Puente en Obrajes, Bolivia Diseño 1 

Universidad Duke  

Edmund Finley Trisha Lowe Nick Menchel Anna Sleeter 

Page 2: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

TABLA DE CONTENIDOS  

I. INTRODUCCIÓN 

II. COMUNICADO DE PROBLEMA 

III. CONDICIONES EXISTENTE 

IV. EVALUACIÓN DE OPCIONES 

V. CALCULACIONES DE DISEÑO a. BLOQUES b. VIGAS c. MUROS DE CONTENCIÓN d. PILARES e. FLUJO DE AGUA f. OTRAS CONSIDERACIONES  

VI. DIBUJOS DEL DISEÑO  

VII. CONSTRUCCIÓN 

VIII. OPERACIÓN y MANTENIMIENTO 

IX. LISTA DE MATERIALES y PRESUPUESTOS DE COSTOS 

X. DISEÑOS PARA ENCOFRADOS 

  

APPENDICES  

A. PRESENTATIONS 

a. CONCEPTUAL DESIGN 

b. 30% DESIGN 

c. 60% DESIGN 

B. RAILROAD BRIDGE 

C. LITERATURE REVIEW 

Page 3: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

INTRODUCCIÓN  

Dr. Christine Beaule, una arqueóloga actualmente enseña a  la universidad de Hawaii a Manoa, ha llevado a cabo en Bolivia por más o menos diez años. Basado en algunas comentarios acerca  de  las  dificultades  las  comunidades  están  sufriendo  en  el  altiplano  donde  ella  hubo trabajado, el capítulo estudiantil de la universidad de Duke de Ingenieros Sin Fronteras decidió a participar. Especificamente, los miembros de la comunidad encontran sufrimientos importantes durante la estación de lluvias cuando los ríos locales suben. En el mayo 2008, seis estudiantes y Dr. Beaule llevaron a cabo un viaje para evaluar el terreno en la zona Obrajes. En este viaje, los estudiantes inspeccionaron seis lugares posibles para cruzar y les entrevistaron a los miembros de la comunidad. Basado en la inspección de esta data, el lugar más apropriado, lo más cerca del pueblo de Obrajes, fue escogido. Para construir el puente a este  lugar ayuda al transporte al la ciudad de Oruro. Durante el semester de la primavera de 2009, muchos grupos estudiantiles en el curso CE 142: Diseño de Ingeniería Sostenible diseñaron los pasos para el terreno. Basado en las contribuciones de prefectura de zona (el ministerio gobernal de ingeniero con una oficina en Oruro),  un  terreno  ligeramente  río  abajo  del  terreno  planeado  fue  escogido.  Los  diseños estudiantils  fueron  formulado  por  la  dirección  de  Dr.  David  Schaad,  el  profesor  que  está enseñando CE 142, y también con las contribuciones de varios profesores de ingeniero cívil a la universidad de Duke. Basado en los diseños hechos para la clase, un diseño final será escogido y construido durante el verano 2009. Un grupo de estudiantes trabajarán con los miembros de la comunidad para completar la construcción.   

COMUNICADO DE PROBLEMA  

  Durante  la  estación de  lluvias,  los  ríos de Obrajes  inundan  y  causan problemas  en  el transporte de cultivo, de  las manadas,  los estudiantes a escuela, y  los pacientes que necesitan ayuda médica. Por consiguiente, un puente mejoraría la calidad de vida de la gente que viven en la  zona.  El  puente  debe  ser  construido  con  cuidado  y  con  eficacia  con  la  usa  limitada  de maquinaria, materiales  limitadas,  y  trabajo  no  especializado,  y  también  a  seguir  de  cerca  un horario rígido. Además, lo que es sostenible debe ser considerado a fin de que los ciudadanos de zona puedan mantener el puente fácilmente sin ayuda exterior. 

Page 4: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

 CONDICIONES EXISTENTES 

 Actualmente, el cruce más cerca está ocho millas de Obrajes. Esto es muy inconveniente y no es adecuado para las necesidades de las comunidaes. 

  

Figura 1: Cruce cerca de Obrajes durante la temporada seca  

              

Figura 2: El río en Condor Chinoka

Page 5: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

Este mapa muestra el área alrededor en el valle. El sitio propuesto para el puente está indicado por el círculo.    

Figure 3: Mapa de Obrajes y área alrededor (Prefectura de Obrajes) 

Page 6: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

EVALUACIÓN DE OPCIONES  

FASE DE DISEÑO CONCEPTUAL     Alcantarillas  Calzada endurecida  Zanja 

Costo (2)  2  2  1 

Materiales (3)  1  1  1 

Herramientos (3)  1  1  1 

Disponibilidad de Materiales (1) 

2  1  1 

Viabilidad (2)  2  3  1 

Capacidad de Flujo (1) 1  3  2 

Tiempo (3)  2  2  1 

Mantenimiento (1)  1  2  3 

Vida útil (1)  1  3  2 

Modas de Fallar (1)  1  3  2 

Pericia (2)  3  2  1 

Adaptabilidad (3)  2  1  1 

           

Total  38  41  29 

 Después de hacer  investigación,  intialmente decidimos en  tres categorías de diseños posibles. Incluyen diseño de alcantarillas, diseño de calzada endurecida, y diseño de zanja. Determinamos doce  criterio  de  los  diseños,  y  los  pesa  entre  1‐3  desde  lo más  importante  hasta  lo menos importante.  Cada  diseño  fue  anotado  según  estos  criterios.  Los  pesos  y  anotados  fue multiplicados y añadidos. El diseño zanja  fue el mejor, pero este diseño  todavía  requiere otra métoda de cruzar. Por eso, escogimos el diseño alcantarillado. El cruce sería excavado un poco como una zanja, y alcantarillas pondría a través del arco.   FASE 30% DE DISEÑO, FASE 60% DE DISEÑO, y FASE 90% DISEÑO  Después  de  hacer  las  calculaciones  de  fuerza  y  flujo,  nos  damos  cuenta  que  alcantarillas solamente  no  pueden  proveer  flujo  adecuado.  Entonces,  nuestro  diseño  cambió  para  incluir arcos apoyados con pilares en el centro con alcantarillas a los lados. Vea a Apendice A para las presentaciones (conceptual, 30%, 60%). 

Page 7: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

                  

CALCULACIONES DEL DISEÑO 

Page 8: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

A. DISEÑO DEL BLOQUE Para determinar carga viva para del bloque, estimamos usando las dimensiones y pesos de 

una camión U‐Haul de 17 pies como el peor de  los casos. Estimamos que 75% del peso de  la camión acta  sobre  las  llantas al  fondo, por eso 37,5% acta  sobre cada  llanta. El  caso peor de peso occuría cuando una de  las  llantas al fondo está centrada entre dos de  las vigas de apoyo debajo del bloque. Nuestro diseño incluye cuatro de esas vigas debajo del bloque. Para diseñar el bloque, consideramos una sección de un pie y la tratamos como una viga. Los pesos sobre el puente  incluye  el  peso  immovil  del  peso  del  bloque,  y  el  peso  movil  de  la  camion,  y  las reacciones  de  apoyo  de  las  vigas.  Porque  este  es  un  caso  estaticamente  indeterminado involucrando concreto, y  requiere análisis de  fallar, usamos una  function de MATLAB se  llama three_moment.m  escrito  por  Dr.  Henri  Gavin,  el  W.  H.  Gardner  Jr.  professor  asociado  de ingenería  civil  y  medio  ambiente  a  Universidad  Duke,  y  la  usamos  usando  el  programa runthreemomentSLAB.m.  De  este,  obtenemos  la  fuerza  cortante  máximo  (tensil)  y  mínimo (compresivo), momento de doblar, y deflección para la sección transversal, y gráficos de fuerza cortante, momento de doblar, y deflección para la sección transversal. 

El bloque fue diseñado para asegurar que ningún refuerzo de fuerza cortante sea requisito, solo  refuerzo  longitudinal.  Después  de  hacer  las  calculaciones  usando  los  números  del three_moment.m,  determinamos  las  dimensiones  del  bloque.  Después,  introducimos  el momento máximo en una hoja de cálculo diseñado por Dr. Joseph Nadeau, professor asociado del  práctico  de  ingenería  civil  y  medio  ambiente  a  Universidad  Duke,  para  determiner  el refuerzo necesario longitudinal. 

 B. DISEÑO DE LAS VIGAS 

El caso del peso que consideramos incluye el peso del bloque, el peso de las vigas, y el peso movil  de  las  llantas  al  fondo  que  están  exactamente  al  centro  del  arco  entre  pilares.  Para determiner  la  fuerza cortante y momento, otra vez usamos  la  function  three_moment.m. Los momentos máximos son  introducidos en  la hoja de cálculo de Dr. Nadeau para determiner  las dimensiones y refuerzo de las vigas. Por favor note que originalmente, supusimos que las vigas sería 18 pulgadas de ancho y 24 pulgadas de profundidad, y que estes números fueron usados para el muro de contención y  las calculaciones para  los pilares. Hemos calculado dimensiones nuevas  para  las  vigas  de  apoyo  basadas  por  un  cambio  del  diseño  del  bordillo,  pero  no cambiamos los diseños del muro de contención ni los diseños de los pilares. 

 C. MUROS DE CONTENCIÓN 

Los pilares a los extremos de la calzada al lado de las alcantarillas necesitaron ser diseñados como muros de contención para asegurar que pudieran apoyar la carga de la tierra/gravalla y las alcantarillas.  Una sección de una pie (≈ 0.3 metros) fue considerada.  El diseño fue revisado para asegurar que  la capacidad de  la tierra que resistir  la presión de  la carga no fuera sobrepasado, que el muro no se trasladaría y que el muro no daría la vuelta.  Luego el tallo, el talón, y el dedo de  pie  fueron  revisados  para  determinar  cual  refuerzo  cortante  y  acero  flexural  fueron requeridos.  D. PILAR CENTRAL 

El  pilar  en  el  centro  fue  diseñado  tomando  una  sección  de  una  pie  (≈  0.3  metros)  y tratándola como una columna.  Para los propósitos de constructabilidad, el muro necesitó tener un pie  (≈ 0.3 metros) mas o menos de ancho.   Con ese ancho, no  refuerzo  fue necesario.   La base  fue  diseñado  y  revisado  por momento  de  flexión  y  fuerza  cortante  para  determinar  el refuerzo necesario. 

Page 9: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

 E. FLUJO HIDRÁULICO 

En cada etapa de nuestro diseño, hicimos calculaciones del  flujo para asegurar que había bastante espacio para el agua para no causar un efecto como lo de una presa detrás del puente.  Una hoja de calculo fue diseñado utilizando las ecuaciones de Manning y Darcy‐Weisbach. 

Otro factor que estamos considerando en nuestro diseño del flujo viene de las condiciones actuales en el sitio.   Como se puede ver en el  imagen de Google,  tanto como en una  foto del viaje  de  evaluación  del  sitio  del  año  pasado,  un  puente  de  ferrocarril  que  ya  existe  está dificultando  el  flujo  natural  del  río.    Este  puente  pasa  sobre  el  río  después  de  que  los  dos riachuelos se  juntan, mientras que nuestro puente solo pasará sobre uno de estos riachuelos.  Así que hemos hecho suposiciones preliminares que con tal de que el area abierta de la sección transversal  de  nuestro  puente  es mas  grande  que  lo  del  puente  de  ferrocarril  existente,  no vamos a  limitar el  flujo.   Vamos a tener que reevaluar esta suposición al  llegar al sitio y tener datos mas precisos.  Consulta Apéndice A. 

  F. OTRAS CONSIDERACIONES 

Los  espacios  entre  las  alcantarillas  y  la  cantidad  de  tierra  y  gravalla  puesta  sobre  las alcantarillas  fue  revisado  usando  las  provisiónes  del  Código  de  la  Associación  Americano  de Officiales Estatales de Carreteras y Transportación (AASHTO).                   

Page 10: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

              

Page 11: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 12: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 13: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

three_moment.m 4/30/2009

function [M,R,M_Diag,V_Diag,d_Diag,D_max] = three_moment(L,I,w,E)% [M,R,M_Diag,V_Diag,d_Diag,D_max] = three_moment(L,I,w,E)% solve the three-moment equations for a continuous beam of N spans.%% input:% L is a vector of length N containing the lengths of each span.% I is a vector of length N containing the moments of inertia of each span.% w is a vector of length N containing the uniform loads on each span.% E is a scalar constant for the modulus of elasticity.%% output:% M is a vector of lenght N+1 containing the moments at each support% R is a vector of lenght N+1 containing the reactions at each support% M_Diag is a vector of the moment diagram% V_Diag is a vector of the shear diagram% d_Diag is a vector of the displacement diagram% D_max is a vector of the max absolute displacement of each span%% This program assumes that none of the supports are moment resisting,% that there are no hinges in the beam, that all the spans are made of% the same material, and that each spans is prismatic.

% H.P. Gavin, Civil and Environmental Engineering, Duke University, 1/24/00

N = length(L); % number of spans

F = zeros(N-1,N-1); % initialize the matrix to be zero

for j=1:N-1 % create the flexibility matrix(8)-(10)if ( j > 1 )

F(j,j-1) = L(j) / I(j);end

F(j,j) = 2 * ( L(j) / I(j) + L(j+1) / I(j+1) );

if ( j < N-1 )F(j,j+1) = L(j+1) / I(j+1);

endend

for j=1:N-1 % create the right-hand-side vector(11)

d(j) = - w(j)*L(j)^3 / ( 4 * I(j) ) - w(j+1)*L(j+1)^3 / (4 * I(j+1) );end

m = inv(F) * d(:); % compute the internal moments (7)

for j=1:N-1 % compute the reactions (12)

r(j) = w(j)*L(j)/2 + w(j+1)*L(j+1)/2 - m(j)/L(j) - m(j)/L(j+1);

if ( j > 1 )r(j) = r(j) + m(j-1)/L(j);

end

if ( j < N-1 )r(j) = r(j) + m(j+1)/L(j+1);

endend

R = [ w(1)*L(1)/2 + m(1)/L(1) r(:)' w(N)*L(N)/2 + m(N-1)/L(N) ];

M = [ 0 m' 0 ]; % end moments are zero.

for j=1:N % compute the slopes (15)

1

Page 14: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

three_moment.m 4/30/2009

slope(j) = -( w(j)*L(j)^3 / 24 + ...M(j+1)*L(j) / 6 + M(j)*L(j) / 3 ) / (E*I(j));

end

if ( abs ( sum(R) - sum (w .* L) ) < 1e-9 )disp (' yes! ') % equilibrium check ... should be close tozero

end

% ---------- shear, moment, slope, and deflection data and plots -----------

for j=1:N % x-axis data for shear, moment, slope, and deflectiondiagramsx(:,j) = [ 0:L(j)/55:L(j) ]' ;

end

[row,col] = size(x);

for j=1:NVo = ( M(j) - M(j+1) ) / L(j) - w(j)*L(j)/2; % shear atleftV_Diag(:,j) = Vo + w(j)*x(:,j);M_Diag(:,j) = M(j) - Vo*x(:,j) - (1/2)*w(j)*x(:,j).^2 ;s_Diag(:,j) = cumtrapz( M_Diag(:,j) ) * x(2,j) / (E*I(j)) + slope(j) ;d_Diag(:,j) = cumtrapz( s_Diag(:,j) ) * x(2,j) ;

end

% ------------- print key results to screen --------------

fprintf('------------------------------------------------------------------\n');fprintf(' Moment ShearDeflection\n');fprintf(' Maximum %12.5e %12.5e %12.5e\n', ...

max(max(M_Diag)), max(max(-V_Diag)), max(max(d_Diag)) );fprintf(' Minimum %12.5e %12.5e %12.5e\n', ...

min(min(M_Diag)), min(min(-V_Diag)), min(min(d_Diag)) );

fprintf('------------------------------------------------------------------\n');

for j=1:N % x-axis data for shear and moment diagram plotsx(:,j) = x(:,j) + sum( L(1:j-1) ) ;

end

V_Diag(row+1,:) = zeros(1,col); % close the polygon for shaded plotsM_Diag(row+1,:) = zeros(1,col);V_Diag(row+2,:) = zeros(1,col);M_Diag(row+2,:) = zeros(1,col);x(row+1,:) = x(row,:);x(row+2,:) = x(1,:);

% Plotting

figure(1);subplot(4,1,1)% fill ( x , -V_Diag , -V_Diag ) % shaded plot% grid onplot ( x , -V_Diag, '-b' ) % line plotylabel('Internal Shear (lbf)')

subplot(4,1,2)% fill ( x , M_Diag , M_Diag ) % shaded plot% grid onplot ( x , M_Diag , '-b' ) % line plotylabel('Internal Moment (lbf.in)')

2

Page 15: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

three_moment.m 4/30/2009

subplot(4,1,3)plot ( x(1:row,:) , s_Diag , '-b' ) % line plot

% plot ( x(1:row,:) , s_Diag , '-b', 'LineWidth', 2 ) % line plot% grid onylabel('Slope')

subplot(4,1,4)% plot ( x(1:row,:) , d_Diag , '-b', 'LineWidth', 2 ) % line plot% grid onplot ( x(1:row,:) , d_Diag , '-b' ) % line plotxlabel('span (in)')ylabel('Deflection (in)')

D_max = max(abs(d_Diag))M_Diag = M_Diag(:);V_Diag = V_Diag(:);d_Diag = d_Diag(:);

% ------------------------------------------------------------- THREE_MOMENT

3

Page 16: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 17: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 18: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 19: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 20: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

runthreemomentSLAB.m 4/30/2009

% Slab (s) Design (approximated as "beam")

% constantsg = 9.81 % m/s^2E = 29e9k = 2402.24 % mass/unit volume of concrete, kg/m^3m = .2032 % width of curb, mh = .4572 % height of curbL = 3.5; % total span of "beam" (dv slab) (m)Ls = [L/3 L/3 L/3]; % distance between supportsb = 1*0.3048; % "width" of "beam" cross section (m)d = .22; % "height" of "beam" cross section - DEPTH (m)I = (1/12).*b.*d.^3; % InertiaIs = [I I I]; % doesn't actually matter because it's the same for

% each span since constant cross section

F_c = m*h*b*k*g; % Force from the curbF_v = 23444.674; % Force from the vehicle tire (back)

% DEAD LOADSw = L*b*d; % calculation of self-weight of slab for "beam"

% ie (dv slab)ws = [w w w]; % distributed load for each span (between supports)Ps = [0]; % Vector containing point loads (none in dead case)xs = [0]; % positions of point loads

three_moment(Ls,Is,E,ws,Ps,xs)

% LIVE LOADSws = [0 0 0]; % no distributed live loadsPs = [F_c F_v F_v F_c]; % Vector containing point loadsxs = [0.1016 0.5833 2.7233 3.3984]; % positions of point loads

three_moment(Ls,Is,E,ws,Ps,xs)

1

Page 21: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 22: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 23: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

Concrete COMPRESSIVE strength, fc' = 2500 psi (≥2,500 psi [ACI 5.1.1]) = 2.5 ksi R/C DENSITY = 150 lbs/ft3

YIELD stress of reinforcing steel, fy = 40000 psi (≤ 80,000 psi [ACI 9.4]) = 40 ksi MINIMUM Clear Cover = 1.5 in [ACI 7.7.1]yield strain, εy = 0.00138 MINIMUM vertical clear spacing = 1.0 in [ACI 7.6.2]

Young's modulus of steel, Es = 29000 ksi [ACI 8.5.2]Intensity of WSB = 0.85 fc' [ACI 10.2.7.1] MINIMUM max-strain in tensile steel, min εt = 0.004 [ACI 10.3.5]

β1 = 0.85 [ACI 10.2.7.3] CRUSHING strain of concrete, εcu = 0.003 [ACI 10.2.3]m = fy/0.85fc' = 18.8 Compression-controlled strain limit = 0.00138 = εy [ACI 10.3.3]

Tension-controlled strain limit = 0.005 [ACI 10.3.4]Compression-controlled φ = 0.65 [ACI 9.3.2.2]

Tension-controlled φ = 0.90 [ACI 9.3.2.1]

ASSUMED strength reduction factor, φ = 0.90 <<<<< 0.90

self-weight MD = 4 kip-ft <<<<< need to calculate <<<<< beam self wt = 108.3 lbs/ftMD = 0 kip-ft <<<<< Does not include beam self weightML = 4 kip-ft

Factored moment, Mu = 11.91664 kip-ft <<<<< Considers ONLY Dead & Live moments via 1.4D and 1.2D+1.6L [ACI 9.2.1]req'd Mn = Mu/φ = 13.2 kip-ft = 158.9 kip-in = 158889 lb-in

TARGETED reinforcement ratio, ρ = 0.0100 0.0050 = MINIMUM reinforcement ratio [ACI 10.5.1]0.0116 = DEFLECTIONS not likely an issue if below this limit0.0194 = MAXIMUM reinf ratio (corresponding to epsilon_t=0.004)0.0309 = BALANCED reinforcement ratio

Rn = … = 362.4 psireq'd bd2 = Mn/Rn = 438.5 in3

DESIRED d/b ratio = 1.50 0.57 = actual d/b

Beam WIDTH, b [in] = 12 5.8 = req'd b based on desired d/b ratio >>>>> 6.0Beam HEIGHT, h [in] = 9 7.9 = req'd h = req'd d + dims related to size & # of layers of bars

>>>>> CHANGING b and/or h ALTERS Mu b/c of NEW beam self weight >>>>> beam self wt = 108.3 lbs/ft

d = 6.8 in <<<<<dt = 6.8 in NOTE: d & dt calculated from h accounting for stirrup size and longitudinal bar size & # of layers.

req'd Rn = (req'd Mn)/bd2 = 362.4 psireq'd reinforcement ratio, ρ = … = 0.0045

req'd As = ρbd = 0.725 in2

shear STIRRUP bar SIZE = # dia = 0.000 in

# of LAYERS for longitudinal bars = 1TOTAL # of longitudinal BARS = 2 1.65 total req'd 0 = adjust # bars (do NOT use)

Longitudinal Bar SIZE = #6 dia = 0.75 in area = 0.440 in2 1 in = min HCS [ACI 7.6.1]>>>>> CHANGING stirrup size, # of layers, and/or longitudinal bar size ALTERS d >>>>>

TOTAL Selected Area of Steel, As = 0.880 in2

Reinforcement ratio, ρ = As/bd = 0.0108MINIMUM beam width, min b = 5.5 in <<<<< min required b for adequate horizontal clear cover (CC) and clear spacing (CS) [ACI 7.7.1 & 7.6.1]

Total cost = 20.28$ /ft <<<<< cost/ft: forms, rebar, and concrete

Longitudinal bar symmetry <<<<< Can bars be arranged symmetrically? If yellow, then user needs to assess.

INP

UT

BE

AM

SIZ

E

in = req'd d based on selected b and targeted reinf ratio

STE

EL

Page 24: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

Longitudinal bar vertical alignment <<<<< Can bars be arranged vertically, if required? If yellow, then user needs to assess.Minimum # of longitudinal bars <<<<< Is there at least the minumum # of bars?

Maximum longitudinal bar size (#11) <<<<< Is the bar size permitted?

x = 1.62 in <<<<< distance from compression face of beam to the N.A.εs = 0.00954 <<<<< average strain in tension steel >>>>> 6.9 = approx ductility (εs/εy)εt = 0.00954 <<<<< maximum strain in tension steel >>>>> 6.9 = approx ductility (εt/εy)

Strength Reduction Factor, φ = 0.90 [ACI 9.3.1]Nominal Strength, Mn = 18 kip-ft [ACI 10.2]

DESIGN STRENGTH, φMn = 16 kip-ft [ACI 9.3.1]

Over design: 35.1%>>>>> INSUFFICIENT Design Strength requires UPDATING assumed strength reduction factor >>>>>

Concrete COMPRESSIVE strength, fc' = 2500 psi Nominal Strength, Mn = 18 kip-ft Adequate Design Strength (φMn) [ACI 9.1.1]YIELD stress of reinforcing steel, fy = 40000 psi strength reduction factor, φ = 0.90 Meets minimum reinforcement ratio (ρmin) [ACI 10.5.1]

Meets minimum max-tensile steel strain (min εt) [ACI 10.3.5]b = 12 in DESIGN STRENGTH, φMn = 16 kip-fth = 9 in Mu = 11.9166391 kip-ft Adequate VERTICAL CC & CS [ACI 7.7.1 & 7.6.2]d = 6.8 in Overdesigned by 35.1% Adequate HORIZONTAL CC & CS [ACI 7.7.1 & 7.6.1]dt = 6.8 in Longitudinal bar symmetry *

approx ductility (εs/εy) = 6.9 Longitudinal bar vertical alignment [ACI 7.6.2]*# of Longitudinal BARS = 2 approx ductility (εt/εy) = 6.9 Minimum # of longitudinal bars

size of Longitudinal BARS = #6 Maximum longitudinal bar size (#11)# of Layers = 1

Total As = 0.880 in2

reinforcement ratio, ρ = 0.0045d/b = 0.57

size of STIRRUPS = #plywood FORM mat'l & labor = 14.49$ /ft

beam self weight = 108.3 lbs/ft Long. REBAR mat'l & labor = 2.10$ /ftclear cover (CC) = 1.5 in CONCRETE mat'l, labor & equip = 3.68$ /ft CC = clear cover

Total cost = 20.28$ /ft CS = clear spacing

fcp (psi) fy (psi) b h d dt As phi*Mn Mu d/b rho forms $ rebar $ concrete $ total $2500 40000 12 9 6.8 6.8 0.880 16 11.916639 0.57 0.0045 14.49$ 2.10$ 3.68$ 20.28$

(*) It is NOT guaranteed, unless filled-green, that symmetry and vertical alignment of longitudinal bars can be achieved given the # of bars and the # of layers of bars. If filled-yellow, user must validate these requirements.

