presupuesto deductivo y adicional

Post on 13-May-2017

242 Views

Category:

Documents

9 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Obra

Sub Presupuesto

Cliente

Ubicación

ITEM DESCRIPCION UNIDAD METRADO

01 VEREDAS

01.01 OBRAS PRELIMINARES

01.01.01 TRAZO Y REPLANTEO m2 66.20

01.02 MOVIMIENTO DE TIERRAS

01.02.01 EXTENDIDO Y COMPACTADO DE BASE GRANULAR PARA VEREDAS, H=10CM m2 66.20

01.02.02 PERFILADO Y COMPACTADO DE VEREDAS m2 66.20

01.03 CONCRETO SIMPLE

01.03.01 ENCOFRADO Y DESENCOFRADO P/VEREDAS m2 75.45

01.03.02 VEREDA RIGIDA DE CONCRETO F'C=175 KG/CM2 E=10CM.,PASTA 1:2 m2 66.20

01.03.03 JUNTAS DE DILATACIÓN EN VEREDAS m2 37.40

02 PAVIMENTO RIGIDO

02.01 MOVIMIENTO DE TIERRAS

02.01.01 RELLENO CON MATERIAL DE PRESTAMO EN BASE DE PAVIMENTO m3 23.95

02.02 CONCRETO F´C 210 KG/CM2

02.02.01 CONCRETO FC 210 KG/CM2 PAVIMENTO RIGIDO m3 23.95

02.03 CANAL DE CONCRETO ARMADA

02.03.01 COLOCACION DE TAPAS DE FF - INSPECCION und 3.00

Obra REAHBILITACION DEL SERVICIO DE TRANSITABILIDAD PEATONAL Y VEHICULAR DEL PASAJE LA OROYA - MARIANO MELGAR

Sub Presupuesto SARDINEL TIPO BURBUJA, REDUCCION 20 cm BERMA

Cliente MINUCIPALIDAD DISTRITAL DE MARIANO MELGAR

Ubicación MARIANO MELGAR - AREQUIPA - AREQUIPA

ITEM DESCRIPCION UNIDAD METRADO

01 BERMAS

01.01 OBRAS PRELIMINARES

01.01.01 TRAZO Y REPLANTEO m2 66.20

01.02 MOVIMIENTO DE TIERRAS

01.02.01 EXTENDIDO Y COMPACTADO DE BASE GRANULAR PARA VEREDAS, H=10CM m2 66.20

01.02.02 PERFILADO Y COMPACTADO DE VEREDAS m2 66.20

01.03 CONCRETO SIMPLE

01.03.01 BERMA RIGIDA DE CONCRETO F'C=175 KG/CM2 E=10CM.,PASTA 1:2 m2 66.20

02 SARDINEL TIPO BURBUJA

02.01 MOVIMIENTO DE TIERRAS

02.01.01 EXCAVACION DE ESTRUCTURAS m 349.37

02.01.02 ELIMINACION DE MATERIAL CON EQUIPO m3 16.77

02.02 CONCRETO SIMPLE

02.02.01 SARDINEL SUMERGIDO TIPO BURBUJA INV ENCOFRADO DE F'c = 175 Kg/cm2 m 349.37

02.03 OTROS

02.03.01 JUNTAS DE DILATACIÓN C/3M (UND) und 114.00

02.03.02 PINTURA EN SARDINELES TIPO BURBUJA m 349.37

ITEM DESCRIPCION UNIDAD P.U.

