presupuesto
DESCRIPTION
presupuesto de losa con bovedillaTRANSCRIPT
ANALISIS DE PRECIOS UNITARIOS SIN IVA
PROYECTO:PARTIDA No.: UNIDAD:S.G
ITEM No.:
A- MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO SUBTOTAL
CONCRETO 1:2:2 M3 2.10 $155.61 $326.78
BOVEDILLA 15X20X60 UNIDAD 196.00 $0.75 $147.00
VIGUETA ML 35.30 $10.00 $353.00
ELECTROMALLA LISA 15X15X6/6 2.35X6 UNIDAD 2.00 $30.00 $60.00
CLAVOS 5" LB 2.50 $0.80 $2.00
REGLA PACHA COMO CONTRAVIENTO VARAS 6.00 $0.90 $5.40
CUARTON DE PINO (PUNTALES) VARAS 12.90 $5.00 $64.50
TABLA DE PINO VARAS 2.39 $2.00 $4.78
HIERRO #2 QUINTAL 0.09 $54.00 $4.86
HIERRO #3 QUINTAL 0.74 $54.00 $39.96
ALAMBRE DE AMARRE LB 8.30 $1.50 $12.45
SIERRA PARA CORTAR HIERRO UNIDAD 1.00 $2.50 $2.50
HELADOS UNIDAD 70.00 $0.40 $28.00
ADISOL GALON 1.20 $6.00 $7.20
SUB-TOTAL $1,058.43
B- MANO DE OBRA
DESCRIPCION JORNAL PRESTACION JORN-TOTAL RENDIMIENTO SUBTOTAL
1 ALBAÑIL $14.00 $2.00 $16.00 0.32 $5.12
3 AUXILIARES $9.00 $1.25 $10.25 0.32 $3.28
1 ARMADOR $14.00 $2.00 $16.00 0.12 $1.92
1 AUXILIAR $9.00 $1.25 $10.25 0.12 $1.23
SUB-TOTAL $11.55
C-EQUIPO Y HERRAMIENTA
DESCRIPCIÓN TIPO CAPACIDAD RENDIMIENTO COSTO/HORA SUB-TOTAL
HERRAMIENTAS CONV 5% $0.58
SUB-TOTAL $0.58
D-SUBCONTRAATODESCRIPCION UNIDAD CANTIDAD PRECIO SUBTOTAL
ARMADOR #2 QQ 0.09 12.28 $1.11
ARMADOR #3 QQ 0.47 $11.53 $5.42COLOCACION DE PUNTALES UNIDAD 6 $0.92 $5.52
BOMBA DE CONCRETO M3 2.1 $18.00 $37.80
ANDAMIO UNIDAD 1 $2.00 $2.00
MANEJO DEL CONCRETO M3 2.1 $25.00 $52.50
SUBTOTAL: $104.34
COSTO DIRECTO $1,174.91
LOSA VT1-20 (e= 20 cm, REFUERZO DE TEMPERATURA ELECTROMALA LISA 15X15X6/6) (f´c=210 kg/cm2) (PROP 1:2:2)
COSTO INDIRECTO 20% $234.98
PRECIO UNITARIO $1,409.89
ANALISIS DE PRECIOS UNITARIOS
SIN IVA
PROYECTO:
PARTIDA No.:
ITEM No.: CONCRETO 1:2:2
A- MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO SUBTOTAL
CEMENTO BOLSA 11.00 $7.95 $87.45
ARENA M3 0.63 $16.50 $10.40
GRAVA M3 0.63 $30.00 $18.90
AGUA BARRIL 1.24 $2.00 $2.48
SUBTOTAL: $119.23B- MANO DE OBRA
DESCRIPCION JORNAL PRESTACION JORN-TOTAL RENDIMIENTO SUBTOTAL