AN

ALY

SIS

OU

TPU

T

Page 25: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 26: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 27: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 28: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 29: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

runthreemomentBEAM.m 4/30/2009

% Beam Design

% constantsg = 9.81 % m/s^2E = 29e9k = 2402.24 % mass/unit volume of concrete, kg/m^3 (=150 lbm/ft^3)m = .2032 % width of curb, m (=8 in)h = .4572 % height of curb, m (=18 in)L = 6.2033; % span of beam between piers (m) (=20.35 ft)Lb = [L]; % for only two piers, without middle pierb = 0.3048; % "width" of "beam" cross section (m), (=1 ft)d = .22; % "depth" of "slab" cross section (m), (approx 9 in)q = 0.3048; % width of beam and slab cross sections (m), (=1 ft)H = (20/12)*0.3048; % height of beam cross section (m), (=20 in)n = 1.167 % distance between midpoint of any two supports, mI = (1/12).*b.*H.^3; % InertiaIb = [I];

F_c = m*h*k*g; % Distributed force from the curbF_v = 23444.674; % Force from the vehicle tire (back), NF_t = 7814.891; % Force from vehicle tire (front), N

% Outer Beam Design (support beams)

% % Outer Beam DEAD LOADS% w = d*(n/2)*k*g; % Distributed load from slab% wb =[w+F_c]; % Total distributed load over beam, slab + curb%% Pb = [0] % No point loads in live case% xb = [0] % Position of the nonexistent point loads%% three_moment(Lb, Ib, E, wb, Pb, xb)

% % Outer Beam LIVE LOADS% wb = [0] % No live distributed load%% Pb = [F_v+F_t] % Point load acting at COM of vehicle% xb = [L/2]; % Worst case scenario, when max force is midspan%% three_moment(Lb, Ib, E, wb, Pb, xb)% %% Inner Beam Design (support beams)

% % Inner Beam DEAD LOADS% w = d*(n)*k*g; % Distributed load from slab% wb =[w+F_c]; % Total distributed load over beam, slab + curb%% Pb = [0] % No point loads in live case% xb = [0] % Position of the nonexistent point loads%% three_moment(Lb, Ib, E, wb, Pb, xb)

% Inner Beam LIVE LOADSwb = [0] % No live distributed load

Pb = [F_v+F_t] % Point load acting at COM of vehiclexb = [L/2]; % Worst case scenario, when max force is midspan

three_moment(Lb, Ib, E, wb, Pb, xb)

%

1

Page 30: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 31: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 32: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

Concrete COMPRESSIVE strength, fc' = 2500 psi (≥2,500 psi [ACI 5.1.1]) = 2.5 ksi R/C DENSITY = 150 lbs/ft3

YIELD stress of reinforcing steel, fy = 40000 psi (≤ 80,000 psi [ACI 9.4]) = 40 ksi MINIMUM Clear Cover = 1.5 in [ACI 7.7.1]

yield strain, εy = 0.00138 MINIMUM vertical clear spacing = 1.0 in [ACI 7.6.2]

Young's modulus of steel, Es = 29000 ksi [ACI 8.5.2]

Intensity of WSB = 0.85 fc' [ACI 10.2.7.1] MINIMUM max-strain in tensile steel, min εt = 0.004 [ACI 10.3.5]

β1 = 0.85 [ACI 10.2.7.3] CRUSHING strain of concrete, εcu = 0.003 [ACI 10.2.3]

m = fy/0.85fc' = 18.8 Compression-controlled strain limit = 0.00138 = εy [ACI 10.3.3]Tension-controlled strain limit = 0.005 [ACI 10.3.4]

Compression-controlled φ = 0.65 [ACI 9.3.2.2]Tension-controlled φ = 0.90 [ACI 9.3.2.1]

ASSUMED strength reduction factor, φ = 0.90 <<<<< 0.90

self-weight MD = 10 kip-ft <<<<< need to calculate <<<<< beam self wt = 250.0 lbs/ft

MD = 19 kip-ft <<<<< Does not include beam self weight

ML = 36 kip-ft

Factored moment, Mu = 90.76675 kip-ft <<<<< Considers ONLY Dead & Live moments via 1.4D and 1.2D+1.6L [ACI 9.2.1]

req'd Mn = Mu/φ = 100.9 kip-ft = 1210.2 kip-in = 1210223 lb-in

TARGETED reinforcement ratio, ρ = 0.0100 0.0050 = MINIMUM reinforcement ratio [ACI 10.5.1]0.0116 = DEFLECTIONS not likely an issue if below this limit0.0194 = MAXIMUM reinf ratio (corresponding to epsilon_t=0.004)0.0309 = BALANCED reinforcement ratio

Rn = … = 362.4 psi

req'd bd2 = Mn/Rn = 3339.9 in3

DESIRED d/b ratio = 1.50 1.51 = actual d/b

Beam WIDTH, b [in] = 12 11.4 = req'd b based on desired d/b ratio >>>>> 16.7Beam HEIGHT, h [in] = 20 18.6 = req'd h = req'd d + dims related to size & # of layers of bars

>>>>> CHANGING b and/or h ALTERS Mu b/c of NEW beam self weight >>>>> beam self wt = 250.0 lbs/ft

d = 18.1 in <<<<<dt = 18.1 in NOTE: d & dt calculated from h accounting for stirrup size and longitudinal bar size & # of layers.

req'd Rn = (req'd Mn)/bd2 = 362.4 psireq'd reinforcement ratio, ρ = … = 0.0045

req'd As = ρbd = 2.002 in2

shear STIRRUP bar SIZE = # dia = 0.000 in

# of LAYERS for longitudinal bars = 1TOTAL # of longitudinal BARS = 5 4.55 total req'd 0 = adjust # bars (do NOT use)

Longitudinal Bar SIZE = #6 dia = 0.75 in area = 0.440 in2 1 in = min HCS [ACI 7.6.1]>>>>> CHANGING stirrup size, # of layers, and/or longitudinal bar size ALTERS d >>>>>

TOTAL Selected Area of Steel, As = 2.200 in2

Reinforcement ratio, ρ = As/bd = 0.0101MINIMUM beam width, min b = 10.75 in <<<<< min required b for adequate horizontal clear cover (CC) and clear spacing (CS) [ACI 7.7.1 & 7.6.1]

Total cost = 39.45$ /ft <<<<< cost/ft: forms, rebar, and concrete

Longitudinal bar symmetry <<<<< Can bars be arranged symmetrically? If yellow, then user needs to assess.Longitudinal bar vertical alignment <<<<< Can bars be arranged vertically, if required? If yellow, then user needs to assess.

Minimum # of longitudinal bars <<<<< Is there at least the minumum # of bars?Maximum longitudinal bar size (#11) <<<<< Is the bar size permitted?

INP

UT

BE

AM

SIZ

E

in = req'd d based on selected b and targeted reinf ratio

ST

EE

L

Page 33: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

x = 4.06 in <<<<< distance from compression face of beam to the N.A.εs = 0.01039 <<<<< average strain in tension steel >>>>> 7.5 = approx ductility (εs/εy)

εt = 0.01039 <<<<< maximum strain in tension steel >>>>> 7.5 = approx ductility (εt/εy)Strength Reduction Factor, φ = 0.90 [ACI 9.3.1]

Nominal Strength, Mn = 120 kip-ft [ACI 10.2]

DESIGN STRENGTH, φMn = 108 kip-ft [ACI 9.3.1]

Over design: 19.2%>>>>> INSUFFICIENT Design Strength requires UPDATING assumed strength reduction factor >>>>>

Concrete COMPRESSIVE strength, fc' = 2500 psi Nominal Strength, Mn = 120 kip-ft Adequate Design Strength (φMn) [ACI 9.1.1]

YIELD stress of reinforcing steel, fy = 40000 psi strength reduction factor, φ = 0.90 Meets minimum reinforcement ratio (ρmin) [ACI 10.5.1]

Meets minimum max-tensile steel strain (min εt) [ACI 10.3.5]

b = 12 in DESIGN STRENGTH, φMn = 108 kip-ft

h = 20 in Mu = 90.76675 kip-ft Adequate VERTICAL CC & CS [ACI 7.7.1 & 7.6.2]d = 18.1 in Overdesigned by 19.2% Adequate HORIZONTAL CC & CS [ACI 7.7.1 & 7.6.1]dt = 18.1 in Longitudinal bar symmetry *

approx ductility (εs/εy) = 7.5 Longitudinal bar vertical alignment [ACI 7.6.2]*

# of Longitudinal BARS = 5 approx ductility (εt/εy) = 7.5 Minimum # of longitudinal barssize of Longitudinal BARS = #6 Maximum longitudinal bar size (#11)

# of Layers = 1

Total As = 2.200 in2

reinforcement ratio, ρ = 0.0045d/b = 1.51

size of STIRRUPS = #plywood FORM mat'l & labor = 25.70$ /ft

beam self weight = 250.0 lbs/ft Long. REBAR mat'l & labor = 5.26$ /ftclear cover (CC) = 1.5 in CONCRETE mat'l, labor & equip = 8.50$ /ft CC = clear cover

Total cost = 39.45$ /ft CS = clear spacing

fcp (psi) fy (psi) b h d dt As phi*Mn Mu d/b rho forms $ rebar $ concrete $ total $2500 40000 12 20 18.1 18.1 2.200 108 90.76675 1.51 0.0045 25.70$ 5.26$ 8.50$ 39.45$

(*) It is NOT guaranteed, unless filled-green, that symmetry and vertical alignment of longitudinal bars can be achieved given the # of bars and the # of layers of bars. If filled-yellow, user must validate these requirements.

AN

ALY

SIS

OU

TP

UT

Page 34: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 35: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 36: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

Concrete COMPRESSIVE strength, fc' = 2500 psi (≥2,500 psi [ACI 5.1.1]) = 2.5 ksi R/C DENSITY = 150 lbs/ft3

YIELD stress of reinforcing steel, fy = 40000 psi (≤ 80,000 psi [ACI 9.4]) = 40 ksi MINIMUM Clear Cover = 1.5 in [ACI 7.7.1]

yield strain, εy = 0.00138 MINIMUM vertical clear spacing = 1.0 in [ACI 7.6.2]

Young's modulus of steel, Es = 29000 ksi [ACI 8.5.2]

Intensity of WSB = 0.85 fc' [ACI 10.2.7.1] MINIMUM max-strain in tensile steel, min εt = 0.004 [ACI 10.3.5]

β1 = 0.85 [ACI 10.2.7.3] CRUSHING strain of concrete, εcu = 0.003 [ACI 10.2.3]

m = fy/0.85fc' = 18.8 Compression-controlled strain limit = 0.00138 = εy [ACI 10.3.3]Tension-controlled strain limit = 0.005 [ACI 10.3.4]

Compression-controlled φ = 0.65 [ACI 9.3.2.2]Tension-controlled φ = 0.90 [ACI 9.3.2.1]

ASSUMED strength reduction factor, φ = 0.90 <<<<< 0.90

self-weight MD = 10 kip-ft <<<<< need to calculate <<<<< beam self wt = 250.0 lbs/ft

MD = 29 kip-ft <<<<< Does not include beam self weight

ML = 36 kip-ft

Factored moment, Mu = 103.6428 kip-ft <<<<< Considers ONLY Dead & Live moments via 1.4D and 1.2D+1.6L [ACI 9.2.1]

req'd Mn = Mu/φ = 115.2 kip-ft = 1381.9 kip-in = 1381903 lb-in

TARGETED reinforcement ratio, ρ = 0.0100 0.0050 = MINIMUM reinforcement ratio [ACI 10.5.1]0.0116 = DEFLECTIONS not likely an issue if below this limit0.0194 = MAXIMUM reinf ratio (corresponding to epsilon_t=0.004)0.0309 = BALANCED reinforcement ratio

Rn = … = 362.4 psi

req'd bd2 = Mn/Rn = 3813.7 in3

DESIRED d/b ratio = 1.50 1.51 = actual d/b

Beam WIDTH, b [in] = 12 11.9 = req'd b based on desired d/b ratio >>>>> 17.8Beam HEIGHT, h [in] = 20 19.7 = req'd h = req'd d + dims related to size & # of layers of bars

>>>>> CHANGING b and/or h ALTERS Mu b/c of NEW beam self weight >>>>> beam self wt = 250.0 lbs/ft

d = 18.1 in <<<<<dt = 18.1 in NOTE: d & dt calculated from h accounting for stirrup size and longitudinal bar size & # of layers.

req'd Rn = (req'd Mn)/bd2 = 362.4 psireq'd reinforcement ratio, ρ = … = 0.0045

req'd As = ρbd = 2.139 in2

shear STIRRUP bar SIZE = # dia = 0.000 in

# of LAYERS for longitudinal bars = 1TOTAL # of longitudinal BARS = 5 4.86 total req'd 0 = adjust # bars (do NOT use)

Longitudinal Bar SIZE = #6 dia = 0.75 in area = 0.440 in2 1 in = min HCS [ACI 7.6.1]>>>>> CHANGING stirrup size, # of layers, and/or longitudinal bar size ALTERS d >>>>>

TOTAL Selected Area of Steel, As = 2.200 in2

Reinforcement ratio, ρ = As/bd = 0.0101MINIMUM beam width, min b = 10.75 in <<<<< min required b for adequate horizontal clear cover (CC) and clear spacing (CS) [ACI 7.7.1 & 7.6.1]

Total cost = 39.45$ /ft <<<<< cost/ft: forms, rebar, and concrete

Longitudinal bar symmetry <<<<< Can bars be arranged symmetrically? If yellow, then user needs to assess.Longitudinal bar vertical alignment <<<<< Can bars be arranged vertically, if required? If yellow, then user needs to assess.

Minimum # of longitudinal bars <<<<< Is there at least the minumum # of bars?Maximum longitudinal bar size (#11) <<<<< Is the bar size permitted?

INP

UT

BE

AM

SIZ

E

in = req'd d based on selected b and targeted reinf ratio

ST

EE

L

Page 37: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

x = 4.06 in <<<<< distance from compression face of beam to the N.A.εs = 0.01039 <<<<< average strain in tension steel >>>>> 7.5 = approx ductility (εs/εy)

εt = 0.01039 <<<<< maximum strain in tension steel >>>>> 7.5 = approx ductility (εt/εy)Strength Reduction Factor, φ = 0.90 [ACI 9.3.1]

Nominal Strength, Mn = 120 kip-ft [ACI 10.2]

DESIGN STRENGTH, φMn = 108 kip-ft [ACI 9.3.1]

Over design: 4.4%>>>>> INSUFFICIENT Design Strength requires UPDATING assumed strength reduction factor >>>>>

Concrete COMPRESSIVE strength, fc' = 2500 psi Nominal Strength, Mn = 120 kip-ft Adequate Design Strength (φMn) [ACI 9.1.1]

YIELD stress of reinforcing steel, fy = 40000 psi strength reduction factor, φ = 0.90 Meets minimum reinforcement ratio (ρmin) [ACI 10.5.1]

Meets minimum max-tensile steel strain (min εt) [ACI 10.3.5]

b = 12 in DESIGN STRENGTH, φMn = 108 kip-ft

h = 20 in Mu = 103.64275 kip-ft Adequate VERTICAL CC & CS [ACI 7.7.1 & 7.6.2]d = 18.1 in Overdesigned by 4.4% Adequate HORIZONTAL CC & CS [ACI 7.7.1 & 7.6.1]dt = 18.1 in Longitudinal bar symmetry *

approx ductility (εs/εy) = 7.5 Longitudinal bar vertical alignment [ACI 7.6.2]*

# of Longitudinal BARS = 5 approx ductility (εt/εy) = 7.5 Minimum # of longitudinal barssize of Longitudinal BARS = #6 Maximum longitudinal bar size (#11)

# of Layers = 1

Total As = 2.200 in2

reinforcement ratio, ρ = 0.0045d/b = 1.51

size of STIRRUPS = #plywood FORM mat'l & labor = 25.70$ /ft

beam self weight = 250.0 lbs/ft Long. REBAR mat'l & labor = 5.26$ /ftclear cover (CC) = 1.5 in CONCRETE mat'l, labor & equip = 8.50$ /ft CC = clear cover

Total cost = 39.45$ /ft CS = clear spacing

fcp (psi) fy (psi) b h d dt As phi*Mn Mu d/b rho forms $ rebar $ concrete $ total $2500 40000 12 20 18.1 18.1 2.200 108 103.64275 1.51 0.0045 25.70$ 5.26$ 8.50$ 39.45$

(*) It is NOT guaranteed, unless filled-green, that symmetry and vertical alignment of longitudinal bars can be achieved given the # of bars and the # of layers of bars. If filled-yellow, user must validate these requirements.

AN

ALY

SIS

OU

TP

UT

Page 38: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 39: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 40: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 41: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 42: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 43: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 44: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 45: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

width of wall= 11.48 ft<---(We will analyze a 1 ft. section of the wall)

from river bed to top of wall= 8.2 ftsoil density= 125 pcf

depth of burying= 2.5 ftheight= 11.45 ft

stem thickness= 1.75 ftbase thickness= 0.75 ft

base= 7.083332 ft

stem= 10.7 ft <---Choose the height of the stem

heel= 3.666666 fttoe= 1.666666 ft

slab width= 11.48 ftslab thickness= 0.722 ft

slab length= 20.35 ftAs in slab= 10.1024 in^2

beam width= 1 ftbeam height= 1.67 ftbeam length= 20.35 ft# of beams= 4

As in beams= 2.2 in^2

slab density= 152.8863 pcfbeam density= 153.1196 pcf

Fd= 2.029723 kips<---Dead load (from slab and beams)

Fl= 0.914634 kips <---Live loadFs= 2.88365 kips <---Self-weight of the stemFh= 0.818125 kips <---Self-weight of the base

Fg= 4.904166 kips<---Weight of the soil above the heel

Fg2= 0.520833 kips <---Weight of soil above the toe

Check Bearing Capacity

P= 12.07113 kips<---Resultant force from the above loads

M= 1.139352 kip-ft<---Resultant moment from the above loads

A= 7.083332 ft^2 <---area of the bottom of the base

I= 29.61635 ft^4<---Moment of inertia of the area of the bottom of the base

sigma = P/A +M*x/I <---The pressure distribution along the base of the wall, where x=0 at the edge of the heel

Design of a Retaining Wall

Page 46: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

sigma(end of base)= 1.976658 ksf

<---Maximum pressure; if it exceeds 2 ksf (the bearing capacity of the soil), modify the dimensions of the wall to lower it

Check Sliding

P2= 11.1565 kips<---The resultant force without a live load on the wall

phi= 33 degrees <---Estimated angle of reposemu= 0.649408 <---Coefficient of frictionFf= 7.245114 kips

pp= 1166.041 lbs/ft^2 <---Passive pressure of soilFp= 1603.307 lbs <---Passive force from the soil

pa= 421.9338 lbs/ft^2 <---Active pressure of soilFa= 2415.571 lbs <---Active force from the soil

resisting forces = 8.84842 kipsapplied forces= 2.415571 kips

resisting/applied= 3.663076<---This ratio must be equal to or greater than 1.5

Check Overturningstabilizing moment= 41.56657 kip-ft

overturning moment= 9.219429 kip-ft

stabilizing/overturning= 4.508584<---This ratio must be equal to or greater than 1.5

Check ShearStem Shear

fc'= 2500 psify= 40,000 psi

po= 1337.5 psf <---At-rest pressure of soilVu= 7155.625 lbsVc= 21600 lbs

phiVc= 16200 lbs<---phiVc needs to be greater than Vu

Heel ShearVu= 4.904166 kipsVc= 7.2 kips

phiVc= 5.4 kips<---phiVc needs to be greater than Vu

Toe Shearsigma(critical section)= 1.931776 ksf

Vu= 2.279919 kips

phiVc= 5.4 kips<---phiVc needs to be greater than Vu

Page 47: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

Design Flexural SteelIn the Stem

pp= 4536.96 psf

x= 0

<---This is where the moment will be evaluated (x=0 at the bottom of the stem and is positive going up the stem)

M(x)= 86572.77 lb-ft

1.4M(x)= 121201.9 lb-ft

<---Factor the dead load moment by 1.4, according to LRFD design process

As= 2.2 in^2

<---Make an initial guess about the area of steel in order to calculate the location of the neutral axis.

N.A. is at x= 3.45098 in

<---x=0 at the side of the cross-section of the stem furthest from the reinforcing steel

As_calculated= 2.199122 in^2

<---Change the initial guess for the area of steel until this calculated result matches it closely

In the HeelM= 8.990969 kip-ft

1.4M= 12.58736 kip-ft

<---Factor the dead load moment by 1.4, according to LRFD design process

As= 0.681 in^2

<---Make an initial guess about the area of steel in order to calculate the location of the neutral axis.

N.A. is at x= 1.068235 in

<---x=0 at the side of the cross-section of the heel furthest from the reinforcing steel

As_calculated= 0.680874 in^2

<---Change the initial guess for the area of steel until this calculated result matches it closely

In the Toesigma(critical section)= 1.912541 ksf

Ft= 3.240998 kips<---Effective force on the toe that causes the moment

M= 3.240997 kip-ft

<---In the moment calculation, it is conservatively assumed that Ft acts at 0.6 of the toe length.

1.4M= 4.537396 kip-ft

<---Factor the dead load moment by 1.4, according to LRFD design process

Page 48: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

As= 0.233 in^2

<---Make an initial guess about the area of steel in order to calculate the location of the neutral axis.

N.A. is at x= 0.36549 in

<---x=0 at the side of the cross-section of the toe furthest from the reinforcing steel

As_calculated= 0.232896 in^2

<---Change the initial guess for the area of steel until this calculated result matches it closely

Check Development LengthFor the Stem

cb= 1 in

<---cb is the smaller of: 1. one-half the center-to-center spacing of the bars in the stem 2. the distance from the edge of concrete to the nearest center of a bar

db= 0.75 in<---the diameter of the bars used in the stem

Ld= 33.75 in

<---the bars must have sufficient development length in the toe, which is where they originate

*Note: The steel used in the stem is extended into the toe, and thus Ld for the toe is the same as the Ld for the stem; the reinforcement in the toe will develop sufficiently unless the stem is extraordinarily short.

For the Heel

cb= 3 in

<---cb is one-half the center-to-center spacing of the bars in the heel

db= 0.75 in<---the diameter of the bars used in the stem

Ld= 11.25 in

<---the bars must have sufficient development length in the toe, which is where they originate

Page 49: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 50: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 51: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

DESIGN OF STRIP FOOTING

fy 40 ksi rho 0.0045fcprime 2.5 ksi shear phi 0.75

live load 3175 kg 6999.677 lbs bending phi 0.9dead load 793 kg 1748.266 lbs beta 1 0.85

bearing pressure 1500 psf epsilon y 0.001379wall thickness 18 inches 1.5 feet

factored load 13297.4

DESIGN FOR SHEAR

recommended width 5.831962 feet 1.777582 metersactual width 5.905512 feet 1.8 meters

ult. bearing pres. 2251.693 psf

thickness guess 0.166667 of total widththickness min 11.81102 inches 0.3

actual thickness 11.81102 inches 0.3 meterseffective depth 7.811024 inches 0.29 meters

shear critical sect. 18.62205 inchesVu 3494.262 lbs/ft

phiVn 7029.921 lbs/ftphiVn > Vu? 3535.66

DESIGN FOR MOMENT

bending critical sect. 26.43307 inchesMu 5462.759 lbs/ftMn 6069.732 lbs/ft (assuming strain > .0005)Rn 0.099484m 18.82353

rho 0.002548reqd. area steel 0.23885 sqin

number of bars/foot 1size of bars 3 As 0.441786

CHECK RHO

rho 0.004713rho min 0.003024

rho > rho min? 0.001689

"rho max" x 0.815292 inchesepsilon s 0.025742

> epsilon y? 0.024363not too much steel? 0.021742bending phi good? 0.020742

CHECK DEVELOPMENT LENGTH

bar spacing big, Category A applies

Page 52: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

Ld 12 inchesLd < critical sect? 14.43307

SHRINKAGE AND TEMPERATURE STEEL

reqd. area steel 1.674003 sqinnumber of bars 4

size of bars 3 As 1.767146spacing 17.71654 inches

spacing limit 18 inchesgood? 0.283465

Page 53: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

                  

DIBUJOS DEL DISEÑO 

Page 54: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 55: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 56: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 57: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 58: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 59: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño
Page 60: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

                  

CONSTRUCCIÓN 

Page 61: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

 CONSIDERACIÓNES DE CONSTRUCCIÓN 

 DIVISIÓN DE TRABAJO  Miembros de la comunidad provendrán el trabajo. El ingeniero profesional que va a acompañarnos actuará como jefe de construcción. Miembros del equipo  Duke trabajarán en la construcción también. Las comunidades tendrán la responsabilidad del mantenimiento del puente.     HORARIO DE CONSTRUCCIÓN    El horario es flexible; hay días extras que permitan retrasos.  

 SEGURIDAD 

Antes  que  empieza  la  construcción,  habrá  una  clase  de  orientación,  conducido  en español, para  los miembros de  la comunidad que trabajarán en el puente. Trabajadores tienen que  llevar zapatos cubiertos mientras trabajan. Van a  llevar cascos, gafas y guantes cuando es necesario.  

Dos miembros del equipo Duke han sido certificados en primeros auxilios y RCP     

OPERACIÓN y MANTENIMIENTO  

Tendremos clases, conducidos en español, con miembros de la comunidad para enseñarles el mantenimiento del puente. 

Se va a conducir inspecciones regulares cada dos años durante la temporada seca. En estas inspecciones, se va a evaluar el sitio para cambios en pendiente. Las alcantarillas deben ser inspeccionados para obstrucción. La tierra debe ser examinado para asegurar que no ha sido erosión. Elementos de concreto deben ser examinados para grietas. Todas las inspecciones deben ser documentados. 

Mas frecuentemente (cada seis meses), las alcantarillas deben ser examinadas para escombros y limpiados si es necesario. Durante estas inspecciones intermitentes, cambios significantes deben ser documentados. Inspecciones deben ser conducidas después de tormentas grandes, inundación o otros eventos que pueden dañar el puente. 

No habrán mas costos de operación que los inspecciones y reparos. Materiales necesarios para reparos pueden ser obtenidos en Oruro o ordenados en La Paz. La Prefectura y/o la comunidad habrán responsables de obtener dinero para estos reparos. 

Page 62: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

LIST OF MATERIALS MATERIALES 

 ITEM  

artículo QUANTITY  cantidad 

COST (US$) coste 

Portland Cement Cemento Portland 

200 bags  1260 

2 m diameter culverts (5 m long) 

 2 m (diámetro) alcantarilla, 5 m (largo)

3  300 

1.5 m diameter culvert (5 m long) 

1.5 m (diámetro) alcantarilla, 5 m (L) 

1  100 

Concrete concreto 

40 m3   

Coarse Aggregate (Gravel) Grava, gravilla 

134 equivalent bags  1480 

Fine Aggregate (Sand) Arena, agregado, mezcla ? 

67 equivalent bags  440 

Water agua 

Readily available  0 

Fill tierra 

300 m3  0 

Plywood Contrachapado, Madera terciada, Triplay, Madera contraplancada, venesta ? 

Will depend on availability  1000 

Lumber (i.e. 2x4s) Madera de construccion 

Will depend on availability  1000 

Rakes rastrillos 

5  150 

Nails clavos 

1000  50 

Trowels Paleta, badilejo 

5  20 

Shovels palas 

10  170 

Wheelbarrows carretilla 

5  430 

Concrete Mixer mezcladora 

2 or more  2000 

Page 63: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

Stakes estacas 

200  50 

Fly Nails Clavos (tipo: “fly”) 

50  20 

Tape Measures cinta métrica, metro 

5  20 

Levels nivel 

5  20 

Spray Paint pintar (pintura) con

pulverizador (con spray) 

20  100 

Surveying Equipment equipo de encuesta, de

inspección, de peritaje, de sondeo (?) 

*brought from Duke  0 

Sharpies Rotulador (pluma?) 

