estimulacion en pozoz horizontales

82
Successful Stimulation of Open Hole Carbonate Formations Using Coiled Tubing A Pr e s e n tati on f or th e Gu l f Coas t  Pe r mian Bas i n Stu dy Gr oup  Pr e s e n ted B y: Je ff H arr is  BJ S e r vices (Coi l te ch) M i dland, T e xas  

Upload: gonzalezsgj

Post on 14-Apr-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 1/82

Successful Stimulation of Open Hole

Carbonate FormationsUsing Coiled Tubing

A Presentation for the Gulf Coast 

Permian Basin Study Group 

Presented By: 

Jeff H arr is 

BJ Services (Coil tech) 

M idland, Texas  

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 2/82

OR 

GETTING THE MOST FROM

HORIZONTAL OIL AND GASWELL ACID TREATMENTS

USING

TECHNOLOGY 

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 3/82

Why the titles? What’s this to

do with acidizing HorizontalWells? 

Too many CT jobs are performedthe same way they were done

“back when”

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 4/82

Our own in-

house survey 

But first ...

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 5/82

How many of you

have had experiencesin stimulating HZ

wells?

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 6/82

 Economically have

your Hz wells provento be ……. 

Good

Fairor Poor?

(be honest)

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 7/82

How were your

wells stimulated? 

 - -

-

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 8/82

Did you know only40% of the Hz wells

drilled are likely to

become economicallyviable 

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 9/82

Hopefully after thisdiscussion we can

increase our “luck”when stimulating Hz

wells!!!! 

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 10/82

Part One 

Some Simple

Basics

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 11/82

What does a simplehorizontal well look 

like?

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 12/82

Heel

A Basic Horizontal WellA horizontal well may be drilledA horizontal well may be drilled

into a gas or oil bearing strata,into a gas or oil bearing strata,

as well as being used for water, steam or miscibleas well as being used for water, steam or miscibleflood injection.flood injection.

Lateral Section

Build SectionFractures

A Basic Horizontal Well

50 to more than 1500 metres of lateral

section depending upon objectives…..

Heel

Toe

Target formation 

150 to more than 5000 ft of lateral section

depending upon objectives...

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 13/82

 

Horizontal wells

are expensive to

drill andstimulate so why

drill

horizontally?

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 14/82

The decision to drill a well

horizontally may depend uponmany factors 

and can include  

 the necessity for greater exposure of narrow target zones to the wellbore

a reduction of solids migration to the

wellbore because of reduced drawdown

intersection of naturally occurring

vertical fractures 

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 15/82

Part Two 

The

Formation

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 16/82

Simply put the extremes of the

types of rock we drill into

for oil or gas are

 a tight, low perm carbonate

a fractured carbonate with good

porosity and permeability

a sandstone

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 17/82

Consider

A very tight,low perm/low porosity

carbonate reservoir

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 18/82

No upward folding to cause

stress fractures 

Low Perm / Low Porosity 

Carbonate Reservoir 

(tombstone)

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 19/82

When there are No

fractures and low permeability... 

… Matrix Acidizing has

ONLY VERY LIMITEDEFFECTIVENESS IF ANY! 

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 20/82

Now Consider 

a fractured carbonatereservoir with good

porosity and permeability 

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 21/82

Carbonate Reservoir 

The best example of this type of reservoir is

formed by an upward folding of the formation to

causes stress fractures 

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 22/82

Horizontal wells

drilled into this type of 

formation areespecially suited to

squeezed matrix acidstimulation techniques 

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 23/82

 Finally ….. 

….. sandstone reservoirs - a

topic for discussion on

another day!!!

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 24/82

Part Three 

Formation Damage 

(typically carbonate reservoirs)

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 25/82

Fact : Almost all horizontalwells are very susceptible to a

variety of formationdamaging mechanisms while

drilling. 

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 26/82

Drilling damage across

the wellbore may look 

like …..... 

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 27/82

Drilling Damage

FracturePlugging Pore Plugging

Filter Cake

Shallow

MatrixDamage

Wellbore Crushing

Also possible damage

from rock polishing, aqueous

phase trapping, the use of poor fluid choices etc.

Drill fines may be as

small as 2 microns!!

Shallow MatrixDamage

Wellbore

Crushing

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 28/82

Drilling damage along

the wellbore may look 

like ...….. 

