liq de obra - ejemplo

Upload: jossmel-hilario

Post on 04-Nov-2015

8 views

Category:

Documents


0 download

DESCRIPTION

IIQUIDACION

TRANSCRIPT

LIQUID TOTALRESUMEN DE LIQUIDACION DE OBRAPRESUPUESTO: EL OTRO CANALCONTRATISTA: EL FIRMEUBICACIN: EL PARAISOCLIENTE: EL JUGADORSISTEMA: PRECIOS UNITARIOSVALORIZACIONESVALORIZACIONESSALDOSITEMDESCRIPCIONRECALCULADASPAGADASMonto S/IGVMonto S/IGV01.00CONTRACTUAL01.01VALORIZACIONES2,426,850.152,395,616.1531,234.00CONTRACTUAL2,426,850.152,395,616.1531,234.00MAYORES METRADOS0.000.000.00PARTIDAS NUEVAS0.000.000.0001.02REAJUSTES (CON DEDUCCIONES)60,283.5823,442.2536,841.330.000.000.00CONTRACTUAL60,283.5823,442.2536,841.33ADICIONAL0.000.000.00MAYORES METRADOS0.000.000.00SUB-TOTAL ( A )2,487,133.732,419,058.4068,075.3368,075.3302.00OTROSAnexo N 01VALORIZACION DE MATERIALES EN OBRA60,516.440.0060,516.44Anexo N 02GASTOS GENERALES - SALDO POR PAGAR321,270.290.00321,270.29Anexo N 03UTILIDAD DEJADA DE PERCIBIR POR PAGAR7,649.290.007,649.29Anexo N 04COSTO DE RENOVACION DE CARTAS FIANZAS240,076.850.00240,076.85Anexo N 05COSTO DE RENOVACION DE POLIZAS32,403.550.0032,403.55Anexo N 06GASTOS ARBITRALES177,500.000.00177,500.00Anexo N 07INTERES POR DEMORA EN PAGO DE VALORIZACIONES365.390.00365.39Anexo N 08LUCRO CESANTE366,417.270.00366,417.27Anexo N 09MAYORES GASTOS GENERALES POR AMPL. DE PLAZO1,007,160.730.001,007,160.73--------VALORIZACIONES N 10 Y N 11 NO PAGADASSUB-TOTAL ( B )2,213,359.810.002,213,359.8103.00VALORIZACION BRUTA ( A + B )4,700,493.542,419,058.402,281,435.14SUB-TOTAL ( 1 )4,700,493.542,419,058.402,281,435.1404.00ADELANTOSOTORGADOSAMORTIZADOSLIQUIDACION04.01DIRECTO1,164,626.89479,123.23685,503.6604.02PARA MATERIALES1,327,673.95346,948.65980,725.30SUB-TOTAL ( 2 )2,492,300.84826,071.881,666,228.9605.00I.G.V.IGV (1) - (2)05.01IGV 19.00%116,889.17SUB-TOTAL ( 3 )116,889.1706.00DIFERENCIALIQUIDACION06.01TOTAL ((1)-(2)+(3))732,095.36SALDO A FAVOR DEL CONTRATISTA732,095.36NOTA:Esta Liquidacin contiene algunos errores que se corregiran durante el desarrollo del caso practico

