lanas stop 100

204
Nº100 RECOPILACIÓN RECUEIL P.V.P.: 5,95 ® ® 100 MODELOS 100 MODÈLES

Upload: lanas-stop

Post on 21-Jul-2016

298 views

Category:

Documents


14 download

DESCRIPTION

100 modelos para bebé, complementos y hogar

TRANSCRIPT

  • N100 RECOPILACIN

    RECUEIL

    N100N100N100 RECOPILACIN P.V.P.: 5,95

    N100N100

    100 MODELOS 100 MODLES

  • BEBSLAYETTE

    ContenidoEdito ......

    1. Nido + Giza n 8 2. Beb

    3. Bambini

    4. Nido + Giza n 5 + Nuvole

    5. Nido + Giza n 8

    12. Nido + Angora + Giza n 8

    13. Nido + Giza n 8

    14. Nido + Giza n 8

    16. Beb + Giza n 5

    17. Nido

    24. Extra Merino 25. Extra Merino

    26. Sirena

    27. Giza n 5 29. Giza n 5

    28. Giza n 5

    38. Bambini

    37. Prima Merino

    39. Nuvole + Sur40. Giza n 8 + Angora

    46. Sur

    47. Polo

    48. Sirena 49. Giza n 5

    50. Nido

    51. Nido

    52. Beb

  • BEBSLAYETTE

    ContenidoEdito ......

    6. Giza n 8 7. Giza n 5

    8. Copito 9. Bambini

    10. Viena 11. Nido

    18. Copito + Chicago19. Nylgorina

    20. Prima Merino

    21. Bambini

    22. Nido

    23. Piccolo + Top Merino

    30. Nido31. Nido

    32. Beb

    34. Piccolo

    35. Piccolo

    42. Vincit

    43. Top Merino 44. Extra Merino45. Nido

    15. Giza n 8 33. Peke 36. Prima Merino 41. Nido

  • 1 Giza n 8

    2Beb

    Nido +

  • 3 Bambini

  • Nido +Giza n 5 + Nuvole

    5Nido +

    Giz

    a n

    8

  • 6 Giza n 8

    7 Giza n 5

    6666 Giza n 8

    Giz

    a n

    5

    66

  • www.lanasstop.comwww.lanasstop.com

    8 Copito

  • 9 Bambini

  • Vie

    na10

  • Nido

    12Nido + Angora +

    11

    Giz

    a n

    8

  • 13Nido + Giza n 8

    14Nido + Giza n 8

  • Giza n 815

  • 16Beb + Giza n 5

    17Nido

  • www.lanasstop.comwww.lanasstop.comwww.lanasstop.com

    18Copito + Chicago

    19Nylgorina

  • 20Prima Merino

  • Bamb

    ini21

  • www.lanasstop.comwww.lanasstop.com

    22Nido

    23Piccolo + Top Merino

    24 Extra Merino

  • 25Extra Merino

  • 26Sirena27Giza n

    528Giza n

    5

    29Giza n 5

  • Nid

    o

    30 Nido

  • 32Beb

  • 33Peke

  • 34Piccolo

    35Piccolo

  • 36Prima Merino

  • 37Extra Merino

    38 Bambini

  • 39Nuvole + Sur

  • 40Giza n 8 + Giza n 8 +

    Ango

    ra

  • 41 Nido

  • 42 Vincit43Top Merino

  • www.lanasstop.comwww.lanasstop.com

    45 Nido

    44Extra Merino

  • 46 Sur

  • 48 Sirena

    47 Polo

  • 49 Giza n 5

    50 Nido

  • 51 Nido52 Beb

  • COMPLEMENTOS . ACCESOIRES

    53. Extra Merino 54. Mexico 86 55. Astn + Stop Mohair 56. Mexico 86 57. Viena

    58. Top Merino 59. Extra Merino 60. Aspen 61. Vincit 62. Mexico 86

    63. Astn 64. Dakar 65. Dakar 66. Dakar 67. Mexico 86

    68. Nacar 69. Nacar 70. Fenicia 71. Chicago

    72. Fenicia 74. Nacar 76. Fenicia 77. Fresa 75. Cintya

  • 58. Top Merino 59. Extra Merino 60. Aspen 61. Vincit 62. Mexico 86

    63. Astn 64. Dakar 65. Dakar 66. Dakar 67. Mexico 86

    68. Nacar 69. Nacar 70. Fenicia 71. Chicago

    72. Fenicia 74. Nacar 76. Fenicia 77. Fresa 75. Cintya

    73. Mexico 86 82. Capricho 83. Nacar 84. Stop Mohair 85. Fenicia

    78. Nacar 79. Stop 82 80. Nacar 81. Nacar

    86. Nacar 87. Fenicia 88. Nacar 89. Nacar 90. Fresa

    91. Nacar 92. Nacar 93. Nacar 94. Nacar 95. Nacar

    96. Fenicia 97. Fenicia 98. Fenicia 99. Platino 100. Fenicia

  • 53Extra Merino

  • 54Mexico 86

  • 55Stop Mohair +

    Dak

    ar

  • 56Mexico 86

    57 Viena

    58Top Merino

  • 59Extra Merino

  • 60Aspen

    61 Vincit62Mexico 86

    63Astn

  • 64 Dakar

  • 65 Dakar 66 Dakar

    67 Mexico 86

  • 68 Nacar

  • 69 Nacar

  • 70 Fenicia 71 Chicago

  • 72 Fenicia

  • 73 Mexico 86

    74 Nacar

  • 74 Nacar 75 Cintya 76 Fenicia

    77 Fresa

  • 78 Nacar

  • 79 Stop 82

  • 80Nacar

    81Nacar

  • 82 Capricho

  • 83Nacar

    84Stop Mohair

  • 85 Fenicia

  • 86 Nacar

    87 Fenicia 88 Nacar

  • CONTRAPORTADACONTRE-COUVERTURE

    BACK PAGE

    89 Nacar

  • 90 Fresa91

    Nacar

  • 92 Nacar

  • 93 Nacar

  • 94 Nacar

  • 95 Nacar 96 Fenicia

  • 97 Fenicia

  • 98 Fenicia

  • 99 Platino 100 Fenicia

    LANAS STOPINFITEX, S.A.

    Avda. de Madrid, s/n - 26140 LARDERO (La Rioja) Espaa - Tel.: 941 448 600- Export: + 34 941 448 620- Fax: + 34 941 448 616 e.mail: [email protected] - Export: [email protected] - www.lanasstop.com - EDITA: LANAS STOP

    DIRECCIN, MAQUETACIN Y COORDINACIN: DEPTO. DE DISEO Y PUBLICIDADFOTOGRAFA: JORDI FARRUS - JOSEP PAGANS - FOTOGRAFO COLABORADOR: JUAN ACHIAGA URBIOLA

    ESTILISMO: LUISA GRAU - LUISA TORRESIMPRIME Y ENCUADERNA: grupo grfico 2005, S.L. - Distribucin en Quioscos: SGEL - DEPOSITO LEGAL: C305-2008

  • CUADERNO DE EXPLICACIONESDESIGN BOOKCAHIER DEXPLICATIONSLAN

    AS

    STO

    P

  • Pgina /Page 2

    QUERIDOS TEJEDORES:

    Tienen en sus manos un ejemplar de nuestra re-vista recopilatoria BEST-OF N 100 que contie-ne 100 de los modelos que ms xito han tenido entre todo ustedes. Esperamos que disfruten te-jiendo estos modelos.LANAS STOP lleva 40 aos dedicada al de-sarrollo, investigacin y creacin de hilos para labores y diseos originales, para que nuestros consumidores disfruten tejiendo sus prendas tanto como nosotros disendolas. Tenemos nuevos proyectos, grandes objetivos y muchas ganas de continuar con esta tarea, adaptndonos a las nuevas tecnologas, utili-zando innovadoras materias y mejorando las clsicas, obteniendo siempre productos de gran calidad.

    El equipo que formamos LANAS STOP les da-mos las gracias por confiar en nosotros. Sin uste-des estas 100 publicaciones no habran podido ver la luz.

    Deseamos que sigan compartiendo un feliz tri-cotar con nosotros. LANAS STOP

    1. RECOMENDACIONES

    Antes de comenzar la labor tengan en cuenta los siguientes consejos:

    - Lea todo el texto que corresponde a la prenda antes de comenzar la labor. A veces hay que llevar a cabo varias acciones a la vez (por ejem-plo: disminuir en un costado para la sisa y en el opuesto para el escote con algunas pasadas de diferencia).

    - Elabore una muestra de orientacin: las me-didas que se facilitan en este cuadernillo son orientativas. Cada persona tiene una tensin distinta de tejido y a veces la variacin entre dos muestras con los mismos materiales y agujas puede ser sustancial.Una vez que haya hecho la muestra comprue-be las medidas (vease el captulo 2 muestra de orientacin) y determine si necesita usar agu-jas ms finas o ms gruesas.

    - Cuando adquiera la lana para realizar su labor es siempre conveniente que compre uno o dos ovillos ms de los que se indican en la explica-cin: cabe la posibilidad de que se estropee alguno, o de que nos falte un poquito o de que queramos hacer algn complemento. Si nos fal-ta lana puede resultar complicado encontrar la misma tintada. Si le sobra lana puede guardarla para una prxima labor combinada.

    - Antes de abandonar la labor, termine siempre la pasada. Si no va a ser una labor continuada y va a tejer con varios das de diferencia, hay un truco que ayuda a que no se vea la raya de continuacin de la labor: de las dos agujas que utiliza para tejer, que una tenga 1/2 punto ms que la otra. Se notar mucho menos el corte de la labor.

    - Las fibras con mucho pelo como el mohair o la angora deben tejerse con agujas muy gruesas y diseos muy flojos para que no queden apelma-zadas y despeinadas.

    DEAR KNITTERS,

    You have in your hands our 100th issue with a collection of our BEST -OF, featuring the 100 patterns you have chosen as your favourites. We hope you enjoy knitting these models.For 40 years, LANAS STOP has been dedicated to developing, researching and creating yarns for original projects and designs, to ensure that our customers enjoy making their garments as much as we enjoy designing them. We have a whole range of great new projects and ideas, and we continue to work to familia-rise ourselves with the new technologies, using innovative materials and improving our classic yarns, while always maintaining the highest qua-lity standards for our products.

    The staff here at LANAS STOP would like to thank you for your confidence in us. Without you, these 100 issues would never have been possible.

    We hope we will be able to share a good knit-ting with us. LANAS STOP

    1. RECOMMENDATIONS

    Before you begin, bear in mind the following hints and tips:

    - Read the whole pattern before starting the garment. Sometimes you may need to do more than one thing at once (for example: you may be asked to decrease on one side for the ar-mhole and on the other side for the neck edge, with just a few rows difference).

    - Knit a test sample: the measurements provi-ded in this booklet are simply a guide. Everyo-ne knits with a different tension, and sometimes two samples knitted with the same materials and needles may vary considerably.Once youve knitted the sample, check the measurements (see chapter 2: Test sample) and decide whether you need to use bigger or smaller needles.- When you buy the yarn for your project, its a good idea to buy one or two extra balls; theres always a chance that one could be spoilt, or that you may be a bit short or you may want to make some matching accessory. If you run out of wool, its sometimes difficult to find yarn from the same dye lot. If you have extra wool left over, you can always keep it to use in some future project which requires a combination of yarns.

    - Always finish your row before setting aside your work. If youre not going to be able to make the whole garment at once, and you have to let se-veral days go by before resuming your knitting, heres a trick which helps to avoid the line which may occur when you take up the work again: one of the two needles you use should be half a size larger than the other. The break in the work will be much less noticeable.

    - Yarns with a lot of fluff like mohair or angora should be knitted with very large needles and very loose designs to avoid becoming lumpy and straggly.

    Chres tricoteuses,

    Vous avez en votre possession un exemplaire de notre revue BEST OFF N100 ou vous trouverez 100 de nos modles qui ont eu un grand succs auprs de vous. Nous dsirons que vous jouissiez en tissant ces modles.Depuis 40 ans LANAS STOP se consacre au d-veloppement, la recherche et la cration de fils pour des travaux et modles originaux, pour que nos tricoteuses aient autant de plaisir tricoter les modles que nous en avons les crer.Nous avons de nouveaux projets, de grands objectifs et une grande motivation pour conti-nuer dans cet exercice, en nous adaptant aux nouvelles technologies, en utilisant de nouve-lles matires et en amliorant les classiques, en maintenant toujours la qualit de nos produits.

    Lquipe de LANAS STOP vous remercie de votre confiance. Sans vous ces 100 publications nauraient pas vu le jour.

    Nous vous souhaitons de continuer partager dheureux tricoter avec nous.

    LANAS STOP

    RECOMMANDATIONS

    Avant de commencer votre travail, tenez comp-te des conseils suivants :

    Lisez entirement le texte qui correspond au modle avant de commencer le travail. Par-fois, il faut raliser diverses actions en mme temps (par exemple : diminuer dun ct pour lemmanchure et de lautre ct dim pour lencolure avec quelques rangs de diffrence).