20  40 

Helmets cascos 

20  90 

Gloves (leather) guantes (de cuero) 

20  50 

Breathing Masks respiradors 

10  20 

Safety Glasses gafas 

10  20 

Wood saws Sierra (hacksaw) 

10  300 

TOTAL    $9130   

• Based on volume of concrete of 40 m3 and volume of fill of 300 m3 and assumed 

3‐2‐1 concrete mix ratio.   

DISEÑOS ENCOFRADOS    Los encofrados serán construidas de madera y contrachapado. Esperamos volver a emplear tanta de esta madera como posible al construir nuevas formas. 

Page 64: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

PROPIEDAD DEL PROYECTO Y SOSTENIBILIDAD  Al completar el proyecto, el puente le va a pertenecer a las comunidades locales en el valle de Obrajes y va a ser su propiedad. Planeamos dar propiedad y responsabilidad legal a la Prefectura de Oruro, como es normal con proyectos de infraestructura en el área. Sin embargo, mantenimiento será últimamente la responsabilidad de las comunidades. Con la ayuda de la Dra. Christine Beaule, una arqueóloga quien esta involucrado extensamente con las comunidades locales y quien va a quedarse con nosotros durante nuestra estancia, vamos a asegurar la transferencia de la propiedad. Hemos preparado un memorándum de entendimiento que estará firmado por los alcaldes de los pueblos y las aldeas de alrededor. Este documento les pondrá la responsabilidad del mantenimiento del puente con las comunidades cuales se beneficia, no con EWB. Los siguientes son dos partes del memorándum. El primero es un memorándum legal que estará firmado por la oficina de ingeniería local de la Prefectura de Oruro. El segundo es el documento que estará presentado a los alcaldes de las comunidades locales de Iruma, Jachuma, Condor Chinoka y Obrajes. Consulta Apéndice D para los documentos.

Page 65: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

                  

APPENDICES    

Page 66: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

EDMUND FINLEY

TRISHA LOWE

NICK MENCHEL

ANNA SLEETER

CONCEPTUAL DESIGN

Current Conditions

Iruma Obrajes 2

CULVERT

Encases a flowing body of water in steel, concrete, etc. over which fill and then a road can be placed

Must be optimized so that culvert openings and fill can withstand the river flow

DRIFT/HARDENED ROADWAY

Makes riverbed more passable by providing a hard surface so that trucks don’t get stuck in the mud

Requires pouring large slabs of concrete

Page 67: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

TRENCH

Requires digging out a narrower but deeper channel to direct water through and thus decreases the span

Still requires some sort of bridge, culvert, etc. to actually cross

Culvert Hardened Roadway

Trench

Cost (2) 2 2 1

Materials (3) 1 1 1

Tools (3) 1 1 1

Material Availability (1)

2 1 1

Feasibility (2) 2 3 1

Flow Capacity (1) 1 3 2

Time (3) 2 2 1

Maintenance (1) 1 2 3

Lifespan (1) 1 3 2

Failure Modes (1) 1 3 2

Expertise (2) 3 2 1

Adaptability (3) 2 1 1

Totals 38 41 29

Profile View Plan View

Page 68: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

EDMUND FINLEY

TRISHA LOWE

NICK MENCHEL

ANNA SLEETER

30% DESIGN PRESENTATION

FLOW CALCULATIONS

Manning’s Equation:

Q = flowA = cross-sectional areav = velocityκ = conversion constantn = Manning coefficient of roughnessRh = hydraulic radius So = slope

2/10

3/2 SARn

Q hκ

=

OBRAJES I CROSS SECTION

k = 1.0 (for SI units)

n = 0.030 (for a “clean and straight” channel)

Rh = A/P = 0.587

So = 0.04551

FORCE CALCULATIONS: FLOW FORCE

v

smSR

nv h 985.42/1

03/2 ==

κ

smSAR

nQ h

32/1

03/2 47.86==

κ

PamN

AFpNQVF 851,24

3452.17050,431050,431 2 ===⇒== ρ

Page 69: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

FORCE CALCULATIONS: HYDROSTATIC FORCE

xPagxxp 9807=== ργ

hp γ=

p h

x

0

FORCE CALCULATIONS: TOTAL FORCE

totp

x

0

xPaPaptot 9807851,24 +=

OUR DESIGN

Page 70: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

EDMUND FINLEY

TRISHA LOWE

NICK MENCHEL

ANNA SLEETER

60% DESIGN PRESENTATION

30% DESIGN

TO AVOID THIS… LIVE LOADS

Vehicle Gross Weight (kg)

Wheelbase (m)

Track (approx., m)

17’ U-Haul 6373 4.47 2.14

14’ U-Haul 4990 4.09 1.98

10’ U-Haul 3901 3.53 1.68

Pick-Up Truck

2921 3.68 1.70

Standard Size Car

1652 2.87 1.63

Page 71: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

BEAM DESIGN LOAD CALCULATIONS

Live Loads (37.5% of the weight of a 17’ U-Haul)

Dead Loads (due to slab)

Using beam design program, d=0.2032 m (assuming 0.15 m deep slab)

23444.7 N

11722.35 N11722.35 N

10210.89 N 10210.89 N

6828.02 N/m

3 m

SLAB DESIGN LOAD CALCULATIONS

Widest Load Spacing, Narrowest Beam Spacing

Limiting case

Maximum Moment: 6534.7 N*m

Minimum Depth: 0.15 m

Designed as a beam

667.47 N 667.47 N23,444.7 N 23,444.7 N

24,112.2 N 24,112.2 N0.1016 m

0.68 m

1.63 m

3.5 m

• 667.47 N load is from curb• 23,444.7 N load is from 37.5% of the weight of a 17’U-Haul Truck

SLAB DESIGN CONSIDERATIONS

Determined optimal beam spacing (1.90 m)Used different track measurements

Cases ConsideredEach of the four vehicles centered on the span

Each of the four vehicles as far to one edge as possible

Smallest and largest vehicles with one tire centered on the span (basically the same as vehicle at edge)

Checked against 0.15 m slab depth to ensure that the moment created would be safe

0.15 m was estimate for slab depth used when designing beam, so recalculation was not necessary

PIER DESIGN

Designed as a wall

3.5 m x 0.3048 m x 2 m

2 m

3.5 m0.3048 m

Page 72: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

AMOUNT OF CONCRETE AND FILL

Concrete2 beams spanning piers, slab spanning crossing, 5 piers

Total volume: 28 cubic meters

FillAround culverts

Total volume:

UPDATED PROFILE VIEW

PLAN VIEW WHAT COMES NEXT

Determine footing for piers

Adjust pier shape if necessary

Check moment calculations to ensure slabs and beams are thick enough

Design armoring

Design curb on slab

Design reinforcement for concrete

Page 73: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

EDMUND FINLEY

TRISHA LOWE

NICK MENCHEL

ANNA SLEETER

BOLIVIA BRIDGE:FINAL DESIGN

PROJECT BACKGROUND

DESIGN ALTERNATIVES CONSIDERED ALTERNATIVESCulvert Hardened

RoadwayTrench

Cost (2) 2 2 1

Materials (3) 1 1 1

Tools (3) 1 1 1

Material Availability (1)

2 1 1

Feasibility (2) 2 3 1

Flow Capacity (1) 1 3 2

Time (3) 2 2 1

Maintenance (1) 1 2 3

Lifespan (1) 1 3 2

Failure Modes (1) 1 3 2

Expertise (2) 3 2 1

Adaptability (3) 2 1 1

Totals 38 41 29

Page 74: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

CONCEPTUAL DESIGN 30%/60% DESIGN

FINAL DESIGN DESIGN DILEMMAS

SiteInaccurate/inadequate surveying data

Lack of flow data (rainfall, size of flood plain)

Lack of soil data

ConstructabilityLimited materials

Unknown skill sets of laborers

Quantity of laborers

Time

No heavy machinery!

Page 75: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

ASSUMPTIONS

SiteCross-section we were asked to build for is near Obrajes 1, Cross-Section 3 data, so we will use this as an approximation

Extrapolated max flow from assuming waterline is at its highest touching the bank; also considered slope of land from using surveying data of the Obrajes 1 crossing

Assumed the soil had low bearing capacity

ConstructabilityWere able to get a materials list from NGO, Engineers in Action

Assuming unskilled labor

Time/manual labor available – can’t do much to change

Simple design

TOOLS

To find internal bending moments and shear forcesDr. Gavin’s “three_moment.m” Matlab file for continuous beamsUses the three moment equationInputs: spans (between supports), live loads (point loads), dead loads (distributed loads)Outputs: Max internal bending moments, shear forces, displacements

To test design dimensionsDr. Nadeau’s “Beam Design” excel worksheet, from CE 133 (Concrete Design)Uses design variables and material properties to determine if, for a given cross-section, a “beam” can carry the internal momentAlso outputs reinforcement specifications

CALCULATIONS

Loading conditions:Live Loads:

Worst case scenario: a 17’ U-Haul sized vehicle, fully loaded, assumed 75% of weight is carried by back tires

Dead Loads:Curb designed for safety

Self-weight of the components

Weight of parts being supported

Positions:Mid-span and at supports are the worst

CURB DESIGN

Page 76: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

SLAB DESIGN

Dead Load

Live Load

SLAB DIMENSIONS

ΦVn ≥ 1.6VL + 1.2VD

VL = 1.74 x 104 N, VD = 1.52 x 10-1 N

… d ≥ 6.95 in + at least 1.5 in clear cover

h = 22 cm (~8.66 in)

Slab is 3.5m across, and 6.2m between piers

BEAM DESIGN

Page 77: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

OUTER BEAMS

Dead Load

w=wcurb+wslab

Live Load Fvehicle

INNER BEAMS

Dead Load

w=wslab

Live Load Fvehicle

BEAM DIMENSIONS

ML = 35.53, MD = 18.5 (outer), 29.23 (inner), kip-ft

From Beam Design worksheet…

Outer beam: could be 12 in x 18 in

Inner beam: needs to be 12 in x 20 in

Went with 12 in x 20 in

Reinforcement: 1 layer, (5) #6 Longitudinal bars +

#3 shear stirrups every ~14.5 in

RETAINING WALL DESIGN

Piers on sides by fill and culverts needed to be designed as retaining walls

Stem thickness set to 12” for constructability purposes

Height: 10.505 ft

Base thickness: 0.955 ft

Base length: 10 ft

Heel length: 6 ft

Toe length: 3 ft

Page 78: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

PIER AND FOOTING DESIGN

Designed pier by considering a one foot section as a column

Strip footing

Wall thickness set at 18” for constructability purposes

Base length: 1.8 m

Base thickness: 0.3 m

1 #3 bar/ft

ARMORING

Design a retaining wall to sit in between culverts

Above top of culverts, have a second, unreinforced concrete slab, at an angle

Culvert

Road Bed

FILL

Water flow

Angled slab

Retaining wall

Page 79: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

APPROACHES

Not to be greater than 15 degree slope

Will depend on actual site conditions and therefore will be determined on-site

Needs to follow existing roadway

Sloping can begin on area over culverts as long as minimum required soil covering (depending on culvert size) is maintained

OTHER DESIGN CONSIDERATIONS

FLOW CALCULATIONS

Existing railroad bridge is the limiting factorRailroad bridge – two streams;Our bridge – one stream;Comparable cross-sections = OK!Assumed water height up to bank, and used this assumption to calculate an existing flowIf our culverts run full we are still OK as cross sectional area is larger than original cross sectional areaWill implement a grading plan, “just in case”

TOPOGRAPHY

Page 80: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

SATELLITE IMAGE RAILROAD BRIDGE

CONSTRUCTION PLAN MATERIALS/COSTS

Based on volume of concrete of 40 m3 and volume of fill of 300 m3 and assumed 3:2:1 concrete mix ratio (ratio will be determined after speaking with locals who have experience with concrete)

Summarized material list: Portland cement, gravel, sand, culverts, wood for construction, protective gear, nails/fasteners, shovels, wheelbarrows, other tools

Total estimated cost: ~$9500 (US), NOT INCLUDING rebar costs

See design book for cost breakdown

Page 81: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

OPERATION & MAINTENANCE

Sign posted that only one vehicle may pass at a time… Could post weight limit as wellRegular inspections should occur every 2 years (during the dry season)Culverts need to be checked ever 6 months for debris/blockage, and cleared if necessaryInspections should also be made after especially heavy stormsMaintenance up to community members/Prefecturain Oruro

FINAL DESIGN

QUESTIONS?

Page 82: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

Appendix B

“Upstream” of railroad bridge

Google Earth Image of Obrajes River Valley

Page 83: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

Literature Review CE 142/Dr. Schaad Group: Bolivia Bridge Trisha Lowe, Anna Sleeter, Nick Menchel, Ed Finley Culverts

A Better Design For Box Culverts? by Kornel Kerenyi, J. Sterling Jones, Kevin Goeden, Richard Phillips, and Paul Oien, September/October 2005, http://www.tfhrc.gov/pubrds/05sep/07.htm

This is a look at a study done by the South Dakota DOT on the effect of inlet geometry on the flow of water through precast and cast-in-place concrete box culverts.

Load Performance of In Situ Corrugated Steel Highway CulvertsJ. Perf. Constr. Fac. Volume 23, Issue 1, pp. 32-39 (January/February 2009) Issue Date: January/February 2009 This examines a study of 39 in-service corrugated steel culverts in Ohio of varying sizes. The strains of the culverts resulting from the dynamic and static loads of trucks driving across the bridges were experimentally obtained. The researchers look for a correlation between backfill height and loading conditions and the strain induced.

Structural analysis and design : bridges, culverts, and pipes (book) Transportation research record, 0361-1981 ; 1624 Culvert distress and failure case histories and trenchless technology (book) Washington, D.C. : National Academy Press, 1994. Analysis, design, and behavior of underground culverts (book) Washington, D.C. : Transportation Research Board, National Research Council, 1989. Structural design manual for improved inlets and culverts (book) [Washington, D.C.] : U.S. Dept. of Transportation, Federal Highway Administration ; Springfield, Va. : National Technical Information Service [distributor], 1983. JOURNAL OF IRRIGATION AND DRAINAGE ENGINEERING-ASCE 134 (6): 831-839 NOV-DEC 2008

“Entrance Loss Coefficients and Inlet Control Head-Discharge Relationships for Buried-Invert Culverts”

Page 84: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

http://www.uq.edu.au/~e2hchans/mel_culv.html Hydraulics of Minimum Energy Loss (MEL) culverts and bridge waterways

http://www.habitat.adfg.alaska.gov/images2/culvertexample.jpg

good picture http://stream.fs.fed.us/fishxing/case/Consumes/index.html

small river case study from California AIR FORMED ARCH CULVERT CONSTRUCTION Washington County http://www.iowadot.gov/operationsresearch/reports/reports_pdf/hr_and_tr/reports/hr313.pdf

Culvert construction in Iowa Completion Report, Squaw Creek Culvert Fish Passage Improvement Project, Squaw Creek, Little Salmon River Subbasin North Central Idaho http://www.usbr.gov/pn/programs/fcrps/thp/srao/littlesalmon/completion/sqawcrk-culvert.pdf

detailed day by day account of construction http://www.lmnoeng.com/CircularCulvert.htm

jackpot website. Culvert design… http://isddc.dot.gov/OLPFiles/FHWA/012545.pdf US DOT, Federal Highway Administration, “Hydraulic Design Series No. 5- Hydraulic Design of Highway Culverts.” (addtl link: www.fhwa.dot.gov/engineering/hydraulics/library_arc.cfm?pub_number=7&id=13) http://www.fsl.orst.edu/geowater/FX3/help/7_Culvert_Basics/Culvert_Materials_and_Construction.htm “Culvert Materials and Construction.” (as well as “Culvert Shapes”) http://www.oxfordplasticsinc.com/culvertpipe.htm

“Plastic Culvert Pipe Using Polyethylene” http://scitation.aip.org/getpdf/servlet/GetPDFServlet?filetype=pdf&id=JIDEDH000124000005000271000001&idtype=cvips&prog=normal

Includes lots of the necessary calculations for culvert design http://scitation.aip.org/getpdf/servlet/GetPDFServlet?filetype=pdf&id=JPCFEV000021000004000264000001&idtype=cvips&prog=normal

Explains development of minimum energy loss culverts and examples in Australia (written by same person as book referenced in Other/Combo section)

Page 85: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

http://www.deldot.gov/information/pubs_forms/manuals/bridge_design/pdf/bdm-07-culvert-design.pdf

From the Delaware Department of Transportation, describes several types of culverts and includes diagrams http://proquest.umi.com/pqdlink?vinst=PROD&attempt=1&fmt=6&startpage=-1&ver=1&vname=PQD&RQT=309&did=733932201&exp=01-18-2014&scaling=FULL&vtype=PQD&rqt=309&cfc=1&TS=1232418773&clientId=15020

Doctoral dissertation about large span culverts (it’s around 460 pages, but based on the table of contents there are definitely some sections that may be helpful) http://apps.isiknowledge.com/full_record.do?product=WOS&search_mode=Refine&qid=19&SID=2C3JdFM8lK4bNed9IdK&page=1&doc=2&cacheurlFromRightClick=no “Finite Element Study of Stability of Corroded Metal Culverts.” Talks about corrosion in steel culverts- may be useful http://apps.isiknowledge.com/full_record.do?product=WOS&search_mode=Refine&qid=19&SID=2C3JdFM8lK4bNed9IdK&page=1&doc=4&cacheurlFromRightClick=no “Field performance and analysis of 3-m-diameter induced trench culvert under a 19.4-m soil cover.” A lot of soil cover, but it’s a trench culvert, and may also give us an idea about how a culvert handles large loads. http://apps.isiknowledge.com/full_record.do?product=WOS&search_mode=Refine&qid=19&SID=2C3JdFM8lK4bNed9IdK&page=1&doc=6&cacheurlFromRightClick=no “Lin Au culvert, Hong Kong: taming the torrent.” Relevance: heavy quick storm region. http://apps.isiknowledge.com/full_record.do?product=WOS&search_mode=Refine&qid=19&SID=2C3JdFM8lK4bNed9IdK&page=1&doc=9&cacheurlFromRightClick=no “Field performance of high density polyethylene culvert pipe” http://apps.isiknowledge.com/full_record.do?product=WOS&search_mode=Refine&qid=19&SID=2C3JdFM8lK4bNed9IdK&page=1&doc=10&cacheurlFromRightClick=no “Hydraulic design of a longitudinal culvert for lock filling and emptying systems.” Relevance: Parts pertaining to In-Chamber Longitudinal Culvert System (ILCS) Basically, go to Web of Science and search culvert design, there are at least a million more. http://apps.isiknowledge.com/full_record.do?product=WOS&search_mode=Refine&qid=19&SID=2C3JdFM8lK4bNed9IdK&page=2&doc=16&cacheurlFromRightClick=no “Red River U-frame lock No 1 - Backfill-structure-foundation interaction” Might be helpful because talks about designing using little soil property data, etc.

Page 86: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

http://apps.isiknowledge.com/full_record.do?product=WOS&search_mode=Refine&qid=19&SID=2C3JdFM8lK4bNed9IdK&page=2&doc=17&cacheurlFromRightClick=no STRUCTURAL RESPONSE OF FULL-SCALE CONCRETE BOX CULVERT http://apps.isiknowledge.com/full_record.do?product=WOS&search_mode=Refine&qid=19&SID=2C3JdFM8lK4bNed9IdK&page=2&doc=18&cacheurlFromRightClick=no PERFORMANCE OF DEEP-CORRUGATED STEEL BOX-TYPE CULVERT http://apps.isiknowledge.com/full_record.do?product=WOS&search_mode=Refine&qid=19&SID=2C3JdFM8lK4bNed9IdK&page=2&doc=19&cacheurlFromRightClick=no STRUCTURAL EVALUATION OF BOX CULVERTS http://apps.isiknowledge.com/full_record.do?product=WOS&search_mode=GeneralSearch&qid=29&SID=2C3JdFM8lK4bNed9IdK&page=1&doc=3&cacheurlFromRightClick=no Creating a hydrographic network from its cartographic representation: a case study using Ordnance Survey MasterMap data Trenches http://www.ehow.com/how_2=054436_dig-trench.html How To Dig a Trench. Well, duh, but maybe something useful? http://www.gomestic.com/Home-Improvement/Trench-Digging-101.381859

Trench Digging 101

http://www.wikihow.com/Excavate-a-Trench How to excavate a trench http://www.easydigging.com/trenching_guide.html Easy Digging Trenching Guide

Modeling Trench Sidewall and Bottom Flow in On-Site Wastewater Systems J.Hydrologic Engrg. Volume 13, Issue 8, pp. 693-701 (August 2008) Issue Date: August 2008

This is a study on the amount of wastewater that enters trench sides versus trench bottoms.

Slurry walls : design, construction, and quality control (book) David B. Paul, Richard R. Davidson, and Nicholas J. Cavalli, editors. Recommended technical provisions for construction practice in shoring and sloping of trenches and excavations (book); Author: Yorkel, Felix Y.

Page 87: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

Hardened Roadway http://www.patentstorm.us/patents/6775952/description.html Basically, if we do a hardened roadway with concrete, we’re going to need to make sure it doesn’t chip due to the trucks or the water. This patent is for some system to protect the joints from spalling. Other/Combo/Rural Bridges Brian D Davis, PE, Assistant Resident Engineer with NC DOT: Garret Road culvert engineer, said during fieldtrip he would be willing to talk more with us during our design/answer questions/supply drawings of DOT culverts http://books.google.com/books?id=VCNmKQI6GiEC&pg=PA440&lpg=PA440&dq=culvert+design&source=bl&ots=plOVmwi0fR&sig=aBwE4nJttOgjekDXRYqtaXBrY2w&hl=en&sa=X&oi=book_result&resnum=8&ct=result#PPR8,M1

Hydraulics textbook that includes lots of diagrams and modeling equations http://apps.isiknowledge.com/full_record.do?product=WOS&search_mode=Refine&qid=33&SID=2C3JdFM8lK4bNed9IdK&page=1&doc=1&cacheurlFromRightClick=no

Benefits of timber-concrete composite action in rural bridges

http://apps.isiknowledge.com/full_record.do?product=WOS&search_mode=Refine&qid=33&SID=2C3JdFM8lK4bNed9IdK&page=1&doc=3&cacheurlFromRightClick=no “Low-water stream crossings - The Iowa experience.” Relevance: talks about cheaper alternatives for privately owned rural roads; “Low-water stream crossings (LWSCs) can provide a low-cost and reasonably safe alternative. Three types of LWSC are unvented fords, vented fords, and low-water bridges.” http://apps.isiknowledge.com/full_record.do?product=WOS&search_mode=Refine&qid=33&SID=2C3JdFM8lK4bNed9IdK&page=1&doc=4&cacheurlFromRightClick=no “Cost-effective structures for off-system bridges.” http://apps.isiknowledge.com/full_record.do?product=WOS&search_mode=Refine&qid=33&SID=2C3JdFM8lK4bNed9IdK&page=2&doc=11&cacheurlFromRightClick=no “Toward a low-cost structures design manual for rural roads in developing countries” http://apps.isiknowledge.com/full_record.do?product=WOS&search_mode=Refine&qid=33&SID=2C3JdFM8lK4bNed9IdK&page=2&doc=14&cacheurlFromRightClick=no “The Inverted Tee shallow bridge system for rural areas.” http://apps.isiknowledge.com/full_record.do?product=WOS&search_mode=Refine&qid=33&SID=2C3JdFM8lK4bNed9IdK&page=2&doc=18&cacheurlFromRightClick=no DESIGN FLOOD ESTIMATION FOR BRIDGES, CULVERTS AND CHANNEL IMPROVEMENT WORKS ON SMALL RURAL CATCHMENTS

Page 88: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

(see also: http://apps.isiknowledge.com/full_record.do?product=WOS&search_mode=Refine&qid=33&SID=2C3JdFM8lK4bNed9IdK&page=2&doc=17) http://www.allbusiness.com/manufacturing/nonmetallic-mineral-product-manufacturing/487675-1.html

“Tips for building PT slabs: what concrete contractors need to know about post-tensioned slabs...” May be useful for hardened roadway, but also for road in general. http://74.125.47.132/search?q=cache:WskbDzMnieUJ:www.transport-links.org/transport_links/filearea/documentstore/130_Conceptual%2520Example%2520Solution.doc+seasonally+flooded+roadway+design&hl=en&ct=clnk&cd=6&gl=us&client=firefox-a Basically research on a situation much like ours, comparing culverts to other options such as a drift, built in rural area (Zimbabwe?) ftp://ftp.odot.state.or.us/techserv/roadway/web_drawings/roadway/rev_13/pdf/rd516.pdf Methods of securing concrete barriers to roadway- may be useful if we dig a trench, or even around culverts, or any other time we need to secure large slabs of concrete to the ground http://www.wfl.fhwa.dot.gov/td/publications/soil_nails.htm

“Application of Ground Anchors and Soil Nails in Roadway Construction.” This is supposed to be in CD form, but we may be able to request copies if it seems worthy? http://www.anchorengr.com/projects-bridge-roadway-design.htm I just like the three main pics on this page- alternatives to culverts, also interesting way of leading up to bridge with stones- we could possibly use that method. http://www.patentstorm.us/patents/6775952/description.html Basically, if we do a hardened roadway with concrete, we’re going to need to make sure it doesn’t chip due to the trucks or the water. This patent is for some system to protect the joints from spalling.

Page 89: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

PRESUPUESTO &CONSTRUCCION

REPRESENTANTE EN SANTA CRUZArq. Erika Maturana MejiaC. Beni N! 7.5 Edif. LibertadorT e l . : ( 5 9 1 ) 3 3 5 9 5 6 1 9 . F a x : 3 3 3 0 4 5 9Cel .721 22366E mail : en'raturana@revistap),c com

REPRESENTANTE EN TARUAIng. Walter Guerrero V.Te l . : (591) 3 - 6643591

Quedo prohibido lo reproduccion porciol o toiolde lo Rev is lo , s in p rev io ou lo r izoc ion porescriio del Director.

Registrodo lo Propiedod intelectuot en elInsli lulo Boliviono de Culturo.

Quedo hecho el dep6sito legolNo. 4 -3-271-90

El contenido de los orticulos firmodos son de exclusivoresponsobil idod del ovtot sin que esto refleje en nodoolguno, el criterio de lo direccion.

PUBLICACION CUATRIMESTRAL

Codo uno plonteo16 problemos dislinios y requerirode uno plonil icoci6n y plontocion distintq, seqin susnecesidodes. Disene iu jordin uti l izondo los eipociosdisponibles poro logror el mejor efecto posible.

Disefiondo un Peoueio JordinTodos los iordines son uno creoci6n oersonql.