VAL CONTRECALCULO DE VALORIZACIONES CONTRACTUALESPRESUPUESTO: EL OTRO CANALCONTRATISTA: EL FIRMEUBICACIN: EL PARAISOCLIENTE: EL JUGADORSISTEMA: PRECIOS UNITARIOSVALORIZACION 1VALORIZACION 2VALORIZACION 3VALORIZACION 4VALORIZACION 5VALORIZACION 6VALORIZACION 7VALORIZACION 8VALORIZACION 9VALORIZACIONACUMULADOSALDOItemDescripcin de la partidaUndMetradoPrecioParcialOct-07Nov-07Dec-07Jan-08Feb-08Mar-08Apr-08May-08Jun-08DE CIERREUnitarioMetradoParcialMetradoParcialMetradoParcialMetradoParcialMetradoParcialMetradoParcialMetradoParcialMetradoParcialMetradoParcialMetradoParcialMetradoParcialMetradoParcial01.00.00OBRAS PRELIMINARES01.01.00Movilizacin y Desmovilizacin de Maquinaria y Equiposvje6.003,258.5919,551.540.000.002.006,517.181.003,258.590.000.000.000.000.000.000.000.000.000.000.000.000.000.003.009,775.773.009,775.7701.02.00Campamento de Obram2200.00127.5625,512.000.000.00169.2021,583.1510.801,377.650.000.00(10.80)(1,377.65)0.000.000.000.000.000.000.000.000.000.00169.2021,583.1530.803,928.8501.03.00Cartel de Identificacin de la Obra de 4.00m x 3.00mm212.00176.172,114.040.000.0012.002,114.040.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0012.002,114.040.000.0001.04.00Camino de Acceso - Mejoramiento de Trocha Carrozablekm14.708,486.31124,748.760.000.002.5021,215.782.2919,433.650.867,298.230.000.000.000.000.000.000.000.000.000.000.000.005.6547,947.659.0576,801.1102.00.00BOCATOMA - REHABILITACIN Y MEJORAMIENTO02.01.00OBRAS DE CONCRETO02.01.01Demolicin de Estructurasm30.8311.409.460.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.839.4602.01.02Concreto fc = 210 kg/cm2m33.31328.561,087.530.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.003.311,087.5302.02.00ENCOFRADO Y DESENCOFRADO02.02.01Encofrado y Desencofradom226.8326.19702.680.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0026.83702.6802.03.00ACERO DE REFUERZO.02.03.01Acero de Refuerzo fy = 4200 kg/cm2kg141.273.97560.840.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00141.27560.8402.04.00JUNTAS02.04.01Juntas Elastomricasm3.2013.2442.370.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.003.2042.3702.05.00ESTRCUTURAS METALICAS02.05.01Compuerta Metlica 1.0 x 1.20 m Canal de Limpiaund1.001,038.321,038.320.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.001,038.3202.05.02Compuerta 1.75 x 0.90 m (Regulacin de Ingreso)und1.001,348.321,348.320.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.001,348.3202.05.03Rejilla Metlica de Barras de 5/8"m21.76128.27225.760.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.76225.7603.00.00CANAL PRINCIPAL03.01.00TRABAJOS PRELIMINARES03.01.01Trazo y Replanteo - Plataformakm19.481,798.2335,029.520.000.002.043,668.394.007,192.9210.9519,690.622.003,596.460.000.000.000.000.000.000.000.000.000.0018.9934,148.390.49881.1303.01.02Control Topogrfico en Canaleskm19.482,179.9642,465.620.000.000.000.001.162,528.750.841,831.171.302,833.950.932,027.360.000.001.012,201.760.0365.400.000.005.2711,488.3914.2130,977.2303.02.00MOVIMIENTO DE TIERRAS03.02.01Excavacin en Material Suelto - Plataformam374,524.776.89513,475.670.000.003,241.9522,337.0426,100.43179,831.9617,554.28120,948.9923,342.39160,829.07(914.50)(6,300.91)0.000.000.000.000.000.000.000.0069,324.55477,646.155,200.2235,829.5203.02.02Excavacin de Roca Suelta - Plataformam329,195.5717.50510,922.480.000.001,293.4622,635.5514,588.65255,301.388,057.17141,000.485,256.2991,985.080.000.000.000.000.000.000.000.000.000.0029,195.57510,922.480.000.0003.02.03Excavacin de Roca Fija - Plataformam37,368.9020.80153,273.120.000.00467.759,729.200.000.000.000.001,041.6221,665.705,859.53121,878.220.000.000.000.000.000.000.000.007,368.90153,273.120.000.0003.02.04Excavacin en Material Suelto - Caja de Canalm319,067.895.83111,165.800.000.000.000.00436.562,545.14965.005,625.952,867.8016,719.271,023.125,964.791,061.006,185.63138.76808.9712.7174.100.000.006,504.9537,923.8612,562.9473,241.9403.02.05Excavacin de Roca Suelta - Caja de Canalm36,843.8718.55126,953.790.000.000.000.001,112.3620,634.28936.9017,379.50496.569,211.19216.924,023.87(261.99)(4,859.91)90.861,685.45163.123,025.880.000.002,754.7351,100.244,089.1475,853.5503.02.06Excavacin de Roca Fija - Caja de Canalm31,047.9025.1126,312.770.000.000.000.000.000.0038.98978.79123.403,098.5711.98300.82247.066,203.688.46212.43202.425,082.770.000.00632.3015,877.05415.6010,435.7203.02.07Perfilado de Taludes de Cortem20,670.001.9640,513.200.000.00120.00235.204,000.007,840.000.000.00790.501,549.38625.001,225.00127.00248.920.000.000.000.000.000.005,662.5011,098.5015,007.5029,414.7003.02.08Refine de Tald y Fondo de Canal (e = 0.05 cm)m268,553.071.2686,376.870.000.000.000.001,665.002,097.902,896.823,649.994,753.905,989.914,116.005,186.161,548.001,950.484,407.425,553.35401.25505.580.000.0019,788.3924,933.3748,764.6861,443.5003.02.09Tratamiento de Camino de Servicio ( e = 0.10 m)m251,675.007.46385,495.500.000.000.000.00428.753,198.484,107.0030,638.222,109.6015,737.621,716.0012,801.363,422.6525,532.970.000.000.000.000.000.0011,784.0087,908.6439,891.00297,586.8603.02.10Eliminacin de Material Excedente (Eliminacin Lateral)m331,003.612.0964,797.540.000.005,003.1610,456.600.000.000.000.001,461.323,054.16419.35876.443,783.167,906.80273.80572.24434.99909.130.000.0011,375.7823,775.3819,627.8341,022.1603.02.11Relleno de Berma con Material Impermeablem20,670.003.1865,730.600.000.000.000.00130.00413.400.000.000.000.00202.50643.950.000.000.000.000.000.000.000.00332.501,057.3520,337.5064,673.2503.03.00REVESTIMIENTO DE CANAL TRAPEZOIDAL03.03.01Revestimiento de Canal C/C fc = 175 kg/cm2, e = 0.075 mm268,670.0722.501,545,076.580.000.000.000.001,950.0043,875.003,054.7568,731.883,797.6585,447.133,763.5084,678.7598.402,214.003,646.8982,055.032,945.6166,276.230.000.0019,256.80433,278.0049,413.271,111,798.5803.03.02Acabado de Revestimiento de Canal y Curadom268,670.076.48444,982.050.000.000.000.002,028.0013,141.44(2,028.00)(13,141.44)3,891.4025,216.273,642.6123,604.11251.911,632.382,880.0918,662.983,423.7522,185.900.000.0014,089.7691,301.6454,580.31353,680.4103.04.00ENCOFRADO Y DESENCOFRADO03.04.01Encofrado y Desencofrado de Canal (Cercha e = 0.075 m)m22,921.252.7763,491.860.000.000.000.00520.001,440.401,051.002,911.271,317.153,648.513,763.5010,424.900.000.001,159.403,211.54555.001,537.350.000.008,366.0523,173.9614,555.2040,317.9003.05.00DRENAJE EN CANAL03.05.01Suministro y Colocacin de Encofrado e = 12"m22,945.1034.84102,607.280.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.002,945.10102,607.2803.05.02Suministro y Colocacin de Geotextil no Tejidom22,864.1018.4952,957.210.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.002,864.1052,957.2103.06.00JUNTAS03.06.01Juntas Asflticas de 1"m23,073.355.08117,212.620.000.000.000.000.000.000.000.00552.502,806.70947.004,810.76364.851,853.441,367.206,945.382,748.1513,960.600.000.005,979.7030,376.8817,093.6586,835.7403.07.00MEJORAMIENTO DE TERRENO CON ENROCADO03.07.01Suministro y Colocacin de Enrocadom27,978.7826.85214,230.240.000.000.000.00362.509,733.13504.5313,546.63220.005,907.0075.602,029.860.000.001,197.2232,145.36830.0022,285.500.000.003,189.8585,647.474,788.93128,582.7704.00.00OBRAS DE ARTE - CANAL04.01.00TOMAS PRINCIPALES (02 UNIDADES)04.01.01Trazo y Replanteo - Tomas Principalesm238.821.8973.370.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0038.8273.3704.01.02Excavacin a Mano en Material Sueltom366.8222.391,496.100.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0066.821,496.1004.01.03Cama de Apoyo con Material Seleccionado e = 0.10 mm25.123.6218.530.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.005.1218.5304.01.04Relleno Compactado con Material Seleccionadom31.2246.9857.320.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.2257.3204.01.05Relleno compactado con Material Propiom34.3220.5088.560.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.004.3288.5604.01.06Concreto fc = 100 kg/cm2m31.00221.09221.090.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.00221.0904.01.07Concreto fc = 210 kg/cm2m319.97328.566,561.340.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0019.976,561.3404.01.08Encofrado y Desencofradom2107.1526.192,806.260.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00107.152,806.2604.01.09Acero de Refuerzo fy = 4200 kg/cm2kg1,183.353.974,697.900.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001,183.354,697.9004.01.10Juntas Asflticas de 1"m14.305.0872.640.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0014.3072.6404.01.11Suministro en Instalacin de Tubera PVC D = 315 mm C - 5m3.4071.13241.840.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.003.40241.8404.01.12Suministro en Instalacin de Tubera PVC D = 160 mm S - 25m40.0019.12764.800.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0040.00764.8004.01.13Suministro en Instalacin de Tubera PVC D = 315 mm S - 25m3.4066.91227.490.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.003.40227.4904.01.14Compuerta Metlica Tipo I (0.80 x 0.65 m)und2.00548.621,097.240.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.002.001,097.2404.01.15Compuerta Metlica Tipo II (0.50 x 0.55 m)und1.00472.21472.210.