    Faites un chantillon : les mesures fournies dans cette revue sont donnes titre indicatif. Cha-que personne exerce une tension diffrente lors du tricotage, de sorte que la diffrence entre deux chantillons avec la mme matire et les mmes aiguilles peut tre consquente.Une fois lchantillon ralis, comparez les me-sures (voir le chapitre 2 Echantillon ) et prenez ce moment la dcision de travailler avec des aiguilles plus fines ou plus grosses.

    Lorsque vous achetez la laine pour faire un modle, il est conseill dacheter une ou deux pelotes en plus que celles prconises dans lexplication ; il peut arriver que vous en abmiez lune dentre elles, quil en manque un peu ou bien que nous dsirions faire un petit compl-ment au modle. Sil vous manque de la laine, il peut savrer compliqu de retrouver le mme bain. En cas de surplus de laine vous pourrez lutiliser en combinant sur votre prochain mo-dle.

    Avant de laisser le tricot, terminez toujours le rang. Si vous ne tricotez pas rgulirement et que vous reprenez votre tricot au bout de plu-sieurs jours, il y a une astuce pour viter une mar-que de reprise du rang : parmi les deux aiguilles que vous utilisez, tricotez avec une aiguille nu-mro plus grande que lautre. On remarquera beaucoup moins la marque de reprise du rang sur le tricot.

    Les fibres qui ont beaucoup de poil comme le mohair ou langora doivent se tricoter avec des aiguilles trs grosses et des dessins plus lches pour que la laine ne feutre pas.

  • Pgina /Page 3

    2 - Muestra de orientacin

    Lo primero que hemos de hacer antes de tejer una prenda de punto a medida es tejer la lla-mada MUESTRA DE ORIENTACIN. Se elabora con la lana y las agujas que vamos a utilizar en nuestra labor. Cuanto mayor sea la muestra me-jor, con mayor precisin se podrn contar pun-tos y vueltas. Para una buena muestra de 10 x 10 cm. lo mejor es tejer un cuadrado de, al menos 15 cm. de lado. Si se teje con una lana muy fi na, en un punto de dibujo especialmente pequeo, bastar con una muestra de 5 x 5 cm. sobre un cuadrado de 8 cm. de lado.La prueba de punto se sujeta sobre una base blanda como la tabla de planchar o una pie-za lisa de goma-espuma. El punto ha de estar bien liso sin estirarlo! pudindolo planchar lige-ramente, aunque no es necesario. Las muestras elsticas no se deben planchar nunca.Podemos medir directamente sobre la mues-tra, poniendo una cinta mtrica sobre la labor siguiendo exactamente el curso de puntos y pasadas (ver foto). Con unos alfi leres se pueden acotar 10 cm. de largo por 10 cm. de alto y con-tar los puntos y las pasadas que quedan en el interior de este cuadrado imaginario. Por ejem-plo, en la foto necesitaramos montar 15 puntos y tejer 21 pasadas para obtener un cuadrado de 10 x 10 cm. de labor.

    Otra forma ms sencilla de me-dir es recortar una ventana cuadrada de 10 x 10 cm. sobre un cartn duro, colocarla sobre la muestra y contar los puntos y pasadas que se ven en su interior.Una vez que obtenga los re-sultados de su muestra com-pare las cifras con las que se ofrecen en la explicacin. Si las diferencias que se apre-cian son mnimas, ocasio-nadas porque usted teje ms fl ojo o ms apretado, entonces se pueden igualar utilizando agujas medio n-mero ms fi nas o ms grue-sas respectivamente. Si las diferencias son grandes, ha de calcular los puntos segn su muestra para obtener las medidas que necesite tal y como le hemos indicado en este apartado.

    2 - Test sample

    The fi rst thing we have to do before knitting a made-to-measure garment is to knit what is known as a TEST SAMPLE. This is done using the wool and the needles that we are going to use in the actual garment. The bigger the sample, the easier it will be to count the stitches and rows. For a good sample measuring 10 x 10 cms. the best thing is to knit a square with sides of at least 15 cms. If you are knitting with very fi ne wool and with a very small stitch pattern, a 5 x 5 cm. sample from an 8 cm.-sided square will be big enough.Secure the knitting sample to a soft base such as an ironing board or a smooth piece of foam rubber. The knitting must be perfectly smooth (but dont stretch it!) and may be lightly ironed, although this is not necessary. Ribbing samples should never be ironed.We can measure directly on the sample by pla-cing the tape measure over the square, exactly in line with the stitches or rows (see photo). Mark off a 10 cm. square with some pins and count the stitches and rows inside this imaginary area. For example, in photo we would need to cast on 15 stitches and knit 21 rows to obtain a square measuring 10 x 10 cms. of knitting.

    Another simpler way to measure is to cut a squa-re window measuring 10 x 10 cms. out of a pie-ce of card and place it over the sample, and then count the stitches and rows you see inside.Once you have the results of your sample, com-

    pare the fi gures with the fi gures in the direc-tions. If there is only a small difference bet-ween them, because you knit more loosely or tightly, then you can make this up by using needles which are half a number smaller or bigger accordingly. If there is a big differen-ce, you will have to calculate the stitches you will need to give you the right mea-surement using your test sample, as shown above.

    2 - chantillon

    Avant de faire un tricot sur mesure, il faut dabord raliser ce que lon appelle un CHANTILLON . Il est labor avec la laine et les aiguilles que nous allons utiliser pour notre ouvrage. Plus lchantillon est grand, mieux ce sera, puisque les mailles et les rangs pourront tre compts avec une plus grande prcision. Pour un bon chantillon de 10 x 10 cm, lidal consiste tri-coter un carr dau moins 15 cm de ct. Si lon tricote, avec une laine trs fi ne, un point au des-sin particulirement petit, un chantillon de 5 x 5 cm sur un carr de 8 cm de ct sera suffi sant.Lchantillon de tricot est fi x un support mou comme une planche repasser ou un morceau lisse en caoutchouc mousse. Les mailles doivent tre bien lisses (non tires !). On peut le repas-ser lgrement, mais a nest pas ncessaire. Les chantillons en ctes ne doivent jamais tre repasss.Nous pouvons effectuer la mesure directement sur lchantillon, en plaant un mtre mtalli-que sur louvrage suivant exactement le cours des mailles et des rangs (voir photo). laide dpingles, il est possible de dlimiter 10 cm de large sur 10 cm de haut et de compter les mai-lles et les rangs se trouvant lintrieur de ce ca-rr imaginaire. Par exemple, sur la photo 2, nous aurions besoin de monter 21 mailles et de trico-ter 15 rangs pour obtenir un carr de 10 x 10 cm.

    Une autre faon plus simple de mesurer consiste dcouper une fentre carre de 10 x 10 cm sur un carton dur, de la placer sur lchantillon et de compter les mailles et les rangs se trouvant lintrieur.Une fois obtenus les rsultats de votre chanti-llon, comparez vos valeurs avec celles conte-nues dans lexplication. Si les diffrences appr-cies sont minimes, provoques par votre faon de tricoter (plus lche ou plus serre), vous pouvez vous ajuster en utilisant des aiguilles dun demi numro plus fi nes ou plus grosses, respec-tivement. Si les diffrences sont grandes, il vous faudra calculer le nombre de mailles partir de votre chantillon, afi n dobtenir les mesures souhaites telles que nous vous lavons indiqu dans cette rubrique.

    EXEMPLENous voulons tricoter un deva

    nt de 40

    cm de large sur 20 cm de haut jusqu

    lemmanchure. Notre chantillon nous dit

    que le carr de 10 x 10 cm est compo-

    s de 15 mailles et 23 rangs. Une simple

    rgle de trois nous permet de dtermi-

    ner le nombre de mailles monter pour

    que notre devant ait exactement 40

    cm de large et 20 cm de haut jusqu

    lemmanchure.

    Sil y a 15 mailles dans 10 cm

    Il y aura x mailles dans 40 cm.

    Ainsi, x = (15 x 40) / 10 = 60 mailles quil

    nous faudra monter pour obtenir un de-

    vant de 40 cm de large.

    Nous faisons la mme chose avec les

    rangs.

    Sil y a 23 rangs dans 10 cm

    Il y aura y rangs dans 20 cm.

    Ainsi, y = (23 x 20) /10 = 46 rangs quil nous

    faudra tricoter pour obtenir les 20 cm de

    haut jusqu lemmanchure.

    aurions besoin de monter 21 mailles et de trico-ter 15 rangs pour obtenir un carr de 10 x 10 cm.

    EXAMPLEThe front of our garment should

    measure

    40 cms. across and 20 cms. up to the ar-

    mhole. Our test sample tell us that the 10

    x 10 cm. square is made up of 15 stitches

    and 23 rows. Using a simple equation we

    can fi nd out the stitches we have to cast

    on so that our front will be exactly 40 cm.

    wide and 20 cms. up to the armhole.

    If 15 stitches measure 10 cms.

    x stitches must measure 40 cms.

    So x = (15x40) / 10 = 60 stitches, so we

    need to cast on 60 stitches if we want our

    front to measure 40 cms. from side to side.

    We can do the same with the rows.

    If 23 rows measure 10 cms.

    x rows must measure 20 cms.

    So y = (23x20) /10 = 46 rows, so we need

    to knit 46 rows if we want our garment to

    measure 20 cms. up to the armhole.

    Otra forma ms sencilla de me-

    EJEMPLOTenemos que tejer un delantero

    de 40 cm.

    de ancho y 20 cm. de alto hasta la sisa.

    Nuestra muestra de orientacin dice que

    el cuadrado de 10 x 10 cm. lo forman 15

    puntos y 23 pasadas. Con una regla de

    tres simple averiguamos los puntos que

    tendremos que montar para que nuestro

    delantero tenga exactamente 40 cm. de

    ancho y 20 cm. de alto hasta la sisa

    Si 15 puntos miden 10 cm.

    x puntos medirn 40 cm.

    Luego x = (15x40) / 10 = 60 puntos hemos

    de montar para obtener un delantero de

    40 cm. de ancho.

    Con las pasadas haremos lo mismo.

    Si 23 pasadas miden 10 cm.

    y pasadas medirn 20 cm.

    Luego y = (23x20) /10 = 46 pasadas hemos

    de tejer para obtener los 20 cm. de alto

    hasta la sisa.

    Pgina /Page 3

    the fi gures in the direc-tions. If there is only a small difference bet-ween them, because you knit more loosely or tightly, then you can make this up by using needles which are half a number smaller or bigger accordingly. If there is a big differen-ce, you will have to calculate the stitches you will need to give you the right mea-surement using your test sample, as shown above.

  • Pgina /Page 4

    N 1 *** ( primera puesta)

    CONJUNTO ESTAMPADO

    CALIDAD: NIDO ESTAMPADO2 ov. Col. n 275.CALIDAD: ALGODN EGIPCIO MERCERIZADO GIZA N 8 1 ov. Col. n 402.Ag. n 2; ganch. metal n 8; 4 cierres; 6 botones.

    PUNTOS EMPLEADOS: 1 Tubular: ver pgina 125. 2 Elstico 1/1: ver pgina 123.3 Jersey der.: ver pgina 124.4 Musgo: ver pgina 124.5 Calado: ver diagrama. 6 Flor: ver diagrama.

    REALIZACIN JERSEYEspalda: se teje en dos mitades. Con calidad NIDO y ag. n 2, montar 56 p. y tejer 7 p. a p. musgo para las tiras de los botones y 49 p. a p. elstico 1/1. A los 9 cm. cambiar a p. jersey der.. A los 12 cm. del comienzo formar sisas, meng. cada 2 pas. 3 2 y 1 p.. A los 9 cm. del comienzo del p. jersey formar el escote, para ello tejer 24 p. a p. de musgo y 26 p. a p. jersey der.. Tejer 8 pas. con esta disposicin y cerrar los 24 p. a p. de musgo de 1 vez. Seguir tejiendo 5 p. a p. de musgo y el resto a p. jersey der.. A los 11 cm. del comienzo de la sisa formar el hombro cerrando en tres veces: 9 9 y 8 p.. Hacer la otra mitad igual, pero invirtiendo las explicaciones.Delantero: Con calidad NIDO y ag. n 2, montar 100 p. y tejer 4 pas. a p. tubular. Cambiar a p. elstico 1/1 y a los 9 cm. cambiar a p. jersey der. A los 1,5 cm. comenzar la abertura trab. los pri-meros 26 p. y dejando el resto en espera. Seguir trab. con la sig. disposicin: 20 p. jersey der. y 6 p. a p. de musgo para la tira del delantero. A los 12 cm. del comienzo de la labor formar la sisa izqda., meng. cada 2 pas. 3 2 y 1 p.. A los 11 cm. del comienzo de la sisa formar el hombro, cerrando en 3 veces: 9 9 y 8 p.. Continuar trab. con los 74 p. que habamos dejado en espera, aadiendo a la ag. izqda. los 6 p. de la tira del delantero y tejiendo con la sig. disposicin: 6 p. a p. de musgo y 74 p. a p. jersey der.. A los 12 cm. del comienzo de la labor, formar la sisa dcha., meng. cada 2 pas. 3 2 y 1 p.. A los 9 cm. del comienzo del p. jersey formar el escote tejiendo los 54 primeros p. a p. musgo y el resto a p. jersey der.. Seguir as 8 pas. y cerrar los 54 p. musgo de una vez. Seguir con los 26 p. que quedan con la sig. disposicin: 5 p. musgo y el resto a p. jersey der.. A los 11 cm. del comienzo de la sisa formar hombro cerrando en tres ve-ces: 9 9 y 8 p..Mangas: Con calidad NIDO y ag. n 2, montar 52 p. y tejer 2,5 cm. a p. elstico 1/1. Cambiar a p. calado, aumentando en la primera pas. 16 p. repartidos en la labor (68 p.). Seguir, aum. a cada lado cada 14 pas. 1 p. (3 veces) (74 p.). A los 15 cm. del comienzo de la labor formar sisas meng. a cada lado cada 2 pas. 4 p. (8 veces). Quedan 10 p. que se cierran de una vez.Montaje: planchar suavemente las piezas suel-tas por el rev.. Coser hombros, coser mangas y cerrar costuras laterales. Coser 6 botones en la espalda y 4 cierres en la abertura del delante-ro. Con ALGODN EGIPCIO y ganchillo hacer 4 flores (ver diagrama) y coserlas sobre los cierres. Hacer un cordn de 1 m. y pasarlo a travs del elstico (ver foto). Rematar el cordn con dos bolas a ganchillo. Planchar suavem. las costuras por el rev..

