met for 01(i-iii) colpa

234
HOJA DE METRADO ACERO PROYECTO : 1/4" 3/8" OBRA : OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 1/2" 5/8" FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 1" ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N° DESCRIPCION MEDIDAS SUB TOTAL UND LARGO ANCHO ALTO DE LONG. AREA VOL. KG. VECES 01.01.00 OBRAS PROVISIONALES Y OBRAS PRELIMINARES 01.01.01 OBRAS PROVISIONALES 01.01.01.01 CONSTRUCCION DE ALMACEN, OFICINAS Y GUA M2 Alamacen 10.00 4.00 1.00 40.00 Oficinas 4.00 4.00 2.00 32.00 Guardiania 3.00 3.00 1.00 9.00 01.01.01.02 CARTEL DE OBRA CON PLANCHA METALICA Y UND 1.00 01.01.01.03 PLACA RECORDATORIA ACRILICA 0.55X0.45 UND 1.00 01.01.02 OBRAS PRELIMINARES 01.01.02.01 LIMPIEZA Y DEFORESTACION Ha Todo el terreno 1.00 0.60 01.01.02.02 CORTE EN MATERIAL SUELTO M3 1.00 01.01.02.03 CONFORMACION DE TERRAPLENES M3 1.00 01.01.02.04 TRAZO Y REPLANTEO PRELIMINAR M2 90.00 80.00 1.00 7,200.00 01.01.02.05 ELIMINACION DE MATERIAL A BOTADERO M3 1.00 1.20 01.01.02.06 TRANSPORTE DEMATERIALES A OBRA Kg 1.00 ### 01.01.03 CONTROL DE CALIDAD DE OBRA 01.01.03.01 DISEÑO DE MEZCLA UND CONCRETO FC=140 KG/CM2 1.00 CONCRETO FC=175 KG/CM2 1.00 CONCRETO FC=210 KG/CM2 1.00 01.01.03.02 ENSAYO DE RESISTENCIA A LA COMPRESIÓN D UND Zapatas 9.00 Vigas de cimentación 18.00 Columnas 18.00 Vigas 18.00 Losa aligerada 18.00 Escalera y Rampa 9.00 losa deportiva 4.00 Veredas 6.00 PTAR 9.00 01.01.03.03 PRUEBA DE COMPACTACION - DENSIDAD DE CA UND 2.00 01.01.03.04 PRUEBA HIDRAULICA DE TUBERIAS DE DESAGU ML Red colectora UF Ø 110MM 110.60 1.00 110.60 Red de distribución Ø4" MOD-02 4.85 1.00 4.85 MOD-03 18.88 1.00 18.88 MOD-05 5.58 1.00 5.58 Red de distribución Ø2" MOD-02 25.55 1.00 25.55 MOD-03 36.10 1.00 36.10 CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Upload: grobert-zorrilla-canduelas

Post on 15-Jan-2016

25 views

Category:

Documents


0 download

DESCRIPTION

qszqaz

TRANSCRIPT

Page 1: Met for 01(I-III) Colpa

HOJA DE METRADOACERO KG/ML

PROYECTO : 1/4" 0,253/8" 0,58

OBRA : OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 1/2" 1,025/8" 1,6

FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,261" 4,04

ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

01.01.00 OBRAS PROVISIONALES Y OBRAS PRELIMINARES

01.01.01 OBRAS PROVISIONALES

01.01.01.01 CONSTRUCCION DE ALMACEN, OFICINAS Y M2 81.00Alamacen 10.00 4.00 1.00 40.00Oficinas 4.00 4.00 2.00 32.00Guardiania 3.00 3.00 1.00 9.00

01.01.01.02 CARTEL DE OBRA CON PLANCHA METALICAUND 1.00 1.00

01.01.01.03 PLACA RECORDATORIA ACRILICA 0.55X0.4 UND 1.00 1.00

01.01.02 OBRAS PRELIMINARES

01.01.02.01 LIMPIEZA Y DEFORESTACION Ha 0.60Todo el terreno 1.00 0.60

01.01.02.02 CORTE EN MATERIAL SUELTO M3 1.00 582.00

01.01.02.03 CONFORMACION DE TERRAPLENES M3 1.00

01.01.02.04 TRAZO Y REPLANTEO PRELIMINAR M2 7,200.0090.00 80.00 1.00 7,200.00

01.01.02.05 ELIMINACION DE MATERIAL A BOTADERO M3 1.00 1.20 698.40

01.01.02.06 TRANSPORTE DEMATERIALES A OBRA Kg 1.00 817,839.11 817,839.11

01.01.03 CONTROL DE CALIDAD DE OBRA

01.01.03.01 DISEÑO DE MEZCLA UND 1.00CONCRETO FC=140 KG/CM2 1.00CONCRETO FC=175 KG/CM2 1.00CONCRETO FC=210 KG/CM2 1.00

01.01.03.02 ENSAYO DE RESISTENCIA A LA COMPRESI UND 109.00Zapatas 9.00Vigas de cimentación 18.00Columnas 18.00Vigas 18.00Losa aligerada 18.00Escalera y Rampa 9.00losa deportiva 4.00Veredas 6.00PTAR 9.00

01.01.03.03 PRUEBA DE COMPACTACION - DENSIDAD UND 2.00 2.00

01.01.03.04 PRUEBA HIDRAULICA DE TUBERIAS DE DE ML 201.56

Red colectora UF Ø 110MM 110.60 1.00 110.60Red de distribución Ø4"

MOD-02 4.85 1.00 4.85MOD-03 18.88 1.00 18.88

MOD-05 5.58 1.00 5.58Red de distribución Ø2"

MOD-02 25.55 1.00 25.55MOD-03 36.10 1.00 36.10

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Page 2: Met for 01(I-III) Colpa

HOJA DE METRADOACERO KG/ML

PROYECTO : 1/4" 0,253/8" 0,58

OBRA : OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 1/2" 1,025/8" 1,6

FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,261" 4,04

ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

01.01.03.05 PRUEBA HIDRAULICA Y DESINFECCIÓN DE ML 168.12Tuberia PVC SAP Ø 3/4" 99.85 1.00 99.85Tuberia PVC SAP Ø 1/2" 68.27 1.00 68.27

01.01.03.06 PRUEBA HIDRAULICA Y DESINFECCIÓN DE M3 5.00Tanque elevado 5.00

Nro de tableros 5.00Fase - Fase 5.00Fase - tierra 5.00Resistencia Pozo 5.00

Page 3: Met for 01(I-III) Colpa

3

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

01.02.00 CONST. MODULO 01 (06 AULAS Y ESCALERA)01.02.01 TRABAJOS PRELIMINARES01.02.01.01 LIMPIEZA DE TERRENO M2 32.00 9.50 1.00 304.00 304.00

01.02.01.02 TRAZO, NIVELACION Y REPLANTEO M2 32.00 9.50 1.00 304.00 304.00

01.02.02 MOVIMIENTOS DE TIERRAS

01.02.02.01 EXCAVACION PARA CIMIENTOS HASTA M3 84.41Eje A -A M3 1.85 0.80 1.50 4.00 8.88

1.98 0.80 1.50 1.00 2.382.00 0.80 1.50 1.00 2.40

base escalera 1.57 0.55 1.50 1.00 1.300.85 0.80 1.50 1.00 1.02

EJE A' - A' Escalera M3 0.85 0.80 1.18 1.00 0.80Eje B'-B' Escalera M3 2.50 1.00 1.30 1.00 3.25EJE C-C M3 2.20 0.80 1.50 2.00 5.28

2.05 0.80 1.50 3.00 7.382.10 0.80 1.50 1.00 2.52

EJE 1-1 M3 4.90 1.20 1.50 1.00 8.82EJE 3-3, 5-5 M3 4.60 1.30 1.50 2.00 17.94EJE 7-7 M3 4.90 1.50 1.50 1.00 11.03Eje 8'-8' Escalera M3 3.66 0.80 1.15 1.00 3.36Eje 9-9 Escalera M3 5.37 1.00 1.50 1.00 8.06

01.02.02.02 EXCAVACION PARA ZAPATAS DE 1.40 M3 161.06Z-1 M3 2.45 2.20 2.40 3.00 38.81Z-2 M3 2.30 2.55 2.40 2.00 28.15Z-3 M3 2.25 2.00 2.40 3.00 32.40Z-4 M3 2.35 2.10 2.40 2.00 23.69Z-5 M3 2.40 2.00 2.40 1.00 11.52Z-6 M3 1.90 1.80 2.40 1.00 8.21Z-7 M3 2.10 2.00 2.40 1.00 10.08Z-8 M3 1.90 1.80 2.40 1.00 8.21

01.02.02.03 RELLENO Y COMPACTADO EN ZANJAS M3 62.12Eje A -A M3 1.85 0.300 0.30 8.00 1.33

1.98 0.300 0.30 2.00 0.362.00 0.300 0.30 2.00 0.36

base escalera 1.57 0.550 1.50 2.00 2.590.85 0.50 0.30 1.00 0.13

EJE A' - A' Escalera M3 0.85 0.50 0.20 1.00 0.09Eje B'-B' Escalera M3 2.50 0.77 0.20 1.00 0.39EJE C-C M3 2.20 0.300 0.30 4.00 0.79

2.05 0.300 0.30 6.00 1.112.10 0.30 0.30 2.00 0.38

EJE 1-1 M3 4.90 0.43 0.50 2.00 2.08EJE 3-3, 5-5 M3 4.60 0.48 0.50 4.00 4.37EJE 7-7 M3 4.90 0.45 0.50 2.00 2.21Eje 8'-8' Escalera M3 3.66 0.67 0.20 1.00 0.49Eje 9-9 M3 5.37 0.77 0.20 1.00 0.83Z-1 M3 2.45 2.20 1.00 3.00 16.17

menos cimiento corrido 2.45 0.80 0.70 -3.00 -4.12menos Viga de Cimentación 2.45 0.20 0.30 -3.00 -0.44

Z-2 M3 2.30 2.55 1.00 2.00 11.73menos cimiento corrido 2.30 0.80 0.70 -2.00 -2.58menos Viga de Cimentación 2.30 0.20 0.30 -2.00 -0.28

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Page 4: Met for 01(I-III) Colpa

4

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

menos cimiento corrido 0.85 1.30 0.50 -2.00 -1.11menos Viga de Cimentación 1.15 0.35 0.40 -2.00 -0.32

Z-3 M3 2.25 2.00 1.00 3.00 13.50menos cimiento corrido 2.25 0.80 0.70 -3.00 -3.78menos Viga de Cimentación 2.25 0.20 0.30 -3.00 -0.41

Z-4 M3 2.35 2.10 1.00 2.00 9.87menos cimiento corrido 2.35 0.80 0.70 -2.00 -2.63menos Viga de Cimentación 2.35 0.20 0.30 -2.00 -0.28menos cimiento corrido 0.59 1.30 0.50 -2.00 -0.76menos Viga de Cimentación 0.85 0.35 0.40 -2.00 -0.24

Z-5 M3 2.40 2.00 1.00 1.00 4.80menos cimiento corrido 1.58 0.80 0.70 -1.00 -0.88menos Viga de Cimentación 1.58 0.20 0.30 -1.00 -0.09menos cimiento corrido 0.70 1.50 0.50 -1.00 -0.52menos Viga de Cimentación 1.00 0.62 0.40 -1.00 -0.25

Z-6 M3 1.90 1.80 1.00 1.00 3.42menos cimiento corrido 0.85 0.80 0.70 -1.00 -0.48menos Viga de Cimentación 0.85 0.20 0.30 -1.00 -0.05menos cimiento corrido 0.70 1.50 0.50 -1.00 -0.52menos Viga de Cimentación 1.10 0.62 0.40 -1.00 -0.27

Z-7 M3 2.10 2.00 1.00 1.00 4.20menos cimiento corrido 1.30 0.80 0.70 -1.00 -0.73menos Viga de Cimentación 1.30 0.20 0.30 -1.00 -0.08menos cimiento corrido 0.70 1.20 0.50 -1.00 -0.42menos Viga de Cimentación 1.00 0.35 0.40 -1.00 -0.14

Z-8 M3 1.90 1.80 1.00 1.00 3.42menos cimiento corrido 1.20 0.80 0.70 -1.00 -0.67menos Viga de Cimentación 1.20 0.20 0.30 -1.00 -0.07menos cimiento corrido 0.44 1.20 0.50 -1.00 -0.26menos Viga de Cimentación 0.70 0.35 0.40 -1.00 -0.10

01.02.02.04 ELIMINACION DE MATERIAL EXCEDEN m3 229.19 (Excav. cimientos + Excv. zapatas - relleno)*1.25

M3 229.19

01.02.02.05 NIVELACION INT. Y APISONADO FINAL M2 181.70Aula 01 , 2 , y 3 M2 6.74 8.53 3.00 172.48Deposito 4.29 1.57 1.00 6.74Deposito 1.72 1.45 1.00 2.49

01.02.02.06 AFIRMADO DE 4" PARA VEREDAS C/E M2 85.07Vereda frontal M2 31.89 1.52 1.00 48.31Vereda posterior M2 31.89 0.82 1.00 25.99Vereda laterales M2 7.00 0.82 1.00 5.71

4.65 0.82 1.00 3.791.56 0.82 1.00 1.27

01.02.03 OBRAS DE CONCRETO SIMPLE01.02.03.01 FALSA ZAPATA 01.02.03.01.01 FALSA ZAPATA CONCRETO 1:12 CEM M3 36.91

Z-1 M3 2.45 2.20 0.55 3.00 8.89Z-2 M3 2.30 2.55 0.55 2.00 6.45Z-3 M3 2.25 2.00 0.55 3.00 7.43Z-4 M3 2.35 2.10 0.55 2.00 5.43Z-5 M3 2.40 2.00 0.55 1.00 2.64Z-6 M3 1.90 1.80 0.55 1.00 1.88Z-7 M3 2.10 2.00 0.55 1.00 2.31

Page 5: Met for 01(I-III) Colpa

5

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Z-8 M3 1.90 1.80 0.55 1.00 1.88

01.02.03.02 CIMIENTOS.01.02.03.02.01 FALSA CIMENTACION MEZCLA 1:12 M3 25.59

Eje A -A M3 1.85 0.80 0.45 4.00 2.661.98 0.80 0.45 1.00 0.712.00 0.80 0.45 1.00 0.72

base escalera 1.57 0.55 0.15 1.00 0.130.85 0.80 0.45 1.00 0.31

EJE A' - A' Escalera M3 0.85 0.80 0.45 1.00 0.31Eje B'-B' Escalera M3 2.50 1.00 0.45 1.00 1.13EJE C-C M3 2.20 0.80 0.45 2.00 1.58

2.05 0.80 0.45 3.00 2.212.10 0.80 0.45 1.00 0.76

EJE 1-1 M3 4.90 1.20 0.45 1.00 2.65EJE 3-3, 5-5 M3 4.60 1.30 0.45 2.00 5.38EJE 7-7 M3 4.90 1.50 0.45 1.00 3.31Eje 8'-8' Escalera M3 3.66 0.80 0.45 1.00 1.32Eje 9-9 Escalera M3 5.37 1.00 0.45 1.00 2.42

01.02.03.02.02 CIMIENTOS CORRIDOS MEZCLA 1:10 M3 39.43Eje A -A M3 26.45 0.80 0.70 1.00 14.81

base escalera 1.57 0.55 1.50 1.00 1.30Escalera 0.85 0.80 0.70 1.00 0.48

EJE A' - A' Escalera M3 0.85 0.80 0.70 1.00 0.47Eje B'-B' Escalera M3 2.50 1.00 0.70 1.00 1.75EJE C-C M3 26.45 0.80 0.70 1.00 14.81Eje 8'-8' Escalera M3 3.66 0.80 0.70 1.00 2.05Eje 9-9 M3 5.38 1.00 0.70 1.00 3.76

01.02.03.03 SOBRECIMIENTOS01.02.03.03.01 CONCRETO 1:8+25% P.M. PARA SOBR M3 8.00

Eje A-A Entre ejes 1 y 7 (Sec A-A) M3 3.62 0.13 0.55 3.00 0.782.53 0.13 0.55 3.00 0.54

Eje A-A Entre ejes 8 y 9 (Sec F-F) 0.83 0.13 0.70 1.00 0.08Eje A'-A' Entre ejes 8 y 9 (Sec F-F) M3 1.70 0.13 0.70 1.00 0.15Eje B'-B' Entre ejes 8 y 9 (Sec F-F) M3 3.17 0.23 0.70 1.00 0.51Eje C-C Entre ejes 1y7 (Sec A-A) M3 3.62 0.13 0.55 6.00 1.55Eje 1-1, 3-3, 5-5, 7-7 Entre ejes A-B, M3 3.08 0.23 0.70 6.00 2.97Eje 8-8 y 9-9 Entre ejes A y B' M3 2.34 0.23 0.70 2.00 0.75

1.36 0.23 0.70 2.00 0.44Eje 8'-8' Entre ejes A - B, B - C M3 2.49 0.13 0.70 1.00 0.23

01.02.03.03.02 ENCOFRADO Y DEDESENCOFRADO SOBM2 93.73Eje A-A Entre ejes 1 y 7 (Sec A-A) M2 3.62 0.55 6.00 11.95

Tapa 0.13 0.55 6.00 0.432.53 0.55 6.00 8.35

Tapa 0.13 0.55 6.00 0.43Eje A-A Entre ejes 8 y 9 (Sec F-F) 0.83 0.70 2.00 1.16

Tapa 0.13 0.70 2.00 0.18Eje A'-A' Entre ejes 8 y 9 (Sec F-F) 1.70 0.70 2.00 2.38Eje B'-B' Entre ejes 8 y 9 (Sec F-F) 3.17 0.70 2.00 4.44Eje C-C Entre ejes 1y7 (Sec A-A) 3.62 0.55 12.00 23.89

Tapa 0.13 0.55 12.00 0.86Eje 1-1, 3-3, 5-5, 7-7 Entre ejes A-B, B-C 3.08 0.70 12.00 25.83Eje 8-8 y 9-9 Entre ejes A y B' 2.34 0.70 4.00 6.54

Page 6: Met for 01(I-III) Colpa

6

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

1.36 0.70 4.00 3.82Eje 8'-8' Entre ejes A - B, B - C 2.49 0.70 2.00 3.48

01.02.03.03.03 ACERO EN SOBRECIMIENTO F'Y=4,200 KG kg/ml 536.25Eje A-A Entre Ejes 1y7 (Sec A-A)

Acero Long. 3.620 0.58 15.00 31.49Acero Long. 2.530 0.58 3.00 4.40Acero Vertical 0.85 0.58 65.00 32.04Acero Vertical 0.85 0.58 9.00 4.44

Eje A-A Entre ejes 8 y 9 (Sec F-F) 0.00Acero Long. 0.83 0.58 4.00 1.93Acero Vertical 0.85 0.58 3.00 1.48

Eje A'-A' Entre ejes 8 y 9 (Sec F-F) 0.00Acero Long. 1.70 0.58 4.00 3.94Acero Vertical 0.85 0.58 5.00 2.47

Eje B'-B' Entre ejes 8 y 9 (Sec F-F) 0.00Acero Long. 3.17 0.58 4.00 7.35Acero Vertical 0.85 0.58 12.00 5.92

Eje C-C Entre ejes 1y7 (Sec A-A) 8.00 8.00Acero Long. 3.62 0.58 3.00 6.30Acero Vertical 0.85 0.58 78.00 38.45

Eje 1-1, 3-3, 5-5, 7-7 Entre ejes A-B, B-C 6.00 6.00Acero Long. 3.08 0.58 4.00 7.13Acero Vertical 1.00 0.58 44.00 25.52

Eje 8-8 y 9-9 Entre ejes A y B' 0.00Acero Long. 2.34 0.58 4.00 5.42Acero Vertical 1.00 0.58 9.00 5.22Acero Long. 1.36 0.58 4.00 3.17Acero Vertical 1.00 0.58 6.00 3.48

Eje 8'-8' Entre ejes A - B, B - C 0.00Acero Long. 2.49 0.58 4.00 5.77Acero Vertical 1.00 0.58 9.00 5.22

321.11

01.02.03.04 FALSO PISO01.02.03.04.01 CONCRETO EN FALSOPISO MEZCLA 1 M2 181.70

03 Aulas M2 6.74 8.53 3.00 172.48Depósito de Escalera M2 4.29 1.57 1.00 6.74

1.72 1.45 1.00 2.4901.02.03.04.02 CONCRETO EN FALSOPISO MEZCLA 1: M2 172.48

03 Aulas 6.74 8.53 3.00 172.48

01.02.04 OBRAS DE CONCRETO ARMADO01.02.04.01 ZAPATAS01.02.04.01.01 CONCRETO EN ZAPATAS F'C=210 KG/ M3 53.69

Z-1 M3 2.45 2.20 0.80 3.00 12.94Z-2 M3 2.30 2.55 0.80 2.00 9.38Z-3 M3 2.25 2.00 0.80 3.00 10.80Z-4 M3 2.35 2.10 0.80 2.00 7.90Z-5 M3 2.40 2.00 0.80 1.00 3.84Z-6 M3 1.90 1.80 0.80 1.00 2.74Z-7 M3 2.10 2.00 0.80 1.00 3.36Z-8 M3 1.90 1.80 0.80 1.00 2.74

01.02.04.01.02 ACERO EN ZAPATAS FY=4200 KG/CM2 1508.18Z-1 2.45x2.20 KG/ML 3.00

Acero lado A

Page 7: Met for 01(I-III) Colpa

7

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Ø5/8" @ .15 2.45 1.60 16.00 188.16

2.45Acero lado B

Ø5/8" @ .15 2.20 1.60 17.00 179.52

2.20

Z-2 2.55x2.30 2.00Acero lado A

Ø5/8" @ .15 2.55 1.60 16.00 130.56

2.55Acero lado B

Ø5/8" @ .15 2.30 1.60 18.00 132.48

2.30

Z-3 2.25x2.20 3.00Acero lado A

Ø5/8" @ .15 2.25 1.60 15.00 162.00

2.25Acero lado B

Ø5/8" @ .15 2.20 1.60 16.00 168.96

2.20

Z-4 2.35x2.10 2.00Acero lado A

Ø5/8" @ .15 2.35 1.60 15.00 112.80

2.35Acero lado B

Ø5/8" @ .15 2.10 1.60 16.00 107.52

2.10

Z-5 2.40x2.00 1.00Acero lado A

Ø5/8" @ .15 2.40 1.60 14.00 53.76

2.40Acero lado B

Ø5/8" @ .15 2.00 1.60 17.00 54.40

2.00

Z-6 1.90x1.80 1.00Acero lado A

Ø5/8" @ .15 1.90 1.60 12.00 36.48

1.90Acero lado B

Ø5/8" @ .15 1.80 1.60 13.00 37.44

1.80

Z-7 2.10x2.00 1.00Acero lado A

Ø5/8" @ .15 2.10 1.60 14.00 47.04

2.10Acero lado B

Ø5/8" @ .15 2.00 1.60 15.00 48.00

2.00

Z-8 1.90x1.80 1.00Acero lado A

Page 8: Met for 01(I-III) Colpa

8

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Ø5/8" @ .15 1.90 1.02 13.00 25.19

1.90Acero lado B

Ø5/8" @ .15 1.80 1.02 13.00 23.87

1.80

01.02.04.02 CIMIENTO REFORZADO01.02.04.02.01 CONCRETO EN CIMIENTO REFORZADO M3 35.28

Eje 1-1 M3 7.20 1.20 0.50 1.00 4.32Eje 3-3 y 5-5 M3 7.20 1.30 0.50 2.00 9.36Eje 7-7 M3 7.20 1.50 0.50 1.00 5.40

16.20

01.02.04.02.02 ACERO EN CIMIENTO REF. FY=4200 KG/CM2 633.22Eje 1-1 1.00

Ø1/2"

1.1 1.10 1.02 48.00 53.86

0.2 Ø1/2" 0.2 7.60 1.02 4.00 31.017.2

Eje 3-3 y 5-5 2.00Ø1/2"

1.2 1.20 1.02 48.00 117.50

0.2 Ø1/2" 0.2 7.60 1.02 4.00 62.027.2

Eje 7-7 1.00Ø1/2"

1.4 1.40 1.02 48.00 68.54

0.2 Ø1/2" 0.2 7.60 1.02 4.00 31.017.2 269.28

01.02.04.03 VIGAS DE CIMENTACION01.02.04.03.01 CONCRETO EN VIGAS DE CIMENTACIONM3 9.91

Eje A-A Entre ejes del 1-1 al 7-7 M3 3.70 0.20 0.35 6.00 1.55Eje C-C Entre ejes del 1-1 al 7-7 M3 3.70 0.20 0.35 6.00 1.55EJE 1-1, 3-3 Y 5-5 M3 6.40 0.35 0.40 3.00 2.69

0.23 0.25 0.40 -3.00 -0.07EJE 8-8 M3 6.40 0.62 0.40 1.00 1.59

0.23 0.25 0.40 -1.00 -0.022.62

01.02.04.03.02 ENCOFRADO Y DESENCOFRADO VIGA M3 65.63Eje A-A Entre ejes del 1-1 al 7-7 M3 3.70 0.35 12.00 15.54Eje C-C Entre ejes del 1-1 al 7-7 M3 3.70 0.35 12.00 15.54EJE 1-1, 3-3 Y 5-5 M3 6.40 0.40 6.00 15.36

0.23 0.40 -6.00 -0.55EJE 8-8 M3 6.40 0.40 2.00 5.12

0.23 0.40 -2.00 -0.1814.81

01.02.04.03.03 ACERO EN VIGA DE CIM. FY=4200 KG/CM2 946.59Eje A-A Entre ejes del 1-1 al 7-7 1.00

Page 9: Met for 01(I-III) Colpa

9

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

2Ø1/2"0.2 17.1 0.2 17.50 1.02 2.00 35.70

0.2 2Ø1/2" 0.2 17.50 1.02 2.00 35.7017.1

Traslapes 0.60 1.02 4.00 2.45

0.3 1.05 0.58 64.00 38.98

0.15

Eje C-C Entre ejes del 1-1 al 7-7 1.002Ø1/2"

0.2 17.1 0.2 17.50 1.02 2.00 35.70

0.2 2Ø1/2" 0.2 17.50 1.02 2.00 35.7017.1

Traslapes 0.60 1.02 4.00 2.45

0.3 1.05 0.58 64.00 38.98

0.15

EJE 1-1, 4-4, Y 5-5 3.002Ø1/2"

0.5 7.15 0.5 8.15 1.02 2.00 49.88

0.2 4Ø1/2" 0.2 7.55 1.02 4.00 92.417.15

0.5 2Ø1/2" 0.5 8.15 1.02 2.00 49.887.15

0.85 2.45 0.58 25.00 106.57

0.3

EJE 8-8 1.003Ø1/2"

0.5 7.15 0.5 8.15 1.02 3.00 24.94

0.2 4Ø1/2" 0.2 7.55 1.02 4.00 30.807.15

0.5 3Ø1/2" 0.5 8.15 1.02 3.00 24.947.15

0.85 2.95 0.58 25.00 42.77

0.55 298.74

01.02.04.04 COLUMNAS

01.02.04.04.01 CONCRETO F'C=175 KG/CM2. PARA C M3 2.94

Page 10: Met for 01(I-III) Colpa

10

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

EN COLUMNETAS

Eje C-C 1er nivel M3 0.25 0.13 1.18 12.00 0.46

Eje C-C 2do nivel M3 0.25 0.13 0.99 12.00 0.38

Eje A-A 1er nivel M3 0.25 0.13 0.99 12.00 0.38

Eje A-A 2do nivel M3 0.25 0.13 1.89 12.00 0.74

En pazadiso M3 0.25 0.13 0.95 22.00 0.68

En escalera descanzo M3 0.25 0.13 1.03 4.00 0.13

En escalera 1er nivel M3 0.25 0.13 1.32 2.00 0.09

En escalera 1er nivel M3 0.23 0.13 1.32 2.00 0.08

01.02.04.04.02 CONCRETO EN COLUMNAS F'C=210 KG M3 25.59

C-1 M3 0.65 0.20 7.75 10.00 10.08

0.35 0.35 0.20 7.75 10.00 5.43

0.2

0.2

0.65

C-2 M3 0.50 0.20 7.75 4.00 3.10

0.35 0.35 0.20 7.75 4.00 2.17

0.2

0.2

0.5

C-3 M3 0.25 0.23 8.75 4.00 2.01

0.23 Escalera M3 0.25 0.23 6.60 2.00 0.76

0.25

C-4 EN ESCALERA M3 0.40 0.23 7.05 2.00 1.30

0.23 0.00

0.4

C-5 EN ESCALERA M3 0.30 0.23 5.43 2.00 0.75

0.23

0.3

01.02.04.04.03 ENCOFRADO Y DESENCOFRADO NORM M2 315.51

C-1 M2 0.65 7.75 12.00 60.45

0.35 0.40 7.75 20.00 62.00

0.2 0.65 7.75 4.00 20.15

0.2 0.42 7.75 4.00 13.02

0.65

C-2 M2 0.50 7.75 4.00 15.50

0.35 0.27 7.75 4.00 8.37

Page 11: Met for 01(I-III) Colpa

11

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

0.2 0.40 7.75 8.00 24.80

0.2

0.5

C-3 M2 0.25 8.75 8.00 17.50

0.23 Escalera 0.25 6.60 4.00 6.60

0.25

C-4 EN ESCALERA M2 0.40 7.05 4.00 11.28

0.23 0.23 7.05 2.00 3.24

0.4

C-5 EN ESCALERA M2 0.30 5.43 4.00 6.52

0.23 0.23 5.43 2.00 2.50

0.3

EN COLUMNETAS

Eje C-C 1er nivel M2 0.25 2.19 24.00 13.11

0.13 2.19 12.00

Eje C-C 2do nivel M2 0.25 1.09 24.00 6.51

M2 0.13 1.94 12.00 3.02

Eje A-A 1er nivel M2 0.25 1.29 24.00 7.71

0.13 1.29 24.00 4.01

Eje A-A 2do nivel M2 0.25 1.09 24.00 6.51

0.13 1.09 24.00 3.39

En pazadiso M2 0.25 1.05 44.00 11.55

M2 0.13 1.05 15.00 2.05

En escalera descanzo M2 0.63 0.95 3.00 1.80

En escalera 1er nivel M2 0.49 1.32 2.00 1.29

En escalera 1er nivel M2 0.50 1.32 2.00 1.32

En escalera PASAMANO M2 0.50 1.32 2.00 1.32

01.02.04.04.04 ACERO GRADO 60 EN COLUMNAS KG 5162.07

MODULO DE AULAS KG/ML

C-1 KG 10.00

12Ø5/8" 9.65 1.60 12.00 1852.80

ESTRIBOS Ø3/8 KG 1.70 0.58 48.00 473.28

ESTRIBOS Ø3/8 1.50 0.58 48.00 417.60

C-2 4.00

10Ø5/8" 9.65 1.60 10.00 617.60

ESTRIBOS Ø3/8 KG 1.40 0.58 48.00 155.90

ESTRIBOS Ø3/8 1.50 0.58 48.00 167.04

Page 12: Met for 01(I-III) Colpa

12

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

C-3 4.00

4Ø1/2" 10.40 1.02 4.00 169.73

ESTRIBOS Ø3/8 KG 0.96 0.58 54.00 120.27

C-4 2.00

4Ø5/8" 9.65 1.60 4.00 123.52

2Ø1/2" 9.65 1.02 2.00 39.37

ESTRIBOS Ø3/8 KG 1.26 0.58 48.00 70.16

C-5 2.00

4Ø5/8" 8.05 1.60 4.00 103.04

ESTRIBOS Ø3/8 KG 1.06 0.58 35.00 43.04

C-3 EN ESCALERA 2.00

4Ø1/2" 8.67 1.02 4.00 70.75

ESTRIBOS Ø3/8 KG 0.96 0.58 35.00 38.98

COLUMNAS DE CONFINAMIENTO

Eje C-C 1er nivel 12.00

4Ø3/8" 3.92 0.58 4.00 108.99

ESTRIBOS Ø1/4" KG 0.76 0.25 17.00 38.76

Eje C-C 2do nivel 12.00

4Ø3/8" 2.69 0.58 4.00 74.75

ESTRIBOS Ø1/4" KG 0.76 0.25 17.00 38.76

Eje A-A 1er nivel 12.00

4Ø3/8" 3.22 0.58 4.00 89.51

ESTRIBOS Ø1/4" KG 0.76 0.25 23.00 52.44

Eje A-A 2do nivel 12.00

4Ø3/8" 1.96 0.58 4.00 54.71

ESTRIBOS Ø1/4" KG 0.76 0.25 18.00 41.04

En pazadiso 22.00

4Ø3/8" 1.80 0.58 4.00 91.87

ESTRIBOS Ø1/4" KG 0.76 0.25 12.00 50.16

En escalera descanzo 3.00

4Ø3/8" 1.42 0.58 4.00 9.92

ESTRIBOS Ø1/4" KG 0.76 0.25 12.00 6.84

En escalera 1er nivel 4.00

4Ø3/8" 2.89 0.58 4.00 26.82

ESTRIBOS Ø1/4" KG 0.76 0.25 19.00 14.44

01.02.04.05 VIGAS

01.02.04.05.01 RELLENO DE CONCRETO F'C=175 KG/ M3 1.00

EN TIMPANOS AULAS 5.35 0.23 0.08 8.00 0.74

Page 13: Met for 01(I-III) Colpa

13

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

EN TIMPANO ESCALERA 7.60 0.23 0.08 2.00 0.26

01.02.04.05.02 CONCRETO F'C=175 KG/CM2. PARA VI M3 1.64

Vigueta confinamiento (.13 x .10) (Muros y M3 3.62 0.13 0.10 18.00 0.85

Vigueta confinamiento (.13 x .10) (Muros y M3 2.53 0.13 0.10 6.00 0.20

Vigueta confinamiento (.13 x .10) (Parapet M3 31.73 0.13 0.10 1.00 0.41

Vigueta confinamiento (.13 x .10) (Parapet M3 1.39 0.13 0.10 2.00 0.04

Vigueta confinamiento PM (.13 x .10) (Para M3 3.22 0.13 0.10 2.00 0.08

Vigueta confinamiento PM (.13 x .10) (Para M3 1.70 0.13 0.10 1.00 0.02

Vigueta confinamiento PM (.13 x .10) (Esca M3 3.40 0.13 0.10 1.00 0.04

01.02.04.05.03 CONCRETO F'C=210 KG/CM2. PARA VI M3 28.03

V2 (0.35 x 0.55), Ejes 2,4,6 M3 6.40 0.35 0.55 3.00 3.70

V1 (0.23 x 0.35), Ejes 1,7 M3 6.40 0.23 0.35 2.00 1.03

6.40 0.12 0.20 2.00 0.31

V4 (0.23 x 0.35), Ejes 3,5 M3 6.40 0.23 0.35 2.00 1.03

V3 (0.20 x 0.55), Ejes A-A y C-C M3 26.45 0.20 0.55 2.00 5.82

2V3 (0.20 x 0.30), Ejes A-A y C-C M3 26.45 0.20 0.30 2.00 3.17

V4 (0.35 x variable) M3 2.00 0.35 0.48 7.00 2.33

V6 (0.13 x 0.40) M3 26.45 0.13 0.40 1.00 1.38

VA-1 (0.23 x 0.30) M3 7.20 0.23 0.30 4.00 1.99

VA-2 (0.23 x 0.25) Tímpanos M3 6.70 0.23 0.25 4.00 1.54

Triángulo fachada M3 0.23 4.00 1.41 1.30

Triángulo posterior M3 0.23 4.00 0.87 0.80

ESCALERA

V7 (0.13 x 0.45) M3 3.27 0.13 0.45 1.00 0.19

V8 (0.23 x 0.20) M3 1.37 0.23 0.20 2.00 0.13

M3 2.34 0.23 0.20 2.00 0.21

V3(0.20X0.55) M3 3.27 0.20 0.55 1.00 0.36

V5 (0.23 x variado) M3 2.00 0.23 0.48 2.00 0.44

V6 (0.13 x 0.40) M3 5.68 0.13 0.40 1.00 0.30

V10 (0.25 x 0.20) M3 2.00 0.25 0.20 1.00 0.10

2V-1 (0.23x0.25) M3 4.38 0.23 0.25 2.00 0.50

2V-3 (0.20x0.30) M3 3.27 0.20 0.30 2.00 0.39

M3 1.95 0.20 0.30 2.00 0.23

Triángulo chico M3 0.23 2.00 0.39 0.18

Triángulo grande M3 0.23 2.00 1.30 0.60

01.02.04.05.04 ENCOFRADO Y DESENCOFRADO DE V M2 278.10

Page 14: Met for 01(I-III) Colpa

14

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

V2 (0.35x0.55) Ejes: 2,4,6

Cara lateral Interior M2 6.40 0.35 6.00 13.44

Cara interior o fondo M2 6.40 0.35 3.00 6.72

V1 (0.23 x 0.35), Ejes 1,7

Cara lateral exterior M2 6.40 0.35 2.00 4.48

Cara lateral Interior M2 6.40 0.15 2.00 1.92

V4 (0.23 x 0.35), Ejes 3,5

Cara lateral Interior M2 6.40 0.15 4.00 3.84

V3(0.20x0.55), Eje C-C y A-A

Cara lateral M2 26.45 0.35 3.00 27.77

Cara lateral exterior M2 26.45 0.55 1.00 14.55

Cara inferior o fondo M2 26.45 0.20 2.00 10.58

2V3 (0.20 x 0.30), Ejes A-A y C-C - SEGUNDO NIVEL

Cara lateral M2 26.45 0.30 4.00 31.74

Cara inferior o fondo M2 26.45 0.20 2.00 10.58

V-4 En voladizo (0.35 x Variable)

