    The joint venture INGECONS LIBYA for General Construction, is a com-pany founded in 2009 by:

    The main object of this society it’s for the general construction of all typesof civil engineering and residential building.

    Our company philosophy is the give the customer a wide range of solutions, so

    he choose that best suits your idea, so we have commercial alliances with vari-

    ous companies throughout the world, and thus be able to respond effectively and

    quickly to the different needs of our customers in each area.

    LIBYAN INVESTMENT AND DEVELOPMENT COMPANY with 40% participation.  

    INGECONS & URBASERVICIOS, S.A. with 60% participation. 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    4/126

     

  • 8/19/2019 Presentacion Ingecons Libya - Red

    5/126

     

    PRESENTATION 

    Introduction. History 

    INGECONS & URBASERVICIOS, S.A., is the result of the application of a consolida-tion strategy of several departments, having different activities, united for a common aim:the construction, with the objective to give to the client the maximum satisfaction in allaspects: studies, planning, price, quality, service, delays, etc. Its existence over time fol-lowed the following chronology: 

    - Department Plumbing & Drainage Installation was deployed in 2000 as a departmentspecializing in hydraulics and plumbing in the construction field, both as a civil build-ing. 

    - Department Electrical & Air Conditioning was deployed in 2002, specializes in electri-cal installations, air conditioning and home automation in new housing, industries, ho-tels, etc., in 2004, she has definitely broadened its scope by diversifying into two dis-tinct areas, the electrification and automation on one side, and air conditioning/coolingand maintenance of the other reviewers.

    - Department Building Engineering was deployed in 2003 as a construction departmentspecializing in large projects and work, both residential as non-residential, character-ized by their magnitude and complexity. 

    - Department Metal Work & Glazing was deployed in 2000, dedicated to all types offacades, structures, curtain walls, metal coatings, glass and special facades. 

    The importance given by INGECONS & URBASERVICIOS, S.A.  to Human Capital isvery huge. We have a large team of people with high decision-making capacity, technicalknowledge and experience. 

    Design of the strategic plan 

    The design of the strategic plan INGECONS & URBASERVICIOS, S.A. consists offollowing steps: 

      The concept of organization  The nature of its activities.   The reason of its existence.   The group she serves. 

      Its principles and core values. 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    6/126

     

    Areas of Business, Projects 

    Engineering  A great technical multidisciplinary team favors that all the studies and budgets that we

    make are perfectly adjusted to the needs of the client. We have a policy of continuous of

    our technicians in the latest novelties in the fields of engineering and architecture. The

    influence of the Group in all the fields related to the construction facilitates the interaction

    of the different techniques and methodologies applicable to the construction, which turns

    the technical team of INGECONS & URBASERVICIOS, S.A. into Leader and Technologi-cal Associate in the works contracted with our clients.

    Construction The trading area of construction and real estate development is represented by IN-

    GECONS & URBASERVICIOS, S.A., which integrally realizes all services related to theconstruction. It was created as an answer to the market need of an integral service, withhigh professional capacity, and a strict control of quality, prices and delays. It was the re-sult of the consolidation of the efforts of its founders and collaborators and their large ex-perience in the construction sector. 

    INGECONS & URBASERVICIOS, S.A. is a company, which however has a solid expe-rience, then a great part of its professionals have more than 20 years of occupational ac-

    tivity. This allows us to be agile and flexible, but at the same time to be solid and rigorous

    as the more veteran companies. However, as our critical mass is smaller, we need less

    response time to answer the requests of our clients.

    Industrial The trading area of industrial automation studies designs and installs industrial automa-

    tion systems, which control the heating, air conditioned, alarm, light, blinds, awnings, etc.,

    with the most recent technology. All these installations are able to control absolutely allthe systems by cellular phone, if needed, and with a program that allows the most effi-cient energy utilization, and consequently important energy savings and an improvementof environmental protection. 

    The industrial automation system described below is designed for the control of build-

    ing, either of offices and hotels or private houses. It integrates the lighting, air condition-

    ing, engines of blinds and curtains, presence and access controls, monitoring and control

    from a central control point, etc. All these functions are perfectly coordinated and man-

    aged in order to obtain the best rates of comfort, energy saving and safety in the building

    or house. 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    7/126

     

  • 8/19/2019 Presentacion Ingecons Libya - Red

    8/126

     

    Areas of Business, Installations 

    Air Conditionning. Maintenance and service 

    The trading area of air conditioning was created with a clear technological and ecologi-cal ideology, realising an integral management and control of the installations and ser-vices in the aim of controlling and giving comfort and welfare. We opt for the achievementof the proposed objectives with an unavoidable premise, the environmental protection,and so our air conditioning systems are based on new technologies and ecological gas-es. 

    The products we install are manufactured by the most important manufacturers in the

    world, the controls and automatisms are of latest generation, and allow an important re-duction of the air conditioning costs. 

    INGECONS & URBASERVICIOS, S.A. in the field of Maintenance and ManagementServices has a primary objective: to achieve the minimum cost and maximum safetypossible for staff, the minimum environmental disturbance, the proper use and operation

    of equipment and facilities for clients who have placed their trust.

    Electrical installations 

    The trading area of electrical installations is composed of several areas, which canmake all types of works, as follows: 

      Electricity  Public lighting.

      Connections of low and medium voltage.  Bypasses in low and medium voltage.  Electric transformers.  Switchboards.  Industrial buildings. 

    Domestic electrification.  Protection against lighting strokes.

      Water treatment plants.  Desalination plants.

      Control and automatisms.   Purifying plants.   Traffic tunnels.   Water pumping.   Water management. 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    9/126

     

  • 8/19/2019 Presentacion Ingecons Libya - Red

    10/126

     

    10 

    Areas of Business, Installations 

    Hydraulic installations. Wastewater treatment and sanitation 

    The trading area of hydraulic installation is dedicated to the realization of hydraulicand fire-fighting installations, either in civil works or building. One of our specializations incivil works is the setting up of all kind of polyethylene pipes. We are certified by the De-partment of Industry, and are in compliance with all the requirements of the certificationfor this type of installations. Is divided into two large areas: 

    Civil works 

    Buildings 

    In this department, the main activity is focused in the construction, operation,maintenance and plant maintenance treatment of wastewater and sanitation. 