    REALIZACIN GORROCon calidad NIDO y ag. del n 2 montar 134 p.. Tejer 4 pas. a p. tubular y seguir a p. elstico 1/1.

    N 1 *** (newborn)

    PATTERNED SET

    QUALITY: NIDO ESTAMPADO2 balls no. 275QUALITY: ALGODN EGIPCIO MERCERIZADO GIZA N 81 ball no. 402.No. 2 needles; no. 8 metal crochet hook; 4 fas-teners; 6 buttons.

    STITCHES USED: 1. Tubular stitch: see page125. 2. 1/1 Rib stitch: see page 123 . 3. Stocking stitch: see page 125.4. Garter stitch: see page 124. 5. Lace stitch: see chart . 6. Flower: see chart.

    DIRECTIONS FOR JERSEYBack: knit in two parts. Using NIDO quality and no. 2 needles, cast on 56 st. and knit 7 garter st. for the buttonhole bands and 49 st. in 1/1 rib stitch. After 9 cm. change to stocking stitch. 12 cm. from beg., shape armholes, decreasing neck edge by 3 2 and 1 st. every 2 rows. 9 cm. from the beginning of the stocking stitch, shape the neck: knit 24 garter st. and 26 stocking st. Knit 8 rows this way and cast off the 24 st. straight in garter stitch. Continue knitting 5 garter st. and the rest in stocking st. 11 cm. from the beginning of the armhole, shape the shoulder by casting off in three steps: 9 9 and 8 st. Work other half in the same way but reversing directions.Front: With NIDO quality and no. 2 needles, cast on 100 st. and knit 4 rows in tubular st. Change to 1/1 rib stitch and after 9 cm. change to stocking st. After 1.5 cm. begin the opening by knitting the first 26 st. and leaving the rest on a holder. Continue working as follows: 20 stocking st. and 6 garter st. for front band. When work measures 12 cm., shape armhole at left side, decreasing 3 2 and 1 st. every 2 rows. 11 cm. from the be-ginning of the armhole, shape the shoulder by casting off in three steps: 9 9 and 8 st. Continue working with the 74 st. on the holder, adding the 6 st. from the front band to the left needle and knitting as follows: 6 st. in garter st. and 74 in stoc-king st. When work measures 12 cm., shape right armhole, decreasing 3 2 and 1 st. every 2 rows. 9 cm. from the beginning of the stocking stitch, shape the neck: knit the 54 first st. in garter st. and the rest in stocking st. Knit 8 rows this way and cast off all 54 sts. straight in garter stitch. Continue with the 26 rem. st. as follows: 5 garter st. and the rest in stocking stitch. 11 cm. from the beginning of the armhole, shape the shoulder by casting off in three steps: 9 9 and 8 st.Sleeves: With NIDO quality and no. 2 needles, cast on 52 st. and knit 2.5 cm. in 1/1 rib stitch. Change to lace stitch, and increase by 16 st. spread evenly over the first row (68 sts.). Con-tinue, increasing. 1 st. each side every 14 rows (3 times) (74 sts.). 15 cm. from the beginning of the work, shape armholes by decr. 4 st. each side every 2 rows (8 times). Cast off rem. 10 sts. straight.Finishing: iron each piece gently on wrong side. Sew shoulders, sleeves and side seams. Sew 6 buttons on the back and 4 fasteners on the front opening. With ALGODN EGIPCIO, crochet 4 flowers (see chart) and sew them over the fas-teners. Make a 1 m. cord and pass it through the ribbing (see photo). Finish the cord with two cro-chet bobbles. Iron seams gently on WS.

    DIRECTIONS FOR HATWith NIDO quality and no. 2 needles, cast on 134 st. Knit 4 rows in tubular st., then cont. in 1/1 rib stitch. After 8 cm. change to lace stitch, decrea-

    N 1*** (moins dun mois)

    ENSEMBLE CHINE

    QUALIT : NIDO ESTAMPADO2 pel. Coul. n 275.QUALIT : ALGODN EGIPCIO MERCERIZADO GIZA N 81 pel. Coul. n 402.Furnitures: Aig. n 2; croch. mtal n 8 ; 4 ferme-tures ; 6 boutons.

    POINTS EMPLOYS : 1. Lisire en biais : voir page 124.2. Ctes 1/1 : voir page 123. 3. Jersey end. : voir page 123.4. Mousse : voir page 124. 5. Ajour : voir diagramme. 6. Fleur : voir diagramme.

    RALISATION PULLDos : tricot en deux moitis. En qualit NIDO et avec laig. n 2, monter 56 m. et travailler 7 m. en p. mousse pour les lisires des boutons et 49 m. en ctes 1/1. Au bout de 9 cm, passer en p. jersey end.. A 12 cm de haut. totale, former emmanchures, en dim. tous les 2 rgs 3 2 et 1 m.. A 9 cm du commencement du p. jersey, former lencolure ; cet effet, tricoter 24 m. en p. mousse et 26m. en p. jersey. end.. Tricoter 8 rgs selon cette disposition et rabattre les 24 m. en p. mousse en 1 seule fois. Continuer tricoter 5 m. en p. mousse et le reste en p. jersey end.. A 11 cm du commencement de lemmanchure, former lpaule en rabattant en trois fois : 9 9 et 8 m.. Faire lautre moiti de la mme manire, mais en inversant les explications.Devant : En qualit NIDO et avec laig. n 2, monter 100 m. et tricoter 4 rgs en p. lisire en biais. Passer en ctes 1/1 et au bout de 9 cm, passer en p. jersey end.. Au bout de 1,5 cm, commencer louverture en trav. les 26 premires m. et en laissant le reste en attente. Continuer trav. selon la disposition suiv. : 20 p. jersey end. et 6 m. en p. mousse pour la lisire du devant. 12 cm de haut. totale, former lemmanchure g., en dim. tous les 2 rgs 3 2 et 1 m.. A 11 cm du commencement de lemmanchure, former lpaule en rabattant en 3 fois : 9 9 et 8 m.. Continuer trav. avec les 74 m. que nous avions laisses en attente, en ajoutant laig. g. les 6 m. de la lisire du devant et en tricotant selon la disposition suiv. : 6 m. en p. mousse et 74 m. en p. jersey end.. 12 cm de haut. totale, former lemmanchure dr., en dim. tous les 2 rgs 3 2 et 1 m.. A 9 cm du commencement du p. jersey, former lencolure en tricotant les 54 premires m. en p. mousse et le reste en p. jersey. end.. Continuer ainsi 8 rgs et rabattre les 54 m. en p. mousse en une seule fois. Continuer avec les 26 m. restantes selon la disposition suiv. : 5 p. mous-se et le reste en p. jersey end.. A 11 cm du com-mencement de lemmanchure, former lpaule en rabattant en trois fois : 9 9 et 8 m..Manches : En qualit NIDO et avec laig. n 2, monter 52 m. et tricoter 2,5 cm. en ctes 1/1. Passer en p. ajour, en augmentant au premier rg 16 m. rparties sur louvrage (68 m.). Conti-nuer, en aug. de chaque ct, tous les 14 rgs, 1 m. (3 fois) (74 m.). 15 cm de haut. totale, former emmanchures en dim. de chaque ct, tous les 2 rgs, 4 m. (8 fois). Il reste 10 m. qui sont rabattues en une fois.Assemblage : repasser lgrement les pices spares sur lenv.. Coudre paules, coudre manches et fermer coutures latrales. Coudre 6 boutons sur le dos et 4 fermetures sur louverture du devant. En qualit COTON GYPTIEN et laide du crochet, raliser 4 fleurs (voir diagra-mme) puis les coudre sur les fermetures. Faire un cordon de 1 m et le passer travers llastique

    Espaol English Franais

  • Pgina /Page 5

    A los 8 cm. cambiar a p. calado, meng. en la 1 pas. 12 p. repartidos en la labor (122 p.). A los 11 cm. de p. calado comenzar a meng. 1 p. de cada 2p. del rev. (91 p.). Continuar tejiendo 2 cm. ms y dejar todos los p. en espera para pa-sar frunce. Planchar suavem. por el rev. y coser costura lateral. Fruncir los p. que se han dejado en espera y rematar. Hacer un cordn de 30 cm. aprox., hacer un lazo con l y coserlo en la parte superior del gorro.

    REALIZACIN BOTITASCon calidad NIDO y ag. n 2 montar 51 p. y tejer a p. de musgo con la sig. disposicin (las pas. pares se trab. como se presentan):1 pas.: 1 p., 1 aum., 24 p., 1 aum., 1 p., 1 aum., 24 p., 1 aum. y 1 p.; 3 pas.: 1 p., 1 aum., 26 p., 1 aum., 1 p., 1 aum., 26 p., 1 aum. y 1 p.; 5 pas.: 1 p., 1 aum., 28 p., 1 aum., 1 p., 1 aum., 28 p., 1 aum. y 1 p.; 7 pas.: 1 p., 1 aum., 30 p., 1 aum., 1 p., 1 aum., 30 p., 1 aum. y 1 p.; 9 pas.: 1 p., 1 aum., 32 p., 1 aum., 1 p., 1 aum., 32 p., 1 aum. y 1 p.; Quedan 71 p.. Tejer 4 pas. ms a p. de musgo y formar del sig. modo el borde de la suela: 4 pas. a p. jersey der.. Los p. de la 5 pas. se tejen a p. jersey enganchando junto a cada p. el correspondiente que hemos tejido en la pri-mera pas. del borde . Seguir, trab. 16 pas. a p. calado y 4 pas. a p. de musgo. Comenzamos el empeine y para ello dejamos en espera 28 p. a cada lado. Continuamos con los p. centrales a p. calado, meng. 1 p. en la 1 pas. (14 p.), y te-jiendo en cada pas. los p. de los extremos junto a 1 p. de cada lado que hemos dejado en es-pera. Trab. con esta disposicin 12 pas. (quedan 16 p. en espera a cada lado). Unir todos los p. (total 46 p.) y tejer 8 cm. a p. elstico 1/1. Cerrar todos los p. de una vez. Coser costuras. Hacer dos cordones y pasar por el comienzo del p. elstico (ver foto). Hacer una borla de ganchillo en cada extremo de los cordones.

    sing 12 sts. evenly in the 1st row (122 sts.). 11 cm. from lace stitch, begin decr. 1 st. for every 2 P. (91 sts). Continue knitting 2 cm. more and leave all the st. on a holder for gathering. Iron seam gently on WS and sew side seam. Gather the st. on holder and fi nish. Crochet a cord of approx. 30 cm., form it into a loop and sew it to the top of the hat.

    DIRECTIONS FOR BOOTEESWith NIDO and no. 2 needles, cast on 51 st. and work in garter stitch as follows (work the even rows as they appear on the needle):1st row: 1 st., incr. 1, 24 st., incr. 1, 1 st., incr. 1, 24 st., incr. 1 and 1 st. 3rd row: 1 st., incr. 1, 26 st., incr. 1, 1 st., incr. 1, 26 st., incr. 1 and 1 st. 5th row. 1 st., incr. 1, 28 st., incr. 1, 1 st., incr. 1, 28 st., incr. 1 and 1 st. 7th row. 1 st., incr. 1, 30 st., incr. 1, 1 st., incr. 1, 30 st., incr. 1 and 1 st. 9th row. 1 st., incr. 1, 32 st., incr. 1, 1 st., incr. 1, 32 st., incr. 1 and 1 st. There are now 71 st. Knit 4 more rows in garter stitch and shape the edge of the sole as follows: 4 rows in stocking st. The st. in the 5 following rows are worked in stocking st., picking up with each stitch the corresponding stitch from the fi rst row of the edge. Cont. with 16 rows in lace stitch and then 4 rows in garter st. Begin the instep, leaving 28 st. each side on a holder. Continue with the centre sts. in lace stitch, decr. 1 st. in the 1st row (14 st.). In each row knit in the stitches from the edges with every 1 st. from each side on the hol-der. Work this way for 12 rows (there are 16 rows each side on the holder). Join all the stitches (to-tal 46 st.) and knit 8 cm. in 1/1 rib stitch. Cast off all the sts. straight. Sew seams. Make two cords and pass through the beginning of the rib stitch (see photo). Make a crochet bobble on both ends of the cords.

