COMPONENTE HECHO POR :REVISADO POR : ING. J.CHIRINOSFECHA : JUNIO DEL 2014
ITEM DESCRIPCION DE LA PARTIDA VECES MEDIDAS PARCIAL TOTAL
LARGO ANCHO ALTO
ITEM DESCRIPCION DE LA PARTIDA VECES LARGO ANCHO ALTO PARCIAL
VS-2 EJE 1 1.00 4.9 0.25 0.25 0.31VS-2 EJE 3 1.00 4.9 0.25 0.25 0.31VB 1.00 PER= 0.1 0.2 0.5406.04.03 LOSA ALIGERADA06.04.03.01 ACERO DE REFUERZO Fy =4,200 Kg/cm206.04.03.02 ENCOFRADO Y DESENCOFRADO PARA LOSAS ALIGERADAS
LOSA 01 1 4.75 6.8 32.3VOLADO FRONT 1 6.8 0.3 2.04VOLADO IZQ 1 4.75 0.3 1.43VOLADO DER. 1 4.75 0.3 1.43
2 0.3 0.3 0.18
LADRILLO PARA TECHO 1 289 289VOLADO FRONTAL 1 17 17
2 20 40
VIGUETA 17 5.05 0.1 0.15 1.29LOSA 1 6.8 4.75 0.05 0.24LOSA VOLADO 1 7.4 0.3 0.05 0.02
06.04.04 CAMARAS DE DESAGUE06.04.04.01 ACERO DE REFUERZO Fy =4,200 Kg/cm206.04.04.02 ENCOFRADO Y DESENCOFRADO PARA CAMARAS
TAPA DE CONCRETO 2 AREA: 0.75 1 1.5MURO CAJA DE DESAGUE 2 1.3 1.07 2.78MURO CAJA DE DESAGUE 2 2.3 1.07 4.92MURO DE POZA DE DESAGUE 2 2 1.6 6.4MURO DE POZA DE DESAGUE 2 1 1.6 3.2
2 1 1.4 2.8
TAPA DE CONCRETO 2 AREA: 0.75 0.2 0.3FONDO DE CAJA DE DESAGUE 1 1.3 2.3 0.15 0.45FONDO DE POZO DE DESAGUE 1 1.3 2.3 0.15 0.45MURO CAJA DE DESAGUE 2 1.3 0.15 1.07 0.42MURO CAJA DE DESAGUE 2 2.3 0.15 1.07 0.74
PROYECTO : "AMPLIACION y CONSTRUCCIÓN DEL SISTEMA DE ALMACENAMIENTO DE AGUA POTABLE R-4"
FORMULA : 03. RESERVORIO 500M3 y CASETA DE VALVULASLUGAR : DISTRITO DE ISLAy, PROVINCIA DE ISLAy, DEPARTAMENTO DE AREQUIPA
06.0006.0106.01.01
06.01.02
06.0206.02.01
06.02.02
06.02.03
06.02.04
06.02.05
06.02.06
06.02.08
06.0306.03.01
06.03.02
06.03.03
06.03.04
06.03.05
06.0406.04.0106.04.01.0106.04.01.02
06.04.01.03
06.04.0206.04.02.0106.04.02.02
CASETA DE VALVULASTRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL
ENTRE EJES A,D Y 1,3TRAZO NIVELES Y REPLANTEO ENTRE EJES A,D Y 1,3
MOVIMIENTO DE TIERRASCONFORMACION DE PLATAFORMA CORTE C/EQ. H=0.25 m. ENTRE EJES A,D Y 1,3
EXCAVACION ZANJAS EN TSR SIN EXPLOSIVOS EJE 1EJE 3EJE A
ENSANCHE EN CIMIENTO CORRIDO EXCAVACION PARA TUBERIAS EXCAVACION CAMARA DE DESAGUE EXCAVACION POZA DE DESAGUE
RELLENO COMPACTADO CON MATERIAL GRANULAR e=0.10 m AL 95% P.M CIMIENTOSELIMINACION DE MATERIAL EXCEDENTE HASTA 30 MT (C/CARRETILLA) EJE 1
EJE 3EJE A
ENSANCHE EN CIMIENTO CORRIDO EXCAVACION PARA TUBERIASELIMINACION DE MATERIAL EN POZA DE DESAGUE ELIMINACION DE MATERIAL EN CAMARA DE
DESAGUE RELLENOELIMINACION DE MATERIAL EXCEDENTE CARGUIO MANUAL VOLQUETE
NIVELACION INTERIOR APISONADO MANUAL INTERIOR DE CASETA DE VALVULASAFIRMADO DE 4" PARA PISOS INTERIOR DE CASETA DE VALVULAS
OBRAS DE CONCRETO SIMPLECONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS EJE 1
EJE 3EJE A
ENSANCHE EN CIMIENTO CORRIDOCONCRETO 1:8+25% PM PARA SOBRECIMIENTOS EJE 1
EJE 3EJE A
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS EJE 1EJE 3EJE A
