Page 1: 1600-000-000-RPT-0001.R2

KUWAIT OIL COMPANY (K.S.C.)

Project EF/1600

1600-000-000-RPT-0001

PHSER Stage 2

Report

R2 20/01/10 For use/ Action (Revised in line with Scope change)

MB Project RF

R1 9th March 2008

For use/Action JL Projects DS

Rev Date Revision By Chk’d Section PE Client

Page 2: 1600-000-000-RPT-0001.R2

Project Number Document Number Rev Date Sheet

EF/1600

1600-000-000-RPT-0001 R2 20th Jan

2010 2 of 9

S:\EF1600\EF1600_Common\DCC\EF1600- ITB Package\Att 1 - Project Specific Documents\1. South Kuwait Facilities\1.1 Common to All\HSE\EF1600 PHSER Stage 2 Report 20-01-10 Rev.2.doc

1.0 TERMS OF REFERENCE

To review the planning and preparedness of the project “Elevated Substations in SEK” (EF1600) before entering the Detailed Design Stage as part of Contract Action. The review will be conducted in accordance with KOC.GE.050.

2.0 METHODOLOGY

The review team was held as a single meeting with personnel present from the FEED design Team, Controlling Team and Asset support teams; refer to attendees below. The review was conducted in the PMC FEED office in Wynyard on Wednesday 20

th January 2010.

It was noted that there was no specific HSE Team representation at the meeting which is contrary to KOC-GE-050. The meeting agreed to proceed with the review and issue the report to all concerned HSE Teams for review. Any further action or review would be discussed between Controlling and HSE Teams following this. No PHSER 1 report was available for the meeting to review. The team briefly reviewed the project and the requirements for PHSER#1 and concluded to continue with the PHSER Stage 2 review on the basis that the process and facilities are not novel to KOC and they are all within existing operating areas. Thus existing KOC Safety Management Systems were deemed to be adequate to manage HSE risks through the project cycle. The check list from Appendix 2 of KOC.GE.050 was reviewed by the team, with the FEED and Controlling Teams responses to what has and will be completed recorded. Documentation prepared for Technical Specification for the Detailed Design Stage was reviewed when reviewing project specific deliverables and referenced where applicable to support the information provided by the teams. Recommendations that arose during the review were categorized as follows

Minor: some small shortcomings or possible improvements identified, e.g. slight deviation from good practice, or minor factual or textual error, or possible improvement for future projects which should be noted and addressed by a brief comment or as part of the documentation updates, but which are expected to have little HSE risk impact. Appropriate responses to Project specific issues should be addressed during the execution of the Project Medium: more significant shortcomings in the information, basis, design, analysis or safety justifications or arrangements, which will require further analysis or clarification, and which may have a small but noticeable impact on the HSE risks. A clear action plan should be developed to address Medium issues prior to the submission of Tenders so that the Contract Scope of Work can be adequately defined. Major: potentially serious shortcomings in the information, basis, design, analysis or safety justifications or arrangements, which are critical to the HSE risks and safety demonstration and which will require urgent attention. These will impact the services and thus cost for the EPC Contractor. These must be fully closed out prior to the issue of the ITB.

The team findings were recorded as shown in the PHSER 2 worksheets below. The team thus

Page 3: 1600-000-000-RPT-0001.R2

Project Number Document Number Rev Date Sheet

EF/1600

1600-000-000-RPT-0001 R2 20th Jan

2010 3 of 9

S:\EF1600\EF1600_Common\DCC\EF1600- ITB Package\Att 1 - Project Specific Documents\1. South Kuwait Facilities\1.1 Common to All\HSE\EF1600 PHSER Stage 2 Report 20-01-10 Rev.2.doc

agreed that at the time of the meeting the notes taken were an accurate reflection of the comments made during the review. The Controlling Team PE will be responsible for ensuring that all recommendations are responded to or transferred to a responsible team in a timely manner for consideration.

3.0 FNDINGS

A total of 7 recommendations have been made, 5 of which fall into the Medium category. No Major Category recommendations were made. The lack of a PHSER Stage 1 review did not appear to have prevented the correct, health, safety and environmental procedures being implemented during the FEED stage.

4.0 TEAM MEMBERS

NAME POSITION E-MAIL

Jim Martin

Project Engineer PMC-AMEC

[email protected]

Meshari Al-Bader

Associate Project Engineer PMC-AMEC

[email protected]

Rechard Punter

Lead Const. Eng. PMC-AMEC

[email protected]

Les Smalls

Lead Elect. Eng. PMC-AMEC

[email protected]

David Sullivan

Lead Inst. Eng. PMC-AMEC

[email protected]

Abdul Hadi AlZuabi

Senior Engineer

KOC-MP VIII

[email protected]

Nasser Al-Attar

Elect Eng Specialist KOC – Main. SK

[email protected]

Rashid Aldosari

Inst. Eng KOC – Main. SK

[email protected]

Ali Shams Elect Eng

KOC – OTS (SEK)

[email protected]

Page 4: 1600-000-000-RPT-0001.R2

P

roje

ct N

um

ber

Docum

ent N

um

ber

Rev

Date

S

heet

E

F/1

600

1600-0

00-0

00-R

PT

-0001

R2

20

th J

an

2010

4 o

f 9

S:\

EF

16

00

\EF

16

00

_C

om

mo

n\D

CC

\EF

16

00

- IT

B P

acka

ge

\Att

1 -

Pro

ject

Sp

ecific

Do

cu

me

nts

\1.

