alvora presentation en web

29

Upload: rimvydas-raginis

Post on 12-Apr-2017

53 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: ALVORA presentation EN web
Page 2: ALVORA presentation EN web

• Joint Stock Company "Alvora" was founded in 1993. The company began operating with threeengineers, 20 assemblers and welders.• At present day 350 employees are the members of the company’s team.• Welders of the company are qualified to perform manual metal arc welding, semi automatic inertgas welding and gas tungsten arc welding.• The company has assembled over 12.000 tons of various structural steel constructions.• The company has executed many projects not only in Lithuania but in other places abroad.• Alvora" has its own material and technical base in an area of 1.5 hectares with a total area ofbuildings - 3150 m². Administrative premises are 1216 m². At the base are machine shops, metalfabrication shop, warehouse, storage area for building materials. The company has its own fleet ofvehicles and a variety of construction machinery.

ABOUT THE COMPANY

Page 3: ALVORA presentation EN web

THE MAIN ACTIVITIES

• Installation of district heating networks• Installation of water supply pipes and sewage systems• Construction of industrial buildings• Construction of power plants, boiler houses and pump stations• Construction of commercial buildings• Manufacturing and assembly of structural steel• High pressure and medium pressure gas and oil pipelines

„Alvora“ design, manufacture, build and install all types of buildings and constructions that range from private housesto industrial plants and buildings that are assembled of prefabricated structural steel. The main activities of thecompany can be summarised (but not limited) as follows:

Page 4: ALVORA presentation EN web

NOT LIMITED TO LITHUANIA

JSC "Alvora" every year is growing rapidly, not limited toLithuania. In order to expand the territorial scope of activity, itwas decided to enter:

• the Russian market - it was created a Joint Venture Company"ALVORA-BALT" in Kaliningrad in 2000.

• the Republic of Belarus - opened representative office inMinsk in 2001 and subsidiary company "ALVORA-BEL" of JSC"Alvora" in Brest in 2009.

Page 5: ALVORA presentation EN web

Currently the company employs 350 staff:• 80 engineers and technicians;• 150 fitters• 40 welders;• 40 other high-class specialists.

NUMBER OF EMPLOYEES

Page 6: ALVORA presentation EN web

million EUR

Value of construction and installation works

Page 7: ALVORA presentation EN web

JSC "ALVORA" holds state licenses and certificates of the Republic of Lithuania, Belarus and Russian Federation whichpermit to design, construct and install the following:- boiler plants and auxiliary equipment,- gas pipelines, gas equipment, oil pipelines,- indoor and outdoor water supply pipes, waste and rain water networks, sewage pipes,- air duct systems, heating systems and equipment.- licenses permitting execution of civil works.

CERTIFICATES AND LICENSES

Page 8: ALVORA presentation EN web

CERTIFICATES AND LICENSES

CJSC „Alvora“ applies:• internationally recognized quality control system certified with ISO 9001 certificate to secure high

quality of the carried-out work;• is accredited for OHSAS 18001:2007 occupational health and safety management system;• is also accredited for ISO 14001:2004 environmental management systems.

Page 9: ALVORA presentation EN web

CJSC „ALVORA“, Visorių str. 33, Vilnius

Civil works. The area of the superstructure(administrative offices) - 790 m².

COMPANY’S OFFICE

Page 10: ALVORA presentation EN web

Mounting of the 423m3 demineralized water tankand the 87m3 condensate tank.

Assembly of a shaft for a combined-cycle gas turbine:• Gas turbine 270 MW;• Steam turbine 180 MW;• Generator 455 MW;• Optional equipment.

Mounting of the high pressure pipeline 1 352 m,operating pressure 55 bar, diameter DN 400(406.4 x 8.8 mm).

EXECUTED WORKSInstallation of the 9th block at the Lithuanian Power Plant

in Elektrėnai, Lithuania

Page 11: ALVORA presentation EN web

• The construction of a gas compressor station, assemblyand installation of gas compressor unit RV050(63)/03.

• Capacity 433.330 m3/h gas, output pressure 55 bar, powered by Man Turbo AG natural gas turbine THM 1304-11 DLN,output 11.5 MW – 3 pcs.

• Assembly and installation of tubular gas cooler G12 249 27 GEA Luftkuhle GmbH with fans mounted on a single frameand rotated by variable-frequency electric motors – 3 pcs.

EXECUTED WORKSGas compressor station in Širvintos, Lithuania

Page 12: ALVORA presentation EN web

• The main gas pipeline Ø711 mm, 17 300 m• Start-up camera and camera from cleaning device Ø813• Trap components Ø711 No. 1, 2• Gas transfer platform• Gas metering and distribution station

EXECUTED WORKSLNG terminal in Klaipėda, Lithuania

Page 13: ALVORA presentation EN web

The length of uninsulated pipe 2 x ∅355.6/500 - 400 m.Installation of the fixed support, construction of a thermal camera.

EXECUTED WORKSConstruction of heating networks, in Vilnius, Lithuania

Page 14: ALVORA presentation EN web

• Production and installation ofsteel structures, installation ofreinforced concrete slab.

• Production and installation ofmetal structures stairs, masonrywalls and partitions.

• Construction works werecarried out within 4 months.

EXECUTED WORKSHotel “Le Meridien Villon” in Vilnius, Lithuania

Page 15: ALVORA presentation EN web

• Construction and installationwork of administrativebuilding, warehouse, garage,water tower, boiler room withrepair facilities and 2 pumpstations.

•Design, manufacture andinstallation of steel structures.

• Mounting of the roof and wallpanels.

EXECUTED WORKSDisposal plant of animal raw „Saria Bio-Industries“, Republic of Belarus

Page 16: ALVORA presentation EN web

Turn-key construction works.The total area of the building of the logistics center 17 500 m².

