equipo de apoyo en tierra
DESCRIPTION
Equipo de apoyo en tierraTRANSCRIPT
-
REPORT TO IGHC 17
VANCOUVER, CANADA
MAY 2004
Chairman : Gerhard Chairman : Gerhard BaumgartenBaumgarten
Secretariat : Thierry Secretariat : Thierry NossentNossent
-
MISSION AND KEY OJECTIVES
Develop functional specifications, standards, safe operating procedures and training for ground support equipment
Forum and focal point for information on future developments and new Ground Support Equipment products and services
-
CORE ACTIVITY
AIRPORTHANDLINGMANUAL
CHAPTER 9
-
RAMPSG MEMBERSHIPIGHC MEMBERS
REGISTERED SUPPLIERS
AIRLINES
-
ACCOMPLISHMENTS
Rampsg finalised 7 work programme items as presented in Agenda items 8.3.1 to 8.3.7
-
REVISED ITEMAHM 915 Standard Controls
-
REVISED ITEMAHM 933 Functional Specification for a Powered Extension Platform to Lower Deck Container/Pallet Loader
-
REVISED ITEMAHM 963 Functional Specification for a Baggage/Cargo Cart
-
REVISED ITEMAHM 966 Functional Specification for a 125 inch Pallet Dolly
-
REVISED ITEMAHM 972 Functional Specification for a Ground Power Unit for Aircraft Electrical
-
REVISED ITEMAHM 975 Functional Specification for Self-Propelled Aircraft De-Icing/Anti-Icing Unit
-
REVISED ITEMAHM 975 Functional Specification for Self-Propelled Aircraft De-Icing/Anti-Icing Unit
-
UPPER DECK SERVICING ISSUES
A380 Launch is getting closer
-
UPPER DECK SERVICING ISSUESReference Cabin Layout : 555 passenger
A380 3c Up 03/04/2001
A380 upper deck : 199 passenger
equal : B757-200 with 200 passenger (two class config.)
A380 3c Main 03/04/2001
A380 main deck : 356 passengerequal : B767 with 350 passenger (single class)
or A340-600 with 345 passenger (two class config.)
-
UPPER DECK SERVICING ISSUEScritical path of minimum TAT ( ~ 90 min. )
10 20 30 40 9050 60 70 80
3
26
28
30
3
50
(min.)
bridges
deboarding
catering U/D
boarding
bridges
refueling
Assumption : Upper Deck : F/C+B/C+Y/C ; Main Deck : Y/C ( 544 Passenger)Bridges at M1L + U1L
The remaining time for cabin services (catering + cleaning) is the bottle neck, if the A380 is served only with 2 bridges
-
UPPER DECK SERVICING ISSUES
To keep
short turn around time
servicing of each level
with separate
crew and GSE
is a MUST !!!
Cross-section of A380 in comparision with B747
-
UPPER DECK SERVICING ISSUES
A380 - Service
each deck
Separately !!!
M/D Cleaning
M/D Catering
U/D Catering
U/D Cleaning
M/D stair
M/D Catering
-
NEW ITEMAHM 926 Functional Specification for Upper Deck Catering Vehicle
-
UPPER DECK CATERING
First version of the Functional Specifications for Upper Deck Catering vehicle was finalised
Working group considered inputs from various stakeholders
Standardisation bodies such as SAE and ISO to set their standards
Development, testing and production
Further revisions of AHM926 are possible
-
UPPER DECK CATERINGCritical Issues
PositioningProximity of wing and EngineTargeting
160 cm 110 cm110 cm
-
UPPER DECK CATERINGCritical Issues
Aircraft and Operator SafetyWorking at 8,2 m heightTransferring of loads between van body and aircraft above the wing
-
UPPER DECK CATERING
-
UPPER DECK CARGO LOADING
Various Options Still foreseen
The Super Loader
Traditional In-line version
Other versions developed
by some manufacturers
-
UPPER DECK CARGO LOADING
Various Options Still foreseen
Modification of
existing Main Deck Loaders
Transportable Adaptor
for ad-hoc operations.
-
UPPER DECK CARGO LOADING
Critical IssuesPositioning
Clearance (including use on other aircraft types)Target
Aircraft and Operator SafetyOperator accessWorking at 8,2 m height
PricingMarket size
Transportation for delivery
-
UPPER DECK CARGO LOADING
Critical Issues
20 cmGap between loader front platform and fuselage
Best solution:
Foldable loading platform integrated in the aircraftto bridge the gap
8,10 m
Cross-section of A380F in comparision with B747F
-
A380 TOWING ISSUESThe towbar :
Design like all Airbus aircraftFitting according :SAE 1614 Issue C Standard Cat V
Towing fitting & pinTowing fitting & pinA/C Typ Cat pin diameter pin lengthA340-500/600 IV 2.50 inch 8.00 inch
A380 V 3.38 inch 8.00 inch
Prevention of use of a A380 towbar at A340-600 possible
final design no ideal solution A340A340--500/600500/600 A380A380
-
A380 TOWING ISSUESTowbarless Tractor
towing of empty dead aircraft should be possibledead aircraft in the meaning of:
no active body gear steeringno hydraulic powerno electric power
But : for towing of heavy A380 the Body Wheel Steering has to be powered
APU (90 KVA) running (with mechanic on board)or GPU running on Towbarless Tractor
-
A380 TOWING ISSUESTowbarless Tractor
Approval from Airbus for Towbarless Towing Vehicle
Airbus asks for same Qualification Processas for other Airbus Aircraft typesVery cost and time consumingFor new tractor, all AI Aircraft types have to be testedAirbus refuses simplified procedure (like Boeing)
-
NEXT STEP
Ramp Services & Equipment working group to draft functional specifications for an Upper Deck Loader
Next meeting: SEP 14-16, 2004 in Montreal
Inputs from Airlines, GSE Manufacturers and Service Providers are required
-
PROPOSED ACTIONS
IGHC/17 to endorse the finalised work items for subsequent approval by the IATA Airport Services Committee
Extend the Rampsg mandate in order to continue the work programme shown at Agenda item 8.3
-
THANK YOU THANK YOU
The Ramp & Equipment GroupThe Ramp & Equipment Group
MISSION AND KEY OJECTIVESCORE ACTIVITYRAMPSG MEMBERSHIPACCOMPLISHMENTSREVISED ITEMREVISED ITEMREVISED ITEMREVISED ITEMREVISED ITEMREVISED ITEMREVISED ITEMNEW ITEMPROPOSED ACTIONS