    (voir photo). Raliser deux boules au crochet aux extrmits du cordon. Repasser lgrem. les coutures sur lenv.

    RALISATION BONNETEn qualit NIDO et avec laig. n 2, monter 134 m.. Tricoter 4 rgs en p. lisire en biais puis pour-suivre en ctes 1/1. Au bout de 8 cm, passer en p. ajour en dim. au 1er rg 12 m. rparties sur louvrage (122 m.). Au bout de 11 cm de p. ajour, commencer dim. 1 m. toutes les 2 m. de lenv. (91 m.). Continuer tricoter 2 cm de plus, et laisser toutes les m. en attente pour fron-cer. Repasser lgrem. sur lenv. et effectuer la couture latrale. Froncer les m. laisses en atten-te et terminer. Faire un cordon denv. 30 cm, en faire une boucle et le coudre sur la partie sup-rieure du bonnet.

    RALISATION DES SOULIERSEn qualit NIDO et avec laig. n 2, monter 51 m. et tricoter en p. mousse selon la disposition suiv. (les rgs pairs sont trav. tels que prsents) :1er rg : 1 m., 1 aug., 24 m., 1 aug., 1 m., 1 aug., 24 m., 1 aug. et 1 m. ; 3e rg : 1 m., 1 aug., 26 m., 1 aug., 1 m., 1 aug., 26 m., 1 aug. et 1 m. ; 5e rg : 1 m., 1 aug., 28 m., 1 aug., 1 m., 1 aug., 28 m., 1 aug. et 1 m. ; 7e rg : 1 m., 1 aug., 30 m., 1 aug., 1 m., 1 aug., 30 m., 1 aug. et 1 m. ; 9e rg : 1 m., 1 aug., 32 m., 1 aug., 1 m., 1 aug., 32 m., 1 aug. et 1 m. ; il reste 71 m.. Tricoter 4 rgs de plus en p. mousse et former le bord de la semelle de la manire suivante : 4 rgs en p. jersey end.. Les m. du 5e rg sont tricotes en p. jersey, en croche-tant avec chaque m. celle qui lui correspond et que nous avons tricot au premier rg du bord. Continuer trav. 16 rgs en p. ajour et 4 rgs en p. mousse. Commencer lempeigne ; cet effet, laisser 28 m. en attente de chaque ct. Poursui-vre avec les m. centrales en p. ajour, en dim. 1 m. au 1er rg (14 m.) et en tricotant chaque rg les m. des extrmits avec 1 m. de chaque ct que nous avions laiss en attente. Trav. 12 rgs se-lon cette disposition (il reste 16 m. en attente de chaque ct). Unir toutes les m. (total 46 m.) et tricoter 8 cm en ctes 1/1. Rabattre toutes les m. en une fois. Faire les coutures. Faire deux cor-dons et les passer juste au dbut des ctes (voir photo). Faire un pompon au crochet chaque extrmit des cordons.

    FLOR - FLOWER - FLEUR

    1

    2

    * **

    *

    P. CALADOLACE ST.

    PT. AJOUR

    1

    3

    5

    7

    FLOR - FLOWER - FLEUR

    12

    ** *

    *

    P. CALADOLACE ST.PT. AJOUR

    1357

    N 2 ** (Talla 1 puesta)

    JERSEY CELESTE CON BOTITAS

    CALIDAD BEB 2 ov. n 402 y 1 ov. n 000.Ag. n 2. Ganch. de metal n 8.6 botones.

    PUNTOS EMPLEADOS: 1 Jersey der.: ver pgina 124. 2 Escama: ver pgina 124.3 Musgo: ver pgina 124.4 Ochos: ver diagrama. 5 Jersey rev.: ver pgina 124. 6 Bajo: ver pgina 126.

    No 2 ** (Size Newborn)

    LIGHT BLUE SWEATER AND BOOTEES

    QUALITY BEBE2 balls No 402 and 1 ball No 000Pair of No 2 needles. No 8 metal crochet hook. 6 buttons.

    STITCHES USED 1. Stocking stitch: see page 125. 2. Scale stitch: see page 125.3. Garter stitch: see page 124.4. Cable stitch: see chart. 5. Reverse Stocking stitch: see page 124. 6. Double Crochet stitch: see page126.

    N 2 ** (Taille : 1er ge)

    BRASSIERE BLEUE AVEC CHAUSSONS

    QUALITE BEBE2 pel. Col. n 402 et 1 pel. Col. n000.Aig n 2. Crochet en mtal n8Fournitures : 6 boutons

    POINTS EMPLOYES : 1 Jersey end: voir page 123. 2 Pt dcaille: voir page 125.3 Mousse: voir page 124.4 Torsades: voir diag. 5 Jersey env: voir page 123.6 M serre: voir page 126.

    Espaol English Franais

  • Pgina /Page 6

    7 Cangrejo: ver pgina.

    REALIZACIN JERSEY Delantero: Con lana de otro col. montar 85 p.. Cambiar a col. blanco y trab. 4 pas. a p. jersey der.. Soltar la lana con la que hemos montado los p. y colocar los p. en otra ag., cambiar a col. azul y tejer juntos al der. 1 p. de cada ag.. Trab. 1 pas. a p. escama. Cambiar y trab. los p. de la sig. manera: 12 p. a p. musgo, 16 p. a p. ochos (seguir diagrama), 29 p. a p. musgo, 16 p. a p. ochos (seguir diagrama) y 12 p. a p. musgo. A los 11 cm. del comienzo, formas sisas, meng. en ambos lados cada 2 pas.: 2-2 y 1 p. (75 p.). A los 19 cm. del comienzo, meng. para el escote 9 p. centrales y hacer cada lado por separado. Seguir meng. cada 2 pas.: 3-2-2 y 2 p.. Quedan 24 p. para el hombro, a los 21 cm. de largo total, cerrar todos los p. de 1 vez.Espalda izqda.: Con lana de otro col. montar 47 p.. Cambiar a col. blanco y trab. 4 pas. a p. jersey der.. Soltar la lana con la que hemos mon-tado los p. y colocar los p. en otra ag., cambiar a col. azul y tejer juntos al der. 1 p. de cada ag.. Trab. 1 pas. a p. escama y seguir a p. musgo. A los 11 cm. del comienzo forma sisa en el lado izqdo. igual que en el delantero (42 p.). A los 20 cm. del comienzo, formar escote, cerrando en el lado der. cada 2 pas.: 6-6 y 6 p.. Quedan 24 p. para el hombro, a los 21 cm. de largo total, cerrar todos los p. de 1 vez.Trabajar la espalda der. igual pero invirtiendo las explicaciones, y abriendo al mismo tiempo 5 ojales repartidos de la sig. manera: 3 p. a p. mus-go, meng. 1 p., en la pas. sig. aum. 1 p. donde se ha quitado.Mangas: Con lana de otro col. montar 48 p.. Cambiar a col. blanco y trab. 4 pas. a p. jersey der.. Soltar la lana con la que hemos montado los p. y colocar los p. en otra ag., cambiar a col. azul y tejer juntos al der. 1 p. de cada ag.. Trab. 1 pas. a p. escama. Cambiar y trab. los p. de la sig. manera: 16 p. a p. musgo, 16 p. a p. ochos (seguir diagrama) y 16 p. a p. musgo, aum. en ambos lados cada 8 pas.: 1 p. 8 veces (64 p.). A los 14 cm. del comienzo, meng. en ambos lados cada 2 pas.: 2 p. 9 veces y 6 p. 1 vez. El resto de los p. se cierran de 1 vez.Tira de escote: Con lana de otro col. montar 82 p.. Cambiar a col. blanco y trab. 4 pas. a p. jer-sey der.. Soltar la lana con la que hemos mon-tado los p. y colocar los p. en otra ag., cambiar a col. azul y tejer juntos al der. 1 p. de cada ag.. Trab. 1 pas. a p. escama y 4 pas. a p. musgo. Dejar todos los p. en espera para remallar.MONTAJE: En col. blanco, bordar topitos en la tira central del der. que divide los ochos, en el delantero y en las mangas (Ver foto). Planchar suave las piezas sueltas por el rev.. Coser hom-bros, montar mangas y coser costuras. Remallar la tira alrededor del escote de espaldas y de-lantero. Planchar suave las costuras por el rev.. Coser los botones.

    REALIZACIN BOTITAS (Se empieza por la caa).Con lana de otro col. montar 42 p.. Cambiar a col. blanco y trab. 4 pas. a p. jersey der.. Soltar la lana con la que hemos montado los p. y co-locar los p. en otra ag., cambiar a col. azul y tejer juntos al der. 1 p. de cada ag.. Trab. 1 pas. a p. escama. Cambiar y trab. los p. de la sig. manera: 12 p. a p. musgo, 2 p. al rev., 14 p. a p. ochos (seguir diagrama), 2 p. al rev. y 12 p. a p. musgo. Al terminar el 4 cruce de ochos, dejar en espera los 12 p. de cada extremo y trab. los 18 p. centrales hasta obtener 4 cruces de ochos ms para el empeine (total 8 cruces). Recoger en los 2 lados del empeine 16 p. por lado ms los 12 p. de cada extremo dejados en espera (74 p.) y trab. 16 pas. a p. musgo meng. en la 1 de ellas 1 p. (73 p.) y formar la suela de la sig. manera: 4 p. a p. musgo, 2 p. juntos der., 24 p. a p. musgo, 2 p. juntos der., 9 p. a p. musgo, 2 p. juntos der., 24 p. a p. musgo, 2 p. juntos der.

    7. Crab stitch: see page.

    DIRECTIONS FOR SWEATERFront: Cast on 85 sts. in a different color. Chan-ge to White and work 4 rows of Stocking st. Drop wool used for casting on and place sts. on ano-ther needle. Change to Blue and K tog. 1 st. from each needle. Work 1 row of Scale st. then chan-ge and work sts. as foll: 12 sts. in Garter st., 16 sts. in Cable st. (see chart), 29 sts. in Garter st., 16 sts. in Cable st. (see chart) and 12 sts. in Garter st. When work measures 4 3/10 in. from beg., shape armholes by decr. at both sides every 2 rows: 2-2 and 1 st. (75 sts.). At 7 1/2 in. from beg., decr. 9 central sts. for neck edge and cont. each side separately. Cont. decr. every 2 rows: 3-2-2 and 2 sts. 24 sts. rem. for shoulder; cast them off straight at 8 1/4 in. from beg.Left back: Cast on 47 sts. in a different color. Change to White and work 4 rows of Stocking st. Drop wool used for casting on and place sts. on another needle. Change to Blue and K tog. 1 st. from each needle. Work 1 row of Scale st. then cont. in Garter st. When work measures 4 3/10 in. from beg., shape armhole at left side as for front (42 sts.). At 7 8/10 in. from beg., shape neck edge, decr. at right side every 2 rows: 6-6 and 6 sts. 24 sts. rem. for shoulder; cast them off straight at 8 1/4 in. from beg.Work right back in same way but reversing ins-tructions and adding 5 evenly spaced buttonho-les as foll: 3 sts. in garter st., decr. 1 st. then incr. 1 st. on foll. row where previously decreased.Sleeves: Cast on 48 sts. in a different color. Chan-ge to White and work 4 rows of Stocking st. Drop wool used for casting on and place sts. on ano-ther needle. Change to Blue and K tog. 1 st. from each needle. Work 1 row of Scale st. then change and work sts. as foll: 16 sts. in Garter st., 16 sts. in Cable st., (see chart) and 16 sts. in Gar-ter st., incr. at both sides every 8 rows: 1 st. 8 times (64 sts.). At 5 1/2 in. from beg., decr. at both sides every 2 rows: 2 sts. 9 times and 6 sts. once. Cast off straight rem. sts. Neck band: Cast on 82 sts. in a different color. Change to White and work 4 rows of Stocking st. Drop wool used for casting on and place sts. on another needle. Change to Blue and K tog. 1 st. from each needle. Work 1 row of Scale st. then 4 rows of Garter st. Leave all sts. on a holder.TO MAKE UP: Using White, embroider small po-lka dots on central band dividing cables, on front and sleeves (see photo). Iron each piece gently on WS. Sew shoulders, place sleeves and sew seams. Stitch band around neck edges of backs and front. Iron seams gently on WS. Sew on buttons.

