copia de valorizacion cerco rumiallana 03 regenerado miercoles

Post on 25-Nov-2015

16 Views

Category:

Documents

7 Downloads

Preview:

Click to see full reader

TRANSCRIPT

VAL 01NOMBRE DEL PROYECTOCERCO PERIMETRICO SECTOR PARGASHA - MARIATEGUI - RUMIALLANA - TRAMO 5N VALORIZACIN03PERIODO DE VALORIZACINCENTRO DE COSTOS PEPMonto Original S/.:23,028.28N ORDEN DE TRABAJOMonto Adicionales S/.:0CONTRATISTAECOSEM TINGO PALCA R.L.Monto Actual S/.:10,706.17RUC20489454654No Adicionales:0TEMDESCRIPCINPRESUPUESTO CONTRACTUALVAL ACUM. ANTERIORVALORIZACION ACTUALVALORIZACION ACUMULADASALDO A VALORIZARUNDCANT.COSTO UNITARIO US $COSTO TOTAL US $CANT.COSTO TOTAL US $CANT.COSTO TOTAL US $% AVANCECANT.COSTO TOTAL US $% AVANCECANT.COSTO TOTAL US $PRESUPUESTO CONTRATADO1.00OBRAS PROVISIONALES602.68273.890.0273.890.0328.791.01CASETA P/GUARDIANIA Y/0 ALAMACENmes1.17115.38135.000.8092.3068%0.8092.3068%0.3742.701.02BAO PORTATIL TIPO DYSALmes1.17153.85180.000.80123.0868%0.80123.0868%0.3756.921.03CERCO DE MALLA PVC DE 1 M ALTURA PARA LIMITE DE SEGURIDAD DE OBRAm251.001.15287.6851.0558.5120%51.0558.5120%199.95229.172.00TRABAJOS PRELIMINARES1,765.1069.350.069.350.01,695.752.01RELLENO COMPACTADO A MANO CON MATERIAL TIPO CALIZAm311.6860.88711.040.00%0.00.00%11.68711.042.02ELIMINACION DE AGUA DE ZONA DE TRABAJO CON MOTOBOMBAm3151.824.15629.750.00%0.00.00%151.82629.752.03LIMPIEZA DE TERRENO MANUALm2105.410.6467.710.00%0.00.00%105.4167.712.04TRAZO NIVELES Y REPLANTEO PRELIMINARm2105.003.40356.6020.4269.3519%20.4269.3519%84.58287.253.00MOVIMIENTO DE TIERRAS1,294.06128.5510%0.0128.550.01,165.513.01EXCAVACION DE ZANJAS PARA CIMENTACION CORRIDAm314.7912.85190.118.06103.6054%8.06103.6054%6.7386.513.02CORTE EN TERRENO ROCOSO SIN EMPLEO DE EXPLOSIVOS, CIMIENTOS CORRIDOSm311.2053.08594.550.4724.954%0.4724.954%10.73569.6016091.853.03ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)m318.4927.55509.400.00%0.00.00%18.49509.403.04EXCAVACION DE MATERIAL DE DESMONTE CON MAQUINARIA0.00%0.00.0100%4.00OBRAS DE CONCRETO SIMPLE3,683.752,536.6969%0.02,536.690.01,147.0624029.54.01SOLADOS 1:12 E=4"m24.227.5431.820.100.752%0.100.752%4.1231.074.02CIMIENTOS CORRIDOS (Mezcla 1:10 + 30% P.G.)m329.5164.351,898.9710.66685.9736%10.66685.9736%18.851,213.004.03ENCOFRADO Y DESENCOFRADO NORMAL PARA CIMIENTOS CORRIDOSm26.8916.41113.0864.681,061.59939%64.681,061.59939%(57.79)(948.51)4.04CONCRETO EN SOBRECIMIENTO CORRIDO A=0.15M. MEZCLA 1:8 CEMENTO HORMIGON + 25% PIEDRA tvm36.3295.23601.853.00285.6947%3.00285.6947%3.32316.164.05ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOSm263.2516.411,038.0330.63502.6948%30.63502.6948%32.62535.344.06ENCOFRADO Y DESENCOFRADO NORMAL PARA SOLADOS0.00%0.00.0100%5.00OBRAS DE CONCRETO ARMADO6,536.534,731.4872%0.04,731.480.01,805.055.01COLUMNAS05.01.01CONCRETO EN COLUMNAS fc=210 kg/cm2m32.91162.29472.269.651,566.10332%9.651,566.10332%(6.74)(1,093.84)05.01.02ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNASm2119.2819.842,366.3365.001,289.5054%65.001,289.5054%54.281,076.8305.01.03ACERO EN COLUMNAS Fy=4200 KG/CM2kg621.882.661,655.16547.561,457.3588%547.561,457.3588%74.32197.815.02VIGAS05.02.01CONCRETO EN VIGA DE MURO fc=210 kg/cm2m32.91162.29472.260.00%0.00.00%2.91472.2605.02.02ENCOFRADO Y DESENCOFRADO EN VIGASm229.1022.12643.670.00%0.00.00%29.10643.6705.02.03ACERO EN VIGASkg360.752.57926.85162.90418.5345%162.90418.5345%197.85508.326.00ALBANILERIA5,776.101,569.7527%0.01,569.750.04,206.356.01MURO DE BLOQUE DE CONCRETO VIBRADO E=20 cm MEZCLA 1:5 (CEMENTO:ARENA)m2261.9317.944,699.0287.501,569.7533%87.501,569.7533%174.433,129.276.02TARRAJEO DE VIGAS Y COLUMNAS INCLUYE ARISTASm2100.8510.681,077.080.00%0.00.00%100.851,077.087.00CARPINTERIA METALICA77.900.000%0.00.000.077.907.01ALAMBRE DE PUES PROTECCIN DE CERCO PERIMETRICOm332.040.2377.900.00%0.00.00%332.0477.908.00VARIOS288.460.000.00.000.0288.468.01LIMPIEZA FINAL DE OBRAm21.00288.46288.460.00%0.00.00%1.00288.468.02TUBERA PVC SAP 1/2", PASE ALAMBRES DE SEGURIDAD0.00%8.03JUNTAS DE DILATACIN DE TECKNOPORT E=1", EN COLUMNAS0.00%TOTAL COSTO DIRECTO:20,024.589,309.7146%9,309.7146%10,714.87GASTOS GENERALESX%10.00%2,002.46930.97930.971,071.49UTILIDADY%5.00%1,001.23465.49465.49535.74TOTAL $.:23,028.280.010,706.1710,706.1812,322.10CONTRATISTASUPERVISORORIGINADORSUPERINTENDENTE DE PROYECTOS23,028.28FECHA:FECHAFECHAFECHA