    We have developed new areas of work: 

     

    Hydraulic installations of general potable water network.  Water pumping.   Impulses.   Purifying plants.   Juntions.   Changes in networks.   Valves.   Industrial parks.   Distribution to communities.   Irrigation unions. 

      Plumbing and drainage installations.  Fire-fighting installations.   Real estate developments.   Repairs. 

      Engineering, implementation of hydraulic works and outfalls.  Operation of ater supply stations and water treatment.   Waste management and recovery of bio solids in agriculture.   Studies and Research, Development and Innovation (R+D+I), in collaboration

    institutions.   Installation work of simultaneous of electricity and thermal use of biogas. 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    11/126

     

    11 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    12/126

     

    12 

    Human Resources. Quality and Environment 

    There are three basic lines of action, on which policy is, based INGECONS & URBAS-ERVICIOS, S.A. RRHH: 

    The consolidation of these three areas has led to the creation of a large multidiscipli-nary team with wide measure of discretion, expertise and experience, able to provide thebest customer service, and to generate and manage numerous business areas effective-ly and thoroughly. 

    Of the three basic axes emerge the following pillars of our corporate culture: 

    INGECONS & URBASERVICIOS, S.A., promotes the generation of opportunities foremployees, along that detect and enhance personal skills of the same, with the ultimateaim of retaining the best professionals. 

    One of the objectives of the Mission, its employees and business partners of thesame, is to obtain high levels of occupational health and safety and strict adherence tothe LPRL (Spanish Law of Prevention and Safety at work). 

    Our prevention policy is thus based on the following principles: 

      Prevention of Occupational Risks.  Incorporation of new staff.  Training, adaptation and development.

      Recruitment, retention and motivation of talented people.  Suport and enhance the transfer of training and learning.  The implementation of teamwork and quality control as tolos to promo-

    te excellence in a job well done.  Enhance the personal qualitites of our employees regarding skills, as-

    sertiveness, empathy and proactivity.  The development of the rejection of the routine, exercise discipline in

    the execution of the work and safety control and exercise leadership

    and to protect and respect the group.

      Integration Principle of preventive action in all positions.  Compliance with laws and regulations in force concerning the Prevention of

    Occupational Risks.   Training of all employees in prevention, developing their human and profes-

    sional potential.   Periodic compliance reviews of occupational healt.   Study and analysis of the risks of each job and its prevention.    A detailed study of risks in each of our works, by the appropriate Plan of

    Work Safety. 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    13/126

     

    13 

     As a result, they leave nothing to chance, we get involved to be more effective, we learnand we formed, thereby achieving more aware and more competent in the prevention ofoccupational hazards. A deep involvement with business partners, promotes an extremecoordination with them in the field of prevention of occupational hazards. 

    The consequence of this is to achieve a strong, trained and sensitized on preventionteam work. 

    For this reason, INGECONS & URBASERVICIOS, S.A., based his performance as astrategic plan, one of whose pillars is the Social Responsibility to be a fundamental as-pect underpinning this pillar of respect for the environment. Therefore, inculcate valuesand behaviors that respect the environment, teaching and showing good environmentalpractices in each and every one of those members of the Group in the activities of thedifferent areas of the business. To implement these principles, management is proposedas MISSION: 

    • Take the necessary steps to prevent pollution and, when this is not possible, to minimize

    • Systematically reduce waste by recycling wherever possible, and make efficient use o

    sources, raw materials and energy. 

    • Take all necessary measures to ensure compliance with all environmental regulatioble to our activities at State level and Local Autonomy and any requirement that thescribes in the future. 

    • To establish procedures for periodic review of compliance with environmental poliimplementation of corrective measures before any breaches detected. 

    • Define and regularly review environmental objectives and targets established in comthis environmental policy, in the process of continuous improvement of our performaspect to the environment. 

    • Disseminate environmental policy among employees, suppliers, subcontractors andholders. 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    14/126

     

    14 

    Projects 

    HOTEL ATRIUM BEACH – Villajoyosa (Alicante) 

    DESCRIPTION: 

    Project symbolic of the first order because it is the largest hotel in Europe at the fore-front of beach, with 1470 rooms, and unique thanks to its fun zones as the walk of stars,restaurants, shops, themed areas , area lakes, lazy river, swimming pool with waves, etc. 

    Built on a plot of 28,000 m2 with 10,000 m

    2 of slab foundation, 2 basements (on the se-

    cond at 9 m below sea level), a ground floor and 19 floors for a total of 120,000 m2 con-

    struction. Management and Construction of all work. Execution of all masonry (900 of1470 rooms have been made) and we are awaiting the resumption of work to finish this

    contract once again obtained the permit modification by the owner. Work done in record

    time, excavation and foundations in 3 months (in solving problems pumping nearly

    3,000,000 litters / day), the structure was completed in 10 months, we worked 24 hours a

    day permanently until early last summer.

    BUILDING ATRIUM PLAZA – Benidorm (Alicante) 

    DESCRIPTION: 

    Project 80 apartments, ground floor commercial and two basements, the second at 12

    m. under the sidewalk, made with screen walls and lattice structure with forged and

    shaped fan. Total of 8 floors with a total of 15,000 m2 of construction. Engineering Man-

    agement and Construction of the full work. Running the entire site in "turnkey". The work

    was done on time.

    BUILDING MESANA – Altea (Alicante) 

    DESCRIPTION: 

    Draft of 63 apartments, front line beach. Total of 8 floors with a total of 15,000 m2 of

    construction. 

    Rebuilding and strengthening the original structure. Execution of all masonry work, in-

    stallation and finishing. The site was done on schedule and is currently completing. 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    15/126

     

    15 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    16/126

     

    16 

    Projects 

    PARQUER WARNER – San Martín de la Vega (Madrid) 

    DESCRIPTION: 

    Draft comprehensive reform paths inside the park, including areas with new gardens

    and new access to attractions. Construction Events Centre and the new attraction

    Scooby Doo. Technical Management and Construction of all work. Execution of all work.

    The work was done in record time, by performing any internal reform in 2 months and the

    construction of the Events Centre with all facilities (kitchen, air conditioning, fire protec-

    tion, plumbing and electricity) and the attraction Scooby Doo in 3 months.

    SPA BLANCAFORT – La Garriga (Barcelona) 

    DESCRIPTION: 

    Draft comprehensive reform of the resort centre, including with new electrical, plumb-ing and air conditioning. 