8 AUXILIARES $56.00 $16.00 $72.00 0.23 $16.56
SUBTOTAL: $16.56
C-EQUIPO Y HERRAMIENTAS
DESCRIPCION TIPO CAPACIDAD RENDIMIENTO COSTO/HORA SUBTOTAL
HERRAMIENTAS CONV 3 % $4.07
CONCRETERA 1.8 $5.00 $9.00
VIBRADOR 1.8 $3.12 $5.62
COMBUSTIBLE 1.8 $0.63 $1.13
SUBTOTAL: $19.82
D-SUBCONTRATOS
DESCRIPCION UNIDAD CANTIDAD PRECIO SUBTOTAL
SUBTOTAL
COSTO DIRECTO $155.61
COSTO INDIRECTO 20% $31.12
PRECIO UNITARIO $186.73
UNIDAD:M3
ANALISIS DE PRECIOS UNITARIOS
SIN IVA
PROYECTO:PARTIDA No.:
ITEM No.:
A- MATERIALESDESCRIPCION UNIDAD CANTIDAD PRECIO SUBTOTAL
CONCRETO 1:2:2 M3 0.09 $155.61 $13.62
BOVEDILLA 15X20X60 UNIDAD 8.17 $0.75 $6.13
VIGUETA ML 1.47 $10.00 $14.70
ELECTROMALLA LISA 15X15X6/6 2.35X6 UNIDAD 0.08 $30.00 $2.50
CLAVOS 5" LB 0.10 $0.80 $0.08
REGLA PACHA COMO CONTRAVIENTO VARAS 0.25 $0.90 $0.23
CUARTON DE PINO (PUNTALES) VARAS 0.54 $5.00 $2.69
TABLA DE PINO VARAS 0.10 $2.00 $0.20
HIERRO #2 QUINTAL 0.004 $54.00 $0.20
HIERRO #3 QUINTAL 0.03 $54.00 $1.67
ALAMBRE DE AMARRE LB 0.35 $1.50 $0.52
SIERRA PARA CORTAR HIERRO UNIDAD 0.04 $2.50 $0.10
HELADOS UNIDAD 2.92 $0.40 $1.17
ADISOL GALON 0.05 $6.00 $0.30
SUB-TOTAL $44.09
B- MANO DE OBRA
DESCRIPCION JORNAL PRESTACION JORN-TOTAL RENDIMIENTO SUBTOTAL
1 ALBAÑIL $14.00 $2.00 $16.00 0.32 $0.21
3 AUXILIARES $9.00 $1.25 $10.25 0.32 $0.14
1 ARMADOR $14.00 $2.00 $16.00 0.12 $0.08
1 AUXILIAR $9.00 $1.25 $10.25 0.12 $0.05
SUB-TOTAL $0.48
C-EQUIPO Y HERRAMIENTADESCRIPCIÓN TIPO CAPACIDAD RENDIMIENTO COSTO/HORA SUB-TOTAL
HERRAMIENTAS CONV 5% $0.02
SUB-TOTAL $0.02D-SUBCONTRAATO
DESCRIPCION UNIDAD CANTIDAD PRECIO SUBTOTAL
ARMADOR #2 QQ 0.0040 $12.28 $0.05
ARMADOR #3 QQ 0.02 $11.53 $0.23
COLOCACION DE PUNTALES UNIDAD 0.25 $0.92 $0.23
BOMBA DE CONCRETO M3 0.0875 $18.00 $1.58
ANDAMIO UNIDAD 0.04 $2.00 $0.08
MANEJO DEL CONCRETO M3 0.0875 $25.00 $2.19
SUBTOTAL: $4.35
COSTO DIRECTO $48.94
UNIDAD:M2LOSA VT1-20 (e= 20 cm, REFUERZO DE TEMPERATURA ELECTROMALA LISA 15X15X6/6)
(f´c=210 kg/cm2) (PROP 1:2:2)
COSTO INDIRECTO 20% $9.79
PRECIO UNITARIO $58.73