  • HOJA DE RESUMEN METRADOS DE OBRA

    PROPIETARIO: MUNICIPALIDAD DISTRITAL DE MOLINOSDISTRITO: MOLINOSPROVINCIA: JAUJAREGION: JUNIN FECHA : ENERO 2012GRUPO: ESTRUCTURAS HECHO : MAVV

    PARTIDA DESCRIPCION UNID. BLOQUE I BLOQUE II BLOQUE III BLOQUE IV BLOQUE V CERCO EXTERIOR TOTAL

    I.- ESTRUCTURAS01.00 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES01.01 Limpieza de terreno m2 159.38 191.25 201.52 347.40 58.00 182.35 869.70 2009.60

    `01.02 Trazo, Niveles y Replanteo m2 159.38 191.25 201.52 347.40 58.00 182.35 869.70 2009.6001.03 Cartel de Obra 7.20X3.60 glb 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.0001.04 Oficina, Guardiania y Almacen General glb 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.0001.05 Obras Preliminares varias (inst. agua, luz, desague) glb 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.0001.06 Movilizacin de Equipo est 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00

    02.00 MOVIMIENTO DE TIERRAS02.01 Excavacin de zanjas hasta H=2.00 m. m3 322.46

    02.01.01 Zapatas m3 54.52 36.53 40.96 35.88 10.40 0.00 0.00 178.2802.01.02 Cimientos m3 27.26 4.41 7.66 39.31 10.84 54.71 0.00 144.18

    02.02 Relleno compactado con material propio m3 16.24 8.89 9.35 17.25 0.54 7.29 0.00 59.5602.03 Eliminacion de material excedente m3 85.20 41.67 51.06 75.31 26.91 61.63 0.00 341.7702.04 Nivelacin interior y Apisonado de Terreno E = 0.15 m. m2 159.38 191.25 201.52 347.40 58.00 0.00 869.70 1827.2502.05 Corte superficial terreno con maquinaria m3 15.94 19.13 20.15 34.74 5.80 0.00 0.00 95.7602.06 Relleno con material seleccionado a maquinaria m3 21.21 210.38 221.67 277.92 0.00 0.00 77.36 808.5402.07 Demolicin de construcciones existentes m2 195.00 220.00 315.45 38.50 8.00 91.18 58.85 926.9803.00 OBRAS DE CONCRETO SIMPLE03.01 Solado para zapatas, Concreto 1:12 E= 10 cm. m2 31.55 39.00 44.75 38.50 8.00 0.00 0.00 161.8003.02 Cimiento corrido, Concreto C:H = 1:10 + 30% P.G. m3 19.28 26.35 30.65 27.14 11.90 45.59 0.00 160.8903.03 Sobrecimientos

    03.03.01 Concreto C:H = 1:8 + 25% P.M. m3 3.10 4.92 4.01 5.21 7.47 10.94 0.00 35.6503.03.02 Encofrado y desencofrado m2 6.19 62.96 53.48 69.49 29.88 145.88 0.00 367.89

    03.04 Gradas y Rampas03.04.01 Concreto en gradas, F'c = 140 Kg/m2 m3 0.00 0.00 califor 0.00 0.00 0.00 25.10 25.1003.04.02 Encofrado y desencofrado de gradas m2 0.00 0.00 0.00 0.00 0.00 0.00 63.65 63.65

    03.05 Jardinera Tipo II y III03.05.01 Concreto en jardinera, F'c = 140 Kg/m2 m3 0.00 0.00 0.00 0.00 0.00 0.00 19.87 19.8703.05.02 Encofrado y desencofrado de jardinera m2 0.00 0.00 0.00 0.00 0.00 0.00 150.25 150.25

    03.06 Fuente de Agua03.06.01 Concreto en fuente, F'c = 140 Kg/m2 m3 0.00 0.00 0.00 0.00 0.00 0.00 3.78 3.7803.06.02 Encofrado y desencofrado de fuente m2 0.00 0.00 0.00 0.00 0.00 0.00 14.40 14.40

    04.00 OBRAS DE CONCRETO ARMADO04.01 ZAPATAS

    04.01.01 Concreto F'c= 210 Kg/cm m3 18.93 23.40 26.85 23.10 4.80 0.00 0.00 97.0804.01.02 Acero Fy=4200Kg/cm kg 447.08 570.24 667.26 568.26 79.20 0.00 0.00 2332.04

    04.02 VIGAS DE CIMENTACION04.02.01 Concreto F'c=210 kg/cm m3 7.01 8.00 8.92 10.68 2.53 0.00 0.00 37.1404.02.02 Encofrado y desencofrado (dos usos) m2 56.08 64.00 71.36 85.44 15.48 0.00 0.00 292.3604.02.03 Acero Fy=4200 kg/cm2 kg 775.25 884.15 1052.92 1143.34 334.89 0.00 0.00 4190.55

    04.03 COLUMNAS04.03.01 Concreto F'c=210 kg/cm m3 8.71 9.23 11.03 7.49 2.15 8.51 0.00 47.1204.03.02 Encofrado y desencofrado - columnas normal m2 107.93 110.81 132.38 112.35 34.40 226.92 0.00 724.7804.03.04 Acero Fy=4200 kg/cm kg 979.98 1102.65 1319.59 910.27 369.50 900.85 0.00 5582.84

    04.04 VIGAS04.04.01 Concreto F'c=210 kg/cm m3 7.01 8.00 8.92 10.68 3.03 3.71 0.00 41.3504.04.02 Encofrado y desencofrado m2 73.61 84.00 93.66 100.12 34.38 148.23 0.00 534.0004.04.03 Acero Fy=4200 kg/cm2 kg 817.88 926.78 998.83 1059.49 334.89 420.17 0.00 4558.04

    04.05 LOSAS MACIZAS04.05.01 Concreto F'c=210 kg/cm m3 0.00 0.00 1.75 4.80 9.87 0.00 0.00 16.4204.05.02 Encofrado y desencofrado m2 0.00 0.00 17.49 47.98 65.79 0.00 0.00 131.2604.05.03 Acero Fy=4200 kg/cm2 kg 0.00 0.00 86.53 241.36 769.97 0.00 0.00 1097.86

    04.06 PLACAS04.06.01 Concreto F'c=210 kg/cm m3 0.00 0.00 1.09 2.47 0.00 0.00 0.00 3.5604.06.02 Encofrado y desencofrado m2 0.00 0.00 31.46 71.24 0.00 0.00 0.00 102.7004.06.03 Acero Fy=4200 kg/cm2 kg 0.00 0.00 75.94 172.71 0.00 0.00 0.00 248.65

    04.07 RAMPAS04.07.01 Concreto F'c = 210 Kg/cm2 m3 0.00 0.00 0.00 0.00 0.00 0.00 10.23 10.2304.07.02 Encofrado y Desencofrado m2 0.00 0.00 0.00 0.00 0.00 0.00 100.02 100.0204.07.03 Acero Fy=4200 kg/cm kg 0.00 0.00 0.00 0.00 0.00 0.00 111.79 111.79

    04.08 BANCAS04.08.01 Concreto F'c = 210 Kg/cm2 m3 0.00 0.00 0.00 0.00 0.00 0.00 2.86 2.8604.08.02 Encofrado y Desencofrado m2 0.00 0.00 0.00 0.00 0.00 0.00 15.16 15.1604.08.03 Acero Fy=4200 kg/cm kg 0.00 0.00 0.00 0.00 0.00 0.00 49.28 49.28

    04.09 JARDINERAS04.09.01 Concreto F'c = 210 Kg/cm2 m3 0.00 0.00 0.00 0.00 0.00 0.00 9.81 9.81

    PROYECTO: "MEJORAMIENTO Y EQUIPAMIENTO DE LA I.E.SECUNDARIA LEONCIO QUISPE DE CHAUPIMARCA DELDISTRITO DE MOLINOS, PROVINCIA DE JAUJA- JUNIN"

