GUARICO

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA TO13, TRAMO DOS CAMINOS (PROG.

139+000) - SECTOR LA FE (PROG. 60+000), ESTADO GUARICO

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA TO13, TRAMO DOS CAMINOS (PROG.

139+000) - SECTOR LA FE (PROG. 60+000), ESTADO GUARICO

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA TO13, TRAMO DOS CAMINOS (PROG.

139+000) - SECTOR LA FE (PROG. 60+000), ESTADO GUARICO

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA TO13, TRAMO BASE AEREA CARRIZAL

(PROG. 185+000) - PUENTE MEMO (PROG. 224+000), ESTADO

GUARICO

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA TO13, TRAMO BASE AEREA CARRIZAL

(PROG. 185+000) - PUENTE MEMO (PROG. 224+000), ESTADO

GUARICO

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA TO13, TRAMO BASE AEREA CARRIZAL

(PROG. 185+000) - PUENTE MEMO (PROG. 224+000), ESTADO

GUARICO

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA TO13, TRAMO BASE AEREA CARRIZAL

(PROG. 185+000) - PUENTE MEMO (PROG. 224+000), ESTADO

GUARICO

7 de 7104/17/2023

17:30:29

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0016 3/28/2012 9,679,917.45 9,679,917.41 9,679,917.42 100.00 4,321,391.72 4,321,391.72 2 AC 4,321,391.72 0.00 4,321,391.72 9,679,917.42

CV-0016 1 6,069,517.26 2,709,605.92 3,359,911.34CV-0016 2 3,610,400.16 1,611,785.80 1,998,614.36

CV-0017 4/11/2012 46,587,332.95 46,587,332.93 46,587,332.98 100.00 20,797,916.50 20,797,916.50 4 AC 20,797,916.50 0.00 20,797,916.50 46,587,332.98

CV-0017 10/16/2012 1 26,525,947.30 11,841,940.76 14,684,006.54CV-0017 12/5/2012 2 19,229,543.27 8,584,617.53 10,644,925.74CV-0017 4/18/2013 3 786,279.20 351,017.50 435,261.70CV-0017 4/18/2013 4 45,563.21 20,340.71 25,222.50

CV-0018 3/28/2012 15,175,495.08 15,175,389.55 13,700,814.90 90.28 6,774,774.59 6,116,435.23 2 AC 6,774,774.59 0.00 6,774,774.59 14,359,154.26

CV-0018 4/12/2013 1 6,417,533.21 2,864,970.19 3,552,563.028/5/2013 2 7,283,281.69 3,251,465.04 4,031,816.65

CV-0019 3/28/2012 11,647,057.14 11,646,542.23 11,646,519.12 100.00 5,199,579.08 5,199,579.08 2 AC 5,199,579.08 0.00 5,199,579.08 11,646,519.12

CV-0019 1 8,713,858.60 3,890,115.45 4,823,743.15CV-0019 2/7/2013 2 2,932,660.52 1,309,463.63 1,623,196.89

CV-0020 3/28/2012 7,160,330.86 7,160,330.86 0.00 3,196,576.28 AC 3,196,576.28 0.00 3,196,576.28 3,196,576.28

CV-0021 TALLER CHAMA, C.A. 3/26/2012 75,728,147.66 75,728,147.40 75,728,147.48 100.00 33,807,208.78 33,807,208.78 9 AC 33,807,208.78 0.00 33,807,208.78 75,728,147.48

CV-0021 TALLER CHAMA, C.A. 8/27/2012 1 3,200,724.14 1,428,894.71 1,771,829.43CV-0021 TALLER CHAMA, C.A. 8/27/2012 2 12,253,954.47 5,470,515.39 6,783,439.08CV-0021 TALLER CHAMA, C.A. 8/27/2012 3 10,882,057.93 4,858,061.58 6,023,996.35CV-0021 TALLER CHAMA, C.A. 9/18/2012 4 6,009,393.69 2,682,765.04 3,326,628.65CV-0021 TALLER CHAMA, C.A. 9/21/2012 5 7,754,408.98 3,461,789.73 4,292,619.25CV-0021 TALLER CHAMA, C.A. 10/22/2012 6 8,524,916.78 3,805,766.42 4,719,150.36CV-0021 TALLER CHAMA, C.A. 11/13/2012 7 7,794,826.49 3,479,833.26 4,314,993.23CV-0021 TALLER CHAMA, C.A. 5/3/2013 8 18,811,680.10 8,398,071.48 10,413,608.62CV-0021 TALLER CHAMA, C.A. 5/3/2013 9 496,184.90 221,511.17 274,673.73

CV-0022 3/28/2012 3,290,748.05 3,290,747.32 3,290,747.32 100.00 1,469,083.95 1,469,083.95 1 AC 1,469,083.95 0.00 1,469,083.95 3,290,747.32

4/12/2013 1 3,290,747.32 1,469,083.95 1,821,663.37

PROYECTOS E INVERSIONES PROINVER,

RATL, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, ASFALTADO DE LA AUTOPISTA GRAN MARISCAL DE

AYACUCHO, SECTOR KEMPIS, ESTADO MIRANDA

PROYECTOS E INVERSIONES PROINVER,

RATL, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, ASFALTADO DE LA AUTOPISTA GRAN MARISCAL DE

AYACUCHO, SECTOR KEMPIS, ESTADO MIRANDA

PROYECTOS E INVERSIONES PROINVER,

RATL, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, ASFALTADO DE LA AUTOPISTA GRAN MARISCAL DE

AYACUCHO, SECTOR KEMPIS, ESTADO MIRANDA

INVERSIONE PETROCIV, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DEL TRAMO AUTOPISTA JUSEPIN, PROG.

0+910 A LA 1+440, ESTADO MONAGAS

INVERSIONE PETROCIV, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DEL TRAMO AUTOPISTA JUSEPIN, PROG.

0+910 A LA 1+440, ESTADO MONAGAS

INVERSIONE PETROCIV, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DEL TRAMO AUTOPISTA JUSEPIN, PROG.

0+910 A LA 1+440, ESTADO MONAGAS

INVERSIONE PETROCIV, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DEL TRAMO AUTOPISTA JUSEPIN, PROG.

0+910 A LA 1+440, ESTADO MONAGAS

INVERSIONE PETROCIV, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DEL TRAMO AUTOPISTA JUSEPIN, PROG.

0+910 A LA 1+440, ESTADO MONAGAS

PROYECTOS E INVERSIONES PROINVER,

RATL, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION Y MEJORAS DE LA CARRETERA VIEJA CARACAS - LA GUAIRA. ESTADO

VARGASPROYECTOS E

INVERSIONES PROINVER, RATL, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION Y MEJORAS DE LA CARRETERA VIEJA CARACAS - LA GUAIRA. ESTADO

VARGAS

PROYECTOS E INVERSIONES PROINVER,

RATL, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES. REHABILITACION Y MEJORAS DE LA CARRETERA

TEJERIA - EL CONSEJO, ESTADO ARAGUA

PROYECTOS E INVERSIONES PROINVER,

RATL, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES. REHABILITACION Y MEJORAS DE LA CARRETERA

TEJERIA - EL CONSEJO, ESTADO ARAGUA

PROYECTOS E INVERSIONES PROINVER,

RATL, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES. REHABILITACION Y MEJORAS DE LA CARRETERA

TEJERIA - EL CONSEJO, ESTADO ARAGUA

PROYECTOS E INVERSIONES PROINVER,

RATL, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES. REHABILITACION Y MEJORAS DE LA FALLA DE BORDE EN EL SECTOR SABANETA, DE LA

CARRETERA TEJERIA - EL CONSEJO, ESTADO ARAGUA

REHABILITACION INTEGRAL DE LA TO01, TRAMO SAN CRISTOBAL -

LIMITE MERIDA. ESTADO TACHIRA

REHABILITACION INTEGRAL DE LA TO01, TRAMO SAN CRISTOBAL -

LIMITE MERIDA. ESTADO TACHIRAREHABILITACION INTEGRAL DE LA TO01, TRAMO SAN CRISTOBAL -

LIMITE MERIDA. ESTADO TACHIRAREHABILITACION INTEGRAL DE LA TO01, TRAMO SAN CRISTOBAL -

LIMITE MERIDA. ESTADO TACHIRAREHABILITACION INTEGRAL DE LA TO01, TRAMO SAN CRISTOBAL -

LIMITE MERIDA. ESTADO TACHIRAREHABILITACION INTEGRAL DE LA TO01, TRAMO SAN CRISTOBAL -

LIMITE MERIDA. ESTADO TACHIRAREHABILITACION INTEGRAL DE LA TO01, TRAMO SAN CRISTOBAL -

LIMITE MERIDA. ESTADO TACHIRAREHABILITACION INTEGRAL DE LA TO01, TRAMO SAN CRISTOBAL -

LIMITE MERIDA. ESTADO TACHIRAREHABILITACION INTEGRAL DE LA TO01, TRAMO SAN CRISTOBAL -

LIMITE MERIDA. ESTADO TACHIRAREHABILITACION INTEGRAL DE LA TO01, TRAMO SAN CRISTOBAL -

LIMITE MERIDA. ESTADO TACHIRA

PROYECTOS E INVERSIONES PROINVER,

RATL, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, DEMARCACION Y SEÑALIZACION DE LA CARRETERA TEJERIAS - EL CONSEJO, ESTADO

ARAGUA

8 de 7104/17/2023

17:30:30

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0023 3/30/2012 2,362,655.23 2,362,655.23 2,362,655.23 100.00 1,054,756.80 1,054,756.80 1 AC 1,054,756.80 0.00 1,054,756.80 2,362,655.23

CV-0023 1 2,362,655.23 1,054,756.80 1,307,898.43

CV-0024 3/28/2012 46,782,351.46 46,782,350.82 46,781,524.88 100.00 20,884,978.33 20,884,978.33 1 AC 20,884,978.33 0.00 20,884,978.33 46,781,524.88

CV-0024 1 46,781,524.88 20,884,978.33 25,896,546.55

CV-0025 4/20/2012 10,984,680.95 10,984,680.89 6,250,827.58 56.90 4,903,875.42 2,790,548.03 2 AC 4,903,875.42 0.00 4,903,875.42 8,364,154.97

CV-0025 12/11/2012 1 3,776,118.06 1,685,766.99 2,090,351.07CV-0025 2/13/2013 2 2,217,306.20 989,868.84 1,227,437.36

3/13/2013 3 257,403.32 114,912.20 142,491.12

CV-0026 3/27/2012 126,213,592.00 126,213,590.27 15,993,626.46 12.67 56,345,353.57 7,140,011.81 2 AC 56,345,353.57 0.00 56,345,353.57 65,198,968.22

CV-0026 12/6/2012 1 9,294,969.11 4,149,539.78 5,145,429.33CV-0026 2/27/2013 2 6,698,657.35 2,990,472.03 3,708,185.32

CV-0027 4/27/2012 10,679,566.58 10,679,566.58 10,168,927.23 95.22 4,767,663.65 4,539,699.67 3 AC 4,767,663.65 0.00 4,767,663.65 10,396,891.21

CV-0027 8/22/2012 1 4,636,035.45 2,069,658.69 2,566,376.76CV-0027 2 377,882.62 168,697.60 209,185.02CV-0027 12/7/2012 3 5,155,009.16 2,301,343.38 2,853,665.78

CV-0028 3/27/2012 58,252,427.00 300,752,426.99 97,951,248.20 32.57 134,264,476.44 43,683,592.97 9 AC 26,005,547.77 0.00 26,005,547.77 188,532,131.67

AC2 108,258,928.67 0.00 108,258,928.67CV-0028 1/25/2013 1 18,757,766.01 8,374,002.69 10,383,763.32CV-0028 5/31/2013 2 4,289,342.39 1,914,885.00 2,374,457.39CV-0028 5/31/2013 3 1,159,462.79 517,617.32 641,845.47CV-0028 5/31/2013 4 560,458.64 250,204.75 310,253.89CV-0028 5/31/2013 5 8,696,564.93 3,882,395.06 4,814,169.87CV-0028 5/31/2013 6 1,758,184.38 784,903.74 973,280.64CV-0028 5/31/2013 7 2,383,031.81 1,019,210.63 1,363,821.18CV-0028 6/4/2013 8 4,340,299.06 1,937,633.51 2,402,665.55CV-0028 8/15/2013 9 56,006,138.19 25,002,740.27 31,003,397.92

CV-0029 3/27/2012 67,961,165.00 67,961,164.90 41,345,706.61 60.84 30,339,805.80 18,457,904.76 10 AC 30,339,805.80 0.00 30,339,805.80 53,227,607.65

PROYECTOS E INVERSIONES PROINVER,

RATL, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, FALLA DE BORDE EN EL GUAIRE, MUNICIPIO

LIBERTADOR, CARACAS (ESTADIO UNIVERSITARIO)

PROYECTOS E INVERSIONES PROINVER,

RATL, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, FALLA DE BORDE EN EL GUAIRE, MUNICIPIO

LIBERTADOR, CARACAS (ESTADIO UNIVERSITARIO)

PROYECTOS E INVERSIONES PROINVER,

RATL, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES. ASFALTADO DE LA AUTOPISTA GRAN MARISCAL DE AYACUCHO, ESTADO MIRANDA

PROYECTOS E INVERSIONES PROINVER,

RATL, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES. ASFALTADO DE LA AUTOPISTA GRAN MARISCAL DE AYACUCHO, ESTADO MIRANDA

VIALIDAD Y CONSTRUCCIONES

SUCRE, S.A.

REHABILITACION Y MANTENIMIENTO EN EL TRAMO

OSPINO - AGUA BLANCA, ESTADO PORTUGUESA

VIALIDAD Y CONSTRUCCIONES

SUCRE, S.A.

REHABILITACION Y MANTENIMIENTO EN EL TRAMO

OSPINO - AGUA BLANCA, ESTADO PORTUGUESA

VIALIDAD Y CONSTRUCCIONES

SUCRE, S.A.

REHABILITACION Y MANTENIMIENTO EN EL TRAMO

OSPINO - AGUA BLANCA, ESTADO PORTUGUESA

ZAGO MAQUINARIAS, C.A.

CONSTRUCCION DE LA CARRETERA BOCONO - LA MARQUESEÑA,

TRAMOS I Y III.

ZAGO MAQUINARIAS, C.A.

CONSTRUCCION DE LA CARRETERA BOCONO - LA MARQUESEÑA,

TRAMOS I Y III.ZAGO MAQUINARIAS, C.A.

CONSTRUCCION DE LA CARRETERA BOCONO - LA MARQUESEÑA,

TRAMOS I Y III.

CONSTRUCTORA EL MORRACHON, C.A.

REHABILITACION DE LA CARRETERA TO05, TRAMO LA

PEDRERA - SAN CRISTOBAL (PROG. 324+571 HASTA 633+471),

ESTADO TACHIRA

CONSTRUCTORA EL MORRACHON, C.A.

REHABILITACION DE LA CARRETERA TO05, TRAMO LA

PEDRERA - SAN CRISTOBAL (PROG. 324+571 HASTA 633+471),

ESTADO TACHIRA

CONSTRUCTORA EL MORRACHON, C.A.

REHABILITACION DE LA CARRETERA TO05, TRAMO LA

PEDRERA - SAN CRISTOBAL (PROG. 324+571 HASTA 633+471),

ESTADO TACHIRA

CONSTRUCTORA EL MORRACHON, C.A.

REHABILITACION DE LA CARRETERA TO05, TRAMO LA

PEDRERA - SAN CRISTOBAL (PROG. 324+571 HASTA 633+471),

ESTADO TACHIRA

ZAGO MAQUINARIAS, C.A.

CONSTRUCCION DEL TRAMO CASARAPA - RIO GRANDE DE LA AUTOPISTA GRAN MARISCAL DE AYACUCHO, ESTADO MIRANDA

ZAGO MAQUINARIAS, C.A.

CONSTRUCCION DEL TRAMO CASARAPA - RIO GRANDE DE LA AUTOPISTA GRAN MARISCAL DE AYACUCHO, ESTADO MIRANDA

ZAGO MAQUINARIAS, C.A.

CONSTRUCCION DEL TRAMO CASARAPA - RIO GRANDE DE LA AUTOPISTA GRAN MARISCAL DE AYACUCHO, ESTADO MIRANDA

ZAGO MAQUINARIAS, C.A.

CONSTRUCCION DEL TRAMO CASARAPA - RIO GRANDE DE LA AUTOPISTA GRAN MARISCAL DE AYACUCHO, ESTADO MIRANDA

ZAGO MAQUINARIAS, C.A.

CONSTRUCCION DEL TRAMO CASARAPA - RIO GRANDE DE LA AUTOPISTA GRAN MARISCAL DE AYACUCHO, ESTADO MIRANDA

ZAGO MAQUINARIAS, C.A.

CONSTRUCCION DEL TRAMO CASARAPA - RIO GRANDE DE LA AUTOPISTA GRAN MARISCAL DE AYACUCHO, ESTADO MIRANDA

ZAGO MAQUINARIAS, C.A.

CONSTRUCCION DEL TRAMO CASARAPA - RIO GRANDE DE LA AUTOPISTA GRAN MARISCAL DE AYACUCHO, ESTADO MIRANDA

ZAGO MAQUINARIAS, C.A.

CONSTRUCCION DEL TRAMO CASARAPA - RIO GRANDE DE LA AUTOPISTA GRAN MARISCAL DE AYACUCHO, ESTADO MIRANDA

ZAGO MAQUINARIAS, C.A.

CONSTRUCCION DEL TRAMO CASARAPA - RIO GRANDE DE LA AUTOPISTA GRAN MARISCAL DE AYACUCHO, ESTADO MIRANDA

ZAGO MAQUINARIAS, C.A.

CONSTRUCCION DEL TRAMO CASARAPA - RIO GRANDE DE LA AUTOPISTA GRAN MARISCAL DE AYACUCHO, ESTADO MIRANDA

ZAGO MAQUINARIAS, C.A.

CONSTRUCCION DE LA AUTOPISTA CENTRO OCCIDENTAL TO01.

9 de 7104/17/2023

17:30:30

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0029 11/5/2012 1 10,140,966.83 4,527,217.34 5,613,749.49CV-0029 2/6/2013 2(1A) 500,241.45 223,322.08 276,919.37CV-0029 4/11/2013 3 24,038,582.93 10,731,510.24 13,307,072.69CV-0029 4/11/2013 4 223,063.34 99,581.85 123,481.49CV-0029 4/11/2013 5 148,708.90 66,387.90 82,321.00CV-0029 5/30/2013 6(3A) 757,310.60 338,085.09 419,225.51CV-0029 5/30/2013 7(4A) 4,177.04 1,864.75 2,312.29CV-0029 5/30/2013 8(5A) 3,561.36 1,589.90 1,971.46CV-0029 5/30/2013 9 2,725,767.86 1,216,860.65 1,508,907.21CV-0029 5/31/2013 10 2,067,215.33 922,863.99 1,144,351.34CV-0029 5/31/2013 11 736,110.97 328,620.97 407,490.00

CV-0030 6/21/2012 636,899.22 636,622.91 636,622.91 100.00 284,330.01 284,330.01 2 AC 284,330.01 0.00 284,330.01 636,622.91

11/23/2012 1 561,067.73 250,476.67 310,591.064/8/2013 2 75,555.18 33,853.34 41,701.84

CV-0031 6/4/2012 52,699,200.00 52,699,200.00 52,699,199.98 100.00 23,526,428.57 23,526,428.57 4 AC 23,526,428.57 0.00 23,526,428.57 52,699,199.98

CV-0031 10/18/2012 1 5,539,507.24 2,472,994.31 3,066,512.93CV-0031 2 20,235,513.97 9,033,711.60 11,201,802.37CV-0031 12/6/2012 3 23,165,041.54 10,341,536.40 12,823,505.14CV-0031 4/17/2013 4 134,444.97 60,020.08 74,424.89CV-0031 4/17/2013 5 614,761.29 274,447.01 340,314.28CV-0031 4/17/2013 6 574,387.55 256,423.02 317,964.53CV-0031 4/18/2013 7 2,435,543.42 1,087,296.15 1,348,247.27

CV-0032 3/29/2012 23,355,308.67 23,355,300.64 23,355,300.62 100.00 10,426,477.09 10,426,477.09 5 AC 10,426,477.09 0.00 10,426,477.09 23,355,300.62

CV-0032 8/7/2012 1 1,910,490.28 852,897.45 1,057,592.83CV-0032 8/22/2012 2 7,217,217.29 3,221,972.01 3,995,245.28CV-0032 9/24/2012 3 4,017,541.52 1,793,545.32 2,223,996.20CV-0032 10/17/2012 4 4,319,928.24 1,928,539.40 2,391,388.84CV-0032 12/12/2012 5 5,890,123.29 2,629,522.91 3,260,600.38

ZAGO MAQUINARIAS, C.A.

CONSTRUCCION DE LA AUTOPISTA CENTRO OCCIDENTAL TO01.ZAGO MAQUINARIAS,

C.A.CONSTRUCCION DE LA AUTOPISTA

CENTRO OCCIDENTAL TO01.ZAGO MAQUINARIAS, C.A.

CONSTRUCCION DE LA AUTOPISTA CENTRO OCCIDENTAL TO01.ZAGO MAQUINARIAS,

C.A.CONSTRUCCION DE LA AUTOPISTA

CENTRO OCCIDENTAL TO01.ZAGO MAQUINARIAS, C.A.

CONSTRUCCION DE LA AUTOPISTA CENTRO OCCIDENTAL TO01.ZAGO MAQUINARIAS,

C.A.CONSTRUCCION DE LA AUTOPISTA

CENTRO OCCIDENTAL TO01.ZAGO MAQUINARIAS, C.A.

CONSTRUCCION DE LA AUTOPISTA CENTRO OCCIDENTAL TO01.ZAGO MAQUINARIAS,

C.A.CONSTRUCCION DE LA AUTOPISTA

CENTRO OCCIDENTAL TO01.ZAGO MAQUINARIAS, C.A.

CONSTRUCCION DE LA AUTOPISTA CENTRO OCCIDENTAL TO01.ZAGO MAQUINARIAS,

C.A.CONSTRUCCION DE LA AUTOPISTA

CENTRO OCCIDENTAL TO01.ZAGO MAQUINARIAS, C.A.

CONSTRUCCION DE LA AUTOPISTA CENTRO OCCIDENTAL TO01.

TELCONS INGENIEROS, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DE JUNTAS DE DILATACION CON

SISTEMA DE ASFALTADO ELASTOMERICO FBJS MASTIC, EN

LA AUTOPISTA FRANCISCO FAJARDO, SENTIDO OESTE - ESTE,

SEGUNDO PISO, CHACAITO, DISTRITO CAPITAL

CONSTRUCCIONES HER-BROSS, C.A.

REHABILITACION INTEGRAL DE LA TO17, TRAMO LARA - ZULIA I

ETAPA, PROG. 59+000 HASTA LA 65+000, (REHABILITACION DEL

PUENTE SICARE Y SUSTITUCION DE ALCANTATILLAS) Y PROG. 80+000

HASTA LA 80+400, CONSTRUCCION DE MURO DE

CONTENCION) ESTADOS LARA - ZULIA

CONSTRUCCIONES HER-BROSS, C.A.

REHABILITACION INTEGRAL DE LA TO17, TRAMO LARA - ZULIA I

ETAPA, PROG. 59+000 HASTA LA 65+000, (REHABILITACION DEL

PUENTE SICARE Y SUSTITUCION DE ALCANTATILLAS) Y PROG. 80+000

HASTA LA 80+400, CONSTRUCCION DE MURO DE

CONTENCION) ESTADOS LARA - ZULIA

CONSTRUCCIONES HER-BROSS, C.A.

REHABILITACION INTEGRAL DE LA TO17, TRAMO LARA - ZULIA I

ETAPA, PROG. 59+000 HASTA LA 65+000, (REHABILITACION DEL

PUENTE SICARE Y SUSTITUCION DE ALCANTATILLAS) Y PROG. 80+000

HASTA LA 80+400, CONSTRUCCION DE MURO DE

CONTENCION) ESTADOS LARA - ZULIA

CONSTRUCCIONES HER-BROSS, C.A.

REHABILITACION INTEGRAL DE LA TO17, TRAMO LARA - ZULIA I

ETAPA, PROG. 59+000 HASTA LA 65+000, (REHABILITACION DEL

PUENTE SICARE Y SUSTITUCION DE ALCANTATILLAS) Y PROG. 80+000

HASTA LA 80+400, CONSTRUCCION DE MURO DE

CONTENCION) ESTADOS LARA - ZULIA

CONSTRUCCIONES HER-BROSS, C.A.

REHABILITACION INTEGRAL DE LA TO17, TRAMO LARA - ZULIA I

ETAPA, PROG. 59+000 HASTA LA 65+000, (REHABILITACION DEL

PUENTE SICARE Y SUSTITUCION DE ALCANTATILLAS) Y PROG. 80+000

HASTA LA 80+400, CONSTRUCCION DE MURO DE

CONTENCION) ESTADOS LARA - ZULIA

CONSTRUCCIONES HER-BROSS, C.A.

REHABILITACION INTEGRAL DE LA TO17, TRAMO LARA - ZULIA I

ETAPA, PROG. 59+000 HASTA LA 65+000, (REHABILITACION DEL

PUENTE SICARE Y SUSTITUCION DE ALCANTATILLAS) Y PROG. 80+000

HASTA LA 80+400, CONSTRUCCION DE MURO DE

CONTENCION) ESTADOS LARA - ZULIA

CONSTRUCCIONES HER-BROSS, C.A.

REHABILITACION INTEGRAL DE LA TO17, TRAMO LARA - ZULIA I

ETAPA, PROG. 59+000 HASTA LA 65+000, (REHABILITACION DEL

PUENTE SICARE Y SUSTITUCION DE ALCANTATILLAS) Y PROG. 80+000

HASTA LA 80+400, CONSTRUCCION DE MURO DE

CONTENCION) ESTADOS LARA - ZULIA

CONSTRUCCIONES HER-BROSS, C.A.

REHABILITACION INTEGRAL DE LA TO17, TRAMO LARA - ZULIA I

ETAPA, PROG. 59+000 HASTA LA 65+000, (REHABILITACION DEL

PUENTE SICARE Y SUSTITUCION DE ALCANTATILLAS) Y PROG. 80+000

HASTA LA 80+400, CONSTRUCCION DE MURO DE

CONTENCION) ESTADOS LARA - ZULIA

INVERSIONES COFLAN, C.A.

REHABILITACION DE LA TO01, TRAMO KM. 0 NACIONAL -

DISTRIBUIDOR SAN BLAS, ENTRE EL KM. 44 AL 55+300, LIMITE CON EL ESTADO ARAGUA EN SU PISTA

NOTE (HORARIO NOCTURNO) ESTADO ARAGUA.

INVERSIONES COFLAN, C.A.

REHABILITACION DE LA TO01, TRAMO KM. 0 NACIONAL -

DISTRIBUIDOR SAN BLAS, ENTRE EL KM. 44 AL 55+300, LIMITE CON EL ESTADO ARAGUA EN SU PISTA

NOTE (HORARIO NOCTURNO) ESTADO ARAGUA.

INVERSIONES COFLAN, C.A.

REHABILITACION DE LA TO01, TRAMO KM. 0 NACIONAL -

DISTRIBUIDOR SAN BLAS, ENTRE EL KM. 44 AL 55+300, LIMITE CON EL ESTADO ARAGUA EN SU PISTA

NOTE (HORARIO NOCTURNO) ESTADO ARAGUA.

INVERSIONES COFLAN, C.A.

REHABILITACION DE LA TO01, TRAMO KM. 0 NACIONAL -

DISTRIBUIDOR SAN BLAS, ENTRE EL KM. 44 AL 55+300, LIMITE CON EL ESTADO ARAGUA EN SU PISTA

NOTE (HORARIO NOCTURNO) ESTADO ARAGUA.

INVERSIONES COFLAN, C.A.

REHABILITACION DE LA TO01, TRAMO KM. 0 NACIONAL -

DISTRIBUIDOR SAN BLAS, ENTRE EL KM. 44 AL 55+300, LIMITE CON EL ESTADO ARAGUA EN SU PISTA

NOTE (HORARIO NOCTURNO) ESTADO ARAGUA.

INVERSIONES COFLAN, C.A.

REHABILITACION DE LA TO01, TRAMO KM. 0 NACIONAL -

DISTRIBUIDOR SAN BLAS, ENTRE EL KM. 44 AL 55+300, LIMITE CON EL ESTADO ARAGUA EN SU PISTA

NOTE (HORARIO NOCTURNO) ESTADO ARAGUA.

10 de 7104/17/2023

17:30:30

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0033 4/20/2012 11,159,946.13 11,159,946.13 0.00 4,982,118.81 AC 4,982,118.81 0.00 4,982,118.81 4,982,118.81

CV--0034 3/27/2012 85,506,908.93 85,506,908.85 63,039,192.14 73.72 38,172,727.20 28,142,496.50 4 AC 38,172,727.20 0.00 38,172,727.20 73,069,422.84

CV--0034 10/26/2012 1 7,187,594.49 3,208,747.54 3,978,846.95CV--0034 1/25/2013 2 13,476,803.60 6,016,430.18 7,460,373.42CV--0034 4/12/2013 3 27,125,118.66 12,109,427.98 15,015,690.68CV--0034 8/5/2013 4 15,249,675.39 6,807,890.80 8,441,784.59

CV-0035 9/20/2012 32,626,081.92 32,625,737.92 32,625,737.95 100.00 14,565,215.15 14,565,215.15 4 AC 14,565,215.15 0.00 14,565,215.15 32,625,737.95

CV-0035 O.C.E.C.A. 1 22,986,182.97 10,261,688.83 12,724,494.14CV-0035 O.C.E.C.A. 4/8/2013 2 8,395,116.32 3,747,819.79 4,647,296.53CV-0035 O.C.E.C.A. 4/5/2013 3 1,022,869.81 456,638.31 566,231.50CV-0035 O.C.E.C.A. 4/17/2013 4 221,568.85 99,068.22 122,500.63

CV-0036 TERRAVIAL, C.A. 3/23/2012 1,315,440.76 1,315,440.76 1,053,666.40 80.10 587,250.34 470,386.79 2 AC 587,250.34 0.00 587,250.34 1,170,529.95

CV-0036 TERRAVIAL, C.A. 8/29/2012 1 1,053,666.40 470,386.79 583,279.61

CV-0037 4/18/2012 41,972,452.16 41,972,452.12 16,432,560.98 39.15 18,737,701.86 7,335,964.73 4 AC 18,737,701.86 0.00 18,737,701.86 27,834,298.11

CV-0037 10/16/2012 1 3,364,753.59 1,502,122.14 1,862,631.45CV-0037 12/3/2012 2 4,304,637.05 1,921,712.97 2,382,924.08CV-0037 4/24/2013 3 6,001,541.00 2,679,259.38 3,322,281.62CV-0037 4/24/2013 4 2,761,629.34 1,232,870.24 1,528,759.10

CV-0038 4/16/2012 12,628,410.93 12,628,410.94 12,628,410.94 100.00 5,637,683.45 5,637,683.45 4 AC 5,637,683.45 0.00 5,637,683.45 12,628,410.94

CV-0038 10/30/2012 1 272,919.19 121,838.93 151,080.26CV-0038 12/13/2012 2 423,547.04 189,083.50 234,463.54CV-0038 3 268,571.52 119,898.00 148,673.52CV-0038 4 11,663,373.19 5,206,863.02 6,456,510.17

CV-0039 4/16/2012 15,164,459.64 15,164,459.21 15,164,459.16 100.00 6,769,848.05 6,769,848.06 5 AC 6,769,848.05 0.00 6,769,848.05 15,164,459.15

CV-0039 1 7,522,842.96 3,358,412.04 4,164,430.92CV-0039 7/31/2012 2 2,705,074.25 1,207,622.44 1,497,451.81

VIALIDAD Y CONSTRUCCIONES

SUCRE, S.A.

BACHEO MAYOR DE LA AUTOPISTA GRAN MARISCAL DE AYACUCHO,

TRAMO DISTRIBUIDOR CAUCAGUA - DISTRIBUIDOR HIGUEROTE,

ENTRE LA PROG. 48+000 HASTA LA 18+300, ESTADO MIRANDA

ZAGO MAQUINARIAS, C.A.

REHABILITACION INTEGRAL Y BCHEO EN TODAS LAS

TRONCALES, REASFALTADO, REACONDICIONAMIENTO Y

AMPLIACION DE LA TO13, TRAMO DISTRIBUIDOR MATURIN HASTA LA

CEIBA, ESTADO ANZOATEGUI.ZAGO MAQUINARIAS,

C.A.

REHABILITACION INTEGRAL Y BCHEO EN TODAS LAS

TRONCALES, REASFALTADO, REACONDICIONAMIENTO Y

AMPLIACION DE LA TO13, TRAMO DISTRIBUIDOR MATURIN HASTA LA

CEIBA, ESTADO ANZOATEGUI.

ZAGO MAQUINARIAS, C.A.

REHABILITACION INTEGRAL Y BCHEO EN TODAS LAS

TRONCALES, REASFALTADO, REACONDICIONAMIENTO Y

AMPLIACION DE LA TO13, TRAMO DISTRIBUIDOR MATURIN HASTA LA

CEIBA, ESTADO ANZOATEGUI.

ZAGO MAQUINARIAS, C.A.

REHABILITACION INTEGRAL Y BCHEO EN TODAS LAS

TRONCALES, REASFALTADO, REACONDICIONAMIENTO Y

AMPLIACION DE LA TO13, TRAMO DISTRIBUIDOR MATURIN HASTA LA

CEIBA, ESTADO ANZOATEGUI.

ZAGO MAQUINARIAS, C.A.

REHABILITACION INTEGRAL Y BCHEO EN TODAS LAS

TRONCALES, REASFALTADO, REACONDICIONAMIENTO Y

AMPLIACION DE LA TO13, TRAMO DISTRIBUIDOR MATURIN HASTA LA

CEIBA, ESTADO ANZOATEGUI.OBRAS, CONSTRUCCIONES Y ELECTRICIDAD, C.A.

(OCECA)

REHABILITACION INTEGRAL DE TRAMOS EN LA CARRETERA

PANAMERICANA, (KM. 23,5 AL KM. 25 SENTIDO CARACAS - LOS

TEQUES, KM. 25 AL KM. 32, AMBOS SENTIDOS Y KM. 42 AL KM. 44,

AMBOS SENTIDOS. ESTADO MIRANDA

REHABILITACION INTEGRAL DE TRAMOS EN LA CARRETERA

PANAMERICANA, (KM. 23,5 AL KM. 25 SENTIDO CARACAS - LOS

TEQUES, KM. 25 AL KM. 32, AMBOS SENTIDOS Y KM. 42 AL KM. 44,

AMBOS SENTIDOS. ESTADO MIRANDA

REHABILITACION INTEGRAL DE TRAMOS EN LA CARRETERA

PANAMERICANA, (KM. 23,5 AL KM. 25 SENTIDO CARACAS - LOS

TEQUES, KM. 25 AL KM. 32, AMBOS SENTIDOS Y KM. 42 AL KM. 44,

AMBOS SENTIDOS. ESTADO MIRANDA

REHABILITACION INTEGRAL DE TRAMOS EN LA CARRETERA

PANAMERICANA, (KM. 23,5 AL KM. 25 SENTIDO CARACAS - LOS

TEQUES, KM. 25 AL KM. 32, AMBOS SENTIDOS Y KM. 42 AL KM. 44,

AMBOS SENTIDOS. ESTADO MIRANDA

REHABILITACION INTEGRAL DE TRAMOS EN LA CARRETERA

PANAMERICANA, (KM. 23,5 AL KM. 25 SENTIDO CARACAS - LOS

TEQUES, KM. 25 AL KM. 32, AMBOS SENTIDOS Y KM. 42 AL KM. 44,

AMBOS SENTIDOS. ESTADO MIRANDA

REHABILITACION INTEGRAL EN TODAS LAS TRONCALES,

SUSTITUCION DE ALCANTARILLAS EN LA TO09, BOCA DE UCHIRE,

MUNICIPIO SAN JUAN DE CAPISTRAN, PROG. 210+500.

ESTADO ANZOATEGUI

REHABILITACION INTEGRAL EN TODAS LAS TRONCALES,

SUSTITUCION DE ALCANTARILLAS EN LA TO09, BOCA DE UCHIRE,

MUNICIPIO SAN JUAN DE CAPISTRAN, PROG. 210+500.

ESTADO ANZOATEGUICOVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

REHABILITACION Y MANTENIMIENTO DEL TRAMO: CARRETERA LOS TOTUMOS -

CHARALLAVE, CARMEN DE CURA, ESTADO MIRANDA

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

REHABILITACION Y MANTENIMIENTO DEL TRAMO: CARRETERA LOS TOTUMOS -

CHARALLAVE, CARMEN DE CURA, ESTADO MIRANDA

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

REHABILITACION Y MANTENIMIENTO DEL TRAMO: CARRETERA LOS TOTUMOS -

CHARALLAVE, CARMEN DE CURA, ESTADO MIRANDA

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

REHABILITACION Y MANTENIMIENTO DEL TRAMO: CARRETERA LOS TOTUMOS -

CHARALLAVE, CARMEN DE CURA, ESTADO MIRANDA

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

REHABILITACION Y MANTENIMIENTO DEL TRAMO: CARRETERA LOS TOTUMOS -

CHARALLAVE, CARMEN DE CURA, ESTADO MIRANDA

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

REHABILITACION Y MANTENIMIENTO EN EL TRAMO GUANARE - BISCUCUY, ESTADO

PORTUGUESA

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

REHABILITACION Y MANTENIMIENTO EN EL TRAMO GUANARE - BISCUCUY, ESTADO

PORTUGUESA

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

REHABILITACION Y MANTENIMIENTO EN EL TRAMO GUANARE - BISCUCUY, ESTADO

PORTUGUESA

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

REHABILITACION Y MANTENIMIENTO EN EL TRAMO GUANARE - BISCUCUY, ESTADO

PORTUGUESA

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

REHABILITACION Y MANTENIMIENTO EN EL TRAMO GUANARE - BISCUCUY, ESTADO

PORTUGUESA

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

REHABILITACION Y MANTENIMIENTO DE LA TO01,

TRAMO SABANETA - LA PASTORA, ESTADO LARA

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

REHABILITACION Y MANTENIMIENTO DE LA TO01,

TRAMO SABANETA - LA PASTORA, ESTADO LARA

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

REHABILITACION Y MANTENIMIENTO DE LA TO01,

TRAMO SABANETA - LA PASTORA, ESTADO LARA

11 de 7104/17/2023

17:30:30

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0039 8/28/2012 3 1,754,038.22 783,052.78 970,985.44CV-0039 12/11/2012 4 3,137,390.20 1,400,620.63 1,736,769.57CV-0039 1/18/2013 5 45,113.53 20,140.17 24,973.36

CV-0040 1,887,451.04 1,887,451.04 0.00 842,612.07 AC 842,612.07 0.00 842,612.07 842,612.07

CV-0041 4/16/2012 3,638,569.26 3,638,569.23 3,638,569.25 100.00 1,624,361.28 1,624,361.28 2 AC 1,624,361.28 0.00 1,624,361.28 3,638,569.25

CV-0041 10/17/2012 1 2,436,035.90 1,087,516.03 1,348,519.87CV-0041 1/16/2013 2 1,202,533.35 536,845.25 665,688.10

CV-0042 4/16/2012 5,374,393.36 5,374,393.36 4,424,348.11 82.32 2,399,282.75 1,975,155.42 2 AC 2,399,282.75 0.00 2,399,282.75 4,848,475.44

CV-0042 1 1,868,347.07 834,083.52 1,034,263.55CV-0042 2/19/2013 2 2,556,001.04 1,141,071.90 1,414,929.14

CV-0043 7/20/2012 77,913,043.43 77,913,043.43 77,913,043.41 100.00 34,782,608.67 34,782,608.67 5 AC 34,782,608.67 0.00 34,782,608.67 77,913,043.41

CV-0043 10/25/2012 1 8,421,837.59 3,759,748.93 4,662,088.66CV-0043 10/29/2012 2 11,939,046.13 5,329,931.31 6,609,114.82CV-0043 11/28/2012 3 40,453,318.72 18,059,517.29 22,393,801.43CV-0043 2/15/2013 4 3,789,499.85 1,691,741.01 2,097,758.84CV-0043 8/23/2013 5 13,309,341.12 5,941,670.13 7,367,670.99

CV-0044 3/19/2012 69,202,583.81 69,202,583.81 44,315,810.95 64.04 30,894,010.63 19,783,844.18 7 AC 30,894,010.63 0.00 30,894,010.63 55,425,977.40

CV-0044 11/28/2012 1 3,314,445.41 1,479,663.13 1,834,782.28CV-0044 11/28/2012 2 8,787,002.81 3,922,769.11 4,864,233.70CV-0044 3/4/2013 3 6,691,227.16 2,987,154.98 3,704,072.18CV-0044 3/4/2013 4 6,149,727.21 2,745,413.94 3,404,313.27CV-0044 3/25/2013 5 6,212,547.87 2,773,458.87 3,439,089.00CV-0044 5/3/2013 6 8,236,815.64 3,677,149.84 4,559,665.80CV-0044 5/27/2013 7 4,924,044.85 2,198,234.31 2,725,810.54

CV-0045 4/12/2012 25,242,718.45 24,973,565.95 24,973,565.95 100.00 11,269,070.74 11,269,070.74 4 AC 11,269,070.74 0.00 11,269,070.74 24,973,565.95

CV-0045 9/4/2012 1 19,925.36 8,895.25 11,030.11CV-0045 9/4/2012 2 10,750,717.11 4,799,427.28 5,951,289.83CV-0045 3 7,476,324.98 3,337,645.08 4,138,679.90CV-0045 10/15/2012 4 4,697,191.99 2,096,960.71 2,600,231.28CV-0045 5 2,029,406.51 1,026,142.42 1,003,264.09

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

REHABILITACION Y MANTENIMIENTO DE LA TO01,

TRAMO SABANETA - LA PASTORA, ESTADO LARA

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

REHABILITACION Y MANTENIMIENTO DE LA TO01,

TRAMO SABANETA - LA PASTORA, ESTADO LARA

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

REHABILITACION Y MANTENIMIENTO DE LA TO01,

TRAMO SABANETA - LA PASTORA, ESTADO LARA

VIALIDAD Y CONSTRUCCIONES

SUCRE, S.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO

CARRETERA VIEJA LAS ADJUNTAS - LOS TEQUES, ESTADO MIRANDA

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION NUEVA CUA, ESTADO MIRANDA

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION NUEVA CUA, ESTADO MIRANDA

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION NUEVA CUA, ESTADO MIRANDA

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

REHABILITACION Y MANTENIMIENTO DEL TRAMO

CHARALLAVE - OCUMARE DEL TUY, ESTADO MIRANDA

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

REHABILITACION Y MANTENIMIENTO DEL TRAMO

CHARALLAVE - OCUMARE DEL TUY, ESTADO MIRANDA

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

REHABILITACION Y MANTENIMIENTO DEL TRAMO

CHARALLAVE - OCUMARE DEL TUY, ESTADO MIRANDA

CONSTRUCCIONES YAMARO, C.A.

REHABILITACION DE LA LARA - ZULIA, TO17, ENTRE LOS

SIGUIENTES TRAMOS: DESDE DISTRIBUIDOR SABANETA HASTA

DISTRIBUIDOR CARORA, DESDE LA PROG. 36+000 HASTA LA PROG.

53+000 Y DESDE LA PROG. 59+300 HASTA LA PROG. 64+000.

ESTADO LARACONSTRUCCIONES YAMARO, C.A.CONSTRUCCIONES YAMARO, C.A.CONSTRUCCIONES YAMARO, C.A.CONSTRUCCIONES YAMARO, C.A.CONSTRUCCIONES YAMARO, C.A.

CONSTRUCTORA LOBATERA, C.A.

REHABILITACION DE LA TO01, TRAMO KM. 0 NACIONAL - DISTRIBUIDOR SAN BLAS,

ESTADOS: DISTRITO CAPITAL , ARAGUA Y CARABOBO,

REHABILITACION DE LA TO01, , II ETAPA, TRAMO KM. 0 - KM. 32,

ESTADO MIRANDACONSTRUCTORA LOBATERA, C.A.

REHABILITACION DE LA TO01, TRAMO KM. 0 NACIONAL - DISTRIBUIDOR SAN BLAS,

ESTADOS: DISTRITO CAPITAL , ARAGUA Y CARABOBO,

REHABILITACION DE LA TO01, , II ETAPA, TRAMO KM. 0 - KM. 32,

ESTADO MIRANDA

CONSTRUCTORA LOBATERA, C.A.

REHABILITACION DE LA TO01, TRAMO KM. 0 NACIONAL - DISTRIBUIDOR SAN BLAS,

ESTADOS: DISTRITO CAPITAL , ARAGUA Y CARABOBO,

REHABILITACION DE LA TO01, , II ETAPA, TRAMO KM. 0 - KM. 32,

ESTADO MIRANDA

CONSTRUCTORA LOBATERA, C.A.

REHABILITACION DE LA TO01, TRAMO KM. 0 NACIONAL - DISTRIBUIDOR SAN BLAS,

ESTADOS: DISTRITO CAPITAL , ARAGUA Y CARABOBO,

REHABILITACION DE LA TO01, , II ETAPA, TRAMO KM. 0 - KM. 32,

ESTADO MIRANDA

CONSTRUCTORA LOBATERA, C.A.

REHABILITACION DE LA TO01, TRAMO KM. 0 NACIONAL - DISTRIBUIDOR SAN BLAS,

ESTADOS: DISTRITO CAPITAL , ARAGUA Y CARABOBO,

REHABILITACION DE LA TO01, , II ETAPA, TRAMO KM. 0 - KM. 32,

ESTADO MIRANDA

CONSTRUCTORA LOBATERA, C.A.

REHABILITACION DE LA TO01, TRAMO KM. 0 NACIONAL - DISTRIBUIDOR SAN BLAS,

ESTADOS: DISTRITO CAPITAL , ARAGUA Y CARABOBO,

REHABILITACION DE LA TO01, , II ETAPA, TRAMO KM. 0 - KM. 32,

ESTADO MIRANDA

CONSTRUCTORA LOBATERA, C.A.

REHABILITACION DE LA TO01, TRAMO KM. 0 NACIONAL - DISTRIBUIDOR SAN BLAS,

ESTADOS: DISTRITO CAPITAL , ARAGUA Y CARABOBO,

REHABILITACION DE LA TO01, , II ETAPA, TRAMO KM. 0 - KM. 32,

ESTADO MIRANDA

CONSTRUCTORA LOBATERA, C.A.

REHABILITACION DE LA TO01, TRAMO KM. 0 NACIONAL - DISTRIBUIDOR SAN BLAS,

ESTADOS: DISTRITO CAPITAL , ARAGUA Y CARABOBO,

REHABILITACION DE LA TO01, , II ETAPA, TRAMO KM. 0 - KM. 32,

ESTADO MIRANDAINVERSIONES BANAVEN, C.A.

REHABILITACION DE LA TO09, DEL TRAMO CARRETERA CUMANA - PERTIGALETTE, ESTADO SUCRE

INVERSIONES BANAVEN, C.A.

REHABILITACION DE LA TO09, DEL TRAMO CARRETERA CUMANA - PERTIGALETTE, ESTADO SUCREINVERSIONES BANAVEN,

C.A.

REHABILITACION DE LA TO09, DEL TRAMO CARRETERA CUMANA - PERTIGALETTE, ESTADO SUCREINVERSIONES BANAVEN,

C.A.

REHABILITACION DE LA TO09, DEL TRAMO CARRETERA CUMANA - PERTIGALETTE, ESTADO SUCREINVERSIONES BANAVEN,

C.A.

REHABILITACION DE LA TO09, DEL TRAMO CARRETERA CUMANA - PERTIGALETTE, ESTADO SUCREINVERSIONES BANAVEN,

C.A.

REHABILITACION DE LA TO09, DEL TRAMO CARRETERA CUMANA - PERTIGALETTE, ESTADO SUCRE

12 de 7104/17/2023

17:30:30

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0046 5/9/2012 69,902,912.62 69,902,912.62 38,917,376.13 55.67 30,206,657.42 17,373,828.63 4 AC 30,206,657.42 0.00 30,206,657.42 51,750,204.92

CV-0046 8/16/2012 1 19,475,682.11 8,694,500.94 10,781,181.17CV-0046 11/20/2012 2 8,504,204.39 3,796,519.82 4,707,684.57CV-0046 3 3,457,456.02 1,543,507.15 1,913,948.87CV-0046 4/22/2013 4 7,480,033.61 3,339,300.72 4,140,732.89

CV-0047 4/4/2012 4,689,244.00 4,689,243.90 4,666,789.93 99.52 2,093,412.50 2,083,388.37 3 AC 2,093,412.50 0.00 2,093,412.50 4,676,814.06

CV-0047 10/1/2012 1 306,901.76 137,009.72 169,892.04CV-0047 12/7/2012 2 4,295,969.97 1,917,843.74 2,378,126.23CV-0047 2/15/2013 3 63,918.20 28,534.91 35,383.29

CV-0048 7/30/2012 2,427,184.46 2,167,128.98 1,083,564.49 AC AC 1,083,564.49 0.00 1,083,564.49 1,083,564.49

CV-0049 ONICA, C.A. 7/27/2012 58,434,781.14 58,061,493.46 58,061,493.47 100.00 26,086,955.87 26,086,955.87 4 10/26/2012 AC 26,086,955.87 0.00 26,086,955.87 58,061,493.47

CV-0049 ONICA, C.A. 10/26/2012 1 17,692,504.29 7,898,439.42 9,794,064.87CV-0049 ONICA, C.A. 11/14/2012 2 19,767,676.32 8,824,855.50 10,942,820.82CV-0049 ONICA, C.A. 12/26/2012 3 19,290,036.01 8,611,623.22 10,678,412.79CV-0049 ONICA, C.A. 3/11/2013 4 1,311,276.85 752,037.73 559,239.12

CV-0050 3/24/2012 13,841,649.73 13,841,649.71 13,841,649.71 100.00 6,179,307.92 6,179,307.92 4 AC 6,179,307.92 0.00 6,179,307.92 13,841,649.71

CV-0050 3/24/2012 1 3,746,195.95 1,672,408.91 2,073,787.04CV-0050 3/24/2012 8/14/2012 2 4,061,789.13 1,813,298.72 2,248,490.41CV-0050 3/24/2012 12/10/2012 3 5,768,333.83 2,575,149.03 3,193,184.80CV-0050 3/24/2012 12/11/2012 4 265,330.80 118,451.26 146,879.54

CV-0051 3/30/2012 76,698,199.77 76,698,199.77 61,716,678.46 80.47 34,240,267.76 27,552,088.62 9 AC 34,240,267.76 0.00 34,240,267.76 68,404,857.60

CV-0051 1 4,084,356.62 1,823,373.49 2,260,983.13CV-0051 2 4,754,359.47 2,122,481.91 2,631,877.56CV-0051 3 8,304,752.99 3,707,479.02 4,597,273.97CV-0051 10/22/2012 4 4,601,187.15 2,054,101.41 2,547,085.74CV-0051 11/23/2012 5 7,763,126.38 3,465,681.42 4,297,444.96CV-0051 1/29/2012 6 12,690,508.54 5,665,405.60 7,025,102.94CV-0051 4/9/2013 7 3,495,517.47 1,560,498.87 1,935,018.60CV-0051 4/29/2013 8 11,838,239.31 5,284,928.27 6,553,311.04

CONSTRUCTORA PEDECA, C.A.

REHABILITACION Y MANTENIMIENTO DE LA TO09,

TRAMO BOCA DE UCHIRE - REDOMA DE LAS PALOMAS,

ESTADO ANZOATEGUI

CONSTRUCTORA PEDECA, C.A.

REHABILITACION Y MANTENIMIENTO DE LA TO09,

TRAMO BOCA DE UCHIRE - REDOMA DE LAS PALOMAS,

ESTADO ANZOATEGUI

CONSTRUCTORA PEDECA, C.A.

REHABILITACION Y MANTENIMIENTO DE LA TO09,

TRAMO BOCA DE UCHIRE - REDOMA DE LAS PALOMAS,

ESTADO ANZOATEGUI

CONSTRUCTORA PEDECA, C.A.

REHABILITACION Y MANTENIMIENTO DE LA TO09,

TRAMO BOCA DE UCHIRE - REDOMA DE LAS PALOMAS,

ESTADO ANZOATEGUI

CONSTRUCTORA PEDECA, C.A.

REHABILITACION Y MANTENIMIENTO DE LA TO09,

TRAMO BOCA DE UCHIRE - REDOMA DE LAS PALOMAS,

ESTADO ANZOATEGUI

PILOTES PERFORADOS, C.A. (PILPER, CA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, RECONSTRUCCION DEL CAJON SABANA GRANDE, UBICADO EN LA TRONCAL 1

(CARRETERA PANAMERICANA), EN LA POBLACION DE SABANA

GRANDE, ESTADO TRUJILLO.PILOTES PERFORADOS,

C.A. (PILPER, CA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, RECONSTRUCCION DEL CAJON SABANA GRANDE, UBICADO EN LA TRONCAL 1

(CARRETERA PANAMERICANA), EN LA POBLACION DE SABANA

GRANDE, ESTADO TRUJILLO.

PILOTES PERFORADOS, C.A. (PILPER, CA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, RECONSTRUCCION DEL CAJON SABANA GRANDE, UBICADO EN LA TRONCAL 1

(CARRETERA PANAMERICANA), EN LA POBLACION DE SABANA

GRANDE, ESTADO TRUJILLO.

PILOTES PERFORADOS, C.A. (PILPER, CA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, RECONSTRUCCION DEL CAJON SABANA GRANDE, UBICADO EN LA TRONCAL 1

(CARRETERA PANAMERICANA), EN LA POBLACION DE SABANA

GRANDE, ESTADO TRUJILLO.REPRESENTACIONES

ANGO, C.A.

REHABILITACION DEL TRAMO ENCRUCIJADA - TAGUANTAR

(PROG. DESDE 24+000 HASTA 43+300), ESTADO NUEVA ESPARTA

REHABILITACION DE LA LARA - ZULIA, TO17, ENTRE EL

DISTRIBUIDOR PUNTA IGUANA (PROGRESIVA 0+000) HASTA EL

PUENTE BURRO NEGRO (PROGRESIVA 70+900) ESTADO

ZULIA

CONSTRUCCIONES YAMARO, C.A.

BACHEO GENERAL TO09, DISTRIBUIDOR CAUCAGUA -BARCELONA, DESDE PROG.

78+000 A PLAYA PINTADA, PROG. 187+000, ESTADO MIRANDA,

ASFALTADO DE LA CARRETERA TO09, PROG. 78+000,

DISTRIBUIDOR CAUCAGUA - BARCELONA, HASTA LA

INCORPORACION A LA AUTOPISTA GRAN MARISCAL DE AYACUCHO Y REPARACION DE FALLA DE BORDE

EN PROGRESIVA 80+360.CONSTRUCCIONES YAMARO, C.A.

BACHEO GENERAL TO09, DISTRIBUIDOR CAUCAGUA -BARCELONA, DESDE PROG.

78+000 A PLAYA PINTADA, PROG. 187+000, ESTADO MIRANDA,

ASFALTADO DE LA CARRETERA TO09, PROG. 78+000,

DISTRIBUIDOR CAUCAGUA - BARCELONA, HASTA LA

INCORPORACION A LA AUTOPISTA GRAN MARISCAL DE AYACUCHO Y REPARACION DE FALLA DE BORDE

EN PROGRESIVA 80+360.

CONSTRUCCIONES YAMARO, C.A.

BACHEO GENERAL TO09, DISTRIBUIDOR CAUCAGUA -BARCELONA, DESDE PROG.

78+000 A PLAYA PINTADA, PROG. 187+000, ESTADO MIRANDA,

ASFALTADO DE LA CARRETERA TO09, PROG. 78+000,

DISTRIBUIDOR CAUCAGUA - BARCELONA, HASTA LA

INCORPORACION A LA AUTOPISTA GRAN MARISCAL DE AYACUCHO Y REPARACION DE FALLA DE BORDE

EN PROGRESIVA 80+360.

CONSTRUCCIONES YAMARO, C.A.

BACHEO GENERAL TO09, DISTRIBUIDOR CAUCAGUA -BARCELONA, DESDE PROG.

78+000 A PLAYA PINTADA, PROG. 187+000, ESTADO MIRANDA,

ASFALTADO DE LA CARRETERA TO09, PROG. 78+000,

DISTRIBUIDOR CAUCAGUA - BARCELONA, HASTA LA

INCORPORACION A LA AUTOPISTA GRAN MARISCAL DE AYACUCHO Y REPARACION DE FALLA DE BORDE

EN PROGRESIVA 80+360.

CONSTRUCCIONES YAMARO, C.A.

BACHEO GENERAL TO09, DISTRIBUIDOR CAUCAGUA -BARCELONA, DESDE PROG.

78+000 A PLAYA PINTADA, PROG. 187+000, ESTADO MIRANDA,

ASFALTADO DE LA CARRETERA TO09, PROG. 78+000,

DISTRIBUIDOR CAUCAGUA - BARCELONA, HASTA LA

INCORPORACION A LA AUTOPISTA GRAN MARISCAL DE AYACUCHO Y REPARACION DE FALLA DE BORDE

EN PROGRESIVA 80+360.

CONSTRUCCIONES Y ASFALTO ANDES, C.A.

REHABILITACION DE LA CARRETERA LO01, TRAMO

BARINAS - MERIDA, ETAPA I, ESTADOS BARINAS - MERIDA

CONSTRUCCIONES Y ASFALTO ANDES, C.A.

REHABILITACION DE LA CARRETERA LO01, TRAMO

BARINAS - MERIDA, ETAPA I, ESTADOS BARINAS - MERIDA

CONSTRUCCIONES Y ASFALTO ANDES, C.A.

REHABILITACION DE LA CARRETERA LO01, TRAMO

BARINAS - MERIDA, ETAPA I, ESTADOS BARINAS - MERIDA

CONSTRUCCIONES Y ASFALTO ANDES, C.A.

REHABILITACION DE LA CARRETERA LO01, TRAMO

BARINAS - MERIDA, ETAPA I, ESTADOS BARINAS - MERIDA

CONSTRUCCIONES Y ASFALTO ANDES, C.A.

REHABILITACION DE LA CARRETERA LO01, TRAMO

BARINAS - MERIDA, ETAPA I, ESTADOS BARINAS - MERIDA

CONSTRUCCIONES Y ASFALTO ANDES, C.A.

REHABILITACION DE LA CARRETERA LO01, TRAMO

BARINAS - MERIDA, ETAPA I, ESTADOS BARINAS - MERIDA

CONSTRUCCIONES Y ASFALTO ANDES, C.A.

REHABILITACION DE LA CARRETERA LO01, TRAMO

BARINAS - MERIDA, ETAPA I, ESTADOS BARINAS - MERIDA

CONSTRUCCIONES Y ASFALTO ANDES, C.A.

REHABILITACION DE LA CARRETERA LO01, TRAMO

BARINAS - MERIDA, ETAPA I, ESTADOS BARINAS - MERIDA

CONSTRUCCIONES Y ASFALTO ANDES, C.A.

REHABILITACION DE LA CARRETERA LO01, TRAMO

BARINAS - MERIDA, ETAPA I, ESTADOS BARINAS - MERIDA

13 de 7104/17/2023

17:30:30

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0051 6/10/2013 9 4,184,630.53 1,868,138.63 2,316,491.90

CV-0052 INRAJOCA, C.A. 6/4/2012 13,999,999.76 13,999,999.01 10,505,407.65 75.04 6,249,999.90 4,689,914.15 4 AC 6,249,999.90 0.00 6,249,999.90 12,065,493.40

CV-0052 INRAJOCA, C.A. 9/26/2012 1 3,218,155.67 1,436,676.64 1,781,479.03CV-0052 INRAJOCA, C.A. 12/5/2012 2 1,229,526.40 548,895.72 680,630.68CV-0052 INRAJOCA, C.A. 2/21/2013 3 2,332,642.24 1,041,358.15 1,291,284.09CV-0052 INRAJOCA, C.A. 4/3/2013 4 3,725,083.34 1,662,983.64 2,062,099.70

CV-0053 7/30/2012 2,912,621.33 2,580,176.23 2,580,176.23 100.00 1,300,277.38 1,300,277.38 1 AC 1,300,277.38 0.00 1,300,277.38 2,580,176.23

CV-0053 12/11/2012 1 2,580,176.23 1,300,277.38 1,279,898.85

CV-0054 5/9/2012 56,549,170.32 56,549,170.48 41,345,180.38 73.11 25,245,165.32 18,457,669.83 4 AC 25,245,165.32 0.00 25,245,165.32 48,132,675.87

CV-0054 1 10,058,865.66 4,490,565.03 5,568,300.63CV-0054 11/28/2012 2 13,603,827.09 6,073,137.10 7,530,689.99CV-0054 3/19/2013 3 15,875,831.59 7,087,424.82 8,788,406.77CV-0054 6/3/2013 4 1,806,656.04 806,542.88 1,000,113.16

CV-0055 4/13/2012 4,705,257.82 4,705,257.80 4,067,231.73 86.44 2,100,561.53 1,815,728.46 5 AC 2,100,561.53 0.00 2,100,561.53 4,352,064.80

CV-0055 10/1/2012 1 561,530.21 250,683.13 310,847.08CV-0055 1/11/2013 2 1,093,044.69 487,966.38 605,078.31CV-0055 3/19/2013 3 622,731.66 278,005.21 344,726.45CV-0055 3/19/2013 4 765,061.45 341,545.29 423,516.16CV-0055 5/3/2013 5 1,024,863.72 457,528.45 567,335.27

CONSTRUCCIONES Y ASFALTO ANDES, C.A.

REHABILITACION DE LA CARRETERA LO01, TRAMO

BARINAS - MERIDA, ETAPA I, ESTADOS BARINAS - MERIDAREHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REHABILITACION VIAL

LOS DOS RIOS - AGUA BLANCA, MUNICIPIO MONTES, ESTADO

SUCREREHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REHABILITACION VIAL

LOS DOS RIOS - AGUA BLANCA, MUNICIPIO MONTES, ESTADO

SUCRE

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION VIAL LOS DOS RIOS - AGUA BLANCA, MUNICIPIO MONTES, ESTADO

SUCRE

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION VIAL LOS DOS RIOS - AGUA BLANCA, MUNICIPIO MONTES, ESTADO

SUCRE

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION VIAL LOS DOS RIOS - AGUA BLANCA, MUNICIPIO MONTES, ESTADO

SUCRE

REPRESENTACIONES ANGO, C.A.

REHABILITACION DEL TRAMO CARRETERA PUNTA DE PIEDRA - PORLAMAR, (PROGRESIVA EN LA LOCAL 1, DESDE 43+300 HASTA 48+500 Y EN LA LOCAL 5 DESDE 4+950 HASTA 2+200). ESTADO

NUEVA ESPARTAREPRESENTACIONES

ANGO, C.A.

REHABILITACION DEL TRAMO CARRETERA PUNTA DE PIEDRA - PORLAMAR, (PROGRESIVA EN LA LOCAL 1, DESDE 43+300 HASTA 48+500 Y EN LA LOCAL 5 DESDE 4+950 HASTA 2+200). ESTADO

NUEVA ESPARTACONSTRUCTORA

PEDECA, C.A.

REHABILITACION INTEGRAL DE LA TO17, TRAMO LARA - ZULIA I

ETAPA, PROG. 80+400 HASTA LA 106+800, ESTADO LARA - ZULIA.

CONSTRUCTORA PEDECA, C.A.

REHABILITACION INTEGRAL DE LA TO17, TRAMO LARA - ZULIA I

ETAPA, PROG. 80+400 HASTA LA 106+800, ESTADO LARA - ZULIA.

CONSTRUCTORA PEDECA, C.A.

REHABILITACION INTEGRAL DE LA TO17, TRAMO LARA - ZULIA I

ETAPA, PROG. 80+400 HASTA LA 106+800, ESTADO LARA - ZULIA.

CONSTRUCTORA PEDECA, C.A.

REHABILITACION INTEGRAL DE LA TO17, TRAMO LARA - ZULIA I

ETAPA, PROG. 80+400 HASTA LA 106+800, ESTADO LARA - ZULIA.

CONSTRUCTORA PEDECA, C.A.

REHABILITACION INTEGRAL DE LA TO17, TRAMO LARA - ZULIA I

ETAPA, PROG. 80+400 HASTA LA 106+800, ESTADO LARA - ZULIA.