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.00472.2104.01.16Compuerta Metlica Tipo III (0.40 x 0.45 m)und1.00430.20430.200.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.00430.2004.01.17Rejilla Metlica de Barras de 5/8"m22.40128.27307.850.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.002.40307.8504.01.18Mira Metlica Graduadam3.0026.7480.220.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.003.0080.2204.02.00ACUEDUCTOS (03 UNIDADES)04.02.01Trazo y Replanteo - Acueductosm228.601.8954.050.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0028.6054.0504.02.02Limpieza de Caucem313.3019.30256.690.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0013.30256.6904.02.03Excavacin a Mano en Material Sueltom317.2522.39386.230.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0017.25386.2304.02.04Concreto Ciclpeo en Apoyos fc = 140 kg/cm2 + 30% P.G.m312.32237.762,929.200.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0012.322,929.2004.02.05Concreto fc = 175 kg/cm2m36.41304.201,949.920.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.006.411,949.9204.02.06Concreto fc = 210 kg/cm2m315.56328.565,112.390.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0015.565,112.3904.02.07Encofrado y Desencofradom2267.4626.197,004.780.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00267.467,004.7804.02.08Acero de Refuerzo fy = 4200 kg/cm2kg1,652.803.976,561.620.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001,652.806,561.6204.02.09Juntas Water Stop 6"m37.4021.59807.470.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0037.40807.4704.02.10Juntas de Cartn Embreadom24.802.3811.420.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.004.8011.4204.03.00PASE VEHICULAR04.03.01Trazo y Replanteo - Pase Vehicularm2223.581.89422.570.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00223.58422.5704.03.02Excavacin a Mano en Conglomeradom3259.9326.126,789.370.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00259.936,789.3704.03.03Relleno Compactado con Material Seleccionadom344.7246.982,100.950.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0044.722,100.9504.03.04Concreto fc = 100 kg/cm2m318.41221.094,070.270.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0018.414,070.2704.03.05Concreto fc = 210 kg/cm2m391.93328.5630,204.520.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0091.9330,204.5204.03.06Encofrado y Desencofradom2497.0726.1913,018.260.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00497.0713,018.2604.03.07Acero de Refuerzo fy = 4200 kg/cm2kg13,138.873.9752,161.310.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0013,138.8752,161.3104.03.08Juntas Water Stop 6"m27.0021.59582.930.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0027.00582.9304.04.00PASARELAS (07 UNIDADES)04.04.01Trazo y Replanteo - Pasarelasm233.801.8963.880.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0033.8063.8804.04.02Excavacin a Mano en Material Sueltom315.5822.39348.840.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0015.58348.8404.04.03Concreto Ciclpeo fc = 140 kg/cm2 + 25% P.M.m314.87231.003,434.970.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0014.873,434.9704.04.04Concreto fc = 210 kg/cm2m316.87328.565,542.810.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0016.875,542.8104.04.05Encofrado y Desencofradom2134.6626.193,526.750.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00134.663,526.7504.04.06Acero de Refuerzo fy = 4200 kg/cm2kg1,285.703.975,104.230.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001,285.705,104.2304.05.00CANOA (18 UNIDADES)04.05.01Trazo y Replanteo - Canoam2220.001.89415.800.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00220.00415.8004.05.02Excavacin a Mano en Material Sueltom3204.1122.394,570.020.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00204.114,570.0204.05.03Concreto Ciclpeo fc = 140 kg/cm2 + 25% P.M.m372.63231.0016,777.530.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0072.6316,777.5304.05.04Concreto fc = 175 kg/cm2m312.96304.203,942.430.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0012.963,942.4304.05.05Concreto fc = 210 kg/cm2m368.34328.5622,453.790.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0068.3422,453.7904.05.06Encofrado y Desencofradom2626.1026.1916,397.560.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00626.1016,397.5604.05.07Acero de Refuerzo fy = 4200 kg/cm2kg5,602.533.9722,242.040.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.005,602.5322,242.0404.05.08Emboquillado de Piedra 6" Asentado fc = 140 kg/cm2 e = 0.20 mm2395.0036.2014,299.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00395.0014,299.0004.05.09Juntas Asflticas de 1"m114.405.08581.150.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00114.40581.1504.06.00MUROS DE CPNTENCIN (01 UNIDAD)04.06.01Trazo y Replanteo - Muro de Contencinm222.501.8942.530.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0022.5042.5304.06.02Excavacin a Mano en Conglomeradom340.5026.121,057.860.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0040.501,057.8604.06.03Concreto fc = 210 kg/cm2m39.00328.562,957.040.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.009.002,957.0404.06.04Encofrado y Desencofradom272.6326.191,902.180.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0072.631,902.1804.06.05Acero de Refuerzo fy = 4200 kg/cm2kg680.313.972,700.830.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00680.312,700.8304.06.06Relleno Compactado con Material Seleccionadom344.2546.982,078.870.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0044.252,078.8704.07.00TOMAS LATERALES (17 UNIDADES)04.07.01Trazo y Replanteo - Tomas Lateralesm2152.751.89288.700.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00152.75288.7004.07.02Excavacin a Mano en Material Sueltom3228.0022.395,104.920.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00228.005,104.9204.07.03Cama de Apoyo con Material Seleccionado e = 0.10 mm254.323.62196.640.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0054.32196.6404.07.04Relleno Compacatado Con Material Seleccionadom322.8946.981,075.370.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0022.891,075.3704.07.05Relleno Compacatado Con Material Propiom348.8820.501,002.040.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0048.881,002.0404.07.06Concreto fc = 100 kg/cm2m33.09221.09683.170.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.003.09683.1704.07.07Concreto fc = 210 kg/cm2m340.97328.5613,461.100.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0040.9713,461.1004.07.08Encofrado y Desencofradom2227.2826.195,952.460.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00227.285,952.4604.07.09Acero de Refuerzo fy = 4200 kg/cm2kg3,786.713.9715,033.240.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.003,786.7115,033.2404.07.10Juntas Asflticas de 1"m124.105.08630.430.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00124.10630.4304.07.11Suministro e Instalacin de Tubera PVC D = 315 mm S - 25m67.1566.914,493.010.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0067.154,493.0104.07.12Compuerta Metlica Tipo III (0.40 x 0.45 m)und17.00430.207,313.400.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0017.007,313.4004.08.00ALIVIADERO (02 UNIDADES)04.08.01Excavacin a Mano en Material Sueltom330.2622.39677.520.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0030.26677.5204.08.02Concreto Ciclpeo fc = 140 kg/cm2 + 25% P.M.m321.10231.004,874.100.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0021.104,874.1004.08.03Encofrado y Desencofradom224.8026.19649.510.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0024.80649.5104.08.04Juntas Asflticas de 1"m23.005.08116.840.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0023.00116.8405.00.00MITIGACIN DEL IMPACTO AMBIENTAL05.01.00Plan de Manejo Ambientalest1.0011,685.1911,685.190.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.0011,685.1905.02.00Reforestacin en Eje de Canal y Zonas Sensiblesm24,000.002.068,240.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.004,000.008,240.00TOTAL COSTO DIRECTO5,246,068.600.00120,492.13573,844.07421,090.28457,918.32274,175.4448,868.39154,054.49135,908.440.002,186,351.483,059,717.121,573,344.803,059,717.12GASTOS GENERALES10.50%550,837.200.0012,651.6760,253.6344,214.4848,081.4228,788.425,131.1816,175.7214,270.390.00229,566.91321,270.30165,201.20321,270.29UTILIDAD0.50%26,230.340.00602.462,869.222,105.452,289.591,370.88244.34770.27679.540.0010,931.7615,298.597,866.7215,298.58SUB - TOTAL PRESUPUESTO (sin I.G.V.)5,823,136.140.00133,746.26636,966.92467,410.21508,289.33304,334.7454,243.91171,000.48150,858.370.002,426,850.153,396,286.011,746,412.723,396,285.99IGV19.00%1,106,395.870.0025,411.79121,023.7188,807.9496,574.9757,823.6010,306.3432,490.0928,663.090.00461,101.53645,294.34331,818.41645,294.34TOTAL PRESUPUESTO6,929,532.010.00159,158.05757,990.63556,218.15604,864.30362,158.3464,550.25203,490.57179,521.460.002,887,951.684,041,580.352,078,231.134,041,580.33