  • PARTIDA DESCRIPCION UNID. BLOQUE I BLOQUE II BLOQUE III BLOQUE IV BLOQUE V CERCO EXTERIOR TOTAL

    04.09.02 Encofrado y Desencofrado m2 0.00 0.00 0.00 0.00 0.00 0.00 73.50 73.5004.09.03 Acero Fy=4200 kg/cm kg 0.00 0.00 0.00 0.00 0.00 0.00 180.32 180.32

    04.10 SOBRECIMIENTOS REFORZADOS04.10.01 Concreto F'c=210 kg/cm m3 6.65 0.00 0.00 0.00 0.00 0.00 0.00 6.6504.10.02 Encofrado y desencofrado m2 88.68 0.00 0.00 0.00 0.00 0.00 0.00 88.6804.10.03 Acero Fy=4200 kg/cm2 kg 202.72 0.00 0.00 0.00 0.00 0.00 0.00 202.72

    05.00 ESTRUCTURAS METALICAS05.01 COLUMNAS METALICAS

    05.01.01 Pieza para armado- CM1 pza 2.00 2.00 2.00 0.00 0.00 0.00 0.00 6.0005.01.02 Pieza para armado- CM2 pza 2.00 3.00 2.00 7.00 0.00 0.00 0.00 14.0005.01.03 Pieza para montaje- CM1 pza 2.00 2.00 2.00 0.00 0.00 0.00 0.00 6.0005.01.04 Pieza para montaje- CM2 pza 2.00 3.00 2.00 7.00 0.00 0.00 0.00 14.00

    05.02 VIGAS METALICAS05.02.01 Viga para armado - VMA ml 18.30 22.50 21.90 54.20 0.00 0.00 0.00 116.9005.02.02 Viga para armado - VMB ml 18.22 22.60 22.70 54.20 0.00 0.00 0.00 117.7205.02.03 Viga para armado - VM1, VM11 ml 63.25 71.48 82.13 93.50 0.00 0.00 0.00 310.3605.02.04 Viga para montaje - VMA ml 18.30 22.50 21.90 54.20 0.00 0.00 0.00 116.9005.02.05 Viga para montaje - VMB ml 18.22 22.60 22.70 54.20 0.00 0.00 0.00 117.7205.02.06 Viga para montaje - VM1, VM11 ml 63.25 71.48 82.13 93.50 0.00 0.00 0.00 310.36

    06.00 OTROS06.01 Rotura de Probetas und 15.00 15.00 15.00 15.00 5.00 8.00 5.00 78.0006.02 Flete est 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.0006.03 Placa recordatoria und 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00

  • HOJA DE METRADOS DE OBRA

    PROPIETARIO: MUNICIPALIDAD DISTRITAL DE MOLINOSDISTRITO: MOLINOSPROVINCIA: JAUJAREGION: JUNIN FECHA : ENERO 2012GRUPO: ESTRUCTURAS - BLOQUE I HECHO : MAVV

    PARTIDA DESCRIPCION UNID. CANT.MEDIDAS

    PARCIALLARGO ANCHO ALTO

    I.- ESTRUCTURAS01.00 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES01.01 Limpieza de terreno m2 1.00 159.38 159.38

    `01.02 Trazo, Niveles y Replanteo m2 1.00 159.38 159.3801.03 Cartel de Obra 7.20X3.60 glb 1.00 0.00 0.0001.04 Oficina, Guardiania y Almacen General glb 1.00 0.00 0.0001.05 Obras Preliminares varias (inst. agua, luz, desague) glb 1.00 0.00 0.0001.06 Movilizacin de Equipo est 1.00 0.00 0.00

    02.00 MOVIMIENTO DE TIERRAS02.01 Excavacin de zanjas hasta H=2.00 m.

    02.01.01 Zapatas m3Z-1 6.00 1.50 1.50 1.90 25.65Z-2 4.00 1.50 1.50 1.90 17.10Z-3 1.00 1.27 1.30 1.65Z-4 2.00 0.80 0.80 1.30 1.66Z-5 2.00 1.50 1.50 1.30 5.85Z-6 2.00 1.00 1.00 1.30 2.60

    02.01.02 Cimientos m3Muros de sogaEje 1'-1' 1.00 3.50 0.50 0.80 1.40

    1.00 3.20 0.50 0.80 1.28Eje 1-1 1.00 4.90 0.50 1.20 2.94Eje 2-2 1.00 4.90 0.50 1.20 2.94Eje 3-3 1.00 4.90 0.50 1.20 2.94Eje 4-4 1.00 4.90 0.50 1.20 2.94Eje 5-5 1.00 4.90 0.50 1.20 2.94Eje A-A entre Eje 1-2 1.00 1.55 0.50 1.20 0.93Eje A-A entre Eje 2-3 1.00 2.75 0.50 1.20 1.65Eje A-A entre Eje 3-4 1.00 2.48 0.50 1.20 1.49Eje A-A entre Eje 4-5 1.00 1.45 0.50 1.20 0.87Eje B-B entre Eje 1-2 1.00 1.55 0.50 1.20 0.93Eje B-B entre Eje 2-3 1.00 2.75 0.50 1.20 1.65Eje B-B entre Eje 3-4 1.00 2.48 0.50 1.20 1.49Eje B-B entre Eje 4-5 1.00 1.45 0.50 1.20 0.87

    02.02 Relleno compactado con material propioZapatas m3Z-1 6.00 1.50 1.50 1.90 25.65Descontando Volumen Zapata(Inc. Solado) -6.00 1.50 1.50 0.70 -9.45Descontando Volumen Columna -6.00 0.50 0.25 1.20 -0.90Descontando Volumen Cimiento -6.00 3.10 0.50 1.00 -9.30Descontando Volumen Sobrecimiento -6.00 3.10 0.15 0.20 -0.56Z-2 4.00 1.50 1.80 1.90 20.52Descontando Volumen Zapata(Inc. Solado) -4.00 1.50 1.80 0.70 -7.56Descontando Volumen Columna -4.00 0.50 0.25 1.20 -0.60Descontando Volumen Cimiento -4.00 2.80 0.50 1.00 -5.60Descontando Volumen Sobrecimiento -4.00 2.80 0.15 0.20 -0.34Z-3 1.00 1.27 1.30 1.65Descontando Volumen Zapata(Inc. Solado) -1.00 1.27 0.60 -0.76Descontando Volumen Columna -2.00 0.25 0.25 0.60 -0.08Descontando Volumen Cimiento -1.00 1.50 0.50 0.60 -0.45Descontando Volumen Sobrecimiento -1.00 1.50 0.15 0.20 -0.05Z-4 2.00 0.80 0.80 1.30 1.66Descontando Volumen Zapata(Inc. Solado) -2.00 0.80 0.80 0.60 -0.77Descontando Volumen Columna -2.00 0.25 0.25 0.60 -0.08Descontando Volumen Cimiento -2.00 0.55 0.50 0.60 -0.33Descontando Volumen Sobrecimiento -2.00 0.55 0.15 0.20 -0.03Z-5 2.00 1.50 1.50 1.30 5.85Descontando Volumen Zapata(Inc. Solado) -2.00 1.50 1.50 0.70 -3.15Descontando Volumen Columna -2.00 0.65 0.35 0.50 -0.23Z-6 2.00 1.00 1.00 1.30 2.60

    PROYECTO: "MEJORAMIENTO DE LA CALIDAD DEL SERVICIO EDUCATIVO DE LA I.E. SECUNDARIA LEONCIO QUISPE - DISTRITO DE MOLINOS, PROVINCIA DE JAUJA- JUNN"

  • Descontando Volumen Zapata(Inc. Solado) -2.00 1.00 1.00 0.70 -1.40Descontando Volumen Columna -2.00 0.40 0.20 0.50 -0.08

    02.03 Eliminacion de material excedentePartida 02.01 - 02.02 + 30% esponjamiento m3 1.00 65.54 1.30 85.20

    02.04 Nivelacin interior y Apisonado de Terreno E = 0.15 m. m2Bloque I 1.00 159.38 159.38

    02.05 Corte superficial terreno con maquinaria m3Bloque I 1.00 159.38 0.10 15.94

    02.06 Relleno con material seleccionado a maquinaria m3En Escenario 1.00 21.21 1.00 21.21

    02.07 Demolicin de construcciones existentes m2Bloque I 1.00 195.00 195.00

    03.00 OBRAS DE CONCRETO SIMPLE03.01 Solado para zapatas, Concreto 1:12 E= 10 cm. m2

    Z-1 6.00 1.50 1.50 13.50Z-2 4.00 1.50 1.50 9.00Z-3 1.00 1.27 1.27Z-4 2.00 0.80 0.80 1.28Z-5 2.00 1.50 1.50 4.50Z-6 2.00 1.00 1.00 2.00