01 VEREDAS

01.01 OBRAS PRELIMINARES

01.01.01 TRAZO Y REPLANTEO m2 1.65

01.02 MOVIMIENTO DE TIERRAS

01.02.01 EXTENDIDO Y COMPACTADO DE BASE GRANULAR PARA VEREDAS, H=10CM m2 6.89

01.02.02 PERFILADO Y COMPACTADO DE VEREDAS m2 6.88

01.03 CONCRETO SIMPLE

01.03.01 ENCOFRADO Y DESENCOFRADO P/VEREDAS m2 37.35

01.03.02 VEREDA RIGIDA DE CONCRETO F'C=175 KG/CM2 E=10CM.,PASTA 1:2 m2 41.75

01.03.03 JUNTAS DE DILATACIÓN EN VEREDAS m2 5.73

PRESUPUESTO ADICIONAL N° 01

REAHBILITACION DEL SERVICIO DE TRANSITABILIDAD PEATONAL Y VEHICULAR DEL PASAJE LA OROYA - MARIANO MELGAR

20 CM DE VEDERA ADICIONAL, PAVIMENTO, TAPAS DE INSPECCION

MINUCIPALIDAD DISTRITAL DE MARIANO MELGAR

MARIANO MELGAR - AREQUIPA - AREQUIPA

CUADRO COMPARATIVO ADICIONAL Y DEDUCTIVO VINCULANTE

COSTO DIRECTO

GASTOS GENERALES

COSTO DIRECTO

GASTOS GENERALES

TOTAL PRESUPUESTO

TOTAL PRESUPUESTO

PRESUPUESTO DEDUCTIVO N° 01

02 PAVIMENTO RIGIDO

02.01 MOVIMIENTO DE TIERRAS

02.01.01 RELLENO CON MATERIAL DE PRESTAMO EN BASE DE PAVIMENTO m3 58.05

02.02 CONCRETO F´C 210 KG/CM2

02.02.01 CONCRETO FC 210 KG/CM2 PAVIMENTO RIGIDO m3 374.67

02.03 CANAL DE CONCRETO ARMADA

02.03.01 COLOCACION DE TAPAS DE FF - INSPECCION und 215.05

03 BERMAS

03.01 OBRAS PRELIMINARES

03.01.01 TRAZO Y REPLANTEO m2 1.65

03.02 MOVIMIENTO DE TIERRAS

03.02.01 EXTENDIDO Y COMPACTADO DE BASE GRANULAR PARA VEREDAS, H=10CM m2 7.18

03.02.02 PERFILADO Y COMPACTADO DE VEREDAS m2 21.50

03.03 CONCRETO SIMPLE

03.03.01 BERMA RIGIDA DE CONCRETO F'C=175 KG/CM2 E=10CM.,PASTA 1:2 m2 34.78

04 SARDINEL TIPO BURBUJA

04.01 MOVIMIENTO DE TIERRAS

04.01.01 EXCAVACION DE ESTRUCTURAS m 1.57

04.01.02 ELIMINACION DE MATERIAL CON EQUIPO m3 19.41

04.02 CONCRETO SIMPLE

04.02.01 SARDINEL SUMERGIDO TIPO BURBUJA INV ENCOFRADO DE F'c = 175 Kg/cm2 m 19.16

04.03 OTROS

04.03.01 JUNTAS DE DILATACIÓN C/3M (UND) und 5.58

04.03.02 PINTURA EN SARDINELES TIPO BURBUJA m 4.41

TOTAL PRESUPUESTO

COSTO DIRECTO

GASTOS GENERALES

PRECIO PARCIAL

1.65 109.23

6.89 456.12

6.88 455.46

37.35 2,818.06

41.75 2,763.85

5.73 214.30

58.05 1,390.30

374.67 8,973.35

215.05 645.15

17,825.81

891.29

18,717.10

REAHBILITACION DEL SERVICIO DE TRANSITABILIDAD PEATONAL Y VEHICULAR DEL PASAJE LA OROYA - MARIANO MELGAR

PRECIO PARCIAL

1.65 109.23

7.18 475.32

21.50 1,423.30

34.78 2,302.44

1.57 548.51

19.41 325.51

19.16 6,693.93

5.58 636.12

4.41 1,540.72

14,055.07

702.75

14,757.82

66.20 109.23 109.23

66.20 456.12 456.12

66.20 455.46 455.46

75.45 - -

66.20 2,763.85 2,763.85

37.40 214.30 214.30