    DIRECTIONS FOR BOOTEES (Start with leg).Cast on 42 sts. in a different color. Change to White and work 4 rows of Stocking st. Drop wool used for casting on and place sts. on another needle. Change to Blue and K tog. 1 st. from each needle. Work 1 row of Scale st. then chan-ge and work sts. as foll: 12 sts. in Garter st., P2, 14 sts. in Cable st. (see chart), P2 and 12 sts. in Garter st. On completion of 4 cables, leave 12 sts. at each end on holders and cont. with 18 central sts. to make another 4 cables for instep (total 8 cables). Pick up 16 sts. at both sides of instep, plus 12 sts. at each side from holders (74 sts.), and work 16 rows of Garter st., decr. 1 st. on 1st row (73 sts.) and shaping sole as foll: 4 sts. in Garter st., K2 tog., 24 sts. in Garter st., K2 tog., 9 sts. in Garter st., K2 tog., 24 sts. in Garter st., K2 tog., and 4 sts. in Garter st. Cont. decr. every 2 rows down to 53 sts. then cast off straight. TO MAKE UP Using White, embroider small polka dots on central band dividing cables. Sew sole and rear seam. Using crochet hook and Whi-te, work 1 row of Double Crochet st. and 1 row of Crab st. around sole. Using Blue and White, make an upholstery cord and thread it through work after 4th cable and cables at center. Make

    7 Pt dcrevisse: voir page.

    REALISATION DE LA BRASSIEREDEVANT: avec une laine dune autre couleur, monter 85 m. En blanc tric 4 rgs en jersey end. Enlever la laine du montage et mettre les m sur une autre aig, en bleu tric ens lend 1 m de chaque aig. Tric 1 rg de pt dcaille. Ensuite tric de la manire suivante : 12 m au pt mousse, 16 m en torsades (voir diag), 29 m au pt mousse, 16 m en torsade (voir diag) et 12 m au pt mousse. A 11 cm de HT, faire les emmanchures, dim de chaque ct, ts les 2 rgs : 2 fs 2 m et 1 fs 1 m. On a 75 m. A 19 cm de HT, dim pour lencolure les 9 m centrales et faire chaque ct sparment. Continuer dim ts les 2 rgs : 1 fs 3 m, 3 fs 2 m. Il reste 24 m pour lpaule, 21 cm de HT, rabattre ttes ls m en 1 seule fs.DOS GCHE: Avec une laine dune autre couleur, monter 47 m. En blanc tric 4 rgs de jersey end. Enlever la laine du montage et placer les m sur une autre aig, en bleu tric ens lend 1 m de chaque aig. Tric un rg de pt dcaille et continuer au pt mousse. A 11 cm de HT faire lemmanchure en dim ct gche de la mme manire que pour le devant. On a 42 m. A 20 cm de HT, faire lencolure, dim ct dt, ts les 2 rgs : 3 fs 6 m. Il reste 24 m pour lpaule, 21 cm de HT rabattre ttes les m en 1 seule fs.Tric le dos dt de la mme manire en inversant les explications et en rpartissant 5 boutonnires de la manire suivantes : 3 m au pt mousse, 1 dim, au rg suivant aug au niveau de la dim.MANCHES: Avec une laine dune autre couleur monter 48 m. En blanc tric 4 rgs de jersey end. Enlever la laine du montage et placer les m sur une autre aig, en bleu tric ens lend 1 m de chaque aig. Tric 1 rg de pt dcaille. Ensuite tric de la manire suivante : 16 m au pt mousse, 16 m de torsades (voir diag) et 16 m de pt mousse, aug de chaque ct, ts les 8 rgs : 8 fs 1 m. On a 64 m. A 14 cm de HT, dim de chaque ct, ts les 2 rgs : 9 fs 2 m et 1 fs 6 m. Le reste des m se rabat en 1 seule fs.BANDE DENCOLURE: Avec une laine dune autre couleur, monter 82 m. En blanc tric 4 rgs en jersey end. Enlever la laine du montage et placer les m sur une autre aig, en bleu tric ens lend 1 m de chaque aig. Tric 1 rg de pt dcaille et 4 rgs de pt mousse. Laisser ttes les m en attente.MONTAGE: En blanc, broder les petites boules sur la bande centrale du devant que divise les torsades, sur le devant et sur les manches (voir photo). Repasser lgrement les diffrentes pices sur lenv. Coudre les paules, monter les manches et coudre les coutures. Coudre pts arrire la bande tt autour de lencolure du dos et des devants. Repasser lgrement les coutu-res sur lenv. Coudre les boutons.

    REALISATION DES CHAUSSONS: on commence par la jambe.Avec une laine dune autre couleur, monter 42 m. En blanc tric 4 rgs en jersey end. Enlever la laine de montage et placer les m sur une autre aig, en bleu tric ens lend 1 m de chaque aig. Tric un rg de pt dcaille. Tric ensuite de la ma-nire suivante : 12 m au pt mousse, 2 m env, 14 m en torsade (voir diag), 2 m env, et 12 m au pt mousse. A la fin du 4me croisement de torsade, laisser les 12 m de chaque extrmit en attente et tric les 18 m centrales jusqu ce que lon ob-tienne 4 croisements de torsades de plus pour le dessus de pied (total 8 croisements). Remailler sur les cts du dessus de pied 16 m de chaque ct plus les 12 m de chaque extrmit laisses en attente. On a 74 m et tric 16 rgs au pt mousse en rpartissant sur le 1er rg, 1 dim. On a 73 m et faire la semelle de la manire suivante : 4 m au pt mousse, 2 m ens end, 24 m au pt mousse, 2 m ens end, 9 m au pt mousse, 2 m ens end, 24 m au pt mousse, 2 m ens end et 4 m au pt mousse. Faire ces dim ts les 2 rgs jusqu ce que lon ob-tienne 53 m et rabattre ttes les m en 1 seule fs.

  • Pgina /Page 7

    y 4 p. a p. musgo. Realizar stos meng. cada 2 pas. hasta que nos queden 53 p. y cerrar todos los p. de 1 vez. MONTAJE: En col. blanco, bordar topitos en la tira central del der. que divide los ochos. Coser la suela y la costura posterior. Con el ganch. y en col. blanco trab. alrededor de la suela 1 pas. a p. bajo y 1 pas. a p. de cangrejo. En los col. azul y blanco, hacer un cordn de tapicera y pasarlo al terminar el 4 cruce de ochos y a partir de los ochos del centro. En cada extremo hacer borlita en col. blanco y hacer una lazada en el centro.

    a tassle in White at each end and a loop at the center.

    *

    *

    OCHOS - CABLE ST. - TORSADES

    13579Repetir de * a *.

    Las pas. pares se trab. como se presentan.

    Repeat from * to *.Work even rows as they appear.

    Rpter tj. de * *.Les rgs. pairs sont trav. comme ils se prsentent.

    N 3 ** (Tallas: 3, 6 y 9 meses)

    PELELE AZUL

    CALIDAD BAMBINI5 ov. (6 ov.) Col. n 402.Ag. n 2 1/2 y n 3. 18 botones.

    PUNTOS EMPLEADOS: 1 Tubular: ver pgina 125. 2 Elstico 1/1: ver pgina 123. 3 Jersey der.: ver pgina 124. 4 Ochos: Ver diagrama 1 y 2.

    REALIZACIN: (Comenzar por la pierna der.).Con ag. n 2 1/2, montar 55 p. y trab. 4 pas. a p. tubular y seguir a p. elstico 1/1. A los 5 cm. del comienzo, cambiar a ag. n 3 y seguir a p. jersey der., aum. en la 1 pas.: 19 p. repartidos (74 p.). Seguir aum. en ambos lados cada 8 pas.: 1 p. 4 veces (1 p. 6 veces - 1 p. 8 veces) y cada 2 pas.: 1 p. 2 veces (86 p.) (90 p. - 94 p.). A los 20 cm. (21 cm. - 22 cm.) del comienzo, dejar todos los p. en espera.Trab. la pierna izqda. igual.Unir todos los p., aum. 6 p. centrales y 5 p. a cada lado (188 p.) (196 p. - 204 p.). Seguir recto a p. jersey der., excepto los 6 p. de cada orilla (tiras abrochado) que se trab. a p. de musgo. Realizando al mismo tiempo en el centro de la tira del lado izqdo. 9 ojales de 1 p. cada uno, el 1 a 5 cm. del comienzo y los otros a 4 cm. (4,5 cm. de distancia. A los 21 cm. (23 cm. - 25 cm.) medidos del centro de la entrepierna, seguir el diagrama del canes: cada pasada comienza en el grfi co de la mitad izquierda y termina en el de la mitad derecha (170 p.) (178 p. - 186 p.). A los 42 cm. (44 cm. - 46 cm.) del comienzo, for-mar sisas, distribuyendo los p. as: 82 p. (86 p. - 90 p.) para el delantero y 44 p. (46 p. - 48 p.) para cada espalda. Seguir con los 44 p. (46 p. - 48 p.) de la espalda izqda., el resto dejarlos en espera y trab. con la misma disposicin, meng. en el lado izqdo. cada 2 pas.: 3-2-1 y 1 p. (37 p.) (39 p. - 41 p.). Seguir recto y a los 57,5 cm. (59,5 - 61,5 cm.) de largo total, formar escote y hombro, meng. en el lado izqdo. para los hombros 18 p. (19 p. - 20 p.) en 3 veces: 6-6 y 6 p. (6-6 y 7 p. - 6-7 y 7 p.) y para el escote, meng. en el lado der.: 6-6 y 7 p. (6-7 y 7 p. - 7-7 y 7 p.).Recoger los p. 44 p. (46 p. 48 p.) dejados en es-pera de la espalda der. y trab. igual que la es-palda izqda. pero invirtiendo las explicaciones y con ojales. Recoger los p. 82 p. (86 p. - 90 p.) del delantero y meng. en ambos lados cada 2 pas.: 3-2-1 y 1 p.

    No. 3 ** (Sizes: 3, 6 and 9 months)

    BLUE ROMPER SUIT

    QUALITY BAMBINI5 (6) balls no. 402No. 2 1/2 and no. 3 needles.18 buttons.

    STITCHES USED: Tubular stitch: see page125. 1/1 rib stitch: see page 123.Stocking stitch: see page 125. Cable stitch: see charts 1 and 2.

    DIRECTIONS: (Start with right leg.)Using no. 2 1/2 needles, cast on 55 st. and work 4 rows in tubular st. then cont. in 1/1 rib st., After 5 cm., change to no. 3 needles and cont. in K, incr. 19 st. evenly across fi rst row (74 st.). Cont. incr. 1 st. each side every 8 rows, 4 times (1 st., 6 times - 1 st., 8 times); 1 st. every 2 rows, 2 times (86 st.) (90-94). When work measures 20 cm. (21-22), place all st. on holder.Work left leg in same way.Join all st. together, incr. 6 centre st. and 5 st. each side (188 st.) (196-204). Cont. in K stocking st., except for 6 st. each edge for buttonhole bands. Work these st. in garter st.. At same time, make 9 1-st. buttonholes in centre of left band; the fi rst, 5 cm. from beginning, and the others at a distance of 4 cm. (4.5). When work measures 21 cm. (23-25) from centre of crotch, follow yoke chart: each row starts in left half yoke chart and fi nishes in right half yoke chart (170 st.) (178-186). When work measures 42 cm. (44-46), shape armholes as follows: 82 st. (86-90) for front, and 44 st. (46-48) for each back. Cont. with the 44 st. (46-48) for left back, leaving all rem. st. on holder. Work in same way, decr. at left side every 2 rows as follows: 3-2-1 and 1 st. (37 st.) (39-41). Cont. straight, and when work measures 57.5 cm. (59.5-61.5), shape neck edge and shoulder. For shoulders, decr. 18 st. (19-20) in 3 steps as follows: 6-6 and 6 st. (6-6 and 7 st. - 6-7 and 7 st.); and for neck edge, decr. at right side as follows: 6-6 and 7 st. (6-7 and 7 st. - 7-7 and 7 st.).Pick up 44 st. (46-48) from holder for right back and work as for left back but reversing directions and with buttonholes. Pick up the 82 st. (86-90) for front, and decr. each side every 2 rows as follows: 3-2-1 and 1 st. (68 st.) (72-76). Cont. straight, and 8.5 cm. from beginning of armhole, shape neck edge by decr. 8 centre st., then cont. each side separa-tely. Cont. decr. every 2 rows as follows: 3-3-2-1-1-1 and 1 st. (3-3-2-2-1-1 and 1 st. - 3-3-2-2-1-1-1

    N 3 ** (Tailles : 3, 6 et 9 mois)

    BODY BLEU

    QUALITE BAMBINI5 pel. (6 pel.) Col. n 402.Aig n2 et n3.Fournitures : 18 boutons

    POINTS EMPLOYES : 1- Pt tubulaire: voir page 125. 2- Cte 1/1 : voir page 123. 3- Jersey end : voir page 123. 4- Torsades : voir diag 1 et 2.