Puertos de Seguridod FORTEPuerlos que lienen lo propiedod de sequridod qhrindo cl o.ero con rrn eleoonle ocob.,,lo

"n.od

&

LA PORTADA

lJn principio fundomentol poro el disefiode jardines es lo sinplicidod, sobretodo

cuondo el espocio es linitodo. Losproyectos complicodos no producen unsenlimiento de serenidod. Adem6s har6nporecer otn m6s pequefio cuolquier iordin

pequefio

Soldoduro de piezos de Polietileno, en redes P6g. 14de olmocenomienfo, lrolomienio y conducci6n de oguo.

P69.17-32

r,::_,' I

An6lisis de Precios Unitorios

Pisos lnduslrioles con

Guio Closificodo Sonlo Cruz

Guio Closificodo Oruro

Guio Clqsificodq [o Pqz

Guio Closificodq Cochobombo

Pdg.6

Pog. l0idod oue

P69.56

Pig.7l-74

P69.75

P69.79-83

Pog.83 '85

ruenos que f lenen ro propreooo oe sequnooo quehrindo el ocero. con un eleoonie ocobodo en modero.Son puertos ocorozodos que tienen un sislemo decierre especiol. lonlo en lo cerroduro propiomente,coro en todo el perimelro de lo puerto.

Precios de Moterioles de Conshucci6n P69.35-zM

Cielo Roso de yeso pog. 53

conSTrucTlvo

Guio de Proveedores Po9.6l-70

I:r

I

Page 90: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

PRECIOS DE MATERIALESNOTA:LOS PRECIOS SON EN MONEDA NACTONAL (BOLIVIANOS) Y EL TIPO DE CAMBIOCONSIDERADO DE 8s.7.00 POR DOLAR. LOS PRECIOS INCLUYEN EL l .V 'A.

INDICEP r ig.

. ACERO PARA CONSTRUCCTON . . . . . . . . . 36

. ACONDTCTONADORES DE AtRE ........... 36

. ADHESIVOS . . . . . . . . . . . . . . . . . . . . . 36

. ADtTtvos . . . . . . . . . . . . . . 36

. ADOQUTNES . . . . . . . . . . . . . . . . . . 36

. AISLAI\i]IENTO TERMICO YACUSTICO ,. 36

. ALTGEFANTES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36

. ALAt \ ,4BRES Y MALLAS . . . . . . . . . . . . . . . . . . . . . . . . . 36'ARtDOSY P1EDRAS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36. ALFOMBRAS Y EMPAPELADOS ......., 37. AZULEJOS Y CERAN, I tCOS . . . . . . . . . . . . . . .37' B A S U R E R O S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 7. BOMBAS DE AGUA . . . . . . . . . . . . . . . . . . . . . . . . . . .37. CALEFONES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37. cANOSYACCESORrOS. . . . . . . . . . . . . . . . . . . . . . 37. CAMARA DE POLTETTLENO . . . . . . . . . . . . . . . . . 37. cAMARA SEPTtCA. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38. CARPINTERIA DE ALUIV]INIO ....,... .... 38. cARPtNTERIA DE t \ , lADERA. . . . . . . . . . . . . . . . . 38

r . CEMENTOS . . . . . . . . . . .38. c tELo FALSO PLAFON . . . . . . . . . . . . . . . . . . . . . . .38.CLAVOS . . . . . . . . . . . . . . . . . 38. CUB|ERTAS . . . . . . . . . . . . . . . . . . . . . 38. DOMOS DE PVC . . . . . . . . . . . . . . . . . . . . . . . . . . . . .38. ESTUCOS Y CALES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38. FTJACIONES EN SECO. . . . . . . . . . . . . . . . .38. GAVIONES . . . . . . . . . . . . 38. G R t F E R I A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 9. HERRAMIENTAS . . . . . . , . . .39. I I\,4PERMEABI LIZANTES

SUPERFtCtALES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39. INSTALACION ELECTRtCA. . . . . . . . . . . . . . . . . . 39. INSTALACION SANtTARIA. . . . . . . . . . . . . . . . . . . . 39. TNSTALACTON TELEFONTCA . . . . . . . . . . . . .40

- . LADRTLLOS . . . . . . . . . . . . . . . . . .40. LADRTLLO VTSTO BRTCK . . . . . . . . . . . . . . . . . . . . .40. LOSETAS . . . . . . . . . . . . . . . 40. tv tADERAS . . . . . . . . . . . .40. MADERA E1A8ORADA . . . . . . . . . . . . . . . . . . . . . . . . 40. tv tANGUERAS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40. MOSATCOS Y ZOCALOS . . . . . . . . . . . . . . . . . . . . . . 41. MATERIAL ELECTRICO DE EI\4PALIUE .,. 4'1. TVATERtAL EXPLOSTVO . . . . . . . . . . . . . . . . . . . . . . . . 41. IVESONES DE PIEDRA CORTADA .. ..., 41. P |NTURAS . . . . . . . . . . . . . . . . . . . .41. P INTURAS EPOXtCAS. . . . . . . . . . . . . . . . . . . . . . . . . . 41. P tsos . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41. PLANCHAS DE ACERO . . . . . . . . . . . . . . . . . . . . . . . . 41. pLANCHAS DE ACR|L tCO . . . . . . . . . . . . . . . . . . . 41. POLITUBOS . . . . . . . . . . . . . . . 41. QUINQUELLERIA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42

P a g .. SELLANTES . . . . . . . . . . . . .42. SOGAS . . . . . . . . . . . . . . . . - . - . - . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42. TANQUES . . . . . - . . . . . . . . . . . 42. TEJAS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42. TIERRATOSCAY SUELO SELECCIONADO ...42. TUBOS DE CERAMTCA . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42

Pa s .. TUBOS DE HORMTGON . . . . . . . . . . . . . . . . . . . . .42. TUBOS Y ACCESORIOS DE PVC .-....42. TUBERIAS Y ACC.NOVAFORT...,...,,... 43. TUBOS Y ACC, P/AGUA CALIENTE ...,.,.,.44. VIDRIOS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44

gltf ,: ii9r.usJ.l: I ittt] t5

Page 91: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

PRECIOS DE'VIATERIATES

ffi DESCAtPCtoN UNIDAOLi Paz Cbba Sta. Ctuz

^9

3547 35 4715157 615735 26 85 ?6

135 71 13571237 50 237 5A34103 34103604 55 604551 3 3 0 1 3 3 0

LrsO t/4 (6 hm.) BAR j2 m.L tSo5/16" (6mm)BAR 12h.Lrso3/8" (8drm. )BAR 12mLrso 1 /2 (10mh)BARj2nrLlso tB (j2 mm.) BAR 12 m.Ls03/4 ' ( t6mm )BAR 12h

ANGLJLAR t/B'x 3/4" BAR6mANGULAR 1 /8 'x1 ' BARsnANGULAR 1/8.X1 1/4' BAR6 m,ANGULAF ]/8 \ I II2' BA86MANGULAR 1 /B ' r2 BAR6m

ANGULAF 3 /16 . r 1 ' BAR6hANGULAR3/16, t i 1 /2 , BAR 6mANGULAR I / ]6 I2 " 8AR6MANGULAR3/16 ' r 2 t /2 BAF 6h

TUBULAR CUADRADO iSxi5]UBI]LAR CUADMDO 2Ox2OTIJBULAR CUADMDO 25125TIIBULAR CUADMDO40x40

TUBULAR REDONDO DE lgmhTUSULAF REDONDO DE 22 MMTITBULAR REoONDO DE 25hhTU8ILAR REOONDO DE l5mmTUBULAR REDONDO DE 50 hh

TUBULAR FECTANG!LAR sor.l0 6mI 5 ESPESOR DELTUBOTUBULAR RECTANGULAR 5OrJO 6h2O ESPESOR OEL TI]BO

PLET NA j/B'x 3/4. (3 r 20)mmPLETTNA 1/B'r 1'(3 x 25)mmPLE1NA 1/B,x j j/2" (3;3i)hm

PLET NA3/8 x 2 , (10x50)mhPLETNA l8 r 21 /2 { tOr6o lhmPLET|NA3/8 . r t .1 t0 \ 75)mm

Ba.ra 3950Bara 69 0OBara 99 008am 15600Bara 257 50

37686t 4293 27

153272605342576

12319/ 99

12396156/920398

Bara 76 O0Bana 10200

Baru 16550Bana 214 SO

Barra 13500 12040Bana 2135A 2A211Bam 322 50 3067/Baft 385 00 365 65

Bam 46.00 43 49Bana S/ OO 54 08

Bam fioAo p3o1

Eara 41OO 38 /BBana Sooo 47 27Barm 55 OO 52 64Baria 78 35 /4 43BaEa IIOOO 104 4j

Batra j64 50 1565i

8am 19250 18293

37 3556287301

83 88134021994081 t9

1 0 6 1 11579621816

34343

BaFa 88 50Ba@ 13700Bara 21000Bara 88 63

Bata 166 21Bana 229 32Bana 2y 2ABara 3fi 09

Bana 39 21Bara 59 t5

79 261 n a 2r 3 8 8 079J2

10093149722A6U26106325 42

iF[ili3s3ilFf i3ri8i;:8fl :il:

['i+l*fi]rflil#- [t::+ll+::;'t ;; u lll::lm ;i;i

28648 ?7A21 2561640796 387 /4 368 25476A0 45222 428 45

39312 373 72 353 83368 55 35029 3317934762 33038 31314

3 6 1 5 3 6 1 59280 928A

1?600 126002852A 2852a13540 13540167 70 167 7A

3 6 1 592 80

126002852Ar354016710

75 90 75 90 75 9070 60 70 60 70 60

12600 12600 126OO117 2A 117 2a ft 2a/0 60 70 60 70 60

12560 12560 1256010350 10350 103509300 93 00 93 l]O1850 T750 t6 50

f llsol -

Presupuesto O "or",

PRECIO

6 l 5 735 26

13571

34103604 551 3 3 0

3712662392 36

154 822564941814

4.0\ oFA RL tc 7^ rnanra | ",,

,";;;;;--, , . ,o . . uJ .6 ru00 18J000ACON DE AIRE FRJO LG 9KACON DE AIRE FR O LC 12K

Pza 225AOA Z25AAA 22SOAOPza 2790A0 27\AOA 27gO AA^^i3l Rifli;fllt9 919:,h ;;; ;;## ;iiiii 1i;33i

iiSl R:l::i::t: e1,e:;'\'; ;;;;; ;jffi ;H;;Ij]lTo'ncro'ao.colon:il r; d;;; ;;Jii3 ##;gDESCRIPCION UNIDAD PRECIO

69 039 3 1 8

12471148851 9 3 1 9

CARP]COLA I,IONOPOLPEGAALFOMBRA NONOPOL

COLA FRESCAPEGATUBO PAM PVC [,IONOPOIPEGAToDO (CLEFA tvtoNoPor Ipecqrooo lcLern MoNopoL)

:imHx11,T3'^^,"3,::l *'*, li:3,?illtblltiiHi$??i,?t?x3[ 13

GIGI1 2 K g(gGIGI1 8 L l

8806 89 0690 50 so 50

r8004 180048 0 0 8 0 0

21580 2158012551 125 51600 25 60025

434 00 434 oO13000 13000

24240 202001720A 172A0

4 1 3 05 1 5 16395

11671

44 8949 7669 0698 98

12304192112908534545

17325

35 3653406959

EINDA CEM[4tCOBINDAFRAGUAOORB NDAEXTMsr(AcoLA

PEGAMENTO PAMVINIL

AFULL PARA ALFOMEM(jB LLs )

lxs. 34.00 34.00 34 o0K9. 33.00 3300 33.0020Kg |9OO TtgOO l t9O018K9. 68.00 68.00 6800

?4 S03 6 7 06340

77 00 77 oA

iiiiStiEFitFfiB3S SJS lt3,'it, i:FULLCoLAPAFAMADEM

I2o ho I

iiii:3H ;ili ili8FFi l:8Jt;,PEGAI\,IENTO PVC p t4 pARARoNh

iFSiilEiiS iyS i:I iitriiisililitiS3tEy3Ii3;3

ffi.,*i:trfffftrfr;l ;lil.ecqv'v'o^q_ oi* i"r,".t j i- ;,; :;;3 ,9i;3I romvos

-----l

494 60 494605,16830 516830

423 70 423 7A118030 1 .18030393570 3 935 /O

1/2Lr 50 70 50 /0I L t 9730 87 30Gl 31090 31090

r L r 61 50 6150Gt 2A2fi ?a2 ft

?" 28ooo 28o.oo 28o.oo380.00 390.00 380.00

2 1 8 036 706340

24 8a36 706340

494605,16830

42J701,180303 935 70

50708730

3 1 0 9 0

6T 502021A

DESCRIPCION UNIDAO PRECIO

;s:;iilEiii ff ?ilI+f#;[,,0.85 Kg 3600 36 O0 36 0l]20 Kg. 480 o0 48OOO 4S0 n0

20Kg 764 i]O 76400 i6j00

S (AMENT 700 SUPER PLAST|F|CANTE 20 K9 978 OO

14000

2 1 8 0 0516001800050500

2,40A0a629 0060500

110C0r71o i l2 1 8 0 C51601r130005050!

? ,40000629 00605 00

97800 9/800

DESCRIPCION UNIDAD PRECIO

rF p?a J ._o i rc i7a

DESCRIPCION UNIDAD PRECIO

;m'fffY"*'**"* :,'j' '::l:DOBIE TERMOMEI\IBMNA SIM ;i ;;;;

283 00 283 0€40 00 40oo92 00 92 0o

1 3 0 1 3 02 6 0 2 6 03 9 1 3 9 1524 520

147 147294 294

592 592

8 8 7 8 8 71 1 8 3 1 1 8 31 4 5 1 4 8 0

1 3 02 6 03 9 1520

294

5 9 2

8 8 71T 8314 80

;1ff triiiilid1,ff'jJj'i i if88 069 0 5 0

18004800

2158A125 51600 25

4340013000

2A2AA17204

l-AM DE VloRtO 25 mm. ESPESOR [rt2 2]60 21.60 2i.60

@DESCRIPCION UNIDAD PRECIO

91d cbba. $a cru!CASEIoNES 5OxSOxi2cmCASEToNES 50x50x15 cmCASEToNES S0x5Ox2O cmCASETONES4OT4OxI5 cmCASETONES 40x4Ox2O cm

PLASToFoRM TIF.A tOOi4Oxt2 cmPLASTOFORM TIRA lOOi4OiI5.MPLASTOFORM T]RA iOOx4Ot2O cmPLASToFoRM TFA iO0r50xi2.mPLASTOFORI,I TIRA IOO\5OII5 CMPLASToFORM TIRA t0Or50x2O cn

1050 10501 3 0 0 1 3 0 01 7 0 0 1 7 O O8 5 0 8 5 0

1100 1T 0o

165020 5027 5020 5026 0034 50

1 6 5 020 502t 5A20 5026 0034 50

10 501 3 0 017008 5 0

11 00

1 6 5 020 5A27 502050260A34 50

i a 0

DESCBIPCION UNIDAD PFECIOLaPa Cbba. Sh Cruz

ALAMBRE OE A]\,IARREALAMBRE GALVANIZADO 4 8ALA(,18RE GALVAN]ZADO I 1OALAMERE GALVAN ZADO 4 ]2

ALAMBRETEJIDOALAMBRETEJIDOR/4omxO90

ALAMERE CON PUAS GALV SIMPLEALAMBRE PUAS GAL. ShtpLE {sOOm )

MALLA M]LIMETR]CA PLAST COMALLA MILI\4ETRiCA PLASI (50 h )

KS. 18.00 18oO 18.00^9. 22.40 22.0a 22.a0^9. 22.A0 Z2.AO 22an^g 22AA 22aO 22oa

rlrz 5.90 5 90 s 90Ho o 15500 l55OO t5500

1, o0o o8o ooono o t6500 16500 1650n

M2 1980 19 .80 rc annol/o SOO OO SOO OO gOO0o

UNIDAD PRECIOLa Pd Cbba Sta Cu

ARENACOMUN

GMVACOMUN

RIPEOCNANCADO

RPEOERUTO

P EDFA PARA C MIENTOSPIEDM LAJA S N CORTARFIEDRA TAF]JA S]N CORTARP]EOM TAR JA CORTADAY PI]LIDA

80 0095 00

80 0095 00

M3ri3M3

[43]\i3

M3l'43M3

rJ3[13M2M2M2

5 6 1 030 00 80 0o95 00 95 00

80 00 80 0o95 00 95 OO

95 00 95 OO10000 100 0o85 00 8500

95 001000085 00

75 00/5 0031 003 1 0 0

12000

1?000753074 3A/9 507 9 5 09 1 3 0

108 50

75 00 75 oO75 00 /5 OO. 3 1 0 0-- 3100-- 120 0a

/5 3074 3A795079509 1 3 0

r0850

DESCRIPCION

Page 92: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

PRECIOS DE MATERIALES

t*

I

ALFOMBRAS Y EMPAPELADOS BASUREROS CANOS Y ACCESORIOS

DESCRIPCION TJNIDAD PRECIOLaPd Cbba Sh Cruz

DESCRIPCION UNIDAD PRECIOLaPd Cbba Sta Cruz

DESCRIPCION IJNIDAD PRECIOLaPa Cbba Sta Cdz

ALFOMBM M2ALFOMBMP]ALTOTMFICONAL M2ALFOMEM PELO ALTO NAL M2ALFo]\,jBM DE PELO MED ANO NAL M2ALFOMBMPELO BAJO NAL M2ALFo[4BMA|'4ER CANA M2ALFOMBM TlPo PERSA 24 0x3-10 cm PzaALFOMBRATlPoPERSA200x300cm PzaALFOMBRATAP SOLD SMAT

2500 25 00 25 007500 7500 /5 00

10000 10000 1000019600 1s600 1960012600 12600 1260010500 10500 1050017880 t /880 17880

1,43410 143410 1.43.4101,3.45 20 I34520 1,34520

6270 6210 627a

AZULEJOS Y CERAMICOS

DESCRIPCION UNIDAD PRECIOLaPd Cbba Sta Ctoz

MULEJoBLANCoNAL 15xi5AZILEJo CoLOR NAL 15x15M!LEJ0 DEC0RADO 15xT5MILEJO CoLOR BRAS 15x15AZULEJO DECoMDO BMS 15x15AZULEJO DECoRADo BRAS 20115MULEJO DECoRADO BRAS 20120

CERAMICA NACIoNAL 22x34CERAMICA NACI0NAL 25r25CEMMICANACLoNAL 34x34CEM[4|CA NAC oNAL 40!40CERAMICANAC ONAL 2OX3OCEFAlrrlCA NAC oNAL 32132RANDASNACIONAL

PISo CERAMICO EL ANE 20x20PlSo CERAIIICO EL ANE 20x30PlSo CERA[41C0 EL ANE 33x33PlSo CEMMICo EL ANE 33x33

ENCHAPES SANTINI 8x25cmL NMRoCKSANTIN ?5x25cmL NEA CLASIK SANTIN 25x25cmL NEA GRANITIK SANTINI 25x25cmL NEARUST K SANT Nl25r25cm

MULEJoELANE(ELTEl15x15 M2AZULEJo ELANE SLANCO 15x15 M2AZULEJoELANEAzUL15x l5 M2MULEJo ELANE DECOMoo 20120 M2AZULEJo ELANE DECOFADo 20x25 M2

M2M2M2M2M2M2M2

M2M2M2t\r2M2M2

M2M2M2M2

M2M2M2M2M2

30 00 320033 00 360036 00 38004590 45904590 45906 1 3 0 6 1 3 06670 66 70

41 00 41 003S00 39 004 5 0 0 4 5 0 045 00 45004240 42004240 42 0A7 5 0 7 5 0

58 50 58 5055 S0 55 9055 30 55 3058 60 58 6062 80 6280

32 50 82s060 60 6060

10330 103309920 9920

32 0036 0038 00459045 906 1 3 066 70

4 1 0 039 0045 004500420442AA7 5 0

5 8 5 05590553058 6062 80

s2 5060 60

103 3099 20

30 0030 0025 5025 5020 00

RANDAELIANE FANCY BLAC( 6 50x20 PzaMNDAS ELIANE FIISTAGRAY6 50x15 PzaMNDAS ELIANEARIES 10x20 PzaRANDAS EL ANE PYXIS GREEN 7 50X20 Pza

REVESTIM ENTo CERAl\,llCO NAL [42ENCNAPE LADRILLO NACIONAL IJ2

BALDoSACERAM SEMGRES 15t15 M2BALDoSACERAM ESM DEC 15x15 M2BALD0SACERAMICAESMALT. 11r23 M2CERAM CA ESMALTADA NAL 2(]X3O M2

CERAM CA ESI\IALTADA BRAS 33x33 M2CERAM CA ESI,IALTADA EMS 30x30 M2CERAM CA ESMALTADA BRAS 25x25 M2CEMM CA ESI,IALTADA ERAS 20x20 M2CERAM CA ESTIALTADA 8RAS 20x30 M2

CERAM KAISERPSCNA 11x24 M2CEMM KA SER R0J0 NATLIRAL24r1l M2CEMM KA SER ROJO NAT RISTCO24XlI M2CERAMICAM SER ROJo NAT 24x24 M2CEMM KA SEn P S0 R0J0 NAT RUSTC0 24124 M2ENCHAPE R0J0 NATUML IPARED( 5 5124)M2

REVEST.CAPR C|-AS|CA31x31 M2REVESICAPR.GRANITo31x3 l M2REVEST.CAPR NATUML24x24 M2REVEST.CAPR-NATUMLl'1x24 M2REVESICAPR ALMENDRA20X30 M2

30606 1 1 0

6090

96208 6 0 090207624782A

3 0 0 03 0 0 0255025502000

17 903 0 0

24 AA23 00

45 0030 00

30 606 1 1 056 5060 90

96 2086 0090 20T62AT82A

30 0030 0025 5025 5020 00

1 7 9 03 0 0

24 0A23 00

45 0030 00

4115 47153 9 1 5 3 9 1 53 9 1 5 3 9 t 55 1 1 5 5 1 1 55 1 1 5 5 1 1 53915 3915

5 1 1 5 5 1 1 54 9 1 5 4 9 1 55 1 1 5 5 1 1 54/30 47 304 3 1 5 4 3 1 5

1 7 9 03 0 0

24002 3 0 0

4 5 0 03000

30 606 1 1 056 5060 90

96 2086 0090 2076 2078 20

4T 15

39 t55 1 1 55 1 1 53 9 1 5

5 1 1 54 9 1 55 1 1 54/304 3 1 5

EEIEBASURERO ARTUR TO COMPLETO PzaCABEZAL PARA BASURERo iARTUR T0 Pza

265 986! 4S

265 98644864 48

BOMBAS DE AGUA

DESCBIPCION UNIDAD PRECIOLa Pa Cbba, Sia Cruz

EOMBA DEAGUAO 75 H P TAL ANAEOMBADEAGIJAl H P TAL ANABOMBADEAGUAl 5N P ITALIANABOMBADEAGUA2 H P IAL ANABOMEADEAGUA5 5 H P ITALIANABOMBADEAGUAT5H P ITALANA

U n d 1 1 1 3 0 0 1 i 1 3 0 0 1 , 1 1 3 0 0Unid '1403 00 1 ,40300 140300Unid 183900 183900 I83900Unid 3234 00 3.23400 3234 00Unid 5 438 00 5,43800 543800Unt 6,29200 6,29200 6 292 00

CALEFONES

DESCRIPCION UNIDAD PRECIOLaPd Cbba, Sta Cruz

CANOS Y ACCESOFIOS

DESCRIPCION UNIDAD PBECIOL! Pd Cbba Sta cruz

Pza i4000 14000 140 00Pza 23500 23500 235 00Pza 27000 270 00 27000Pza 32500 325 00 32500Pza 40500 40500 40500Pza 50500 505 00 50500Pza 69500 695 00 69500Pza 799 00 799 00 799 00Pza 1230 00 123000 1,23000r i 2500 2500 2500Mt 4200 4?00 4200Ml 48 50 48500 4850

CALEFONAGAS JUNKERS 180Lls Pza 4,30000 4 30000 4.300l]OCALEFONAGAS JUNKERS240LIs Pza 4,80000 48OOl]O 4,80000CALEFoNAGASSPLEND D 14 LL pormn Pza 2,094 0O 2 094 l]O 2.09,4 0O

CALEFoN ELECTRC0 RHEN30C Pza 181130 I81130 1 ,81130CALEr-oN ELECTR C0 RHEN40c Pza 265950 265950 2 ,65950CALEi_oN ELECTR C0 RHEN50C Pza 2619/ l ] 261970 2 ,61970CALEFQNELECTRC0 R|1EN52G Pza 274010 2,tAA 1A 214A 1ACALEFoNELECTRC0 RNEN 65c Pza 402960 4 .02960 4 02960

CANER A GALV 1/2'LONG 6 4 mCANER A GALV 3/4'LONG 64 hCANERAGALVAN 1 LoNG 64mCANERAGALV 1 ]/4'LONG 64 MCANERAGALV I 1/2'LoNG 64 mCANER A GALVAN 2' LONG 6 4 MCANER A GALV 21 l? 'LONG 64NCANERAGALVAN 3 LoNG 64 mCANERIAGALVAN 4 LoNG 64mCANER1A GALVAN ZADA DE 1/2CANERIAGALVAN ZADA DE 3/4CANERIA GALVAN ZADA DE ] ̂

CoDO GALVANZADO 1/2 (12mh) PaCoDO GALVAN ZADO 3/4 (16mm) PzaCoDO GALVAN ZADO l' (25mm ) P2aC0D0 GALVAN ZADO 1 1/4'(30mm) PaCODo GALVAN ZADO 1 1/2'(37mm ) PzaCODo GALVANIZ-qDO 2'(50mm ) P4CODo GALVANiZADo 2 1/2' (60mm ) PzaCODo GALVANIZA0o 3'(75mm ) PhCODo GALVANIZADo 4' (100mh ) PzaCOPLA GALVANIZADA 1/2 (12mm) PzCOPLA CALVAN 2ADA3/4 (16mm) PzaCOPLA GALVAN ZADA 1 (25mm ) PzaCOPLA GALVAN ZADA i 1/4^(30mm) PzaCoPLA GALVAN ZADA 1 1/2' (37mm ) PaCoPLA GALVAN ZADA 2 (50mm ) PzaCoPLAGALVAN ZADA 2ll2 (60mm) PzaCoPLA GALVAN ZADA 3 (75mm ) PzaCoPLAGALVAN ZADA 4 (100mm) Pa

TEE GALVAN ZADA 1j2 (12mm) PzaIEE GALVAN ZADA 3i4' (16mm ) PzaIEE GALVANIZADA1 (25mm) PzaTEEGALVANIZADAl 1/4 (30mm) PzaTEE GALVANIZADA 1 1/2 (37mm) PzaIEE GALVANIZADA 2 (somm) PzaTEE GALVANIZAoA 2 i/2 {60mm ) PzaIEEGALVANIZADA 3 (75mm) PzaTEE GALVANIZADA 4 (l00mn) Pza