SUMA ALZADA: NO SE RECALCULA SE CONSIDERA EL SUBTOTAL DE LO TRAMITADOPRECIOS UNITARIOS: SE RECALCULA CON SUS PROPIOS PRECIOS UNITARIOS Y % GG Y % UTRECALCULO DESDE EL PRIMER DIA HASTA LA ULTIMA DEL PERIODO. NO SE ACUMULA DOS PERIODOSMETRADO ACUMULADO REALMENTE EJECUTADO DE ACUERDO A CONSTATACION FISICA O METRADOS SUTENTADOSVALORIZACION FACUMULADA DE ACUERDO A NORMAS : PRECIOS UNITARIOS O SUMA ALZADASALDO DE OBRA NO EJECUTADO: POR DEDUCTIVO DE OBRA O POR METRADO NO EJECUTADO O AMBOSPOR DEFINIR: GASTOS GENERALES NO PAGADOS Y UTILIDAD DEJADA DE PERCIBIR

REAJ CONTREAJUSTE MAXIMO - CONTRATO PRINCIPALPRESUPUESTO: EL OTRO CANALCONTRATISTA: EL FIRMEUBICACIN: EL PARAISOCLIENTE: EL JUGADORSISTEMA: PRECIOS UNITARIOSVALVALORIZACIONREAJUSTE - REINTEGRODEDUCCION AL REAJUSTEREAJUSTENPERIODOREALPROG.MESK-1REALPROG.RECONOCIDOADEL. DIRECTOADEL. MAT.A PAGAR( 1 )( 2 )( 3 )(4)=(1)*(3)(5)=(2)*(3)( 6 )( 7 )( 8 )(9)=(6)-(7)-(8)01October-07PARCIAL0.000.00Nov-070.0160.000.000.000.000.000.00ACUMULADO0.000.000.000.000.000.000.000.0002November-07PARCIAL133,746.26133,746.26Dec-070.0222,942.422,942.422,942.42506.72748.181,687.52ACUMULADO133,746.26133,746.262,942.422,942.422,942.42506.72748.181,687.5203December-07PARCIAL636,966.92636,966.92Jan-080.02415,287.2115,287.2115,287.212,667.265,055.187,564.77ACUMULADO770,713.18770,713.1818,229.6318,229.6318,229.633,173.985,803.369,252.2904January-08PARCIAL467,410.21467,410.21Feb-080.02411,217.8511,217.8511,217.851,957.253,709.525,551.08ACUMULADO1,238,123.391,238,123.3929,447.4829,447.4829,447.485,131.239,512.8814,803.3705February-08PARCIAL508,289.33508,289.33Mar-080.02311,690.6511,690.6511,690.652,027.084,527.935,135.64ACUMULADO1,746,412.721,746,412.7241,138.1341,138.1341,138.137,158.3114,040.8119,939.0106March-08PARCIAL304,334.74304,334.74Apr-080.0195,782.365,782.365,782.36970.962,585.152,226.25ACUMULADO2,050,747.462,050,747.4646,920.4946,920.4946,920.498,129.2716,625.9622,165.2607April-08PARCIAL54,243.9154,243.91May-080.0271,464.591,464.591,464.59259.59502.27702.73ACUMULADO2,104,991.372,104,991.3748,385.0848,385.0848,385.088,388.8617,128.2322,867.9908May-08PARCIAL171,000.48171,000.48Jun-080.0294,959.014,959.014,959.01886.541,583.362,489.11ACUMULADO2,275,991.852,275,991.8553,344.0953,344.0953,344.099,275.4018,711.5925,357.1009June-08PARCIAL150,858.37150,858.37Jul-080.0466,939.496,939.496,939.491,293.501,540.224,105.77ACUMULADO2,426,850.222,426,850.2260,283.5860,283.5860,283.5810,568.9020,251.8129,462.87TOTAL2,426,850.222,426,850.2260,283.5860,283.5860,283.5810,568.9020,251.8129,462.87

