presupuesto

10
ANALISIS DE PRECIOS UNITARIOS SIN IVA PROYECTO: PARTIDA No.: ITEM No.: A- MATERIALES DESCRIPCION UNIDAD CANTIDAD PRECIO CONCRETO 1:2:2 M3 2.10 $155.61 BOVEDILLA 15X20X60 UNIDAD 196.00 $0.75 VIGUETA ML 35.30 $10.00 ELECTROMALLA LISA 15X15X6/6 2.35X6 UNIDAD 2.00 $30.00 CLAVOS 5" LB 2.50 $0.80 REGLA PACHA COMO CONTRAVIENTO VARAS 6.00 $0.90 CUARTON DE PINO (PUNTALES) VARAS 12.90 $5.00 TABLA DE PINO VARAS 2.39 $2.00 HIERRO #2 QUINTAL 0.09 $54.00 HIERRO #3 QUINTAL 0.74 $54.00 ALAMBRE DE AMARRE LB 8.30 $1.50 SIERRA PARA CORTAR HIERRO UNIDAD 1.00 $2.50 HELADOS UNIDAD 70.00 $0.40 ADISOL GALON 1.20 $6.00 SUB-TOTAL B- MANO DE OBRA DESCRIPCION JORNAL PRESTACION JORN-TOTAL RENDIMIENTO 1 ALBAÑIL $14.00 $2.00 $16.00 0.32 3 AUXILIARES $9.00 $1.25 $10.25 0.32 1 ARMADOR $14.00 $2.00 $16.00 0.12 1 AUXILIAR $9.00 $1.25 $10.25 0.12 SUB-TOTAL C-EQUIPO Y HERRAMIENTA DESCRIPCIÓN TIPO CAPACIDAD RENDIMIENTO COSTO/HORA HERRAMIENTAS CONV 5% SUB-TOTAL D-SUBCONTRAATO DESCRIPCION UNIDAD CANTIDAD PRECIO ARMADOR #2 QQ 0.09 12.28 ARMADOR #3 QQ 0.47 $11.53 COLOCACION DE PUNTALES UNIDAD 6 $0.92 BOMBA DE CONCRETO M3 2.1 $18.00 ANDAMIO UNIDAD 1 $2.00 MANEJO DEL CONCRETO M3 2.1 $25.00 SUBTOTAL: COSTO DIRECTO LOSA VT1-20 (e= 20 cm, REFUERZO DE TEMPERATURA ELECTROMALA LISA 15X15X kg/cm2) (PROP 1:2:2)

Upload: luis-quant

Post on 04-Feb-2016

223 views

Category:

Documents


0 download

DESCRIPTION

presupuesto de losa con bovedilla

TRANSCRIPT

Page 1: presupuesto

ANALISIS DE PRECIOS UNITARIOS SIN IVA

PROYECTO:PARTIDA No.: UNIDAD:S.G

ITEM No.:

A- MATERIALES

DESCRIPCION UNIDAD CANTIDAD PRECIO SUBTOTAL

CONCRETO 1:2:2 M3 2.10 $155.61 $326.78

BOVEDILLA 15X20X60 UNIDAD 196.00 $0.75 $147.00

VIGUETA ML 35.30 $10.00 $353.00

ELECTROMALLA LISA 15X15X6/6 2.35X6 UNIDAD 2.00 $30.00 $60.00

CLAVOS 5" LB 2.50 $0.80 $2.00

REGLA PACHA COMO CONTRAVIENTO VARAS 6.00 $0.90 $5.40

CUARTON DE PINO (PUNTALES) VARAS 12.90 $5.00 $64.50

TABLA DE PINO VARAS 2.39 $2.00 $4.78

HIERRO #2 QUINTAL 0.09 $54.00 $4.86

HIERRO #3 QUINTAL 0.74 $54.00 $39.96

ALAMBRE DE AMARRE LB 8.30 $1.50 $12.45

SIERRA PARA CORTAR HIERRO UNIDAD 1.00 $2.50 $2.50

HELADOS UNIDAD 70.00 $0.40 $28.00

ADISOL GALON 1.20 $6.00 $7.20

SUB-TOTAL $1,058.43

B- MANO DE OBRA

DESCRIPCION JORNAL PRESTACION JORN-TOTAL RENDIMIENTO SUBTOTAL

1 ALBAÑIL $14.00 $2.00 $16.00 0.32 $5.12

3 AUXILIARES $9.00 $1.25 $10.25 0.32 $3.28

1 ARMADOR $14.00 $2.00 $16.00 0.12 $1.92

1 AUXILIAR $9.00 $1.25 $10.25 0.12 $1.23

SUB-TOTAL $11.55

C-EQUIPO Y HERRAMIENTA

DESCRIPCIÓN TIPO CAPACIDAD RENDIMIENTO COSTO/HORA SUB-TOTAL

HERRAMIENTAS CONV 5% $0.58

SUB-TOTAL $0.58

D-SUBCONTRAATODESCRIPCION UNIDAD CANTIDAD PRECIO SUBTOTAL

ARMADOR #2 QQ 0.09 12.28 $1.11

ARMADOR #3 QQ 0.47 $11.53 $5.42COLOCACION DE PUNTALES UNIDAD 6 $0.92 $5.52

BOMBA DE CONCRETO M3 2.1 $18.00 $37.80

ANDAMIO UNIDAD 1 $2.00 $2.00

MANEJO DEL CONCRETO M3 2.1 $25.00 $52.50

SUBTOTAL: $104.34

COSTO DIRECTO $1,174.91

LOSA VT1-20 (e= 20 cm, REFUERZO DE TEMPERATURA ELECTROMALA LISA 15X15X6/6) (f´c=210 kg/cm2) (PROP 1:2:2)