CONCRETO F'C= 140 kg/cm2 PARA GRADAS Y DADOS DE CONCRETO DADO DE APOYOGRADAS INTERIOR DE CUARTO DE VALVULAS
ENCOFRADO Y DESENCOFRADO DE GRADAS Y DADOS DE CONCRETO GRADAS INTERIOR DE CUARTO DE VALVULAS
CONTRAPASO DADO DE APOYOOBRAS DE CONCRETO ARMADO COLUMNAS
ACERO DE REFUERZO Fy =4,200 Kg/cm2ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS COLUMNA C-1
COLUMNA C-2COLUMNA C-2
CONCRETO EN COLUMNAS F'C=210 kg/cm2COLUMNA C-1COLUMNA C-2COLUMNA C-2
VIGASACERO DE REFUERZO Fy =4,200 Kg/cm2
VIGAS: ENCOFRADO Y DESENCOFRADO V-A EJE 1V-A EJE 3
V-A EJE A V-A EJE D V-101VS-2 EJE 1VS-2 EJE 3
VIGAS: CONCRETO F'C= 210 kg/cm2V-A EJE 1V-A EJE 3
V-A EJE A V-A EJE D V-101
1.00
1.00
1.00
1.001.001.002.001.001.001.00
1.25
1.301.301.302.601.301.301.30-1.25
1.00
1.00
1.00
1.001.001.002.00
1.001.001.00
2.002.002.00
41
134
2.005.004.00
2.005.004.00
1.001.001.001.001.001.001.00
9.30
9.30
9.30
4.364.367.651.179.602.302.30
18.50
4.364.367.651.179.602.302.304.86
38.38
5.35
5.35
4.364.367.651.17
6.086.085.55
6.086.085.55
AREA: AREA:
AREA: AREA: PERI=
PER= PER= PER=
AREA: AREA: AREA:
3.903.906.604.657.404.904.90
3.903.906.604.65
6.70
6.70
6.70
0.600.600.601.000.601.301.30
0.35
0.600.600.601.000.601.301.30
6.80
6.80
0.600.600.601.00
0.250.250.25
1.001.001.00
0.060.75
0.750.171.00
1.200.500.50
0.150.060.06
PER= PER= PER= PER= PER= PER= PER=
0.250.250.25
1.551.551.551.551.201.071.75
0.60
1.551.551.551.551.201.751.07
1.001.001.001.00
0.900.900.90
0.900.900.90
0.601.00
2.001.000.60
3.202.332.70
3.202.332.70
0.700.701.001.001.200.500.50
0.350.350.500.500.60
62.31
62.31
62.31
4.054.057.113.636.913.205.23
4.86
5.275.279.254.728.996.804.16 (6.07)
38.38
36.38
36.38
2.622.624.592.34
1.371.371.25
10.9410.949.99
4.040.75
1.500.512.40
7.685.835.40
0.960.730.68
2.732.736.604.658.882.452.45
62.31
62.31
62.31
34.19
4.86
38.38
38.38
36.38
36.38
12.16
3.98
31.88
4.79
4.41
404.6118.91
2.36
540.7830.49
4.35
06.04.03.03 DET.LADRILLO HUECO DE ARCILLA 15X30X30 cm PARA TECHO ALIGERADO
06.04.03.04 VOLADO LADO IZQ Y DER.CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2
06.04.04.03 MURO DE POZA DE DESAGUECONCRETO F'C= 210 kg/cm2 EN CAMARAS
MURO POZA DE DESAGUE 2 2.3 0.15 1.6 1.1MURO POZA DE DESAGUE 2 1 0.15 1.6 0.48MURO POZA DE DESAGUE 1 1 0.15 1.4 0.21
6.05 MUROS Y TABIQUES DE ALBAÑILERIA06.05.01
EJE 1 ENTRE EJE C Y D 1 1.6 2.15 3.44EJE 3 ENTRE EJE A Y B 1 1.3 2.15 2.8EJE 3 ENTRE EJE C Y D 1 1.6 2.15 3.44EJE A 1 1.45 2.15 3.12EJE A 1 2.05 2.15 4.41EJE 1 ENTRE EJE B Y C 1 1 1 1EJE 3 ENTRE EJE B Y C 1 1 1 1EJE 1 ENTRE EJE C Y D 1 AREA= 0.55 0.55EJE 3 ENTRE EJE A Y B 1 AREA= 0.55 0.55EJE A 1 1 1 1
6.06 REVOQUES ENLUCIDOS Y MOLDURAS06.06.01
EJE 1 1 AREA= 14.3 14.3EJE 2 1 AREA= 14.3 14.3
1
EJE 1 1 AREA= 16.15 16.15EJE 2 1 AREA= 16.15 16.15BORDE DE LOSA 1 PERI= 21.5 0.2 4.3
-3 1 1 (3.00)
PER
PUERTA P-1 1 PER 5.8 5.86.07 CIELORRASOS06.07.01
MACISA 1 AREA: 1.4 1.4ALERO 1 AREA: 2.92 2.92ALERO 2 AREA: 2.63 5.26