So

uth

Ku

wa

it F

acili

tie

s\1

.1 C

om

mo

n t

o A

ll\H

SE

\EF

16

00

PH

SE

R S

tag

e 2

Re

po

rt 2

0-

01

-10

Re

v.2

.do

c

4.0

P

HS

ER

2 W

OR

KS

HE

ET

S

Item

P

HS

ER

Acti

vit

y

PH

SE

R C

om

men

t O

bserv

ati

on

/Reco

mm

en

dati

on

P

rio

rity

B

y

1

To

co

nfi

rm

that

all

H

SE

co

ncern

s

rela

tin

g

to

the

ch

ara

cte

risti

cs o

f th

e f

ull

lif

ecycle

of

the

pro

ject,

no

vel

tech

no

log

y an

d th

e n

atu

re o

f th

e lo

cati

on

h

ave b

een

id

en

tifi

ed

1.1

R

evie

w

the

health,

safe

ty

and

environm

enta

l hazard

s

inhere

nt

in t

he p

roposed d

evelo

pm

ent

to e

nsure

adeq

uate

id

entification o

f th

ose h

azard

s t

hat

warr

ant

specia

l att

ention

or

furt

her

investig

ation.

Confirm

that

accepta

ble

solu

tions

are

availa

ble

or

are

capable

of

bein

g d

evelo

ped w

ithin

the

tim

escale

and o

rganis

ation o

f th

e p

roposed p

roje

ct.

T

opic

s

consid

ere

d t

ypic

ally

inclu

de:

1.1

a

Pro

pert

ies

of

the

pro

cess

mate

rials

(M

SD

Ss

are

re

quired f

or

all

raw

mate

rials

, pro

ducts

and inte

rmedia

te

str

eam

s)

Pro

ject

is n

ot

involv

ed d

irectly w

ith t

he p

rocess u

nits.

Serv

ice b

uild

ing

s c

onta

in m

ate

rials

such a

s H

VA

C a

nd

transfo

rmer

oils

, batt

eries,

die

sel etc

for

whic

h M

SD

S

already e

xis

t.

1.1

b

Reactive c

hem

icals

mix

ing

matr

ix

Not

applic

able

– n

on p

rocess u

nits.

1.1

c

Pro

cessin

g

conditio

ns

(norm

al,

sta

rt-u

p,

shutd

ow

n

&

excurs

ion)

N/A

no p

rocessin

g o

f m

ate

rials

.

1.1

d

Pro

cess i

nvento

ries,

fire

and e

xplo

sio

n p

ote

ntial, s

tore

d

energ

y,

toxic

rele

ase p

ote

ntial.

Min

imal q

uantities o

f m

ate

rials

in 1

.1a a

bove.

1.1

e

Occupational health /

health m

anag

em

ent.

N

o n

ew

mate

rials

– e

xis

ting

KO

C c

ontr

ols

will

apply

.

1.1

f Im

pact

on G

roup P

olic

ies,

targ

ets

and s

trate

gie

s.

No c

oncern

s identified.

1.1

g

Pro

ject

str

ate

gy f

or

inhere

ntly s

afe

r desig

n

Pro

ject

impro

ves s

afe

ty b

y e

levation s

witch r

oom

.

1.1

h

Tra

nsport

ation h

azard

s /

ris

ks.

N

o t

ransport

ation identified f

or

pro

cess h

azard

s.

1.2

R

evie

w

pro

ject

pla

ns

to

colle

ct

info

rmation

on

pre

vio

us

incid

ents

and t

o a

ddre

ss t

hem

in t

he d

esig

n.

Lessons learn

ed e

xerc

ises p

erf

orm

ed a

nd input

into

P

roje

ct.

M

inute

s o

f m

eeting

pro

duced a

s a

record

C

aptu

re o

f pro

ject

execution issues f

rom

FM

P P

roje

cts

(b

row

nfield

modific

ations)

by r

evie

w o

f docum

enta

tion b

y

Page 5: 1600-000-000-RPT-0001.R2

P

roje

ct N

um

ber

Docum

ent N

um

ber

Rev

Date

S

heet

E

F/1

600

1600-0

00-0

00-R

PT

-0001

R2

20

th J

an

2010

5 o

f 9

S:\

EF

16

00

\EF

16

00

_C

om

mo

n\D

CC

\EF

16

00

- IT

B P

acka

ge

\Att

1 -

Pro

ject

Sp

ecific

Do

cu

me

nts

\1.

So

uth

Ku

wa

it F

acili

tie

s\1

.1 C

om

mo

n t

o A

ll\H

SE

\EF

16

00

PH

SE

R S

tag

e 2

Re

po

rt 2

0-

01

-10

Re

v.2

.do

c

Item

P

HS

ER

Acti

vit

y

PH

SE

R C

om

men

t O

bserv

ati

on

/Reco

mm

en

dati

on

P

rio

rity

B

y

pers

onnel in

volv

ed f

rom

FM

P p

lanned f

or

futu

re b

y r

evie

w

of

Pro

ject

docum

enta

tion a

nd d

raw

ing

s.

1.3

R

evie

w t

he im

pact

of

the p

roposed d

evelo

pm

ent

on e

xis

ting

fa

cili

ties,

and v

ice v

ers

a,

both

onsite a

nd o

ffsite.

Revie

w

the inte

rfaces b

etw

een n

ew

and e

xis

ting

facili

ties.

Environm

enta

l – p

relim

inary

EIA

develo

ped a

nd a

ppro

ved

by K

uw

ait E

PA

. S

afe

ty –

QR

A n

ot

pla

nned f

or

this

sta

ge;

will

be c

om

ple

ted

during

Deta

il desig

n b

y E

PC

Contr

acto

r.