VALORIZACIONES TRAMITADAS - APROBADAS POR PERIODOSVALORIZACIONES PROGRAMADAS ULTIMO CAO ACTUALIZADO POR PERIODOPERIODO SIGUIENTE DE LA VALORIZACION"K" - 1 DEL PERIODO SIGUIENTE DE LA VALORIZACINOBRA ADELANTADA:REAJUSTE DEL PERIODOOBRA ATRASADA: REAJUSTE ACUMULADO NO MAYOR AL REAJUSTE ACUMULADO PROGRAMADORUSTENTO DE DEDUCCIONES EN DOCUMENTO ADJUNTO

DED REAJ CONT ADDEDUCCION POR REAJUSTE QUE NO CORRESPONDE POR ADELANTO DIRECTOPRESUPUESTO: EL OTRO CANALCONTRATISTA: EL FIRMEUBICACIN: EL PARAISOCLIENTE: EL JUGADORFORMULA :D=A*V/C*( Kr/Ka-1)A=1,164,626.89C=5,823,136.14Ka =K de fecha de adelantoFECHA ADELA. :Oct-07Kr =K de fecha de reajusteVALPERIODOVALORIZACIONDEDUCCIONNMES DEMES DE(V)FACTORKrKaMENSUALVALREGULARIZACION(A* V/C)PARCIAL01October-07November-070.000.001.0161.0030.00ACUMULADO0.000.000.0002November-07December-07133,746.2626,749.241.0221.003506.72ACUMULADO133,746.2626,749.24506.7203December-07January-08636,966.92127,393.351.0241.0032,667.26ACUMULADO770,713.18154,142.593,173.9804January-08February-08467,410.2193,482.011.0241.0031,957.25ACUMULADO1,238,123.39247,624.615,131.2305February-08March-08508,289.33101,657.841.0231.0032,027.08ACUMULADO1,746,412.72349,282.447,158.3106March-08April-08304,334.7460,866.931.0191.003970.96ACUMULADO2,050,747.46410,149.378,129.2707April-08May-0854,243.9110,848.781.0271.003259.59.2,104,991.37420,998.158,388.8608May-08June-08171,000.4834,200.091.0291.003886.54ACUMULADO2,275,991.85455,198.249,275.4009June-08July-08150,858.3730,171.671.0461.0031,293.50ACUMULADO2,426,850.22485,369.9010,568.90TOTAL2,426,850.22485,369.9010,568.90

Monto de Deduccin de Reajuste que no correspondeMonto puede ser negativo, cuando el Kr < KaKr = Mes siguiente de la valorizacin

DRQNOC AM DEDUCCION DEL REAJUSTE QUE NO CORRESPONDEPOR ADELANTO PARA MATERIALESPRESUPUESTO: EL OTRO CANALCONTRATISTA: EL FIRMECoef. Incid. =Factor x % de Incidencia (Formula Polinomica)UBICACIN: EL PARAISOV =Valorizacin del mesCLIENTE: EL JUGADORImo =Indice INEI del Insumo del mes Base o Referencial.Ima =Indice INEI del Insumo del mes del mes de Adelanto.FORMULA DE DEDUCCION =Coef. Incid. x V x ( Imr-Ima) / ImoImr =Indice INEI del Insumo del mes de Reajuse.F.P. UNICADESCRIPCION DEL MATERIAL:AGREGADO GRUESOIU =5VAL.PERIODOMES DEADELANTO OTORGADOVAL.COEF.ADELANTOImrImaImoMONTOADELANTOSALDO DELDEDUCCIONNREGULAR.MONTOINCIDENCIAUTULIZADO (A)MAXIMOPORADELANTOPARCIAL MENSUALMESMONTOUTILIZABLEUTILIZARPOR UTILIZARD=(4)*((5)( 1 )( 2 )( 3 )( 4 )( 5 )( 6 )( 7 )(8)=(1)*(7)/(6)( 9 )(10)=(9)-(4)-(6))/(7)01October-07November-07November-07553,242.020.000.095010.00504.94504.94440.90483,076.02483,076.02483,076.020.000.00ACUMULADO02November-07December-07133,746.260.0950112,706.91530.90504.94440.900.00483,076.02470,369.11748.18748.18ACUMULADO03December-07January-08636,966.920.0950160,516.70541.77504.94440.900.00470,369.11409,852.415,055.185,055.18ACUMULADO04January-08February-08467,410.210.0950144,407.52541.77504.94440.900.00409,852.41365,444.893,709.523,709.52ACUMULADO05February-08March-08508,289.330.0950148,291.35546.28504.94440.900.00365,444.89317,153.544,527.934,527.93ACUMULADO06March-08April-08304,334.740.0950128,914.11544.36504.94440.900.00317,153.54288,239.432,585.152,585.15ACUMULADO07April-08May-0854,243.910.095015,153.58547.91504.94440.900.00288,239.43283,085.84502.27502.27ACUMULADO08May-08June-08171,000.480.0950116,246.35547.91504.94440.900.00283,085.84266,839.501,583.361,583.36ACUMULADO09June-08July-08150,858.370.0950114,332.69552.32504.94440.900.00266,839.50252,506.811,540.221,540.22ACUMULADOTOTAL1,238,123.39117,631.1320,251.8120,251.81F.P. UNICADESCRIPCION DEL MATERIAL:CEMENTO PORTLAND TIPO IIU =21VAL.PERIODOMES DEADELANTO OTORGADOVAL.COEF.ADELANTOImrImaImoMONTOADELANTOSALDO DELDEDUCCIONNREGULAR.MONTOINCIDENCIAUTULIZADO (A)MAXIMOPORADELANTOPARCIAL MENSUALMESMONTOUTILIZABLEUTILIZARPOR UTILIZARD=(4)*((5)( 1 )( 2 )( 3 )( 4 )( 5 )( 6 )( 7 )(8)=(1)*(7)/(6)( 9 )(10)=(9)-(4)-(6))/(7)01October-07November-07November-07774,432.770.000.132990.00350.43350.43350.43774,432.77774,432.77774,432.770.00ACUMULADO02November-07December-07133,746.260.1329917,787.24350.43350.43350.430.00774,432.77756,645.530.00ACUMULADO03December-07January-08636,966.920.1329984,711.76350.43350.43350.430.00756,645.53671,933.770.00ACUMULADO04January-08February-08467,410.210.1329962,162.01350.43350.43350.430.00671,933.77609,771.770.00ACUMULADO05February-08March-08508,289.330.1329967,598.62350.43350.43350.430.00609,771.77542,173.150.00ACUMULADO06March-08April-08304,334.740.1329940,474.21350.43350.43350.430.00542,173.15501,698.940.00ACUMULADO07April-08May-0854,243.910.132997,214.03350.43350.43350.430.00501,698.94494,484.920.00ACUMULADO08May-08June-08171,000.480.1329922,741.76350.43350.43350.430.00494,484.92471,743.150.00ACUMULADO09June-08July-08150,858.370.1329920,063.02350.43350.43350.430.00471,743.15451,680.130.00ACUMULADOTOTAL1,238,123.39164,661.000.00