    Technical Management and Construction of all work. Execution of all facilities as a

    "turnkey". 

    The work was done by providing the technical means (foreman and manager) to coor-

    dinate industrial and business plumbing, electricity and air conditioning.

    CONECTION FUENTE LIVIANA – Huerta del Marquesado (Cuenca) 

    DESCRIPTION: 

    Pipe two new sources to the bottling plant Fuente Liviana 

    Technical Management and Construction of all work. 

    Execution of all work. 

    The work connected issuer made on schedule, facilities were given to the owner  

  • 8/19/2019 Presentacion Ingecons Libya - Red

    17/126

     

    17 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    18/126

     

    18 

    Other Projects 

    Viaducts of the Madrid Valencia road  

    In these projects our technicians have participated in several fields, either directing the

    project or working on it. 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    19/126

     

    19 

    Viaducts of the Madrid Valencia road  

  • 8/19/2019 Presentacion Ingecons Libya - Red

    20/126

     

    20 

    Other Projects 

    Viaducts of the Madrid Valencia road  

  • 8/19/2019 Presentacion Ingecons Libya - Red

    21/126

     

    21 

    Valencia  Alicante road  

    Tunnels of the MadridValencia road  

  • 8/19/2019 Presentacion Ingecons Libya - Red

    22/126

     

    22 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    23/126

     

    23 

    Introduction. History

    The Engineering Department was founded in 2003 and is currently the head ofthe INGECONS & URBASERVICIOS, S.A. construction. In his long business ca-reer, the group has performed a multitude of infrastructure in ports, airports, hos-pitals, roads, waterworks and many other areas that prove their creditworthinessand experience in the construction sector. 

     At present, we are oriented towards total customer satisfaction, both publicand private, and commitment to represent the pillars of society that is based ondaily work in our company. 

    We have developed I+D+I to be at the forefront of technical developments in

    the sector without forgetting to minimize the environmental impact that our busi-ness generates. Finally, there is always a strong commitment to local employ-ment at any spot where we are developing our business. 

    Areas of business 

    The Engineering Department has extensive experience in the field of PublicWorks, with large built infrastructure such as airports, hospitals, universities,

    ports, roads, car parks and sewage, among others. 

    With regard to private work, the Engineering Department is specialized in the

    development of housing and residential construction, commercial and leisure

    centers, hotels, industrial buildings and large private estates. 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    24/126

     

    24 

    Ágora, City of the Arts and the Sciences (Valencia) 

    Budget: 41.991.417 € - UTE Becsa, Rover Alcisa y CyEs. 

    Termination: Year 2010 

    Description: The Agora is a plant covered surface 4.800m2 elliptical, being used in itsconstruction more than 7.000 tons of structural steel. The fixed cover reaches a maxi-mum height of 70m and 85m above ground level with open umbrellas. The structure isformed by pointed metal frames of different sizes; they create a domed interior of variableheight. At the top of the deck have two mobile structures “lamas”. The project has been

    drafted by D. Santiago Calatrava and his team. 

    Party Palace (Castellón) 

    Budget: 17.652.520 € 

    Termination: Year 2011 

    Description: The “Palau de la Festa” is located on a plot of approximately 15.000m2, ofwhich the oval-shaped building occupies 2.800 m

    2 and four plants in a total built area of

    5.800 m2. 

    The structure is forged nerve reticular interval between 12 and 80 cm. The roofs of thehall and the stage are of sheet metal on metal trusses, the rest of shells are inverted notpassable. The facade is ventilated with colourful ceramic pieces, and the main facadebuilt with ceramic blades that make the role of the curtain wall hood 

    New Hospital La Fe (Valencia) 

    Budget: 216.263.000€ - UTE Becsa, Dragados, ACS y Edificaciones Ferrando. 

    Termination: Year 2011 

    Description: In the main building there are three common plants: the basement, theground floor and the first floor, where are most central services. On these plants are

    raised six towers, four of them for hospitalization and two for External Consultation. This

    horizontal design will allow physicians and patients to share and manage resources bet-

    ter. The four towers of hospitalization have all the single rooms and some 180 offices.

    While the two towers have 195 rooms, External Consultation and 116 local special exami-

    nations. 

    Projects: Public Work. Buildings

  • 8/19/2019 Presentacion Ingecons Libya - Red

    25/126

     

    25 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    26/126

     

    26 

    Regional hospital de La Plana (Castellón) 

    Budget: 21.614.800€ - UTE Becsa, Dragados, y Torrescámara. 

    Termination: 2003 

    Description: Complete construction of a building of 24.000 m2, with capacity for 180beds, urbanization and construction of the exterior surface parking  

    Auditorium, University Jaume I (Castellón) 

    Budget: 19.300.000€ 

    Termination: 2009 

    Description: The structure consists of concrete walls 50 cm thick with 10 cm insulation inthe center. Due to the considerable height of the building, its performance has been usedtype climbing formwork. The room is completed with the installation of 658 seats and astage which consists of three levels of galleries, comb and contrapeine. The ventilated

    façade is Lammax type of Saloni, both of the stage and the room using 3x1 m parts inblack. Deputy Auditorium was built module toilets with combined curtain wall facade ofglass and white compact material 

    Building Espaitec, University Jaume I (Castellón) 

    Budget: 12.206.171€ 

    Termination: 2009 

    Description: 1.937 m2 building comprising basement aimed to facilities, ground and firstfloor, which houses offices and workshops. Made of solid concrete walls and floor tile

    views and hollow core slabs. In the building there are two types of cover, an inverted end

    in gravel and the other with photovoltaic glass. The facades are solid concrete walls with

    expanded polystyrene in the center which makes the function of isolation. Movinord pre-

    fabricated partition type interior, floor tiles and aluminum frames. 

    Projects: Public Work. Buildings

  • 8/19/2019 Presentacion Ingecons Libya - Red

    27/126

     

    27 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    28/126

     

    28 

    Link Enrique Gimeno av. with Round South (Castellón)  

    Budget: 4.266.170 € 

    Termination: 2009 

    Description: Implementation of Link Av. Enrique Gimeno with Ronda Sur, preserving thecurrent route and executing a roundabout with an inner radius and outer 54m of 69.1 m,and three lanes of 4.20 m at the level of Avenue which runs perpendicular to the slopeand round. The work is complemented by two bridges structure, consisting of a board of31 and 26.8 m respectively and a single span of 25m both. For the construction of these

    bridges has been used a total of 48 isostatic precast beams of 0.90 m deep 4.2 m apartand connected by a slab of compression of 0.25 m. 