QR

A f

rom

FM

P

revie

wed a

s p

art

of

the d

evelo

pm

ent

of

FE

ED

Docum

ents

, part

icula

rly w

ith r

espect

to s

ubsta

tion locations.

Spacin

g o

f eq

uip

ment

is t

o C

om

pany layout

sta

ndard

s.

Ris

k a

ssessm

ent

carr

ied o

ut

for

MA

A-M

52 s

ubsta

tion

location.

1.4

R

evie

w

the

pro

posed

location

to

ensure

th

at

any

chara

cte

ristics

of

specia

l H

SE

concern

have

been

acknow

ledg

ed,

e.g

. sta

kehold

ers

, lo

cal

popula

tion,

local

environm

ent,

sensitiv

e

recepto

rs,

geog

raphic

al

featu

res,

hydro

log

y,

bio

div

ers

ity,

mete

oro

log

ical conditio

ns e

tc.

See 1

.3 a

bove.

1.5

R

evie

w d

raft

constr

uction p

hilo

sophy i

nclu

din

g n

um

bers

in

work

forc

e,

access

to

site,

inte

ractions

with

exis

ting

opera

tions,

sig

nific

ant

hazard

s and environm

enta

l im

pact

likely

to b

e e

ncounte

red d

uring

constr

uction,

inclu

din

g u

se

of

substa

nces/m

ate

rials

hazard

ous t

o h

ealth a

nd a

lso t

he

applic

ation

of

specia

l H

ealth,

Safe

ty

and

Environm

enta

l Leg

isla

tion.-

.

Constr

uction a

ctivitie

s w

ere

inclu

ded in p

relim

inary

EIA

. C

onstr

uction involv

es k

now

n t

ypes o

f m

ate

rials

and e

xis

ting

te

chniq

ues.

Constr

ucta

bili

ty r

evie

w w

ill b

e c

arr

ied o

ut

on 2

1/0

1/2

010.

1.6

R

evie

w t

he e

xpecte

d e

mis

sio

ns p

rofile

. T

he f

ollo

win

g w

ill

typic

ally

need

to

be

consid

ere

d

over

the

full

rang

e

of

possib

le

conditio

ns,

i.e.

ste

ady

sta

te,

sta

rt-u

p

shutd

ow

n,

em

erg

ency r

ele

ase,

norm

al, m

axim

um

, end o

f ru

n,

etc

.:

1.6

a

Vents

, oily

w

aste

s,

waste

wate

r,

hazard

ous

&

non-

hazard

ous s

olid

s &

slu

dg

e

New

build

ing

s w

ill b

e t

ied into

exis

ting

sew

era

ge s

yste

ms.

N

o incre

ase in p

ers

onnel.

Tra

nsfo

rmer

bunds /

dra

ins c

overe

d b

y d

rain

pits.

Page 6: 1600-000-000-RPT-0001.R2

P

roje

ct N

um

ber

Docum

ent N

um

ber

Rev

Date

S

heet

E

F/1

600

1600-0

00-0

00-R

PT

-0001

R2

20

th J

an

2010

6 o

f 9

S:\

EF

16

00

\EF

16

00

_C

om

mo

n\D

CC

\EF

16

00

- IT

B P

acka

ge

\Att

1 -

Pro

ject

Sp

ecific

Do

cu

me

nts

\1.

So

uth

Ku

wa

it F

acili

tie

s\1

.1 C

om

mo

n t

o A

ll\H

SE

\EF

16

00

PH

SE

R S

tag

e 2

Re

po

rt 2

0-

01

-10

Re

v.2

.do

c

Item

P

HS

ER

Acti

vit

y

PH

SE

R C

om

men

t O

bserv

ati

on

/Reco

mm

en

dati

on

P

rio

rity

B

y

1.6

b

Fla

res

N/A

1.6

c

Nois

e,

sm

ell,

vis

ual im

pact

KO

C s

tandard

s w

ill b

e a

pplie

d –

nois

e f

rom

genera

tor

mitig

ate

d b

y e

nclo

sure

s /

walls

. R

eco

mm

en

dati

on

-1

Revie

w C

ontr

acto

rs s

cope o

f w

ork

to v

erify

their

responsib

ilities f

or

nois

e s

urv

eys b

oth

befo

re a

nd a

fter

constr

uction.

Mediu

m

PM

C

1.6

d

Poin

t sourc

e &

fug

itiv

e e

mis

sio

ns

Genera

tor

exhausts

/ b

att

ery

room

– v

enting

to c

urr

ent

KO

C

sta

ndard

s.

1.6

e

Gre

enhouse g

as a

nd N

Ox e

mis

sio

ns

KO

C e

nvironm

enta

l sta

ndard

s c

over

HV

AC

gases

Reco

mm

en

dati

on

- 2

R

evie

w e

mis

sio

n s

tandard

s t

o b

e a

pplie

d t

o g

enera

tors

.

Mediu

m

PM

C

1.6

f C

apabili

ties f

or

off

site t

reatm

ent

and d

isposal

Exis

ting

dis

posal ro

ute

s w

ill b

e u

sed –

no n

ew

waste

s

req

uirin

g a

ltern

ative d

isposals

is inclu

ded.

2

To

veri

fy t

hat

all

ap

pli

cab

le r

eg

ula

tio

ns,

sta

nd

ard

s,

an

d

rele

van

t K

OC

exp

ecta

tio

ns h

ave b

een

id

en

tifi

ed

.

2.1

R

evie

w t

he P

roje

ct’s l

ist

of

appro

ved s

pecific

ations,

Codes

and S

tandard

s.