    03.02 Cimiento corrido, Concreto C:H = 1:10 + 30% P.G. m3Muros de sogaEje 1'-1' 1.00 2.95 0.60 0.50 0.89

    1.00 3.20 0.60 0.50 0.96Eje 1-1 1.00 7.50 0.50 0.60 2.25Eje 2-2 1.00 7.50 0.50 0.60 2.25

    2.00 1.00 0.50 0.60 0.602.00 0.50 0.50 0.60 0.30

    Eje 5-5 1.00 7.50 0.50 0.60 2.25Eje A-A entre Eje 1-2 1.00 4.03 0.50 0.60 1.21Eje A-A entre Eje 2-3 1.00 4.28 0.50 0.60 1.28Eje A-A entre Eje 3-4 1.00 4.03 0.50 0.60 1.21Eje A-A entre Eje 4-5 1.00 3.98 0.50 0.60 1.19Eje B-B entre Eje 1-2 1.00 4.03 0.50 0.60 1.21Eje B-B entre Eje 2-3 1.00 4.28 0.50 0.60 1.28Eje B-B entre Eje 3-4 1.00 4.03 0.50 0.60 1.21Eje B-B entre Eje 4-5 1.00 3.98 0.50 0.60 1.19

    03.03 Sobrecimientos, concreto C:H = 1:8 + 25% P.M. m3Muros de sogaEje 1'-1' 1.00 2.95 0.15 0.40 0.18

    1.00 3.20 0.15 0.40 0.19Eje 1-1 1.00 7.50 0.15 0.40 0.45Eje 5-5 1.00 7.50 0.15 0.40 0.45Eje A-A entre Eje 1-2 1.00 4.03 0.15 0.40 0.24Eje A-A entre Eje 2-3 1.00 4.28 0.15 0.40 0.26Eje A-A entre Eje 3-4 1.00 4.03 0.15 0.40 0.24Eje A-A entre Eje 4-5 1.00 3.98 0.15 0.40 0.24Eje B-B entre Eje 1-2 1.00 4.03 0.15 0.40 0.24Eje B-B entre Eje 2-3 1.00 2.14 0.15 0.40 0.13Eje B-B entre Eje 3-4 1.00 4.03 0.15 0.40 0.24Eje B-B entre Eje 4-5 1.00 3.98 0.15 0.40 0.24

    03.03.02 Encofrado y desencofrado m2Eje 1'-1' 2.00 2.95 0.15 0.40 0.35

    2.00 3.20 0.15 0.40 0.38Eje 1-1 2.00 7.50 0.15 0.40 0.90Eje 5-5 2.00 7.50 0.15 0.40 0.90Eje A-A entre Eje 1-2 2.00 4.03 0.15 0.40 0.48Eje A-A entre Eje 2-3 2.00 4.28 0.15 0.40 0.51Eje A-A entre Eje 3-4 2.00 4.03 0.15 0.40 0.48Eje A-A entre Eje 4-5 2.00 3.98 0.15 0.40 0.48Eje B-B entre Eje 1-2 2.00 4.03 0.15 0.40 0.48Eje B-B entre Eje 2-3 2.00 2.14 0.15 0.40 0.26Eje B-B entre Eje 3-4 2.00 4.03 0.15 0.40 0.48Eje B-B entre Eje 4-5 2.00 3.98 0.15 0.40 0.48

    03.04 Gradas y Rampas

  • 03.04.01 Concreto en gradas y rampas, F'c = 140 Kg/m2 m3Bloque I 1.00 0.00 0.00

    03.04.02 Encofrado y desencofrado de gradas m2Bloque I 1.00 0.00 0.00

    03.05 Jardinera Tipo II y III03.05.01 Concreto en jardineras F'c = 140 Kg/m2 m3

    Bloque I 1.00 0.00 0.00

    03.05.02 Encofrado y desencofrado de jardinera m2Bloque I 1.00 0.00 0.00

    03.06 Fuente de Agua03.06.01 Concreto en fuente, F'c = 140 Kg/m2 m3

    Bloque I 1.00 0.00 0.00

    03.06.02 Encofrado y desencofrado de fuente m2Bloque I 1.00 0.00 0.00

    04.00 OBRAS DE CONCRETO ARMADO04.01 ZAPATAS

    04.01.01 Concreto F'c= 210 Kg/cm m3Z-1 6.00 1.50 1.50 0.60 8.10Z-2 4.00 1.50 1.50 0.60 5.40Z-3 1.00 1.27 0.60 0.76Z-4 2.00 0.80 0.80 0.60 0.77Z-5 2.00 1.50 1.50 0.60 2.70Z-6 2.00 1.00 1.00 0.60 1.20

    Parcial

    04.01.02 Acero Fy=4200Kg/cm kgZ-1 (x) 6.00 12.00 1.50 1/2" 0.99 106.92Z-1 (Y) 6.00 12.00 1.50 1/2" 0.99 106.92Z-2 (x) 4.00 12.00 1.50 1/2" 0.99 71.28Z-2 (Y) 4.00 12.00 1.50 1/2" 0.99 71.28Z-3 (x) 1.00 3.00 1.60 1/2" 0.99 4.75Z-3 (Y) 1.00 6.00 0.80 1/2" 0.99 4.75Z-4 (x) 2.00 4.00 1.00 1/2" 0.99 7.92Z-4 (Y) 2.00 6.00 1.00 1/2" 0.99 11.88Z-5 (x) 2.00 7.00 1.50 1/2" 0.99 20.79Z-5 (Y) 2.00 7.00 1.50 1/2" 0.99 20.79Z-6 (x) 2.00 5.00 1.00 1/2" 0.99 9.90Z-6 (Y) 2.00 5.00 1.00 1/2" 0.99 9.90

    04.02 VIGAS DE CIMENTACION04.02.01 Concreto F'c=210 kg/cm m3

    VCONEX 1,2 (.25 x .40)Entre el Eje 1-2 2.00 4.03 0.25 0.40 0.81Entre el Eje 2-3 2.00 4.28 0.25 0.40 0.86Entre el Eje 3-4 2.00 4.03 0.25 0.40 0.81Entre el Eje 4-5 2.00 3.98 0.25 0.40 0.80

    VCONEX A,B,C,D,E (.25 x .40) 5.00 7.50 0.25 0.40 3.75

    04.02.02 Encofrado y desencofrado m2VCONEX 1,2 (.25 x .40)Entre el Eje 1-2 4.00 4.03 0.40 6.44Entre el Eje 2-3 4.00 4.28 0.40 6.84Entre el Eje 3-4 4.00 4.03 0.40 6.44Entre el Eje 4-5 4.00 3.98 0.40 6.36

    VCONEX A,B,C,D,E (.25 x .40) 10.00 7.50 0.40 30.00

    Parcial

    04.02.03 Acero Fy=4200 kg/cm2 kgVCONEX 1,2 (.25 x .40)Acero Longitudinal Superior 2.00 3.00 18.00 1/2" 0.99 106.92Acero Longitudinal Inferior 2.00 3.00 18.00 1/2" 0.99 106.92Estribos 2.00 83.00 1.30 3/8" 0.56 120.85

    VCONEX A,B,C,D,E (.25 x .40)Acero Longitudinal Superior 5.00 4.00 8.00 1/2" 0.99 158.40

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

  • Acero Longitudinal Inferior 5.00 4.00 8.00 1/2" 0.99 158.40Estribos 5.00 34.00 1.30 3/8" 0.56 123.76

    04.03 COLUMNAS04.03.01 Concreto F'c=210 kg/cm m3

    C-1 (Eje A-A) 5.00 0.25 0.50 5.85 3.66C-1 (Eje B-B) 5.00 0.25 0.50 6.70 4.19C-2 3.00 0.25 0.25 4.60 0.86