VAL02NOMBRE DEL PROYECTOCERCO PERIMETRICO SECTOR PARGASHA - MARIATEGUI - RUMIALLANA - TRAMO 5N VALORIZACIN03PERIODO DE VALORIZACINCENTRO DE COSTOS PEPMonto Original S/.:23,028.28N ORDEN DE TRABAJOMonto Adicionales S/.:0CONTRATISTAECOSEM TINGO PALCA R.L.Monto Actual S/.:2,214.42RUC20489454654No Adicionales:0TEMDESCRIPCINPRESUPUESTO CONTRACTUALVAL ACUM. ANTERIORVALORIZACION ACTUALVALORIZACION ACUMULADASALDO A VALORIZARUNDCANT.COSTO UNITARIO US $COSTO TOTAL US $CANT.COSTO TOTAL US $CANT.COSTO TOTAL US $% AVANCECANT.COSTO TOTAL US $% AVANCECANT.COSTO TOTAL US $PRESUPUESTO CONTRATADO1.00OBRAS PROVISIONALES602.68273.8953.850.0327.740.0274.941.01CASETA P/GUARDIANIA Y/0 ALAMACENmes1.17115.38135.000.8092.300.2023.0817%1.00115.3885%0.1719.62115.381.02BAO PORTATIL TIPO DYSALmes1.17153.85180.000.80123.080.2030.7717%1.00153.8585%0.1726.151.03CERCO DE MALLA PVC DE 1 M ALTURA PARA LIMITE DE SEGURIDAD DE OBRAm251.001.15287.6851.0558.510.00%51.0558.5120%199.95229.172.00TRABAJOS PRELIMINARES1,765.1069.350.000.069.350.01,695.752.01RELLENO COMPACTADO A MANO CON MATERIAL TIPO CALIZAm311.6860.88711.040.00.00%0.00.00%11.68711.042.02ELIMINACION DE AGUA DE ZONA DE TRABAJO CON MOTOBOMBAm3151.824.15629.750.00.00%0.00.00%151.82629.752.03LIMPIEZA DE TERRENO MANUALm2105.410.6467.710.00.00%0.00.00%105.4167.712.04TRAZO NIVELES Y REPLANTEO PRELIMINARm2105.003.40356.6020.4269.350.00%20.4269.3519%84.58287.253.00MOVIMIENTO DE TIERRAS1,294.06128.550.000%0.0128.550.01,165.513.01EXCAVACION DE ZANJAS PARA CIMENTACION CORRIDAm314.7912.85190.118.06103.600.00%8.06103.6054%6.7386.513.02CORTE EN TERRENO ROCOSO SIN EMPLEO DE EXPLOSIVOS, CIMIENTOS CORRIDOSm311.2053.08594.550.4724.950.00%0.4724.954%10.73569.6016091.853.03ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)m318.4927.55509.400.00.00%0.00.00%18.49509.404.00OBRAS DE CONCRETO SIMPLE3,683.752,536.6919.751%0.02,556.440.01,127.3124029.54.01SOLADOS 1:12 E=4"m24.227.5431.820.100.752.6219.7562%2.7220.5064%1.5011.324.02CIMIENTOS CORRIDOS (Mezcla 1:10 + 30% P.G.)m329.5164.351,898.9710.66685.970.00%10.66685.9736%18.851,213.004.03ENCOFRADO Y DESENCOFRADO NORMAL PARA CIMIENTOS CORRIDOSm26.8916.41113.0864.681,061.590.00%64.681,061.59939%(57.79)(948.51)4.04CONCRETO EN SOBRECIMIENTO CORRIDO A=0.15M. MEZCLA 1:8 CEMENTO HORMIGON + 25% PIEDRA tvm36.3295.23601.853.00285.690.00%3.00285.6947%3.32316.164.05ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOSm263.2516.411,038.0330.63502.690.00%30.63502.6948%32.62535.345.00OBRAS DE CONCRETO ARMADO6,536.534,731.48541.228%0.05,272.700.01,263.835.01COLUMNAS05.01.01CONCRETO EN COLUMNAS fc=210 kg/cm2m32.91162.29472.269.651,566.100.00%9.651,566.10332%(6.74)(1,093.84)05.01.02ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNASm2119.2819.842,366.3365.001,289.500.00%65.001,289.5054%54.281,076.8305.01.03ACERO EN COLUMNAS Fy=4200 KG/CM2kg621.882.661,655.16547.561,457.350.00%547.561,457.3588%74.32197.815.02VIGAS0.005.02.01CONCRETO EN VIGA DE MURO fc=210 kg/cm2m32.91162.29472.260.01.35219.0946%1.35219.0946%1.56253.1705.02.02ENCOFRADO Y DESENCOFRADO EN VIGASm229.1022.12643.670.012.90285.3444%12.90285.3444%16.20358.3305.02.03ACERO EN VIGASkg360.752.57926.85162.90418.5314.3236.794%177.22455.3249%183.53471.536.00ALBANILERIA5,776.101,569.75984.5717%0.02,554.320.03,221.786.01MURO DE BLOQUE DE CONCRETO VIBRADO E=20 cm MEZCLA 1:5 (CEMENTO:ARENA)m2261.9317.944,699.0287.501,569.7536.70658.4014%124.202,228.1547%137.732,470.876.02TARRAJEO DE VIGAS Y COLUMNAS INCLUYE ARISTASm2100.8510.681,077.080.030.54326.1730%30.54326.1730%70.31750.917.00CARPINTERIA METALICA77.900.0037.7348%0.037.730.040.177.01ALAMBRE DE PUES PROTECCIN DE CERCO PERIMETRICOm332.040.2377.900.0160.8137.7348%160.8137.7348%171.2340.178.00VARIOS288.460.00288.460.0288.460.00.08.01LIMPIEZA FINAL DE OBRAm21.00288.46288.460.01.00288.46100%1.00288.46100%0.00.0TOTAL COSTO DIRECTO:20,024.589,309.711,925.5810%11,235.2956%8,789.29GASTOS GENERALESX%10.00%2,002.46930.97192.561,123.53878.93UTILIDADY%5.00%1,001.23465.4996.28561.76439.46TOTAL $.:23,028.2810,706.172,214.4212,920.5910,107.68CONTRATISTASUPERVISORORIGINADORSUPERINTENDENTE DE PROYECTOS23,028.27FECHA:FECHAFECHAFECHA