    Line 2 of the streetcar, section 0 (Alicante) 

    Budget: 9.204.067 € - UTE Becsa, Tecsa y CHM 

    Termination: 2011 

    Description: The works provide for the construction of the section 0 of the tram line 2 of

     Alicante, from its junction with line 1 (PK 0 +000) to the square of the source Plá Boule-vard. Construction of a double track tramway platform, with two-way path almost parallelin plan and elevation, except the first few meters of the system linking with Line 1. De-spite being a stretch of not too long, the work includes the construction of various struc-tures along its route: “Salto del Carnero” viaduct, underpass, and manifold mating “BonHivern”. 

    Urbanitation Benicalap Sur (Valencia) 

    Budget: 6.011.671 € 

    Termination: 2004 

    Description: The lands are located north of the city of Valencia, next to Benicalap neigh-borhood, between two historic axes are the way of Moncada and Burjassot. The surface

    of the development is close to a preferential use 200.000m2 residential flats. The distribu-

    tion of surfaces is as follows: Plots for residential use: 55.342m2; plots of commercial use:

    5.472m2; Plots for school use: 21.987m

    2; Green Zone: 25.549m

    2; other facilities:

    23.100m2; road surface: 64.139m

    2. 

    Projects: Public Work. Urbanization

  • 8/19/2019 Presentacion Ingecons Libya - Red

    29/126

     

    29 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    30/126

     

    30 

    Structural rehabilitation of firm Highway A-3 (Valencia) 

    Budget: 7.045.926 € - UTE Becsa y Rafael Morales 

    Termination: 2008 

    Description: The work consists of rehabilitation of the pavement over a length of 21km,including the completion of a groove and the replacement of the current layer of tread isworn to correct structural deficiencies in the firm and the surface deformations with anaverage depth of 6 cm and a hot asphalt mix type S-20. Finally we proceeded to extendan M-10 type mixed across the width of the roadway and its shoulders and wearing

    course, 3 cm thick. 

    Reinforcement of road surface of the road N-340 (Tarragona) 

    Budget: 5.390.739 € 

    Termination: 2008 

    Description: The milling was conducted at a depth of 12cm thick medium and replace-

    ment with the application of an asphalt mix type s-20 with conventional bitumen 40/50.The most degraded areas were milling is 30cm thick and the replacement was made witha special asphalt mix called high modulus (Mam) to have a dynamic modulus greaterthan 10,000 km and thus be able to withstand much more burden than a bituminous mix-ture conventional. 

    Variant of the road CV-128 in Catí (Castellón) 

    Budget: 2.500.000 € 

    Termination: 2008 

    Description: It has built a new track variant for the southern part of the population,3.017m in length, connecting with the existing road illuminated by two roundabouts and

    building radio 17m eight works of art, made of concrete frames to save roads and ravines

    that cross the new layout. They have enabled two new accesses to the population since

    the variant through an underpass and roundabout game. The new road has a width of

    9m. 

    Projects: Public Work. Highway

  • 8/19/2019 Presentacion Ingecons Libya - Red

    31/126

     

    31 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    32/126

     

    32 

    New fishing industrial zone Vinaroz Port (Castellón) 

    Budget: 10.974.648 € - UTE Becsa, Joca Ingeniería y Construcciones y Sixconstructor  

    Termination: In execution 

    Description: Construction of different areas for the location of facilities such as the newauction, mooring docks, and roads of interior spaces for sports and industrial activities.Implementation of the dyke of the future industrial zone and the new sports area andgeneral construction services to provide new facilities for urban services necessary fortheir operation, according to the provisions of the Plan of Use of Space Port”. 

    Extension Castellón's Port (Castellón) 

    Budget: 51.050.459 € - UTE Becsa y Fcc 

    Termination: 2004 

    Description: Making a yard on Hill of 320.000m2 +1.5 delimited by a vertical breakwaterby floating caissons 33.75 m in length and 19.6 m wide. Also dredging was conducted

    with a 3.115 million m3 entry. 

    Platform for containers in the Port (Castellón) 

    Budget: 29.357.982 € - UTE Becsa y Fcc 

    Termination: 2005 

    Description: Construction of a quay length of 410mm and 14 drafts, and a Ro-Ro berth.

    Esplanade for collection of containers and general merchandise of 120,000 m2, based ona dredge and fill of 1,300,000 m3 of concrete and asphalt pavements, offices, workshop

    and warehouse. Foundations and ways Portainé Panamax cranes, with the entire neces-

    sary infrastructure. 

    Projects: Public Work. Maritimes

  • 8/19/2019 Presentacion Ingecons Libya - Red

    33/126

     

    33 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    34/126

     

    34 

    Aircraft parking platform  Base Aérea de los Llanos (Albacete) 

    Budget: 1.357.996 € - UTE Becsa y Rafael Morales 

    Termination: 2004 

    Description: Execution of the construction of two concrete platforms 180x100m HP-45for aircraft parking. This work was included in the reforms being made in Los Llanos AirBase motivated by the same choice as the venue for special training for NATO pilots(Tactical Leadership Program, TLP). The work consisted of leveling the cash fund, graded aggregates and a concrete slab 30

    cm. thick. In addition, drainage of the platform with two troughs of 200m in length and50cm wide. 

    New Airport “ AZAHAR “ Coast (Castellón) 

    Budget: 109.239.692 € - UTE Besca y Fcc 

    Termination: 2009 

    Description:  Airport facilities consisting of a runway of 2.700 m in length, category I, 4Dkey (B-757 aircraft), upgradeable to 4.000 m, aircraft parking platform for 55.000 m

    2 pas-

    senger terminal, control tower, building for Fire Fighting Service with all necessary facili-ties for fire, power plant, cargo terminal, airfield, handling, wastewater treatment plant.,emitting center, parking, both for private cars to taxis and buses. 

    Passengers' terminus of the new airport “ AZAHAR “ Coast (Castellón) 

    Budget: 12.000.000 € - UTE Becsa y Fcc 

    Termination: 2009 

    Projects: Public Work. Airports

  • 8/19/2019 Presentacion Ingecons Libya - Red

    35/126

     

    35 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    36/126

     

    36 

    Waste water station, “Font de la Pedra” (Alicante) 

    Budget: 13.666.468 € 

    Termination: 2004 

    Description: This facility has a maximum treatment capacity of 20.000 m3/day and co-vers an area of 27.775 m

    2. 