PILOTES PERFORADOS, C.A. (PILPER, CA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, RECONSTRUCCION DEL PUENTE CAUS, UBICADO EN

LA TO01, (CARRETERA PANAMERICANA), ENTRE LAS POBLACIONES DE SABANA

GRANDE Y SABANA LIBRE. ESTADO TRUJILLOPILOTES PERFORADOS,

C.A. (PILPER, CA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, RECONSTRUCCION DEL PUENTE CAUS, UBICADO EN

LA TO01, (CARRETERA PANAMERICANA), ENTRE LAS POBLACIONES DE SABANA

GRANDE Y SABANA LIBRE. ESTADO TRUJILLO

PILOTES PERFORADOS, C.A. (PILPER, CA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, RECONSTRUCCION DEL PUENTE CAUS, UBICADO EN

LA TO01, (CARRETERA PANAMERICANA), ENTRE LAS POBLACIONES DE SABANA

GRANDE Y SABANA LIBRE. ESTADO TRUJILLO

PILOTES PERFORADOS, C.A. (PILPER, CA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, RECONSTRUCCION DEL PUENTE CAUS, UBICADO EN

LA TO01, (CARRETERA PANAMERICANA), ENTRE LAS POBLACIONES DE SABANA

GRANDE Y SABANA LIBRE. ESTADO TRUJILLO

PILOTES PERFORADOS, C.A. (PILPER, CA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, RECONSTRUCCION DEL PUENTE CAUS, UBICADO EN

LA TO01, (CARRETERA PANAMERICANA), ENTRE LAS POBLACIONES DE SABANA

GRANDE Y SABANA LIBRE. ESTADO TRUJILLO

PILOTES PERFORADOS, C.A. (PILPER, CA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, RECONSTRUCCION DEL PUENTE CAUS, UBICADO EN

LA TO01, (CARRETERA PANAMERICANA), ENTRE LAS POBLACIONES DE SABANA

GRANDE Y SABANA LIBRE. ESTADO TRUJILLO

14 de 7104/17/2023

17:30:30

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0056 4/13/2012 10,998,896.26 10,998,881.12 8,616,532.41 78.34 4,910,221.54 3,846,666.27 7 AC 4,910,221.54 0.00 4,910,221.54 9,680,087.68

CV-0056 9/17/2012 1 1,153,951.93 515,157.11 638,794.82CV-0056 9/28/2012 2 602,923.41 269,162.24 333,761.17CV-0056 05/11/20121 3 1,439,918.74 642,820.87 797,097.87CV-0056 11/21/2012 4 867,790.39 387,406.43 480,383.96CV-0056 2/5/2013 5 1,918,651.15 856,540.69 1,062,110.46CV-0056 3/14/2013 6 870,940.21 388,812.60 482,127.61CV-0056 6/3/2013 7 1,762,356.58 786,766.33 975,590.25

CV-0057 5/9/2012 27,727,639.65 27,727,639.07 25,681,962.42 92.62 12,378,410.56 11,465,161.79 3 AC 12,378,410.56 0.00 12,378,410.56 26,595,211.19

CV-0057 9/20/2012 1 9,991,445.77 4,460,466.86 5,530,978.91CV-0057 11/12/2012 2 10,133,699.03 4,523,972.78 5,609,726.25CV-0057 3/21/2013 3 5,556,817.62 2,480,722.15 3,076,095.47

CV-0058 7/30/2012 3,476,733.12 3,476,690.27 3,476,690.27 100.00 1,552,113.00 1,552,113.00 4 AC 1,552,113.00 0.00 1,552,113.00 3,476,690.28

CV-0058 3/12/2013 1 999,610.45 446,254.67 553,355.78CV-0058 3/12/2013 2 1,059,679.39 473,071.16 586,608.23CV-0058 5/13/2013 3 1,293,802.43 577,590.37 716,212.06CV-0058 6/5/2013 4 123,598.01 55,196.80 68,401.21

CV-0059 7/4/2012 276,162.76 276,162.73 276,162.71 100.00 123,286.95 123,286.95 2 AC 123,286.95 0.00 123,286.95 276,162.71

CV-0059 12/26/2012 1 113,564.40 50,698.40 62,866.00CV-0059 2/26/2013 2 162,598.31 72,588.55 90,009.76

CV-0060 7/4/2012 359,990.14 359,990.12 0.00 160,709.89 AC 160,709.89 0.00 160,709.89 160,709.89

CV-0061 7/4/2012 629,009.52 629,009.52 629,009.52 100.00 280,807.82 280,807.82 2 AC 280,807.82 0.00 280,807.82 629,009.53

CV-0061 12/26/2012 1 453,931.03 202,647.78 251,283.25CV-0061 2/26/2013 2 175,078.50 78,160.04 96,918.46

PILOTES PERFORADOS, C.A. (PILPER, CA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, RECONSTRUCCION DEL PUENTE LA PLAYA, UBICADO

EN LA TO01, (CARRETERA PANAMERICANA), ENTRE LAS POBLACIONES DEL DIVIDIVE Y

AGUASANTA, ESTADO TRUJILLOPILOTES PERFORADOS, C.A. (PILPER, CA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, RECONSTRUCCION DEL PUENTE LA PLAYA, UBICADO

EN LA TO01, (CARRETERA PANAMERICANA), ENTRE LAS POBLACIONES DEL DIVIDIVE Y

AGUASANTA, ESTADO TRUJILLO

PILOTES PERFORADOS, C.A. (PILPER, CA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, RECONSTRUCCION DEL PUENTE LA PLAYA, UBICADO

EN LA TO01, (CARRETERA PANAMERICANA), ENTRE LAS POBLACIONES DEL DIVIDIVE Y

AGUASANTA, ESTADO TRUJILLO

PILOTES PERFORADOS, C.A. (PILPER, CA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, RECONSTRUCCION DEL PUENTE LA PLAYA, UBICADO

EN LA TO01, (CARRETERA PANAMERICANA), ENTRE LAS POBLACIONES DEL DIVIDIVE Y

AGUASANTA, ESTADO TRUJILLO

PILOTES PERFORADOS, C.A. (PILPER, CA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, RECONSTRUCCION DEL PUENTE LA PLAYA, UBICADO

EN LA TO01, (CARRETERA PANAMERICANA), ENTRE LAS POBLACIONES DEL DIVIDIVE Y

AGUASANTA, ESTADO TRUJILLO

PILOTES PERFORADOS, C.A. (PILPER, CA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, RECONSTRUCCION DEL PUENTE LA PLAYA, UBICADO

EN LA TO01, (CARRETERA PANAMERICANA), ENTRE LAS POBLACIONES DEL DIVIDIVE Y

AGUASANTA, ESTADO TRUJILLO

PILOTES PERFORADOS, C.A. (PILPER, CA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, RECONSTRUCCION DEL PUENTE LA PLAYA, UBICADO

EN LA TO01, (CARRETERA PANAMERICANA), ENTRE LAS POBLACIONES DEL DIVIDIVE Y

AGUASANTA, ESTADO TRUJILLO

PILOTES PERFORADOS, C.A. (PILPER, CA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, RECONSTRUCCION DEL PUENTE LA PLAYA, UBICADO

EN LA TO01, (CARRETERA PANAMERICANA), ENTRE LAS POBLACIONES DEL DIVIDIVE Y

AGUASANTA, ESTADO TRUJILLOCONSTRUCTORA

PEDECA, C.A.

REHABILITACION DEL TRAMO ZULIA - LARA, TO17, DESDE

DISTRIBUIDOR PUNTA IGUANA, PROG. 0+000, HASTA PUENTE

PALMA, PROG. 97+400, ESTADO ZULIA.

CONSTRUCTORA PEDECA, C.A.

REHABILITACION DEL TRAMO ZULIA - LARA, TO17, DESDE

DISTRIBUIDOR PUNTA IGUANA, PROG. 0+000, HASTA PUENTE

PALMA, PROG. 97+400, ESTADO ZULIA.

CONSTRUCTORA PEDECA, C.A.

REHABILITACION DEL TRAMO ZULIA - LARA, TO17, DESDE

DISTRIBUIDOR PUNTA IGUANA, PROG. 0+000, HASTA PUENTE

PALMA, PROG. 97+400, ESTADO ZULIA.

CONSTRUCTORA PEDECA, C.A.

REHABILITACION DEL TRAMO ZULIA - LARA, TO17, DESDE

DISTRIBUIDOR PUNTA IGUANA, PROG. 0+000, HASTA PUENTE

PALMA, PROG. 97+400, ESTADO ZULIA.

TELCONS INGENIEROS, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DE JUNTAS DE DILATACION EN LA

AUTOPISTA FCO. FAJARDO Y SUS DIST. VIALES CARACAS DTTO

CAPITAL.

TELCONS INGENIEROS, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DE JUNTAS DE DILATACION EN LA

AUTOPISTA FCO. FAJARDO Y SUS DIST. VIALES CARACAS DTTO

CAPITAL.

TELCONS INGENIEROS, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DE JUNTAS DE DILATACION EN LA

AUTOPISTA FCO. FAJARDO Y SUS DIST. VIALES CARACAS DTTO

CAPITAL.

TELCONS INGENIEROS, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DE JUNTAS DE DILATACION EN LA

AUTOPISTA FCO. FAJARDO Y SUS DIST. VIALES CARACAS DTTO

CAPITAL.

TELCONS INGENIEROS, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DE JUNTAS DE DILATACION EN LA

AUTOPISTA FCO. FAJARDO Y SUS DIST. VIALES CARACAS DTTO

CAPITAL.

CONSTRUCCIONES MARECA 2000, C.A.

EMERGENCIA EN LA VIA TO09 (CORRECCION FALLA DE BORDE),

TRAMO CARUPANO - GUIRIA, PROG. 658+450, SECTOR SANTA ROSA,

MUNICIPIO VALDEZ, ESTADO SUCRE.

CONSTRUCCIONES MARECA 2000, C.A.

EMERGENCIA EN LA VIA TO09 (CORRECCION FALLA DE BORDE),

TRAMO CARUPANO - GUIRIA, PROG. 658+450, SECTOR SANTA ROSA,

MUNICIPIO VALDEZ, ESTADO SUCRE.

CONSTRUCCIONES MARECA 2000, C.A.

EMERGENCIA EN LA VIA TO09 (CORRECCION FALLA DE BORDE),

TRAMO CARUPANO - GUIRIA, PROG. 658+450, SECTOR SANTA ROSA,

MUNICIPIO VALDEZ, ESTADO SUCRE.

CONSTRUCCIONES MARECA 2000, C.A.

VIA TO09, TRAMO: GUIRIA - RIO SALADO, PROG. 673+300, FALLA

DE BORDE Y CONTENCION, ESTADO SUCRE

CONSTRUCCIONES MARECA 2000, C.A.

CORRECCION DE FALLA DE BORDE EN LA VIA TO09, TRAMO

CARUPANO - IRAPA, MUNICIPIO CAJIGAL, PROG. 613+500, ESTADO

SUCRE

CONSTRUCCIONES MARECA 2000, C.A.

CORRECCION DE FALLA DE BORDE EN LA VIA TO09, TRAMO

CARUPANO - IRAPA, MUNICIPIO CAJIGAL, PROG. 613+500, ESTADO

SUCRE

CONSTRUCCIONES MARECA 2000, C.A.

CORRECCION DE FALLA DE BORDE EN LA VIA TO09, TRAMO

CARUPANO - IRAPA, MUNICIPIO CAJIGAL, PROG. 613+500, ESTADO

SUCRE

15 de 7104/17/2023

17:30:30

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0062 4/25/2012 9,708,703.16 9,708,694.25 7,284,822.00 75.03 4,334,242.48 3,252,152.69 3 AC 4,334,242.48 0.00 4,334,242.48 8,366,911.79

CV-0062 8/7/2012 1 3,677,901.44 1,641,920.29 2,035,981.15CV-0062 2 3,606,920.56 1,610,232.40 1,996,688.16

CV-0063 4/25/2012 6,310,678.39 6,310,678.39 6,310,678.42 100.00 2,817,267.14 2,817,267.14 4 AC 2,817,267.14 0.00 2,817,267.14 6,310,678.42

CV-0063 8/27/2012 1 954,002.95 425,894.18 528,108.77CV-0063 10/10/2012 2 1,877,426.31 838,136.75 1,039,289.56CV-0063 1/23/2013 3 3,346,134.21 1,493,809.92 1,852,324.29CV-0063 4/16/2013 4 133,114.95 59,426.29 73,688.66

CV-0064 5/8/2012 8,076,000.40 8,076,000.34 8,076,000.31 100.00 3,605,357.32 3,605,357.32 6 AC 3,605,357.32 0.00 3,605,357.32 8,076,000.31

CV-0064 9/27/2012 1 161,102.75 71,920.87 89,181.88CV-0064 9/27/2012 2 423,671.88 189,139.23 234,532.65CV-0064 10/2/2012 3 1,516,821.61 677,152.51 839,669.10CV-0064 11/12/2012 4 670,968.63 299,539.57 371,429.06CV-0064 12/11/2012 5 3,107,114.96 1,387,104.90 1,720,010.06CV-0064 3/4/2013 6 658,423.99 293,939.28 364,484.71CV-0064 5/13/2013 7 1,537,896.49 686,560.96 851,335.53

CV-0065 CONSTRUCTORA SALEMI 5/7/2012 20,025,881.39 20,025,881.34 19,728,498.04 98.52 8,940,125.62 8,940,125.62 5 AC 8,940,125.62 0.00 8,940,125.62 19,728,498.04

8/9/2012 1 2,228,436.12 994,837.56 1,233,598.5610/16/2012 2 14,152.32 6,318.00 7,834.3210/16/2012 3 7,268,750.99 3,244,978.12 4,023,772.8712/13/2012 4 7,219,889.26 3,223,164.85 3,996,724.413/12/2013 5 2,997,269.35 1,470,827.09 1,526,442.26

CV-0066 4/23/2012 15,963,209.17 15,963,209.17 15,963,209.17 100.00 7,126,432.67 7,126,432.67 2 AC 7,126,432.67 0.00 7,126,432.67 15,963,209.17

CV-0066 4/23/2012 7/23/2012 1 15,160,924.52 6,768,269.88 8,392,654.64CV-0066 4/23/2012 11/12/2012 2 802,284.65 358,162.79 444,121.86

CV-0067 4/23/2012 13,999,999.98 13,999,999.98 13,999,999.98 100.00 6,249,999.99 6,249,999.99 2 AC 6,249,999.99 0.00 6,249,999.99 13,999,999.98

ASFALTADORA REGIONAL, C.A.

REHABILITACION Y MANTENIMIENTO DE LA TO01, TRAMO BARBULA - SAN DIEGO,

ESTADO CARABOBO

ASFALTADORA REGIONAL, C.A.

REHABILITACION Y MANTENIMIENTO DE LA TO01, TRAMO BARBULA - SAN DIEGO,

ESTADO CARABOBOASFALTADORA REGIONAL, C.A.

REHABILITACION Y MANTENIMIENTO DE LA TO01, TRAMO BARBULA - SAN DIEGO,

ESTADO CARABOBO

ASFALTADORA REGIONAL, C.A.

REHABILITACION Y MANTEMINIENTO DE LA TRONCAL

TO01, CARRETERA LAS TRINCHERAS, ESTADO CARABOBO

ASFALTADORA REGIONAL, C.A.

REHABILITACION Y MANTEMINIENTO DE LA TRONCAL

TO01, CARRETERA LAS TRINCHERAS, ESTADO CARABOBO

ASFALTADORA REGIONAL, C.A.

REHABILITACION Y MANTEMINIENTO DE LA TRONCAL

TO01, CARRETERA LAS TRINCHERAS, ESTADO CARABOBO

ASFALTADORA REGIONAL, C.A.

REHABILITACION Y MANTEMINIENTO DE LA TRONCAL

TO01, CARRETERA LAS TRINCHERAS, ESTADO CARABOBO

ASFALTADORA REGIONAL, C.A.

REHABILITACION Y MANTEMINIENTO DE LA TRONCAL

TO01, CARRETERA LAS TRINCHERAS, ESTADO CARABOBO

CONSTRUCTORA TDK, C.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO CIRUNVALACION NORTE DE BARQUISIMETO, MUNICIPIO IRIBARREN, ESTADO LARA

CONSTRUCTORA TDK, C.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO CIRUNVALACION NORTE DE BARQUISIMETO, MUNICIPIO IRIBARREN, ESTADO LARA

CONSTRUCTORA TDK, C.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO CIRUNVALACION NORTE DE BARQUISIMETO, MUNICIPIO IRIBARREN, ESTADO LARA

CONSTRUCTORA TDK, C.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO CIRUNVALACION NORTE DE BARQUISIMETO, MUNICIPIO IRIBARREN, ESTADO LARA

CONSTRUCTORA TDK, C.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO CIRUNVALACION NORTE DE BARQUISIMETO, MUNICIPIO IRIBARREN, ESTADO LARA

CONSTRUCTORA TDK, C.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO CIRUNVALACION NORTE DE BARQUISIMETO, MUNICIPIO IRIBARREN, ESTADO LARA

CONSTRUCTORA TDK, C.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO CIRUNVALACION NORTE DE BARQUISIMETO, MUNICIPIO IRIBARREN, ESTADO LARA

CONSTRUCTORA TDK, C.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO CIRUNVALACION NORTE DE BARQUISIMETO, MUNICIPIO IRIBARREN, ESTADO LARA

REHABILITACION Y MANTENIMIENTO DE LA TO17,

TRAMO DISTRIBUIDOR EL RODEO, LAS DELICIAS. ESTADO LARA

EDALPE CONSTRUCCIONES, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DE LA TO01, TRAMO EL PALITO -

MORON, MUNICIPIO JUAN JOSE MORA, ESTADO CARABOBO

EDALPE CONSTRUCCIONES, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DE LA TO01, TRAMO EL PALITO -

MORON, MUNICIPIO JUAN JOSE MORA, ESTADO CARABOBO

EDALPE CONSTRUCCIONES, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DE LA TO01, TRAMO EL PALITO -

MORON, MUNICIPIO JUAN JOSE MORA, ESTADO CARABOBO

EDALPE CONSTRUCCIONES, C.A.

REHABILITACION Y MANTENIMIENTO DE LA TO01,

TRAMO LA RAYA - MORON, ESTADO CARABOBO

16 de 7104/17/2023

17:30:30

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0067 8/28/2012 1 7,200,924.36 3,214,698.38 3,986,225.98CV-0067 12/11/2012 2 6,799,075.62 3,035,301.61 3,763,774.01

CV-0068 4/23/2012 4,854,368.92 4,854,368.92 4,854,368.92 100.00 2,167,128.98 2,167,128.98 2 AC 2,167,128.98 0.00 2,167,128.98 4,854,368.92

CV-0068 1 1,981,099.96 884,419.63 1,096,680.33CV-0068 11/27/2012 2 2,873,268.96 1,282,709.35 1,590,559.61

CV-0069 4/13/2012 13,186,407.76 13,186,407.72 12,501,499.23 94.81 5,886,789.18 5,581,026.44 2 AC 5,886,789.18 5,886,789.18 12,807,261.97

CV-0069 1 10,230,081.12 4,567,000.50 5,663,080.62CV-0069 1/28/2013 2 2,271,418.11 1,014,025.94 1,257,392.17

CV-0070 4/13/2012 12,071,875.84 12,071,875.84 12,071,875.84 100.00 5,389,230.29 5,389,230.29 2 AC 5,389,230.29 0.00 5,389,230.29 12,071,875.84

CV-0070 1 8,933,341.22 3,988,098.76 4,945,242.46CV-0070 11/30/2012 2 3,138,534.62 1,401,131.53 1,737,403.09

EDALPE CONSTRUCCIONES, C.A.

REHABILITACION Y MANTENIMIENTO DE LA TO01,

TRAMO LA RAYA - MORON, ESTADO CARABOBO

EDALPE CONSTRUCCIONES, C.A.

REHABILITACION Y MANTENIMIENTO DE LA TO01,

TRAMO LA RAYA - MORON, ESTADO CARABOBO

EDALPE CONSTRUCCIONES, C.A.

REHABILITACION Y MANTENIMIENTO DE LA TO03,

TRAMO BOCA DE AROA - MORON, ESTADO CARABOBO

EDALPE CONSTRUCCIONES, C.A.

REHABILITACION Y MANTENIMIENTO DE LA TO03,

TRAMO BOCA DE AROA - MORON, ESTADO CARABOBO

EDALPE CONSTRUCCIONES, C.A.

REHABILITACION Y MANTENIMIENTO DE LA TO03,

TRAMO BOCA DE AROA - MORON, ESTADO CARABOBO

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA TO12, TRAMO ORITUCO (PROG. 109+500)

- LOS ALPES (PROG. 89+300), ESTADO GUARICO

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA TO12, TRAMO ORITUCO (PROG. 109+500)

- LOS ALPES (PROG. 89+300), ESTADO GUARICO

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA TO12, TRAMO ORITUCO (PROG. 109+500)

- LOS ALPES (PROG. 89+300), ESTADO GUARICO

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA TO14, TRAMO SAN RAFAEL DE ONOTO

(PROG. 53+000) - ZARAZA (PROG. 84+300), ESTADO GUARICO

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA TO14, TRAMO SAN RAFAEL DE ONOTO

(PROG. 53+000) - ZARAZA (PROG. 84+300), ESTADO GUARICO

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA TO14, TRAMO SAN RAFAEL DE ONOTO

(PROG. 53+000) - ZARAZA (PROG. 84+300), ESTADO GUARICO

17 de 7104/17/2023

17:30:30

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0071 4/23/2012 19,399,998.72 19,399,998.59 14,356,083.26 74.00 8,660,713.72 6,408,965.75 2 AC 8,660,713.72 0.00 8,660,713.72 16,607,831.23

CV-0071 2/7/2013 1 6,754,665.27 3,015,475.57 3,739,189.70CV-0071 3/20/2013 2 7,601,417.99 3,393,490.18 4,207,927.81

CV-0072 4/23/2012 13,579,993.09 13,579,953.13 13,579,953.12 100.00 6,062,496.92 6,062,496.92 2 AC 6,062,496.92 0.00 6,062,496.92 13,579,953.12

CV-0072 3/20/2013 1 12,456,933.33 5,561,130.95 6,895,802.38CV-0072 2 1,123,019.79 501,365.97 621,653.82

CV-0073 5/9/2012 36,750,443.16 36,750,443.16 24,971,846.94 67.95 16,406,447.84 11,148,145.96 2 AC 16,406,447.84 0.00 16,406,447.84 30,230,148.82

CV-0073 12/7/2012 1 11,724,226.11 5,234,029.52 6,490,196.595/28/2013 2 13,247,620.83 5,914,116.44 7,333,504.39

CV-0074 4/26/2012 15,337,852.06 15,336,545.16 15,336,545.17 100.00 6,847,255.39 6,847,255.39 2 AC 6,847,255.39 0.00 6,847,255.39 15,336,545.17

CV-0074 1 11,145,549.89 4,975,691.92 6,169,857.97CV-0074 12/4/2012 2 4,190,995.28 1,871,563.47 2,319,431.81

CV-0075 5/10/2012 4,843,463.50 4,843,463.50 4,345,536.02 89.72 2,162,260.49 1,939,971.44 3 AC 2,162,260.49 0.00 2,162,260.49 4,567,825.07

CV-0075 5/10/2012 1 2,471,141.80 1,103,188.31 1,367,953.49CV-0075 5/10/2012 12/10/2012 2 996,809.86 445,004.40 551,805.46CV-0075 5/10/2012 4/23/2013 3 877,584.36 391,778.73 485,805.63

CV-0076 OMSATHYA, C.A. 5/7/2012 12,113,996.62 12,113,996.62 11,208,051.29 92.52 5,408,034.21 5,003,594.34 5 AC 5,408,034.21 0.00 5,408,034.21 11,612,491.16

CV-0076 OMSATHYA, C.A. 1 1,010,825.37 451,261.33 559,564.04CV-0076 OMSATHYA, C.A. 2 2,226,912.45 994,157.35 1,232,755.10CV-0076 OMSATHYA, C.A. 10/29/2012 3 1,468,805.34 655,716.67 813,088.67CV-0076 OMSATHYA, C.A. 12/13/2012 4 2,652,805.19 1,184,288.03 1,468,517.16CV-0076 OMSATHYA, C.A. 2/8/2013 5 3,848,702.94 1,718,170.96 2,130,531.98

CONSTRUCTORA LOCURCIO, S.A.

REHABILITACION Y MANTENIMIENTO DE LA TO11, TRAMO LA ENCREUCIJADA DE CARABOBO - NIRGUA, ESTADO

CARABOBO

CONSTRUCTORA LOCURCIO, S.A.

REHABILITACION Y MANTENIMIENTO DE LA TO11, TRAMO LA ENCREUCIJADA DE CARABOBO - NIRGUA, ESTADO

CARABOBO

CONSTRUCTORA LOCURCIO, S.A.

REHABILITACION Y MANTENIMIENTO DE LA TO11, TRAMO LA ENCREUCIJADA DE CARABOBO - NIRGUA, ESTADO

CARABOBO

CONSTRUCTORA LOCURCIO, S.A.

REHABILITACION Y MANTENIMIENTO DE LA TO05, CARRETERA VALENCIA - SAN CARLOS, ESTADO CARABOBO

CONSTRUCTORA LOCURCIO, S.A.

REHABILITACION Y MANTENIMIENTO DE LA TO05, CARRETERA VALENCIA - SAN CARLOS, ESTADO CARABOBO

CONSTRUCTORA LOCURCIO, S.A.

REHABILITACION Y MANTENIMIENTO DE LA TO05, CARRETERA VALENCIA - SAN CARLOS, ESTADO CARABOBO

SERVICIOS Y CONSTRUCCIONES

JOARDICA, C.A.

REHABILITACION DE LA TO09, DEL TRAMO CARRETERA CUMANA -

GUIRIA, ESTADO SUCRE

SERVICIOS Y CONSTRUCCIONES

JOARDICA, C.A.

REHABILITACION DE LA TO09, DEL TRAMO CARRETERA CUMANA -

GUIRIA, ESTADO SUCRE

OBRAS, CONSTRUCCIONES Y ELECTRICIDAD, C.A.

(OCECA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS TRONCALES, MURO DE

CONTENCION (SACOCRETO), FALLA DE BORDE DEL RIO GUARENA, EN EL SECTOR AGUA AMARILLA, KM. 26, AUTOPISTA GRAN MARISCAL

DE AYACUCHO, PETARE - GUARENAS, ESTADO MIRANDA

OBRAS, CONSTRUCCIONES Y ELECTRICIDAD, C.A.

(OCECA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS TRONCALES, MURO DE

CONTENCION (SACOCRETO), FALLA DE BORDE DEL RIO GUARENA, EN EL SECTOR AGUA AMARILLA, KM. 26, AUTOPISTA GRAN MARISCAL

DE AYACUCHO, PETARE - GUARENAS, ESTADO MIRANDA

OBRAS, CONSTRUCCIONES Y ELECTRICIDAD, C.A.

(OCECA)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS TRONCALES, MURO DE

CONTENCION (SACOCRETO), FALLA DE BORDE DEL RIO GUARENA, EN EL SECTOR AGUA AMARILLA, KM. 26, AUTOPISTA GRAN MARISCAL

DE AYACUCHO, PETARE - GUARENAS, ESTADO MIRANDA

CONSTRUCTORA CASMORCA, C.A.

REHABILITACION Y MANTENIMIENTO TRAMO PUENTE

GUARDAGALLO - VERAGACHA, PROGRESIVAS 0+000 HASTA LA +500, MUNICIPIO IRRIBARREN,

ESTADO LARA

CONSTRUCTORA CASMORCA, C.A.

REHABILITACION Y MANTENIMIENTO TRAMO PUENTE

GUARDAGALLO - VERAGACHA, PROGRESIVAS 0+000 HASTA LA +500, MUNICIPIO IRRIBARREN,

ESTADO LARA

CONSTRUCTORA CASMORCA, C.A.

REHABILITACION Y MANTENIMIENTO TRAMO PUENTE

GUARDAGALLO - VERAGACHA, PROGRESIVAS 0+000 HASTA LA +500, MUNICIPIO IRRIBARREN,

ESTADO LARA

CONSTRUCTORA CASMORCA, C.A.

REHABILITACION Y MANTENIMIENTO TRAMO PUENTE

GUARDAGALLO - VERAGACHA, PROGRESIVAS 0+000 HASTA LA +500, MUNICIPIO IRRIBARREN,

ESTADO LARAREHABILITACION Y

MANTENIMIENTO DE LA TO04, TRAMO BARQUISIMETO - LA LUCIA, PROG. 0+000 HASTA LA 53+000,

ESTADO LARA

REHABILITACION Y MANTENIMIENTO DE LA TO04,

TRAMO BARQUISIMETO - LA LUCIA, PROG. 0+000 HASTA LA 53+000,

ESTADO LARA

REHABILITACION Y MANTENIMIENTO DE LA TO04,

TRAMO BARQUISIMETO - LA LUCIA, PROG. 0+000 HASTA LA 53+000,

ESTADO LARA

REHABILITACION Y MANTENIMIENTO DE LA TO04,

TRAMO BARQUISIMETO - LA LUCIA, PROG. 0+000 HASTA LA 53+000,

ESTADO LARA

REHABILITACION Y MANTENIMIENTO DE LA TO04,

TRAMO BARQUISIMETO - LA LUCIA, PROG. 0+000 HASTA LA 53+000,

ESTADO LARA

REHABILITACION Y MANTENIMIENTO DE LA TO04,

TRAMO BARQUISIMETO - LA LUCIA, PROG. 0+000 HASTA LA 53+000,

ESTADO LARA

18 de 7104/17/2023

17:30:30

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0077 4/23/2012 33,907,858.41 33,907,345.64 33,907,345.64 100.00 15,137,436.79 15,137,436.79 2 AC 15,137,436.79 0.00 15,137,436.79 33,907,345.64

CV-0077 8/3/2012 1 24,680,591.28 11,018,121.11 13,662,470.17CV-0077 11/13/2012 2 9,226,754.36 4,119,315.68 5,107,438.68

CV-0078 4/27/2012 19,709,312.43 19,709,311.64 19,709,311.64 100.00 8,798,800.19 8,798,800.19 4 AC 8,798,800.19 0.00 8,798,800.19 19,709,311.64

CV-0078 1 10,243,758.29 4,573,106.38 5,670,651.91CV-0078 2 922,012.88 411,612.90 510,399.98CV-0078 3 1,314,149.76 586,674.00 727,475.76CV-0078 3/4/2013 4 7,229,390.71 3,227,406.91 4,001,983.80

CV-0079 4/27/2012 34,727,391.72 34,692,403.27 34,692,403.27 100.00 15,503,299.88 15,503,299.88 5 AC 15,503,299.88 0.00 15,503,299.88 34,692,403.27

CV-0079 11/22/2012 1 1,769,886.54 790,127.92 979,758.62CV-0079 11/22/2012 2 1,216,522.66 543,090.48 673,432.18CV-0079 11/22/2012 3 6,860,743.55 3,062,831.94 3,797,911.61CV-0079 12/7/2012 4 10,704,755.76 4,778,908.82 5,925,846.94CV-0079 2/28/2013 5 5,323,819.19 2,376,705.00 2,947,114.19CV-0079 7/9/2013 6 8,816,675.57 3,951,635.72 4,865,039.85

CV-0080 5/2/2012 3,245,825.24 3,245,825.24 3,080,974.76 94.92 1,449,029.13 1,375,435.16 1 AC 1,449,029.13 0.00 1,449,029.13 3,154,568.73

CV-0080 1 3,080,974.76 1,375,435.16 1,705,539.60

CV-0081 ONICA, C.A. 4/23/2012 9,708,737.83 9,563,100.72 9,563,100.69 100.00 4,334,257.96 4,334,257.96 4 AC 4,334,257.96 0.00 4,334,257.96 9,563,100.69

CV-0081 ONICA, C.A. 9/4/2012 1 1,714,901.33 765,580.95 949,320.38CV-0081 ONICA, C.A. 9/27/2012 2 4,132,144.63 1,844,707.43 2,287,437.20CV-0081 ONICA, C.A. 11/14/2012 3 3,029,077.74 1,723,969.58 1,305,108.16CV-0081 ONICA, C.A. 4/1/2013 4 686,976.99 0.00 686,976.99

CV-0082 4/23/2012 54,368,645.41 72,599,356.23 63,382,466.08 87.30 32,410,426.89 28,295,743.80 5 AC 24,271,716.70 0.00 24,271,716.70 67,497,149.17

AC2 8,138,710.19 0.00 8,138,710.19CV-0082 1 6,108,612.06 2,727,058.96 3,381,553.10CV-0082 2 14,100,014.52 6,294,649.34 7,805,365.18CV-0082 3 19,860,514.21 8,866,300.99 10,994,213.22

OBRAS, CONSTRUCCIONES Y ELECTRICIDAD, C.A.

(OCECA)

REHABILITACION INTEGRAL DE LA CARRETERA PANAMERICANA,

TRAMO CARACAS - LOS TEQUES, ESTADOS DISTRITO CAPITAL -

MIRANDA

OBRAS, CONSTRUCCIONES Y ELECTRICIDAD, C.A.

(OCECA)

REHABILITACION INTEGRAL DE LA CARRETERA PANAMERICANA,

TRAMO CARACAS - LOS TEQUES, ESTADOS DISTRITO CAPITAL -

MIRANDA

OBRAS, CONSTRUCCIONES Y ELECTRICIDAD, C.A.

(OCECA)

REHABILITACION INTEGRAL DE LA CARRETERA PANAMERICANA,

TRAMO CARACAS - LOS TEQUES, ESTADOS DISTRITO CAPITAL -

MIRANDA

ALFI CONSTRUCTORA 18662, C.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO CARRETERA VIEJA PETARE -

GUARENAS, ESTADO MIRANDA

ALFI CONSTRUCTORA 18662, C.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO CARRETERA VIEJA PETARE -

GUARENAS, ESTADO MIRANDAALFI CONSTRUCTORA

18662, C.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO CARRETERA VIEJA PETARE -

GUARENAS, ESTADO MIRANDAALFI CONSTRUCTORA

18662, C.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO CARRETERA VIEJA PETARE -

GUARENAS, ESTADO MIRANDAALFI CONSTRUCTORA

18662, C.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO CARRETERA VIEJA PETARE -

GUARENAS, ESTADO MIRANDA

ALFI CONSTRUCTORA 18662, C.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO

CARRETRA PANAMERICANA KM. 0 - PUERTA MOROCHA, (LO01 DEL KM. 16 AL KM. 32 EN SENTIDO COCHE - LOS TEQUES Y DEL KM. 32 AL KM.

3 EN SENTIDO LOS TEQUES - COCHE), ESTADO MIRANDA

ALFI CONSTRUCTORA 18662, C.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO

CARRETRA PANAMERICANA KM. 0 - PUERTA MOROCHA, (LO01 DEL KM. 16 AL KM. 32 EN SENTIDO COCHE - LOS TEQUES Y DEL KM. 32 AL KM.

3 EN SENTIDO LOS TEQUES - COCHE), ESTADO MIRANDA

ALFI CONSTRUCTORA 18662, C.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO

CARRETRA PANAMERICANA KM. 0 - PUERTA MOROCHA, (LO01 DEL KM. 16 AL KM. 32 EN SENTIDO COCHE - LOS TEQUES Y DEL KM. 32 AL KM.

3 EN SENTIDO LOS TEQUES - COCHE), ESTADO MIRANDA

ALFI CONSTRUCTORA 18662, C.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO

CARRETRA PANAMERICANA KM. 0 - PUERTA MOROCHA, (LO01 DEL KM. 16 AL KM. 32 EN SENTIDO COCHE - LOS TEQUES Y DEL KM. 32 AL KM.

3 EN SENTIDO LOS TEQUES - COCHE), ESTADO MIRANDA

ALFI CONSTRUCTORA 18662, C.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO

CARRETRA PANAMERICANA KM. 0 - PUERTA MOROCHA, (LO01 DEL KM. 16 AL KM. 32 EN SENTIDO COCHE - LOS TEQUES Y DEL KM. 32 AL KM.

3 EN SENTIDO LOS TEQUES - COCHE), ESTADO MIRANDA

ALFI CONSTRUCTORA 18662, C.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO

CARRETRA PANAMERICANA KM. 0 - PUERTA MOROCHA, (LO01 DEL KM. 16 AL KM. 32 EN SENTIDO COCHE - LOS TEQUES Y DEL KM. 32 AL KM.

3 EN SENTIDO LOS TEQUES - COCHE), ESTADO MIRANDA

ALFI CONSTRUCTORA 18662, C.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO

CARRETRA PANAMERICANA KM. 0 - PUERTA MOROCHA, (LO01 DEL KM. 16 AL KM. 32 EN SENTIDO COCHE - LOS TEQUES Y DEL KM. 32 AL KM.

3 EN SENTIDO LOS TEQUES - COCHE), ESTADO MIRANDAINVERSIONES Y

CONSTRUCCIONES PARRA AGULLEIRO (INCOPACA), C.A.

REHABILITACION Y MANTENIMIENTO EN EL TRAMO

SAN RAFAEL ONOTO - BOCONOITO, ESTADO PORTUGUESA

INVERSIONES Y CONSTRUCCIONES PARRA AGULLEIRO (INCOPACA), C.A.

REHABILITACION Y MANTENIMIENTO EN EL TRAMO

SAN RAFAEL ONOTO - BOCONOITO, ESTADO PORTUGUESA

REHABILITACION DE LA TO06, TRAMO MARACAIBO - MARA,

ESTADO ZULIA

REHABILITACION DE LA TO06, TRAMO MARACAIBO - MARA,

ESTADO ZULIAREHABILITACION DE LA TO06, TRAMO MARACAIBO - MARA,

ESTADO ZULIAREHABILITACION DE LA TO06, TRAMO MARACAIBO - MARA,

ESTADO ZULIAREHABILITACION DE LA TO06, TRAMO MARACAIBO - MARA,

ESTADO ZULIA

PAVIMENTADORA ONICA, S.A.

REHABILITACION DELL TRAMO MACHIQUES - COLON, DESDE

PUENTE ECUADOR - REDOMA DE CASIGUA, PROG. 441+700 HASTA

LA PROG. 496+400, MUNICIPIO JESUS MARIA SEMPRUM, ZONA SUR

DEL LAGO, ESTADO ZULIA

PAVIMENTADORA ONICA, S.A.

REHABILITACION DELL TRAMO MACHIQUES - COLON, DESDE

PUENTE ECUADOR - REDOMA DE CASIGUA, PROG. 441+700 HASTA

LA PROG. 496+400, MUNICIPIO JESUS MARIA SEMPRUM, ZONA SUR

DEL LAGO, ESTADO ZULIA

PAVIMENTADORA ONICA, S.A.

REHABILITACION DELL TRAMO MACHIQUES - COLON, DESDE

PUENTE ECUADOR - REDOMA DE CASIGUA, PROG. 441+700 HASTA

LA PROG. 496+400, MUNICIPIO JESUS MARIA SEMPRUM, ZONA SUR

DEL LAGO, ESTADO ZULIA

PAVIMENTADORA ONICA, S.A.

REHABILITACION DELL TRAMO MACHIQUES - COLON, DESDE

PUENTE ECUADOR - REDOMA DE CASIGUA, PROG. 441+700 HASTA

LA PROG. 496+400, MUNICIPIO JESUS MARIA SEMPRUM, ZONA SUR

DEL LAGO, ESTADO ZULIA

19 de 7104/17/2023

17:30:30

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0082 12/7/2012 4 17,368,488.47 7,753,789.50 9,614,698.97CV-0082 17/012/2013 5 5,944,836.82 2,653,945.01 3,290,891.81

CV-0083 4/27/2012 44,660,000.00 44,660,000.00 22,100,716.83 49.49 19,937,500.00 9,866,391.45 2 AC 19,937,500.00 19,937,500.00 32,171,825.38

CV-0083 12/26/2012 1 8,959,946.61 3,999,976.17 4,959,970.44CV-0083 4/11/2013 2 13,140,770.22 5,866,415.28 7,274,354.94

CV-0084 4/27/2012 34,949,999.92 34,949,983.21 27,480,495.95 78.63 15,602,678.54 12,107,364.27 3 AC 15,602,678.54 0.00 15,602,678.54 30,975,810.22

CV-0084 12/21/2012 1 5,849,908.51 2,450,852.02 3,399,056.49CV-0084 4/16/2013 2 15,866,100.12 7,083,080.41 8,783,019.71CV-0084 7/9/2013 3 5,764,487.32 2,573,431.84 3,191,055.48

CV-0085 4/27/2012 40,776,000.00 40,775,998.45 5,234,259.80 12.84 18,203,571.43 2,336,723.13 1 AC 18,203,571.43 0.00 18,203,571.43 21,101,108.10

CV-0085 4/11/2013 1 5,234,259.80 2,336,723.13 2,897,536.67

CV-0086 4/25/2012 4,506,119.12 4,506,119.12 4,506,119.12 100.00 2,011,660.32 2,011,660.32 1 AC 2,011,660.32 2,011,660.32 4,506,119.12

8/20/2012 1 4,506,119.12 2,011,660.32 2,494,458.80

CV-0087 4/25/2012 3,278,916.83 3,278,916.83 3,278,916.83 100.00 1,463,802.16 1,463,802.16 1 AC 1,463,802.16 0.00 1,463,802.16 3,278,916.83

CV-0087 8/20/2012 1 3,278,916.83 1,463,802.16 1,815,114.67

PAVIMENTADORA ONICA, S.A.

REHABILITACION DELL TRAMO MACHIQUES - COLON, DESDE

PUENTE ECUADOR - REDOMA DE CASIGUA, PROG. 441+700 HASTA

LA PROG. 496+400, MUNICIPIO JESUS MARIA SEMPRUM, ZONA SUR

DEL LAGO, ESTADO ZULIA

PAVIMENTADORA ONICA, S.A.

REHABILITACION DELL TRAMO MACHIQUES - COLON, DESDE

PUENTE ECUADOR - REDOMA DE CASIGUA, PROG. 441+700 HASTA

LA PROG. 496+400, MUNICIPIO JESUS MARIA SEMPRUM, ZONA SUR

DEL LAGO, ESTADO ZULIACONSTRUCCIONES Y

MANTENIMIENTO COSA, C.A.

BACHEO DE VIA EL TIGRE - CIUDAD BOLIVAR, TO16, ETAPA II, ESTADOS

ANZOATEGUI -BOLIVAR

CONSTRUCCIONES Y MANTENIMIENTO COSA,

C.A.

BACHEO DE VIA EL TIGRE - CIUDAD BOLIVAR, TO16, ETAPA II, ESTADOS

ANZOATEGUI -BOLIVARCONSTRUCCIONES Y

MANTENIMIENTO COSA, C.A.

BACHEO DE VIA EL TIGRE - CIUDAD BOLIVAR, TO16, ETAPA II, ESTADOS

ANZOATEGUI -BOLIVAR

CONSTRUCCIONES Y MANTENIMIENTO COSA,

C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, AMPLIACION Y MEJORAS PARA LA VIA TO16, BAJO

HONDO - LA MADAMA (PROG. 12+000 A LA PROG. 6+492),

ESTADO ANZOATEGUICONSTRUCCIONES Y

MANTENIMIENTO COSA, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, AMPLIACION Y MEJORAS PARA LA VIA TO16, BAJO

HONDO - LA MADAMA (PROG. 12+000 A LA PROG. 6+492),

ESTADO ANZOATEGUI

CONSTRUCCIONES Y MANTENIMIENTO COSA,

C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, AMPLIACION Y MEJORAS PARA LA VIA TO16, BAJO

HONDO - LA MADAMA (PROG. 12+000 A LA PROG. 6+492),

ESTADO ANZOATEGUI

CONSTRUCCIONES Y MANTENIMIENTO COSA,

C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, AMPLIACION Y MEJORAS PARA LA VIA TO16, BAJO

HONDO - LA MADAMA (PROG. 12+000 A LA PROG. 6+492),

ESTADO ANZOATEGUICONSTRUCCIONES Y

MANTENIMIENTO COSA, C.A.

REHABILITACION Y MANTENIMIENTO DE LA TO16, TRAMO CANTAURA - EL TIGRE

(PROG. 6+492 A LA PROG. 0+000), ESTADO ANZOATEGUI

CONSTRUCCIONES Y MANTENIMIENTO COSA,

C.A.

REHABILITACION Y MANTENIMIENTO DE LA TO16, TRAMO CANTAURA - EL TIGRE

(PROG. 6+492 A LA PROG. 0+000), ESTADO ANZOATEGUI

SUMINISTRO DE MATERIALES

ELECTRICOS ORIENTE, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DEL SISTEMA DE ALUMBRADO PUBLICO

DESDE HOYO DE LA PUERTA HASTA EL KM. 0, SECTOR TAZON,

AMBOS SENTIDOS, ESTADO MIRANDA

SUMINISTRO DE MATERIALES

ELECTRICOS ORIENTE, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, RECUPERACION DEL SISTEMA DE ALUMBRADO DE LOS

TUNELES DE VUELTA GRANDE, KEMPIS Y CAUCAGUITA, AUTOPISTA

GRAN MARISCAL DE AYACUCHO, ESTADO MIRANDASUMINISTRO DE

MATERIALES ELECTRICOS ORIENTE,

C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, RECUPERACION DEL SISTEMA DE ALUMBRADO DE LOS

TUNELES DE VUELTA GRANDE, KEMPIS Y CAUCAGUITA, AUTOPISTA

GRAN MARISCAL DE AYACUCHO, ESTADO MIRANDA

20 de 7104/17/2023

17:30:30

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0088 4/25/2012 3,156,289.86 3,156,289.86 3,156,289.86 100.00 1,409,057.98 1,409,057.98 1 AC 1,409,057.98 0.00 1,409,057.98 3,156,289.86

8/23/2012 1 3,156,289.86 1,409,057.98 1,747,231.88

CV-0089 4/25/2012 16,488,605.20 16,488,605.20 16,488,605.20 100.00 7,360,984.47 7,360,984.47 3 AC 7,360,984.47 7,360,984.47 16,488,605.20

CV-0089 8/10/2012 1 11,427,558.70 5,101,588.71 6,325,969.99CV-0089 9/13/2012 2 4,549,923.59 2,031,215.89 2,518,707.70CV-0089 6/10/2013 3 511,122.91 228,179.87 282,943.04

CV-0090 5/14/2012 50,000,000.00 50,000,000.00 1,919,449.47 3.84 22,321,428.57 856,897.09 1 AC 22,321,428.57 0.00 22,321,428.57 23,383,980.95

CV-0090 7/9/2013 1 1,919,449.47 856,897.09 1,062,552.38

CV-0091 5/14/2012 30,000,000.00 30,000,000.00 3,245,910.10 10.82 13,392,857.15 1,449,067.01 2 13,392,857.15 0.00 13,392,857.15 15,189,700.24

CV-0091 2,259,437.56 1,008,677.48 1,250,760.08

CV-0091 986,472.54 440,389.53 546,083.01

CV-0092 5/7/2012 81,062,679.59 81,062,679.59 32,951,691.68 40.65 36,188,696.25 14,710,576.66 3 AC 36,188,696.25 0.00 36,188,696.25 54,429,811.27

CV-0092 11/5/2012 1 23,969,556.05 10,700,694.67 13,268,861.38CV-0092 5/13/2012 2 4,053,008.05 1,809,378.60 2,243,629.45CV-0092 12/14/2012 3 4,929,127.58 2,200,503.39 2,728,624.19

CV-0093 4/30/2012 14,495,577.51 14,495,577.51 10,393,160.51 71.70 6,471,239.96 4,639,803.80 1 AC 6,471,239.96 0.00 6,471,239.96 12,224,596.67

CV-0093 12/4/2012 1 10,393,160.51 4,639,803.80 5,753,356.71

CV-0094 8/1/2012 25,000,000.00 24,999,999.99 19,789,773.31 79.16 12,680,170.80 8,834,720.25 7 AC 12,680,170.80 0.00 12,680,170.80 23,635,223.86

CV-0094 1/10/2013 1 1,771,552.01 790,871.44 980,680.57

SUMINISTRO DE MATERIALES

ELECTRICOS ORIENTE, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REACONDICIONAMIENTO DEL

SISTEMA DE ALUMBRADO PUBLICO EN LOS DISTRIBUIDORES HOYO DE

LA PUERTA, CORTADA DE MATURIN, PARACOTOS Y LAS TEJERIAS DE LA AUTOPISTA

REGIONAL DEL CENTRO. ESTADO MIRANDA

CONSTRUCTORA RIO CUYUNI, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DEL SISTEMA DE ALUMBRADO PUBLICO DE LA AUTOPISTA REGIONAL DEL CENTRO EN AMBOS SENTIDOS, DESDE HOYO DE LA PUERTA,

ESTADO MIRANDA HASTA TEJERIAS, ESTADO ARAGUA.

CONSTRUCTORA RIO CUYUNI, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DEL SISTEMA DE ALUMBRADO PUBLICO DE LA AUTOPISTA REGIONAL DEL CENTRO EN AMBOS SENTIDOS, DESDE HOYO DE LA PUERTA,

ESTADO MIRANDA HASTA TEJERIAS, ESTADO ARAGUA.

CONSTRUCTORA RIO CUYUNI, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DEL SISTEMA DE ALUMBRADO PUBLICO DE LA AUTOPISTA REGIONAL DEL CENTRO EN AMBOS SENTIDOS, DESDE HOYO DE LA PUERTA,

ESTADO MIRANDA HASTA TEJERIAS, ESTADO ARAGUA.

CONSTRUCTORA RIO CUYUNI, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DEL SISTEMA DE ALUMBRADO PUBLICO DE LA AUTOPISTA REGIONAL DEL CENTRO EN AMBOS SENTIDOS, DESDE HOYO DE LA PUERTA,

ESTADO MIRANDA HASTA TEJERIAS, ESTADO ARAGUA.O & D

CONSTRUCCIONES, C.A.

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO, TO01

(PROG. 22+450 HASTA 22+990), ESTADO MIRANDA

O & D CONSTRUCCIONES, C.A.

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO, TO01

(PROG. 22+450 HASTA 22+990), ESTADO MIRANDA

O & D CONSTRUCCIONES, C.A.

REHABILITACION DE LA TO01, TRAMO: KM. 0 NACIONAL - DISTRIBUIDOR SAN BLAS,

ESTADOS: DISTRITO CAPITAL, MIRANDA, ARAGUA Y CARABOBO (PROG. 22+000 HASTA 22+450).

O & D CONSTRUCCIONES, C.A.

REHABILITACION DE LA TO01, TRAMO: KM. 0 NACIONAL - DISTRIBUIDOR SAN BLAS,

ESTADOS: DISTRITO CAPITAL, MIRANDA, ARAGUA Y CARABOBO (PROG. 22+000 HASTA 22+450).

O & D CONSTRUCCIONES, C.A.

REHABILITACION DE LA TO01, TRAMO: KM. 0 NACIONAL - DISTRIBUIDOR SAN BLAS,

ESTADOS: DISTRITO CAPITAL, MIRANDA, ARAGUA Y CARABOBO (PROG. 22+000 HASTA 22+450).

CONSTRUCTORA VIDALSA 27, C.A.

CONSTRUCCION DEL PAR VIAL BARINAS - SANTA INES - SANTA

LUCIA, BARINAS. ESTADO BARINAS

CONSTRUCTORA VIDALSA 27, C.A.

CONSTRUCCION DEL PAR VIAL BARINAS - SANTA INES - SANTA

LUCIA, BARINAS. ESTADO BARINASCONSTRUCTORA VIDALSA 27, C.A.

CONSTRUCCION DEL PAR VIAL BARINAS - SANTA INES - SANTA

LUCIA, BARINAS. ESTADO BARINASCONSTRUCTORA VIDALSA 27, C.A.

CONSTRUCCION DEL PAR VIAL BARINAS - SANTA INES - SANTA

LUCIA, BARINAS. ESTADO BARINAS

CONSTRUCTORA 01 DE MARZO, S.A.

REHABILITACION DEL TRAMO: TEMBLADOR - DISTRIBUIDOR ORINOKIA, (PROG. 0+000 - 13+250), ESTADO MONAGAS

CONSTRUCTORA 01 DE MARZO, S.A.

REHABILITACION DEL TRAMO: TEMBLADOR - DISTRIBUIDOR ORINOKIA, (PROG. 0+000 - 13+250), ESTADO MONAGAS

CONSTRUCCIONES Y VIALIDADES, C.A.

(COVIALCA)

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO TO01, CHARALLAVE, SANTA TERESA (PROG. 32+000 HASTA PROG. 37+000 PISTA NORTE Y SUR), ESTADOS MIRANDA Y ARAGUA

CONSTRUCCIONES Y VIALIDADES, C.A.

(COVIALCA)

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO TO01, CHARALLAVE, SANTA TERESA (PROG. 32+000 HASTA PROG. 37+000 PISTA NORTE Y SUR), ESTADOS MIRANDA Y ARAGUA

21 de 7104/17/2023

17:30:31

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0094 1/16/2013 2 1,762,538.39 786,847.50 975,690.89CV-0094 1/17/2013 3 2,731,567.03 1,219,449.57 1,512,117.46CV-0094 4/24/2013 4 1,657,881.61 740,125.72 917,755.89CV-0094 4/24/2013 5 2,240,269.68 1,000,120.40 1,240,149.28CV-0094 5/27/2013 6 4,069,079.57 1,816,553.38 2,252,526.19CV-0094 6/3/2013 7 5,556,885.02 2,480,752.24 3,076,132.78

CV-0095 4/25/2012 57,000,000.00 57,000,000.00 57,000,000.02 100.00 25,446,428.57 25,446,428.57 7 AC 25,446,428.57 0.00 25,446,428.57 57,000,000.02

CV-0095 8/3/2012 1 10,675,300.01 4,765,758.94 5,909,541.07CV-0095 8/14/2012 2 9,578,216.33 4,275,989.44 5,302,226.89CV-0095 10/4/2012 3 13,152,265.80 5,871,547.23 7,280,718.57CV-0095 10/4/2012 4 4,652,580.12 2,077,044.70 2,575,535.42CV-0095 11/29/2012 5 2,301,604.26 1,027,501.90 1,274,102.36CV-0095 2/26/2013 6 11,048,854.34 4,932,524.26 6,116,330.08CV-0095 4/22/2013 7 5,591,179.16 2,496,062.10 3,095,117.06

CV-0096 5/7/2012 67,899,998.61 67,899,884.40 67,899,884.40 100.00 30,312,499.38 30,312,499.38 7 AC 30,312,499.38 0.00 30,312,499.38 67,899,884.42

CV-0096 1 2,726,483.13 1,217,179.97 1,509,303.16CV-0096 2 8,841,151.03 3,946,942.43 4,894,208.60CV-0096 3 12,831,689.06 5,728,432.62 7,103,256.44CV-0096 4 12,127,283.18 5,413,965.71 6,713,317.47CV-0096 12/5/2012 5 13,320,929.13 5,946,843.36 7,374,085.77CV-0096 12/17/2012 6 15,308,243.59 6,834,037.32 8,474,206.27CV-0096 6/6/2013 7 2,744,105.30 1,225,097.97 1,519,007.33

CV-0097 4/27/2012 26,049,999.98 26,049,926.99 26,049,927.00 100.00 11,629,464.27 11,629,464.27 3 AC 11,629,464.27 0.00 11,629,464.27 26,049,927.00

CV-0097 1 8,270,220.76 3,692,062.84 4,578,157.92CV-0097 2 8,650,687.54 3,861,914.08 4,788,773.46CV-0097 11/23/2012 3 9,129,018.70 4,075,487.35 5,053,531.35

CV-0098 7/12/2012 10,070,714.68 10,070,714.68 7,692,019.71 76.38 4,495,854.77 3,433,937.37 3 AC 4,495,854.77 0.00 4,495,854.77 8,753,937.11

CV-0098 4/25/2013 1 44,060.80 19,670.00 24,390.80CV-0098 4/26/2013 2 1,827,700.65 815,937.79 1,011,762.86CV-0098 3 5,820,258.26 2,598,329.58 3,221,928.68

CV-0099 5/11/2012 42,993,636.75 42,993,607.46 42,084,224.82 97.88 19,193,587.84 18,787,600.38 5 AC 19,193,587.84 0.00 19,193,587.84 42,490,212.28

CV-0099 5/11/2012 1 6,012,736.06 2,684,257.17 3,328,478.89CV-0099 5/11/2012 2 9,669,690.28 4,316,826.02 5,352,864.26CV-0099 5/11/2012 11/12/2012 3 13,212,151.33 5,898,281.85 7,313,869.48CV-0099 4 10,402,435.67 4643944.5 5,758,491.17CV-0099 2/15/2013 5 2,787,211.48 1,244,290.84 1,542,920.64

CONSTRUCCIONES Y VIALIDADES, C.A.

(COVIALCA)

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO TO01, CHARALLAVE, SANTA TERESA (PROG. 32+000 HASTA PROG. 37+000 PISTA NORTE Y SUR), ESTADOS MIRANDA Y ARAGUA

CONSTRUCCIONES Y VIALIDADES, C.A.

(COVIALCA)

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO TO01, CHARALLAVE, SANTA TERESA (PROG. 32+000 HASTA PROG. 37+000 PISTA NORTE Y SUR), ESTADOS MIRANDA Y ARAGUA

CONSTRUCCIONES Y VIALIDADES, C.A.

(COVIALCA)

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO TO01, CHARALLAVE, SANTA TERESA (PROG. 32+000 HASTA PROG. 37+000 PISTA NORTE Y SUR), ESTADOS MIRANDA Y ARAGUA

CONSTRUCCIONES Y VIALIDADES, C.A.

(COVIALCA)

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO TO01, CHARALLAVE, SANTA TERESA (PROG. 32+000 HASTA PROG. 37+000 PISTA NORTE Y SUR), ESTADOS MIRANDA Y ARAGUA

CONSTRUCCIONES Y VIALIDADES, C.A.

(COVIALCA)

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO TO01, CHARALLAVE, SANTA TERESA (PROG. 32+000 HASTA PROG. 37+000 PISTA NORTE Y SUR), ESTADOS MIRANDA Y ARAGUA

CONSTRUCCIONES Y VIALIDADES, C.A.

(COVIALCA)

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO TO01, CHARALLAVE, SANTA TERESA (PROG. 32+000 HASTA PROG. 37+000 PISTA NORTE Y SUR), ESTADOS MIRANDA Y ARAGUACONSTRUCCIONES

YAMARO, C.A.

REHABILITACION INTEGRAL DE LA TO17, TRAMO LARA - ZULIA, I ETAPA, PROGRESIVAS 0+000 HASTA 80+400, MUNICIPIO

TORRES, ESTADO LARACONSTRUCCIONES

YAMARO, C.A.

REHABILITACION INTEGRAL DE LA TO17, TRAMO LARA - ZULIA, I ETAPA, PROGRESIVAS 0+000 HASTA 80+400, MUNICIPIO

TORRES, ESTADO LARA

CONSTRUCCIONES YAMARO, C.A.

REHABILITACION INTEGRAL DE LA TO17, TRAMO LARA - ZULIA, I ETAPA, PROGRESIVAS 0+000 HASTA 80+400, MUNICIPIO

TORRES, ESTADO LARA

CONSTRUCCIONES YAMARO, C.A.

REHABILITACION INTEGRAL DE LA TO17, TRAMO LARA - ZULIA, I ETAPA, PROGRESIVAS 0+000 HASTA 80+400, MUNICIPIO

TORRES, ESTADO LARA

CONSTRUCCIONES YAMARO, C.A.

REHABILITACION INTEGRAL DE LA TO17, TRAMO LARA - ZULIA, I ETAPA, PROGRESIVAS 0+000 HASTA 80+400, MUNICIPIO

TORRES, ESTADO LARA

CONSTRUCCIONES YAMARO, C.A.

REHABILITACION INTEGRAL DE LA TO17, TRAMO LARA - ZULIA, I ETAPA, PROGRESIVAS 0+000 HASTA 80+400, MUNICIPIO

TORRES, ESTADO LARA

CONSTRUCCIONES YAMARO, C.A.

REHABILITACION INTEGRAL DE LA TO17, TRAMO LARA - ZULIA, I ETAPA, PROGRESIVAS 0+000 HASTA 80+400, MUNICIPIO

TORRES, ESTADO LARA

CONSTRUCCIONES YAMARO, C.A.

REHABILITACION INTEGRAL DE LA TO17, TRAMO LARA - ZULIA, I ETAPA, PROGRESIVAS 0+000 HASTA 80+400, MUNICIPIO

TORRES, ESTADO LARA

CONSORCIO VENECA, C.A.

REHABILITACION DE LA TO03, TRAMO MORON - CORO, ESTADO

FALCON

CONSORCIO VENECA, C.A.

REHABILITACION DE LA TO03, TRAMO MORON - CORO, ESTADO

FALCONCONSORCIO VENECA, C.A.

REHABILITACION DE LA TO03, TRAMO MORON - CORO, ESTADO

FALCONCONSORCIO VENECA, C.A.

REHABILITACION DE LA TO03, TRAMO MORON - CORO, ESTADO

FALCONCONSORCIO VENECA, C.A.

REHABILITACION DE LA TO03, TRAMO MORON - CORO, ESTADO

FALCONCONSORCIO VENECA, C.A.

REHABILITACION DE LA TO03, TRAMO MORON - CORO, ESTADO

FALCONCONSORCIO VENECA, C.A.

REHABILITACION DE LA TO03, TRAMO MORON - CORO, ESTADO

FALCONCONSORCIO VENECA, C.A.

REHABILITACION DE LA TO03, TRAMO MORON - CORO, ESTADO

FALCON

VIALIDAD Y CONSTRUCCIONES

SUCRE, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION Y BACHEO DE LA VIA DE ACCESO A LA PARROQUIA MACHURUCUTO,

MUNICIPIO PEDRO GUAL, ESTADO MIRANDA

VIALIDAD Y CONSTRUCCIONES

SUCRE, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION Y BACHEO DE LA VIA DE ACCESO A LA PARROQUIA MACHURUCUTO,

MUNICIPIO PEDRO GUAL, ESTADO MIRANDA

VIALIDAD Y CONSTRUCCIONES

SUCRE, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION Y BACHEO DE LA VIA DE ACCESO A LA PARROQUIA MACHURUCUTO,

MUNICIPIO PEDRO GUAL, ESTADO MIRANDA

VIALIDAD Y CONSTRUCCIONES

SUCRE, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION Y BACHEO DE LA VIA DE ACCESO A LA PARROQUIA MACHURUCUTO,

MUNICIPIO PEDRO GUAL, ESTADO MIRANDA

VIALIDAD Y CONSTRUCCIONES

SUCRE, C.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO:

CARRETERA HIGUEROTE - CHIRIMENA, ESTADO MIRANDA

VIALIDAD Y CONSTRUCCIONES

SUCRE, C.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO:

CARRETERA HIGUEROTE - CHIRIMENA, ESTADO MIRANDA

VIALIDAD Y CONSTRUCCIONES

SUCRE, C.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO:

CARRETERA HIGUEROTE - CHIRIMENA, ESTADO MIRANDA

VIALIDAD Y CONSTRUCCIONES

SUCRE, C.A.

REHABILITACION Y MANTENIMIENTO DEL TRAMO:

CARRETERA HIGUEROTE - CHIRIMENA, ESTADO MIRANDA

CONSTRUCTORES VENEZOLANOS, C.A.

REHABILITACION DE LA TO06, TRAMO MARACAIBO - VILLA DE PERIJA (PROG. 243+100) HASTA PROG. 306+600. ESTADO ZULIA

CONSTRUCTORES VENEZOLANOS, C.A.

REHABILITACION DE LA TO06, TRAMO MARACAIBO - VILLA DE PERIJA (PROG. 243+100) HASTA PROG. 306+600. ESTADO ZULIA

CONSTRUCTORES VENEZOLANOS, C.A.

REHABILITACION DE LA TO06, TRAMO MARACAIBO - VILLA DE PERIJA (PROG. 243+100) HASTA PROG. 306+600. ESTADO ZULIA

CONSTRUCTORES VENEZOLANOS, C.A.

REHABILITACION DE LA TO06, TRAMO MARACAIBO - VILLA DE PERIJA (PROG. 243+100) HASTA PROG. 306+600. ESTADO ZULIA

CONSTRUCTORES VENEZOLANOS, C.A.

REHABILITACION DE LA TO06, TRAMO MARACAIBO - VILLA DE PERIJA (PROG. 243+100) HASTA PROG. 306+600. ESTADO ZULIA

CONSTRUCTORES VENEZOLANOS, C.A.

REHABILITACION DE LA TO06, TRAMO MARACAIBO - VILLA DE PERIJA (PROG. 243+100) HASTA PROG. 306+600. ESTADO ZULIA

22 de 7104/17/2023

17:30:31

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0100 5/7/2012 3,495,145.62 3,495,145.62 2,021,727.55 57.84 1,560,332.87 902,556.95 2 AC 1,560,332.87 0.00 1,560,332.87 2,679,503.47

CV-0100 12/11/2012 1 1,101,238.22 491,624.21 609,614.01CV-0100 4/3/2013 2 920,489.33 410,932.74 509,556.59

CV-0101 21/05/25012 114,556,999.00 114,556,998.71 35,119,642.18 30.66 51,141,517.41 15,678,411.71 5 AC 51,141,517.41 0.00 51,141,517.41 70,582,747.88

CV-0101 1 4,274,943.47 1,908,456.91 2,366,486.56CV-0101 2 6,085,479.48 2,716,731.92 3,368,747.56CV-0101 12/3/2012 3 4,893,853.43 2,184,756.00 2,709,097.43CV-0101 3/21/2013 4 11,599,697.26 5,178,436.28 6,421,260.98CV-0101 4/18/2013 5 8,265,668.54 3,690,030.60 4,575,637.94

CV-0102 5/15/2012 52,427,184.47 52,427,184.47 49,890,025.23 95.16 23,404,993.07 22,272,332.70 4 AC 23,404,993.07 0.00 23,404,993.07 51,022,685.60

CV-0102 1 7,470,678.59 3,335,124.37 4,135,554.22CV-0102 2 13,668,326.04 6,101,931.27 7,566,394.77CV-0102 3 20,331,075.32 9,076,372.91 11,254,702.41CV-0102 4 8,419,945.28 3,758,904.15 4,661,041.13

CV-0103 6/14/2012 33,140,492.49 33,140,492.49 32,126,200.10 96.94 14,794,862.72 14,342,053.61 3 AC 14,794,862.72 0.00 14,794,862.72 32,579,009.21

CV-0103 1 17,262,082.28 7,706,286.73 9,555,795.55CV-0103 12/4/2012 2 6,050,680.50 2,701,196.65 3,349,483.85CV-0103 12/11/2012 3 8,813,437.32 3,934,570.23 4,878,867.09

CV-0104 5/15/2012 46,601,941.75 46,601,941.75 36,296,750.54 77.89 20,804,438.28 16,203,906.50 3 AC 20,804,438.28 0.00 20,804,438.28 40,897,282.32

CV-0104 1 9,754,724.94 4,354,787.92 5,399,937.02CV-0104 2 13,688,908.56 6,111,119.90 7,577,788.66CV-0104 12/4/2012 3 12,853,117.04 5,737,998.68 7,115,118.36

CV-0105 5/14/2012 10,291,261.99 10,291,261.99 8,467,126.35 82.27 4,594,313.39 3,779,965.34 4 AC 4,594,313.39 0.00 4,594,313.39 9,281,474.40

CV-0105 1 846,490.57 377,895.79 468,594.78CV-0105 2 2,485,598.83 1,109,642.34 1,375,956.49CV-0105 3 709,720.66 316,839.58 392,881.08

MONTILLA ALVAREZ ROMMELL NABOTH JALIL

(INVERMACRO)

REHABILITACION DE LA LO02, TRAMO MERIDA - SANTA BARBARA

DEL ZULIA, ESTADO MERIDA

MONTILLA ALVAREZ ROMMELL NABOTH JALIL

(INVERMACRO)

REHABILITACION DE LA LO02, TRAMO MERIDA - SANTA BARBARA

DEL ZULIA, ESTADO MERIDAMONTILLA ALVAREZ

ROMMELL NABOTH JALIL (INVERMACRO)

REHABILITACION DE LA LO02, TRAMO MERIDA - SANTA BARBARA

DEL ZULIA, ESTADO MERIDA

CONSTRUCTORA PEDECA, C.A.

REHABILITACION DEL TRAMO: MACHIQUES - COLON , PROG.

328+000 HASTA LA PROG. 441+700, ESTADO ZULIA

CONSTRUCTORA PEDECA, C.A.

REHABILITACION DEL TRAMO: MACHIQUES - COLON , PROG.

