GORE ICA GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS OBRA: ”CONSTRUCCIÓN SIST. DE DESAGÜE EN EL SECTOR HORNO VIEJO, SEBASTIÁN BARRANCA Y VISTA ALEGRE” SECTOR HORNO VIEJO FECHA: 15 DE AGOSTO DEL 2,003. RESIDENTE DE OBRA: ING. GUSTAVO GARCÍA DÍAZ ____________________________________________________________________________________________________________ ______________________ PRUEBA HIDRAULICA Nº01 403.745 404.20 1.35 2.08 402.395 402.12 L = 45.80 B8A PVC Ø 8” B9

Upload: edwards-ballon-cardenas

Post on 03-Oct-2015

246 views

Category:

Documents


0 download

DESCRIPTION

ensayo matematico de como actua la hidrualixa

TRANSCRIPT

GORE ICA

GERENCIA REGIONAL DE INFRAESTRUCTURA

SUB GERENCIA DE OBRAS

OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE

SECTOR HORNO VIEJO

FECHA: 15 DE AGOSTO DEL 2,003.

RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ

__________________________________________________________________________________________________________________________________

PRUEBA HIDRAULICA N01

403.745

404.20

1.35

2.08

402.395

402.12

L = 45.80

B8A

PVC 8

B9

Ho =16.50cm to=3:40 pm

Hf = 16.50cmTf =3:52 pm

Perdida Real =0.00 cm

Perdida admisible =

GORE ICA

GERENCIA REGIONAL DE INFRAESTRUCTURA

SUB GERENCIA DE OBRAS

OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE

SECTOR HORNO VIEJO

FECHA: 15 DE AGOSTO DEL 2,003.

RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ

__________________________________________________________________________________________________________________________________

PRUEBA HIDRAULICA N02

403.749403.345

1.30

1.35

402.449402.395

L=10.87M

PVC 8

B 8B8 A

Ho = 10.00cm to =3:42pm

Hf =10.00cm

tf=3:54pm

Perdida Real = 0.00cm

Perdida admisible =

GORE ICA

GERENCIA REGIONAL DE INFRAESTRUCTURA

SUB GERENCIA DE OBRAS

OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE

SECTOR HORNO VIEJO

FECHA: 15 DE AGOSTO DEL 2,003.

RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ

__________________________________________________________________________________________________________________________________

PRUEBA HIDRAULICA N03

403.853

1.00403.749

402.853 1.30

402.449

L =50.50

PVC 6B 8

Bz01

Ho =14.50 cm to =3:44pm

Hf = 14.50 cm tf = 3:55pm

Perdida real

= 0.00 cm

Perdida admisible=

GORE ICA

GERENCIA REGIONAL DE INFRAESTRUCTURA

SUB GERENCIA DE OBRAS

OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE

SECTOR HORNO VIEJO

FECHA: 15 DE AGOSTO DEL 2,003.

RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ

__________________________________________________________________________________________________________________________________

PRUEBA HIDRAULICA N04

404.327404.123

1.00 1.38

403.327

402.743

L = 47.0 m

PVC 6B 6

Bz 03

Ho = 23.80 cm to = 3:46 pm

Hf = 23.80 cm tf = 4:01 pm

Perdida real

= 0.00cm

Perdida admisible =

GORE ICA

GERENCIA REGIONAL DE INFRAESTRUCTURA

SUB GERENCIA DE OBRAS

OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE

SECTOR HORNO VIEJO

FECHA: 15 DE AGOSTO DEL 2,003.

RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ

__________________________________________________________________________________________________________________________________

PRUEBA HIDRAULICA N05

B6

404.123

h=1.38

402.743

L=33.90ml.

405.15 h=1.84

404.015

PVC 8

404.40

h=1.25

403.31

402.765

L=60.60ml.

PVC 8

B3

B4

ho = 10.00cm to = 3.48pm

hf = 10.00cm tf = 4.05 pm

Perdida Real = 0.00 cm

Perdida admisible =

GORE ICA

GERENCIA REGIONAL DE INFRAESTRUCTURA

SUB GERENCIA DE OBRAS

OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE

SECTOR HORNO VIEJO

FECHA: 20 DE AGOSTO DEL 2,003.

RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ

__________________________________________________________________________________________________________________________________

PRUEBA HIDRAULICA N06

.

403.745h=1.35

403.655

402.395

h=1.00

402.655

L=51.10ml.

PVC 6

B8A

Bz 01A

ho = 40.00cm to = 3.44pm

hf = 40.00cm tf = 4.25 pm

Perdida Real = 0.00 cm

Perdida admisible =

GORE ICA

GERENCIA REGIONAL DE INFRAESTRUCTURA

SUB GERENCIA DE OBRAS

OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE

SECTOR HORNO VIEJO

FECHA: 20 DE AGOSTO DEL 2,003.

RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ

__________________________________________________________________________________________________________________________________

PRUEBA HIDRAULICA N07

.

403.997 h=1.50

405.749

402.497

h=1.30

402.449

L=9.50 ml.

PVC 8

B7

B8

ho = 35.00cm to = 3:46pm

hf = 35.00cm tf = 4:20 pm

Perdida Real = 0.00 cm

Perdida admisible =

GORE ICA

GERENCIA REGIONAL DE INFRAESTRUCTURA

SUB GERENCIA DE OBRAS

OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE

SECTOR HORNO VIEJO

FECHA: 20 DE AGOSTO DEL 2,003.

RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ

__________________________________________________________________________________________________________________________________

PRUEBA HIDRAULICA N08

.

403.997 h=1.50

403.682

402.497

h=1.00

402.682

L=37.00 ml.

PVC 6

B7

Bz 02

ho = 23.00cm to = 3:49pm

hf = 23.00cm tf = 4:15 pm

Perdida Real = 0.00 cm

Perdida admisible =

GORE ICA

GERENCIA REGIONAL DE INFRAESTRUCTURA

SUB GERENCIA DE OBRAS

OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE

SECTOR HORNO VIEJO

FECHA: 20 DE AGOSTO DEL 2,003.

RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ

__________________________________________________________________________________________________________________________________

PRUEBA HIDRAULICA N09

.

404.123 h=1.38

403.997

402.743

h=1.50

402.497

L=30.70 ml.

PVC 8

B6

B7

ho = 70.00cm to = 3:50pm

hf = 70.00cm tf = 4:19 pm

Perdida Real = 0.00 cm

Perdida admisible =

GORE ICA

GERENCIA REGIONAL DE INFRAESTRUCTURA

SUB GERENCIA DE OBRAS

OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE

SECTOR HORNO VIEJO

FECHA: 20 DE AGOSTO DEL 2,003.

RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ

__________________________________________________________________________________________________________________________________

PRUEBA HIDRAULICA N10

.

404.015 h=1.25

403.203

402.765

h=1.35

401.853

L=61.70 ml.

PVC 8

B4

BE

ho = 17.00cm to = 3:51pm

hf = 17.00cm tf = 4:17 pm

Perdida Real = 0.00 cm

Perdida admisible =

GORE ICA

GERENCIA REGIONAL DE INFRAESTRUCTURA

SUB GERENCIA DE OBRAS

OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE

SECTOR HORNO VIEJO

FECHA: 20 DE AGOSTO DEL 2,003.

RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ

__________________________________________________________________________________________________________________________________

PRUEBA HIDRAULICA N11

.

405.901 h=1.40

405.15

404.501

h=1.84

404.40

403.31

L=61.70 ml.

PVC 8

B2

B3

ho = 23.00cm to = 3:54pm

hf = 23.00cm tf = 4:13 pm

Perdida Real = 0.00 cm

Perdida admisible =

GORE ICA

GERENCIA REGIONAL DE INFRAESTRUCTURA

SUB GERENCIA DE OBRAS

OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE

SECTOR HORNO VIEJO

FECHA: 20 DE AGOSTO DEL 2,003.

RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ

__________________________________________________________________________________________________________________________________

PRUEBA HIDRAULICA N12

.

405.901 h=1.40

405.661

404.501

h=1.00

404.661

L=32.00 ml.

PVC 6

B2

Bz 04

ho = 22.00cm to = 3:56pm

hf = 22.00cm tf = 4:11 pm

Perdida Real = 0.00 cm

Perdida admisible =

GORE ICA

GERENCIA REGIONAL DE INFRAESTRUCTURA

SUB GERENCIA DE OBRAS

OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE

SECTOR HORNO VIEJO

FECHA: 20 DE AGOSTO DEL 2,003.

RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ

__________________________________________________________________________________________________________________________________

PRUEBA HIDRAULICA N13

.

407.720 h=1.20

405.901

406.520

h=1.40

404.501

L=65.00 ml.

PVC 8

B1

B2

ho = 23.00cm to = 3:59pm

hf = 23.00cm tf = 4:10 pm

Perdida Real = 0.00 cm

Perdida admisible =

GORE ICA

GERENCIA REGIONAL DE INFRAESTRUCTURA

SUB GERENCIA DE OBRAS

OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE

SECTOR HORNO VIEJO

FECHA: 09 DE SEPTIEMBRE DEL 2,003.

RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ

__________________________________________________________________________________________________________________________________

PRUEBA HIDRAULICA N14

.

407.717 h=2.45

407.507

405.267

h=2.00

405.507

L=48.00 ml.

PVC 8

B2

B3

ho = 57.00 cm to = 11:14 a.m.

hf = 57.00 cm tf = 11:45 a.m.

