    Hydraulic Calculations

    for 

    Project: Tottus Huancayo - Sala de Ventas 1

    Drawing no.:

    Date: 25/01/2016

    Design

    Remote area number:

    Remote area location:

    Occupancy classification: extra hazard group II

    Density: 0.20 gpm/feed2

    Area of application: 2000 feet2

    Coverage per sprinkler: 269 feet2

    Type of sprinklers calculated:

    No. of sprinklers calculated: 5

    In rack demand:

    Hose streams: none outside + 100 insideTotal water required (including hose streams): 779.42 gpm at 66.09 psi [ 73.17 psi safety margin ]

    Total water required at base of system riser: 429.42 gpm at 63.68 psi

    Type of system: wet pipe

    Volume of dry or preaction system:

    Water Supply Information

    Date:

    Location:

    Source:

    Contractor: VBS

    Name of designer:Authority having jurisdiction: INDECI

    Notes

    System has been automatically peaked by the "Simple Hydraulic Calculator" computer program.

  • 8/18/2019 Calculo Sala de Ventas 1

    2/7

    report created by the "Simple Hydraulic Calculator" version 2.3.4 from www.igneusinc.com

    25/01/2016 Page 2

    Hydraulic Demand Graph

    0100 200 300 400 500 600 700

    GPM

    0

    25

    50

    75

    100

    125

    150

    175

    P

    S

    I

    (A)

    (B)

    (C)

    (D)

    (E)

    (F)

    Water Source:

     A) 150 ps i Static

    B) 700 gpm at 141.2 psi

    Source at BOR:

    C) 149.15 ps i Static

    D) 429.4 gpm at 136.85 psi

    E) 700 gpm at 118.77 psi

    Demand at BOR:

    F) 429.4 gpm at 63.68 ps i

  • 8/18/2019 Calculo Sala de Ventas 1

    3/7

    report created by the "Simple Hydraulic Calculator" version 2.3.4 from www.igneusinc.com

    5/01/2016 Pa

    Supply Analysis

    Static Residual Available Total Required

    Node at Pressure Pressure Flow Pressure Demand Pressure

    [psi] [psi] [gpm] [psi] [gpm] [psi]

    UG-1 150.0 140.0 750.0 139.26 779.42 66.09

    Node Analysis

    Elev Pressure Req Disch Discharge

    Node Tag [M] Type [psi] [gpm] [gpm]

    M1-1 23.830 ref 25.147 0.000

    M1-2 23.830 ref 24.404 0.000

    M1-3 23.830 ref 23.778 0.000

    M1-4 23.830 ref 23.247 0.000

    M1-5 23.830 ref 22.790 0.000

    M1-6 23.830 ref 22.393 0.000M1-7 23.830 ref 22.045 0.000

    M1-8 23.830 ref 21.737 0.000

    M1-9 23.830 ref 21.462 0.000

    M1-10 23.830 ref 21.218 0.000

    M1-11 23.830 ref 21.130 0.000

    M2-1 23.830 ref 21.912 0.000

    M2-2 23.830 ref 21.901 0.000

    M2-3 23.830 ref 21.866 0.000

    M2-4 23.830 ref 21.802 0.000

    M2-5 23.830 ref 21.704 0.000

    M2-6 23.830 ref 21.575 0.000

    M2-7 23.830 ref 21.413 0.000

    M2-8 23.830 ref 21.222 0.000

    M2-9 23.830 ref 21.002 0.000

    M2-10 23.830 ref 20.754 0.000

    Register for complete node information.

  • 8/18/2019 Calculo Sala de Ventas 1

    4/7

    report created by the "Simple Hydraulic Calculator" version 2.3.4 from www.igneusinc.com

    5/01/2016 Pa

    Pipe Information

    negative pipe flow (Q) indicates flow is from node 2 towards node 1

    Node 1 Discharge Nom Fittings L [M] material total (Pt)

    Pipe Elev & Flow i.d. num & length F [M] C factor elev (Pe)

    Node 2 [M] K-factor [gpm] [in] [M] T [M] psi/M frict (Pf)

