valorizacion

Post on 06-Oct-2015

4 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

un modelo para valorizaciones

TRANSCRIPT

  • Municipalidad Provincial Huancabamba

    PROCESO : ADJUDICACION DIRECTA PUBLICA N 01-2014-MDP-CEP-PRIMERA CONVOCATORIA MODALIDAD DE EJECUCIN : CONTRATA - A SUMA ALZADA

    OBRA PLAZO DE EJECUCIN : 102 DAS CALENDARIOSPROPIETARIO: MUNICIPALIDAD DISTRITAL DE PAIMAS VALOR REFERENCIAL : S/. Inc/IGV.UBICACIN : CIDADAD DE PAIMAS, DISTRITO PAIMAS,PROVINCIA AYABACA, PIURA MONTO CONTRATADO : S/. Inc/IGV.CONTRATISTA: CONSORCIO GRAU FECHA BASE : 24 De Noviembre del 2014RESIDENTE : ING. MANUEL ALBERTO VINCES RENTERIA FACTOR DE RELACINSUPERVISOR : ING. VICTOR HURTADO ZAMORA

    P.U. PARCIAL(S/.) (S/.) METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL % METRADO PARCIAL %

    01 OBRAS PROVISIONALES 16,254.1901.01 OBRAS PROVISIONALES 16,254.1901.01.01 CARTEL DE OBRA IMPRESIN DE BANNER 8.20X3.60M (SOPORTE DE MADERA) und 1.00 1,400.85 1,400.85 1.00 1400.85 0.00 0.00 1.00 1400.85 100.00% 0.00 0.00 0.00%01.01.02 ALQUILER DE ALMACEN PARA LA OBRA mes 3.00 300.00 900.00 1.00 300.00 0.00 0.00 1.00 300.00 33.33% 2.00 600.00 66.67%01.01.03 TRANQUERAS DE MADERA 1.20 X 2.40 m, PARA DESVIO DE TRANSITO VEHICULAR und 3.00 268.43 805.29 3.00 805.29 0.00 0.00 3.00 805.29 100.00% 0.00 0.00 0.00%01.01.04 SEALIZACION, DESVIO DEL TRANSITO Y PROTECCION DE LA OBRA und 1.00 2,148.05 2,148.05 0.20 429.61 0.80 1718.44 1.00 2148.05 100.00% 0.00 0.00 0.00%01.01.05 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Glb 1.00 5,000.00 5,000.00 0.50 2500.00 0.00 0.00 0.50 2500.00 50.00% 0.50 2500.00 50.00%01.01.06 FLETE TERRESTRE SULLANA - PAIMAS Glb 1.00 6,000.00 6,000.00 0.50 3000.00 0.30 1800.00 0.80 4800.00 80.00% 0.20 1200.00 20.00%02 PAVIMENTACION CON ADOQUIN 72,361.7902.01 TRABAJOS PRELIMINARES 72,361.7902.01.01 TRAZO NIVELES Y REPLANTE DURANTE LA EJECUCION DE OBRA... m2 6,206.97 1.51 9,372.52 6206.97 9372.52 0.00 0.00 6206.97 9372.52 100.00% 0.00 0.00 0.00%02.01.02 CONTROL TOPOGRAFICO DURANTE LA EJEC. DEOBRA m2 6,206.97 1.32 8,193.20 6206.97 8193.20 0.00 0.00 6206.97 8193.20 100.00% 0.00 0.00 0.00%02.01.03 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 2,377.27 23.05 54,796.07 2377.27 54796.07 0.00 0.00 2377.27 54796.07 100.00% 0.00 0.00 0.00%02.02 MOVIMIENTO DE TIERRAS 441,117.7302.02.01 CORTE DE TERRENO A NIVEL DE SUBRASANTE C/EQUIPO m3 2,568.83 5.05 12,972.59 2568.86 12972.74 0.00 0.00 2568.86 12972.74 100.00% -0.03 -0.15 0.00%02.02.02 EXCAVACION MANUAL P/SARDINELES PERALTADOS m3 26.19 30.87 808.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 26.19 808.49 100.00%02.02.03 ELIMINACION DE MATERIAL EXCEDENTE PROVENIENTE DE LA DEMOLICION DEL PAVIMENTO CON EQUIPO PESADO HATA 15KM.m3 3,861.87 12.63 48,775.42 3861.87 48775.42 0.00 0.00 3861.87 48775.42 100.00% 0.00 0.00 0.00%02.02.04 RELLENO CON OVER DE 4" A 6" E=30CM m3 1,861.82 80.75 150,341.97 450.00 36337.50 0.00 0.00 450.00 36337.50 24.17% 1411.82 114004.47 75.83%02.02.05 RELLENO CON MATERIAL GRANULAR E=20CM m2 6,206.67 11.73 72,804.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6206.67 72804.24 100.00%02.02.06 CONFORMACION DE SUB-RASANTE C/EQUIPO m3 6,206.67 3.51 21,785.41 0.00 0.00 3620.00 12706.20 3620.00 12706.20 58.32% 2586.67 9079.21 41.68%02.02.07 BASE GRANULAR E=0.20 m m2 6,206.67 14.55 90,307.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6206.67 90307.05 100.00%02.02.08 CAMA ARENA GRUESA E=0.05M, PARA ASENTADO DE ADOQUINES . m2 6,206.67 6.98 43,322.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6206.67 43322.56 100.00%02.03 CONCRETO SIMPLE 387,269.5002.03.01 CONCRETO f'c=175 kg/cm2 EN SARDINELES SUMERGIDOS m3 6.39 377.96 2,415.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6.39 2415.16 100.00%02.03.02 ENCOFRADO Y DESENCOFRADO EN SARDINELES SUMERGIDOS m2 10.97 42.99 471.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 10.97 471.60 100.00%02.03.03 PAVIMENTO CON ADOQUINES DE CONCRETO F'C=420 KG/CM2 10X20X8 CM SUMINISTRO Y COLOCACIONm2 6,206.67 60.65 376,434.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6206.67 376434.54 100.00%02.03.04 CRTE. ADOQUINES DE CONCRETO. 10X20X8 cm m 395.04 20.12 7,948.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 395.04 7948.20 100.00%02.04 CONCRETO ARMADO 30,133.8902.04.01 CONCRETO f'c=175 kg/cm2 EN SARDINELES LONGITUDINALMENTE PERALTADO m3 42.25 377.96 15,968.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 42.25 15968.81 100.00%02.04.02 ENCOFRADO Y DESENCOFRADO DE SARDINELES PERALTADO m2 140.83 42.95 6,048.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 140.83 6048.65 100.00%02.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 2,193.63 3.70 8,116.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2193.63 8116.43 100.00%02.05 NIVELACION DE CAJAS DE AGUA, DESAGUE Y BUZONES 4,285.0802.05.01 NIVELACION DE CAJAS DE AGUA und 46.00 31.17 1,433.82 46.00 1433.82 0.00 0.00 46.00 1433.82 100.00% 0.00 0.00 0.00%02.05.02 NIVELACION DE CAJAS DE DESAGUE und 46.00 46.74 2,150.04 46.00 2150.04 0.00 0.00 46.00 2150.04 100.00% 0.00 0.00 0.00%02.05.03 NIVELACION DE BUZONES EN GENERAL und 3.00 233.74 701.22 3.00 701.22 0.00 0.00 3.00 701.22 100.00% 0.00 0.00 0.00%02.06 VARIOS 8,446.87