PRESUPUESTO ADICIONAL N° 01

REAHBILITACION DEL SERVICIO DE TRANSITABILIDAD PEATONAL Y VEHICULAR DEL PASAJE LA OROYA - MARIANO MELGAR

20 CM DE VEDERA ADICIONAL, PAVIMENTO, TAPAS DE INSPECCION

MINUCIPALIDAD DISTRITAL DE MARIANO MELGAR

MARIANO MELGAR - AREQUIPA - AREQUIPA

PARCIAL

PARCIAL

CUADRO COMPARATIVO ADICIONAL Y DEDUCTIVO VINCULANTE

COSTO DIRECTO

GASTOS GENERALES

COSTO DIRECTO

GASTOS GENERALES

TOTAL PRESUPUESTO

TOTAL PRESUPUESTO

PRESUPUESTO DEDUCTIVO N° 01

METRADOS

ADICIONAL

DEDUCTIVO

VINCULANTE ADICIONAL DEDUCTIVO

153.86

23.95 1,390.30 1,390.30

23.95 8,973.35 8,973.35

3.00 645.15 645.15

66.20 -109.23 -109.23

66.20 -475.32 -475.32

66.20 -1,423.30 -1,423.30

66.20 -2,302.44 -2,302.44

349.37 -548.51 -548.51

16.77 -325.51 -325.51

349.37 -6,693.93 -6,693.93

114.00 -636.12 -636.12

349.37 -1,540.72 -1,540.72

952.68

47.63

1,000.31 TOTAL PRESUPUESTO

COSTO DIRECTO

GASTOS GENERALES

METRADOS

ITEM DESCRIPCION

01 VEREDAS

01.01 OBRAS PRELIMINARES

01.01.01 TRAZO Y REPLANTEO

CANT. LONGITUD ANCHO

(MT) (MT)

CUADRA 01 - AREA = -

- AREA = -

1.00 AREA = 1.94

CUADRA 02 1.00 AREA =

1.00 AREA = 12.08

CUADRA 03 1.00 AREA = 10.31

- AREA = -

CALLE ROSASPATA 1.00 AREA = 11.12

- AREA = -

CUADRA 04 - AREA = -

01.01.03 MOVIMIENTO DE TIERRAS

CANT. LONGITUD ANCHO

(MT) (MT)

CUADRA 01 - AREA = -

- AREA = -

1.00 AREA = 1.94

CUADRA 02 1.00 AREA =

1.00 AREA = 12.08

CALLES/PASAJES

LADO IZQUIERDO A1

CALLES/PASAJES

LADO IZQUIERDO A1

AREA VEREDAS

CUADRA 03 1.00 AREA = 10.31

1.00 AREA = -

CALLE ROSASPATA 1.00 AREA = 11.12

- AREA = -

CUADRA 04 - AREA = -

01.01.03.02 PERFILADO Y COMPACTADO DE VEREDAS

CANT. LONGITUD ANCHO

(MT) (MT)

CUADRA 01 - AREA = -

- AREA = -

1.00 AREA = 1.94

CUADRA 02 1.00 AREA =

1.00 AREA = 12.08

CUADRA 03 1.00 AREA = 10.31

1.00 AREA = -

CALLE ROSASPATA 1.00 AREA = 11.12

- AREA = -

CUADRA 04 - AREA = -

CONCRETO SIMPLE

VEREDAS

ENCOFRADO Y DESENCOFRADO P/VEREDAS

CALLES/PASAJES

CANT.

CUADRA 01

AREA VEREDAS

AREA VEREDAS

CALLES/PASAJES

LADO IZQUIERDO A1

CUADRA 02

CUADRA 03

CALLE ROSASPATA

CUADRA 04

01.01.04.01.02 VEREDA RIGIDA DE CONCRETO F'C=175 KG/CM2 E=10CM.,PASTA 1:2

CANT. LONGITUD ANCHO

(MT) (MT)

CUADRA 01 - AREA = -

- AREA = -

1.00 AREA = 1.94

CUADRA 02 1.00 AREA =

1.00 AREA = 12.08

CUADRA 03 1.00 AREA = 10.31

1.00 AREA = -

CALLE ROSASPATA 1.00 AREA = 11.12

- AREA = -

CUADRA 04 - AREA = -

01.01.04.01.03 JUNTAS DE DILATACIÓN EN VEREDAS

CALLES/PASAJES IZQ IZQ. L. JUNTA

AREA VEREDAS

TOTAL (m2)