    04.03.02 Encofrado y desencofrado - columnas normal m2C-1 (Eje A-A) 5.00 1.50 5.85 43.88C-1 (Eje B-B) 5.00 1.50 6.70 50.25C-2 3.00 1.00 4.60 13.80

    Parcial

    04.03.04 Acero Fy=4200 kg/cm kgC-1 (Eje A-A) Acero Longitudinal 5.00 4.00 6.85 5/8" 1.55 212.35

    5.00 2.00 6.85 1/2" 0.99 67.82Estribos 5.00 30.00 1.50 3/8" 0.56 126.00C-1 (Eje B-B) Acero Longitudinal 5.00 4.00 7.70 5/8" 1.55 238.70

    5.00 2.00 7.70 1/2" 0.99 76.23Estribos 5.00 35.00 1.50 3/8" 0.56 147.00C-2Acero Longitudinal 3.00 4.00 5.60 1/2" 0.99 66.53Estribos 3.00 27.00 1.00 3/8" 0.56 45.36

    04.04 VIGAS04.04.01 Concreto F'c=210 kg/cm m3

    VIGA A,B (.25 x .40)Entre el Eje 1-2 2.00 4.03 0.25 0.40 0.81Entre el Eje 2-3 2.00 4.28 0.25 0.40 0.86Entre el Eje 3-4 2.00 4.03 0.25 0.40 0.81Entre el Eje 4-5 2.00 3.98 0.25 0.40 0.80

    VIGA P 1,2,3,4,5 (.25 x .40) 5.00 7.50 0.25 0.40 3.75

    04.04.02 Encofrado y desencofrado m2VIGA A,B (.25 x .40)Entre el Eje 1-2 4.00 4.03 0.40 6.44

    2.00 4.03 0.25 2.01Entre el Eje 2-3 4.00 4.28 0.40 6.84

    2.00 4.28 0.25 2.14Entre el Eje 3-4 4.00 4.03 0.40 6.44

    2.00 4.03 0.25 2.01Entre el Eje 4-5 4.00 3.98 0.40 6.36

    2.00 3.98 0.25 1.99

    VIGA P 1,2,3,4,5 (.25 x .40) 10.00 7.50 0.40 30.005.00 7.50 0.25 9.38

    Parcial

    04.04.03 Acero Fy=4200 kg/cm2 kgVIGA A,B (.25 x .40)Acero Longitudinal Superior 2.00 3.00 18.00 1/2" 0.99 106.92Acero Longitudinal Inferior 2.00 3.00 18.00 1/2" 0.99 106.92Bastones Extremos 2.00 2.00 2.00 5/8" 1.55 12.40Bastones Medios 2.00 3.00 3.25 5/8" 1.55 30.23Estribos 2.00 83.00 1.30 3/8" 0.56 120.85

    VCONEX A,B,C,D,E (.25 x .40)Acero Longitudinal Superior 5.00 4.00 8.00 1/2" 0.99 158.40Acero Longitudinal Inferior 5.00 4.00 8.00 1/2" 0.99 158.40Estribos 5.00 34.00 1.30 3/8" 0.56 123.76

    04.05 LOSAS MACIZAS04.05.01 Concreto F'c=210 kg/cm m3

    Bloque I 1.00 0.00 0.00

    04.05.02 Encofrado y desencofrado m2Bloque I 1.00 0.00 0.00

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

  • 04.05.03 Acero Fy=4200 kg/cm2 kgBloque I 1.00 0.00 0.00

    04.06 PLACAS04.06.01 Concreto F'c=210 kg/cm m3

    Bloque I 1.00 0.00 0.00

    04.06.02 Encofrado y desencofrado m2Bloque I 1.00 0.00 0.00

    04.06.03 Acero Fy=4200 kg/cm2 kgBloque I 1.00 0.00 0.00

    04.07 RAMPAS04.07.01 Concreto F'c = 175 Kg/cm2 M3

    Bloque I 1.00 0.00 0.00

    04.07.02 Encofrado y Desencofrado M2Bloque I 1.00 0.00 0.00

    04.07.03 Acero Fy=4200 kg/cm kgBloque I 1.00 0.00 0.00

    04.08 BANCAS04.08.01 Concreto F'c = 175 Kg/cm2 M3

    Bloque I 1.00 0.00 0.00

    04.08.02 Encofrado y Desencofrado M2Bloque I 1.00 0.00 0.00

    04.08.03 Acero Fy=4200 kg/cm kgBloque I 1.00 0.00 0.00

    04.09 JARDINERAS04.09 Concreto F'c = 175 Kg/cm2 M3

    04.09.01 Bloque I 1.00 0.00 0.00

    04.09.02 Encofrado y Desencofrado M2Bloque I 1.00 0.00 0.00

    04.09.03 Acero Fy=4200 kg/cm kgBloque I 1.00 0.00 0.00

    04.10 SOBRECIMIENTOS REFORZADOS04.10.01 Concreto F'c=210 kg/cm m3

    En el eje 1-1 1.00 7.50 0.15 1.70 1.91Entre el eje 1-1 y el eje 2-2 1.00 10.20 0.15 1.70 2.60En el eje 5-5 1.00 7.50 0.15 1.90 2.14

    04.10.02 Encofrado y desencofrado m2En el eje 1-1 2.00 7.50 1.70 25.50Entre el eje 1-1 y el eje 2-2 2.00 10.20 1.70 34.68En el eje 5-5 2.00 7.50 1.90 28.50

    Parcial

    04.10.03 Acero Fy=4200 kg/cm2 kgEn el eje 1-1 (X) 8.00 7.90 3/8" 0.56 35.39En el eje 1-1 (Y) 30.00 1.90 3/8" 0.56 31.92Entre el eje 1-1 y el eje 2-2 (X) 8.00 10.50 3/8" 0.56 47.04Entre el eje 1-1 y el eje 2-2 (Y) 42.00 1.90 3/8" 0.56 44.69En el eje 5-5 (X) 2.00 7.50 3/8" 0.56 8.40En el eje 5-5 (Y) 30.00 2.10 3/8" 0.56 35.28

    05.00 ESTRUCTURAS METALICAS05.01 COLUMNAS METALICAS

    05.01.01 Pieza para armado- CM1 pzaColumnas Metalica 1 1.00 2.00 2.00

    05.01.02 Pieza para armado- CM2 pzaColumnas Metalica 2 1.00 2.00 2.00

    05.01.03 Pieza para montaje- CM1 pzaColumnas Metalica 1 1.00 2.00 2.00

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

  • 05.01.04 Pieza para montaje- CM2 pzaColumnas Metalica 2 1.00 2.00 2.00

    05.02 VIGAS METALICAS

    05.02.01 Viga para armado - VMA mlViga Metalica A 1.00 18.30 18.30

    05.02.02 Viga para armado - VMB mlViga Metalica B 1.00 18.22 18.22

    05.02.03 Viga para armado - VM1, VM11 mlViga Metalica 1 1.00 11.90 11.90Viga Metalica 2 1.00 12.30 12.30Viga Metalica 3 1.00 12.65 12.65Viga Metalica 4 1.00 13.00 13.00Viga Metalica 5 1.00 13.40 13.40

    05.02.04 Viga para montaje - VMA mlViga Metalica A 1.00 18.30 18.30

    05.02.05 Viga para montaje - VMB mlViga Metalica B 1.00 18.22 18.22

    05.02.06 Viga para montaje - VM1, VM11 mlViga Metalica 1 1.00 11.90 11.90Viga Metalica 2 1.00 12.30 12.30Viga Metalica 3 1.00 12.65 12.65Viga Metalica 4 1.00 13.00 13.00Viga Metalica 5 1.00 13.40 13.40

