presentation zagreb mielczarski

16
Coordinated development Coordinated development of the power systems of the power systems 8th International Conference on the 8th International Conference on the European Energy Market European Energy Market Wadysaw Mielczarski Wadysaw Mielczarski Technical University of Lodz, Poland Technical University of Lodz, Poland

Upload: wladyslaw-mielczarski

Post on 06-Apr-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Presentation Zagreb Mielczarski

8/3/2019 Presentation Zagreb Mielczarski

http://slidepdf.com/reader/full/presentation-zagreb-mielczarski 1/16

Coordinated developmentCoordinated developmentof the power systemsof the power systems

8th International Conference on the8th International Conference on theEuropean Energy MarketEuropean Energy Market

W adys aw MielczarskiW adys aw MielczarskiTechnical University of Lodz, PolandTechnical University of Lodz, Poland

Page 2: Presentation Zagreb Mielczarski

8/3/2019 Presentation Zagreb Mielczarski

http://slidepdf.com/reader/full/presentation-zagreb-mielczarski 2/16

D ecision of the European UnionD ecision of the European Union

The crucial step into the development of theThe crucial step into the development of theEuropean energy infrastructure wasEuropean energy infrastructure was DecisionDecision

No 1364/2006/EC [1] published in September No 1364/2006/EC [1] published in September

2006. This decision includes: (a) guidelines for 2006. This decision includes: (a) guidelines for transtrans--European energy networks; (b)European energy networks; (b)identification of projects of common interestidentification of projects of common interestand priority projects, including those of and priority projects, including those of European interest; (c) creation of a moreEuropean interest; (c) creation of a morefavourable context for development of thosefavourable context for development of thosenetworks.networks.

Page 3: Presentation Zagreb Mielczarski

8/3/2019 Presentation Zagreb Mielczarski

http://slidepdf.com/reader/full/presentation-zagreb-mielczarski 3/16

N omination of the CoordinatorsN omination of the Coordinators

TheThe EuropeanEuropean CommissionCommission inin September September 20072007appointedappointed four four EuropeanEuropean CoordinatorsCoordinators toto facilitatefacilitate thethefollowingfollowing projects projects::(a) Power link between Germany, Poland and(a) Power link between Germany, Poland andLithuaniaLithuania -- Prof. W. Mielczarski; (b) Connection of Prof. W. Mielczarski; (b) Connection of offshore wind power in Northern Europe (Denmark,offshore wind power in Northern Europe (Denmark,Germany and Poland)Germany and Poland) - - Mr G Adamovitch; (c)Mr G Adamovitch; (c)Connection between France and Spain, especiallyConnection between France and Spain, especiallySentmenat (ES)Sentmenat (ES) ± ± Bescanó (ES)Bescanó (ES) ± ± Baixas (FR) lineBaixas (FR) line - -Prof. Monti and (d) for the NABUCCO pipelineProf. Monti and (d) for the NABUCCO pipeline - - Mr Mr Van ArtsenVan Artsen

Page 4: Presentation Zagreb Mielczarski

8/3/2019 Presentation Zagreb Mielczarski

http://slidepdf.com/reader/full/presentation-zagreb-mielczarski 4/16

Projects Projects of of commoncommon interest interest relaterelate toto thethe electricityelectricity andand gasgasnetworksnetworks referredreferred toto inin thethe DecisionDecision meetingmeeting thethe objectivesobjectives andand

priorities priorities laidlaid downdown inin itit.. TheyThey mustmust displaydisplay potential potential economiceconomic

viabilityviability. . TheThe economiceconomic viabilityviability of of aa project project isis assessedassessed by by meansmeansof of aa costcost--benefit benefit analysisanalysis inin termsterms of of thethe environment,environment, thethe securitysecurity of of supplysupply andand territorialterritorial cohesioncohesion.. ProjectsProjects of of commoncommon interestinterest arearelistedlisted inin AnnexesAnnexes IIII andand IIIIII toto thethe DecisionDecision..3ULRULW\3ULRULW\ SURMHFWVSURMHFWV DUHDUH VHOHFWHGVHOHFWHG IURPIURP DPRQJDPRQJ WKHWKH SURMHFWVSURMHFWV