Cara lateral exterior M2 2.00 0.48 2.00 1.90

Cara lateral interior M2 2.00 0.28 12.00 6.60

Cara inferior o fondo M2 2.00 0.35 7.00 4.90

V6 (0.13 x 0.40)

Cara lateral exterior M2 26.45 0.40 1.00 10.58

Cara lateral interior M2 26.45 0.20 1.00 5.29

Cara inferior o fondo M2 26.45 0.13 1.00 3.44

VA-1(0.23x0.30) segundo nivel

Cara lateral M2 6.40 0.30 8.00 15.36

VA-2 (0.23 x 0.25) Tímpanos M2 3.43 0.25 8.00 6.85

M2 3.43 0.25 8.00 6.85

Triángulo grande M2 1.41 8.00 11.28

Triángulo grande M2 0.87 8.00 6.96

Cara inferior o fondo M2 2.00 0.23 4.00 1.84

Cara inferior o fondo M2 2.00 0.23 4.00 1.84

Caras laterales (Frontal) M2 0.23 0.15 8.00 0.28

ESCALERAS

V7 (0.13 x 0.45) fondo M2 3.27 0.45 1.00 1.47

lateral 3.24 0.13 2.00 0.84

V8 (0.23 x 0.20) fondo M2 1.37 0.23 2.00 0.63

lateral 1.37 0.20 4.00 1.09

Page 15: Met for 01(I-III) Colpa

15

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

fondo M2 2.34 0.23 2.00 1.07

lateral M2 2.34 0.20 4.00 1.87

V3(0.20X0.55) fondo M2 3.27 0.20 1.00 0.65

lateral M2 3.27 0.35 2.00 2.29

V5 (0.23 x variado) fondo M2 2.00 0.23 2.00 0.92

lateral M2 2.00 0.48 4.00 3.80

V6 (0.13 x 0.40) fondo M2 5.68 0.13 1.00 0.74

lateral M2 5.68 0.40 2.00 4.54

V10 (0.25 x 0.20) fondo M2 2.00 0.25 1.00 0.50

lateral M2 2.00 0.20 1.00 0.40

2V-1 (0.23x0.25) fondo M2 4.38 0.23 2.00 2.01

lateral M2 4.38 0.25 4.00 4.38

2V-3 (0.20x0.30) fondo M2 3.27 0.20 2.00 1.31

lateral M2 3.27 0.30 4.00 3.92

fondo M2 1.95 0.20 2.00 0.78

lateral M2 1.95 0.30 4.00 2.34

Triángulo chico fondo M2 0.23 2.00 0.46

lateral M2 0.39 4.00 1.55

Triángulo grande fondo M2 0.23 2.00 0.46

lateral M2 1.30 4.00 5.20

Viga de Confinamiento M2 nro caras

Vigueta confinamiento (.13 x .10) (Muros y M2 3.62 2.00 0.10 18.00 13.03

Vigueta confinamiento (.13 x .10) (Muros y M2 2.53 2.00 0.10 6.00 3.04

Vigueta confinamiento (.13 x .10) (Parapet M2 31.73 2.00 0.10 1.00 6.35

Vigueta confinamiento (.13 x .10) (Parapet M2 1.39 2.00 0.10 2.00 0.55

Vigueta confinamiento PM (.13 x .10) (Para M2 3.22 2.00 0.10 2.00 1.29

Vigueta confinamiento PM (.13 x .10) (Para M2 1.70 2.00 0.10 1.00 0.34

Vigueta confinamiento PM (.13 x .10) (Esca M2 3.40 2.00 0.10 1.00 0.68

01.02.04.05.05 ACERO GRADO 60 EN VIGAS kg/ml 3950.06

V2 (0.35x0.55) Ejes: 2, 4, 6 3.00

3 Ø 5/8"

0.4 9.15 0.4 9.95 1.60 3.00 143.28

2 Ø 5/8"

0.4 9.15 0.3 9.85 1.60 2.00 94.56

Bastones

1Ø 3/4" 3.20 2.26 1.00 21.70

Page 16: Met for 01(I-III) Colpa

16

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

3.2

2Ø 1/2" 2.85 1.02 2.00 17.44

0.4 2.45

2Ø 3/4" 4.45 2.26 2.00 60.34

4.45

1 Ø 1/2"

0.4 2.35 0.3 3.05 1.02 1.00 9.33

Estribos 0.3

Ø 3/8" 0.5 1.80 0.58 48.00 150.34

0.3

0.43 1.65 0.58 19.00 54.55

V1 (0.23 x 0.35), Ejes 1,7 2.00

2 Ø 1/2"

0.3 7.15 0.3 7.75 1.02 2.00 31.62

3 Ø 1/2"

0.3 9.15 0.3 9.75 1.02 3.00 59.67

2 Ø 1/2"

0.3 7.15 0.3 7.75 1.02 3.00 47.43

Bastones

1Ø 1/2" 1.65 1.02 2.00 6.73

0.3 1.35

1Ø 5/8" 2.35 1.60 1.00 7.52

2.35

2 Ø 5/8"

0.4 2.35 0.3 3.05 1.60 2.00 19.52

Estribos 0.18

Ø 3/8" 0.3 1.16 0.58 42.00 56.52

Page 17: Met for 01(I-III) Colpa

17

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

0.3

0.43 1.65 0.58 19.00 36.37

0.3

0.15 1.10 0.58 42.00 53.59

V4 (0.23 x 0.35), Ejes 3,5 2.00

2 Ø 1/2"

0.3 7.15 0.3 7.75 1.02 2.00 31.62

2 Ø 1/2"

0.3 9.15 0.3 9.75 1.02 2.00 39.78

Bastones

1Ø 1/2" 1.65 1.02 1.00 3.37

0.3 1.35

2Ø 5/8" 2.35 1.60 2.00 15.04

2.35

2 Ø 5/8"

0.4 2.35 0.3 3.05 1.60 2.00 19.52

Estribos 0.18

Ø 3/8" 0.3 1.16 0.58 42.00 56.52

0.3

0.43 1.65 0.58 19.00 36.37

V3(0.20x0.55), Eje C-C y A-A 2.00

3 Ø 5/8"

0.4 26.4 0.4 27.20 1.60 3.00 261.12

3 Ø 5/8"

0.4 26.4 0.4 27.20 1.60 3.00 261.12

2 Ø 1/2"

Page 18: Met for 01(I-III) Colpa

18

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

0.3 26.4 0.3 27.00 1.02 2.00 110.16

Estribos 0.15

0.5 1.50 0.58 174.00 302.76

Ø 3/8"

2V3 (0.20 x 0.30), Ejes A-A y C-C - SEGUNDO NIVEL 2.00

3 Ø 1/2"

0.25 26.4 0.25 26.90 1.02 3.00 164.63

3 Ø 1/2"

0.25 26.4 0.25 26.90 1.02 3.00 164.63

Estribos 0.15

0.25 1.00 0.58 174.00 201.84

Ø 3/8"

V6 (0.13 x 0.40) 1.00

2 Ø 1/2"

0.35 26.4 0.35 27.10 1.02 1.00 27.64

2 Ø 1/2"

0.35 26.4 0.35 27.10 1.02 1.00 27.64

Estribos 0.05

0.15 0.75 0.25 120.00 22.50

Ø 1/4" 0.35

0.15

VA-1(0.23x0.30) segundo nivel 4.00

2 Ø 1/2"

0.25 7.15 0.25 7.65 1.02 2.00 62.42

2 Ø 1/2"

0.25 7.15 0.25 7.65 1.02 2.00 62.42

Estribos 0.18

0.25 1.06 0.58 36.00 88.53

Ø 3/8"

VA-2 (0.23 x 0.25) Tímpanos

Page 19: Met for 01(I-III) Colpa

19

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

4.00

2 Ø 1/2"

5.3

1 6.40 1.02 4.00 104.45

0.1

2 Ø 1/2"

4.65

1 5.65 1.02 4.00 92.21

2 Ø 1/2" 0.3

0.62.80 1.02 4.00 45.70

1.9

Estribos 0.18

0.2 0.96 0.58 56.00 124.72

Ø 3/8"

Estribos 0.18

0.337 1.23 0.58 28.00 80.23

Ø 3/8"

ESCALERAS

V7 (0.13x0.45) 1.00

2 Ø 5/8"

0.40 3.68 0.40 4.48 1.60 2.00 14.34

2 Ø 5/8"

0.40 3.68 0.40 4.48 1.60 2.00 14.34

Estribos 0.08

0.4 1.16 0.58 20.00 13.46

Ø 3/8"

V8 (0.23x0.20) y V5(23xVar.) 2.00

2 Ø 1/2"

0.15 4.6 0.15 4.90 1.02 2.00 19.99

2 Ø 1/2"

0.15 6.15 6.30 1.02 2.00 25.70

Page 20: Met for 01(I-III) Colpa

20

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

2 Ø 5/8"

2.95 0.30 3.25 1.60 2.00 20.80

2 Ø 5/8"

0.30 1.95 0.30 2.55 1.60 2.00 16.32

Estribos 0.18

0.15 0.86 0.25 28.00 12.04

Ø 1/4"

Estribos 0.18

0.425 1.41 0.58 12.00 19.63

Ø 3/8"

V3(0.20X0.55) 1.00

2 Ø 5/8"

0.40 3.68 0.30 4.38 1.60 2.00 14.02

2 Ø 5/8"

0.40 3.68 0.40 4.48 1.60 2.00 14.34

1 Ø 1/2"

0.45 1.3 1.75 1.02 2.00 3.57

Estribos 0.15

0.5 1.50 0.58 24.00 20.88

Ø 3/8"

V6 (0.13x0.40) 1.00

1 Ø 1/2"

0.35 6.47 0.35 7.17 1.02 1.00 7.31

1 Ø 1/2"

0.35 6.47 0.35 7.17 1.02 1.00 7.31

Estribos 0.05

0.15 0.75 0.25 39.00 7.31

Ø 1/4" 0.35

Page 21: Met for 01(I-III) Colpa

21

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

0.15

V10 (0.25 x 0.20) 1.00

2 Ø 1/2"

0.15 2.35 0.15 2.65 1.02 2.00 5.41

2 Ø 1/2"

0.15 2.35 0.15 2.65 1.02 2.00 5.41

Estribos 0.2

0.15 0.90 0.25 11.00 2.47

Ø 1/4"

2V-1 (0.23x0.25)

Timpanos 2V-1 (023x025) 2.00

2 Ø 1/2"

5.5

1 6.60 1.02 2.00 26.93

0.1

2 Ø 1/2"

5.05

1 6.05 1.02 2.00 24.68

2 Ø 1/2" 0.3

1.80 1.02 2.00 7.34

0.95 0.55

2 Ø 1/2" 3.00

2.90 1.02 2.00 17.75

0.1 2.35 0.45

0.3

2.6 3.05 1.02 2.00 18.67

0.15

Estribos 0.18

0.2 0.96 0.58 28.00 15.90

Ø 3/8"

Estribos 0.18

0.43 1.41 0.58 14.00 34.35

Page 22: Met for 01(I-III) Colpa

22

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Ø 3/8"

2V-3 (0.20x0.30) Eje B'-B' 1.00

2 Ø 1/2"

0.25 3.68 0.25 4.18 1.02 2.00 8.53

2 Ø 1/2"

0.25 3.68 0.25 4.18 1.02 2.00 8.53

Estribos 0.15

0.25 1.00 0.58 24.00 13.92

Ø 3/8"

2V-3 (0.20x0.30) Eje A-A 1.00

2 Ø 1/2"

0.25 5.665 0.25 6.17 1.02 2.00 12.58

2 Ø 1/2"

0.25 5.665 0.25 6.17 1.02 2.00 12.58

Estribos 0.15

0.25 1.00 0.58 38.00 22.04

Ø 3/8"

Vigueta confinamiento (.13 x .10) (Muros M3 18.00

2 Ø 3/8"

0.1 3.57 0.1 3.77 0.58 2.00 78.72

Estribo Ø 1/4" 0.1

0.1 Ø1/4" 0.1 0.30 0.25 19.00 25.65

Vigueta confinamiento (.13 x .10) (Muros M3 6.00

2 Ø 3/8"

0.1 2.48 0.1 2.68 0.58 2.00 18.65

Estribo Ø 1/4" 0.1

0.1 Ø1/4" 0.1 0.30 0.25 12.00 5.40

Vigueta confinamiento (.13 x .10) (Parap M3 1.00

Page 23: Met for 01(I-III) Colpa

23

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

2 Ø 3/8"

0.1 32.16 0.1 32.36 0.58 2.00 37.54

Estribo Ø 1/4" 0.1

0.1 Ø1/4" 0.1 0.30 0.25 137.00 10.28

Vigueta confinamiento (.13 x .10) (Parap M3 1.00

2 Ø 3/8"

0.1 1.835 0.1 2.04 0.58 2.00 2.36

Estribo Ø 1/4" 0.1

0.1 Ø1/4" 0.1 0.30 0.25 7.00 0.53

Vigueta confinamiento (.13 x .10) (Parap M3 1.00

2 Ø 3/8"

0.1 1.85 0.1 2.05 0.58 2.00 2.38

Estribo Ø 1/4" 0.1

0.1 Ø1/4" 0.1 0.30 0.25 10.00 0.75

Vigueta confinamiento PM (.13 x .10) (Pa M3 2.00

2 Ø 3/8"

0.1 3.15 0.1 3.35 0.58 2.00 7.77

Estribo Ø 1/4" 0.1

0.1 Ø1/4" 0.1 0.30 0.25 17.00 2.55

Vigueta confinamiento PM (.13 x .10) (Pa M3 2.00

2 Ø 3/8"

0.1 1.65 0.1 1.85 0.58 2.00 4.29

Estribo Ø 1/4" 0.1

0.1 Ø1/4" 0.1 0.30 0.25 12.00 1.80

Vigueta confinamiento PM (.13 x .10) (Es M3 1.00

2 Ø 3/8"

0.1 3.35 0.1 3.55 0.58 2.00 4.12

Estribo Ø 1/4" 0.1

Page 24: Met for 01(I-III) Colpa

24

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

0.1 Ø1/4" 0.1 0.30 0.25 19.00 1.43

01.02.04.06 LOSAS

01.02.04.06.01 LOSA ALIGERADA h=0.20 m

01.02.04.06.01.01 CONCRETO F'C=210 KG/CM2. PARA L M3 16.85

En Viguetas

Viguetas entre A - B Y C M3 4.00 0.10 0.15 96.00 5.76

Viguetas en volado de Aulas M3 4.00 0.10 0.15 18.00 1.08

Viguetas en volado de escalera 3.27 0.10 0.15 4.00 0.20

En Losa e= 0.05

Paño A, entre 1 al 7 M3 6.60 4.00 0.05 6.00 7.92

Paño en Volado 1-1 al 7-7 M3 4.00 1.39 0.05 6.00 1.66

En Volado de Escalera M3 3.27 1.39 0.05 1.00 0.23

01.02.04.06.01.02 ENCOFRADO Y DESENCOFRADO EN L M2 210.93

Paño A, entre 1 al 7 M2 6.60 4.00 6.00 158.40

Paño en Volado 1-1 al 7-7 m2 4.00 2.00 6.00 48.00

En Volado de Escalera m2 3.27 1.39 1.00 4.53

01.02.04.06.01.03 ACERO GRADO 60 EN LOSAS ALIGER KG 1350.84

1 Ø ½” corrido (positivo) KG 26.40 20.00 1.02 538.56

Traslape Ø ½” (positivo) KG 0.60 40.00 1.02 24.48

1 Ø 5/8" bastón (negativo) KG 2.95 100.00 1.60 472.00

1 Ø 1/2” bastón (negativo) KG 1.47 40.00 1.02 60.18

Temperatura Ø ¼” KG 9.00 102.00 0.25 229.50

ESCALERA

1 Ø ½” KG 3.73 3.00 1.02 11.41

1 Ø 1/2” bastón KG 1.51 3.00 1.02 4.61

1 Ø 1/2” bastón KG 3.30 3.00 1.02 10.10

01.02.04.06.01.04 LADRILLO HUECO/ARCILLA 15X30X30 UND 1757.00

Und 8.33 210.93

01.02.04.07 ESCALERA

01.02.04.07.01 CONCRETO F'C=210 KG/CM2. PARA E M3 3.54

PRIMER TRAMO M3 3.08 1.57 0.15 1.00 0.73

M3 1.64 1.72 0.20 1.00 0.56

M3 0.20 1.57 0.15 2.00 0.05

Area de encofrado de losa x (8.33 Unid. x m2)

Page 25: Met for 01(I-III) Colpa

25

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

M3 0.38 1.57 0.21 1.00 0.06

M3 (0.30x0.167x1.57)/2 11.00 0.43

SEGUNDO TRAMO M3 3.20 1.57 0.15 1.00 0.75

M3 1.64 1.72 0.20 1.00 0.56

M3 (0.30x0.167x1.57)/2 10.00 0.39

01.02.04.07.02 ENCOFRADO Y DESENCOFRADO EN E M2 21.00

PRIMER TRAMO M2 3.08 1.57 1.00 4.84

M2 1.64 1.72 1.00 2.81

M2 1.57 0.17 11.00 2.88

SEGUNDO TRAMO M2 3.20 1.57 1.00 5.02

M2 1.64 1.72 1.00 2.82

M2 1.57 0.17 10.00 2.62

01.02.04.07.03 ACERO GRADO 60 EN ESCALERAS KG 203.09

1er TRAMO KG/ML

Ø1/2” @ 0.20m KG 4.25 1.02 8.00 34.68

Ø1/2” @ 0.20m KG 2.12 1.02 8.00 17.30

Ø1/2” @ 0.20m KG 2.78 1.02 8.00 22.68

Ø1/2” @ 0.10m KG 1.10 1.02 8.00 8.98

Ø3/8” @ 0.25m KG 1.57 0.58 13.00 11.84

2do TRAMO

Ø1/2” @ 0.20m KG 5.62 1.02 8.00 45.86

Ø1/2” @ 0.20m KG 2.10 1.02 4.00 8.57

Ø3/8” @ 0.20m KG 1.70 0.58 8.00 7.89

Ø3/8” @ 0.20m KG 1.70 0.58 8.00 7.89

Ø3/8” @ 0.20m KG 1.57 0.58 14.00 12.75

Ø 1/2” @ 0.30m LOSA MACIZA KG 3.27 0.58 5.00 9.48

Ø1/2” @ 0.20m LOSA MACIZA KG 3.27 0.58 8.00 15.17

01.02.04.08 GARGOLA

01.02.04.08.01 CONCRETO F'C=175 KG/CM2. PARA G M3 0.03

GARGOLA M3 0.20 0.20 0.10 4.00 0.02

GARGOLA M3 0.20 0.05 0.15 8.00 0.01

01.02.04.08.02 ENCOFRADO Y DESENCOFRADO EN G M2 0.94

M2 0.70 0.20 4.00 0.56

M2 0.20 0.10 4.00 0.08

M2 0.15 0.05 8.00 0.06

Page 26: Met for 01(I-III) Colpa

26

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

M2 0.15 0.20 8.00 0.24

01.02.04.08.03 ACERO GRADO 60 EN GARGOLA KG KG/ML 4.22

Ø 1/4” KG 1.29 0.25 8.00 2.58

Ø 1/4” KG 0.82 0.25 8.00 1.64

01.02.05 ESTRUCTURAS DE MADERA Y COBERTURAS

01.02.05.01 ESTRUCTURAS DE MADERA

01.02.05.01.01 TIJERALES DE MADERA TORNILLO DE P2 pie pulg pulg 983.52

Tijerales de madera tornillo 2" x 6" 6.00

Brida Superior Izquierdo P2 17.55 2.00 6.00 1.00 105.31

Brida Superior Derecho P2 19.69 2.00 6.00 1.00 118.11

Brida Inferior p2 35.19 2.00 6.00 1.00 211.12

Montantes 2" x 4" P2 7.87 2.00 4.00 2.00 62.99

P2 11.15 2.00 4.00 1.00 44.62

Diágonales 2" x 4" P2 1.64 2.00 4.00 2.00 13.12

P3 3.12 2.00 4.00 2.00 24.93

P4 4.10 2.00 4.00 2.00 32.81

P5 6.89 2.00 4.00 2.00 55.12

Cartelas tipo 1 P2 0.70 0.40 1.00 4.00 72.31

tipo 2 P2 0.30 0.25 1.00 2.00 9.68

tipo 3 P2 0.50 0.30 1.00 2.00 19.37

tipo 4 P2 0.60 0.30 1.00 4.00 46.48

tipo 5 P2 0.60 0.30 1.00 4.00 46.48

tipo 6 P2 0.40 0.30 1.00 4.00 30.99

tipo 7 P2 0.80 0.35 1.00 2.00 36.15

tipo 8 P2 0.50 0.30 1.00 2.00 19.37

tipo 9 P2 0.60 0.30 1.00 2.00 23.24

tipo 10 P2 0.35 0.25 1.00 2.00 11.30

01.02.05.01.02 TIJERALES TIMPANO DE MADERA TORNIP2 pie pulgadas pulgadas 127.62

En aulas P2 17.55 2.00 3.00 4.00 35.10

P2 19.69 2.00 3.00 4.00 39.37

Tijerales tímpano 2" x 3" en escalera P2 53.15 2.00 3.00 2.00 53.15

01.02.05.01.03 CORREAS DE MADERA TORNILLO 2" x P2 732.28

Longitudinalmente Modulo de 06 aulas P2 91.54 2.00 3.00 16.00 732.28

01.02.05.01.04 CORREAS DE MADERA TORNILLO 3" x P2 172.90

Page 27: Met for 01(I-III) Colpa

27

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

En escalera P2 14.11 3.00 4.00 7.00 98.75

En escalera P2 18.54 3.00 4.00 4.00 74.15

01.02.05.01.05 FRISOS DE MADERA TORNILLO E=1”x8 P2 143.92

Frisos 1"x8" Frontal y posterior Aulas Modu P2 89.24 1.00 8.00 2.00 118.99

Frisos 1"x8" Frontal y posterior Escalera P2 18.70 1.00 8.00 2.00 24.93

01.02.05.01.06 FRISOS DE MADERA TORNILLO E=1”x3 P2 24.70

FRISOS 1"x3" LATERAL ESCALERAS P2 24.33 1.00 3.00 1.00 6.08

FRISOS 1"x3" LATERALES AULAS P2 37.24 1.00 3.00 2.00 18.62

01.02.05.02 COBERTURA

01.02.05.02.01 COBERTURA CON FLEXIFORTE DE 1.83XM2 361.02

En Aulas

Cobertura con Cobertura Flexiforte rojo en M2 11.55 27.90 322.25

Escalera

Cobertura con Cobertura Flexiforte rojo en M2 8.20 4.30 35.26

1.35 2.60 3.51

01.02.05.02.02 CUMBRERA CON FLEXIFORTE DE ONDA Ml 33.65

En Aulas

Cumbrera con calamina galvanizada N° 30 Ml 27.95 1.00 27.95

Escalera

Cumbrera con calamina galvanizada N° 30 Ml 5.70 1.00 5.70

01.02.06 MUROS DE ALBAÑILERIA

01.02.06.01 MURO DE CABEZA LADRILLO KK 18 H M2 205.70

Ejes 1-1, 3-3, 5-5 y 7-7 (1er PISO) M2 6.15 2.70 4.00 66.42

Ejes 1-1, 3-3, 5-5 y 7-7 (2do PISO) M2 6.15 2.70 4.00 66.42

Ejes 1-1, 3-3, 5-5 y 7-7 (2do PISO)-Timpa M2 6.15 1.14 4.00 28.08

Escalera (laterales) ejes 8 y 9 M2 3.70 2.80 2.00 20.72

Escalera (laterales) ejes 8 y 9 (parte sup.) M3 3.70 2.73 2.00 20.19

Escalera (laterales) ejes B' y B' M2 2.93 1.32 1.00 3.87

01.02.06.02 MURO DE SOGA LADRILLO KK 18 HUE M2 129.03

Eje C (Primer Piso), entre ejes: del 1-1 al M2 3.12 0.78 6.00 14.70

Eje C (Segundo Piso), entre ejes: del 1-1 a M2 3.12 0.99 6.00 18.44

Eje A (Primer Piso) entre ejes: 1-2,3-4,5- M2 3.12 1.69 3.00 15.77

Eje A (Primer Piso) entre ejes: 2-3,3-4.5- M2 2.03 1.69 3.00 10.26

Page 28: Met for 01(I-III) Colpa

28

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Eje A (Segundor Piso) entre ejes: 1-2,3-4 M2 3.12 1.89 3.00 17.64

Eje A (segundo Piso) entre ejes: 2-3,3-4. M2 2.03 1.89 3.00 11.48

PARAPETO DEL SEGUNDO PISO

Entre ejes: 1 al 7 fachada principal M2 20.56 0.95 1.00 19.53

Eje 1-1 1.39 0.95 1.00 1.32

ESCALERA

Eje B' Entre 8 y 9 Segundo nivel M2 2.69 0.91 1.00 2.46

Eje A' Entre 8 y 9 M2 1.57 1.80 1.00 2.83

Entre ejes 8 y 9 (B'-A) M2 2.51 1.80 1.00 4.52

Entre ejes 8 y 9 (B'-A) Trapecio M2 2.51 0.55 1.00 1.38

Eje A, entre 8 y 9 M2 0.64 2.75 1.00 1.76

Baranda 1 M2 1.50 1.00 1.00 1.50

Parapeto del 2do piso fachada M2 4.33 0.95 1.00 4.11

Parapeto del 2do piso M2 1.40 0.95 1.00 1.33

01.02.07 REVOQUES ENLUCIDOS Y MOLDURAS

01.02.07.01 TARRAJEO EN INTERIORES ACABAD M2 399.86

Primer nivel

Ejes 1-1, 3-3, 5-5,7-7 M2 6.40 2.85 6.00 109.44

Eje C-C, 1-1 al 7-7 M2 3.62 1.04 6.00 22.48

Eje A entre ejes: 1-2,3-4,5-6 M2 3.62 1.94 3.00 21.01

Eje A entre ejes: 2-3,3-4.5-6 M2 2.53 1.94 3.00 14.69

Segundo Nivel

Ejes 1-1, 3-3, 5-5,7-7 M2 6.40 2.70 6.00 103.68

Eje C-C, 1-1 al 7-7 M2 3.62 1.09 6.00 23.57

Eje A entre ejes: 1-2,3-4,5-6 M2 3.62 1.99 3.00 21.56

Eje A entre ejes: 2-3,3-4.5-6 M2 2.53 1.99 3.00 15.07

ESCALERA PRIMER PISO DEPOSITO

Eje 9 Primer piso (deposito) M2 4.40 2.20 1.00 9.68

Eje 8 Primer piso (deposito) M2 1.40 1.70 2.00 4.76

Eje A' DEPOSITO M2 1.55 1.70 1.00 2.64

Eje A PRIMER PISO M2 0.65 2.64 1.00 1.71

ENTRE EJES 8 y 9 Primer piso M2 3.00 2.20 1.00 6.60

Eje B' Primer piso deposito M2 3.24 1.20 1.00 3.89

CAJA DE ESCALERA

Eje 8 y 9 M2 3.60 3.70 2.00 26.64

Eje B' M2 3.24 1.00 1.00 3.24

Eje A ambas caras M2 1.60 1.00 2.00 3.20

Entre Ejes 8 y 9 Baranda ambas caras M2 3.00 1.00 2.00 6.00

Page 29: Met for 01(I-III) Colpa

29

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

01.02.07.02 TARRAJEO EN EXTERIORES CON CEM M2 304.70

Primer nivel

Eje C-C, entre 1-1 al 7-7 M2 3.62 1.14 6.00 24.65

Eje A entre ejes: 1-2,3-4,5-6 M2 3.62 2.04 3.00 22.10

Eje A entre ejes: 2-3,3-4.5-6 M2 2.53 2.04 3.00 15.45

Eje 1-1, y 7-7, entre A-A y C-C M2 6.40 2.95 2.00 37.76

Segundo Nivel

Eje C-C, entre 1-1 al 7-7 M2 3.62 1.04 6.00 22.48

Eje A entre ejes: 1-2,3-4,5-6 M2 3.62 1.99 3.00 21.56

Eje A entre ejes: 2-3,3-4.5-6 M2 2.53 1.99 3.00 15.07

Eje 1-1, 7-7, entre A-A y C-C M2 6.40 2.70 2.00 34.56

Eje 1-1, 7-7, entre A-A y C-C Timpano, in M2 6.40 0.60 2.00 7.68

Eje 1-1, 7-7, entre A-A y C-C Timpano, su M2 6.20 0.60 2.00 7.44

Parapetos

Entre ejes: 1 al 7 fachada principal M2 20.69 1.05 2.00 43.45

Eje 1-1 1.90 1.05 2.00 3.99

Escalera

Eje B' PRIMER PISO M2 3.24 0.94 1.00 3.05

Eje B' SEGUNDO PISO M2 3.24 1.00 1.00 3.24

Eje 9 Primer piso M2 4.68 2.70 1.00 12.64

Eje 9 Segundo piso M2 4.68 2.73 1.00 12.77

Parapeto fachada frontal M2 5.60 1.05 2.00 11.76

1.90 1.05 2.00 3.99

Gargolas

Frontal M2 0.20 0.10 4.00 0.08

Frontal M2 0.15 0.05 8.00 0.06

Lateral M2 0.25 0.20 4.00 0.20

Fondo y techo M2 0.20 0.20 8.00 0.32

Techo M2 0.20 0.05 8.00 0.08

Interior gargola M2 0.40 0.20 4.00 0.32

01.02.07.03 TARRAJEO DE SUPERFICIE DE COL M2 190.75

INTERIORES

Primer Nivel

Eje A1 Y A7 M2 0.67 2.65 2.00 3.55

Eje A2, A4, Y A6 M2 1.45 2.65 3.00 11.53

Eje A3, A5 M2 1.22 2.65 2.00 6.47

Eje B1,B3, B5, Y B7 M2 0.25 2.65 6.00 3.98

Page 30: Met for 01(I-III) Colpa

30

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Eje C1 Y C7 M2 0.47 2.65 2.00 2.49