    REALISATION : (on commence par la jambe dte)Avec des aig n 2/ , monter 55 m et tric 4 rgs au pt tubulaire et continuer en cte 1/1. A 5 cm de HT, avec des aig n3, continuer en jersey end, rpartir sur le 1er rg 19 aug. On a 74 m. Continuer aug, ts les 8 rgs : 4 fs 1 m (6 fs 1 m 8 fs 1 m) et ts les 2 rgs : 2 fs 1 m. On a 86m (90 m -94 m). A 20 cm (21 cm 22 cm) de HT, laisser ttes les m en attente.Tric la jambe gche de la mme manire.Runir les deux jambes en aug 6 m au centre (entrejambe) et 5 m de chaque ct. On a 188 m (196 m -204 m). Continuer dt en jersey end, lexception des 6 m de chaque bord (bande de boutonnage) que lon tric au pt mousse. Rali-ser en mme temps, au centre de la bande de boutonnage du ct gche, 9 boutonnires de 1 m chacune, la 1re 5 cm de HT et les autre 4 cm (4.5 cm) dintervalle. A 21 cm (23 cm - 25 cm) partir de lentrejambe, continuer avec le diagramme du empicement: chaque range commence au demi empicement gauche et fi ni au demi empicement droit. On a 170 m (178 m - 186 m). A 42 cm (44 cm - 46 cm) de HT, faire las emmanchures de la manire suivan-te : 82 m (86 m - 90 m) pour le devant et 44 m (46 m - 48 m) pour chaque partie du dos.Continuer sur les 44 m (46 m - 48 m) du dos gche, et laisser le reste des m en attente, dim ct gche, ts les 2 rgs : 1 fs 3 m, 1 fs 2 m, 2 fs 1 m. On a 37 m (39 m - 41 m). Continuer dt et 57.5 cm (59.5 cm - 61.5 cm) de HT, faire lencolure et lpaule, dim ct gche pour lpaule : 3 fs 6 m (2 fs 6 m, 1 fs 7m - 1 fs 6 m, 2 fs 7m) et pour lencolure, dim ct dt : 2 fs 6 m, 1 fs 7m (1 fs 6 m, 2 fs 7 m - 3 fs 7m).Reprendre les 44 m (46 m - 48 m) laisses en at-tente du dos dt et tric de la mme manire que pour le dos gche mais en inversant les explica-tions et sans faire de boutonnires.Reprendre les 82 m (86 m - 90 m) du devant et dim de chaque ct, ts les 2 rgs : 1 fs 3 m, 1 fs 2 m, 2 fs 1 m. On a 68 m (72 m - 76 m). Conti-

    Espaol English Franais

    MONTAGE: En blanc, broder les petites boules sur la bande centrale du jersey end qui divise les torsades. Coudre la semelle et les coutures postrieures. Avec un crochet, en blanc, faire tt autour de la semelle 1 rg de m serre et 1 rg de pt dcrevisse. En bleu et blanc, faire un cordon de tapisserie et le passer au niveau du 4me croisement de torsades et au niveau des torsa-des centrales. A chaque extrmit faire une pe-tite boule en blanc et faire un nud au centre.

  • Pgina /Page 8Pgina /Page 8Pgina /Page 8Pgina /Page 8Pgina /Page 8Pgina /Page 8Pgina /Page 8Pgina /Page 8Pgina /Page 8Pgina /Page 8

    **

    12345678

    Esp

    ald

    a iz

    qu

    ierd

    a -

    Le

    ft b

    ac

    k -

    Do

    s g

    au

    ch

    e

    Mita

    d iz

    qu

    ierd

    a d

    el d

    ela

    nte

    ro -

    left

    ha

    lf fr

    on

    t -

    De

    mi-d

    eva

    nt

    ga

    uc

    he

    Mita

    d d

    ere

    ch

    a d

    el d

    ela

    nte

    ro -

    rig

    ht

    ha

    lf fr

    on

    t -

    De

    mi-d

    eva

    nt

    dro

    it

    Esp

    ald

    a d

    ere

    ch

    a -

    rig

    ht

    ba

    ck

    - D

    os

    dro

    it

    **

    12345678

    Mita

    d d

    ere

    cha

    de

    l ca

    nes

    - R

    ight

    ha

    lf yo

    ke -

    De

    mi e

    mp

    ic

    em

    ent

    dro

    it

    Mita

    d iz

    qui

    erd

    a d

    el c

    ane

    s -

    Le

    ft ha

    lf yo

    ke -

    De

    mi e

    mp

    ic

    em

    ent

    ga

    uche

    continuar con la mitad derecha

    Continue with right half

    continuer avec la moiti droite

    viene de la mitad izquierda

    it comes from left half

    il vient depuis la moiti gauche

    Rep

    etir

    de

    * a

    *.

    Rep

    ea

    t fro

    m *

    to *

    .R

    p

    ter t

    j. d

    e *

    *

    .

  • Pgina /Page 9

    (68 p.) (72 p. - 76 p.). Seguir recto y a los 8,5 cm. del comienzo de la sisa, formar escote, meng. 8 p. centrales y trab. cada lado por separado. Seguir meng. cada 2 pas.: 3-3-2-1-1-1 y 1 p. (3-3-2-2-1-1 y 1 p. - 3-3-2-2-1-1-1 y 1 p.). Quedan 18 p. (19 p. - 20 p.) para el hombro, a los 57,5 cm. (59,5 - 61,5 cm.) de largo total, cerrarlos en 3 ve-ces como en la espalda. Trab. el otro lado igual, pero invirtiendo las explicaciones. Mangas: Con ag. n 2 1/2, montar 45 p. y trab. 4 pas. a p. tubular y seguir a p. elstico 1/1. A los 2,5 cm. del comienzo, cambiar a ag. n 3 y seguir a p. jersey der., aum. en la 1 pas.: 13 p. repartidos (58 p.). Seguir aum. en ambos lados cada 10 pas.: 1 p. 4 veces (1 p. 6 veces) (66 p.) (70 p.). A los 16,5 cm. (18,5 cm. - 20,5 cm.) del comienzo, meng. en ambos lados cada 2 pas.: 3 p. 1 vez (3 y 2 p.), 1 p. 12 veces, 2-2-2 y 3 p.. Quedan 18 p., a los 25,5 cm. (27,5 cm. - 29,5 cm.) de largo total, cerrar todos los p. de 1 vez. Cuellos: Con ag. n 2 1/2, montar 55 p. (57 p. - 59 p.) y trab. 4 pas. a p. tubular y seguir a p. elstico 1/1. A los 4 cm. del comienzo, trab. 1 pas. al der. meng. 14 p. repartidos en los p. del rev. (41 p.) (43 p. - 45 p.), trab. 1 pas. y meng. todos los p. de 1 vez. Trab. otro cuello igual. Tiras entrepierna: Parte trasera: Con ag. n 2 1/2, montar montar 131 p. (135 p. - 139 p.) y trab. 4 pas. a p. tubular. Seguir a p. elstico 1/1. A los 2 cm. de largo total, dejar todos los p. en espera para remallar. Hacer el mismo trab. para la tira parte delantera, pero a 1 cm. del comienzo rea-lizar 9 ojales de 1 p. cada uno, el 1 a 4 p. (5 p. - 6 p.) de la orilla y los otros a 14 p. de distancia. MONTAJE: Planchar suave las piezas sueltas por el rev.. Coser hombros, montar mangas y coser costuras. Colocar cuellos alrededor del escote, partiendo del centro del delantero hasta la mi-tad de las tiras de abrochado y coser. Doblar la mitad del p. elstico de las piernas hacia el derecho de la labor. Remallar tiras entrepiernas. Coser los botones. Planchar suave las costuras por el rev..

    and 1 st.). There are 18 st. rem. (19-20) for each shoulder. When work measures 57.5 cm. (59-61), cast off all st. in 3 steps as for back. Work other side in same way but reversing directions. Sleeves: using no. 2 1/2 needles, cast on 45 st. and work 4 rows in tubular st., then cont. in 1/1 rib st.. After 2.5 cm., change to no. 3 needles and cont. in K, incr. 13 st. evenly across fi rst row (58 st.). Cont. incr. 1 st. each side every 10 rows, 4 times (1 st., 6 times) (66 st.) (70). When work mea-sures 16.5 cm. (18.5-20.3), decr. 3 st. each side every 2 rows, once (3 and 2 st.); 1 st. 12 times; and 2-2-2 and 3 st.. There are now 18 st. rem.. When work measures 25.5 cm. (27.5-29.5), cast off all st. straight. Collars: using no. 2 1/2 needles, cast on 55 st. (57-59) and work 4 rows in tubular st., then cont. in 1/1 rib st.. After 4 cm., K 1 row, decr. 14 st. evenly in P st. (41 st.) (43-45), work 1 row and cast off straight. Make other collar in same way. Crotch bands. Back: using no. 2 1/2 needles, cast on 131 st. (135-139) and work 4 rows in tu-bular st.. Cont. in 1/1 rib st.. After 2 cm., leave all st. on holder. Work in same way for front crotch band, but after 1 cm., make 9 1-st. buttonholes; the fi rst, 4 st. (5-6) from edge and the others at a distance of 14 st.. FINISHING: iron each piece gently on wrong side. Sew shoulders, place sleeves and sew seams. Place collars around neck edge beg. at cen-tre until half of buttonhole bands, and sew. Fold half ribbing on legs to right side of work. Attach crotch bands. Sew on buttons. Iron seams gently on wrong side.

    nuer dt et 8.5 cm de HT demmanchures, faire lencolure, dim les 8 m centrale et tric chaque ct sparment. Continuer dim, ts les 2 rgs : 2 fs 3 m, 1 fs 2 m, 4 fs 1 m (2 fs 3 m, 2 fs 2 m, 3 fs 1 m - 2 fs 3 m, 2 fs 2 m, 4 fs 1 m). Il reste 18 m (19 m - 20 m) pour les paules, 57.5 cm (59.5 cm - 61.5 cm) de HT, rabattre pour les paules en 3 fs comme pour le dos. MANCHES : Avec des aig n 2 , monter 45 m et tric 4 rgs au pt tubulaire et continuer en cte 1/1. A 2.5 cm de HT, avec des aig n 3, continuer en jersey end, rpartir sur le 1er rg 13 aug. On a 58 m. Continuer aug de chaque ct, ts les 10 rgs : 4 fs 1 m (6 fs 1 m). On a 66 m (70 m). A 16.5 cm (18.5 cm - 20.5 cm) de HT, dim de chaque ct, ts les 2 rgs : 1 fs 3 m (1 fs 3 m, 1 fs 2 m, 12 fs 1 m, 3 fs 2 m et 1 fs 3 m. Il reste 18 m, 25.5 cm (27.5 cm - 29.5 cm) de HT, rabattre ttes les m en 1 seule fs.COLS : Avec es aig n 2 , monter 55 m (57 m - 59 m) et tric 44 rgs au pt tubulaire et continuer en cte 1/1. A 4 cm de HT, tric 1 rg end en rpartis-sant 14 dim sur les m env. On a 41 m (43 m - 45 m), tric 1 rg et dim ttes les m en 1 seule fs.Tric lautre col de la mme manire.BANDES DENTREJAMBE : Partie arrire : avec des aig n 2 , monter 131 m (135 m - 139 m) et tric 4 rgs en pt tubulaire. Continuer en cte 1/1. A 2 cm de HT, laisser ttes les m en attente. Faire le mme trav pour la partie avant mais 1 cm de HT, faire 9 boutonnires de 1 m chacune, la 1re 4 m (5 m - 6 m) du bord et les autres 14 m dintervalle.MONTAGE : Repasser lgrement les diffrentes pices sur lenv. Coudre les paules, monter les manches et coudre les coutures. Placer les cols tt autour de lencolure, en partant du centre du devant jusqu la moiti des bandes de bouton-nage et coudre. Plier en deux sur lend les ctes des jambes. Coudre les bandes de lentrejambe pts arrire. Coudre les boutons. Repasser l-grement les coutures sur lenv.

    N 4 ** (Talla 1 puesta)

    CHAQUETA ESTAMPADA

    CALIDAD NIDO ESTAMPADO 2 ov. n 238CALIDAD GIZA N 5 ESTAMPADO1 ov. n 238CALIDAD NUVOLE1 ov. n 000Ag. n 2. Ganch. de metal n 6.7 botones.

    PUNTOS EMPLEADOS: 1 Musgo: ver pgina 124. 2 Jersey der.: ver pgina 124. 3 Escama: ver pgina 124. 4 Garbanzo: ver pgina 124. 5 Rosetas: ver diagrama.

    REALIZACIN Cuerpo: (Se trab. al contra comenzando por la manga der.).Con Lana, montar 46 p. y tejer 8 pas. a p. jer-sey der., en la sig. pas. trab. jareta as: con una ag. recoger los p. de la 1 pas y con una 3 ag. trab. juntos al der. 1 p. de cada ag.. Con Lana Nuvole, trab. 2 pas. a p. de musgo. Cambiar a

    No. 4 ** (Size newborn)

    PATTERNED JACKET

    QUALITY NIDO ESTAMPADO2 balls No 238.QUALITY GIZA No. 5 ESTAMPADO1 ball No 238.QUALITY NUVOLE1 ball No. 000.Pair of N 2 needles. N 6 metal crochet hook. 7 buttons.