CALLES/PASAJES

LADO IZQUIERDO A1

LONGITUD CANT. ASFALTICA

L

CUADRA 01 8.88 3.00 0.20

16.43 6.00 0.20

17.12 6.00 0.20

8.02 3.00 0.20

CUADRA 02 27.67 9.00 0.20

7.60 3.00 0.20

0.52 1.00 0.20

18.05 6.00 0.20

CUADRA 03 12.26 4.00 0.20

21.87 7.00 0.20

31.28 10.00 0.20

CALLE ROSASPATA 29.22 10.00 0.20

19.84 7.00 0.20

CUADRA 04 8.45 3.00 0.20

19.92 7.00 0.20

29.86 10.00 0.20

TOTAL (m)

02.06

02.06.01 RELLENO CON MATERIAL DE PRESTAMO EN BASE DE PAVIMENTO

CUADRA 05 - Area - -

- Area - -

CUADRA 04 1.00 Area 52.95 0.20

1.00 Area 16.13 0.20

CUADRA 03 1.00 Area -

1.00 Area -

CUADRA 02 1.00 Area 22.99 0.20

1.00 Area 27.70 0.20

CUADRA 01 1.00 Area -

1.00 Area -

1.00 Area -

1.00 Area -

PAVIMENTO RIGIDO DE CONCRETO

LONGITUD ANCHO TOTAL

(MT) (MT) A1 + A2

AREA = - -

AREA = - -

AREA = 0.43 2.37

AREA = 9.03 9.03

AREA = 2.65 14.73

AREA = 13.98 24.29

AREA = -

AREA = 4.66 15.78

AREA = - - EXTENDIDO Y COMPACTADO DE BASE GRANULAR PARA VEREDAS, H=10CM

AREA = - - CANT.

CUADRA 01 -

-

1.00

CUADRA 02 1.00

LONGITUD ANCHO TOTAL 1.00

(MT) (MT) A1 + A2

CUADRA 03 1.00

1.00

AREA = - -

AREA = - - CALLE ROSASPATA 1.00

AREA = 0.43 2.37 -

AREA = 9.03 9.03 CUADRA 04 -

AREA = 2.65 14.73

CALLES/PASAJES

AREA VEREDAS

LADO DERECHO A2

LADO DERECHO A2

AREA VEREDAS 66.20

AREA = 13.98 24.29

AREA = -

AREA = 4.66 15.78

AREA = - -

AREA = - -

LONGITUD ANCHO TOTAL

(MT) (MT) A1 + A2

AREA = - -

AREA = - -

AREA = 0.43 2.37

AREA = 9.03 9.03

AREA = 2.65 14.73

AREA = 13.98 24.29

AREA = -

AREA = 4.66 15.78

AREA = - -

AREA = - -

LADO IZQUIERDO A1= L x aLADO DERECHO A2= L x a AREA =

A1+A2

LONGITUD ALTO LONGITUD ALTO

(MT) (MT) (MT) (MT)

408.00 0.10 5.15 0.10 41.32

8.02 0.10 11.18 0.10 1.92

- 0.10 -

- 0.10 -

AREA VEREDAS

AREA VEREDAS 66.20

AREA VEREDAS 66.20

LADO DERECHO A2

27.67 0.10 14.75 0.10 4.24

7.60 0.10 5.79 0.10 1.34

0.52 0.10 22.23 0.10 2.28

18.05 0.10 13.23 0.10 3.13

12.26 0.10 5.42 0.10 1.77

21.87 0.10 23.76 0.10 4.56

31.28 0.10 13.49 0.10 4.48

9.53 0.10 0.95

18.01 0.10 1.80

29.22 0.10 21.22 0.10 5.04

19.84 0.10 6.44 0.10 2.63

- 0.10 - 0.10 -

- 0.10 - 0.10 -

- 0.10 - 0.10 -

75.45

LONGITUD ANCHO TOTAL

(MT) (MT) A1 + A2

AREA = - -

AREA = - -

AREA = 0.43 2.37

AREA = 9.03 9.03

AREA = 2.65 14.73

AREA = 13.98 24.29

AREA = -

AREA = 4.66 15.78

AREA = - -

AREA = - -

DER DER. L. JUNTA TOTAL

AREA VEREDAS 66.20

TOTAL (m2)