    VALORIZACIN N 02 - CONTRATO PRINCIPAL

    PARTIDA

    1,767,384.221,767,384.22

    : MEJORAMIENTODE LA AV. GRA Y CALLE ENRIQUE LOPEZ ALBUJAR EN LA CIUDAD DE PAIMAS, DISTRITO DE PAIMAS, PROVINCIA DE AYABACA- PIURA

    Diceimbre-2014

    1.00000

    ANTERIOR ACTUALDESCRIPCIONSALDOS

    ACUMULADOUNID METRADOPRESUPUESTO BASE AVANCE

  • Municipalidad Provincial Huancabamba

    PROCESO : ADJUDICACION DIRECTA PUBLICA N 01-2014-MDP-CEP-PRIMERA CONVOCATORIA MODALIDAD DE EJECUCIN : CONTRATA - A SUMA ALZADA

    OBRA PLAZO DE EJECUCIN : 102 DAS CALENDARIOSPROPIETARIO: MUNICIPALIDAD DISTRITAL DE PAIMAS VALOR REFERENCIAL : S/. Inc/IGV.UBICACIN : CIDADAD DE PAIMAS, DISTRITO PAIMAS,PROVINCIA AYABACA, PIURA MONTO CONTRATADO : S/. Inc/IGV.CONTRATISTA: CONSORCIO GRAU FECHA BASE : 24 De Noviembre del 2014RESIDENTE : ING. MANUEL ALBERTO VINCES RENTERIA FACTOR DE RELACINSUPERVISOR : ING. VICTOR HURTADO ZAMORA