Eje C2, C4, Y C6 M2 1.05 2.65 3.00 8.35

Eje C3, C5 M2 0.82 2.65 2.00 4.35

Segundo Nivel

Eje A1 Y A7 M2 0.67 2.70 2.00 3.62

Eje A2, A4, Y A6 M2 1.45 2.70 3.00 11.75

Eje A3, A5 M2 1.22 2.70 2.00 6.59

Eje B1,B3, B5, Y B7 M2 0.25 2.70 6.00 4.05

Eje C1 Y C7 M2 0.47 2.70 2.00 2.54

Eje C2, C4, Y C6 M2 1.05 2.70 3.00 8.51

Eje C3, C5 M2 0.82 2.70 2.00 4.43

EXTERIORES

Primer Nivel

Eje A1 Y A7 M2 0.90 2.75 2.00 4.95

Eje A2, A4, Y A6 M2 0.65 2.75 3.00 5.36

Eje A3, A5 M2 0.65 2.75 2.00 3.58

Eje B1, B7 M2 0.25 2.75 2.00 1.38

Eje C1 Y C7 M2 1.10 2.75 2.00 6.05

Eje C2, C4, Y C6 M2 1.05 2.75 3.00 8.66

Eje C3, C5 M2 1.05 2.75 2.00 5.78

Segundo Nivel

Eje A1 Y A7 M2 0.90 2.70 2.00 4.86

Eje A2, A4, Y A6 M2 0.65 2.70 3.00 5.27

Eje A3, A5 M2 0.65 2.70 2.00 3.51

Eje B1 Y B7 M2 0.25 2.70 2.00 1.35

Eje C1 Y C7 M2 1.10 2.70 2.00 5.94

Eje C2, C4, Y C6 M2 1.05 2.70 3.00 8.51

Eje C3, C5 M2 1.05 2.70 2.00 5.67

Columnetas en pazadizo

0.25 0.95 48.00 11.40

0.13 0.95 16.00 1.98

ESCALERA

Eje B'8 y B'9 M2 0.26 4.60 2.00 2.39

Eje B'8 y B'9 M2 0.14 5.40 2.00 1.51

Eje B'9 M2 0.30 4.60 1.00 1.38

Eje A'8 Y A'9 M2 0.25 5.95 3.00 4.46

Eje A 8, A9 M2 0.40 6.10 3.00 7.32

Eje A 8, A9 M2 0.26 6.10 2.00 3.17

Columneta en pazadizo M2 0.25 0.95 14.00 3.32

Columneta en pazadizo M2 0.13 0.95 6.00 0.74

Page 31: Met for 01(I-III) Colpa

31

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

01.02.07.04 TARRAJEO EN SUPERFICIE DE VIGAS M2 235.86

INTERIORES

Primer nivel

EJE 2, 4, 6 Fondo M2 6.40 0.35 3.00 6.72

EJE 2, 4, 6 Lateral M2 6.60 0.35 6.00 13.86

EJE 1, 3, 5, 7 Lateral M2 6.60 0.15 6.00 5.94

Eje A Fondo M2 3.70 0.20 6.00 4.44

Eje A Lateral M2 4.00 0.35 6.00 8.40

Eje C Fondo M2 3.70 0.20 6.00 4.44

Eje C Lateral M2 3.70 0.35 6.00 7.77

Eje A alfeizer de ventanas M2 3.62 0.10 3.00 1.09

Eje A alfeizer de ventanas M2 2.53 0.10 3.00 0.76

Eje C alfeizer de ventanas M2 3.62 0.10 6.00 2.17

Segundo Nivel

EJE 1, 3, 5, 7 Lateral M2 6.60 0.30 6.00 11.88

Eje A Fondo M2 3.70 0.20 6.00 4.44

Eje A Lateral M2 4.00 0.30 6.00 7.20

Eje C Fondo M2 3.70 0.20 6.00 4.44

Eje C Lateral M2 3.70 0.30 6.00 6.66

Eje A alfeizer de ventanas M2 3.62 0.10 3.00 1.09

Eje A alfeizer de ventanas M2 2.53 0.10 3.00 0.76

Eje C alfeizer de ventanas M2 3.62 0.10 6.00 2.17

Escalera

Eje 8 y 9 M2 4.30 0.25 2.00 2.15

Eje B' 1er nivel M2 3.73 0.25 1.00 0.93

Eje B' 2do nivel M2 3.73 0.30 1.00 1.12

Eje A primer y segundo nivel M2 3.73 0.30 2.00 2.24

EXTERIORES

Primer nivel

EJE 1 Y 7 laterales M2 7.20 0.55 2.00 7.92

EJE 1 Y 7 laterales M2 2.00 0.48 2.00 1.90

EJE del 1 al 7 Fondo M2 2.00 0.35 7.00 4.90

EJE del 1 al 7 Laterales M2 2.00 0.28 12.00 6.60

Eje C alfeizer de ventanas fachada posteri M2 3.62 0.10 6.00 2.17

Eje C laterales M2 26.45 0.55 1.00 14.55

Eje A alfeizer de ventanas fachada principa M2 3.62 0.10 3.00 1.09

Eje A alfeizer de ventanas fachada principa M2 2.53 0.10 3.00 0.76

Eje A fachada principal M2 4.00 0.35 6.00 8.40

Page 32: Met for 01(I-III) Colpa

32

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Segundo Nivel

EJE 1 Y 7 laterales M2 7.20 0.30 2.00 4.32

EJE 1 Y 7 laterales Timpano M2 3.43 0.25 4.00 3.43

EJE del 1 al 7 laterales M2 2.40 0.55 16.00 21.31

EJE del 1 al 7 Fondo M2 2.00 0.23 14.00 6.44

Eje C alfeizer de ventanas fachada posteri M2 3.62 0.10 6.00 2.17

Eje C laterales M2 26.45 0.55 1.00 14.55

Eje A alfeizer de ventanas fachada principa M2 3.62 0.10 3.00 1.09

Eje A alfeizer de ventanas fachada principa M2 2.53 0.10 3.00 0.76

Eje A fachada principal M2 4.00 0.30 6.00 7.20

Viga en voladizo M2 26.45 0.40 1.00 10.58

Viga en voladizo M2 4.00 0.20 6.00 4.80

Parapeto en alero M2 24.60 0.10 2.00 4.92

Parapeto en alero M2 1.90 0.10 2.00 0.38

Escalera

Eje A fachada principal primer piso M2 3.75 0.35 1.00 1.31

Eje A fachada principal segundo piso M2 3.75 0.30 1.00 1.13

Parapeto en alero M2 6.50 0.10 1.00 0.65

Parapeto en alero M2 1.90 0.10 1.00 0.19

Eje B' fachada posterior segundo piso M2 3.75 0.30 1.00 1.13

Eje B' alfeizer de ventanas fachada posteri M2 3.75 0.15 1.00 0.56

01.02.07.05 TARRAJEO PULIDO BOLEADO GRIS E M2 14.31

Parapeto de aula 24.60 0.36 1.00 8.86

Parapeto de aula 1.90 0.36 1.00 0.68

Pasamanos en escalera 5.70 0.36 1.00 2.05

Parapeto de escalera 5.65 0.36 1.00 2.03

Parapeto de escalera 1.90 0.36 1.00 0.68

01.02.07.06 VESTIDURA DE DERRAMES EN PUERTA ML 117.84

Primer nivel

P-1 ML 2.64 6.00 15.81

V-3 Eje AA ML 2.53 3.00 7.59

V-2 Eje AA ML 3.62 3.00 10.86

V-1 EJE CC ML 3.62 6.00 21.72

Segundo nivel

P-1 ML 2.64 6.00 15.81

V-3 Eje AA ML 2.53 3.00 7.59

V-2 Eje AA ML 3.62 3.00 10.86

Page 33: Met for 01(I-III) Colpa

33

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

V-1 EJE CC ML 3.62 6.00 21.72

ESCALERA

P-2 ML 2.64 1.00 2.64

V-4 ML 3.24 1.00 3.24

01.02.07.07 BRUÑAS E=1CM ML 803.24

Primer nivel

Eje AA, Entre 1-2, 3-4, 5-6 ML 6.59 6.00 39.54

Eje AA, Entre 2-3, 3-4,5-6 ML 5.50 6.00 33.00

Eje C-C, Entre del 1-2,2-3,3-4,4-5,5-6, ML 4.79 12.00 57.48

Eje 1-1 y 7-7 (interior y exterior) ML 16.35 4.00 65.40

Eje 3-3, 5-5 ML 16.35 4.00 65.40

Segundo nivel

Eje AA, Entre 1-2, 3-4, 5-6 ML 6.39 6.00 38.34

Eje AA, Entre 2-3, 3-4,5-6 ML 5.30 6.00 31.80

Eje C-C, Entre del 1-2,2-3,3-4,4-5,5-6, ML 4.99 12.00 59.88

Eje 1-1 y 7-7 (interior y exterior) ML 22.10 4.00 88.40

Eje 1-1 y 7-7 Timpano ML 16.80 2.00 33.60

Eje 3-3, 5-5 ML 15.95 4.00 63.80

Voladizo

Del eje 1-1 al 7-7 ML 1.84 20.00 36.75

2.14 2.00 4.27

1.39 2.00 2.77

1.32 4.00 5.26

1.70 2.00 3.40

1.40 2.00 2.80

Altura 0.90 64.00 57.60

En escalera

Entre el eje 8-8 al 9-9 ML 1.33 4.00 5.32

0.95 4.00 3.80

ML 2.74 2.00 5.48

0.90 4.00 3.60

Eje 8-8 y 9-9 primer nivel 13.90 3.00 41.70

Eje 8-8 y 9-9 segundo nivel 17.95 3.00 53.85

01.02.08 CIELORASO

01.02.08.01 CIELORRASOS CON MEZCLA DE CEM M2 222.48

Aulas (primer nivel) M2 6.60 4.00 6.00 158.40

Voladizo aulas M2 4.00 1.89 6.00 45.24

Voladizo escalera M2 3.27 1.89 1.00 6.16

Page 34: Met for 01(I-III) Colpa

34

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Voladizo escalera M2 1.70 1.89 1.00 3.20

Deposito debajo de escalera M2 3.24 1.42 1.00 4.60

Escalera 2° tramo M2 3.15 1.55 1.00 4.88

01.02.08.02 CIELORRASO SUSPENDIDO CON TRIPLAM2 317.17

Aulas (segundo nivel) M2 8.50 6.60 3.00 168.30

Voladizo (Frontal y posterior)- segundo niv M2 8.50 2.00 6.00 102.00

Alero lateral - segundo nivel M2 11.35 0.60 2.00 13.62

ESCALERA

INTERIOR M2 5.45 3.25 1.00 17.71

LATERAL M2 5.45 0.60 1.00 3.27

PASADIZO M2 4.35 2.00 1.00 8.70

1.79 2.00 1.00 3.57

01.02.08.03 RODON DE MADERA TORNILLO CEPILLAML 189.25

INTERIOR

Aulas (segundo nivel) ML 8.50 6.00 51.00

Aulas (segundo nivel) ML 6.60 6.00 39.60

EXTERIOR

Eje AA ML 26.45 1.00 26.45

Eje CC ML 26.45 1.00 26.45

EJE 1-1 Y 77 ML 11.35 2.00 22.70

ESCALERA

INTERIOR ML 11.95 1.00 11.95

LATERAL ML 5.45 1.00 5.45

PASADIZO ML 5.65 1.00 5.65

01.02.09 PISOS Y VEREDAS

01.02.09.01 PISOS

01.02.09.01.01 PISO DE MADERA MACHIHEMBRADA DE 1"x4" C/DURMIENTES DE 2"x3" EN PRIMER PISO 170.85

Aulas (primer nivel) M2 8.50 6.70 3.00 170.85

01.02.09.01.02 PISO DE MADERA MACHIHEMBRADA DE 1"x4" C/DURMIENTES DE 3"x1.5" EN SEGUNDO PISO 170.85

Aulas (Segundo nivel) M2 8.50 6.70 3.00 170.85

01.02.09.01.03 PISO DE CEMENTO PULIDO E=2" BRU M2 65.97

Deposito debajo de escalera M2 3.24 1.52 1.00 4.92

Deposito debajo de escalera M2 1.54 1.20 1.00 1.85

Pasadizo de circulación Modulo de 06 aula M2 26.30 1.85 1.00 48.66

Page 35: Met for 01(I-III) Colpa

35

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Pasadizo de circulación escalera M2 5.70 1.85 1.00 10.55

01.02.09.02 VEREDAS

01.02.09.02.01 VEREDA DE CONCRETO DE 4" CON BR M2 84.48

Frontal M2 31.89 1.50 1.00 47.84

Posterior M2 27.93 0.80 1.00 22.34

3.81 0.80 1.00 3.05

Laterales M2 7.03 0.80 1.00 5.62

Laterales M2 4.68 0.80 1.00 3.74

2.35 0.80 1.00 1.88

01.02.09.02.02 CONCRETO F'C=140 KG/CM2 EN UÑAS M3 6.89

Frontal M3 31.89 1.00 0.08 2.55

Posterior M3 27.93 1.00 0.08 2.23

3.81 1.00 0.08 0.30

Laterales M2 7.03 1.00 0.08 0.56

Laterales M2 4.68 1.00 0.08 0.37

2.35 1.00 0.08 0.19

Corte J-J Frontal M3 1.50 0.30 0.20 5.00 0.45

Corte J-J Posterior M3 0.80 0.30 0.20 5.00 0.24

01.02.09.02.03 JUNTAS DE CONTRACCION ML 6.90

Vereda frontal ML 1.50 3.00 4.50

Vereda posterior de Aulas ML 0.80 3.00 2.40

01.02.09.02.04 JUNTAS DE DILATACION EN VEREDAS ML 89.94Vereda frontal ML 1.50 5.00 7.50

Vereda posterior de Aulas ML 0.80 5.00 4.00

Vereda lateral de Aulas ML 0.80 3.00 2.40

perimetral al modulo ML 76.04 1.00 76.04

01.02.10 ZOCALOS, CONTRAZOCALOS Y REVESTIMIENTOS

01.02.10.01 ZOCALOS

01.02.10.01.01 ZOCALO DE CEMENTO MEZCLA CEME ML 121.21

Fachada posterior ML 28.85 1.00 28.85

Fachada posterior escalera ML 3.75 1.00 3.75

Fachada lateral aula izquierda ML 7.23 1.00 7.23

Fachada lateral aula derecha ML 2.55 1.00 2.55

Fachada frontal ML 26.45 1.00 26.45

Fachada frontal aula 2° piso ML 26.45 1.00 26.45

Escalera primer tramo ML 3.19 1.00 3.19

Page 36: Met for 01(I-III) Colpa

36

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Descanso ML 1.58 1.00 1.58

Escalera segundo tramo ML 3.43 1.00 3.43

ML 1.69 1.00 1.69

Eje 8 deposito ML 1.52 1.00 1.52

Eje 8' deposito ML 2.96 1.00 2.96

Eje A deposito ML 0.64 1.00 0.64

Eje A' deposito ML 1.50 1.00 1.50

Eje B' deposito ML 3.24 1.00 3.24

Eje A' deposito ML 1.70 1.00 1.70

Entre ejes 9 - 9 ML 4.48 1.00 4.48

01.02.10.02 CONTRAZOCALOS

01.02.10.02.01 CONTRAZOCALO DE MADERA TORNILLO ML 124.80

INTERIOR AULAS Primer nivel ML 8.50 3.00 25.50

ML 6.70 6.00 40.20

menos puerta P1 ML 1.10 -3.00 -3.30

INTERIOR AULAS Segundo nivel ML 8.50 3.00 25.50

ML 6.70 6.00 40.20

menos puerta P1 ML 1.10 -3.00 -3.30

01.02.10.03 REVESTIMIENTO GRADAS DE ESCALERAS

01.02.10.03.01 FORJADO Y REVESTIM. DE GRADAS Y M2 35.65

Pasos M2 1.55 23.00 35.65

01.02.10.03.02 FORJADO Y REVESTIM. DE DESCANSO M2 4.92

Primer descanzo M2 3.24 1.52 1.00 4.92

01.02.10.03.03 BARANDA DE TUBERIA DE F°G° DE 2" ML 12.78

ML 12.78 1.00 12.78

01.02.10.03.04 CANTONERAS METALICAS CON PLANC Pza 23.00

Cantoneras en pasos de escaleras de 3” x3 Pza 23.00

01.02.11 CARPINTERIA DE MADERA

01.02.11.01 PUERTAS

01.02.11.01.01 PUERTA DE MADERA CEDRO TABLERO M2 19.77

Puerta de madera cedro en Aulas M2 1.10 2.64 6.00 17.39

Puerta de madera cedro en Escalera M2 0.90 2.64 1.00 2.38

Page 37: Met for 01(I-III) Colpa

37

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

01.02.11.01.02 COLOCACION DE PUERTAS UND 7.00 7.00

01.02.11.02 PIZARRA

01.02.11.02.01 PIZARRA TIPO ACRILICO DE 1.20X4.5 UND 6.00 6.00

01.02.12 CARPINTERIA METALICA

01.02.12.01 VENTANA

01.02.12.01.01 VENTANA METALICA M2 98.29

Primer nivel

V-1 M2 3.67 1.60 6.00 35.23

V-2 M2 3.67 0.70 3.00 7.71

V-3 M2 2.57 0.70 3.00 5.40

Segundo nivel

V-1 M2 3.67 1.60 6.00 35.23

V-2 M2 3.67 0.70 3.00 7.71

V-3 M2 2.57 0.70 3.00 5.40

ESCALERA

V-4 ML 3.24 0.50 1.00 1.62

01.02.12.01.02 COLOCACION DE VENTANAS UND 25.00 25.00

01.02.13 CERRAJERIA

01.02.13.01 CERRADURA PARA PUERTAS UND 7.00 7.00

01.02.13.02 MANIJA DE BRONCE 4” P/PUERTA UND 7.00 7.00

01.02.14 VIDRIO, CRISTALES Y SIMILARES

01.02.14.01 VIDRIO SEMIDOBLE P2 1058.01

Primer nivel

V-1 M2 3.67 1.60 6.00 379.23

V-2 M2 3.67 0.70 3.00 82.96

V-3 M2 2.57 0.70 3.00 58.09

Segundo nivel

V-1 M2 3.67 1.60 6.00 379.23

V-2 M2 3.67 0.70 3.00 82.96

V-3 M2 2.57 0.70 3.00 58.09

ESCALERA

V-4 ML 3.24 0.50 1.00 17.44

Page 38: Met for 01(I-III) Colpa

38

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

01.02.15 PINTURA

01.02.15.01 PINTURA EN MUROS INTERIORES

01.02.15.01.01 PINTURA LATEX EN MUROS INTERIOR M2 331.50

Primer nivel

Ejes 1-1, 3-3, 5-5,7-7 M2 6.40 2.85 6.00 109.44

Eje C-C, 1-1 al 7-7 M2 3.62 1.04 6.00 22.48

Eje A entre ejes: 1-2,3-4,5-6 M2 3.62 1.94 3.00 21.01

Eje A entre ejes: 2-3,3-4.5-6 M2 2.53 1.94 3.00 14.69

Segundo Nivel

Ejes 1-1, 3-3, 5-5,7-7 M2 6.40 2.70 6.00 103.68

Eje C-C, 1-1 al 7-7 M2 3.62 1.09 6.00 23.57

Eje A entre ejes: 1-2,3-4,5-6 M2 3.62 1.99 3.00 21.56

Eje A entre ejes: 2-3,3-4.5-6 M2 2.53 1.99 3.00 15.07

01.02.15.01.02 PINTURA LATEX EN COLUMNAS Y VIG M2 182.87

PINTURA EN COLUMNAS INTERIORES

Primer Nivel

Eje A1 Y A7 M2 0.67 2.65 2.00 3.55

Eje A2, A4, Y A6 M2 1.45 2.65 3.00 11.53

Eje A3, A5 M2 1.22 2.65 2.00 6.47

Eje B1,B3, B5, Y B7 M2 0.25 2.65 6.00 3.98

Eje C1 Y C7 M2 0.47 2.65 2.00 2.49

Eje C2, C4, Y C6 M2 1.05 2.65 3.00 8.35

Eje C3, C5 M2 0.82 2.65 2.00 4.35

Segundo Nivel

Eje A1 Y A7 M2 0.67 2.70 2.00 3.62

Eje A2, A4, Y A6 M2 1.45 2.70 3.00 11.75

Eje A3, A5 M2 1.22 2.70 2.00 6.59

Eje B1,B3, B5, Y B7 M2 0.25 2.70 6.00 4.05

Eje C1 Y C7 M2 0.47 2.70 2.00 2.54

Eje C2, C4, Y C6 M2 1.05 2.70 3.00 8.51

Eje C3, C5 M2 0.82 2.70 2.00 4.43

PINTURA LATEX EN VIGAS INTERIORES

Primer nivel

EJE 2, 4, 6 Fondo M2 6.40 0.35 3.00 6.72

EJE 2, 4, 6 Lateral M2 6.60 0.35 6.00 13.86

EJE 1, 3, 5, 7 Lateral M2 6.60 0.15 6.00 5.94

Eje A Fondo M2 3.70 0.20 6.00 4.44

Eje A Lateral M2 4.00 0.35 6.00 8.40

Page 39: Met for 01(I-III) Colpa

39

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Eje C Fondo M2 3.70 0.20 6.00 4.44

Eje C Lateral M2 3.70 0.35 6.00 7.77

Eje A alfeizer de ventanas M2 3.62 0.10 3.00 1.09

Eje A alfeizer de ventanas M2 2.53 0.10 3.00 0.76

Eje C alfeizer de ventanas M2 3.62 0.10 6.00 2.17

Segundo Nivel

EJE 1, 3, 5, 7 Lateral M2 6.60 0.30 6.00 11.88

Eje A Fondo M2 3.70 0.20 6.00 4.44

Eje A Lateral M2 4.00 0.30 6.00 7.20

Eje C Fondo M2 3.70 0.20 6.00 4.44

Eje C Lateral M2 3.70 0.30 6.00 6.66

Eje A alfeizer de ventanas M2 3.62 0.10 3.00 1.09

Eje A alfeizer de ventanas M2 2.53 0.10 3.00 0.76

Eje C alfeizer de ventanas M2 3.62 0.10 6.00 2.17

Escalera

Eje 8 y 9 M2 4.30 0.25 2.00 2.15

Eje B' 1er nivel M2 3.73 0.25 1.00 0.93

Eje B' 2do nivel M2 3.73 0.30 1.00 1.12

Eje A primer y segundo nivel M2 3.73 0.30 2.00 2.24

01.02.15.01.03 PINTURA LATEX EN MUROS INTERIOR M2 29.28

ESCALERA PRIMER PISO DEPOSITO

Eje 9 Primer piso (deposito) M2 4.40 2.20 1.00 9.68

Eje 8 Primer piso (deposito) M2 1.40 1.70 2.00 4.76

Eje A' DEPOSITO M2 1.55 1.70 1.00 2.64

Eje A PRIMER PISO M2 0.65 2.64 1.00 1.71

ENTRE EJES 8 y 9 Primer piso M2 3.00 2.20 1.00 6.60

Eje B' Primer piso deposito M2 3.24 1.20 1.00 3.89

01.02.15.02 PINTURA EN MUROS EXTERIORES

01.02.15.02.01 PINTURA LATEX EN MUROS EXTERIO M2 345.34

Primer nivel

Eje C-C, entre 1-1 al 7-7 M2 3.62 1.14 6.00 24.65

Eje A entre ejes: 1-2,3-4,5-6 M2 3.62 2.04 3.00 22.10

Eje A entre ejes: 2-3,3-4.5-6 M2 2.53 2.04 3.00 15.45

Eje 1-1, y 7-7, entre A-A y C-C M2 6.40 2.95 2.00 37.76

Segundo Nivel

Eje C-C, entre 1-1 al 7-7 M2 3.62 1.04 6.00 22.48

Eje A entre ejes: 1-2,3-4,5-6 M2 3.62 1.99 3.00 21.56

Page 40: Met for 01(I-III) Colpa

40

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Eje A entre ejes: 2-3,3-4.5-6 M2 2.53 1.99 3.00 15.07

Eje 1-1, 7-7, entre A-A y C-C M2 6.40 2.70 2.00 34.56

Eje 1-1, 7-7, entre A-A y C-C Timpano, in M2 6.40 0.60 2.00 7.68

Eje 1-1, 7-7, entre A-A y C-C Timpano, su M2 6.20 0.60 2.00 7.44

Parapetos

Entre ejes: 1 al 9 fachada principal M2 21.94 1.05 2.00 46.07

Eje 1-1 1.90 1.05 2.00 3.99

Escalera

Eje B' PRIMER PISO M2 3.24 0.94 1.00 3.05

Eje B' SEGUNDO PISO M2 3.24 1.00 1.00 3.24

Eje 9 Primer piso M2 4.68 2.70 1.00 12.64

Eje 9 Segundo piso M2 4.68 2.73 1.00 12.77

Parapeto fachada frontal M2 5.60 1.05 2.00 11.76

1.90 1.05 2.00 3.99

CAJA DE ESCALERA

Eje 8 y 9 M2 3.60 3.70 2.00 26.64

Eje B' M2 3.24 1.00 1.00 3.24

Eje A ambas caras M2 1.60 1.00 2.00 3.20

Entre Ejes 8 y 9 Baranda ambas caras M2 3.00 1.00 2.00 6.00

01.02.15.02.02 PINTURA LATEX EN COLUMNAS Y VI M2 237.30

PINTURA LATEX EN COLUMNAS EXTERIORES

Primer Nivel

Eje A1 Y A7 M2 0.90 2.75 2.00 4.95

Eje A2, A4, Y A6 M2 0.65 2.75 3.00 5.36

Eje A3, A5 M2 0.65 2.75 2.00 3.58

Eje B1, B7 M2 0.25 2.75 2.00 1.38

Eje C1 Y C7 M2 1.10 2.75 2.00 6.05

Eje C2, C4, Y C6 M2 1.05 2.75 3.00 8.66

Eje C3, C5 M2 1.05 2.75 2.00 5.78

Segundo Nivel

Eje A1 Y A7 M2 0.90 2.70 2.00 4.86

Eje A2, A4, Y A6 M2 0.65 2.70 3.00 5.27

Eje A3, A5 M2 0.65 2.70 2.00 3.51

Eje B1 Y B7 M2 0.25 2.70 2.00 1.35

Eje C1 Y C7 M2 1.10 2.70 2.00 5.94

Eje C2, C4, Y C6 M2 1.05 2.70 3.00 8.51

Eje C3, C5 M2 1.05 2.70 2.00 5.67

Columnetas en pazadizo

Page 41: Met for 01(I-III) Colpa

41

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

0.25 0.95 24.00 5.70

0.13 0.95 10.00 1.23

ESCALERA

Eje B'8 y B'9 M2 0.26 4.60 2.00 2.39

Eje B'8 y B'9 M2 0.14 5.40 2.00 1.51

Eje B'9 M2 0.30 4.60 1.00 1.38

Eje A'8 Y A'9 M2 0.25 5.95 3.00 4.46

Eje A 8, A9 M2 0.40 6.10 3.00 7.32

Eje A 8, A9 M2 0.26 6.10 2.00 3.17

Columneta en pazadizo M2 0.25 0.95 14.00 3.32

Columneta en pazadizo M2 0.13 0.95 6.00 0.74

PINTURA LATEX EN VIGAS EXTERIORES

Primer nivel

EJE 1 Y 7 laterales M2 7.20 0.55 2.00 7.92

EJE 1 Y 7 laterales M2 2.00 0.48 2.00 1.90

EJE del 1 al 7 Fondo M2 2.00 0.35 7.00 4.90

EJE del 1 al 7 Laterales M2 2.00 0.28 12.00 6.60

Eje C alfeizer de ventanas fachada posteri M2 3.62 0.10 6.00 2.17

Eje C laterales M2 26.45 0.55 1.00 14.55

Eje A alfeizer de ventanas fachada principa M2 3.62 0.10 3.00 1.09

Eje A alfeizer de ventanas fachada principa M2 2.53 0.10 3.00 0.76

Eje A fachada principal M2 4.00 0.35 6.00 8.40

Segundo Nivel

EJE 1 Y 7 laterales M2 7.20 0.30 2.00 4.32

EJE 1 Y 7 laterales Timpano M2 3.43 0.25 4.00 3.43

EJE del 1 al 7 laterales M2 2.40 0.55 16.00 21.31

EJE del 1 al 7 Fondo M2 2.00 0.23 14.00 6.44

Eje C alfeizer de ventanas fachada posteri M2 3.62 0.10 6.00 2.17

Eje C laterales M2 26.45 0.55 1.00 14.55

Eje A alfeizer de ventanas fachada principa M2 3.62 0.10 3.00 1.09

Eje A alfeizer de ventanas fachada principa M2 2.53 0.10 3.00 0.76

Eje A fachada principal M2 4.00 0.30 6.00 7.20

Viga en voladizo M2 26.45 0.40 1.00 10.58

Viga en voladizo M2 4.00 0.20 6.00 4.80

Parapeto en alero M2 24.60 0.10 2.00 4.92

Parapeto en alero M2 1.90 0.10 2.00 0.38

Escalera

Eje A fachada principal primer piso M2 3.75 0.35 1.00 1.31

Eje A fachada principal segundo piso M2 3.75 0.30 1.00 1.13

Page 42: Met for 01(I-III) Colpa

42

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Parapeto en alero M2 6.50 0.10 1.00 0.65

Parapeto en alero M2 1.90 0.10 1.00 0.19

Eje B' fachada posterior segundo piso M2 3.75 0.30 1.00 1.13

Eje B' alfeizer de ventanas fachada posteri M2 3.75 0.15 1.00 0.56

01.02.15.02.03 PINTURA LATEX EN GARGOLAS COLO M2 1.06

Gargolas

Frontal M2 0.20 0.10 4.00 0.08

Frontal M2 0.15 0.05 8.00 0.06

Lateral M2 0.25 0.20 4.00 0.20

Fondo y techo M2 0.20 0.20 8.00 0.32

Techo M2 0.20 0.05 8.00 0.08

Interior gargola M2 0.40 0.20 4.00 0.32

01.02.15.02.04 PINTURA DE ZOCALO C/ESMALTE H=0 ML 121.21

EN EXTERIOR

Fachada posterior ML 28.85 1.00 28.85

Fachada posterior escalera ML 3.75 1.00 3.75

Fachada lateral aula izquierda ML 7.23 1.00 7.23

Fachada lateral aula derecha ML 2.55 1.00 2.55

Fachada frontal ML 26.45 1.00 26.45

Fachada frontal aula 2° piso ML 26.45 1.00 26.45

Escalera primer tramo ML 3.19 1.00 3.19

Descanso ML 1.58 1.00 1.58

Escalera segundo tramo ML 3.43 1.00 3.43

ML 1.69 1.00 1.69

Eje 8 deposito ML 1.52 1.00 1.52

Eje 8' deposito ML 2.96 1.00 2.96

Eje A deposito ML 0.64 1.00 0.64

Eje A' deposito ML 1.50 1.00 1.50

Eje B' deposito ML 3.24 1.00 3.24

Eje A' deposito ML 1.70 1.00 1.70

Entre ejes 9 - 9 ML 4.48 1.00 4.48

01.02.15.03 PINTURA DE CIELORRASO

01.02.15.03.01 PINTURA LATEX EN CIELO RASO CO M2 208.00

Aulas (primer nivel) M2 6.60 4.00 6.00 158.40

Voladizo aulas M2 4.00 1.39 6.00 33.24

Voladizo escalera M2 3.27 1.39 1.00 4.53

Page 43: Met for 01(I-III) Colpa

43

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Voladizo escalera M2 1.70 1.39 1.00 2.35