RIRI FRPPRQFRPPRQ LQWHUHVWLQWHUHVW 7R7R EHEH HOLJLEOHHOLJLEOH WKH\WKH\ PXVWPXVW KDYHKDYH DDVLJQLILFDQWVLJQLILFDQW LPSDFWLPSDFW RQRQ WKHWKH SURSHUSURSHU IXQFWLRQLQJIXQFWLRQLQJ RIRI WKHWKHLQWHUQDOLQWHUQDO PDUNHWPDUNHW RQRQ WKHWKH VHFXULW\VHFXULW\ RIRI VXSSO\VXSSO\ DQG RUDQG RU WKHWKHXVHXVH RIRI UHQHZDEOHUHQHZDEOH HQHUJ\HQHUJ\ VRXUFHVVRXUFHV 3ULRULW\3ULRULW\ SURMHFWVSURMHFWVZKLFKZKLFK DUHDUH OLVWHGOLVWHG LQLQ $QQH[$QQH[ ,, WRWR WKHWKH 'HFLVLRQ'HFLVLRQ KDYHKDYH

SULRULW\SULRULW\ IRUIRU WKHWKH JUDQWLQJJUDQWLQJ RIRI &RPPXQLW\&RPPXQLW\ ILQDQFLDOILQDQFLDO

DecisionDecision 1364/2006/EC1364/2006/EC lists projects eligible for Communitylists projects eligible for Communityassistance under Regulation (EC) Noassistance under Regulation (EC) No 2236/952236/95 and ranks themand ranks them

in three categories.in three categories.

Page 5: Presentation Zagreb Mielczarski

8/3/2019 Presentation Zagreb Mielczarski

http://slidepdf.com/reader/full/presentation-zagreb-mielczarski 5/16

P ower grid in Central EuropeP ower grid in Central Europe

Page 6: Presentation Zagreb Mielczarski

8/3/2019 Presentation Zagreb Mielczarski

http://slidepdf.com/reader/full/presentation-zagreb-mielczarski 6/16

P riority projects inP riority projects in N orthern EuropeN orthern Europe

Page 7: Presentation Zagreb Mielczarski

8/3/2019 Presentation Zagreb Mielczarski

http://slidepdf.com/reader/full/presentation-zagreb-mielczarski 7/16

R elations of CoordinatorsR elations of Coordinators

European Union

EuropeanCommission

High LevelGroups

European EnergyCoordinator

G overnm ent A G overnmen t B

Regulatory A Regulatory B

PDCLitPol Link or GerPol LinkTSO_A TSO_B

Pow er line SystemB

System A

Page 8: Presentation Zagreb Mielczarski

8/3/2019 Presentation Zagreb Mielczarski

http://slidepdf.com/reader/full/presentation-zagreb-mielczarski 8/16

P olandP oland--Lithuania connectionLithuania connection

E kE k

NewStation

NewStation

AlytusAlytus

OlsztynM tkiOlsztynM tki

P ockP ock

KozieniceKozienice

Stanis awów

Ostro ka

Narew

O tarzew

Stanis awówStanis awów

Ostro kaOstro ka

NarewNarew

O tarzewO tarzew

SiedlceSiedlce

Page 9: Presentation Zagreb Mielczarski

8/3/2019 Presentation Zagreb Mielczarski

http://slidepdf.com/reader/full/presentation-zagreb-mielczarski 9/16

G ermanyG ermany- -P oland connectionsP oland connections

Page 10: Presentation Zagreb Mielczarski

8/3/2019 Presentation Zagreb Mielczarski

http://slidepdf.com/reader/full/presentation-zagreb-mielczarski 10/16

Coordination of power stationsCoordination of power stations

and network developmentand network development

Electric Power System

Power producers

Networkoperators

ChineseWall

InvestmentPlan

InvestementPlan

Power stations Power Networks

Page 11: Presentation Zagreb Mielczarski

8/3/2019 Presentation Zagreb Mielczarski

http://slidepdf.com/reader/full/presentation-zagreb-mielczarski 11/16

P ower market ?P ower market ?