Confirm

that

these a

re a

ppro

priate

, ta

kin

g

into

account

curr

ent

industr

y

conventions

and,

where

applic

able

, th

ose

in

exis

tence

on

associa

ted

exis

ting

fa

cili

ties.

All

KO

C s

tandard

s,

specific

ations,

KO

C H

SE

MS

and F

ire

and S

afe

ty R

eg

ula

tions s

hall

be a

pplie

d.

These a

re a

ppro

priate

as t

hey a

re b

ein

g r

evie

wed a

s p

art

of

the F

EE

D d

evelo

pm

ent.

P

roje

ct

specific

ation a

ddenda

genera

ted w

here

req

uired.

2.2

R

evie

w t

he s

trate

gy f

or

assuring

com

plia

nce w

ith t

he K

OC

H

SE

MS

Expecta

tions.

Pro

ject

HS

E P

lan d

evelo

ped b

y P

MC

in a

ccord

ance w

ith

KO

C-G

E-0

48 f

or

FE

ED

sta

ge.

Will

be d

evelo

ped b

y C

ontr

acto

r fo

r E

PC

Phase.

2.3

R

evie

w t

he l

ocal

and n

ational

reg

ula

tory

req

uirem

ents

, and

the p

roje

ct’s

pro

posal fo

r a “

license t

o o

pera

te”

Exis

ting

pla

nt

opera

ting

under

exis

ting

pla

ns.

EIA

will

be a

ppro

ved b

y K

uw

ait E

PA

during

execution o

f E

PC

Phase.

3

To

co

nfi

rm

that

an

ad

eq

uate

H

SE

p

lan

h

as

been

esta

bli

sh

ed

.

Page 7: 1600-000-000-RPT-0001.R2

P

roje

ct N

um

ber

Docum

ent N

um

ber

Rev

Date

S

heet

E

F/1

600

1600-0

00-0

00-R

PT

-0001

R2

20

th J

an

2010

7 o

f 9

S:\

EF

16

00

\EF

16

00

_C

om

mo

n\D

CC

\EF

16

00

- IT

B P

acka

ge

\Att

1 -

Pro

ject

Sp

ecific

Do

cu

me

nts

\1.

So

uth

Ku

wa

it F

acili

tie

s\1

.1 C

om

mo

n t

o A

ll\H

SE

\EF

16

00

PH

SE

R S

tag

e 2

Re

po

rt 2

0-

01

-10

Re

v.2

.do

c

Item

P

HS

ER

Acti

vit

y

PH

SE

R C

om

men

t O

bserv

ati

on

/Reco

mm

en

dati

on

P

rio

rity

B

y

3.1

R

evie

w

the

Health,

Safe

ty

and

Environm

enta

l pla

n,

and

ensure

that

:

3.1

a

Adeq

uate

exte

rnal, i

nte

rnal, s

pecia

list

and p

eer

revie

ws

have b

een s

chedule

d.

Team

revie

wed T

able

1 o

f H

SE

pla

n.

All

revie

ws e

xcept

the

Constr

ucta

bili

ty r

evie

w h

ave b

een c

om

ple

ted a

nd m

inute

s

pro

duced.

Reco

mm

en

dati

on

– 3

A

Constr

ucta

bili

ty r

evie

w s

hall

be h

eld

and r

ecord

ed b

efo

re

ITT

is issued.

To b

e h

eld

on 2

1/0

1/2

010.

Mediu

m

PM

C

3.1

b

A p

lan h

as b

een d

evelo

ped f

or

the c

onduct

of

PH

SE

Rs

Desig

n P

hase –

in H

SE

Pla

n

EP

C P

hase a

s p

er

LS

TK

Contr

act

sta

ndard

.

3.1

c

The

pro

gra

mm

e

and

inte

nded

org

anis

ation

for

the

pro

cure

ment,

execution

and

revie

w

of

HS

E

stu

die

s,

inclu

din

g H

ealth A

ssessm

ent,

and E

IA e

tc.

are

in p

lace.

FE

ED

phase is inclu

ded in t

he P

MC

PM

P.

Desig

n P

hase s

hall

be d

evelo

ped b

y E

PC

Contr

acto

r as

part

of

their s

cope a

nd s

chedulin

g o

f w

ork

s.

3.1

d

Develo

p t

he P

roje

ct

HS

E p

lan

at

the C

PP

sta

ge a

nd

obta

in H

SE

Gro

up e

ndors

em

ent

PM

C H

SE

pla

ns h

ave b

een issued.

(To b

e issued t

o H

SE

S

EK

, H

SE

Export

, and H

SE

Gas o

pera

tions).

3.1

e

The s

tudie

s a

re s

chedule

d t

o b

e c

om

ple

ted in g

ood t

ime

to

ensure

th

at

actions

can

be

incorp

ora

ted

into

th

e

desig

n a

nd t

hat

resourc

es a

re a

vaila

ble

in o

rder

to c

arr

y

out

the w

ork

.

All

except

one s

tudy h

ave b

een c

om

ple

ted d

uring

FE

ED

sta

ge.

See 3

.1a

3.1

f C

ontr

acto

r sele

ction a

nd p

rocure

ment

str

ate

gy a

ligned

with K

OC

HS

EM

S e

xpecta

tions

All

Contr

acto

rs a

nd V

endors

are

fro

m K

OC

Appro

ved lis

ts.

3.2

R

evie

w t

he inte

ntions f

or

the t

rackin

g o

f actions a

risin

g f

rom

H

SE

stu

die

s.

FE

ED

has b

een c

overe

d b

y r

evie

w o

f actions f

rom

min

ute

s.