3 3 0 3 3 0 3 3 04 3 0 4 8 0 4 8 08 0 0 8 0 0 8 0 0

1700 t7 00 170023 50 2350 23 5029 00 2900 29 0079 00 79 00 /9 00

10900 10900 1090019800 19800 19800

3 5 0 3 5 0 3 5 04 5 0 4 5 0 4 5 0724 720 720

1400 1400 14001550 1550 15 502300 23 00 23 006500 65 00 65 007800 78 00 78 00

18200 18200 18200

5 0 0 5 0 0 5 0 07 5 0 7 5 0 7 5 0

12AA 1204 120A22aA 220A 220A3 1 0 0 3 1 0 0 3 1 0 04500 4500 4500

10500 10500 1050014500 14500 1450024840 24844 24gAa

1 2 0 0 1 2 0 0 1 2 0 017 00 1700 170023 50 2350 235058 50 5850 58 5068 00 6800 68 001 1 5 0 0 | 5 0 0 1 1 5 0 0

0 0 0 0 0 0 0 0 021500 21500 21500500 00 500 00 50000

CRUZ GALVAN ZADA ll2 {12mm )CRUZ GALVAN ZADA3/4 (l6mm )CRUZ GALVAN ZADA 1 (25mm)cRUz GALVANIZADA 1 1/4 (30mm)CRUZ GALVAN ZADA I 1/2' (37mm )CRUZ GALVAN ZADA2 (50mm )CRUZ GALVAN ZADA2ll2 (60hm )CRUZ GALVANIZADA 3 (75mm )CRUZ GALVANiZAoA 4 (100mm )

Presupuesto & Construcci6n Ano 19 N'46, Noviembre 2008 - Febrero 2009 | 37 |

N PLE HEXAGONALCALV 1 /2 (12mm)Pza 380 380 380N PLE HEMCONALGALV 3 /4 (16mm)Pza 500 500 500NPLENEXAGONALGALVl ' (25mm) Pza i00 700 700N PLE NEMGONALGALV T 1/4' Pza 25 50 25 50 25 50NIPLE }IEXAGONAL GALV 1 1/2" Pza 1550 1550 1550NIPLE IIE/"AGONAL GALV 2 (50hm) Pza 2800 2800 2800

UNION UNVERSALGALV l /2 ' (12mm) Pza 140AUNIONUNVERSALGALV3i4 ' (16hm) Pza 1650UNIoN UNVERSALGALV 1" (25mm) Pa 1950IJN0N UNVERSALGALV i 1i4 P2a 2850UN 0N UN VERSALGALV I ll2 Pza 43 50UN 0N UN VERSALGALV 2 {60mm) Pza 7150

REDICC|oNGALVANIZADA3/4L l/2' PuRED!CC|oN GALVANIZADA 1 ' 1/2 PzREDUCCION GALVAN zADA la 3/4 PzaREDUCCION GALVAN ZADAl 1/411 PzaREDUCCION GALVAN ZADAI 1/2' I PzaREDUCCION GALVAN 2ADA 2.1 Pza

1 4 0 0 1 4 0 01 6 5 0 1 6 5 01 9 5 0 1 S 5 02850 28 504350 43507r 50 /l 50

LLAVE DE PASO CORTINAl/2'F,VLLAVE DE PASO CORTINA3/4" FVLLAVE DE PASO CORTINAl FVLLAVE DE PASO CORTINA] J/2 F.VLLAVE DE PASO CORTINA 2' FVLLAVE DE PASO GLOBO 1/2'FVLLAVE DE PASO GLOEO 3]4' F.V

CANERADECOBREDEl /2 6 mlsCANER A DE COERE DE 3I4"6 mlsCANERADECoBREDE 1" 6 mls

CODoDECoBRE 1 i2 (12mm )CO00DECoBRE3i4" l l6mm lC0D0 DE CoBRE 1" (25mm)

TEE DE COBRE 1/2 (12mm)IEEDECOBRE3/4 ( l6mm)TEE DE C08RE l'(25mm )

UNION UNIVERSAL COBRE DE '2'UNION UNIVERSAL COBRE DE3/4'UNION UN VERSAL COBRE DE 1'

4 00 400 4005 0 0 5 0 0 5 0 05 5 0 5 5 0 5 5 0

1 3 0 0 1 3 0 0 1 3 0 0i 6 0 0 1 6 0 0 1 6 0 02000 20 00 20 00

48 00 4800 48 0055 00 55 00 55 00

1 1 5 0 0 r 1 5 0 0 | 5 0 022840 22804 2284438500 385 00 385 005000 50 00 50 00s800 98 00 98 00

335 00 33500 33500506 00 506 00 50600

1 2 0 0 0 0 1 2 0 0 0 0 1 2 0 0 0 0

1300 1300 13 003000 30 00 30 004000 40 00 4000

1 8 0 0 1 8 0 0 1 8 0 048 50 4850 48506800 68 00 68 00

Pza 1600 1600 i600Pza 35 00 35 00 35 00Pza 4500 45 00 4500

Pza 4600 46 00 46 00Pza /800 78 00 78 00Pza 11600 11600 11600

TERMINALRoSCA NT.CoBREDEl/2 PzaTERMNALRoSCA NT CoBREDE3/4 PzaTERMNALROSCA NT.CoBREDEl P2a

CoDoTERM N RoSCA lNl CoDRE l/2 PzaCoDoTERM N RoSCA Nr CoBRE 314 PzaC000TERM N RoSCA Nr CoBRE 1' Pza

LLAVEDE PASo CoRI NACoBRE DE t2" P%LLAVE DE PASoCoRT NACoBRE DE3/1" P2a

t 6 0 0 1 6 0 0 1 6 0 03500 35 00 35 0D4500 45 00 45 00

83601 r 5 0 0

83 60 83 601 1 5 0 0 n 5 0 0

CAMARA OE POLIETILENO

DESCBIPCION UNIDAD PRECIOLa Pd Chba Sla Cu

MCAMARA D=60cm 60cm Protunddad PzaCAI4ARA D=60cm,80cm Frcfuoddad PzaCAIiARA D= 60cm l00cmProiunddad P2a

27000 250 00 225 0032830 314 03 285 48364 /8 34892 31720

Page 93: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

PRECIOS DE MATERIALES

CAMARA SEPTICA

DESCRIPCION UNIDAD PRECIO

EEi@CAMAM SEPTLCADE 3OO LlCAMARA SEPTICADE 5OO LICAIiARA SEPT CA DE 1OO(] LICAMAM SEPTICADE2OOO LICAMAM SEPT]CADE 5OOO LLCAMARA SEPT CADE lOOOO LI

MEEIE&ffiFOSASEPT CA 25OO LlFOSASEPTCAllO|] LIFOSASEPTICA50OO LLCAMAM DESGMSADoRA25x35x35

405 00 40500 40500688 50 688 50 688 50

122540 1,22504 1225402,670 00 2,670 00 2 670006,680 00 0,680 00 6 68000

13690 0013,690 00 1369000

282500 2 825 00 2,825001248 00 I24800 1248006 080 00 6.08000 6,08000

75 00 75 00 75 00

CAMARA40r40x40 (ECoCAMARA)CAMARA 60x60x60 (E C oCAMARA)CAMARA 60t60x80 (Ec oCAI,IARA)CAI,ARA 60x60x120 (ECoCAMARA)CAIIARA 80X60X120 {ECoCAMAFA)

BIOFOSADE lOOO LLBIOFOSADE 15OO LIB]OFOSADE2OOO LtB OFOSADE25OO Lt

15700 137 0046000 403 00543 00 47500628 00 54/00700 00 61200

1529 00 139300 1208 002084 00 1901 1650002040 00 24 0B 209300319500 291500 2536 00

CAMAMSANTARIA'SAN BURG'D=glCN Pza J2244 J2240

1 7 1 0 0504 00594008680076500

CARPINTENIA DE ALUMINIO

DESCBIPCION UNIDAD PRECIOLa Pd Cbba Sta Cruz

BoX DUCIIA EN'L. 0 80x0 80x180BOXTINAEN L l 50x0 70xi 50

Pza 1 ,36500 1 ,36500 136500Pza i 52500 I52500 1 ,52500

VENTANACORREDzAl00r l202Hlas Pza 50000 50000 50000VENTANACoRREDIZA2 00xl 20 3 llias Pza 1 050 00 1 050 00 1 050 00VENTANACoRRED|ZA300r l204 N ias Pu 1 ,49600 1 ,49600 149600PUERTACoRREDZA240x200C&IDR0Pza 2 ,88200 2 ,88200 288200

CARPINTERIA DE MADERA

DESCBIPCION UNIDAD PRECIOLa Paz Cbba Sla Cruz

PUERTA MOLDEADA PRESTIGE2 TABLERoS 70/80 cm X210m

2 TABLEROS DE90/100 cm r210 mPUERTA MOLDEADA SINFONIA6 TABLEROS 70/80 cm r210nPUERTA MOLDEADA SlNFON A6TABLEROS90/100 cm x210 mPUERTA MOLDEADA IIORIZON2 TABLERoS 70/80 cm x 2 10 mPUERTA i\4OLDEADA HOR]ZON2 TABLEROS 90/100 cm x 2 10 m

35424 --

36225 -

354 20 .-

x6225 -

CEMENTOS

DESCRIPCION UNIDAD PRECIO

CEMENToPoRTLANDVIACHA KgCEMENTOBLANCO KgCEMENTO BIANCo ToLTECA Bo sa

CEMENTO VIACHA ESTANDAR {50 Kq )PLIESTo EN VACNA BolsaPUESTo EN AV URUGUAY BolsaPUESTo EN ELALTO BolsaPUESTo EN CALACoTo BolsaPUESTO EN VILLA FATIMA BosaPUESTO EN R O SECo BosaPIESTO EN oRURO BosaPUESTo EN CoCIIABAMBA Bo saCEMENTO VIACHA ESPECIAL (50 Kg.)PUESTo ENVACfIA BolsaPUESTo EN AV LJRIJGLIAY eolsaPUESTo EN ELALTo BohaPUESTOEN CALACOTo EosaPUEST,OENVILLAFATMA BosaPllESTo EN R|oSECo Bo saPUESIo EN oRURO BolsaPUESToENCoCHABAMBA B.lsa

0 9 6

17500

0 9 6 0 9 64 5 0 4 5 0

17500 1 /500

0 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 0

0 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 0

4800 0001 S 0 0 0 0 04 8 0 0 0 0 04 8 0 0 0 0 01 8 0 0 0 0 048 00 00043 00 0000 0 0 4 8 0 0

4 9 5 0 0 0 04950 0 004950 00049s0 000'19 50 0 004 9 5 0 0 0 04 9 5 0 0 0 00 011 49 50

DESCRIPCION UNIDAD PRECIOLaPd Cbba, Sla CM

CEMENTO WARNES PMARNESCEI,IENTO WARNES P/STA CRUZ

CEMENTO CAMBA P/STA CRIJZCEMENTOFANCESA

CEMENTo CoBoCE (s0 Kg)CEMENTO PORTLAND '30CEI,IENTO ESPECIAL IP.3OCEMENTO SUPER OR I,4OCEMENTO ALTA RES STENC A P.4O

CEMENTO EMISA (50 Kg.)CEMENTO EMISA P40CEMENTo Er\,llSA L-30CEMENTo El\,llSA lP 30

- - 482047 30 -

-- 4960 -..

4820 --

465047 504500 - -

47 5A4800

460047 50

CIELO FALSO PLAFON

DESCBIPCION UNIDAD PBECIOLzPaz Cbba Sta Cruz

LoSETADISENADA 100x100 cmLoSETAACUSTICAD-9 100x100 cmLoSETA M0LDEADA 50x50 cmLoSETAS TEXPoR I21r5x60 5N2 5LoSETAS REVIPoR 1 21x5x60 5x25

MAX PLACA DURALT2 40x1 20x6mMM PLACA DURAL T 1201120x6mMAXIPLACADUMLLT060n 20x6m

3146 31 46 3 i 4631 68 31 68 31 681 0 4 5 1 0 4 5 1 0 4 53971 3971 39713 3 1 1 3 3 1 1 3 3 1 1

10758 10373 1094553 68 51 81 536827 50 2585 2695

CLAVOS

UNIDAD PBECIOLaPd Cbba Sta. Cruz

M2[42

DESCRIPCION

CLAVOS KgCLAVoS DE lllERRO DE4 (100mm) KgCLAVoS DEN ERRoDE3 (75mm) (g

CLAVoS DE 1 Y1 1/2'(25mm y37mm)KgCLAVOS PARA CALAM NA Kq

r800 1800 18 001 8 0 0 1 8 0 0 1 8 0 01 8 0 0 1 8 0 0 1 8 0 01 8 0 0 1 8 0 0 1 8 0 020 50 20 50 2050

CUBIERTAS

DESCRIPCION PRECIOLaPd Cbba Sta Cruz

UNIDAD

PLACAoNDUL olRALll244x108 m PacaPLACAONDUL DURALIT I 83x103 m Pa€PLACAoNDUL o!RALT30t1 08m x6mm PlacaPLACAONDULADA M2PLACARESI 10 DURAL T2 44x 103 PacaPLACARESI 10 DUML T244 x 103 M2FLACAFRANC oNDULNE2001097 PlacaPLACAFRANCESAONDULNE l'12CUMBRERAONDUL NE l] gOxO 40 Pza

CANALIT 7 50x1 00m PlacaCANALTgJ I,I2ONo NADE DURALIT 2 44x0 53h P acaoND NADE DURALT 1 83x0 53m P acaOND NADE DURAL T [I2

TEJAESPANoLADllFALlTl 60x1 05m PlacaTEJAESPANOLA DL]RALITr] TOXI {]sM PIACATEJAESPANOLADURALT M2

CALAMINAONDi ]LADAN'33 M2CALAMINAoNDLILADAN' 33 1 8010 70 UnidCALAM NAoNDULADAN" 331 80x0 80 UnrdCALAM NAoNDLILADAN'33 2 l5x0 80 !ndCALAl,l NAONDLILADAN' 33 2 45x0 80 !ndCALANI \AONDULADAN'33 3x0 80 Llnd

CALA]\IINAONDULADAN'32 M2CALAMINAoNDULADAN 32 1 80x090 UndCALAM NAONDULADAN'3?O 90 i215 U dCALAM NAoNDULADAN'32 245x0 90 Unid

CALAI{ \AONDULADAN" 28 M2CALAM NAONDULADA N '28 ]8DT( ] 80 UNdCALAI,IINAoNDULADA N 28 2 ]5r0 80 lh dCALAIiINAoNDULADAN'28 2 45i0 80 Ui dCALAMINAoNDULADAN'28 3x0 80 UnLd

14 30 74 3A 74 3D55 /0 55 70 557011140 11140 ln 40282A 2E?0 2S2A

10590 10590 10590420a 4240 420087 60 8760 87 6046 40 1640 464054 00 54 00 54 00

63370 63370 63370s4 50 84 50 8.4 5029 90 29 90 29 90224A 2ZAD 22 40n2a 2x2a n20

68 80 68 80 68 8037 95 37 S5 37955t 70 5t 70 5170

23 95 23 9528 35 283534 50 34 5040 00 40004600 46 005650 56 50

64 60 64 609300 93 00

1 1 1 0 0 1 1 1 0 0121AA 124 AA15500 15500

23 9528 3534 504000,16005 6 5 0

290342 5A50 325i 06

64609 3 0 01 1 1 0 0124 00tss 00

2603 26 034254 425050 32 503257 06 5/06

CALAM NA PLANAN'30 2ilt\\2 47 75 4115 4T 75Und 95 50 95 50 95 50

| 38 | presupuesto & Construcci6n Aio 19 N" 46, Noviembre 2008 - Febrero 2009

DESCRIPCION UNIDAD PRECIOLaPar Cbba Sia

CALAM NAPLANAN'28 2ri

CALAITTINA PLANA N' 26 2x1

CALAM OND PLAST. N '12180x080CALAM oND PLAST N'12240x080CALAM oND PLAST N'12300x080CALAM OND PLAST CAN'12

CALAM OND PLAST N"16 1 80x0 80CALAI,I OND PLAST. N'16 2 4010 80

CALAM OND PLAST N'16300x080CALAMINAOND PLAST CA N' 16

M2 55 25 55 25 55 25Unid 11050 11050 1 i0 50

M2 69 50 6S 50Und 13900 13900

Pa 55 50 55 50Pza 75 50 75 50Pza 98 50 98 50[,t2 41 00 41 00

Pza 11120 11124Pu 14250 14250

69 5t)13900

55 50

98 5041 00

11120142CJ

M216500 16500 165 0075 00 75 00 75 00

DESCRIPCION PRECIOUNIDAD

oOMO P MM DAL 0 40x0 21D0M0 P RAM oAL0 61x0 61D0M0 P MM DAL 1001100D0M0 PIRAMIDAL 1 22x1 22D0M0 P|RAM|DAL180x1S0DOMO REDONDO DAMETRO 045DOMO REOONDO D AI,IETRO l] 60

8 8 1 0 8 8 1 0 8 8 1 0345 30 345 30 3453009620 896 20 896 20

1,058 00 1.05800 1,058 001063 30 1.06330 1,063 30

264 00 264 00 264 00351 90 35190 351 90

ESTUCOS Y CALES

DESCRIPCION UNIDAD PRECIOLa Pd Cbba Sta,Cruz

ESTUCO BEDOYAESTUCo BEDoYA 36 KgESTUCO PANDOEsTlJCo PANool8KgCAL

YESo CoBoCE 30 KgCALLACALERA 9 K9

Kg 055 055 055Bo sa 1950 1950 1950(q 050 050 050Bolsa 900 900 s00Kg 047 047 047Bolsa 9 60 160 960B o s a 1 1 5 0 1 1 5 0 1 1 5 0Bosa 1000 1000 1000

FIJACIONES EN SECO

DESCRIPCION UNIDAD PRECIOkPd Cbba, Sta. Cruz

T MFONDOS DE 5 1/2xll4TMFONDoS0E4l /2x114T RAFoNDoS DE4il/4TLMFONDOS DE3Xl/4

GANCHoS J DEi50nmGANCFoS J DE 120 mmGANCNoSJDE 80 mmGANCHOS PAMTEJA60-80GANCHOS DE l4 cmGANCHOSDEi0cm

TORN]LLO DE F JAC ONCANCAMO

F JADOR DE ALAAUTOTRABANTEF JADOR DE ALA S MPLE

TORNILLO P/MADERA sxs0 dmTORN!LL0 P/MADERA 5x80 mm6 5oTORN LLO P/MADERA5ilC0 mm

ToRN LLo P/MADEFA6[50 mrnToRN LLO P/MAoEFA6X80 mmTORNLLLO P/MADERA6 x 100 mm

Pa 234 230 230Pza 215 215 215P z a 1 9 0 1 9 0 1 9 0Pza 340 340 340

Pza 254 254 250Pza 2 30 2 30 234Pb 20a 200 200P.a 180 1 80 180Pza 240 244 240Pza 240 244 240

3 5 06 5 08 0 0

75013001450

1 4 5 1 4 5 1 4 51 5 0 0 1 5 0 0 1 5 0 0231 231 231

3 1 0 s t o 3 1 06 50 650 650

3 5 06 5 08 0 0

/ 5 01 3 0 0t4 50

6 5 08 0 0

7 5 01 3 0 014 50

GAVIONES

DESCBIPCION UNIDAD PRECIOLaPd Cbba Sla Cruz

GAVIoN CoRNSA15011x0 5GAVIoN CoRNSA150, l0n 0 SDGAVIoNCoRNSAI 50 i1 0 r1 0 rCDGAV 0N COR NSA2 0rhl Crl] 50GAV 0N CoRINSA2 00x10x1 0GAV 0N CoRINSA2 00i1 0r10/5!

Pza 18880 18880 198 00Pza 296 l0 29610 31000Pza 32900 32900 3 !300Pza 27r 60 27160 28560Pza 38S50 38850 40250Pza 36050 36050 374 50

Page 94: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

PRECIOS DE MATERIATES

DESCBIPCION

GAVIoN CORINSA 3 00x1 oxo 50 pzaGAVIoN CoRINSA 3 0011 0i1 0 pzaGAVTON coR NsA4 00x1 0x0 50 pzaGAVIONCORINSA4 OOXI OXl O PZAGAV0NCOR|NSA500x10x050 pzaGAVIoN CoRINSA5 00kl 0K1O pza

COLCHONETA CoR NSA 3 0l]x2 ox() 30 pzcoLcHoNETA CORTNSA 3 oor2 oxo 23 pzaCoLCHoNETA cOF|NSA 300x2oxo iZ pzaCoLCNoNETA CORINSA 4 O0x2 0x0 30 pzaCOLCHoNETA CoR NSA 4 0Ox2 oxo 23 pzaCOLCHoNETA CoR NSA 400x20r01/ pzaCoLCHoNETA CoR NSA 5 0012 {]rl]30 pzaCOLCHoNETA CoR NSA 500x20x023 pzaCoLC|oNETA CoRINSA 500x20x017 pzaCoLCIIONETA CORINSA 6 0Ox2 Oxo 30 pzaCoLCHONETA CoR NSA 6 0012 0rO 23 paCoLCHoNETA CoRINSA 6 0012 Or0 i7 pza

Enr?r,t!t:L!tr

3S850 3885057120 5712A5 1 1 0 0 5 1 1 0 074200 742A063630 636 3091350 S1350

47810 4751A45010 4501041090 4109062510 6251058940 589 40556 50 556 507714A 7714073850 738 5070350 703 5094290 942 90882 00 8820082S 10 82810

40250585 205250075600650 309215A

49210

42990639106034057050785407525071750956 90896 008 4 2 1 0

GAVION MACCAFERR 1 5X1x1/sDGAV ON MACCAFERR 2x1ro5/CDGAV 0N MACCAFERRI 2x1xi /S0GAV ON MACCAFERRI 2X1X1/CDGAVI0N MACCAFERRT 3x1x1/CDGAVION MACCAFERR 4X1X'CDGAV ON MACCAFERR 5x1x't/COGAV ON ]\,IAC CAFERR] 5X2x] jc DGAV 0N MACCAFERRI 4xlx(] 5/C0GAVION MACCAFERRI 5XJXO 5/CD

COLCHONETA RENO MA 4X2Xo 17COLCHONETA RENo MA 5x2xo 17COLCHONETA RENO MA 6X2XO 17

28317 28317 2831726547 26541 265 41353 86 35386 353S638913 38913 38913564 92 56492 564 92743 99 74399 74399859 56 859 56 859 56

1.48512 1,48512 14951251337 51337 513 37635S9 63589 63589

CoLChoNETA RENO MA 4rxo 23COLCHoNETA RENO MA 5x2x0 23COLCHONETA RENO MA 6x2io 23COLCHONEIA RENo MA 4x2xo 30CoLCNoNETA RENol\,lA 5r2x0 30

667S0 667 80 66780821 t6 82116 821 16

1.12656 1 . i2656 11?656726 60 726 60 726 60744 96 744 S6 14496

Pa 577 80 57780 57790Pza 740 64 740 64 740 04Pza 813 12 873 12 Si3 12

DESCRIPCION UNIDAD PBECIO

MEZCLAOORA P/LAVAMANOS BRASMEZCLADORA P/BIDETT BRASMEZCLADORA P/LAVAPLATOS BMSI',IEZCLADoRA P/T NA BRASi\4EZCLADORA PARA LAVAMANOS

. F.V CFOMOMEZCLADOM P/BIDETT FV CROIT1OMEZCLADOR Y TRANSFERENC A

ITIEZCLAD0RA TINIVDUCHA |TALMEZCLADOM P/B DETT ]TALIANOMEZCLAOORA P/LAVAMANO ITALMEZCLAOORALAVAPLATO

GRIFO DE 1/2'CROIIADOGRIFO DE ]/2' MOVIL CROI{ADOGRIFERIAPAMLAVARROPA

MEZC CROMO P/LAVABoMEZC CROMO F/B DETTMEZC CROMO P/TINA. DUCHAMEZC CROIIO P/LAVAPLATOS

I,IEZC CROMO ORO P/LAVABOMEZC CROMO ORO P/BIDETTMEZC CROMO ORO P/TINA.OUCHAMEZC CROMO ORO P/LAVABO

Pa 2012APza 26850Pza 23360Pza 2A120

Pza 221APza 5860

19900 19780 1967019340 200 20 200 2023170 UlA 225a038560 385 60 376 90

271AA T1A0340 t0 34010

24124268 50233602012018830

?11458 706940

2632AM7 2A

19650268 50233 6020124r 8 8 3 0

24 9060 006800

MEZCLADoM P/LAVAMANoS F.V GALA JqoMEZCLADoRAF/B DETT FV GALA JgoIIEZCLADoRA P/DUCHAF.V GALA JqoMEZCLADoM P/LAVAMANoS tV ROJO JgoMEZCLADORAP/BIDETTiVROJO JgoMEZCLAooRA P/IINA F.V CALA Jgo

ndrrtfifinE t

19320 7932A 7%2A858 50 85850 85850i19A 7119A f i1507471A 787 70 78770904 00 90400 904 00

1 1 0 0 8 0 1 1 0 0 8 0 1 1 0 0 8 0

378 J0 38440 401 1039580 40780 41990600 40 61820 63660039 70 659 80 67940

49940 51450 529 9051950 53550 55140756 20 779 00 805 3081160 825 20 84980

37S 00 342 00 32530384 20 366 70 36080405 80 38160 343 50

MEZCLADoM P/LAVAMANo N CoLAZZ pzMEZCLADOMP/DUCHANICOIAZZ| PaMEZCLADoFAP/TINA,DUCHAN|CoLAZ| pza

DESCRIPCION UNIDAD PRECIOLa Pa: Cbba Sh.Cruz

EADILEJO 1400 14008 0 0 8 0 0

40 00 40001 6 0 0 1 6 0 04500 45 0065 00 650035 00 350050 00 50 0021AA 210020 00 20 00

325 00 325 0040 00 4000900 900

50 00 50 0053 00 53 00

35000 35000280 00 280 00

14 008 0 0

40 001 6 0 045 00650035 0050 0027 0020 00

3250040 009.00

50 0053 00

3500028000

ESPATULA PhPLANCHA P/ALBANILERIA pzaPLOI1ADA PZAMART LLo pzaN VEL DE MANO Pza[,!ART|LLo MEDIANO pzaCoMBODE 2Kg pzaZINZELI\,IEDIANO pzaBALDE P/ALBAIiI LERIA PZACoRTADoR DE P1S0 CEMM C0 YMULEJO pzCIERRRAMETALICA(ARCO) pzaHoJA MEIAL CA (NTCHOLSoN) pzaPALA PzaPICOTA pzaCARRETILLA C/ NEUI,IAT CO GMNDE pzaCARRETILLA C/ NELJMATICO [TED|ANO Fza