DE LA FORMULA POLINOMICA COEFICIENTE = FACTOR x % INCIDENCIAMONTO DE ADELANTO DEFLACTADO A LA FECHA REFERERENCIALMonto de Deduccin de Reajuste que no correspondeMonto puede ser negativo, cuando el Ir < Ia

FP CONTFACTOR DE REAJUSTE " K "PRESUPUESTO: EL OTRO CANALCONTRATISTA: EL FIRMEUBICACIN: EL PARAISOCLIENTE: EL JUGADORSISTEMA: PRECIOS UNITARIOSAREA GEOGRAFICA: 6K = 0.169 Jr/Jo + 0.228 CAr/CAo + 0.263 MMr/MMo + 0.340 GUr/GUoJun-07October-07November-07December-07January-08February-08March-08April-08May-08June-08July-08August-08CODIGODESCRIPCININD.FACTOR%INDICESINDICESCOEF. DEINDICESCOEF. DEINDICESCOEF. DEINDICESCOEF. DEINDICESCOEF. DEINDICESCOEF. DEINDICESCOEF. DEINDICESCOEF. DEINDICESCOEF. DEINDICESCOEF. DEINDICESCOEF. DEBASEMESINCIDENCIAMESINCIDENCIAMESINCIDENCIAMESINCIDENCIAMESINCIDENCIAMESINCIDENCIAMESINCIDENCIAMESINCIDENCIAMESINCIDENCIAMESINCIDENCIAMESINCIDENCIAJMANO DE OBRA INC. LEYES SOCIALES470.169100.00%361.47374.220.175374.220.175374.220.175374.780.175374.780.175374.780.175374.780.175374.780.175374.780.175395.430.185395.710.185CAAGREGADO GRUESO50.22841.67%440.90447.75504.94530.90541.77541.77546.28544.36547.91547.91552.32554.77CEMENTO PORTLAND TIPO I2158.33%350.43350.430.230350.430.244350.430.250350.430.253350.430.253350.430.254350.430.253350.430.254350.430.254350.430.255350.000.256MMMAQUINARIA Y EQUIPO NACIONAL480.26322.43%331.63324.76325.03323.63322.01319.93315.58313.53318.76318.76324.89329.16MAQUINARIA Y EQUIPO IMPORTADO4977.57%263.88251.510.253249.820.251247.960.250246.150.248242.970.245236.030.239232.000.236236.910.241236.910.241241.560.245246.800.250GUINDICE GENERAL DE PRECIOS AL CONSUMIDOR390.340100.00%318.24323.170.345323.530.346324.990.347325.710.348328.670.351332.090.355332.600.355333.830.357336.400.359338.270.361340.270.364K1 DE REAJUSTEK=1.003K=1.016K=1.022K=1.024K=1.024K=1.023K=1.019K=1.027K=1.029K=1.046K=1.055

LA SUMA DE FACTORES DEBE SUMAR 1

INDICINDICE DE REAJUSTE - INEIPRESUPUESTO: EL OTRO CANALCONTRATISTA: EL FIRMEUBICACIN: EL PARAISOCLIENTE: EL JUGADORSISTEMA: PRECIOS UNITARIOSAREA GEOGRAFICA: 6CODIGOJun-07Jul-07Aug-07Sep-07Oct-07Nov-07Dec-07Jan-08Feb-08Mar-08Apr-08May-08Jun-08Jul-08Aug-085440.90439.97441.47445.12447.75504.94530.90541.77541.77546.28544.36547.91547.91552.32554.7721350.43350.43350.43350.43350.43350.43350.43350.43350.43350.43350.43350.43350.43350.43350.0039318.24319.76320.19322.15323.17323.53324.99325.71328.67332.09332.60333.83336.40338.27340.2747361.47374.22374.22374.22374.22374.22374.22374.78374.78374.78374.78374.78374.78395.43395.7148331.63332.23331.09331.54324.76325.03323.63322.01319.93315.58313.53318.76324.38324.89329.1649263.88263.67263.09261.18251.51249.82247.96246.15242.97236.03232.00236.91244.34241.56246.80

AMORT AD-MATADELANTO PARA MATERIALESPRESUPUESTO: EL OTRO CANALCONTRATISTA: EL FIRMEUBICACIN: EL PARAISOCLIENTE: EL JUGADORADELANTODESCRIPCINMONTO CONTRATADOMONTO OTORGADO%FECHA DE PAGOPAGO N 01CONTRACTUAL5,823,136.141,327,673.9522.80%Nov-07TOTAL S/IGV5,823,136.141,327,673.9522.80%AMORTIZACION DE ADELANTO PARA MATERIALESPRESUPUESTO: EL OTRO CANALCONTRATISTA: EL FIRMEUBICACIN: EL PARAISOCLIENTE: EL JUGADORVALORIZACIONPERIODOCONTRACTUAL01October-070.0002November-070.0003December-0740,174.6304January-0857,294.2405February-0882,546.5906March-0881,207.4407April-082,555.0608May-0844,174.4909June-0838,996.20TOTAL AMORTIZADO346,948.65TOTAL OTORGADO1,327,673.95SALDO POR AMORTIZAR980,725.30ADELANTO DIRECTOPRESUPUESTO: EL OTRO CANALCONTRATISTA: EL FIRMEUBICACIN: EL PARAISOCLIENTE: EL JUGADORFORMULA POLINOMICADESCRIPCINMONTO CONTRATADOMONTO OTORGADO%FECHA DE PAGOPAGO N 01CONTRACTUAL5,823,136.141,164,626.8920.00%Oct-07TOTAL S/IGV5,823,136.141,164,626.8920.00%AMORTIZACION DE ADELANTO DIRECTOPRESUPUESTO: EL OTRO CANALCONTRATISTA: EL FIRMEUBICACIN: EL PARAISOCLIENTE: EL JUGADORVALORIZACIONPERIODOCONTRACTUAL01October-070.0002November-0725,923.4003December-07123,437.5504January-0891,838.6705February-08100,192.2106March-0860,989.3907April-0810,486.1508May-0835,298.0609June-0830,957.80TOTAL AMORTIZADO479,123.23TOTAL OTORGADO1,164,626.89SALDO POR AMORTIZAR685,503.66