Deposito debajo de escalera M2 3.24 1.42 1.00 4.60

Escalera 2° tramo M2 3.15 1.55 1.00 4.88

01.02.15.03.02 PINTURA LATEX EN CIELO RASO CO M2 291.67

Aulas (segundo nivel) M2 8.50 6.60 3.00 168.30

Voladizo (Frontal y posterior)- segundo niv M2 8.50 1.50 6.00 76.50

Alero lateral - segundo nivel M2 11.35 0.60 2.00 13.62

ESCALERA

INTERIOR M2 5.45 3.25 1.00 17.71

LATERAL M2 5.45 0.60 1.00 3.27

PASADIZO M2 4.35 2.00 1.00 8.70

1.79 2.00 1.00 3.57

01.02.15.04 PINTURA EN ESTRUCTURA METALICA

01.02.15.04.01 ML 12.78

ML 12.78 1.00 12.78

01.02.15.04.02 ML 30.82

ML 1.34 23.00 30.82

01.02.15.04.03 ML 7.04

Encuentro mod aulas y escalera ML 2.74 1.00 2.74

2.95 1.00 2.95

Junta en piso entre escalera y aula ML 1.35 1.00 1.35

01.02.15.04.04 PINTURA ANTICORROSIVO ZINCROMA ML 66.96

Canaleta de plancha galvanizada 1/32” s/d

Aulas ML 27.93 2.00 55.86

Escalera ML 6.55 1.00 6.55

Escalera ML 4.55 1.00 4.55

01.02.15.04.05 PINTURA EN VENTANAS C/ESMALTE Y M2 98.29

Primer nivel

V-1 M2 3.67 1.60 6.00 35.23

V-2 M2 3.67 0.70 3.00 7.71

V-3 M2 2.57 0.70 3.00 5.40

Segundo nivel

PINTURA ANTICORROSIVO ZINCROMATO ACABADO CON ESMALTE SINTETICO COLOR BAYO EN BARANDAS

PINTURA ANTICORROSIVO ZINCROMATO ACABADO CON ESMALTE SINTETICO COLOR NEGRO EN CANTONERAS

PINTURA ANTICORROSIVO ZINCROMATO ACABADO CON ESMALTE SINTETICO COLOR BAYO EN TAPAJUNTAS

Page 44: Met for 01(I-III) Colpa

44

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

V-1 M2 3.67 1.60 6.00 35.23

V-2 M2 3.67 0.70 3.00 7.71

V-3 M2 2.57 0.70 3.00 5.40

ESCALERA

V-4 ML 3.24 0.50 1.00 1.62

01.02.16 SISTEMA DE AGUA DE LLUVIA

01.02.16.01 CANALETA DE PLANCHA GALVANIZADA

01.02.16.01.01 CANALETA DE PLANCHA GALVANIZADA ML 66.96

AULAS ML 27.93 2.00 55.86

ESCALERA ML 6.55 1.00 6.55

ESCALERA ML 4.55 1.00 4.55

01.02.16.01.02 TUBERIA DE BAJADA PVC SAP 4" DE ML 46.85

Modulo de aulas eje A -A ML 10.45 2.00 20.90

Modulo de aulas eje C - C ML 8.65 3.00 25.95

01.02.16.01.03 CODOS PVC SAL 4”X90° PZA 3.00 5.00 15.00

01.02.16.02 COLUMNETA PARA SOPORTE DE TUBERIAS

01.02.16.02.01 CONCRETO EN COLUMNAS f'c= 175 kg M3 0.40

0.25 0.20 1.60 5.00 0.40

01.02.16.02.02 ENCOFRADO Y DESENCOFRADO NORM M2 5.20

0.65 1.60 5.00 5.20

01.02.17 VARIOS

01.02.17.01 JUNTA DE CONSTRUCCION CON TEK M2 9.32

Frontal 1er nivel M2 2.19 0.13 9.00 2.56

2do nivel M2 1.99 0.13 9.00 2.32

Posterior 1er nivel M2 1.29 0.13 12.00 2.00

2do nivel M2 1.09 0.13 12.00 1.69

Escalera M2 1.04 0.23 2.00 0.48

M2 1.04 0.13 2.00 0.27

01.02.17.02 JUNTA SELLADA CON POLIURETANO ML 70.11

Frontal 1er nivel M2 2.19 9.00 19.67

2do nivel M2 1.99 9.00 17.87

Posterior 1er nivel M2 1.29 12.00 15.42

2do nivel M2 1.09 12.00 13.02

Escalera M2 1.04 2.00 2.07

Page 45: Met for 01(I-III) Colpa

45

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 01 (06 AULAS Y ESCALERA ) 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

M2 1.04 2.00 2.07

01.02.17.03 TAPAJUNTAS METALICA DE 1/16"X6" S ML 5.69

Encuentro mod aulas y escalera ML 2.74 1.00 2.74

2.95 1.00 2.95

01.02.17.04 JUNTA CON PLATINA METALICA DE 4" ML 1.35

Junta en piso entre escalera y aula ML 1.35 1.00 1.35

01.02.17.05 LIMPIEZA FINAL DE OBRA M2 32.00 9.50 1.00 304.00 304.00

Page 46: Met for 01(I-III) Colpa

46

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

01.03.00 MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. ADMINISTRATIVOS01.03.01 TRABAJOS PRELIMINARES01.03.01.01 LIMPIEZA DE TERRENO M2 26.00 9.50 1.00 247.00 247.00

01.03.01.02 TRAZO, NIVELACION Y REPLANTEO M2 26.00 9.50 1.00 247.00 247.00

01.03.02 MOVIMIENTOS DE TIERRAS01.03.02.01 EXCAVACION PARA CIMIENTOS HASTA m3 76.06

Eje A -A M3 1.85 0.80 1.50 1.00 2.221.75 0.80 1.50 1.00 2.101.70 0.80 1.50 2.00 4.08

base escalera 1.57 0.55 1.50 1.00 1.300.85 0.80 1.50 1.00 1.021.83 0.80 1.50 1.00 2.20

EJE A' - A' Escalera M3 0.85 0.80 1.18 1.00 0.80Eje B'-B' Escalera M3 2.50 1.00 1.30 1.00 3.25Eje B-B M3 3.28 0.50 1.15 1.00 1.88Eje B'-B' M3 3.30 0.50 1.15 1.00 1.90EJE C-C M3 2.05 0.80 1.50 2.00 4.92

1.95 0.80 1.50 1.00 2.341.90 0.80 1.50 2.00 4.56

Eje 8'-8' Escalera M3 3.66 0.80 1.15 1.00 3.36Eje 9-9 Escalera M3 5.37 1.00 1.50 1.00 8.06EJE 15-15 M3 4.90 1.20 1.50 1.00 8.82EJE 9-9, 10-10 m3 4.90 1.50 1.50 1.00 11.03EJE 13-13 M3 4.60 1.30 1.50 1.00 8.97EJE 14-14 M3 4.70 0.50 1.15 1.00 2.70EJE 13'-13' 0.48 0.50 1.15 2.00 0.55

01.03.02.02 EXCAVACION PARA ZAPATAS DE 1.40 MT A 2.15 MT DE PROFUNDIDAD 153.43Z-1 M3 2.45 2.20 2.40 3.00 38.81Z-2 M3 2.30 2.55 2.40 1.00 14.08Z-3 M3 2.25 2.00 2.40 3.00 32.40Z-4 M3 2.35 2.10 2.40 1.00 11.84Z-5 M3 2.40 2.00 2.40 1.00 11.52Z-6 M3 1.90 1.80 2.40 1.00 8.21Z-7 M3 2.10 2.00 2.40 2.00 20.16Z-8 M3 1.90 1.80 2.40 2.00 16.42

01.03.02.03 RELLENO Y COMPACTADO EN ZANJAS CON EQUIPO LIVIANO 49.74Eje A -A M3 1.85 0.30 0.30 2.00 0.33

1.75 0.30 0.30 2.00 0.321.70 0.30 0.30 4.00 0.611.83 0.30 0.30 2.00 0.33

Eje B-B M3 3.28 0.185 0.20 2.00 0.24Eje B'-B' M3 3.30 0.185 0.20 2.00 0.24EJE C-C M3 2.05 0.30 0.30 4.00 0.74

1.95 0.30 0.30 2.00 0.35base escalera 1.57 0.55 1.50 2.00 2.59

0.85 0.50 0.30 1.00 0.13EJE A' - A' Escalera M3 0.85 0.50 0.20 1.00 0.09Eje B'-B' Escalera M3 2.50 0.77 0.20 1.00 0.39Eje 8'-8' Escalera M3 3.66 0.67 0.20 1.00 0.49Eje 9-9 M3 5.37 0.77 0.20 1.00 0.83

1.90 0.30 0.30 4.00 0.68EJE 15-15 M3 4.90 0.50 0.50 1.00 1.23

4.90 0.35 0.50 1.00 0.86

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Page 47: Met for 01(I-III) Colpa

47

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

EJE 9-9, 10-10 M3 4.90 0.45 0.50 1.00 1.104.90 0.12 0.10 1.00 0.064.55 0.39 0.17 1.00 0.301.45 0.70 0.50 1.00 0.51

EJE 13-13 M3 4.60 0.48 0.50 2.00 2.184.60 0.06 0.10 2.00 0.06

EJE 13'-13' 0.48 0.19 0.20 2.00 0.04

EJE 14-14 M3 4.70 0.185 0.20 2.00 0.35Z-1 M3 2.45 2.20 1.00 3.00 16.17

menos cimiento corrido 2.45 0.80 0.70 -3.00 -4.12menos Viga de Cimentación 2.45 0.20 0.30 -3.00 -0.44menos columna 0.35 0.20 1.00 -3.00 -0.21

Z-2 M3 2.55 2.30 1.00 1.00 5.86menos cimiento corrido 2.55 0.80 0.70 -1.00 -1.43menos Viga de Cimentación 2.55 0.20 0.30 -1.00 -0.15menos cimiento corrido 0.85 1.30 0.50 -1.00 -0.55menos Viga de Cimentación 1.15 0.35 0.40 -1.00 -0.16

Z-3 M3 2.25 2.00 1.00 3.00 13.50menos cimiento corrido 2.25 0.80 0.70 -3.00 -3.78menos Viga de Cimentación 2.25 0.20 0.30 -3.00 -0.41

0.54 0.50 0.30 -1.00 -0.08Z-4 M3 2.35 2.10 1.00 1.00 4.94

menos cimiento corrido 2.35 0.80 0.70 -1.00 -1.32menos Viga de Cimentación 2.35 0.20 0.30 -1.00 -0.14menos cimiento corrido 0.59 1.30 0.50 -1.00 -0.38menos Viga de Cimentación 0.85 0.35 0.40 -1.00 -0.12

0.35 0.20 1.00 -1.00 -0.07Z-5 M3 2.40 2.00 1.00 1.00 4.80

menos cimiento corrido 2.40 0.80 0.70 -1.00 -1.34menos Viga de Cimentación 1.32 0.20 0.30 -1.00 -0.08menos cimiento corrido 0.70 1.50 0.70 -1.00 -0.73menos Viga de Cimentación 1.00 0.35 0.30 -1.00 -0.11

1.20 0.23 0.30 -1.00 -0.08Z-6 M3 1.90 1.80 1.00 1.00 3.42

menos cimiento corrido 1.20 0.80 0.70 -1.00 -0.67menos Viga de Cimentación 1.20 0.20 0.30 -1.00 -0.07menos cimiento corrido 0.27 0.35 0.70 -1.00 -0.06menos Viga de Cimentación 0.27 0.23 0.30 -1.00 -0.02

0.35 0.20 1.00 -1.00 -0.07Z-7 M3 2.10 2.00 1.00 1.00 4.20

menos cimiento corrido 1.30 0.80 0.70 -2.00 -1.46menos Viga de Cimentación 1.30 0.20 0.30 -2.00 -0.16menos cimiento corrido 0.70 1.20 0.50 -2.00 -0.84menos Viga de Cimentación 1.00 0.35 0.40 -2.00 -0.28

Z-8 M3 1.90 1.80 1.00 1.00 3.42menos cimiento corrido 1.20 0.80 0.70 -2.00 -1.34menos Viga de Cimentación 1.20 0.20 0.30 -2.00 -0.14menos cimiento corrido 0.44 1.20 0.50 -2.00 -0.52menos Viga de Cimentación 0.70 0.35 0.40 -2.00 -0.20menos columna 0.35 0.20 1.00 -1.00 -0.07

01.03.02.04 ELIMINACION DE MATERIAL EXCEDEN m3 224.69 (Excav. cimientos + Excv. zapatas - relleno)*1.25

M3 224.69

01.03.02.05 NIVELACION INT. Y APISONADO FINAL M2 146.43Sala de Computo M2 12.43 6.74 1.00 83.78

Page 48: Met for 01(I-III) Colpa

48

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Sala de Profesores M2 4.02 5.61 1.00 22.55SS.HH. M2 1.97 1.00 1.00 1.97SS.HH. M2 1.92 1.00 1.00 1.92Dirección M2 3.25 4.08 1.00 13.26Secretaria M2 4.09 3.36 1.00 13.73Deposito 4.29 1.57 1.00 6.74Deposito 1.72 1.45 1.00 2.49

01.03.02.06 AFIRMADO DE 4" PARA VEREDAS M2 57.35Vereda frontal M2 22.17 1.52 1.00 33.58Vereda posterior M2 22.17 0.82 1.00 18.07Vereda laterales M2 7.00 0.82 1.00 5.71

01.03.03 OBRAS DE CONCRETO SIMPLE01.03.03.01 FALSA ZAPATA 01.03.03.01.01 FALSA ZAPATA CONCRETO 1:12 CEM M3 35.16

Z-1 M3 2.45 2.20 0.55 3.00 8.89Z-2 M3 2.30 2.55 0.55 1.00 3.23Z-3 M3 2.25 2.00 0.55 3.00 7.43Z-4 M3 2.35 2.10 0.55 1.00 2.71Z-5 M3 2.40 2.00 0.55 1.00 2.64Z-6 M3 1.90 1.80 0.55 1.00 1.88Z-7 M3 2.10 2.00 0.55 2.00 4.62Z-8 M3 1.90 1.80 0.55 2.00 3.76

01.03.03.02 CIMIENTOS.01.03.03.02.01 FALSA CIMENTACION MEZCLA 1:12 C M3 20.97

Eje A -A M3 1.85 0.80 0.45 1.00 0.671.75 0.80 0.45 1.00 0.631.70 0.80 0.45 2.00 1.221.83 0.80 0.45 1.00 0.66

EJE C-C M3 2.05 0.80 0.45 2.00 1.481.95 0.80 0.45 1.00 0.701.90 0.80 0.45 2.00 1.37

EJE 15-15 M3 4.90 1.20 0.45 1.00 2.65EJE 9-9, 10-10 M3 4.90 1.50 0.45 1.00 3.31EJE 4-4 M3 4.60 1.30 0.45 1.00 2.69

base escalera 1.57 0.55 0.15 1.00 0.130.85 0.80 0.45 1.00 0.31

EJE A' - A' Escalera M3 0.85 0.80 0.45 1.00 0.31Eje B'-B' Escalera M3 2.50 1.00 0.45 1.00 1.13Eje 8'-8' Escalera M3 3.66 0.80 0.45 1.00 1.32Eje 9-9 Escalera M3 5.37 1.00 0.45 1.00 2.42

01.03.03.02.02 CIMIENTOS CORRIDOS MEZCLA 1:10 M3 67.51Eje A -A M3 21.35 0.80 0.70 1.00 11.96

menos columnas M3 0.65 0.20 0.70 -4.00 -0.36menos columnas M3 0.35 0.20 0.70 -6.00 -0.29menos columnas M3 0.50 0.20 0.70 -2.00 -0.14

EJE B-B M3 3.90 0.50 0.70 1.00 1.37Eje B'-B' M3 3.30 0.50 0.70 1.00 1.15EJE C-C M3 21.35 0.80 0.70 1.00 11.96EJE 4'-4' ss.hh. M3 0.48 0.50 0.70 2.00 0.34eje 5-5 6.04 0.50 0.70 1.00 2.11

Page 49: Met for 01(I-III) Colpa

49

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

CIMIENTOS CORRIDOS MEZCLA 1:10 M3Eje A -A M3 26.45 0.80 0.70 1.00 14.81

base escalera 1.57 0.55 1.50 1.00 1.30Escalera 0.85 0.80 0.70 1.00 0.48

EJE A' - A' Escalera M3 0.85 0.80 0.70 1.00 0.47Eje B'-B' Escalera M3 2.50 1.00 0.70 1.00 1.75EJE C-C M3 26.45 0.80 0.70 1.00 14.81Eje 8'-8' Escalera M3 3.66 0.80 0.70 1.00 2.05Eje 9-9 M3 5.38 1.00 0.70 1.00 3.76

01.03.03.03 SOBRECIMIENTOS01.03.03.03.01 CONCRETO 1:8+25% P.M. PARA SOBR M3 6.44

Eje A-A Entre ejes 2-3, 3-4 (Sec A-A) M3 3.50 0.13 0.55 2.00 0.50Eje A-A Entre ejes 1-2 (Sec A-A) 2.395 0.13 0.55 1.00 0.17

2.495 0.13 0.55 2.00 0.36Eje B-B Entre ejes 5 y 6 (Sec H-H) 3.15 0.13 0.70 1.00 0.29Eje B'-B' Entre ejes 4 y 5 (Sec H-H) M3 3.30 0.13 0.70 1.00 0.30Eje C-C Entre ejes 1 al 6 (Sec A-A) M3 3.50 0.13 0.55 5.00 1.25Eje 1-1, 4-4, 6-6 Entre ejes A-B, B-C M3 3.08 0.23 0.70 6.00 2.97Eje 4'-4' entre 4-5 M3 1.00 0.13 0.70 1.00 0.09Eje 5-5 5.66 0.13 0.70 1.00 0.51

01.03.03.03.02 ENCOFRADO Y DESENCOFRADO NORM M2 79.25Eje A-A Entre ejes 2-3, 3-4 (Sec A-A) M3 3.50 0.55 4.00 7.70Eje A-A Entre ejes 1-2 (Sec A-A) 2.395 0.55 2.00 2.63

2.495 0.55 4.00 5.49Eje B-B Entre ejes 5 y 6 (Sec H-H) 3.15 0.70 2.00 4.41Eje B'-B' Entre ejes 4 y 5 (Sec H-H) M3 3.30 0.70 2.00 4.62Eje C-C Entre ejes 1 al 6 (Sec A-A) M3 3.50 0.55 10.00 19.25Eje 1-1, 4-4, 6-6 Entre ejes A-B, B-C M3 3.08 0.70 12.00 25.83Eje 4'-4' entre 4-5 M3 1.00 0.70 2.00 1.40Eje 5-5 5.66 0.70 2.00 7.92

01.03.03.03.03 ACERO EN SOBRECIMIENTO GRADO 6 KG kg/ml 423.36Eje A-A Entre ejes 2-3, 3-4 (Sec A-A) M3

Acero Long. 3.50 0.58 6.00 12.18Acero Long. 2.395 0.58 3.00 4.17Acero Long. 2.495 0.58 6.00 8.68Acero Vertical 0.85 0.58 24.00 11.83Acero Vertical 0.85 0.58 8.00 3.94Acero Vertical 0.85 0.58 18.00 8.87

Eje C-C Entre ejes 1 al 6 (Sec A-A) M3 5.00Acero Long. 3.50 0.58 3.00 30.45Acero Vertical 0.85 0.58 12.00 29.58

Eje 1-1, 4-4, 6-6 Entre ejes A-B, B-C 6.00Acero Long. 3.08 0.58 4.00 42.87Acero Vertical 1.00 0.58 10.00 34.80

235.98

01.03.03.04 FALSO PISO01.03.03.04.01 CONCRETO EN FALSOPISO MEZCLA M2 146.20

Laboratorio M2 12.43 6.67 1.00 82.91Sala de Profesores M2 4.02 5.61 1.00 22.55SS.HH. M2 1.92 1.00 1.00 1.92SS.HH. M2 2.10 1.00 1.00 2.10Secretaria y dirección 6.74 4.08 1.00 27.50Depósito de Escalera M2 4.29 1.57 1.00 6.74

Page 50: Met for 01(I-III) Colpa

50

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

1.72 1.45 1.00 2.4901.03.03.04.02 CONCRETO EN FALSO PISO DE 4" DE 1 M2 83.33

Sala de Computo 6.72 12.40 1.00 83.33Aula 5 6.72 8.20 1.00 55.10

01.03.04 OBRAS DE CONCRETO ARMADO01.03.04.01 ZAPATAS01.03.04.01.01 CONCRETO EN ZAPATAS F'C=210 KG/ M3 30.64

Z-1 M3 2.45 2.20 0.55 3.00 8.89Z-2 M3 2.30 2.55 0.55 1.00 3.23Z-3 M3 2.25 2.00 0.55 3.00 7.43Z-4 M3 2.35 2.10 0.55 1.00 2.71Z-7 M3 2.10 2.00 0.55 2.00 4.62Z-8 M3 1.90 1.80 0.55 2.00 3.76

01.03.04.01.02 ACERO PARA ZAPATAS GRADO 60 1228.52Z-1 2.45x2.20 KG/ML 3.00

Acero lado A

Ø5/8" @ .15 2.45 1.60 16.00 188

2.45Acero lado B

Ø5/8" @ .15 2.20 1.60 17.00 180

2.20

Z-2 2.55x2.30 1.00Acero lado A

Ø5/8" @ .15 2.55 1.60 16.00 065

2.55Acero lado B

Ø5/8" @ .15 2.30 1.60 18.00 066

2.30

Z-3 2.25x2.20 3.00Acero lado A

Ø5/8" @ .15 2.25 1.60 15.00 162

2.25Acero lado B

Ø5/8" @ .15 2.20 1.60 16.00 169

2.20

Z-4 2.35x2.10 1.00Acero lado A

Ø5/8" @ .15 2.35 1.60 15.00 056

2.35Acero lado B

Ø5/8" @ .15 2.10 1.60 16.00 054

2.10

Z-7 2.10x2.00 2.00Acero lado A

Ø5/8" @ .15 2.10 1.60 14.00 094

2.10Acero lado B

Ø5/8" @ .15 2.00 1.60 15.00 096

2.00

Page 51: Met for 01(I-III) Colpa

51

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Z-8 1.90x1.80 2.00Acero lado A

Ø5/8" @ .15 1.90 1.02 13.00 050

1.90Acero lado B

Ø5/8" @ .15 1.80 1.02 13.00 048

1.80

01.03.04.02 CIMIENTO REFORZADO01.03.04.02.01 CONCRETO EN CIMIENTO REFORZADO M3 21.96

Eje 1-1 y 6-6 M3 7.20 1.20 0.50 2.00 8.64Eje 4-4 M3 7.20 1.30 0.50 1.00 4.68

8.64

01.03.04.02.02 ACERO EN CIMIENTO REF. FY=4200 KG/CM2 429.22Eje 1-1 y 6-6 2.00

Ø1/2"1.1 1.10 1.02 48.00 53.86

0.2 Ø1/2" 0.2 7.60 1.02 4.00 31.017.2

Eje 4-4 1.00Ø1/2"

1.2 1.20 1.02 48.00 58.75

0.2 Ø1/2" 0.2 7.60 1.02 4.00 31.017.2 254.60

01.03.04.03 VIGAS DE CIMENTACION01.03.04.03.01 CONCRETO EN VIGAS DE CIMENTACIONM3 6.85

Eje A-A entre 1-1 al 6-6 M3 3.55 0.20 0.35 5.00 1.24Eje C-C entre 1-1 al 6-6 M3 3.55 0.20 0.35 5.00 1.24EJE 1-1, 4-4 3, 6-6 M3 6.40 0.35 0.40 3.00 2.69

0.23 0.25 0.40 -3.00 -0.071.75

01.03.04.03.02 ENCOFRADO Y DESENCOFRADO VIGA M3 49.53Eje A-A entre 1-1 al 6-6 M3 3.55 0.35 10.00 12.42Eje C-C entre 1-1 al 6-6 M3 3.55 0.35 10.00 12.42EJE 1-1, 4-4, 6-6 M3 6.40 0.40 6.00 15.36

0.23 0.40 -6.00 -0.559.87

01.03.04.03.03 ACERO EN VIGA DE CIMENTACION GRADO 60 782.21Eje A-A entre 1-1 al 6-6 1.00

2Ø1/2"0.2 21.3 0.2 21.70 1.02 2.00 44.27

0.2 2Ø1/2" 0.2 21.70 1.02 2.00 44.2721.3

Traslapes 0.60 1.02 8.00 4.90

0.3 1.05 0.58 80.00 48.72

Page 52: Met for 01(I-III) Colpa

52

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

0.15

Eje C-C entre 1-1 al 6-6 1.002Ø1/2"

0.2 21.3 0.2 21.70 1.02 2.00 44.27

0.2 2Ø1/2" 0.2 21.70 1.02 2.00 44.2721.3

Traslapes 0.60 1.02 8.00 4.90

0.3 1.05 0.58 80.00 48.72

0.15

EJE 1-1, 4-4 6-6 3.002Ø1/2"

0.5 7.15 0.5 8.15 1.02 2.00 49.88

0.2 4Ø1/2" 0.2 7.55 1.02 4.00 92.417.15

0.5 2Ø1/2" 0.5 8.15 1.02 2.00 49.887.15

0.85 2.45 0.58 25.00 106.57

0.3 199.16

01.03.04.04 COLUMNAS

01.03.04.04.01 CONCRETO F'C=175 KG/CM2. PARA M3 3.29

EN COLUMNETAS

Eje C-C 1er nivel M3 0.25 0.13 1.18 7.00 0.27

Eje C-C 1er nivel M3 0.25 0.13 1.89 2.00 0.12

Eje C-C 1er nivel M3 0.25 0.13 2.59 1.00 0.08

Eje C-C 1er nivel M3 0.13 0.13 1.40 1.00 0.02

Eje C-C 2do nivel M3 0.25 0.13 0.99 10.00 0.32

Eje A-A 1er nivel M3 0.25 0.13 1.89 10.00 0.61

Eje B-B 1er nivel M3 0.25 0.13 3.00 3.00 0.29

Eje B'-B' 1er nivel M3 0.25 0.13 3.00 2.00 0.20

Eje A-A 2do nivel M3 0.25 0.13 1.89 10.00 0.61

En pazadiso M3 0.25 0.13 0.95 15.00 0.46

En escalera descanzo M3 0.25 0.13 1.03 4.00 0.13

En escalera 1er nivel M3 0.25 0.13 1.32 2.00 0.09

En escalera 1er nivel M3 0.23 0.13 1.32 2.00 0.08

Page 53: Met for 01(I-III) Colpa

53

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

01.03.04.04.02 CONCRETO EN COLUMNAS F'C=210 KG M3 20.69

C-1 M3 0.65 0.20 7.75 8.00 8.06

0.35 0.35 0.20 7.75 8.00 4.34

0.2

0.2

0.65

C-2 M3 0.50 0.20 7.75 4.00 3.10

0.35 0.35 0.20 7.75 4.00 2.17

0.2

0.2

0.5

C-3 M3 0.25 0.23 8.75 3.00 1.51

0.23

0.25

C-4 EN ESCALERA M3 0.25 0.23 3.30 4.00 0.76

0.23

0.25

C-5 EN ESCALERA M3 0.30 0.23 5.43 2.00 0.75

0.23

0.3

01.03.04.04.03 ENCOFRADO Y DESENCOFRADO NORM M2 274.83

C-1 M2 0.65 7.75 14.00 70.53

0.35 0.40 7.75 16.00 49.60

0.2

0.2 0.42 7.75 2.00 6.51

0.65

C-2 M2 0.50 7.75 4.00 15.50

0.35 0.27 7.75 4.00 8.37

0.2 0.40 7.75 8.00 24.80

0.2

0.5

C-3 M2 0.25 8.75 6.00 13.13

0.23

0.25

Page 54: Met for 01(I-III) Colpa

54

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

C-4 EN ESCALERA M2 0.25 3.30 8.00 6.60

0.23 0.23 3.30 4.00 3.04

0.25

C-5 EN ESCALERA M2 0.30 5.43 4.00 6.52

0.23 0.23 5.43 2.00 2.50

0.3

EN COLUMNETAS

Eje C-C 1er nivel M2 0.25 1.29 14.00 4.50

0.13 1.29 7.00 1.17

Eje C-C 1er nivel M2 0.25 1.99 4.00 1.99

0.13 1.99 2.00 0.52

Eje C-C 1er nivel M2 0.25 2.69 2.00 1.34

0.13 2.69 1.00 0.35

Eje C-C 1er nivel M2 0.13 1.50 2.00 0.39

0.13 1.50 1.00 0.20

Eje C-C 2do nivel M2 0.25 1.09 20.00 5.43

M2 0.13 1.09 10.00 1.41

Eje A-A 1er nivel M2 0.25 2.19 20.00 10.93

0.13 2.19 10.00 2.84

Eje B-B 1er nivel M2 0.25 3.10 6.00 4.65

0.13 3.10 2.00 0.81

Eje B'-B' 1er nivel M2 0.25 3.10 4.00 3.10

0.13 3.10 2.00 0.81

Eje A-A 2do nivel M2 0.25 1.99 20.00 9.93

0.13 1.99 10.00 2.58

En pazadiso M2 0.25 1.05 30.00 7.88

M2 0.13 1.05 9.00 1.23

En escalera descanzo M2 0.63 0.95 3.00 1.80

En escalera 1er nivel M2 0.49 1.32 2.00 1.29

En escalera 1er nivel M2 0.50 1.32 2.00 1.32

En escalera PASAMANO M2 0.50 1.32 2.00 1.32

01.03.04.04.04 ACERO GRADO 60 EN COLUMNAS KG 5257.72

MODULO DE AULAS KG/ML

C-1 KG 8.00

12Ø5/8" 9.65 1.60 12.00 1482.24

ESTRIBOS Ø3/8 KG 1.70 0.58 48.00 378.62

Page 55: Met for 01(I-III) Colpa

55

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

ESTRIBOS Ø3/8 1.50 0.58 48.00 334.08

C-2 4.00

10Ø5/8" 9.65 1.60 10.00 617.60

ESTRIBOS Ø3/8 KG 1.40 0.58 48.00 155.90

ESTRIBOS Ø3/8 1.50 0.58 48.00 167.04

C-3 3.00

4Ø1/2" 10.40 1.02 4.00 127.30

ESTRIBOS Ø3/8 KG 0.96 0.58 54.00 90.20

C-4 Escalera 4.00

2Ø1/2" 4.00 1.02 2.00 32.64

2Ø1/2" 4.00 1.02 2.00 32.64

ESTRIBOS Ø3/8 KG 0.96 0.58 23.00 51.23

COLUMNAS DE CONFINAMIENTO

Eje C-C 1er nivel 7.00

4Ø3/8" 3.04 0.58 4.00 49.29

ESTRIBOS Ø1/4" KG 0.76 0.25 17.00 22.61

Eje C-C 1er nivel 2.00

4Ø3/8" 3.94 0.58 4.00 18.26

ESTRIBOS Ø1/4" KG 0.76 0.25 17.00 6.46

Eje C-C 1er nivel 1.00

4Ø3/8" 4.49 0.58 4.00 10.41

ESTRIBOS Ø1/4" KG 0.76 0.25 20.00 3.80

Eje C-C 1er nivel 1.00

4Ø3/8" 1.45 0.58 4.00 3.36

ESTRIBOS Ø1/4" KG 0.76 0.25 7.00 1.33

Eje C-C 2do nivel 10.00

4Ø3/8" 1.79 0.58 4.00 41.41

ESTRIBOS Ø1/4" KG 0.76 0.25 17.00 32.30

Eje A-A 1er nivel 10.00

4Ø3/8" 4.14 0.58 4.00 95.93

ESTRIBOS Ø1/4" KG 0.76 0.25 23.00 43.70

Eje B-B 1er nivel 3.00

4Ø3/8" 4.80 0.58 4.00 33.41

ESTRIBOS Ø1/4" KG 0.76 0.25 23.00 13.11

Eje B'-B' 1er nivel 2.00

4Ø3/8" 4.80 0.58 4.00 22.27

ESTRIBOS Ø1/4" KG 0.76 0.25 23.00 8.74

Eje A-A 2do nivel 10.00

4Ø3/8" 2.89 0.58 4.00 66.93

Page 56: Met for 01(I-III) Colpa

56

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

ESTRIBOS Ø1/4" KG 0.76 0.25 17.00 32.30

Eje A'-A' 1er nivel ss.hh. 3.00

4Ø3/8" 5.29 0.58 4.00 122.61

ESTRIBOS Ø1/4" KG 0.76 0.25 23.00 43.70

En pazadiso 15.00

4Ø3/8" 1.80 0.58 4.00 62.64

ESTRIBOS Ø1/4" KG 0.76 0.25 12.00 34.20

C-3 EN ESCALERA 2.00

4Ø1/2" 8.67 1.02 4.00 601.35

ESTRIBOS Ø3/8 KG 0.96 0.58 35.00 331.30

En escalera descanzo 3.00

4Ø3/8" 1.42 0.58 4.00 33.06

ESTRIBOS Ø1/4" KG 0.76 0.25 12.00 22.80

En escalera 1er nivel 4.00

4Ø3/8" 2.89 0.58 4.00 20.11

ESTRIBOS Ø1/4" KG 0.76 0.25 19.00 10.83

01.03.04.05 VIGAS

01.03.04.05.01 RELLENO DE CONCRETO F'C=175 KG/ M3 0.54

EN TIMPANOS AULAS 5.35 0.23 0.08 3.00 0.28

EN TIMPANOS ESCALERA 7.60 0.23 0.08 2.00 0.26

01.03.04.05.02 CONCRETO F'C=175 KG/CM2. PARA VI M3 1.28

Vigueta confinamiento (.13 x .10) (Muros y M3 3.50 0.13 0.10 15.00 0.68

Vigueta confinamiento (.13 x .10) (Muros y M3 2.40 0.13 0.10 3.00 0.09

Vigueta confinamiento (.13 x .10) (Muros y M3 2.50 0.13 0.10 3.00 0.10

Vigueta confinamiento (.13 x .10) (Muros y M3 2.80 0.13 0.10 1.00 0.04

Vigueta confinamiento (.13 x .10) (Muros y M3 5.67 0.13 0.10 1.00 0.07

Vigueta confinamiento (.13 x .10) (Parapet M3 21.35 0.13 0.10 1.00 0.28

Vigueta confinamiento (.13 x .10) (Parapet M3 1.39 0.13 0.10 1.00 0.02

01.03.04.05.03 CONCRETO F'C=210 KG/CM2. PARA VI M3 36.90

V2 (0.35 x 0.55), Ejes 2,4,9,11 M3 6.40 0.35 0.55 4.00 4.93

V1 (0.23 x 0.35), Ejes 1,5,8, 12 M3 6.40 0.23 0.35 4.00 2.06

6.40 0.12 0.20 4.00 0.61

V4 (0.23 x 0.35), Ejes 3,10 M3 6.40 0.23 0.35 2.00 1.03

V3 (0.20 x 0.55), Ejes A-A y C-C M3 17.15 0.20 0.55 4.00 7.55

2V3 (0.20 x 0.30), Ejes A-A y C-C M3 17.15 0.20 0.30 4.00 4.12

V4 (0.35 x variable) M3 1.50 0.35 0.48 10.00 2.49

V6 (0.13 x 0.40) M3 17.15 0.13 0.40 2.00 1.78

Page 57: Met for 01(I-III) Colpa

57

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

VA-1 (0.23 x 0.30) M3 7.20 0.23 0.30 6.00 2.98

VA-2 (0.23 x 0.25) Tímpanos M3 6.70 0.23 0.25 6.00 2.31

Triángulo fachada M3 0.23 6.00 1.41 1.95

Triángulo posterior M3 0.23 6.00 0.87 1.20

ESCALERA

V7 (0.13 x 0.45) M3 3.27 0.13 0.45 1.00 0.19

V8 (0.23 x 0.20) M3 1.37 0.23 0.20 2.00 0.13

M3 2.34 0.23 0.20 2.00 0.21

V3(0.20X0.55) M3 3.27 0.20 0.55 1.00 0.36

V3(0.40 x variable) M3 1.95 0.40 0.48 1.00 0.37

V5 (0.23 x variado) M3 1.50 0.23 0.48 2.00 0.33

V6 (0.13 x 0.40) M3 5.68 0.13 0.40 1.00 0.30

V10 (0.25 x 0.20) M3 2.00 0.25 0.20 1.00 0.10

2V-1 (0.23x0.25) M3 4.38 0.23 0.25 2.00 0.50

2V-3 (0.20x0.30) M3 3.27 0.20 0.30 2.00 0.39

M3 1.95 0.20 0.30 2.00 0.23

Triángulo chico M3 0.23 2.00 0.39 0.18

Triángulo grande M3 0.23 2.00 1.30 0.60

01.03.04.05.04 ENCOFRADO Y DESENCOFRADO DE V M2 360.77

V2 (0.35x0.55) Ejes: 2,4,9,11

Cara lateral Interior M2 6.40 0.35 8.00 17.92

Cara interior o fondo M2 6.40 0.35 4.00 8.96

V1 (0.23 x 0.35), Ejes: 1,5,8, 12

Cara lateral exterior M2 6.40 0.35 4.00 8.96

Cara lateral Interior M2 6.40 0.15 4.00 3.84

V4 (0.23 x 0.35), Ejes 3,10

Cara lateral Interior M2 6.40 0.15 4.00 3.84

V3(0.20x0.55), Eje C-C y A-A

Cara lateral M2 17.15 0.35 4.00 24.01

Cara lateral exterior M2 17.15 0.55 4.00 37.73

Cara inferior o fondo M2 17.15 0.20 4.00 13.72

2V3 (0.20 x 0.30), Ejes A-A y C-C - SEGUNDO NIVEL

Cara lateral M2 17.15 0.30 8.00 41.16

Cara inferior o fondo M2 17.15 0.20 4.00 13.72

V-4 En voladizo (0.35 x Variable)