    06.00 OTROS06.01 ROTURA DE PROBETAS

    Cimientos, Columnas, Vigas, Losas, etc. Unid 1.00 15.00 15.0006.02 FLETE

    para materiales y equipo en general est 1.00 0.00 0.0006.03 PLACA RECORDATORIA

    Placa recordatoria Unid 1.00 0.00 0.00

  • HOJA DE METRADOS DE OBRA

    PROPIETARIO: MUNICIPALIDAD DISTRITAL DE MOLINOSDISTRITO: MOLINOSPROVINCIA: JAUJA

    FECHA : ENERO 2012HECHO : MAVV

    TOTAL

    159.38159.38

    0.000.000.000.00

    54.52

    27.26

    16.24

    PROYECTO: "MEJORAMIENTO DE LA CALIDAD DEL SERVICIO EDUCATIVO DE LA I.E. SECUNDARIA LEONCIO QUISPE - DISTRITO

  • 85.20

    159.38

    15.94

    21.21

    195.00

    31.55

    19.28

    3.10

    6.19

  • 0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    18.93

    Total

    447.08

    7.01

    56.08

    Total

    775.25

  • 8.71

    107.93

    Total

    979.98

    7.01

    73.61

    Total

    817.88

    0.00

    0.00

  • 0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    6.65

    88.68

    Total

    202.72

    2.00

    2.00

    2.00

  • 2.00

    18.30

    18.22

    63.25

    18.30

    18.22

    63.25

    15.00

    0.00

    0.00

  • HOJA DE METRADOS DE OBRA

    PROPIETARIO: MUNICIPALIDAD DISTRITAL DE MOLINOSDISTRITO: MOLINOSPROVINCIA: JAUJAREGION: JUNIN FECHA : ENERO 2012GRUPO: ESTRUCTURAS - BLOQUE II HECHO : MAVV

    PARTIDA DESCRIPCION UNID. CANT.MEDIDAS

    PARCIAL TOTALLARGO ANCHO ALTO

    I.- ESTRUCTURAS01.00 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES01.01 Limpieza de terreno m2 1.00 22.50 8.50 191.25 191.25

    `01.02 Trazo, Niveles y Replanteo m2 1.00 22.50 8.50 191.25 191.2501.03 Cartel de Obra 7.20X3.60 glb 1.00 0.00 0.00 0.0001.04 Oficina, Guardiania y Almacen General glb 1.00 0.00 0.00 0.0001.05 Obras Preliminares varias (inst. agua, luz, desague) glb 1.00 0.00 0.00 0.0001.06 Movilizacin de Equipo est 1.00 0.00 0.00 0.00

    02.00 MOVIMIENTO DE TIERRAS02.01 Excavacin de zanjas hasta H=2.00 m. 36.53

    02.01.01 Zapatas m3Z-1 10.00 1.50 1.50 0.85 19.13Z-2 4.00 1.50 1.50 0.85 7.65Z-5 2.00 1.50 1.50 1.30 5.85Z-6 3.00 1.00 1.00 1.30 3.90

    02.01.02 Cimientos m3 4.41Muros de sogaEje 1-1 1.00 3.10 0.50 0.15 0.23Eje 2-2 1.00 4.70 0.50 0.15 0.35Eje 3-3 1.00 3.10 0.50 0.15 0.23Eje 4-4 1.00 3.10 0.50 0.15 0.23Eje 5-5 1.00 3.10 0.50 0.15 0.23Eje A-A entre Eje 1-2 1.00 1.29 0.50 0.15 0.10Eje A-A entre Eje 2-3 1.00 2.58 0.50 0.15 0.19Eje A-A entre Eje 3-4 1.00 5.20 0.50 0.15 0.39Eje A-A entre Eje 4-5 1.00 4.13 0.50 0.15 0.31Eje B-B entre Eje 1-2 1.00 1.29 0.50 0.15 0.10Eje B-B entre Eje 2-3 1.00 2.58 0.50 0.15 0.19Eje B-B entre Eje 3-4 1.00 5.20 0.50 0.15 0.39Eje B-B entre Eje 4-5 1.00 4.13 0.50 0.15 0.31Entre el eje 4-5 y el eje A-B 1.00 6.23 0.50 0.15 0.47Division S.H. y Almacen 2.00 1.05 0.50 0.15 0.16Division S.H., Almacen y Ambientes 2.00 3.50 0.50 0.15 0.53

    02.02 Relleno compactado con material propioZapatas m3 8.89Z-1 10.00 1.50 1.50 0.85 19.13Descontando Volumen Zapata(Inc. Solado) -10.00 1.50 1.50 0.70 -15.75Descontando Volumen Columna -10.00 0.50 0.25 0.15 -0.19Z-2 4.00 1.50 1.80 0.85 9.18Descontando Volumen Zapata(Inc. Solado) -4.00 1.50 1.80 0.70 -7.56Descontando Volumen Columna -4.00 0.50 0.25 0.15 -0.08Z-5 2.00 1.50 1.50 1.30 5.85Descontando Volumen Zapata(Inc. Solado) -2.00 1.50 1.50 0.70 -3.15Descontando Volumen Columna -2.00 0.65 0.35 0.50 -0.23Z-6 3.00 1.00 1.00 1.30 3.90Descontando Volumen Zapata(Inc. Solado) -3.00 1.00 1.00 0.70 -2.10Descontando Volumen Columna -3.00 0.40 0.20 0.50 -0.12

    02.03 Eliminacion de material excedentePartida 02.01 - 02.02 + 30% esponjamiento m3 1.00 32.05 1.30 41.67 41.67

    02.04 Nivelacin interior y Apisonado de Terreno E = 0.15 m. m2 191.25Bloque II 1.00 22.50 8.50 191.25

    02.05 Corte superficial terreno con maquinaria m3 19.13Bloque II 1.00 22.50 8.50 0.10 19.13

    02.06 Relleno con material seleccionado a maquinaria m3 210.38Para alcanzar nivel +1.10 m. 1.00 22.50 8.50 1.10 210.38

    02.07 Demolicin de construcciones existentes m2 220.00Bloque II 1.00 220.00 220.00

    03.00 OBRAS DE CONCRETO SIMPLE03.01 Solado para zapatas, Concreto 1:12 E= 10 cm. m2 39.00

    PROYECTO: "MEJORAMIENTO DE LA CALIDAD DEL SERVICIO EDUCATIVO DE LA I.E. SECUNDARIA LEONCIO QUISPE - DISTRITO DE MOLINOS, PROVINCIA DE JAUJA- JUNN"

  • Z-1 10.00 1.50 1.50 22.50Z-2 4.00 1.50 1.50 9.00Z-5 2.00 1.50 1.50 4.50Z-6 3.00 1.00 1.00 3.00

    03.02 Cimiento corrido, Concreto C:H = 1:10 + 30% P.G. m3 26.35Muros de sogaEje 1-1 1.00 7.50 0.50 0.60 2.25Eje 3-3 1.00 7.50 0.50 0.60 2.25Eje 4-4 1.00 7.50 0.50 0.60 2.25Eje 5-5 1.00 7.50 0.50 0.60 2.25Eje A-A entre Eje 1-2 1.00 3.95 0.50 0.60 1.19Eje A-A entre Eje 2-3 1.00 3.95 0.50 0.60 1.19Eje A-A entre Eje 3-4 1.00 6.75 0.50 0.60 2.03Eje A-A entre Eje 4-5 1.00 6.60 0.50 0.60 1.98Eje B-B entre Eje 1-2 1.00 3.95 0.50 0.60 1.19Eje B-B entre Eje 2-3 1.00 3.95 0.50 0.60 1.19Eje B-B entre Eje 3-4 1.00 6.75 0.50 0.60 2.03Eje B-B entre Eje 4-5 1.00 6.60 0.50 0.60 1.98Entre el eje 4-5 y el eje A-B 1.00 6.23 0.50 0.60 1.87Division S.H. y Almacen 2.00 1.05 0.50 0.60 0.63Division S.H., Almacen y Ambientes 2.00 3.50 0.50 0.60 2.10