Valorizacin 03NOMBRE DEL PROYECTOCERCO PERIMETRICO SECTOR PARGASHA - MARIATEGUI - RUMIALLANA - TRAMO 5N VALORIZACIN03PERIODO DE VALORIZACINCENTRO DE COSTOS PEPMonto Original S/.:23,028.28N ORDEN DE TRABAJOMonto Adicionales S/.:0CONTRATISTAECOSEM TINGO PALCA R.L.Monto Actual S/.:10,107.59RUC20489454654No Adicionales:0TEMDESCRIPCINPRESUPUESTO CONTRACTUALVAL ACUM. ANTERIORVALORIZACION ACTUALVALORIZACION ACUMULADASALDO A VALORIZARUNDCANT.COSTO UNITARIO US $COSTO TOTAL US $CANT.COSTO TOTAL US $CANT.COSTO TOTAL US $% AVANCEN PROTOCOLOCANT.COSTO TOTAL US $% AVANCECANT.COSTO TOTAL US $PRESUPUESTO CONTRATADO1.00OBRAS PROVISIONALES602.680.00327.740.000.0327.740.0274.940327.741.01CASETA P/GUARDIANIA Y/0 ALAMACENmes1.17115.38135.001.00115.380.00.00%1.00115.3885%0.1719.621.00115.381.02BAO PORTATIL TIPO DYSALmes1.17153.85180.001.00153.850.00.00%1.00153.8585%0.1726.151153.851.03CERCO DE MALLA PVC DE 1 M ALTURA PARA LIMITE DE SEGURIDAD DE OBRAm251.001.15287.6851.0558.510.00.00%51.0558.5120%199.95229.1751.0558.512.00TRABAJOS PRELIMINARES1,765.100.069.35185.090.0254.440.01,510.66069.352.01RELLENO COMPACTADO A MANO CON MATERIAL TIPO CALIZAm311.6860.88711.040.00.000.00.00%0.00.00%11.68711.04002.02ELIMINACION DE AGUA DE ZONA DE TRABAJO CON MOTOBOMBAm3151.824.15629.750.00.000.00.00%0.00.00%151.82629.75002.03LIMPIEZA DE TERRENO MANUALm2105.410.6467.710.00.000.00.00%0.00.00%105.4167.71002.04TRAZO NIVELES Y REPLANTEO PRELIMINARm2105.003.40356.6020.4269.3554.50185.0952%0174.92254.4471%30.08102.1620.4269.353.00MOVIMIENTO DE TIERRAS1,294.060.0128.551,199.0393%0.01,327.580.0(33.52)01931.463.01EXCAVACION DE ZANJAS PARA CIMENTACION CORRIDAm314.7912.85190.118.06103.6071.68921.33485%0179.741,024.93539%(64.95)(834.82)8.06103.63.02CORTE EN TERRENO ROCOSO SIN EMPLEO DE EXPLOSIVOS, CIMIENTOS CORRIDOSm311.2053.08594.550.4724.950.00.00%0.4724.954%10.73569.600.4724.953.03ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)m318.4927.55509.400.00.0010.08277.7055%1610.08277.7055%8.41231.70004.00OBRAS DE CONCRETO SIMPLE3,683.750.02,556.442,396.3365%0.04,952.780.0(1,269.03)02769.134.01SOLADOS 1:12 E=4"m24.227.5431.822.7220.510.00.00%2.7220.5164%1.5011.312.7220.54.02CIMIENTOS CORRIDOS (Mezcla 1:10 + 30% P.G.)m329.5164.351,898.9710.66685.9712.35794.5942%0323.011,480.5678%6.50418.4110.66685.974.03ENCOFRADO Y DESENCOFRADO NORMAL PARA