    STITCHES USED: 1. Garter stitch: see page 124. 2. Stocking stitch: see page125. 3. Scale stitch: see page 125. 4. Bobble stitch: see page. 123.5. Rosettes: see chart.

    DIRECTIONSBody: (Work in rev. order beg. with right sleeve).Using Wool, cast on 46 sts. and work 8 rows in Stocking st. On next row work casing as foll: using one needle pick up sts. from 1st row and with 3rd needle K tog. 1 st. from each needle. Using Nuvole Wook, work 2 rows in Garter st. Change to Cotton and work 3 rows in Stocking

    N 4 ** (Taille : 1er ge)

    PULL BAYADERE

    QUALITE NIDO ESTAMPADO2 pel. Col. n 238QUALITE GIZA No. 5 ESTAMPADO1 pel. Col. n 238QUALITE NUVOLE1 pel. Col. n 238.Aig n 2. Crochet en acier n6.Fournitures : 7 boutons.

    POINTS EMPLOYES : 1 Pt mousse: voir page 124. 2 Jersey end: voir page 123. 3 Pt dcaille: voir page 125 . 4 Pt dastrakan: voir page 124. 5 Fleurs: voir diag.

    REALISATIONCORPS: Se tric en travers en commenant par la manche dteEn laine, monter 46 m et tric 8 rgs de jersey end, au 9me rg faire une coulisse ainsi : avec une aig relever les m du 1er rg et avec une 3me aig tric ens lend, 1 m de chaque aig. En NUVOLE, tric 2 rgs de pt mousse. En GIZA, tric 3 rgs de jer-

    Espaol English Franais

  • Pgina /Page 10

    sey end et 3 rgs de pt dastrakan. En NUVOLE tric 2 rgs de pt mousse. En laine tric 10 rgs de jersey end en rpartissant sur le 1er rg 14 aug. On a 60 m. *En GIZA tric 4 rgs de pt dcaille. En Laine tric 10 rgs de jersey end*, rpter ces 14 rgs. En mme temps, aug de chaque ct ts les 14 rgs : 4 fs 1 m. On a 68 m. A 14 cm de HT (6me rg de la 5me rayure en laine), aug de chaque ct pour former le corps, ts les 2 rgs : fs 1 m et 1 fs 34 m. On a 146 m. Continuer tric de la mme manire. Lorsque lon a tric la 7me rayure de coton au pt dcaille, au 2me rg de la rayure suivante en laine rpartir les m pour le devant et pour le dos dt de la manire suivante : laisser en attente les 73 premires m pour le devant et continuer sur les 73 m restantes pour le dos dt, dim ct dt, pour lencolure : 1 fs 2 m. On a 71 m. Continuer tric les m de la mme manire. Lorsque lon obtient 9 rayures de pt dcaille, en Laine tric 4 rgs de jersey end, 12 rgs de pt mousse pour la bande de boutonnage et rabattre ttes les m en 1 seule fs. En mme temps, au 6me rg de pt mousse faire 5 boutonnires de 2 m cha-cune, la 1re 10 m de lencolure et les autres 11 m dintervalle.Continuer avec les 73 m du devant laisses en attente et tric en laine 4 rgs de jersey end, dim ct gche, pour lencolure, ts les 2 rgs : 2 fs 3 m, 1 fs 2 m et 1 fs 1 m. En mme temps, la fi n du 4me rg de jersey end, tric les m de la ma-nire suivante : * En NUVOLE, 2 rgs de pt mous-se, en GIZA, 3 rg de jersey end et 3 rgs de pt dastrakan. En NUVOLE, 2 rgs de pt mousse. En laine 4 rgs de jersey end*. Rpter ces 14 rgs, 4 fs de plus. En mme temps, au 3me rg du dernier motif en GIZA, aug ct gche pour lencolure ts les 2 rgs : 1 fs 1 m, 1 fs 2 m, 2 fs 3 m. On a 73 m. Sur le 2me rg de laine de ces 4 derniers rgs, laisser ttes les m en attente. Monter 71 m pour le dos gche, et tric de la mme manire que pour le dos dt, mais en inversant les explications et sans faire de boutonnires. On a 73 m. Au 8me rg de jersey end, runir les m du dos avec celles du devant. On a 146 m et conti-nuer tric de la mme manire. Aprs la 4me rayure de pt dcaille du dos et 9 rgs de jersey end en laine, rabattre de chaque ct, ts les 2 rgs : 1 fs 34 m et 5 fs 1 m. On a 68 m. Continuer tric de la mme manire pour la manche gche et dim de chaque ct, ts les 14 rgs : 4 fs 1 m. On a 60 m. Une fs la 5me rayure de la manche au pt dcaille termine, continuer avec la laine et tric 10 rgs de jersey end, rpartir 14 dim sur le dernier rg. On a 46 m. En NUVOLE, tric 2 rgs de pt mousse. En GIZA tric 3 rgs de jersey end et 3 rgs de pt dastrakan. En NUVOLE, tric 2 rgs de pt mousse. En laine tric 8 rgs de jersey end et rabat-tre ttes les m en 1 seule fs.Plier le poignet gche 4 rgs sur lenv du trav et coudre la coulisse. BANDE DENCOLURE: En laine, monter 86 m et tric 8 rgs de pt mousse et laisser ttes les m en atten-te. En mme temps, raliser 1 boutonnire ct gche de 2 m et a 4 m du bord.MONTAGE : BANDE DE LA PARTIE INFERIEURE : En laine, relever 150 m sur le bord de la partie inf-rieure et tric 1 rg en jersey end. En NUVOLE tric 2rgs de pt mousse. En GIZA, tric 3 rgs de jersey end et 3 rgs de pt dastrakan. En NUVOLE, tric 2 rgs de pt mousse. En laine tric 8 rgs de jersey end et rabattre ttes les m en 1 seule fs. Plier la partie infrieure 4 rgs sur lenv du trav et coudre la coulisse. Coudre les coutures et les boutons. Repasser lgrement sur lenv.

    st. and 3 rows in Bobble st. Change to Nuvole Wool and work 2 rows in Garter st. Change to Wool and work 10 rows is Stocking st., incr. evenly across 1st row 14 sts. (60 sts.). *Change to Cotton and work 4 rows in Scale st. Change to Wool and work 10 rows in stocking st.*. Repeat these 14 rows. At same time, incr. at both sides every 14 rows: 1 st. 4 times (68 sts.). When work measures 5 1/2 in. from beg. (6 rows of 5th stripe of wool), shape body by incr. at both sides every 2 rows: 1 st. 5 times and 34 sts. once (146 sts.). Cont. work. sts. in same way. On completion of 7th stripe of Cotton in Scale st. and on 2nd row of next stripe in Wool, divide sts. for front and right back as foll: place 1st 73 sts. for front on holder and cont. with rem. 73 sts. for right back, decr. at right side for neck edge: 2 sts. once (71 sts.). Cont. work sts. in same way. On completion of 9 stripes of Scale st., change to Wool and work 4 rows in Stocking st., 12 rows in Garter st. for buttonhole band and cast off straight all sts. At same time, on 6th row of Garter st., make 5 2-st. buttonholes, 1st hole at 10 sts. from neck edge and rem. holes at 11-st. intervals. Cont. with 73 sts. left on holder for front and using Wool work 4 rows in Stocking st., decr. at left side for neck edge every 2 rows: 3-3-2 and 1 st. (64 sts.). At same time, on completion of 4 rows of Stocking st., work sts. as foll: *using Nuvole Wool, 2 rows in Garter st. Using Cotton, 3 rows in Stoc-king st. and 3 rows in Bobble st. Using Nuvole Wool, 2 rows in Garter st. Using Wool, 4 rows in Stocking st.*. Repeat these 14 rows 4 more times. At same time, on 3rd row of last Cotton pattern, incr. at left side for neck edge every 2 rows: 1-2-3 and 3 sts. (73 sts.). On 2nd row of last 4 rows in Wool, place all sts. on holder.Cast on 71 sts. for left back and work as for right back but reversing directions and without buttonholes (73 sts.). On 8th row of Stocking st., join sts. for back to those of front (146 sts.) and cont. work all sts. in same way. On completion of 4th stripe of Scale st. for back plus 9 rows of Stocking st. in Wool, cast off at both sides every 2 rows: 34 sts. once and 1 st. 5 times (68 sts.). Cont. for left sleeve, work. sts. in same way and decr. at both sides every 14 rows: 1 st. 4 times (60 sts.). On completion of 5th strip of Scale st. for sleeve, cont. with Wool and work 10 rows in Stocking st., decr. evenly across last row 14 sts. (46 sts.). Chan-ge to Nuvole Wool and work 2 rows in Garter st. Change to Cotton and work 3 rows in Stocking st. and 3 rows in Bobble st. Change to Nuvole Wool and work 2 rows in Garter st. Change to Wool and work 8 rows in Stocking st. then cast off straight all sts. Fold left cuff 4 rows to WS and sew casing. Neck edge band: Using Wool, cast on 86 sts. and work 8 rows in Garter st. then place all sts. on hol-der. At same time, make 1 2-st. buttonhole at left side, 4 sts. from edge. TO MAKE UP: Lower band: Using wook, pick up 150 sts. around edge of lower part and work 1 row in Stocking st. Change to Nuvole Wool and

    work 2 rows in Garter st. Chan-ge to Cotton and work 3 rows in Stocking st. and 3 rows in Bobble st. Change to Nuvo-le Wool and work 2 rows in Garter st. Change to Wool and work 8 rows in Stocking st. and cast off straight all sts. Fold lower part 4 rows to WS and sew casing. Sew seams and sew on buttons. Iron gently on WS.

    Perl y trab. 3 pas. a p. jersey der. y 3 pas. a p. de garbanzo. Cambiar a Lana Nuvole y trab. 2 pas. a p. de musgo. Cambiar a Lana y trab. 10 pas. a p. jersey der., aum. en la 1 de ellas 14 p. repartidos (60 p.). *Cambiar a Perl y trab. 4 pas. a p. de escama. Cambiar a Lana y trab. 10 pas. a p. jersey der.*, repetir stas 14 pas.. Al mismo tiempo, aum. en ambos lados cada 14 pas.: 1 p. 4 veces (68 p.). A los 14 cm. del comienzo (6 pas. de la 5 raya de lana), aumentar en ambos lados para formar el cuerpo cada 2 pas.: 1 p. 5 veces y 34 p. 1 vez (146 p.). Seguir trab. los p. de la misma manera. Una vez trab. la 7 raya de Perl a p. de escama y en la 2 pas. de la sig. raya en Lana, repartir los p. para el delantero y para la espalda der. as: dejar en espera los 73 p. primeros para el delantero y seguir con los 73 p. restantes para la espalda der., meng. en el lado der. para el escote: 2 p. 1 vez (71 p.). Seguir trab. los p. de la misma manera. Al obtener 9 rayas de p. de escama, cambiar a Lana y trab. 4 pas. a p. jersey der., 12 pas. a p. de musgo para la tira de abrochado y cerrar todos los p. de 1 vez. Al mismo tiempo, en la 6 pas. de p. de musgo, realizar 5 ojales de 2 p. cada uno, el 1 a 10 p. del escote y los otros a 11 p. de distancia. Seguir con los 73 p. del delantero dejados en espera y trab. con Lana 4 pas. a p. jersey der., meng. en el lado izqdo. para el escote cada 2 pas.: 3-3-2 y 1 p. (64 p.). Al mismo tiempo, al ter-minar las 4 pas. de p. jersey der., trab. los p. de la sig. manera: *con Lana Nuboli, 2 pas. a p. de musgo. Con Perl, 3 pas. a p. jersey der. y 3 pas. a p. de garbanzo. Con Lana Nuboli, 2 pas. a p. de musgo. Con Lana 4 pas. a p. jersey der.*. Re-petir stas 14 pas. 4 veces ms. Al mismo tiem-po, en la 3 pas. del ltimo motivo de Perl, au-mentar en el lado izqdo. para el escote cada 2 pas.: 1-2-3 y 3 p. (73 p.). En la 2 pas. de Lana de stas 4 pas. ltimas, dejar todos los p. en espera.Montar 71 p. para la espalda izqda. y trab. igual que la espalda der., pero invirtiendo las expli-caciones y sin ojales (73 p.). En la 8 pas. de p. jersey der., unir los p. de la espalda con los p. del delantero (146 p.) y seguir trab. los p. de la misma manera. Una vez trab. la 4 raya de p. de escama de la espalda ms 9 pas. de p. jer-sey der. de Lana, cerrar en ambos lados cada 2 pas.: 34 p. 1 vez y 1 p. 5 veces (68 p.). Seguir para la manga izqda. tejiendo los p. de la mis-ma manera y meng. en ambos lados cada 14 pas.: 1 p. 4 veces (60 p.). Una vez trab. la 5 raya de la manga de p. de escama, seguir con Lana y trab. 10 pas. a p. jersey der., meng. en la ltima de ellas 14 p. repartidos (46 p.). Cambiar a Lana Nuvole y trab. 2 pas. a p. de musgo. Cambiar a Perl y trab. 3 pas. a p. jersey der. y 3 pas. a p. de garbanzo. Cambiar a Lana Nuvole y trab. 2 pas. a p. de musgo. Cambiar a Lana y trab. 8 pas. a p. jersey der. y cerrar todos los p. de 1 vez. Doblar el puo izqdo. 4 pas. hacia el rev. de la labor y coser la jareta. Tira escote: Con lana, montar 86 p. y tejer 8 pas. a p. de musgo y dejar todos los p. en espera para remallar. Al mismo tiempo, realizar 1 ojal en el lado izqdo. de 2 p. y a 4 p. de la orilla.MONTAJE: Tira parte inferior: Con lana, remontar 150 p. sobre la orilla de la parte inferior y trab. 1 pas. a p. jersey der.. Cambiar a Lana Nuvole y trab. 2 pas. a p. de musgo. Cambiar a Perl y trab. 3 pas. a p. jersey der. y 3 pas. a p. de garbanzo. Cambiar a Lana Nuvole y trab. 2 pas. a p. de mus-go. Cambiar a Lana y tejer 8 pas. a p. jersey der. y cerrar todos los p. de 1 vez. Doblar la parte infe-rior 4 pas. hacia el rev. de la labor y coser la jareta. Coser costuras y coser botones. Planchar suave por el rev..