    EDAR de Vinaroz (Castellón) 

    Budget: 10.858.568 € 

    Termination: 2007 

    Description: Sewage station, the main sewage pumping and interconnection betweenthe outfall and Vinaroz EDAR. The works consisted in the construction of a pumping sta-tion of dirty water, mains sewage discharge from the intermediate pump station, maindrive to the EDAR, wastewater treatment plant and collector, by gravity, until the connec-tion with the outfall. Use of curtain wall and cladding facade. Finish line with the corporate

    image of the brand. 

    Arrangement of the Coastal Front “L’Arbre del Gos” Pinedo (Valencia) 

    Budget: 9.642.476 € - UTE Becsa y Mediterráneo Servicios Marinos 

    Termination: 2007 

    Description: The process provided for beach reclamation consists of healthy, regulariza-tion of the beach, lifting the front elevation and removal of current expense to allow dry

    beach a distance of about 65m from the present coastline. Regeneration of the dunes

    has been designed by a string of transverse dunes, artificial. The core of dunes formed

    and shaped through the transfer of dredged sand, and dune fixation is performed by a

    network of "bardissas" consisting of kneeling dry reed (Arundo Dórax) thread link be-

    tween rods on which floor. 

    Projects: Public Work. Environment

  • 8/19/2019 Presentacion Ingecons Libya - Red

    37/126

     

    37 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    38/126

     

    38 

    Parking Regional Hospital II (Castellón) 

    Budget: 10.800.000 € 

    Termination: 2010 

    Description: Gran Vía underground parking and ground Tárrega Monteblanco ProvincialHospital. It covers a small area of outdoor parking, main entrance, emergency en-trance ... Capacity 909 seats in three basements. It has two ramps and two exit ramps. The sur-face area is 7.601m

    2. Its shape in plan is an irregular polygon of 57ml 126ml long and

    wide, and an external ramp 29'7ml x 6ml wide. Within the work performed included thedevelopment of both the garden surface inside the Provincial Hospital and the Gran VíaTárrega and Dr. Clara. 

    Parking of the Trade fair (Albacete) 

    Budget: 6.296.490 € 

    Termination: 2009 

    Description: This car park will have a total surface 22892.58 m

    2, and have a capacity of 422 cars to be parked on two floors. As has become

    customary at present the parking will be mixed system, as available in the systemsquares and plazas hourly rate for residents of the area. It will also have large squareswhose minimum size will be 240cm x 475cm, complemented by innovative facilities andhave four pedestrian accesses and two elevators suitable access. 

    Parking Chile Aragón (Valencia) 

    Budget: 12.000.000 € 

    Termination: 2009 

    Description: The new street parking Chile is located 300 meters from the Mestalla foot-ball field. Parking is mixed for both the rotation and to use by residents, and has a capac-

    ity of 531 beds in two floors and a total area 14 500 m2. 

    Projects: Public Work. Parkings

  • 8/19/2019 Presentacion Ingecons Libya - Red

    39/126

     

    39 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    40/126

     

    40 

    Residential buildings “Benicalap Norte” (Valencia) 

    Budget: 16.340.550 € 

    Termination: 2009 

    Description: The work consists of 157 houses, plant offices, shops and a basement in aconstruction area of 19.318,85 m

    2. 

    This is in a basement for parking spaces consisting of 194 parking spaces and 143 stor-age rooms, two apartment buildings (one with three doorways comprising ground floor

    plus four heights and another with five doorways floor consists of more eight heights, inwhich the first floor is for offices) and plants available for commercial premises. 

    Residential buildings “Mariposa” Warsaw (Poland) 

    Termination: In execution 

    Description: Building with 105 apartments with surfaces varied from 26 to 103 m2. Polish

     Architects architectural renown ARE, directed by Jakub Waclawek have designed thismodern building, distinguished by their pure forms and simple facades. The cozy space will stand out for their perfect finish for all common elements. On theground floor premises will be built and commercial services. 

    Residential buildings “Ciudad Norte” Campanar (Valencia) 

    Budget: 37.134.841 € 

    Termination: 2007 

    Description: Five blocks of 15 floors, designed to ensure a wide variety of types and thebest views and guidelines of the houses, to maximize natural light. It consists of a land-

    scaped area that integrates the common recreation areas. Homes 2-4 bedrooms. 

    Projects: Private Work: Residential

  • 8/19/2019 Presentacion Ingecons Libya - Red

    41/126

     

    41 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    42/126

     

    42 

    Comercial mall “El Corte Inglés” (Castellón) 

    Budget: 12.354.476 € - UTE Lubasa y Fcc 

    Termination: 2006 

    Description: Construction of the lands formerly occupied by the tracks and train station.Construction of a boulevard of 3.080 m long and 30 m wide, resolving intersections withthe perpendicular streets through 7 roundabouts and squares. Extension of Paseo Ribal-ta, rebuilding and restoring the old fencing on the station. Construction of 8.000 m

    2  of

    places in the environment of the new shopping center El Corte Inglés.  

    Comercial mall “Puerto Azahar” (Castellón) 

    Budget: 13.943.481 € 

    Termination: 2003 

    Description: Construction of a leisure center in port land which, being adjacent to the ur-

    ban area, the Port Authority has changed its use to integrate them into the city. It has aconstructed area of 7.300m

    2  in two unique buildings, glass curtain wall finishes and

    porcelain tile ventilated facade. Movie house ten rooms, rooms for commercial uses, bars,restaurants, pubs, playgrounds, etc. In the underground and below sea level in an area of13.500 m

    2, has built 525 parking spaces. 

    Hotel NH Puerto Sagunto (Valencia) 

    Budget: 4.299.402 € 

    Termination: 2007 

    Description: Building of 100 rooms hotel, sponsored by the Investment Property Con-crete, and exploitation of the property leased to the chain NH Hoteles. Initially the project had a 3-star hotel and finally, thanks to improvements and modifica-

    tions made during execution has been granted the rating of 4 stars. The building compris-

    es a basement, ground floor, four floors of hotel and housing. 