328+000 HASTA LA PROG. 441+700, ESTADO ZULIA

CONSTRUCTORA PEDECA, C.A.

REHABILITACION DEL TRAMO: MACHIQUES - COLON , PROG.

328+000 HASTA LA PROG. 441+700, ESTADO ZULIA

CONSTRUCTORA PEDECA, C.A.

REHABILITACION DEL TRAMO: MACHIQUES - COLON , PROG.

328+000 HASTA LA PROG. 441+700, ESTADO ZULIA

CONSTRUCTORA PEDECA, C.A.

REHABILITACION DEL TRAMO: MACHIQUES - COLON , PROG.

328+000 HASTA LA PROG. 441+700, ESTADO ZULIA

CONSTRUCTORA PEDECA, C.A.

REHABILITACION DEL TRAMO: MACHIQUES - COLON , PROG.

328+000 HASTA LA PROG. 441+700, ESTADO ZULIA

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA CARRETERA TO09, TRAMO

BARCELONA - CUMANA (PROG. 314+600 HASTA 348+700).

ESTADO ANZOATEGUI

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA CARRETERA TO09, TRAMO

BARCELONA - CUMANA (PROG. 314+600 HASTA 348+700).

ESTADO ANZOATEGUI

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA CARRETERA TO09, TRAMO

BARCELONA - CUMANA (PROG. 314+600 HASTA 348+700).

ESTADO ANZOATEGUI

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA CARRETERA TO09, TRAMO

BARCELONA - CUMANA (PROG. 314+600 HASTA 348+700).

ESTADO ANZOATEGUI

CONSTRUCTORA CONKOR, C.A.

REHABILITACION DE LA CARRETERA TO09, TRAMO

BARCELONA - CUMANA (PROG. 314+600 HASTA 348+700).

ESTADO ANZOATEGUI

CONSTRUCTORA CONKOR, C.A.

REHABILITACION Y MANTENIMIENTO DE LA TO03,

TRAMO LA VELA DE CORO - BOCA DE YARACUY (PROG. 73+700

HASTA PROG. 145+400). ESTADO FALCON

CONSTRUCTORA CONKOR, C.A.

REHABILITACION Y MANTENIMIENTO DE LA TO03,

TRAMO LA VELA DE CORO - BOCA DE YARACUY (PROG. 73+700

HASTA PROG. 145+400). ESTADO FALCON

CONSTRUCTORA CONKOR, C.A.

REHABILITACION Y MANTENIMIENTO DE LA TO03,

TRAMO LA VELA DE CORO - BOCA DE YARACUY (PROG. 73+700

HASTA PROG. 145+400). ESTADO FALCON

CONSTRUCTORA CONKOR, C.A.

REHABILITACION Y MANTENIMIENTO DE LA TO03,

TRAMO LA VELA DE CORO - BOCA DE YARACUY (PROG. 73+700

HASTA PROG. 145+400). ESTADO FALCON

CONSTRUCTORA CONKOR, C.A.

REHABILITACION INTEGRAL DE LA TRONCAL TO03, TRAMO CORO

(PROG. 264+000) - SANTA RITA (PROG. 441+700). ESTADO

FALCON

CONSTRUCTORA CONKOR, C.A.

REHABILITACION INTEGRAL DE LA TRONCAL TO03, TRAMO CORO

(PROG. 264+000) - SANTA RITA (PROG. 441+700). ESTADO

FALCON

CONSTRUCTORA CONKOR, C.A.

REHABILITACION INTEGRAL DE LA TRONCAL TO03, TRAMO CORO

(PROG. 264+000) - SANTA RITA (PROG. 441+700). ESTADO

FALCON

CONSTRUCTORA CONKOR, C.A.

REHABILITACION INTEGRAL DE LA TRONCAL TO03, TRAMO CORO

(PROG. 264+000) - SANTA RITA (PROG. 441+700). ESTADO

FALCON

CONSTRUCTOTA GEOVIAL, C.A.

REHABILITACION Y MANTENIMIENTO TRAMO

CHIRGUITA - COJEDITO (PRO. 36+500 HASTA PROG. 142+800).

ESTADO COJEDES

CONSTRUCTOTA GEOVIAL, C.A.

REHABILITACION Y MANTENIMIENTO TRAMO

CHIRGUITA - COJEDITO (PRO. 36+500 HASTA PROG. 142+800).

ESTADO COJEDES

CONSTRUCTOTA GEOVIAL, C.A.

REHABILITACION Y MANTENIMIENTO TRAMO

CHIRGUITA - COJEDITO (PRO. 36+500 HASTA PROG. 142+800).

ESTADO COJEDES

CONSTRUCTOTA GEOVIAL, C.A.

REHABILITACION Y MANTENIMIENTO TRAMO

CHIRGUITA - COJEDITO (PRO. 36+500 HASTA PROG. 142+800).

ESTADO COJEDES

23 de 7104/17/2023

17:30:31

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0105 5/17/2013 4 4,425,316.29 1,975,587.63 2,449,728.66

CV-0106 5/8/2012 26,807,133.48 26,807,133.31 22,636,191.17 84.44 11,967,470.31 10,105,442.50 9 AC 11,967,470.31 0.00 11,967,470.31 24,498,218.98

CV-0106 1 2,214,236.93 988,498.63 1,225,738.30CV-0106 11/15/2012 2 793,084.45 354,055.56 439,028.89CV-0106 11/23/2012 3 3,447,136.00 1,538,900.00 1,908,236.00CV-0106 11/27/2012 4 2,577,577.78 1,150,704.37 1,426,873.41CV-0106 12/17/2012 5 5,363,935.37 2,394,614.01 2,969,321.36CV-0106 2/15/2013 6 1,227,726.07 548,092.00 679,634.07CV-0106 2/25/2013 7 3,286,737.40 1,467,293.48 1,819,443.92CV-0106 5/31/2013 8 2,089,415.24 932,774.66 1,156,640.58CV-0106 5/31/2013 9 1,636,341.93 730,509.79 905,832.14

CONSTRUCTOTA GEOVIAL, C.A.

REHABILITACION Y MANTENIMIENTO TRAMO

CHIRGUITA - COJEDITO (PRO. 36+500 HASTA PROG. 142+800).

ESTADO COJEDES

PILOTES PERFORADOS, C.A. (PILPERCA)

REHABILITACION DEL TRAMO: DISTRIBUIDOR LA "N" EN LA LARA - ZULIA, INTERSECCION RAMAL 052

CON TRONCAL 17, (PROG. 166+400), ESTADO ZULIA

PILOTES PERFORADOS, C.A. (PILPERCA)

REHABILITACION DEL TRAMO: DISTRIBUIDOR LA "N" EN LA LARA - ZULIA, INTERSECCION RAMAL 052

CON TRONCAL 17, (PROG. 166+400), ESTADO ZULIA

PILOTES PERFORADOS, C.A. (PILPERCA)

REHABILITACION DEL TRAMO: DISTRIBUIDOR LA "N" EN LA LARA - ZULIA, INTERSECCION RAMAL 052

CON TRONCAL 17, (PROG. 166+400), ESTADO ZULIA

PILOTES PERFORADOS, C.A. (PILPERCA)

REHABILITACION DEL TRAMO: DISTRIBUIDOR LA "N" EN LA LARA - ZULIA, INTERSECCION RAMAL 052

CON TRONCAL 17, (PROG. 166+400), ESTADO ZULIA

PILOTES PERFORADOS, C.A. (PILPERCA)

REHABILITACION DEL TRAMO: DISTRIBUIDOR LA "N" EN LA LARA - ZULIA, INTERSECCION RAMAL 052

CON TRONCAL 17, (PROG. 166+400), ESTADO ZULIA

PILOTES PERFORADOS, C.A. (PILPERCA)

REHABILITACION DEL TRAMO: DISTRIBUIDOR LA "N" EN LA LARA - ZULIA, INTERSECCION RAMAL 052

CON TRONCAL 17, (PROG. 166+400), ESTADO ZULIA

PILOTES PERFORADOS, C.A. (PILPERCA)

REHABILITACION DEL TRAMO: DISTRIBUIDOR LA "N" EN LA LARA - ZULIA, INTERSECCION RAMAL 052

CON TRONCAL 17, (PROG. 166+400), ESTADO ZULIA

PILOTES PERFORADOS, C.A. (PILPERCA)

REHABILITACION DEL TRAMO: DISTRIBUIDOR LA "N" EN LA LARA - ZULIA, INTERSECCION RAMAL 052

CON TRONCAL 17, (PROG. 166+400), ESTADO ZULIA

PILOTES PERFORADOS, C.A. (PILPERCA)

REHABILITACION DEL TRAMO: DISTRIBUIDOR LA "N" EN LA LARA - ZULIA, INTERSECCION RAMAL 052

CON TRONCAL 17, (PROG. 166+400), ESTADO ZULIA

PILOTES PERFORADOS, C.A. (PILPERCA)

REHABILITACION DEL TRAMO: DISTRIBUIDOR LA "N" EN LA LARA - ZULIA, INTERSECCION RAMAL 052

CON TRONCAL 17, (PROG. 166+400), ESTADO ZULIA

24 de 7104/17/2023

17:30:31

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0107 TALLER CHAMA, C.A. 5/14/2012 21,556,454.54 21,556,453.32 8,332,755.23 38.66 9,623,417.21 3,719,980.03 5 AC 9,623,417.21 0.00 9,623,417.21 14,236,192.41

CV-0107 TALLER CHAMA, C.A. 1 841,764.85 375,787.88 465,976.97CV-0107 TALLER CHAMA, C.A. 11/29/2012 2 1,406,094.49 627,720.76 778,373.73CV-0107 TALLER CHAMA, C.A. 12/11/2012 3 1,611,171.12 719,272.82 891,898.30CV-0107 TALLER CHAMA, C.A. 4/16/2013 4 1,660,654.18 741,363.48 919,290.70CV-0107 TALLER CHAMA, C.A. 8/5/2013 5 2,813,070.59 1,255,835.09 1,557,235.50

CV-0108 5/17/2012 3,405,974.61 3,405,974.21 3,405,974.20 100.00 1,520,524.38 1,520,524.38 2 AC 1,520,524.38 0.00 1,520,524.38 3,405,974.20

CV-0108 1 2,557,113.94 1,141,568.73 1,415,545.21CV-0108 12/6/2012 2 848,860.26 378,955.65 469,904.61

CV-0109 TALLER CHAMA, C.A. 5/14/2012 4,912,119.48 4,912,119.48 1,132,042.15 23.05 2,192,910.48 505,375.96 3 AC 2,192,910.48 0.00 2,192,910.48 2,819,576.67

CV-0109 TALLER CHAMA, C.A. 1 1,132,042.15 505,375.96 626,666.19CV-0109 TALLER CHAMA, C.A. 7/12/2013 2 353,904.04 157,992.88 195,911.16CV-0109 TALLER CHAMA, C.A. 7/12/2013 3 1,164,400.15 519,821.50 644,578.65

CV-0110 TALLER CHAMA, C.A. 5/14/2012 7,959,645.02 6,503,394.59 5,797,752.97 89.15 3,553,412.96 2,923,420.85 5 AC 3,553,412.96 0.00 3,553,412.96 6,427,745.08

CV-0110 TALLER CHAMA, C.A. 1 857,566.04 382,841.98 474,724.06CV-0110 TALLER CHAMA, C.A. 2 199,911.82 89,246.35 110,665.47CV-0110 TALLER CHAMA, C.A. 11/30/2012 3 1,158,447.93 517,164.26 641,283.67CV-0110 TALLER CHAMA, C.A. 3/20/2013 4 2,277,152.66 1,016,586.01 1,260,566.65CV-0110 TALLER CHAMA, C.A. 6/29/2013 5 1,304,674.52 917,582.25 387,092.27

CV-0111 TALLER CHAMA, C.A. 5/14/2012 24,800,000.00 24,793,227.58 19,033,439.55 76.77 11,071,428.57 8,497,071.23 2 AC 11,071,428.57 0.00 11,071,428.57 21,607,796.89

CV-0111 8/27/2012 1 17,503,574.07 7,814,095.57 9,689,478.50CV-0111 11/21/2012 2 1,529,865.48 682,975.66 846,889.82

CV-0112 9/10/2012 28,700,719.12 28,700,719.12 20,126,830.05 70.13 12,812,821.04 8,985,191.99 1 AC 12,812,821.04 0.00 12,812,821.04 23,954,459.10

CV-0112 12/3/2012 1 20,126,830.05 8,985,191.99 11,141,638.06

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, CONSTRUCCION DE PANTALLAS ATIRANTADAS EN

TALUDES DE LA CARRETERA LA FRIA - LA GRITA, ESTADO TACHIRAREHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, CONSTRUCCION DE

PANTALLAS ATIRANTADAS EN TALUDES DE LA CARRETERA LA

FRIA - LA GRITA, ESTADO TACHIRA

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, CONSTRUCCION DE PANTALLAS ATIRANTADAS EN

TALUDES DE LA CARRETERA LA FRIA - LA GRITA, ESTADO TACHIRA

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, CONSTRUCCION DE PANTALLAS ATIRANTADAS EN

TALUDES DE LA CARRETERA LA FRIA - LA GRITA, ESTADO TACHIRA

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, CONSTRUCCION DE PANTALLAS ATIRANTADAS EN

TALUDES DE LA CARRETERA LA FRIA - LA GRITA, ESTADO TACHIRA

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, CONSTRUCCION DE PANTALLAS ATIRANTADAS EN

TALUDES DE LA CARRETERA LA FRIA - LA GRITA, ESTADO TACHIRA

PROYECTOS MARAQUERO, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REPARACION DE FALLAS DE BORDE EN LAS PROG.

9+600 Y 22+200, TRAMO CUMANACOA - MONAGAS,

MUNICIPIO MONTES. ESTADO SUCRE

PROYECTOS MARAQUERO, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REPARACION DE FALLAS DE BORDE EN LAS PROG.

9+600 Y 22+200, TRAMO CUMANACOA - MONAGAS,

MUNICIPIO MONTES. ESTADO SUCRE

PROYECTOS MARAQUERO, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REPARACION DE FALLAS DE BORDE EN LAS PROG.

9+600 Y 22+200, TRAMO CUMANACOA - MONAGAS,

MUNICIPIO MONTES. ESTADO SUCRE

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, SUSTITUCION DE ALCANTARILLA EN LA VIA TO01,

PROG. 715+850, SECTOR RAICITOS, MUNICIPIO ALBERTO

ADRIANI, ESTADO MERIDAREHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, SUSTITUCION DE

ALCANTARILLA EN LA VIA TO01, PROG. 715+850, SECTOR

RAICITOS, MUNICIPIO ALBERTO ADRIANI, ESTADO MERIDA

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, SUSTITUCION DE ALCANTARILLA EN LA VIA TO01,

PROG. 715+850, SECTOR RAICITOS, MUNICIPIO ALBERTO

ADRIANI, ESTADO MERIDA

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, SUSTITUCION DE ALCANTARILLA EN LA VIA TO01,

PROG. 715+850, SECTOR RAICITOS, MUNICIPIO ALBERTO

ADRIANI, ESTADO MERIDAREHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, PROTECCION DE ESTRIBOS DEL PUENTE LA VEGA (SEBORUCO), ESTADO TACHIRAREHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, PROTECCION DE

ESTRIBOS DEL PUENTE LA VEGA (SEBORUCO), ESTADO TACHIRA

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, PROTECCION DE ESTRIBOS DEL PUENTE LA VEGA (SEBORUCO), ESTADO TACHIRA

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, PROTECCION DE ESTRIBOS DEL PUENTE LA VEGA (SEBORUCO), ESTADO TACHIRA

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, PROTECCION DE ESTRIBOS DEL PUENTE LA VEGA (SEBORUCO), ESTADO TACHIRA

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, PROTECCION DE ESTRIBOS DEL PUENTE LA VEGA (SEBORUCO), ESTADO TACHIRAREHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, CONSTRUCCION DE PROTECCIONES HIDRAULICAS DE LOS ESTRIBOS DE PUENTE REAL

TO05, MUNICIPIO SAN CRISTOBAL, ESTADO TACHIRA

CONSTRUCTORA LOBATERA, C.A.

REHABILITACION DE LA LARA - ZULIA, TO01, DESDE LA PROG.

0+000 HASTA LA PROG. 10+000 Y DESDE LA PROG. 17+075 HASTA LA PROG. 63+300, ESTADO LARA

CONSTRUCTORA LOBATERA, C.A.

REHABILITACION DE LA LARA - ZULIA, TO01, DESDE LA PROG.

0+000 HASTA LA PROG. 10+000 Y DESDE LA PROG. 17+075 HASTA LA PROG. 63+300, ESTADO LARA

25 de 7104/17/2023

17:30:31

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0113 6/1/2012 2,621,359.22 2,621,325.49 2,621,325.48 100.00 1,170,249.65 1,170,249.65 3 AC 1,170,249.65 0.00 1,170,249.65 2,621,325.48

CV-0113 1/16/2013 1 706,171.18 315,254.99 390,916.19CV-0113 6/6/2013 2 1,751,527.14 781,931.76 969,595.38CV-0113 6/6/2013 3 163,627.16 73,062.90 90,564.26

CV-0114 5/28/2012 15,145,631.05 15,145,630.90 14,511,501.24 95.81 6,761,442.44 6,478,348.77 2 AC 6,761,442.44 0.00 6,761,442.44 14,794,594.91

CV-0114 1 10,543,212.44 4,706,791.27 5,836,421.17CV-0114 12/11/2012 2 3,968,288.80 1,771,557.50 2,196,731.30

CV-0115 8/29/2012 50,000,000.00 49,999,999.85 46,682,338.94 93.36 22,321,428.57 20,840,329.89 5 AC 22,321,428.57 0.00 22,321,428.57 48,163,437.62

CV-0115 11/8/2012 1 5,858,988.84 2,615,620.02 3,243,368.82CV-0115 11/8/2012 2 5,634,595.29 2,515,444.33 3,119,150.96CV-0115 11/14/2012 3 6,630,785.21 2,960,171.97 3,670,613.24CV-0115 12/7/2012 4 6,202,314.99 2,768,890.62 3,433,424.37CV-0115 7/9/2013 5 22,355,654.61 9,980,202.95 12,375,451.66

CV-0116 5/24/2012 2,424,999.99 2,424,999.99 2,104,622.85 86.79 1,082,589.28 939,563.78 3 AC 1,082,589.29 0.00 1,082,589.29 2,247,648.36

CV-0116 3/22/2013 1 129,718.96 57,910.25 71,808.71CV-0116 3/22/2013 2 279,649.75 124,843.64 154,806.11CV-0116 3/22/2013 3 1,695,254.14 756,809.89 938,444.25

CV-0117 5/23/2012 33,949,999.98 33,949,999.98 10,693,973.44 31.50 15,156,249.99 4,774,095.29 1 AC 15,156,249.99 0.00 15,156,249.99 21,076,128.14

CV-0117 10,693,973.44 4,774,095.29 5,919,878.15

CV-0118 5/21/2012 999,622.85 999,622.85 999,622.85 100.00 446,260.20 446,260.20 2 AC 446,260.20 0.00 446,260.20 999,622.85

CV-0118 1 496,168.29 221,503.70 274,664.59CV-0118 2 503,454.56 224,756.50 278,698.06

INVERSIONES Y CONSTRUCCIONES DIETI,

C.A.

REHABILITACION DE LA TO07, TRAMO MERIDA - LA GRITA (PROG. 538+500 HASTA PROG. 581+000).

ESTADO MERIDA

INVERSIONES Y CONSTRUCCIONES DIETI,

C.A.

REHABILITACION DE LA TO07, TRAMO MERIDA - LA GRITA (PROG. 538+500 HASTA PROG. 581+000).

ESTADO MERIDA

INVERSIONES Y CONSTRUCCIONES DIETI,

C.A.

REHABILITACION DE LA TO07, TRAMO MERIDA - LA GRITA (PROG. 538+500 HASTA PROG. 581+000).

ESTADO MERIDA

INVERSIONES Y CONSTRUCCIONES DIETI,

C.A.

REHABILITACION DE LA TO07, TRAMO MERIDA - LA GRITA (PROG. 538+500 HASTA PROG. 581+000).

ESTADO MERIDA

CONSTRUCTORA MARJOCA, C.A.

REHABILITACION DEL TRAMO: TRUJILLO - LA PASTORA (PROG.

543+500 HASTA 565+200), ESTADO TRUJILLO

CONSTRUCTORA MARJOCA, C.A.

REHABILITACION DEL TRAMO: TRUJILLO - LA PASTORA (PROG.

543+500 HASTA 565+200), ESTADO TRUJILLO

CONSTRUCTORA MARJOCA, C.A.

REHABILITACION DEL TRAMO: TRUJILLO - LA PASTORA (PROG.

543+500 HASTA 565+200), ESTADO TRUJILLO

VENEZOLANA DE INVERSIONES Y

CONSTRUCCIONES CLERICO, C.A. (VINCLER,

C.A.)

REHABILITACION POR BACHEO DE LA TO05, TRAMO BARINAS - SAN

CRISTOBAL (DESDE LA PROG. 599+650 HASTA LA PROG.

655+400) ESTADOS TACHIRA Y BARINAS

VENEZOLANA DE INVERSIONES Y

CONSTRUCCIONES CLERICO, C.A. (VINCLER,

C.A.)

REHABILITACION POR BACHEO DE LA TO05, TRAMO BARINAS - SAN

CRISTOBAL (DESDE LA PROG. 599+650 HASTA LA PROG.

655+400) ESTADOS TACHIRA Y BARINAS

VENEZOLANA DE INVERSIONES Y

CONSTRUCCIONES CLERICO, C.A. (VINCLER,

C.A.)

REHABILITACION POR BACHEO DE LA TO05, TRAMO BARINAS - SAN

CRISTOBAL (DESDE LA PROG. 599+650 HASTA LA PROG.

655+400) ESTADOS TACHIRA Y BARINAS

VENEZOLANA DE INVERSIONES Y

CONSTRUCCIONES CLERICO, C.A. (VINCLER,

C.A.)

REHABILITACION POR BACHEO DE LA TO05, TRAMO BARINAS - SAN

CRISTOBAL (DESDE LA PROG. 599+650 HASTA LA PROG.

655+400) ESTADOS TACHIRA Y BARINAS

VENEZOLANA DE INVERSIONES Y

CONSTRUCCIONES CLERICO, C.A. (VINCLER,

C.A.)

REHABILITACION POR BACHEO DE LA TO05, TRAMO BARINAS - SAN

CRISTOBAL (DESDE LA PROG. 599+650 HASTA LA PROG.

655+400) ESTADOS TACHIRA Y BARINAS

VENEZOLANA DE INVERSIONES Y

CONSTRUCCIONES CLERICO, C.A. (VINCLER,

C.A.)

REHABILITACION POR BACHEO DE LA TO05, TRAMO BARINAS - SAN

CRISTOBAL (DESDE LA PROG. 599+650 HASTA LA PROG.

655+400) ESTADOS TACHIRA Y BARINAS

INVERSIONES Y CONSTRUCCIONES

PARRA AGULLEIRO, C.A. (INCOPACA).

REHABILITACION DE LA TO01, TRAMO AEROPUERTO DE MERIDA -

SECTOR LA "Y", PROGRESIVAS 742+700 - 5+000, ESTADO

MERIDA

INVERSIONES Y CONSTRUCCIONES

PARRA AGULLEIRO, C.A. (INCOPACA).

REHABILITACION DE LA TO01, TRAMO AEROPUERTO DE MERIDA -

SECTOR LA "Y", PROGRESIVAS 742+700 - 5+000, ESTADO

MERIDA

INVERSIONES Y CONSTRUCCIONES

PARRA AGULLEIRO, C.A. (INCOPACA).

REHABILITACION DE LA TO01, TRAMO AEROPUERTO DE MERIDA -

SECTOR LA "Y", PROGRESIVAS 742+700 - 5+000, ESTADO

MERIDA

INVERSIONES Y CONSTRUCCIONES

PARRA AGULLEIRO, C.A. (INCOPACA).

REHABILITACION DE LA TO01, TRAMO AEROPUERTO DE MERIDA -

SECTOR LA "Y", PROGRESIVAS 742+700 - 5+000, ESTADO

MERIDA

CONSTRUCCIONES Y MANTENIMIENTO COSA,

C.A.

REHABILITACION DE LA CARRETERA LO09, CON EMPALME EN LA TO15, TRAMO EL CARITO -

ESPINO (PROG. 0+000 A LA PROG. 25+000). ESTADO GUARICO

CONSTRUCCIONES Y MANTENIMIENTO COSA,

C.A.

REHABILITACION DE LA CARRETERA LO09, CON EMPALME EN LA TO15, TRAMO EL CARITO -

ESPINO (PROG. 0+000 A LA PROG. 25+000). ESTADO GUARICO

INVERSIONES VELASQUEZ

FERNANDEZ, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DEL SISTEMA DE ILUMINACION DE LA AUTOPISTA GRAN MARISCAL DE

AYACUCHO, ENTRE EL SECTOR DE LA MONTAÑTA Y EL DISTRIBUIDOR LOS BORDONES DE LA CIUDAD DE

CUMANA. ESTADO SUCREINVERSIONES VELASQUEZ

FERNANDEZ, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DEL SISTEMA DE ILUMINACION DE LA AUTOPISTA GRAN MARISCAL DE

AYACUCHO, ENTRE EL SECTOR DE LA MONTAÑTA Y EL DISTRIBUIDOR LOS BORDONES DE LA CIUDAD DE

CUMANA. ESTADO SUCRE

INVERSIONES VELASQUEZ

FERNANDEZ, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DEL SISTEMA DE ILUMINACION DE LA AUTOPISTA GRAN MARISCAL DE

AYACUCHO, ENTRE EL SECTOR DE LA MONTAÑTA Y EL DISTRIBUIDOR LOS BORDONES DE LA CIUDAD DE

CUMANA. ESTADO SUCRE

26 de 7104/17/2023

17:30:31

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0119 INGENIERIA HQ89, C.A. 6/11/2012 53,940,163.21 53,940,163.21 25,990,037.11 48.18 24,080,430.01 11,602,695.15 4 AC 24,080,430.01 0.00 24,080,430.01 38,467,771.97

CV-0119 INGENIERIA HQ89, C.A. 12/10/2012 1 14,036,228.30 6,266,173.35 7,770,054.95CV-0119 INGENIERIA HQ89, C.A. 5/29/2013 2 658,840.91 294,125.41 364,715.50CV-0119 INGENIERIA HQ89, C.A. 5/29/2013 3 1,078,623.08 481,528.16 597,094.92CV-0119 INGENIERIA HQ89, C.A. 5/29/2013 4 10,216,344.82 4,560,868.23 5,655,476.59

CV-0120 6/7/2012 17,475,728.13 17,475,728.12 17,475,728.12 100.00 7,801,664.35 7,801,664.35 5 AC 7,801,664.35 0.00 7,801,664.35 17,475,728.12

CV-0120 1 5,725,146.68 2,555,869.06 3,169,277.62CV-0120 2 2,843,413.70 1,269,381.12 1,574,032.58CV-0120 3 4,771,044.19 2,129,930.44 2,641,113.75CV-0120 12/7/2012 4 2,333,628.55 1,041,798.46 1,291,830.09CV-0120 1/25/2013 5 1,802,495.00 804,685.27 997,809.73

CV-0121 5/23/2012 35,379,780.40 35,379,779.82 35,379,779.83 100.00 15,794,544.82 15,794,544.82 7 AC 15,794,544.82 0.00 15,794,544.82 35,379,779.83

CV-0121 1 8,693,452.52 3,881,005.59 4,812,446.93CV-0121 2 8,697,250.33 3,882,701.04 4,814,549.29CV-0121 3 2,770,617.64 1,236,882.88 1,533,734.76CV-0121 12/11/2012 4 6,351,134.36 2,835,327.84 3,515,806.52CV-0121 1/17/2013 5 3,718,353.88 1,659,979.41 2,058,374.47CV-0121 3/20/2013 6 2,537,843.43 1,132,965.82 1,404,877.61CV-0121 4/10/2013 7 2,611,127.67 1,165,682.24 1,445,445.43

CV-0122 5/28/2012 2,448,199.12 2,448,199.12 2,295,292.66 93.75 1,092,946.04 1,024,684.23 1 AC 1,092,946.04 0.00 1,092,946.04 2,363,554.47

CV-0122 11/13/2012 1 2,295,292.66 1,024,684.23 1,270,608.43

CV-0123 5/20/2012 1,421,433.93 1,421,433.93 475,012.00 33.42 634,568.72 212,058.93 1 AC 634,568.72 0.00 634,568.72 897,521.79

CV-0123 2/8/2013 1 475,012.00 212,058.93 262,953.07

CV-0124 5/28/2012 4,967,914.54 4,967,914.51 4,245,219.26 85.45 2,217,818.99 1,895,187.18 3 AC 2,217,818.99 0.00 2,217,818.99 4,567,851.07

CV-0124 12/4/2012 1 153,417.79 68,490.09 84,927.70CV-0124 12/4/2012 2 1,313,686.61 586,467.24 727,219.37CV-0124 4/29/2013 3 2,778,114.86 1,240,229.85 1,537,885.01

BACHEO GENERAL EN LA TO09, DISTRIBUIDOR CAUCAGUA -

BARCELONA, DESDE LA PROG. 78+000 A PLAYA PINTADA (PROG.

187+000), REHABILITACION TRONCAL 09 DESDE EL GUAPO (PROG. 135+860) HASTA PLAYA

PINTADA (PROG. 187+000), ESTADO MIRANDA

BACHEO GENERAL EN LA TO09, DISTRIBUIDOR CAUCAGUA -

BARCELONA, DESDE LA PROG. 78+000 A PLAYA PINTADA (PROG.

187+000), REHABILITACION TRONCAL 09 DESDE EL GUAPO (PROG. 135+860) HASTA PLAYA

PINTADA (PROG. 187+000), ESTADO MIRANDA

BACHEO GENERAL EN LA TO09, DISTRIBUIDOR CAUCAGUA -

BARCELONA, DESDE LA PROG. 78+000 A PLAYA PINTADA (PROG.

187+000), REHABILITACION TRONCAL 09 DESDE EL GUAPO (PROG. 135+860) HASTA PLAYA

PINTADA (PROG. 187+000), ESTADO MIRANDA

BACHEO GENERAL EN LA TO09, DISTRIBUIDOR CAUCAGUA -

BARCELONA, DESDE LA PROG. 78+000 A PLAYA PINTADA (PROG.

187+000), REHABILITACION TRONCAL 09 DESDE EL GUAPO (PROG. 135+860) HASTA PLAYA

PINTADA (PROG. 187+000), ESTADO MIRANDA

BACHEO GENERAL EN LA TO09, DISTRIBUIDOR CAUCAGUA -

BARCELONA, DESDE LA PROG. 78+000 A PLAYA PINTADA (PROG.

187+000), REHABILITACION TRONCAL 09 DESDE EL GUAPO (PROG. 135+860) HASTA PLAYA

PINTADA (PROG. 187+000), ESTADO MIRANDACONSTRUCTORA

GARCIA-GUERRA, C.A.

MANTENIMIENTO DE LA TO05, TRAMO BARINAS - ESTACION DE

SERVICIO SANTA BARBARA (PROG. 355+881 505+100), ESTADO

BARINAS

CONSTRUCTORA GARCIA-GUERRA, C.A.

MANTENIMIENTO DE LA TO05, TRAMO BARINAS - ESTACION DE

SERVICIO SANTA BARBARA (PROG. 355+881 505+100), ESTADO

BARINAS

CONSTRUCTORA GARCIA-GUERRA, C.A.

MANTENIMIENTO DE LA TO05, TRAMO BARINAS - ESTACION DE

SERVICIO SANTA BARBARA (PROG. 355+881 505+100), ESTADO

BARINAS

CONSTRUCTORA GARCIA-GUERRA, C.A.

MANTENIMIENTO DE LA TO05, TRAMO BARINAS - ESTACION DE

SERVICIO SANTA BARBARA (PROG. 355+881 505+100), ESTADO

BARINAS

CONSTRUCTORA GARCIA-GUERRA, C.A.

MANTENIMIENTO DE LA TO05, TRAMO BARINAS - ESTACION DE

SERVICIO SANTA BARBARA (PROG. 355+881 505+100), ESTADO

BARINAS

CONSTRUCTORA GARCIA-GUERRA, C.A.

MANTENIMIENTO DE LA TO05, TRAMO BARINAS - ESTACION DE

SERVICIO SANTA BARBARA (PROG. 355+881 505+100), ESTADO

BARINAS

INVERSIONES COFLAN, C.A.

REHABILITACION DE LA TO01, TRAMO: KM 0 NACIONAL -

DISTRIBUIDOR SAN BLAS, ENTRE EL DISTRIBUIDOR LA VICTORIA Y EL DISTRIBUIDOR LAS TEJERIAS, EN EL ESTADO ARAGUA EN SU PISTA SUR

INVERSIONES COFLAN, C.A.

REHABILITACION DE LA TO01, TRAMO: KM 0 NACIONAL -

DISTRIBUIDOR SAN BLAS, ENTRE EL DISTRIBUIDOR LA VICTORIA Y EL DISTRIBUIDOR LAS TEJERIAS, EN EL ESTADO ARAGUA EN SU PISTA SUR

INVERSIONES COFLAN, C.A.

REHABILITACION DE LA TO01, TRAMO: KM 0 NACIONAL -

DISTRIBUIDOR SAN BLAS, ENTRE EL DISTRIBUIDOR LA VICTORIA Y EL DISTRIBUIDOR LAS TEJERIAS, EN EL ESTADO ARAGUA EN SU PISTA SUR

INVERSIONES COFLAN, C.A.

REHABILITACION DE LA TO01, TRAMO: KM 0 NACIONAL -

DISTRIBUIDOR SAN BLAS, ENTRE EL DISTRIBUIDOR LA VICTORIA Y EL DISTRIBUIDOR LAS TEJERIAS, EN EL ESTADO ARAGUA EN SU PISTA SUR

INVERSIONES COFLAN, C.A.

REHABILITACION DE LA TO01, TRAMO: KM 0 NACIONAL -

DISTRIBUIDOR SAN BLAS, ENTRE EL DISTRIBUIDOR LA VICTORIA Y EL DISTRIBUIDOR LAS TEJERIAS, EN EL ESTADO ARAGUA EN SU PISTA SUR

INVERSIONES COFLAN, C.A.

REHABILITACION DE LA TO01, TRAMO: KM 0 NACIONAL -

DISTRIBUIDOR SAN BLAS, ENTRE EL DISTRIBUIDOR LA VICTORIA Y EL DISTRIBUIDOR LAS TEJERIAS, EN EL ESTADO ARAGUA EN SU PISTA SUR

INVERSIONES COFLAN, C.A.

REHABILITACION DE LA TO01, TRAMO: KM 0 NACIONAL -

DISTRIBUIDOR SAN BLAS, ENTRE EL DISTRIBUIDOR LA VICTORIA Y EL DISTRIBUIDOR LAS TEJERIAS, EN EL ESTADO ARAGUA EN SU PISTA SUR

INVERSIONES COFLAN, C.A.

REHABILITACION DE LA TO01, TRAMO: KM 0 NACIONAL -

DISTRIBUIDOR SAN BLAS, ENTRE EL DISTRIBUIDOR LA VICTORIA Y EL DISTRIBUIDOR LAS TEJERIAS, EN EL ESTADO ARAGUA EN SU PISTA SUR

INVERSIONES NUEVO NORTE, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REPARACION DE FALLA DE BORDE EN EL TRAMO

SAN ANTONIO - EL BANQUEADO - LIMITE ESTADO SUCRE, MUNICIPIO ACOSTA, PROG. 96+000. ESTADO

MONAGASINVERSIONES NUEVO NORTE, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REPARACION DE FALLA DE BORDE EN EL TRAMO

SAN ANTONIO - EL BANQUEADO - LIMITE ESTADO SUCRE, MUNICIPIO ACOSTA, PROG. 96+000. ESTADO

MONAGASINVERSIONES NUEVO

NORTE, C.A.

REHABILITACION INTEGRAL Y BACHEO ENTODAS LAS

TRONCALES, COLOCACION DE ALCANTARILLAS TUBULARES DE

CONCRETO, TRAMO: SAN ANTONIO - EL RINCON - LIMITE SUCRE, MUNICIPIO ACOSTA - ESTADO

MONAGAS, PROG. 95+020INVERSIONES NUEVO

NORTE, C.A.

REHABILITACION INTEGRAL Y BACHEO ENTODAS LAS

TRONCALES, COLOCACION DE ALCANTARILLAS TUBULARES DE

CONCRETO, TRAMO: SAN ANTONIO - EL RINCON - LIMITE SUCRE, MUNICIPIO ACOSTA - ESTADO

MONAGAS, PROG. 95+020INVERSIONES NUEVO NORTE, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS TRONCALES, BACHEO Y

REPAVIMENTACION EN LA VIA CUMANA -CUMANACOA - LIMITE

MONAGAS, PROG. 25+000 HASTA LA 84+000, MUNICIPIO SUCRE Y

MONTES, ESTADO SUCREINVERSIONES NUEVO NORTE, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS TRONCALES, BACHEO Y

REPAVIMENTACION EN LA VIA CUMANA -CUMANACOA - LIMITE

MONAGAS, PROG. 25+000 HASTA LA 84+000, MUNICIPIO SUCRE Y

MONTES, ESTADO SUCRE

INVERSIONES NUEVO NORTE, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS TRONCALES, BACHEO Y

REPAVIMENTACION EN LA VIA CUMANA -CUMANACOA - LIMITE

MONAGAS, PROG. 25+000 HASTA LA 84+000, MUNICIPIO SUCRE Y

MONTES, ESTADO SUCRE

INVERSIONES NUEVO NORTE, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS TRONCALES, BACHEO Y

REPAVIMENTACION EN LA VIA CUMANA -CUMANACOA - LIMITE

MONAGAS, PROG. 25+000 HASTA LA 84+000, MUNICIPIO SUCRE Y

MONTES, ESTADO SUCRE

27 de 7104/17/2023

17:30:31

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0125 6/11/2012 4,612,223.25 4,612,223.25 4,612,223.25 100.00 2,059,028.24 2,059,028.24 1 AC 2,059,028.24 0.00 2,059,028.24 4,612,223.25

CV-0125 1 4,612,223.25 2,059,028.24 2,553,195.01

CV-0126 6/1/2012 16,504,852.17 16,504,836.25 16,504,836.25 100.00 7,368,237.58 7,368,237.58 3 AC 7,368,237.58 0.00 7,368,237.58 16,504,836.25

CV-0126 2/20/2013 1 10,992,133.15 4,907,202.30 6,084,930.85CV-0126 3/21/2013 2 4,407,769.02 1,967,754.03 2,440,014.99CV-0126 6/29/2013 3 1,104,934.08 493,281.25 611,652.83

CV-0127 6/21/2012 5,299,496.91 5,299,496.91 3,236,380.62 61.07 2,365,846.84 1,444,812.78 3 AC 2,365,846.84 0.00 2,365,846.84 4,157,414.68

CV-0127 12/19/2012 1 406,901.38 181,652.40 225,248.98CV-0127 4/26/2013 2 1,925,815.46 859,739.05 1,066,076.41CV-0127 5/28/2013 3 903,663.78 403,421.33 500,242.45

CV-0128 INVERSIONES EDAC, C.A. 6/1/2012 35,405,000.00 35,405,000.00 12,013,620.44 33.93 15,805,803.57 5,363,223.41 1 AC 15,805,803.57 0.00 15,805,803.57 22,456,200.60

CV-0128 11/14/2012 1 12,013,620.44 5,363,223.41 6,650,397.03

CV-0129 17,475,728.17 17,475,728.17 17,475,728.15 100.00 7,801,664.36 7,800,664.36 6 AC 7,801,664.36 0.00 7,801,664.36 17,476,728.15

CV-0129 1 4,373,494.96 1,952,453.11 2,421,041.85CV-0129 10/26/2012 2 2,098,627.45 936,887.26 1,161,740.19CV-0129 10/30/2012 3 3,770,794.51 1,682,390.41 2,088,404.10CV-0129 11/20/2012 4 5,345,738.53 2,386,490.42 2,959,248.11CV-0129 12/6/2012 5 1,639,125.66 731,752.53 907,373.13CV-0129 4/16/2013 6 247,947.04 110,690.63 137,256.41

EDALPE CONSTRUCCIONES, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REPARACION DE FALLA DE BORDE Y DRENAJE EN EL

SECTOR ROCIO, TRAMO LA ENTRADA - TRINCHERAS (PROG.

166+200), MUNICIPIO NAGUANAGUA, ESTADO

CARABOBOEDALPE CONSTRUCCIONES, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REPARACION DE FALLA DE BORDE Y DRENAJE EN EL

SECTOR ROCIO, TRAMO LA ENTRADA - TRINCHERAS (PROG.

166+200), MUNICIPIO NAGUANAGUA, ESTADO

CARABOBOCONSTRUCTORA LOCURCIO, S.A.

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO, TRAMO: DISTRIBUIDOR SAN BLAS - CAMPO

DE CARABOBO (PROGRESIVA DESDE 0+000 HASTA 10+800, AMBOS SENTIDOS), ESTADO

CARABOBOCONSTRUCTORA LOCURCIO, S.A.

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO, TRAMO: DISTRIBUIDOR SAN BLAS - CAMPO

DE CARABOBO (PROGRESIVA DESDE 0+000 HASTA 10+800, AMBOS SENTIDOS), ESTADO

CARABOBO

CONSTRUCTORA LOCURCIO, S.A.

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO, TRAMO: DISTRIBUIDOR SAN BLAS - CAMPO

DE CARABOBO (PROGRESIVA DESDE 0+000 HASTA 10+800, AMBOS SENTIDOS), ESTADO

CARABOBO

CONSTRUCTORA LOCURCIO, S.A.

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO, TRAMO: DISTRIBUIDOR SAN BLAS - CAMPO

DE CARABOBO (PROGRESIVA DESDE 0+000 HASTA 10+800, AMBOS SENTIDOS), ESTADO

CARABOBOINVERSIONES C.C.M. DE VENEZUELA 2001, C.A.

MEJORAMIENTO VIAL, SECTOR LAS CLAVELLINAS, PARROQUIA SANTA

ROSA, ESTADO LARA

INVERSIONES C.C.M. DE VENEZUELA 2001, C.A.

MEJORAMIENTO VIAL, SECTOR LAS CLAVELLINAS, PARROQUIA SANTA

ROSA, ESTADO LARAINVERSIONES C.C.M. DE VENEZUELA 2001, C.A.

MEJORAMIENTO VIAL, SECTOR LAS CLAVELLINAS, PARROQUIA SANTA

ROSA, ESTADO LARAINVERSIONES C.C.M. DE VENEZUELA 2001, C.A.

MEJORAMIENTO VIAL, SECTOR LAS CLAVELLINAS, PARROQUIA SANTA

ROSA, ESTADO LARAREHABILITACION INTEGRAL DE LA TO05, TRAMO CAMPO CARABOBO,

ESTADO CARABOBO (DESDE LA PROG. 07+800 HASTA LA 12+000 Y DESDE LA PROG. 19+100 HASTA

LA 27+670).

ASFALTADORA REGIONAL, C.A.

REHABILITACION INTEGRAL DE LA AUTOPISTA VALENCIA - PUERTO CABELLO, SENTIDO VALENCIA -

PUERTO CABELLO (PROG. DESDE188+080 A LA 189+482) Y

SENTIDO PUERTO CABELLO - VALENCIA (PROG. 189+040 A LA 188+760 Y DESDE LA 12+500

HASTA LA 7+500), ESTADO CARABOBOASFALTADORA

REGIONAL, C.A.

REHABILITACION INTEGRAL DE LA AUTOPISTA VALENCIA - PUERTO CABELLO, SENTIDO VALENCIA -

PUERTO CABELLO (PROG. DESDE188+080 A LA 189+482) Y

SENTIDO PUERTO CABELLO - VALENCIA (PROG. 189+040 A LA 188+760 Y DESDE LA 12+500

HASTA LA 7+500), ESTADO CARABOBO

ASFALTADORA REGIONAL, C.A.

REHABILITACION INTEGRAL DE LA AUTOPISTA VALENCIA - PUERTO CABELLO, SENTIDO VALENCIA -

PUERTO CABELLO (PROG. DESDE188+080 A LA 189+482) Y

SENTIDO PUERTO CABELLO - VALENCIA (PROG. 189+040 A LA 188+760 Y DESDE LA 12+500

HASTA LA 7+500), ESTADO CARABOBO

ASFALTADORA REGIONAL, C.A.

REHABILITACION INTEGRAL DE LA AUTOPISTA VALENCIA - PUERTO CABELLO, SENTIDO VALENCIA -

PUERTO CABELLO (PROG. DESDE188+080 A LA 189+482) Y

SENTIDO PUERTO CABELLO - VALENCIA (PROG. 189+040 A LA 188+760 Y DESDE LA 12+500

HASTA LA 7+500), ESTADO CARABOBO

ASFALTADORA REGIONAL, C.A.

REHABILITACION INTEGRAL DE LA AUTOPISTA VALENCIA - PUERTO CABELLO, SENTIDO VALENCIA -

PUERTO CABELLO (PROG. DESDE188+080 A LA 189+482) Y

SENTIDO PUERTO CABELLO - VALENCIA (PROG. 189+040 A LA 188+760 Y DESDE LA 12+500

HASTA LA 7+500), ESTADO CARABOBO

ASFALTADORA REGIONAL, C.A.

REHABILITACION INTEGRAL DE LA AUTOPISTA VALENCIA - PUERTO CABELLO, SENTIDO VALENCIA -

PUERTO CABELLO (PROG. DESDE188+080 A LA 189+482) Y

SENTIDO PUERTO CABELLO - VALENCIA (PROG. 189+040 A LA 188+760 Y DESDE LA 12+500

HASTA LA 7+500), ESTADO CARABOBO

ASFALTADORA REGIONAL, C.A.

REHABILITACION INTEGRAL DE LA AUTOPISTA VALENCIA - PUERTO CABELLO, SENTIDO VALENCIA -

PUERTO CABELLO (PROG. DESDE188+080 A LA 189+482) Y

SENTIDO PUERTO CABELLO - VALENCIA (PROG. 189+040 A LA 188+760 Y DESDE LA 12+500

HASTA LA 7+500), ESTADO CARABOBO

28 de 7104/17/2023

17:30:31

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0130 1,433,054.57 1,433,054.55 1,346,850.08 93.98 639,756.51 601,272.36 AC AC 639,756.51 0.00 639,756.51 1,385,334.23

CV-0130 7/9/2013 1 1,346,850.08 601,272.36 745,577.72

CV-0131 8/10/2012 45,130,770.43 45,130,770.43 40,822,931.28 90.45 20,147,665.37 18,224,522.90 2 AC 20,147,665.37 0.00 20,147,665.37 42,746,073.75

1 31,344,290.34 13,992,986.76 17,351,303.584/17/2013 2 9,478,640.94 4,231,536.14 5,247,104.80

CV-0132 7/19/2012 6,148,189.78 6,148,189.78 6,148,189.78 100.00 2,744,727.58 2,744,727.58 2 AC 2,744,727.58 0.00 2,744,727.58 6,148,189.78

CV-0132 9/26/2012 1 5,728,176.07 2,557,221.46 3,170,954.61CV-0132 11/16/2012 2 420,013.71 187,506.12 232,507.59

CV-0133 6/14/2012 1,198,792.55 1,198,792.10 1,198,792.04 100.00 535,175.25 535,175.25 2 AC 535,175.25 0.00 535,175.25 1,198,792.04

CV-0133 12/11/2013 1 906,706.70 404,779.78 501,926.92CV-0133 8/1/2013 2 292,085.34 130,395.47 161,689.87

CV-0134 6/14/2012 1,059,309.06 1,059,309.06 759,295.22 71.68 472,905.83 338,971.08 1 AC 472,905.83 0.00 472,905.83 893,229.97

CV-0134 5/20/2013 1 759,295.22 338,971.08 420,324.14

CV-0135 6/15/2012 4,173,019.17 4,173,019.17 0.00 1,862,954.99 AC 1,862,954.99 0.00 1,862,954.99 1,862,954.99

CV-0136 6/15/2012 12,621,339.39 11,647,056.97 12,621,339.22 108.37 5,634,526.52 5,634,526.52 2 AC 5,634,526.52 0.00 5,634,526.52 12,621,339.22

CV-0136 1 11,720,898.68 5,232,544.06 6,488,354.62CV-0136 5/21/2013 2 900,440.54 401,982.46 498,458.08

ASFALTADORA REGIONAL, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REPARACION DE LOS HOMBRILLOS DE LA AUTOPISTA VALENCIA - PUERTO CABELLO,

DESDE LA PROGRESIVA 180+400 A LA 175+400, ESTADO CARABOBO.

ASFALTADORA REGIONAL, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REPARACION DE LOS HOMBRILLOS DE LA AUTOPISTA VALENCIA - PUERTO CABELLO,

DESDE LA PROGRESIVA 180+400 A LA 175+400, ESTADO CARABOBO.

CONSTRUCTORA GUMEGA, C.A.

REHABILITACION LO09 CON EMPALME TO15, TRAMO SAN

DIEGO DE CABRUTICA - MAPIRE, ETAPA I, PROGRESIVAS DESDE LA

108+093 HASTA LA 138+000, ESTADO ANZOATEGUI.

EMPRESA D&A CONSTRUCCIONES, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, PROTECCION HIDRAULICA Y ESTABILIZACION AL

TALUD DEL TERRAPLEN, CORRESPONDIENTE AL SEGMENTO

DE LAS PERGOLAS DE LA AUTOPISTA FRANCISCO FAJARDO,

UBICADO A LA ALTURA DE PARQUE CENTRAL, SENTIDO ESTE - OESTE, MUNICIPIO LIBERTADOR, DISTRITO

CAPITALEMPRESA D&A

CONSTRUCCIONES, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, PROTECCION HIDRAULICA Y ESTABILIZACION AL

TALUD DEL TERRAPLEN, CORRESPONDIENTE AL SEGMENTO

DE LAS PERGOLAS DE LA AUTOPISTA FRANCISCO FAJARDO,

UBICADO A LA ALTURA DE PARQUE CENTRAL, SENTIDO ESTE - OESTE, MUNICIPIO LIBERTADOR, DISTRITO

CAPITALPROYECTOS MARAQUERO, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REPARACION DE FALLA DE BORDE Y COLOCACION

DE ALCANTATILLAS TUBULARES DE CONCRETO EN LA VIA LOCAL 07,

PROG. 36+900, SAN FELIZ - QUEBRADA SECA - GUANAGUANA,

MUNICIPIO CEDEÑO, ESTADO MONAGASPROYECTOS

MARAQUERO, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REPARACION DE FALLA DE BORDE Y COLOCACION

DE ALCANTATILLAS TUBULARES DE CONCRETO EN LA VIA LOCAL 07,

PROG. 36+900, SAN FELIZ - QUEBRADA SECA - GUANAGUANA,

MUNICIPIO CEDEÑO, ESTADO MONAGAS

PROYECTOS MARAQUERO, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REPARACION DE FALLA DE BORDE Y COLOCACION

DE ALCANTATILLAS TUBULARES DE CONCRETO EN LA VIA LOCAL 07,

PROG. 36+900, SAN FELIZ - QUEBRADA SECA - GUANAGUANA,

MUNICIPIO CEDEÑO, ESTADO MONAGASPROYECTOS

MARAQUERO, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REPARACION DE FALLA DE BORDE Y SUSTITUCION DE ALCANTARILLA EN LA PROG.

APROX. 122+200, TO10 - CARIPITO - MUNICIPIO BOLIVAR, ESTADO

MONAGASPROYECTOS

MARAQUERO, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REPARACION DE FALLA DE BORDE Y SUSTITUCION DE ALCANTARILLA EN LA PROG.

APROX. 122+200, TO10 - CARIPITO - MUNICIPIO BOLIVAR, ESTADO

MONAGASCONSTRUCTORA 01 DE

MARZO, S.A.

REHABILITACION Y MANTENIMIENTO DE LA TO15, TRAMO LIMITE TEMBLADOR - TUCUPITA, DESDE LA PROG. 521+900 HASTA 544+500,

MUNICIPIO TUCUPITA. ESTADO DELTA AMACURO

PILOTES PERFORADOS, C.A. (PILPER, C.A.)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, ESTABILIZACION DE FALLA EN EL SECTOR EL

INDIGENTE DE LA AUTOPISTA ANTONIO JOSE DE SUCRE, ESTADO

SUCRE

PILOTES PERFORADOS, C.A. (PILPER, C.A.)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, ESTABILIZACION DE FALLA EN EL SECTOR EL

INDIGENTE DE LA AUTOPISTA ANTONIO JOSE DE SUCRE, ESTADO

SUCRE

PILOTES PERFORADOS, C.A. (PILPER, C.A.)

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, ESTABILIZACION DE FALLA EN EL SECTOR EL

INDIGENTE DE LA AUTOPISTA ANTONIO JOSE DE SUCRE, ESTADO

SUCRE

29 de 7104/17/2023

17:30:31

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0137 6/22/2012 9,708,473.66 9,708,473.60 8,270,594.39 85.19 4,334,140.03 3,692,229.64 3 AC 4,334,140.03 0.00 4,334,140.03 8,912,504.78

CV-0137 10/19/2012 1 4,277,118.33 1,909,427.83 2,367,690.50CV-0137 1/31/2013 2 3,164,715.64 1,412,819.48 1,751,896.16CV-0137 1/31/2013 3 828,760.42 369,982.33 458,778.09

CV-0138 7/2/2012 1,799,999.13 1,799,999.13 899,999.57 AC 899,999.57 0.00 899,999.57 899,999.57

CV-0139 8/15/2012 6,775,998.70 6,775,998.70 4,436,355.39 65.47 3,024,999.42 1,980,515.80 4 AC 3,024,999.42 0.00 3,024,999.42 5,480,839.01

CV-0139 1 1,617,521.09 722,107.63 895,413.46CV-0139 12/5/2012 2 272,586.00 121,690.18 150,895.82CV-0139 4/3/2013 3 1,286,685.19 574,413.03 712,272.16CV-0139 4/24/2013 4 1,259,563.11 562,304.96 697,258.15

CV-0140 7/12/2012 8,794,171.78 8,793,524.09 6,605,753.98 75.12 3,925,969.55 2,948,997.32 3 AC 3,925,969.55 0.00 3,925,969.55 7,582,726.21

CV-0140 10/11/2012 1 2,520,670.44 1,125,299.31 1,395,371.13CV-0140 11/29/2012 2 1,028,698.54 459,240.42 569,458.12CV-0140 11/29/2012 3 1,798,052.93 802,702.20 995350.73CV-0140 3/13/2013 4 1,258,332.07 561,755.39 696,576.68

CV-0141 6/20/2012 1,702,842.72 1,702,842.72 1,702,842.72 100.00 1 11/20/2012 1 1,702,842.72 0.00 1,702,842.72 1,702,842.72

CV-0142 6/25/2012 7,529,995.02 7,529,995.02 5,266,490.60 69.94 3,361,604.92 2,351,111.88 1 12/12/2012 AC 3,361,604.92 0.00 3361604.92 6,276,983.64

CV-0142 1 5,266,490.60 2,351,111.88 2,915,378.72

CONSORCIO MONTE CARMELO, C.A.

REHABILITACION DEL TRAMO: TRUJILLO - BOCONO, PROG. DESDE

0+000 HASTA 19+000. ESTADO TRUJILLO

CONSORCIO MONTE CARMELO, C.A.

REHABILITACION DEL TRAMO: TRUJILLO - BOCONO, PROG. DESDE

0+000 HASTA 19+000. ESTADO TRUJILLO

CONSORCIO MONTE CARMELO, C.A.

REHABILITACION DEL TRAMO: TRUJILLO - BOCONO, PROG. DESDE

0+000 HASTA 19+000. ESTADO TRUJILLO

CONSORCIO MONTE CARMELO, C.A.

REHABILITACION DEL TRAMO: TRUJILLO - BOCONO, PROG. DESDE

0+000 HASTA 19+000. ESTADO TRUJILLO

COOPERATIVA SERVICIOS A.J.T. 2000,

R.L.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, SUSTITUCION DE ALCANTARILLAS TRONCAL 9, BOCA DE CHAVEZ, MUNICIPIO SAN JUAN DE CAPISTRANO, PROG. 212+200.

ESTADO ANZOATEGUI

ESTRUCTURAS NACIONALES, S.A.

(ENSA)

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO, TO01, CONSTRUCCION DE NUEVOS

SISTEMAS DE DRENAJES EN LA AUTOPISTA VALLE-COCHE, PROG.

1+400 (KM. 1.4), DISTRITO CAPITAL

ESTRUCTURAS NACIONALES, S.A.

(ENSA)

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO, TO01, CONSTRUCCION DE NUEVOS

SISTEMAS DE DRENAJES EN LA AUTOPISTA VALLE-COCHE, PROG.

1+400 (KM. 1.4), DISTRITO CAPITAL

ESTRUCTURAS NACIONALES, S.A.

(ENSA)

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO, TO01, CONSTRUCCION DE NUEVOS

SISTEMAS DE DRENAJES EN LA AUTOPISTA VALLE-COCHE, PROG.

1+400 (KM. 1.4), DISTRITO CAPITAL

ESTRUCTURAS NACIONALES, S.A.

(ENSA)

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO, TO01, CONSTRUCCION DE NUEVOS

SISTEMAS DE DRENAJES EN LA AUTOPISTA VALLE-COCHE, PROG.

1+400 (KM. 1.4), DISTRITO CAPITAL

ESTRUCTURAS NACIONALES, S.A.

(ENSA)

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO, TO01, CONSTRUCCION DE NUEVOS

SISTEMAS DE DRENAJES EN LA AUTOPISTA VALLE-COCHE, PROG.

1+400 (KM. 1.4), DISTRITO CAPITAL

ESTRUCTURAS NACIONALES, S.A.

(ENSA)

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO, TO01, CONSTRUCCION DE NUEVOS SISTEMAS DE DRENAJE EN LA

AUTOPISTA REGIONAL DEL CENTRO, EN LA PROG. 30+000,

KM. 30, ESTADO MIRANDAESTRUCTURAS

NACIONALES, S.A. (ENSA)

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO, TO01, CONSTRUCCION DE NUEVOS SISTEMAS DE DRENAJE EN LA

AUTOPISTA REGIONAL DEL CENTRO, EN LA PROG. 30+000,

KM. 30, ESTADO MIRANDA

ESTRUCTURAS NACIONALES, S.A.

(ENSA)

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO, TO01, CONSTRUCCION DE NUEVOS SISTEMAS DE DRENAJE EN LA

AUTOPISTA REGIONAL DEL CENTRO, EN LA PROG. 30+000,

KM. 30, ESTADO MIRANDA

ESTRUCTURAS NACIONALES, S.A.

(ENSA)

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO, TO01, CONSTRUCCION DE NUEVOS SISTEMAS DE DRENAJE EN LA

AUTOPISTA REGIONAL DEL CENTRO, EN LA PROG. 30+000,

KM. 30, ESTADO MIRANDA

ESTRUCTURAS NACIONALES, S.A.

(ENSA)

REHABILITACION DE LA AUTOPISTA REGIONAL DEL CENTRO, TO01, CONSTRUCCION DE NUEVOS SISTEMAS DE DRENAJE EN LA

AUTOPISTA REGIONAL DEL CENTRO, EN LA PROG. 30+000,

KM. 30, ESTADO MIRANDAASOCIACION

COOPERATIVA ALBA, CONSTRUCCIONES Y

PROYECTOS, R.L.

REHABILITACION INTEGRAL Y BACHEO ENTODAS LAS

TRONCALES, REPARACION DE LOSA DE TABLERO DE PISO E INSTALACION DE DEFENSAS,

PUENTE LA CAJA, RIO TINACO, TO13, SECTOR LA PLATERA, MUNICIPIO TINACO. ESTADO

COJEDES

CONSTRUCTORA 01 DE MARZO, S.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, TO15, TRAMO TEMBLADOR - TUCUPITA DESDE LA PROG. 451+750 HASTA 521+900 MUNICIPIO LIBERTADOR. ESTADO

MONAGASCONSTRUCTORA 01 DE

MARZO, S.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, TO15, TRAMO TEMBLADOR - TUCUPITA DESDE LA PROG. 451+750 HASTA 521+900 MUNICIPIO LIBERTADOR. ESTADO

MONAGAS

30 de 7104/17/2023

17:30:31

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0143 7/25/2012 1,347,288.23 1,347,123.47 1,347,123.45 100.00 601,467.96 601,467.96 2 AC 601,467.96 0.00 601,467.96 1,347,123.45

CV-0143 10/24/2012 1 1,119,051.56 499,576.59 619,474.97CV-0143 12/6/2012 2 228,071.89 101,891.37 126,180.52

CV-0144 7/30/2012 1,094,984.39 1,094,425.13 1,094,425.12 100.00 488,832.32 488,832.32 2 AC 488,832.32 0.00 488,832.32 1,094,425.12

CV-0144 10/26/2012 1 885,393.64 395,265.02 490,128.62CV-0144 4/10/2013 2 209,031.48 93,567.30 115,464.18

CV-0145 9/27/2012 46,747,825.60 46,747,825.60 31,393,666.45 67.16 20,869,565.00 14,015,029.68 8 AC 20,869,565.00 0.00 20,869,565.00 38,248,201.77

CV-0145 12/11/2012 1 878,964.25 392,394.76 486,569.49CV-0145 2 2,800,041.14 1,250,018.37 1,550,022.77CV-0145 3/19/2013 3 272,483.66 121,644.49 150,839.17CV-0145 3/19/2013 4 8,469,587.77 3,781,065.97 4,688,521.80CV-0145 4/17/2013 5 8,512,613.27 3,800,273.78 4,712,339.49CV-0145 4/26/2013 6 2,126,718.75 949,428.02 1,177,290.73CV-0145 5/29/2013 7 1,860,002.82 830,358.40 1,029,644.42CV-0145 7/9/2013 8 6,473,254.79 2,889,845.89 3,583,408.90

CV-0146 9/25/2012 19,400,000.00 19,400,000.00 11,242,327.53 57.95 8,660,714.29 5,018,896.22 2 AC 8,660,714.29 0.00 8,660,714.29 14,884,145.60

CV-0146 12/11/2012 1 8,098,492.21 3,615,398.31 4,483,093.90CV-0146 5/27/2013 2 1,193,226.23 532,690.28 660,535.95CV-0146 7/12/2013 3 1,950,609.09 870,807.63 1,079,801.46

CV-0147 9/24/2012 4,869,565.09 4,869,565.09 4,011,592.40 82.38 2,173,912.99 1,790,889.47 3 AC 2,173,912.99 0.00 2,173,912.99 4,394,615.92

CV-0147 4/9/2013 1 1,939,195.20 865,712.15 1,073,483.05CV-0147 5/16/2013 2 953,140.41 425,509.11 527,631.30CV-0147 6/19/2013 3 1,119,256.79 499,668.21 619,588.58

CV-0148 9/24/2012 35,922,245.92 35,922,245.92 24,043,844.06 66.93 16,036,716.93 10,733,858.96 3 AC 16,036,716.93 16,036,716.93 29,346,702.03

CV-0148 2/26/2013 1 2,646,595.59 1,181,515.89 1,465,079.70CV-0148 2/28/2013 2 10,639,605.44 4,749,823.86 5,889,781.58CV-0148 6/25/2013 3 10,757,643.03 4,802,519.21 5,955,123.82

PROYECTOS MARAQUERO, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REPARACION DE FALLA DE BORDE EN LA PROG.

73+170 A 73+196, SECTOR LAS PIONIAS - TRAMO CUMANACOA, LIMITE MONAGAS. MUNICIPIO

MONTES. ESTADO SUCREPROYECTOS MARAQUERO, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REPARACION DE FALLA DE BORDE EN LA PROG.

73+170 A 73+196, SECTOR LAS PIONIAS - TRAMO CUMANACOA, LIMITE MONAGAS. MUNICIPIO

MONTES. ESTADO SUCRE

PROYECTOS MARAQUERO, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REPARACION DE FALLA DE BORDE EN LA PROG.

73+170 A 73+196, SECTOR LAS PIONIAS - TRAMO CUMANACOA, LIMITE MONAGAS. MUNICIPIO

MONTES. ESTADO SUCRETELCONS INGENIEROS,

C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DE JUNTAS DE DILATACION EN

AUTOPISTA NORTE-SUR, DISTRITO CAPITALTELCONS INGENIEROS,

C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DE JUNTAS DE DILATACION EN

AUTOPISTA NORTE-SUR, DISTRITO CAPITAL

TELCONS INGENIEROS, C.A.

REHABILITACION INTEGRAL Y BACHEO EN TODAS LAS

TRONCALES, REHABILITACION DE JUNTAS DE DILATACION EN

AUTOPISTA NORTE-SUR, DISTRITO CAPITAL

INVERSIONES COFLAN, C.A.

REHABILITACION INTEGRAL DE LA TO01, ENTRE EL DISTRIBUIDOR

HOYO DE LA PUERTA (KM. 11) Y EL DISTRIBUIDOR LOS TOTUMOS (KM.

32), ESTADO MIRANDA EN SU PISTA SUR

INVERSIONES COFLAN, C.A.

REHABILITACION INTEGRAL DE LA TO01, ENTRE EL DISTRIBUIDOR

HOYO DE LA PUERTA (KM. 11) Y EL DISTRIBUIDOR LOS TOTUMOS (KM.

32), ESTADO MIRANDA EN SU PISTA SUR

INVERSIONES COFLAN, C.A.

REHABILITACION INTEGRAL DE LA TO01, ENTRE EL DISTRIBUIDOR

HOYO DE LA PUERTA (KM. 11) Y EL DISTRIBUIDOR LOS TOTUMOS (KM.

32), ESTADO MIRANDA EN SU PISTA SUR

INVERSIONES COFLAN, C.A.

REHABILITACION INTEGRAL DE LA TO01, ENTRE EL DISTRIBUIDOR

HOYO DE LA PUERTA (KM. 11) Y EL DISTRIBUIDOR LOS TOTUMOS (KM.

32), ESTADO MIRANDA EN SU PISTA SUR

INVERSIONES COFLAN, C.A.

REHABILITACION INTEGRAL DE LA TO01, ENTRE EL DISTRIBUIDOR

HOYO DE LA PUERTA (KM. 11) Y EL DISTRIBUIDOR LOS TOTUMOS (KM.

32), ESTADO MIRANDA EN SU PISTA SUR

INVERSIONES COFLAN, C.A.

REHABILITACION INTEGRAL DE LA TO01, ENTRE EL DISTRIBUIDOR

HOYO DE LA PUERTA (KM. 11) Y EL DISTRIBUIDOR LOS TOTUMOS (KM.