Reco

mm

en

dati

on

– 4

V

erify

that

the r

eq

uirem

ents

for

this

are

inclu

ded in E

PC

C

ontr

acto

rs H

SE

Scope o

f W

ork

.

Mediu

m

PM

C

3.3

R

evie

w t

he i

nte

nded a

rrang

em

ents

for

the r

esourc

ing

and

train

ing

of

the w

ork

forc

e f

or

the d

evelo

pm

ent.

LS

TK

Contr

act

defines r

esponsib

ility

of

EP

C C

ontr

acto

r to

supply

tra

inin

g.

4

To

co

nfi

rm

that

an

ad

eq

uate

H

SE

ri

sk

man

ag

em

en

t

Page 8: 1600-000-000-RPT-0001.R2

P

roje

ct N

um

ber

Docum

ent N

um

ber

Rev

Date

S

heet

E

F/1

600

1600-0

00-0

00-R

PT

-0001

R2

20

th J

an

2010

8 o

f 9

S:\

EF

16

00

\EF

16

00

_C

om

mo

n\D

CC

\EF

16

00

- IT

B P

acka

ge

\Att

1 -

Pro

ject

Sp

ecific

Do

cu

me

nts

\1.

So

uth

Ku

wa

it F

acili

tie

s\1

.1 C

om

mo

n t

o A

ll\H

SE

\EF

16

00

PH

SE

R S

tag

e 2

Re

po

rt 2

0-

01

-10

Re

v.2

.do

c

Item

P

HS

ER

Acti

vit

y

PH

SE

R C

om

men

t O

bserv

ati

on

/Reco

mm

en

dati

on

P

rio

rity

B

y

str

ate

gy h

as b

een

esta

bli

sh

ed

.

4.1

R

evie

w th

e pote

ntial

for

sig

nific

ant

HS

E in

cid

ents

. It

is

re

asonable

to e

xpect

initia

tion o

f :-

4.1

a

A C

oncept

Safe

ty E

valu

ation (

CS

E)

if s

ignific

ant

hazard

pote

ntial is

identified.

No s

ignific

ant

hazard

s identified d

uring

HA

ZID

4.1

b

An

Environm

enta

l Im

pact

Assessm

ent

(EIA

) if

sig

nific

ant

environm

enta

l im

pact

pote

ntial is

identified.

(In

both

in

sta

nces

the

pote

ntial

will

g

enera

lly

be

reg

ard

ed a

s “

sig

nific

ant”

if

lasting

im

pact

beyond t

he

plo

t boundary

is p

ossib

le.

The r

evie

w s

hould

inclu

de

consid

era

tion o

f th

e p

ote

ntial fo

r a m

ate

rials

receip

t and

dis

patc

h incid

ent.

)

Pre

limin

ary

EIA

pre

pare

d f

or

appro

val.

4.2

R

evie

w

the

pro

posed

crite

ria

for

tole

rable

risk

and

the

means b

y w

hic

h t

he p

roje

ct

inte

nds t

o e

valu

ate

the d

esig

n

ag

ain

st

these

crite

ria

and

dem

onstr

ate

th

at

risk

will

be

min

imis

ed (

ALA

RP

).

Revie

w if

a Q

RA

will

be n

eeded.

Does

pro

ject

sig

nific

antly c

hang

e t

he s

ite r

isk p

rofile

?

QR

A w

ill b

e p

roduced d

uring

EP

C p

hase.

Tole

rable

ris

k s

hall

be in a

ccord

ance w

ith K

OC

Sta

ndard

s.

Pro

ject’s inte

ntion is t

o s

ignific

antly r

educe s

ite r

isk p

rofile

by s

epara

ting

opera

tions p

ers

onnel fr

om

the f

acili

ties a

s

much a

s is p

racticable

.

4.3

R

evie

w t

he d

esig

n p

rincip

les f

or

safe

ty a

nd e

nvironm

enta

l risk c

ontr

ol and m

itig

ation f

eatu

res,

inclu

din

g :

-

4.3

a

Pro

cess c

onta

inm

ent

N/A

– n

o p

roje

ct

work

on p

rocess f

acili

ties.

4.3

b

Unit s

epara

tion /

layout

KO

C-L

-028 u

sed f

or

layout

of

facili

ties.

4.3

c

Pro

tective syste

ms (i.e

. re

lief

syste

ms,

fire

pro

tection,

etc

.)

F&

G a

nd f

ire f

ighting

eq

uip

ment

in a

ccord

ance w

ith K

OC

S

tandard

s is b

ein

g inclu

ded in b

uild

ing

s.

4.3

d

Isola

tion p

hilo

sophy

N/A

– n

o p

roje

ct

work

on p

rocess f

acili

ties.

4.3

e

Pro

tection o

f pers

onnel

See 4

.3b

4.3

f E

merg

ency

serv

ice

pro

vis

ions/e

merg

ency

response

pla

n

Build

ing

s d

esig

n t

o p

rovid

e a

ccess /

eg

ress f

or

em

erg

ency

serv

ices.

Exis

ting

KO

C e

merg

ency s

erv

ices (

fire

/

am

bula

nce)

will

be u

sed.

Page 9: 1600-000-000-RPT-0001.R2

P

roje

ct N

um

ber

Docum

ent N

um

ber

Rev

Date

S

heet

E

F/1

600

1600-0

00-0

00-R

PT

-0001

R2

20

th J

an

2010

9 o

f 9

S:\

EF

16

00

\EF

16

00

_C

om

mo

n\D

CC

\EF

16

00

- IT

B P

acka

ge

\Att

1 -

Pro

ject

Sp

ecific

Do

cu

me

nts

\1.