Cara lateral exterior M2 1.50 0.48 2.00 1.43

Cara lateral interior M2 1.50 0.28 18.00 7.43

Cara inferior o fondo M2 1.50 0.35 10.00 5.25

Page 58: Met for 01(I-III) Colpa

58

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

V6 (0.13 x 0.40)

Cara lateral exterior M2 17.15 0.40 2.00 13.72

Cara lateral interior M2 17.15 0.20 2.00 6.86

Cara inferior o fondo M2 17.15 0.13 2.00 4.46

VA-1(0.23x0.30) segundo nivel

Cara lateral M2 6.40 0.30 12.00 23.04

VA-2 (0.23 x 0.25) Tímpanos M2 3.43 0.25 12.00 10.28

M2 3.43 0.25 12.00 10.28

Triángulo grande M2 1.41 12.00 16.92

Triángulo grande M2 0.87 12.00 10.44

Cara inferior o fondo M2 1.50 0.23 6.00 2.07

Cara inferior o fondo M2 1.50 0.23 6.00 2.07

Caras laterales (Frontal) M2 0.23 0.15 12.00 0.41

ESCALERAS

V7 (0.13 x 0.45) fondo M2 3.27 0.45 1.00 1.47

lateral 3.24 0.13 2.00 0.84

V8 (0.23 x 0.20) fondo M2 1.37 0.23 2.00 0.63

lateral 1.37 0.20 4.00 1.09

fondo M2 2.34 0.23 2.00 1.07

lateral M2 2.34 0.20 4.00 1.87

V3(0.20X0.55) fondo M2 3.27 0.20 1.00 0.65

lateral M2 3.27 0.35 2.00 2.29

V3(0.40 x variable) fondo M2 1.95 0.40 1.00 0.78

lateral M2 1.95 0.48 2.00 1.85

V5 (0.23 x variado) fondo M2 1.50 0.23 2.00 0.69

lateral M2 1.50 0.48 4.00 2.85

V6 (0.13 x 0.40) fondo M2 5.68 0.13 1.00 0.74

lateral M2 5.68 0.40 2.00 4.54

V10 (0.25 x 0.20) fondo M2 2.00 0.25 1.00 0.50

lateral M2 2.00 0.20 1.00 0.40

2V-1 (0.23x0.25) fondo M2 4.38 0.23 2.00 2.01

lateral M2 4.38 0.25 4.00 4.38

2V-3 (0.20x0.30) fondo M2 3.27 0.20 2.00 1.31

lateral M2 3.27 0.30 4.00 3.92

fondo M2 1.95 0.20 2.00 0.78

lateral M2 1.95 0.30 4.00 2.34

Triángulo chico fondo M2 0.23 2.00 0.46

Page 59: Met for 01(I-III) Colpa

59

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

lateral M2 0.39 4.00 1.55

Triángulo grande fondo M2 0.23 2.00 0.46

lateral M2 1.30 4.00 5.20

Viga de Confinamiento M2 nro caras

Vigueta confinamiento (.13 x .10) (Muros y M2 3.50 2.00 0.10 23.00 16.10

Vigueta confinamiento (.13 x .10) (Muros y M2 2.40 2.00 0.10 8.00 3.84

Vigueta confinamiento (.13 x .10) (Muros y M3 1.81 2.00 0.10 1.00 0.36

Vigueta confinamiento (.13 x .10) (Muros y M3 1.45 2.00 0.10 1.00 0.29

Vigueta confinamiento (.13 x .10) (Muros y M3 4.45 2.00 0.10 1.00 0.89

Vigueta confinamiento (.13 x .10) (Muros y M3 1.88 2.00 0.10 1.00 0.38

Vigueta confinamiento (.13 x .10) (Muros y M3 1.63 2.00 0.10 1.00 0.33

Vigueta confinamiento (.13 x .10) (Parapet M2 17.15 2.00 0.10 1.00 3.43

Vigueta confinamiento (.13 x .10) (Parapet M2 1.82 2.00 0.10 2.00 0.73

Vigueta confinamiento (.13 x .10) (Parapet M2 1.39 2.00 0.10 2.00 0.55

Vigueta confinamiento PM (.13 x .10) (Esca M2 3.40 2.00 0.10 1.00 0.68

01.03.04.05.05 ACERO GRADO 60 EN VIGAS kg/ml 5224.99

V2 (0.35x0.55) Ejes: 2,4,9,11 4.00

3 Ø 5/8"

0.4 8.65 0.4 9.45 1.60 3.00 181.44

2 Ø 5/8"

0.4 8.65 0.3 9.35 1.60 2.00 119.68

Bastones

2Ø 3/4" 3.95 2.26 2.00 71.42

3.95

2Ø 1/2" 2.85 1.02 2.00 23.26

0.4 2.45

2Ø 3/4" 3.20 2.26 2.00 57.86

3.2

1 Ø 1/2"

0.4 1.85 0.3 2.55 1.02 1.00 10.40

Estribos 0.3

Ø 3/8" 0.5 1.80 0.58 48.00 200.45

Page 60: Met for 01(I-III) Colpa

60

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

0.3

0.43 1.65 0.58 15.00 57.42

V1 (0.23 x 0.35), Ejes 1,5,8, 12 4.00

2 Ø 1/2"

0.3 7.15 0.3 7.75 1.02 2.00 63.24

3 Ø 1/2"

0.3 8.65 0.3 9.25 1.02 3.00 113.22

2 Ø 1/2"

0.3 7.15 0.3 7.75 1.02 3.00 94.86

Bastones

1Ø 1/2" 1.65 1.02 2.00 13.46

0.3 1.35

1Ø 5/8" 1.85 1.60 1.00 11.84

1.85

2 Ø 5/8"

0.4 1.85 0.3 2.55 1.60 2.00 32.64

Estribos 0.18

Ø 3/8" 0.3 1.16 0.58 42.00 113.03

0.3

0.43 1.65 0.58 15.00 57.42

0.3

0.15 1.10 0.58 42.00 107.18

V4 (0.23 x 0.35), Ejes 3,10 2.00

2 Ø 1/2"

0.3 7.15 0.3 7.75 1.02 2.00 31.62

2 Ø 1/2"

Page 61: Met for 01(I-III) Colpa

61

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

0.3 8.65 0.3 9.25 1.02 2.00 37.74

Bastones

1Ø 1/2" 1.65 1.02 1.00 3.37

0.3 1.35

2Ø 5/8" 1.85 1.60 2.00 11.84

1.85

2 Ø 5/8"

0.4 1.85 0.3 2.55 1.60 2.00 16.32

Estribos 0.18

Ø 3/8" 0.3 1.16 0.58 42.00 56.52

0.3

0.43 1.65 0.58 15.00 28.71

V3(0.20x0.55), Eje C-C y A-A 4.00

3 Ø 5/8"

0.4 17.1 0.4 17.90 1.60 3.00 343.68

3 Ø 5/8"

0.4 17.1 0.4 17.90 1.60 3.00 343.68

2 Ø 1/2"

0.3 17.1 0.3 17.70 1.02 2.00 144.43

Estribos 0.15

0.5 1.50 0.58 116.00 403.68

Ø 3/8"

2V3 (0.20 x 0.30), Ejes A-A y C-C - SEGUNDO NIVEL 4.00

3 Ø 1/2"

0.25 17.1 0.25 17.60 1.02 3.00 215.42

3 Ø 1/2"

0.25 17.1 0.25 17.60 1.02 3.00 215.42

Page 62: Met for 01(I-III) Colpa

62

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Estribos 0.15

0.25 1.00 0.58 116.00 269.12

Ø 3/8"

V6 (0.13 x 0.40) 2.00

2 Ø 1/2"

0.35 17.1 0.35 17.80 1.02 1.00 36.31

2 Ø 1/2"

0.35 17.1 0.35 17.80 1.02 1.00 36.31

Estribos 0.05

0.15 0.75 0.25 80.00 30.00

Ø 1/4" 0.35

0.15

VA-1(0.23x0.30) segundo nivel 6.00

2 Ø 1/2"

0.25 7.15 0.25 7.65 1.02 2.00 93.64

2 Ø 1/2"

0.25 7.15 0.25 7.65 1.02 2.00 93.64

Estribos 0.18

0.25 1.06 0.58 36.00 132.80

Ø 3/8"

VA-2 (0.23 x 0.25) Tímpanos

6.00

2 Ø 1/2"

5.3

1 6.40 1.02 4.00 156.67

0.1

2 Ø 1/2"

4.65

1 5.65 1.02 4.00 138.31

2 Ø 1/2" 0.3

0.62.80 1.02 4.00 68.54

1.9

Page 63: Met for 01(I-III) Colpa

63

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Estribos 0.18

0.2 0.96 0.58 56.00 187.08

Ø 3/8"

Estribos 0.18

0.337 1.23 0.58 28.00 120.34

Ø 3/8"

ESCALERAS

V7 (0.13x0.45) 1.00

2 Ø 5/8"

0.40 3.68 0.40 4.48 1.60 2.00 14.34

2 Ø 5/8"

0.40 3.68 0.40 4.48 1.60 2.00 14.34

Estribos 0.08

0.4 1.16 0.58 20.00 13.46

Ø 3/8"

V8 (0.23x0.20) y V5(23xVar.) 2.00

2 Ø 1/2"

0.15 4.6 0.15 4.90 1.02 2.00 19.99

2 Ø 1/2"

0.15 6.15 6.30 1.02 2.00 25.70

2 Ø 5/8"

2.95 0.30 3.25 1.60 2.00 20.80

2 Ø 5/8"

0.30 1.95 0.30 2.55 1.60 2.00 16.32

Estribos 0.18

0.15 0.86 0.25 28.00 12.04

Ø 1/4"

Estribos 0.18

Page 64: Met for 01(I-III) Colpa

64

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

0.425 1.41 0.58 12.00 19.63

Ø 3/8"

V3(0.20X0.55) 1.00

2 Ø 5/8"

0.40 5.63 0.30 6.33 1.60 2.00 20.26

2 Ø 5/8"

0.40 3.68 0.40 4.48 1.60 2.00 14.34

1 Ø 1/2"

0.45 1.3 1.75 1.02 2.00 3.57

2 Ø 5/8"

0.40 1.95 0.30 2.65 1.60 2.00 8.48

2 Ø 5/8"

0.40 1.95 0.30 2.65 1.60 2.00 8.48

Estribos 0.15

0.5 1.50 0.58 24.00 20.88

Ø 3/8"

Estribos 0.38

0.425 1.81 0.58 12.00 12.60

Ø 3/8"

V6 (0.13x0.40) 1.00

1 Ø 1/2"

0.35 6.47 0.35 7.17 1.02 1.00 7.31

1 Ø 1/2"

0.35 6.47 0.35 7.17 1.02 1.00 7.31

Estribos 0.05

0.15 0.75 0.25 39.00 7.31

Ø 1/4" 0.35

0.15

V10 (0.25 x 0.20) 1.00

Page 65: Met for 01(I-III) Colpa

65

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

2 Ø 1/2"

0.15 2.35 0.15 2.65 1.02 2.00 5.41

2 Ø 1/2"

0.15 2.35 0.15 2.65 1.02 2.00 5.41

Estribos 0.2

0.15 0.90 0.25 11.00 2.47

Ø 1/4"

2V-1 (0.23x0.25)

Timpanos 2V-1 (023x025) 2.00

2 Ø 1/2"

5.5

1 6.60 1.02 2.00 26.93

0.1

2 Ø 1/2"

5.05

1 6.05 1.02 2.00 24.68

2 Ø 1/2" 0.3

1.80 1.02 2.00 7.34

0.95 0.55

2 Ø 1/2" 3.00

2.90 1.02 2.00 17.75

0.1 2.35 0.45

0.3

2.6 3.05 1.02 2.00 18.67

0.15

Estribos 0.18

0.2 0.96 0.58 28.00 15.90

Ø 3/8"

Estribos 0.18

0.43 1.41 0.58 14.00 34.35

Ø 3/8"

Page 66: Met for 01(I-III) Colpa

66

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

2V-3 (0.20x0.30) Eje B'-B' 1.00

2 Ø 1/2"

0.25 3.68 0.25 4.18 1.02 2.00 8.53

2 Ø 1/2"

0.25 3.68 0.25 4.18 1.02 2.00 8.53

Estribos 0.15

0.25 1.00 0.58 24.00 13.92

Ø 3/8"

2V-3 (0.20x0.30) Eje A-A 1.00

2 Ø 1/2"

0.25 5.665 0.25 6.17 1.02 2.00 12.58

2 Ø 1/2"

0.25 5.665 0.25 6.17 1.02 2.00 12.58

Estribos 0.15

0.25 1.00 0.58 38.00 22.04

Ø 3/8"

Vigueta confinamiento (.13 x .10) (Muros M3 15.00

2 Ø 3/8"

0.1 3.45 0.1 3.65 0.58 2.00 63.51

Estribo Ø 1/4" 0.1

0.1 Ø1/4" 0.1 0.30 0.25 19.00 21.38

Vigueta confinamiento (.13 x .10) (Muros M3 3.00

2 Ø 3/8"

0.1 2.35 0.1 2.55 0.58 2.00 8.87

Estribo Ø 1/4" 0.1

0.1 Ø1/4" 0.1 0.30 0.25 11.00 2.47

Vigueta confinamiento (.13 x .10) (Muros M3 3.00

2 Ø 3/8"

0.1 2.5 0.1 2.70 0.58 2.00 9.40

Page 67: Met for 01(I-III) Colpa

67

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Estribo Ø 1/4" 0.1

0.1 Ø1/4" 0.1 0.30 0.25 9.00 2.03

Vigueta confinamiento (.13 x .10) (Muros M3 1.00

2 Ø 3/8"

0.1 2.75 0.1 2.95 0.58 2.00 10.27

Estribo Ø 1/4" 0.1

0.1 Ø1/4" 0.1 0.30 0.25 8.00 1.80

Vigueta confinamiento (.13 x .10) (Muros M3 1.00

2 Ø 3/8"

0.1 5.6 0.1 5.80 0.58 2.00 20.18

Estribo Ø 1/4" 0.1

0.1 Ø1/4" 0.1 0.30 0.25 23.00 5.18

Vigueta confinamiento (.13 x .10) (Parap M3 1.00

2 Ø 3/8"

0.1 21.3 0.1 21.50 0.58 2.00 24.94

Estribo Ø 1/4" 0.1

0.1 Ø1/4" 0.1 0.30 0.25 58.00 4.35

Vigueta confinamiento (.13 x .10) (Parap M3 1.00

2 Ø 3/8"

0.1 1.34 0.1 1.54 0.58 2.00 1.79

Estribo Ø 1/4" 0.1

0.1 Ø1/4" 0.1 0.30 0.25 8.00 0.60

01.03.04.06 LOSA ALIGERADA h=0.20 m

01.03.04.06.01 CONCRETO F'C=210 KG/CM2. PARA L M3 13.40

En Viguetas

Viguetas entre A - B Y C M3 3.85 0.10 0.15 80.00 4.62

Viguetas en volado de Aulas M3 3.85 0.10 0.15 15.00 0.87

En Losa e= 0.05

Paño A, entre 1 al 12 M3 6.60 3.85 0.05 5.00 6.35

Paño en Volado 1-1 al 12 M3 3.85 1.39 0.05 5.00 1.33

En Volado de Escalera M3 3.27 1.39 0.05 1.00 0.23

Page 68: Met for 01(I-III) Colpa

68

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

01.03.04.06.02 ENCOFRADO Y DESENCOFRADO EN L M2 160.45

Paño A, entre 1 al 12 M2 6.60 3.85 5.00 127.05

Paño en Volado 1-1 al 12 m2 3.85 1.50 5.00 28.88

En Volado de Escalera m2 3.27 1.39 1.00 4.53

01.03.04.06.03 ACERO GRADO 60 EN LOSAS ALIGER KG 1169.15

1 Ø ½” corrido (positivo) KG 9.00 38.00 1.02 348.84

1 Ø ½” corrido (positivo) KG 5.00 38.00 1.02 193.80

1 Ø 5/8" bastón (negativo) KG 2.95 76.00 1.60 358.72

1 Ø 1/2” bastón (negativo) KG 1.47 38.00 1.02 57.17

Temperatura Ø ¼” KG 9.00 82.00 0.25 184.50

ESCALERA

1 Ø ½” KG 3.73 3.00 1.02 11.41

1 Ø 1/2” bastón KG 1.51 3.00 1.02 4.61

1 Ø 1/2” bastón KG 3.30 3.00 1.02 10.10

01.03.04.06.04 LADRILLO HUECO DE ARCILLA 15X30 UND 1299.00

Und 8.33 155.93

01.03.04.07 ESCALERA

01.03.04.07.01 CONCRETO F'C=210 KG/CM2. PARA E M3 3.54PRIMER TRAMO M3 3.08 1.57 0.15 1.00 0.73

M3 1.64 1.72 0.20 1.00 0.56

M3 0.20 1.57 0.15 2.00 0.05

M3 0.38 1.57 0.21 1.00 0.06

M3 (0.30x0.167x1.57)/2 11.00 0.43

SEGUNDO TRAMO M3 3.20 1.57 0.15 1.00 0.75

M3 1.64 1.72 0.20 1.00 0.56

M3 (0.30x0.167x1.57)/2 10.00 0.39

01.03.04.07.02 ENCOFRADO Y DESENCOFRADO EN E M2 21.00PRIMER TRAMO M2 3.08 1.57 1.00 4.84

M2 1.64 1.72 1.00 2.81

M2 1.57 0.17 11.00 2.88

SEGUNDO TRAMO M2 3.20 1.57 1.00 5.02

M2 1.64 1.72 1.00 2.82

M2 1.57 0.17 10.00 2.62

01.03.04.07.03 ACERO GRADO 60 EN ESCALERAS KG 203.091er TRAMO KG/ML

Ø1/2” @ 0.20m KG 4.25 1.02 8.00 34.68

Ø1/2” @ 0.20m KG 2.12 1.02 8.00 17.30

Ø1/2” @ 0.20m KG 2.78 1.02 8.00 22.68

Ø1/2” @ 0.10m KG 1.10 1.02 8.00 8.98

Ø3/8” @ 0.25m KG 1.57 0.58 13.00 11.84

Area de encofrado de losa x (8.33 Unid. x m2)

Page 69: Met for 01(I-III) Colpa

69

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

2do TRAMO

Ø1/2” @ 0.20m KG 5.62 1.02 8.00 45.86

Ø1/2” @ 0.20m KG 2.10 1.02 4.00 8.57

Ø3/8” @ 0.20m KG 1.70 0.58 8.00 7.89

Ø3/8” @ 0.20m KG 1.70 0.58 8.00 7.89

Ø3/8” @ 0.20m KG 1.57 0.58 14.00 12.75

Ø 1/2” @ 0.30m LOSA MACIZA KG 3.27 0.58 5.00 9.48

Ø1/2” @ 0.20m LOSA MACIZA KG 3.27 0.58 8.00 15.17

01.03.04.08 GARGOLA

01.03.04.08.01 CONCRETO F'C=175 KG/CM2. PARA M3 0.02

GARGOLA M3 0.20 0.20 0.10 3.00 0.01

GARGOLA M3 0.20 0.05 0.15 6.00 0.01

01.03.04.08.02 ENCOFRADO Y DESENCOFRADO EN G M2 0.71

M2 0.70 0.20 3.00 0.42

M2 0.20 0.10 3.00 0.06

M2 0.15 0.05 6.00 0.05

M2 0.15 0.20 6.00 0.18

01.03.04.08.03 ACERO GRADO 60 EN GARGOLAS KG KG/ML 3.17

Ø 1/4” KG 1.29 0.25 6.00 1.94

Ø 1/4” KG 0.82 0.25 6.00 1.23

01.03.05 ESTRUCTURAS DE MADERA Y COBERTURAS

01.03.05.01 ESTRUCTURAS DE MADERA

01.03.05.01.01 TIJERALES DE MADERA TORNILLO DE P2 pie pulg pulg 819.60

Tijerales de madera tornillo 2" x 6" 5.00

Brida Superior Izquierdo P2 17.55 2.00 6.00 1.00 87.76

Brida Superior Derecho P2 19.69 2.00 6.00 1.00 98.43

Brida Inferior p2 35.19 2.00 6.00 1.00 175.94

Montantes 2" x 4" P2 7.87 2.00 4.00 2.00 52.49

P2 11.15 2.00 4.00 1.00 37.18

Diágonales 2" x 4" P2 1.64 2.00 4.00 2.00 10.94

P3 3.12 2.00 4.00 2.00 20.78

P4 4.10 2.00 4.00 2.00 27.34

P5 6.89 2.00 4.00 2.00 45.93

Cartelas tipo 1 P2 0.70 0.40 1.00 4.00 60.26

tipo 2 P2 0.30 0.25 1.00 2.00 8.07

tipo 3 P2 0.50 0.30 1.00 2.00 16.14

tipo 4 P2 0.60 0.30 1.00 4.00 38.74

Page 70: Met for 01(I-III) Colpa

70

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

tipo 5 P2 0.60 0.30 1.00 4.00 38.74

tipo 6 P2 0.40 0.30 1.00 4.00 25.82

tipo 7 P2 0.80 0.35 1.00 2.00 30.13

tipo 8 P2 0.50 0.30 1.00 2.00 16.14

tipo 9 P2 0.60 0.30 1.00 2.00 19.37

tipo 10 P2 0.35 0.25 1.00 2.00 9.42

01.03.05.01.02 TIJERALES TIMPANOS DE MADERA TO P2 pie pulgadas pulgadas 109.01

En aulas P2 17.55 2.00 3.00 3.00 26.33

P2 19.69 2.00 3.00 3.00 29.53

Tijerales tímpano 2" x 3" en escalera P2 53.15 2.00 3.00 2.00 53.15

01.03.05.01.03 CORREAS DE MADERA TORNILLO 2" x P2 576.12

Longitudinalmente Modulo de 06 aulas P2 72.01 2.00 3.00 16.00 576.12

01.03.05.01.04 CORREAS DE MADERA TORNILLO 3" x P2 172.90

En escalera P2 14.11 3.00 4.00 7.00 98.75

En escalera P2 18.54 3.00 4.00 4.00 74.15

01.03.05.01.05 FRISOS DE MADERA TORNILLO E=1”x8 P2 120.95

Frisos 1"x8" Frontal y posterior Aulas Modu P2 72.01 1.00 8.00 2.00 96.02

Frisos 1"x8" Frontal y posterior Escalera P2 18.70 1.00 8.00 2.00 24.93

01.03.05.01.06 FRISOS DE MADERA TORNILLO E=1”x3 P2 24.70

FRISOS 1"x3" LATERAL ESCALERAS P2 24.33 1.00 3.00 1.00 6.08

FRISOS 1"x3" LATERALES AULAS P2 37.24 1.00 3.00 2.00 18.62

01.03.05.02 COBERTURA

01.03.05.02.01 COBERTURA CON FLEXIFORTE DE 1.83XM2 73.27

En Aulas

Cobertura con Cobertura Flexiforte rojo en M2 11.55 21.95 1.00 34.50

Escalera

Cobertura con Cobertura Flexiforte rojo en M2 8.20 4.30 1.00 35.26

1.35 2.60 1.00 3.51

01.03.05.02.02 CUMBRERA CON FLEXIFORTE DE ONDAMl 27.65

En Aulas

Cumbrera con calamina galvanizada N° 30 Ml 21.95 1.00 21.95

Escalera

Page 71: Met for 01(I-III) Colpa

71

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Cumbrera con calamina galvanizada N° 30 Ml 5.70 1.00 5.70

01.03.06 MUROS DE ALBAÑILERIA

01.03.06.01 MURO DE CABEZA LADRILLO KK 18 H M2 155.70

Ejes 1, 4, 6 (1er PISO) M2 6.15 2.70 3.00 49.82

Ejes 1, 4,6 (2do PISO) M2 6.15 2.70 3.00 49.82

Ejes 1, 4, 6 (2do PISO)-Timpanos. M2 6.15 1.14 3.00 21.06

Escalera (laterales) ejes 5' y 6 M2 3.85 1.82 2.00 13.98

Escalera (laterales) ejes 5' y 6 (parte sup.) M3 3.85 2.73 2.00 21.02

01.03.06.02 MURO DE SOGA LADRILLO KK 18 HUE M2 146.53

Eje C (Primer Piso), entre ejes: del 2-3 y M2 3.00 0.78 2.00 4.71

Eje C (Primer Piso), entre ejes: del 1-2, M2 3.00 1.69 3.00 15.17

Eje C (Segundo Piso), entre ejes: del 1al M2 3.00 0.99 5.00 14.78

Eje A (Primer Piso) entre ejes: 1 al 2 M2 1.92 1.69 1.00 3.24

Eje A (Primer Piso) entre ejes: 2-3, 3-4 M2 3.00 1.69 2.00 10.11

Eje A (Primer Piso) entre ejes: 1-2 M2 1.92 1.69 1.00 3.24

Eje A (Primer Piso) entre ejes: 2-3,3-4, M2 2.03 1.69 2.00 6.82

Eje A (Segundor Piso) entre ejes: 1-2,4 M2 3.00 1.89 2.00 11.31

Eje A (segundo Piso) entre ejes: 2-3,3- M2 1.92 1.89 3.00 10.89

Muro de armario M2 0.60 1.89 3.00 3.39

muro de gabinete para gas M2 0.60 1.89 1.00 1.13

Eje 4'-4' M2 0.97 2.95 1.00 2.86

Eje 5-5 M2 5.67 2.95 1.00 16.73

Eje B'-B' M2 3.29 2.95 1.00 9.71

Eje B-B M2 3.15 2.95 1.00 9.29

PARAPETO DEL SEGUNDO PISO

Entre ejes: 1-6 fachada principal M2 23.35 0.95 1.00 22.18

Eje 1-1 1.02 0.95 1.00 0.97

01.03.07 REVOQUES ENLUCIDOS Y MOLDURAS

01.03.07.01 TARRAJEO PRIMARIO RAYADO CON m2 29.53

SS.HH. 5.34 1.20 1.00 6.41

SS.HH. 5.44 1.20 1.00 6.53

Mesa de Trabajo tipo 1 3.00

3.60 0.95 1.00 3.42

3.60 0.10 2.00 0.72

0.95 0.10 2.00 0.19

0.75 0.80 8.00 4.80

Page 72: Met for 01(I-III) Colpa

72

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

0.10 0.80 6.00 0.48

0.80 0.80 2.00 1.28

Mesa de Trabajo tipo 2 1.00

1.80 0.95 1.00 1.71

1.80 0.10 2.00 0.36

0.95 0.10 2.00 0.19

0.75 0.80 2.00 1.20

0.10 0.80 2.00 0.16

0.80 0.80 1.00 0.64

0.65 0.80 2.00 1.04

0.50 0.80 1.00 0.40

01.03.07.02 TARRAJEO EN INTERIORES ACABADO M2 416.61

Primer nivel

Ejes 1-1, 4-4, 5-5,6-6 M2 6.40 2.85 6.00 109.44

Ejes 5'-5' M2 0.97 1.65 2.00 3.20

Eje C, entre ejes: del 2-3 y 5-6 M2 3.47 1.04 2.00 7.18

Eje C , entre ejes: del 1-2, 3-4, M2 3.47 1.94 2.00 13.43

Eje C entre ejes: del 4-5 M2 3.47 0.74 1.00 2.55

Eje A entre ejes: 1-2 M2 2.37 1.94 1.00 4.59

Eje A entre ejes: 2-3,3-4 M2 3.47 1.94 2.00 13.43

Eje A entre ejes: 4-5, 5-6 M2 2.47 1.94 2.00 9.56

Eje B-B M2 3.15 3.10 2.00 19.53

Eje B'-B' M2 3.29 3.10 1.00 10.20

Eje B'-B' M2 3.29 1.90 1.00 6.25

Eje B'-B' Armario de laboratorio M2 0.60 1.94 6.00 6.97

Eje A entre ejes: 4-5,8-9,10-11 M2 3.47 1.94 3.00 20.14

Segundo Nivel

Ejes 1-1, 4-4,6-6 M2 6.40 2.70 4.00 69.12

Eje C-C, 1-1 al 6-6 M2 3.47 1.09 6.00 22.59

Eje A entre ejes: 1-2,4-5 M2 2.37 1.99 2.00 9.41

Eje A entre ejes: 2-3,3-4,5-6 M2 3.47 1.99 3.00 20.66

ESCALERA PRIMER PISO DEPOSITO

Eje 9 Primer piso (deposito) M2 4.40 2.20 1.00 9.68

Eje 8 Primer piso (deposito) M2 1.40 1.70 2.00 4.76

Eje A' DEPOSITO M2 1.55 1.70 1.00 2.64

Eje A PRIMER PISO M2 0.65 2.64 1.00 1.71

ENTRE EJES 8 y 9 Primer piso M2 3.00 2.20 1.00 6.60

Eje B' Primer piso deposito M2 3.24 1.20 1.00 3.89

CAJA DE ESCALERA

Page 73: Met for 01(I-III) Colpa

73

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Eje 8 y 9 M2 3.60 3.70 2.00 26.64

Eje B' M2 3.24 1.00 1.00 3.24

Eje A ambas caras M2 1.60 1.00 2.00 3.20

Entre Ejes 8 y 9 Baranda ambas caras M2 3.00 1.00 2.00 6.00

01.03.07.03 TARRAJEO EN EXTERIORES CON CE M2 263.67

Primer nivel

Eje C-C, entre 1-1 al 2-2 M2 3.47 2.04 1.00 7.06

Eje C-C, entre 2-3, 5-6 M2 3.47 1.14 2.00 7.88

Eje C-C, entre 3-4,4-5 M2 3.47 1.14 2.00 7.88

Eje A entre ejes: 1-2 M2 2.37 2.04 1.00 4.82

Eje A entre ejes: 2-3,3-4 M2 3.47 2.04 2.00 14.12

Eje A entre ejes: 4-5,5-6 M2 3.47 2.04 2.00 14.12

Eje 1-1,Y 6-6 entre A-A y C-C M2 6.40 2.95 2.00 37.76

Segundo Nivel

Eje C-C, 1-1 al 6-6 M2 3.47 1.04 5.00 17.96

Eje A entre ejes: 1-2,4-5 M2 2.37 1.99 2.00 9.41

Eje A entre ejes: 2-3,3-4,5-6 M2 3.47 1.99 3.00 20.66

Eje 1-1, 6-6 entre A-A y C-C M2 6.40 2.70 2.00 34.56

Eje 1-1, 6-6, entre A-A y C-CTimpano, in M2 6.40 0.60 2.00 7.68

Eje 1-1, 6-6, entre A-A y C-CTimpano, su M2 6.20 0.60 2.00 7.44

Parapetos

Entre ejes: 1 al 6 fachada principal M2 21.35 1.05 2.00 44.84

Eje 1-1 1.40 1.05 2.00 2.94

Escalera

Eje 6-7 Segundo piso M2 4.35 2.73 2.00 23.74

Gargolas

Frontal M2 0.20 0.10 3.00 0.06

Frontal M2 0.15 0.05 6.00 0.05

Lateral M2 0.25 0.20 3.00 0.15

Fondo y techo M2 0.20 0.20 6.00 0.24

Techo M2 0.20 0.05 6.00 0.06

Interior gargola M2 0.40 0.20 3.00 0.24

01.03.07.04 TARRAJEO DE SUPERFICIE DE COLU M2 154.82

INTERIORES

Primer Nivel

Eje A1, A6 M2 0.67 2.65 2.00 3.55

Eje A5 M2 1.05 2.65 1.00 2.78

Page 74: Met for 01(I-III) Colpa

74

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Eje A4, A5 M2 1.22 2.65 3.00 9.70