    03.03 Sobrecimientos, concreto C:H = 1:8 + 25% P.M. m3 4.92Muros de sogaEje 1-1 1.00 7.50 0.15 0.40 0.45Eje 3-3 1.00 7.50 0.15 0.40 0.45Eje 4-4 1.00 7.50 0.15 0.40 0.45Eje 5-5 1.00 7.50 0.15 0.40 0.45Eje A-A entre Eje 1-2 1.00 2.45 0.15 0.40 0.15Eje A-A entre Eje 2-3 1.00 3.95 0.15 0.40 0.24Eje A-A entre Eje 3-4 1.00 5.65 0.15 0.40 0.34Eje A-A entre Eje 4-5 1.00 6.60 0.15 0.40 0.40Eje B-B entre Eje 1-2 1.00 3.95 0.15 0.40 0.24Eje B-B entre Eje 2-3 1.00 3.95 0.15 0.40 0.24Eje B-B entre Eje 3-4 1.00 6.75 0.15 0.40 0.41Eje B-B entre Eje 4-5 1.00 6.60 0.15 0.40 0.40Entre el eje 4-5 y el eje 1-2 1.00 5.50 0.15 0.40 0.33Division S.H. y Almacen 2.00 1.05 0.15 0.40 0.13Division S.H., Almacen y Ambientes 2.00 2.25 0.15 0.40 0.27

    03.03.02 Encofrado y desencofrado m2 62.96Eje 1-1 2.00 7.50 0.40 6.00Eje 3-3 2.00 7.50 0.40 6.00Eje 4-4 2.00 7.50 0.40 6.00Eje 5-5 2.00 7.50 0.40 6.00Eje A-A entre Eje 1-2 2.00 2.45 0.40 1.96Eje A-A entre Eje 2-3 2.00 3.95 0.40 3.16Eje A-A entre Eje 3-4 2.00 5.65 0.40 4.52Eje A-A entre Eje 4-5 2.00 6.60 0.40 5.28Eje B-B entre Eje 1-2 2.00 3.95 0.40 3.16Eje B-B entre Eje 2-3 2.00 3.95 0.40 3.16Eje B-B entre Eje 3-4 2.00 6.75 0.40 5.40Eje B-B entre Eje 4-5 2.00 6.60 0.40 5.28Entre el eje 4-5 y el eje 1-2 2.00 5.50 0.40 4.40Division S.H. y Almacen 2.00 1.05 0.40 0.84Division S.H., Almacen y Ambientes 2.00 2.25 0.40 1.80

    03.04 Gradas y Rampas03.04.01 Concreto en gradas y rampas, F'c = 140 Kg/m2 m3 0.00

    Bloque II 1.00 0.00 0.00

    03.04.02 Encofrado y desencofrado de gradas m2 0.00Bloque II 1.00 0.00 0.00

    03.05 Jardinera Tipo II y III03.05.01 Concreto en jardineras F'c = 140 Kg/m2 m3 0.00

    Bloque II 1.00 0.00 0.00

    03.05.02 Encofrado y desencofrado de jardinera m2 0.00Bloque II 1.00 0.00 0.00

    03.06 Fuente de Agua03.06.01 Concreto en fuente, F'c = 140 Kg/m2 m3 0.00

    Bloque II 1.00 0.00 0.00

    03.06.02 Encofrado y desencofrado de fuente m2 0.00Bloque II 1.00 0.00 0.00

    04.00 OBRAS DE CONCRETO ARMADO

  • 04.01 ZAPATAS04.01.01 Concreto F'c= 210 Kg/cm m3 23.40

    Z-1 10.00 1.50 1.50 0.60 13.50Z-2 4.00 1.50 1.50 0.60 5.40Z-5 2.00 1.50 1.50 0.60 2.70Z-6 3.00 1.00 1.00 0.60 1.80

    Parcial Total

    04.01.02 Acero Fy=4200Kg/cm kg 570.24Z-1 (x) 10.00 12.00 1.50 1/2" 0.99 178.20Z-1 (Y) 10.00 12.00 1.50 1/2" 0.99 178.20Z-2 (x) 4.00 12.00 1.50 1/2" 0.99 71.28Z-2 (Y) 4.00 12.00 1.50 1/2" 0.99 71.28Z-5 (x) 2.00 7.00 1.50 1/2" 0.99 20.79Z-5 (Y) 2.00 7.00 1.50 1/2" 0.99 20.79Z-6 (x) 3.00 5.00 1.00 1/2" 0.99 14.85Z-6 (Y) 3.00 5.00 1.00 1/2" 0.99 14.85

    04.02 VIGAS DE CIMENTACION04.02.01 Concreto F'c=210 kg/cm m3 8.00

    VCONEX 1,2 (.25 x .40)Entre el Eje 1-2 2.00 3.95 0.25 0.40 0.79Entre el Eje 2-3 2.00 3.95 0.25 0.40 0.79Entre el Eje 3-4 2.00 6.75 0.25 0.40 1.35Entre el Eje 4-5 2.00 6.60 0.25 0.40 1.32

    VCONEX A,B,C,D,E (.25 x .40) 5.00 7.50 0.25 0.40 3.75

    04.02.02 Encofrado y desencofrado m2 64.00VCONEX 1,2 (.25 x .40)Entre el Eje 1-2 4.00 3.95 0.40 6.32Entre el Eje 2-3 4.00 3.95 0.40 6.32Entre el Eje 3-4 4.00 6.75 0.40 10.80Entre el Eje 4-5 4.00 6.60 0.40 10.56

    VCONEX A,B,C,D,E (.25 x .40) 10.00 7.50 0.40 30.00

    Parcial Total

    04.02.03 Acero Fy=4200 kg/cm2 kg 884.15VCONEX 1,2 (.25 x .40)Acero Longitudinal Superior 2.00 3.00 23.00 1/2" 0.99 136.62Acero Longitudinal Inferior 2.00 3.00 23.00 1/2" 0.99 136.62Estribos 2.00 117.00 1.30 3/8" 0.56 170.35

    VCONEX A,B,C,D,E (.25 x .40)Acero Longitudinal Superior 5.00 4.00 8.00 1/2" 0.99 158.40Acero Longitudinal Inferior 5.00 4.00 8.00 1/2" 0.99 158.40Estribos 5.00 34.00 1.30 3/8" 0.56 123.76

    04.03 COLUMNAS04.03.01 Concreto F'c=210 kg/cm m3 9.23

    C-1 (Eje A-A) 5.00 0.25 0.50 4.85 3.03C-1 (Eje B-B) 5.00 0.25 0.50 5.70 3.56C-1 (Entre el eje A-B) 4.00 0.25 0.50 5.28 2.64

    04.03.02 Encofrado y desencofrado - columnas normal m2 110.81C-1 (Eje A-A) 5.00 1.50 4.85 36.38C-1 (Eje B-B) 5.00 1.50 5.70 42.75C-1 (Entre el eje A-B) 4.00 1.50 5.28 31.68

    Parcial Total

    04.03.04 Acero Fy=4200 kg/cm kg 1102.65C-1 (Eje A-A) Acero Longitudinal 5.00 4.00 5.85 5/8" 1.55 181.35

    5.00 2.00 5.85 1/2" 0.99 57.92Estribos 5.00 30.00 1.50 3/8" 0.56 126.00C-1 (Eje B-B) Acero Longitudinal 5.00 4.00 6.70 5/8" 1.55 207.70

    5.00 2.00 6.70 1/2" 0.99 66.33Estribos 5.00 35.00 1.50 3/8" 0.56 147.00C-1 (Entre el eje A-B)Acero Longitudinal 4.00 4.00 6.28 5/8" 1.55 155.74

    4.00 2.00 6.28 1/2" 0.99 49.74Estribos 4.00 33.00 1.50 3/8" 0.56 110.88

    04.04 VIGAS04.04.01 Concreto F'c=210 kg/cm m3 8.00

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

  • VIGA A,B (.25 x .40)Entre el Eje 1-2 2.00 3.95 0.25 0.40 0.79Entre el Eje 2-3 2.00 3.95 0.25 0.40 0.79Entre el Eje 3-4 2.00 6.75 0.25 0.40 1.35Entre el Eje 4-5 2.00 6.60 0.25 0.40 1.32