DESCFIPCION UNIDAD PBECIOLaPa Cbt€ Sh Cruz

IGOLDENSOIGOLFLEXGOLPR[ , IER]GOLTECHOSMTOPlO/SEALIGOLTRANSPARENTE

LAM NA SIKA GR SLAM NAS KAC/ALUM N]OLAM]NAS KA S/ALI]M N]OLAMINADEASF TIGRE CJALUMLA(4INA DE ASF. TIGRE S]ALUM

MULTI.SEAL

UN ToP 620 REVEST PTFACHAoASI3T 5 Kg )

3KS 13600 13600 136003Kg 348 00 34800 34SOO3& 151 00 151 00 151 0017K9 69/ 00 69700 697003 7 5 K 9 1 1 1 8 0 0 1 1 1 8 0 0 1 1 1 8 0 03K9 22AAA 22A00 22A 00

72200 722AA 722AA

1,36024 1 360 24 1,36024

M2 10300 10300 10300M2 59 00 5900 5900\,12 53 00 53 00 53 0ol'42 43 00 43 00 43 00M2 4300 4300 43 00

25M

I,IEMB GEoTEXTILALUj\rj|NIO3 5 mm M2 8344MEMBGEoTEXTILS/ALUMNO35mm M2 ZO96[4EBR ASFALT. M]NEMLIZADA4 mm l\,12 iOT (]0MEER ASFPOLIETILENOALL]M 35MM I\,l2 7924MEBR AS L ICAALIJMN 035mm M2 604S

8344 834478 96 78 96

1 0 1 0 8 1 0 1 0 87924 79 2460 48 60 48

INSTALACION ELECTRICA

DESCFIPCION UNIDAD PRECIOLa Paz Chba, Si., Cruz

Tw ALATTIBRE CU 1x18(100m1)TW-ALAMBRECUIx ' ]6 100mt)TW ALAMBRE CU 1114 (10oml)TW .ALAMBRE C! 1n2 (100m1)TW - AI-AMBRE CU 1rl0 (100mt)TW ALAMBRE CU lx00 (1O0DL)

Ro l lo T1750 11750 11750Rol lo 18200 18200 18200Ra a 272Aa 272AA 272AARo o 4?300 42300 42300Rollo 659 00 659 00 659 00Rollo 1 070 00 I 0/0 00 1 070 0{]

1 9 1 0 0 1 9 1 0 0 1 9 1 0 0299 00 299 00 2990045700 45700 457 0070300 703 00 703 00

1 1 3 1 0 0 1 . 1 3 1 0 0 1 , 1 3 1 0 01 862 00 1,86200 1862002,846 00 2,846 00 2 846004,25000 4 250 00 4.25000

TW CAELET H LOS C! 1r7r16 (1oont )RotoIW-CABLET H LOs cU 1x7x14(i00mt) Ro oTW CABLE 7 HILoSCU 1x7x12(1o0ml) Ro oTw- CABLE i NILOS cU'ttno(1oomt) RoloTW- CABLE 7 Hllos CLJ 1tx08 (100mr)RoIoIw - CABLE 7 H LoS cU l7xo6 (i00ml)RoIoTW CABLE 7 H LOS CU 1xtu04 (100m1)Ro oIW -CABLET N Los cU 1x7x02(100m1 ) Ro o

TW- CABLE Tq H LoS CU 1xtgxlioTW CABLE19 FILoS CU 1xTglz1]TW - CABLE 19 NILoS CLJ 1x19x3/OTW ' CABLE 19 HILoS C! 1x19x4/0

CTll CoRDoN MELLIZO CU ,22 looliT 14100 14100CIM- CORDoN MELLZ0 CLJ 2x2O (tooml )Roto j9900 j99OOCTV OcDoNVc '0CJ2.18 O()nt / oolo 20500 .g5OOCTM-CoRDoN[,lELLiZoCL]2x16 (1Ooml) Rono 307 0O 38700cTM 'coRDoN MELLIZo cU 2x14 (100mr)Rolto 66s00 66500CTM-CoRDoNMELL|ZoCu2Kl2(10ont)Ro o 994 O0 99400CTM.CoRDoNMELLIZoCU2iI0(1o0mt)Ro o1,46900 1,46900

MT 86 50 8650MT 10650 10650t\rT 16850 16850MT 19850 19850

86 50106501685019850

1 4 1 0 01 9 9 0 02850038700665 00994 00

1,46900

ELECTRICA

DESCRIPCION UNIDAD PHECIOLa Pd Cbba Sta Cruz

ADCAELECoNCENTR|CoCLJ2xI0(1O(]ml)RoIot58000 158000 15800!ADCqBLE CONCENTR C0 CU zt8 (100m1)Rotto 2450002450 O0 2.450 OOAD CABLECoNCENTRICo CLI2x6 (100m1) RoIo 4 930 OO 4,93000 4 930 O0ADCABLECoNCENTRICOCU2I4(t00ml)RoIo 6,20000 62oooo 620000

CADDUPLEXAIUMINIo2XTToE(100m1) Roto 55000 ssoo0 55oooCADDUPLEXALU/\4NlO2X7x06(1o0hr)Ro o 1,10000 1, j0O0O 1, j0000cADDUPLEXALUMNLo2X/x04(T00m1)Roto 1 85000 1,85000 1,85000CADDLJPLEXALIMIN02X7K02(100m1)Ro o 42b0(]O 4,250Ol] 4.2SOOO

CABLE cu CONCENIR cO 3xoCABLECU CONCENTRC03x6CABLE PAM TV 2x22 S MPLECABLE PAFA TV 2x22 DoBLE

IUEo P/lNSl ELECT. Cd L=3m 1i2TUEo P/NSI ELECI Cd L=3m 5/8'TIJBo Pi NST. ELECT Cd L:3m 3/4"TUBO P/lNSl ELECT. Cd L=3m 1'

INTERRUPToR TERMICo Unip 6Amp PzaINTERRIPTORTERM Unp 1015Amp PzaINTERRUPTOR TERM Unp 20-30Amp PzaNTERRUPToRTERMICoBipoIaT 15Amp PaINTERRUPToB TERM|COBpoar30Amp PzaINTERRLJPToRTERM C0 Bpoar60Anp pzaINTERRUPToR TERM CoTdpo 4 15Amp PzaNTERRUPToRTER[,tlCoTrpoar30Amp PzaNTERRUPToRTERM|CoTIpoar60Anp pzaINTERRUPToRTERMC0I00Amp PzINTERRUPToRTERMICo200Amp Pza

CL,lA RECTANGULAR DoBLE PAVCO PzaCAJA RECTANGILARSIMPLE PAVCo Pz

100m 2 04100 204100 204100100m 218000 2,18000 2,18000100 m 35000 350 00 35000100m 20960 209 60 20960

Tubo 340 3 40 340Tubo 490 490 490Tubo 700 700 /00Tubo 860 860 860

1850 i8 50 18 501850 1850 18501850 1850 185048 50 48 50 48 504850 48 50 485048 50 4850 48 5057 00 5/00 57 0057 00 57 00 5/ 0062 50 62 50 6250

18850 18850 18850599 50 59950 599 50

CAJA OCTOGONAL PAVCO

TIJEERIA CONOUFLEX PAVCO1/2'TUBERIA CONOUFLEX PAVCO 3/4'

[4]MI

4 6 02 8 04 3 0

2203 4 0

0 6 00 6 0

4 6 02844 3 0

2203 4 0

0 6 00 6 0

2BA4 3 0

2203 4 0

0 6 00 6 0

ADAPTADOR CONDUFLEX PAVCO 1/2' MIUNION CONDIJFLEXPAVCO 1/2' M

INSTALACION SANITARIA

DESCRIPCION UNIDAD PBECIO

MNo FERRUM-FLoREN 2 PZA C/ACC JgoBANo FERRLIM-FLoREN 3 PZA C/ACC JgoBANo FERRUM DoRICA 3 PZA C/ACC JgoBANo FERRUM.ADR Al 3 PZA C/ACC JgoEANO DECAMONTECARLO 3 PZA oIAcc JgoBANo DECADE VILLE 3 PZA C/ACC Jgo

BANERAl 50x0 70 CoN GRIFERIA PzaBANEMl 67x075 CoN GRIFERIA PzaBAN HIDROM 1 7010 80 C/MOT' PzaBAN HDRoMCIRC D=15m C/MOT. PzaBAN HDRoM CIRC 0=l8m C/Mol PzaBAN NIDRoM ESQUI R=15 m C/Mot Pza

NoDORo BLANCO T/BAJo C/ACC PuNoDORo BLANCo T/ALTO C/ACC Pa|NoDoRO FERRU[,] - FLoREN T]Bl"lO PzaINODoROFERRUMDoRICA PzaINODoRO FERRUM - A0RIATiCA Pza

LAVAMANOS BLANCo CON GR FER A PaLAVAMANOS FERRUI\,j - FLoRENC A PzLAVAMANOS FERRIII4 DoRICA Pza

i 36420 1,364 20 1364201 6-48 50 I 648 50 1 648 502137 70 2,1317A 2,137 7A2,877 0A 2Bn A0 2,8fi aA1,92824 192820 1928201,75710 1.15710 1757 10

I08380 1,08380 1,083801.187 60 1,19760 1,187601 , 1 6 5 1 0 1 1 6 5 1 0 1 1 6 5 1 03 , 5 3 1 5 0 3 5 3 1 5 0 3 5 3 1 5 04 70070 4,70070 4 700 705 01740 5,01740 5,01740

50770 507 70 507 70397 90 397 90 397 9085000 85000 85000

1,322 70 1,322 70 1.322 70151930 1,51930 1,51930

397 80 38310 3720037880 36610 35900663 90 65500 63660574 50 343 70 538 80

104 70 9650 9060253 90 253 90 25390

1,42700 13/830 13459038200 36610 358 60

287 2A 2115A 2659n43610 42610 4074046470 449 70 43650

29 30 29 30 24 6025 70 24 60 23 6019 70 1850 173033 00 30 80 28 50

11000 11000 1100010200 10200 10200

PEDESTALBLANCOURINAR O BLANCO CON SIFONT NABLANCACON GRIFERABIDETT BLANCO CON GR]FERA

BIOETT FERRUM. FLORENCIAB DETT FERRUM DORICAB OETT FERRUM.ADRATICA

TOALLEROJABONEFAPERCNA

BASE DUCHA0 80x0 80BASE DUCHA0 75x0 /5

Presupuesto & Construcci6n Afio lg N" 46, Noviembre 200g _ Febrero 200g

Page 95: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

INSTALACION SANITARIA

DESCRIPCION UNIDAD PRECIOt Pd Cbba, Sta, Cruz

DUCHALORENZETTMETALICA PzaDUCHALORENZETT PLASILcA(2R) PaoUCHALORENZEIT PLASTCA(1R) PzaLAVAPTAToS C/2 DEPoS Y2FREGAD PaLAVAPLAToS C/2 0EP0S Y 1 FREGAD PuLAVAPLAToS C/l 0EP0S Y 1 FREGAD PzaREJILLADE PiSo PzaCHICOT LLO GALVANIZADo 30cm PzaCNICOT LLO PVC 30cm PzaCAJA INTERCEPTORA DE llo 25x25 PzaLAVARROPA DE CEMENTO Pza|-AVADERo DE FIERRO ENLOSADo Pza

@ACCESoRIOSG-1/ JsoJABoNEMBLANCA A.18 PzaPERCHADoBLEBLANCA4-600 PaPERCHASIMPLE BLANCAA 680 PzaT0ALLER0SBLANCOA'586 PzaPAPELERo BLANCOA-48o PzaINODoRO BLANCoT/ALTo EXI P-]5 PzaLAVAMANOS BLANCO L-15 PzaURINARo BLANCOM-/11 PzaURINAR0 BLANCO C/S|FoN M-712 PzaINODoRO CoLOR RAVENA(BE 68) PzaTANOUE COLoR (BE 68) PzaINOD COLoR NIDRA RAVENA (BE-68) Pza

LAVAMANoS COLoR RAVENA (8E,68) PzaLAVAM S0B COLoR MVENA (BE-68) PzaPEDESTAL COLoR MVENA (8E.68) PzaBIDETT C0L0R RAVENA(BE 68) Pza

INODoRO C0L0R RAVENA(CE 17) PzaTANOUECoLOR(GE 17) PaLAVAMANoS COLoR MVENA(GE-j7) PzaLAVAM S0B COLoR MVENA (GE 17) PuPEDESTAL COLOR RAVENA (GE,17) PaINODoRO COLoR DE V LLE (CR-37) PaTANoUE COLOR (CR't) PhLAVAMANoS COLoR DEVILLE (CR'37) FzaLAVAM S0B CoLOR DEVILLE (CR-34 P4LAVAM ENV C0L0R DE VILLE (CR 37) PuPEDESTALCoLOR DE VILLE (CR.37) PaBIDETT coloR DE V LLE (CR 37) PzaNODoRo COLoR CARMRA (BE-83) PzTANOUE COLOR CARRARA (BE-83) PaINOD COLOR HIDRACARRARA{BE 83) Pz

420 00 42000 420 001S500 19500 1950095 00 9500 95 00

1,05000 1 050 00 1.05000530 00 53000 530 00280 00 28000 280 003500 35 00 35 001500 1500 15008 0 0 8 0 0 8 0 0

35 00 3500 35 0013000 13000 1300038000 380 00 380 00

134 30 13430 13! 302310 x1a 237A1430 1430 14 301240 1244 12 4a28 80 28 80 28 802530 25 30 25 30

21120 21124 2112A10340 10340 103401/950 17950 17S50250 50 25050 250 5031320 31320 3132036000 360 00 360 0022144 221 4A 221 4A

1 7 3 1 0 1 7 3 1 0 1 7 3 1 024164 2416A 2416A13680 13680 1368025930 25S 30 259 30

28840 28840 288 4036000 360 00 360 00165 70 16570 1657019830 19830 198301 3 0 1 0 1 3 0 1 0 1 3 0 1 047944 47940 479 40360 00 360 00 3600024274 24270 24210257 60 25760 257 0011550 11550 1155015200 15200 15200xT26A 37260 31260859 00 85900 8590053290 532 90 532906727A 270 67210

N0D0R0 M0N08L0DK lpo Amenei S PzLAVAMANoS CON PEDESTAL PuLAVAMAMOS DE EMPOTRAR PzaLAVAMAMOS ART STICOS PhLAVAMAMOS DE VIDRIO PuURNARIOPEAUENO PbURNARIoMEDIANO PbURNARIODEPEUR NARIO DE ESQI.JINA

MEZCLADoR LAVAMANOS CRISTAL Pa[lEZ CLADoR LAVAMANOS CANo ALTO PzaMEZCLADOR LAVAMANoSMoNo[rANDoPza[,IEZCLADOR OI]CHAI,IEZCLADOR T NA, DUCNAI,IEZCLADoRSDETI,IEZCLADoR DE CoC NA

ALAMBRE ESIAIIADO MONOPOLAR 18 10Om 5530 5530ALAMBRE ESTANADO MONOPoLAR 19 100m 38 30 3830ALAMBRE ESTANADO MONOPOLAR 20 1O0m 3250 3250

658 75248002442524800248 00104 6330225581 2531000

3100039525 .--23250 -31000 . - -3487527125 --2T125

INSTALACION TELEFONICA

DESCRIPCION UNIDAD PRECIOLaPd Cbba Sla Cnz

55 3038 303250

CABLED/RECUB P/EXTER0R2x l9 100m 13990 13990 13990CABLE DE BAoAJA Ci AUTOPoRI 2x20 100 m 18000 1S000 18000CABLETELE P/INTERIORES 2x2i 100m 7460 7460 7460

CABLEo/RECUB P/EXTER0R2x21 100m 14900 14900 114900CABLETELF. P/INTERIoRES 2120 100m 9770 S770 S770CABLEENToRCNADoP/NTER|oR2124100m 4400 4400 4400CABLEENToRCNADoP/NTER|ORAi26 100m 3630 3630 3630CABLEENToRCf IADoP/NTER]oRZxrZ 100m 6120 6120 6120

LADRILLOS

DESCRIPCION UNIDAD PFECIOLa Pd Cbba Sla Cruz

LADRlLLO6H24xlSxl2cm PbLADRILLo6H 12xl8x12cm PaLADR|LLo6H24x l5r l15cm PzaLADRlLL06H24x15r95cm PbLADRILLO6H 12x18x95cm Pza

LADRLLO6H22sr lsxS5cm PzaLADRLLO3H24x ls rBcm PhLADRLLO2H24x12x65cn PzaLADRILLOCAMEoTE 18N 25x12x65cm PzaLADRLLOCELoS|A l2 i l6x l6cm PzaLADRLLO6H 15x258x105 PzaLADRLLOOH 15x125x105 PzaLADRLLOOH2ox2sr loscm PzaLADRLLO3HVSTO7x25x125 Pza

ADoBITO lE 5x1lx22 PzaADoBlTO2da 5x1lr22 PzaLADRLLOOH CEMPEX PzaLADR LLO S 6H CEMPEX PzaLADR LLO GAMBOTE CERAPEX Pza

CERAMICAPtroSA ALIVIANADA 13 cm PzaCEMMICAP/LoSA ALIVIANADA i0 cm PzaCERAM CAP/LoSA ALIVANADAT cm PzaCERAMICAP/LoSA ALIVIANADA 10 cm PzaCEMMICAP/LoSA ALIVIANADA 12 cm PzaCERAMICAP/LoSAALIVANADA16 cm Pza

1 9 4 1 9 41 3 0 1 3 01 5 8 1 5 81 N 1 2 61 0 4 1 0 4

126 126i 1 0 1 1 00s2 0921 1 6 1 1 61 0 9 1 0 9

1 3 81 0 51 6 01 0 5

0 7 50 6 0

2 3 93254 0 04 3 0

325 325291 291

1 0 01 5 01 0 9

LADRILLO VISTO BRICK

DESCRIPCION UNIDAD PRECIOLaPd Cbba Sb.Cruz

CURVA I]ORIZONTAL 63CURVA NORIZONTAL 5SCt]RVANORIZONTAL 55CURVAI]ORIZONTAL48CURVAVERTCAL69CURVAVERTCAL66CURVAVERTLCAL64[{UROESIANDARMUROAIIGERADOIIURO ESTANDAR MEDIOI\,iLJRO ESTANDAR ANGULARENCNAPEANCHOENCI]APECORTOEOTAGUAS PARAVENTANABOTAGI]AS TRAD C ONALBOTAGI]AS CIJRVO PzaBOTAGUAS RECTO PhB SELADO VERTICAL DoBLE PzaB SELADO PUNTA VERT CAL PAB SELADO PUNTA REDONDA PhB SELADO PUNTAREDONDADOBLE PaTERMINACIoNESREooNDA PzaTERM NACIoNESRECTA Ph

1 8 3 1 8 3 1 8 32 1 2 2 1 2 2 1 2238 238 238246 ?46 2461 8 3 1 8 3 1 8 3229 229 2292 5 6 2 5 6 2 5 61 2 4 1 2 4 1 ? 0124 i 20 1200 9 0 0 9 0 0 9 01 4 6 1 4 6 1 4 60 9 0 0 9 0 0 9 00 7 5 0 7 5 0 7 51 4 6 1 4 6 1 4 61 4 6 1 4 6 1 4 61 20 124 1201 4 6 1 4 6 1 4 6124 124 1201 2 a 1 2 A 1 2 01 20 124 1201 2 4 1 2 4 1 2 0124 124 120124 124 120

LOSETAS

DESCRIPCION UNIDAD PBECIOLa Pd Cbba. Sh Cruz

LoSETA oNDUL 10cm (32 pzim2) P2aLoSETA DoBLETlocm PuLoSETA DoBLET 8cm PuLoSETA NEXAG 10cm (34 pzalm2) PzLoSETA NEX coNcREIEc 112 pz6 i m2) PaLOSETA DOBLE'S'CoNCRETEC(32 pzAi m2) Pza

250 250 254254 250 250224 220 2242 A A 2 0 0 2 0 06 3 0 6 3 0 6 3 0

215 215

DESCRIPCION UNIDAD PRECIOLaPd Cbba Sli CDz

MADEMDECONSTRL]CCION P2I,ADEM CEPILLADA P2MADERA DURA AJIPA P2[,lADERA ASERRADAAL]\,lENDRlLLo P2I{ADEM OCHOO P2MADEM ROBLE P2MADERA PALO I4ARIA P2

MACNIEMSREI,IARA P2MACI]IEMBRE GABI]N P2MACNIEMERE LAUREL P2MACI]IEMBREPALOMAFIA P2

4 3 09 3 44 5 15043367 1 4504

9034 5 14 8 35 0 4

4 3 0 4 3 09 3 4 9 3 44 51 4515 0 4 5 0 43 3 6 3 3 61 1 4 | 1 45 0 4 5 0 4

9 0 3 9 0 34 5 1 4 5 1483 4 835 0444 5 04

Presupuesto & Construcci6n Affo 19 N" 46, Noviembre 2008 - Febrero

PARQUET MARACON D SENOPAROUET ROBLE

PAROUFI TAJIBOPARQUET TAJIBO CON D SENO

ZOCALo cEDRo3 (75mm )ZOCALo MARA3 (75mm)

ZOCALo TAMM3 (75mm)ZOCALo TARARA4 (100mm)

ZOCALoTrJ BO3 (75mm )ZOCALo TAJ BO4'(100mm )

DESCRIPCION

DESCBIPCION

UNIDAO PBECIOLa Pd Cbba Sta,

M2M2M2

3960 39 604 5 1 0 4 5 1 03850 38 50

1214 12101324 1320

1 1 5 5 1 1 5 51324 1320

s900 95 5610500 1028913500 1324016600 162/1 157245 00 2401527840 ?7253

21840 21370 241

25940 25400 241

M 2 4 5 1 0 4 5 1 0M2 5060 50 60M2 47 3A 4T 30

M 1 0 4 5 t 0 ! 5M 1 3 7 5 1 3 7 5

VENESTA 2&i122x4 mm

MULT LAM NADoS 244xl22xO mmMULT LAM NADoS 244x122x8 mmMULTILAMINAD0S 244x122x10 mhMILTILAM NADoS 244x122x15 mmMULT LAM NADoS 244x124i18 mm

TABLES MELAMIN C0 S0BOLMA (1cara)300x122x9mm PzaTABLES MELAMIN C0 S0BOLMA {i€E)300x122r15mn PzaTABLES MELAMIN C0 S0BOLMA(1@ra)300x122x18mm PzaTABLES MELAMIN C0 SoBOLMA{2caEs)300x122$mm PzaTABLES MELAi\,llN C0 SoBOLMA (2ca6s)300x122x l5mm PzaTABLES MELAIVIN C0 SOBOLMA(2ca.at300x122x18mm Pta

TABLEXRUSTC04loxlS3tgmm PzaTABLEXRUSTC0410x183xl2mm Pa

MELAM NA IIADERASYNERGY275x2 l0x18mml\,lELAM NA BLANCO SYNERGY215x2 1a\18nn]\,IELAM NAMUL VERDE275x183x18mmI,IELAM NACREMA BLANCo282x183x1smm

19800 19220 18735300 22294 217

29100 266 30

?5400 249 80

302 00 296 30

349 00 342 30

670 00 670 00

586 00 586 00

585 00 585 00

43500 43500585 00 58500

RUSTICoSPRENSADoS 205n mrgmm Pz 10400 10180RISTICOSPRENSADoS 205n $rlsmm Pza 16050 15/30RUSTICoSPRENSADoS 205n mxl8mm Pa 19120 18640

DER VADoS MADEM205xl 75xgmm PzaDER VADoS MADEM 2 05x1 75x12mm P.aDER VADoS MADEM 2 05i 75x15mm Pza

104 00 101 8013910 13590 13216050 15730 153 40

DESCRIPCION UNIDAD PRECIOLa Pa: Cbba. Sh.