32), ESTADO MIRANDA EN SU PISTA SUR

INVERSIONES COFLAN, C.A.

REHABILITACION INTEGRAL DE LA TO01, ENTRE EL DISTRIBUIDOR

HOYO DE LA PUERTA (KM. 11) Y EL DISTRIBUIDOR LOS TOTUMOS (KM.

32), ESTADO MIRANDA EN SU PISTA SUR

INVERSIONES COFLAN, C.A.

REHABILITACION INTEGRAL DE LA TO01, ENTRE EL DISTRIBUIDOR

HOYO DE LA PUERTA (KM. 11) Y EL DISTRIBUIDOR LOS TOTUMOS (KM.

32), ESTADO MIRANDA EN SU PISTA SUR

INVERSIONES COFLAN, C.A.

REHABILITACION INTEGRAL DE LA TO01, ENTRE EL DISTRIBUIDOR

HOYO DE LA PUERTA (KM. 11) Y EL DISTRIBUIDOR LOS TOTUMOS (KM.

32), ESTADO MIRANDA EN SU PISTA SUR

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

REHABILITACION INTEGRAL DEL TRAMO: CARRETERA GUATOPO -

SANTA TERESA, ESTADO MIRANDA

COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.)

REHABILITACION INTEGRAL DEL TRAMO: CARRETERA GUATOPO -

SANTA TERESA, ESTADO MIRANDACOVIALCA

(CONSTRUCCIONES Y VIALIDADES, C.A.)

REHABILITACION INTEGRAL DEL TRAMO: CARRETERA GUATOPO -

SANTA TERESA, ESTADO MIRANDACOVIALCA

(CONSTRUCCIONES Y VIALIDADES, C.A.)

REHABILITACION INTEGRAL DEL TRAMO: CARRETERA GUATOPO -

SANTA TERESA, ESTADO MIRANDA

TELCONS INGENIEROS, C.A.

REHABILITACION DE JUNTAS DE DILATACION EN LA GRAN CARACAS

TELCONS INGENIEROS, C.A.

REHABILITACION DE JUNTAS DE DILATACION EN LA GRAN CARACASTELCONS INGENIEROS,

C.A.REHABILITACION DE JUNTAS DE

DILATACION EN LA GRAN CARACASTELCONS INGENIEROS, C.A.

REHABILITACION DE JUNTAS DE DILATACION EN LA GRAN CARACAS

OSMAR CONSTRUCCIONES Y

MANTENIMIENTO, C.A.

REHABILITACION DEL VIADUCTO LA CABRERA. ESTADO CARABOBO

OSMAR CONSTRUCCIONES Y

MANTENIMIENTO, C.A.

REHABILITACION DEL VIADUCTO LA CABRERA. ESTADO CARABOBOOSMAR

CONSTRUCCIONES Y MANTENIMIENTO, C.A.

REHABILITACION DEL VIADUCTO LA CABRERA. ESTADO CARABOBOOSMAR

CONSTRUCCIONES Y MANTENIMIENTO, C.A.

REHABILITACION DEL VIADUCTO LA CABRERA. ESTADO CARABOBO

31 de 7104/17/2023

17:30:31

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0149 9/20/2012 20,452,173.92 20,452,173.92 6,110,847.21 29.88 9,130,434.79 2,728,056.80 3 AC 9,130,434.79 0.00 9,130,434.79 12,513,225.20

CV-0149 1/24/2013 1 65,954.74 29,444.08 36,510.66CV-0149 4/22/2013 2 2,966,395.61 1,324,283.76 1,642,111.85CV-0149 6/10/2013 3 3,078,496.86 1,374,328.96 1,704,167.90

CV-0150 10/24/2012 12,621,359.22 12,621,359.22 12,621,359.21 100.00 5,634,535.37 5,634,535.37 5 AC 5,634,535.37 0.00 5,634,535.37 12,621,359.21

CV-0150 1 2,876,963.42 1,284,358.67 1,592,604.75CV-0150 4/2/2013 2 1,176,394.86 525,176.28 651,218.58CV-0150 4/11/2013 3 3,507,622.00 1,565,902.68 1,941,719.32CV-0150 4/17/2013 4 2,352,028.27 1,050,012.62 1,302,015.65CV-0150 4/22/2013 5 2,708,350.66 1,209,085.12 1,499,265.54

PILOTES PERFORADOS, C.A. (PILPERCA)

CULMINACION DE OBRAS DE ESTABILIZACION DE TALUD EN LA PROG. 0+850, EN LA AUTOPISTA CARACAS - LA GUAIRA, DISTRITO

CAPITAL

PILOTES PERFORADOS, C.A. (PILPERCA)

CULMINACION DE OBRAS DE ESTABILIZACION DE TALUD EN LA PROG. 0+850, EN LA AUTOPISTA CARACAS - LA GUAIRA, DISTRITO

CAPITAL

PILOTES PERFORADOS, C.A. (PILPERCA)

CULMINACION DE OBRAS DE ESTABILIZACION DE TALUD EN LA PROG. 0+850, EN LA AUTOPISTA CARACAS - LA GUAIRA, DISTRITO

CAPITAL

PILOTES PERFORADOS, C.A. (PILPERCA)

CULMINACION DE OBRAS DE ESTABILIZACION DE TALUD EN LA PROG. 0+850, EN LA AUTOPISTA CARACAS - LA GUAIRA, DISTRITO

CAPITAL

GRUPO GRIHER DE VENEZUELA, C.A.

REHABILITACION DEL TRAMO LA TOSCANA - JUSEPIN Y ACCESOS

(14,5 KM. DESDE LA PROGRESIVA 0+000 HASTA LA PROGRESIVA 14+500), ESTADO MONAGAS

GRUPO GRIHER DE VENEZUELA, C.A.

REHABILITACION DEL TRAMO LA TOSCANA - JUSEPIN Y ACCESOS

(14,5 KM. DESDE LA PROGRESIVA 0+000 HASTA LA PROGRESIVA 14+500), ESTADO MONAGAS

GRUPO GRIHER DE VENEZUELA, C.A.

REHABILITACION DEL TRAMO LA TOSCANA - JUSEPIN Y ACCESOS

(14,5 KM. DESDE LA PROGRESIVA 0+000 HASTA LA PROGRESIVA 14+500), ESTADO MONAGAS

GRUPO GRIHER DE VENEZUELA, C.A.

REHABILITACION DEL TRAMO LA TOSCANA - JUSEPIN Y ACCESOS

(14,5 KM. DESDE LA PROGRESIVA 0+000 HASTA LA PROGRESIVA 14+500), ESTADO MONAGAS

GRUPO GRIHER DE VENEZUELA, C.A.

REHABILITACION DEL TRAMO LA TOSCANA - JUSEPIN Y ACCESOS

(14,5 KM. DESDE LA PROGRESIVA 0+000 HASTA LA PROGRESIVA 14+500), ESTADO MONAGAS

GRUPO GRIHER DE VENEZUELA, C.A.

REHABILITACION DEL TRAMO LA TOSCANA - JUSEPIN Y ACCESOS

(14,5 KM. DESDE LA PROGRESIVA 0+000 HASTA LA PROGRESIVA 14+500), ESTADO MONAGAS

32 de 7104/17/2023

17:30:31

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0151 4/18/2012 19,438,222.05 19,407,918.02 19,078,542.91 98.30 8,677,777.70 8,517,206.66 2 5/10/2012 AC 8,677,777.70 0.00 8,677,777.70 19,239,113.95

CV-0151 6/26/2012 1 8,672,511.65 3,871,656.99 4,800,854.66CV-0151 10/10/2012 2 10,406,031.26 4,645,549.67 5,760,481.59

CV-0152 5/16/2012 432,000.00 432,000.00 432,000.00 100.00 192,857.15 192,857.15 2 6/14/2012 AC 192,857.15 0.00 192,857.15 432,000.00

CV-0152 10/19/2012 1 375,705.42 167,725.64 207,979.78CV-0152 12/20/2012 2 56,294.58 25,131.51 31,163.07

CV-0154 4/25/2012 1,199,988.18 1,199,988.18 963,049.08 80.25 1 10/17/2012 1 963,049.08 0.00 963,049.08 963,049.08

CV-0156 7/31/2012 450,000.00 450,000.00 66,512.35 14.78 200,892.86 29,693.02 1 8/20/2012 AC 200,892.86 0.00 200,892.86 237,712.19

CV-0156 7/29/2013 1 66,512.35 29,693.02 36,819.33

CV-0157 4/25/2012 500,000.00 500,000.00 251,202.08 50.24 223,214.29 112,143.79 2 5/23/2012 AC 223,214.29 0.00 223,214.29 362,272.58

CV-0157 3/7/2013 1 24,119.13 10,767.47 13,351.66CV-0157 4/30/2013 2 227,082.95 101,376.32 125,706.63

CV-0158 4/25/2012 1,146,500.00 1,146,500.00 604,733.64 52.75 511,830.36 269,970.38 2 6/7/2012 AC 511,830.36 0.00 511,830.36 846,593.62

CV-0158 7/10/2013 1 84,054.20 37,524.20 46,530.00CV-0158 7/10/2013 2 520,679.44 232,446.18 288,233.26

CV-0159 4/27/2012 9,998,660.61 9,998,660.61 0.00 4,463,687.77 AC 5/9/2012 AC 4,463,687.77 0.00 4,463,687.77 4,463,687.77

CV-0160 4/25/2012 796,432.02 796,432.02 607,951.69 76.33 355,550.21 271,407.01 1 5/25/2012 AC 355,550.21 355,550.21 692,094.89

CV-0160 5/27/2013 1 607,951.69 271,407.01 336,544.68

CV-0161 4/25/2012 350,000.00 349,999.92 234,835.61 67.10 156,250.00 104,837.33 1 5/21/2012 AC 156,250.00 0.00 156,250.00 286,248.28

CV-0161 12/13/2012 1 234,835.61 104,837.33 129,998.28

CV-0162 LOMA REDONDA, C.A. 5/18/2012 2,000,000.00 2,000,000.00 719,915.09 36.00 892,857.15 321,390.67 3 6/12/2012 AC 892,857.15 0.00 892,857.15 1,291,381.57

VENEZOLANA DE INVERSIONES Y

CONSTRUCCIONES CLERICO, C.A.

(VINCCLER, C.A.)

REHABILITACION POR BACHEO DE LA TO05, TRAMO BARINAS - SAN CRISTOBAL, ESTADO TACHIRAVENEZOLANA DE

INVERSIONES Y CONSTRUCCIONES

CLERICO, C.A. (VINCCLER, C.A.)

REHABILITACION POR BACHEO DE LA TO05, TRAMO BARINAS - SAN CRISTOBAL, ESTADO TACHIRA

VENEZOLANA DE INVERSIONES Y

CONSTRUCCIONES CLERICO, C.A.

(VINCCLER, C.A.)

REHABILITACION POR BACHEO DE LA TO05, TRAMO BARINAS - SAN CRISTOBAL, ESTADO TACHIRA

CONSTRUCCIONES E Y D, C.A.

VIA LO02, MUELLE CARIACO - SANTA MARIA, PROG. 42+680, FALLA DE BORDE EN LA VIA,.

ESTADO SUCRECONSTRUCCIONES E Y D,

C.A.

VIA LO02, MUELLE CARIACO - SANTA MARIA, PROG. 42+680, FALLA DE BORDE EN LA VIA,.

ESTADO SUCRECONSTRUCCIONES E Y D,

C.A.

VIA LO02, MUELLE CARIACO - SANTA MARIA, PROG. 42+680, FALLA DE BORDE EN LA VIA,.

ESTADO SUCRE

CONSTRUCTORA HERVICAS, C.A.

REPARACION DE HUNDIMIENTO DE CALZADA Y COLAPSO DE

ALCANTARILLA, DISTRIBUIDOR ALTAMIRA, AVENIDA BOYACA

(COTA MIL), MUNICIPIO CHACAO, ESTADO MIRANDA

CONSTRUCTORA SANAL, C.A.

CORRECCION DE FALLA DE BORDE VIA LO04, PROG. 71+900,

MUNICIPIO CAMPO ELIAS. ESTADO MERIDA

CONSTRUCTORA SANAL, C.A.

CORRECCION DE FALLA DE BORDE VIA LO04, PROG. 71+900,

MUNICIPIO CAMPO ELIAS. ESTADO MERIDA

INVERSIONES MENDEZ, C.A. (INMENCA)

CORRECCION DE FALLA DE BORDE VIA LO04, PROG. 5+800,

PARROQUIA SANTA ELENA DE ARENALES, ESTADO MERIDA

INVERSIONES MENDEZ, C.A. (INMENCA)

CORRECCION DE FALLA DE BORDE VIA LO04, PROG. 5+800,

PARROQUIA SANTA ELENA DE ARENALES, ESTADO MERIDA

INVERSIONES MENDEZ, C.A. (INMENCA)

CORRECCION DE FALLA DE BORDE VIA LO04, PROG. 5+800,

PARROQUIA SANTA ELENA DE ARENALES, ESTADO MERIDA

CONSTRUCTORA RIO NEGRO, C.A.

REPRACION DE ALCANTARILLA, VIA LO03, PROG. 11+800, TRAMO LA

"y" - TOVAR, MUNICIPIO ZEA, ESTADO MERIDA

CONSTRUCTORA RIO NEGRO, C.A.

REPRACION DE ALCANTARILLA, VIA LO03, PROG. 11+800, TRAMO LA

"y" - TOVAR, MUNICIPIO ZEA, ESTADO MERIDA

CONSTRUCTORA RIO NEGRO, C.A.

REPRACION DE ALCANTARILLA, VIA LO03, PROG. 11+800, TRAMO LA

"y" - TOVAR, MUNICIPIO ZEA, ESTADO MERIDA

CONSTRUCTORA EL MORRACHON, C.A.

REMOCION DE DERRUMBES Y RESTITUCION DE L CALZADA,

SECTOR EL AZUL, PROG. 30+150, LO03, MUNICIPIO SEBORUCO.

ESTADO TACHIRA

CONSTRUCTORA BELCON, C.A.

CONSTRUCCION DE MURO DE CONTENCION, VIA LO03, PROG.

14+900, TRAMO LA "Y" - TOVAR, MUNICIPIO ZEA, ESTADO MERIDA

CONSTRUCTORA BELCON, C.A.

CONSTRUCCION DE MURO DE CONTENCION, VIA LO03, PROG.

14+900, TRAMO LA "Y" - TOVAR, MUNICIPIO ZEA, ESTADO MERIDA

INVERSIONES DALKA DE DALIA MARGARITA

CHACON

SUSTITUCION DE ALCANTARILLA EN LA VIA TO07, PROG. 348+000,

TRAMO LIMITE TRUJILLO - TIMOTES, MUNICIPIOS MIRANDA Y RANGEL,

ESTADO MERIDAINVERSIONES DALKA DE

DALIA MARGARITA CHACON

SUSTITUCION DE ALCANTARILLA EN LA VIA TO07, PROG. 348+000,

TRAMO LIMITE TRUJILLO - TIMOTES, MUNICIPIOS MIRANDA Y RANGEL,

ESTADO MERIDACONSTRUCCION DE VARIANTE Y MUROS DE GAVIONES, PROG. 411+500, CARRETERA TO07,

TRAMO APARTADEROS - MERIDA, SECTOR SAN ROMAN, MUNICIPIO

RANGEL, ESTADO MERIDA

33 de 7104/17/2023

17:30:31

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0162 LOMA REDONDA, C.A. 3/12/2013 1 239,652.29 106,987.63 132,664.66CV-0162 LOMA REDONDA, C.A. 3/12/2013 2 187,945.49 83,904.24 104,041.25CV-0162 LOMA REDONDA, C.A. 3/12/2013 3 292,317.31 130,498.80 161,818.51

CV-0164 5/4/2012 300,000.00 300,000.00 100,667.99 33.56 133,928.57 44,941.07 1 6/7/2012 AC 133,928.57 0.00 133,928.57 189,655.49

CV-0164 5/27/2013 1 100,667.99 44,941.07 55,726.92

CV-0165 RANSURCA, C.A. 4/25/2012 3,000,000.00 3,000,000.00 0.00 1,339,385.72 AC 6/7/2012 AC 1,339,385.72 0.00 1,339,385.72 1,339,385.72

CV-0166 5/9/2012 1,800,000.00 1,799,999.94 1,535,792.17 85.32 803,571.43 685,621.51 3 6/11/2012 AC 803,571.43 0.00 803,571.43 1,653,742.09

CV-0166 12/26/2012 1 789,079.97 352,267.85 436,812.12CV-0166 12/26/2012 2 181,396.30 80,980.49 100,415.81CV-0166 4/4/2013 3 565,315.90 252,373.17 312,942.73

CV-0167 4/25/2012 490,000.00 490,000.00 369,877.02 75.49 218,750.00 165,123.67 3 5/28/2012 AC 218,750.00 0.00 218,750.00 423,503.35

CV-0167 5/17/2012 1 31,731.41 14,165.81 17,565.60CV-0167 5/17/2013 2 80,969.84 36,147.25 44,822.59CV-0167 5/17/2013 3 257,175.77 114,810.61 142,365.16

CV-0169 5/14/2012 400,000.00 400,000.00 0.00 178,571.43 AC 6/7/2012 AC 178,571.43 0.00 178,571.43 178,571.43

CV-0170 4/27/2012 1,170,692.00 1,170,691.33 1,040,790.88 88.90 522,630.36 464,638.79 1 AC 522,630.36 0.00 522,630.36 1,098,782.45

CV-0170 11/26/2012 1 1,040,790.88 464,638.79 576,152.09

CV-0171 4/27/2012 1,724,849.41 1,724,848.98 1,724,848.93 100.00 770,022.06 770,022.06 2 5/9/2012 AC 770,022.06 770,022.06 1,724,848.93

CV-0171 8/22/2012 1 1,544,346.18 689,440.26 854,905.92CV-0171 11/2/2012 2 180,502.75 80,581.80 99,920.95

CV-0172 PLADICOMA, C.A. 6/5/2012 600,000.00 600,000.00 0.00 267,857.15 AC 7/6/2012 AC 267,857.15 267,857.15 267,857.15

CV-0173 5/22/2012 1,499,799.37 1,430,199.26 1,319,988.14 92.29 669,553.29 589,280.42 1 6/20/2012 AC 669,553.29 0.00 669,553.29 1,400,261.01

CV-0173 10/15/2012 1 1,319,988.14 589,280.42 730,707.72

CONSTRUCCION DE VARIANTE Y MUROS DE GAVIONES, PROG. 411+500, CARRETERA TO07,

TRAMO APARTADEROS - MERIDA, SECTOR SAN ROMAN, MUNICIPIO

RANGEL, ESTADO MERIDA

CONSTRUCCION DE VARIANTE Y MUROS DE GAVIONES, PROG. 411+500, CARRETERA TO07,

TRAMO APARTADEROS - MERIDA, SECTOR SAN ROMAN, MUNICIPIO

RANGEL, ESTADO MERIDA

CONSTRUCCION DE VARIANTE Y MUROS DE GAVIONES, PROG. 411+500, CARRETERA TO07,

TRAMO APARTADEROS - MERIDA, SECTOR SAN ROMAN, MUNICIPIO

RANGEL, ESTADO MERIDAINVERSIONES JAVIMAGUA DE

FRANCISCO JAVIER JAIMES GOMEZ

CONSTRUCCION DE ESTRUCTURA DE CONFINAMIENTO, VIA LO04,

PROG. 90+900, MUNICIPIO CAMPO ELIAS, ESTADO MERIDA

INVERSIONES JAVIMAGUA DE

FRANCISCO JAVIER JAIMES GOMEZ

CONSTRUCCION DE ESTRUCTURA DE CONFINAMIENTO, VIA LO04,

PROG. 90+900, MUNICIPIO CAMPO ELIAS, ESTADO MERIDAMANTENIMIENTO MENOR EN LA VIA

TO07, TRAMO TOVAR - PUENTE VICTORIA, MUNICIPIO TOVAR Y

ANTONIO PINTO SALINAS, ESTADO MERIDA

DESARROLLOS Y VIALIDAD, C.A.

REHABILITACION DE VARIANTE PROVISIONAL, VIA LO03, PROG.

10+200, TRAMO LA "Y" - TOVAR, SECTOR MINA CARBON, MUNICIPIO

ZEA, ESTADO MERIDADESARROLLOS Y VIALIDAD, C.A.

REHABILITACION DE VARIANTE PROVISIONAL, VIA LO03, PROG.

10+200, TRAMO LA "Y" - TOVAR, SECTOR MINA CARBON, MUNICIPIO

ZEA, ESTADO MERIDA

DESARROLLOS Y VIALIDAD, C.A.

REHABILITACION DE VARIANTE PROVISIONAL, VIA LO03, PROG.

10+200, TRAMO LA "Y" - TOVAR, SECTOR MINA CARBON, MUNICIPIO

ZEA, ESTADO MERIDA

DESARROLLOS Y VIALIDAD, C.A.

REHABILITACION DE VARIANTE PROVISIONAL, VIA LO03, PROG.

10+200, TRAMO LA "Y" - TOVAR, SECTOR MINA CARBON, MUNICIPIO

ZEA, ESTADO MERIDACONSTRUCTORA EL

TRIUNFO, C.A.

REPRARACION DE ALCANTARILLA METALICA, VIA LO04, PROG.

58+500, MUNICIPIO CAMPO ELIAS, ESTADO MERIDA

CONSTRUCTORA EL TRIUNFO, C.A.

REPRARACION DE ALCANTARILLA METALICA, VIA LO04, PROG.

58+500, MUNICIPIO CAMPO ELIAS, ESTADO MERIDA

CONSTRUCTORA EL TRIUNFO, C.A.

REPRARACION DE ALCANTARILLA METALICA, VIA LO04, PROG.

58+500, MUNICIPIO CAMPO ELIAS, ESTADO MERIDA

CONSTRUCTORA EL TRIUNFO, C.A.

REPRARACION DE ALCANTARILLA METALICA, VIA LO04, PROG.

58+500, MUNICIPIO CAMPO ELIAS, ESTADO MERIDA

INVERSIONES Y CONSTRUCCIONES

ARZOCA, C.A.

CONSTRUCCION DE MURO DE GAVIONES EN LA VIA LO08, SECTOR GARIBALDI, PROG.

14+000, MUNICIPIO ALBERTO ADRIANI, ESTADO MERIDA

TELCONS INGENIEROS, C.A.

REPARACION DE JUNTAS DE LOS PUENTES VIA TO01, TORONDOY,

MUYAPA, SAN PEDRO, PLAYA GRANDE, AGUAS CALIENTES Y GUARURIES. ESTADO MERIDA

TELCONS INGENIEROS, C.A.

REPARACION DE JUNTAS DE LOS PUENTES VIA TO01, TORONDOY,

MUYAPA, SAN PEDRO, PLAYA GRANDE, AGUAS CALIENTES Y GUARURIES. ESTADO MERIDA

TELCONS INGENIEROS, C.A.

REPARACION DE JUNTAS DE LOS VIADUCTOS CAMPO ELIAS,

MIRANDA Y SUCRE. ESTADO MERIDA

TELCONS INGENIEROS, C.A.

REPARACION DE JUNTAS DE LOS VIADUCTOS CAMPO ELIAS,

MIRANDA Y SUCRE. ESTADO MERIDA

TELCONS INGENIEROS, C.A.

REPARACION DE JUNTAS DE LOS VIADUCTOS CAMPO ELIAS,

MIRANDA Y SUCRE. ESTADO MERIDAAMPLIACION DE CAJON Y

RECTIFICACION DE CURVA EN LA VIA TO07, PROG. 407+400, SECTOR PIEDRA BLANCA III, MUNICIPIO RANGEL. ESTADO

MERIDA

CONSTRUCCIONES Y MANTENIMIENTO JV &

NC, C.A.

CONSTRUCCION DE PANTALLA ATIRANTADA EN EL SECTOR SANTA

EDUVIGIS, VIA SAN PEDRO, PARROQUIA LOS TEQUES,

MUNICIPIO GUAICAIPURO. ESTADO MIRANDA.CONSTRUCCIONES Y

MANTENIMIENTO JV & NC, C.A.

CONSTRUCCION DE PANTALLA ATIRANTADA EN EL SECTOR SANTA

EDUVIGIS, VIA SAN PEDRO, PARROQUIA LOS TEQUES,

MUNICIPIO GUAICAIPURO. ESTADO MIRANDA.

34 de 7104/17/2023

17:30:32

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0174 5/4/2012 299,999.92 299,999.64 203,990.68 68.00 133,928.54 91,067.27 2 6/7/2012 AC 133,928.54 0.00 133,928.54 246,851.95

CV-0174 12/14/2012 1 171,381.75 76,509.71 94,872.04CV-0174 7/11/2013 2 32,608.93 14,557.56 18,051.37

INVERSIONES MENDEZ, C.A. (INMENCA)

CONSTRUCCION DE ALCANTARILLADO VIA TO07,

PROGRESIVA 376+300, TRAMO LIMITE TRUJILLO - APARTADEROS,

SECTOR EL SAPO, MUNICIPIO MIRANDA, ESTADO MERIDA

INVERSIONES MENDEZ, C.A. (INMENCA)

CONSTRUCCION DE ALCANTARILLADO VIA TO07,

PROGRESIVA 376+300, TRAMO LIMITE TRUJILLO - APARTADEROS,

SECTOR EL SAPO, MUNICIPIO MIRANDA, ESTADO MERIDA

INVERSIONES MENDEZ, C.A. (INMENCA)

CONSTRUCCION DE ALCANTARILLADO VIA TO07,

PROGRESIVA 376+300, TRAMO LIMITE TRUJILLO - APARTADEROS,

SECTOR EL SAPO, MUNICIPIO MIRANDA, ESTADO MERIDA

35 de 7104/17/2023

17:30:32

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0175 5/25/2012 500,000.00 500,000.00 269,771.11 53.95 223,214.29 120,433.53 1 6/21/2012 AC 223,214.29 0.00 223,214.29 372,551.87

CV-0175 4/24/2013 1 269,771.11 120,433.53 149,337.58

CV-0176 5/9/2012 400,000.00 399,999.86 145,605.24 36.40 178,571.43 65,002.34 2 6/7/2012 AC 178,571.43 0.00 178,571.43 259,174.33

CV-0176 8/20/2012 1 64,640.44 28,857.34 35,783.10CV-0176 11/26/2012 2 80,964.80 36,145.00 44,819.80

CV-0177 5/10/2012 2,700,000.00 2,700,000.00 1,966,592.99 72.84 1,205,357.14 877,943.33 8 5/23/2012 AC 1,205,357.14 0.00 1,205,357.14 2,294,006.80

CV-0177 2/20/2013 1 200,908.34 89,691.23 111,217.11CV-0177 4/29/2013 2 68,514.32 30,586.75 37,927.57CV-0177 4/29/2013 3 68,514.32 30,586.75 37,927.57CV-0177 4/29/2013 4 201,439.25 89,928.25 111,511.00CV-0177 5/3/2012 5 220,601.85 98,482.97 122,118.88CV-0177 5/3/2013 6 61,662.89 27,528.08 34,134.81CV-0177 7/3/2013 7 623,623.26 278,403.24 345,220.02CV-0177 7/10/2013 8 521,328.76 232,736.06 288,592.70

CV-0179 5/4/2012 500,000.00 500,000.00 315,797.16 63.16 223,214.29 140,980.88 2 6/12/2012 AC 223,214.29 0.00 223,214.29 398,030.57

CV-0179 9/12/2012 1 120,716.51 53,891.30 66,825.21CV-0179 11/20/2012 2 195,080.65 87,089.58 107,991.07

CV-0180 5/4/2012 270,000.00 270,000.00 255,221.89 94.53 120,535.72 113,938.34 2 6/12/2012 AC 120,535.72 0.00 120,535.72 261,819.27

CV-0180 9/10/2012 1 199,335.14 88,988.90 110,346.24CV-0180 12/10/2012 2 55,886.75 24,949.44 30,937.31

CV-0182 5/31/2012 499,924.76 399,924.76 240,118.91 60.04 223,180.70 107,195.94 1 6/7/2012 AC 223,180.70 0.00 223,180.70 356,103.67

CV-0182 10/15/2012 1 240,118.91 107,195.94 132,922.97

CV-0184 RUCAPI, C.A. 6/11/2012 1,799,998.89 1,799,997.75 1,680,742.62 93.37 803,570.94 750,331.53 1 6/27/2012 AC 803,570.94 0.00 803,570.94 1,733,982.03

CV-0184 RUCAPI, C.A. 2/21/2013 1 1,680,742.62 750,331.53 930,411.09

INVERSIONES VELMOCA DE LUIS ALEXANDER

VELAZCO MOLINA

CORRECCION DE FALLA DE BORDE, VIA LO03, PROG. 10+300, TRAMO

LA Y, MUNICIPIO ZEA, EDO. MERIDA

INVERSIONES VELMOCA DE LUIS ALEXANDER

VELAZCO MOLINA

CORRECCION DE FALLA DE BORDE, VIA LO03, PROG. 10+300, TRAMO

LA Y, MUNICIPIO ZEA, EDO. MERIDA

CONSTRUCTORA ESBELCA, C.A.

REMOCION DE DERRUMBE Y CONSTRUCCION DE OBRAS DE DRENAJES Y CONTENCION, VIA

LO04, PROG. 69+500, LA POSADA, MUNICIPIO CAMPO ELIAS, ESTADO

MERIDA

CONSTRUCTORA ESBELCA, C.A.

REMOCION DE DERRUMBE Y CONSTRUCCION DE OBRAS DE DRENAJES Y CONTENCION, VIA

LO04, PROG. 69+500, LA POSADA, MUNICIPIO CAMPO ELIAS, ESTADO

MERIDA

CONSTRUCTORA ESBELCA, C.A.

REMOCION DE DERRUMBE Y CONSTRUCCION DE OBRAS DE DRENAJES Y CONTENCION, VIA

LO04, PROG. 69+500, LA POSADA, MUNICIPIO CAMPO ELIAS, ESTADO

MERIDA

INVERSIONES CHARA TUY, C.A.

CONSTRUCCION DE PROTECCIONES HIDRAULICAS Y

REPARACION DEL PUENTE PICHAO, VIA LO04, TRAMO PETARE - SANTA LUCIA, PROG. 34+450, MUNICIPIO PAZ CASTILLO, ESTADO MIRANDA

INVERSIONES CHARA TUY, C.A.

CONSTRUCCION DE PROTECCIONES HIDRAULICAS Y

REPARACION DEL PUENTE PICHAO, VIA LO04, TRAMO PETARE - SANTA LUCIA, PROG. 34+450, MUNICIPIO PAZ CASTILLO, ESTADO MIRANDA

INVERSIONES CHARA TUY, C.A.

CONSTRUCCION DE PROTECCIONES HIDRAULICAS Y

REPARACION DEL PUENTE PICHAO, VIA LO04, TRAMO PETARE - SANTA LUCIA, PROG. 34+450, MUNICIPIO PAZ CASTILLO, ESTADO MIRANDA

INVERSIONES CHARA TUY, C.A.

CONSTRUCCION DE PROTECCIONES HIDRAULICAS Y

REPARACION DEL PUENTE PICHAO, VIA LO04, TRAMO PETARE - SANTA LUCIA, PROG. 34+450, MUNICIPIO PAZ CASTILLO, ESTADO MIRANDA

INVERSIONES CHARA TUY, C.A.

CONSTRUCCION DE PROTECCIONES HIDRAULICAS Y

REPARACION DEL PUENTE PICHAO, VIA LO04, TRAMO PETARE - SANTA LUCIA, PROG. 34+450, MUNICIPIO PAZ CASTILLO, ESTADO MIRANDA

INVERSIONES CHARA TUY, C.A.

CONSTRUCCION DE PROTECCIONES HIDRAULICAS Y

REPARACION DEL PUENTE PICHAO, VIA LO04, TRAMO PETARE - SANTA LUCIA, PROG. 34+450, MUNICIPIO PAZ CASTILLO, ESTADO MIRANDA

INVERSIONES CHARA TUY, C.A.

CONSTRUCCION DE PROTECCIONES HIDRAULICAS Y

REPARACION DEL PUENTE PICHAO, VIA LO04, TRAMO PETARE - SANTA LUCIA, PROG. 34+450, MUNICIPIO PAZ CASTILLO, ESTADO MIRANDA

INVERSIONES CHARA TUY, C.A.

CONSTRUCCION DE PROTECCIONES HIDRAULICAS Y

REPARACION DEL PUENTE PICHAO, VIA LO04, TRAMO PETARE - SANTA LUCIA, PROG. 34+450, MUNICIPIO PAZ CASTILLO, ESTADO MIRANDA

INVERSIONES CHARA TUY, C.A.

CONSTRUCCION DE PROTECCIONES HIDRAULICAS Y

REPARACION DEL PUENTE PICHAO, VIA LO04, TRAMO PETARE - SANTA LUCIA, PROG. 34+450, MUNICIPIO PAZ CASTILLO, ESTADO MIRANDA

CONSTRUCCIONES Y ASFALTO ANDES, C.A.

REHABILITACION DE CALZADA, VIA LO04, PROG. 2+700, TRAMO:

SANTA ELENA DE ARENALES - LA AZULITA, MUNICIPIO OBISPO

RAMOS DE LORA, ESTADO MERIDA

CONSTRUCCIONES Y ASFALTO ANDES, C.A.

REHABILITACION DE CALZADA, VIA LO04, PROG. 2+700, TRAMO:

SANTA ELENA DE ARENALES - LA AZULITA, MUNICIPIO OBISPO

RAMOS DE LORA, ESTADO MERIDA

CONSTRUCCIONES Y ASFALTO ANDES, C.A.

REHABILITACION DE CALZADA, VIA LO04, PROG. 2+700, TRAMO:

SANTA ELENA DE ARENALES - LA AZULITA, MUNICIPIO OBISPO

RAMOS DE LORA, ESTADO MERIDA

CONSTRUCCIONES Y ASFALTO ANDES, C.A.

CORRECCION DE FALLA DE BORDE VIA LO04, PROG. 7+ 600, SECTOR

LOS LIMONES, TRAMO SANTA ELENA DE ARENALES - -LA

AZULITA, MUNICIPIO ANDRES BELLO, ESTADO MERIDA

CONSTRUCCIONES Y ASFALTO ANDES, C.A.

CORRECCION DE FALLA DE BORDE VIA LO04, PROG. 7+ 600, SECTOR

LOS LIMONES, TRAMO SANTA ELENA DE ARENALES - -LA

AZULITA, MUNICIPIO ANDRES BELLO, ESTADO MERIDA

CONSTRUCCIONES Y ASFALTO ANDES, C.A.

CORRECCION DE FALLA DE BORDE VIA LO04, PROG. 7+ 600, SECTOR

LOS LIMONES, TRAMO SANTA ELENA DE ARENALES - -LA

AZULITA, MUNICIPIO ANDRES BELLO, ESTADO MERIDA

EMPRESA ASOCIATIVA MULTISERVICIOS

VICTORIA

REPARACION DE ALCANTARILLA, CARRETERA TO04: PAVIA - LIMITE

FALCON, SECTOR COPEYAL, PARROQUIA AGUEDO FELIPE

ALVARADO, MUNICIPIO IRRIBARREN Y URDANETA, ESTADO

LARAEMPRESA ASOCIATIVA MULTISERVICIOS

VICTORIA

REPARACION DE ALCANTARILLA, CARRETERA TO04: PAVIA - LIMITE

FALCON, SECTOR COPEYAL, PARROQUIA AGUEDO FELIPE

ALVARADO, MUNICIPIO IRRIBARREN Y URDANETA, ESTADO

LARACONSTRUCCION DE TERRAPLEN DE

ACCESOS Y JUNTAS DE DILATACION DEL PUENTE BOCA DE

MORA. ESTADO ANZOATEGUICONSTRUCCION DE TERRAPLEN DE

ACCESOS Y JUNTAS DE DILATACION DEL PUENTE BOCA DE

MORA. ESTADO ANZOATEGUI

36 de 7104/17/2023

17:30:32

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0185 5/18/2012 400,000.00 400,000.00 0.00 178,571.43 AC 6/7/2012 AC 178,571.43 0.00 178,571.43 178,571.43

CV-0186 LOMA REDONDA, C.A. 5/25/2012 600,000.00 600,000.00 0.00 267,857.15 AC 7/30/2012 AC 267,857.15 0.00 267,857.15 267,857.15

CV-0187 5/14/2012 250,150.00 250,149.93 250,149.92 100.00 111,674.11 111,674.11 2 6/7/2012 AC 111,674.11 0.00 111,674.11 250,149.92

CV-0187 8/27/2012 1 173,726.83 77,556.62 96,170.21CV-0187 2/22/2013 2 76,423.09 34,117.49 42,305.60

CV-0188 5/29/2012 1,245,450.00 1,245,450.00 0.00 556,004.47 AC AC 556,004.47 0.00 556,004.47 556,004.47

CV-0189 5/31/2012 1,155,749.96 1,155,749.96 0.00 515,959.81 AC AC 515,959.81 0.00 515,959.81 515,959.81

CV-0190 6/13/2012 900,000.00 874,851.36 874,851.36 100.00 2 8/24/2012 1 829,935.04 0.00 829,935.04 874,851.36

CV-0190 1/29/2013 2 44,916.32 44,916.32

CV-0191 5/24/2012 2,999,871.38 2,999,871.38 0.00 1,339,228.30 AC 6/7/2012 AC 1,339,228.30 0.00 1,339,228.30 1,339,228.30

CV-0192 5/24/2012 3,998,826.68 3,998,826.68 2,311,126.56 57.80 1,785,190.48 1,031,752.94 2 6/7/2012 AC 1,785,190.48 1,785,190.48 3,064,564.10

CV-0192 1 1,855,056.46 828,150.21 1,026,906.25CV-0192 4/15/2013 2 456,070.10 203,602.73 252,467.37

CV-0193 5/18/2012 395,000.00 395,000.00 395,000.00 100.00 176,339.29 176,339.29 2 6/6/2012 AC 176,339.29 0.00 176,339.29 395,000.00

CV-0193 5/18/2012 8/1/2012 1 363,109.25 162,102.35 201,006.90CV-0193 6/4/2013 2 31,890.75 14,236.94 17,653.81

VIAS Y CANALIZACIONES, S.A.

CONSTRUCCION DE MURO DE CONTENCION VIA LO02, TRAMO

PUENTE VICTORA - EL VIGIA, PROGRESIVA 26+600, MUNICIPIO

ALBERTO ADRIANI, ESTADO MERIDA

CORRECCION DE FALLA DE BORDE, VIA LO04, PROG. 74+900 A

75+200, TRAMO LAS CRUCES-MERIDA, (PUENTE LA ODREGOSA), MUNICIPIO CAMPO ELIAS EDO. EDO

MERIDA

INVERSIONES DALKA DE DALIA MARGARITA

CHACON

CONSTRUCCION DE UN MURO DE GAVIONES EN LA VIA TO07, PROG. 349+600, TRAMO LIMITE TRUJILLO - TIMOTES, MUNICIPIOS MIRANDA Y

RANGEL. ESTADO MERIDAINVERSIONES DALKA DE

DALIA MARGARITA CHACON

CONSTRUCCION DE UN MURO DE GAVIONES EN LA VIA TO07, PROG. 349+600, TRAMO LIMITE TRUJILLO - TIMOTES, MUNICIPIOS MIRANDA Y

RANGEL. ESTADO MERIDA

INVERSIONES DALKA DE DALIA MARGARITA

CHACON

CONSTRUCCION DE UN MURO DE GAVIONES EN LA VIA TO07, PROG. 349+600, TRAMO LIMITE TRUJILLO - TIMOTES, MUNICIPIOS MIRANDA Y

RANGEL. ESTADO MERIDAEMPRESA DE PRODUCCION SOCIAL DE

SEÑALIZACIONES DEMARCACIONES Y

CONSTRUCCIONES, C.A (EPS SEDEMARCA)

REPARACION DEL PUENTE MIFAFI VIA TO07, PROG, 389+100

MUNICIPIO RANGEL EDO. MERIDA

EMPRESA DE PRODUCCION SOCIAL DE

SEÑALIZACIONES DEMARCACIONES Y

CONSTRUCCIONES, C.A (EPS SEDEMARCA)

AMPLIACION Y RECALCE DEL PUENTE BARRO NEGRO, VIA TO07,

PROG, 392+250. MUNICIPIO RANGEL EDO. MERIDA

CONSTRUCCIONES SINGMAVI, C.A.

CONSTRUCCION DE MURO DE GAVIONES EN LA VIA TO09,

PROGRESIVA 161+600, MUNICIPIO PEDRO GUAL, ESTADO MIRANDA

CONSTRUCCIONES SINGMAVI, C.A.

CONSTRUCCION DE MURO DE GAVIONES EN LA VIA TO09,

PROGRESIVA 161+600, MUNICIPIO PEDRO GUAL, ESTADO MIRANDA

CORPORACION PRILOCK, C.A.

REPARACION DE LA VIA AGRICOLA, SECTORES SANTO DOMINGO, EL

ALGODONAL, SAN PEDRO, VENEGARA - MUNICIPIO JAUREGUI,

ESTADO TACHIRA

CORPORACION PRILOCK, C.A.

REPARACION DE LA VIA AGRICOLA, SECTORES ALTO DUQUE, LAS

AGUADAS, CARRIZAL, EL PUEBLITO, BONIQUEA, EL PACHAL, SANTA ANA DEL VALLE, MUNICIPIO

JAUREGUI, ESTADO TACHIRACORPORACION PRILOCK,

C.A.

REPARACION DE LA VIA AGRICOLA, SECTORES ALTO DUQUE, LAS

AGUADAS, CARRIZAL, EL PUEBLITO, BONIQUEA, EL PACHAL, SANTA ANA DEL VALLE, MUNICIPIO

JAUREGUI, ESTADO TACHIRA

CORPORACION PRILOCK, C.A.

REPARACION DE LA VIA AGRICOLA, SECTORES ALTO DUQUE, LAS

AGUADAS, CARRIZAL, EL PUEBLITO, BONIQUEA, EL PACHAL, SANTA ANA DEL VALLE, MUNICIPIO

JAUREGUI, ESTADO TACHIRA

VIAS Y CANALIZACIONES, S.A.

CONSTRUCCION DE VARIANTE PROG. 408+100, CARRETERA TO07, TRAMO APARTADEROS -

MERIDA, SECTOR PIEDRA BLANCA, MUNICIPIO RANGEL DEL ESTADO

MERIDA

VIAS Y CANALIZACIONES, S.A.

CONSTRUCCION DE VARIANTE PROG. 408+100, CARRETERA TO07, TRAMO APARTADEROS -

MERIDA, SECTOR PIEDRA BLANCA, MUNICIPIO RANGEL DEL ESTADO

MERIDA

VIAS Y CANALIZACIONES, S.A.

CONSTRUCCION DE VARIANTE PROG. 408+100, CARRETERA TO07, TRAMO APARTADEROS -

MERIDA, SECTOR PIEDRA BLANCA, MUNICIPIO RANGEL DEL ESTADO

MERIDA

37 de 7104/17/2023

17:30:32

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0194 5/18/2012 600,000.00 600,000.00 600,000.00 100.00 267,857.15 267,857.15 2 6/8/2012 AC 267,857.15 0.00 267,857.15 600,000.00

CV-0194 8/15/2012 1 532,373.26 237,666.64 294,706.62CV-0194 6/11/2013 2 67,626.74 30,190.51 37,436.23

CV-0195 5/25/2012 4,595,185.88 4,595,185.73 4,595,185.72 100.00 2,051,422.77 2,051,422.27 5 6/14/2012 AC 2,051,422.77 0.00 2,051,422.77 4,595,186.22

CV-0195 9/12/2012 1 903,207.13 403,217.47 499,989.66CV-0195 10/8/2012 2 1,242,257.67 554,579.32 687,678.35CV-0195 10/8/2012 3 1,119,961.18 499,982.67 619,978.51CV-0195 12/4/2012 4 622,123.19 277,733.57 344,389.62CV-0195 5/7/2013 5 707,636.55 315,909.24 391,727.31

CV-0196 5/29/2012 805,000.00 805,000.00 0.00 359,375.00 AC AC 359,375.00 0.00 359,375.00 359,375.00

CV-0197 5/18/2012 390,821.08 390,821.08 0.00

CV-0199 5/14/2012 6,843,653.49 6,843,653.49 3,962,288.49 57.90 3,055,202.45 1,768,878.81 9 6/14/2012 AC 3,055,202.45 0.00 3,055,202.45 5,248,612.13

CV-0199 11/30/2012 1 67,389.16 30,084.45 37,304.71CV-0199 1/11/2013 2 527,766.31 235,609.96 292,156.35CV-0199 1/11/2013 3 984,339.96 439,437.48 544,902.48CV-0199 4/24/2013 4 909,516.32 406,034.07 503,482.25CV-0199 5/14/2013 5(1A) 8,925.72 3,984.70 4,941.02CV-0199 5/14/2013 6(2A) 67,940.87 30,330.75 37,610.12CV-0199 5/14/2013 7(3A) 133,836.81 59,748.58 74,088.23CV-0199 8/2/2013 8(4A) 105,798.17 47,231.33 58,566.84CV-0199 8/12/2013 9 1,156,775.17 516,417.49 640,357.68

CV-0200 6/8/2012 400,000.00 400,000.00 318,256.88 79.56 1 12/10/2012 1 318,256.88 0.00 318,256.88 318,256.88

CV-0201 6/8/2012 140,000.00 140,000.00 135,845.08 97.03 1 1 135,845.08 135,845.08 135,845.08

VIAS Y CANALIZACIONES, S.A.

REHABILITACION DE LA VIA SECTOR LOS PANTANOS, PROG.

357+200, TRONCAL TO07, TRAMO LIMITE TRUJILLO - APARTADEROS,

MUNICIPIO MIRANDA, ESTADO MERIDA

VIAS Y CANALIZACIONES, S.A.

REHABILITACION DE LA VIA SECTOR LOS PANTANOS, PROG.

357+200, TRONCAL TO07, TRAMO LIMITE TRUJILLO - APARTADEROS,

MUNICIPIO MIRANDA, ESTADO MERIDA

VIAS Y CANALIZACIONES, S.A.

REHABILITACION DE LA VIA SECTOR LOS PANTANOS, PROG.

357+200, TRONCAL TO07, TRAMO LIMITE TRUJILLO - APARTADEROS,

MUNICIPIO MIRANDA, ESTADO MERIDA

INVERSIONES Y CONSTRUCCIONES

ORIGABY, C.A.

CONSTRUCCION DE SECCION DEL PUENTE LA BARTOLA, ETAPA II,

LO07, PROG. 64+750, SECTOR LA BARTOLA, ESTADO YARACUY

INVERSIONES Y CONSTRUCCIONES

ORIGABY, C.A.

CONSTRUCCION DE SECCION DEL PUENTE LA BARTOLA, ETAPA II,

LO07, PROG. 64+750, SECTOR LA BARTOLA, ESTADO YARACUY

INVERSIONES Y CONSTRUCCIONES

ORIGABY, C.A.

CONSTRUCCION DE SECCION DEL PUENTE LA BARTOLA, ETAPA II,

LO07, PROG. 64+750, SECTOR LA BARTOLA, ESTADO YARACUY

INVERSIONES Y CONSTRUCCIONES

ORIGABY, C.A.

CONSTRUCCION DE SECCION DEL PUENTE LA BARTOLA, ETAPA II,

LO07, PROG. 64+750, SECTOR LA BARTOLA, ESTADO YARACUY

INVERSIONES Y CONSTRUCCIONES

ORIGABY, C.A.

CONSTRUCCION DE SECCION DEL PUENTE LA BARTOLA, ETAPA II,

LO07, PROG. 64+750, SECTOR LA BARTOLA, ESTADO YARACUY

INVERSIONES Y CONSTRUCCIONES

ORIGABY, C.A.

CONSTRUCCION DE SECCION DEL PUENTE LA BARTOLA, ETAPA II,

LO07, PROG. 64+750, SECTOR LA BARTOLA, ESTADO YARACUYEMPRESA DE

PRODUCCION SOCIAL DE SEÑALIZACIONES

DEMARCACIONES Y CONSTRUCCIONES, C.A

(EPS SEDEMARCA)

RECALCE DEL ESTRIBO, CONSTRUCCION DE PROTECCION HIDRAULICA Y REPARACION DE JUNTAS DEL PUENTE MUCUJUN, PROGR, 450+800, MUNICIPIO

LIBERTADOR EDO, MERIDA

CONSTRUCTORA BENAVI, C.A.

EMERGENCIA EN LA VIA TO10, TRAMO CARUPANO (REDOMA EL

YUNQUE - CASANAY), PROGRESIVA 17+410, MUNICIPIO ANDRES

MATA, ESTADO SUCRE

FECHA DE INICIO A PARTIR DE LA FIRMA CONTRATO

PILOTES PERFORADOS, C.A. (PILPER, CA)

REPARACION Y MANTENIMIENTO GENERAL DEL PUENTE CHAMA,

UBICADO EN LA VIA TO01, PROG. 736+934, MUNICIPIO ALBERTO

ADRIANI, ESTADO MERIDA

PILOTES PERFORADOS, C.A. (PILPER, CA)

REPARACION Y MANTENIMIENTO GENERAL DEL PUENTE CHAMA,

UBICADO EN LA VIA TO01, PROG. 736+934, MUNICIPIO ALBERTO

ADRIANI, ESTADO MERIDA

PILOTES PERFORADOS, C.A. (PILPER, CA)

REPARACION Y MANTENIMIENTO GENERAL DEL PUENTE CHAMA,

UBICADO EN LA VIA TO01, PROG. 736+934, MUNICIPIO ALBERTO

ADRIANI, ESTADO MERIDA

PILOTES PERFORADOS, C.A. (PILPER, CA)

REPARACION Y MANTENIMIENTO GENERAL DEL PUENTE CHAMA,

UBICADO EN LA VIA TO01, PROG. 736+934, MUNICIPIO ALBERTO

ADRIANI, ESTADO MERIDA

PILOTES PERFORADOS, C.A. (PILPER, CA)

REPARACION Y MANTENIMIENTO GENERAL DEL PUENTE CHAMA,

UBICADO EN LA VIA TO01, PROG. 736+934, MUNICIPIO ALBERTO

ADRIANI, ESTADO MERIDA

PILOTES PERFORADOS, C.A. (PILPER, CA)

REPARACION Y MANTENIMIENTO GENERAL DEL PUENTE CHAMA,

UBICADO EN LA VIA TO01, PROG. 736+934, MUNICIPIO ALBERTO

ADRIANI, ESTADO MERIDA

PILOTES PERFORADOS, C.A. (PILPER, CA)

REPARACION Y MANTENIMIENTO GENERAL DEL PUENTE CHAMA,

UBICADO EN LA VIA TO01, PROG. 736+934, MUNICIPIO ALBERTO

ADRIANI, ESTADO MERIDA

PILOTES PERFORADOS, C.A. (PILPER, CA)

REPARACION Y MANTENIMIENTO GENERAL DEL PUENTE CHAMA,

UBICADO EN LA VIA TO01, PROG. 736+934, MUNICIPIO ALBERTO

ADRIANI, ESTADO MERIDA

PILOTES PERFORADOS, C.A. (PILPER, CA)

REPARACION Y MANTENIMIENTO GENERAL DEL PUENTE CHAMA,

UBICADO EN LA VIA TO01, PROG. 736+934, MUNICIPIO ALBERTO

ADRIANI, ESTADO MERIDA

PILOTES PERFORADOS, C.A. (PILPER, CA)

REPARACION Y MANTENIMIENTO GENERAL DEL PUENTE CHAMA,

UBICADO EN LA VIA TO01, PROG. 736+934, MUNICIPIO ALBERTO

ADRIANI, ESTADO MERIDA

CONSTRUCTORA SANTA MARTA, C.A.

CORRECCION DE FALLA DE BORDE, VIA LO04, PROG. 1+100, SECTOR

CAÑO PICURE, TRAMO SANTA ELENA DE ARENALES - LA AZULITA,

MUNICIPIO OBISPO RAMOS DE LORA, ESTADO MERIDA

CONSTRUCTORA SANTA MARTA, C.A.

SUSTITUCION DE ALCANTARILLA EN LA VIA TO01, PROG. 656+181,

SECTOR EL QUEBRADON, MUNICIPIO ALBERTO ADRIANI.

ESTADO MERIDA

38 de 7104/17/2023

17:30:32

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0202 5/18/2012 3,999,999.99 3,999,999.99 0.00 1,785,714.28 AC 10/1/2012 AC 1,785,714.28 0.00 1,785,714.28 1,785,714.28

CV-0203 7/2/2012 700,000.00 700,000.00 372,609.00 53.23 312,500.00 166,343.31 1 8/20/2012 AC 312,500.00 0.00 312,500.00 518,765.69

CV-0203 2/21/2013 1 372,609.00 166,343.31 206,265.69

CV-0204 5/18/2012 1,200,000.00 1,199,998.64 1,199,998.64 100.00 535,714.29 535,714.29 2 5/28/2012 AC 535,714.29 0.00 535,714.29 1,199,998.64

CV-0204 8/13/2012 1 1,042,161.65 465,250.74 576,910.91CV-0204 4/24/2013 2 157,836.99 70,463.55 87,373.44

CV-0205 5/29/2012 897,333.06 897,333.01 897,333.00 100.00 400,595.12 400,595.12 3 6/8/2012 AC 400,595.12 0.00 400,595.12 897,333.00

CV-0205 9/7/2012 1 455,660.37 203,419.81 252,240.56CV-0205 9/13/2012 2 257,608.78 115,003.92 142,604.86CV-0205 2/27/2013 3 184,063.85 82,171.39 101,892.46

EMPRESA SOCIALISTA DE INFRAESTRUCTURA,

SERVICIOS Y REDES DEL ESTADO PORTUGUESA,

S.A. (ESINSEP)

REPARACIONES EN LA PLATAFORMA VIAL POR FALLAS DE

BORDES, HUNDIMIENTOS Y COLAPSOS DE ALCANTARILLAS EN LA VIA TRONCAL 007, DESDE EL LIMITE LARA HASTA EL LIMITE TRUJILLO, MUNICIPIOS UNDA Y SUCRE. ESTADO PORTUGUESA

CONSTRUCTORA MUNDIAL DE

INVERSIONES, C.A

SUSTITUCION DE ALCANTARILLA EN LA VIA TO01, PROG. 716+070,

SECTOR RIECITOS, MUNICIPIO ALBERTO ADRIANI. ESTADO

MERIDA

CONSTRUCTORA MUNDIAL DE

INVERSIONES, C.A

SUSTITUCION DE ALCANTARILLA EN LA VIA TO01, PROG. 716+070,

SECTOR RIECITOS, MUNICIPIO ALBERTO ADRIANI. ESTADO

MERIDA

INVERSIONES EFITA XXI, C.A.

HUNDIMIENTO DE PAVIMENTO EN LA VIA TO16, TRAMO ANACO- CANTAURA, PROG. 91+400, MUNICIPIO FREITES. ESTADO

ANZOATEGUI

INVERSIONES EFITA XXI, C.A.

HUNDIMIENTO DE PAVIMENTO EN LA VIA TO16, TRAMO ANACO- CANTAURA, PROG. 91+400, MUNICIPIO FREITES. ESTADO

ANZOATEGUI

INVERSIONES EFITA XXI, C.A.

HUNDIMIENTO DE PAVIMENTO EN LA VIA TO16, TRAMO ANACO- CANTAURA, PROG. 91+400, MUNICIPIO FREITES. ESTADO

ANZOATEGUI

INVERSIONES Y CONSTRUCCIONES

ORIGABY, C.A.

CONSTRUCCION DE PROTECCION HIDRAULICA Y REPARACION DE ACCESO AL PUENTE LA VIRGEN,

VIA TO01, PROG. 272+200, AUTOPISTA CENTRO OCCIDENTAL

"CIMARRON ANDRESOTE", MUNICIPIO INDEPENDENCIA,

ESTADO YARACUYINVERSIONES Y CONSTRUCCIONES

ORIGABY, C.A.

CONSTRUCCION DE PROTECCION HIDRAULICA Y REPARACION DE ACCESO AL PUENTE LA VIRGEN,

VIA TO01, PROG. 272+200, AUTOPISTA CENTRO OCCIDENTAL

"CIMARRON ANDRESOTE", MUNICIPIO INDEPENDENCIA,

ESTADO YARACUY

INVERSIONES Y CONSTRUCCIONES

ORIGABY, C.A.

CONSTRUCCION DE PROTECCION HIDRAULICA Y REPARACION DE ACCESO AL PUENTE LA VIRGEN,

VIA TO01, PROG. 272+200, AUTOPISTA CENTRO OCCIDENTAL

"CIMARRON ANDRESOTE", MUNICIPIO INDEPENDENCIA,

ESTADO YARACUY

INVERSIONES Y CONSTRUCCIONES

ORIGABY, C.A.

CONSTRUCCION DE PROTECCION HIDRAULICA Y REPARACION DE ACCESO AL PUENTE LA VIRGEN,

VIA TO01, PROG. 272+200, AUTOPISTA CENTRO OCCIDENTAL

"CIMARRON ANDRESOTE", MUNICIPIO INDEPENDENCIA,

ESTADO YARACUY

39 de 7104/17/2023

17:30:32

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0206 5/29/2012 1,000,000.00 1,000,000.00 1,000,000.00 100.00 446,428.57 446,428.58 2 6/15/2012 AC 446,428.57 0.00 446,428.57 999,999.99

CV-0206 8/31/2012 1 859,106.16 383,529.54 475,576.62CV-0206 5/27/2013 2 140,893.84 62,899.04 77,994.80

CV-0207 5/29/2012 1,300,000.00 1,300,000.00 1,300,000.00 100.00 580,357.15 580,357.14 2 6/15/2012 AC 580,357.15 0.00 580,357.15 1,300,000.02

CV-0207 10/29/2012 1 1,208,130.37 539,343.92 668,786.45CV-0207 5/14/2013 2 91,869.64 41,013.22 50,856.42

CV-0208 5/31/2012 4,199,999.94 4,199,998.77 4,199,998.78 100.00 1,874,999.98 1,874,999.98 2 6/19/2012 AC 1,874,999.98 0.00 1,874,999.98 4,199,998.78

CV-0208 EFITA XXI 10/8/2012 1 2,717,656.57 1,213,239.54 1,504,417.03CV-0208 EFITA XXI 12/17/2012 2 1,482,342.21 661,760.44 820,581.77

CV-0209 COOPERATIVA TARABAY 6/22/2012 499,995.15 499,995.12 499,995.13 100.00 249,997.58 249,997.58 2 7/17/2012 AC 249,997.58 0.00 249,997.58 499,995.13

CV-0209 COOPERATIVA TARABAY 11/30/2012 1 319,412.80 159,706.40 159,706.40CV-0209 COOPERATIVA TARABAY 2/13/2013 2 180,582.33 90,291.18 90,291.15

CONSTRUCTORA RIO CRECIDO, C.A.

REPARACION DE ACCESOS Y OBRAS HIDRAULICAS DEL PUENTE

PANAPO EN CARRETERA TO09, PROG. 192+000, SECTOR PANAPO.

ESTADO MIRANDA

CONSTRUCTORA RIO CRECIDO, C.A.

REPARACION DE ACCESOS Y OBRAS HIDRAULICAS DEL PUENTE

PANAPO EN CARRETERA TO09, PROG. 192+000, SECTOR PANAPO.

ESTADO MIRANDA

CONSTRUCTORA RIO CRECIDO, C.A.

REPARACION DE ACCESOS Y OBRAS HIDRAULICAS DEL PUENTE

PANAPO EN CARRETERA TO09, PROG. 192+000, SECTOR PANAPO.

ESTADO MIRANDA

CONSTRUCTORA RIO CRECIDO, C.A.

CONSTRUCCION DE CABEZAL DE ALCANTARILLA Y RESTITUCION DE

TERRAPLEN EN LA VIA TO09, PROG. 173+900. ESTADO

MIRANDA

CONSTRUCTORA RIO CRECIDO, C.A.

CONSTRUCCION DE CABEZAL DE ALCANTARILLA Y RESTITUCION DE

TERRAPLEN EN LA VIA TO09, PROG. 173+900. ESTADO

MIRANDA

CONSTRUCTORA RIO CRECIDO, C.A.

CONSTRUCCION DE CABEZAL DE ALCANTARILLA Y RESTITUCION DE

TERRAPLEN EN LA VIA TO09, PROG. 173+900. ESTADO

MIRANDA

INVERSIONES EFITA XXI, C.A.

REPARACION DEL PUENTE DEL DISTRIBUIDOR LOS MESONES, VIA TO09, MUNICIPIO SIMON BOLIVAR,

ESTADO ANZOATEGUI

REPARACION DEL PUENTE DEL DISTRIBUIDOR LOS MESONES, VIA TO09, MUNICIPIO SIMON BOLIVAR,

ESTADO ANZOATEGUI

REPARACION DEL PUENTE DEL DISTRIBUIDOR LOS MESONES, VIA TO09, MUNICIPIO SIMON BOLIVAR,

ESTADO ANZOATEGUIREPARACION Y MEJORAS DEL KM. 26 DE LA CARRETERA

PANAMERICANA, SECTOR LA MATICA, VIA LOS ALPES,

PARROQUIA LOS TEQUES, MUNICIPIO GUAICAIPURO, PROG.

26+000, ESTADO MIRANDA

REPARACION Y MEJORAS DEL KM. 26 DE LA CARRETERA

PANAMERICANA, SECTOR LA MATICA, VIA LOS ALPES,

PARROQUIA LOS TEQUES, MUNICIPIO GUAICAIPURO, PROG.

26+000, ESTADO MIRANDA

REPARACION Y MEJORAS DEL KM. 26 DE LA CARRETERA

PANAMERICANA, SECTOR LA MATICA, VIA LOS ALPES,

PARROQUIA LOS TEQUES, MUNICIPIO GUAICAIPURO, PROG.

26+000, ESTADO MIRANDA

40 de 7104/17/2023

17:30:32

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0210 7/2/2012 1,150,000.00 1,150,000.00 0.00 513,392.86 AC 8/20/2012 AC 513,392.86 0.00 513,392.86 513,392.86

CV-0211 6/15/2012 1,199,999.99 1,199,999.98 1,199,999.96 100.00 600,000.00 600,000.00 4 6/11/2012 AC 600,000.00 0.00 600,000.00 1,199,999.96

CV-0211 10/22/2012 1 541,075.69 270,537.85 270,537.84CV-0211 11/29/2012 2 259,713.24 129,856.62 129,856.62CV-0211 11/29/2012 3 73,146.87 36,573.44 36,573.43CV-0211 1/23/2013 4 326,064.16 163,032.09 163,032.07

CV-0212 6/19/2012 1,125,111.96 1,125,111.96 950,765.65 84.50 502,282.13 424,448.95 1 6/29/2012 AC 502,282.13 0.00 502,282.13 1,028,598.83

CV-0212 5/10/2013 1 950,765.65 424,448.95 526,316.70

CV-0213 7/2/2012 2,159,871.96 2,159,871.96 2,159,871.96 100.00 1,079,935.98 1,079,935.98 1 7/17/2012 AC 1,079,935.98 0.00 1,079,935.98 2,159,871.96

CV-0213 12/10/2012 1 2,159,871.96 1,079,935.98 1,079,935.98

CV-0214 7/19/2012 900,000.00 900,000.00 190,234.76 21.14 401,785.72 84,926.23 1 9/17/2012 AC 401,785.72 0.00 401,785.72 507,094.25

CV-0214 2/21/2013 1 190,234.76 84,926.23 105,308.53

CV-0215 7/2/2012 1,450,000.00 1,450,000.00 0.00 647,321.43 AC 8/20/2012 AC 647,321.43 0.00 647,321.43 647,321.43

CV-0225 7/19/2012 1,758,241.03 1,758,241.03 0.00 784,929.03 AC 10/15/2012 AC 784,292.03 0.00 784,292.03 784,292.03

CV-0226 7/31/2012 500,000.00 499,624.42 339,473.09 67.95 223,214.29 151,550.49 1 9/17/2012 AC 223,214.29 0.00 223,214.29 411,136.89

CV-0226 12/26/2012 1 339,473.09 151,550.49 187,922.60

CV-0232 7/31/2012 1,500,000.00 1,500,000.00 0.00 669,642.86 AC 10/22/2012 AC 669,642.86 669,642.86 669,642.86

CONSTRUCTORA MUNDIAL DE

INVERSIONES, C.A

CONSTRUCCION DE DRENAJES, ELEMENTOS DE CONTENCION Y

REPARACION DE LA ESTRUCTURA, PUENTE LA BLANCA, VIA TO01,

PROG, 735+164, MUNICIPIO ALBERTO ADRIANI, EDO, MERIDA

CONSTRUCTORA ANDES MISSOURI, R.L.

SUSTITUCION DE LA ALCANTARILLA SECTOR ZORCA, PROGRESIVA 663+641, TO05, MUNICIPIO

INDEPENDENCIA, ESTADO TACHIRA

CONSTRUCTORA ANDES MISSOURI, R.L.

SUSTITUCION DE LA ALCANTARILLA SECTOR ZORCA, PROGRESIVA 663+641, TO05, MUNICIPIO

INDEPENDENCIA, ESTADO TACHIRACONSTRUCTORA ANDES

MISSOURI, R.L.

SUSTITUCION DE LA ALCANTARILLA SECTOR ZORCA, PROGRESIVA 663+641, TO05, MUNICIPIO

INDEPENDENCIA, ESTADO TACHIRACONSTRUCTORA ANDES

MISSOURI, R.L.

SUSTITUCION DE LA ALCANTARILLA SECTOR ZORCA, PROGRESIVA 663+641, TO05, MUNICIPIO

INDEPENDENCIA, ESTADO TACHIRACONSTRUCTORA ANDES

MISSOURI, R.L.

SUSTITUCION DE LA ALCANTARILLA SECTOR ZORCA, PROGRESIVA 663+641, TO05, MUNICIPIO

INDEPENDENCIA, ESTADO TACHIRA

INVERSIONES EFITA XXI, C.A.

CONSTRUCCION DE JUNTAS DE DILATACION EN EL PUENTE UNARE (CLARINES), VIA TO09, MUNICIPIO BRUZUAL. ESTADO ANZOATEGUI

INVERSIONES EFITA XXI, C.A.

CONSTRUCCION DE JUNTAS DE DILATACION EN EL PUENTE UNARE (CLARINES), VIA TO09, MUNICIPIO BRUZUAL. ESTADO ANZOATEGUI

ASOCIACION COOPERATIVA

VENEZOLANA DE SERVICIOS MULTIPLES

32474, R.L.