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 29/82

Drilling fluid 

Overbalanced fines Overbalanced fines 

migration into fractures migration into fractures 

Open Hole Section Open Hole Section 

Compressed Filter Cake - Compressed Filter Cake - considered to be 2 to 5 mm thick considered to be 2 to 5 mm thick 

Drilling Fluid & 

Cuttings 

Loosely held fines 

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 30/82

Formation damage one finds

restricting flow in vertical wellsmay also occur in horizontal

wells

- for example 

 Fluid incompatibilities

Oil wetting the formation

Anhydrite or soft rock smearing

Sulphur deposition in high H2S wells

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 31/82

 b

Horizontal Well Drilling DamageHorizontal Well Drilling Damage

The heaviest damage is to be expected at the heelThe heaviest damage is to be expected at the heel

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 32/82

Part Four

Designing Horizontal

Well Acid StimulationPrograms 

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 33/82

Horizontal well stimulation

program design requires

intercompany teamwork! 

Geologists, reservoir engineers, mud

engineers, technologists, laboratory

and specialised service company staff all have a role in designing the best

stimulation program possible

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 34/82

Before recommending any

stimulation treatment we

carefully carryout many

tests and observations.

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 35/82

Well data

Geology reports

Drill cuttings

Drilling mud

Stimulation Program 

Acid solubility 

Service Company

Experience 

Target zones

Drill Bit

ROP

Fractures

Well fluids

Stimulation

 package design

Computer modelling

SEM analysis

Drilling reports

losses

Other information

Core flow studies 

 porosityGas shows 

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 36/82

Hz Well Stimulation ProgramPossibilities 

Fracturing

Enzyme Squeeze Treatments

Acidizing

Oil or Water Based Fluids

Carbonate

SandstoneOther specialised treatments

Roto-Jet

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 37/82

Assuming the drilling fluids

have been designed to beacid compatible …... 

….. then acid is the best stimulationmedia for removing drill fines, drill

cuttings, filter cake, crushed and

polished rock, and acid soluble LCM

both around the near wellbore and

into any extending fractures 

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 38/82

But how do we conveythe acid to the damaged

areas of the wellbore andformation, as well as

squeezing acid into thefractures? 

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 39/82

By ……... 

Bullheading aciddown tubing - NO,

NO, NO!!! 

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 40/82

Why? Because acidwill go where IT wants

to go - not where YOU

want it to go. THERESULT

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 41/82

  Water 

Oh No!

Not Another Water Well!

I should have listened to

Jeff  

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 42/82

By ……... 

Bullheading acid down tubing

using diverting agents (wax

beads, benzoic acid, salt) -NO!!!

Pumping acid downproduction tubing placed at

various depths along the lateral

-

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 43/82

By ……... 

Pumping acid down a work 

string RIH to the toe while

pumping acid down thebackside of the workstring

hoping to palce acid all alongthe OH lateral - NO!!!

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 44/82

By ……... 

Pumping acid down a work 

string RIH to the toe with holes

along the length of the lateralhoping to obtain limited entry -

I don’t think so!!!!

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 45/82

Why? Because acidwill go where IT wants

to go - not where YOU

want it to go. THERESULT

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 46/82

  Water 

Oh No!

The acid still went

where it wanted to go

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 47/82

Then How????? 

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 48/82

I know of a couple of methodsthat have worked for me. 

So-

Let’s talk about them -

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 49/82

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 50/82

The tool was developed for 

removing hard scales, but I thought“what a great acidizing tool this

could be for open hole” The first jobs went great - well productivity

increased as much as 7 fold. That prompted

an SPE paper (SPE 54467).

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 51/82

The first candidates were deeper 

wells that had fairly high BHTand the acid reacted almost

instantly as the tool was run

along the length of the OH.

Then someone read the SPE

paper and wanted to use the tool

and procedure on a San Andres

open hole horizontal!!

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 52/82

Since the San Andres doesn’t have a

very high BHT, the customer 

wanted some type of diversion to

insure that the acid went where he 

wanted it to go!

I suggested a method that had

worked for me over the yearsFOAM

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 53/82

But wait a minute …….. 

Foam as a diverting agent!

Surely it’s only good forshaving!!!

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 54/82

Not so! 

A 75% quality foam willprovide a thick, viscous, non-

damaging fluid media that is a

useful diverting agent in both

vertical and Hz wells

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 55/82

 Obviously the foam must be

acid compatible ….. 

….. such foams are able

to divert acid very

effectively

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 56/82

So the

customer said“OK, let’s try

it! 

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 57/82

But I want to be sure this FoamTechnology is working …... 

I want to use isotope tracers in the

acid stages”. 

Sounded like a good idea to me…..

another trip into the hole$

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 58/82

After stimulating and logging

four wells, using tagged acidstages and foam diversion

stages…. 