Page 2: presupuesto

COSTO INDIRECTO 20% $234.98

PRECIO UNITARIO $1,409.89

Page 3: presupuesto

ANALISIS DE PRECIOS UNITARIOS

SIN IVA

PROYECTO:

PARTIDA No.:

ITEM No.: CONCRETO 1:2:2

A- MATERIALES

DESCRIPCION UNIDAD CANTIDAD PRECIO SUBTOTAL

CEMENTO BOLSA 11.00 $7.95 $87.45

ARENA M3 0.63 $16.50 $10.40

GRAVA M3 0.63 $30.00 $18.90

AGUA BARRIL 1.24 $2.00 $2.48

SUBTOTAL: $119.23B- MANO DE OBRA

DESCRIPCION JORNAL PRESTACION JORN-TOTAL RENDIMIENTO SUBTOTAL

8 AUXILIARES $56.00 $16.00 $72.00 0.23 $16.56

SUBTOTAL: $16.56

C-EQUIPO Y HERRAMIENTAS

DESCRIPCION TIPO CAPACIDAD RENDIMIENTO COSTO/HORA SUBTOTAL

HERRAMIENTAS CONV 3 % $4.07

CONCRETERA 1.8 $5.00 $9.00

VIBRADOR 1.8 $3.12 $5.62

COMBUSTIBLE 1.8 $0.63 $1.13

SUBTOTAL: $19.82

D-SUBCONTRATOS

DESCRIPCION UNIDAD CANTIDAD PRECIO SUBTOTAL

SUBTOTAL

COSTO DIRECTO $155.61

COSTO INDIRECTO 20% $31.12

PRECIO UNITARIO $186.73

UNIDAD:M3

Page 4: presupuesto

ANALISIS DE PRECIOS UNITARIOS

SIN IVA

PROYECTO:PARTIDA No.:

ITEM No.:

A- MATERIALESDESCRIPCION UNIDAD CANTIDAD PRECIO SUBTOTAL

CONCRETO 1:2:2 M3 0.09 $155.61 $13.62

BOVEDILLA 15X20X60 UNIDAD 8.17 $0.75 $6.13

VIGUETA ML 1.47 $10.00 $14.70

ELECTROMALLA LISA 15X15X6/6 2.35X6 UNIDAD 0.08 $30.00 $2.50

CLAVOS 5" LB 0.10 $0.80 $0.08

REGLA PACHA COMO CONTRAVIENTO VARAS 0.25 $0.90 $0.23

CUARTON DE PINO (PUNTALES) VARAS 0.54 $5.00 $2.69

TABLA DE PINO VARAS 0.10 $2.00 $0.20

HIERRO #2 QUINTAL 0.004 $54.00 $0.20

HIERRO #3 QUINTAL 0.03 $54.00 $1.67

ALAMBRE DE AMARRE LB 0.35 $1.50 $0.52

SIERRA PARA CORTAR HIERRO UNIDAD 0.04 $2.50 $0.10

HELADOS UNIDAD 2.92 $0.40 $1.17

ADISOL GALON 0.05 $6.00 $0.30

SUB-TOTAL $44.09

B- MANO DE OBRA

DESCRIPCION JORNAL PRESTACION JORN-TOTAL RENDIMIENTO SUBTOTAL

1 ALBAÑIL $14.00 $2.00 $16.00 0.32 $0.21

3 AUXILIARES $9.00 $1.25 $10.25 0.32 $0.14

1 ARMADOR $14.00 $2.00 $16.00 0.12 $0.08

1 AUXILIAR $9.00 $1.25 $10.25 0.12 $0.05

SUB-TOTAL $0.48

C-EQUIPO Y HERRAMIENTADESCRIPCIÓN TIPO CAPACIDAD RENDIMIENTO COSTO/HORA SUB-TOTAL

HERRAMIENTAS CONV 5% $0.02

SUB-TOTAL $0.02D-SUBCONTRAATO

DESCRIPCION UNIDAD CANTIDAD PRECIO SUBTOTAL

ARMADOR #2 QQ 0.0040 $12.28 $0.05

ARMADOR #3 QQ 0.02 $11.53 $0.23

COLOCACION DE PUNTALES UNIDAD 0.25 $0.92 $0.23

BOMBA DE CONCRETO M3 0.0875 $18.00 $1.58

ANDAMIO UNIDAD 0.04 $2.00 $0.08

MANEJO DEL CONCRETO M3 0.0875 $25.00 $2.19

SUBTOTAL: $4.35

COSTO DIRECTO $48.94

UNIDAD:M2LOSA VT1-20 (e= 20 cm, REFUERZO DE TEMPERATURA ELECTROMALA LISA 15X15X6/6)

(f´c=210 kg/cm2) (PROP 1:2:2)

Page 5: presupuesto

COSTO INDIRECTO 20% $9.79

PRECIO UNITARIO $58.73