FALLA DE BORDE EN LA AVENIDA BOYACA, SENTIDO OESTE - ESTE, SECTOR QUEBRADA DE GAMBOA,

DISTRITO CAPITALASOCIACION

COOPERATIVA VENEZOLANA DE

SERVICIOS MULTIPLES 32474, R.L.

FALLA DE BORDE EN LA AVENIDA BOYACA, SENTIDO OESTE - ESTE, SECTOR QUEBRADA DE GAMBOA,

DISTRITO CAPITAL

CONSTRUCTORA MUNDIAL DE

INVERSIONES, C.A

CORRECCION DE FALLA DE BORDE Y SUSTITUCION DE ALCANTARILLA

COLAPSADA, VIA LO04, PROG. 69+900, EL CHAMICERO,

MUNICIPIO CAMPO ELIAS, ESTADO MERIDA.

CONSTRUCTORA MUNDIAL DE

INVERSIONES, C.A

CORRECCION DE FALLA DE BORDE Y SUSTITUCION DE ALCANTARILLA

COLAPSADA, VIA LO04, PROG. 69+900, EL CHAMICERO,

MUNICIPIO CAMPO ELIAS, ESTADO MERIDA.

CONSTRUCTORA MUNDIAL DE

INVERSIONES, C.A

REPARACION DE ALCANTARILLA EN LA VIA TO01, PROG. 735+425, SECTOR BRISAS DEL CHAMA, MUNICIPIO ALBERTO ADRIANI,

ESTADO MERIDA

EMPRESA DE PRODUCCION SOCIAL DE

SEÑALIZACIONES DEMARCACIONES Y

CONSTRUCCIONES, C.A (EPS SEDEMARCA)

CONSTRUCCION DE ELEMENTO DE CONTENCION EN LA VIA LO02, TRAMO PUENTE VICTORIA - EL

VIGIA, PROG. 1+100, MUNICIPIO ANTONIO PINTO SALINAS, ESTADO

MERIDA

TALUDES ANCLADOS, C.A. (TALAN, C.A.)

REHABILITACION DE LA CALZADA, VIA TO07, PROG. 417+300, SECTOR PARQUE ALBERTO

CARNEVALLI, MUNICIPIO RANGEL. ESTADO MERIDA

TALUDES ANCLADOS, C.A. (TALAN, C.A.)

REHABILITACION DE LA CALZADA, VIA TO07, PROG. 417+300, SECTOR PARQUE ALBERTO

CARNEVALLI, MUNICIPIO RANGEL. ESTADO MERIDA

TALUDES ANCLADOS, C.A. (TALAN, C.A.)

CORRECCION DE FALLA DE BORDE EN LA VIA LO08, PROG. 9+800, SECTOR CARACOL, MUNICIPIO ALBERTO ADRIANI Y SUCRE,

ESTADO MERIDA

41 de 7104/17/2023

17:30:32

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0233 7/31/2012 1,500,000.00 1,499,999.88 640,050.41 42.67 669,642.86 285,736.79 1 8/30/2012 AC 669,642.86 0.00 669,642.86 1,023,956.48

CV-0233 4/30/2013 1 640,050.41 285,736.79 354,313.62

CV-0234 10/26/2012 7,999,999.97 7,999,977.04 4,276,518.08 53.46 3,571,428.56 1,909,159.87 2 11/9/2012 AC 3,571,428.56 0.00 3,571,428.56 5,938,786.77

CV-0234 4/18/2013 1 2,119,972.81 946,416.44 1,173,556.37CV-0234 8/1/2013 2 2,156,545.27 962,743.43 1,193,801.84

CV-0235 10/26/2012 5,999,999.98 5,999,999.98 0.00 2,678,571.42 AC 11/9/2012 AC 2,678,571.42 0.00 2,678,571.42 2,678,571.42

CV-0238 8/23/2012 2,200,000.00 2,200,000.00 318,025.33 14.46 982,142.86 141,975.60 1 9/17/2012 AC 982,142.86 0.00 982,142.86 1,158,192.59

CV-0238 4/18/2013 1 318,025.33 141,975.60 176,049.73

CV-0239 8/23/2012 6,800,000.00 6,800,000.00 514,977.95 7.57 3,035,714.29 229,900.87 1 9/17/2012 AC 3,035,714.29 0.00 3,035,714.29 3,320,791.37

CV-0239 4/18/2013 1 514,977.95 229,900.87 285,077.08

CV-0240 8/23/2012 3,200,000.00 3,200,000.00 514,977.95 16.09 1,482,571.43 283,900.87 1 9/17/2012 AC 1,482,751.43 0.00 1,482,751.43 1,713,828.51

CV-0240 4/18/2013 1 514,977.95 283,900.87 231,077.08

CV-0249 TALLER CHAMA, C.A. 7/31/2012 2,500,000.00 2,500,000.00 0.00 1,116,071.43 AC 9/7/2012 AC 1,116,071.43 0.00 1,116,071.43 1,116,071.43

CV-0250 TALLER CHAMA, C.A. 8/6/2012 4,682,189.19 4,682,189.19 4,682,164.76 100.00 2,090,263.03 2,090,263.03 4 8/27/2012 AC 2,090,263.03 0.00 2,090,263.03 4,682,164.76

CV-0250 TALLER CHAMA, C.A. 2/15/2013 1 811,510.81 362,281.61 449,229.20CV-0250 TALLER CHAMA, C.A. 2/15/2013 2 2,329,443.60 1,039,930.18 1,289,513.42CV-0250 TALLER CHAMA, C.A. 2/15/2013 3 1,397,526.24 623,895.65 773,630.59CV-0250 TALLER CHAMA, C.A. 7/15/2013 4 143,684.11 64,155.59 79,528.52

CV-0251 8/28/2012 2,250,000.00 2,250,000.00 0.00 1,004,464.29 AC 10/22/2012 AC 1,004,464.29 1,004,464.29 1,004,464.29

INGENIERIA, PROYECTOS,

CONSTRUCCIONES Y SERVICIOS ( I.P.C.S.),

C.A.

CONSTRUCCION DE CAJON Y CANALIZACION EN LA VIA LO02, TRAMO PUENTE VICTORIA - EL

VIGIA, PROG. 10+700, MUNICIPIO ANTONIO PINTO SALINAS. ESTADO

MERIDAINGENIERIA, PROYECTOS,

CONSTRUCCIONES Y SERVICIOS ( I.P.C.S.),

C.A.

CONSTRUCCION DE CAJON Y CANALIZACION EN LA VIA LO02, TRAMO PUENTE VICTORIA - EL

VIGIA, PROG. 10+700, MUNICIPIO ANTONIO PINTO SALINAS. ESTADO

MERIDAPLENYTUD, ASESORIA E

INVERSIONES, C.A.

REPARACION DE FALLA DE BORDE Y REMOCION DE DERRUMBRES, SECTOR BRAMON - DELICIAS,

PROG. 26+804 - 59+111, LO09, MUNICIPIO RAFAEL URDANETA,

ESTADO TACHIRAPLENYTUD, ASESORIA E

INVERSIONES, C.A.

REPARACION DE FALLA DE BORDE Y REMOCION DE DERRUMBRES, SECTOR BRAMON - DELICIAS,

PROG. 26+804 - 59+111, LO09, MUNICIPIO RAFAEL URDANETA,

ESTADO TACHIRA

PLENYTUD, ASESORIA E INVERSIONES, C.A.

REPARACION DE FALLA DE BORDE Y REMOCION DE DERRUMBRES, SECTOR BRAMON - DELICIAS,

PROG. 26+804 - 59+111, LO09, MUNICIPIO RAFAEL URDANETA,

ESTADO TACHIRAPLENYTUD, ASESORIA E

INVERSIONES, C.A.

REPARACION DE FALLA DE BORDE Y REMOCION DE DERRUMBRES, SECTOR DELICIAS / VILLA PAEZ,

59+111 - 78+751, LO09, MUNICIPIO RAFAEL URDANETA,

ESTADO TACHIRA

CONSTRUCCIONES MIRNABAL, C.A.

REPARACION Y RECALCE DE APOYOS DEL PUENTE Y

CONSTRUCCION DE PROTECCION HIDRAULICA DEL PUENTE SANTO

NIÑO DE ATOCHE I, VIA MARACAY - OCUMARE, ESTADO ARAGUA

CONSTRUCCIONES MIRNABAL, C.A.

REPARACION Y RECALCE DE APOYOS DEL PUENTE Y

CONSTRUCCION DE PROTECCION HIDRAULICA DEL PUENTE SANTO

NIÑO DE ATOCHE I, VIA MARACAY - OCUMARE, ESTADO ARAGUA

CONSTRUCCIONES MIRNABAL, C.A.

DEMOLICION DE LA ESTRUCTURA EXISTENTE Y CONSTRUCCION DEL PUENTE EL SALTO, VIA MARACAY -

OCUMARE. ESTADO ARAGUA

CONSTRUCCIONES MIRNABAL, C.A.

DEMOLICION DE LA ESTRUCTURA EXISTENTE Y CONSTRUCCION DEL PUENTE EL SALTO, VIA MARACAY -

OCUMARE. ESTADO ARAGUA

CONSTRUCCIONES MIRNABAL, C.A.

DEMOLICION DE LA ESTRUCTURA EXISTENTE Y CONSTRUCCION DEL PUENTE SANTO NIÑO DE ATOCHE

II, VIA MARACAY - OCUMARE. ESTADO ARAGUA

CONSTRUCCIONES MIRNABAL, C.A.

DEMOLICION DE LA ESTRUCTURA EXISTENTE Y CONSTRUCCION DEL PUENTE SANTO NIÑO DE ATOCHE

II, VIA MARACAY - OCUMARE. ESTADO ARAGUAREHABILITACION DE LA VIA Y

ESTABILIZACION DE TALUD EN EL SECTOR EL JOQUE, VIA LO04,

PROG. 55+600, MUNICIPIO CAMPO ELIAS. ESTADO MERIDA

REHABILITACION DEL PUENTE LAS GUARDIAS, TO07, VIA EL RODEO - QUIBOR, PROG. 4+100, MUNICIPIO

JIMENEZ, ESTADO LARAREHABILITACION DEL PUENTE LAS GUARDIAS, TO07, VIA EL RODEO - QUIBOR, PROG. 4+100, MUNICIPIO

JIMENEZ, ESTADO LARA

REHABILITACION DEL PUENTE LAS GUARDIAS, TO07, VIA EL RODEO - QUIBOR, PROG. 4+100, MUNICIPIO

JIMENEZ, ESTADO LARA

REHABILITACION DEL PUENTE LAS GUARDIAS, TO07, VIA EL RODEO - QUIBOR, PROG. 4+100, MUNICIPIO

JIMENEZ, ESTADO LARA

REHABILITACION DEL PUENTE LAS GUARDIAS, TO07, VIA EL RODEO - QUIBOR, PROG. 4+100, MUNICIPIO

JIMENEZ, ESTADO LARA

TALUDES ANCLADOS, C.A. (TALAN, C.A.)

CORRECCION DE FALLA DE BORDE EN LA VIA LO08, PROG. 10+600, SECTOR CARACOL, MUNICIPIOS

ALBERTO ADRIANI Y SUCRE. ESTADO MERIDA

42 de 7104/17/2023

17:30:32

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0252 8/28/2012 2,000,000.00 2,000,000.00 0.00 892,857.15 AC 10/22/2012 AC 892,857.15 892,857.15 892,857.15

CV-0255 GRUPO BEYCA, C.A. 12/21/2012 599,523.90 599,523.90 0.00 299,761.95 AC 2/18/2013 AC 299,761.95 299,761.95 299,761.95

CV-0257 9/11/2012 14,367,000.00 14,366,999.97 14,366,999.99 100.00 6,413,839.29 6,413,839.29 3 AC 6,413,839.29 0.00 6,413,839.29 14,366,999.99

CV-0257 10/25/2012 1 11,584,062.53 5,171,456.49 6,412,606.04CV-0257 12/5/2012 2 2,351,671.95 1,049,853.55 1,301,818.40CV-0257 4/18/2013 3 431,265.51 192,529.25 238,736.26

TALUDES ANCLADOS, C.A. (TALAN, C.A.)

CORRECCION DE FALLA DE BORDE EN LA VIA LO08, PROG. 8+400, SECTOR BOLERO, MUNICIPIOS ALBERTO ADRIANI Y SUCRE.

ESTADO MERIDA

DESLIZAMIENTO DE TALUD EN EL SECTOR PORTACHUELO, TACARIGUA, MUNICIPIO

GOMEZ,ESTADO NUEVA ESPARTA

CONSTRUCCIONES HER-BROSS, C.A.

CONTINUACION DE LA VIA DE PENETRACION RURAL, SECTOR ASENTAMIENTO CANAGUAIMA, MUNICIPIO CEDEÑO, ESTADO

MONAGAS.

CONSTRUCCIONES HER-BROSS, C.A.

CONTINUACION DE LA VIA DE PENETRACION RURAL, SECTOR ASENTAMIENTO CANAGUAIMA, MUNICIPIO CEDEÑO, ESTADO

MONAGAS.

CONSTRUCCIONES HER-BROSS, C.A.

CONTINUACION DE LA VIA DE PENETRACION RURAL, SECTOR ASENTAMIENTO CANAGUAIMA, MUNICIPIO CEDEÑO, ESTADO

MONAGAS.

CONSTRUCCIONES HER-BROSS, C.A.

CONTINUACION DE LA VIA DE PENETRACION RURAL, SECTOR ASENTAMIENTO CANAGUAIMA, MUNICIPIO CEDEÑO, ESTADO

MONAGAS.

43 de 7104/17/2023

17:30:32

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0267 8/20/2012 3,299,999.98 3,299,999.98 0.00 1,473,214.28 AC 8/31/2012 AC 1,473,214.28 0.00 1,473,214.28 1,473,214.28

CV-0273 9/5/2012 3,000,000.00 3,000,000.00 1,104,609.53 36.82 1,339,285.72 493,129.26 1 10/11/2012 AC 1,339,285.72 0.00 1,339,285.72 1,950,765.99

CV-0273 5/9/2013 1 1,104,609.53 493,129.26 611,480.27

CV-0274 10/24/2012 1,900,000.00 1,900,000.00 0.00 0.00

CV-0289 9/26/2012 1,600,846.81 1,598,722.92 1,051,494.74 65.77 714,663.76 469,417.30 2 10/16/2012 AC 714,663.76 0.00 714,663.76 1,296,741.20

CV-0289 12/5/2012 1 447,059.24 199,580.02 247,479.22CV-0289 12/18/2012 2 604,435.50 269,837.28 334,598.22

CV-0301 11/6/2012 3,000,000.00 2,999,991.32 324,611.77 10.82 1,339,285.72 144,915.97 2 11/28/2012 AC 1,339,285.72 0.00 1,339,285.72 1,518,981.52

CV-0301 5/6/2013 1 179,492.70 80,130.67 99,362.03CV-0301 5/6/2013 2 145,119.07 64,785.30 80,333.77

CV-0302 9/27/2012 5,433,845.58 5,433,825.50 5,433,825.50 100.00 1 4/29/2013 1 5,433,825.50 0.00 5,433,825.50 5,433,825.50

CV-0306 9/10/2012 12,376,896.00 12,376,896.00 12,376,896.00 100.00 5,525,400.00 5,525,400.00 AC 5,525,400.00 0.00 5,525,400.00 12,376,896.00

CV-0306 1 1/29/2013 1 12,376,896.00 5,525,400.00 6,851,496.00

CV-0312 9/21/2012 5,341,655.57 5,341,655.57 5,341,655.57 100.00 1 1 5,341,655.57 0.00 5,341,655.57 5,341,655.57

CV-0315 9/28/2012 16,637,616.13 16,637,616.13 9,487,481.01 57.02 7,427,507.20 4,235,482.60 1 AC 7,427,507.20 0.00 7,427,507.20 12,679,505.61

CV-0315 1/29/2013 1 9,487,481.01 4,235,482.60 5,251,998.41

CONSTRUCTORA EL MORRACHON, C.A.

ESTABILIZACION DE TALUD EN LA VIA TO07, PROG. 429+800, SECTOR VALLE HERMOSO,

MUNICIPIO RANGEL. ESTADO MERIDA

CONSTRUCCIONES E INVERSIONES COINCA,

C.A.

ESTABILIZACION DE TALUD Y REPARACION DE CALZADA VIA

TO07, PROG. 427+000, SECTOR CACUTE BAJO, MUNICIPIO RANGEL,

ESTADO MERIDACONSTRUCCIONES E

INVERSIONES COINCA, C.A.

ESTABILIZACION DE TALUD Y REPARACION DE CALZADA VIA

TO07, PROG. 427+000, SECTOR CACUTE BAJO, MUNICIPIO RANGEL,

ESTADO MERIDA

URBANIZADORA GLOBAL, C.A.

ESTABILIZACION DE TALUD VIA TO07, PROG. 426+500, SECTOR

CACUTE ALTO, MUNICIPIO RANGEL. ESTADO MERIDA

FECHA DE INICIO A PARTIR DE LA FIRMA CONTRATO

SERVINTEGRAL 0207, C.A.

DEMOLICION Y CONSTRUCCION DE ESTRIBO EN PUENTE QUEBRADA

DE ARMO, CARRETERA TO05 (PROG. 170+460) - MUNICIPIO

ARAURE, ESTADO PORTUGUESA

SERVINTEGRAL 0207, C.A.

DEMOLICION Y CONSTRUCCION DE ESTRIBO EN PUENTE QUEBRADA

DE ARMO, CARRETERA TO05 (PROG. 170+460) - MUNICIPIO

ARAURE, ESTADO PORTUGUESA

SERVINTEGRAL 0207, C.A.

DEMOLICION Y CONSTRUCCION DE ESTRIBO EN PUENTE QUEBRADA

DE ARMO, CARRETERA TO05 (PROG. 170+460) - MUNICIPIO

ARAURE, ESTADO PORTUGUESAESTRUCTURAS

METALICAS GUARIN ESMEGUAR, C.A.

REPARACION DEL ESTRIBO PUENTE LA GOMEZ, PROG. 55+036 RO14, MUNICIPIO CARDENAS. ESTADO

TACHIRA

ESTRUCTURAS METALICAS GUARIN

ESMEGUAR, C.A.

REPARACION DEL ESTRIBO PUENTE LA GOMEZ, PROG. 55+036 RO14, MUNICIPIO CARDENAS. ESTADO

TACHIRA

ESTRUCTURAS METALICAS GUARIN

ESMEGUAR, C.A.

REPARACION DEL ESTRIBO PUENTE LA GOMEZ, PROG. 55+036 RO14, MUNICIPIO CARDENAS. ESTADO

TACHIRA

OSMAR CONSTRUCCIONES Y

MANTENIMIENTO, C.A.

REHABILITACION DE FALLA DE BORDE CANAL NORTE, AUTOPISTA

FRANCISCO FAJARDO, SECTOR PARATE BUENO, CARACAS,

DISTRITO CAPITAL

MAMMOET VENEZUELA, C.A.

IZADO DEL PUENTE LIBERTADOR, AUTOPISTA SAN CRISTOBAL - LA

FRIA, MUNICIPIO CARDENAS, ESTADO TACHIRA

MAMMOET VENEZUELA, C.A.

IZADO DEL PUENTE LIBERTADOR, AUTOPISTA SAN CRISTOBAL - LA

FRIA, MUNICIPIO CARDENAS, ESTADO TACHIRA

INVERSIONES ELICAR 2001, C.A.

OBRA DE EMERGENCIA PARA CANALIZACION DE LA QUEBRADA LA LLOVIZNA Y REPOSICION DE

LATERAL DE LA VIA EN LA CARRTERA PETARE - GUARENAS,

PROG. 10+200 A 10+800, SECTORES AGUAS AMARILLAS Y ARAGUANEY, MUNICIPIO SUCRE,

ESTADO MIRANDA

TERRA CONSTRUCCIONES, C.A

REHABILITACION INTEGRAL DE LA CIRCUNVALACION 3, ESTADO

ZULIATERRA

CONSTRUCCIONES, C.A

REHABILITACION INTEGRAL DE LA CIRCUNVALACION 3, ESTADO

ZULIA

44 de 7104/17/2023

17:30:32

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0316 9/28/2012 24,349,634.97 24,349,625.98 21,017,170.20 86.31 10,870,372.76 9,382,665.28 3 12/10/2012 AC 10,870,372.76 0.00 10,870,372.76 22,504,877.68

CV-0316 1 16,697,356.47 7,454,177.00 9,243,179.47CV-0316 1/29/2013 2 3,851,471.00 1,719,406.70 2,132,064.30CV-0316 3/14/2013 3 468,342.73 209,081.58 259,261.15

CV-0317 10/2/2012 14,608,694.87 14,608,694.87 0.00 6,521,738.78 AC 6,521,738.78 0.00 6,521,738.78 6,521,738.78

CV-0318 10/2/2012 29,217,391.30 29,217,391.30 11,865,320.97 40.61 13,043,478.26 5,297,018.29 1 AC 13,043,478.26 0.00 13,043,478.26 19,611,780.94

CV-0318 3/4/2013 1 11,865,320.97 5,297,018.29 6,568,302.68

CV-0319 10/16/2012 53,340,866.98 53,340,866.98 46,102,705.33 86.43 23,812,887.05 20,581,564.89 4 AC 23,812,887.05 0.00 23,812,887.05 49,334,027.49

CV-0319 2/26/2013 1 4,366,990.94 1,949,549.53 2,417,441.41CV-0319 3/25/2013 2 5,483,211.16 2,447,862.13 3,035,349.03CV-0319 5/9/2013 3 19,172,084.39 8,558,966.25 10,613,118.14CV-0319 7/9/2013 4 17,080,418.84 7,625,186.98 9,455,231.86

CV-0320 11/12/2012 48,058,120.79 48,058,120.79 21,454,518.21 AC AC 21,454,518.21 0.00 21,454,518.21 21,454,518.21

CV-0321 11/30/2012 14,550,000.00 14,550,000.00 10,041,675.11 69.01 6,495,535.72 4,482,890.69 5 AC 6,495,535.72 0.00 6,495,535.72 12,054,320.14

CV-0321 4/17/2013 1 2,603,305.54 1,162,189.98 1,441,115.56CV-0321 4/17/2013 2 1,276,170.78 569,719.10 706,451.68CV-0321 4/17/2013 3 799,580.19 356,955.44 442,624.75CV-0321 5/3/2013 4 4,504,134.51 2,010,774.34 2,493,360.17CV-0321 7/12/2013 5 858,484.09 383,251.83 475,232.26

CV-0338 10/18/2012 1,323,298.84 1,323,298.75 1,323,298.75 100.00 1 12/14/2012 1 1,323,298.75 0.00 1,323,298.75 1,323,298.75

CV-0339 10/5/2012 4,177,525.54 4,177,525.54 3,730,611.34 89.30 1 3/12/2013 1 3,730,611.34 3,730,611.34 3,730,611.34

PILOTES PERFORADOS, C.A. (PILPERCA)

RECONSTRUCCION DEL PUENTE CUPIRA, TO09. ESTADO MIRANDA

PILOTES PERFORADOS, C.A. (PILPERCA)

CONSTRUCCION DEL PUENTE CUPIRA, TO09. ESTADO MIRANDAPILOTES PERFORADOS,

C.A. (PILPERCA)CONSTRUCCION DEL PUENTE

CUPIRA, TO09. ESTADO MIRANDAPILOTES PERFORADOS, C.A. (PILPERCA)

CONSTRUCCION DEL PUENTE CUPIRA, TO09. ESTADO MIRANDA

INVERSIONES NUEVO NORTE, C.A.

REHABILITACION INTEGRAL EN LA TO10, TRAMO ALCABALA DEL

ROSARIO HASTA DISTRIBUIDOR LOS POZOS, MUNICIPIO

LIBERTADOR, ESTADO MONAGAS (PROG. 0+000 HASTA LA PROG.

40+000).

CONSTRUCTORA LOBATERA, C.A.

REHABILITACION INTEGRAL DE LA VIALIDAD DESDE KM. 52 A LA

CEIBA (PROG. 0+000 A LA 38+000), ESTADO ANZOATEGUI

FUNDACION LABORATORIO DE

SERVICIOS TECNICOS PETROLEROS (F.L.S.T.P.)

REHABILITACION INTEGRAL DEL PUENTE SOBRE EL LAGO DE MARACAIBO. ESTADO ZULIA

FUNDACION LABORATORIO DE

SERVICIOS TECNICOS PETROLEROS (F.L.S.T.P.)

REHABILITACION INTEGRAL DEL PUENTE SOBRE EL LAGO DE MARACAIBO. ESTADO ZULIA

FUNDACION LABORATORIO DE

SERVICIOS TECNICOS PETROLEROS (F.L.S.T.P.)

REHABILITACION INTEGRAL DEL PUENTE SOBRE EL LAGO DE MARACAIBO. ESTADO ZULIA

FUNDACION LABORATORIO DE

SERVICIOS TECNICOS PETROLEROS (F.L.S.T.P.)

REHABILITACION INTEGRAL DEL PUENTE SOBRE EL LAGO DE MARACAIBO. ESTADO ZULIA

FUNDACION LABORATORIO DE

SERVICIOS TECNICOS PETROLEROS (F.L.S.T.P.)

REHABILITACION INTEGRAL DEL PUENTE SOBRE EL LAGO DE MARACAIBO. ESTADO ZULIA

OSMAR CONSTRUCCIONES Y

MANTENIMIENTO, C.A.

CONTINUACION DE LA RESTITUCION DE LA PLATAFORMA

VIAL DE ACCESO AL PUENTE ARAGUITA AGUAS ARRIBA, PROG.

66+320, SECTOR ARAGUITA, TO12, ESTADO MIRANDA

MAQUINARIAS PARILLI, C.A. (MAPARCA)

REHABILITACION Y MANTENIMIENTO DE LA TO01,

TRAMO SABANETA - LA PASTORA (PROG. 3+300), ESTADO LARA

MAQUINARIAS PARILLI, C.A. (MAPARCA)

REHABILITACION Y MANTENIMIENTO DE LA TO01,

TRAMO SABANETA - LA PASTORA (PROG. 3+300), ESTADO LARA

MAQUINARIAS PARILLI, C.A. (MAPARCA)

REHABILITACION Y MANTENIMIENTO DE LA TO01,

TRAMO SABANETA - LA PASTORA (PROG. 3+300), ESTADO LARA

MAQUINARIAS PARILLI, C.A. (MAPARCA)

REHABILITACION Y MANTENIMIENTO DE LA TO01,

TRAMO SABANETA - LA PASTORA (PROG. 3+300), ESTADO LARA

MAQUINARIAS PARILLI, C.A. (MAPARCA)

REHABILITACION Y MANTENIMIENTO DE LA TO01,

TRAMO SABANETA - LA PASTORA (PROG. 3+300), ESTADO LARA

MAQUINARIAS PARILLI, C.A. (MAPARCA)

REHABILITACION Y MANTENIMIENTO DE LA TO01,

TRAMO SABANETA - LA PASTORA (PROG. 3+300), ESTADO LARA

D & A CONSTRUCCIONES, C.A.

REPOSICION DE BARANDA DEL PUENTE IZCARAGUA - OCHOA I -

OCHOA II, UBICADOS EN LA CARRETERA VIEJA PETARE -

GUARENAS, ESTADO MIRANDA

MAQUINARIAS OBRAS DE TIERRA Y ASFALTO, C.A.

(MOTIASCA)

OBRA DE EMERGENCIA EN LA AUTOPISTA JOSE ANTONIO PAEZ, PROGRESIVA 50+410, TRAMO BARINAS - GUANARE, SECTOR

TINAJITAS. ESTADO PORTUGUESA

45 de 7104/17/2023

17:30:32

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0340 11/23/2012 6,247,290.28 6,247,290.28 5,866,080.94 93.90 2,788,968.88 2,618,786.14 1 12/3/2012 AC 2,788,968.88 0.00 2,788,968.88 6,036,263.68

CV-0340 12/13/2012 1 5,866,080.94 2,618,786.14 3,247,294.80

CV-0341 DESARROLLO 1945, C.A. 10/5/2012 2,040,467.45 2,040,467.45 2,040,467.45 100.00 910,922.97 910,922.97 1 11/6/2012 AC 910,922.97 0.00 910,922.97 2,040,467.45

CV-0341 DESARROLLO 1945, C.A. 1/18/2013 1 2,040,467.45 910,922.97 1,129,544.48

CV-0342 12/21/2012 1,475,269.50 1,475,269.50 1,328,009.94 90.02 1 2/26/2013 1 1,328,009.94 1,328,009.94 1,328,009.94

CV-0354 11/12/2012 586,692.60 586,692.60 0.00 261,916.34 AC 12/28/2012 AC 261,916.34 261,916.34 261,916.34

CV-0355 11/23/2012 3,974,709.42 3,974,709.42 3,038,570.43 76.45 1,774,423.85 1,356,504.66 1 12/4/2012 AC 1,774,423.85 0.00 1,774,423.85 3,456,489.62

CV-0355 2/19/2013 1 3,038,570.43 1,356,504.66 1,682,065.77

CV-0372 11/12/2012 4,919,277.80 4,919,277.80 1,260,629.77 25.63 2,196,106.16 536,949.36 2 AC 2,196,106.16 0.00 2,196,106.16 2,919,786.57

CV-0372 4/25/2013 1 1,114,986.13 497,761.67 617,224.46CV-0372 11/26/2012 2 145,643.64 39,187.69 106,455.95

CV-0375 11/12/2012 15,768,608.00 15,768,608.00 15,768,608.00 100.00 7,039,557.15 7,039,557.15 1 11/26/2012 AC 7,039,557.15 0.00 7,039,557.15 15,768,608.00

CV-0375 2/7/2013 1 15,768,608.00 7,039,557.15 8,729,050.85

CV-0376 11/12/2012 2,092,119.28 2,092,119.28 1,743,183.74 83.32 1 12/3/2012 1 1,743,183.74 0.00 1,743,183.74 1,743,183.74

CV-0379 11/12/2012 2,500,000.00 2,500,000.00 800,352.81 32.01 1,116,071.43 357,300.36 1 12/5/2012 AC 1,116,071.43 0.00 1,116,071.43 1,559,123.88

INVERSIONES CHARA TUY 2005, C.A.

REPARACION COLAPSO DE TUBERIA METALICA, PROG. 4+500,

CARRETERA PANAMERICANA TRAMO COCHE - LOS TEQUES,

MUNICIPIO LIBERTADOR, DISTRITO CAPITAL.

INVERSIONES CHARA TUY 2005, C.A.

REPARACION COLAPSO DE TUBERIA METALICA, PROG. 4+500,

CARRETERA PANAMERICANA TRAMO COCHE - LOS TEQUES,

MUNICIPIO LIBERTADOR, DISTRITO CAPITAL.REPARACION DE FALLA DE BORDE

EN LA AUTOPISTA FRANCISCO FAJARDO (ANTIMANO - CARICUAO),

CARACAS, DISTRITO CAPITALREPARACION DE FALLA DE BORDE

EN LA AUTOPISTA FRANCISCO FAJARDO (ANTIMANO - CARICUAO),

CARACAS, DISTRITO CAPITAL

MAXEL, SUMINISTROS Y CONSTRUCCION

CONSTRUCCION DE CAJON DE PASO DE DOS (2) CELDAS SOBRE

CAÑO MADRE VIEJA, EN LA VIA ALTERNA DE LA POBLACION DE

GUANARITO, MUNICIPIO GUANARITO. ESTADO

PORTUGUESA

CONSTRUCCIONES LOS CASTROS, C.A.

REMOCION DE DERRUMBES, TIERRAS Y LODOS EN EL TRAMO

VIAL CARRETERA EL JUNQUITO, KM. 28, VIA LA COLONIA TOVAR CON KM. 1, CARRETERA CARAYACA, MUNICIPIO VARGAS. ESTADO

VARGAS

TODO ACERCA DE EDIFICACIONES, C.A.

(TAECA)

ESTABILIZACION DE TALUD EN LA CARRETERA VIEJA PETARE -

GUARENAS, SECTOR OCHOA, PROG. 18+000, ESTADO MIRANDA

TODO ACERCA DE EDIFICACIONES, C.A.

(TAECA)

ESTABILIZACION DE TALUD EN LA CARRETERA VIEJA PETARE -

GUARENAS, SECTOR OCHOA, PROG. 18+000, ESTADO MIRANDA

INVERSIONES ELICAR 2001, C.A.

REHABILITACION Y REPARACION DE LA VIA LO02-FA: TRAMO

BARIRO - LIMITE ESTADO LARA, MUNICIPIO CUCHIVACOA, ESTADO

FALCON

INVERSIONES ELICAR 2001, C.A.

REHABILITACION Y REPARACION DE LA VIA LO02-FA: TRAMO

BARIRO - LIMITE ESTADO LARA, MUNICIPIO CUCHIVACOA, ESTADO

FALCON

INVERSIONES ELICAR 2001, C.A.

REHABILITACION Y REPARACION DE LA VIA LO02-FA: TRAMO

BARIRO - LIMITE ESTADO LARA, MUNICIPIO CUCHIVACOA, ESTADO

FALCON

INVERSIONES ELICAR 2001, C.A.

REHABILITACION Y ASFALTADO DE LA CARRETERA LEZAMA -

CASIANERO, MUNICIPIO MONAGAS, ESTADO GUARICO.

INVERSIONES ELICAR 2001, C.A.

REHABILITACION Y ASFALTADO DE LA CARRETERA LEZAMA -

CASIANERO, MUNICIPIO MONAGAS, ESTADO GUARICO.

PROYECTOS Y CONSTRUCCIONES

ORIENTE, C.A.

SUSTITUCION DE ALCANTARILLA COLAPSADA EN LA VIA TO09, TRAMO SANTA FE - CUMANA,

PROG. 382+000, SECTOR YAGUARACUAL, MUNICIPIO SUCRE,

ESTADO SUCRE

CONSTRUCTORA COSTA CARIBE, C.A.

CONSTRUCCION DE TERRAZAS, COLOCACION DE MALLA DE

GUIADO Y SIEMBRA DE GRAMINEAS, VIA TO07,

PROGRESIVA 338+100, TRAMO LIMITE TRUJILLO - APARTADEROS, MUNICIPIOS MIRANDA Y RANGEL,

ESTADO MERIDA

46 de 7104/17/2023

17:30:32

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0379 4/25/2013 1 800,352.81 357,300.36 443,052.45

CV-0384 11/12/2012 1,392,532.57 1,392,532.57 868,395.79 62.36 621,666.33 387,676.69 3 11/29/2012 AC 621,666.33 0.00 621,666.33 1,102,385.43

CV-0384 5/8/2013 1 277,583.89 123,921.38 153,662.51CV-0384 6/10/2013 2 42,891.86 19,148.15 23,743.71CV-0384 8/14/2013 3 547,920.04 244,607.16 303,312.88

CV-0385 11/21/2012 19,181,749.94 19,181,447.48 0.00 8,563,281.23 AC 11/22/2012 AC 8,563,281.23 0.00 8,563,281.23 8,563,281.23

CV-0388 11/19/2012 23,313,900.00 23,313,900.00 14,925,596.66 64.02 10,407,991.07 6,663,212.80 1 12/5/2012 AC 10,407,991.07 0.00 10,407,991.07 18,670,374.93

CV-0388 4/9/2013 1 14,925,596.66 6,663,212.80 8,262,383.86

CV-0391 11/19/2012 12,135,922.33 12,135,922.30 8,800,594.74 72.52 5,417,822.47 3,928,838.28 1 12/4/2012 AC 5,417,822.47 5,417,822.47 10,289,578.93

CV-0391 4/4/2013 1 8,800,594.74 3,928,838.28 4,871,756.46

CV-0392 11/30/2012 473,120.07 473,120.07 0.00 211,214.32 AC 1/28/2013 AC 211,214.32 0.00 211,214.32 211,214.32

CV-0401 INSICA, C.A. 11/15/2012 1,399,181.76 1,399,170.96 927,157.76 66.26 624,634.72 413,909.72 1 11/20/2012 AC 624,634.72 624,634.72 1,137,882.76

CV-0401 INSICA, C.A. 5/9/2013 1 927,157.76 413,909.72 513,248.04

CV-0402 12/3/2012 36,543,750.54 36,543,750.54 0.00 16,314,174.35 AC 12/3/2012 AC 16,314,174.35 16,314,174.35 16,314,174.35

CV-0404 11/19/2012 62,895,258.00 62,895,065.65 27,149,358.35 43.17 28,078,240.18 12,120,249.27 2 11/20/2012 AC 28,078,240.18 0.00 28,078,240.18 43,107,349.26

CV-0404 4/12/2013 1 11,011,756.77 4,915,962.85 6,095,793.92

CONSTRUCTORA COSTA CARIBE, C.A.

CONSTRUCCION DE TERRAZAS, COLOCACION DE MALLA DE

GUIADO Y SIEMBRA DE GRAMINEAS, VIA TO07,

PROGRESIVA 338+100, TRAMO LIMITE TRUJILLO - APARTADEROS, MUNICIPIOS MIRANDA Y RANGEL,

ESTADO MERIDACONSTRUCCIONES Y ASFALTO ANDES, C.A.

PAVIMENTACION DE LAS CALLES EN EL SECTOR FRANCISCO RUEDA,

LA AZULITA, MUNICIPIO ANDRES BELLO. ESTADO MERIDA

CONSTRUCCIONES Y ASFALTO ANDES, C.A.

PAVIMENTACION DE LAS CALLES EN EL SECTOR FRANCISCO RUEDA,

LA AZULITA, MUNICIPIO ANDRES BELLO. ESTADO MERIDA

CONSTRUCCIONES Y ASFALTO ANDES, C.A.

PAVIMENTACION DE LAS CALLES EN EL SECTOR FRANCISCO RUEDA,

LA AZULITA, MUNICIPIO ANDRES BELLO. ESTADO MERIDA

CONSTRUCCIONES Y ASFALTO ANDES, C.A.

PAVIMENTACION DE LAS CALLES EN EL SECTOR FRANCISCO RUEDA,

LA AZULITA, MUNICIPIO ANDRES BELLO. ESTADO MERIDA

CONSTRUCTORA HERVICAS, C.A.

REHABILITACION DE LA VIA SAN JUAN - DOS CAMINOS, DESDE EL

SECTOR EL VERTEDERO DE BASURA DEL MUNICIPIO ORTIZ HASTA DOS CAMINOS, ESTADO

GUARICO

CONSTRUCTORA MARJOCA, C.A.

REHABILITACION CONSTRUCCION Y REPARACION DE OBRAS DE CONTENCION, DRENAJES,

RESTITUCION DE CALZADAS Y REASFALTADO DE CARRETERA

TO07, CRUCE DE FLOR DE PATRIA Y TRAMO ARBOL REDONDO (II ETAPA), MUNICIPIO BOCONO Y MUNICIPIO PAMPAN, ESTADO

TRUJILLOCONSTRUCTORA MARJOCA, C.A.

REHABILITACION CONSTRUCCION Y REPARACION DE OBRAS DE CONTENCION, DRENAJES,

RESTITUCION DE CALZADAS Y REASFALTADO DE CARRETERA

TO07, CRUCE DE FLOR DE PATRIA Y TRAMO ARBOL REDONDO (II ETAPA), MUNICIPIO BOCONO Y MUNICIPIO PAMPAN, ESTADO

TRUJILLOINVERSIONES Y

CONSTRUCCIONES DIETI, C.A.

CULMINAR LA COLOCACION DE CARPETA ASFALTICA EN DOS

PUENTES Y LA SEGUNDA CARPETA ASFALTICA EN 7 KM. EN EL PAR

VIAL "LA FLECHA - TUREN", ESTADO PORTUGUESA

INVERSIONES Y CONSTRUCCIONES DIETI,

C.A.

CULMINAR LA COLOCACION DE CARPETA ASFALTICA EN DOS

PUENTES Y LA SEGUNDA CARPETA ASFALTICA EN 7 KM. EN EL PAR

VIAL "LA FLECHA - TUREN", ESTADO PORTUGUESA

V.M.P. PROYECTOS Y CONSTRUCCIONES, C.A.

CONSTRUCCION MURO DE CONTENCION Y OBRAS DE

DRENAJE EN LA FALLA DE BORDE, VIA LO08, TRAMO: RIO CHICO - EL

GUAPO, PROGRESIVA 9+450, SECTOR LAS NAVAS, MUNICIPIO

PAEZ. ESTADO MIRANDA

MANTENIMIENTO Y PROTECCION HIDRAULICA DEL PUENTE EL

ROSARIO VIA TO01, AUTOPISTA CENTRO OCCIDENTAL, PROG. 287+650, ESTADO YARACUY

MANTENIMIENTO Y PROTECCION HIDRAULICA DEL PUENTE EL

ROSARIO VIA TO01, AUTOPISTA CENTRO OCCIDENTAL, PROG. 287+650, ESTADO YARACUY

PROYECTOS Y CONSTRUCCIONES

SABPI, C.A.

CULMINACION DE LA FALLA DE BORDE EN EL SECTOR SAN

FRANCISCO Y REHABILITACION DE LA VIA PRINCIPAL QUE COMUNICA A LAS PARROQUIAS CARAYACA Y EL JUNKO CON LA PARROQUIA DE CATIA LA MAR, ESTADO VARGAS

CONSORCIO VENECA, C.A.

REHABILITACION Y MANTENIMIENTO DE LA VIALIDAD

DE LA SIERRA FALCONIANA, MUNICIPIOS BOLIVAR, PETIT,

SUCRE, UNION, COLINA Y FEDERACION, ESTADO FALCON

CONSORCIO VENECA, C.A.

REHABILITACION Y MANTENIMIENTO DE LA VIALIDAD

DE LA SIERRA FALCONIANA, MUNICIPIOS BOLIVAR, PETIT,

SUCRE, UNION, COLINA Y FEDERACION, ESTADO FALCON

47 de 7104/17/2023

17:30:32

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0404 5/27/2013 2 16,137,601.58 7,204,286.42 8,933,315.16

CV-0409 11/23/2012 1,718,365.26 1,718,365.26 0.00 767,127.35 AC 12/8/2012 AC 767,127.35 0.00 767,127.35 767,127.35

CV -0411 12/10/2012 3,400,997.13 3,400,997.09 3,103,706.65 91.26 1,518,302.29 1,385,583.33 1 12/13/2012 AC 1,518,302.29 0.00 1,518,302.29 3,236,425.61

CV -0411 3/18/2013 1 3,103,706.65 1,385,583.33 1,718,123.32

CV-0416 OMSATHYA, C.A. 12/6/2012 2,000,000.00 2,000,000.00 501,923.88 25.10 892,857.15 224,073.16 1 12/13/2012 AC 892,857.15 0.00 892,857.15 1,170,707.87

CV-0416 OMSATHYA, C.A. 2/24/2013 1 501,923.88 224,073.16 277,850.72

CV-0534 1/13/2012 2,395,406.18 2,395,406.18 2,395,406.18 100.00 1,069,377.76 1,069,377.76 1 1/31/2012 AC 1,069,377.76 0.00 1,069,377.76 2,395,406.18

CV-0534 9/17/2012 1 2,395,406.18 1,069,377.76 1,326,028.42

CV-0535 1/19/2012 3,231,510.88 3,231,508.40 2,694,441.12 83.38 1,442,638.79 1,202,875.50 1 1/31/2012 AC 1,442,638.79 0.00 1,442,638.79 2,934,204.41

CV-0535 9/3/2012 1 2,694,441.12 1,202,875.50 1,491,565.62

CV-0536 1/11/2012 3,391,353.55 3,391,353.55 3,391,353.55 100.00 1,513,997.12 1,513,997.12 1 1/17/2012 AC 1,513,997.12 0.00 1,513,997.12 3,391,353.55

CV-0536 1/11/2012 2/8/2012 1 3,391,353.55 1,513,997.12 1,877,356.43

CV-0537 3/6/2012 5,734,129.70 5,734,129.70 4,025,911.50 70.21 2,559,879.33 1,797,281.93 3 6/14/2012 AC 2,559,879.33 0.00 2,559,879.33 4,788,508.90

CV-0537 1/22/2013 1 1,557,477.47 695,302.44 862,175.03CV-0537 1/22/2013 2 1,692,575.77 755,614.19 936,961.58CV-0537 5/15/2013 3 775,858.26 346,365.30 429,492.96

CV-0538 2/24/2012 4,999,924.40 4,999,924.40 4,846,508.07 96.93 2 6/3/2012 1 4,846,508.07 0.00 4,846,508.07 #REF!

CV-0539 3/6/2012 1,721,605.00 1,721,605.00 1,721,605.00 100.00 768,573.66 768,573.66 1 3/22/2012 AC 768,573.66 0.00 768,573.66 1,721,605.00

CV-0539 9/17/2012 1 1,721,605.00 768,573.66 953,031.34

CONSORCIO VENECA, C.A.

REHABILITACION Y MANTENIMIENTO DE LA VIALIDAD

DE LA SIERRA FALCONIANA, MUNICIPIOS BOLIVAR, PETIT,

SUCRE, UNION, COLINA Y FEDERACION, ESTADO FALCON

CONSTRUCTORA EL MORRACHON, C.A.

CONSTRUCCION DE CAJON DE PASO DE 2X2, VIA TO07, PROG.

341+900, SECTOR TIMOTES, MUNICIPIO MIRANDA. ESTADO

MERIDA

PROYECTOS MARAQUERO, C.A.

REPARACION DE LA FALLA DE BORDE EN LA VIA LO01, TRAMO SAN ANTONIO - TRISTE - LIMITE

ESTADO SUCRE, MUNICPIO ACOSTA, PROG. 10+000. ESTADO

MONAGAS, PROYECTOS

MARAQUERO, C.A.

REPARACION DE LA FALLA DE BORDE EN LA VIA LO01, TRAMO SAN ANTONIO - TRISTE - LIMITE

ESTADO SUCRE, MUNICPIO ACOSTA, PROG. 10+000. ESTADO

MONAGAS,

REHABILITACION DEL ASFALTO SOBRE EL TABLERO, REPARACION

DE SELLOS DE JUNTAS DE DILATACION Y PROTECCIONES

HIDRAULICAS DEL PUENTE SANTA ROSA, INTERCOMUNAL

BARQUISIMETO - CABUDARE, MUNICIPIO IRRIBARREN, ESTADO

LARA

REHABILITACION DEL ASFALTO SOBRE EL TABLERO, REPARACION

DE SELLOS DE JUNTAS DE DILATACION Y PROTECCIONES

HIDRAULICAS DEL PUENTE SANTA ROSA, INTERCOMUNAL

BARQUISIMETO - CABUDARE, MUNICIPIO IRRIBARREN, ESTADO

LARA

OSMAR CONSTRUCCIONES Y

MANTENIMIENTO, C.A.

REPARACION DE FALLA EN EL DISTRIBUIDOR SANTA FE,

MUNICIPIO BARUTA. ESTADO MIRANDA

OSMAR CONSTRUCCIONES Y

MANTENIMIENTO, C.A.

REPARACION DE FALLA EN EL DISTRIBUIDOR SANTA FE,

MUNICIPIO BARUTA. ESTADO MIRANDA

OSMAR CONSTRUCCIONES Y

MANTENIMIENTO, C.A.

REPARACION DE FALLA EN LA AUTOPISTA FRANCISCO FAJARDO,

A LA ALTURA DE LA CARLOTA, CANAL DE SERVICIO Y CANAL

LENTO DE LA AUTOPISTA. CARACAS, DISTRITO CAPITALOSMAR

CONSTRUCCIONES Y MANTENIMIENTO, C.A.

REPARACION DE FALLA EN LA AUTOPISTA FRANCISCO FAJARDO,

A LA ALTURA DE LA CARLOTA, CANAL DE SERVICIO Y CANAL

LENTO DE LA AUTOPISTA. CARACAS, DISTRITO CAPITAL

PROYECTOS E INVERSIONES PROINVER

RATL, C.A.

REHABILITACION Y ACONDICIONAMIENTO DE LA RUTA PRESIDENCIAL PARA LA CUMBRE

DE LA COMUNIDADD DE ESTADOS LATINOAMERICANOS Y DEL CARIB

(CELAC)PROYECTOS E

INVERSIONES PROINVER RATL, C.A.

REHABILITACION Y ACONDICIONAMIENTO DE LA RUTA PRESIDENCIAL PARA LA CUMBRE

DE LA COMUNIDADD DE ESTADOS LATINOAMERICANOS Y DEL CARIB

(CELAC)ESTRUCTURAS METALICAS GUARIN, C.A.

(ESMEGUAR,C.A.)

REPARACION PUENTE ONIA, VIA TO01, PROG. 743+055, SECTOR

ONIA, MUNICIPIO ALBERTO ADRIANI, ESTADO MERIDA

ESTRUCTURAS METALICAS GUARIN, C.A.

(ESMEGUAR,C.A.)

REPARACION PUENTE ONIA, VIA TO01, PROG. 743+055, SECTOR

ONIA, MUNICIPIO ALBERTO ADRIANI, ESTADO MERIDA

ESTRUCTURAS METALICAS GUARIN, C.A.

(ESMEGUAR,C.A.)

REPARACION PUENTE ONIA, VIA TO01, PROG. 743+055, SECTOR

ONIA, MUNICIPIO ALBERTO ADRIANI, ESTADO MERIDA

ESTRUCTURAS METALICAS GUARIN, C.A.

(ESMEGUAR,C.A.)

REPARACION PUENTE ONIA, VIA TO01, PROG. 743+055, SECTOR

ONIA, MUNICIPIO ALBERTO ADRIANI, ESTADO MERIDA

INVERSIONES CANTON Y ASOCIADOS, C.A.

CONSTRUCCION DE OBRAS DE DRENAJES Y PROTECCIONES

HIDRAULICAS DEL PUENTE GOMEZ, TO09, TRAMO BARCELONA -

PIRITU, PROG. 312+120, MUNICIPIO BOLIVAR. ESTADO

ANZOATEGUI

SERVICIOS TODITO 2020, C.A.

REHABILITACION Y ASFALTADO DE LA VIA DE TURMERITO, DISTRITO

CAPITAL

SERVICIOS TODITO 2020, C.A.

REHABILITACION Y ASFALTADO DE LA VIA DE TURMERITO, DISTRITO

CAPITAL

48 de 7104/17/2023

17:30:33

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0541 3/1/2012 4,264,527.00 4,264,482.40 4,264,482.39 100.00 2 3/14/2012 1 3,742,649.46 0.00 3,742,649.46 4,264,482.39

CV-0541 7/3/2012 2 521,832.93 0.00 521,832.93

CV-0542 QUINRIACA, C.A. 4/17/2012 1,500,000.00 1,499,999.96 1,499,999.96 100.00 669,642.86 669,642.86 2 5/23/2012 AC 669,642.86 0.00 669,642.86 1,499,999.97

CV-0542 QUINRIACA, C.A. 1/23/2013 1 1,305,515.50 582,819.42 722,696.08CV-0542 QUINRIACA, C.A. 4/24/2013 2 194,484.47 86,823.44 107,661.03

CV-0543 QUINRIACA, C.A. 4/17/2012 1,500,000.00 1,499,999.89 1,499,999.84 100.00 669,642.86 669,642.86 4 5/18/2012 AC 669,642.86 0.00 669,642.86 1,499,999.84

CV-0543 QUINRIACA, C.A. 6/19/2012 1 806,300.21 359,955.45 446,344.76CV-0543 QUINRIACA, C.A. 10/10/2012 2 159,570.63 71,236.89 88,333.74CV-0543 QUINRIACA, C.A. 10/26/2012 3 146,783.48 65,528.34 81,255.14CV-0543 QUINRIACA, C.A. 2/18/2013 4 387,345.52 172,922.18 214,423.34

CV-0545 QUINRIACA, C.A. 4/17/2012 1,999,951.40 1,999,951.37 1,999,951.40 100.00 892,835.45 892,835.45 4 5/17/2012 AC 892,835.45 0.00 892,835.45 1,999,951.40

CV-0545 QUINRIACA, C.A. 6/19/2012 1 1,016,791.96 453,924.98 562,866.98CV-0545 QUINRIACA, C.A. 9/28/2012 2 203,880.64 91,018.15 112,862.49CV-0545 QUINRIACA, C.A. 11/16/2012 3 181,393.06 80,979.05 100,414.01CV-0545 QUINRIACA, C.A. 2/5/2013 4 597,885.74 266,913.27 330,972.47

CV-0549 MOLMOR, C.A. 3/20/2012 700,000.00 700,000.00 576,910.90 82.42 312,500.00 257,549.51 1 6/13/2012 AC 312,500.00 0.00 312,500.00 631,861.39

CV-0549 MOLMOR, C.A. 10/9/2012 1 576,910.90 257,549.51 319,361.39

CV-0550 4/25/2012 2,152,543.59 2,152,543.59 1,019,257.00 47.35 960,956.96 455,025.45 2 6/22/2012 AC 960,956.96 0.00 960,956.96 1,525,188.51

CV-0550 12/10/2012 1 777,616.01 347,150.01 430,466.00CV-0550 4/29/2013 2 241,640.99 107,875.44 133,765.55

CV-0551 3/20/2012 4,790,477.25 4,781,280.27 0.00 4,302,248.83 AC 5/10/2012 AC 4,302,248.83 0.00 4,302,248.83 4,302,248.83

CV-0552 3/9/2012 5,330,018.50 5,330,018.50 5,330,018.50 100.00 2,379,472.55 2,379,472.55 1 3/28/2012 AC 2,379,472.55 0.00 2,379,472.55 5,330,018.50

CV-0552 3/9/2012 7/4/2012 1 5,330,018.50 2,379,472.55 2,950,545.95

CONSTRUCCIONES HER-BROSS, C.A.

VIA DE PENETRACION RURAL, SECTOR ASENTAMIENTO

CANAGUAIMA, MUNICIPIO CEDEÑO. ESTADO MONAGAS

CONSTRUCCIONES HER-BROSS, C.A.

VIA DE PENETRACION RURAL, SECTOR ASENTAMIENTO

CANAGUAIMA, MUNICIPIO CEDEÑO. ESTADO MONAGASRECONSTRUCCION DE ESTRIBOS Y

RECUPERACION DE LA ESTRUCTURA DEL PUENTE LAS

FLORES, SECTOR PIEDRA MORENA, UBICADO A 1,5 KM. DE LA LO03,

ESTADO TACHIRARECONSTRUCCION DE ESTRIBOS Y

RECUPERACION DE LA ESTRUCTURA DEL PUENTE LAS

FLORES, SECTOR PIEDRA MORENA, UBICADO A 1,5 KM. DE LA LO03,

ESTADO TACHIRA

RECONSTRUCCION DE ESTRIBOS Y RECUPERACION DE LA

ESTRUCTURA DEL PUENTE LAS FLORES, SECTOR PIEDRA MORENA,

UBICADO A 1,5 KM. DE LA LO03, ESTADO TACHIRAESTABILIZACION DE TALUD,

SECTOR LOS MIRTOS, PROGRESIVA 654 + 200, TO07, MUNICIPIO JOSE MARIA VARGAS, ESTADO TACHIRA

ESTABILIZACION DE TALUD, SECTOR LOS MIRTOS, PROGRESIVA 654 + 200, TO07, MUNICIPIO JOSE MARIA VARGAS, ESTADO TACHIRA

ESTABILIZACION DE TALUD, SECTOR LOS MIRTOS, PROGRESIVA 654 + 200, TO07, MUNICIPIO JOSE MARIA VARGAS, ESTADO TACHIRA

ESTABILIZACION DE TALUD, SECTOR LOS MIRTOS, PROGRESIVA 654 + 200, TO07, MUNICIPIO JOSE MARIA VARGAS, ESTADO TACHIRA

ESTABILIZACION DE TALUD, SECTOR LOS MIRTOS, PROGRESIVA 654 + 200, TO07, MUNICIPIO JOSE MARIA VARGAS, ESTADO TACHIRARESTITUCION DE LA CALZADA,

SUSTITUCION DE ALCANTARILLAS Y CONSTRUCCION DE MURO DE GAVIONES TO01, TRAMO LA

MULERA - SAN ANTONIO, MUNICIPIO BOLIVAR, ESTADO

TACHIRA

RESTITUCION DE LA CALZADA, SUSTITUCION DE ALCANTARILLAS Y

CONSTRUCCION DE MURO DE GAVIONES TO01, TRAMO LA

MULERA - SAN ANTONIO, MUNICIPIO BOLIVAR, ESTADO

TACHIRA

RESTITUCION DE LA CALZADA, SUSTITUCION DE ALCANTARILLAS Y

CONSTRUCCION DE MURO DE GAVIONES TO01, TRAMO LA

MULERA - SAN ANTONIO, MUNICIPIO BOLIVAR, ESTADO

TACHIRA

RESTITUCION DE LA CALZADA, SUSTITUCION DE ALCANTARILLAS Y

CONSTRUCCION DE MURO DE GAVIONES TO01, TRAMO LA

MULERA - SAN ANTONIO, MUNICIPIO BOLIVAR, ESTADO

TACHIRA

RESTITUCION DE LA CALZADA, SUSTITUCION DE ALCANTARILLAS Y

CONSTRUCCION DE MURO DE GAVIONES TO01, TRAMO LA

MULERA - SAN ANTONIO, MUNICIPIO BOLIVAR, ESTADO

TACHIRA

CONSTRUCCION DE MURO DE CONTENCION, CARRETERA LO02, PROGRESIVA 25+700, SECTOR

QUEBRADA EL DIABLO, MUNICIPIO ALBERTO ADRIANI, ESTADO

MERIDACONSTRUCCION DE MURO DE

CONTENCION, CARRETERA LO02, PROGRESIVA 25+700, SECTOR

QUEBRADA EL DIABLO, MUNICIPIO ALBERTO ADRIANI, ESTADO

MERIDACONSTRUCTORA MIOL,

C.A. (MIOLCA)

EMERGENCIAS POR LLUVIAS EN VARIOS SECTORES DE LAS

PARROQUIAS TORRES Y LARA DEL MUNICIPIO TORRES, ESTADO LARA

CONSTRUCTORA MIOL, C.A. (MIOLCA)

EMERGENCIAS POR LLUVIAS EN VARIOS SECTORES DE LAS

PARROQUIAS TORRES Y LARA DEL MUNICIPIO TORRES, ESTADO LARA

CONSTRUCTORA MIOL, C.A. (MIOLCA)

EMERGENCIAS POR LLUVIAS EN VARIOS SECTORES DE LAS

PARROQUIAS TORRES Y LARA DEL MUNICIPIO TORRES, ESTADO LARA

CONSTRUCTORA HERVICAS, C.A.

COLAPSO DE RUBERIA DE AGUAS SERVIDAS, CARRETERA

PANAMERICANA, KM. 16. ESTADO MIRANDA

OBRAS, CONSTRUCCIONES Y ELECTRICIDAD, C.A.

(OCECA)

REHABILITACION DE LOS ESPALDONES DE CONCRETO DEL

RIO GUAIRE, DEL TRAMO LOS CHAGUARAMOS, CARACAS.

DISTRITO CAPITALOBRAS,

CONSTRUCCIONES Y ELECTRICIDAD, C.A.

(OCECA)

REHABILITACION DE LOS ESPALDONES DE CONCRETO DEL

RIO GUAIRE, DEL TRAMO LOS CHAGUARAMOS, CARACAS.

DISTRITO CAPITAL

49 de 7104/17/2023

17:30:33

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0554 2/16/2012 2,999,594.71 2,998,078.54 2,998,078.55 100.00 2 6/3/2012 1 2,744,309.27 0.00 2,744,309.27 2,998,078.55

CV-0554 5/30/2013 2 253,769.28 0.00 253,769.28

CV-0555 2/16/2012 4,198,108.98 4,198,108.98 2,388,346.52 56.89 1,874,155.80 1,066,226.13 1 2/27/2012 AC 1,874,155.80 0.00 1,874,155.80 3,196,276.19

CV-0555 9/20/2012 1 2,388,346.52 1,066,226.13 1,322,120.39

CV-0556 3/20/2012 4,000,000.00 3,999,999.99 3,755,579.04 93.89 1,785,714.29 1,676,597.81 5 6/19/2012 AC 1,785,714.29 0.00 1,785,714.29 3,864,695.52

CV-0556 3/20/2012 10/26/2012 1 160,506.81 71,654.83 88,851.98CV-0556 3/20/2012 10/26/2012 2 64,996.12 29,016.13 35,979.99CV-0556 3/20/2012 10/26/2012 3 2,002,891.73 894,148.10 1,108,743.63CV-0556 12/10/2012 4 525,000.10 234,375.05 290,625.05CV-0556 12/19/2012 5 1,002,184.28 447,403.70 554,780.58

CV-0558 4/4/2012 2,350,000.00 2,350,000.00 1,790,085.11 76.17 1,049,107.15 799,145.14 3 4/17/2012 AC 1,049,107.15 0.00 1,049,107.15 2,040,047.12

CV-0558 6/19/2012 1 642,376.92 286,775.41 355,601.51

CV-0558 9/18/2012 2 1,119,995.16 499,997.84 619,997.32

CV-0558 11/12/2012 3 27,713.03 12,371.89 15,341.14

CV-0559 3/9/2012 2,350,000.00 2,350,000.00 1,231,717.01 52.41 1,049,107.15 549,873.66 4 3/23/2012 AC 1,049,107.15 0.00 1,049,107.15 1,730,950.50

CV-0559 3/9/2012 8/2/2012 1 69,452.21 31,005.45 38,446.76

CV-0559 10/9/2012 2 70,240.87 31,357.53 38,883.34

CV-0559 10/9/2012 3 151,245.70 67,520.40 83,725.30

CV-0559 10/9/2012 4 940,778.23 419,990.28 520,787.95

INVERSIONES CANTON Y ASOCIADOS, C.A.

CONSTRUCCION DE MURO DE SOSTENIMIENTO Y REPOSICION DE

ACCESO AL PUENTE BOCA DE UCHIRE, TO09, TRAMO BOCA DE

UCHIRE - LIMITE ESTADO MIRANDA, PROG. 212+300, ESTADO

ANZOATEGUI

INVERSIONES CANTON Y ASOCIADOS, C.A.

CONSTRUCCION DE MURO DE SOSTENIMIENTO Y REPOSICION DE

ACCESO AL PUENTE BOCA DE UCHIRE, TO09, TRAMO BOCA DE

UCHIRE - LIMITE ESTADO MIRANDA, PROG. 212+300, ESTADO

ANZOATEGUIINVERSIONES CANTON Y ASOCIADOS, C.A.

REPARACION GENERAL DEL PUENTE BOCA DE UCHIRE SOBRE EL RIO UCHIRE, VIA TO09, PROG. 205+690, ESTADO ANZOATEGUI

INVERSIONES CANTON Y ASOCIADOS, C.A.

REPARACION GENERAL DEL PUENTE BOCA DE UCHIRE SOBRE EL RIO UCHIRE, VIA TO09, PROG. 205+690, ESTADO ANZOATEGUI

COMPAÑÍA ANONIMA DE INGENIERIA Y PROYECTOS (CADEINPRO)

REPARACION DE CAJON DE PASO, SECTOR VIRGEN DE TARIBA,

AUTOPISTA SAN CRISTOBAL - LA FRIA, TRAMO I, MUNICIPIO

CARDENAS. ESTADO TACHIRACOMPAÑÍA ANONIMA DE

INGENIERIA Y PROYECTOS (CADEINPRO)

REPARACION DE CAJON DE PASO, SECTOR VIRGEN DE TARIBA,

AUTOPISTA SAN CRISTOBAL - LA FRIA, TRAMO I, MUNICIPIO

CARDENAS. ESTADO TACHIRA

COMPAÑÍA ANONIMA DE INGENIERIA Y PROYECTOS (CADEINPRO)

REPARACION DE CAJON DE PASO, SECTOR VIRGEN DE TARIBA,

AUTOPISTA SAN CRISTOBAL - LA FRIA, TRAMO I, MUNICIPIO

CARDENAS. ESTADO TACHIRA

COMPAÑÍA ANONIMA DE INGENIERIA Y PROYECTOS (CADEINPRO)

REPARACION DE CAJON DE PASO, SECTOR VIRGEN DE TARIBA,

AUTOPISTA SAN CRISTOBAL - LA FRIA, TRAMO I, MUNICIPIO

CARDENAS. ESTADO TACHIRA

COMPAÑÍA ANONIMA DE INGENIERIA Y PROYECTOS (CADEINPRO)

REPARACION DE CAJON DE PASO, SECTOR VIRGEN DE TARIBA,

AUTOPISTA SAN CRISTOBAL - LA FRIA, TRAMO I, MUNICIPIO

CARDENAS. ESTADO TACHIRA

COMPAÑÍA ANONIMA DE INGENIERIA Y PROYECTOS (CADEINPRO)

REPARACION DE CAJON DE PASO, SECTOR VIRGEN DE TARIBA,

AUTOPISTA SAN CRISTOBAL - LA FRIA, TRAMO I, MUNICIPIO

CARDENAS. ESTADO TACHIRACONSTRU-SERVI EL GUAMANCHE, C.A.

CONSTRUCCION DE MUROS DE GAVIONES Y REPARACION DE

ACCESO DEL PUENTE LA CEIBITA, VIA TO07, PROG. 18+100,

MUNICIPIO JIMENEZ, ESTADO LARA

CONSTRU-SERVI EL GUAMANCHE, C.A.

CONSTRUCCION DE MUROS DE GAVIONES Y REPARACION DE

ACCESO DEL PUENTE LA CEIBITA, VIA TO07, PROG. 18+100,

MUNICIPIO JIMENEZ, ESTADO LARACONSTRU-SERVI EL GUAMANCHE, C.A.

CONSTRUCCION DE MUROS DE GAVIONES Y REPARACION DE

ACCESO DEL PUENTE LA CEIBITA, VIA TO07, PROG. 18+100,

MUNICIPIO JIMENEZ, ESTADO LARA

PROYECTOS Y CONSTRUCCIONES ANASTHASIA, C.A.

CONSTRUCCION DE PROTECCION HIDRAULICA Y RESTITUCION DE

ACCESOS AL PUENTE LA CEIBITA, VIA TO07, TRAMO: QUIBOR - EL

TOCUYO, PROG. 8+320, MUNICIPIO JIMENEZ, ESTADO LARA

PROYECTOS Y CONSTRUCCIONES ANASTHASIA, C.A.

CONSTRUCCION DE PROTECCION HIDRAULICA Y RESTITUCION DE

ACCESOS AL PUENTE LA CEIBITA, VIA TO07, TRAMO: QUIBOR - EL

TOCUYO, PROG. 8+320, MUNICIPIO JIMENEZ, ESTADO LARA

PROYECTOS Y CONSTRUCCIONES ANASTHASIA, C.A.