Eje A2, A3 M2 1.45 2.65 2.00 7.69

Eje B1,B4, B5, B-6 M2 0.25 2.65 6.00 3.98

Eje C1 C6 M2 0.47 2.65 2.00 2.49

Eje C2, C3, C5 M2 1.05 2.65 3.00 8.35

Eje C4 M2 0.82 2.65 1.00 2.17

Segundo Nivel

Eje A1, A6 M2 0.67 2.70 2.00 3.62

Eje A4 M2 0.82 2.70 4.00 8.86

Eje A2, A3, A5 M2 1.22 2.70 3.00 9.88

Eje B1, B4, B5 M2 0.25 2.70 4.00 2.70

Eje C1, C6 M2 0.47 2.70 2.00 2.54

Eje C4 M2 0.82 2.70 1.00 2.21

Eje C2, C3, C5 M2 1.05 2.70 3.00 8.51

EXTERIORES

Primer Nivel

Eje A1, A6 M2 0.90 2.75 2.00 4.95

Eje A2, A3, A4,A5, M2 0.65 2.75 4.00 7.15

Eje B1,B6 M2 0.25 2.75 2.00 1.38

Eje C1, C6 M2 1.10 2.75 2.00 6.05

Eje C2, C3, C4, C5 M2 1.05 2.75 4.00 11.55

Segundo Nivel

Eje A1 A6 M2 0.90 2.70 2.00 4.86

Eje A2, A3, A4, A5 M2 0.65 2.70 4.00 7.02

Eje B1, B6 M2 0.25 2.70 2.00 1.35

Eje C1 C6 M2 1.10 2.70 2.00 5.94

Eje C2, C3, C4, C5 M2 1.05 2.70 4.00 11.34

Columnetas en pazadizo

0.25 0.95 30.00 7.13

0.13 0.95 9.00 1.11

ESCALERA

Eje B'6 y B'5 M2 0.25 3.10 2.00 1.55

Eje B'6 y B'5 M2 0.23 3.10 2.00 1.43

Eje A'6 y A'5 M2 0.25 3.10 2.00 1.55

Eje A'6 y A'5 M2 0.23 3.10 2.00 1.43

01.03.07.05 TARRAJEO EN SUPERFICIE DE VIGA M2 165.14

INTERIORES

Primer nivel

Page 75: Met for 01(I-III) Colpa

75

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

EJE 2, 3, 5 Fondo M2 6.40 0.35 3.00 6.72

EJE 2, 3, 5 Lateral M2 6.60 0.35 6.00 13.86

EJE 1, 4, 6 Lateral M2 6.60 0.15 4.00 3.96

Eje A Fondo M2 3.55 0.20 5.00 3.55

Eje A Lateral M2 3.85 0.35 5.00 6.74

Eje C Fondo M2 3.55 0.20 5.00 3.55

Eje C Lateral M2 3.55 0.35 5.00 6.21

Eje A alfeizer de ventanas M2 3.50 0.10 2.00 0.70

Eje A alfeizer de ventanas M2 2.40 0.10 3.00 0.72

Eje C alfeizer de ventanas M2 3.47 0.10 5.00 1.74

Segundo Nivel

EJE 1, 4, 6 Lateral M2 6.60 0.30 4.00 7.92

Eje A Fondo M2 3.55 0.20 5.00 3.55

Eje A Lateral M2 3.85 0.30 5.00 5.78

Eje C Fondo M2 3.55 0.20 5.00 3.55

Eje C Lateral M2 3.55 0.30 5.00 5.32

Eje A alfeizer de ventanas M2 3.50 0.10 3.00 1.05

Eje A alfeizer de ventanas M2 2.35 0.10 2.00 0.47

Eje C alfeizer de ventanas M2 3.50 0.10 5.00 1.75

EXTERIORES

Primer nivel

EJE 1,6 laterales M2 7.20 0.55 2.00 7.92

EJE 1,6 laterales M2 1.50 0.48 2.00 1.43

EJE del 1 al 6 Fondo M2 1.50 0.35 5.00 2.62

EJE del 1 al 6 Laterales M2 1.50 0.28 8.00 3.30

Eje C alfeizer de ventanas fachada poste M2 3.50 0.10 5.00 1.75

Eje C laterales M2 21.35 0.55 1.00 11.74

Eje A alfeizer de ventanas fachada princi M2 3.50 0.10 2.00 0.70

Eje A alfeizer de ventanas fachada princi M2 2.43 0.10 3.00 0.73

Segundo Nivel

EJE 1, 6 laterales M2 7.20 0.30 2.00 4.32

EJE 1, 6 laterales Timpano M2 3.43 0.25 4.00 3.43

EJE del 1 al 6 laterales M2 1.90 0.55 6.00 6.33

EJE del 1 al 6 Fondo M2 1.50 0.23 3.00 1.04

Eje C alfeizer de ventanas fachada poste M2 3.50 0.10 5.00 1.75

Eje C laterales M2 21.35 0.55 1.00 11.74

Eje A alfeizer de ventanas fachada princi M2 3.50 0.10 3.00 1.05

Eje A alfeizer de ventanas fachada princi M2 2.40 0.10 2.00 0.48

Eje A fachada principal M2 3.85 0.30 5.00 5.78

Page 76: Met for 01(I-III) Colpa

76

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Viga en voladizo M2 21.35 0.40 1.00 8.54

Viga en voladizo M2 3.85 0.20 5.00 3.85

Parapeto en alero M2 21.35 0.10 2.00 4.27

Parapeto en alero M2 1.40 0.10 2.00 0.28

Escalera

Eje A fachada principal primer piso M2 3.75 0.35 1.00 1.31

Eje A fachada principal segundo piso M2 3.75 0.30 1.00 1.13

Parapeto en alero M2 6.50 0.10 1.00 0.65

Parapeto en alero M2 1.90 0.10 1.00 0.19

Eje B' fachada posterior segundo piso M2 3.75 0.30 1.00 1.13

Eje B' alfeizer de ventanas fachada posteri M2 3.75 0.15 1.00 0.56

01.03.07.06 TARRAJEO PULIDO BOLEADO GRIS E M2 12.96

Parapeto de aula 21.35 0.36 1.00 7.69

Parapeto de aula 1.40 0.36 1.00 0.50

Pasamanos en escalera 5.70 0.36 1.00 2.05

Parapeto de escalera 5.65 0.36 1.00 2.03

Parapeto de escalera 1.90 0.36 1.00 0.68

01.03.07.07 VESTIDURA DE DERRAMES EN PUERT ML 83.15

Primer nivel

P-1 ML 2.64 1.00 2.64

P-3 ML 2.64 2.00 5.27

P-2 ML 2.40 2.00 4.80

V-3 Eje AA ML 2.40 3.00 1.00

V-2 Eje AA ML 3.50 2.00 7.00

V-3 Eje AA ML 2.50 2.00 1.00

V-1 EJE CC ML 3.50 3.00 10.50

V-2 EJE CC ML 3.50 2.00 7.00

Segundo nivel

P-1 ML 2.64 2.00 5.27

V-3 Eje AA ML 2.40 2.00 4.79

V-2 Eje AA ML 3.50 3.00 10.50

V-1 EJE CC ML 3.50 5.00 17.50

ESCALERA

P-2 ML 2.64 1.00 2.64

V-4 ML 3.24 1.00 3.24

01.03.07.08 BRUÑAS E=1CM ML 698.11

Page 77: Met for 01(I-III) Colpa

77

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Primer nivel

Eje AA, Entre 2-3, 3-4 ML 6.44 4.00 25.76

Eje AA, Entre 1-2,4-5,5-6 ML 5.35 6.00 32.10

Eje C-C, Entre del 1-2,2-3,3-4,4-5,5-6 ML 4.64 10.00 46.40

Eje 1-1 y 6-6 (interior y exterior) ML 16.35 4.00 65.40

Eje 4-4,5-5 ML 16.35 4.00 65.40

Segundo nivel

Eje AA, Entre 1-2,4-5 ML 6.27 4.00 25.08

Eje AA, Entre 2-3, 3-4,5-6 ML 5.20 6.00 31.17

Eje C-C, Entre 1-1 al 6-6 ML 4.87 10.00 48.70

Eje 1,6 (interior y exterior) ML 22.10 4.00 88.40

Eje 1,6 Timpano ML 16.80 4.00 67.20

Eje 4-4 ML 15.95 2.00 31.90

Voladizo

Del eje 1-1 al 6-6 ML 1.78 40.00 71.00

1.05 4.00 4.20

Altura 0.90 44.00 39.60

En escalera

ML 1.20 3.00 3.60

3.85 6.00 23.10

ML 1.80 3.00 5.40

3.65 3.00 10.95

4.25 3.00 12.75

01.03.08 CIELORASO

01.03.08.01 CIELORRASOS CON MEZCLA DE CEM M2 172.55

Aulas (primer nivel) M2 6.60 3.85 5.00 127.05

Voladizo aulas M2 3.85 1.39 5.00 26.66

Voladizo escalera M2 3.27 1.89 1.00 6.16

Voladizo escalera M2 1.70 1.89 1.00 3.20

Deposito debajo de escalera M2 3.24 1.42 1.00 4.60

Escalera 2° tramo M2 3.15 1.55 1.00 4.88

01.03.08.02 CIELORRASO SUSPENDIDO CON TRIPLAM2 211.89

Aulas (segundo nivel) M2 8.35 6.60 1.00 55.11

Sala de computo (segundo nivel) M2 12.40 6.60 1.00 81.84

Voladizo (Frontal y posterior)- segundo niv M2 8.35 1.50 1.00 12.53

Voladizo (Frontal y posterior)- segundo niv M2 12.40 1.50 1.00 18.60

Alero lateral - segundo nivel M2 11.35 0.60 2.00 13.62

ESCALERA

Page 78: Met for 01(I-III) Colpa

78

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

INTERIOR M2 5.45 3.25 1.00 17.71

LATERAL M2 5.45 0.60 1.00 3.27

PASADIZO M2 4.35 1.50 1.00 6.52

1.79 1.50 1.00 2.68

01.03.08.03 RODON DE MADERA TORNILLO CEPILLAML 199.05

INTERIOR

Aulas (segundo nivel) ML 8.35 2.00 16.70

Aulas (segundo nivel) ML 6.60 2.00 13.20

Sala de computo (segundo nivel) M2 12.40 2.00 24.80

Sala de computo (segundo nivel) M2 6.60 2.00 13.20

EXTERIOR

Eje AA ML 21.35 2.00 42.70

Eje CC ML 21.35 2.00 42.70

EJE 1-1 Y 77 ML 11.35 2.00 22.70

ESCALERA

INTERIOR ML 11.95 1.00 11.95

LATERAL ML 5.45 1.00 5.45

PASADIZO ML 5.65 1.00 5.65

01.03.09 PISOS Y VEREDAS

01.03.09.01 PISOS

01.03.09.01.01 PISO DE MADERA MACHIHEMBRADA DE 1"x4" C/DURMIENTES DE 2"x3" EN PRIMER PISO 49.54

Sala de Profesores M2 5.60 4.00 1.00 22.40

Dirección y secretaria M2 4.05 6.70 1.00 27.14

01.03.09.01.02 PISO DE MADERA MACHIHEMBRADA DE 1"x4" C/DURMIENTES DE 3"x1.5" EN SEGUNDO PISO 55.95

Aulas (Segundo nivel) M2 8.35 6.70 1.00 55.95

01.03.09.01.03 PISO DE CEMENTO PULIDO E=2" - BR M2 212.12

Laboratorio M2 12.40 6.70 1.00 83.08

Sala de Computo M2 12.40 6.70 1.00 83.08

Piso de Ciculación M2 21.22 1.35 1.00 28.65

Deposito debajo de escalera M2 3.24 1.52 1.00 4.92

Deposito debajo de escalera M2 1.54 1.20 1.00 1.85

Pasadizo de circulación escalera M2 5.70 1.85 1.00 10.55

01.03.09.01.04 PISO CERAMICO NORDICA AZUL + GRIS M2 1.88

SS.HH. 1.94 0.97 1.00 1.88

Page 79: Met for 01(I-III) Colpa

79

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

SS.HH. 1.89 0.97 1.00 1.83

01.03.09.02 VEREDAS

01.03.09.02.01 VEREDA DE CONCRETO DE 4" CON B M2 62.58

Frontal M2 22.18 1.50 1.00 33.27

Posterior M2 22.18 0.80 1.00 17.74

Laterales M2 7.23 0.80 2.00 11.57

01.03.09.02.02 CONCRETO F'C=140 KG/CM2 EN UÑAS M3 4.89

Frontal M3 22.18 1.00 0.08 1.77

Posterior M3 22.18 1.00 0.08 1.77

Laterales M3 10.00 1.00 0.08 0.80

Corte J-J Frontal M3 1.50 0.30 0.20 4.00 0.36

Corte J-J Posterior M3 0.80 0.30 0.20 4.00 0.19

01.03.09.02.03 JUNTAS DE CONTRACCION ML 12.20

Vereda frontal ML 1.50 2.00 3.00

Vereda posterior de Aulas ML 0.80 2.00 1.60

vereda lateral de Escalera ML 0.80 2.00 1.60

vereda lateral aulas ML 3.00 2.00 6.00

01.03.09.02.04 JUNTAS DE DILATACION EN VEREDAS ML 68.44

Vereda frontal ML 1.50 4.00 6.00

Vereda posterior de Aulas ML 0.80 4.00 3.20

perimetral al modulo ML 59.24 1.00 59.24

01.03.10 ZOCALOS, CONTRAZOCALOS Y REVESTIMIENTOS

01.03.10.01 ZOCALOS

01.03.10.01.01 ZOCALO DE CEMENTO MEZCLA CEME ML 98.24

Fachada posterior ML 21.38 1.00 21.38

Fachada lateral aula ML 7.23 2.00 14.46

Fachada frontal ML 21.38 1.00 21.38

menos vanos 1.10 -1.00 -1.10

menos vanos 1.00 -2.00 -2.00

Fachada frontal aula 2° piso ML 21.38 1.00 21.38

Descanso ML 1.58 1.00 1.58

Escalera segundo tramo ML 3.43 1.00 3.43

ML 1.69 1.00 1.69

Eje 8 deposito ML 1.52 1.00 1.52

Eje 8' deposito ML 2.96 1.00 2.96

Page 80: Met for 01(I-III) Colpa

80

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Eje A deposito ML 0.64 1.00 0.64

Eje A' deposito ML 1.50 1.00 1.50

Eje B' deposito ML 3.24 1.00 3.24

Eje A' deposito ML 1.70 1.00 1.70

Entre ejes 9 - 9 ML 4.48 1.00 4.48

01.03.10.01.02 ZOCALO INTERIOR C/CERAMICO 0.20X0 M2 19.44

SS.HH. 5.45 1.80 1.00 9.81

SS.HH. 5.35 1.80 1.00 9.63

01.03.10.02 CONTRAZOCALOS

01.03.10.02.01 CONTRAZOCALO DE MADERA TORNILLO ML 47.63

Interior Sala de Profesores Primer nivel ML 8.95 2.00 17.90

3.29 1.00 3.29

Interior secretaria ML 20.08 1.00 20.08

ML 6.36 1.00 6.36

01.03.10.02.02 CONTRAZOCALO CEMENTO S/COLOREAML 76.40

Laboratorio ML 12.40 2.00 24.80

6.70 2.00 13.40

Sala de Computo ML 12.40 2.00 24.80

6.70 2.00 13.40

01.03.10.03 REVESTIMIENTO GRADAS DE ESCALERAS

01.03.10.03.01 FORJADO Y REVESTIM. DE GRADAS Y M2 35.65

Pasos M2 1.55 23.00 35.65

01.03.10.03.02 FORJADO Y REVESTIM. DE DESCANSO M2 4.92

Primer descanzo M2 3.24 1.52 1.00 4.92

01.03.10.03.03 BARANDA DE TUBERIA DE F°G° DE 2" ML 12.78

ML 12.78 1.00 12.78

01.03.10.03.04 CANTONERAS METALICAS CON PLANC Pza 23.00

Cantoneras en pasos de escaleras de 3” x3 Pza 23.00

01.03.11 CARPINTERIA DE MADERA

01.03.11.01 PUERTAS

01.03.11.01.01 PUERTA DE MADERA CEDRO TABLER M2 35.29

Page 81: Met for 01(I-III) Colpa

81

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Puerta de madera cedro en Aulas M2 1.10 2.64 3.00 8.70

1.00 2.64 3.00 7.90

Puerta en ss.hh. M2 0.70 2.64 2.00 3.70

Puerta en gabinete para gas 1.35 0.64 1.00 0.86

Puerta tipo closet en laboratorio 1.61 1.89 2.00 6.07

1.51 1.89 2.00 5.69

Puerta de madera cedro en Escalera M2 0.90 2.64 1.00 2.38

01.03.11.01.02 COLOCACION DE PUERTAS UND 14.00 14.00

01.03.11.02 PIZARRA

01.03.11.02.01 PIZARRA TIPO ACRILICO DE 1.20X4.5 UND 3.00 3.00

01.03.12 CARPINTERIA METALICA

01.03.12.01 VENTANA

01.03.12.01.01 VENTANA METALICA M2 69.84

Primer nivel

V-1 M2 3.52 1.60 2.00 11.26

V-2 M2 3.52 0.70 4.00 9.86

V-3 M2 2.42 0.70 1.00 1.69

V-4 M2 2.32 1.60 1.00 3.71

V-5 M2 2.52 0.70 2.00 3.53

Segundo nivel

V-1 M2 3.52 1.60 5.00 28.16

V-2 M2 3.52 0.70 2.00 4.93

V-3 M2 2.42 0.70 3.00 5.08

ESCALERA

V-4 ML 3.24 0.50 1.00 1.62

01.03.12.01.02 COLOCACION DE VENTANAS UND 21.00 21.00

01.03.13 CERRAJERIA

01.03.13.01 CERRADURA PARA PUERTAS UND 5.00 5.00

01.03.13.02 CERRADURA PTA.BAÑO UND 2.00 2.00

01.03.13.03 MANIJA DE BRONCE DE 4" PARA PUE UND 7.00 7.00

01.03.14 VIDRIO, CRISTALES Y SIMILARES

Page 82: Met for 01(I-III) Colpa

82

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

01.03.14.01 VIDRIO SEMIDOBLE P2 696.02

Primer nivel

V-1 M2 3.52 1.60 2.00 121.24

V-2 M2 3.52 0.70 4.00 106.09

V-3 M2 2.42 0.70 1.00 18.23

V-4 M2 2.32 1.60 1.00

V-5 M2 2.52 0.70 2.00 37.98

Segundo nivel

V-1 M2 3.52 1.60 5.00 303.11

V-2 M2 3.52 0.70 2.00 53.04

V-3 M2 2.42 0.70 3.00 54.70

ESCALERA

V-4 ML 3.24 0.50 1.00 1.62

01.03.15 PINTURA

01.03.15.01 PINTURA EN INTERIORES

01.03.15.01.01 PINTURA LATEX EN MUROS INTERIOR M2 341.28

Primer nivel

Ejes 1-1, 4-4, 5-5,6-6 M2 6.40 2.85 6.00 109.44

Ejes 5'-5' M2 0.97 1.65 2.00 3.20

Eje C, entre ejes: del 2-3 y 5-6 M2 3.47 1.04 2.00 7.18

Eje C , entre ejes: del 1-2, 3-4, M2 3.47 1.94 2.00 13.43

Eje C entre ejes: del 4-5 M2 3.47 0.74 1.00 2.55

Eje A entre ejes: 1-2 M2 2.37 1.94 1.00 4.59

Eje A entre ejes: 2-3,3-4 M2 3.47 1.94 2.00 13.43

Eje A entre ejes: 4-5, 5-6 M2 2.47 1.94 2.00 9.56

Eje B-B M2 3.15 3.10 2.00 19.53

Eje B'-B' M2 3.29 3.10 1.00 10.20

Eje B'-B' M2 3.29 1.90 1.00 6.25

Eje B'-B' Armario de laboratorio M2 0.60 1.94 6.00

Eje A entre ejes: 4-5,8-9,10-11 M2 3.47 1.94 3.00 20.14

Segundo Nivel

Ejes 1-1, 4-4,6-6 M2 6.40 2.70 4.00 69.12

Eje C-C, 1-1 al 6-6 M2 3.47 1.09 6.00 22.59

Eje A entre ejes: 1-2,4-5 M2 2.37 1.99 2.00 9.41

Eje A entre ejes: 2-3,3-4,5-6 M2 3.47 1.99 3.00 20.66

01.03.15.01.02 PINTURA LATEX EN COLUMNAS Y VIG M2 162.60

PINTURA EN COLUMNAS INTERIORES

Page 83: Met for 01(I-III) Colpa

83

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Primer Nivel

Eje A1, A6 M2 0.67 2.65 2.00 3.55

Eje A5 M2 1.05 2.65 1.00 2.78

Eje A4, A5 M2 1.22 2.65 3.00 9.70

Eje A2, A3 M2 1.45 2.65 2.00 7.69

Eje B1,B4, B5, B-6 M2 0.25 2.65 6.00 3.98

Eje C1 C6 M2 0.47 2.65 2.00 2.49

Eje C2, C3, C5 M2 1.05 2.65 3.00 8.35

Eje C4 M2 0.82 2.65 1.00 2.17

Segundo Nivel

Eje A1, A6 M2 0.67 2.70 2.00 3.62

Eje A4 M2 0.82 2.70 4.00 8.86

Eje A2, A3, A5 M2 1.22 2.70 3.00 9.88

Eje B1, B4, B5 M2 0.25 2.70 4.00 2.70

Eje C1, C6 M2 0.47 2.70 2.00 2.54

Eje C4 M2 0.82 2.70 1.00 2.21

Eje C2, C3, C5 M2 1.05 2.70 3.00 8.51

PINTURA LATEX EN VIGAS INTERIORES

Primer nivel

EJE 2, 3, 5 Fondo M2 6.40 0.35 3.00 6.72

EJE 2, 3, 5 Lateral M2 6.60 0.35 6.00 13.86

EJE 1, 4, 6 Lateral M2 6.60 0.15 4.00 3.96

Eje A Fondo M2 3.55 0.20 5.00 3.55

Eje A Lateral M2 3.85 0.35 5.00 6.74

Eje C Fondo M2 3.55 0.20 5.00 3.55

Eje C Lateral M2 3.55 0.35 5.00 6.21

Eje A alfeizer de ventanas M2 3.50 0.10 2.00 0.70

Eje A alfeizer de ventanas M2 2.40 0.10 3.00 0.72

Eje C alfeizer de ventanas M2 3.47 0.10 5.00 1.74

Segundo Nivel

EJE 1, 4, 6 Lateral M2 6.60 0.30 4.00 7.92

Eje A Fondo M2 3.55 0.20 5.00 3.55

Eje A Lateral M2 3.85 0.30 5.00 5.78

Eje C Fondo M2 3.55 0.20 5.00 3.55

Eje C Lateral M2 3.55 0.30 5.00 5.32

Eje A alfeizer de ventanas M2 3.50 0.10 3.00 1.05

Eje A alfeizer de ventanas M2 2.35 0.10 2.00 0.47

Eje C alfeizer de ventanas M2 3.50 0.10 5.00 1.75

Page 84: Met for 01(I-III) Colpa

84

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Escalera

Eje 8 y 9 M2 4.30 0.25 2.00 2.15

Eje B' 1er nivel M2 3.73 0.25 1.00 0.93

Eje B' 2do nivel M2 3.73 0.30 1.00 1.12

Eje A primer y segundo nivel M2 3.73 0.30 2.00 2.24

01.03.15.02 PINTURA EN EXTERIORES

01.03.15.02.01 PINTURA LATEX EN MUROS EXTERIO M2 262.87

Primer nivel

Eje C-C, entre 1-1 al 2-2 M2 3.47 2.04 1.00 7.06

Eje C-C, entre 2-3, 5-6 M2 3.47 1.14 2.00 7.88

Eje C-C, entre 3-4,4-5 M2 3.47 1.14 2.00 7.88

Eje A entre ejes: 1-2 M2 2.37 2.04 1.00 4.82

Eje A entre ejes: 2-3,3-4 M2 3.47 2.04 2.00 14.12

Eje A entre ejes: 4-5,5-6 M2 3.47 2.04 2.00 14.12

Eje 1-1,Y 6-6 entre A-A y C-C M2 6.40 2.95 2.00 37.76

Segundo Nivel

Eje C-C, 1-1 al 6-6 M2 3.47 1.04 5.00 17.96

Eje A entre ejes: 1-2,4-5 M2 2.37 1.99 2.00 9.41

Eje A entre ejes: 2-3,3-4,5-6 M2 3.47 1.99 3.00 20.66

Eje 1-1, 6-6 entre A-A y C-C M2 6.40 2.70 2.00 34.56

Eje 1-1, 6-6, entre A-A y C-CTimpano, in M2 6.40 0.60 2.00 7.68

Eje 1-1, 6-6, entre A-A y C-CTimpano, su M2 6.20 0.60 2.00 7.44

Parapetos

Entre ejes: 1 al 6 fachada principal M2 21.35 1.05 2.00 44.84

Eje 1-1 1.40 1.05 2.00 2.94

Escalera

Eje 6-7 Segundo piso M2 4.35 2.73 2.00 23.74

01.03.15.02.02 PINTURA LATEX EN COLUMNAS Y VI M2 163.79

PINTURA LATEX EN COLUMNAS EXTERIORES

Primer Nivel

Eje A1, A6 M2 0.90 2.75 2.00 4.95

Eje A2, A3, A4,A5, M2 0.65 2.75 4.00 7.15

Eje B1,B6 M2 0.25 2.75 2.00 1.38

Eje C1, C6 M2 1.10 2.75 2.00 6.05

Eje C2, C3, C4, C5 M2 1.05 2.75 4.00 11.55

Segundo Nivel

Eje A1 A6 M2 0.90 2.70 2.00 4.86

Page 85: Met for 01(I-III) Colpa

85

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Eje A2, A3, A4, A5 M2 0.65 2.70 4.00 7.02

Eje B1, B6 M2 0.25 2.70 2.00 1.35

Eje C1 C6 M2 1.10 2.70 2.00 5.94

Eje C2, C3, C4, C5 M2 1.05 2.70 4.00 11.34

Columnetas en pazadizo

0.25 0.95 30.00 7.13

0.13 0.95 9.00 1.11

ESCALERA

Eje B'6 y B'5 M2 0.25 3.10 2.00 1.55

Eje B'6 y B'5 M2 0.23 3.10 2.00 1.43

Eje A'6 y A'5 M2 0.25 3.10 2.00 1.55

Eje A'6 y A'5 M2 0.23 3.10 2.00 1.43

PINTURA LATEX EN VIGAS EXTERIORES

Primer nivel

EJE 1,6 laterales M2 7.20 0.55 2.00 7.92

EJE 1,6 laterales M2 1.50 0.48 2.00 1.43

EJE del 1 al 6 Fondo M2 1.50 0.35 5.00 2.62

EJE del 1 al 6 Laterales M2 1.50 0.28 8.00 3.30

Eje C alfeizer de ventanas fachada poste M2 3.50 0.10 5.00 1.75

Eje C laterales M2 21.35 0.55 1.00 11.74

Eje A alfeizer de ventanas fachada princi M2 3.50 0.10 2.00 0.70

Eje A alfeizer de ventanas fachada princi M2 2.43 0.10 3.00 0.73

Segundo Nivel

EJE 1, 6 laterales M2 7.20 0.30 2.00 4.32

EJE 1, 6 laterales Timpano M2 3.43 0.25 4.00 3.43

EJE del 1 al 6 laterales M2 1.90 0.55 6.00 6.33

EJE del 1 al 6 Fondo M2 1.50 0.23 3.00 1.04

Eje C alfeizer de ventanas fachada poste M2 3.50 0.10 5.00 1.75

Eje C laterales M2 21.35 0.55 1.00 11.74

Eje A alfeizer de ventanas fachada princi M2 3.50 0.10 3.00 1.05

Eje A alfeizer de ventanas fachada princi M2 2.40 0.10 2.00 0.48

Eje A fachada principal M2 3.85 0.30 5.00 5.78

Viga en voladizo M2 21.35 0.40 1.00 8.54

Viga en voladizo M2 3.85 0.20 5.00 3.85

Parapeto en alero M2 21.35 0.10 2.00 4.27

Parapeto en alero M2 1.40 0.10 2.00 0.28

Escalera

Eje A fachada principal primer piso M2 3.75 0.35 1.00 1.31

Eje A fachada principal segundo piso M2 3.75 0.30 1.00 1.13

Page 86: Met for 01(I-III) Colpa

86

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Parapeto en alero M2 6.50 0.10 1.00 0.65