EXECUTED WORKSTransport and logistics terminal in Rakov city, Republic of Belarus

Page 17: ALVORA presentation EN web

Construction works.

The area of an industrialbuilding - 12 400 m².

The area of administrativebuilding - 3 400 m².

EXECUTED WORKSDairy factory in Turov, Republic of Belarus

Page 18: ALVORA presentation EN web

Executed construction and installationworks:• mounting of pitched tiles roof;• finishing works;• other works.

EXECUTED WORKSReconstruction of hotel in Brest, Republic of Belarus

Page 19: ALVORA presentation EN web

Turn-key construction works.The total area of the building– 24 090 m².

EXECUTED WORKSConstruction of the logistics center in the industrial zone „Borovcy“,

Baranovichi, Republic of Belarus

Page 20: ALVORA presentation EN web

Turn-key construction works:• area of building in Zelva city – 2 216 m²• area of building in Diatlovo city – 2 216 m²• area of building in Borisov city – 10 337 m²

EXECUTED WORKSConstruction of shopping centers „Evroopt“, Republic of Belarus

Page 21: ALVORA presentation EN web

Executed works:• Design, manufacture and installation of metal

structures.• Roof installation, installation of panels,

installation of roofing panels in industrial anddomestic buildings.

• Cladding profiled sheet facades.

EXECUTED WORKSExpansion of fish processing factory complex „Santa Bremor“, Republic of Belarus

Page 22: ALVORA presentation EN web

Construction of factory for the production of stretch film

• Turn-key construction works.

• The area of an industrialbuilding 11 721 m2

• The area of the office building3 130 m2

EXECUTED WORKS„Evipak Industries“, Fanipol city, Republic of Belarus

Page 23: ALVORA presentation EN web

• Production of cast bored pile foundations.• Installation of monolithic foundations (9 104 m3).• Installation of precast concrete elements (86 294 t).

EXECUTED WORKSShopping centre „Zamok“, Minsk, Republic of Belarus

Page 24: ALVORA presentation EN web

Warehouse area 13 703 м2

EXECUTED WORKSReconstruction of the logistics warehouse „Avtotor“,

Kaliningrad, Russian Federation

Page 25: ALVORA presentation EN web

Fabrication and installation of steelstructures, installation of roof and walls,making concrete slabs, flooringinstallation.

The area of the building - 30,000 m2,installed 1450 tons of metal frameworks.

EXECUTED WORKSUniversal Centre „Mega-Centre“, Kaliningrad, Russian Federation

Page 26: ALVORA presentation EN web

During its existence the company installed more than 300 kilometers of main natural gas pipelines in the territory of Lithuania and the Belarusian Republic aswell as the Russian Federation. In the period 2004-2015, works were carried out:• Construction of natural gas supplly pipeline Pabradė - Visaginas (Ø323 mm, 22 000 m)• Construction of natural gas supplly pipeline Kaunas – Šakiai (Ø711 mm, 15 200 m; trap components)• Construction of natural gas supplly pipeline Panevėžys – Klaipėda (Ø508 mm, 6 295 m)• Construction of natural gas supplly pipeline Šakiai – Jurbarkas (Ø406mm, 13 200m; trap components; cleaning device camera)• Construction of oil transmission pipeline ДРУЖБА (Druzhba), located on Унеча – Мозырь (Ø820 mm, 3 000 m)• Construction of natural gas supplly pipeline from the border of Lithuania to compressor station «Краснознаменская» (Ø720 mm, 9 200m; trap

components)• Construction of natural gas supplly pipeline Šakiai - Kaliningrad (Ø711 mm, 6 140 m; trap components)• Construction of natural gas supplly pipeline from Utena gas distribution centre (start-up camera and camera from cleaning device Ø355 mm; trap

components)• Construction of high pressure natural gas pipeline from Elektrėnai gas distribution centre to 9th CCGT block at „Lietuvos elektrinė“ (Ø406 mm, 1 352 m)• Construction of natural gas supplly pipeline tap from main gas supplly pipeline Minsk-Vilnius-Kaunas-Kaliningrad to the 2nd power block of Kaliningrad

CHP-2 (receiving chamber of cleaning unit Ø520 mm; trap components)• Construction of natural gas supplly pipeline from Tauragė gas distribution centre to Klaipėda gas distribution centre (Ø406 mm, 103 000 m, Ø323 mm,

4.500m, start-up camera and camera from cleaning device Ø406, trap components Ø406)• LNG terminal in Klaipėda (Ø711 mm, 17 300 m, start-up camera and camera from cleaning device Ø813, trap components Ø711, sea gas transfer platform,

gas metering and distribution station)

EXECUTED WORKSNatural gas supply pipelines

Page 27: ALVORA presentation EN web

In 2015, as the general contractor ourcompany perform a full range of workson the construction:

• Ø813 mm x 12.5, length 110 500 m

• Start-up camera and receivingcamera from the cleaning unit

• Trap components No.14, 15, 16, 17,18, 19, 20, 21, 22

EXECUTED WORKSConstruction of main gas supply pipeline Klaipėda – Kuršėnai

Page 28: ALVORA presentation EN web

Recreation center "Vilkokšnis"Jankovicai, Trakai district, Lithuania

In the beautiful regional park of Aukštadvarison the lake is located "Vilkokšnis" recreation center.

The cozy, two floor wooden houses provide a complete andhigh-quality comfort for a good holiday.The recreation center has eighteen houses, two tennis courts, football and basketball courts, a sauna complex.

Page 29: ALVORA presentation EN web

CJSC "Alvora"Visorių str. 33, 08300 Vilnius

The Republic of Lithuaniawww.alvora.lt

Telephone +370 5 2700 717Fax +370 5 2700 718email: [email protected]