It was confirmed that the acid

went where he wanted it togo!!!!

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 59/82

The following illustration is the basic procedure used on those

four wells

Over time there have been

variations of this procedureused to “fit the purpose” 

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 60/82

Foam Diverted Acid Squeeze

1. Coil tubing is RIH to the toe and the

wellbore is cleaned underbalanced at a

designed penetration speed to get 360°/nozzle

coverage with the rotating jetting tool

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 61/82

Foam Diverted Acid Squeeze

2. Circulation continues until returns are clean

3. Foam is pumped to the BHA

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 62/82

Foam Diverted Acid Squeezing

4. The OH is filled with foam

- it is not necessary to fill the well completely

with foam

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 63/82

Foam Diverted Acid Squeezing

5. Close in the well, start PUH and

acidizing by pumping calculated volumes

of acid and foam stages

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 64/82

Foam Diverted Acid Squeezing

6. Continue pumping acid and foam stages

along the target intervals of the open hole

until desired acid coverage is achieved

7. Flush CT and OH (gas lift if desired)

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 65/82

Are the results always as good

as the examples in the SPEPaper?

As far as increasing

productivity…. 

The answer is…. not always…. 

BUT

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 66/82

There is an additional benefit that

has made using the rotating jettingtool and foam diverted acid squeeze

stimulations beneficial…. Less acid/foot….A lot less acid/foot….

7 to 10 gal/ft has produced the sameresults as the 35 to 50 gal/ft used with

other methods.

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 67/82

The San Andres wells we have

stimulated in the last 3-4 yearshave had laterals >5000 ft long

With 1.75” coiled tubing and the 1.75”tool, pumping rates <1.5 bpm meant long

 job times…. some over 40 hours. 

Our customers (field personnel) weren’ttoo crazy about sitting on these jobs for

hours and hours and …. So ….

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 68/82

We were ask if there was some

way to cut the job time!!!!

We requested a larger

rotating tool and got it…. plus larger coiled tubing

and equipment.

N bl t 3

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 69/82

 Now we were able to pump 3 -

3.5 bpm and the job time was cut

in half….18 to 20 hours….field

 personnel happier but still not

that happy!

I had heard about a new self-

diverting acid system that was inhigh demand in Saudi - So I

looked into it - a year or so later!

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 70/82

This is what I learned about the

self-diverting acid system Single Surfactant System

Stimulates and diverts in a single stage - design and

operation less complicated

Break mechanisms: hydrocarbon, water, internal breaker and system also breaks on spending of acid

Matrix Acidizing Applications Are Delayed Viscosifying System

• Self Diverting Acid

Viscosified Diverted Acid

• Staged Acid

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 71/82

Application

For carbonate and sandstone acidizing

Acid Type - HCl, HF

Surfactant added to acid

Concentration range - 40-80 gpt in acid

HCL concentration range - 20-28%

Internal breaker recommended for  - Wells with no Oil/Condensate- Wells with no Formation Water  Production

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 72/82

Application

Incompatible - some mutual solvents,

surfactants, corrosion inhibitors

Temperature stable to 275ºF Surfactant type - amphoteric, worm-like

micelle

Wettability - water wets limestone

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 73/82

The next slide is a graph thathelped me understand how the

system worked.I also sent this information to the customer 

(Production Eng and Field Forman) and

 pointed out that we could cut job time even

more….It wasn’t a hard sell!! 

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 74/82

Viscosity of Spent Acid vs. calculated %HCL concentration

28% HCL initially -- Ambient Temperature and 150F

0

200

400

600

800

1000

1200

0 5 10 15 20 25 30

%HCL (calculated)