Parapeto en alero M2 1.90 0.10 1.00 0.19

Eje B' fachada posterior segundo piso M2 3.75 0.30 1.00 1.13

Eje B' alfeizer de ventanas fachada posteri M2 3.75 0.15 1.00 0.56

01.03.15.02.03 PINTURA LATEX EN GARGOLAS COLO M2 0.80

Gargolas

Frontal M2 0.20 0.10 3.00 0.06

Frontal M2 0.15 0.05 6.00 0.05

Lateral M2 0.25 0.20 3.00 0.15

Fondo y techo M2 0.20 0.20 6.00 0.24

Techo M2 0.20 0.05 6.00 0.06

Interior gargola M2 0.40 0.20 3.00 0.24

01.03.15.02.04 PINTURA DE ZOCALO C/ESMALTE H=0. ML 80.51

Fachada posterior ML 21.38 1.00 21.38

Fachada lateral aula ML 7.23 2.00 14.46

Fachada frontal ML 21.38 1.00 21.38

menos vanos 1.10 -1.00 -1.10

menos vanos 1.00 -2.00 -2.00

Fachada frontal aula 2° piso ML 21.38 1.00 21.38

Descanso ML 1.58 1.00 1.58

Escalera segundo tramo ML 3.43 1.00 3.43

01.03.15.02.05 PINTURA DE CONTRAZOCALO C/ESMA ML 76.40

Laboratorio ML 12.40 2.00 24.80

6.70 2.00 13.40

Sala de Computo ML 12.40 2.00 24.80

6.70 2.00 13.40

01.03.15.03 PINTURA EN CIELO RASOS

01.03.15.03.01 PINTURA LATEX EN CIELO RASO CO M2 170.07

Aulas (primer nivel) M2 6.60 3.85 5.00 127.05

Voladizo aulas M2 3.85 1.39 5.00 26.66

Voladizo escalera M2 3.27 1.39 1.00 4.53

Voladizo escalera M2 1.70 1.39 1.00 2.35

Deposito debajo de escalera M2 3.24 1.42 1.00 4.60

Escalera 2° tramo M2 3.15 1.55 1.00 4.88

Page 87: Met for 01(I-III) Colpa

87

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

01.03.15.03.02 PINTURA LATEX EN CIELO RASO COL M2 211.89

Aulas (segundo nivel) M2 8.35 6.60 1.00 55.11

Sala de computo (segundo nivel) M2 12.40 6.60 1.00 81.84

Voladizo (Frontal y posterior)- segundo ni M2 8.35 1.50 1.00 12.53

Voladizo (Frontal y posterior)- segundo ni M2 12.40 1.50 1.00 18.60

Alero lateral - segundo nivel M2 11.35 0.60 2.00 13.62

ESCALERA

INTERIOR M2 5.45 3.25 1.00 17.71

LATERAL M2 5.45 0.60 1.00 3.27

PASADIZO M2 4.35 1.50 1.00 6.52

1.79 1.50 1.00 2.68

01.03.15.04 PINTURA EN ESTRUCTURA METALICA

01.03.15.04.01 ML 7.04

Encuentro mod aulas y escalera ML 2.74 1.00 2.74

2.95 1.00 2.95

Junta en piso entre escalera y aula ML 1.35 1.00 1.35

01.03.15.04.02 PINTURA ANTICORROSIVO ZINCROMA ML 51.48

Canaleta de plancha galvanizada 1/32” s/d

Aulas ML 21.98 2.00 43.96

Escalera ML 3.76 1.00 3.76

Escalera ML 3.76 1.00 3.76

01.03.15.04.03 PINTURA EN VENTANAS C/ESMALTE Y M2 69.84

Primer nivel

V-1 M2 3.52 1.60 2.00 11.26

V-2 M2 3.52 0.70 4.00 9.86

V-3 M2 2.42 0.70 1.00 1.69

V-4 M2 2.32 1.60 1.00 3.71

V-5 M2 2.52 0.70 2.00 3.53

Segundo nivel

V-1 M2 3.52 1.60 5.00 28.16

V-2 M2 3.52 0.70 2.00 4.93

V-3 M2 2.42 0.70 3.00 5.08

ESCALERA

V-4 ML 3.24 0.50 1.00 1.62

PPINTURA ANTICORROSIVO ZINCROMATO ACABADO CON ESMALTE SINTETICO COLOR BAYO EN TAPAJUNTAS

Page 88: Met for 01(I-III) Colpa

88

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

01.03.16 SISTEMA DE AGUA DE LLUVIA

01.03.16.01 CANALETA DE PLANCHA GALVANIZADA

01.03.16.01.01 CANALETA DE PLANCHA GALVANIZADA ML 52.68

AULAS ML 22.58 2.00 45.16

ESCALERA ML 3.76 1.00 3.76

ESCALERA ML 3.76 1.00 3.76

01.03.16.01.02 TUBERIA DE BAJADA PVC SAP 4" DE ML 36.80

Modulo de aulas eje A -A ML 9.65 2.00 19.30

Modulo de aulas eje C - C ML 8.75 2.00 17.50

01.03.16.01.03 CODOS PVC SAL 4”X90° PZA 3.00 4.00 12.00

01.03.16.02 COLUMNETA PARA SOPORTE DE TUBERIAS

01.03.16.02.01 CONCRETO EN COLUMNAS f'c= 175 kg M3 0.32

0.25 0.20 1.60 4.00 0.32

01.03.16.02.02 ENCOFRADO Y DESENCOFRADO NORM M2 4.16

0.65 1.60 4.00 4.16

01.03.17 APARATOS SANITARIOS Y ACCESORIOS

01.03.17.01 INODORO TOP PIECE BLANCO INC/AC UND 2.00

PRIMER NIVEL 2.00

01.03.17.02 LAVATORIO FONTANA INC/ACCESORI UND 2.00

PRIMER NIVEL 2.00

01.03.17.03 PAPELERA DE LOSA Y BARRA PLASTI UND 2.00

PRIMER NIVEL 2.00

01.03.17.04 COLOCACION DE APARATOS SANITAR UND 4.00

PRIMER NIVEL 1.00 4.00 4.00

01.03.17.05 COLOCACION DE ACCESORIOS SANIT UND 2.00

PRIMER NIVEL 1.00 2.00 2.00

01.03.18 INSTALACIONES SANITARIAS

01.03.18.01 SALIDAS DE DESAGUE

01.03.18.01.01 SALIDA DE DESAGUE Ø 4" PTO 2.00

PRIMER NIVEL PTO 2.00

01.03.18.01.02 SALIDA DE DESAGUE Ø 2" PTO 2.00

PRIMER NIVEL PTO 2.00

Page 89: Met for 01(I-III) Colpa

89

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

01.03.18.01.03 SALIDA DE VENTILACION TUB. Ø 2" PTO 6.00

PRIMER NIVEL PTO 6.00

01.03.18.02 RED COLECTOR

01.03.18.02.01 TUBERIA UPVC UF 110MM PARA DESA M 55.47 1.00 55.47

01.03.18.02.02 EXCAVACION DE ZANJA DE 0.40XH=0. M 55.47 1.00 55.47

01.03.18.02.03 RELLENO Y COMPACTADO DE ZANJA DE M 55.47 1.00 55.47

01.03.18.03 RED DISTRIBUCION

01.03.18.03.01 TUBERIA DE PVC SAL 4" - DESAGUE ML 4.85

PRIMER NIVEL 2.50 1.00 2.50

1.75 1.00 1.75

ML 0.30 2.00 0.60

01.03.18.03.02 TUBERIA DE PVC SAL 2" - DESAGUE ML 25.55

PRIMER NIVEL ML 6.80 1.00 6.80

1.20 1.00 1.20

6.10 1.00 6.10

2.45 1.00 2.45

1.10 1.00 1.10

1.20 1.00 1.20

1.70 1.00 1.70

0.90 1.00 0.90

0.30 2.00 0.60

Montante de ventilacion 3.50 1.00 3.50

01.03.18.03.03 EXCAVACION DE ZANJA DE 0.40X0.50 ML 30.40

Tuberia de desague de 4" 4.85 1.00 4.85

Tuberia de desague de 2" 25.55 1.00 25.55

01.03.18.03.04 RELLENO Y COMPACTADO DE ZANJA DE ML 30.40

Tuberia de desague de 4" 4.85 1.00 4.85

Tuberia de desague de 2" 25.55 1.00 25.55

01.03.18.04 ACCESORIOS PARA REDES

01.03.18.04.01 CODO PVC SAL 2" X 45º UND 3.00

1er nivel 3.00

Page 90: Met for 01(I-III) Colpa

90

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

01.03.18.04.02 CODO PVC SAL DE 2" X 90 UND 8.00

Lavatorio 6.00

Ventilación 2.00

01.03.18.04.03 CODO PVC SAL DE 4" X 90 UND 1.00

1er nivel 1.00

01.03.18.04.04 CODO VENTILACION PVC SAL DE 4" - 2 UND 2.00

Inodoro 2.00

01.03.18.04.05 YEE DE PVC SAL C/REDUCCION DE 4" UND 4.00

1er nivel 4.00

01.03.18.04.06 YEE PVC - SAP DE 4" X 4" UND 2.00

1er nivel 2.00

01.03.18.04.07 YEE PVC SAP DE 2" X 2" UND 4.00

1er nivel 4.00

01.03.18.05 ADITAMENTO VARIOS

01.03.18.05.01 SUMIDERO CROMADO 2" EN PISO UND 2.00

1er nivel 2.00

01.03.18.05.02 REGISTRO ROSCADO DE BRONCE DE UND 1.00

1er nivel 1.00

1er nivel 1.00

01.03.18.06 CAMARA DE INSPECCION

01.03.18.06.01 CAJA DE REGISTRO DE DESAGUE 12" XPZA 3.00 3.00

01.03.18.06.02 CAJA DE REGISTRO DE DESAGUE 24" XPZA 1.00 1.00

01.03.19 SISTEMA DE AGUA FRIA

01.03.19.01 SALIDA PARA AGUA FRIA

01.03.19.01.01 SALIDA DE AGUA FRIA CON TUBERIA DPTO 8.00

1er nivel 8.00

01.03.19.02 RED DE CONDUCCIÒN Y DISTRIBUCION

01.03.19.02.01 TUBERIA PVC SAP CLASE - 10 Ø 3/4" ML 57.90

Page 91: Met for 01(I-III) Colpa

91

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

del punto 02 al punto 03 51.15 1.00 51.15

del punto 03 hasta reduccion 6.75 1.00 6.75

01.03.19.02.02 TUBERIA PVC SAP CLASE - 10 Ø 1/2" ML 26.65

PRIMER NIVEL ML 9.65 1.00 9.65

3.00 4.00 12.00

ML 1.00 1.00 1.00

1.50 1.00 1.50

2.50 1.00 2.50

01.03.19.02.03 EXCAVACION DE ZANJA DE 0.30X0.40 ML 84.55

Tuberia de Agua de 1/2" 26.65 1.00 26.65

Tuberia de Agua de 3/4" 57.90 1.00 57.90

01.03.19.02.04 RELLENO Y COMPACTADO DE ZANJA DE ML 84.55

Tuberia de Agua de 1/2" 26.65 1.00 26.65

Tuberia de Agua de 3/4" 57.90 1.00 57.90

01.03.19.03 ACCESORIOS PARA REDES DE AGUA FRIA

01.03.19.03.01 TEE PVC SAP Ø 3/4" P/AGUA UND 1.00

1er nivel 1.00

01.03.19.03.02 TEE PVC SAP Ø 1/2" UND 6.00

1er nivel 6.00

01.03.19.03.03 REDUCCIONES PVC SAP Ø 3/4" A 1/2" UND 2.00

1er nivel 2.00

01.03.19.03.04 CODO PVC SAP Ø 3/4" UND 2.00

1er nivel 2.00

01.03.19.03.05 CODO PVC SAP Ø 1/2" UND 14.00

1er nivel 14.00

01.03.19.04 LLAVES Y VALVULAS

01.03.19.04.01 VALVULA DE COMPUERTA Ø 3/4" UND 2.00

1er nivel 2.00

01.03.19.04.02 VALVULA DE COMPUERTA Ø 1/2" UND 2.00

1er nivel 2.00

01.03.19.05 PIEZAS VARIAS

01.03.19.05.01 CAJA CON TAPA METALICA PARA VALVUND 6.00

1er nivel 6.00

01.03.19.05.02 CAJA CON TAPA METALICA PARA VAL UND 2.00

Page 92: Met for 01(I-III) Colpa

92

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0,58OBRA : CONSTRUCCION MODULO 02 (01 SALON DE USOS MULTIPLES, SALA DE COMPUTO, BIBLIOTECA, Y AMB. 1/2" 1,02

5/8" 1,6FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2,26

1" 4,04ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICASHOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

2.00

01.03.20 VARIOS

01.03.20.01 JUNTA DE CONSTRUCCION CON TEK M2 19.15

Frontal 1er nivel M2 2.19 0.13 7.00 14.00

2do nivel M2 1.99 0.13 8.00 2.06

Posterior 1er nivel M2 1.29 0.13 10.00 1.67

2do nivel M2 1.09 0.13 10.00 1.41

01.03.20.02 JUNTA SELLADA CON POLIURETANO ML 54.88

Frontal 1er nivel M2 2.19 7.00 15.30

2do nivel M2 1.99 8.00 15.88

Posterior 1er nivel M2 1.29 10.00 12.85

2do nivel M2 1.09 10.00 10.85

01.03.20.03 TAPAJUNTAS METALICA DE 1/16"X6" S ML 5.69

Encuentro mod aulas y escalera ML 2.74 1.00 2.74

2.95 1.00 2.95

01.03.20.04 JUNTA CON PLATINA METALICA DE 4" ML 7.04

Encuentro mod aulas y escalera ML 2.74 1.00 2.74

2.95 1.00 2.95

Junta en piso entre escalera y aula ML 1.35 1.00 1.35

01.03.20.05 LIMPIEZA FINAL DE OBRA M2 1.00 210.90 210.90

Page 93: Met for 01(I-III) Colpa

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0.560 OBRA : CONSTRUCCION MODULO 3 - SS.HH. (PROFESORES Y ALUMNOS) 1/2" 0.990

5/8" 1.550 FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2.240

1" 3.960 ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

01.04 MODULO 03 - SS.HH. (SS.HH. PROFESORES Y SS.HH. ALUMNOS)

01.04.01 TRABAJOS PRELIMINARES

01.04.01.01 LIMPIEZA DE TERRENO M2 6.77 11.39 1.00 77.11 77.11

01.04.01.02 TRAZO, NIVELACION Y REPLANTEO M2 6.77 11.39 1.00 77.11 77.11

01.04.02 MOVIMIENTOS DE TIERRAS

01.04.02.01 EXCAVACION PARA CIMIENTOS HASTA 1.50 MT TERRENO m3 14.74

Eje 1 - 1 M3 2.91 0.50 1.05 1.00 1.53

Eje 2 - 2 M3 2.91 0.70 1.05 1.00 2.14

Eje 3 - 3 M3 2.91 0.90 1.05 1.00 2.75

Eje 4 - 4 M3 2.31 0.50 1.05 1.00 1.21

EJE A - A M3 8.83 0.50 1.05 1.00 4.64

EJE B-B M3 8.83 0.50 1.05 1.00

ENTRE LOS EJES 2-3 Y 3-4 M3 0.81 0.60 0.30 6.00 0.87

Entre los Ejes A-B M3 3.30 0.60 0.30 1.00 0.59M3 3.20 0.60 0.30 1.00 0.58M3 0.81 0.50 1.05 1.00 0.43

01.04.02.02 EXCAVACION PARA ZAPATAS DE 1.40 MT A 2.15 MT DE PROFUNDIDAD 3.00

Z-1 M3 1.30 1.10 1.05 2.00 3.00

01.04.02.03 RELLENO Y COMPACTADO EN ZANJAS CON EQUIPO LIVIANO 6.56

Eje 1 - 1 M3 2.91 0.37 0.45 1.00 0.48

Eje 2 - 2 M3 2.91 0.57 0.45 1.00 0.75

Eje 3 - 3 M3 2.91 0.67 0.45 1.00 0.88

Eje 4 - 4 M3 2.31 0.37 0.45 1.00 0.38

EJE A - A M3 8.83 0.37 0.45 1.00 1.47

EJE B-B 8.83 0.37 0.45 1.00 1.47

Z-1 M3 1.30 1.10 0.45 2.00 1.29

menos Viga de Cimentación 0.90 0.13 0.45 -2.00 -0.110.50 0.13 0.45 -2.00 -0.06

01.04.02.04 ELIMINACION DE MATERIAL EXCEDENTE A BOTADERO m3 13.98

(Excav. cimientos + Excv. zapatas - relleno)*1.25

M3 13.98

01.04.02.05 NIVELACION INT. Y APISONADO FINAL P/RECIBIR AL FALS M2 29.71

SS.HH. Profesores M2 1.59 1.41 2.00 4.48

SS.HH 3.31 3.83 1.00 12.683.31 3.79 1.00 12.54

01.04.02.06 AFIRMADO DE 4" PARA VEREDAS M2 42.16

Vereda frontal M2 11.39 2.40 1.00 27.34

Vereda posterior M2 11.39 0.80 1.00 9.11

Vereda laterales M2 3.57 0.80 2.00 5.71

01.04.03 OBRAS DE CONCRETO SIMPLE

01.04.03.01 CIMIENTOS.

01.04.03.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON M3 11.95

Eje 1 - 1 M3 2.91 0.50 0.60 1.00 0.87

Eje 2 - 2 M3 2.91 0.70 0.60 1.00 1.22

Eje 3 - 3 M3 2.91 0.90 0.60 1.00 1.57

Eje 4 - 4 M3 2.31 0.50 0.60 1.00 0.69

EJE A - A M3 8.83 0.50 0.60 1.00 2.65

EJE B-B M3 8.83 0.50 0.60 1.00 2.65

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

K31
luis:
K32
luis:
K33
luis:
Page 94: Met for 01(I-III) Colpa

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0.560 OBRA : CONSTRUCCION MODULO 3 - SS.HH. (PROFESORES Y ALUMNOS) 1/2" 0.990

5/8" 1.550 FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2.240

1" 3.960 ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

ENTRE LOS EJES 2-3 Y 3-4 M3 0.81 0.60 0.30 6.00 0.87

Entre los Ejes A-B M3 3.30 0.60 0.30 1.00 0.59M3 3.20 0.60 0.30 1.00 0.58M3 0.81 0.50 0.60 1.00 0.24

01.04.03.02 SOBRECIMIENTOS

01.04.03.02.01 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS M3 1.12

Eje 1 - 1 M3 1.61 0.13 0.30 1.00 0.06

Eje 2 - 2 M3 3.31 0.13 0.30 1.00 0.13

Eje 3 - 3 M3 3.31 0.23 0.20 1.00 0.15

Eje 4 - 4 M3 3.31 0.13 0.30 1.00 0.13

EJE A - A M3 3.36 0.13 0.30 1.00 0.133.31 0.13 0.30 1.00 0.130.91 0.13 0.30 1.00 0.04

EJE B-B M3 1.96 0.13 0.30 1.00 0.081.98 0.13 0.30 1.00 0.080.91 0.13 0.30 1.00 0.04

ENTRE LOS EJES 2-3 Y 3-4 M3 1.13 0.13 0.10 4.00 0.061.29 0.13 0.10 2.00 0.03

Entre los Ejes A-B M3 0.61 0.13 0.10 4.00 0.03M3 0.91 0.13 0.30 1.00 0.04

01.04.03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL DE SOBRECIMIEN M2 16.20

Eje 1 - 1 M3 1.61 0.30 2.00 0.97

Eje 2 - 2 M3 3.31 0.30 2.00 1.99

Eje 3 - 3 M3 3.31 0.20 2.00 1.32

Eje 4 - 4 M3 3.31 0.30 2.00 1.99

EJE A - A M3 3.36 0.30 2.00 2.023.31 0.30 2.00 1.990.91 0.30 2.00 0.55

EJE B-B M3 1.96 0.30 2.00 1.181.98 0.30 2.00 1.190.91 0.30 2.00 0.55

ENTRE LOS EJES 2-3 Y 3-4 M3 1.13 0.10 8.00 0.901.29 0.10 4.00 0.52

Entre los Ejes A-B M3 0.61 0.10 8.00 0.490.13 0.10 2.00 0.03

M3 0.91 0.30 2.00 0.55

01.04.03.03 FALSO PISO

01.04.03.03.01 CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIG M2 29.71

SS. HH. M2 1.59 1.41 2.00 4.483.31 3.83 1.00 12.683.31 3.79 1.00 12.54

01.04.03.04 MUROS DE CONCRETO EN URINARIO

01.04.03.04.01 MURO DE CONCRETO F'C=175 KG/CM2 PARA URINARIO M3 0.45

SS. HH. VARONES M3 2.37 0.10 1.20 1.00 0.282.26 0.30 0.15 1.00 0.100.50 0.10 1.20 1.00 0.06

01.04.03.04.02 ENCOFRADO Y DESENCOFRADO EN URINARIA M2 4.96

SS. HH. VARONES M2 2.37 1.20 1.00 2.842.26 0.15 2.00 0.680.60 1.20 2.00 1.44

01.04.04 OBRAS DE CONCRETO ARMADO

K74
luis:
K75
luis:
K76
luis:
Page 95: Met for 01(I-III) Colpa

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0.560 OBRA : CONSTRUCCION MODULO 3 - SS.HH. (PROFESORES Y ALUMNOS) 1/2" 0.990

5/8" 1.550 FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2.240

1" 3.960 ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

01.04.04.01 ZAPATAS

01.04.04.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 M3 1.72

Z-1 M3 1.30 1.10 0.60 2.00 1.72

01.04.04.01.02 ACERO PARA ZAPATAS GRADO 60 32.80

Z-1 1.30x1.10 KG/ML 2.00

Acero lado A

5 Ø1/2" 1.05 1.60 5.00 017

1.05

Acero lado B

4 Ø1/2" 1.25 1.60 4.00 016

1.25

01.04.04.02 VIGAS DE CIMENTACION

01.04.04.02.01 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 M3 2.32

Eje 1 - 1 M3 3.24 0.13 0.45 1.00 0.191.29 0.13 0.45 1.00 0.08

M3 1.53 0.13 0.45 3.00 0.27M3 1.66 0.13 0.45 1.00 0.10

ENTRE LOS EJES 1-1Y 2-2 3.34 0.23 0.45 1.00 0.35

Eje 2 - 2 3.56 0.13 0.45 1.00 0.21

Eje A - A 6.12 0.13 0.45 1.00 0.36

ENTRE LOS EJES A-A Y B-B 6.12 0.13 0.45 1.00 0.363.66 0.13 0.45 1.00 0.211.84 0.13 0.45 1.00 0.111.66 0.13 0.45 1.00 0.10

01.04.04.02.02 ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION M3 33.36

Eje 1 - 1 M3 3.24 0.45 2.00 2.921.29 0.45 2.00 1.16

M3 1.53 0.45 6.00 4.13M3 1.66 0.45 2.00 1.49

ENTRE LOS EJES 1-1Y 2-2 3.34 0.45 2.00 3.01

Eje 2 - 2 3.56 0.45 2.00 3.20

Eje A - A 6.12 0.45 2.00 5.51

ENTRE LOS EJES A-A Y B-B 6.12 0.45 2.00 5.513.66 0.45 2.00 3.291.84 0.45 2.00 1.651.66 0.45 2.00 1.49

01.04.04.02.03 ACERO EN VIGA DE CIMENTACION GRADO 60 325.60

EJE A-A (0.13x0.45) 1.00

2Ø3/8"

0.2 8.42 0.2 8.82 0.56 3.00 14.82

0.2 2Ø3/8" 0.2 8.82 0.56 3.00 14.82

8.42

0.4 1.18 0.25 46.00 13.57

0.09

ENTRE A-A Y B-B (0.13x0.45) 1.00

2Ø3/8"

0.2 8.42 0.2 8.82 0.56 3.00 14.82

0.2 2Ø3/8" 0.2 8.82 0.56 3.00 14.82

8.42

Page 96: Met for 01(I-III) Colpa

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0.560 OBRA : CONSTRUCCION MODULO 3 - SS.HH. (PROFESORES Y ALUMNOS) 1/2" 0.990

5/8" 1.550 FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2.240

1" 3.960 ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

0.4 1.88 0.25 48.00 22.56

0.09

EJE B-B (0.13x0.45) 1.00

2Ø3/8"

0.2 8.42 0.2 8.82 0.56 3.00 14.82

0.2 2Ø3/8" 0.2 8.82 0.56 3.00 14.82

8.42

0.4 1.88 0.25 45.00 21.15

0.09

EJE 1-1 (0.13x0.45) 1.00

2Ø3/8"

0.2 3.72 0.2 4.12 0.56 3.00 6.92

0.2 2Ø3/8" 0.2 4.12 0.56 3.00 6.92

3.72

0.4 1.88 0.25 23.00 10.81

0.09

EJE 2-2 (0.13x0.45) 1.00

2Ø3/8"

0.2 3.72 0.2 4.12 0.56 3.00 6.92

0.2 2Ø3/8" 0.2 4.12 0.56 3.00 6.92

3.72

0.4 1.88 0.25 21.00 9.87

0.09

ENTRE LOS EJES 1-1 Y 2-2 (0.23x0.45) 1.00

2Ø1/2"

0.2 3.72 0.2 4.12 0.99 3.00 12.24

0.2 2Ø1/2" 0.2 4.12 0.99 3.00 12.24

3.72

0.4 1.88 0.56 21.00 22.11

0.19

ENTRE LOS EJES 1-1 Y 2-2 (0.13x0.45) 5.00

3Ø1/2"

0.2 1.69 0.2 2.09 0.56 3.00 17.56

Page 97: Met for 01(I-III) Colpa

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0.560 OBRA : CONSTRUCCION MODULO 3 - SS.HH. (PROFESORES Y ALUMNOS) 1/2" 0.990

5/8" 1.550 FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2.240

1" 3.960 ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

0.2 3Ø1/2" 0.2 2.09 0.56 3.00 17.56

1.69

0.4 1.88 0.25 21.00 49.35

0.09

01.04.04.03 COLUMNAS

01.04.04.03.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 2.87

P - 1 M3 0.50 0.13 3.58 5.00 1.16

0.5 M3 0.50 0.13 3.64 4.00 0.95

0.13

P - 2

0.24

0.11 M3 0.24 0.11 4.82 2.00 0.25

0.13 M3 0.40 0.13 4.82 2.00 0.50

0.4

01.04.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL DE COLUMNAS M2 44.80

P - 1 M2 0.50 3.58 10.00 17.90

0.5 M2 0.50 3.64 8.00 14.56

0.13 M2

P - 2

0.24

0.11 M2 0.24 4.82 4.00 4.63

0.13 M2 0.40 4.82 4.00 7.71

0.4

01.04.04.03.03 ACERO GRADO 60 EN COLUMNAS KG 440.70

MODULO DE AULAS KG/ML

P - 1 9.00

6Ø1/2" KG 4.80 1.02 6.00 264.38

ESTRIBOS Ø 1/4" KG 0.85 0.25 23.00 43.99

ESTRIBOS Ø 1/4" 0.85 0.25 23.00 43.99

P - 2 2.00

4Ø 1/2" KG 6.05 0.99 4.00 47.92

4Ø 3/8" KG 5.81 0.56 4.00 26.03

ESTRIBOS Ø 1/4" KG 0.96 0.25 30.00 14.40

01.04.04.04 VIGAS

Page 98: Met for 01(I-III) Colpa

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0.560 OBRA : CONSTRUCCION MODULO 3 - SS.HH. (PROFESORES Y ALUMNOS) 1/2" 0.990

5/8" 1.550 FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2.240

1" 3.960 ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

01.04.04.04.01 CONCRETO EN VIGAS F´C=210 KG/CM2 M3 2.35

VIGA (0.13 x 0.20), Eje A - A M3 7.15 0.13 0.20 1.00 0.19

M3 5.83 0.13 0.20 1.00 0.15

VIGA DE CONF. (0.13 x 0.20), Eje A - A M3 9.55 0.13 0.20 1.00 0.25

VIGA (0.13 x 0.20), Eje B - B M3 7.15 0.13 0.20 1.00 0.19

M3 5.83 0.13 0.20 1.00 0.15

VIGA DE CONF. (0.13 x 0.20), Eje B-B M3 9.55 0.13 0.20 1.00 0.25

VIGA DE CONF. (0.13 x 0.20), Eje B-B M3 5.31 0.13 0.20 1.00 0.14

V - 2 (0.13 x 0.50), Ejes 1 - 1 M3 3.54 0.13 0.50 1.00 0.23

V - 2 (0.13 x 0.20), Ejes 1 - 1 M3 0.50 0.13 0.20 2.00 0.03

Viga de confinamiento (13x20) 1.65 0.13 0.20 1.00 0.04

Eje 2-2 13x20 4.54 0.13 0.20 1.00 0.12

Eje 3-3 24x20 4.54 0.24 0.20 1.00 0.22

V - 1 (0.13 x 0.50), Ejes 4-4 M3 3.54 0.13 0.50 1.00 0.23

V - 1 (0.13 x 0.20), Ejes 4-4 M3 0.50 0.13 0.20 2.00 0.03

Viga de confinamiento (13x20) 3.54 0.13 0.20 1.00 0.09

Eje A'-A' 1.56 0.13 0.20 1.00 0.04

01.04.04.04.02 ENCOFRADO Y DESENCOFRADO DE VIGAS M2 11.63

VIGA DE CONF. (0.13 x 0.20), Eje A - A M2 9.55 0.20 2.00 3.82

VIGA DE CONF. (0.13 x 0.20), Eje B-B 9.55 0.20 2.00

Puerta M3 0.90 0.13 2.00 0.23

VIGA DE CONF. (0.13 x 0.20), Eje B-B M3 5.31 0.20 2.00

Ventana M3 1.92 0.13 2.00 0.50

V - 2 (0.13 x 0.50), Ejes 1 - 1 M3 3.54 0.30 2.00 2.12

Base M2 3.25 0.13 1.00 0.42

Viga de confinamiento (13x20) M2 1.65 0.20 2.00 0.66

V - 1 (0.13 x 0.50), Ejes 2 - 2 M3 3.54 0.30 2.00 2.12

Base M2 2.60 0.13 1.00 0.34

Viga de confinamiento (13x20) M2 3.54 0.20 2.00 1.42

01.04.04.04.03 ACERO GRADO 60 EN VIGAS kg/ml 403.43

VIGA (0.13 x 0.20), Eje A - A 1.00

Page 99: Met for 01(I-III) Colpa

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0.560 OBRA : CONSTRUCCION MODULO 3 - SS.HH. (PROFESORES Y ALUMNOS) 1/2" 0.990

5/8" 1.550 FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2.240

1" 3.960 ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

2 Ø 1/2"

7.05 5.95 13.30 1.02 2.00 27.13

0.15 0.15

7.20.3

7.50 1.02 2.00 15.30

0.36.1

6.40 1.02 2.00 13.06

Estribos 0.08

Ø 1/4" 0.15 0.66 0.25 65.00 10.72

VIGA DE CONF. (0.13 x 0.20), Eje A - A 1.00

2 Ø 1/2"

0.15 9.5 0.15 9.80 1.02 2.00 19.99

2 Ø 1/2"

0.15 9.5 0.15 9.80 1.02 2.00 19.99

Estribos 0.08

Ø 1/4" 0.15 0.66 0.25 46.00 7.59

VIGA (0.13 x 0.20), Eje B - B 1.00

2 Ø 1/2"

7.05 5.95 13.30 1.02 2.00 27.13

0.15 0.15

7.20.3

7.50 1.02 2.00 15.30

0.36.1

6.40 1.02 2.00 13.06

Page 100: Met for 01(I-III) Colpa

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0.560 OBRA : CONSTRUCCION MODULO 3 - SS.HH. (PROFESORES Y ALUMNOS) 1/2" 0.990

5/8" 1.550 FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2.240

1" 3.960 ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Estribos 0.08

Ø 1/4" 0.15 0.66 0.25 74.00 12.21

VIGA DE CONF. (0.13 x 0.20), Eje B-B

2 Ø 1/2"

0.15 9.5 0.15 9.80 1.02 2.00 19.99

2 Ø 1/2"

0.15 9.5 0.15 9.80 1.02 2.00 19.99

Estribos 0.08

0.15 0.66 0.25 54.00 8.91

Ø 3/8"

VIGA DE CONF. (0.13 x 0.20), Eje B-B

2 Ø 1/2"

0.15 5.25 0.15 5.55 1.02 2.00 11.32

2 Ø 1/2"

0.15 5.25 0.15 5.55 1.02 2.00 11.32

Estribos 0.08

0.15 0.66 0.25 26.00 4.29

Ø 3/8"

V - 2 (0.13 x 0.50), Ejes 1 - 1 1.00

2 Ø 1/2"

0.07 4.5 0.07 4.64 1.02 2.00 9.47

2 Ø 3/8"

0.7 0.15 0.85 0.58 2.00 0.99

2 Ø 1/2"

0.25 3.5 0.3 4.05 1.02 2.00 8.26

Estribos 0.08

0.45 1.26 0.56 24.00 16.93

Ø 3/8"

Estribos 0.08

Page 101: Met for 01(I-III) Colpa

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0.560 OBRA : CONSTRUCCION MODULO 3 - SS.HH. (PROFESORES Y ALUMNOS) 1/2" 0.990

5/8" 1.550 FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2.240

1" 3.960 ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

0.15 0.66 0.56 6.00 2.22

Ø 3/8"

VIGA DE CONF. (0.13 x 0.20), Eje 1-1

2 Ø 1/2"

0.15 1.6 0.15 1.90 1.02 2.00 3.88

Estribos 0.08

0.15 0.61 0.25 7.00 1.07

Ø 1/4"

Eje 2-2 13x20

2 Ø 1/2"

0.15 4.5 0.15 4.80 1.02 2.00 9.79

2 Ø 1/2"

0.15 4.5 0.15 4.80 1.02 2.00 9.79

Estribos 0.08

0.15 0.66 0.25 26.00 4.29

Ø 3/8"

Eje 3-3 24x20

2 Ø 1/2"

0.15 4.5 0.15 4.80 1.02 2.00 9.79

2 Ø 1/2"

0.15 4.5 0.15 4.80 1.02 2.00 9.79

Estribos 0.19

0.15 0.88 0.25 26.00 5.72

Ø 3/8"

V - 1 (0.13 x 0.50), Ejes 4-4 1.00

2 Ø 1/2"

0.07 4.5 0.07 4.64 1.02 2.00 9.47

2 Ø 3/8"

0.7 0.15 0.85 0.58 2.00 0.99

2 Ø 1/2"

Page 102: Met for 01(I-III) Colpa

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0.560 OBRA : CONSTRUCCION MODULO 3 - SS.HH. (PROFESORES Y ALUMNOS) 1/2" 0.990

5/8" 1.550 FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2.240

1" 3.960 ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

0.25 3.5 0.3 4.05 1.02 2.00 8.26

Estribos 0.08

0.45 1.26 0.56 24.00 16.93

Ø 3/8"

Estribos 0.08

0.15 0.66 0.56 6.00 2.22

Ø 3/8"

VIGA DE CONF. (0.13 x 0.20), Eje 4-4

2 Ø 1/2"

0.15 3.5 0.15 3.80 1.02 2.00 7.75

Estribos 0.08

0.15 0.61 0.25 14.00 2.14

Ø 1/4"

Eje A'-A'

2 Ø 3/8"

0.15 1.5 0.15 1.80 0.58 2.00 2.09

2 Ø 3/8"

0.15 1.5 0.15 1.80 0.58 2.00 2.09

Estribos 0.19

0.15 0.88 0.25 10.00 2.20

Ø 3/8"

01.04.04.05 MUROS DE CONCRETO EN LAVADERO

01.04.04.05.01 MURO DE CONCRETO F'C=175 KG/CM2 PARA LAVADERO M3 0.54

SS. HH. MUJERES Muro 2.41 0.10 0.25 1.00 0.06

Muro 2.41 0.10 0.30 1.00 0.07

Base 2.41 0.30 0.10 1.00 0.07

Muro 0.30 0.10 0.25 2.00 0.02

LAVADERO EXTERIOR Muro 3.62 0.10 0.25 1.00 0.09

Muro 3.62 0.10 0.30 1.00 0.11

Base 3.62 0.30 0.10 1.00 0.11

Muro 0.30 0.10 0.25 2.00 0.02

01.04.04.05.02 ACERO GRADO 60 EN LAVADERO KG. 8.50Ø 1/4"

Page 103: Met for 01(I-III) Colpa

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0.560 OBRA : CONSTRUCCION MODULO 3 - SS.HH. (PROFESORES Y ALUMNOS) 1/2" 0.990

5/8" 1.550 FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2.240

1" 3.960 ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

0.2 2.36 0.2 5.12 0.25 4.00 5.12

2.36

Ø 1/4"

0.2 2.36 0.2 2.76 0.25 2.00 1.38

Ø 1/4"

0.20 0.20.80 0.25 10.00 2.00

0.4

01.04.04.06 LOSAS

01.04.04.06.01 LOSA ALIGERADA h=0.20 m

01.04.04.06.01.01 CONCRETO EN LOSA ALIGERADA F´C=210 KG/CM2 M3 4.27

En Viguetas

Viguetas entre A - B M3 7.05 0.10 0.15 8.00 0.85

Viguetas entre A - B M3 5.95 0.10 0.15 8.00 0.71

En Losa e= 0.05

M3 7.05 4.17 0.05 1.00 1.47

M3 5.95 4.17 0.05 1.00 1.24

01.04.04.06.01.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA M2 51.34

M2 3.81 3.28 2.00 24.99

1.59 1.28 1.00 2.04

1.56 1.28 1.00 2.00

m2 4.57 1.50 2.00 13.71

8.12 0.53 2.00 8.61

01.04.04.06.01.03 ACERO GRADO 60 EN LOSAS ALIGERADAS KG 450.60

1 Ø ½” corrido (positivo) KG 7.75 16.00 1.02 126.48

1 Ø ½” corrido (positivo) KG 6.55 16.00 1.02 106.90

1 Ø 1/2" bastón (negativo) KG 4.35 16.00 1.02 70.99

1 Ø 1/2” bastón (negativo) KG 2.95 16.00 1.02 48.14

1 Ø 1/2” bastón (negativo) KG 2.30 16.00 1.02 37.54

Temperatura Ø ¼” KG 4.57 53.00 0.25 60.55

01.04.04.06.01.04 LADRILLO HUECO/ARCILLA 15X30X30 P/TECHO ALIGERADO UND 427.69

Und 8.33 51.34

01.04.05 ESTRUCTURAS DE MADERA Y COBERTURAS

01.04.05.01 ESTRUCTURAS DE MADERA

Area de encofrado de losa x (8.33 Unid. x m2)