CONSTRUCCION DE PROTECCION HIDRAULICA Y RESTITUCION DE

ACCESOS AL PUENTE LA CEIBITA, VIA TO07, TRAMO: QUIBOR - EL

TOCUYO, PROG. 8+320, MUNICIPIO JIMENEZ, ESTADO LARA

PROYECTOS Y CONSTRUCCIONES ANASTHASIA, C.A.

CONSTRUCCION DE PROTECCION HIDRAULICA Y RESTITUCION DE

ACCESOS AL PUENTE LA CEIBITA, VIA TO07, TRAMO: QUIBOR - EL

TOCUYO, PROG. 8+320, MUNICIPIO JIMENEZ, ESTADO LARA

PROYECTOS Y CONSTRUCCIONES ANASTHASIA, C.A.

CONSTRUCCION DE PROTECCION HIDRAULICA Y RESTITUCION DE

ACCESOS AL PUENTE LA CEIBITA, VIA TO07, TRAMO: QUIBOR - EL

TOCUYO, PROG. 8+320, MUNICIPIO JIMENEZ, ESTADO LARA

50 de 7104/17/2023

17:30:33

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

CV-0560 3/19/2012 6,000,000.00 6,000,000.00 2,864,387.65 47.74 2,678,571.43 1,278,744.50 2 5/23/2012 AC 2,678,571.43 0.00 2,678,571.43 4,264,214.58

CV-0560 12/5/2012 1 185,062.88 82,617.36 102,445.52CV-0560 5/22/2013 2 461,136.22 205,864.39 255,271.83CV-0562 6/12/2013 3 754,321.74 336,750.78 417,570.96CV-0562 6/12/2013 4 1,463,866.81 653,511.97 810,354.84

CV-0561 3/19/2012 5,500,000.00 5,500,000.00 355,049.48 6.46 2,455,357.15 158,504.24 3 5/23/2012 AC 2,455,357.15 0.00 2,455,357.15 2,651,902.39

CV-0561 12/14/2012 1 171,541.98 76,581.24 94,960.74CV-0561 3/19/2013 2 55,682.09 24,858.08 30,824.01CV-0561 4/30/2013 3 127,825.41 57,064.92 70,760.49

CV-0562 3/9/2012 7,401,000.00 7,400,999.95 1,473,055.52 19.90 3,700,500.00 736,527.77 4 3/13/2012 AC 3,700,500.00 0.00 3,700,500.00 4,437,027.75

CV-0562 10/2/2012 1 1,150,540.05 575,270.03 575,270.02CV-0562 12/18/2012 2 322,515.47 161,257.74 161,257.73

CV-0563 3/9/2012 8,196,000.00 8,183,872.67 3,761,673.13 45.96 4,098,000.00 1,880,836.57 3 3/13/2012 AC 4,098,000.00 0.00 4,098,000.00 5,978,836.56

CV-0563 3/9/2012 7/3/2012 1 1,870,070.21 935,035.11 935,035.10CV-0563 8/27/2012 2 568,808.18 284,404.09 284,404.09CV-0563 10/3/2012 3 1,322,794.74 661,397.37 661,397.37

CV-0566 4/17/2012 2,499,747.59 2,495,511.61 2,346,614.43 94.03 1,115,958.75 1,047,595.74 2 5/10/2012 AC 1,115,958.75 0.00 1,115,958.75 2,414,977.44

CV-0566 5/2/2013 1 234,276.21 104,587.60 129,688.61CV-0566 5/2/2013 2 2,112,338.22 943,008.14 1,169,330.08

CV-0567 4/17/2012 1,499,688.32 1,499,684.76 1,453,761.22 96.94 669,503.72 649,000.55 1 5/10/2012 AC 669,503.72 0.00 669,503.72 1,474,264.39

CV-0567 10/15/2012 1 1,453,761.22 649,000.55 804,760.67284 TOTAL CV: 4,295,650,475.97 4,731,725,100.66 3,289,506,654.65 2,100,907,908.68 1,454,279,358.38 5,391,932,410.69 ### 3,936,975,237.93 #REF!

IP-CV-0155 5/18/2012 1,319,891.41 1,319,891.41 189,642.62 14.37 183,318.25 26,339.24 6 6/20/2012 AC 183,318.25 0.00 183,318.25 346,621.63

IP-CV-0155 6/11/2013 1 10,935.58 1,518.83 9,416.75IP-CV-0155 6/11/2013 2 12,638.60 1,755.36 10,883.24IP-CV-0155 6/11/2013 3 15,700.20 2,180.58 13,519.62IP-CV-0155 6/11/2013 4 66,028.47 9,170.62 56,857.85IP-CV-0155 7/10/2013 5 37,114.65 5,154.81 31,959.84

CONSTRUCTORA APROE, C.A.

REPARACION DE FALLA DE BORDE SECTOR LA PARED, PROGRESIVAS 28+470, MUNICIPIO AYACUCHO,

EN EL ESTADO TACHIRA

CONSTRUCTORA APROE, C.A.

REPARACION DE FALLA DE BORDE SECTOR LA PARED, PROGRESIVAS 28+470, MUNICIPIO AYACUCHO,

EN EL ESTADO TACHIRACONSTRUCTORA APROE,

C.A.

REPARACION DE FALLA DE BORDE SECTOR LA PARED, PROGRESIVAS 28+470, MUNICIPIO AYACUCHO,

EN EL ESTADO TACHIRACOOPERATIVA

COFABRICA 657, R.S

VIA LO02, MUELLE CARIACO - SANTA MARIA, PROG. 3+150 A 3+400, DETERIORO DE DOS

ALCANTARILLAS DE CONCRETO CON COSTURA (NO APTAS PARA

INFRAESTRUCTURA VIAL), RECTIFICACION DE VIA. ESTADO

SUCRE

COOPERATIVA COFABRICA 657, R.S

VIA LO02, MUELLE CARIACO - SANTA MARIA, PROG. 3+150 A 3+400, DETERIORO DE DOS

ALCANTARILLAS DE CONCRETO CON COSTURA (NO APTAS PARA

INFRAESTRUCTURA VIAL), RECTIFICACION DE VIA. ESTADO

SUCRECONSTRUCTORA APROE, C.A.

REPRACION DE FALLA DE BORDE, SECTOR EL VALLADO, PROG. 20+778, LO07, MUNICIPIO

LOBATERA Y UREÑA, ESTADO TACHIRA

CONSTRUCTORA APROE, C.A.

REPRACION DE FALLA DE BORDE, SECTOR EL VALLADO, PROG. 20+778, LO07, MUNICIPIO

LOBATERA Y UREÑA, ESTADO TACHIRA

CONSTRUCTORA APROE, C.A.

REPRACION DE FALLA DE BORDE, SECTOR EL VALLADO, PROG. 20+778, LO07, MUNICIPIO

LOBATERA Y UREÑA, ESTADO TACHIRA

CONSTRUCTORA APROE, C.A.

REPRACION DE FALLA DE BORDE, SECTOR EL VALLADO, PROG. 20+778, LO07, MUNICIPIO

LOBATERA Y UREÑA, ESTADO TACHIRA

COOPERATIVA COFABRICA 657, R.S

VIA LO02, MUELLE CARIACO - SANTA MARIA, PROG. 3+150 A 3+400, DETERIORO DE DOS

ALCANTARILLAS DE CONCRETO CON COSTURA (NO APTAS PARA

INFRAESTRUCTURA VIAL), RECTIFICACION DE VIA. ESTADO

SUCRECOOPERATIVA

COFABRICA 657, R.S

VIA LO02, MUELLE CARIACO - SANTA MARIA, PROG. 3+150 A 3+400, DETERIORO DE DOS

ALCANTARILLAS DE CONCRETO CON COSTURA (NO APTAS PARA

INFRAESTRUCTURA VIAL), RECTIFICACION DE VIA. ESTADO

SUCRE

COOPERATIVA COFABRICA 657, R.S

VIA LO02, MUELLE CARIACO - SANTA MARIA, PROG. 3+150 A 3+400, DETERIORO DE DOS

ALCANTARILLAS DE CONCRETO CON COSTURA (NO APTAS PARA

INFRAESTRUCTURA VIAL), RECTIFICACION DE VIA. ESTADO

SUCRECOOPERATIVA

COFABRICA 657, R.S

VIA RO01, LA LLANADA DE GUIRIA - EMPALME CON TO10, SECTOR LOS COCOS, PROG. 0+000 A LA 5+100,

HUNDIMIENTO DE LA CALZADA POR DETERIORO DE UNA BATERIA

DE ALCANTARILLA, MUNICIPIO ANDRES MATA. ESTADO SUCRE

COOPERATIVA COFABRICA 657, R.S

VIA RO01, LA LLANADA DE GUIRIA - EMPALME CON TO10, SECTOR LOS COCOS, PROG. 0+000 A LA 5+100,

HUNDIMIENTO DE LA CALZADA POR DETERIORO DE UNA BATERIA

DE ALCANTARILLA, MUNICIPIO ANDRES MATA. ESTADO SUCRE

COOPERATIVA COFABRICA 657, R.S

VIA RO01, LA LLANADA DE GUIRIA - EMPALME CON TO10, SECTOR LOS COCOS, PROG. 0+000 A LA 5+100,

HUNDIMIENTO DE LA CALZADA POR DETERIORO DE UNA BATERIA

DE ALCANTARILLA, MUNICIPIO ANDRES MATA. ESTADO SUCRE

COOPERATIVA COFABRICA 657, R.S

VIA RO01, LA LLANADA DE GUIRIA - EMPALME CON TO10, SECTOR LOS COCOS, PROG. 0+000 A LA 5+100,

HUNDIMIENTO DE LA CALZADA POR DETERIORO DE UNA BATERIA

DE ALCANTARILLA, MUNICIPIO ANDRES MATA. ESTADO SUCRECONSTRUCCIONES Y

MANTENIMIENTOS JV & NC, C.A.

REPARACION DE FALLA DE BORDE Y HUNDIMIENTO EN LA VIA PRINCIPAL, SECTOR LOS BARRIALES - GUAREMAL, PARROQUIA LOS TEQUES,

MUNICIPIO BOLIVARIANO DE GUAICAIPURO. ESTADO MIRANDACONSTRUCCIONES Y

MANTENIMIENTOS JV & NC, C.A.

REPARACION DE FALLA DE BORDE Y HUNDIMIENTO EN LA VIA PRINCIPAL, SECTOR LOS BARRIALES - GUAREMAL, PARROQUIA LOS TEQUES,

MUNICIPIO BOLIVARIANO DE GUAICAIPURO. ESTADO MIRANDA

CONSTRUCCIONES Y MANTENIMIENTOS JV &

NC, C.A.

REPARACION DE FALLA DE BORDE Y HUNDIMIENTO EN LA VIA PRINCIPAL, SECTOR LOS BARRIALES - GUAREMAL, PARROQUIA LOS TEQUES,

MUNICIPIO BOLIVARIANO DE GUAICAIPURO. ESTADO MIRANDACONSTRUCCIONES Y

MANTENIMIENTOS JV & NC, C.A.

CONSTRUCCION DE PANTALLA ATIRANTADA EN EL SECTOR

VARIANTES DE GUAYAS, MUNICIPIO GUAICAIPURO. ESTADO MIRANDA.

CONSTRUCCIONES Y MANTENIMIENTOS JV &

NC, C.A.

CONSTRUCCION DE PANTALLA ATIRANTADA EN EL SECTOR

VARIANTES DE GUAYAS, MUNICIPIO GUAICAIPURO. ESTADO MIRANDA.

YEANETTE MARIA CONDE REYES, F.P.

SERVICIOS DE INSPECCION TECNICA Y ADMINISTRATIVA DE LA OBRA: REHABILITACION INTEGRAL

KM. 29+900, AUTOPISTA REGIONAL DEL CENTRO, ESTADO

MIRANDA (CV-0517)YEANETTE MARIA CONDE

REYES, F.P.

SERVICIOS DE INSPECCION TECNICA Y ADMINISTRATIVA DE LA OBRA: REHABILITACION INTEGRAL

KM. 29+900, AUTOPISTA REGIONAL DEL CENTRO, ESTADO

MIRANDA (CV-0517)

YEANETTE MARIA CONDE REYES, F.P.

SERVICIOS DE INSPECCION TECNICA Y ADMINISTRATIVA DE LA OBRA: REHABILITACION INTEGRAL

KM. 29+900, AUTOPISTA REGIONAL DEL CENTRO, ESTADO

MIRANDA (CV-0517)

YEANETTE MARIA CONDE REYES, F.P.

SERVICIOS DE INSPECCION TECNICA Y ADMINISTRATIVA DE LA OBRA: REHABILITACION INTEGRAL

KM. 29+900, AUTOPISTA REGIONAL DEL CENTRO, ESTADO

MIRANDA (CV-0517)

YEANETTE MARIA CONDE REYES, F.P.

SERVICIOS DE INSPECCION TECNICA Y ADMINISTRATIVA DE LA OBRA: REHABILITACION INTEGRAL

KM. 29+900, AUTOPISTA REGIONAL DEL CENTRO, ESTADO

MIRANDA (CV-0517)

YEANETTE MARIA CONDE REYES, F.P.

SERVICIOS DE INSPECCION TECNICA Y ADMINISTRATIVA DE LA OBRA: REHABILITACION INTEGRAL

KM. 29+900, AUTOPISTA REGIONAL DEL CENTRO, ESTADO

MIRANDA (CV-0517)

51 de 7104/17/2023

17:30:33

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

IP-CV-0155 7/10/2013 6 47,225.12 6,559.04 40,666.08

IP-CV-0216 8/9/2012 3,651,102.22 3,598,584.08 1,649,061.53 45.83 507,097.53 229,036.33 5 8/20/2012 AC 507,097.53 0.00 507,097.53 1,927,122.73

IP-CV-0216 12/7/2012 1 268,890.18 37,345.86 231,544.32IP-CV-0216 3/4/2013 2 193,782.59 26,914.25 166,868.34IP-CV-0216 7/9/2013 3 272,521.81 37,850.25 234,671.56IP-CV-0216 7/9/2013 4 265,866.73 36,925.94 228,940.79IP-CV-0216 7/9/2013 5 648,000.22 90,000.03 558,000.19

IP-CV-0217 8/9/2012 1,446,203.29 1,425,506.43 55,526.94 3.90 200,861.57 7,712.07 1 9/21/2012 AC 200,861.57 0.00 200,861.57 248,676.44

IP-CV-0217 7/9/2013 1 55,526.94 7,712.07 47,814.87

IP-CV-0218 8/9/2012 867,218.85 855,298.89 93,899.54 10.98 120,447.06 13,041.61 2 AC 120,447.06 0.00 120,447.06 201,304.99

IP-CV-0218 8/12/2013 1 65,362.30 9,078.10 56,284.20

IP-CV-0218 2 28,537.24 3,963.51 24,573.73

IP-CV-0219 9/12/2012 1,063,137.77 1,047,822.92 722,399.86 68.94 147,658.02 100,333.32 2 AC 147,658.02 0.00 147,658.02 769,724.56

IP-CV-0219 1/31/2013 1 339,165.11 47,106.27 292,058.84IP-CV-0219 7/9/2013 2 383,234.75 53,227.05 330,007.70

IP-CV-0220 8/9/2012 418,927.20 413,297.83 300,659.29 72.75 58,184.33 41,758.23 1 AC 58,184.33 0.00 58,184.33 317,085.39

IP-CV-0220 2/6/2013 1 300,659.29 41,758.23 258,901.06

IP-CV-0221 8/6/2012 279,859.08 279,859.08 279,859.08 100.00 1 9/7/2012 1 175,582.47 0.00 175,582.47 279,859.08

9/20/2012 2 104,276.61 0.00 104,276.61

YEANETTE MARIA CONDE REYES, F.P.

SERVICIOS DE INSPECCION TECNICA Y ADMINISTRATIVA DE LA OBRA: REHABILITACION INTEGRAL

KM. 29+900, AUTOPISTA REGIONAL DEL CENTRO, ESTADO

MIRANDA (CV-0517)N.D.A. CONSTRUCCIONES

NINMAR

INSPECCION DE LA OBRA: CONSTRUCCION DE LA CARRETERA

BOCONO - LA MARQUESEÑA, TRAMO I Y III, QUE EJECUTA LA

EMPRESA: ZAGO MAQUINARIAS, C.A., SEGÚN CONTRATO CV-0026N.D.A.

CONSTRUCCIONES NINMAR

INSPECCION DE LA OBRA: CONSTRUCCION DE LA CARRETERA

BOCONO - LA MARQUESEÑA, TRAMO I Y III, QUE EJECUTA LA

EMPRESA: ZAGO MAQUINARIAS, C.A., SEGÚN CONTRATO CV-0026

N.D.A. CONSTRUCCIONES

NINMAR

INSPECCION DE LA OBRA: CONSTRUCCION DE LA CARRETERA

BOCONO - LA MARQUESEÑA, TRAMO I Y III, QUE EJECUTA LA

EMPRESA: ZAGO MAQUINARIAS, C.A., SEGÚN CONTRATO CV-0026

N.D.A. CONSTRUCCIONES

NINMAR

INSPECCION DE LA OBRA: CONSTRUCCION DE LA CARRETERA

BOCONO - LA MARQUESEÑA, TRAMO I Y III, QUE EJECUTA LA

EMPRESA: ZAGO MAQUINARIAS, C.A., SEGÚN CONTRATO CV-0026

N.D.A. CONSTRUCCIONES

NINMAR

INSPECCION DE LA OBRA: CONSTRUCCION DE LA CARRETERA

BOCONO - LA MARQUESEÑA, TRAMO I Y III, QUE EJECUTA LA

EMPRESA: ZAGO MAQUINARIAS, C.A., SEGÚN CONTRATO CV-0026

N.D.A. CONSTRUCCIONES

NINMAR

INSPECCION DE LA OBRA: CONSTRUCCION DE LA CARRETERA

BOCONO - LA MARQUESEÑA, TRAMO I Y III, QUE EJECUTA LA

EMPRESA: ZAGO MAQUINARIAS, C.A., SEGÚN CONTRATO CV-0026

YEANETTE MARIA CONDE REYES, F.P.

INSPECCION DE LA REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO, TO01 (PROG. 22+450 HASTA 22+990), ESTADO MIRANDA, QUE EJECUTA

LA EMPRESA: O & D CONSTRUCCIONES, C.A., SEGÚN

CONTRATO CV-0090YEANETTE MARIA CONDE REYES, F.P.

INSPECCION DE LA REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO, TO01 (PROG. 22+450 HASTA 22+990), ESTADO MIRANDA, QUE EJECUTA

LA EMPRESA: O & D CONSTRUCCIONES, C.A., SEGÚN

CONTRATO CV-0090YEANETTE MARIA CONDE

REYES, F.P.

INSPECCION DE LA REHABILITACION DE LA TO01,

TRAMO: KM. 0 NACIONAL - DISTRIBUIDOR SAN BLAS,

ESTADOS: DISTRITO CAPITAL, MIRANDA, ARAGUA Y CARABOBO (PROG. 22+000 HASTA 22+450), QUE EJECUTA LA EMPRESA: O & D CONSTRUCCIONES, C.A., SEGÚN

CONTRATO CV-0091YEANETTE MARIA CONDE REYES, F.P.

INSPECCION DE LA REHABILITACION DE LA TO01,

TRAMO: KM. 0 NACIONAL - DISTRIBUIDOR SAN BLAS,

ESTADOS: DISTRITO CAPITAL, MIRANDA, ARAGUA Y CARABOBO (PROG. 22+000 HASTA 22+450), QUE EJECUTA LA EMPRESA: O & D CONSTRUCCIONES, C.A., SEGÚN

CONTRATO CV-0091

YEANETTE MARIA CONDE REYES, F.P.

INSPECCION DE LA REHABILITACION DE LA TO01,

TRAMO: KM. 0 NACIONAL - DISTRIBUIDOR SAN BLAS,

ESTADOS: DISTRITO CAPITAL, MIRANDA, ARAGUA Y CARABOBO (PROG. 22+000 HASTA 22+450), QUE EJECUTA LA EMPRESA: O & D CONSTRUCCIONES, C.A., SEGÚN

CONTRATO CV-0091ALMARIS HERNANDEZ INGENIERO F.P.

INSPECCION DE LA OBRA: REHABILITACION DE LA TO09, CARRTERA CUMANA - GUIRIA,

ESTADO SUCRE, QUE EJECUTA LA EMPRESA: JOARDICA, C.A., SEGÚN

CONTRATO N° CV-0073

ALMARIS HERNANDEZ INGENIERO F.P.

INSPECCION DE LA OBRA: REHABILITACION DE LA TO09, CARRTERA CUMANA - GUIRIA,

ESTADO SUCRE, QUE EJECUTA LA EMPRESA: JOARDICA, C.A., SEGÚN

CONTRATO N° CV-0073

ALMARIS HERNANDEZ INGENIERO F.P.

INSPECCION DE LA OBRA: REHABILITACION DE LA TO09, CARRTERA CUMANA - GUIRIA,

ESTADO SUCRE, QUE EJECUTA LA EMPRESA: JOARDICA, C.A., SEGÚN

CONTRATO N° CV-0073

YUNIS SUAREZ SERVICIOS

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO TEMBLADOR - DISTRIBUIDOR ORINOQUIA (PROG. 0+000 -

13+250), ESTADO MONAGAS QUE EJECUTA LA EMPRESA:

CONSTRUCTORA 01 DE MARZO, S.A., SEGÚN CONTRATO CV-0093

YUNIS SUAREZ SERVICIOS

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO TEMBLADOR - DISTRIBUIDOR ORINOQUIA (PROG. 0+000 -

13+250), ESTADO MONAGAS QUE EJECUTA LA EMPRESA:

CONSTRUCTORA 01 DE MARZO, S.A., SEGÚN CONTRATO CV-0093

YUNIS SUAREZ SERVICIOS

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, ASFALTADO DE LA AUTOPISTA GRAN MARISCAL DE

AYACUCHO, SECTOR KEMPIS, ESTADO MIRANDA QUE EJECUTA LA

EMPRESA: PROYECTOS E INVERSIONES PROINVER RATL,

C.A., SEGÚN CONTRATO CV-0016

52 de 7104/17/2023

17:30:33

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

IP-CV-0222 8/9/2012 1,353,070.40 1,353,070.40 1,353,070.40 100.00 187,926.44 187,926.44 AC AC 187,926.44 0.00 187,926.44 1,353,070.40

9/24/2012 1 1,353,070.40 187,926.44 1,165,143.96

IP-CV-0223 8/20/2012 155,471.88 153,234.34 127,990.06 83.53 2 1 54,048.61 54,048.61 127,990.06

10/15/2012 2 73,941.45 0.00 73,941.45

IP-CV-0224 8/20/2012 298,255.89 298,255.89 298,255.89 100.00 1 10/11/2012 1 285,250.31 0.00 285,250.31 298,255.89

IP-CV-0224 10/11/2012 2 13,005.58 0.00 13,005.58

IP-CV-0227 8/20/2012 336,932.11 332,080.53 332,080.53 100.00 2 11/13/2012 1 252,079.48 0.00 252,079.48 332,080.53

IP-CV-0227 4/17/2013 2 80,001.05 0.00 80,001.05

IP-CV-0228 8/20/2012 95,196.60 93,814.85 93,814.85 100.00 1 4/17/2013 1 93,814.85 93,814.85 93,814.85

IP-CV-0229 8/20/2012 207,136.98 204,148.40 0.00 0.00 0.00

IP-CV-0230 8/23/2012 2,054,414.80 2,054,414.80 1,758,714.33 85.61 308,162.22 263,807.15 10 9/13/2012 AC 308,162.22 0.00 308,162.22 1,803,069.40

IP-CV-0230 10/2/2012 1 109,402.41 16,410.36 92,992.05IP-CV-0230 10/2/2012 2 127,348.91 19,102.34 108,246.57

YUNIS SUAREZ SERVICIOS

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, ASFALTADO DE LA AUTOPISTA GRAN MARISCAL DE AYACUCHO, ESTADO MIRANDA

QUE EJECUTA LA EMPRESA: PROYECTOS E INVERSIONES

PROINVER RATL, C.A., SEGÚN CONTRATO CV-0024

JUAN CARLOS SUPERLANO LOPEZ

(INVERSIONES J. SUPERLANO)

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO CARRETERA CHARALLAVE - OCUMARE DEL TUY, ESTADO MIRANDFA, QUE EJECUTA LA EMPRESA: COVIALCA, SEGÚN

CONTRATO N. CV-0042

JUAN CARLOS SUPERLANO LOPEZ

(INVERSIONES J. SUPERLANO)

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO DEL TRAMO VIAL CHARALLAVE - SANTA TERESA (PROG. 2+500 HASTA 5+750,

PISTA SUR), ESTADO MIRANDA, QUE EJECUTA LA EMPRESA:

COVIALCA, SEGÚN CONTRATO N. CV-0007JUAN CARLOS

SUPERLANO LOPEZ (INVERSIONES J.

SUPERLANO)

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO DEL TRAMO VIAL CHARALLAVE - SANTA TERESA (PROG. 2+500 HASTA 5+750,

PISTA SUR), ESTADO MIRANDA, QUE EJECUTA LA EMPRESA:

COVIALCA, SEGÚN CONTRATO N. CV-0007JUAN CARLOS

SUPERLANO LOPEZ (INVERSIONES J.

SUPERLANO)

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REHABILITACION Y

MEJORAS DE LA CARRETRA TEJERIA - EL CONSEJO, ESTADO ARAGUA,

QUE EJECUTA LA EMPRESA: PROYECTOS E INVERSIONES PROINVER RATL, C.A. SEGÚN

CONTRATO N. CV-0019JUAN CARLOS

SUPERLANO LOPEZ (INVERSIONES J.

SUPERLANO)

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REHABILITACION Y

MEJORAS DE LA CARRETRA TEJERIA - EL CONSEJO, ESTADO ARAGUA,

QUE EJECUTA LA EMPRESA: PROYECTOS E INVERSIONES PROINVER RATL, C.A. SEGÚN

CONTRATO N. CV-0019JUAN CARLOS

SUPERLANO LOPEZ (INVERSIONES J.

SUPERLANO)

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, DEMARCACION Y

SEÑALIZACION DE LA CARRETERA TEJERIA - EL CONSEJO, ESTADO

ARAGUA, QUE EJECUTA LA EMPRESA: PROYECTOS E

INVERSIONES PROINVER RATL, C.A. SEGÚN CONTRATO N. CV-0022

JUAN CARLOS SUPERLANO LOPEZ

(INVERSIONES J. SUPERLANO)

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REHABILITACION Y MEJORA DE LA FALLA DE BORDE EN EL SECTOR SABANETA DE LA

CARRETERA TEJERIA - EL CONSEJO, ESTADO ARAGUA, QUE

EJECUTA LA EMPRESA: PROYECTOS E INVERSIONES PROINVER RATL,

C.A. SEGÚN CONTRATO N. CV-0020

COOPERATIVA "CONSTRUCCIONES Y SUMINISTROS SPAZIO"

R.L

INSPECCION DE LA OBRA: REHABILITACION DE LA

CARRETERA LO01, TRAMO BARINAS - MERIDA, ETAPA I,

ESTADOS BARINAS - MERIDA, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES Y ASFALTO ANDES, C.A. SEGÚN CONTRATO N°

CV-0051COOPERATIVA "CONSTRUCCIONES Y SUMINISTROS SPAZIO"

R.L

INSPECCION DE LA OBRA: REHABILITACION DE LA

CARRETERA LO01, TRAMO BARINAS - MERIDA, ETAPA I,

ESTADOS BARINAS - MERIDA, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES Y ASFALTO ANDES, C.A. SEGÚN CONTRATO N°

CV-0051

COOPERATIVA "CONSTRUCCIONES Y SUMINISTROS SPAZIO"

R.L

INSPECCION DE LA OBRA: REHABILITACION DE LA

CARRETERA LO01, TRAMO BARINAS - MERIDA, ETAPA I,

ESTADOS BARINAS - MERIDA, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES Y ASFALTO ANDES, C.A. SEGÚN CONTRATO N°

CV-0051

53 de 7104/17/2023

17:30:33

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

IP-CV-0230 10/2/2012 3 222,448.74 33,367.31 189,081.43IP-CV-0230 5/17/2012 4 123,246.08 18,486.91 104,759.17IP-CV-0230 12/11/2012 5 207,940.89 31,191.13 176,749.76IP-CV-0230 1/31/2013 6 339,924.34 50,988.65 288,935.69IP-CV-0230 4/8/2013 7 93,629.93 14,044.49 79,585.44IP-CV-0230 5/6/2013 8 317,095.70 47,564.36 269,531.34IP-CV-0230 7/9/2013 9 112,088.32 16,813.25 95,275.07

8/8/2013 10 105,589.01 15,838.35 89,750.66

IP-CV-0237 317,100.15 313,195.92 180,827.51 57.74 3 4/22/2013 1 109,237.70 0.00 109,237.70 180,827.51

IP-CV-0237 4/22/2013 2 64,143.50 0.00 64,143.50IP-CV-0237 6/25/2013 3 7,446.31 0.00 7,446.31

IP-CV-0243 10/18/2012 1,966,019.30 1,966,019.30 0.00 273,058.24 AC 11/9/2012 AC 273,058.24 0.00 273,058.24 273,058.24

IP-CV-0245 8/21/2012 422,081.41 416,154.83 416,154.83 100.00 58,622.42 58,622.42 3 AC 58,622.42 0.00 58,622.42 416,154.85

IP-CV-0245 10/22/2013 1 172,889.21 24,012.39 148,876.82IP-CV-0245 2/6/2013 2 187,646.28 26,061.98 161,584.30IP-CV-0245 6/6/2013 3 55,619.36 8,548.05 47,071.31

COOPERATIVA "CONSTRUCCIONES Y SUMINISTROS SPAZIO"

R.L

INSPECCION DE LA OBRA: REHABILITACION DE LA

CARRETERA LO01, TRAMO BARINAS - MERIDA, ETAPA I,

ESTADOS BARINAS - MERIDA, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES Y ASFALTO ANDES, C.A. SEGÚN CONTRATO N°

CV-0051

COOPERATIVA "CONSTRUCCIONES Y SUMINISTROS SPAZIO"

R.L

INSPECCION DE LA OBRA: REHABILITACION DE LA

CARRETERA LO01, TRAMO BARINAS - MERIDA, ETAPA I,

ESTADOS BARINAS - MERIDA, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES Y ASFALTO ANDES, C.A. SEGÚN CONTRATO N°

CV-0051

COOPERATIVA "CONSTRUCCIONES Y SUMINISTROS SPAZIO"

R.L

INSPECCION DE LA OBRA: REHABILITACION DE LA

CARRETERA LO01, TRAMO BARINAS - MERIDA, ETAPA I,

ESTADOS BARINAS - MERIDA, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES Y ASFALTO ANDES, C.A. SEGÚN CONTRATO N°

CV-0051

COOPERATIVA "CONSTRUCCIONES Y SUMINISTROS SPAZIO"

R.L

INSPECCION DE LA OBRA: REHABILITACION DE LA

CARRETERA LO01, TRAMO BARINAS - MERIDA, ETAPA I,

ESTADOS BARINAS - MERIDA, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES Y ASFALTO ANDES, C.A. SEGÚN CONTRATO N°

CV-0051

COOPERATIVA "CONSTRUCCIONES Y SUMINISTROS SPAZIO"

R.L

INSPECCION DE LA OBRA: REHABILITACION DE LA

CARRETERA LO01, TRAMO BARINAS - MERIDA, ETAPA I,

ESTADOS BARINAS - MERIDA, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES Y ASFALTO ANDES, C.A. SEGÚN CONTRATO N°

CV-0051

COOPERATIVA "CONSTRUCCIONES Y SUMINISTROS SPAZIO"

R.L

INSPECCION DE LA OBRA: REHABILITACION DE LA

CARRETERA LO01, TRAMO BARINAS - MERIDA, ETAPA I,

ESTADOS BARINAS - MERIDA, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES Y ASFALTO ANDES, C.A. SEGÚN CONTRATO N°

CV-0051

COOPERATIVA "CONSTRUCCIONES Y SUMINISTROS SPAZIO"

R.L

INSPECCION DE LA OBRA: REHABILITACION DE LA

CARRETERA LO01, TRAMO BARINAS - MERIDA, ETAPA I,

ESTADOS BARINAS - MERIDA, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES Y ASFALTO ANDES, C.A. SEGÚN CONTRATO N°

CV-0051CONSTRUCTORA KIDD MENDOZA (RODOLFO

JOSE MENDOZA DUGARTE)

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO EN EL TRAMO OSPINO - AGUA BLANCA, ESTADO PORTUGUESA, QUE EJECUTA LA

EMPRESA: VIALIDAD Y CONSTRUCCIONES SUCRE, C.A., SEGÚN CONTRATO N° CV-0025

CONSTRUCTORA KIDD MENDOZA (RODOLFO

JOSE MENDOZA DUGARTE)

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO EN EL TRAMO OSPINO - AGUA BLANCA, ESTADO PORTUGUESA, QUE EJECUTA LA

EMPRESA: VIALIDAD Y CONSTRUCCIONES SUCRE, C.A., SEGÚN CONTRATO N° CV-0025

CONSTRUCTORA KIDD MENDOZA (RODOLFO

JOSE MENDOZA DUGARTE)

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO EN EL TRAMO OSPINO - AGUA BLANCA, ESTADO PORTUGUESA, QUE EJECUTA LA

EMPRESA: VIALIDAD Y CONSTRUCCIONES SUCRE, C.A., SEGÚN CONTRATO N° CV-0025

CONSTRUCCIONES AL, C.A.

INSPECCION DE LA OBRA: CONSTRUCCION DE LA AUTOPISTA CENTRO OCCIDENTAL, TO01, QUE

EJECUTA LA EMPRESA: ZAGO MAQUINARIAS, C.A., SEGÚN

CONTRATO N° CV-0029

YUNIS SUAREZ SERVICIOS

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO SANTA BARBARA -AGUASAY -

CAMPO MAR, ESTADO MONAGAS, QUE EJECUTA LA EMPRESA: HER-BROSS, C.A. SEGÚN CONTRATO N.

CV-0010

YUNIS SUAREZ SERVICIOS

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO SANTA BARBARA -AGUASAY -

CAMPO MAR, ESTADO MONAGAS, QUE EJECUTA LA EMPRESA: HER-BROSS, C.A. SEGÚN CONTRATO N.

CV-0010

YUNIS SUAREZ SERVICIOS

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO SANTA BARBARA -AGUASAY -

CAMPO MAR, ESTADO MONAGAS, QUE EJECUTA LA EMPRESA: HER-BROSS, C.A. SEGÚN CONTRATO N.

CV-0010

YUNIS SUAREZ SERVICIOS

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO SANTA BARBARA -AGUASAY -

CAMPO MAR, ESTADO MONAGAS, QUE EJECUTA LA EMPRESA: HER-BROSS, C.A. SEGÚN CONTRATO N.

CV-0010

54 de 7104/17/2023

17:30:33

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

IP-CV-0246 8/21/2012 1,247,723.31 1,247,723.31 1,247,723.31 100.00 173,294.90 173,294.91 2 AC 173,294.90 0.00 173,294.90 1,247,723.30

IP-CV-0246 9/22/2012 1 767,357.77 106,577.47 660,780.30IP-CV-0246 2/16/2013 2 480,365.54 66,717.44 413,648.10

IP-CV-0247 8/21/2012 98,522.24 98,522.24 98,522.24 100.00 13,683.65 13,683.65 2 AC 13,683.65 0.00 13,683.65 98,522.24

IP-CV-0247 2/20/2013 1 73,973.65 10,274.12 63,699.53IP-CV-0247 2/20/2013 2 24,548.59 3,409.53 21,139.06

IP-CV-0248 12/3/2012 481,617.68 481,617.68 481,617.68 100.00 3 12/10/2012 1 56,957.49 56,957.49 481,617.68

IP-CV-0248 12/3/2012 12/10/2012 2 327,807.98 327,807.98IP-CV-0248 12/3/2012 12/10/2012 3 96,852.21 96,852.21

IP-CV-0253 9/5/2012 2,246,878.50 6,237,531.61 1,001,560.19 16.06 312,066.46 139,105.58 1 9/27/2012 AC 312,066.46 0.00 312,066.46 1,174,521.07

IP-CV-0253 9/28/2012 1 1,001,560.19 139,105.58 862,454.61

IP-CV-0254 9/5/2012 1,685,159.12 1,660,890.61 0.00 234,049.88 AC 9/27/2012 AC 234,049.88 0.00 234,049.88 234,049.88

IP-CV-0259 9/3/2012 1,011,000.69 996,494.34 617,798.82 62.00 140,416.76 85,805.39 2 AC 140,416.76 0.00 140,416.76 672,410.19

IP-CV-0259 2/6/2013 1 158,815.21 22,057.67 136,757.54IP-CV-0259 4/18/2013 2 458,983.61 63,747.72 395,235.89

YUNIS SUAREZ SERVICIOS

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REHABILITACIONDEL TRAMO AUTOPISTA JUSEPIN, PROG.

0+910 A LA 1+440, ESTADO MONAGAS, QUE EJECUTA LA

EMPRESA: INVERSIONES PETROCIV, C.A., SEGUN CONTRATO

CV-0017YUNIS SUAREZ SERVICIOS

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LOAS TRONCALES, REHABILITACIONDEL TRAMO AUTOPISTA JUSEPIN, PROG.

0+910 A LA 1+440, ESTADO MONAGAS, QUE EJECUTA LA

EMPRESA: INVERSIONES PETROCIV, C.A., SEGUN CONTRATO

CV-0017

YUNIS SUAREZ SERVICIOS

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LOAS TRONCALES, REHABILITACIONDEL TRAMO AUTOPISTA JUSEPIN, PROG.

0+910 A LA 1+440, ESTADO MONAGAS, QUE EJECUTA LA

EMPRESA: INVERSIONES PETROCIV, C.A., SEGUN CONTRATO

CV-0017YUNIS SUAREZ

SERVICIOS

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LOAS TRONCALES, REPARACION FALLAS DE BORDE EN LA PROG.9+600 Y 22+200, TRAMO CUMANACOA - MONAGAS, MUNICIPIO MONTES,

ESTADO SUCRE, QUE EJECUTA LA EMPRESA: PROYECTOS

MARAQUERO, C.A., SEGUN CONTRATO CV-0108.YUNIS SUAREZ

SERVICIOS

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LOAS TRONCALES, REPARACION FALLAS DE BORDE EN LA PROG.9+600 Y 22+200, TRAMO CUMANACOA - MONAGAS, MUNICIPIO MONTES,

ESTADO SUCRE, QUE EJECUTA LA EMPRESA: PROYECTOS

MARAQUERO, C.A., SEGUN CONTRATO CV-0108.

YUNIS SUAREZ SERVICIOS

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LOAS TRONCALES, REPARACION FALLAS DE BORDE EN LA PROG.9+600 Y 22+200, TRAMO CUMANACOA - MONAGAS, MUNICIPIO MONTES,

ESTADO SUCRE, QUE EJECUTA LA EMPRESA: PROYECTOS

MARAQUERO, C.A., SEGUN CONTRATO CV-0108.

INSPECCIONES Y SUPERVISIONES

MENDOZA, FP (OMAR RAMON MENDOZA)

INSPECCION DE LA OBRA: REHABILITACION DE LA TO13, BASE AEREA CARRIZAL (PROG.

185+000), PUENTE MEMO (PROG. 224+000), ESTADO GUARICO, QUE

EJECUTA LA EMPRESA: CONSTRUCTORA CONKOR, C.A., SEGÚN CONTRATO N. CV-0015

INSPECCIONES Y SUPERVISIONES

MENDOZA, FP (OMAR RAMON MENDOZA)

INSPECCION DE LA OBRA: REHABILITACION DE LA TO13, BASE AEREA CARRIZAL (PROG.

185+000), PUENTE MEMO (PROG. 224+000), ESTADO GUARICO, QUE

EJECUTA LA EMPRESA: CONSTRUCTORA CONKOR, C.A., SEGÚN CONTRATO N. CV-0015

INSPECCIONES Y SUPERVISIONES

MENDOZA, FP (OMAR RAMON MENDOZA)

INSPECCION DE LA OBRA: REHABILITACION DE LA TO13, BASE AEREA CARRIZAL (PROG.

185+000), PUENTE MEMO (PROG. 224+000), ESTADO GUARICO, QUE

EJECUTA LA EMPRESA: CONSTRUCTORA CONKOR, C.A., SEGÚN CONTRATO N. CV-0015

CONSTRUCTORA CALPER, C.A.

INSPECCION DE LA OBRA: DISTRIBUIDOR DE ACCESO A LA CIUDAD SOCIALISTA CARIBIA,

DESDE LA AUTOPISTA CARACAS - LA GUAIRA. ESTADO VARGAS, QUE

EJECUTA LA EMPRESA: ZAGO MAQUINARIAS, C.A., SEGÚN

CONTRATO N° CV-0008

CONSTRUCTORA CALPER, C.A.

INSPECCION DE LA OBRA: DISTRIBUIDOR DE ACCESO A LA CIUDAD SOCIALISTA CARIBIA,

DESDE LA AUTOPISTA CARACAS - LA GUAIRA, ESTADO VARGAS, QUE

EJECUTA LA EMPRESA: ZAGO MAQUINARIAS, C.A., SEGÚN

CONTRATO CV-0008

SERVICIOS Y CONSTRUCCIONES

DECALPER, C.A.

INSPECCION DE LA OBRA: CONSTRUCCION DEL TRAMO

CASARAPA - RIO GRANDE DE LA AUTOPISTA GRAN MARISCAL DE AYACUCHO, ESTADO MIRANDA,

QUE EJECUTA LA EMPRESA: ZAGO MAQUINARIAS, C.A., SEGÚN

CONTRATO CV-0028

YUNIS SUAREZ SERVICIOS

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LOAS TRONCALES, AMPLIACION Y

MEJORAS PARA LA VIA TO16, BAJO HONDO - LA MADAMA (PROG. 12+000 A LA PROG. 6+492), ESTADO ANZOATEGUI, QUE

EJECUTA LA EMPRESA: CONSTRUCCIONES Y

MANTENIMIENTO COSA, C.A., SEGUN CONTRATO CV-0084.YUNIS SUAREZ

SERVICIOS

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LOAS TRONCALES, AMPLIACION Y

MEJORAS PARA LA VIA TO16, BAJO HONDO - LA MADAMA (PROG. 12+000 A LA PROG. 6+492), ESTADO ANZOATEGUI, QUE

EJECUTA LA EMPRESA: CONSTRUCCIONES Y

MANTENIMIENTO COSA, C.A., SEGUN CONTRATO CV-0084.

YUNIS SUAREZ SERVICIOS

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LOAS TRONCALES, AMPLIACION Y

MEJORAS PARA LA VIA TO16, BAJO HONDO - LA MADAMA (PROG. 12+000 A LA PROG. 6+492), ESTADO ANZOATEGUI, QUE

EJECUTA LA EMPRESA: CONSTRUCCIONES Y

MANTENIMIENTO COSA, C.A., SEGUN CONTRATO CV-0084.

55 de 7104/17/2023

17:30:33

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

IP-CV-0260 9/10/2012 1,179,586.22 1,162,605.03 151,419.66 13.02 163,831.42 21,030.51 1 AC 163,831.42 0.00 163,831.42 294,220.57

IP-CV-0260 4/17/2013 1 151,419.66 21,030.51 130,389.15

IP-CV-0261 9/10/2012 217,768.28 214,695.19 152,352.05 70.96 30,245.60 21,160.01 1 AC 30,245.60 0.00 30,245.60 161,437.64

IP-CV-0261 2/5/2013 1 152,352.05 21,160.01 131,192.04

IP-CV-0263 OCTOJUL29, C.A. 9/10/2012 349,222.10 344,191.48 349,222.12 101.46 48,503.07 48,503.07 2 AC 48,503.07 0.00 48,503.07 349,222.12

IP-CV-0263 OCTOJUL29, C.A. 11/8/2012 1 258,428.80 35,892.89 222,535.91IP-CV-0263 OCTOJUL29, C.A. 3/21/2013 2 90,793.32 12,610.18 78,183.14

IP-CV-0264 OCTOJUL29, C.A. 9/10/2012 381,463.93 375,970.54 375,970.53 100.00 52,981.10 58,191.21 3 AC 52,981.10 0.00 52,981.10 370,760.42

IP-CV-0264 OCTOJUL29, C.A. 1 295,941.63 41,103.00 254,838.63

IP-CV-0264 OCTOJUL29, C.A. 3/22/2013 2 65,708.88 9,126.23 56,582.65

IP-CV-0264 OCTOJUL29, C.A. 6/14/2013 3 14,320.02 7,961.98 6,358.04

IP-CV-0265 10/5/2012 982,118.79 967,980.62 309,361.38 31.96 1 4/17/2013 1 309,361.38 309,361.38 309,361.38

IP-CV-0266 10/5/2012 392,848.10 387,188.47 387,188.47 100.00 2 3/27/2013 1 360,361.29 0.00 360,361.29 387,188.47

IP-CV-0266 6/25/2013 2 26,827.18 0.00 26,827.18

YUNIS SUAREZ SERVICIOS

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO DE LA TO16, TRAMO CANTAURA - EL TIGRE,

PROG. 6+492 A LA PROG. 0+000, ESTADO ANZOATEGUI, QUE

EJECUTA LA EMPRESA: CONSTRUCCIONES Y

MANTENIMIENTO COSA, C.A., SEGÚN CONTRATO N. CV-0085

YUNIS SUAREZ SERVICIOS

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO DE LA TO16, TRAMO CANTAURA - EL TIGRE,

PROG. 6+492 A LA PROG. 0+000, ESTADO ANZOATEGUI, QUE

EJECUTA LA EMPRESA: CONSTRUCCIONES Y

MANTENIMIENTO COSA, C.A., SEGÚN CONTRATO N. CV-0085

YUNIS SUAREZ SERVICIOS

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES TO15, TRAMO

TEMBLADOR - TUCUPITA, DESDELA PROG. 451+750 HASTA 521+900, MUNICIPIO LIBERTADOR, ESTADO

MONAGAS, QUE EJECUTA LA EMPRESA: CONSTRUCTORA 01 DE MARZO, S.A., SEGÚN CONTRATO

CV-0142YUNIS SUAREZ

SERVICIOS

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES TO15, TRAMO

TEMBLADOR - TUCUPITA, DESDELA PROG. 451+750 HASTA 521+900, MUNICIPIO LIBERTADOR, ESTADO

MONAGAS, QUE EJECUTA LA EMPRESA: CONSTRUCTORA 01 DE MARZO, S.A., SEGÚN CONTRATO

CV-0142

INSPECCION DE LA OBRA: REHABILITACION DE TO14, TRAMO

SAN RAFAEL DE ONOTO (PROG. 53+000) - ZARAZA (PROG.

84+300), ESTADO GUARICO, QUE EJECUTA LA EMPRESA:

CONSTRUCTORA CONKOR, C.A., SEGÚN CONTRATO N. CV-0070

INSPECCION DE LA OBRA: REHABILITACION DE TO14, TRAMO

SAN RAFAEL DE ONOTO (PROG. 53+000) - ZARAZA (PROG.

84+300), ESTADO GUARICO, QUE EJECUTA LA EMPRESA:

CONSTRUCTORA CONKOR, C.A., SEGÚN CONTRATO N. CV-0070

INSPECCION DE LA OBRA: REHABILITACION DE TO14, TRAMO

SAN RAFAEL DE ONOTO (PROG. 53+000) - ZARAZA (PROG.

84+300), ESTADO GUARICO, QUE EJECUTA LA EMPRESA:

CONSTRUCTORA CONKOR, C.A., SEGÚN CONTRATO N. CV-0070

INSPECCION DE LA OBRA: REHABILITACION DE TO12, TRAMO ORITUCO (PROG. 109+500) - LOS ALPES (PROG. 89+300), ESTADO

GUARICO, QUE EJECUTA LA EMPRESA: CONSTRUCTORA

CONKOR, C.A., SEGÚN CONTRATO N. CV-0069

INSPECCION DE LA OBRA: REHABILITACION DE TO12, TRAMO ORITUCO (PROG. 109+500) - LOS ALPES (PROG. 89+300), ESTADO

GUARICO, QUE EJECUTA LA EMPRESA: CONSTRUCTORA

CONKOR, C.A., SEGÚN CONTRATO N. CV-0069

INSPECCION DE LA OBRA: REHABILITACION DE TO12, TRAMO ORITUCO (PROG. 109+500) - LOS ALPES (PROG. 89+300), ESTADO

GUARICO, QUE EJECUTA LA EMPRESA: CONSTRUCTORA

CONKOR, C.A., SEGÚN CONTRATO N. CV-0069

INSPECCION DE LA OBRA: REHABILITACION DE TO12, TRAMO ORITUCO (PROG. 109+500) - LOS ALPES (PROG. 89+300), ESTADO

GUARICO, QUE EJECUTA LA EMPRESA: CONSTRUCTORA

CONKOR, C.A., SEGÚN CONTRATO N. CV-0069

INVERSIONES J. SUPERLANO, F.P.

INSPECCION DE LA OBRA: REHABILITACION DE LA

CARRETERA LO09, CON EMPALME EN LA TO15, TRAMO EL CARITO -

ESPINO (PROG. 0+000 A LA PROG. 25+000), ESTADO GUARICO QUE

EJECUTA LA EMPRESA: CONSTRUCCIONES Y

MANTENIMIENTO COSA, C.A., SEGÚN CONTRATO N° CV-0117

INVERSIONES J. SUPERLANO, F.P.

INSPECCION DE LA OBRA: RAHABILITACION Y

MANTENIMIENTO DE LA TO05, CARRETERA VALENCIA - SAN

CARLOS, ESTADO CARABOBO, QUE EJECUTA LA EMPRESA:

CONSTRUCTORA LOCURCIO, C.A., SEGÚN CONTRATO N° CV-0072

INVERSIONES J. SUPERLANO, F.P.

INSPECCION DE LA OBRA: RAHABILITACION Y

MANTENIMIENTO DE LA TO05, CARRETERA VALENCIA - SAN

CARLOS, ESTADO CARABOBO, QUE EJECUTA LA EMPRESA:

CONSTRUCTORA LOCURCIO, C.A., SEGÚN CONTRATO N° CV-0072

56 de 7104/17/2023

17:30:33

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

IP-CV-0268 9/10/2012 1,648,919.72 1,625,182.27 1,625,182.27 100.00 229,016.63 229,016.63 7 9/21/2012 AC 229,016.63 0.00 229,016.63 1,625,182.27

IP-CV-0268 9/21/2012 1 308,821.18 42,891.83 265,929.35IP-CV-0268 9/21/2012 2 277,084.12 38,483.91 238,600.21IP-CV-0268 3 380,476.26 52,843.92 327,632.34IP-CV-0268 10/31/2012 4 134,592.49 18,693.40 115,899.09IP-CV-0268 1/21/2013 5 66,582.12 9,247.52 57,334.60IP-CV-0268 3/1/2013 6 319,627.58 44,392.72 275,234.86IP-CV-0268 5/28/2013 7 137,998.52 22,463.33 115,535.19

INGENIERO JOSE TEJERA GARCIA

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA

TO17, TRAMO LARA- ZULIA, I ETAPA, PROG. 0+000 HASTA 80+400, MUNICIPIO TORRES,

ESTADO LARA, QUE EJECUTA LA EMPRESA: CONSTRUCCIONES

YAMARO, C.A., SEGÚN CONTRATO CV-0095INGENIERO JOSE TEJERA

GARCIA

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA

TO17, TRAMO LARA- ZULIA, I ETAPA, PROG. 0+000 HASTA 80+400, MUNICIPIO TORRES,

ESTADO LARA, QUE EJECUTA LA EMPRESA: CONSTRUCCIONES

YAMARO, C.A., SEGÚN CONTRATO CV-0095

INGENIERO JOSE TEJERA GARCIA

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA

TO17, TRAMO LARA- ZULIA, I ETAPA, PROG. 0+000 HASTA 80+400, MUNICIPIO TORRES,

ESTADO LARA, QUE EJECUTA LA EMPRESA: CONSTRUCCIONES

YAMARO, C.A., SEGÚN CONTRATO CV-0095

INGENIERO JOSE TEJERA GARCIA

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA

TO17, TRAMO LARA- ZULIA, I ETAPA, PROG. 0+000 HASTA 80+400, MUNICIPIO TORRES,

ESTADO LARA, QUE EJECUTA LA EMPRESA: CONSTRUCCIONES

YAMARO, C.A., SEGÚN CONTRATO CV-0095

INGENIERO JOSE TEJERA GARCIA

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA

TO17, TRAMO LARA- ZULIA, I ETAPA, PROG. 0+000 HASTA 80+400, MUNICIPIO TORRES,

ESTADO LARA, QUE EJECUTA LA EMPRESA: CONSTRUCCIONES

YAMARO, C.A., SEGÚN CONTRATO CV-0095

INGENIERO JOSE TEJERA GARCIA

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA

TO17, TRAMO LARA- ZULIA, I ETAPA, PROG. 0+000 HASTA 80+400, MUNICIPIO TORRES,

ESTADO LARA, QUE EJECUTA LA EMPRESA: CONSTRUCCIONES

YAMARO, C.A., SEGÚN CONTRATO CV-0095

INGENIERO JOSE TEJERA GARCIA

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA

TO17, TRAMO LARA- ZULIA, I ETAPA, PROG. 0+000 HASTA 80+400, MUNICIPIO TORRES,

ESTADO LARA, QUE EJECUTA LA EMPRESA: CONSTRUCCIONES

YAMARO, C.A., SEGÚN CONTRATO CV-0095

INGENIERO JOSE TEJERA GARCIA

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA

TO17, TRAMO LARA- ZULIA, I ETAPA, PROG. 0+000 HASTA 80+400, MUNICIPIO TORRES,

ESTADO LARA, QUE EJECUTA LA EMPRESA: CONSTRUCCIONES

YAMARO, C.A., SEGÚN CONTRATO CV-0095

57 de 7104/17/2023

17:30:33

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

IP-CV-0269 9/10/2012 1,243,744.28 1,225,832.32 1,217,436.49 99.32 172,742.26 169,088.40 5 9/21/2012 AC 172,742.26 0.00 172,742.26 1,221,090.35

IP-CV-0269 9/21/2012 1 173,939.86 24,158.31 149,781.55IP-CV-0269 10/29/2012 2 279,730.32 38,851.43 240,878.89IP-CV-0269 11/23/2012 3 382,208.66 53,084.54 329,124.12IP-CV-0269 2/1/2013 4 300,927.60 41,795.50 259,132.10IP-CV-0269 3/7/2013 5 80,630.05 11,198.62 69,431.43

IP-CV-0270 9/17/2012 230,219.56 226,945.15 129,978.34 57.27 31,974.94 18,052.55 4 AC 31,974.94 0.00 31,974.94 143,900.73

IP-CV-0270 12/3/2012 1 24,808.16 3,445.58 21,362.58IP-CV-0270 12/3/2012 2 5,783.16 803.22 4,979.94IP-CV-0270 1/21/2013 3 33,512.25 4,654.48 28,857.77IP-CV-0270 4/17/2013 4 65,874.77 9,149.27 56,725.50

IP-CV-0271 9/17/2012 821,673.81 809,842.68 809,842.68 100.00 5 10/15/2012 1 65,162.84 0.00 65,162.84 809,842.68

IP-CV-0271 10/15/2012 2 319,484.06 0.00 319,484.06IP-CV-0271 11/13/2012 3 247,044.63 0.00 247,044.63IP-CV-0271 1/15/2013 4 82,298.06 0.00 82,298.06IP-CV-0271 5/2/2013 5 95,853.09 0.00 95,853.09

IP-CV-0272 RACH INVERSIONES 9/10/2012 623,597.16 614,617.56 159,676.59 25.98 86,610.72 22,177.31 4 AC 86,610.72 0.00 86,610.72 224,110.00

IP-CV-0272 RACH INVERSIONES 11/9/2012 1 24,351.05 3,382.09 20,968.96IP-CV-0272 RACH INVERSIONES 12/3/2012 2 40,676.31 5,649.49 35,026.82IP-CV-0272 RACH INVERSIONES 12/7/2012 3 46,608.88 6,473.46 40,135.42IP-CV-0272 RACH INVERSIONES 5/9/2013 4 48,040.35 6,672.27 41,368.08

IP-CV-0275 10/5/2012 286,033.85 286,033.85 272,381.98 95.23 3 1 124,179.52 0.00 124,179.52 272,381.98

IP-CV-0275 11/16/2012 2 10,121.86 0.00 10,121.86IP-CV-0275 3/12/2013 3 138,080.60 0.00 138,080.60

INGENIERO JOSE TEJERA GARCIA

INSPECCION DE LA OBRA: REHABILITACION DE LA TO06, TRAMO MARACAIBO - VILLA DE PERIJA, (PROG. 243+100 HASTA

PROG. 306+600), ESTADO ZULIA, QUE EJECUTA LA EMPRESA:

CONSTRUCTORES VENEZOLANOS, C.A., SEGÚN CONTRATO N° CV-

0099INGENIERO JOSE TEJERA

GARCIA

INSPECCION DE LA OBRA: REHABILITACION DE LA TO06, TRAMO MARACAIBO - VILLA DE PERIJA, (PROG. 243+100 HASTA

PROG. 306+600), ESTADO ZULIA, QUE EJECUTA LA EMPRESA:

CONSTRUCTORES VENEZOLANOS, C.A., SEGÚN CONTRATO N° CV-

0099

INGENIERO JOSE TEJERA GARCIA

INSPECCION DE LA OBRA: REHABILITACION DE LA TO06, TRAMO MARACAIBO - VILLA DE PERIJA, (PROG. 243+100 HASTA

PROG. 306+600), ESTADO ZULIA, QUE EJECUTA LA EMPRESA:

CONSTRUCTORES VENEZOLANOS, C.A., SEGÚN CONTRATO N° CV-

0099

INGENIERO JOSE TEJERA GARCIA

INSPECCION DE LA OBRA: REHABILITACION DE LA TO06, TRAMO MARACAIBO - VILLA DE PERIJA, (PROG. 243+100 HASTA

PROG. 306+600), ESTADO ZULIA, QUE EJECUTA LA EMPRESA:

CONSTRUCTORES VENEZOLANOS, C.A., SEGÚN CONTRATO N° CV-

0099

INGENIERO JOSE TEJERA GARCIA

INSPECCION DE LA OBRA: REHABILITACION DE LA TO06, TRAMO MARACAIBO - VILLA DE PERIJA, (PROG. 243+100 HASTA

PROG. 306+600), ESTADO ZULIA, QUE EJECUTA LA EMPRESA:

CONSTRUCTORES VENEZOLANOS, C.A., SEGÚN CONTRATO N° CV-

0099

INGENIERO JOSE TEJERA GARCIA

INSPECCION DE LA OBRA: REHABILITACION DE LA TO06, TRAMO MARACAIBO - VILLA DE PERIJA, (PROG. 243+100 HASTA

PROG. 306+600), ESTADO ZULIA, QUE EJECUTA LA EMPRESA:

CONSTRUCTORES VENEZOLANOS, C.A., SEGÚN CONTRATO N° CV-

0099FLOR FILGUEIRA OHEP

INGENIERO CIVIL

INSPECCION DE LA OBRA: REHABILITACION INTEGRALY

BACHEO EN TODAS LAS TRONCALES, PROTECCION DE

ESTRIBOS DEL PUENTE LA VEGA (SEBORUCO), ESTADO TACHIRA,

QUE EJECUTA LA EMPRESA: TALLER CHAMA, C.A., SEGÚN CONTRATO

N° CV-0110FLOR FILGUEIRA OHEP

INGENIERO CIVIL

INSPECCION DE LA OBRA: REHABILITACION INTEGRALY

BACHEO EN TODAS LAS TRONCALES, PROTECCION DE

ESTRIBOS DEL PUENTE LA VEGA (SEBORUCO), ESTADO TACHIRA,

QUE EJECUTA LA EMPRESA: TALLER CHAMA, C.A., SEGÚN CONTRATO

N° CV-0110

FLOR FILGUEIRA OHEP INGENIERO CIVIL

INSPECCION DE LA OBRA: REHABILITACION INTEGRALY

BACHEO EN TODAS LAS TRONCALES, PROTECCION DE

ESTRIBOS DEL PUENTE LA VEGA (SEBORUCO), ESTADO TACHIRA,

QUE EJECUTA LA EMPRESA: TALLER CHAMA, C.A., SEGÚN CONTRATO

N° CV-0110

FLOR FILGUEIRA OHEP INGENIERO CIVIL

INSPECCION DE LA OBRA: REHABILITACION INTEGRALY

BACHEO EN TODAS LAS TRONCALES, PROTECCION DE

ESTRIBOS DEL PUENTE LA VEGA (SEBORUCO), ESTADO TACHIRA,

QUE EJECUTA LA EMPRESA: TALLER CHAMA, C.A., SEGÚN CONTRATO

N° CV-0110

FLOR FILGUEIRA OHEP INGENIERO CIVIL

INSPECCION DE LA OBRA: REHABILITACION INTEGRALY

BACHEO EN TODAS LAS TRONCALES, PROTECCION DE

ESTRIBOS DEL PUENTE LA VEGA (SEBORUCO), ESTADO TACHIRA,

QUE EJECUTA LA EMPRESA: TALLER CHAMA, C.A., SEGÚN CONTRATO

N° CV-0110INVERSIONES J.

SUPERLANO

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REHABILITACION Y

MANTENIMIENTO DEL TRAMO VIAL CHARALLAVE - SANTA TERESA, DEL ESTADO MIRANDA, QUE EJECUTA

LA EMPRESA: COVIALCA, C.A., SEGÚN CONTRATO N° CV-0011

INVERSIONES J. SUPERLANO

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REHABILITACION Y

MANTENIMIENTO DEL TRAMO VIAL CHARALLAVE - SANTA TERESA, DEL ESTADO MIRANDA, QUE EJECUTA

LA EMPRESA: COVIALCA, C.A., SEGÚN CONTRATO N° CV-0011

INVERSIONES J. SUPERLANO

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REHABILITACION Y

MANTENIMIENTO DEL TRAMO VIAL CHARALLAVE - SANTA TERESA, DEL ESTADO MIRANDA, QUE EJECUTA

LA EMPRESA: COVIALCA, C.A., SEGÚN CONTRATO N° CV-0011

INVERSIONES J. SUPERLANO

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REHABILITACION Y

MANTENIMIENTO DEL TRAMO VIAL CHARALLAVE - SANTA TERESA, DEL ESTADO MIRANDA, QUE EJECUTA

LA EMPRESA: COVIALCA, C.A., SEGÚN CONTRATO N° CV-0011

INVERSIONES J. SUPERLANO

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REHABILITACION Y

MANTENIMIENTO DEL TRAMO VIAL CHARALLAVE - SANTA TERESA, DEL ESTADO MIRANDA, QUE EJECUTA

LA EMPRESA: COVIALCA, C.A., SEGÚN CONTRATO N° CV-0011

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, CONSTRUCCION DE

PANTALLAS ATIRANTADAS EN TALUDES DE LA CARRETERA LA

FRIA - LA GRITA, ESTADO TACHIRA, QUE EJECUTA LA EMPRESA: TALLER

CHAMA, C.A., SEGÚN CONTRATO N° CV-0107

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, CONSTRUCCION DE

PANTALLAS ATIRANTADAS EN TALUDES DE LA CARRETERA LA

FRIA - LA GRITA, ESTADO TACHIRA, QUE EJECUTA LA EMPRESA: TALLER

CHAMA, C.A., SEGÚN CONTRATO N° CV-0107

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, CONSTRUCCION DE

PANTALLAS ATIRANTADAS EN TALUDES DE LA CARRETERA LA

FRIA - LA GRITA, ESTADO TACHIRA, QUE EJECUTA LA EMPRESA: TALLER

CHAMA, C.A., SEGÚN CONTRATO N° CV-0107

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, CONSTRUCCION DE

PANTALLAS ATIRANTADAS EN TALUDES DE LA CARRETERA LA

FRIA - LA GRITA, ESTADO TACHIRA, QUE EJECUTA LA EMPRESA: TALLER

CHAMA, C.A., SEGÚN CONTRATO N° CV-0107

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, CONSTRUCCION DE

PANTALLAS ATIRANTADAS EN TALUDES DE LA CARRETERA LA

FRIA - LA GRITA, ESTADO TACHIRA, QUE EJECUTA LA EMPRESA: TALLER

CHAMA, C.A., SEGÚN CONTRATO N° CV-0107ASOCIACION

COOPERATIVA BUENA VISTA DE BARINITAS,

R.L.

INSPECCION DE LA OBR: REHABILITACION DE LA

CARRETERA TO05, TRAMO LA PEDRERA - SAN CRISTOBAL, PROG.

624+571 HASTA 633+471, ESTADO TACHIRA, QUE EJECUTA LA

EMPRESA: CONSTRUCTORA EL MORRACHON, SEGÚN CONTRATO

CV-0027ASOCIACION COOPERATIVA BUENA VISTA DE BARINITAS,

R.L.

INSPECCION DE LA OBR: REHABILITACION DE LA

CARRETERA TO05, TRAMO LA PEDRERA - SAN CRISTOBAL, PROG.

624+571 HASTA 633+471, ESTADO TACHIRA, QUE EJECUTA LA

EMPRESA: CONSTRUCTORA EL MORRACHON, SEGÚN CONTRATO

CV-0027

ASOCIACION COOPERATIVA BUENA VISTA DE BARINITAS,

R.L.

INSPECCION DE LA OBR: REHABILITACION DE LA

CARRETERA TO05, TRAMO LA PEDRERA - SAN CRISTOBAL, PROG.