    P.U. PARCIAL(S/.) (S/.) METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL % METRADO PARCIAL %

    VALORIZACIN N 02 - CONTRATO PRINCIPAL

    PARTIDA

    1,767,384.221,767,384.22

    : MEJORAMIENTODE LA AV. GRA Y CALLE ENRIQUE LOPEZ ALBUJAR EN LA CIUDAD DE PAIMAS, DISTRITO DE PAIMAS, PROVINCIA DE AYABACA- PIURA

    Diceimbre-2014

    1.00000

    ANTERIOR ACTUALDESCRIPCIONSALDOS

    ACUMULADOUNID METRADOPRESUPUESTO BASE AVANCE

    02.06.01 CURADO DE CONCRETO CON ADITIVO m2 94.82 8.30 787.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 94.82 787.01 100.00%02.06.02 JUNTAS ASFLATICAS DE E=1". m 92.18 8.79 810.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 92.18 810.26 100.00%02.06.03 PINTURA DE TRAFICO PARA SARDINELES m2 399.91 10.61 4,243.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 399.91 4243.05 100.00%02.06.04 LIMPIEZA FINAL DE OBRA m2 6,206.07 0.42 2,606.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6206.07 2606.55 100.00%03 VEREDAS DE CONCRETO 2,779.8003.01 TRABAJOS PRELIMINARES 2,779.8003.01.01 TRAZO, NIVELES Y REPLANTEO DURANTE LA OBRA m2 1,117.02 1.80 2,010.64 1117.02 2010.64 0.00 0.00 1117.02 2010.64 100.00% 0.00 0.00 0.00%03.01.02 DEMOLICION DE VEREDAS H=10CM. m2 65.74 11.70 769.16 65.74 769.16 0.00 0.00 65.74 769.16 100.00% 0.00 0.00 0.00%03.02 MOVIMIENTO DE TIERRAS 27,875.4803.02.01 CORTE MANUAL HASTA NIVEL DE SU RASANTE P/VEREDAS, RAMPAS, MARTILLOS INC. UASm3 120.74 30.87 3,727.24 0.00 0.00 50.00 1543.50 50.00 1543.50 41.41% 70.74 2183.74 58.59%03.02.02 BASE CON AFIRMADO E=0.10M P/VEREDAS m2 1,117.02 15.63 17,459.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1117.02 17459.02 100.00%03.02.03 CONFORMACION EN VEREDAS CON PLANCHA COMPACATADORA m2 1,117.02 4.05 4,523.93 0.00 0.00 450.00 1822.50 450.00 1822.50 40.29% 667.02 2701.43 59.71%03.02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 171.44 12.63 2,165.29 0.00 0.00 50.00 631.50 50.00 631.50 29.16% 121.44 1533.79 70.84%03.03 CONCRETO SIMPLE 93,104.2903.03.01 CONCRETO F'C=175KG/CM2,ACABADO FROTACHADO BRUADO C/METRO m2 1,024.80 35.19 36,062.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1024.80 36062.71 100.00%03.03.02 CONCRETO f'c=175 kg/cm2 PARA UAS DE VEREDAS, RAMPAS Y MARTILLOS m3 113.01 375.37 42,420.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 113.01 42420.56 100.00%03.03.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS, RAMPAS Y MARTILLOS INC. UAS m2 106.08 39.87 4,229.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 106.08 4229.41 100.00%03.03.04 CURADO DE CONCRETO CON ADITIVO m2 1,116.02 8.30 9,262.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1116.02 9262.97 100.00%03.03.05 JUNTAS ASFALTICAS E=1", H=0.10m, EN VEREDAS, RAMPAS Y MARTILLOS m 128.40 8.79 1,128.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 128.40 1128.64 100.00%04 MUROS DE CONTENCION04.01 TRABAJOS PRELIMINARES 648.9204.04.01 TRAZO Y REPLANTEO m2 418.66 1.55 648.92 418.66 648.92 0.00 0.00 418.66 648.92 100.00% 0.00 0.00 0.00%04.02 MOVIMIENTO DE TIERRAS 26,341.4404.02.01 CORTE MANUAL PARA CIMENTACION EN TERRENO NATURAL m3 430.64 34.92 15,037.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 430.64 15037.95 100.00%04.02.02 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO m3 185.80 39.20 7,283.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 185.80 7283.36 100.00%04.02.03 ELIMINACION MANUAL DE MATERIAL DE EXCEDENTE m3 318.30 12.63 4,020.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 318.30 4020.13 100.00%04.03 OBRAS DE CONCRETO SIMPE 165,053.9204.03.01 COLOCACION DE CAMA DE HORMIGON, E=0.30M m2 418.66 35.20 14,736.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 418.66 14736.83 100.00%04.03.02 CIMIENTO CORRIDO 1:8 +30%PIEDRA GRANDE . m3 209.33 213.99 44,794.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 209.33 44794.53 100.00%04.03.03 CONSTRUCCION DE MURO DE PIEDRA CON MEZCLA 1:6 + 75%PM INC. ENBOQUILLADOm3 361.09 286.75 103,542.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 361.09 103542.56 100.00%04.03.04 JUNTAS ASFALTICAS m 225.00 8.80 1,980.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 225.00 1980.00 100.00%05 AREAS VERDES 25,385.9805.01 CORTE DE TERRENO DE FORMA MANUAL m3 178.53 40.73 7,271.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 178.53 7271.53 100.00%05.02 TIERRA DE CHACRA VEGETAL m3 178.53 49.40 8,819.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 178.53 8819.38 100.00%05.03 SEMBRADO DE GRASS AMERICANO INCLUYE SUMINISTRO Y PREPARACION m2 1,190.20 6.05 7,200.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1190.20 7200.71 100.00%05.04 SEMBRADO DE PLANTONES FICUS Y TAPADO DE HOYOS. und 62.00 33.78 2,094.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 62.00 2094.36 100.00%06 OTROS 1,361.3306.01 PINTADO Y DEMARCACION DE PAVIMENTO M 135.75 1.71 232.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 135.75 232.13 100.00%06.02 SEALIZACION VERTICAL DE TRANCITO und 4.00 282.30 1,129.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4.00 1129.20 100.00%