MAS DEL 20% POR ACTUALIZACIN DEL PTO CONTRATADOMONTO AMORTIZADO POR MES DE ACUERDO A FACTURACION PAGADAMONTO AMORTIZADO POR MES DE ACUERDO A FACTURACION PAGADA

VAL TRAM- PAGPAGOS EFECTUADOS - VALORIZACIONESPRESUPUESTO: EL OTRO CANALCONTRATISTA: EL FIRMEUBICACIN: EL PARAISOCLIENTE: EL JUGADORVAL.MONTO CONT.REAJUSTEPARCIALAMORTIZACIONES S/IGVMONTOTOTALPERIODOFACTURAFECHA DES/IGVS/IGVS/IGVDIRECTOMATERIALESPARCIALC/AMORTIZACIONESI.G.V.A COBRARNPAGO010.000.000.000.000.000.000.000.000.00October-07--------------02128,460.87385.38128,846.2525,923.400.0025,923.40102,922.8519,555.34122,478.19November-07001-0003611/7/0803618,343.899,028.77627,372.66123,437.5540,174.63163,612.18463,760.4888,114.49551,874.97December-07001-0003641/28/08001-0003651/30/0804459,193.3410,432.16469,625.5091,838.6757,294.24149,132.91320,492.5960,893.59381,386.18January-08001-0003812/28/0805500,961.059,905.96510,867.01100,192.2182,546.59182,738.80328,128.2162,344.36390,472.57February-08001-0003823/27/0806304,946.965,765.15310,712.1160,989.3981,207.44142,196.83168,515.2832,017.90200,533.18March-08001-0004155/2/080752,430.74(38,464.88)13,965.8610,486.152,555.0613,041.21924.65175.681,100.33April-08001-0004445/28/0808176,490.28(11,036.21)165,454.0735,298.0644,174.4979,472.5585,981.5216,336.49102,318.01May-08001-0004616/26/0809154,789.0237,425.92192,214.9430,957.8038,996.2069,954.00122,260.9423,229.58145,490.52June-08001-0004747/31/08TOTAL S/.2,395,616.1523,442.252,419,058.40479,123.23346,948.65826,071.881,592,986.52302,667.441,895,653.96VALORIZACION TRAMITADAVAL.MONTO CONT.REAJUSTEPARCIALAMORTIZACIONES S/IGVMONTOTOTALPERIODOFACTURAFECHA DES/IGVS/IGVS/IGVDIRECTOMATERIALESPARCIALC/AMORTIZACIONESI.G.V.A COBRARNPAGO0453,624.5153,624.5110,724.9021,449.8032,174.7021,449.814,075.4625,525.27NOV'06TOTAL S/.53,624.510.0053,624.5110,724.9021,449.8032,174.7021,449.814,075.4625,525.27VALORIZACION POR TRAMITARVAL.MONTO CONT.REAJUSTEPARCIALAMORTIZACIONES S/IGVMONTOTOTALPERIODOFACTURAFECHA DES/IGVS/IGVS/IGVDIRECTOMATERIALESPARCIALC/AMORTIZACIONESI.G.V.A COBRARNPAGOVAL 01-ADIC0.000.000.000.000.000.000.00NOV'06VAL 01- MAY MET0.000.000.000.000.000.000.00NOV'06TOTAL S/.0.000.000.000.000.000.000.000.000.00

VAL MAT-A02Anexo N 01VALORIZACION DE MATERIALES Y HERRAMIENTAS EN OBRAPRESUPUESTO: EL OTRO CANALCONTRATISTA: EL FIRMEUBICACIN: EL PARAISOCLIENTE: EL JUGADORItemDescripcin de la partidaUndMetradoPrecioParcialUnitario1.00MATERIALES EN ALMACEN1.01Aditivo SIKA (02 cilindros, 01 cerrado, 01abierto)gal105.0028.002,940.001.02Curet (02 cilindros, 01 cerrado, 01abierto)gal100.0010.081,008.001.03Varillas corrugadas de 1/2"x9 m (319und)kg2,842.292.617,418.381.04Varillas corrugadas de 5/8"x9 m (28und)kg395.642.611,032.621.05Varillas corrugadas de 3/8"x9 m (58und)kg292.322.61762.961.06Alambre Negro N 16kg1,403.003.354,700.051.07Dinamita (embalada en 04 cajas)und1,194.000.861,026.841.08Cordon Detonantem5,900.000.603,540.001.09Guia lentam1,153.000.10115.301.10Anfokg110.002.77304.701.11Fulminanteund249.000.41102.091.12Alambre Negro N 08kg64.003.35214.401.13Cerchasund100.0018.001,800.001.14Listones 3.5m x 3" x 2"und16.001.0016.001.15Listones 3.00m x 3" x 2"und56.000.8044.801.16Regla 3.00 m x 2 1/2" x 2"und14.0012.00168.001.17Tablas de 3.05m x 8" x 1"und46.0012.00552.001.18Paneles 2.44m x 1.21m x 8.5cmund16.0021.00336.001.19Paneles 2.44m x 79.50cm x 8.5cmund2.0021.0042.001.20Paneles 2.44m x 60.00cm x 8.5cmund4.0021.0084.001.21Paneles 2.44m x 80.00cm x 8.5cmund2.0021.0042.001.22Tapas de Panel 88.00cm x 60.00cm x 8.50cmund8.0011.0088.001.23Triplay 19mm 2.44 x 2.44 x 1.22 x 2cmund2.0021.0142.021.24Calaminaplancha2.0022.5045.001.25Cubosund27.009.00243.001.26Tecnopor 2.39cm x 1.20 x 2.50 cmplancha36.005.50198.001.27Yesobls3.0513.4541.021.28Bases de Cerchasund86.002.00172.001.29Bases de Cubosund16.005.0080.001.30Brazos Armados de Cerchasund52.007.85408.201.31Madera Junta de Dilatacionund55.009.00495.001.32Plancha de Aluminio 1.00m x 92.00cmund5.0022.00110.001.33Listones de 2.00 x 2.00 x Diferentes medidasund9.005.0045.001.34Listones de 2.00 x 3.00 x 3.00und57.008.00456.001.35Brazos de Cerchas (Entre usados y nuevos)und131.009.001,179.001.36Chapas de cerchas (diferentes dimensiones)und300.006.501,950.001.37Bases de Cerchas Usadasund200.001.50300.001.38Clavos de 4"kg15.003.7856.701.39Clavos de 3"kg80.503.78304.292.00MATERIALES EN OBRA2.01Piedra para enrocadom3112.5028.003,150.002.02Arenam36.5025.00162.503.00MATERIALES EN LOCAL DE BATALLON DE INFANTERIA N 633.01Dinamita (embalada en 39 cajas)und13,104.000.8611,269.443.02Cordon Detonantem9,000.000.605,400.003.03Guia lentam3,000.000.10300.003.04Anfokg300.002.77831.003.05Fulminanteund2,300.000.41943.00TOTAL COSTO DIRECTO54,519.31GASTOS GENERALES10.50%5,724.53UTILIDAD0.50%272.60SUB - TOTAL PRESUPUESTO (sin I.G.V.)60,516.44IGV19.00%11,498.12TOTAL PRESUPUESTOS/.72,014.56Notas:1.-Se adjunta copia del Acta de Inventario de bienes del campamento y constatacin fsica de laobra donde se indica la relacin de materiales arriba consignados.2.-El clculo de peso de las varillas de acero es el siguiente:Descripcionk/mlongitud-mcantidadpeso tot kgVarillas corrugadas de 5/8"x9 m (28und)1.579.0028.00395.64Varillas corrugadas de 1/2"x9 m (319 und)0.999.00319.002,842.29Varillas corrugadas de 3/8"x9 m (58und)0.569.0058.00292.32