Perdida Real = 0.00 cm

Perdida Admisible = 1.00 cm.

GORE ICA

GERENCIA REGIONAL DE INFRAESTRUCTURA

SUB GERENCIA DE OBRAS

OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE

SECTOR HORNO VIEJO

FECHA: 09 DE SEPTIEMBRE DEL 2,003.

RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ

__________________________________________________________________________________________________________________________________

PRUEBA HIDRAULICA N15

.

407.400 h=1.65

407.507

405.750

h=2.00

405.507

L=50.00 ml.

PVC 8

B4

B3

ho = 47.00 cm to = 11:15 a.m.

hf = 47.00 cm tf = 11:44 a.m.

Perdida Real = 0.00 cm

Perdida Admisible = 1.00 cm.

GORE ICA

GERENCIA REGIONAL DE INFRAESTRUCTURA

SUB GERENCIA DE OBRAS

OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE

SECTOR HORNO VIEJO

FECHA: 09 DE SEPTIEMBRE DEL 2,003.

RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ

__________________________________________________________________________________________________________________________________

PRUEBA HIDRAULICA N16

.

407.250 h=1.20

407.400

406.05

h=1.65

405.7500

L=60.00 ml.

PVC 8

B5

B4

ho = 29.00 cm to = 11:16 a.m.

hf = 29.00 cm tf = 11:41 a.m.

Perdida Real = 0.00 cm

Perdida Admisible = 1.50 cm.

GORE ICA

GERENCIA REGIONAL DE INFRAESTRUCTURA

SUB GERENCIA DE OBRAS

OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE

SECTOR HORNO VIEJO

FECHA: 09 DE SEPTIEMBRE DEL 2,003.

RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ

__________________________________________________________________________________________________________________________________

PRUEBA HIDRAULICA N17

.

407.590 h=1.20

407.250

406.39

h=1.20

406.050

L=60.00 ml.

PVC 8

B6

B5

ho = 20.00 cm to = 11:19 a.m.

hf = 20.00 cm tf = 11:39 a.m.

Perdida Real = 0.00 cm

Perdida Admisible = 1.50 cm.

GORE ICA

GERENCIA REGIONAL DE INFRAESTRUCTURA

SUB GERENCIA DE OBRAS

OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE

SECTOR HORNO VIEJO

FECHA: 09 DE SEPTIEMBRE DEL 2,003.

RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ

__________________________________________________________________________________________________________________________________

PRUEBA HIDRAULICA N18

.

407.765 h=1.10

407.590

406.665

h=1.20

406.390

L=54.10 ml.

PVC 8

B7

B6

ho = 23.50 cm to = 11:21 a.m.

hf = 23.50 cm tf = 11:37 a.m.

Perdida Real = 0.00 cm

Perdida Admisible = 1.20 cm.

GORE ICA

GERENCIA REGIONAL DE INFRAESTRUCTURA

SUB GERENCIA DE OBRASOBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRESECTOR HORNO VIEJO

FECHA: 13 DE SEPTIEMBRE DEL 2,003.

RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ

__________________________________________________________________________________________________________________________________

PRUEBA HIDRAULICA N 19

.

406.900 h=1.00

406.506

405.900

h=1.47

405.436

405.036

L=49.00 ml.

PVC 8

B10

BE

ho = 9.00 cm to = 11:54 a.m.

hf = 9.00 cm tf = 12:30 m.

Perdida Real = 0.00 cm

Perdida Admisible = 1.00 cm.

GORE ICA

GERENCIA REGIONAL DE INFRAESTRUCTURA

SUB GERENCIA DE OBRASOBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRESECTOR HORNO VIEJO

FECHA: 13 DE SEPTIEMBRE DEL 2,003.

RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ

__________________________________________________________________________________________________________________________________

PRUEBA HIDRAULICA N 20

.

407.717 h=2.45

407.717

405.267

h=2.70

405.017

L=36.00 ml.

PVC 8

S=6.9%o

B2

B1

ho = 65.00 cm to = 12:15 p.m.

hf = 65.00 cm tf = 12:30 p.m.

Perdida Real = 0.00 cm

Perdida Admisible = 0.60 cm.

GORE ICA

GERENCIA REGIONAL DE INFRAESTRUCTURA

SUB GERENCIA DE OBRASOBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRESECTOR HORNO VIEJO

FECHA: 13 DE SEPTIEMBRE DEL 2,003.

RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ

__________________________________________________________________________________________________________________________________

PRUEBA HIDRAULICA N 21

.

407.717 h=2.70

407.810

405.017

h=4.50

405.017

403.310

L=12.25 ml.

PVC 8

S=26.40%o

B1

BE

ho = 67.50 cm to = 12:14 p.m.

hf = 67.50 cm tf = 12:31 p.m.

Perdida Real = 0.00 cm

Perdida Admisible = 0.25 cm.