MANGUERA3/8 L|SA(1omm)IVANGUERA 1i2' LlsA (12mm )ITANGUERA5/8 L|SA(16mm)IIANGUERAl/? ESIRIADA(12mm )i\,lANGUERA5i8 (16mm)IlANGUERA3i4 (20mnr )

300 300 3( !3 6 0 3 6 0 3 0725 725 153 9 5 3 9 5 3 9 54 6 0 4 6 0 4 t5 9 0 5 9 0 5 5

Page 96: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

PRECIOS DE MATERIATES

DESCBIPCION UNIDAD PBECIO DESCRIPCION UNIDAD PRECIOriPa: Cbba Sta,Cm

DESCBIPCION UNIDAD PBECIOLaPd Cbba, Si!, Cruz

MOSAICO MARMOLADo DE 30x30MOSA C0 MARMOLADO DE 20x20MOSAICo GMNITICO DE 30x30MoSA|Co GMNITICO DE 20x20

MoSAICO CoRRIENTE 0E 25x25MOSA CO CORRIENTE DE 20x20ZOCALO MARMoLADO DE 25xi 0ZOCALO GRAN TICO DE 25X10ZOCAIO CORRIENTE DE 2l]X1O

12100 121A086 90 86 9084 70 84 7079?0 19 2A

36,30 363033 00 330031 90 31 S03190 31,9027 50 2f 5A

MATERIAL ELECTRICO DE EMPALME

DESCRIPCION UNIDAD PRECIOLaPd Cbba. Sta,C@

M2tv2M2M2

M2M2[r]MIMI

1214086 90u107924

36 3033 003 1 9 031902154

INTERRUPTOR S [,IPLE ESMALTADOCONMUTADOR ESMALTADOPULSADOR ESMALTADOENCNUFE PURED ESMALTADODIMMER ESMALTADOENCHUFE TELEFONO ESMALTADOENCHI]FE TV ESMALTADO

INTERRUPTOR SIMPLEALUM]NIOINTERR CON LUZPILOTO ALU]\,lCON[lUTADORALIJMIN OPULSADORALUMINIOENCi]IJFE PURED ALUM]NIODIM[,IERALUMINIOENChUFE TELEFONO ALUMINIOENCHUFETVALIJM NIO

1 1 5 0 1 1 5 01 6 0 0 1 6 0 01400 14 001800 18003000 g0 001 9 0 0 1 9 0 01900 19 00

1150 11 501/00 17001 8 0 0 1 8 0 01400 14 0078 00 78 0080 00 80 001 9 0 0 1 9 0 01 9 0 0 1 9 0 0

1 1 5 01 6 0 0t4 00180030 001 9 0 01 9 0 0

11 50l7 001 8 0 014007 8 0 080 001 9 0 0i 9 0 0

MATEHIAL TXPLOSIVO

DESCRIPCION UNIDAD PRECIO

D NAMITA

GUIAFULMNANTE

Pza 290 290 290Kg 290 290 290M r 1 6 0 1 6 0 1 6 0Pza 130 I 30 1 30

MESONES DE PIEDRA PIZARRA COBTADAOXIDADA F:NA

DE PIEDRA PIZARMNATUML60X6O p2aDE PIEDRA PIZARM NATiJML 70x70 pzaDE P EDM PIZARRA NATUML 8Ox8O pa

OE P EDMPIZARMSEMIPUL DA 6Ox6O PzaDE PIEDMPIZARMSEMIPLIL DA 70x70 p2aDE PIEDMP ZARMSEiTIPLIL DA 00x80 p2a

DESCRIPCION UNIDAD PRECIO

-- 257 9A.-- 2941A

- 330 80-- 367 7A.-- 44124

PINTURAS

oEscRrPctoN PFECIO

197 70?26 5031450

2U2A302 00377 40

UNIDAD

LATEX TRADIC ONAL MONOPOLLATEX TRAD C ONAL MONOPOL

LATEX TEXTUMDOR MONOPOLLATEX TEXTURADOR MONOPOLREVESI ENLIJCIDO EN GENERALBLANCO MONOPOLBEVEST ENLUC DO EN GENEMLSLANCO MONOPOL

SELLADOR DE PMEDESTRANSPARENIE MONOPOLSELLADOR DE PAREDESTMNSPARENTE MONOPOLSELLADOR PARE BLANCO MONOPOLSELTADOR PARE BLANCO MONOPOL

Gt 83 58 83 5S18lt 397 74 357 74

G 10465 1046s18Lt 527 66 527 66

10465527 66

lSLt 27469 274 68 27468Gl 67 76 67 76 67 7618tt 33252 332,92 332_92

MASAACRIL EXT. BLANCA MONOPOL GI 5761 5761 5761MASAACRIL EXI. BLANCA MONOPOL 18LI 28042 28042 28A 42

9 1 9 1 9 1 S 1

18Lr 46081 46081 46081

G 11046 n046 110.461ELL 55212 55272 55272

Gl 1262118L l 632 80

SUPERLATEX ACRILICO MONOPOLSUPERLATEX ACRIL CO MONOPOL

LATEX SATINADO MONOPOLLATEX SATINADO MONOPOL

12621 1262163280 632 80

PINTIJRASINTEIBRILLO MONOPOLPINTURA SINTFI. BRILLO MONOPOLANTICORROSIVA OXIDO DE HIERROMATE CAOBAMONOPOLANT CORROS]VA OX DO DE H ERROMATE CAOBAMONOPOLANTICORROSIVA EXTM RESISTENTEBLANCOMONOPOLANTICORROS VA ErIRA RESISTENTEBLANCOMONOPOL

PINT HORNO ALQIJ DICAMONOPOLP NT. HORNO ALOUIDICA MONOPOLALPEX CELESTE MONOPOLALPEXCELESTE MONOPOL

PINTURA P/PISCINAS BLANCAI ONOPOLP NTUM PJP SC NAS BLANCAMONOPOL

ASFALTEX NEGRO MONOPOLASFALTEX l\T0NOPOL

IMPERlVEAEILIZANTE S LICONADOPARACONCRETO MONOPOLIMPERMEABIL ZANTE SIL CONADOP/PAREDES HU['EDAS

PINTI]M DE DEMARCACION DECALLES BLANCo [rjoNOPOLPINTURADE DEMARCAC ON DECALLES BLANCO MONOPOLP]NTURA DE DEIVARCACION DECALLES AMARILLO MONOPOLPINTUMDE DEMARCAC ON DECALLESAMARILLO MONOPOLP NTUM DE DEMARCACION DECALLES NEGRO MONOPOLPINTUM DE DEMARCACION DECALLES NEGRO I,iONOPOL

G18Lr

GI

1 8 L t

GI

1S L l

G1 8 L lGI18 L t

GI

18 L t

G1 8 L l

12243 122435/543 575 43

12187 121A1

575 96 575 96

4998 49 98

858 97 858 97

27398 2n9A 273981348 /6 1 ,34876 1 ,34876

25053 250 53 250 531,23207 1232A1 1n2A7

11962 17962 17962

870 38 870 38 8/0 38

1224357543

12181

12607605 64

575 96

49 98

85897

12607605 64

P NTUMDEPORI ELANCAMONOPOL GPINIUM DEPOBT. BLANCA MONOPOL 18 LL

BARNIZ COPAL BRILLOSO MONOPOL GIBARNIZ COPAL BRILLOSO MONOPOL 18LIBARNIZCR]STAL BRILL JVIONOPOL GEARN ZCRISTAL BR]LL MONOPOL 18Lt

roll 23828 238 28 238 28

1 0 L t

G

1 8 L l

GI

18L l

GI

18Lt 1 ,12AM 112014 1 ,12014

t 3 l 8 1 1 3 1 8 1 1 3 1 8 165667 656 67 656 67

16891 16891 16891

8 '1396

69 i6

929043374

92 9043314

12126647 46

127 26 1212660/ 46 60746

88 06 88 0643106 43106

i8893 18893 18893

921 69 92169 92169

19901 19901 19901

97265 91265 97265

22834 228y 228y'

81396 81396

6916 69 t6

1264760564

13251 13251627 62 62162

BARNIZ MAR NO FILTRO SOLCRBRILLOSOMONOPOLBARNIZ MARINO FILTRO SOLARBRLLOSOMONOPOL

MASILLA P/ MADEM MONOPOL

SELLADOR P/MADEM [,lONOPOLSELLADOR P/[,IADERA MONOPOL

TAPA POROTRANS MONOPOLTAPA PORO TRANS I\,IONOPOL

CARPICoLATMNS l\,loNOPoLCARP CoLAIRANS I\,IoNOPOL

PEGAPARKET (PEG P/PARKET)PEGAPARKET (PEC P/PAR(ET)PEGATEXMONOPOL

PEG,qTODO TRANS I'ONOPOLPEGA AZULEJO MONOPOL

PINTURAPAMP ZARRANEGROPINTURA PARA PIZARRA NEGRO

TNTE LATEX AMARILLO OCRET NTE P MAOEMDEAGUAVIOLETA

PINTOLEO BLANCOPNTOLEOBLANCO

G

1 8 L t

9aT2 9072 907241832 41832 418323843 3843 3843

64244 642M 64202

20916347 6249301

326913664

GI

G1 8 L t

GI18 Lr

G1 8 L L

12K2 A K18Lt

LIGI

G1 8 L r

10 L l1 0 L t

GI1 8 L t

20916347 6249301

3 2 6 913664

132 51627 62

88 064 3 1 0 6

20s 163416249301

32,6913664

92 90433 74

69074 698 74 6S8 74386 89 38689 386 89

2 9 1 9 2 9 1 9 2 9 1 948559 48559 48559

AGUARRAZ MINERAIAGIJARRAZMINEML

THINNER UNIVERSATTHINNER UNIVERSqL

BARN|Z MATEBARNIZ COPAL MATE

2422 2422 24U44S 55 449 55 449 55

3542 3542 3542448 56 &8 56 448 56

l L l16 L l

16 Lr

Gt 1U82 13482 134A213Lt 64442 64442 e/,442

PINTURAS

DESCRIPCION UNIDAD PRECIOLapa. Cbba, ShCruz

SIKAGUARD 63 E[llOLOG COstMFooR156s $FooR261

30(q 493 00 493 00 493 0010Kg 1,3.|4 00 1,34400 1,3440025Kg 3,494 00 3,494 00 3,49400

PISOS

DESCRIPCION UNIDAD PRECIOLaPd Cbba. Sla, C@

P|SoPAK305x30 5cm F16 mh M2PAVIFLEX 30x30 cm e=1 6 mm M2DLJRAFLEX3oX3oome=3mm M2ZoCALoS DE VINIL 7 5 cm MlFUELLAS P/ESCALEMi 20t0 30 cm MlCONTMHUELLASP/ESCALEM [,lPERFILDE GMDA MPlSo TRANSPMENTE 0 60 cm GRUESo MlPISOTMNSPARENTE 060 cm DELG MlP SO CERAMICO NAC]ONAL M2P]SO CERAMICO ESMALTADO M2

PISO ALTO TMF CO ROBLE NATUML M2 19590 19590 19590PSoAXEXDoMESTICO M2 17A4A 17rc4A 1704aPISoDECORUSo NTENSTVO l\]t2 19090 19690 19690PlsoDoMEsTlco t\,i2 11680 11680 11680Plso DoMEsTlco lNTENstvo NAT M2 137 10 137 1o 137 10PtsousocoMERcAL M2 26820 2682A 2652A

35 20 35 7035 20 36 003620 &'701500 150050 00 500011 30 11 301870 21104240 M3025 00 28003 3 1 0 3 0 2 048 60 4680

45 6050 0049 501 5 0 050 001 5 0 0249056 40330036 204520

DESCRIPCION UNIDAD PRECIOLapd Cbbr, Sia,C@

PLANCHADE 1/40'(0 00 nm )PLANCHA DE 1/32' (0 75 mm )PLANcHADE l/16 {1s0 mm )PLANCHADE 2 mmPLANCHADE 1/8 (3mm )PLANoHA DE 3/16' (5mm )PLANCHA DE 1/4. (6mm )PLANcFADE 5/16 (8mm )PLANCNADE 3/8'(1omh )

15700 15700 1570019630 19630 13630407 80 40780 407 8051280 51280 5128073260 1U6A 7326a

1,18050 118050 1 ,180501,49530 1,495 30 1,495 301,98?70 198210 198210247830 2,47430 2,47830

PLANCHAS DE ACRILICO

DESCRIPCION UNIDAD PRECIOLa Paz Cbba Sia. CEz

PLANCHAS ACRIL 100x2 0G2PLANCHAS ACRIL 1 00x200 3PLANCHAS ACR L 1 O()XZ OO.5PLAUC|AS ACRIL 1 20x2 40,3PLANCHAS ACRIL 1 2012 40-5PLANCHAS AcRtL 1 00x2 00x1PLANCHAS ACRIL 0 98x180

M2

19880 19080 19880305 60 30560 305 60521 80 521 80 521 80467 50 467 50 46750793 30 793 30 793 3010150 10150 iot 5012650 12650 12650

DESCRIPCION UNIDAD PRECIOLaPd Cbba, sh,CM

PoLITUBO 112 100mls (12mm)PoLITUBo 3/4" 100mh (20mh )PoLITUBo 1'100mls (25nm)POL TUBO I1l? 100mts (37mm)POL TUEO 2 50ms (50mm )

126002184031000830 00

1,00000

Presupuesto & Construcci6n Affo lg N.46, No.viembre 200g _ Febrero 200g

Page 97: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

OUINOUELLERIA

DESCRIPCION UNIDAD PRECIOLaPa Cbba Sk Cu

CNAPA DoBLE PERILLAINTER OR pzaCHAPA CHINA pza

l:EmCERMDUM TUBULAR S/PASO pzaCERFADURA ILJBULAR BANo pzaCERRAoURA TUBILAR DoRMITOR|O paCERMDURATUBULARACCESO PaCERRADURACILINDRICAS/PASo pzaCERRADURA C LINDRICA BANo pzaCERRADIIM C L NoRICA DoRMITOR O pzaCERRADUMC LINDR CAACCESO pzaCERRADUM SOBREPONERACCESO pzaCERR SoBREPoNERACCESo c/cadena FzaCERR SoBREPoNERACCESo dsegob pza

BISAGRA ANGoSTA PASADoR SUELTO pafBISACRA ANG PASADoR SUELTO dmbeza parB SAGM ANGoSTA PASADoR nEi,|ACHADO Par

CANDADOS4s mmCANDADO REFORZADO 50 mm

70 0025 00

9500 95 00 95 0012500 12500 12500T2800 12800 r280012800 12300 1280012000 12100 127001r300 119.10 1300012600 129 /0 1330014200 14700 1510012500 12500 1250014000 14000 14000r0800 i1 l00 114 00

1 2 0 0 1 2 0 0 1 2 0 01600 1600 t6 001 5 4 0 1 5 4 0 1 5 4 05 4 0 5 4 0 s 4 07 3 0 7 3 0 / 3 09 2 0 9 2 0 9 2 A

1 8 3 0 1 8 3 0 1 8 3 024 3A 243A 243A2844 284A 28 40

i 6 0 0 1 6 0 0 1 6 0 01 1 0 0 1 1 0 0 1 1 0 08 7 0 8 7 a 8 7 0210 21A 21A3 90 390 3903 0 0 3 0 0 3 0 0

7800 78 00 78 001/000 17000 17000

15000 15000 150 0013000 13000 1300012500 12500 12500

7000 70 0025 00 25 00

P|CAPoRIE 1/2 CAtiA 6 (15onm.)P CAPoRTE T2CANA12 (3OOhm )PCAPORTEEMBUTD0l0cmP CAPORTE EMBUTIDo 15 cmP CAPORTE EMBUTIDo 30 cmPICAPoRTE DE BRoNCE 15cm

BISAGP'ATE

CNAPA EXI CRoMADAP/CIADMDA PzaC|APA NT. CRoMADA P/CLIADMDA pzaCHAPA EANo CROM P/CUADMDA pza

CHAPA EXI OX DADA P/oE BOLA pzaCHAPA INT.oXIDADA P/DE BOLA pzaCNAPA BANOOXIDADA P/DE BOLA pza

CNAPA EXT CRo]\4ADA C/MAN VELA pzaCHAPA Nl CRoMAoA Ci MANIVELA pa

17000 17000 1700012000 12000 12000130 00 13000 13000

r2500 12500 1250012500 12500 12500

SELLANTES

DESCRIPCION UNIDAD PRECIOkPd cbba. st ctoz

CoLMAJINTAS sL {25Ks)TAPAGoTERoS (10Ks)SELLATECI]OSSKAFLEXl l -FCs MFLEX 152 [,t

Pza 706 97 706 97 706 97Pza 50 82 50 82 50 8250Cc 1000 1000 100037AG 122A0 1220a 122AA370G 8200 82 00 82 00

SOGAS

DESCRIPCION UNIDAD PRECIOla Pa Cbba Sia Cruz

1 5 0484

1 0 0 0t4 001 8 01 9 0

1 0 0 01 4 0 0

TANOUES

DESCntPCTON

socADE 1/8 (3mm )SoGADE 38 (1omm)SoGADE i /2 ( l2mm)SOGADE3i4 (20,nm )SOCADE PLAST C0 3/'16'(5mm )SOGADE PLASTICo l/4' (6mh )SoGADE PLASTICo 1/2' (12mm lSoGADE PLAsTlco 3/4 (20mm )

[i!MIMIMIMIMI

I 5 0 1 5 04 8 0 4 8 0

1 0 0 0 1 0 0 01400 14001 8 0 1 8 01 9 0 1 9 0

1 0 0 0 1 0 0 014 00 i400

UNIDAD PRECIOLa Pe Cbba Sta Cruz

liittfirTANQUEDURALTAQUAFLEX500 LL pza s0460 50460 50460TANQUEDURALTAOUAFLEX1000L l Pza 99340 89340 8S340TANOIJE DUMLIT AQIIAFLEX 1400Lt Pza 1,12750 1127 So 112150

Er(! lil{'.rflEllTANQUE CAIIPEON CL 250 LITANOUE CANIPEON CL3Ol] LtTANQUE CAMPEON CL 5OO LLTANQIJE CAMPEON CL lOOO LtTANQUE CAMPEON CL2OO(] Lt

Pza 37741 36135 43362Pza 38544 385 4.4 481 80Pza 762 85 56210 76285Pza 1 ,20450 112420 I20450Pza 2,69808 2 698 08 269808

TANOUES

DESCBIPCION UNIDAD PBECIOLa Pa Cbba Sta Cruz

TANQUE CAMPEON CL Sl]Ol] LlTANoUE CAI\,IPEON CL 10000 LtTANQUE CAIIPEON CL2OOOO LIEIIEIWITANQUEAQUAFLEX500LIsTANQUE AQUAFLEX lOOO LISTAN0UE AQUAFLEX 1400 Lls

[IEM[ti7!|iEtitTniIritr|lTANoUE B CAPANEGRO40O LlsTANQUE B CAPANEGRo 600 LtsTANOUE BICAPANEGRo 111]O LlsTANQUE BICAPANEGRO 25l)l] LhTANQIJE BICAPANEGRO 5OOO LG

TANQUE BICAPA COLOR,lOl] LISTANQUE ELCAPAC0L0R 6Ol) LlsTANQUE B CAPA C0L0R 1100 LlsTANOUE B CAPA COLoR 25OO LlsTANQUE BICAPACOLoR 5000 Lrs

TANoUE TRICAPA CoLOR 400 LrsTANQUE TRICAPA C0LOR 600 LrsTANQUE TRICAPAC0L0R 1100 LlsTANQUE TR CAPACOLOR 25OO LKTANOUETR CAPA COLOR 51]OO LG

TANQIJE AQUASOL 250 LlsTANQUEAQIJASOL4S0 Lls

Pza 6 825 50 6 82500 6.022 50Pza I 2 045 00 1 2 045 00 I 2,045 00Pza 20 075 0020,075 0020,075 00

Pza 65000 59000 61000Pza 1 ,23000 I 10800 1 19000Pza 1 ,56400 1447 00 I49000

Pza 62720 643 65 66009Pza 78958 814 22 83886Pa 1 ,24142 129657 133171Pza 2 .92 i 82 302436 312690Pza 5 ,82659 603159 623659

Pza 69695 71343 72991Pza 878 25 902 93 927 6lPza 1365A4 1,43A22 1.475 4APza 323266 3 ,39524 3 ,49782Pza 623200 6 ,43 /04 664208

Ph 951 44 967 S7 98449Pza 1 ,1600S 1 18481 120954Pza 1 ,80645 1 85167 1 .896 89Pza 460402 4 .70665 4 ,80927Pza 7568 60 7,77368 7.97800

Pzd 32000 30000 28000Pza 50000 48000 45000

TANQUE DE 450 LIs IIONO CAPATANQUE DE 650 Lts MONo,CAPATANoUE DE1200 Lls MONO-CAPA

TANQIE 0E450 Lls Bl CAPATANQUE DE 650 Lls BICAPATANOUE DE 1200Lts B .CAPA

TANQUE DE 450 Lts TR CAPATANQUE DE 650 Lts TR -CAPATANoLIE DE 1?00 Lts TR -CAPA

Pza 36315 36315 36315Pza s44 73 544 73 54473Pza 1016 82 101682 1 ,01682

Pta 40350 40350 40350Pza 531 04 581 04 581 04P2 1 ,07331 10733 i 10 /331

Pza 48824 48824 48824Pza 70613 70613 70613Pza 1 180 64 l . ' 18064 r .18064

TEJAS

DESCRIPCION UNIDAD PRECIOLa Pa Cbba Sla Cruz

TEJA DUNTEX COLON ALCUMBRERA COLONIALTEJADUNTEX FRANCESA

Pza Z4A 240 ---Pza 672 672 ---Pza 264 264Pza 672 672

4 3 84 3 81 5 2

TEJACOLoN AL50 cm TECERBoL PzaTEJAESPANoLA40cmTECERBOL PzaTEJAESPANOLA50cmTECERBoL PzTEJACF CACo 43 cm TECERBoL PzaTEJAFRANCESA43cmTECERBOL PzaCUI\,IBREM40cmTECERBoL l\1CUMBREM PLANA(34[5) PzaTEJARoMANA39Cm NCERPAZ PzaTEJA ESPAIIOLA 40 CM NCERPM PZATEJACoLoNIAL 50 cm INCERPM PzaTEJA ROI\,IANA O ESPAIiOLA M2

TEJACOLoNAL50 cm NORMAL PaTEJACOLoN AL50 cm ESPECIAL PhTEJACOLoN AL45 cm TAPACANAL Pza

TEJACoLOR DE Ho PLANA PzaTEJACOLOR DE HO DOBLEROMANA PZACUMBRERA C0L0R DEH0RMIcON Pza

3 5 0 3 5 03 5 0 3 5 0180 I 80

4080 4080

-- 3603 6 0

-- 384

TIERRATOSCA Y SUELO SELECCIONADO

DESCRIPCION

2 5 03 0 03 0 03 0 03 0 05 0 0

3 5 03 5 01 8 0

4080

UNIDAD PHECIOLa Paz Cbba. Sla C@

5000 4600 00010274 14270 0009 1 9 0 9 1 9 0 0 0 08650 86 50 0008 1 1 0 8 1 1 0 4 3 3 037 80 32 30 27000 3 3 0 3 3 0 0 0

62 50 3780 32401 5 2 0 1 0 8 0 8 6 08 1 1 0 8 1 1 0 0 0 0

TiERM SELECCIONADAABONO VECETAL (TURBA)ABONOORGANCO

T]ERRANEGRA

ADOBE DET]ERMSEMILLA RAY GRASSCESPED NATURAL{TEPES)TURBA MOLIDA

M3M3M3[,13M3M3

KgM21\,13

l 42 l Presupuesto & Construcci6n Aio 19 N" 46. Noviernbre 2008 - Febrero 2009

DESCRIPCION UNIDAD PRECIOLa pd Cbba Sta,

i550 1550 --28 80 2880 _3650 3650 -5 7 1 0 5 7 1 09950 99 50 _

14950 14950 -183 70 '18370 -239 70 239 70 -.-

332 50 33250 _

TUBO CEMM CO4' P/DESAGUETUBO CEMM CO 6 P/DESAGUEcoDoCERAMc04CODOCERAMCO6

TEECERAMc04 ' (100mm )IEECERAMc06 ' (150mm )YEECEMMICo6 ( l00mm)YEECERAMICo4 (150mm)

TUBoDENo 4 P/DESAGUE (100mm ) MlTUEoDEHo 6 P/DESAGIE (150mh ) MlTUBODEHo 8 P/DESAGUE (200mm ) MTIBODE Ho 10 F/DESAGUE{250mn )MTUBo DE Ho 12 P/DESAGUE {300mm )[,1

TUBo DE Fo 16 P/DESAGUE (400mh )MlTUBoDEl-lo 19 P/DESAGUE (460mm )MlTUBoDENo 20 P/DESACUE (500mm )Ml

TUBO DE Ho 24^P]DESAGUE (61omm )Ml

TUBo DEHo 24 H"ARMADo MTUBo DE Ho 28 H"ARMADo MTUBo DE No 32 H"ARMADO [,

TUBoDEFo 40 NoARMADOTUBoDENo 4S l loARMADO

TIBODEHo 4 P/DRENAJETUBODEHo 6 'P /DRENAJETUBo DE Ho I'P/DRENAJE

TUBo DEfo l0 P/DRENAJETUBoDENo 12 P/DRENAJE

TUBoDEHo 16 'P IDRENAJETLIBODEHo 18'PIDRENAJETUBo DE Ho 22 P/DRENTJE

DESCRIPCION

DESCRIPCION

UNIDAD PRECIOL! Pd Cbba St!

MI

MI1,088 00

435S0 -5952070750 - -

[i]MI

MI

1 / 8 0 1 7 8 03320 33 ?0

65 /0 65 7011450 114 50

15300 153002 1 1 3 038244 -.-

UNIOAD PFECIOLa Pa Cbha 91

CoLLAR DE DERIV 2'x1l2' PAVCO Pza 2000 2000CoLLARDE DERIV 2'r3l4'PAVCO Pza 2000 2000CoLLAR DE DERIV 2 1/2"x3/4 PAVCo Pza 240A 24AO

2900 29 002900 29 0034 50 34 50 !34 50 34 50 !5100 5100 : -5100 5100 ,='14600 14600 -

COLLAR DE DERV 3T1/2 PAVCOCOLLAR DE DlRV 3t3/4 PAVCOCOLLAR DE DER V 4t]J2' PAVCOCOLLAR DE DER V 4 x3/4 PAVCoCOLLAR DE DERIV 6 r1l2' PAVCOCOLLAR DE DERIV 6 x3/4 PAVCoCoLLAR DE DERIV 8 xl PAVCo

TUBO DESAGUE PVC L=4 m I 1/2'TLIBO DESACUE PVC L=4m 2'TUBO DESAGUE PVC L=4 m 21l2TUBo DESAGUE PVC L=4 m 3TUBo DESAGUE PVC L=4 m 4TUEo DESAGUE PVCL=4m 6

TUBo ROSCAPVC L- 6 m 1/2TUBo RoSCAPVC L= 6 m 3&TUBo RoSCAPVC L= 6 m 1"TUBO RoSCAPVC L= 6 m 11/2TIBO RoSCA PVC L= 6 m 2

TIBO PVc 1 1/2' L= 4 m (3hm)TUBo PVc 2 'L= 4 m (50mm)TUBo PVC 3 'L :4 m (75nh)TUBo PVC4 L=4 m (100mm)

TUBO CAMPANA E4O L= 6 M 1/2TUBo CAI\,IPANA E-40 L= 6 n 3/4TUBO CAMPANA E.4O L= 6 M I'TUBO CAMPANA E-40 L= 6 m 1il2'

TUBO CAMPANA E-40 L= 6 m 2Tl.lB0 CAMPANA E-40 L= 6 m 2 1/2"TUBo CAI\4PANA E 40 L= 6 m 3'TUBO CAMPANA E-40 L= 6 m 4^

2254 22 503000 30 004574 45705320 53 2074 80 74 80

22040 2ZA 0A

29 60 2S 6039 50 39 5066 00 6600

10600 1060014204 14240

37 80 37 80 37r4800 4800 4€t7924 7924 rcZ

'12000 12000 120.0

140 00 140 00 140c2n a0 277 0a TlE31000 31000 3t0F4 1 1 0 0 4 1 1 0 0 4 1 1 m

2164 2T 60 -36S0 3680 _5420 54 2A8200 8200 -

Page 98: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

PRECIOS DE MATERIATESTUBOS Y DE PVC Y ACCESOPIOS OE PVC

DESCFIPCION UNIDAD PBECIOLa Paz Cbba Sta, C@

DESCRIPCION UNIDAD PRECIOLaPd Cbba, Sb,C@

DESCRIPCION UNIDAD PRECIOLa Paz Cbba, Sta CM

TUBo CAITPANA E.40 L= 6 m 6"TUBO CAMPANA E-40 L= 6 m I'TUBO CAMPANA E-40 L= 6 m 10

666 50 666 50 666 501.39000 1,39000 1390 002,085 00 2,08500 208soo

0 0 0 0 0 0 0 0 086 50 86 50 86 50

12350 12350 1235018000 18000 1800029200 292AA 292AA666 50 666 50 666 50

1,05210 1,052 00 1052 001,63200 I 632 00 163200

232 232 232382 382 3826 0 0 6 0 0 6 0 0

1240 124A Q4A2210 227A 2Z7A

1 0 5 0

1 5 5 0

33 80

4430

/ 0 0

22AA480028 50

TLJBOCLASE6L=6 m 3'(75mm ) TuboIUBoCLASES L=6 m 2.(50mnr) TuboTUBoCLASE9 L-6m 2 t /2 ' (6omm) TuboTUBo CLASE 9 L=6 m 3'(75mm) TuboTUBo CLASE 9 L=6 m 4 (100hm) T0boTUBo cLAsEs L= 6 m 6 (150mm) TuboIUBoCLASESL:6h 8' (200mri ) TuboTUBOCLASE9L=6m 10 (250mm) TuboCoDO 1/2 PVC TGRE- BRAS pzaC0DO3/4 PVC T GRE- BFAS pzaC000I PVC TIGRE BRAS pzaCODo11/2 PVC TIGRE - BRAS pzaCOD02 PVCTIGRE-BRAS Ph