GG-A04Anexo N 02GASTOS GENERALES - SALDO POR PAGARPRESUPUESTO: EL OTRO CANALCONTRATISTA: EL FIRMEUBICACIN: EL PARAISOCLIENTE: EL JUGADORDATOS:Gastos Generales Presupuesto Referencial:550,837.20Factor de relacin1.00Gastos Generales Presupuesto a Contratado:550,837.20Gastos Generales Valorizados - Acumulado a Val 09229,566.91CALCULOGastos Generales Presupuesto a Contratado:550,837.20Gastos Generales Valorizados - Acumulado a Val 09229,566.91Saldo de Gastos Generales por pagar321,270.29I.G.V.61,041.36Total Gasto General a pagar al Contratista:S/.382,311.65Notas:1.00Los componentes de los Gastos Generales han sido contratadospor el plazo total de obra, corresponde reconocer la totalidad de GG

UTILIDADAnexo N 03UTILIDAD DEJADA DE PERCIBIR POR PAGARObra : CONSTRUCCION DEL CANAL DE IRRIGACION SUYTUCCOCHAPROPIETARIO:: EL JUGADORCONTRATISTA:: EL FIRMEUBICACIN: EL PARAISOPRESUPUESTO CONTRATADO (SIN IGV) :5823136.14PRESPUESTO CONTRATADO (CON IGV) :6929532.01ITEMESPECIALIDADCONTRACTUAL01Utilidad del Presup.26,230.3402Utilidad acumulada Liquidacion10,931.76Diferencia15,298.58Factor de Relacion1.00CALCULOSALDO DE UTLIDAD DEJADA DE PAGAR15,298.5850% SALDO DE UTILIDAD POR VALORIZAR7,649.29I.G.V.19.00%1,453.37TOTAL PRESUPUESTO9,102.66

INTERESESAnexo N 06INTERESES POR DEMORA EN PAGO DE VALORIZACIONESPRESUPUESTO: EL OTRO CANALCONTRATISTA: EL FIRMEUBICACIN: EL PARAISOCLIENTE: EL JUGADORVAL.MONTO CONT.PERIODOFACTURAFECHA DEFECHATILMN - MONEDA NACIONALMONTO PORA COBRARNPAGOMAXIMOFACTOR ACUMULADODEMORA ENC/IGVDE PAGOFECHA PAGOFECH. MAX. PELPAGOCONTRACTUAL010.00October-07----------------------------------------------02122,478.19November-07001-0003611/7/0812/31/075.701885.6983476.0403551,874.97December-07001-0003641/28/081/31/085.712575.714040.00001-0003651/30/081/31/085.713555.714040.0004381,386.18January-08001-0003812/28/082/29/085.728225.728730.0005390,472.57February-08001-0003823/27/083/31/085.742575.744570.0006200,533.18March-08001-0004155/2/084/30/085.760895.7598635.85071,100.33April-08001-0004445/28/085/30/085.774765.775850.0008102,318.01May-08001-0004616/26/086/30/085.790845.793050.0009145,490.52June-08001-0004747/31/087/31/085.810245.810240.001052,538.64July-08--------10/12/088/29/085.852415.82679230.001119,592.74August-08-------10/12/089/30/085.852415.8453923.50SUB - TOTAL365.39IGV65.77TOTAL431.16NOTAS1,- SE HA PROYECTADO EL FACTOR DE INTERES TILMNFACTOR ACUMULADO AL 01/07/03 :5.01010FACTOR ACUMULADO AL 31/07/03 :5.02303INCREMENTO DIARIO:0.000417FACTOR PROYECTADOINCREMENTOFACTORDELALDASPOR DIASPROYECTADO31-07-0330/07/03(1.00(0.005.02261031-07-0301/08/031.000.005.02345031-07-0304/08/034.000.005.02470031-07-0330/09/0361.000.035.04847031-07-0303/10/0364.000.035.04972031-07-0311/10/0372.000.035.05306031-07-0316/10/0377.000.035.05515031-07-0315/11/03107.000.045.067660

MAYORES GGAnexo N 08MAYORES GASTOS GENERALESPOR AMPLIACION DE PLAZOPRESUPUESTO: EL OTRO CANALCONTRATISTA: EL FIRMEUBICACIN: EL PARAISOCLIENTE: EL JUGADORGASTOS GENERALES DIARIOS:CALCULO:MONTO DE GASTOS GENERALES CONTRACTUALES:550,837.20sin/I.g.v.PLAZO DE EJECUCION CONTRACTUAL240.00das calendarioGASTO GENERAL DIARIO2,295.16sin/I.g.v.INDICE UNIFICADO DE MES BASE318.24Jun-07AMPLIACIONAPROBADO Y/O EN ARBITRAJEFECHAFACTOR DE ACTUALIZACIONMAYOR GASTO GENERALIGVTOTALMESIND UNIF 392 (APROB.)30May-08333.831.049072,228.6913,001.1685,229.854 (ARBIT.)29May-08333.831.049069,821.0612,567.7982,388.855 (ARBIT.)60May-08333.831.0490144,457.3726,002.33170,459.706 (ARBIT.)126Jun-08336.401.0571305,702.9255,026.53360,729.457 (ARBIT.)71Jul-08338.271.0629173,206.3231,177.14204,383.468 (ARBIT.)63Jul-08338.271.0629153,690.1127,664.22181,354.339 (ARBIT.)20Jul-08338.271.062948,790.518,782.2957,572.8010 (ARBIT.)16Aug-08340.271.069239,263.767,067.4846,331.24TOTAL415.001,007,160.73181,288.941,188,449.67