    Projects: Leisure and trade

  • 8/19/2019 Presentacion Ingecons Libya - Red

    43/126

     

    43 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    44/126

     

    44 

    Multimark automotion building (Castellón) 

    Budget: 13.056.000 € 

    Termination: 2006 

    Description: Building for industrial use for car dealers, workshops and garage. It is builton a plot of 9.500m

    2, consists of two basements, ground floor and two floors. The total

    constructed area of 27.000m2. The building is constructed using precast concrete struc-

    ture. The facades are made with ventilated curtain wall and facade panels and aluminiumcomposite. The cover serves as a parking lot, so it serves as the waterproofing layer

    made for vehicles rolling. 

    Office building “Intercoop” Almazora (Castellón) 

    Budget: 1.565.528 € 

    Termination: 2008 

    Description: The works consisted of conducting a headquarters. 

    Intercoop group offices with 990 m2

     of floor space in a plant, which has a working area of400m

    2, offices, meeting rooms, a classroom, conference room, the Regents, a vending

    area and two patios interiors. The structure is being mixed metal pillars and concrete one-way slab with beams hung upside down, the roof is flat, and the facade combines a fullyglazed facade with a thermo cladding, coated with monolayer. Outside you will find theparking and gardens. 

    Office building “LUBASA” (Castellón) 

    Budget: 26.000.000 € 

    Termination: 2006 

    Description: It has a constructed area of 26.940 m2, distributed over 14.680 m2 for offic-es in basement and three floors, and 12.260 m

    2 in a basement with 450 parking spaces.

    The facade consists of a combination of self-supporting glass curtain wall and facade

    ventilated Saloni porcelain. In the office area 9.000 m2 have been installed under the

    technical pavement which runs the electrical, voice and data. The interior lighting is auto-

    matically adjusted each time according to natural light.  

    Projects: Private Work: Industrial Building

  • 8/19/2019 Presentacion Ingecons Libya - Red

    45/126

     

    45 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    46/126

     

    46 

    ORIGIN is the common name for the different areas of business which operate Area Con-struction Materials INGECONS & URBASERVICIOS, S.A.. Our company manages theproduction of major raw materials applicable to their entire construction and managementof construction waste and demolition. 

    Origin, with over 30 years’ experience, began his career in the mining sector, particu-larly in the mining and processing of aggregate in the town of Castellon, then expand anddiversify production to other facilities and other activities, creating: 

    ORIGIN AGGREGATES consists of various companies engaged in the manufactureand marketing of aggregates. It currently has six farms, among themselves and partici-

    pated in the provinces of Castellón, Valencia, Alicante and Teruel. The total productionamounts to 4.5000.000 ORIGIN AGGREGATES T / year.  

    The first operation that was created is that of Castellón (the Turret Quarry, SAU). It cur-rently has a workforce of about 40 professionals and a production of 2 MM Tons / year. In1991 began the great expansion of facilities ORIGIN AGGREGATES with two new pro-duction facilities, the Turret Quarry in Santa Magdalena de Pulpis (Castellón) and Aggre-gates “Ibañez Andreu” in Alcañiz (Teruel). 

    From 2002, ORIGIN  participates Aggregates “Monte Conto” in Pinoso (Alicante). In2003, Aggregates “Sierra Gorda” is acquired in Xativa (Valencia) and finally in 2005,

    “Gravas y Derivados de Castilla La Mancha” (Albacete). 

    ORIGIN CONCRETE is dedicated to the manufacture of concrete, with six plants in theprovinces of Castellón and Teruel, with a total production of 490.000 m

    3/year and about

    50 employees in total. The oldest plant is Castellón, created in the 70s, from which timehas been responsible for supplying the province of this material without interruption. Be-hind her, other plants were established as the Grau de Castelló (in the Year 2004) or theadjoining population Almazora. Since 2006, ORIGIN CONCRETE began to exploit Alco-cebre plants, Benicarlo and Alcañiz, which had previously been involved. 

    Currently plants Castellón, Castellón Grao, Alcocebre, Benicarlo and Alcaniz, workingunder the brand name and plant Hormasa Almazora as a Concrete Mijares (successor ofConcretes Mijares was bought by ORIGIN CONCRETE in 2006). 

    Our concrete companies known for their expertise, preparation, professionalism and

    experience, possessing Quality Certificates "CV-N BRAND CONCRETE" to prove it. 

    Exploitation and Installations

  • 8/19/2019 Presentacion Ingecons Libya - Red

    47/126

     

    47 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    48/126

     

    48 

    ORIGIN MORTAR is dedicated to the manufacture of dry mortar, reaching an annual pro-duction of 220,000 tons. 

    The supply of the mortar is made by tanker trucks which transported separately rawmaterials that make up the mortar. When it comes to work, the materials are dischargedinto a silo, owned by FROM MORTARS, keeping the materials separate and at the stageof transport. The silo is equipped with a discharge system that performs raw material dos-ing and mixing of materials and water, in quantity, to make the mortar used in the works.This system is known commercially as TECMIX and was developed by ORIGIN in theearly 90s. The burden of raw materials in the tanks is done in modern facilities with im-portant environmental protection measures. 

    CEMENT ORIGIN is dedicated to the manufacture of cement in its different phases. 

     At the beginning of year 2009, was launched a clinker grinding plant and cement manu-facturing in the Grau de Castellón. 

    The ground clinker grinding and cement manufacturing is located on an area of 30,000m2 and located only 300m from the pier bulk of the South Basin of the Port of Castellón.This is a modern, completely organic and in compliance with all legal requirements, as-sisted by a laboratory quality own self. 

    Investing in it is 40 million and consists of a team of 44 people. 

    The INGECONS & URBASERVICIOS, S.A. asphalts business has five manufacturingplants spread asphalt agglomerate along the Mediterranean coast. In particular we havetwo plants in the province of Castellón, one in the province of Tarragona, a province ofValencia and one in Albacete province, with an average production capacity of 220 tons /hour each. 

    The manufacture of asphalt agglomerate is one of the more established businesses toINGECONS & URBASERVICIOS, S.A. with an experience of over 35 years and has sincebeen one of the leading companies in manufacturing, research and development of new

    asphalt. 

    In the Year 2008 with the entry into force of the CE of asphalt mixtures, INGECONS &

    URBASERVICIOS, S.A. was the company most mixtures included in the initial certifica-

    tion of the marking in the entire national territory, which shows the constant concern of our

    company by improving continuing in our processes. 