CIMIENTOS CORRIDOSm26.8916.41113.0864.681,061.5945.92753.68667%110.601,815.261605%(103.71)(1,702.18)64.681061.594.04CONCRETO EN SOBRECIMIENTO CORRIDO A=0.15M. MEZCLA 1:8 CEMENTO HORMIGON + 25% PIEDRA tvm36.3295.23601.853.00285.693.27311.4052%04, 056.27597.0999%0.054.763285.694.05ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOSm263.2516.411,038.0330.63502.6932.70536.6652%04, 0563.331,039.35100%(0.08)(1.32)30.63502.695.00OBRAS DE CONCRETO ARMADO6,536.530.05,272.703,726.8157%0.08,999.500.0(2,462.97)05272.75.01COLUMNAS05.01.01CONCRETO EN COLUMNAS fc=210 kg/cm2m32.91162.29472.269.651,566.108.441,369.73290%18.092,935.83622%(15.18)(2,463.57)9.651566.105.01.02ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNASm2119.2819.842,366.3365.001,289.5033.37662.0128%09, 1098.371,951.5082%20.91414.83651289.505.01.03ACERO EN COLUMNAS Fy=4200 KG/CM2kg621.882.661,655.16547.561,457.35302.82805.9749%02850.382,263.32137%(228.50)(608.16)547.561457.355.02VIGAS05.02.01CONCRETO EN VIGA DE MURO fc=210 kg/cm2m32.91162.29472.261.35219.091.64265.3456%122.99484.44103%(0.08)(12.18)1.35219.0905.02.02ENCOFRADO Y DESENCOFRADO EN VIGASm229.1022.12643.6712.90285.348.35184.7029%1121.25470.0473%7.85173.6312.9285.3405.02.03ACERO EN VIGASkg360.752.57926.85177.22455.32170.89439.0647%11348.11894.3896%12.6432.47177.22455.326.00ALBANILERIA5,776.100.02,554.321,243.5922%0.03,797.900.01,978.2002554.326.01MURO DE BLOQUE DE CONCRETO VIBRADO E=20 cm MEZCLA 1:5 (CEMENTO:ARENA)m2261.9317.944,699.02124.202,228.1549.51888.2119%06, 07, 08173.713,116.3666%88.221,582.66124.22228.156.02TARRAJEO DE VIGAS Y COLUMNAS INCLUYE ARISTASm2100.8510.681,077.0830.54326.1733.28355.3833%13, 1463.82681.5463%37.04395.5430.54326.177.00CARPINTERIA METALICA77.900.037.7338.3649%0.076.080.01.82037.737.01ALAMBRE DE PUES PROTECCIN DE CERCO PERIMETRICOm332.040.2377.90160.8137.73163.5038.3649%15324.3176.0898%7.731.82160.8137.738.00VARIOS288.460.0288.460.000.0288.460.00.00438.848.01LIMPIEZA FINAL DE OBRAm21.00288.46288.461.00288.460.00.00%1.00288.46100%0.00.01288.46TOTAL COSTO DIRECTO:20,024.5811,235.298,789.2144%20,024.49100%0.0913401.27GASTOS GENERALESX%10.00%2,002.461,123.53878.922,002.450.01UTILIDADY%5.00%1,001.23561.76439.461,001.220.00TOTAL $.:23,028.2812,920.5810,107.5923,028.170.10CONTRATISTASUPERVISORORIGINADORSUPERINTENDENTE DE PROYECTOSFECHA:FECHAFECHAFECHA