    Garter st. Chan-ge to Cotton and work 3 rows in Stocking st. and 3 rows in Bobble st. Change to Nuvo-le Wool and work 2 rows in Garter st. Change to Wool and work 8 rows in Stocking st. and cast off straight all sts. Fold lower part 4 rows to WS and sew casing. Sew seams and sew on buttons. Iron gently on WS.

    ROSETA - ROSETTE

    123

  • Pgina /Page 11

    N 5 *** (primera puesta)

    CONJUNTO ROSA

    CALIDAD: NIDO 2 ov. Col. n 302.CALIDAD: ALGODN EGIPCIO MERCERIZADO GIZA N 82 ov. Col. n 000.Ag. n 2; ganch. n 2; 7 botones ncar; 2 m. de cinta de raso blanca de 6 mm. de ancho; 1 m. de cinta de raso blanco de 1 cm. de ancho.

    PUNTOS EMPLEADOS1 Calado: ver diagrama.2 Jersey der.: ver pgina 124.3 Musgo: ver pgina 124.4 Pasacintas: ver diagrama.5 Bajo: ver pgina 126.6 Cangrejo: ver pgina 126.

    REALIZACIN JERSEYSe comienza por la espalda izqda. Con ag. n 2 y lana rosa montar 56 p. y tejer 8 pas. a p. mus-go para la tira de los botones. Seguir a p. de musgo tejiendo 4 pas. en lana y 2 en algodn. Al comenzar la 14 raya en rosa dejar en espera los 48 p. de la izqda. y seguir con los 8 p. restan-tes, aum. para la manga en el lado izqdo. de la labor 55 p. Seguir tejiendo juntos los 63 p. con la misma disposicin que hasta ahora, intercalan-do 2 pas. de algodn cada 4 pas. de lana. Para formar el puo se trab. con la sig. disposicin: * en la 1 pas. de lana rosa tejer 53 p. musgo y vol-verse, tejer los 63 p. a p. musgo (2 pas.), cambiar a algodn y tejer 2 pas. a p. musgo * . Repetir de * a * Hasta obtener 22 rayas rosas. Al comenzar la raya rosa n 23, cerrar los 55 p. que estn en el lado izqdo. de la labor. Quedan 8 p. a la dcha. que se unen a los 48 p. que estaban en espera. Seguir tejiendo con todos los p. a la vez (56 p.) con la misma disposicin que en la espalda y te-jer 7 rayas rosas contando la raya en la que he-mos retomado los p. en espera. Tejer las 2 pas. en algodn y seguir a p. calado (ver diagrama). Al terminar el calado tejer con lana rosa 10 pas. a p. jersey der. 2 pas. a p. musgo y repetir el p. calado (ver diagrama. Tejer la otra mitad del cuerpo con la misma disposicin y terminar en la espalda dcha. con 8 pas. a p. musgo para la tira de los ojales.Canes: con ag. n 2 recoger 270 p. de la parte superior del cuerpo y mangas y tejer a p. cala-do, meng. en la 23 pas. 60 p. repartidos en la la-bor (quedan 210 p.). tejer la pas. n 24 y cambiar a p. jersey der., tejer 4 pas. y hacer el pasacintas (ver diagrama). Tejer 4 pas. ms a p. jersey der. Cambiar a p. musgo, meng. en la 1 pas. 38 p. repartidos en la labor (quedan 172 p.). Tejer una segunda pas. a p. musgo y comenzar el p. ca-lado, meng. en la primera pas. de lana 40 p. re-partidos (quedan 132 p.). En la pas. n 23 del p. calado meng. 44 p. (quedan 88 p.). Tejer 5 pas. ms a p. musgo y cerrar todos los p. de una vez.Montaje: planchar suavem. las piezas sueltas por el rev. Coser las costuras de las mangas. Con el ganch. y algodn blanco hacer una pas. a p. bajo y una segunda a p. cangrejo alrededor de bajo, puos, escote y vistas de la espalda. Pasar una cinta de raso estrecha a travs del pasacin-tas del canes. Con la cinta ms ancha, hacer un lazo zapatero y una rosita y coser en el cen-tro del canes, sobre el pasacintas (ver foto). Con algodn y aguja de bordar, coser unos mo-tivos rococ en la tira central de p. jersey der. del delantero (ver foto). Coser botones en la tira de la espalda izqda. y hacer ojales en la tira de la espalda dcha.

    REALIZACIN BOTITASSe comienza por la suela. Con ag. n2 y lana

    No 5 ***(newborn)

    PINK SET

    QUALITY: NIDO2 balls no. 302.QUALITY: ALGODN EGIPCIO MERCERIZADO GIZA N 82 balls no. 000No. 2 needles; no. 2 crochet hook; 7 mother-of-pearl buttons; 2 m. white satin ribbon, 6 mm. wide; 1 m. white satin ribbon, 1 cm. wide.

    STITCHES USED:1. Mixed stitch: see chart.2. Stocking stitch: see page 125.3. Garter stitch: see page 124.4. Ribbon casing: see chart.5. Single crochet stitch: see page 126.6. Crab stitch: see page 126.

    DIRECTIONS FOR JERSEYStart with left back. Using no. 2 needles and pink wool, cast on 56 sts. and work 8 rows in garter st. for buttonhole band. Cont. in garter st., working 4 rows in wool and 2 in cotton. At row 14 in pink yarn, leave the 48 sts. on the left on holder and cont. with rem. 8 sts., and incr. 55 sts. on the left side for the sleeve. Cont. working the 63 sts. as before, interspersing 2 rows in cotton for every 4 rows in wool. Form cuff as follows: * in first row in pink wool, knit 53 sts. in garter st. and turn round, knit 63 sts. in garter st. (2 rows), change to co-tton and knit 2 rows in garter st. * . Repeat from * to * until there are 22 pink stripes. At beg. of 23rd pink stripe, cast off the 55 sts. on left side of work. Join the 8 rem sts. on right with the 48 sts. on the holder. Cont. working with all the sts. at the same time (56 sts.) as for the back, and knit 7 pink stripes, counting the stripe where the sts. on the holder were picked up. Knit 2 rows in cotton and cont. in mixed st. (see chart). At the end of mixed st., knit 10 rows in stocking st. in pink wool, 2 rows in garter st. and repeat the mixed st. (see chart). Knit other half of body in same way and finish on right back with 8 rows in garter st. for buttonhole band.Yoke: using no. 2 needles, pick up 27 sts. from upper part of the body and sleeves and work in mixed st., decr. 60 sts. evenly across row 23 (210 sts. rem.). Knit row 24 and change to stocking st., work 4 rows and make ribbon casing (see chart). Knit 4 more rows in stocking st.. Change to garter st. and decr. 38 sts. evenly across first row (172 sts. rem.). Work a second row in garter st. and begin mixed st., decr. 40 cms. evenly in the first wool row (132 sts. rem.). In row 23 of the mixed st., decr. 44 sts. (there are 88 sts. rem.). Work 5 more rows in garter st., then cast off straight.Finishing: iron each piece gently on wrong side. Sew sleeve seams. Using crochet hook and whi-te cotton, work one row in single st. and another in crab st. around lower edge, cuffs, neck and back facings. Pull narrow satin ribbon through casing on yoke. Make a bow using wide satin ribbon with a little rose, and sew in the centre of yoke, over casing (see photo). Using cotton yarn and embroidery needle, sew some rococo motifs on central stocking st. band on front (see photo). Sew buttons on left back band and work buttonholes on right back band.

    DIRECTIONS FOR BOOTEESBegin with sole. Using no. 2 needles and wool, cast on 51 sts., work 4 rows in garter st., chan-ge to cotton and work 2 rows in garter st., then change to wool and begin sole as follows (work even rows as they appear on needle): Row 1: In wool. 1 st. in garter st., yarn over needle, 24 sts. in garter st., yarn over needle, 1 st. in garter st., yarn over needle, 24 sts. in garter st., yarn over

    N 5 ***(moins dun mois)

    ENSEMBLE ROSE

    QUALIT : NIDO 2 pel. coul. n 302.QUALIT : ALGODN EGIPCIO MERCERIZADO GIZA N 82 pel. Coul. n 000.Aig. n 2 ; croch. n 2 ; 7 boutons nacrs ; 2 m de ruban de satin blanc de 6 mm de large ; 1 m de ruban en satin blanc de 1 cm de large.

    POINTS EMPLOYS :1. Ajour : voir diagramme.2. Jersey end.: voir page123.3. Mousse: voir page 124.4. Passe-ruban : voir diagramme.5. Maille serre: voir page 126.6. P. dcrevisse: voir page 126.

    RALISATION PULLCommencer par le dos g.. Avec laig. n 2 et en laine rose, monter 56 m. et tricoter 8 rgs en p. mousse pour la lisire des boutons. Poursuivre en p. mousse, en tricotant 4 rgs en laine et 2 en co-ton. Au commencement de la 14e rayure rose, laisser en attente les 48 m. de la g. et poursuivre avec les 8 m. restantes, en aug. 55 m. pour la manche du ct g. de louvrage. Continuer tricoter ensemble les 63 m. suivant la mme dis-position, en intercalant 2 rgs en coton tous les 4 rgs en laine. Pour former le poignet, trav. selon la disposition suiv. : * au 1er rg en laine rose, tricoter 53 p. mousse et retourner, tricoter les 63 m. en p. mousse (2 rgs), passer en coton et tricoter 2 rgs en p. mousse * . Rpter de * * jusqu obtenir 22 rayures roses. Au dbut de la rayure rose n 23, rabattre les 55 m. qui se trouvent sur le ct g. de louvrage. Il reste 8 m. dr., qui sajoutent aux 48 m. qui taient en attente. Continuer tricoter toutes les m. la fois (56 m.) suivant la mme disposition que dans le dos et tricoter 7 rayures roses en comptant celle sur laquelle nous avons repris les m. en attente. Tricoter les 2 rgs en coton et poursuivre en p. ajour (voir diagramme). la fin du point ajour, tricoter en laine rose 10 rgs de p. jersey end. 2 rgs en p. mousse et rpter le p. ajour (voir diagramme). Tricoter lautre moiti du corps selon la mme disposition et terminer dans le dos dr. avec 8 rgs en p. mousse pour la lisire des boutonnires.Empicement : avec laig. n 2 reprendre 270 m. de la partie suprieure du corps et des man-ches, et tricoter en p. ajour, en dim. au 23e rg 60 m. rparties sur louvrage (il reste 210 m.). Tri-coter le rg n 24 et passer en p. jersey end., tri-coter 4 rgs et faire le passe-ruban (voir diagram-me). Tricoter 4 rgs de plus en p. jersey end. Passer en p. mousse, en dim., au 1er rg, 38 m. rparties sur louvrage (il reste 172 m.). Tricoter un second rg en p. mousse et commencer le p. ajour, en dim., sur le premier rg de laine, 40 m. rparties (il reste 132 m.). Au rg n 23 du p. ajour, dim. 44 m. (il reste 88 m.). Tricoter 5 rgs de plus en p. mousse et rabattre toutes les m. en une fois.Assemblage : repasser lgrem. les pices spa-res sur lenv. Faire les coutures des manches. Avec le croch. et en coton blanc, faire un rg en m. serre et un second en p. dcrevisse autour du bas, des poignets, de lencolure et des revers du dos. Passer un ruban en satin troit travers le passe-ruban de lempicement. Avec le ruban le plus large, faire un noeud de