6.08 PISOS Y PAVIMENTOS06.08.01
6.09 VEREDAS DE CONCRETO06.09.01
EJE A 1 7.3 1 7.31 6.7 1 6.7
COMPONENTE HECHO POR :REVISADO POR : ING. J.CHIRINOSFECHA : JUNIO DEL 2014
MEDIDAS
ANCHO ALTO
MURO DE LADRILLO MECANIZADO K.K. SOGA MEZCLA C:A 1:4EJE 1 ENTRE EJE A Y B
1.00 1.30 2.15 2.80
TARRAJEO EN INTERIORES CON CEMENTO ARENA 1:4EJE A
1.00 AREA= 11.80 11.80
06.06.02 VENTANA V-1TARRAJEO EN EXTERIORES CON CEMENTO ARENA 1:4EJE A
-3.00
1.00
AREA= 1.00
11.80
(3.00)
11.80
06.06.03 VENTANA V-1TARRAJEO DE VIGAS
06.06.04 V-101VESTIDURA DE DERRAMES VENTANA V-1
1.00
3
6.80
PER
4.00 0.60
12.00
CIELORRASOS CON MEZCLA DE CEMENTO-ARENA 1:4LOSA ALIGERADO
1 AREA: 32.30 32.30
PISO DE CEMENTO PULIDO PISO 1 1 AREA: 29.37 29.37
NIVELACION INTERIOR APISONADO MANUAL EJE 1 1.00 6.70 1.00 6.70
06.09.02 EJE 3AFIRMADO DE 4" PARA PISOS
PROYECTO : "AMPLIACION y CONSTRUCCIÓN DEL SISTEMA DE ALMACENAMIENTO DE AGUA POTABLE R-4"
FORMULA : 03. RESERVORIO 500M3 y CASETA DE VALVULASLUGAR : DISTRITO DE ISLAy, PROVINCIA DE ISLAy, DEPARTAMENTO DE AREQUIPAITEM
06.16.14
06.16.15
06.16.16
06.16.17
06.16.18
06.16.19
06.16.2006.16.2106.1706.17.0106.17.0206.17.0306.17.0406.17.05
DESCRIPCION DE LA PARTIDA
LINEA DE ADUCCIONLINEA DE ALIMENTACION A RESERVORIO CODO DE FIERRO FUNDIDO BB X 90° 6" (160 MM)LINEA DE ALIMENTACION A RESERVORIO CODO DE FIERRO FUNDIDO BB X 45° 8" (200 MM)LINEA DE LIMPIA Y REBOSECODO DE FIERRO FUNDIDO BB X 90° 8" (200 MM) LINEA DE LIMPIA Y REBOSETEE DE FIERRO FUNDIDO BB X 90° 8" (200 MM) LINEA DE LIMPIA Y REBOSETUBERIA DE FIERRO FUNDIDO DE 6" (160 MM) LINEA DE ADUCCIONLINEA DE ALIMENTACION A RESERVORIO TUBERIA DE FIERRO FUNDIDO DE 8" (200 MM)LINEA DE LIMPIA Y REBOSEMEDIDOR ELECTROMAGNETICO DE CAUDAL TIPO TUBULAR BB DN160 mm. INSTALACION DE ACCESORIOS FIERRO FUNDIDO 8" - 6"INSTALACIONES ELECTRICASSALIDA DE TECHO CON CABLE AWG TW 2.5 MM2SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE TABLERO DE DISTRIBUCION (STD1)CABLE ELECTRICO NYY 2-1X10 MM2 + Cu 1-10 mm2LUMINARIA FLUORESCENTE 2X36W ADOSABLE
VECES
11
1
1
1
1
11
111
1.001.001.001.001.00
PARCIAL
2.003.00
2.00
4.00
3.00
1.00
8.5011.50
19.501.0088.00
2.001.001.0012.502.00
TOTAL
2.00
4.00
3.00
1.00
20.00
19.50
1.0088.00
2.001.001.0012.502.00
LARGO2.003.00
2.00
4.00
3.00
1.00
8.5011.50
19.501.0088.00
2.001.001.0012.502.00
:: ING. J.CHIRINOS: JUNIO DEL 2014
TOTAL UND
TOTAL UND
363.46 KG37.37 M2
123.44 KG21.6 M2
62.31
62.31
62.31
34.19
4.86
38.38
38.38
36.38
36.38
12.16
3.98
31.88
4.79
4.41
404.6118.91
2.36
540.7830.49
4.35
M2
M2
M2
M3
M3
M3
M3
M2
M2
M3
M3
M2
M3
M2
KG M2
M3
KG M2
M3
346.00 UND
1.54 M3
4.15 M3
24.1 M2
37.4 M2
41.88 M2
29.37 M2
20.7 M2
:: ING. J.CHIRINOS: JUNIO DEL 2014
UND
45.40 M2
0.60 M2
17.80 M
20.70 M2
TOTAL
2.00
4.00
3.00
1.00
20.00
19.50
1.0088.00
2.001.001.0012.502.00
UND UND UND UND MM UNDUND
pto pto pto m. und