    M1-1 23.830 q=  0.000 4 5.000 S40 Pt= 25.147

    M1-1 Q= 389.722 4.026 0.000 C=120 Pe=  0.000

    M1-2 23.830 q=  0.000 5.000 0.149 Pf=  0.743

    M1-2 23.830 q=  0.000 4 5.000 S40 Pt= 24.404

    M1-2 Q= 355.165 4.026 0.000 C=120 Pe=  0.000

    M1-3 23.830 q=  0.000 5.000 0.125 Pf=  0.626

    M1-3 23.830 q=  0.000 4 5.000 S40 Pt= 23.778

    M1-3 Q= 325.289 4.026 0.000 C=120 Pe=  0.000

    M1-4 23.830 q=  0.000 5.000 0.106 Pf=  0.532

    M1-4 23.830 q=  0.000 4 5.000 S40 Pt= 23.247

    M1-4 Q= 299.611 4.026 0.000 C=120 Pe=  0.000

    M1-5 23.830 q=  0.000 5.000 0.091 Pf=  0.457

    M1-5 23.830 q=  0.000 4 5.000 S40 Pt= 22.790

    M1-5 Q= 277.612 4.026 0.000 C=120 Pe=  0.000

    M1-6 23.830 q=  0.000 5.000 0.079 Pf=  0.397

    M1-6 23.830 q=  0.000 4 5.000 S40 Pt= 22.393

    M1-6 Q= 258.723 4.026 0.000 C=120 Pe=  0.000

    M1-7 23.830 q=  0.000 5.000 0.07 Pf=  0.348

    M1-7 23.830 q=  0.000 4 5.000 S40 Pt= 22.045

    M1-7 Q= 242.302 4.026 0.000 C=120 Pe=  0.000

    M1-8 23.830 q=  0.000 5.000 0.062 Pf=  0.308

    M1-8 23.830 q=  0.000 4 5.000 S40 Pt= 21.737

    M1-8 Q= 227.605 4.026 0.000 C=120 Pe=  0.000

    M1-9 23.830 q=  0.000 5.000 0.055 Pf=  0.275

    M1-9 23.830 q=  0.000 4 5.000 S40 Pt= 21.462

    M1-9 Q= 213.775 4.026 0.000 C=120 Pe=  0.000

    M1-10 23.830 q=  0.000 5.000 0.049 Pf=  0.245

    M1-10 23.830 q=  0.000 4 5.000 S40 Pt= 21.218

    M1-10 Q= 122.951 4.026 0.000 C=120 Pe=  0.000

    M1-11 23.830 q=  0.000 5.000 0.018 Pf=  0.088

    M2-1 23.830 q=  0.000 4 5.000 S40 Pt= 21.912

    M2-1 Q=  39.697 4.026 0.000 C=120 Pe=  0.000

    M2-2 23.830 q=  0.000 5.000 0.002 Pf=  0.011

    M2-2 23.830 q=  0.000 4 5.000 S40 Pt= 21.901

    M2-2 Q=  74.255 4.026 0.000 C=120 Pe=  0.000

    M2-3 23.830 q=  0.000 5.000 0.007 Pf=  0.035

    M2-3 23.830 q=  0.000 4 5.000 S40 Pt= 21.866

    M2-3 Q= 104.130 4.026 0.000 C=120 Pe=  0.000

    M2-4 23.830 q=  0.000 5.000 0.013 Pf=  0.065

    M2-4 23.830 q=  0.000 4 5.000 S40 Pt= 21.802

    M2-4 Q= 129.809 4.026 0.000 C=120 Pe=  0.000

    M2-5 23.830 q=  0.000 5.000 0.019 Pf=  0.097

  • 8/18/2019 Calculo Sala de Ventas 1

    5/7

    report created by the "Simple Hydraulic Calculator" version 2.3.4 from www.igneusinc.com

    5/01/2016 Pa

    Pipe Information, cont.

    Node 1 Discharge Nom Fittings L [M] material total (Pt)

    Pipe Elev & Flow i.d. num & length F [M] C factor elev (Pe)

    Node 2 [M] K-factor [gpm] [in] [M] T [M] psi/M frict (Pf)

    M2-5 23.830 q=  0.000 4 5.000 S40 Pt= 21.704

    M2-5 Q= 151.808 4.026 0.000 C=120 Pe=  0.000

    M2-6 23.830 q=  0.000 5.000 0.026 Pf=  0.130

    M2-6 23.830 q=  0.000 4 5.000 S40 Pt= 21.575

    M2-6 Q= 170.697 4.026 0.000 C=120 Pe=  0.000

    M2-7 23.830 q=  0.000 5.000 0.032 Pf=  0.161

    M2-7 23.830 q=  0.000 4 5.000 S40 Pt= 21.413

    M2-7 Q= 187.118 4.026 0.000 C=120 Pe=  0.000

    M2-8 23.830 q=  0.000 5.000 0.038 Pf=  0.191

    M2-8 23.830 q=  0.000 4 5.000 S40 Pt= 21.222

    M2-8 Q= 201.815 4.026 0.000 C=120 Pe=  0.000

    M2-9 23.830 q=  0.000 5.000 0.044 Pf=  0.220

    M2-9 23.830 q=  0.000 4 5.000 S40 Pt= 21.002

    M2-9 Q= 215.645 4.026 0.000 C=120 Pe=  0.000

    M2-10 23.830 q=  0.000 5.000 0.05 Pf=  0.249

    M2-10 23.830 q=  0.000 4 5.000 S40 Pt= 20.754

    M2-10 Q= 119.290 4.026 0.000 C=120 Pe=  0.000

    M2-11 23.830 q=  0.000 5.000 0.017 Pf=  0.083

    Register for complete pipe information.

    Material Codes

    Pipe Material

    S40 - Schedule 40 Steel

    Fittings

    A - Alarm Valve

    E - Standard 90 degree elbow

    G - Gate Valve

    T - Tee - Flow turn 90 degrees

  • 8/18/2019 Calculo Sala de Ventas 1

    6/7