So

uth

Ku

wa

it F

acili

tie

s\1

.1 C

om

mo

n t

o A

ll\H

SE

\EF

16

00

PH

SE

R S

tag

e 2

Re

po

rt 2

0-

01

-10

Re

v.2

.do

c

Item

P

HS

ER

Acti

vit

y

PH

SE

R C

om

men

t O

bserv

ati

on

/Reco

mm

en

dati

on

P

rio

rity

B

y

4.4

R

evie

w H

SE

ris

k m

anag

em

ent

str

ate

gy f

or

outs

ourc

ed

facili

ties

N/A

– n

o o

ut-

sourc

ed f

acili

ties.

Em

erg

ency f

acili

ties a

t M

AA

are

pro

vid

ed b

y K

NP

C.

These

will

need t

o b

e r

evie

wed d

uring

EP

C t

o m

anag

e a

ny

chang

es r

eq

uired.

Reco

mm

en

dati

on

– 5

C

ontr

acto

rs H

SE

pla

n m

ust

be a

ligned t

o K

NP

C’s

re

quirem

ents

for

the w

ork

s p

erf

orm

ed a

t M

AA

.

Low

PM

C

5

To

co

nfi

rm t

hat

a H

AZ

OP

str

ate

gy h

as b

een

esta

bli

sh

ed

5.1

R

evie

w p

roposals

for

ensuring

that

the s

cope o

f th

e H

AZ

OP

stu

dy

inclu

des

all

aspects

of

the develo

pm

ent,

in

clu

din

g

vendor

packag

es,

with

a s

ignific

ant

hazard

pote

ntial

HA

ZO

P is n

ot

rele

vant

as t

he P

roje

ct

does n

ot

involv

e a

pro

cess.

Reco

mm

en

dati

on

– 6

R

evie

w w

ith C

om

pany O

pera

tions T

eam

s (

EK

, S

K,

E&

M,

GM

) th

at

their r

eq

uirem

ents

for

chang

e-o

ver

are

inclu

ded

within

the r

eq

uirem

ents

of

the I

TT

. R

eco

mm

en

dati

on

– 7

C

om

pany n

eed t

o r

evie

w e

xis

ting

site p

rocedure

s /

em

erg

ency p

rocedure

s t

o v

erify

whic

h w

ill b

e c

hang

ed b

y

the n

ew

facili

ties a

nd d

evelo

p p

rog

ram

me t

o u

pdate

them

and t

rain

opera

tors

accord

ing

ly.

Mediu

m

Low

PM

C

OT

S /

E

TS

/

GS

5.2

R

evie

w

the

pro

posed

tim

ing

of

the

HA

ZO

P

stu

dy,

resourc

ing

, and in p

art

icula

r arr

ang

em

ents

for

incorp

ora

ting

findin

g in t

he s

pecific

ations f

or

early-o

rder

item

s.

See a

bove

Page 10: 1600-000-000-RPT-0001.R2

System Guideword Consequences Safeguards Action No P S R By

External Hazards

(Natural)

Earthquake Building collapse Design to Building Codes -

UBC Zone 1

Lightning Fire / electrical

equipment failure

New building will be

design according to

international standards

Ground

Slide/Subsidence/Foundation

Building collapse Bore hole sampling / silt

Failure trenching will be

undertaken at

all locations to establish

soil conditions.

Flooding

Damage to

equipment within

Raised elevated

Switchrooms

buildings

Climatic extremes Equipment failure

-Construction

issues

KOC-GE-007 used for

design basis;

Working hours in summer

will be restricted in

accordance

with KOC Practice.

Sandstorms Dust / dirt in

Substations

filtration on air inlets;

Positive pressure inside

the substations. Double

door in luck entry.

Review KOC custom

and practice and ensure

intakes minimise sand

ingress.

1 D 3 M PMC -

Architectural

Vermin Gnoring at cables Ensure vermin guards

fitted where access

ground level access is

provided.

2 C 4 M PMC -

Architectural

External Hazards (Man- Sabotage / Terrorist

made)

Adjacent Land Use Refer to OTS IMP team

Road Traffic

Some perimeter roads to

the substations are also

Public Roads

Vehicle barriers have

been provided to protect

substation facilities.

Contaminated land Oil lakes Visual inspection already

undertaken. Sites selected

on elevated ground.

Aircraft No perceived additional

risk than surrounding

areas or currently present.

Effects on Surrounding Population Centres Not applicable -within

security

area

Traffic Movement Cultural or

Social Aspects

Re-routing of

roads at GCs and

BSs in SEK.

Already allowed for within

design. Within existing

facility security area.

Accommodation requirements Labour force Will be as per current

KOC custom and practice;

numbers will be less than

for current

FMP projects so similar

systems will suffice.

Infrastructure Link & site roads

Will use existing

site roads

HAZID REPORT FORM

1 of 6

Page 11: 1600-000-000-RPT-0001.R2

System Guideword Consequences Safeguards Action No P S R By

Service Mains Water / Power /

Sewerage /

Drainage

Electrical protection and

protection of cables during

construction /

Metal detections/ Hand

excavation

Telecom’s Redirect existing IT

Infrastructure

Review project strategy

and requirements with

3 B 5 M PMC -Control

Engineers

Laydown/spares holding

Identify preliminary

areas and 4 E 1 L

PMC -

Construction

confirm with Asset.

During EPC phase

Drainage

Hazardous

chemical

drainage from

substation battery

room

Collection at neutralisation

pit/ sump prior to removal

by effluent tanker to

company approval

discharge area.

Rain water to evaporation

areas.

Plant Layout Separation generally in

accordance with KOC-L-

027/028.