LADO DERECHO A2

LONGITUD CANT. ASFALTICA LI + LD

L

35.62 12.00 0.20 3.00

11.18 4.00 0.20 2.00

1.20

0.60

14.75 5.00 0.20 2.80

5.79 2.00 0.20 1.00

22.23 8.00 0.20 1.80

13.23 5.00 0.20 2.20

5.42 2.00 0.20 1.20

23.76 8.00 0.20 3.00

13.49 5.00 0.20 3.00

9.53 3.00 0.20 0.60

18.01 6.00 0.20 1.20

21.22 7.00 0.20 3.40

6.44 2.00 0.20 1.80

33.83 11.00 0.20 2.80

29.81 10.00 0.20 3.40

6.72 2.00 0.20 2.40

RELLENO CON MATERIAL DE PRESTAMO EN BASE DE PAVIMENTO 23.95 m3

-

-

10.59 POR ANCHO DE CALZADA

3.23

-

-

4.60 POR TUBERIA

5.54

-

-

-

-

37.40

EXTENDIDO Y COMPACTADO DE BASE GRANULAR PARA VEREDAS, H=10CM 66.20

LONGITUD ANCHO LONGITUD ANCHO TOTAL

(MT) (MT) (MT) (MT) A1 + A2

AREA = - AREA = - -

AREA = - AREA = - -

AREA = 1.94 AREA = 0.43 2.37

AREA = AREA = 9.03 9.03

AREA = 12.08 AREA = 2.65 14.73

AREA = 10.31 AREA = 13.98 24.29

AREA = - AREA = -

AREA = 11.12 AREA = 4.66 15.78

AREA = - AREA = - -

AREA = - AREA = - -

66.20

LADO IZQUIERDO A1 LADO DERECHO A2

AREA VEREDAS

66.20 AREA VEREDAS

BERMAS

OBRAS PRELIMINARES

TRAZO Y REPLANTEO

CANT. LONGITUD ANCHO LONGITUD ANCHO

(MT) (MT) (MT) (MT)

CUADRA 01

CUADRA 02 - AREA = - AREA = -

- AREA = - AREA = -

1.00 AREA = 1.94 AREA = 0.43

CUADRA 03 1.00 AREA = AREA = 9.03

1.00 AREA = 12.08 AREA = 2.65

1.00 AREA = 10.31 AREA = 13.98

1.00 AREA = - AREA =

CALLE ROSASPATA 1.00 AREA = 11.12 AREA = 4.66

- AREA = - AREA = -

- AREA = - AREA = -

MOVIMIENTO DE TIERRAS

EXTENDIDO Y COMPACTADO DE BASE GRANULAR PARA VEREDAS, H=10CM

CALLES/PASAJES LADO IZQUIERDO A1 LADO DERECHO A2

CANT. LONGITUD ANCHO LONGITUD ANCHO

(MT) (MT) (MT) (MT)

CUADRA 01 - AREA = - AREA = -

- AREA = - AREA = -

1.00 AREA = 1.94 AREA = 0.43

CUADRA 02 1.00 AREA = AREA = 9.03

1.00 AREA = 12.08 AREA = 2.65

CUADRA 03 1.00 AREA = 10.31 AREA = 13.98

1.00 AREA = - AREA =

CALLE ROSASPATA 1.00 AREA = 11.12 AREA = 4.66

- AREA = - AREA = -

CALLES/PASAJES

LADO IZQUIERDO A1 LADO DERECHO A2

TOTAL M2

CUADRA 04 - AREA = - AREA = -

AREA VEREDAS

MOVIMIENTO DE TIERRAS

PERFILADO Y COMPACTADO DE VEREDAS

CANT. LONGITUD ANCHO LONGITUD ANCHO

(MT) (MT) (MT) (MT)