MetradosMETRADOS DE OBRA - VALORIZACIN 03PROYECTO: CERCO PERIMETRICO SECTOR PARGASHA - MARIATEGUI - RUMIALLANA - TRAMO 5ITEMDESCRIPCIONDIMENSIONESNo. DECANTIDADUNIDADPROTOCOLOLONG.ANCHOALTOUNID.PARCIALTOTAL01.00: OBRAS PROVISIONALES1.01CASETA P/GUARDIANIA Y/0 ALAMACEN-----0.00mes1.02BAO PORTATIL TIPO DYSAL-----0.00mes1.03CERCO DE MALLA PVC DE 1 M ALTURA PARA LIMITE DE SEGURIDAD DE OBRA-----0.00m02.00: TRABAJOS PRELIMINARES2.01RELLENO COMPACTADO A MANO CON MATERIAL TIPO CALIZA----------0.00m32.02ELIMINACION DE AGUA DE ZONA DE TRABAJO CON MOTOBOMBA----------0.00m32.03LIMPIEZA DE TERRENO MANUAL----------0.00m22.04TRAZO NIVELES Y REPLANTEO PRELIMINAR132.82--65.6021.70.4--8.6854.50m203.00: MOVIMIENTO DE TIERRAS3.01EXCAVACION DE ZANJAS PARA CIMENTACION CORRIDA1Excavaxin DREN32.8021-65.60Excavacin Cimentacin21.70.40.7-6.0871.68m33.02CORTE EN TERRENO ROCOSO SIN EMPLEO DE EXPLOSIVOS, CIMIENTOS CORRIDOS---------------0.00m33.03ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)1636.000.400.70-10.0810.08m304.00: OBRAS DE CONCRETO SIMPLE4.01SOLADOS 1:12 E=4"----------0.00m24.02CIMIENTOS CORRIDOS (Mezcla 1:10 + 30% P.G.)344.100.400.70-12.3512.35m34.03ENCOFRADO Y DESENCOFRADO NORMAL PARA CIMIENTOS CORRIDOS----------3---------------32.80-0.702.0045.9245.92m24.04CONCRETO EN SOBRECIMIENTO CORRIDO A=0.15M. MEZCLA 1:8 CEMENTO HORMIGON + 25% PIEDRA tv-----4-----5-----27.000.200.30-1.62-----27.500.200.30-1.653.27m34.05ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOS4527.00-0.302.0016.20-----27.50-0.302.0016.500.0032.70m305.00: OBRAS DE CONCRETO ARMADO5.01.01.-CONCRETO EN COLUMNAS fc=210 kg/cm290.200.203.5510.001.42100.200.203.5510.001.422.84m35.01.02.-ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS3.000.203.554.008.5292.000.203.556.008.52102.000.203.557.009.9417.0416.333.000.203.553.006.3933.37m25.01.03.-ACERO EN COLUMNAS Fy=4200 KG/CM22Estribos 1/40.7027.000.2520.0094.50Longitudinal 3/84.654.000.5620.00208.32302.82kg5.02.01.-CONCRETO EN VIGA DE MURO fc=210 kg/cm21254.500.200.15-1.6351.64m35.02.02.-ENCOFRADO Y DESENCOFRADO EN VIGAS1154.50-0.152.0016.3520.00-0.202.00-8.008.35m25.02.03.-ACERO EN VIGAS11Estribos 1/40.650.25299.0048.59Longitudinal 3/84.204.000.5613.00122.30170.89kg06.00: ALBAILERIA6.01MURO DE BLOQUE DE CONCRETO VIBRADO E=20 cm MEZCLA 1:5 (CEMENTO:ARENA)10.80-5.00-54.006710.80-4.00-43.20810.80-4.00-43.20140.40m26.02TARRAJEO DE VIGAS Y COLUMNAS INCLUYE ARISTAS30.000.35--10.50130.203.5510.007.101424.500.35--8.580.203.5510.007.1033.28m207.00: CARPINTERIA METALICA7.01ALAMBRE DE PUES PROTECCIN DE CERCO PERIMETRICO1554.50--3.00163.50163.50m08.00: VARIOS8.01LIMPIEZA FINAL DE OBRA171.00---1.001.00m2