624+571 HASTA 633+471, ESTADO TACHIRA, QUE EJECUTA LA

EMPRESA: CONSTRUCTORA EL MORRACHON, SEGÚN CONTRATO

CV-0027

58 de 7104/17/2023

17:30:33

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

IP-CV-0276 9/21/2012 1,348,102.12 1,328,714.50 1,299,086.09 97.77 187,236.41 180,428.63 4 10/17/2012 AC 187,236.41 0.00 187,236.41 1,305,893.87

IP-CV-0276 10/22/2012 1 281,249.63 39,062.45 242,187.18IP-CV-0276 11/1/2012 2 394,680.57 54,816.75 339,863.82IP-CV-0276 12/6/2012 3 370,582.91 51,469.85 319,113.06IP-CV-0276 12/21/2012 4 252,572.98 35,079.58 217,493.40

IP-CV-0277 10/30/2012 1,993,071.83 1,993,071.83 1,110,813.11 55.73 276,815.53 154,279.60 6 12/11/2012 AC 276,815.53 0.00 276,815.53 1,233,349.04

IP-CV-0277 1/17/2013 1 555,891.62 77,207.17 478,684.45IP-CV-0277 1/17/2013 2 242,734.29 33,713.10 209,021.19IP-CV-0277 4/22/2013 3 98,685.67 13,706.34 84,979.33IP-CV-0277 4/26/2013 4 213,501.53 29,652.99 183,848.54

IP-CV-0278 9/10/2012 505,310.57 498,265.95 0.00 0.00

IP-CV-0279 9/10/2012 280,621.48 276,806.97 0.00 0.00

IP-CV-0280 05/010/2012 958,668.21 944,901.72 672,156.89 71.14 133,148.36 93,355.12 2 10/22/2012 AC 133,148.36 0.00 133,148.36 711,950.13

CV-0280 30/10/212 1 497,702.81 69,125.39 428,577.42CV-0280 12/7/2012 2 174,454.08 24,229.73 150,224.35

IP-CV-0281 10/5/2012 476,530.46 470,122.98 462,205.74 98.32 66,184.79 64,195.24 2 AC 66,184.79 0.00 66,184.79 464,195.29

IP-CV-0281 12/21/2012 1 330,582.95 45,914.30 284,668.65IP-CV-0281 12/21/2012 2 131,622.79 18,280.94 113,341.85

INGENIERO DANIEL ELJURI F.P.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA

TRONCAL TO03, TRAMO CORO (PROG. 264+000) - SANTA RITA

(PROG. 441+700), ESTADO FALCON, QUE EJECUTA LA

EMPRESA: CONSTRUCTORA CONKO, C.A., SEGÚN CONTRATO

CV-0104INGENIERO DANIEL

ELJURI F.P.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA

TRONCAL TO03, TRAMO CORO (PROG. 264+000) - SANTA RITA

(PROG. 441+700), ESTADO FALCON, QUE EJECUTA LA

EMPRESA: CONSTRUCTORA CONKO, C.A., SEGÚN CONTRATO

CV-0104

INGENIERO DANIEL ELJURI F.P.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA

TRONCAL TO03, TRAMO CORO (PROG. 264+000) - SANTA RITA

(PROG. 441+700), ESTADO FALCON, QUE EJECUTA LA

EMPRESA: CONSTRUCTORA CONKO, C.A., SEGÚN CONTRATO

CV-0104

INGENIERO DANIEL ELJURI F.P.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA

TRONCAL TO03, TRAMO CORO (PROG. 264+000) - SANTA RITA

(PROG. 441+700), ESTADO FALCON, QUE EJECUTA LA

EMPRESA: CONSTRUCTORA CONKO, C.A., SEGÚN CONTRATO

CV-0104

INGENIERO DANIEL ELJURI F.P.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA

TRONCAL TO03, TRAMO CORO (PROG. 264+000) - SANTA RITA

(PROG. 441+700), ESTADO FALCON, QUE EJECUTA LA

EMPRESA: CONSTRUCTORA CONKO, C.A., SEGÚN CONTRATO

CV-0104ING. CARMEN J. MORENO

L.

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO DE LA TO09, TRAMO BOCA DE UCHIRE - REDOMA DE LAS PALOMAS, ESTADO ANZOATEGUI, QUE

EJECUTA LA EMPRESA: PEDECA, C.A., SEGÚN CONTRATO N° CV-

0046ING. CARMEN J. MORENO

L.

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO DE LA TO09, TRAMO BOCA DE UCHIRE - REDOMA DE LAS PALOMAS, ESTADO ANZOATEGUI, QUE

EJECUTA LA EMPRESA: PEDECA, C.A., SEGÚN CONTRATO N° CV-

0046

ING. CARMEN J. MORENO L.

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO DE LA TO09, TRAMO BOCA DE UCHIRE - REDOMA DE LAS PALOMAS, ESTADO ANZOATEGUI, QUE

EJECUTA LA EMPRESA: PEDECA, C.A., SEGÚN CONTRATO N° CV-

0046

ING. CARMEN J. MORENO L.

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO DE LA TO09, TRAMO BOCA DE UCHIRE - REDOMA DE LAS PALOMAS, ESTADO ANZOATEGUI, QUE

EJECUTA LA EMPRESA: PEDECA, C.A., SEGÚN CONTRATO N° CV-

0046

ING. CARMEN J. MORENO L.

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO DE LA TO09, TRAMO BOCA DE UCHIRE - REDOMA DE LAS PALOMAS, ESTADO ANZOATEGUI, QUE

EJECUTA LA EMPRESA: PEDECA, C.A., SEGÚN CONTRATO N° CV-

0046INVERSORA HIDROGAR,

C.A.

INSPECCION DE LA OBRA: REHABILITACIONINTEGRAL DE LA AUTOPISTA VALENCIA - PUERTO CABELLO, SENTIDO VALENCIA -

PUERTO CABELLO (PROG. DESDE 188+080 A LA 189+482) Y

SENTIDO PUERTO CABELLO - VALENCIA (PROG. 189+040 A LA

188+760 Y DESDE LA 12+500 A LA 7+500), ESTADO CARABOBO QUE

EJECUTA LA EMPRESA: ASFALTADORA REGIONAL, C.A.,

SEGUN CONTRATO CV-0129

FECHA DE INICIO A PARTIR DE LA FECHA DE INICIO DE LA OBRA A INSPECCIONAR

INVERSORA HIDROGAR, C.A.

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO

TRUJILLO - BOCONO (PROG. DESDE 0+000 HASTA 19+000), ESTADO

TRUJILLO, QUE EJECUTA LA EMPRESA: CONSORCIO MONTE

CARMELO, C.A., SEGÚN CONTRATO CV-0137

FECHA DE INICIO A PARTIR DE LA FECHA DE INICIO DE LA OBRA A INSPECCIONAR

TOMAS AURELIO MARSAL FONSECA F.P.

INSPECCION DE LA OBRA REHABILITACION Y

MANTENIMIENTO DE LA TO03, TRAMO LA VELA DE CORO- BOCA

DE YARACUY PROG. 73+700 HASTA PROG. 145+400), ESTADO

FALCON, QUE EJECUTA LA EMPRESA: CONSTRUCTORA

CONKOR, C.A., SEGÚN CONTRATO N° CV-0103

TOMAS AURELIO MARSAL FONSECO F.P.

INSPECCION DE LA OBRA REHABILITACION Y

MANTENIMIENTO DE LA TO03, TRAMO LA VELA DE CORO- BOCA

DE YARACUY PROG. 73+700 HASTA PROG. 145+400), ESTADO

FALCON.

TOMAS AURELIO MARSAL FONSECO F.P.

INSPECCION DE LA OBRA REHABILITACION Y

MANTENIMIENTO DE LA TO03, TRAMO LA VELA DE CORO- BOCA

DE YARACUY PROG. 73+700 HASTA PROG. 145+400), ESTADO

FALCON.CASTRO GUDIÑO ORLANDO JOSE

INGENIERO

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REHABILITACION DEL SISTEMA DE ALUMBRADO PUBLICO DE LA AUTOPISTA REGIONAL DEL

CENTRO, AMBOS SENTIDOS, DESDE HOYO DE LA PUERTA,

ESTADO MIRANDA HASTA TEJERIAS, ESTADO ARAGUA QUE

EJECUTA LA EMPRESA: CONSTRUCTORA RIO CUYUNI, C.A.,

SEGUN CONTRATO N° CV-0089

CASTRO GUDIÑO ORLANDO JOSE

INGENIERO

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REHABILITACION DEL SISTEMA DE ALUMBRADO PUBLICO DE LA AUTOPISTA REGIONAL DEL

CENTRO, AMBOS SENTIDOS, DESDE HOYO DE LA PUERTA,

ESTADO MIRANDA HASTA TEJERIAS, ESTADO ARAGUA QUE

EJECUTA LA EMPRESA: CONSTRUCTORA RIO CUYUNI, C.A.,

SEGUN CONTRATO N° CV-0089

CASTRO GUDIÑO ORLANDO JOSE

INGENIERO

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REHABILITACION DEL SISTEMA DE ALUMBRADO PUBLICO DE LA AUTOPISTA REGIONAL DEL

CENTRO, AMBOS SENTIDOS, DESDE HOYO DE LA PUERTA,

ESTADO MIRANDA HASTA TEJERIAS, ESTADO ARAGUA QUE

EJECUTA LA EMPRESA: CONSTRUCTORA RIO CUYUNI, C.A.,

SEGUN CONTRATO N° CV-0089

59 de 7104/17/2023

17:30:33

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

IP-CV-0282 10/5/2012 91,304.60 91,304.60 91,304.60 100.00 12,681.20 12,681.20 1 AC 12,681.20 0.00 12,681.20 91,304.60

IP-CV-0282 1/21/2013 1 91,304.60 12,681.20 78,623.40

IP-CV-0283 10/5/2012 675,635.20 675,635.20 675,635.20 100.00 93,838.22 93,838.22 5 AC 93,838.22 0.00 93,838.22 675,635.20

IP-CV-0283 12/21/2012 1 55,267.76 7,676.08 47,591.68IP-CV-0283 12/21/2012 2 208,783.79 28,997.75 179,786.04IP-CV-0283 12/21/2012 3 116,221.74 16,141.91 100,079.83IP-CV-0283 21/012013 4 124,969.35 17,356.85 107,612.50IP-CV-0283 1/25/2013 5 170,392.56 23,665.63 146,726.93

IP-CV-0284 10/5/2012 1,418,991.59 1,398,560.69 295,628.96 21.14 197,082.17 41,059.58 2 AC 197,082.17 0.00 197,082.17 451,651.55

IP-CV-0284 6/14/2013 1 235,514.87 32,710.40 202,804.47IP-CV-0284 6/14/2013 2 60,114.09 8,349.18 51,764.91

IP-CV-0285 9/17/2012 477,459.79 470,586.02 470,586.02 100.00 3 3/18/2013 1 317,986.71 0.00 317,986.71 470,586.02

IP-CV-0285 4/3/2013 2 127,510.46 0.00 127,510.46IP-CV-0285 6/25/2013 3 25,088.85 0.00 25,088.85

IP-CV-0286 NUÑEZ T.J., INGENIERIA 11/19/2012 140,114.45 138,096.77 0.00

IP-CV-0287 11/1/2012 1,411,585.70 1,411,585.70 1,402,029.85 99.32 196,053.57 194,726.38 6 03/12/201 AC 196,053.57 0.00 196,053.57 1,403,357.04

IP-CV-0287 12/3/2012 1 160,250.03 22,256.95 137,993.08IP-CV-0287 12/3/2012 2 585,384.52 81,303.41 504,081.11IP-CV-0287 3/13/2013 3 620,988.57 86,248.41 534,740.16IP-CV-0287 5/15/2013 4 3,529.05 490.15 3,038.90IP-CV-0287 5/15/2013 5 16,479.99 2,288.89 14,191.10IP-CV-0287 5/15/2013 6 15,397.69 2,138.57 13,259.12

CASTRO GUDIÑO ORLANDO JOSE

INGENIERO

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES,

REACONDICIONAMIENTO DEL SISTEMA DE ALUMBRADO PUBLICO EN LOS DISTRIBUIDORES HOYO DE

LA PUERTA, CORTADA DE MATURIN, PARACOTOS Y LAS TEJERIAS DE LA AUTOPSTA

REGIONAL DEL CENTRO, ESTADO MIRANDA, QUE EJECUTA LA EMPRESA: SUMINISTRO DE

MATERIALES ELECTRICOS ORIENTE, C.A.. SEGUN CONTRATO N° CV-

0088

CASTRO GUDIÑO ORLANDO JOSE

INGENIERO

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES,

REACONDICIONAMIENTO DEL SISTEMA DE ALUMBRADO PUBLICO EN LOS DISTRIBUIDORES HOYO DE

LA PUERTA, CORTADA DE MATURIN, PARACOTOS Y LAS TEJERIAS DE LA AUTOPSTA

REGIONAL DEL CENTRO, ESTADO MIRANDA, QUE EJECUTA LA EMPRESA: SUMINISTRO DE

MATERIALES ELECTRICOS ORIENTE, C.A.. SEGUN CONTRATO N° CV-

0088

CASTRO GUDIÑO ORLANDO JOSE

INGENIERO

INSPECCION DE LA OBRA: REHABILITACION DE LA TO01,

TRAMO KM. 0 NACONAL, DISTRIBUIDOR SAN BLAS, ENTRE

EL KM. 44 AL 55+300, LIMITE CON EL ESTADO ARAGUA, EN SU PISTA

NORTE (HORARIO NOCTURNA) ESTADO MIRANDA, QUE EJECUTA

LA EMPRESA: INVERSIONES COFLAN, C.A.SEGUN CONTRATO

CV-0032

CASTRO GUDIÑO ORLANDO JOSE

INGENIERO

INSPECCION DE LA OBRA: REHABILITACION DE LA TO01,

TRAMO KM. 0 NACONAL, DISTRIBUIDOR SAN BLAS, ENTRE

EL KM. 44 AL 55+300, LIMITE CON EL ESTADO ARAGUA, EN SU PISTA

NORTE (HORARIO NOCTURNA) ESTADO MIRANDA, QUE EJECUTA

LA EMPRESA: INVERSIONES COFLAN, C.A.SEGUN CONTRATO

CV-0032

CASTRO GUDIÑO ORLANDO JOSE

INGENIERO

INSPECCION DE LA OBRA: REHABILITACION DE LA TO01,

TRAMO KM. 0 NACONAL, DISTRIBUIDOR SAN BLAS, ENTRE

EL KM. 44 AL 55+300, LIMITE CON EL ESTADO ARAGUA, EN SU PISTA

NORTE (HORARIO NOCTURNA) ESTADO MIRANDA, QUE EJECUTA

LA EMPRESA: INVERSIONES COFLAN, C.A.SEGUN CONTRATO

CV-0032

CASTRO GUDIÑO ORLANDO JOSE

INGENIERO

INSPECCION DE LA OBRA: REHABILITACION DE LA TO01,

TRAMO KM. 0 NACONAL, DISTRIBUIDOR SAN BLAS, ENTRE

EL KM. 44 AL 55+300, LIMITE CON EL ESTADO ARAGUA, EN SU PISTA

NORTE (HORARIO NOCTURNA) ESTADO MIRANDA, QUE EJECUTA

LA EMPRESA: INVERSIONES COFLAN, C.A.SEGUN CONTRATO

CV-0032

CASTRO GUDIÑO ORLANDO JOSE

INGENIERO

INSPECCION DE LA OBRA: REHABILITACION DE LA TO01,

TRAMO KM. 0 NACONAL, DISTRIBUIDOR SAN BLAS, ENTRE

EL KM. 44 AL 55+300, LIMITE CON EL ESTADO ARAGUA, EN SU PISTA

NORTE (HORARIO NOCTURNA) ESTADO MIRANDA, QUE EJECUTA

LA EMPRESA: INVERSIONES COFLAN, C.A.SEGUN CONTRATO

CV-0032

CASTRO GUDIÑO ORLANDO JOSE

INGENIERO

INSPECCION DE LA OBRA: REHABILITACION DE LA TO01,

TRAMO KM. 0 NACONAL, DISTRIBUIDOR SAN BLAS, ENTRE

EL KM. 44 AL 55+300, LIMITE CON EL ESTADO ARAGUA, EN SU PISTA

NORTE (HORARIO NOCTURNA) ESTADO MIRANDA, QUE EJECUTA

LA EMPRESA: INVERSIONES COFLAN, C.A.SEGUN CONTRATO

CV-0032

CASTRO GUDIÑO ORLANDO JOSE

INGENIERO

INSPECCION DE LA OBRA: REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO TO01, SISTEMA DE ALUMBRADO PUBLICO Y RED DE ELECTRICIDAD EN LOS

TRAMOS MAITANA - OCAMPO, PORG. 29+000 A 48+000 Y LOMAS

DE NIQUEL - TEJERIAS, PROG. 54+000 A 62+000, ESTADOS

MIRANDA Y ARAGUA, QUE EJECUTA LA EMPRESA: SUMINISTROS DE

MATERIALES ELECTRICOS ORIENTE, C.A., SEGÚN CONTRATO N° CV-

0012

CASTRO GUDIÑO ORLANDO JOSE

INGENIERO

INSPECCION DE LA OBRA: REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO TO01, SISTEMA DE ALUMBRADO PUBLICO Y RED DE ELECTRICIDAD EN LOS

TRAMOS MAITANA - OCAMPO, PORG. 29+000 A 48+000 Y LOMAS

DE NIQUEL - TEJERIAS, PROG. 54+000 A 62+000, ESTADOS

MIRANDA Y ARAGUA, QUE EJECUTA LA EMPRESA: SUMINISTROS DE

MATERIALES ELECTRICOS ORIENTE, C.A., SEGÚN CONTRATO N° CV-

0012

CASTRO GUDIÑO ORLANDO JOSE

INGENIERO

INSPECCION DE LA OBRA: REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO TO01, SISTEMA DE ALUMBRADO PUBLICO Y RED DE ELECTRICIDAD EN LOS

TRAMOS MAITANA - OCAMPO, PORG. 29+000 A 48+000 Y LOMAS

DE NIQUEL - TEJERIAS, PROG. 54+000 A 62+000, ESTADOS

MIRANDA Y ARAGUA, QUE EJECUTA LA EMPRESA: SUMINISTROS DE

MATERIALES ELECTRICOS ORIENTE, C.A., SEGÚN CONTRATO N° CV-

0012

INVERSIONES J. SUPERLANO

INSPECCION DE LA OBRA: REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO, TRAMO DISTRIBUIDOR SAN BLAS - CAMPO

DE CARABOBO (PROG. DESDE 0+000 HASTA 10+800, AMBOS SENTIDOS), ESTADO CARABOBO

QUE EJECUTA LA EMPRESA CONSTRUCTORA LOCURCIO,

SEGÚN CONTRATO N° CV-0126INVERSIONES J.

SUPERLANO

INSPECCION DE LA OBRA: REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO, TRAMO DISTRIBUIDOR SAN BLAS - CAMPO

DE CARABOBO (PROG. DESDE 0+000 HASTA 10+800, AMBOS SENTIDOS), ESTADO CARABOBO

QUE EJECUTA LA EMPRESA CONSTRUCTORA LOCURCIO,

SEGÚN CONTRATO N° CV-0126

INVERSIONES J. SUPERLANO

INSPECCION DE LA OBRA: REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO, TRAMO DISTRIBUIDOR SAN BLAS - CAMPO

DE CARABOBO (PROG. DESDE 0+000 HASTA 10+800, AMBOS SENTIDOS), ESTADO CARABOBO

QUE EJECUTA LA EMPRESA CONSTRUCTORA LOCURCIO,

SEGÚN CONTRATO N° CV-0126

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO TRAMO PUENTE GUARDAGALLO - VERAGACHA,

PROGRESIVAS 0+000 HASTA LA +500, MUNICIPIO IRRIBARREN, ESTADO LARA, QUE EJECUTA LA

EMPRESA: CONSTRUCTORA CASMORCA, C.A., SEGÚN CONTRATO N° CV-0075

FECHA DE INICIO A PARTIR DE LA FECHA DE INICIO DE LA OBRA A INSPECCIONAR

INGENIERIA GONZALEZ M.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA

TO17, TRAMO LARA - ZULIA I ETAPA, PROG. 59+000 HASTA LA 65+000, (REHABILITACIONDEL

PUENTE SICARE Y SUSTITUCION DE ALCANTATILLAS) Y PROG. 80+000

HASTA LA 80+400, CONSTRUCCION DE MURO DE

CONTENCION) ESTADOS LARA - ZULIA, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES HER-BROSS, C.A., SEGUN CONTRATO CV-0031INGENIERIA GONZALEZ

M.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA

TO17, TRAMO LARA - ZULIA I ETAPA, PROG. 59+000 HASTA LA 65+000, (REHABILITACIONDEL

PUENTE SICARE Y SUSTITUCION DE ALCANTATILLAS) Y PROG. 80+000

HASTA LA 80+400, CONSTRUCCION DE MURO DE

CONTENCION) ESTADOS LARA - ZULIA, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES HER-BROSS, C.A., SEGUN CONTRATO CV-0031

INGENIERIA GONZALEZ M.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA

TO17, TRAMO LARA - ZULIA I ETAPA, PROG. 59+000 HASTA LA 65+000, (REHABILITACIONDEL

PUENTE SICARE Y SUSTITUCION DE ALCANTATILLAS) Y PROG. 80+000

HASTA LA 80+400, CONSTRUCCION DE MURO DE

CONTENCION) ESTADOS LARA - ZULIA, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES HER-BROSS, C.A., SEGUN CONTRATO CV-0031

INGENIERIA GONZALEZ M.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA

TO17, TRAMO LARA - ZULIA I ETAPA, PROG. 59+000 HASTA LA 65+000, (REHABILITACIONDEL

PUENTE SICARE Y SUSTITUCION DE ALCANTATILLAS) Y PROG. 80+000

HASTA LA 80+400, CONSTRUCCION DE MURO DE

CONTENCION) ESTADOS LARA - ZULIA, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES HER-BROSS, C.A., SEGUN CONTRATO CV-0031

INGENIERIA GONZALEZ M.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA

TO17, TRAMO LARA - ZULIA I ETAPA, PROG. 59+000 HASTA LA 65+000, (REHABILITACIONDEL

PUENTE SICARE Y SUSTITUCION DE ALCANTATILLAS) Y PROG. 80+000

HASTA LA 80+400, CONSTRUCCION DE MURO DE

CONTENCION) ESTADOS LARA - ZULIA, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES HER-BROSS, C.A., SEGUN CONTRATO CV-0031

INGENIERIA GONZALEZ M.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA

TO17, TRAMO LARA - ZULIA I ETAPA, PROG. 59+000 HASTA LA 65+000, (REHABILITACIONDEL

PUENTE SICARE Y SUSTITUCION DE ALCANTATILLAS) Y PROG. 80+000

HASTA LA 80+400, CONSTRUCCION DE MURO DE

CONTENCION) ESTADOS LARA - ZULIA, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES HER-BROSS, C.A., SEGUN CONTRATO CV-0031

INGENIERIA GONZALEZ M.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA

TO17, TRAMO LARA - ZULIA I ETAPA, PROG. 59+000 HASTA LA 65+000, (REHABILITACIONDEL

PUENTE SICARE Y SUSTITUCION DE ALCANTATILLAS) Y PROG. 80+000

HASTA LA 80+400, CONSTRUCCION DE MURO DE

CONTENCION) ESTADOS LARA - ZULIA, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES HER-BROSS, C.A., SEGUN CONTRATO CV-0031

60 de 7104/17/2023

17:30:34

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

IP-CV-0288 11/1/2012 216,321.41 216,321.41 157,617.40 72.86 30,044.64 21,891.30 5 03/12/201 AC 30,044.64 0.00 30,044.64 165,770.74

IP-CV-0288 11/1/2012 3/12/2013 1 4,318.70 599.82 3,718.88IP-CV-0288 3/12/2013 2 11,357.43 1,577.42 9,780.01IP-CV-0288 3/13/2013 3 40,661.65 5,647.45 35,014.20IP-CV-0288 3/13/2013 4 17,986.75 2,498.16 15,488.59IP-CV-0288 3/13/2013 5 83,292.87 11,568.45 71,724.42

IP-CV-0290 9/21/2012 30,618.97 30,203.00 21,965.32 72.73 1 5/27/2013 1 21,965.32 0.00 21,965.32 21,965.32

IP-CV-0291 9/11/2012 2,086,956.38 2,086,946.02 2,086,946.02 100.00 289,855.05 289,855.05 5 9/27/2012 AC 289,855.05 0.00 289,855.05 2,086,946.02

IP-CV-0291 2/6/2013 1 374,501.84 52,014.14 322,487.70IP-CV-0291 3/1/2013 2 322,136.60 44,741.19 277,395.41IP-CV-0291 3/1/2013 3 496,822.43 69,003.12 427,819.31IP-CV-0291 4/1/2013 4 306,795.84 42,610.53 264,185.31IP-CV-0291 5/28/2013 5 586,689.31 81,486.07 505,203.24

IP-CV-0292 11/6/2012 1,291,950.00 1,273,344.84 639,342.17 50.21 179,437.50 88,797.53 2 AC 179,437.50 0.00 179,437.50 729,982.14

IP-CV-0292 1/24/2013 1 259,198.46 35,999.79 223,198.67IP-CV-0292 6/3/2013 2 380,143.71 52,797.74 327,345.97

IP-CV-0293 11/6/2012 730,235.74 719,716.00 663,741.76 92.22 101,421.63 92,186.37 4 AC 101,421.63 0.00 101,421.63 672,977.02

IP-CV-0293 1/24/2013 1 576.42 80.06 496.36IP-CV-0293 1/24/2013 2 311,002.89 43,194.85 267,808.04IP-CV-0293 1/24/2013 3 216,279.40 30,038.81 186,240.59IP-CV-0293 1/24/2013 4 135,883.05 18,872.65 117,010.40

IP-CV-0294 9/18/2012 195,727.19 193,193.29 128,337.42 66.43 27,184.33 17,824.65 4 AC 27,184.33 0.00 27,184.33 137,697.10

IP-CV-0294 12/3/2012 1 46,792.58 6,498.97 40,293.61IP-CV-0294 1/24/2013 2 7,885.52 1,095.21 6,790.31IP-CV-0294 4/17/2013 3 37,221.96 5,169.72 32,052.24IP-CV-0294 5/29/2013 4 36,437.36 5,060.75 31,376.61

INGENIERIA GONZALEZ M.

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO DEL TRAMO CIRUNVALACION NORTE DE BARQUISIMETO, MUNICIPIO

IRIBARREN, ESTADO LARA, QUE EJECUTA LA EMPRESA:

CONSTRUCTORA TDK, C.A., SEGÚN CONTRATO N° CV-0064INGENIERIA GONZALEZ

M.

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO DEL TRAMO CIRUNVALACION NORTE DE BARQUISIMETO, MUNICIPIO

IRIBARREN, ESTADO LARA, QUE EJECUTA LA EMPRESA:

CONSTRUCTORA TDK, C.A., SEGÚN CONTRATO N° CV-0064

INGENIERIA GONZALEZ M.

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO DEL TRAMO CIRUNVALACION NORTE DE BARQUISIMETO, MUNICIPIO

IRIBARREN, ESTADO LARA, QUE EJECUTA LA EMPRESA:

CONSTRUCTORA TDK, C.A., SEGÚN CONTRATO N° CV-0064

INGENIERIA GONZALEZ M.

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO DEL TRAMO CIRUNVALACION NORTE DE BARQUISIMETO, MUNICIPIO

IRIBARREN, ESTADO LARA, QUE EJECUTA LA EMPRESA:

CONSTRUCTORA TDK, C.A., SEGÚN CONTRATO N° CV-0064

INGENIERIA GONZALEZ M.

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO DEL TRAMO CIRUNVALACION NORTE DE BARQUISIMETO, MUNICIPIO

IRIBARREN, ESTADO LARA, QUE EJECUTA LA EMPRESA:

CONSTRUCTORA TDK, C.A., SEGÚN CONTRATO N° CV-0064

INGENIERIA GONZALEZ M.

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO DEL TRAMO CIRUNVALACION NORTE DE BARQUISIMETO, MUNICIPIO

IRIBARREN, ESTADO LARA, QUE EJECUTA LA EMPRESA:

CONSTRUCTORA TDK, C.A., SEGÚN CONTRATO N° CV-0064

YUNIS SUAREZ SERVICIOS, F.P.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REPARACION DE

GALLA DE BORDE Y SUSTITUCION DE ALCANTARILLA EN LA PROG.

APROX. 122+200, TO10 - CARIPITO - MUNICIPIO BOLIVAR, ESTADO

MONAGAS, QUE EJECUTA LA EMPRESA: PROYECTOS

MARAQUERO, C.A., SEGUN CONTRATO CV-0134

INGENIERO JOSE TEJERA GARCIA

INSPECCION DE LA OBRA: REHABILITACION DE LA LARA -

ZULIA, TO17, ENTRE LOS SIGUIENTES TRAMOS: DESDE

DISTRIBUIDOR SABANETA HASTA DISTRIBUIDOR CARORA, DESDE LA

PROGRESIVA 36+000 HASTA LA PROGRESIVA 53+000 Y DESDE LA PROG. 59+300 HASTA LA PROG.

64+000, ESTADO LARA, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES YAMARO, SEGUN CONTRATO CV-0043

INGENIERO JOSE TEJERA GARCIA

INSPECCION DE LA OBRA: REHABILITACION DE LA LARA -

ZULIA, TO17, ENTRE LOS SIGUIENTES TRAMOS: DESDE

DISTRIBUIDOR SABANETA HASTA DISTRIBUIDOR CARORA, DESDE LA

PROGRESIVA 36+000 HASTA LA PROGRESIVA 53+000 Y DESDE LA PROG. 59+300 HASTA LA PROG.

64+000, ESTADO LARA, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES YAMARO, SEGUN CONTRATO CV-0043

INGENIERO JOSE TEJERA GARCIA

INSPECCION DE LA OBRA: REHABILITACION DE LA LARA -

ZULIA, TO17, ENTRE LOS SIGUIENTES TRAMOS: DESDE

DISTRIBUIDOR SABANETA HASTA DISTRIBUIDOR CARORA, DESDE LA

PROGRESIVA 36+000 HASTA LA PROGRESIVA 53+000 Y DESDE LA PROG. 59+300 HASTA LA PROG.

64+000, ESTADO LARA, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES YAMARO, SEGUN CONTRATO CV-0043

INGENIERO JOSE TEJERA GARCIA

INSPECCION DE LA OBRA: REHABILITACION DE LA LARA -

ZULIA, TO17, ENTRE LOS SIGUIENTES TRAMOS: DESDE

DISTRIBUIDOR SABANETA HASTA DISTRIBUIDOR CARORA, DESDE LA

PROGRESIVA 36+000 HASTA LA PROGRESIVA 53+000 Y DESDE LA PROG. 59+300 HASTA LA PROG.

64+000, ESTADO LARA, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES YAMARO, SEGUN CONTRATO CV-0043

INGENIERO JOSE TEJERA GARCIA

INSPECCION DE LA OBRA: REHABILITACION DE LA LARA -

ZULIA, TO17, ENTRE LOS SIGUIENTES TRAMOS: DESDE

DISTRIBUIDOR SABANETA HASTA DISTRIBUIDOR CARORA, DESDE LA

PROGRESIVA 36+000 HASTA LA PROGRESIVA 53+000 Y DESDE LA PROG. 59+300 HASTA LA PROG.

64+000, ESTADO LARA, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES YAMARO, SEGUN CONTRATO CV-0043

INGENIERO JOSE TEJERA GARCIA

INSPECCION DE LA OBRA: REHABILITACION DE LA LARA -

ZULIA, TO17, ENTRE LOS SIGUIENTES TRAMOS: DESDE

DISTRIBUIDOR SABANETA HASTA DISTRIBUIDOR CARORA, DESDE LA

PROGRESIVA 36+000 HASTA LA PROGRESIVA 53+000 Y DESDE LA PROG. 59+300 HASTA LA PROG.

64+000, ESTADO LARA, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES YAMARO, SEGUN CONTRATO CV-0043

CONSTRUCCIONES Y SERVICIOS VAMACA, C.A.

INSPECCION DE LA OBRA: BACHEO DE LA VIA EL TIGRE - CIUDAD

BOLIVAR, TO16, ETAPA II, ESTADOS ANZOATEGUI - BOLIVAR, QUE

EJECUTA LA EMPRESA: CONSTRUCCIONES Y

MANTENIMIENTO COSA, C.A., SEGÚN CONTRATO N° CV-0083

CONSTRUCCIONES Y SERVICIOS VAMACA, C.A.

INSPECCION DE LA OBRA: BACHEO DE LA VIA EL TIGRE - CIUDAD

BOLIVAR, TO16, ETAPA II, ESTADOS ANZOATEGUI - BOLIVAR, QUE

EJECUTA LA EMPRESA: CONSTRUCCIONES Y

MANTENIMIENTO COSA, C.A., SEGÚN CONTRATO N° CV-0083

CONSTRUCCIONES Y SERVICIOS VAMACA, C.A.

INSPECCION DE LA OBRA: BACHEO DE LA VIA EL TIGRE - CIUDAD

BOLIVAR, TO16, ETAPA II, ESTADOS ANZOATEGUI - BOLIVAR, QUE

EJECUTA LA EMPRESA: CONSTRUCCIONES Y

MANTENIMIENTO COSA, C.A., SEGÚN CONTRATO N° CV-0083

CONSTRUCCIONES Y SERVICIOS VAMACA, C.A.

INSPECCION DE LA OBRA: REHABILITACION DE LA TO09, DEL TRAMO CUMANA - PERTIGALETE, ESTADO SUCRE, QUE EJECUTA LA

EMPRESA: INVERSIONES BANAVEN, C.A., SEGÚN CONTRATO N° CV-

0045CONSTRUCCIONES Y

SERVICIOS VAMACA, C.A.

INSPECCION DE LA OBRA: REHABILITACION DE LA TO09, DEL TRAMO CUMANA - PERTIGALETE, ESTADO SUCRE, QUE EJECUTA LA

EMPRESA: INVERSIONES BANAVEN, C.A., SEGÚN CONTRATO N° CV-

0045

CONSTRUCCIONES Y SERVICIOS VAMACA, C.A.

INSPECCION DE LA OBRA: REHABILITACION DE LA TO09, DEL TRAMO CUMANA - PERTIGALETE, ESTADO SUCRE, QUE EJECUTA LA

EMPRESA: INVERSIONES BANAVEN, C.A., SEGÚN CONTRATO N° CV-

0045

CONSTRUCCIONES Y SERVICIOS VAMACA, C.A.

INSPECCION DE LA OBRA: REHABILITACION DE LA TO09, DEL TRAMO CUMANA - PERTIGALETE, ESTADO SUCRE, QUE EJECUTA LA

EMPRESA: INVERSIONES BANAVEN, C.A., SEGÚN CONTRATO N° CV-

0045

CONSTRUCCIONES Y SERVICIOS VAMACA, C.A.

INSPECCION DE LA OBRA: REHABILITACION DE LA TO09, DEL TRAMO CUMANA - PERTIGALETE, ESTADO SUCRE, QUE EJECUTA LA

EMPRESA: INVERSIONES BANAVEN, C.A., SEGÚN CONTRATO N° CV-

0045YEANETTE MARIA CONDE REYES, F.P.

INSPECCION DE LA OBRA: REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO TO01, CONSTRUCCION DE NUEVOS

SISTEMAS DE DRENAJES EN LA AUTOPISTA VALLE - COHE, PROG.

1+400 (KM. 1.4), DISTRITO CAPITAL, QUE EJUECUTA LA

EMPRESA: ESTRUCTURA NACIONALES, S.A., SEGÚN

CONTRATO N° CV-0139

YEANETTE MARIA CONDE REYES, F.P.

INSPECCION DE LA OBRA: REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO TO01, CONSTRUCCION DE NUEVOS

SISTEMAS DE DRENAJES EN LA AUTOPISTA VALLE - COHE, PROG.

1+400 (KM. 1.4), DISTRITO CAPITAL, QUE EJUECUTA LA

EMPRESA: ESTRUCTURA NACIONALES, S.A., SEGÚN

CONTRATO N° CV-0139

YEANETTE MARIA CONDE REYES, F.P.

INSPECCION DE LA OBRA: REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO TO01, CONSTRUCCION DE NUEVOS

SISTEMAS DE DRENAJES EN LA AUTOPISTA VALLE - COHE, PROG.

1+400 (KM. 1.4), DISTRITO CAPITAL, QUE EJUECUTA LA

EMPRESA: ESTRUCTURA NACIONALES, S.A., SEGÚN

CONTRATO N° CV-0139

YEANETTE MARIA CONDE REYES, F.P.

INSPECCION DE LA OBRA: REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO TO01, CONSTRUCCION DE NUEVOS

SISTEMAS DE DRENAJES EN LA AUTOPISTA VALLE - COHE, PROG.

1+400 (KM. 1.4), DISTRITO CAPITAL, QUE EJUECUTA LA

EMPRESA: ESTRUCTURA NACIONALES, S.A., SEGÚN

CONTRATO N° CV-0139

YEANETTE MARIA CONDE REYES, F.P.

INSPECCION DE LA OBRA: REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO TO01, CONSTRUCCION DE NUEVOS

SISTEMAS DE DRENAJES EN LA AUTOPISTA VALLE - COHE, PROG.

1+400 (KM. 1.4), DISTRITO CAPITAL, QUE EJUECUTA LA

EMPRESA: ESTRUCTURA NACIONALES, S.A., SEGÚN

CONTRATO N° CV-0139

61 de 7104/17/2023

17:30:34

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

IP-CV-0295 AD PRADO INGENIERIA 10/5/2012 2,241,700.11 2,209,771.42 2,060,957.08 93.27 311,347.24 286,244.04 8 AC 311,347.24 0.00 311,347.24 2,086,060.28

IP-CV-0295 AD PRADO INGENIERIA 10/5/2012 10/26/2012 1 336,476.19 46,732.80 289,743.39IP-CV-0295 AD PRADO INGENIERIA 10/5/2012 10/26/2012 2 216,446.99 30,062.08 186,384.91IP-CV-0295 AD PRADO INGENIERIA 10/5/2012 10/28/2012 3 168,981.44 23,469.65 145,511.79IP-CV-0295 AD PRADO INGENIERIA 10/5/2012 10/28/2012 4 215,324.64 29,906.20 185,418.44IP-CV-0295 AD PRADO INGENIERIA 10/5/2012 12/6/2012 5 265,992.31 36,943.38 229,048.93IP-CV-0295 AD PRADO INGENIERIA 12/6/2012 6 154,706.77 21,487.05 133,219.72IP-CV-0295 AD PRADO INGENIERIA 12/6/2012 7 183,584.76 25,497.88 158,086.88IP-CV-0295 AD PRADO INGENIERIA 3/21/2013 8 519,443.98 72,145.00 447,298.98

INSPECCION DE LA OBRA: REHABILITACION DE LA TO09,

DISTRIBUIDOR METROPOLITANO - DISTRIBUIDORCAUCAGUA, PISTA

SUR, ESTADO MIRANDA, QUE EJECUTA LA EMPRESA CONSORCIO VENEVIAL, SEGÚN CONTRATO CV-

0005

INSPECCION DE LA OBRA: REHABILITACION DE LA TO09,

DISTRIBUIDOR METROPOLITANO - DISTRIBUIDORCAUCAGUA, PISTA

SUR, ESTADO MIRANDA, QUE EJECUTA LA EMPRESA CONSORCIO VENEVIAL, SEGÚN CONTRATO CV-

0005

INSPECCION DE LA OBRA: REHABILITACION DE LA TO09,

DISTRIBUIDOR METROPOLITANO - DISTRIBUIDORCAUCAGUA, PISTA

SUR, ESTADO MIRANDA, QUE EJECUTA LA EMPRESA CONSORCIO VENEVIAL, SEGÚN CONTRATO CV-

0005

INSPECCION DE LA OBRA: REHABILITACION DE LA TO09,

DISTRIBUIDOR METROPOLITANO - DISTRIBUIDORCAUCAGUA, PISTA

SUR, ESTADO MIRANDA, QUE EJECUTA LA EMPRESA CONSORCIO VENEVIAL, SEGÚN CONTRATO CV-

0005

INSPECCION DE LA OBRA: REHABILITACION DE LA TO09,

DISTRIBUIDOR METROPOLITANO - DISTRIBUIDORCAUCAGUA, PISTA

SUR, ESTADO MIRANDA, QUE EJECUTA LA EMPRESA CONSORCIO VENEVIAL, SEGÚN CONTRATO CV-

0005

INSPECCION DE LA OBRA: REHABILITACION DE LA TO09,

DISTRIBUIDOR METROPOLITANO - DISTRIBUIDORCAUCAGUA, PISTA

SUR, ESTADO MIRANDA, QUE EJECUTA LA EMPRESA CONSORCIO VENEVIAL, SEGÚN CONTRATO CV-

0005

INSPECCION DE LA OBRA: REHABILITACION DE LA TO09,

DISTRIBUIDOR METROPOLITANO - DISTRIBUIDORCAUCAGUA, PISTA

SUR, ESTADO MIRANDA, QUE EJECUTA LA EMPRESA CONSORCIO VENEVIAL, SEGÚN CONTRATO CV-

0005

INSPECCION DE LA OBRA: REHABILITACION DE LA TO09,

DISTRIBUIDOR METROPOLITANO - DISTRIBUIDORCAUCAGUA, PISTA

SUR, ESTADO MIRANDA, QUE EJECUTA LA EMPRESA CONSORCIO VENEVIAL, SEGÚN CONTRATO CV-

0005

INSPECCION DE LA OBRA: REHABILITACION DE LA TO09,

DISTRIBUIDOR METROPOLITANO - DISTRIBUIDORCAUCAGUA, PISTA

SUR, ESTADO MIRANDA, QUE EJECUTA LA EMPRESA CONSORCIO VENEVIAL, SEGÚN CONTRATO CV-

0005

62 de 7104/17/2023

17:30:34

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

IP-CV-0296 9/18/2012 254,314.99 250,737.60 191,095.03 76.21 35,321.53 26,540.97 4 AC 35,321.53 0.00 35,321.53 199,875.59

IP-CV-0296 11/29/2012 1 72,919.40 10,127.69 62,791.71IP-CV-0296 12/3/2012 2 29,758.78 4,133.16 25,625.62IP-CV-0296 1/14/2013 3 52,015.10 7,224.32 44,790.78IP-CV-0296 4/17/2013 4 36,401.75 5,055.80 31,345.95

IP-CV-0297 10/18/2012 34,659.15 34,179.83 34,179.85 100.00 2 2/6/2013 1 26,229.73 0.00 26,229.73 34,179.85

IP-CV-0297 8/1/2013 2 7,950.12 0.00 7,950.12

IP-CV-0298 10/24/2012 280,859.62 276,646.85 276,646.85 100.00 39,008.28 39,008.28 4 11/16/2012 AC 39,008.28 0.00 39,008.28 276,646.85

IP-CV-0298 12/5/2012 1 49,609.65 6,890.23 42,719.42IP-CV-0298 12/4/2012 2 119,537.05 16,602.37 102,934.68IP-CV-0298 12/4/2012 3 87,626.89 12,170.40 75,456.49IP-CV-0298 6/19/2013 4 19,873.26 3,345.28 16,527.98

IP-CV-0299 10/5/2012 94,854.39 94,854.39 0.00 0.00

IP-CV-0300 10/5/2012 123,383.25 123,383.25 0.00 0.00

IP-CV-0303 10/24/2012 1,971,627.44 1,971,627.44 1,971,627.44 100.00 273,837.14 273,837.14 9 11/30/2012 AC 273,837.14 0.00 273,837.14 1,971,627.44

IP-CV-0303 11/30/2012 1 83,333.13 11,574.05 71,759.08IP-CV-0303 11/30/2012 2 319,040.46 44,311.17 274,729.29IP-CV-0303 11/30/2012 3 283,322.16 39,350.30 243,971.86IP-CV-0303 11/30/2012 4 156,458.85 21,730.40 134,728.45IP-CV-0303 11/30/2012 5 201,891.58 28,040.50 173,851.08IP-CV-0303 11/30/2012 6 221,952.30 30,826.71 191,125.59IP-CV-0303 11/30/2012 7 202,943.88 28,186.65 174,757.23IP-CV-0303 5/31/2013 8 489,775.53 68,024.38 421,751.15IP-CV-0303 7/12/2013 9 12,909.55 1,792.98 11,116.57

IP-CV-0305 10/24/2012 697,767.84 697,767.84 697,767.84 100.00 0.00 3 1/21/2013 1 221,523.77 0.00 221,523.77 697,767.84

IP-CV-0305 1/22/2013 2 231,714.84 0.00 231,714.84IP-CV-0305 1/22/2013 3 244,529.23 0.00 244,529.23

YEANETTE MARIA CONDE REYES, F.P.

INSPECCION DE LA OBRA: REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO TO01, CONSTRUCCION DE NUEVOS

SISTEMAS DE DRENAJES EN LA AUTOPISTA REGIONAL DEL

CENTRO, EN LA PROG. 30+000, KM. 30, ESTADO MIRANDA, QUE

EJECUTA LA EMPRESA: ESTRUCTURA NACIONALES, S.A., SEGÚN CONTRATO N° CV-0140

YEANETTE MARIA CONDE REYES, F.P.

INSPECCION DE LA OBRA: REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO TO01, CONSTRUCCION DE NUEVOS

SISTEMAS DE DRENAJES EN LA AUTOPISTA REGIONAL DEL

CENTRO, EN LA PROG. 30+000, KM. 30, ESTADO MIRANDA, QUE

EJECUTA LA EMPRESA: ESTRUCTURA NACIONALES, S.A., SEGÚN CONTRATO N° CV-0140

YEANETTE MARIA CONDE REYES, F.P.

INSPECCION DE LA OBRA: REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO TO01, CONSTRUCCION DE NUEVOS

SISTEMAS DE DRENAJES EN LA AUTOPISTA REGIONAL DEL

CENTRO, EN LA PROG. 30+000, KM. 30, ESTADO MIRANDA, QUE

EJECUTA LA EMPRESA: ESTRUCTURA NACIONALES, S.A., SEGÚN CONTRATO N° CV-0140

YEANETTE MARIA CONDE REYES, F.P.

INSPECCION DE LA OBRA: REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO TO01, CONSTRUCCION DE NUEVOS

SISTEMAS DE DRENAJES EN LA AUTOPISTA REGIONAL DEL

CENTRO, EN LA PROG. 30+000, KM. 30, ESTADO MIRANDA, QUE

EJECUTA LA EMPRESA: ESTRUCTURA NACIONALES, S.A., SEGÚN CONTRATO N° CV-0140

YEANETTE MARIA CONDE REYES, F.P.

INSPECCION DE LA OBRA: REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO TO01, CONSTRUCCION DE NUEVOS

SISTEMAS DE DRENAJES EN LA AUTOPISTA REGIONAL DEL

CENTRO, EN LA PROG. 30+000, KM. 30, ESTADO MIRANDA, QUE

EJECUTA LA EMPRESA: ESTRUCTURA NACIONALES, S.A., SEGÚN CONTRATO N° CV-0140

YUNIS SUAREZ SERVICIOS, F.P.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REPARACION DE

FALLA DE BORDE Y COLOCACION DE ALCANTARILLAS TUBULARES DE

CONCRETO EN LA VIA LOCAL 07, PROG. 36+900, SAN FELIX -

QUEBRADA SECA - GUANAGUANA, MUNICIPIO CEDEÑO, ESTADO MONAGAS, QUE EJECUTA LA

EMPRESA: PROYECTOS MARAQUERO, C.A.SEGUN CONTRATO N. CV-0133

YUNIS SUAREZ SERVICIOS, F.P.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REPARACION DE

FALLA DE BORDE Y COLOCACION DE ALCANTARILLAS TUBULARES DE

CONCRETO EN LA VIA LOCAL 07, PROG. 36+900, SAN FELIX -

QUEBRADA SECA - GUANAGUANA, MUNICIPIO CEDEÑO, ESTADO MONAGAS, QUE EJECUTA LA

EMPRESA: PROYECTOS MARAQUERO, C.A.SEGUN CONTRATO N. CV-0133

DELFINA MARIA TINIACOS BUSTOS

INSPECCION DE LA OBRA: REHABILITACION DE LA TO06, TRAMO MARACAIBO - MARA,

ESTADO ZULIA, QUE EJECUTA LA EMPRESA: ONICA, S.A., SEGÚN

CONTRATO N° CV-0081DELFINA MARIA

TINIACOS BUSTOS

INSPECCION DE LA OBRA: REHABILITACION DE LA TO06, TRAMO MARACAIBO - MARA,

ESTADO ZULIA, QUE EJECUTA LA EMPRESA: ONICA, S.A., SEGÚN

CONTRATO N° CV-0081

DELFINA MARIA TINIACOS BUSTOS

INSPECCION DE LA OBRA: REHABILITACION DE LA TO06, TRAMO MARACAIBO - MARA,

ESTADO ZULIA, QUE EJECUTA LA EMPRESA: ONICA, S.A., SEGÚN

CONTRATO N° CV-0081

DELFINA MARIA TINIACOS BUSTOS

INSPECCION DE LA OBRA: REHABILITACION DE LA TO06, TRAMO MARACAIBO - MARA,

ESTADO ZULIA, QUE EJECUTA LA EMPRESA: ONICA, S.A., SEGÚN

CONTRATO N° CV-0081

DELFINA MARIA TINIACOS BUSTOS

INSPECCION DE LA OBRA: REHABILITACION DE LA TO06, TRAMO MARACAIBO - MARA,

ESTADO ZULIA, QUE EJECUTA LA EMPRESA: ONICA, S.A., SEGÚN

CONTRATO N° CV-0081CORPORACION BMA2,

C.A.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, RECUPERACION DEL SISTEMA DE ALUMBRADO DE LOS

TUNELES DE VUELTA GRANDE, KEMPIS Y CAUCAGUITA, AUTOPISTA

GRAN MARISCAL DE AYACUCHO, ESTADO MIRANDA, QUE EJECUTA

LA EMPRESA: SUMINISTRO DE MATERIALES ELECTRICOS ORIENTE,

C.A., SEGUN CONTRATO N° CV-0087

FECHA DE INICIO A PARTIR DE LA FECHA DE INICIO DE LA OBRA A INSPECCIONAR

CORPORACION BMA2, C.A.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REHABILITACION DEL SISTEMA DE ALUMBRADO PUBLICO,

DESDE HOYO DE LA PUERTA HASTA EL KM. 0, SECTOR TAZON, AMBOS SENTIDOS, ESTADO, QUE

EJECUTA LA EMPRESA: SUMINISTRO DE MATERIALES ELECTRICOS

ORIENTE, C.A., SEGUN CONTRATO N° CV-0086

FECHA DE INICIO A PARTIR DE LA FECHA DE INICIO DE LA OBRA A INSPECCIONAR

CONSTRUCCIONES OSCAR CASAL

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA TO01, TRAMO SAN CRISTOBAL -

LIMITE MERIDA, ESTADO TACHIRA QUE EJECUTA LA EMPRESA: TALLER

CHAMA, C.A., SEGÚN CONTRATO CV-0021CONSTRUCCIONES

OSCAR CASAL

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA TO01, TRAMO SAN CRISTOBAL -

LIMITE MERIDA, ESTADO TACHIRA QUE EJECUTA LA EMPRESA: TALLER

CHAMA, C.A., SEGÚN CONTRATO CV-0021

CONSTRUCCIONES OSCAR CASAL

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA TO01, TRAMO SAN CRISTOBAL -

LIMITE MERIDA, ESTADO TACHIRA QUE EJECUTA LA EMPRESA: TALLER

CHAMA, C.A., SEGÚN CONTRATO CV-0021

CONSTRUCCIONES OSCAR CASAL

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA TO01, TRAMO SAN CRISTOBAL -

LIMITE MERIDA, ESTADO TACHIRA QUE EJECUTA LA EMPRESA: TALLER

CHAMA, C.A., SEGÚN CONTRATO CV-0021

CONSTRUCCIONES OSCAR CASAL

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA TO01, TRAMO SAN CRISTOBAL -

LIMITE MERIDA, ESTADO TACHIRA QUE EJECUTA LA EMPRESA: TALLER

CHAMA, C.A., SEGÚN CONTRATO CV-0021

CONSTRUCCIONES OSCAR CASAL

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA TO01, TRAMO SAN CRISTOBAL -

LIMITE MERIDA, ESTADO TACHIRA QUE EJECUTA LA EMPRESA: TALLER

CHAMA, C.A., SEGÚN CONTRATO CV-0021

CONSTRUCCIONES OSCAR CASAL

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA TO01, TRAMO SAN CRISTOBAL -

LIMITE MERIDA, ESTADO TACHIRA QUE EJECUTA LA EMPRESA: TALLER

CHAMA, C.A., SEGÚN CONTRATO CV-0021

CONSTRUCCIONES OSCAR CASAL

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA TO01, TRAMO SAN CRISTOBAL -

LIMITE MERIDA, ESTADO TACHIRA QUE EJECUTA LA EMPRESA: TALLER

CHAMA, C.A., SEGÚN CONTRATO CV-0021

CONSTRUCCIONES OSCAR CASAL

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA TO01, TRAMO SAN CRISTOBAL -

LIMITE MERIDA, ESTADO TACHIRA QUE EJECUTA LA EMPRESA: TALLER

CHAMA, C.A., SEGÚN CONTRATO CV-0021

CONSTRUCCIONES OSCAR CASAL

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA TO01, TRAMO SAN CRISTOBAL -

LIMITE MERIDA, ESTADO TACHIRA QUE EJECUTA LA EMPRESA: TALLER

CHAMA, C.A., SEGÚN CONTRATO CV-0021ASOCIACION

COOPERATIVA VENCEDORES DE

VENEZUELA 2480 R.L.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, RAHABILITACION Y BACHEO DE LA VIA DE ACCESO A LA PARROQUIA MACHURUCUTO,

MUNICIPIO PEDRO GUAL, ESTADO MIRANDA, QUE EJECUTA LA

EMPRESA: VIALIDAD Y CONSTRUCCIONES SUCRE, S.A.,

SEGUN CONTRATO CV-0097

ASOCIACION COOPERATIVA

VENCEDORES DE VENEZUELA 2480 R.L.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, RAHABILITACION Y BACHEO DE LA VIA DE ACCESO A LA PARROQUIA MACHURUCUTO,

MUNICIPIO PEDRO GUAL, ESTADO MIRANDA, QUE EJECUTA LA

EMPRESA: VIALIDAD Y CONSTRUCCIONES SUCRE, S.A.,

SEGUN CONTRATO CV-0097

ASOCIACION COOPERATIVA

VENCEDORES DE VENEZUELA 2480 R.L.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, RAHABILITACION Y BACHEO DE LA VIA DE ACCESO A LA PARROQUIA MACHURUCUTO,

MUNICIPIO PEDRO GUAL, ESTADO MIRANDA, QUE EJECUTA LA

EMPRESA: VIALIDAD Y CONSTRUCCIONES SUCRE, S.A.,

SEGUN CONTRATO CV-0097

63 de 7104/17/2023

17:30:34

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

IP-CV-0309 10/15/2012 1,963,924.90 1,935,964.74 1,884,863.62 97.36 272,767.35 261,786.61 6 AC 272,767.35 0.00 272,767.35 1,895,844.36

IP-CV-0309 10/24/2012 1 78,873.26 10,954.62 67,918.64IP-CV-0309 10/24/2012 2 255,761.87 35,522.48 220,239.39IP-CV-0309 10/24/2013 3 371,202.44 51,555.89 319,646.55IP-CV-0309 11/13/2012 4 350,824.98 48,725.69 302,099.29IP-CV-0309 12/7/2012 5 385,355.45 53,521.59 331,833.86IP-CV-0309 1/10/2013 6 442,845.62 61,506.34 381,339.28

IP-CV-0313 10/18/2012 120,718.32 120,718.32 0.00 16,766.43 AC AC 16,766.43 0.00 16,766.43 16,766.43

IP-CV-0314 10/24/2012 28,518.25 28,518.25 28,518.25 100.00 2 12/7/2012 1 14,353.44 0.00 14,353.44 28,518.26

IP-CV-0314 12/7/2012 2 14,164.82 0.00 14,164.82

IP-CV-0336 ZAHER, C.A. 10/5/2012 101,103.94 99,653.59 58,485.69 58.69 14,042.21 8,123.01 2 AC 14,042.21 0.00 14,042.21 64,404.89

IP-CV-0336 ZAHER, C.A. 3/12/2013 1 31,857.25 4,424.62 27,432.63IP-CV-0336 ZAHER, C.A. 7/9/2013 2 26,628.44 3,698.39 22,930.05

IP-CV-0337 ZAHER, C.A. 10/5/2012 297,687.53 297,687.53 244,941.75 82.28 41,345.49 34,019.69 4 AC 41,345.49 0.00 41,345.49 252,267.55

IP-CV-0337 ZAHER, C.A. 12/10/2012 1 24,487.65 3,401.06 21,086.59IP-CV-0337 ZAHER, C.A. 12/10/2012 2 71,904.82 9,986.78 61,918.04IP-CV-0337 ZAHER, C.A. 12/10/2012 3 20,531.20 2,851.56 17,679.64IP-CV-0337 ZAHER, C.A. 7/9/2013 4 128,018.08 17,780.29 110,237.79

IP-CV-0345 10/24/2012 1,444,689.15 1,444,689.15 696,161.70 48.19 216,703.37 104,424.25 4 AC 216,703.37 0.00 216,703.37 808,440.82

IP-CV-0345 6/3/2013 1 375,970.40 56,395.56 319,574.84IP-CV-0345 6/7/2012 2 17,647.52 2,647.13 15,000.39IP-CV-0345 6/7/2012 3 28,891.69 4,333.75 24,557.94IP-CV-0345 6/7/2013 4 273,652.09 41,047.81 232,604.28

IP-CV-0346 10/30/2012 1,262,405.16 1,262,405.16 0.00 189,360.77 AC 11/20/2012 AC 189,360.77 0.00 189,360.77 189,360.77

INGENIERIA ABREU CAMPANARIO

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA TO03, MORON - CORO, ESTADO

FALCON, QUE EJECUTA LA EMPRESA: CONSORCIO VENECA, C.A., SEGÚN CONTRATO N° CV-

0096INGENIERIA ABREU CAMPANARIO

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA TO03, MORON - CORO, ESTADO

FALCON, QUE EJECUTA LA EMPRESA: CONSORCIO VENECA, C.A., SEGÚN CONTRATO N° CV-

0096

INGENIERIA ABREU CAMPANARIO

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA TO03, MORON - CORO, ESTADO

FALCON, QUE EJECUTA LA EMPRESA: CONSORCIO VENECA, C.A., SEGÚN CONTRATO N° CV-

0096

INGENIERIA ABREU CAMPANARIO

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA TO03, MORON - CORO, ESTADO

FALCON, QUE EJECUTA LA EMPRESA: CONSORCIO VENECA, C.A., SEGÚN CONTRATO N° CV-

0096

INGENIERIA ABREU CAMPANARIO

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA TO03, MORON - CORO, ESTADO

FALCON, QUE EJECUTA LA EMPRESA: CONSORCIO VENECA, C.A., SEGÚN CONTRATO N° CV-

0096

INGENIERIA ABREU CAMPANARIO

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA TO03, MORON - CORO, ESTADO

FALCON, QUE EJECUTA LA EMPRESA: CONSORCIO VENECA, C.A., SEGÚN CONTRATO N° CV-

0096

INGENIERIA ABREU CAMPANARIO

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA TO03, MORON - CORO, ESTADO

FALCON, QUE EJECUTA LA EMPRESA: CONSORCIO VENECA, C.A., SEGÚN CONTRATO N° CV-

0096YUNIS SUAREZ SERVICIOS, F.P.

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO DE LA TO15, TRAMO LIMITE TEMBLADOR -TUCUPITA, DESDE LA PROG.

521+900 HASTA LA 544+400, MUNICIPIO TUCUPITA, ESTADO

DELTA AMACURO, QUE EJECUTA LA EMPRESA: CONSTRUCTORA 01 DE MARZO, S.A., SEGÚN CONTRATO

N° CV-0135INGENIERIA &

SERVIPROYECTOS J.D., C.A.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REHABILITACION DEL SISTEMA DE ILUMINACION DE LA AUTOPISTA GRAN MARISCAL DE

AYACUCHO, ENTRE EL SECTOR DE LA MONTAÑTA Y EL DISTRIBUIDOR LOS BORDONES DE LA CIUDAD DE

CUMANA. ESTADO SUCRE, QUE EJECUTA LA EMPRESA:

INVERSIONES VELASQUEZ FERNANDEZ, C.A., SEGUN CONTRATO N° CV-0118

INGENIERIA & SERVIPROYECTOS J.D.,

C.A.INSPECCION DE LA OBRA:

REHABILITACION DE LA LO02, TRAMO MERIDA - SANTA BARBARA DEL ZULIA, ESTADO MERIDA, QUE EJECUTA LA EMPRESA: MONTILLA ALVAREZ ROMMELL NABOTH JALIL (INVERMACRO), SEGÚN CONTRATO

N° CV-0100

INSPECCION DE LA OBRA: REHABILITACION DE LA LO02,

TRAMO MERIDA - SANTA BARBARA DEL ZULIA, ESTADO MERIDA, QUE EJECUTA LA EMPRESA: MONTILLA ALVAREZ ROMMELL NABOTH JALIL (INVERMACRO), SEGÚN CONTRATO

N° CV-0100

INSPECCION DE LA OBRA: REHABILITACION DE LA LO02,

TRAMO MERIDA - SANTA BARBARA DEL ZULIA, ESTADO MERIDA, QUE EJECUTA LA EMPRESA: MONTILLA ALVAREZ ROMMELL NABOTH JALIL (INVERMACRO), SEGÚN CONTRATO

N° CV-0100

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO TRAMO CHIRGUITA - COJEDITO (PROG.

36+500 HASTA PROG. 142+800), ESTADO COJEDES, QUE EJECUTA LA

EMPRESA: CONSTRUCTORA GEOVIAL, C.A., SEGÚN CONTRATO

N° CV-0105

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO TRAMO CHIRGUITA - COJEDITO (PROG.

36+500 HASTA PROG. 142+800), ESTADO COJEDES, QUE EJECUTA LA

EMPRESA: CONSTRUCTORA GEOVIAL, C.A., SEGÚN CONTRATO

N° CV-0105

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO TRAMO CHIRGUITA - COJEDITO (PROG.

36+500 HASTA PROG. 142+800), ESTADO COJEDES, QUE EJECUTA LA

EMPRESA: CONSTRUCTORA GEOVIAL, C.A., SEGÚN CONTRATO

N° CV-0105

COOPERATIVA VENCEDORES DE

VENEZUELA 2480, R.L.

INSPECCION DE LA OBRA: BACHEO GENERAL EN LA TO09,

DISTRIBUIDOR CAUCAGUA - BARCELONA, DESDE LA PROG.

78+000 A PLAYA PINTADA (PROG. 187+000), REHABILITACION

TRONCAL 09 DESDE EL GUAPO (PROG. 135+860) HASTA PLAYA

PINTADA (PROG. 187+000), ESTADO MIRANDA, QUE EJECUTA LA EMPRESA: INGENIERIA HQ89, C.A., SEGUN CONTRATO N° CV-

0119

COOPERATIVA VENCEDORES DE

VENEZUELA 2480, R.L.

INSPECCION DE LA OBRA: BACHEO GENERAL EN LA TO09,

DISTRIBUIDOR CAUCAGUA - BARCELONA, DESDE LA PROG.

78+000 A PLAYA PINTADA (PROG. 187+000), REHABILITACION

TRONCAL 09 DESDE EL GUAPO (PROG. 135+860) HASTA PLAYA

PINTADA (PROG. 187+000), ESTADO MIRANDA, QUE EJECUTA LA EMPRESA: INGENIERIA HQ89, C.A., SEGUN CONTRATO N° CV-

0119

COOPERATIVA VENCEDORES DE

VENEZUELA 2480, R.L.

INSPECCION DE LA OBRA: BACHEO GENERAL EN LA TO09,

DISTRIBUIDOR CAUCAGUA - BARCELONA, DESDE LA PROG.

78+000 A PLAYA PINTADA (PROG. 187+000), REHABILITACION

TRONCAL 09 DESDE EL GUAPO (PROG. 135+860) HASTA PLAYA

PINTADA (PROG. 187+000), ESTADO MIRANDA, QUE EJECUTA LA EMPRESA: INGENIERIA HQ89, C.A., SEGUN CONTRATO N° CV-

0119

COOPERATIVA VENCEDORES DE

VENEZUELA 2480, R.L.

INSPECCION DE LA OBRA: BACHEO GENERAL EN LA TO09,

DISTRIBUIDOR CAUCAGUA - BARCELONA, DESDE LA PROG.

78+000 A PLAYA PINTADA (PROG. 187+000), REHABILITACION

TRONCAL 09 DESDE EL GUAPO (PROG. 135+860) HASTA PLAYA

PINTADA (PROG. 187+000), ESTADO MIRANDA, QUE EJECUTA LA EMPRESA: INGENIERIA HQ89, C.A., SEGUN CONTRATO N° CV-

0119

COOPERATIVA VENCEDORES DE

VENEZUELA 2480, R.L.

INSPECCION DE LA OBRA: BACHEO GENERAL EN LA TO09,

DISTRIBUIDOR CAUCAGUA - BARCELONA, DESDE LA PROG.

78+000 A PLAYA PINTADA (PROG. 187+000), REHABILITACION

TRONCAL 09 DESDE EL GUAPO (PROG. 135+860) HASTA PLAYA

PINTADA (PROG. 187+000), ESTADO MIRANDA, QUE EJECUTA LA EMPRESA: INGENIERIA HQ89, C.A., SEGUN CONTRATO N° CV-

0119

COOPERATIVA VENCEDORES DE

VENEZUELA 2480, R.L.

INSPECCION DE LA OBRA: AMPLIACION DE LA CARRETERA

LO02, SABANETA - PUERTO NUTRIAS, , TRAMO PUENTE PAEZ -

SAN HIPOLITO, EN EL ESTADO BARINAS (II ETAPA), QUE EJECUTA

LA EMPRESA: VIALIDAD Y CONSTRUCCIONES SUCRE, S.A.,

SEGÚN CONTRATO CT-0256

64 de 7104/17/2023

17:30:34

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

IP-CT-0347 11/12/2012 1,363,397.66 1,363,397.66 1,277,338.94 93.69 189,360.79 177,408.19 7 11/21/2012 AC 189,360.79 0.00 189,360.79 1,289,291.54

IP-CT-0347 1/31/2013 1 390,141.44 54,186.31 335,955.13IP-CT-0347 3/13/2013 2 235,347.99 32,687.22 202,660.77IP-CT-0347 4/11/2013 3 204,647.60 28,423.28 176,224.32IP-CT-0347 4/11/2013 4 158,114.87 21,960.40 136,154.47IP-CT-0347 4/11/2013 5 108,923.59 15,128.28 93,795.31IP-CT-0347 6/8/2013 6 52,704.96 7,320.13 45,384.83IP-CT-0347 7/10/2013 7 127,458.49 17,702.57 109,755.92

IP-CV-0348 11/19/2012 775,390.90 764,311.01 260,412.93 34.07 107,693.18 36,168.46 4 12/10/2012 AC 107,693.18 0.00 107,693.18 331,937.65

IP-CV-0348 5/13/2013 1 63,841.20 8,866.83 54,974.37IP-CV-0348 7/9/2013 2 22,866.32 3,175.88 19,690.44IP-CV-0348 7/9/2013 3 99,388.32 13,803.93 85,584.39IP-CV-0348 7/9/2013 4 74,317.09 10,321.82 63,995.27

IP-CV-0349 11/19/2012 1,635,804.07 1,612,329.67 1,139,980.38 70.70 227,195.01 158,330.61 2 12/10/2012 AC 227,195.01 0.00 227,195.01 1,208,844.78

IP-CV-0349 5/10/2013 1 290,018.65 40,280.37 249,738.28IP-CV-0349 6/25/2013 2 392,227.49 54,476.04 337,751.45IP-CV-0349 6/25/2013 3 457,734.24 63,574.20 394,160.04

IP-CV-0350 10/24/2012 1,449,275.24 1,449,275.24 1,449,275.24 100.00 217,391.29 217,391.28 4 11/13/2012 AC 217,391.29 0.00 217,391.29 1,449,275.25

IP-CV-0350 2/5/2013 1 473,906.36 71,085.95 402,820.41IP-CV-0350 2/5/2013 2 529,491.33 79,423.70 450,067.63IP-CV-0350 3/14/2013 3 424,629.66 63,694.45 360,935.21IP-CV-0350 4/4/2013 4 21,247.89 3,187.18 18,060.71

IP-CV-0351 10/30/2012 768,768.80 768,768.80 193,170.06 25.13 1 4/1/2013 1 193,170.06 0.00 193,170.06 193,170.06

IP-CV-0352 10/24/2012 78,016.62 78,016.62 77,405.29 99.22 0.00 1 12/12/2012 1 77,405.29 77,405.29 77,405.29

LOPEZ MORALES MARIA ALEJANDRA F.P.