CUADRA 01 - AREA = - AREA = -

- AREA = - AREA = -

1.00 AREA = 1.94 AREA = 0.43

CUADRA 02 1.00 AREA = AREA = 9.03

1.00 AREA = 12.08 AREA = 2.65

CUADRA 03 1.00 AREA = 10.31 AREA = 13.98

1.00 AREA = - AREA =

CALLE ROSASPATA 1.00 AREA = 11.12 AREA = 4.66

- AREA = - AREA = -

CUADRA 04 - AREA = - AREA = -

EXTENDIDO Y COMPACTADO DE BASE GRANULAR PARA BERMAS, H=10CM

CANT. LONGITUD ANCHO LONGITUD ANCHO

(MT) (MT) (MT) (MT)

CUADRA 01 - AREA = - AREA = -

- AREA = - AREA = -

1.00 AREA = 1.94 AREA = 0.43

CUADRA 02 1.00 AREA = AREA = 9.03

1.00 AREA = 12.08 AREA = 2.65

CUADRA 03 1.00 AREA = 10.31 AREA = 13.98

1.00 AREA = - AREA =

CALLES/PASAJES

LADO IZQUIERDO A1 LADO DERECHO A2

CALLES/PASAJES

LADO IZQUIERDO A1 LADO DERECHO A2

AREA VEREDAS

CALLE ROSASPATA 1.00 AREA = 11.12 AREA = 4.66

- AREA = - AREA = -

CUADRA 04 - AREA = - AREA = -

CONCRETO SIMPLE

BERMA RIGIDA DE CONCRETO F'C=175 KG/CM2 E=10CM.,PASTA 1:2

CANT. LONGITUD ANCHO LONGITUD ANCHO

(MT) (MT) (MT) (MT)

CUADRA 01 - AREA = - AREA = -

1.00 AREA = 1.94 AREA = 0.43

CUADRA 02 1.00 AREA = - AREA = -

1.00 AREA = - AREA = 9.03

1.00 AREA = 12.08 AREA = 2.65

CUADRA 03 1.00 AREA = 10.31 AREA = 13.98

1.00 AREA = AREA = -

2.00 AREA = -

1.00 AREA = -

CALLE ROSASPATA 1.00 AREA = 11.12 AREA = 4.66

1.00 AREA = - AREA = -

01.03.02 SARDINEL TIPO BURBUJA

01.03.02.01 MOVIMIENTO DE TIERRAS

01.03.02.01.01 EXCAVACION DE ESTRUCTURAS

CANT. LONGITUD ANCHO LONGITUD

(MT) (MT) (MT)

CUADRA 01 1.00 4.09 5.16

1.00 13.19 15.16

CUADRA 02 1.00 27.66 14.74

1.00 8.23 22.27

1.00 18.37 0.81

AREA VEREDAS

CALLES/PASAJES

LADO IZQUIERDO A1 LADO DERECHO A2

AREA VEREDAS

CALLES/PASAJES

LADO IZQUIERDO A1 LADO DERECHO A2

13.23

CUADRA 03 1.00 63.51 20.67

1.00 18.32

1.00 3.93

1.00 3.93

1.00 15.25

CALLE ROSASPATA 1.00 15.64 5.53

1.00 27.53 17.80

14.35

01.03.02.01.02 ELIMINACION DE MATERIAL CON EQUIPO

PROVENIENTE DE VOLUMEN ESPONJAMIENTOVOLUMEN

(CORTE - RELLENO) (%) (MT3)

Excavacion manual a nivel de subrasante

13.97 1.20 16.77

TOTAL (m3) 16.77

01.03.02.02 CONCRETO SIMPLE

01.03.02.02.01 SARDINEL SUMERGIDO TIPO BURBUJA INV ENCOFRADO DE F'c = 175 Kg/cm2

CANT. LONGITUD ANCHO LONGITUD

(MT) (MT) (MT)