Valorizacin AdicionalNOMBRE DEL PROYECTOCERCO PERIMETRICO SECTOR PARGASHA - MARIATEGUI - RUMIALLANA - TRAMO 5N VALORIZACINADICIONAL y MAYORES METRADOS 01PERIODO DE VALORIZACINCENTRO DE COSTOS PEPMonto Original S/.:5,862.73N ORDEN DE TRABAJOMonto Adicionales S/.:0CONTRATISTAECOSEM TINGO PALCA R.L.Monto Actual S/.:5,862.73RUC20489454654No Adicionales:0TEMDESCRIPCINPRESUPUESTO CONTRACTUALVAL ACUM. ANTERIORVALORIZACION ACTUALVALORIZACION ACUMULADASALDO A VALORIZARUNDCANT.COSTO UNITARIO US $COSTO TOTAL US $CANT.COSTO TOTAL US $CANT.COSTO TOTAL US $% AVANCEN PROTOCOLOCANT.COSTO TOTAL US $% AVANCECANT.COSTO TOTAL US $PRESUPUESTO ADICIONAL1.00MOVIMIENTO DE TIERRAS3,104.410.003,104.410.03,104.410.0(0.00)1.01EXCAVACION DE DESMONTE CON MAQUINARIAm3235.067.671,802.910.00.0235.061,802.91100%01235.061,802.91100%0.0(0.00)1.02RELLENO DE PIEDRA PARA DRENm365.6019.841,301.500.00.065.601,301.50100%0165.601,301.50100%0.0(0.00)2.00OBRAS DE CONCRETO SIMPLE212.670.00212.670.0212.670.0(0.00)2.01ENCOFRADO Y DESENCOFRADO NORMAL PARA SOLADOSm212.9616.41212.670.00.012.96212.67100%0312.96212.67100%0.0(0.00)3.00VARIOS150.380.00150.380.0150.380.0(0.00)3.01TUBERIA PVC SAP 1/2, PASE ALAMBRE DE SEGURIDADm31.181.231.450.00.01.181.45100%011.181.45100%0.0(0.00)3.02JUNTAS DE DILATACIN DE TECKNOPORT E=1"m213.4911.04148.930.00.013.49148.93100%0313.49148.93100%0.00.004.00VARIOS1,630.570.001,630.570.01,630.570.00.006.01MURO DE BLOQUE DE CONCRETO VIBRADO E=20 cm MEZCLA 1:5 (CEMENTO:ARENA)m290.8917.941,630.570.00.090.891,630.57100%06, 07, 0890.891,630.57100%0.00.00TOTAL COSTO DIRECTO:5,098.030.05,098.03100%5,098.04100%(0.01)GASTOS GENERALESX%10.00%509.800.00509.80509.80(0.00)UTILIDADY%5.00%254.900.00254.90254.90(0.00)TOTAL $.:5,862.730.05,862.735,862.74(0.01)CONTRATISTASUPERVISORORIGINADORSUPERINTENDENTE DE PROYECTOSFECHA:FECHAFECHAFECHA