Provide risk

assessments where

standard can not be

met

5 C 5 H PMC -Projects

and obtain Asset HSE

approval for location. Overhead lines accident will

accour areas

Applicable KOC procedure

will be enforced

Car Parking Facilities Not Part of

design

Site establishment EPC Contractor

responsibility

Check that welfare

facilities 6 C 3 M

PMC -

Contracts

and needs HSE approval including messing

facilities are under KOC procedures adequately covered.

Operational Tie ins Many tie-ins with

multiple

buildings; lengthy

Design to minimise

number of tie-ins.

Plans / Execution

Strategy for design and

execution of Works

7 B 5 M PMC -Projects

handovers / lack

of control

to be agreed by all

concerned

possible

Electrical Hazard.

teams and approved

before issue of ITB.

Simultaneous

operation/construction

Loss of

production.

PMC to hold regular

reviews with Asset during

FEED. EPC Contractor to

liaise during execution

phase as per Contract.

TSA, PTW, RA, etc

HAZID REPORT FORM

2 of 6

Page 12: 1600-000-000-RPT-0001.R2

System Guideword Consequences Safeguards Action No P S R By

Process Hazards Pressure Not applicable -

Civil /

Electrical design

of non

hazardous plant

Inventory Not applicable -

Civil / Electrical

design of non

hazardous plant

Chemical Reaction Not applicable -

Civil / Electrical

design of non

hazardous plant

Toxic Substances Process gas -

H2S/

Contaminated

soil

Up wind of plant; Elevated

sub-stations; No

basements; HVAC from

roof level; gas detection

Integrity Control systems

including ESD /

F&G being

moved and

replaced. Less

production.

Upgrade of safety systems

shall be to latest

standards. Proper

planning, PTW, proper

work control

Corrosion

Not applicable -

Civil /

Electrical design

of non

hazardous plant

Erosion Not applicable -

Civil / Electrical

design of non

hazardous plant

Pressure Testing Not applicable -

Civil / Electrical

design of non

hazardous plant

Hot Surfaces DEG Exhaust Insulation/ lagging of

exhaust

Low temperature Not applicable -

Civil / Electrical

design of non

hazardous plant

Start Up Production loss

during shudown.

Procedures written during

EPC to cover; there will be

no change to the existing

plant operation. Existing

systems shall not be de-

commissioning until new

systems are fully tested

operationally. Gradual

change over. Proper

commesion & testing.

Shutdown No change to

existing systems

Operational stability No change to

existing systems

Process cross connection No change to

existing systems

Fatigue Not applicable

Is process ALARP and BAT No change to

existing systems

Fire and Explosion

Hazards

Stored Flammables Diesel

Generators in

Sub-stations;

Transformer oils

KOC standards shall be

applied, including

standards for fire fighting

in these areas.

HAZID REPORT FORM

3 of 6

Page 13: 1600-000-000-RPT-0001.R2

System Guideword Consequences Safeguards Action No P S R By

Ignition Sources DEG Fire & gas for DEG Hazardous zones to be

reviewed and updated

as required to reflect

changes to risks.

Action closed.

8 C 3 M PMC -Process

/ Tech Safety

Confinement

Battery rooms for

UPS

Ventilation in accordance

with

current KOC standards

and practice

Wind Process gas

blown over

buildings

Gas detector included in

HVAC .

Separation/segregation

Plant to KOC-L-027/ 028

See

above

Active Fire Protection not requires

Passive Fire Protection

Building codes for

architectural

design

Fire Fighting equipment Electrical /

domestic type

fires

Fire extinguishers to be

provided as per KOC Fire

and Safety regulations

Ensure that fire water

ring mains can protect

or are extended to

protect new building

locations.

9 C 5 H PMC -Process

/ Tech Safety

Fire and Gas detection

Electrical /

domestic type Smoke, heat and rate of

Provide fire risk

assessment 10 B 5 M

PMC -Process

/ Tech

temperature rise detectors

as

for new facilities. Action

closed

Safety

per KOC Standards Blowdown Not applicable

Orientation See wind

Means of Escape Trapped Two means of scape from

eaither end of building

PPE Not applicable

Missiles From process

plant -especially

pig traps

Ensure no existing traps

are point towards new

building locations that are

manned or

contain safety critical

equipment.

Shockwaves

Process plant

explosion

Building located in none

Hazardous area.

Combustion products (toxic and

smoke)

Standard building

materials shall be used;

generally non-flammable

Short Circuit Transformer

short circuit

explosion

Provision of blast wall

containment orientation of

substation to direct any

blast debris away from

plant.

HAZID REPORT FORM

4 of 6

Page 14: 1600-000-000-RPT-0001.R2

System Guideword Consequences Safeguards Action No P S R By

Construction/ Operation/ Lifts – Dropped objects Will be covered by Maintenance etc Construction method

statements. No lifts over

live plant anticipated.

Manual Handling Switchgear KOC standards shall be

applied.

Access

Switch gear and

control system KOC Standards shall be

marshalling

cabinets

applied

Override/inhibits Not applicable

By pass UPS bypass Proper planning and

procedure to be followed.

Commonality

Control systems

and Contract strategy still to be

Agree Contract strategy

with all 11 B 5 M

PMC -

Contracts swichgear developed and approved. concerned teams.

Working at heights

Construction

issue Fire and Safety Regs

Isolation

Electrical

systems Can be isolated and will be

provided. PTW/ locks tag.

Confined Space

Raised buildings

in design. KOC Fire and Safety

Construction will

involve

Regulations and PTW will

apply.

digging

Online Testing New Control

System

Commissioning

Develop plan and

strategy and seek

concurrence with Asset.

