HOJA DE METRADOS PROYECTO: DEPARTAMENTO DE 5 PISOS HOJA : ESTRUCTURAS PROPIETARIO : - DEPARTAMENTO : JUNIN PROVINCIA : - DISTRITO : HUANCAYO LUGAR : - HECHO POR : [email protected] REVISADO : - FECHA : ABRIL 2015 ITEM DENOMINACION UNIDAD VECES LARGO ANCHO 01.00 ESTRUCTURAS 01.01.00 OBRAS PRELIMINARES 01.01.01 TRAZO, NIVELES Y REPLANTEO m2 1.00 Area = 113.50 01.01.02 LIMPIEZA DEL TERRENO MANUAL m2 1.00 Area = 113.50 01.02.00 MOVIMIENTO DE TIERRAS 01.02.01 EXCAVACION DE ZANJA MANUAL m3 Z-1,2,4,6,7 6.00 2.00 1.80 Z-3 1.00 1.88 1.80 Z-5 1.00 1.90 1.80 CIMIENTOS A-A 1.00 7.72 0.60 B-B 1.00 5.75 0.50 C-C 1.00 7.76 0.60 1-1 1.00 2.70 0.60 2-2 1.00 6.22 0.50 3-3 1.00 6.00 0.60 CISTERNA 1.00 Area = 3.80 01.02.02 NIVELACION INTERIOR APISONADO MANUAL m2 Z-1,2,4,6,7 6.00 2.00 1.80 Z-3 1.00 1.88 1.80 Z-5 1.00 1.90 1.80 CIMIENTOS A-A 1.00 7.72 0.60 B-B 1.00 5.75 0.50 C-C 1.00 7.76 0.60 1-1 1.00 2.70 0.60 2-2 1.00 6.22 0.50 3-3 1.00 6.00 0.60 CISTERNA 1.00 Area = 3.80 01.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 1.30 81.86

Upload: arzieljeiemeitch

Post on 21-Dec-2015

216 views

Category:

Documents


0 download

DESCRIPTION

Para iniciar con Algun Metrado Modelo

TRANSCRIPT

Page 1: Modelo de Metrados

HOJA DE METRADOS

PROYECTO: DEPARTAMENTO DE 5 PISOS

HOJA : ESTRUCTURAS PROPIETARIO : -

DEPARTAMENTO : JUNIN PROVINCIA : -

DISTRITO : HUANCAYO LUGAR : -

HECHO POR : [email protected] REVISADO : -

FECHA : ABRIL 2015

ITEM DENOMINACION UNIDAD VECES LARGO ANCHO ALTO PARCIAL

01.00 ESTRUCTURAS

01.01.00 OBRAS PRELIMINARES

01.01.01 TRAZO, NIVELES Y REPLANTEO m2

1.00 Area = 113.50 113.50

01.01.02 LIMPIEZA DEL TERRENO MANUAL m2

1.00 Area = 113.50 113.50

01.02.00 MOVIMIENTO DE TIERRAS

01.02.01 EXCAVACION DE ZANJA MANUAL m3

Z-1,2,4,6,7 6.00 2.00 1.80 2.10 45.36

Z-3 1.00 1.88 1.80 2.10 7.11

Z-5 1.00 1.90 1.80 2.10 7.18

CIMIENTOS

A-A 1.00 7.72 0.60 0.50 2.32

B-B 1.00 5.75 0.50 0.50 1.44

C-C 1.00 7.76 0.60 0.50 2.33

1-1 1.00 2.70 0.60 0.50 0.81

2-2 1.00 6.22 0.50 0.50 1.55

3-3 1.00 6.00 0.60 0.50 1.80

CISTERNA 1.00 Area = 3.80 3.15 11.97

01.02.02 NIVELACION INTERIOR APISONADO MANUAL m2

Z-1,2,4,6,7 6.00 2.00 1.80 21.60

Z-3 1.00 1.88 1.80 3.38

Z-5 1.00 1.90 1.80 3.42

CIMIENTOS

A-A 1.00 7.72 0.60 4.63

B-B 1.00 5.75 0.50 2.88

C-C 1.00 7.76 0.60 4.66

1-1 1.00 2.70 0.60 1.62

2-2 1.00 6.22 0.50 3.11

3-3 1.00 6.00 0.60 3.60

CISTERNA 1.00 Area = 3.80 3.15 11.97

01.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3

1.30 81.86 106.42

Page 2: Modelo de Metrados

01.02.00 OBRAS DE CONCRETO SIMPLE

01.02.01 SOLADO EN ZAPATAS E=4" m2

Z-1,2,4,6,7 6.00 2.00 1.80 21.60

Z-3 1.00 1.88 1.80 3.38

Z-5 1.00 1.90 1.80 3.42

CISTERNA 1.00 Area = 3.80 3.80

01.02.02 CONCRETO CICLOPEO 1:10 CON 30% PG m3

A-A 1.00 7.72 0.35 0.50 1.35

B-B 1.00 5.75 0.25 0.50 0.72

C-C 1.00 7.76 0.35 0.50 1.36

1-1 1.00 2.70 0.35 0.50 0.47

2-2 1.00 6.22 0.25 0.50 0.78

3-3 1.00 6.00 0.35 0.50 1.05

01.02.03 ENCOFRADO Y DESENCOFRADO EN CIMIENTOS m2

A-A 2.00 7.72 0.50 7.72

B-B 2.00 5.75 0.50 5.75

C-C 2.00 7.76 0.50 7.76

1-1 2.00 2.70 0.50 2.70

2-2 2.00 6.22 0.50 6.22

3-3 2.00 6.00 0.50 6.00

01.02.05 CONCRETO EN FALSO PISO 1:8 E=4" m2

SOTANO 1.00 Area = 102.94 102.94

01.03.00 OBRAS DE CONCRETO ARMADO

01.03.01 CONCRETO PARA ZAPATAS F'C=175 KG/CM2 m3

Z-1,2,4,6,7 6.00 2.00 1.80 1.50 32.40

Z-3 1.00 1.88 1.80 1.50 5.08

Z-5 1.00 1.90 1.80 1.50 5.13

01.03.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN ZAPATAS kg

Z-1,2,4,6,7 72.00 1.90 Peso = 0.99 135.43

78.00 1.70 Peso = 0.99 131.27

Z-3 12.00 1.78 Peso = 0.99 21.15

13.00 1.70 Peso = 0.99 21.88

Z-5 12.00 1.80 Peso = 0.99 21.38

13.00 1.70 Peso = 0.99 21.88

01.03.03 CONCRETO PARA COLUMNAS F'C=210 KG/CM2 m3

C-1 2.00 0.60 0.25 15.45 4.64

C-2 3.00 0.60 0.25 15.45 6.95

C-3 1.00 0.60 0.25 15.45 2.32

C-4 1.00 0.59 0.25 15.45 2.28

C-5 1.00 0.59 0.25 15.45 2.26

01.03.04 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2

C-1 2.00 1.70 15.45 52.53

C-2 3.00 1.70 15.45 78.80

C-3 1.00 1.70 15.45 26.27

Page 3: Modelo de Metrados

C-4 1.00 1.68 15.45 25.96

C-5 1.00 1.67 15.45 25.80

01.03.05 ACERO F'Y=4200 KG/CM2 GRADO 60 EN COLUMNAS kg

C-1 16.00 16.81 Peso = 1.55 416.89

4.00 16.81 Peso = 0.99 66.57

C-2 24.00 16.81 Peso = 1.55 625.33

6.00 16.81 Peso = 0.99 99.85

C-3 8.00 16.81 Peso = 1.55 208.44

C-4 8.00 16.81 Peso = 1.55 208.44

2.00 16.81 Peso = 0.99 33.28

C-5 8.00 16.81 Peso = 1.55 208.44

2.00 16.81 Peso = 0.99 33.28

ESTRIBOS

C-1 230.00 1.50 Peso = 0.56 193.20

C-2 345.00 1.50 Peso = 0.56 289.80

C-3 115.00 1.50 Peso = 0.56 96.60

C-4 115.00 1.48 Peso = 0.56 95.31

C-5 115.00 1.47 Peso = 0.56 94.67

Page 4: Modelo de Metrados

HOJA DE METRADOS

TOTAL

113.50

113.50

81.86

60.87

106.42

Page 5: Modelo de Metrados

32.20

5.73

36.15

102.94

42.61

352.99

18.44

209.35

Page 6: Modelo de Metrados

2,670.12