INSPECCION DE LA OBRA: AMPLIACION DE LA CARRETERA

LO02, SABANETA -PUERTO NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. ESTADO BARINAS,

QUE EJECUTA LA EMPRESA: COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.), SEGÚN CONTRATO N° CT-0258LOPEZ MORALES MARIA

ALEJANDRA F.P.

INSPECCION DE LA OBRA: AMPLIACION DE LA CARRETERA

LO02, SABANETA -PUERTO NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. ESTADO BARINAS,

QUE EJECUTA LA EMPRESA: COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.), SEGÚN CONTRATO N° CT-0258

LOPEZ MORALES MARIA ALEJANDRA F.P.

INSPECCION DE LA OBRA: AMPLIACION DE LA CARRETERA

LO02, SABANETA -PUERTO NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. ESTADO BARINAS,

QUE EJECUTA LA EMPRESA: COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.), SEGÚN CONTRATO N° CT-0258

LOPEZ MORALES MARIA ALEJANDRA F.P.

INSPECCION DE LA OBRA: AMPLIACION DE LA CARRETERA

LO02, SABANETA -PUERTO NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. ESTADO BARINAS,

QUE EJECUTA LA EMPRESA: COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.), SEGÚN CONTRATO N° CT-0258

LOPEZ MORALES MARIA ALEJANDRA F.P.

INSPECCION DE LA OBRA: AMPLIACION DE LA CARRETERA

LO02, SABANETA -PUERTO NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. ESTADO BARINAS,

QUE EJECUTA LA EMPRESA: COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.), SEGÚN CONTRATO N° CT-0258

LOPEZ MORALES MARIA ALEJANDRA F.P.

INSPECCION DE LA OBRA: AMPLIACION DE LA CARRETERA

LO02, SABANETA -PUERTO NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. ESTADO BARINAS,

QUE EJECUTA LA EMPRESA: COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.), SEGÚN CONTRATO N° CT-0258

LOPEZ MORALES MARIA ALEJANDRA F.P.

INSPECCION DE LA OBRA: AMPLIACION DE LA CARRETERA

LO02, SABANETA -PUERTO NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. ESTADO BARINAS,

QUE EJECUTA LA EMPRESA: COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.), SEGÚN CONTRATO N° CT-0258

LOPEZ MORALES MARIA ALEJANDRA F.P.

INSPECCION DE LA OBRA: AMPLIACION DE LA CARRETERA

LO02, SABANETA -PUERTO NUTRIAS, TRAMO: PUENTE PAEZ - SAN HIPOLITO. ESTADO BARINAS,

QUE EJECUTA LA EMPRESA: COVIALCA (CONSTRUCCIONES Y

VIALIDADES, C.A.), SEGÚN CONTRATO N° CT-0258GUANIPA

CONSTRUCCION

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO:

DISTRIBUIDOR LA "N" EN LA LARA - ZULIA, INTERSECCION RAMAL 052

CON TRONCAL 17, (PROG. 166+400), ESTADO ZULIA, QUE EJECUTA LA EMPRESA: PILOTES

PERFORADOS, C.A., SEGÚN CONTRATO N° CV-0106GUANIPA

CONSTRUCCION

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO:

DISTRIBUIDOR LA "N" EN LA LARA - ZULIA, INTERSECCION RAMAL 052

CON TRONCAL 17, (PROG. 166+400), ESTADO ZULIA, QUE EJECUTA LA EMPRESA: PILOTES

PERFORADOS, C.A., SEGÚN CONTRATO N° CV-0106

GUANIPA CONSTRUCCION

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO:

DISTRIBUIDOR LA "N" EN LA LARA - ZULIA, INTERSECCION RAMAL 052

CON TRONCAL 17, (PROG. 166+400), ESTADO ZULIA, QUE EJECUTA LA EMPRESA: PILOTES

PERFORADOS, C.A., SEGÚN CONTRATO N° CV-0106

GUANIPA CONSTRUCCION

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO:

DISTRIBUIDOR LA "N" EN LA LARA - ZULIA, INTERSECCION RAMAL 052

CON TRONCAL 17, (PROG. 166+400), ESTADO ZULIA, QUE EJECUTA LA EMPRESA: PILOTES

PERFORADOS, C.A., SEGÚN CONTRATO N° CV-0106

GUANIPA CONSTRUCCION

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO:

DISTRIBUIDOR LA "N" EN LA LARA - ZULIA, INTERSECCION RAMAL 052

CON TRONCAL 17, (PROG. 166+400), ESTADO ZULIA, QUE EJECUTA LA EMPRESA: PILOTES

PERFORADOS, C.A., SEGÚN CONTRATO N° CV-0106GUANIPA

CONSTRUCCION

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA

TO17, TRAMO LARA - ZULIA I ETAPA, PROG. 80+400 HASTA LA 106+800, ESTADO LARA - ZULIA.

QUE EJECUTA LA EMPRESA: CONSTRUCTORA PEDECA, C.A., SEGÚN CONTRATO N° CV-0054

GUANIPA CONSTRUCCION

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA

TO17, TRAMO LARA - ZULIA I ETAPA, PROG. 80+400 HASTA LA 106+800, ESTADO LARA - ZULIA.

QUE EJECUTA LA EMPRESA: CONSTRUCTORA PEDECA, C.A., SEGÚN CONTRATO N° CV-0054

GUANIPA CONSTRUCCION

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA

TO17, TRAMO LARA - ZULIA I ETAPA, PROG. 80+400 HASTA LA 106+800, ESTADO LARA - ZULIA.

QUE EJECUTA LA EMPRESA: CONSTRUCTORA PEDECA, C.A., SEGÚN CONTRATO N° CV-0054

GUANIPA CONSTRUCCION

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA

TO17, TRAMO LARA - ZULIA I ETAPA, PROG. 80+400 HASTA LA 106+800, ESTADO LARA - ZULIA.

QUE EJECUTA LA EMPRESA: CONSTRUCTORA PEDECA, C.A., SEGÚN CONTRATO N° CV-0054COOPERATIVA

"CONSTRUCCIONES Y SUMINISTROS SPAZIO"

R.L

INSPECCION DE LA OBRA: REHABILITACION DE LA LARA -

ZULIA, TO17, ENTRE EL DISTRIBUIDOR PUNTA IGUANA

(PROGRESIVA 0+000) HASTA EL PUENTE BURRO NEGRO

(PROGRESIVA 70+900) ESTADO ZULIA, QUE EJECUTA LA EMPRESA:

ONICA, S.A., SEGÚN CONTRATO CV-0049

COOPERATIVA "CONSTRUCCIONES Y SUMINISTROS SPAZIO"

R.L

INSPECCION DE LA OBRA: REHABILITACION DE LA LARA -

ZULIA, TO17, ENTRE EL DISTRIBUIDOR PUNTA IGUANA

(PROGRESIVA 0+000) HASTA EL PUENTE BURRO NEGRO

(PROGRESIVA 70+900) ESTADO ZULIA, QUE EJECUTA LA EMPRESA:

ONICA, S.A., SEGÚN CONTRATO CV-0049

COOPERATIVA "CONSTRUCCIONES Y SUMINISTROS SPAZIO"

R.L

INSPECCION DE LA OBRA: REHABILITACION DE LA LARA -

ZULIA, TO17, ENTRE EL DISTRIBUIDOR PUNTA IGUANA

(PROGRESIVA 0+000) HASTA EL PUENTE BURRO NEGRO

(PROGRESIVA 70+900) ESTADO ZULIA, QUE EJECUTA LA EMPRESA:

ONICA, S.A., SEGÚN CONTRATO CV-0049

COOPERATIVA "CONSTRUCCIONES Y SUMINISTROS SPAZIO"

R.L

INSPECCION DE LA OBRA: REHABILITACION DE LA LARA -

ZULIA, TO17, ENTRE EL DISTRIBUIDOR PUNTA IGUANA

(PROGRESIVA 0+000) HASTA EL PUENTE BURRO NEGRO

(PROGRESIVA 70+900) ESTADO ZULIA, QUE EJECUTA LA EMPRESA:

ONICA, S.A., SEGÚN CONTRATO CV-0049

COOPERATIVA "CONSTRUCCIONES Y SUMINISTROS SPAZIO"

R.L

INSPECCION DE LA OBRA: REHABILITACION DE LA LARA -

ZULIA, TO17, ENTRE EL DISTRIBUIDOR PUNTA IGUANA

(PROGRESIVA 0+000) HASTA EL PUENTE BURRO NEGRO

(PROGRESIVA 70+900) ESTADO ZULIA, QUE EJECUTA LA EMPRESA:

ONICA, S.A., SEGÚN CONTRATO CV-0049INGENIERO JOSE TEJERA

GARCIA F.P.

INSPECCION DE LA OBRA: REHABILITACION DE LA LARA - ZULIA, TO01, DESDE LA PROG.

0+000 HASTA LA PROG. 10+000 Y DESDE LA PROG. 17+075 HASTA LA PROG. 63+300, ESTADO LARA,

QUE EJECUTA LA EMPRESA: CONSTRUCTORA LOBATERA, C.A.,

SEGÚN CONTRATO N° CV-0112

MARIO RICARDO TORRES GUERRERO, FP

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO

CARRETERA PUNTA DE PIEDRA - PORLAMAR, (PROGRESIVAS: EN LA LOCAL 1 DESDE 43+300 HASTA 48+500 Y EN LOCAL 5 DESDE

4+950 HASTA 28+200), ESTADO NUEVA ESPARTA, QUE EJECUTA LA

EMPRESA: REPRESENTACIONES ANGO, C.A., SEGUN CONTRATO N°

CV-0053

65 de 7104/17/2023

17:30:34

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

IP-CV-0353 10/24/2012 65,013.87 65,013.87 0.00 9,752.08 AC 12/4/2012 AC 9,752.08 0.00 9,752.08 9,752.08

IP-CV-0356 10/24/2012 404,999.90 399,167.96 303,906.44 76.13 56,249.99 42,209.22 4 11/19/2012 AC 56,249.99 0.00 56,249.99 317,947.21

IP-CV-0356 3/7/2013 1 93,096.65 12,930.09 80,166.56IP-CV-0356 3/7/2013 2 35,568.44 4,940.06 30,628.38IP-CV-0356 4/5/2013 3 67,480.01 9,372.22 58,107.79IP-CV-0356 4/12/2012 4 107,761.34 14,966.85 92,794.49

IP-CV-0358 11/12/2012 41,119.96 40,527.39 13,741.42 33.91 1 2/20/2013 1 13,741.42 13,741.42 13,741.42

IP-CV-0359 11/12/2012 70,822.60 69,803.04 66,399.53 95.12 1 11/26/2012 1 66,399.53 66,399.53 66,399.53

IP-CV-0360 11/12/2012 2,165,859.65 2,134,670.17 2,134,670.17 100.00 300,813.84 300,813.84 3 11/28/2012 AC 300,813.84 0.00 300,813.84 2,134,670.17

IP-CV-0360 2/4/2013 1 1,079,430.96 149,920.97 929,509.99IP-CV-0360 4/30/2013 2 804,362.95 111,717.08 692,645.87IP-CV-0360 5/30/2013 3 250,876.26 39,175.79 211,700.47

IP-CV-0362 11/23/2012 1,305,568.02 1,286,768.24 1,286,768.24 100.00 181,328.89 181,328.89 3 11/29/2012 AC 181,328.89 181,328.89 1,286,768.25

IP-CV-0362 2/4/2013 1 906,745.55 125,936.88 780,808.67IP-CV-0362 9/27/2650 2 274,203.54 38,083.83 236,119.71IP-CV-0362 5/30/2013 3 105,819.16 17,308.18 88,510.98

IP-CV-0363 11/1/2012 712,797.22 712,797.22 564,856.67 79.25 98,999.61 78,452.32 7 12/12/2012 AC 98,999.61 0.00 98,999.61 585,403.96

IP-CV-0363 1/23/2013 1 50,565.16 7,022.94 43,542.22

MARIO RICARDO TORRES GUERRERO, FP

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO ENCRUCIJADA - TAGUANTAR

(PROGRESIVAS DESDE 24+000 HASTA 43+300), ESTADO NUEVA

ESPARTA, QUE EJECUTA LA EMPRESA: REPRESENTACIONES

ANGO, C.A., SEGÚN CONTRATO N° CV-0048

MARITZA DEL VALLE PEREZ ZAPATA

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REHABILITACION VIAL

LOS DOS RIOS - AGUA BLANCA, MUNICIPIO MONTES, ESTADO

SUCRE, QUE EJECUTA LA EMPRESA: INRAJOCA, C.A., SEGÚN CONTRATO

CV-0052MARITZA DEL VALLE PEREZ ZAPATA

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REHABILITACION VIAL

LOS DOS RIOS - AGUA BLANCA, MUNICIPIO MONTES, ESTADO

SUCRE, QUE EJECUTA LA EMPRESA: INRAJOCA, C.A., SEGÚN CONTRATO

CV-0052

MARITZA DEL VALLE PEREZ ZAPATA

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REHABILITACION VIAL

LOS DOS RIOS - AGUA BLANCA, MUNICIPIO MONTES, ESTADO

SUCRE, QUE EJECUTA LA EMPRESA: INRAJOCA, C.A., SEGÚN CONTRATO

CV-0052

MARITZA DEL VALLE PEREZ ZAPATA

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REHABILITACION VIAL

LOS DOS RIOS - AGUA BLANCA, MUNICIPIO MONTES, ESTADO

SUCRE, QUE EJECUTA LA EMPRESA: INRAJOCA, C.A., SEGÚN CONTRATO

CV-0052

MARITZA DEL VALLE PEREZ ZAPATA

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REHABILITACION VIAL

LOS DOS RIOS - AGUA BLANCA, MUNICIPIO MONTES, ESTADO

SUCRE, QUE EJECUTA LA EMPRESA: INRAJOCA, C.A., SEGÚN CONTRATO

CV-0052ESTUDIOS Y PROYECTOS GISELA LOPEZ F.P.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, COLOCACION DE

ALCANTARILLAS TUBULARES DE CONCRETO, TRAMO: SAN ANTONIO

- EL RINCON - LIMITE SUCRE, MUNICIPIO ACOSTA - ESTADO

MONAGAS, PROG. 95+020, QUE EJECUTA LA EMPRESA:

INVERSIONES NUEVO NORTE, C.A., SEGUN CONTRATO N° CV-0123

ESTUDIOS Y PROYECTOS GISELA LOPEZ F.P.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, REPARACION DE

FALLA DE BORDE EN EL TRAMO SAN ANTONIO - EL BANQUEADO - LIMITE ESTADO SUCRE, MUNICIPIO ACOSTA, PROG. 96+000. ESTADO

MONAGAS, QUE EJECUTA LA EMPRESA: INVERSIONES NUEVO

NORTE, C.A., SEGUN CONTRATO N° CV-0122

PROYECTOS EMILETH SALAZAR F.P.

INSPECCION DE LA OBRA REHABILITACION LO09 CON EMPALME TO15, TRAMO SAN

DIEGO DE CABRUTICA-MAPIRE, ETAPA I, PROG DESDE LA 51+000

HASTA LA 108+093, ESTADO ANZOATEGUI, QUE EJECUTA LA

EMPRESA HER-BROSS, C.A. SEGÚN CONTRATO N° CV-0009PROYECTOS EMILETH

SALAZAR F.P.

INSPECCION DE LA OBRA REHABILITACION LO09 CON EMPALME TO15, TRAMO SAN

DIEGO DE CABRUTICA-MAPIRE, ETAPA I, PROG DESDE LA 51+000

HASTA LA 108+093, ESTADO ANZOATEGUI, QUE EJECUTA LA

EMPRESA HER-BROSS, C.A. SEGÚN CONTRATO N° CV-0009

PROYECTOS EMILETH SALAZAR F.P.

INSPECCION DE LA OBRA REHABILITACION LO09 CON EMPALME TO15, TRAMO SAN

DIEGO DE CABRUTICA-MAPIRE, ETAPA I, PROG DESDE LA 51+000

HASTA LA 108+093, ESTADO ANZOATEGUI, QUE EJECUTA LA

EMPRESA HER-BROSS, C.A. SEGÚN CONTRATO N° CV-0009

PROYECTOS EMILETH SALAZAR F.P.

INSPECCION DE LA OBRA REHABILITACION LO09 CON EMPALME TO15, TRAMO SAN

DIEGO DE CABRUTICA-MAPIRE, ETAPA I, PROG DESDE LA 51+000

HASTA LA 108+093, ESTADO ANZOATEGUI, QUE EJECUTA LA

EMPRESA HER-BROSS, C.A. SEGÚN CONTRATO N° CV-0009PROYECTOS EMILETH

SALAZAR F.P.

INSPECCION DE LA OBRA: REHABILITACION LO09 CON EMPALME TO15, TRAMO SAN DIEGO DE CABRUTI - MAPIRE,

ETAPA I, PROGRESIVAS DESDE LA 108+093 HASTA LA 138+000,

ESTADO ANZOATEGUI, QUE EJECUTA LA EMPRESA:

CONSTRUCTORA GUMECA, C.A., SEGÚN CONTRATO N° CV-0131PROYECTOS EMILETH

SALAZAR F.P.

INSPECCION DE LA OBRA: REHABILITACION LO09 CON EMPALME TO15, TRAMO SAN DIEGO DE CABRUTI - MAPIRE,

ETAPA I, PROGRESIVAS DESDE LA 108+093 HASTA LA 138+000,

ESTADO ANZOATEGUI, QUE EJECUTA LA EMPRESA:

CONSTRUCTORA GUMECA, C.A., SEGÚN CONTRATO N° CV-0131

PROYECTOS EMILETH SALAZAR F.P.

INSPECCION DE LA OBRA: REHABILITACION LO09 CON EMPALME TO15, TRAMO SAN DIEGO DE CABRUTI - MAPIRE,

ETAPA I, PROGRESIVAS DESDE LA 108+093 HASTA LA 138+000,

ESTADO ANZOATEGUI, QUE EJECUTA LA EMPRESA:

CONSTRUCTORA GUMECA, C.A., SEGÚN CONTRATO N° CV-0131

PROYECTOS EMILETH SALAZAR F.P.

INSPECCION DE LA OBRA: REHABILITACION LO09 CON EMPALME TO15, TRAMO SAN DIEGO DE CABRUTI - MAPIRE,

ETAPA I, PROGRESIVAS DESDE LA 108+093 HASTA LA 138+000,

ESTADO ANZOATEGUI, QUE EJECUTA LA EMPRESA:

CONSTRUCTORA GUMECA, C.A., SEGÚN CONTRATO N° CV-0131CONSTRUCCIONES

FEROL, C.A.

INSPECCION DE LA OBRA: REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO TO01, CHARALLAVE, SANTA TERESA (PROG. 32+000 HASTA PROG. 37+000 PISTA NORTE Y SUR), ESTADOS MIRANDA Y ARAGUA,

QUE EJECUTA LA EMPRESA: CONSTRUCCIONES Y VIALIDADES, C.A, SEGÚN CONTRATO CV-0094CONSTRUCCIONES

FEROL, C.A.

INSPECCION DE LA OBRA: REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO TO01, CHARALLAVE, SANTA TERESA (PROG. 32+000 HASTA PROG. 37+000 PISTA NORTE Y SUR), ESTADOS MIRANDA Y ARAGUA,

QUE EJECUTA LA EMPRESA: CONSTRUCCIONES Y VIALIDADES, C.A, SEGÚN CONTRATO CV-0094

66 de 7104/17/2023

17:30:34

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

IP-CV-0363 1/23/2013 2 50,307.88 6,987.21 43,320.67IP-CV-0363 1/23/2013 3 77,966.72 10,828.71 67,138.01IP-CV-0363 5/17/2013 4 47,320.68 6,572.32 40,748.36IP-CV-0363 5/17/2013 5 63,943.70 8,881.07 55,062.63IP-CV-0363 5/30/2013 6 116,143.16 16,130.99 100,012.17IP-CV-0363 6/6/2013 7 158,609.37 22,029.08 136,580.29

IP-CV-0365 11/30/2012 143,694.45 141,643.53 122,808.12 86.70 19,957.56 17,056.68 3 2/15/2013 AC 19,957.56 19,957.56 125,709.00

IP-CV-0365 3/13/2013 1 4,438.16 616.41 3,821.75IP-CV-0365 3/19/2013 2 38,003.07 5,278.20 32,724.87IP-CV-0365 8/1/2013 3 80,366.89 11,162.07 69,204.82

IP-CV-0367 11/23/2012 318,192.30 318,192.30 0.00 44,193.38 AC 2/1/2013 AC 44,193.38 44,193.38 44,193.38

IP-CV-0368 10/26/2012 716,179.47 716,179.47 289,038.25 40.36 99,469.37 40,144.20 1 12/7/2012 AC 99,469.37 0.00 99,469.37 348,363.42

IP-CV-0368 1/14/2013 1 289,038.25 40,144.20 248,894.05

IP-CV-0369 11/14/2012 863,895.09 863,895.09 206,223.89 23.87 119,985.43 177,581.68 1 4/10/2013 AC 119,985.43 0.00 119,985.43 297,567.11

IP-CV-0369 6/25/2013 1 206,223.89 28,642.21 177,581.68

IP-CV-0371 10/26/2012 394,652.98 394,652.98 225,873.84 57.23 54,812.91 31,371.37 2 12/7/2012 AC 54,812.91 0.00 54,812.91 249,315.38

IP-CV-0371 3/22/2013 1 108,372.09 15,051.68 93,320.41IP-CV-0371 3/22/2013 2 117,501.75 16,319.69 101,182.06

IP-CV-0377 12/3/2012 553,132.63 553,132.63 409,763.63 74.08 76,823.98 56,911.61 1 12/14/2012 AC 76,823.98 0.00 76,823.98 429,676.00

IP-CV-0377 3/26/2013 1 192,797.44 26,777.42 166,020.02IP-CV-0377 3/26/2013 2 216,966.19 30,134.19 186,832.00

CONSTRUCCIONES FEROL, C.A.

INSPECCION DE LA OBRA: REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO TO01, CHARALLAVE, SANTA TERESA (PROG. 32+000 HASTA PROG. 37+000 PISTA NORTE Y SUR), ESTADOS MIRANDA Y ARAGUA,

QUE EJECUTA LA EMPRESA: CONSTRUCCIONES Y VIALIDADES, C.A, SEGÚN CONTRATO CV-0094

CONSTRUCCIONES FEROL, C.A.

INSPECCION DE LA OBRA: REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO TO01, CHARALLAVE, SANTA TERESA (PROG. 32+000 HASTA PROG. 37+000 PISTA NORTE Y SUR), ESTADOS MIRANDA Y ARAGUA,

QUE EJECUTA LA EMPRESA: CONSTRUCCIONES Y VIALIDADES, C.A, SEGÚN CONTRATO CV-0094

CONSTRUCCIONES FEROL, C.A.

INSPECCION DE LA OBRA: REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO TO01, CHARALLAVE, SANTA TERESA (PROG. 32+000 HASTA PROG. 37+000 PISTA NORTE Y SUR), ESTADOS MIRANDA Y ARAGUA,

QUE EJECUTA LA EMPRESA: CONSTRUCCIONES Y VIALIDADES, C.A, SEGÚN CONTRATO CV-0094

CONSTRUCCIONES FEROL, C.A.

INSPECCION DE LA OBRA: REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO TO01, CHARALLAVE, SANTA TERESA (PROG. 32+000 HASTA PROG. 37+000 PISTA NORTE Y SUR), ESTADOS MIRANDA Y ARAGUA,

QUE EJECUTA LA EMPRESA: CONSTRUCCIONES Y VIALIDADES, C.A, SEGÚN CONTRATO CV-0094

CONSTRUCCIONES FEROL, C.A.

INSPECCION DE LA OBRA: REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO TO01, CHARALLAVE, SANTA TERESA (PROG. 32+000 HASTA PROG. 37+000 PISTA NORTE Y SUR), ESTADOS MIRANDA Y ARAGUA,

QUE EJECUTA LA EMPRESA: CONSTRUCCIONES Y VIALIDADES, C.A, SEGÚN CONTRATO CV-0094

CONSTRUCCIONES FEROL, C.A.

INSPECCION DE LA OBRA: REHABILITACION DE LA AUTOPISTA

REGIONAL DEL CENTRO TO01, CHARALLAVE, SANTA TERESA (PROG. 32+000 HASTA PROG. 37+000 PISTA NORTE Y SUR), ESTADOS MIRANDA Y ARAGUA,

QUE EJECUTA LA EMPRESA: CONSTRUCCIONES Y VIALIDADES, C.A, SEGÚN CONTRATO CV-0094

PROYECTOS Y CONSTRUCCIONES

MILAGROS MARCANO BOULAGER

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, BACHEO Y

REPAVIMENTACION EN LA VIA CUMANA - CUMANACOA - LIMITE

MONAGAS, PROG. 25+000 HASTA LA 84+000, MUNICIPIOS SUCRE Y MONTES, ESTADO SUCRE, QUE

EJECUTA LA EMPRESA: INVERSIONES NUEVO NORTE, C.A.,

SEGUN CONTRATO N° CV-0124

PROYECTOS Y CONSTRUCCIONES

MILAGROS MARCANO BOULAGER

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, BACHEO Y

REPAVIMENTACION EN LA VIA CUMANA - CUMANACOA - LIMITE

MONAGAS, PROG. 25+000 HASTA LA 84+000, MUNICIPIOS SUCRE Y MONTES, ESTADO SUCRE, QUE

EJECUTA LA EMPRESA: INVERSIONES NUEVO NORTE, C.A.,

SEGUN CONTRATO N° CV-0124

PROYECTOS Y CONSTRUCCIONES

MILAGROS MARCANO BOULAGER

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, BACHEO Y

REPAVIMENTACION EN LA VIA CUMANA - CUMANACOA - LIMITE

MONAGAS, PROG. 25+000 HASTA LA 84+000, MUNICIPIOS SUCRE Y MONTES, ESTADO SUCRE, QUE

EJECUTA LA EMPRESA: INVERSIONES NUEVO NORTE, C.A.,

SEGUN CONTRATO N° CV-0124

PROYECTOS Y CONSTRUCCIONES

MILAGROS MARCANO BOULAGER

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, BACHEO Y

REPAVIMENTACION EN LA VIA CUMANA - CUMANACOA - LIMITE

MONAGAS, PROG. 25+000 HASTA LA 84+000, MUNICIPIOS SUCRE Y MONTES, ESTADO SUCRE, QUE

EJECUTA LA EMPRESA: INVERSIONES NUEVO NORTE, C.A.,

SEGUN CONTRATO N° CV-0124

FUNDACION LABORATORIO

NACIONAL DE VIALIDAD (FUNDALANAVIAL)

INSPECCION DE LA OBRA: BACHEO MAYOR DE LA AUTOPISTA GRAN

MARISCAL DE AYACUCHO, TRAMO DISTRIBUIDOR CAUCAGUA -

DISTRIBUIDOR HIGUEROTE, ENTRE LA PROG. 48+000 HASTA LA PROG. 18+300, ESTADO MIRANDA, QUE EJECUTA LA EMPRESA: VIALIDAD Y CONSTRUCCIONES SUCRE, S.A.,

SEGUN CONTRATO CV-0033

FUNDACION LABORATORIO

NACIONAL DE VIALIDAD (FUNDALANAVIAL)

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO ZULIA - LARA, TO17, DESDE

DISTRIBUIDOR PUNTA IGUANA (PROGRESIVA 0+000) HASTA PUENTE PALMA (PROGRESIVA 97+400), ESTADO ZULIA, QUE

EJECUTA LA EMPRESA: CONSTRUCTORA PEDECA, C.A.,

SEGÚN CONTRATO CV-0057FUNDACION

LABORATORIO NACIONAL DE VIALIDAD

(FUNDALANAVIAL)

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO ZULIA - LARA, TO17, DESDE

DISTRIBUIDOR PUNTA IGUANA (PROGRESIVA 0+000) HASTA PUENTE PALMA (PROGRESIVA 97+400), ESTADO ZULIA, QUE

EJECUTA LA EMPRESA: CONSTRUCTORA PEDECA, C.A.,

SEGÚN CONTRATO CV-0057FUNDACION

LABORATORIO NACIONAL DE VIALIDAD

(FUNDALANAVIAL)

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO LA

FRIA- LA GRITA, ESTADO TACHIRA, QUE EJECUTA LA EMPRESA: TALLER

CHAMA, C.A., SEGÚN CONTRATO CV-0001

FUNDACION LABORATORIO

NACIONAL DE VIALIDAD (FUNDALANAVIAL)

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO LA

FRIA- LA GRITA, ESTADO TACHIRA, QUE EJECUTA LA EMPRESA: TALLER

CHAMA, C.A., SEGÚN CONTRATO CV-0001

FUNDACION LABORATORIO

NACIONAL DE VIALIDAD (FUNDALANAVIAL)

INSPECCION DE LA OBRA: BACHEO GENERAL TO09, DISTRIBUIDOR

CAUCAGUA -BARCELONA, DESDE PROG. 78+000 A PLAYA PINTADA,

PROG. 187+000, ESTADO MIRANDA, ASFALTADO DE LA

CARRETERA TO09, PROG. 78+000, DISTRIBUIDOR CAUCAGUA -

BARCELONA, HASTA LA INCORPORACION A LA AUTOPISTA GRAN MARISCAL DE AYACUCHO Y REPARACION DE FALLA DE BORDE

EN PROGRESIVA 80+360, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES YAMARO, C.A., SEGUN CONTRATO N° CV-0050

FUNDACION LABORATORIO

NACIONAL DE VIALIDAD (FUNDALANAVIAL)

INSPECCION DE LA OBRA: BACHEO GENERAL TO09, DISTRIBUIDOR

CAUCAGUA -BARCELONA, DESDE PROG. 78+000 A PLAYA PINTADA,

PROG. 187+000, ESTADO MIRANDA, ASFALTADO DE LA

CARRETERA TO09, PROG. 78+000, DISTRIBUIDOR CAUCAGUA -

BARCELONA, HASTA LA INCORPORACION A LA AUTOPISTA GRAN MARISCAL DE AYACUCHO Y REPARACION DE FALLA DE BORDE

EN PROGRESIVA 80+360, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES YAMARO, C.A., SEGUN CONTRATO N° CV-0050

FUNDACION LABORATORIO

NACIONAL DE VIALIDAD (FUNDALANAVIAL)

INSPECCION DE LA OBRA: BACHEO GENERAL TO09, DISTRIBUIDOR

CAUCAGUA -BARCELONA, DESDE PROG. 78+000 A PLAYA PINTADA,

PROG. 187+000, ESTADO MIRANDA, ASFALTADO DE LA

CARRETERA TO09, PROG. 78+000, DISTRIBUIDOR CAUCAGUA -

BARCELONA, HASTA LA INCORPORACION A LA AUTOPISTA GRAN MARISCAL DE AYACUCHO Y REPARACION DE FALLA DE BORDE

EN PROGRESIVA 80+360, QUE EJECUTA LA EMPRESA:

CONSTRUCCIONES YAMARO, C.A., SEGUN CONTRATO N° CV-0050

INGENIERO ANA MARIA PEREZ, F.P.

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO DE LA TO11, TRAMO LA ENCREUCIJADA DE CARABOBO - NIRGUA, ESTADO CARABOBO, QUE EJECUTA LA EMPRESA: CONSTRUCTORA

LOCURCIO, C.A., SEGÚN CONTRATO N° CV-0071

INGENIERO ANA MARIA PEREZ, F.P.

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO DE LA TO11, TRAMO LA ENCREUCIJADA DE CARABOBO - NIRGUA, ESTADO CARABOBO, QUE EJECUTA LA EMPRESA: CONSTRUCTORA

LOCURCIO, C.A., SEGÚN CONTRATO N° CV-0071

INGENIERO ANA MARIA PEREZ, F.P.

INSPECCION DE LA OBRA: REHABILITACION Y

MANTENIMIENTO DE LA TO11, TRAMO LA ENCREUCIJADA DE CARABOBO - NIRGUA, ESTADO CARABOBO, QUE EJECUTA LA EMPRESA: CONSTRUCTORA

LOCURCIO, C.A., SEGÚN CONTRATO N° CV-0071

67 de 7104/17/2023

17:30:34

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

IP-CV-0378 12/11/2012 405,686.10 405,686.10 389,011.89 95.89 56,345.29 54,029.43 2 1/21/2013 AC 56,345.29 0.00 56,345.29 391,327.75

IP-CV-0378 1/21/2013 1 282,633.40 39,254.64 243,378.76IP-CV-0378 1/21/2013 2 106,378.49 14,774.79 91,603.70

IP-CV-0381 INGELCA, C.A. 12/17/2012 294,613.20 294,613.20 198,281.52 67.30 40,918.50 27,539.10 6 1/15/2013 AC 40,918.50 0.00 40,918.50 211,660.92

IP-CV-0381 INGELCA, C.A. 1/15/2013 1 33,382.18 4,636.41 28,745.77IP-CV-0381 INGELCA, C.A. 1/15/2013 2 17,441.71 2,422.46 15,019.25IP-CV-0381 INGELCA, C.A. 1/15/2013 3 41,654.79 5,785.39 35,869.40IP-CV-0381 INGELCA, C.A. 1/15/2013 4 25,103.94 3,486.66 21,617.28IP-CV-0381 INGELCA, C.A. 2/18/2013 5 55,503.84 7,708.87 47,794.97IP-CV-0381 INGELCA, C.A. 4/24/2013 6 25,195.06 3,499.31 21,695.75

IP-CV-0395 11/23/2012 932,201.70 932,201.70 695,554.05 74.61 129,472.46 96,604.72 3 12/3/2012 AC 129,472.46 0.00 129,472.46 728,421.79

IP-CV-0395 3/4/2013 1 76,562.23 10,633.64 65,928.59IP-CV-0395 3/20/2013 2 307,788.58 42,748.41 265,040.17IP-CV-0395 7/26/2013 3 311,203.24 43,222.67 267,980.57

IP-CV-0397 11/30/2012 1,339,275.84 1,339,275.84 1,339,275.84 100.00 6 1 169,492.18 0.00 169,492.18 1,339,275.84

IP-CV-0397 2 163,000.79 0.00 163,000.79IP-CV-0397 3 191,819.15 0.00 191,819.15IP-CV-0397 4 179,424.12 0.00 179,424.12IP-CV-0397 6/11/2013 5 554,021.02 0.00 554,021.02IP-CV-0397 6/11/2013 6 81,518.58 0.00 81,518.58

IP-CV-0405 12/6/2012 948,345.71 948,345.71 321,819.15 33.93 1 1/10/2013 1 321,819.15 0.00 321,819.15 321,819.15

INGENIERIA MEGRA DE NEIDA MEJIAS GRATEROL

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO:

TRUJILLO - LA PASTORA (PROG. 543+500 HASTA 565+200),

ESTADO TRUJILLO, QUE EJECUTA LA EMPRESA: MARJOCA, C.A.,

SEGÚN CONTRATO N° CV-0114

INGENIERIA MEGRA DE NEIDA MEJIAS GRATEROL

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO:

TRUJILLO - LA PASTORA (PROG. 543+500 HASTA 565+200),

ESTADO TRUJILLO, QUE EJECUTA LA EMPRESA: MARJOCA, C.A.,

SEGÚN CONTRATO N° CV-0114

INGENIERIA MEGRA DE NEIDA MEJIAS GRATEROL

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO:

TRUJILLO - LA PASTORA (PROG. 543+500 HASTA 565+200),

ESTADO TRUJILLO, QUE EJECUTA LA EMPRESA: MARJOCA, C.A.,

SEGÚN CONTRATO N° CV-0114

INSPECCION DE LA OBRA:REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, RECONSTRUCCION DEL PUENTE LA PLAYA, UBICADO

EN LA TO01, (CARRETERA PANAMERICANA), ENTRE LAS POBLACIONES DEL DIVIDIVE Y

AGUASANTA, ESTADO TRUJILLO, QUE EJECUTA LA EMPRESA: PILOTES PERFORADOS, C.A

(PILPER, C.A.), SEGUN CONTRATO N° CV-0056

INSPECCION DE LA OBRA:REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, RECONSTRUCCION DEL PUENTE LA PLAYA, UBICADO

EN LA TO01, (CARRETERA PANAMERICANA), ENTRE LAS POBLACIONES DEL DIVIDIVE Y

AGUASANTA, ESTADO TRUJILLO, QUE EJECUTA LA EMPRESA: PILOTES PERFORADOS, C.A

(PILPER, C.A.), SEGUN CONTRATO N° CV-0056

INSPECCION DE LA OBRA:REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, RECONSTRUCCION DEL PUENTE LA PLAYA, UBICADO

EN LA TO01, (CARRETERA PANAMERICANA), ENTRE LAS POBLACIONES DEL DIVIDIVE Y

AGUASANTA, ESTADO TRUJILLO, QUE EJECUTA LA EMPRESA: PILOTES PERFORADOS, C.A

(PILPER, C.A.), SEGUN CONTRATO N° CV-0056

INSPECCION DE LA OBRA:REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, RECONSTRUCCION DEL PUENTE LA PLAYA, UBICADO

EN LA TO01, (CARRETERA PANAMERICANA), ENTRE LAS POBLACIONES DEL DIVIDIVE Y

AGUASANTA, ESTADO TRUJILLO, QUE EJECUTA LA EMPRESA: PILOTES PERFORADOS, C.A

(PILPER, C.A.), SEGUN CONTRATO N° CV-0056

INSPECCION DE LA OBRA:REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, RECONSTRUCCION DEL PUENTE LA PLAYA, UBICADO

EN LA TO01, (CARRETERA PANAMERICANA), ENTRE LAS POBLACIONES DEL DIVIDIVE Y

AGUASANTA, ESTADO TRUJILLO, QUE EJECUTA LA EMPRESA: PILOTES PERFORADOS, C.A

(PILPER, C.A.), SEGUN CONTRATO N° CV-0056

INSPECCION DE LA OBRA:REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, RECONSTRUCCION DEL PUENTE LA PLAYA, UBICADO

EN LA TO01, (CARRETERA PANAMERICANA), ENTRE LAS POBLACIONES DEL DIVIDIVE Y

AGUASANTA, ESTADO TRUJILLO, QUE EJECUTA LA EMPRESA: PILOTES PERFORADOS, C.A

(PILPER, C.A.), SEGUN CONTRATO N° CV-0056

INSPECCION DE LA OBRA:REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, RECONSTRUCCION DEL PUENTE LA PLAYA, UBICADO

EN LA TO01, (CARRETERA PANAMERICANA), ENTRE LAS POBLACIONES DEL DIVIDIVE Y

AGUASANTA, ESTADO TRUJILLO, QUE EJECUTA LA EMPRESA: PILOTES PERFORADOS, C.A

(PILPER, C.A.), SEGUN CONTRATO N° CV-0056

YEANETTE MARIA CONDE REYES, F.P.

INSPECCION DE LA OBRA: REHABILITACION DEL VIADUCTO LA

CABRERA, ESTADO CARABOBO, QUE EJECUTA LA EMPRESA: OSMAR

CONSTRUCCIONES Y MANTENIMIENTO, C.A., SEGÚN

CONTRATO CV-0148

YEANETTE MARIA CONDE REYES, F.P.

INSPECCION DE LA OBRA: REHABILITACION DEL VIADUCTO LA

CABRERA, ESTADO CARABOBO, QUE EJECUTA LA EMPRESA: OSMAR

CONSTRUCCIONES Y MANTENIMIENTO, C.A., SEGÚN

CONTRATO CV-0148

YEANETTE MARIA CONDE REYES, F.P.

INSPECCION DE LA OBRA: REHABILITACION DEL VIADUCTO LA

CABRERA, ESTADO CARABOBO, QUE EJECUTA LA EMPRESA: OSMAR

CONSTRUCCIONES Y MANTENIMIENTO, C.A., SEGÚN

CONTRATO CV-0148

YEANETTE MARIA CONDE REYES, F.P.

INSPECCION DE LA OBRA: REHABILITACION DEL VIADUCTO LA

CABRERA, ESTADO CARABOBO, QUE EJECUTA LA EMPRESA: OSMAR

CONSTRUCCIONES Y MANTENIMIENTO, C.A., SEGÚN

CONTRATO CV-0148

INGENIERO AQUILES EDUARDO MARCANO

LOPEZ

INSPECCION DE LA OBRA: REHABILITACION POR BACHEO DE LA TO05, TRAMO BARINAS - SAN

CRISTOBAL (DESDE LA PROG. 599+650 HASTA LA PROG.

655+400) ESTADOS TACHIRA - BARINAS, QUE EJECUTA LA EMPRESA: VENEZOLANA DE

INVERSIONES Y CONSTRUCCIONES CLERICO, C.A., SEGÚN CONTRATO

CV-0115INGENIERO AQUILES EDUARDO MARCANO

LOPEZ

INSPECCION DE LA OBRA: REHABILITACION POR BACHEO DE LA TO05, TRAMO BARINAS - SAN

CRISTOBAL (DESDE LA PROG. 599+650 HASTA LA PROG.

655+400) ESTADOS TACHIRA - BARINAS, QUE EJECUTA LA EMPRESA: VENEZOLANA DE

INVERSIONES Y CONSTRUCCIONES CLERICO, C.A., SEGÚN CONTRATO

CV-0115

INGENIERO AQUILES EDUARDO MARCANO

LOPEZ

INSPECCION DE LA OBRA: REHABILITACION POR BACHEO DE LA TO05, TRAMO BARINAS - SAN

CRISTOBAL (DESDE LA PROG. 599+650 HASTA LA PROG.

655+400) ESTADOS TACHIRA - BARINAS, QUE EJECUTA LA EMPRESA: VENEZOLANA DE

INVERSIONES Y CONSTRUCCIONES CLERICO, C.A., SEGÚN CONTRATO

CV-0115

INGENIERO AQUILES EDUARDO MARCANO

LOPEZ

INSPECCION DE LA OBRA: REHABILITACION POR BACHEO DE LA TO05, TRAMO BARINAS - SAN

CRISTOBAL (DESDE LA PROG. 599+650 HASTA LA PROG.

655+400) ESTADOS TACHIRA - BARINAS, QUE EJECUTA LA EMPRESA: VENEZOLANA DE

INVERSIONES Y CONSTRUCCIONES CLERICO, C.A., SEGÚN CONTRATO

CV-0115

INGENIERO AQUILES EDUARDO MARCANO

LOPEZ

INSPECCION DE LA OBRA: REHABILITACION POR BACHEO DE LA TO05, TRAMO BARINAS - SAN

CRISTOBAL (DESDE LA PROG. 599+650 HASTA LA PROG.

655+400) ESTADOS TACHIRA - BARINAS, QUE EJECUTA LA EMPRESA: VENEZOLANA DE

INVERSIONES Y CONSTRUCCIONES CLERICO, C.A., SEGÚN CONTRATO

CV-0115

INGENIERO AQUILES EDUARDO MARCANO

LOPEZ

INSPECCION DE LA OBRA: REHABILITACION POR BACHEO DE LA TO05, TRAMO BARINAS - SAN

CRISTOBAL (DESDE LA PROG. 599+650 HASTA LA PROG.

655+400) ESTADOS TACHIRA - BARINAS, QUE EJECUTA LA EMPRESA: VENEZOLANA DE

INVERSIONES Y CONSTRUCCIONES CLERICO, C.A., SEGÚN CONTRATO

CV-0115INVERSIONES J. SUPERLANO

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DE LA TO05, TRAMO CAMPO CARABOBO,

ESTADO CARABOBO (DESDE LA PROG. 07+800 HASTA LA 12+000 Y DESDE LA PROG. 19+100 HASTA

LA 27+670), QUE EJECUTA LA EMPRESA: INVERSIONES EDAC, C.A., SEGÚN CONTRATO N° CV-

0128

68 de 7104/17/2023

17:30:34

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

IP-CV-0413 JOGARFA, C.A. 12/12/2012 391,303.74 391,303.74 0.00 54,347.74 AC AC 54,347.74 0.00 54,347.74 54,347.74

IP-CV-0414 JOGARFA, C.A. 12/12/2012 338,070.13 338,070.13 338,070.13 100.00 46,954.19 46,954.19 5 AC 46,954.19 0.00 46,954.19 338,070.13

IP-CV-0414 JOGARFA, C.A. 1 82,027.81 11,392.75 70,635.06IP-CV-0414 JOGARFA, C.A. 4/18/2013 2 34,031.43 4,726.59 29,304.84IP-CV-0414 JOGARFA, C.A. 4/18/2013 3 101,470.49 14,093.12 87,377.37IP-CV-0414 JOGARFA, C.A. 4/18/2013 4 68,040.82 9,450.11 58,590.71IP-CV-0414 JOGARFA, C.A. 5/28/2013 5 52,499.58 7,291.62 45,207.96

IP-CV-0421 12/19/2012 126,008.62 126,008.62 42,758.95 33.93 2 2/6/2013 1 14,511.55 0.00 14,511.55 42,758.95

IP-CV-0421 2/6/2013 2 28,247.40 0.00 28,247.40

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL EN LA

TO10, TRAMO ALCABALA DEL ROSAARIO HASTA DISTRIBUIDOR

LOS POZOS, MUNICIPIO LIBERTADOR, ESTADO MONAGAS (PROG. 0+000 HASTA LA PROG.

40+000), QUE EJECUTA LA EMPRESA INVERSIONES NUEVO

NORTE, C.A., SEGÚN CONTRATO N° CV-0317

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO LA TOSCANA - JUSEPIN Y ACCESOS

(14,5 KM. DESDE LA PROGRESIVA 0+000 HASTA LA PROGRESIVA

14+500), ESTADO MONAGAS, QUE EJECUTA LA EMPRESA: GRUPO GRIHER DE VENEZUELA, C.A.,

SEGÚN CONTRATO N° CV-0150

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO LA TOSCANA - JUSEPIN Y ACCESOS

(14,5 KM. DESDE LA PROGRESIVA 0+000 HASTA LA PROGRESIVA

14+500), ESTADO MONAGAS, QUE EJECUTA LA EMPRESA: GRUPO GRIHER DE VENEZUELA, C.A.,

SEGÚN CONTRATO N° CV-0150

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO LA TOSCANA - JUSEPIN Y ACCESOS

(14,5 KM. DESDE LA PROGRESIVA 0+000 HASTA LA PROGRESIVA

14+500), ESTADO MONAGAS, QUE EJECUTA LA EMPRESA: GRUPO GRIHER DE VENEZUELA, C.A.,

SEGÚN CONTRATO N° CV-0150

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO LA TOSCANA - JUSEPIN Y ACCESOS

(14,5 KM. DESDE LA PROGRESIVA 0+000 HASTA LA PROGRESIVA

14+500), ESTADO MONAGAS, QUE EJECUTA LA EMPRESA: GRUPO GRIHER DE VENEZUELA, C.A.,

SEGÚN CONTRATO N° CV-0150

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO LA TOSCANA - JUSEPIN Y ACCESOS

(14,5 KM. DESDE LA PROGRESIVA 0+000 HASTA LA PROGRESIVA

14+500), ESTADO MONAGAS, QUE EJECUTA LA EMPRESA: GRUPO GRIHER DE VENEZUELA, C.A.,

SEGÚN CONTRATO N° CV-0150

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO LA TOSCANA - JUSEPIN Y ACCESOS

(14,5 KM. DESDE LA PROGRESIVA 0+000 HASTA LA PROGRESIVA

14+500), ESTADO MONAGAS, QUE EJECUTA LA EMPRESA: GRUPO GRIHER DE VENEZUELA, C.A.,

SEGÚN CONTRATO N° CV-0150INVERSIONES ISHTAR 77 DE MARY ESTHER PEÑA

DAVILA

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, RECONSTRUCCION DEL PUENTE CAUS, UBICADO EN

LA TO01, (CARRETERA PANAMERICANA), ENTRE LAS POBLACIONES DE SABANA

GRANDE Y SABANA LIBRE. ESTADO TRUJILLO, QUE EJECUTA LA

EMPRESA: PILOTES PERFORADOS, C.A., SEGUN CINTRATO N° CV-0055

INVERSIONES ISHTAR 77 DE MARY ESTHER PEÑA

DAVILA

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, RECONSTRUCCION DEL PUENTE CAUS, UBICADO EN

LA TO01, (CARRETERA PANAMERICANA), ENTRE LAS POBLACIONES DE SABANA

GRANDE Y SABANA LIBRE. ESTADO TRUJILLO, QUE EJECUTA LA

EMPRESA: PILOTES PERFORADOS, C.A., SEGUN CINTRATO N° CV-0055

69 de 7104/17/2023

17:30:34

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

IP-CV-0424 12/19/2012 125,604.70 125,604.70 123,389.84 98.24 2 2/6/2013 1 8,227.16 0.00 8,227.16 123,389.84

IP-CV-0424 2/6/2013 2 115,162.68 0.00 115,162.68

IP-CV-0423 12/11/2012 1,428,759.04 1,428,759.04 839,573.29 58.76 198,438.76 66,607.41 3 1/3/2013 AC 198,438.76 0.00 198,438.76 971,404.64

IP-CV-0423 3/4/2013 1 126,330.81 17,545.95 108,784.86IP-CV-0423 4/12/2013 2 158,621.47 22,030.76 136,590.71IP-CV-0423 5/17/2013 3 554,621.01 27,030.70 527,590.31

IP-CV-0425 12/11/2012 2,171,320.08 2,171,320.08 1,712,391.33 78.86 301,572.23 237,832.13 4 1/30/2013 AC 301,572.23 301,572.23 1,776,131.43

IP-CV-0425 4/18/2013 1 642,555.31 89,243.79 553,311.52IP-CV-0425 4/18/2013 2 108,649.57 15,090.22 93,559.35IP-CV-0425 4/18/2013 3 132,135.83 18,352.20 113,783.63IP-CV-0425 4/18/2013 4 829,050.62 115,145.92 713,904.70

IP-CV-0428 12/21/2012 1,456,301.92 1,944,624.01 1,159,143.00 59.61 202,264.16 160,992.08 3 1/22/2013 AC 202,264.16 0.00 202,264.16 1,200,415.08

IP-CV-0428 12/21/2012 1/28/2013 1 176,713.42 24,543.53 152,169.89IP-CV-0428 12/21/2012 1/28/2013 2 407,893.28 56,651.84 351,241.44IP-CV-0428 12/21/2012 1/28/2013 3 574,536.30 79,796.71 494,739.59

IP-CV-0429 12/21/2012 3,068,481.14 3,068,481.14 776,847.08 25.32 426,177.94 107,895.43 4 1/22/2013 AC 426,177.94 0.00 426,177.94 1,095,129.59

IP-CV-0429 12/21/2012 1/28/2013 1 123,668.00 17,176.11 106,491.89IP-CV-0429 12/21/2012 1/28/2013 2 176,044.22 24,450.59 151,593.63IP-CV-0429 12/21/2012 1/28/2013 3 141,572.19 19,662.80 121,909.39IP-CV-0429 5/6/2013 4 335,562.67 46,605.93 288,956.74

100 TOTAL IP-CV: 83,480,089.76 87,401,334.60 53,519,582.82 10,196,755.26 6,620,411.73 63,716,338.12 6,471,472.26 57,244,865.86 57,244,865.86

EP-0343 ING. ANA DELIMA 9/26/2012 340,478.85 340,478.85 340,478.85 100.00 157,629.10 157,629.10 3 10/3/2012 AC 157,629.10 0.00 157,629.10 340,478.85

INVERSIONES ISHTAR 77 DE MARY ESTHER PEÑA

DAVILA

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, RECONSTRUCCION DEL CAJON SABANA GRANDE, UBICADO EN LA TRONCAL 1

(CARRETERA PANAMERICANA), EN LA POBLACION DE SABANA

GRANDE, ESTADO TRUJILLO, QUE EJECUTA LA EMPRESA: PILOTES

PERFORADOS , C.A., SEGUN CONTRATO N° CV-0047

INVERSIONES ISHTAR 77 DE MARY ESTHER PEÑA

DAVILA

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL Y

BACHEO EN TODAS LAS TRONCALES, RECONSTRUCCION DEL CAJON SABANA GRANDE, UBICADO EN LA TRONCAL 1

(CARRETERA PANAMERICANA), EN LA POBLACION DE SABANA

GRANDE, ESTADO TRUJILLO, QUE EJECUTA LA EMPRESA: PILOTES

PERFORADOS , C.A., SEGUN CONTRATO N° CV-0047

YEANETTE MARIA CONDE REYES, F.P.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DEL

PUENTE SOBRE EL LAGO DE MARACAIBO, ESTADO ZULIA, QUE

EJECUTA LA EMPRESA: FUNDACION LABORATORIO DE SERVICIOS

TECNICOS PETROLEROS, SEGÚN CONTRATO N° CV-0319

YEANETTE MARIA CONDE REYES, F.P.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DEL

PUENTE SOBRE EL LAGO DE MARACAIBO, ESTADO ZULIA, QUE

EJECUTA LA EMPRESA: FUNDACION LABORATORIO DE SERVICIOS

TECNICOS PETROLEROS, SEGÚN CONTRATO N° CV-0319

YEANETTE MARIA CONDE REYES, F.P.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DEL

PUENTE SOBRE EL LAGO DE MARACAIBO, ESTADO ZULIA, QUE

EJECUTA LA EMPRESA: FUNDACION LABORATORIO DE SERVICIOS

TECNICOS PETROLEROS, SEGÚN CONTRATO N° CV-0319

YEANETTE MARIA CONDE REYES, F.P.

INSPECCION DE LA OBRA: REHABILITACION INTEGRAL DEL

PUENTE SOBRE EL LAGO DE MARACAIBO, ESTADO ZULIA, QUE

EJECUTA LA EMPRESA: FUNDACION LABORATORIO DE SERVICIOS

TECNICOS PETROLEROS, SEGÚN CONTRATO N° CV-0319

SERVICIOS Y CONSTRUCCIONES, C.A.

(SERCO, C.A.)

INSPECCION DE LA OBRA: CONSTRUCCION DEL PAR VIAL BARINAS - SANTA INES - SANTA

LUCIA, BARINAS. ESTADO BARINAS, QUE EJECUTA LA EMPRESA

CONSTRUCTORA VIDALSA 27, C.A., SEGÚN CONTRATO N° CV-0092

SERVICIOS Y CONSTRUCCIONES, C.A.

(SERCO, C.A.)

INSPECCION DE LA OBRA: CONSTRUCCION DEL PAR VIAL BARINAS - SANTA INES - SANTA

LUCIA, BARINAS. ESTADO BARINAS, QUE EJECUTA LA EMPRESA

CONSTRUCTORA VIDALSA 27, C.A., SEGÚN CONTRATO N° CV-0092

SERVICIOS Y CONSTRUCCIONES, C.A.

(SERCO, C.A.)

INSPECCION DE LA OBRA: CONSTRUCCION DEL PAR VIAL BARINAS - SANTA INES - SANTA

LUCIA, BARINAS. ESTADO BARINAS, QUE EJECUTA LA EMPRESA

CONSTRUCTORA VIDALSA 27, C.A., SEGÚN CONTRATO N° CV-0092

SERVICIOS Y CONSTRUCCIONES, C.A.

(SERCO, C.A.)

INSPECCION DE LA OBRA: CONSTRUCCION DEL PAR VIAL BARINAS - SANTA INES - SANTA

LUCIA, BARINAS. ESTADO BARINAS, QUE EJECUTA LA EMPRESA

CONSTRUCTORA VIDALSA 27, C.A., SEGÚN CONTRATO N° CV-0092

SERVICIOS Y CONSTRUCCIONES, C.A.

(SERCO, C.A.)

INSPECCION DE LA OBRA: CONSTRUCCION DEL PAR VIAL BARINAS - SANTA INES - SANTA

LUCIA, BARINAS. ESTADO BARINAS, QUE EJECUTA LA EMPRESA

CONSTRUCTORA VIDALSA 27, C.A., SEGÚN CONTRATO N° CV-0092

CARLOS EDUARDO ALFARO FLEMING

INSPECCION DE LA OBRA: REHABILITACION DELL TRAMO MACHIQUES - COLON, DESDE

PUENTE ECUADOR - REDOMA DE CASIGUA, PROG. 441+700 HASTA

LA PROG. 496+400, MUNICIPIO JESUS MARIA SEMPRUM, ZONA SUR

DEL LAGO, ESTADO ZULIA, QUE EJECUTA LA EMPRESA:

PAVIMENTADORA ONICA, S.A., SEGUN CONTRATO N° CV-0082CARLOS EDUARDO

ALFARO FLEMING

INSPECCION DE LA OBRA: REHABILITACION DELL TRAMO MACHIQUES - COLON, DESDE

PUENTE ECUADOR - REDOMA DE CASIGUA, PROG. 441+700 HASTA

LA PROG. 496+400, MUNICIPIO JESUS MARIA SEMPRUM, ZONA SUR

DEL LAGO, ESTADO ZULIA, QUE EJECUTA LA EMPRESA:

PAVIMENTADORA ONICA, S.A., SEGUN CONTRATO N° CV-0082

CARLOS EDUARDO ALFARO FLEMING

INSPECCION DE LA OBRA: REHABILITACION DELL TRAMO MACHIQUES - COLON, DESDE

PUENTE ECUADOR - REDOMA DE CASIGUA, PROG. 441+700 HASTA

LA PROG. 496+400, MUNICIPIO JESUS MARIA SEMPRUM, ZONA SUR

DEL LAGO, ESTADO ZULIA, QUE EJECUTA LA EMPRESA:

PAVIMENTADORA ONICA, S.A., SEGUN CONTRATO N° CV-0082

CARLOS EDUARDO ALFARO FLEMING

INSPECCION DE LA OBRA: REHABILITACION DELL TRAMO MACHIQUES - COLON, DESDE

PUENTE ECUADOR - REDOMA DE CASIGUA, PROG. 441+700 HASTA

LA PROG. 496+400, MUNICIPIO JESUS MARIA SEMPRUM, ZONA SUR

DEL LAGO, ESTADO ZULIA, QUE EJECUTA LA EMPRESA:

PAVIMENTADORA ONICA, S.A., SEGUN CONTRATO N° CV-0082CARLOS EDUARDO

ALFARO FLEMING

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO: MACHIQUES - COLON , PROG.

328+000 HASTA LA PROG. 441+700, ESTADO ZULIA, QUE EJECUTA LA EMPRESA: PEDECA, C.A., SEGÚN CONTRATO N° CV-

0101

CARLOS EDUARDO ALFARO FLEMING

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO: MACHIQUES - COLON , PROG.

328+000 HASTA LA PROG. 441+700, ESTADO ZULIA, QUE EJECUTA LA EMPRESA: PEDECA, C.A., SEGÚN CONTRATO N° CV-

0101

CARLOS EDUARDO ALFARO FLEMING

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO: MACHIQUES - COLON , PROG.

328+000 HASTA LA PROG. 441+700, ESTADO ZULIA, QUE EJECUTA LA EMPRESA: PEDECA, C.A., SEGÚN CONTRATO N° CV-

0101

CARLOS EDUARDO ALFARO FLEMING

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO: MACHIQUES - COLON , PROG.

328+000 HASTA LA PROG. 441+700, ESTADO ZULIA, QUE EJECUTA LA EMPRESA: PEDECA, C.A., SEGÚN CONTRATO N° CV-

0101

CARLOS EDUARDO ALFARO FLEMING

INSPECCION DE LA OBRA: REHABILITACION DEL TRAMO: MACHIQUES - COLON , PROG.

328+000 HASTA LA PROG. 441+700, ESTADO ZULIA, QUE EJECUTA LA EMPRESA: PEDECA, C.A., SEGÚN CONTRATO N° CV-

0101ESTUDIO INTEGRAL DEL PUENTE SANTA INES Y EMPALMES CON LA

CARRETRA NACIONAL LOCAL PRINCIPAL. HACIA COMPLEJO

AGROINDUSTRIAL SANTA INES, ESTADO BARINAS

70 de 7104/17/2023

17:30:34

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

EP-0343 ING. ANA DELIMA 11/2/2012 1 182,885.25 84,669.10 98,216.15EP-0343 ING. ANA DELIMA 12/6/2012 2 106,444.80 49,280.00 57,164.80EP-0343 ING. ANA DELIMA 12/13/2012 3 51,148.80 23,680.00 27,468.80

EP-0344 ING. ANA DELIMA 9/26/2012 685,924.20 685,924.20 685,924.20 100.00 317,557.50 317,557.50 3 10/3/2012 AC 317,577.50 0.00 317,577.50 685,944.20

EP-0344 ING. ANA DELIMA 12/7/2012 1 301,695.84 139,674.00 162,021.84

EP-0344 ING. ANA DELIMA 12/26/2012 2 263,396.88 121,943.00 141,453.88

EP-0344 ING. ANA DELIMA 2/25/2013 3 120,831.48 55,940.50 64,890.98

2 TOTAL GENERAL EP: 1,026,403.05 1,026,403.05 1,026,403.05 475,186.60 475,186.60 1,501,609.65 475,186.60 1,026,423.05 1,026,423.05

PVIAL-0198 9/3/2012 4,228,698.48 4,228,698.48 3,305,866.45 78.18 1,887,811.82 1,475,833.24 2 9/17/2012 AC 1,887,811.82 0.00 1,887,811.82 3,717,845.03

PVIAL-0198 950,373.20 11/22/2012 1 2,394,296.23 1,068,882.25 1,325,413.98PVIAL-0198 3/21/2013 2 911,570.22 406,950.99 504,619.23

1 TOTAL PVIAL: 4,228,698.48 4,228,698.48 3,305,866.45 1,887,811.82 2,426,206.44 5,193,678.27 1,475,833.24 3,717,845.03 3,717,845.03

406 TOTAL GENERAL AÑO 2012: 4,896,790,394.83 5,336,128,314.80 3,527,148,905.81 0.00 2,343,246,157.73 1,544,362,623.34 35.00 2,106,337.00 0.00 5,871,912,930.94 ### 4,327,970,725.20 #REF!

ESTUDIO INTEGRAL DEL PUENTE SANTA INES Y EMPALMES CON LA

CARRETRA NACIONAL LOCAL PRINCIPAL. HACIA COMPLEJO

AGROINDUSTRIAL SANTA INES, ESTADO BARINAS

ESTUDIO INTEGRAL DEL PUENTE SANTA INES Y EMPALMES CON LA

CARRETRA NACIONAL LOCAL PRINCIPAL. HACIA COMPLEJO

AGROINDUSTRIAL SANTA INES, ESTADO BARINAS

ESTUDIO INTEGRAL DEL PUENTE SANTA INES Y EMPALMES CON LA

CARRETRA NACIONAL LOCAL PRINCIPAL. HACIA COMPLEJO

AGROINDUSTRIAL SANTA INES, ESTADO BARINASPROYECTO DISTRIBUIDOR SANTA

ROSA Y ESTRUCTURAS, MUNICIPIO CRISTOBAL ROJAS, ESTADO

MIRANDAPROYECTO DISTRIBUIDOR SANTA

ROSA Y ESTRUCTURAS, MUNICIPIO CRISTOBAL ROJAS, ESTADO

MIRANDA

PROYECTO DISTRIBUIDOR SANTA ROSA Y ESTRUCTURAS, MUNICIPIO

CRISTOBAL ROJAS, ESTADO MIRANDA

PROYECTO DISTRIBUIDOR SANTA ROSA Y ESTRUCTURAS, MUNICIPIO

CRISTOBAL ROJAS, ESTADO MIRANDA

CONSTRUCTORA ANCEBEL, C.A.

ACONDICIONAMIENTO, DEFORESTACION Y

CONSTRUCCION DE PROTECCION PERIMETRAL DE LA PLANTA DE ASFALTO EN EL SECTOR SAN

VICENTE, MUNICIPIO MATURIN. ESTADO MONAGAS

CONSTRUCTORA ANCEBEL, C.A.

ACONDICIONAMIENTO, DEFORESTACION Y

CONSTRUCCION DE PROTECCION PERIMETRAL DE LA PLANTA DE ASFALTO EN EL SECTOR SAN

VICENTE, MUNICIPIO MATURIN. ESTADO MONAGAS

CONSTRUCTORA ANCEBEL, C.A.

ACONDICIONAMIENTO, DEFORESTACION Y

CONSTRUCCION DE PROTECCION PERIMETRAL DE LA PLANTA DE ASFALTO EN EL SECTOR SAN

VICENTE, MUNICIPIO MATURIN. ESTADO MONAGAS

71 de 7104/17/2023

17:30:34

VALUACIONES TRAMITADAS

CONTRATO N° EMPRESA DESCRIPCION DE LA OBRA N° MONTO BRUTO MONTO NETO

ACTAS

FECHA FIRMA DEL CONTRATO

MONTO ORIGINAL DEL CONTRATO

MONTO MODIFICADO DEL

CONTRATO

RELACIONADO EN EJECUCION DE

OBRAS

% DE AVANCE

ANTICIPO CONTRACTUAL

CONCEDIDO

AMORTIZACION ANTICIPO

CONTRACTUAL

No. DE VAL. REL.

FECHA TRAMITE

AMORTIZACION ANTICIPO

CONTRACTUAL

TOTAL PAGOS TRAMITADOS

 

277 0.005/2/2013 6 61,662.89 27,528.08 34,134.81