   V   i  s  c  o  s   i   t  y   (  c   P   )   @    1

   7  s  e  c  -   1

Divert S 75F

Divert S with CI-25

Divert S 150F

Th fi t ll T C t

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 75/82

2-Dec-05 REVISION DATE GIVEN REQUIRED

REVISED by J. Harris PUMP PUMP COIL

COIL INTERVAL RATE RATE TIME SPEED

STEP DIRECTION FT FT FT FLUID GALLON BBL BPM SCFM MIN FPM

1 DOWN 0 5023 5023 WATER 1,055 25.1 0.25 0 100.5 50.0

2 DOWN 5023 6400 1377 WATER 723 17.2 0.25 0 68.9 20.0

3 DOWN 6400 8088 1688 WATER 20,103 478.6 3.5 0 112.5 15.0

4 UP 8088 7700 388 Load Hole w/Acid 1,680 40.0 3.5 0 11.4 34.0

Close CT Annulus

5 UP 7700 7200 500 ACID 3,500 83.3 3.5 0 23.8 21.0

6 UP 7200 7000 200 Do Not Pump 0 0.0 0 0 9.5 21.0

7 UP 7000 6400 600 ACID 4,200 100.0 3.5 0 28.6 21.0

8 UP 6400 5023 WATER Flush * 6,476 154.2 3.5 0 44.1

* Do not wash at high rate via nozzel or acidize across 

the curve 

TOTALS Total fluid pumped 37,736 Total time (mins) 399.2

Gallons of Acid 10,000 9,380  Total time (hrs) 6.7

Gallons of water  28,356 Acid Pump time (hrs) 63.8

BBL of water  675

NOTE: 10,000 gal of Acid to contain 2 drums of Low PH Scale Inhibitor.

The first well was a Terry County

 producer with a 4 3/4” OH

lateral. MTD was 8088 ft.Pump Schedule

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 76/82

The results of the Self-Diverting

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 77/82

The results of the Self-Diverting

Acid System are impressive…. 

The field is ~30 years old and average

oil production is 10 -12 BOPD

After the well was put on production

the oil was up to 40 BOPD

At the end of one month it was 45BOPD

Last week it was producing 50 BOPD

The second well was a Terry County

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 78/82

4-Jan-06 REVISION DATE GIVEN REQUIREDREVISED by J. Harris PUMP COIL

COIL RATE Acid TIME SPEED

STEP DIRECTION FT FT FT FLUID GALLON BBL BPM Gal/ft MIN FPM

1 DOWN 0 5288 5288 WATER 1,110 26.4 0.25 0 105.8 50.0

2 DOWN 5288 5737 449 WATER 236 5.6 0.25 0 22.5 20.0

3 DOWN 5737 8716 2979 WATER 35,179 837.6 3 0 248.3 12.0

4 UP 8716 8696 20 Load w/Acid 1,050 25.0 3 0 8.3 2.4

Close CT Annulus

5 UP 8696 8440 256 ACID 770 18.3 3 3 6.1 41.96 UP 8440 8360 80 ACID 400 9.5 3 5 3.8 21.0

7 UP 8360 8280 80 ACID 240 5.7 3 3 1.9 42.0

8 UP 8280 7830 450 ACID 2,700 64.3 3 6 21.4 21.0

9 UP 7830 7670 160 ACID 800 19.0 3 5 6.3 25.2

10 UP 7670 7410 260 ACID 1,040 24.8 3 4 8.3 31.5

11 UP 7410 7010 400 ACID 2,400 57.1 3 6 19.0 21.0

12 UP 7010 6880 130 ACID 520 12.4 3 4 4.1 31.5

13 UP 6880 6130 750 ACID 5,250 125.0 3 7 41.7 18.0

14 UP 6130 6030 100 ACID 600 14.3 3 6 4.8 21.015 UP 6030 5860 170 ACID 850 20.2 3 5 6.7 25.2

16 UP 5860 5288 572 WATER Flush * 10,500 250.0 3 0 83.3 25.0

* Do not wash at high rate via nozzel or acidize across 

the curve 

TOTALS Total fluid pumped 63,645 Total time (mins) 592.3

Total Acid 17,250 Total time (hrs) 9.9

Gallons of water  46,395 Acid Pump time (hrs) 2.3

BBL of water  1,105

NOTE: 17,250 gal of Acid to contain 5 drums of Low pH Scale Inhibitor 

INTERVAL

The second well was a Terry County

Water Injection Well

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 79/82

The post-job injection rates are

the same as pre- job rates…. but injection pressures were

25% - 30% lessThis well is a multi-lateral and this

was the last lateral to be

stimulated.

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 80/82

Other Case Results

East Texas - self diverting acid stages

between acid stages down 2 3/8” Tbg. 

Pre-job production - 0 MCFD

Post-job production - 1500 MCFD

Saudi - Hz Injection Well - the diverting

stages were foamed-the surfactant was

used to stabilize the foam (SPE 93536)

Pre-job injection - 17,000 BWD @ 1643 psi

Post-job injection - 77,000 BWD @ 1180 psi

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 81/82

One More Case Result

Saudi - Hz Oil Producer - Acid stages

using diverting acid stages between.

(SPE 94044) Post job results - Production increase of 

76,000 BOPD.

7/27/2019 Estimulacion en Pozoz Horizontales

http://slidepdf.com/reader/full/estimulacion-en-pozoz-horizontales 82/82

Thank you all

for coming today

... 

Any questions? AnyHz OH wells you