TSO

Nodal Power Minimum

Contractsfor power

Contracts

for power

Transmission system

Power Producers

Power Users

DSOs

NodalPower

Minimum

Distribution System

Contractsfor

Power

Contractsfor

Power

Power Users

Power Producers

Local System Operators

Page 12: Presentation Zagreb Mielczarski

8/3/2019 Presentation Zagreb Mielczarski

http://slidepdf.com/reader/full/presentation-zagreb-mielczarski 12/16

Next step toward the EuropeanNext step toward the Europeanelectricelectrici ity networkty network

Communication from the Commission to theCommunication from the Commission to theEuropean Parliament, the Council, theEuropean Parliament, the Council, theEuropean Economic and Social CommitteeEuropean Economic and Social Committeeand the Committee of the Regionsand the Committee of the Regions - - EnergyEnergyinfrastructure priorities for 2020 and beyondinfrastructure priorities for 2020 and beyond - -A Blueprint for an integrated European energyA Blueprint for an integrated European energy

network, 17 November 2010, Brussels.network, 17 November 2010, Brussels.Consultation in 2011.Consultation in 2011.

Page 13: Presentation Zagreb Mielczarski

8/3/2019 Presentation Zagreb Mielczarski

http://slidepdf.com/reader/full/presentation-zagreb-mielczarski 13/16

F inancing the network developmentF inancing the network development

$URXQG$URXQG RQHRQH WULOOLRQWULOOLRQ HXURVHXURV PXVWPXVW EHEH LQYHVWHGLQYHVWHGLQLQ RXURXU HQHUJ\HQHUJ\ V\VWHPV\VWHP EHWZHHQEHWZHHQ WRGD\WRGD\ DQGDQG LQLQ RUGHURUGHU WRWR PHHWPHHW HQHUJ\HQHUJ\ SROLF\SROLF\ REMHFWLYHVREMHFWLYHVDQGDQG FOLPDWHFOLPDWH JRDOVJRDOV $ERXW$ERXW KDOIKDOI RIRI LWLW ZLOOZLOO EHEHUHTXLUHGUHTXLUHG IRUIRU QHWZRUNVQHWZRUNV LQFOXGLQJLQFOXGLQJHOHFWULFLW\HOHFWULFLW\ DQGDQG JDVJDV GLVWULEXWLRQGLVWULEXWLRQ DQGDQGWUDQVPLVVLRQWUDQVPLVVLRQ VWRUDJHVWRUDJH DQGDQG VPDUWVPDUW JULGVJULGV

Out of these investments about 200 bnOut of these investments about 200 bn ¼ ¼ are neededare neededfor energy transmission networks alone. However,for energy transmission networks alone. However,only about 50% of the required investments for only about 50% of the required investments for transmission networks will be taken up by the markettransmission networks will be taken up by the market

by 2020. This leaves a gap of about 100 bn by 2020. This leaves a gap of about 100 bn ¼ ¼..

Page 14: Presentation Zagreb Mielczarski

8/3/2019 Presentation Zagreb Mielczarski

http://slidepdf.com/reader/full/presentation-zagreb-mielczarski 14/16

Involving commercial investorsInvolving commercial investors

TSO s

Investor

Energyusers

Power prodiucers

Finance Return frominvestment

Transmissionfees

T r a n s m

i s s

i o n

l i n e

Lineconstruction

Page 15: Presentation Zagreb Mielczarski

8/3/2019 Presentation Zagreb Mielczarski

http://slidepdf.com/reader/full/presentation-zagreb-mielczarski 15/16

Encouragement and supervisionsEncouragement and supervisions

Currently, the European EnergyCurrently, the European EnergyCoordinators are facilitating theCoordinators are facilitating thedevelopment of the energy infrastructuredevelopment of the energy infrastructureENTSOENTSO ± ± 10 year development plan10 year development plan

ACER ACER ± ± coordination and unification of coordination and unification of grid code and market rulegrid code and market ruleMonitoring ?Monitoring ?

Page 16: Presentation Zagreb Mielczarski

8/3/2019 Presentation Zagreb Mielczarski

http://slidepdf.com/reader/full/presentation-zagreb-mielczarski 16/16

European regional energy marketsEuropean regional energy markets