Basis of plan / strategy

12 C 5 H PMC -Projects

during execution.

Hot working Generally in safe

areas

KOC Fire and Safety

Regulations and PTW will

apply.

Assurance of mobile equipment KOC Fire and Safety

Regulations, PTW and

VEP will apply.

Demolition Existing Control

Buildings

BY Hand and is covered

by KOC Procedure

Ensure that KOC

Procedures for

13 B 4 M PMC -Projects

what information is

required from EPC

Contractor to comply with them

Utilities Fire water Extension of

main discussed

above

Provision of fire hydrants.

Fire water tank located

outside plant area.

Electrical Power

Drains (process/ surface/

sewerage) See above

Waste (Solid/ Liquid)

New buildings will

be as per Demolition plans and

Ensure MSDS's are

available 14 D 4 H KOC -OTS

existing. procedures referenced

above

for all materials to be

removed.

Demolition of

existing buildings

will be used. Identify materials as

part of

FEED design Heating Medium Not applicable

Lighting New Roads KOC standards will be

applied

Inert Gas

HAZID REPORT FORM

5 of 6

Page 15: 1600-000-000-RPT-0001.R2

System Guideword Consequences Safeguards Action No P S R By

Project Design Safety

control

Shutdown Hierarchy Non-process

related

modifications -no

change

Register of safety devices Moving /

changing

Ensure that all relevant

KOC HSEMS

procedures with respect

15 C 5 H PMC -Projects

adhered to

Management of change

procedure

Register of

Safety Critical

equipment

See above

Are design reviews planned IDC's within design team

Issue plan for overall

design 16 B 4 M PMC -Projects

reviews. Discipline Interface IDC's within design team

Personnel/Suppliers/ Selection of appropriate

personnel

Unqualified

personnel/

subcontractors

Properly qualified, trained,

inducted personnel.

Subcontractors

Training A plan will be produced by

the EPC Contractor

KOC Operations to

provide details on

numbers to be

17 C 4 M KOC -OTS

trained and constraints

on

availability. Identify who

is responsible for

ensure that all

necessary personnel

are trained and that the

training has been

delivered. To include in

the ITB that contractor

has to provide training

for new equepment

installed.

Contingencies Medical facilities As per existing KOC

Procedures

Fire fighting Access allowed for within

design

Security

Emergency services

All covered by existing

KOC

Procedures and systems.

Site Spill / Clean up

HSEMS and Fire and

Safety

Regulations apply

Suppliers/Subcontractors KOC Approved

As per Contract

documents

Suitability

Contract options / strategy

still

being developed. Pre

approved subcontractors.

Historic Information Records being retrieved

where available. Site

surveys being used to

substantiate.

HAZID REPORT FORM

6 of 6

Page 16: 1600-000-000-RPT-0001.R2

1

KUWAIT OIL COMPANYKUWAIT OIL COMPANYKUWAIT OIL COMPANYKUWAIT OIL COMPANY

EF EF EF EF –––– 1600160016001600 CONTROL ROOM ENHANCONTROL ROOM ENHANCONTROL ROOM ENHANCONTROL ROOM ENHANCEMENTSCEMENTSCEMENTSCEMENTS

MINUTES OF MEETINGMINUTES OF MEETINGMINUTES OF MEETINGMINUTES OF MEETING Meeting Number: EF-1600-MOM-10-005 Meeting Type: HAZID Workshop

Date: 19th January 2010 Contract: EF 1600

Location: AMEC Design office in Wynyard Parck, UK Recorded By: Meshari Al-Bader

Time: 15:00 hrs to 17:00 hrs

ATTENDEES: KOC Abdul Hadi AlZaubi

Nasser Alattar

Ali Shams

Rashid Aldosari

Senior Engineer/ MP VIII

Electrical Eng. / Main. SK

Electrical Eng. / OTS SEK

Inst. Eng./ Main. SK

DISTRIBUTION: KOC

File: EF/1600 Paul Unsworth – Projects Construction Manager (PMC) Ross Robb – HSEQ Manager (PMC) John Lambert – Engineering Manager Ross Ferguson – Project Engineer 1 All Attendees Document Control Company Team

PMC

Jim Martin

Meshari Al-Bader

Les Smalls

David Sullivan

Rechard Punter

George Renwick

Project Engineer

Associat Project Engineer

Lead Electrical Engineer

Lead Instrument Engineer

Lead construction Engineer

Civil Engineer

ATTACHMENT:

HAZID Report Form

SUBJECT: HAZID STUDY ON EF/1600- ELEVATED SUBSTATIONS IN SEK

NO. DESCRIPTION ACTION BY BY DATE

1.0 The attendees re-visited the HAZID review report MOM-EF1600-0001

completed on 23rd

July 2007 which used a checklist approach to identiy

Hazards accociated with the EF 1600 Works and their implementation.

Record of minute as per attached sheet.

2.0 The identified actions have been subsequently risk ranked in accordance with

methodology included within KOC. SA.018.

3.0 All actions shall be reviewed during the development of the FEED. Those

that have been ranked as HIGH shall be actioned immediately and responses

obtained as part of the basis for the development of the FEED to reduce the

risk.

Those actions ranked as MEDIUM and LOW shall be reviewed by the project

team and dates set for the responses so that the current Contract schedule is

not jeopardized.

PMC

4.0 PMC Technical Safety will review closure of actions as part of PHSER 2

review. PMC

End of Minutes

Page 17: 1600-000-000-RPT-0001.R2

2

Attacments: HAZID Record Forms (6off Sheets)