    Exploitation and Installations

  • 8/19/2019 Presentacion Ingecons Libya - Red

    49/126

     

    49 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    50/126

     

    50 

    Laboratories 

    INGECONS & URBASERVICIOS, S.A. currently has three laboratories dedicated toself through the finished product analytical and technical assistance work for remedieswork and research and development of new products or alternative solutions to existingones. These laboratories are: 

    • Lab 1. Concrete, mortar and aggregates • Lab 2. Agglomerate and asphalt • Lab 3. Cement 

    INGECONS & URBASERVICIOS, S.A. laboratories have been recognized for its quali-ty and actively participation in the System of Innovation Management to get together withother departments of the certificate UNE 166.002. 

    The laboratory service is basically: 

    • Self-production  of building materials through the analysis of final and intermediateproducts of the process, according to the particular needs of each production center. • Self-Monitoring of the final products, in accordance with the requirements of existinglegislation and regulations required its own distinctive quality of volunteers. Management

    and documentation of such monitoring organizations reported (CE) and certification(other products). • Technical assistance in terms of formulation for the manufacture of products, togetherwith production centers responsible for their own research studies and even in collabora-tion with clients. 

    • Participation in committees as certification authorities. 

    Laboratories

  • 8/19/2019 Presentacion Ingecons Libya - Red

    51/126

     

    51 

    Laboratories

  • 8/19/2019 Presentacion Ingecons Libya - Red

    52/126

     

    52 

    Management System I+D+I 

    Today innovation is not limited only to the development and implementation of newtechnologies. It is a comprehensive strategy that can be included in all key organizationalprocesses: in the company's relationship with the market, customer management / distri-bution channels, management of resources, etc.  

    For a company to be considered innovative must have a strategy oriented to innova-tion, able to create value by providing new ideas to market and have an internal organiza-tion to the innovation process to manage the knowledge and skills of employees and en-courage their creativity. 

    The requirement of new buildings and infrastructure, evolving and high technologycomponent, as well as compete in the bidding for works of nationally and internationally inthe best conditions, the company have been put in place a system Management R & D &I Construction Area based on the standard UNE 166.002. 

    On an annual basis, INGECONS & URBASERVICIOS, S.A. held at its facilities in Cas-tellón the Annual Professional Conference I+D+I, which is evident from this company’scommitment to innovation. 

    During the same, the company will direct customers showing their ability to provide in-

    novative solutions to each of the technical problems that appear in projects and worksthis day has become a professional forum in which to exchange ideas, knowledge andexperiences, between government agencies and companies in the construction sector. 

    This is where specialists presented INGECONS & URBASERVICIOS, S.A. projectsimplemented during the previous year, which have been certified by his brilliant qualityand innovation. 

    Management System I+D+I

  • 8/19/2019 Presentacion Ingecons Libya - Red

    53/126

     

    53 

    We introduce several important projects executed with some of our partners. They usu-ally work with us, contributing with technology and know-how by creating a synergy thatallows us to face great challenges. 

    Some typologies of these projects range: 

    Most of them require large technological and human resources. 

      private edification buildings

      Urban planning

     

     Administrative buildings

      Hotels

      Purchase center

       Airports

      Hospitals

      Exhibition centers

      Car parks

      Roadways / Highways

      Tunnels

      Bridges

      Dams and hydropower stations

      Harbor

      High speed railway 

      Coastal works 

    Partnership Projects

  • 8/19/2019 Presentacion Ingecons Libya - Red

    54/126

     

    54 

    Hospital La Fe - Valencia 

    Hospital

  • 8/19/2019 Presentacion Ingecons Libya - Red

    55/126

     

    55 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    56/126

     

    56 

    Comercial Hall

  • 8/19/2019 Presentacion Ingecons Libya - Red

    57/126

     

    57 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    58/126

     

    58 

    Shoreline Pinedo - Saler  

    Coast Works

  • 8/19/2019 Presentacion Ingecons Libya - Red

    59/126

     

    59 

    Littoral regeneration in T.M. Marzarón Island - Murcia 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    60/126

     

    60 

    Works in Valencia’s dock – 32nd American’s Cup 

    Harbor Works

  • 8/19/2019 Presentacion Ingecons Libya - Red

    61/126

     

    61 

    Works in Valencia’s dock – 32nd American’s Cup 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    62/126

     

    62 

    Benicarlo’s harbor extension 

    Harbor Works

  • 8/19/2019 Presentacion Ingecons Libya - Red

    63/126

     

    63 

    Purification works in Canet de Berenguer and L’Almarda - Valencia 

    Sanitation and Purification

  • 8/19/2019 Presentacion Ingecons Libya - Red

    64/126

     

    64 

    Works in the general pluvial drainpipes in Almazora - Castellón 

    Draining Works

  • 8/19/2019 Presentacion Ingecons Libya - Red

    65/126

     

    65 

    Complementary Works 

    Works in the general pluvial drainpipes in Almazora - Castellón 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    66/126

     

    66 

    Dams and swamp works

  • 8/19/2019 Presentacion Ingecons Libya - Red

    67/126

     

    67 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    68/126

     

    68 

    Integration line 1 Valencia underground 

    Railway

  • 8/19/2019 Presentacion Ingecons Libya - Red

    69/126

     

    69 

    Kayseri northern railway construction works 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    70/126

     

    70 

    Coordination and construction of high speed railway contracts 

    Railway

  • 8/19/2019 Presentacion Ingecons Libya - Red

    71/126

     

    71 

    High speed line Madrid – Galicia – Section Zamora 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    72/126

     

    72 

    North – northwest high speed corridor section Madrid – Segovia 

    Railway Tunnel

  • 8/19/2019 Presentacion Ingecons Libya - Red

    73/126

     

    73 

    When a pipeline is built, the construction project not only covers the civil work tolay the pipeline and build the pump/compressor stations, it also has to cover all thework related to the installation of the field devices that will support remote operation. 

    The pipeline is routed along what is known as a 'right of way'. Pipelines are gener-ally built using the following stages: 

    We have worked in the construction on the spanish pipeline system. In some ofmost relevant stations in Spain are the following: 

      Route (right of way) Selection

      Surveying the route 

      Clearing the route 

      Trenching - Main Route and Crossings (roads, rail, other pipes, etc.) 

      Installing the pipe 

      Installing valves, intersections, etc. 