Page 104: Met for 01(I-III) Colpa

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0.560 OBRA : CONSTRUCCION MODULO 3 - SS.HH. (PROFESORES Y ALUMNOS) 1/2" 0.990

5/8" 1.550 FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2.240

1" 3.960 ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

01.04.05.01.01 CORREAS DE MADERA TORNILLO 2" x 2" P2 79.97

Longitudinalmente Modulo P2 14.99 2.00 2.00 16.00 79.97

01.04.05.02 COBERTURA

01.04.05.02.01 COBERTURA CON FLEXIFORTE DE 1.83X1.10 E=2.10MM. M2 69.08

Cobertura con Cobertura Flexiforte rojo en aulas M2 7.50 4.97 1.00 37.28

Cobertura con Cobertura Flexiforte rojo en aulas M2 6.40 4.97 1.00 31.81

01.04.05.02.02 CUMBRERA CON FLEXIFORTE DE ONDA 100 E=1.60MM L=0. Ml 4.97

Cumbrera con calamina galvanizada N° 30 - Modulo II Ml 4.97 1.00 4.97

01.04.06 MUROS DE ALBAÑILERIA

01.04.06.01 MURO DE CABEZA LADRILLO KK 18 HUECOS M2 12.36

Eje 3-3 M2 3.09 4.00 1.00 12.36

01.04.06.02 MURO DE SOGA LADRILLO KK 18 HUECOS M2 89.49

Eje A-A M2 0.91 2.84 1.00 2.58

3.38 3.41 1.00 11.51

3.36 3.41 1.00 11.44

Eje B-B M2 0.91 2.84 1.00 2.58

M2 3.38 3.41 1.00 11.51

M2 3.36 3.41 1.00 11.44

menos puerta P4 0.93 1.95 -2.00 -3.63

menos ventana V1 1.92 0.50 -2.00 -1.92

Eje 1-1 0.74 2.24 2.00 3.32

Eje 2-2 3.31 2.74 1.00 9.07

Eje 4-4 3.31 2.24 1.00 7.41

Eje A'-A' 0.91 2.74 1.00 2.49

1.26 1.70 6.00 12.85

0.23 1.70 8.00 3.06

Muros en lavadero Damas 2.41 0.75 1.00 1.81

Muros en lavadero Damas 0.50 0.50 2.00 0.50

Muros en lavadero Exterior 3.62 0.75 1.00 2.72

Muros en lavadero Exterior 0.50 0.50 3.00 0.75

01.04.07 REVOQUES ENLUCIDOS Y MOLDURAS

01.04.07.01 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA m2 83.38

Servicio higienico Hombres profesores M2 5.10 1.20 1.00 6.12

Servicio higienico Mujeres profesores M2 5.10 1.20 1.00 6.12

Servicio higienico Hombres M2 22.92 1.20 1.00 27.50

Page 105: Met for 01(I-III) Colpa

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0.560 OBRA : CONSTRUCCION MODULO 3 - SS.HH. (PROFESORES Y ALUMNOS) 1/2" 0.990

5/8" 1.550 FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2.240

1" 3.960 ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Servicio higienico Mujeres M2 22.88 1.20 1.00 27.46

Lavadero ss.hh. Mujeres M2 2.41 0.60 1.00 1.45

Lavadero ss.hh. Mujeres M2 2.41 0.30 1.00 0.72

Lavadero ss.hh. Mujeres M2 2.41 0.15 1.00 0.36

Lavadero ss.hh. Mujeres M2 2.41 0.30 1.00 0.72

Lavadero ss.hh. Mujeres 2.41 0.10 1.00 0.24

Lavadero ss.hh. Mujeres 0.30 0.15 2.00 0.09

Lavadero ss.hh. Mujeres 0.45 0.10 2.00 0.09

Lavadero ss.hh. Mujeres 0.75 0.40 1.00 0.30

Lavadero ss.hh. Mujeres 0.30 0.10 2.00 0.06

Lavadero ss.hh. Exterior 3.62 0.60 1.00 2.17

Lavadero ss.hh. Exterior 3.62 0.30 1.00 1.09

Lavadero ss.hh. Exterior 3.62 0.15 1.00 0.54

Lavadero ss.hh. Exterior 3.62 0.30 1.00 1.09

Lavadero ss.hh. Exterior 3.62 0.10 1.00 0.36

Lavadero ss.hh. Exterior 0.30 0.15 2.00 0.09

Lavadero ss.hh. Exterior 0.45 0.10 2.00 0.09

Lavadero ss.hh. Exterior 0.75 0.40 2.00 0.60

Lavadero ss.hh. Exterior 0.30 0.10 2.00 0.06

urinario ss.hh. Varones

2.37 1.20 1.00 2.84

2.37 0.15 2.00 0.71

2.37 0.30 1.00 0.71

0.50 1.20 3.00 1.80

01.04.07.02 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARE M2 97.16

Eje 3-3 M2 3.31 2.94 2.00 19.46

Eje A-A M2 1.40 1.74 1.00 2.44

0.86 2.35 8.00 16.20

Eje B-B M2 1.40 1.74 1.00 2.44

M2 3.80 2.35 1.00 8.95

M2 3.80 2.35 1.00 4.48

menos puerta P4 0.93 1.95 -2.00 -1.82

menos ventana V1 1.92 0.50 -2.00 -0.96

Eje 1-1 0.75 2.44 2.00 1.83

Eje 2-2 3.25 2.94 2.00 19.11

Eje 4-4 3.25 2.44 1.00 7.93

Eje A'-A' 1.25 2.94 2.00 3.68

3.58 0.60 4.00 8.59

2.68 0.60 2.00 3.22

Page 106: Met for 01(I-III) Colpa

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0.560 OBRA : CONSTRUCCION MODULO 3 - SS.HH. (PROFESORES Y ALUMNOS) 1/2" 0.990

5/8" 1.550 FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2.240

1" 3.960 ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Muros en lavadero Damas 2.41 0.50 1.00 1.21

Muros en lavadero Damas 0.50 0.40 2.00 0.40

01.04.07.03 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA M2 108.69

Eje A-A M2 9.59 2.94 1.00 28.19

9.59 4.16 0.50 19.95

Eje B-B M2 9.59 2.94 1.00 28.19

M2 9.59 4.16 0.50 19.95

menos puerta P4 0.93 1.95 -2.00 -3.63

menos ventana V1 1.92 0.50 -2.00 -1.92

Eje 1-1 1.65 2.94 1.00 4.85

Eje 4-4 3.57 2.94 1.00 10.50

Muros en lavadero Exterior 3.62 0.50 1.00 1.81

Muros en lavadero Exterior 0.50 0.40 4.00 0.80

01.04.07.04 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO- M2 17.61

EXTERIORES

Eje A - A

Placa 01 M2 0.50 2.94 3.00 4.41

Placa 02 M2 0.40 4.16 1.00 1.66

Eje B - B

Placa 01 M2 0.50 2.94 5.00 7.35

Placa 02 M2 0.40 4.16 1.00 1.66

Eje 1-1

Placa 01 M2 0.13 2.94 3.00 1.15

Eje 4-4 M2

Placa 01 M2 0.50 2.75 1.00 1.38

01.04.07.05 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-AREN M2 7.94

EXTERIORES

EJE 1 Y 4 laterales M2 3.54 0.35 2.00 2.48

confinamiento 3.54 0.20 1.00 0.71

confinamiento 1.65 0.20 1.00 0.33

EJE A Y B laterales M2 5.10 0.50 1.00 2.55

EJE A Y B laterales M2 3.75 0.50 1.00 1.88

01.04.07.06 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS ML 46.64

P-3 ML 2.15 2.00 4.30

V - 3 ML 0.75 2.00 1.50

V - 1 ML 1.92 2.00 3.84

0.50 4.00 2.00

Page 107: Met for 01(I-III) Colpa

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0.560 OBRA : CONSTRUCCION MODULO 3 - SS.HH. (PROFESORES Y ALUMNOS) 1/2" 0.990

5/8" 1.550 FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2.240

1" 3.960 ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

V2 2.60 2.00 5.20

V2 0.50 2.00 1.00

P-5 ML 1.80 16.00 28.80

01.04.07.07 BRUÑAS E=1CM ML 52.20

EXTERIOR

Elevación Principal ML 11.75 1.00 11.75

9.90 1.00 9.90

Elevación Porterior ML 13.65 1.00 13.65

9.90 1.00 9.90

Elevaciones laterales ML 7.00 1.00 7.00

01.04.08 CIELORASO

01.04.08.01 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA M2 52.34

Modulo SS.HH. M2 1.55 1.40 2.00 4.34

M2 3.25 3.80 1.00 12.35

3.25 3.80 1.00 12.35

Alero exterior 4.57 1.50 2.00 13.71

9.59 0.50 2.00 9.59

01.04.09 PISOS Y VEREDAS

01.04.09.01 PISOS

01.04.09.01.01 PISO CERAMICO NORDICA AZUL + GRIS DE 0.30X0.30 M2 29.04

SS. HH. M2 1.55 1.40 2.00 4.34

3.25 3.80 1.00 12.35

3.25 3.80 1.00 12.35

01.04.09.02 VEREDAS

01.04.09.02.01 VEREDA DE CONCRETO DE 4" CON BRUÑAS DE CANTO Y TR M2 42.01

Frontal M2 11.34 2.40 1.00 27.22

Lateral M2 3.57 0.80 1.00 2.86

Posterior M2 11.34 0.80 1.00 9.07

Lateral M2 3.57 0.80 1.00 2.86

01.04.09.02.02 CONCRETO F'C=140 KG/CM2 EN UÑAS M3 2.40

Frontal M3 11.34 1.00 0.08 0.91

Lateral 3.57 1.00 0.08 0.29

Posterior M3 11.34 1.00 0.08 0.91

Lateral 3.57 1.00 0.08 0.29

01.04.09.02.03 JUNTAS DE CONSTRUCCION EN VEREDAS E=1" ML 39.12

perimetro del módulo 9.59 2.00 19.18

Page 108: Met for 01(I-III) Colpa

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0.560 OBRA : CONSTRUCCION MODULO 3 - SS.HH. (PROFESORES Y ALUMNOS) 1/2" 0.990

5/8" 1.550 FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2.240

1" 3.960 ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

perimetro del módulo 3.57 2.00 7.14

Frontal 2.40 3.00 7.20

Lateral 0.80 2.00 1.60

Posterior 0.80 3.00 2.40

Lateral 0.80 2.00 1.60

01.04.10 ZOCALOS, CONTRAZOCALOS Y REVESTIMIENTOS

01.04.10.01 ZOCALO

01.04.10.01.01 ZOCALO INTERIOR C/CERAMICO TIPO AZULEJO 0.20X0.20 M2 67.20

Servicio higienico Hombres profesores M2 5.10 1.20 1.00 6.12

Servicio higienico Mujeres profesores M2 5.10 1.20 1.00 6.12

Servicio higienico Hombres M2 22.92 1.20 1.00 27.50

Servicio higienico Mujeres M2 22.88 1.20 1.00 27.46

01.04.10.02 CONTRAZOCALO

01.04.10.01.01 ZOCALO DE CEMENTO MEZCLA CEMENTO-ARENA ML 22.92

Fachada posterior ML 9.59 2.00 19.18

Fachada lateral ML 3.57 2.00 7.14

menos puerta P3 ML 0.80 -2.00 -1.60

Fachada lateral P4 ML 0.90 -2.00 -1.80

01.04.10.03 REVESTIMIENTO DE LAVATORIO CORRIDO Y CONDUCTO DE LIMPIEZA

01.04.10.03.01 REVESTIMIENTO EN LAVATORIO CORRIDO CON CERAMICA T M2 16.18

Lavadero ss.hh. Mujeres M2 2.41 0.60 1.00 1.45

Lavadero ss.hh. Mujeres M2 2.41 0.30 1.00 0.72

Lavadero ss.hh. Mujeres M2 2.41 0.15 1.00 0.36

Lavadero ss.hh. Mujeres M2 2.41 0.30 1.00 0.72

Lavadero ss.hh. Mujeres 2.41 0.10 1.00 0.24

Lavadero ss.hh. Mujeres 0.30 0.15 2.00 0.09

Lavadero ss.hh. Mujeres 0.45 0.10 2.00 0.09

Lavadero ss.hh. Mujeres 0.75 0.40 1.00 0.30

Lavadero ss.hh. Mujeres 0.30 0.10 2.00 0.06

Lavadero ss.hh. Exterior 3.62 0.60 1.00 2.17

Lavadero ss.hh. Exterior 3.62 0.30 1.00 1.09

Lavadero ss.hh. Exterior 3.62 0.15 1.00 0.54

Lavadero ss.hh. Exterior 3.62 0.30 1.00 1.09

Lavadero ss.hh. Exterior 3.62 0.10 1.00 0.36

Lavadero ss.hh. Exterior 0.30 0.15 2.00 0.09

Lavadero ss.hh. Exterior 0.45 0.10 2.00 0.09

Lavadero ss.hh. Exterior 0.75 0.40 2.00 0.60

Page 109: Met for 01(I-III) Colpa

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0.560 OBRA : CONSTRUCCION MODULO 3 - SS.HH. (PROFESORES Y ALUMNOS) 1/2" 0.990

5/8" 1.550 FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2.240

1" 3.960 ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Lavadero ss.hh. Exterior 0.30 0.10 2.00 0.06

urinario ss.hh. Varones

2.37 1.20 1.00 2.84

2.37 0.15 2.00 0.71

2.37 0.30 1.00 0.71

0.50 1.20 3.00 1.80

01.04.11 CARPINTERIA DE MADERA

01.04.11.01 PUERTAS

01.04.11.01.01 PUERTA DE MADERA CEDRO TABLERO REBAJADO SEGUN M2 13.60

Puerta de madera cedro P - 3 M2 0.80 2.15 2.00 3.44

P - 4 0.80 2.15 2.00 3.44

P - 5 0.60 1.40 8.00 6.72

01.04.11.01.02 COLOCACION DE PUERTAS UND 12.00 12.00

01.04.12 CARPINTERIA METALICA

01.04.12.01 VENTANA

01.04.12.01.01 VENTANA METALICA M2 4.77

V - 1 M2 1.92 0.50 2.00 1.92

V - 2 M2 2.60 0.50 1.00 1.30

V - 3 M2 1.55 0.50 2.00 1.55

01.04.12.01.02 COLOCACION DE VENTANAS UND 5.00 5.00

01.04.13 CERRAJERIA

01.04.13.01 CERRADURA PARA PUERTAS UND 4.00 4.00

01.04.13.02 CERRADURA PTA.BAÑO UND 8.00 8.00

01.04.13.03 MANIJA DE BRONCE DE 4" PARA PUERTA UND 4.00 4.00

01.04.14 VIDRIO SEMIDOBLE

01.04.14.01 VIDRIO SEMIDOBLE P2 51.29

V - 1 M2 1.92 0.50 2.00 20.67

V - 2 M2 2.60 0.50 1.00 13.99

V - 3 M2 1.55 0.50 2.00 16.63

01.04.15 PINTURA

01.04.15.01 PINTURA EN INTERIORES

Page 110: Met for 01(I-III) Colpa

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0.560 OBRA : CONSTRUCCION MODULO 3 - SS.HH. (PROFESORES Y ALUMNOS) 1/2" 0.990

5/8" 1.550 FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2.240

1" 3.960 ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

01.04.15.01.01 PINTURA LATEX EN MUROS INTERIORES 2 MANOS COLOR A M2 97.16

Eje 3-3 M2 3.31 2.94 2.00 19.46

Eje A-A M2 1.40 1.74 1.00 2.44

0.86 2.35 8.00 16.20

Eje B-B M2 1.40 1.74 1.00 2.44

M2 3.80 2.35 1.00 8.95

M2 3.80 2.35 1.00 4.48

menos puerta P4 0.93 1.95 -2.00 -1.82

menos ventana V1 1.92 0.50 -2.00 -0.96

Eje 1-1 0.75 2.44 2.00 1.83

Eje 2-2 3.25 2.94 2.00 19.11

Eje 4-4 3.25 2.44 1.00 7.93

Eje A'-A' 1.25 2.94 2.00 3.68

3.58 0.60 4.00 8.59

2.68 0.60 2.00 3.22

Muros en lavadero Damas 2.41 0.50 1.00 1.21

Muros en lavadero Damas 0.50 0.40 2.00 0.40

01.04.15.02 PINTURA EN EXTERIORES

01.04.15.02.01 PINTURA LATEX EN MUROS EXTERIORES COLOR CERAMIC M2 108.69

Eje A-A M2 9.59 2.94 1.00 28.19

9.59 4.16 0.50 19.95

Eje B-B M2 9.59 2.94 1.00 28.19

M2 9.59 4.16 0.50 19.95

menos puerta P4 0.93 1.95 -2.00 -3.63

menos ventana V1 1.92 0.50 -2.00 -1.92

Eje 1-1 1.65 2.94 1.00 4.85

Eje 4-4 3.57 2.94 1.00 10.50

Muros en lavadero Exterior 3.62 0.50 1.00 1.81

Muros en lavadero Exterior 0.50 0.40 4.00 0.80

01.04.15.02.02 PINTURA LATEX EN COLUMNAS Y VIGAS EXTERIORES COL M2 25.55

PINTURA LATEX EN COLUMNAS EXTERIORES

EXTERIORES

Eje A - A

Placa 01 M2 0.50 2.94 3.00 4.41

Placa 02 M2 0.40 4.16 1.00 1.66

Eje B - B

Placa 01 M2 0.50 2.94 5.00 7.35

Placa 02 M2 0.40 4.16 1.00 1.66

Page 111: Met for 01(I-III) Colpa

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0.560 OBRA : CONSTRUCCION MODULO 3 - SS.HH. (PROFESORES Y ALUMNOS) 1/2" 0.990

5/8" 1.550 FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2.240

1" 3.960 ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Eje 1-1

Placa 01 M2 0.13 2.94 3.00 1.15

Eje 4-4 M2

Placa 01 M2 0.50 2.75 1.00 1.38

PINTURA LATEX EN VIGAS EXTERIORES 0.00

EXTERIORES 0.00

EJE 1 Y 4 laterales M2 3.54 0.35 2.00 2.48

confinamiento 3.54 0.20 1.00 0.71

confinamiento 1.65 0.20 1.00 0.33

EJE A Y B laterales M2 5.10 0.50 1.00 2.55

EJE A Y B laterales M2 3.75 0.50 1.00 1.88

01.04.15.02.03 PINTURA DE ZOCALO C/ESMALTE H=0.20M COLOR GRIS NI ML 22.92

Fachada ML 9.59 2.00 19.18

lateral ML 3.57 2.00 7.14

menos puerta P3 ML 0.80 -2.00 -1.60

menos puerta P4 ML 0.90 -2.00 -1.80

01.04.15.03 PINTURA EN CIELO RASOS

01.04.15.03.01 PINTURA LATEX EN CIELO RASO COLOR BLANCO SOBRE M2 52.34

Modulo SS.HH. M2 1.55 1.40 2.00 4.34

M2 3.25 3.80 1.00 12.35

3.25 3.80 1.00 12.35

Alero exterior 4.57 1.50 2.00 13.71

9.59 0.50 2.00 9.59

01.04.15.04 PINTURA EN ESTRUCTURA METALICA

01.04.15.04.01 PINTURA ANTICORROSIVO ZINCROMATO ACABADO CON ES ML 9.14

Canaleta de plancha galvanizada 1/32” s/d

Modulo ML 4.57 2.00 9.14

01.04.15.04.02 PINTURA EN VENTANAS C/ESMALTE Y ANTICORROSIVO M2 4.77

V - 1 M2 1.92 0.50 2.00 1.92

V - 2 M2 2.60 0.50 1.00 1.30

V - 3 M2 1.55 0.50 2.00 1.55

01.04.16 SISTEMA DE AGUA DE LLUVIA

01.04.16.01 CANALETA DE PLANCHA GALVANIZADA

01.04.16.01.01 CANALETA DE PLANCHA GALVANIZADA 1/32” S/D ML 9.14

modulo ML 4.57 2.00 9.14

Page 112: Met for 01(I-III) Colpa

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0.560 OBRA : CONSTRUCCION MODULO 3 - SS.HH. (PROFESORES Y ALUMNOS) 1/2" 0.990

5/8" 1.550 FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2.240

1" 3.960 ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

01.04.16.01.02 TUBERIA DE BAJADA PVC SAP 4" DE CANALETA PLUVIAL ML 14.00

Eje A -A ML 7.00 1.00 7.00

Eje B - B ML 7.00 1.00 7.00

01.04.16.01.03 CODOS PVC SAL 4”X90° PZA 3.00 2.00 6.00

01.04.16.02 COLUMNETA PARA SOPORTE DE TUBERIAS

01.04.16.02.01 CONCRETO EN COLUMNAS f'c= 175 kg/cm2 M3 0.16

0.25 0.20 1.60 2.00 0.16

01.04.16.02.02 ENCOFRADO Y DESENCOFRADO NORMAL DE COLUMNAS M2 2.08

0.65 1.60 2.00 2.08

01.04.17 APARATOS SANITARIOS Y ACCESORIOS

01.04.17.01 INODORO TOP PIECE BLANCO INC/ACCESORIOS UND 10.00

10.00

01.04.17.02 LAVATORIO FONTANA INC/ACCESORIOS UND 2.00

2.00

01.04.17.03 PAPELERA DE LOSA Y BARRA PLASTICA, COLOR BLANCO UND 10.00

S.H. Profesores 2.00

S.H. HOMBRES 4.00

S.H. MUJERES 4.00

01.04.17.04 COLOCACION DE APARATOS SANITARIOS UND 12.00

1.00 12.00 12.00

01.04.17.05 COLOCACION DE ACCESORIOS SANITARIOS UND 10.00

1.00 10.00 10.00

01.04.18 INSTALACIONES SANITARIAS

01.04.18.01 SALIDAS DE DESAGUE

01.04.18.01.01 SALIDA DE DESAGUE Ø 4" PTO 10.00

S.H. Profesores PTO 2.00

S.H. Alumnos Varones PTO 4.00

S.H. Alumnos damas PTO 4.00

01.04.18.01.02 SALIDA DE DESAGUE Ø 2" PTO 10.00

PTO 10.00

01.04.18.01.03 SALIDA DE VENTILACION TUB. Ø 2" PTO 10.00

Page 113: Met for 01(I-III) Colpa

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0.560 OBRA : CONSTRUCCION MODULO 3 - SS.HH. (PROFESORES Y ALUMNOS) 1/2" 0.990

5/8" 1.550 FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2.240

1" 3.960 ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

S.H. Profesores PTO 2.00

S.H. Alumnos Varones PTO 4.00

S.H. Alumnos damas PTO 4.00

01.04.18.02 RED COLECTOR

01.04.18.02.01 TUBERIA UPVC UF 110MM PARA DESAGUE M 3.92 1.00 3.92

01.04.18.02.02 TUBERIA UPVC UF 160MM PARA DESAGUE M 87.16 1.00 87.16

01.04.18.02.03 EXCAVACION DE ZANJA DE 0.50XH=0.50-1.40M PARA TUBE M 16.08 1.00 16.08

01.04.18.02.04 EXCAVACION DE ZANJA DE 0.50XH=1.40-3.00M PARA TUBER M 75.00 1.00 75.00

01.04.18.02.05 RELLENO Y COMPACTADO DE ZANJA DE 0.40XH=0.50-1.20M M 91.08 1.00 91.08

01.04.18.03 RED DISTRIBUCION

01.04.18.03.01 TUBERIA DE DESAGUE PVC SAL Ø 4" ML 18.88

SS.HH. ML 14.48 1.00 14.48

0.55 8.00 4.40

01.04.18.03.02 TUBERIA DE DESAGUE PVC SAL Ø 2" ML 36.10

SS. HH. ML 0.87 1.00 0.87

ML 0.33 8.00 2.66

ML 1.01 1.00 1.01

ML 0.31 1.00 0.31

ML 1.88 1.00 1.88

ML 2.42 1.00 2.42

ML 0.58 1.00 0.58

ML 3.93 1.00 3.93

ML 0.68 1.00 0.68

ML 0.23 8.00 1.80

ML 11.13 1.00 11.13

ML 5.12 1.00 5.12

ML 0.51 1.00 0.51

ML 0.80 4.00 3.20

01.04.18.03.03 EXCAVACION DE ZANJA DE 0.40X0.50 PARA TUBERIAS DE ML 54.98

Tuberia de desague de 4" 18.88 1.00 18.88

Tuberia de desague de 2" 36.10 1.00 36.10

Page 114: Met for 01(I-III) Colpa

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0.560 OBRA : CONSTRUCCION MODULO 3 - SS.HH. (PROFESORES Y ALUMNOS) 1/2" 0.990

5/8" 1.550 FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2.240

1" 3.960 ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

01.04.18.03.04 RELLENO Y COMPACTADO DE ZANJA DE 0.40X0.50 PARA TUB ML 54.98

Tuberia de desague de 4" 18.88 1.00 18.88

Tuberia de desague de 2" 36.10 1.00 36.10

01.04.18.04 ACCESORIOS PARA REDES

01.04.18.04.01 CODO PVC SAL 2" X 45º UND 4.00

4.00

01.04.18.04.02 CODO PVC SAL DE 2" X 90º UND 7.00

7.00

01.04.18.04.03 CODO PVC SAL DE 4" X 90º UND 1.00

1.00

01.04.18.04.04 CODO VENTILACION PVC SAL DE 4"-2" UND 2.00

2.00

01.04.18.04.05 YEE DE PVC SAL C/REDUCCION DE 4" A 2" UND 4.00

4.00

01.04.18.04.06 YEE PVC - SAP DE 4" X 4" UND 11.00

11.00

01.04.18.04.07 YEE PVC SAP DE 2" X 2" UND 12.00

12.00

01.04.18.05 ADITAMENTO VARIOS

01.04.18.05.01 SUMIDERO CROMADO DE 2" EN PISO UND 4.00

4.00

01.04.18.05.02 REGISTRO ROSCADO DE BRONCE DE 4" UND 2.00

2.00

01.04.18.05.03 SOMBRERO VENTILACION PVC DE 2" UND 2.00

2.00

01.04.18.06 CAMARA DE INSPECCION

01.04.18.06.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" PZA 1.00 1.00

01.04.18.06.02 CAJA DE REGISTRO DE DESAGUE 24" X 24" PZA 2.00 2.00

01.04.18.06.03 BUZON DE INSPECCION DE DESAGUE Ø 1.20 H=1.50-2.00 UND 2.00 2.00

01.04.19 SISTEMA DE AGUA FRIA

01.04.19.01 SALIDA PARA AGUA FRIA

01.04.19.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" PTO 22.00

S.H. Profesores PTO 4.00

S.H. Alumnos Varones PTO 4.00

S.H. Alumnos damas PTO 8.00

Page 115: Met for 01(I-III) Colpa

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0.560 OBRA : CONSTRUCCION MODULO 3 - SS.HH. (PROFESORES Y ALUMNOS) 1/2" 0.990

5/8" 1.550 FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2.240

1" 3.960 ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

Exterior PTO 6.00

01.04.19.02 RED DE CONDUCCIÒN Y DISTRIBUCION

01.04.19.02.01 TUBERIA PVC SAP CLASE 10 3/4" ML 24.33

del punto 01 al caja para val. 0.50 1.00 0.50

inst. interiores 2.76 1.00 2.76

13.42 1.00 13.42

3.00 1.00 3.00

2.05 1.00 2.05

1.10 1.00 1.10

0.30 5.00 1.50

01.04.19.02.02 TUBERIA PVC SAP CLASE 10, 1/2" ML 41.62

ML 5.80 1.00 5.80

0.30 8.00 2.40

2.61 1.00 2.61

1.00 1.00 1.00

2.20 1.00 2.20

6.00 1.00 6.00

2.00 1.00 2.00

1.00 2.00 2.00

2.00 1.00 2.00

3.60 2.00 7.20

3.20 2.00 6.40

0.50 4.00 2.00

01.04.19.02.03 EXCAVACION DE ZANJA DE 0.30X0.40 PARA TUBERIAS DE ML 65.95

Tuberia de Agua de 1/2" 41.62 1.00 41.62

Tuberia de Agua de 3/4" 24.33 1.00 24.33

01.04.19.02.04 RELLENO Y COMPACTADO DE ZANJA DE 0.30X0.40 PARA TUB ML 65.95

Tuberia de Agua de 1/2" 41.62 1.00 41.62

Tuberia de Agua de 3/4" 24.33 1.00 24.33

01.04.19.03 ACCESORIOS PARA REDES DE AGUA FRIA

01.04.19.03.01 TEE PVC-SAP 3/4" UND 5.00

5.00

01.04.19.04.01 TEE PVC-SAP 1/2" UND 20.00

20.00

01.04.19.04.02 REDUCCIONES PVC-SAP 3/4" A 1/2" UND 5.00

Page 116: Met for 01(I-III) Colpa

HOJA DE METRADO

ACERO KG/MLPROYECTO : 1/4" 0,25

3/8" 0.560 OBRA : CONSTRUCCION MODULO 3 - SS.HH. (PROFESORES Y ALUMNOS) 1/2" 0.990

5/8" 1.550 FECHA : NOVIEMBRE 2011 HECHO POR: 3/4" 2.240

1" 3.960 ESPECIALIDAD : ARQ., EST., INST. SANITARIAS ELECTRICAS HOJA N°

Nº DESCRIPCION MEDIDAS Nº SUB TOTAL

UND LARGO ANCHO ALTODE

LONG. AREA VOL. KG.TOTAL

VECES

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO

5.00

01.04.19.04.03 CODO PVC SAP 3/4" UND 15.00

15.00

01.04.19.04.03 CODO PVC SAP 1/2" UND 27.00

27.00

01.04.19.04 LLAVES Y VALVULAS

01.04.19.04.01 VALVULAS DE COMPUERTA DE BRONCE DE 3/4" UND 5.00

5.00

01.04.19.04.02 VALVULAS DE COMPUERTA DE BRONCE DE 1/2" UND 1.00

1.00

01.04.19.05 PIEZAS VARIAS

01.04.19.05.01 CAJA CON TAPA METALICA PARA VALVULAS 12" X12" EN P UND 5.00

5.00

01.04.19.05.02 CAJA CON TAPA METALICA PARA VALVULAS 8"X8" UND 1.00

1.00

01.04.19.05.03 TUBERIA FIERRO GALVANIZADO 1/2" S/DISEÑO EN URINAR ML 2.20

2.20 1.00 2.20

01.04.19.05.04 TAPON F° G° Ø 1/2" UND. 1.00

1.00 1.00 1.00

01.04.20 VARIOS

01.04.20.01 LIMPIEZA FINAL DE OBRA M2 6.77 11.39 1.00 77.11 77.11

Page 117: Met for 01(I-III) Colpa

HOJA DE METRADOS

ACERO KG/ML

PROYECTO : 1/4" 0.25

3/8" 0.56

1/2" 0.99

OBRA : JUEGOS INFANTILES HECHO POR: 5/8" 1.55

3/4" 2.24

FECHA : NOVIEMBRE 2011 HOJA N° 1" 3.97

Nº DESCRIPCION UNDMEDIDAS Nº SUB TOTAL

TOTALLARGO ANCHO ALTO

DELONG. AREA VOL. KG.

VECES01.06 JUEGOS INFANTILES01.06.01 TRABAJOS PRELIMINARES01.06.01.01 LIMPIEZA DE TERRENO MANUAL M2 30.62 10.74 1.00 328.78 328.7801.06.01.02 TRAZO NIVELES Y REPLANTEO PRELIMINAR M2 30.62 10.74 1.00 328.78 328.7801.06.02 MOVIMIENTO DE TIERRAS01.06.02.01 CORTE Y NIVELACION DE TERRENO MANUAL M3 30.62 10.74 0.15 1.00 49.32 49.3201.06.02.02 EXCAVACION MASIVA MANUAL PARA JUEGOS INFAN M3 2.64

PASAMANOS 0.40 1.00 0.50 2.00 0.20 0.40COLUMPIO 0.60 1.40 0.50 2.00 0.42 0.84TOBOGAN 1.00 1.00 0.50 2.00 0.50 1.00SUBE Y BAJA 0.40 1.00 0.50 2.00 0.20 0.40

01.06.02.03 ELIMINACION DE MATERIAL EXCEDENTE DIST/PROM M3 51.96

01.06.03 OBRAS DE CONCRETO SIMPLE01.06.03.01 CONCRETO F'C= 140 KG/CM2 M3 2.11

PASAMANOS 0.40 1.00 0.40 2.00 0.16 0.32COLUMPIO 0.60 1.40 0.40 2.00 0.34 0.67TOBOGAN 1.00 1.00 0.40 2.00 0.40 0.80SUBE Y BAJA 0.40 1.00 0.40 2.00 0.16 0.32

01.06.04 CAMA DE GRAVILLA01.06.04.01 CAMA DE GRAVILLA e=0.15 M.EN AREA DE JUEGOS M2 30.62 10.74 1.00 328.78 328.7801.06.05 CARPINTERIA METALICA01.06.05.01 PASAMANO METALICO SEGUN DISEÑO UND 1.0001.06.05.02 COLUMPIO METALICO SEGUN DISEÑO UND 1.0001.06.05.03 TOBOGAN METALICO SEGUN DISEÑO UND 1.0001.06.05.04 SUBE Y BAJA METALICO SEGUN DISEÑO UND 1.00

CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. 32664 - COLPA BAJA - HUANUCO, PROVINCIA DE HUANUCO - HUANUCO