    COSTO DIRECTO 1,302,420.21 186,597.00 20,222.14 206,819.14 1,095,601.07

  • Municipalidad Provincial Huancabamba

    PROCESO : ADJUDICACION DIRECTA PUBLICA N 01-2014-MDP-CEP-PRIMERA CONVOCATORIA MODALIDAD DE EJECUCIN : CONTRATA - A SUMA ALZADA

    OBRA PLAZO DE EJECUCIN : 102 DAS CALENDARIOSPROPIETARIO: MUNICIPALIDAD DISTRITAL DE PAIMAS VALOR REFERENCIAL : S/. Inc/IGV.UBICACIN : CIDADAD DE PAIMAS, DISTRITO PAIMAS,PROVINCIA AYABACA, PIURA MONTO CONTRATADO : S/. Inc/IGV.CONTRATISTA: CONSORCIO GRAU FECHA BASE : 24 De Noviembre del 2014RESIDENTE : ING. MANUEL ALBERTO VINCES RENTERIA FACTOR DE RELACINSUPERVISOR : ING. VICTOR HURTADO ZAMORA

    P.U. PARCIAL(S/.) (S/.) METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL % METRADO PARCIAL %

    VALORIZACIN N 02 - CONTRATO PRINCIPAL

    PARTIDA

    1,767,384.221,767,384.22

    : MEJORAMIENTODE LA AV. GRA Y CALLE ENRIQUE LOPEZ ALBUJAR EN LA CIUDAD DE PAIMAS, DISTRITO DE PAIMAS, PROVINCIA DE AYABACA- PIURA

    Diceimbre-2014

    1.00000

    ANTERIOR ACTUALDESCRIPCIONSALDOS

    ACUMULADOUNID METRADOPRESUPUESTO BASE AVANCE

    GASTOS GENERALES (8%) 104,193.62 14,927.76 1,617.77 16,545.53 87,648.09UTILIDAD (7%) 91,169.41 13,061.79 1,415.55 14,477.34 76,692.07SUBTOTAL 1,497,783.24 214,586.55 23,255.46 237,842.01 1,259,941.23IMPUESTO IGV (18%) 269,600.98 38,625.58 4,185.98 42,811.56 226,789.42COSTO TOTAL DE OBRAS CIVILES 1,767,384.22 253,212.13 27,441.44 280,653.57 1,486,730.65TOTAL OBRAS CIVILES (% AVANCE FISICO) 1,767,384.22 253,212.13 14.33% 27,441.44 1.55% 280,653.57 15.88% 1,486,730.65 84.12%

    PRESUPUESTO TOTAL (SIN DESCUESTO DE RETENCION DEL 10% MONTO CONTRATUAL) 1,767,384.22 253,212.13 14.33% 27,441.44 1.55% 280,653.57 15.88% 1,486,730.65 84.12%

top related