Metrados AdicionalMETRADOS DE OBRA ADICIONALPROYECTO: CERCO PERIMETRICO SECTOR PARGASHA - MARIATEGUI - RUMIALLANA - TRAMO 5ITEMDESCRIPCIONDIMENSIONESNo. DECANTIDADUNIDADPROTOCOLOLONG.ANCHOALTOUNID.PARCIALTOTAL01.00: OBRAS PROVISIONALES1.01RELLENO DE PIEDRA PARA DREN32.802.001.00-65.60165.60m31.02CONCRETO EN ZAPATAS f'c= 210 kg/cm2-0.400.7020.005.6035.60m3

Precio UnitarioANALISIS DE COSTOS UNITARIOS - ADICIONAL DE OBRAProyecto:CERCO PERIMETRICO SECTOR PARGASHA - MARIATEGUI - RUMIALLANA - TRAMO 5Partida1.01RELLENO DE PIEDRA PARA DRENRendimientom3IDIA2EQ2Costo unitario por m319.8435CdigoDescripcin RecursoUnidadCuadrillaCantidadPrecio (U$)Parcial (U$)Mano de Obra147010004PEONhh1.00004.00004.680018.720018.7200Equipos337010001HERRAMIENTAS MANUALES%MO3.000037.45001.12351.1235Partida1.02CONCRETO EN ZAPATAS f'c=210 kg/cm2Rendimientom3/DIA10EQ10Costo unitario directo por . m3162.29CdigoDescripcin RecursoUnidadCuadrillaCantidadPrecio (U$)Parcial (U$)Mano de Obra147000022OPERADOR DE EQUIPO LIVIANOhh2.00001.6000616.00009.8500147010002OPERARIOhh2.00001.60006.16009.8500147010003OFICIALhh1.00000.80005.42004.3400147010004PEONhh12.00009.60004.680044.940068.9800Materiales205000039HORMIGONm31.270016.150020.5200205000040AGUAm30.18401.150021.0000221000001CEMENTO PORTLAND TIPO 1 (42.5 kg)bls9.74006.520063.500084.2300Equipos337010001HERRAMIENTAS MANUALES%MO3.000068.9800207.0000348010011MEZCLADORA DE CONCRETO DE 9 -11p3hm1.00000.80005.77004.6200349070003VIBRADOR DE CONCRETO 4 HP 1 50'hm1.00000.8000300.00002.40009.0900