CUADRA 01 1.00 4.09 5.16

1.00 13.19 15.16

CUADRA 02 1.00 27.66 14.74

1.00 8.23 22.27

1.00 18.37 0.81

13.23

CUADRA 03 1.00 63.51 20.67

1.00 18.32

TOTAL M

CALLES/PASAJES

LADO IZQUIERDO A1 LADO DERECHO A2

1.00 3.93

1.00 3.93

1.00 15.25

CALLE ROSASPATA 1.00 15.64 5.53

1.00 27.53 17.80

14.35

01.03.02.02.02 JUNTAS DE DILATACIÓN C/3M (UND)

CANT. LONGITUD JUNTAS LONGITUD

(MT) (UND) (MT)

CUADRA 01 1.00 4.09 1.00 5.16

1.00 13.19 4.00 15.16

CUADRA 02 1.00 27.66 9.00 14.74

1.00 8.23 3.00 22.27

1.00 18.37 6.00 0.81

13.23

CUADRA 03 1.00 63.51 21.00 20.67

1.00 18.32

1.00 3.93

1.00 3.93

1.00 15.25

CALLE ROSASPATA 1.00 15.64 5.00 5.53

1.00 27.53 9.00 17.80

14.35

01.03.02.02.03 PINTURA EN SARDINELES TIPO BURBUJA

CANT. LONGITUD ANCHO LONGITUD

(MT) (MT) (MT)

TOTAL M

CALLES/PASAJES

LADO IZQUIERDO A1 LADO DERECHO A2

UND

CALLES/PASAJES

LADO IZQUIERDO A1 LADO DERECHO A2

CUADRA 01 1.00 4.09 5.16

1.00 13.19 15.16

CUADRA 02 1.00 27.66 14.74

1.00 8.23 22.27

1.00 18.37 0.81

13.23

CUADRA 03 1.00 63.51 20.67

1.00 18.32

1.00 3.93

1.00 3.93

1.00 15.25

CALLE ROSASPATA 1.00 15.64 5.53

1.00 27.53 17.80

14.35

TOTAL M

66.20

TOTAL

A1 + A2

-

-

2.37

9.03

14.73

24.29

-

15.78

-

-

66.20

TOTAL

A1 + A2

-

-

2.37

9.03

14.73

24.29

-

15.78

-

66.20

-

66.20

TOTAL

A1 + A2

-

-

2.37

9.03

14.73

24.29

-

15.78

-

-

TOTAL

A1 + A2

-

-

2.37

9.03

14.73

24.29

-

66.20

15.78

-

-

66.20

TOTAL

A1 + A2

-

2.37

-

-

9.03

14.73

24.29

-

-

-

15.78

-

349.37 m

ANCHO TOTAL

(MT) L1 + L2

9.25

28.35

42.40

30.50

19.18

66.20

66.20

LADO DERECHO A2

13.23

84.18

18.32

3.93

3.93

15.25

21.17

45.33

14.35

16.77 m3

SARDINEL SUMERGIDO TIPO BURBUJA INV ENCOFRADO DE F'c = 175 Kg/cm2 349.37 m

ANCHO TOTAL

(MT) A1 + A2

9.25

28.35

42.40

30.50

19.18

13.23

84.18

18.32

TOTAL M 349.37

LADO DERECHO A2

3.93

3.93

15.25

21.17

45.33

14.35

114.00 und

JUNTAS TOTAL

(UND) A1 + A2

2.00 3.00

5.00 9.00

5.00 14.00

7.00 10.00

- 6.00

4.00 4.00

7.00 28.00

6.00 6.00

1.00 1.00

1.00 1.00

5.00 5.00

2.00 7.00

6.00 15.00

5.00 5.00

349.37 m

ANCHO TOTAL

(MT) A1 + A2

TOTAL M 349.37

LADO DERECHO A2

UND 114.00

LADO DERECHO A2

9.25

28.35

42.40

30.50

19.18

13.23

84.18

18.32

3.93

3.93

15.25

21.17

45.33

14.35

TOTAL M 349.37

top related