    VIGA P 1,2,3,4,5 (.25 x .40) 5.00 7.50 0.25 0.40 3.75

    04.04.02 Encofrado y desencofrado m2 84.00VIGA A,B (.25 x .40)Entre el Eje 1-2 4.00 3.95 0.40 6.32

    2.00 3.95 0.25 1.98Entre el Eje 2-3 4.00 3.95 0.40 6.32

    2.00 3.95 0.25 1.98Entre el Eje 3-4 4.00 6.75 0.40 10.80

    2.00 6.75 0.25 3.38Entre el Eje 4-5 4.00 6.60 0.40 10.56

    2.00 6.60 0.25 3.30

    VIGA P 1,2,3,4,5 (.25 x .40) 10.00 7.50 0.40 30.005.00 7.50 0.25 9.38

    Parcial Total

    04.04.03 Acero Fy=4200 kg/cm2 kg 926.78VIGA A,B (.25 x .40)Acero Longitudinal Superior 2.00 3.00 23.00 1/2" 0.99 136.62Acero Longitudinal Inferior 2.00 3.00 23.00 1/2" 0.99 136.62Bastones Extremos 2.00 2.00 2.00 5/8" 1.55 12.40Bastones Medios 2.00 3.00 3.25 5/8" 1.55 30.23Estribos 2.00 117.00 1.30 3/8" 0.56 170.35

    VCONEX A,B,C,D,E (.25 x .40)Acero Longitudinal Superior 5.00 4.00 8.00 1/2" 0.99 158.40Acero Longitudinal Inferior 5.00 4.00 8.00 1/2" 0.99 158.40Estribos 5.00 34.00 1.30 3/8" 0.56 123.76

    04.05 LOSAS MACIZAS04.05.01 Concreto F'c=210 kg/cm m3 0.00

    Bloque II 1.00 0.00 0.00

    04.05.02 Encofrado y desencofrado m2 0.00Bloque II 1.00 0.00 0.00

    04.05.03 Acero Fy=4200 kg/cm2 kg 0.00Bloque II 1.00 0.00 0.00

    04.06 PLACAS04.06.01 Concreto F'c=210 kg/cm m3 0.00

    Bloque II 1.00 0.00 0.00

    04.06.02 Encofrado y desencofrado m2 0.00Bloque II 1.00 0.00 0.00

    04.06.03 Acero Fy=4200 kg/cm2 kg 0.00Bloque II 1.00 0.00 0.00

    04.07 RAMPAS04.07.01 Concreto F'c = 175 Kg/cm2 M3 0.00

    Bloque II 1.00 0.00 0.00

    04.07.02 Encofrado y Desencofrado M2 0.00Bloque II 1.00 0.00 0.00

    04.07.03 Acero Fy=4200 kg/cm kg 0.00Bloque II 1.00 0.00 0.00

    04.08 BANCAS04.08.01 Concreto F'c = 175 Kg/cm2 M3 0.00

    Bloque II 1.00 0.00 0.00

    04.08.02 Encofrado y Desencofrado M2 0.00Bloque II 1.00 0.00 0.00

    04.08.03 Acero Fy=4200 kg/cm kg 0.00Bloque II 1.00 0.00 0.00

    04.09 JARDINERAS04.09 Concreto F'c = 175 Kg/cm2 M3 0.00

    04.09.01 Bloque II 1.00 0.00 0.00

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

  • 04.09.02 Encofrado y Desencofrado M2 0.00Bloque II 1.00 0.00 0.00

    04.09.03 Acero Fy=4200 kg/cm kg 0.00Bloque II 1.00 0.00 0.00

    04.10 SOBRECIMIENTOS REFORZADOS04.10.01 Concreto F'c=210 kg/cm m3 0.00

    Bloque II 1.00 0.00 0.00

    04.10.02 Encofrado y desencofrado m2 0.00Bloque II 1.00 0.00 0.00

    04.10.03 Acero Fy=4200 kg/cm2 kg 0.00Bloque II 1.00 0.00 0.00

    05.00 ESTRUCTURAS METALICAS05.01 COLUMNAS METALICAS

    05.01.01 Pieza para armado- CM1 pza 2.00Columnas Metalica 1 1.00 2.00 2.00

    05.01.02 Pieza para armado- CM2 pza 3.00Columnas Metalica 2 1.00 3.00 3.00

    05.01.03 Pieza para montaje- CM1 pza 2.00Columnas Metalica 1 1.00 2.00 2.00

    05.01.04 Pieza para montaje- CM2 pza 3.00Columnas Metalica 2 1.00 3.00 3.00

    05.02 VIGAS METALICAS

    05.02.01 Viga para armado - VMA ml 22.50Viga Metalica A 1.00 22.50 22.50

    05.02.02 Viga para armado - VMB ml 22.60Viga Metalica B 1.00 22.60 22.60

    05.02.03 Viga para armado - VM1, VM11 ml 71.48Viga Metalica 1 1.00 13.40 13.40Viga Metalica 2 1.00 13.80 13.80Viga Metalica 3 1.00 14.15 14.15Viga Metalica 4 1.00 14.75 14.75Viga Metalica 5 1.00 15.38 15.38

    05.02.04 Viga para montaje - VMA ml 22.50Viga Metalica A 1.00 22.50 22.50

    05.02.05 Viga para montaje - VMB ml 22.60Viga Metalica B 1.00 22.60 22.60

    05.02.06 Viga para montaje - VM1, VM11 ml 71.48Viga Metalica 1 1.00 13.40 13.40Viga Metalica 2 1.00 13.80 13.80Viga Metalica 3 1.00 14.15 14.15Viga Metalica 4 1.00 14.75 14.75Viga Metalica 5 1.00 15.38 15.38

    06.00 OTROS06.01 ROTURA DE PROBETAS

    Cimientos, Columnas, Vigas, Losas, etc. Unid 1.00 15.00 15.00 15.0006.02 FLETE

    para materiales y equipo en general est 1.00 0.00 0.00 0.0006.03 PLACA RECORDATORIA

    Placa recordatoria Unid 1.00 0.00 0.00 0.00

  • HOJA DE METRADOS DE OBRA

    PROPIETARIO: MUNICIPALIDAD DISTRITAL DE MOLINOSDISTRITO: MOLINOSPROVINCIA: JAUJAREGION: JUNIN FECHA : ENERO 2012GRUPO: ESTRUCTURAS - BLOQUE III HECHO : MAVV

    PARTIDA DESCRIPCION UNID. CANT.MEDIDAS

    PARCIALLARGO ANCHO ALTO

    I.- ESTRUCTURAS01.00 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES01.01 Limpieza de terreno m2 1.00 201.52 201.52

    `01.02 Trazo, Niveles y Replanteo m2 1.00 201.52 201.5201.03 Cartel de Obra 7.20X3.60 glb 1.00 0.00 0.0001.04 Oficina, Guardiania y Almacen General glb 1.00 0.00 0.0001.05 Obras Preliminares varias (inst. agua, luz, desague) glb 1.00 0.00 0.0001.06 Movilizacin de Equipo est 1.00 0.00 0.00

    02.00 MOVIMIENTO DE TIERRAS02.01 Excavacin de zanjas hasta H=2.00 m.

    02.01.01 Zapatas m3Z-1 12.00 1.50 1.50 0.85 22.95Z-2 5.00 1.50 1.50 0.85 9.56Z-5 2.00 1.50 1.50 1.30 5.85Z-6 2.00 1.00 1.00 1.30 2.60

    02.01.02 Cimientos m3Muros de sogaEje 1-1 1.00 7.50 0.50 0.15 0.56Eje 2-2 1.00 7.50 0.50 0.15 0.56Eje 3-3 1.00 7.50 0.50 0.15 0.56Eje 4-4 1.00 10.50 0.50 0.15 0.79Eje 5-5 1.00 10.50 0.50 0.15 0.79Eje A'-A' entre Eje 4-5 1.00 2.05 0.50 0.15 0.15Eje A-A entre Eje 1-2 1.00 5.75 0.50 0.15 0.43Eje A-A entre Eje 2-3 1.00 7.50 0.50 0.15 0.56Eje A-A entre Eje 3-4 1.00 4.00 0.50 0.15 0.30Eje A-A entre Eje 4-5 1.00 4.00 0.50 0.15 0.30Eje B-B entre Eje 1-2 1.00 5.75 0.50 0.15 0.43Eje B-B entre Eje 2-3 1.00 7.50 0.50 0.15 0.56Eje B-B entre Eje 3-4 1.00 4.00 0.50 0.15 0.30Eje B-B entre Eje 4-5 1.00 3.65 0.50 0.15 0.27Entre el eje 2-3 y el eje A-B 1.00 7.25 0.50 0.15 0.54Entre el eje 3-4 y el eje A-B 1.00 3.75 0.50 0.15 0.28Entre el eje 4-5 y el eje A-B 1.00 3.45 0.50 0.15 0.26