      Covering the pipe and trench 

      Tenerife

      Cartagena 

      Castellon 

      Puertollano 

       A Coruña 

       Algeciras 

      Tarragona 

    Refinery Pipeline Works

  • 8/19/2019 Presentacion Ingecons Libya - Red

    74/126

     

    74 

    Refinery Pipeline Works

  • 8/19/2019 Presentacion Ingecons Libya - Red

    75/126

     

    75 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    76/126

     

    76 

    Refinery Pipeline Works

  • 8/19/2019 Presentacion Ingecons Libya - Red

    77/126

     

    77 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    78/126

     

    78 

    Refinery Pipeline Works

  • 8/19/2019 Presentacion Ingecons Libya - Red

    79/126

     

    79 

    Civil Work Construction

  • 8/19/2019 Presentacion Ingecons Libya - Red

    80/126

     

    80 

    Civil Work Construction

  • 8/19/2019 Presentacion Ingecons Libya - Red

    81/126

     

    81 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    82/126

     

    82 

    A28 motorway - Portugal 

    Civil Work Construction

  • 8/19/2019 Presentacion Ingecons Libya - Red

    83/126

     

    83 

    A28 motorway - Portugal 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    84/126

     

    84 

    Mudejar highway A23 motorway - Aragon 

    Civil Work Construction

  • 8/19/2019 Presentacion Ingecons Libya - Red

    85/126

     

    85 

    Cartagena - Vera motorway - Murcia 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    86/126

     

    86 

    Cartagena - Vera motorway - Murcia 

    Civil Work Construction

  • 8/19/2019 Presentacion Ingecons Libya - Red

    87/126

     

    87 

    A3 Madrid – Valencia highway 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    88/126

     

    88 

    Vitoria – Eibar motorway 

    Civil Work Construction

  • 8/19/2019 Presentacion Ingecons Libya - Red

    89/126

     

    89 

    A3 Madrid – Valencia highway 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    90/126

     

    90 

    Hospital 12 October - Madrid 

    Cars Parks

  • 8/19/2019 Presentacion Ingecons Libya - Red

    91/126

     

    91 

    Hospital 12 October - Madrid 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    92/126

     

    92 

    La Palma airport – Canary Islands 

    Cars Parks

  • 8/19/2019 Presentacion Ingecons Libya - Red

    93/126

     

    93 

    La Palma airport – Canary Islands 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    94/126

     

    94 

    Asturias airport 

    Airports

  • 8/19/2019 Presentacion Ingecons Libya - Red

    95/126

     

    95 

    Asturias airport 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    96/126

     

    96 

    La Palma airport – Canary Island 

    Airports

  • 8/19/2019 Presentacion Ingecons Libya - Red

    97/126

     

    97 

    La Palma airport – Canary Island 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    98/126

     

    98 

    Barcelona airport 

    Airports

  • 8/19/2019 Presentacion Ingecons Libya - Red

    99/126

     

    99 

    Barcelona airport 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    100/126

     

    100 

    Castellon airport 

    Airports

  • 8/19/2019 Presentacion Ingecons Libya - Red

    101/126

     

    101 

    Castellon airport 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    102/126

     

    102 

    Castellon airport 

    Airports

  • 8/19/2019 Presentacion Ingecons Libya - Red

    103/126

     

    103 

    Castellon airport 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    104/126

     

    104 

    Castellon airport 

    Airports

  • 8/19/2019 Presentacion Ingecons Libya - Red

    105/126

     

    105 

    Castellon airport 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    106/126

     

    106 

    SCIENCE AND ARTS CITY - VALENCIA 

    Site: 

     Architect:

    Year: 

    http://g.co/maps/2rtcn 

    Santiago Calatrava 

    1997 

    Exhibition Centers

    http://g.co/maps/2rtcnhttp://g.co/maps/2rtcnhttp://g.co/maps/2rtcn

  • 8/19/2019 Presentacion Ingecons Libya - Red

    107/126

     

    107 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    108/126

     

    108 

    PABELLON DE ARAGÓN – EXPO 2008 - ZARAGOZA 

    Exhibition Centers

  • 8/19/2019 Presentacion Ingecons Libya - Red

    109/126

     

    109 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    110/126

     

    110 

    BOXES FORMULA 1TM - VALENCIA 

    Site: 

     Architect: Year: 

    http://g.co/maps/g6xj3 

    Hermann Tilke 2008 

    Sport Centers

  • 8/19/2019 Presentacion Ingecons Libya - Red

    111/126

     

    111 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    112/126

     

    112 

    Technical Sport Center - Villarreal 

    Sport Centers

  • 8/19/2019 Presentacion Ingecons Libya - Red

    113/126

     

    113 

    Technical Sport Center - Villarreal 

    Sport Centers

  • 8/19/2019 Presentacion Ingecons Libya - Red

    114/126

     

    114 

    MADRID SPORTS CENTER 

    Sport Centers

  • 8/19/2019 Presentacion Ingecons Libya - Red

    115/126

     

    115 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    116/126

     

    116 

    JOSE ZORRILLA STADIUM - VALLADOLID 

    Sport Centers

  • 8/19/2019 Presentacion Ingecons Libya - Red

    117/126

     

    117 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    118/126

     

    118 

    UNIVERSITY OF TELECOMUNICATIONS, UPV - VALENCIA 

    Site: 

     Architect: 

    Year: 

    http://g.co/maps/mf5zr  

    Vicente Corell, Joaquín Monfort y José Vicente Palacios 

    2009 

    Cultural Centers

    http://g.co/maps/mf5zrhttp://g.co/maps/mf5zrhttp://g.co/maps/mf5zr

  • 8/19/2019 Presentacion Ingecons Libya - Red

    119/126

     

    119 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    120/126

     

    120 

    TERRA MITICA, BENIDORM - ALICANTE 

    Site: 

     Architect: 

    Year  

    http://g.co/maps/guumy 

    GLOBAL ESTUDIOS 

    2004 

    Theme Parks

    http://g.co/maps/guumyhttp://g.co/maps/guumyhttp://g.co/maps/guumy

  • 8/19/2019 Presentacion Ingecons Libya - Red

    121/126

     

    121 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    122/126

     

    122 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    123/126

     

    123 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    124/126

     

    124 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    125/126

     

    125 

  • 8/19/2019 Presentacion Ingecons Libya - Red

    126/126