TEE 1/2' PVCT GRE BFASTEE 3/4' PVCT GRE BMSTEE 1 PVC TIGRE - ERASTEE I1l2' PVCT GRE BFASTEE2 'PVCTGRE BMS

COPLAS 1/2 PVC TIGRE - BRASCOPLAS 3/4' PVC T GRE BFASCOPLAS 1'PVCTIGRE BRASCOPLAS 1 12'PVCTIGRE BRASCOPLAS 2 PVC TIGRE - BRAS

UN ON UN VERSAL 1/2'PVC TIGRE , BfiASUN ON UN VERSAL 3/4'PVCTGRE BRASIJNION UNIVERSAL 1'PVC T GRE. BRASUNION UNIVERSAL 1 1/2"PVCTIGRE.BRASUN ON UN VERSAL 2'PVCTIGRE.BRAS

CODO PVC P/DESAGUE ?"CODO PVC P/DESAGUE2 1/2^CODO PVC P/DESAGUE3'CODO PVC P/DESAGUE 4'

TEE PVC P]DESAGUE2'TEE PVC P/DESACUE 2 '2'TEE PVC P/DESAGUE 3'TEE PVCP/DESAGUE4'

YEE PVC P/DESAGUE 2"YEE PVC PJDESAGI]E 2 1/2'YEE PVC P/DESAGUE 3'YEE PVC P/DESAGUE 4'

YEE REDUCCION PVCPARADESAGUE4 x I l/2YEE REDUCCION PVCPAFADESAGIE3x2YEE REDUCC ON PVCPARA DESAGUE 4'x 2YEE REDLJCC ON PVCPARADESAGUE 4'x 2 1/2'YEEREDUCCIONPVCPARADESAGUE4T3

Pza 356 356 356Pza 522 522 522Pza 540 540 540Pza 1620 1620 1620Pza 28 80 28 80 28 BO

n a 1 9 9 1 9 9 1 9 9Pa 291 291 291Pza 440 440 440Pza 28 00 28 00 28 00Pza 35 00 35 {]O 35 0O

7 7 4

1 0 5 0

7 T A

1 0 5 0

1550

3J 80

Ph 28A 2 80 2aOPza 450 450 450Pza 500 500 500Pza 800 800 800

Pza 450 450 450Pzd 600 600 600Pza 700 700 700Pu 800 800 OOO

Pza 450 450 450Pza 600 600 600Pza 700 700 / l ]OPza 800 800 8 l ]O

Pza 650 650 650

Pza 600 600 600

Pza 700 700 700

Pza 700 700 700

CAJARECEPToRAP/DESAGIE6120d PzaCA.IA RECEPToMP/DESqG!E 6?0 cn pzaCAJA RECEPToM P/DESAGUE 6"x30 cm Pza

7 0 0

2200480028 50

7 0 0

20048 0028 50

CODo PVC E=40 P/DESAGUE l1i2CODo PVC E=40 PiDESAGUE 2,CoDO PVC E=40 P?DESAGUE2I/2'CoDO PVC E=40 P/DESAGUE 3'C00O PVC E:40 P/DESAGUE 4'

YEE PVC E=40P/DESAGLJE 1 12"YEE PVC E=40 P/DESAGUE 2"YEE PVC E=40 P/DESAGLJE 2 ll2YEE PVC E=40 P/DESAGIE 3YEE PVC E=40 P]DESAGUE4'

TEE PVC E=40 P/DESAGIE 1 1/2"TEE PVC E=40 P/DESAGUE 2'TEE PVC E:40 P/DESAGUE 2 1/2TEE PVC E=40 P/DESAGLJE 3TEE PVC E=40 P/DESAGUE 4

Pza 900 900 900Pb 125A 1250 1250Pza 1900 1900 19 OOPza 28 00 2800 2800Pza 35 00 35 00 35 O0

Pn 1500 1500 1500Pu 1800 1800 t8O0Pm 25 00 25 00 25 ooPza 29 50 29 50 29 50Pza 35 00 3500 3500

Pza 1500 15 00 t5OOPa 1800 1S00 18OOPu 23 50 23 50 23 50Pb 26 00 26 00 26 OOPza 48 00 48 0o 48 0O

CAJA RECEPToRA P/DESAGUE 6120 m PaCAJA RECEPToM P/DESAGUE 6125.n pzaCAJA R EC EPTOM P/D ESAGUE 6'x30 cm PzaCAJA RECEPToM P/DESAGIE 6"x35 cm PzaCAJA RECEPIoM P/DESAGI]E 6 r40 cm pza

C0D0 PVC CLASE I PDESAoUE 2 pzaCODO PVC CLASE 9 P/DESAGUE 4' PUYEE PVC CLASE I P/DESAGIE2 PzYEE PVC CLASE I P]DESAGUE 4" pzaTEE PVC CLASE 9 PJDESAGI]E 2. PzaTEE PVC CLASE I P/DESAGUE4" pza

c0D090.1 /2 (12mm)CODO 90' 3/4' (20mm )coDo90 ' l {25nm )cODo 90'1 1i4 (30mm )coDo 90'1 1/2'(37mm )c00090 '2 ' (50mn)coDO 90' 2 1/2' (60mm )coDo90 '3 ' (75mm )coDO 90' 4' (100nrm )coDo90 '6 ' (150mm )coDo 90'8 {200mm )coDo 45" l/2^(12mm)coD045" 3/4 (20mm )c0D0 45" 1'(25mn )c00045.1 1 /4"coDo45o11/2 ' (3hm)C0Do45'2 (50mm )CODO45 '21 /2 (60mm)coDo4s '3 {75mm )CODo 45'4 (100mm )coDo45"0 (150mm)COD045 '8 (200mm)CODO ROSCA CAMPANA 1/2'CODO ROSCA CAMPANA 3/4'

ooPLA1/2 ' ( r2mm)coPLA 3/4' (20mm )COPLA1 (25mm)coPLA 1 1/4'(30mm )CoPLA 1 ,2' (37mm )CoPLA2'(somri)ooPLA2r /2 ' (60mm)CoPLA3 (75mm )

TAPON HEMBMl/2'(l2mm )TAPoN NEI,IBRA 3/4' (20mh )IAPoN FEMBRA 1 (25mm )TAPoN NEt BRA1 1/2 (37mm )TAPoNHEMBM2 (50mm )TAPON HEMBRA 2 l/2' (60mm )TAPoN HEMBM3^ (75mm )TAPON HEMBM4 (100mm)TAPoN NEMBFA6 {150mm )UNION UNIVERSAL 1 1/2'UNION UNIVERSAL '2'UNION UNIVERSAL3/4'UNION IJNIVERSAL 2'UNION UN VERSAL 1'

TEE 1/2 {12mm )IEE 3/4' (20mm )TEE 1 ' (25mm)TEE I 1/2 (37nm )TEE2 ' (50mm)TEE2i /2 ' (60mm)T E E 3 1 7 5 m m )TEE4 (100mm)TEE 6" (150mm )TEE REDUCC 0N 1\1 x1/2'CCRTEE REoUCCIoN 1 l1'x3/4' CCRTEE REDUCCIoN 6 x6\3' CCRTEE REDUCCION 6'x614' CCR

AoAPTADoR MACNo 1/2' (12mm )AoAPTADoR iVlACHo 3/4" (20mn )ADAPTADoR MACHo t (25mm )ADAPIADoR MACHo 1 1/4' (3omm )ADAPIADOR MAcHo 1 1/2'(37mm )ADAPTADOR MACNO 2' (50mr )ADAPTADoR MACFo 3" (75mm )ADAPTADoR [,jACHo 4 (100mm)

5 0 0 5 0 0 5 0 019 00 1900 19001 0 0 0 1 0 0 0 1 0 0 029 00 29 00 ?9001000 1000 100029 00 29 00 2900

65 00 6500 650068 00 68 00 680075 00 75 00 75 0095 00 9500 95 00

12500 12500 125 00

Pb 20A 200 200Pza 28A 280 280Pza 450 450 450Pza 750 750 750Pza 950 950 950Pza 1400 1400 1400Pza 35 00 35 00 35 00Pa 4800 48 00 48 00Ph VlA U 7D 7APza 2$2A 2%20 2$2APza 71860 71860 71860Pza 2 50 250 2 50Pza 350 350 350Pza 490 490 490Pza 850 850 850Ph 12 50 1250 1250Pa 1a2A 1S2A 182APu 4100 41 00 4 t 00Ph 48 00 4800 4800Pza 95 00 S5 00 95 00Pza 330 00 33000 330 00Pza 688 50 688 50 688 50Pza 250 24A 250Pzd 320 32A 320

PA 200 2 00 20aPza 28A 280 280Pza 4 50 450 4 50Pza /50 750 750Pza 950 950 950Pza 1400 1400 14 00Pza 35 00 35 00 35 00Pza 4800 4800 4800Pb 55 00 55 00 55 00

P z a 1 5 0 1 5 0Pza 250 250

Pb 1600 1600Pza 25 00 25 00Pza 48 00 48 00Pza 13950 13950Pza 84 00 84 00Pza 1020 1A 2aPa 1300 1300Ph 12000 12000

i 5 02504006009 0 0

1 6 0 025AA4800

1395084 001A 201 3 0 0

120001 7 0 0

Pza 1 50 150Pza 250 25APza 300 300Ph 500 500Pza 800 500

Pza 50 50 50 50

254 250 2504 00 400 4006 0 0 6 0 0 6 0 0

1240 1204 120A1 8 0 0 1 8 0 0 1 8 0 084 00 84 00 84005000 500 500

10300 10300 10300450 00 450 00 450001 3 0 0 1 3 0 0 1 3 0 01300 1300 1300

630 00 63000 63000645 00 645 00 645 00

1 5 02503 0 05 0 05 0 09 0 0

50 5064 70

ADAPIADOR HEMBRA 1 1/2'ADAPTADOR HEMEM 2'ADAPTAOOR HEMBRAl/2'ADAPTADOR HEMBRA3/4"

cRuzl (25mm)cRUz 1 l/2'(37mm )cRUz2'(somm )cRUz3'( i5mm )CRlz4 (100mm)

REDIJCCION BUJE 3/4I]/2REDUCCION B(]JE l'x1/2REDUCCION BUJE l x3/4REDUCCION BUJEI '2I'2 PZAREDUCCON BUJE I 12 x3l4' PbREDUCC0N BUJE 1 1 /2x l ' PzaREDUCCIoN BUJE2lli2 PzaREDUCCIoNBUJE2 x3/4" PzaREDUCCIoNBIJE2 xl (50x25)mm PaREDUCCTON BIJE 2,x1 1/2, PzaREDUCCION BUJE21/2 x2 PzaREDUccloN 8UJE312' (75xso)mm raREDUCCONBUJE3 'x21/2 ' PbREDUccoN BUJE 4\2' (100 x50)mn PaREDUCC0N BUJE413 ' (100X/5)mm PaREDUccioNSUJEO 13'(150x75)mm PaREDITCCIoN BUJE 6 x4 (150n00)mm pa

8 0 0 8 0 0 8 0 01000 1000 10001 5 0 1 5 0 1 5 0300 300 3004 0 0 4 0 0 4 0 0

28 00 28 00 28 0037 00 3/00 370056 00 56 00 56 00

15500 15500 155 0022AAA 220A0 22000

1 5 0 1 5 0 1 5 0240 200 200200 200 2aa5 5 0 5 5 0 5 5 05 5 0 5 5 0 5 5 0580 580 5807 1 0 7 1 0 7 1 07 1 0 7 1 0 7 1 0' | 10 710 71A7 1 0 7 1 0 7 1 0

1 1 0 0 1 1 0 0 1 1 0 020 00 20 00 20002A2A 2A2A 2A2045 00 45 00 450045 00 45 00 4500

200 00 200 00 200 00200 00 20000 200 00

DESCRIPCION PHECIOLaPd Cbba. St Cruz

UNIDAD

T U B O L = 6 n D = 1 1 0 m mT U B O L = 6 m D : 1 6 0 m mTUBO L=6m D= 200mmTUBO L=6m D= 250mmTIBO L=6m D= 315mmTUBo L= 6m D= 400mmTUBo L :6m D= 450mmTUBo L= 6m D= 500mm

C0D045" D:110 mhCoDO45 'D - 160 mmCoDO 90 'D = 110mmCoDO 90'D = 160 mm

TEE REDUCIDA D = ll0mmTEE REDUCIDA D=160mm

YEE REDUC 0A D= 110mmYEE REDUC DA D= 160mr

ADAPTADOR Esp qa 4 x 110 mmADAPTADOR Espiga 6 x 160 mmADAPTADOR Esprga 8x200 mm

S LAS YEE D = 160x 110mmSLASYEED= 200x 110 mmSTLASYEE D= 200 x 160 mmSILAS YEE D = 250x 110 mmSILAS YEE D =2s0 x 160 mmSILAS YEE D = 315x110mmS LAS YEE D =315 x 160mmS L A S Y E E D = 4 0 0 x 1 1 0 m mSILAS YEE D = 400x 160 mmSILAS YEE D = 450x 110 mmslLAs YEE D =450 x 160 hmSILAS YEE D =500 x 110 mmS LAS YEE D =500 x 160mm

SLASTEED- l60x 110mmSILASTEED= 200 x 110 'nmSILASTEED= 200 x 160 mmslLAs TEE D = 250r 110 mmSILASIEED=250x160mmSLASTEED= 315 x 110f i rmS LAS TEE D =315 x 160 mmSILAS TEE D = 400 x 110mmSILAS TEE D = 400x 160 mmSILAS TEE D = 450 x 110 mrnSILASTEE D =450r 160 mmSILASTEED=500x110mmS LAS TEE D = 500 x 160 mm

34 50 34 50 34 5062 60 62 60 62 6090 30 90 30 90 30

13150 131 50 1315020424 24424 204 2A31480 3r4 80 314804X7A 4n7A 4153044910 44910 44910

2230 2230 23A47 70 4710 47 7A51 20 5120 5120

10830 10830 10830

Pza 71 4A 71 4A 7140Pza 10830 10830 10830

Pza 10140 10140 10140Pza 23460 23l,60 2UEa

Pu 1980 1980 1980Pza 39 80 39 80 39 80Pza 66 60 6660 6660

Pza 39 40 39 40 39 40Pza 63 60 63 60 63 60Pza 10340 10340 10340Pza 77 0A fi AA 77 A0Pza 10820 10820 10820Pza 83 70 83 /0 83 70l ra 10910 10910 10910Pza 83 60 83 60 83 60Pza 11110 111 10 111 10Pu 4712A 4712A !7120Pb 661 10 661 10 661 10Pza 574 30 574 30 574 30Pza 807 00 807 00 807 00

Pa 36 30 36 30 36 30Pn 63 60 6360 6360Pb i0340 10340 103 40Pza i1a 77a0 ia !Pza 108 l0 10810 10810Pza 1170 77 70 inPza J0910 10910 10910Ph 79 00 79 00 79 00Pu 11124 1112A 11120Pb 471 3a 471 3A 471 30Pza 661 20 661 20 66120Pza 574 30 574 30 574 30Pra 807 00 80700 80700

Presupuesto & Construcci6n Aio 19 N" 46, Novienbre 200g _ Febrero 2009

Page 99: Puente en Obrajes, Bolivia Diseño 1 Universidad Duke · II. COMUNICADO DE PROBLEMA ... LISTA DE MATERIALES y PRESUPUESTOS DE ... Basado en los diseños hechos para la clase, un diseño

PRECIOS DE MATERIATES

TUBOS Y ACCESORIOS DE PRESIOI\PARA AGUA CALIENTE

VIDRIOS

DESCRIPCIONDESCRIPCION UNIDAD PRECIO

La Paz Cbba, Sla, Cruz

UNIDAD PBECIOLa Pa Cbba. Sta C@

CANERAHDRo3- 1 /2 f l2mm)CANERAHDRo3 3 /4 (20mm)CANER A H DRO 3 - 1 (25 mm )

CANERA H DRO 3 COVERTNOR 1]2'CANER A N DRO 3 COVERTI]OR 3/4'CANERAI] DRO 3 COVERTNOR 1'

coDo IPS RoSCA1/2 (90 mm )CoDOlPsR0scA3i4 (20 mm )coDo lPs ROSCA 1 ' (25 mm )CoDOIPSROSCAl ' l /2 (37mm)coDolPsRoScA2 ' (50mm)

TEE 1/2' PS RoSCA(12 mm )TEE 3/4 IPS ROSCA(20mn )TEE f IPS ROSCA(2smm )TEE l1/2 PS RoSCA(37 mm )

CRUZ1l2 PS RoSCA(20 mm )CRUZ 3/4' PS RoSCA (20 mm )CRUZl lPS ROSCA(25 mr )CRUZ11/2 PS ROSCA(37 mm )CRlz2 lPS ROSCA(50 mm )

3 5 0 3 5 05 5 0 5 5 08 5 0 8 5 0

2T A0 27 0A4200 4200

3 5 0 3 5 0 3 5 05 0 0 5 0 0 5 0 07 5 0 7 5 0 7 5 A

1400 14 00 140001 00 61 00 61 00

8 0 01t 301 9 0 0

1 5 0290500

1 4 0 027 8A

3 0 03 5 06 0 0

1 7 5 0

3 5 05 5 08 5 0

T 0 a4204

65 8095 00

14600

65 8095 00

14600

8 0 01 1 3 01 9 0 0

1 5 02 9 05 0 0

t4 0027 8A

3 0 03 5 06 0 0

1 7 5 0

6 5 8 09500

i4600

8 0 01 1 3 01 9 0 0

1 5 02 9 0500

14 00z7 B0

3 0 03 5 06 0 0

17 50

4 5 0 4 5 06 0 0 6 0 0

t 0 0 D 1 0 0 01 7 0 0 1 7 0 0

3 0 0 3 0 04 00 4005 0 0 5 0 07 5 0 4 5 0

2t aa 27 a0

224 2243 7 0 3 1 04 1 0 4 1 04 90 490

3 8 0 3 8 03 1 0 3 1 0

28 80 20 304020 4020140 140

CoDO 90" 1/2 c/cPAVCO(r2mm) PaCoDO 90" 3/4 C/CPAVCO(20mh) PzCoDO45" 1/2 C/C PAVCO(12mm) PzcoDO45'3/4 C/c PAVco (20 mh ) PzaC0DO90'1/2 Camp/Rosca PAVCo Pa

TEE l/2'PAVco (12mm) PzaTEE 3/4' PAVCO (20 mm I PzaCOPLAl/2'PAVCo (12mm ) PzaCOPLA3/4 PAVCo (20 mm ) Pza

ADAPTADoR MACHO t2 PAVCO PzaADAPTADoR MACHO3/4 PAVCO PzaADAPTADoR HEMBRA1/2 PAVCo PzaADAFTADoR HEMBRA3/4 PAVCo Pza

TAPoN HEIIBRA 3/4' PAVCo (20mm ) PaTAPON HEMBM1/2 PAVCo(12mm) Pa

UN ON PATENTE 1/2 PAVCo (12 mm) PzaUN 0N PATENTE 3/4 PAVCo{2onm) PaREDUCCION BIJE3/4'rl/2 PAVCo Pza

VIDROCLARO5mm (240x 2 00) M2VIDROCLARO6mm (240x200) l \ ,12VIDR O BRoNCE 3 mm (2 40 x I 60) l\42VIDR0 BFoNCE4 mm (240x200) [42VIDR0 BRoNCE5mm (240 x 2 00) [,12VloR0 BRoNCE6 mm (240x200) [42VIDR0 ESPEJo3mm (240x 140) M2

V DR 0 CATEDML 3 mm (1 30 x 2 20) [42VDR 0 CATEDML3 mm (l 30x240) M2V DRlo CATEDML 4 mm (1 30 12 20) M2VIDR]O CATEDMLBRONCE4 hm ( r 30x240) M2

VIDRIO MEXICANOV DRIO CLARO FLOATMEXICANO3 m m ( 1 8 3 x 2 4 4 ) M 2V DRIO CLARO FLOATMEXICANO4 m m ( 2 1 3 x 3 3 0 ) M 2V DRIO CLARO FLOATMEXICANO5 m m ( 2 1 3 x 3 3 0 ) M 2V DRIO CLARO FLOAT MEXICANO6mm (244 r 3 30) M2V DRIO CLARO FLOATMEXICANO9 5 m m { 2 & x 3 3 0 ) M 2V DRIO BRONCE GR S MEXICANO4 m m ( 3 3 0 x 2 1 3 ) M 2V DRIO BRONCE GR S MEXICANO5 m m ( 3 3 0 x 2 1 3 ) M 2V DRIO BRONCE GR S MEXICANO6 m m ( 3 3 0 x 2 1 3 ) M 2V DRIOMUL P]ROLT CO ]!lEX CANO6 m m ( 2 1 3 1 3 3 0 ) M 2V DRIO V TROSOL P ROLIT COMEXICANO6 mm (213x3301 M2V DRIOT NTEX PIROLITICOMEXICANo6 mm (230x330) M2

ESPEJo NC0L0R03mm ll2ESPEJo NC0L0R04mm ,\2ESPEJo NC0L0R05mm .^,12ESPEJo CoLOR BRoNCE GRLS3md M2ESPEJo CoLOR BRoNCE GRIS4mm M2ESPEJo CoLOR ERoNCE-GRIS 5 nn M2

V DRlo LAMINADO INCOLoRO 6 mh M2V DRlo LAMINADO C0L0R 5 mm M2V DRlo LAMINADO C0L0R 6 mm li2

3 0 0 3 0 0 3 0 0424 424 4243 0 0 3 0 0 3 0 05 9 0 5 9 0 5 9 0

1 2 8 0 1 2 0 0 1 2 0 0

28 8044201 4 0

3 0 05 8 0224274

2?A310

4 9 0

3 8 03 1 0

7497927246 20632179 A796 0865 63

36 8636 965240

58 33

4988

65 94

8 5 1 6

10343

1 8 6 1 7

7710

95 76

3 0 05 8 02242 7 4

3 0 05 8 0224274

CODo HDRo3FlS0N 1 /2 ' (12mm) PaCODo H DRo 3 FUS 0N 3/4'(20 mm ) PzaCODo H DRo 3 FlS 0N 1 (2s mm ) PacoDo H DRo 3 FUs 0N 11/2 (37mn )PzaCODo H0R03F!S]oN2 (50drm) Pza

TEE 1 /2 'F DRo3FUSION (12 mm) PaTEE 3/4" HDRo3FUSION (20 mm) PaTEE I HDRo3FUS|ON (25 mm) PzaTEE 11/2 'H |oRO3 FUS0N{37mm) Pza

CUPLAI /2 H|DRO3 FUS0N{20mm ) PaCUPLA3/4 H|DRO 3 FUS 0N (20 mm ) PaCUPLAI HDRo3FUS|ON (25 mm ) PzaCUPLAI i/2 HDRo 3 FLJSION (37 mm)PzaCUPLA 2 HDRo3 FUSIoN (50mm) Pza

UNIoN DOBLEFUSON 1 'N]DRo3 PzaUNIoN DOBLE FUSON 1 1/2 HDRo3 Pza!N 0N DoBLEFUSON 2 HDRO3 Pza

TUBEBIA l/2'x3 00 MLs PAVCO PzaTUBERIA3/4'X3 00 Mls PAVCO PbTUBER|Al x3 00 Mts PAVoo Pza

28 0055 50

140 00

33 6056 70

100 90

4 5 06 0 0

1 0 0 01 7 0 0

3 0 04 0 05 0 07 5 0

27 A0

28 0055 50

14000

33 6056 70

100 90

vtDRtos

DESCFIPCION UNIDAD PRECIOLa Paz Cbba, Sla Cruz

4589 45 89 45 895411 UT1 54 719012 9472 9A72

10584 10584 i058412558 12558 1255820549 205 49 205 4926880 268 80 268 8053 66 53 66 53 6657 a2 57 02 57 02/6 65 76 65 76 65

10091 10091 100911t i 30 |130 111 3012999 12999 r299915320 15320 15320

28 46 -3560 - ,58 49 --

V DRIO PLANo NCOLOROz mm M2V DRIO PLANo TNCoLORO 3 mm M2V DRIO PLANo INCOLORO 4 mm M2V DRIO PLANo NCOLORO 5 mm M2V DRlo PLANo INCOLORO 6 mm M2VDRIoPLANo LNCOLoRO 8 mm M2VDRIoPLANoLNCOLoROI0mm M2V DRlo CATEDRAL INCOLoRO 3 mm M2V DRlo CATEDRAL INCOLoRO4 mm M2V DRIO CATEDML C0L0R 4 mm tt2V DR O CATEDML COLOR 5MM II2V DR 0 RAYBAN CIBRONCE3mm M2VDR0MYBAN CTBRoN GRS4 nm [ i2V DR0MYBAN Cr 'BRoN GR]S5om Mz

VIDRIO COLOMBIANOVIDR0CLARo2mm (240r127) M2V|DR0CLARo3mm (2 40x 160) M2VIDR0CLARo4 mm (240x2 00) M2

117 60

22985 --

20T X8 --

207 38 --.

1 1 1 0 9 1 1 1 0 9 1 1 1 0 S1 5 1 4 1 1 5 1 4 1 1 5 1 4 117136 171 36 t7 t 3611294 17294 1729117525 17525 175?5196 98 19698 196 982800

5550144 00

33 605070

10090

559 34 559 34 559 34

57561 575 61 57561

Revisto PRESUPUESTO & CONSTRUCCION . Av Hernondo Siles No. 4982,esq colle 4 Obroies . Tell.: .591]12-278625Q -Fox:2786250. Lo Poz- Boiivio.

Para el interior de Bolivia:

Solicito la siguienten

suscripci6n

A partir de la Revista No. !por cuatro e jemplares. . . . . . . . . . . . .Bs. 100.00

Para el exterior de Bolivia:

Solicito la siguienlen

suscripci6nA partir de la Revista No. !

por cuatro ejemplares .............Bs. 300.00

Remifo importe de mi suscnpci6n o lo Revisto PRESUPUESTO & CONSTRUCCION por lo contidod de Bs .. . . . . . . . . . , con dep6sitoboncorio o nombre de JUAN GUTIERREZ PALZA lDirector de lo revistol o lo cuento corr iente Na 150'0474447 del Bonco Nocionolde Borivio, de fecho

NOMBRE: . .C.l : . . PROFESIONI

EMPRISA NIT

TELEFONOIS): . . . CELULAR: .. CASIL|-A

D',RTCC ON.

CIUDAD: .. PAIS: E-MA.L: . .

E-moil: [email protected]

Para la ciudad de La Paz:

Solicito la siguienlen

suscripcion

A partir de la Revista No. !por cuatro e jemplares . . . . . . . . . . . . .8s. 80.00