    02.02 Relleno compactado con material propioZapatas m3Z-1 12.00 1.50 1.50 0.85 22.95Descontando Volumen Zapata(Inc. Solado) -12.00 1.50 1.50 0.70 -18.90Descontando Volumen Columna -12.00 0.50 0.25 0.15 -0.23Z-2 5.00 1.50 1.80 0.85 11.48Descontando Volumen Zapata(Inc. Solado) -5.00 1.50 1.80 0.70 -9.45Descontando Volumen Columna -5.00 0.50 0.25 0.15 -0.09Z-5 2.00 1.50 1.50 1.30 5.85Descontando Volumen Zapata(Inc. Solado) -2.00 1.50 1.50 0.70 -3.15Descontando Volumen Columna -2.00 0.65 0.35 0.50 -0.23Z-6 2.00 1.00 1.00 1.30 2.60Descontando Volumen Zapata(Inc. Solado) -2.00 1.00 1.00 0.70 -1.40Descontando Volumen Columna -2.00 0.40 0.20 0.50 -0.08

    02.03 Eliminacion de material excedentePartida 02.01 - 02.02 + 30% esponjamiento m3 1.00 39.28 1.30 51.06

    02.04 Nivelacin interior y Apisonado de Terreno E = 0.15 m. m2Bloque III 1.00 201.52 201.52

    02.05 Corte superficial terreno con maquinaria m3Bloque III 1.00 201.52 0.10 20.15

    02.06 Relleno con material seleccionado a maquinaria m3Para alcanzar nivel +1.10 m. 1.00 201.52 1.10 221.67

    PROYECTO: "MEJORAMIENTO DE LA CALIDAD DEL SERVICIO EDUCATIVO DE LA I.E. SECUNDARIA LEONCIO QUISPE - DISTRITO DE MOLINOS, PROVINCIA DE JAUJA- JUNN"

  • 02.07 Demolicin de construcciones existentes m2Bloque III 1.00 315.45 315.45

    03.00 OBRAS DE CONCRETO SIMPLE03.01 Solado para zapatas, Concreto 1:12 E= 10 cm. m2

    Z-1 12.00 1.50 1.50 27.00Z-2 5.00 1.50 1.50 11.25Z-5 2.00 1.50 1.50 4.50Z-6 2.00 1.00 1.00 2.00

    03.02 Cimiento corrido, Concreto C:H = 1:10 + 30% P.G. m3Muros de sogaEje 1-1 1.00 7.50 0.50 0.60 2.25Eje 2-2 1.00 7.50 0.50 0.60 2.25Eje 3-3 1.00 7.50 0.50 0.60 2.25Eje 4-4 1.00 10.50 0.50 0.60 3.15Eje 5-5 1.00 10.50 0.50 0.60 3.15Eje A'-A' entre Eje 4-5 1.00 2.05 0.50 0.60 0.62Eje A-A entre Eje 1-2 1.00 5.75 0.50 0.60 1.73Eje A-A entre Eje 2-3 1.00 7.50 0.50 0.60 2.25Eje A-A entre Eje 3-4 1.00 4.00 0.50 0.60 1.20Eje A-A entre Eje 4-5 1.00 4.00 0.50 0.60 1.20Eje B-B entre Eje 1-2 1.00 5.75 0.50 0.60 1.73Eje B-B entre Eje 2-3 1.00 7.50 0.50 0.60 2.25Eje B-B entre Eje 3-4 1.00 4.00 0.50 0.60 1.20Eje B-B entre Eje 4-5 1.00 3.65 0.50 0.60 1.10Entre el eje 2-3 y el eje A-B 1.00 7.25 0.50 0.60 2.18Entre el eje 3-4 y el eje A-B 1.00 3.75 0.50 0.60 1.13Entre el eje 4-5 y el eje A-B 1.00 3.45 0.50 0.60 1.04

    03.03 Sobrecimientos, concreto C:H = 1:8 + 25% P.M. m3Muros de sogaEje 2-2 1.00 7.50 0.15 0.40 0.45Eje 3-3 1.00 7.50 0.15 0.40 0.45Eje 4-4 1.00 4.90 0.15 0.40 0.29Eje 5-5 1.00 10.50 0.15 0.40 0.63Eje A'-A' entre Eje 4-5 1.00 2.05 0.15 0.40 0.12Eje A-A entre Eje 2-3 1.00 6.40 0.15 0.40 0.38Eje A-A entre Eje 3-4 1.00 1.80 0.15 0.40 0.11Eje B-B entre Eje 2-3 1.00 5.30 0.15 0.40 0.32Eje B-B entre Eje 3-4 1.00 4.00 0.15 0.40 0.24Eje B-B entre Eje 4-5 1.00 3.65 0.15 0.40 0.22Entre el eje 2-3 y el eje A-B 1.00 6.50 0.15 0.40 0.39Entre el eje 3-4 y el eje A-B 1.00 2.90 0.15 0.40 0.17Entre el eje 4-5 y el eje A-B 1.00 3.85 0.15 0.40 0.23

    03.03.02 Encofrado y desencofrado m2Eje 2-2 2.00 7.50 0.40 6.00Eje 3-3 2.00 7.50 0.40 6.00Eje 4-4 2.00 4.90 0.40 3.92Eje 5-5 2.00 10.50 0.40 8.40Eje A'-A' entre Eje 4-5 2.00 2.05 0.40 1.64Eje A-A entre Eje 2-3 2.00 6.40 0.40 5.12Eje A-A entre Eje 3-4 2.00 1.80 0.40 1.44Eje B-B entre Eje 2-3 2.00 5.30 0.40 4.24Eje B-B entre Eje 3-4 2.00 4.00 0.40 3.20Eje B-B entre Eje 4-5 2.00 3.65 0.40 2.92Entre el eje 2-3 y el eje A-B 2.00 6.50 0.40 5.20Entre el eje 3-4 y el eje A-B 2.00 2.90 0.40 2.32Entre el eje 4-5 y el eje A-B 2.00 3.85 0.40 3.08

    03.04 Gradas y Rampas03.04.01 Concreto en gradas y rampas, F'c = 140 Kg/m2 m3

    Bloque III 1.00 0.00 0.00

    03.04.02 Encofrado y desencofrado de gradas m2Bloque III 1.00 0.00 0.00

    03.05 Jardinera Tipo II y III03.05.01 Concreto en jardineras F'c = 140 Kg/m2 m3

    Bloque III 1.00 0.00 0.00

    03.05.02 Encofrado y desencofrado de jardinera m2Bloque III 1.00 0.00 0.00

  • 03.06 Fuente de Agua03.06.01 Concreto en fuente, F'c = 140 Kg/m2 m3

    Bloque III 1.00 0.00 0.00

    03.06.02 Encofrado y desencofrado de fuente m2Bloque III 1.00 0.00 0.00

    04.00 OBRAS DE CONCRETO ARMADO04.01 ZAPATAS

    04.01.01 Concreto F'c= 210 Kg/cm m3Z-1 12.00 1.50 1.50 0.60 16.20Z-2 5.00 1.50 1.50 0.60 6.75Z-5 2.00 1.50 1.50 0.60 2.70Z-6 2.00 1.00 1.00 0.60 1.20

    Parcial

    04.01.02 Acero Fy=4200Kg/cm kgZ-1 (x) 12.00 12.00 1.50 1/2" 0.99 213.84Z-1 (Y) 12.00 12.00 1.50 1/2" 0.99 213.84Z-2 (x) 5.00 12.00 1.50 1/2" 0.99 89.10Z-2 (Y) 5.00 12.00 1.50 1/2" 0.99 89.10Z-5 (x) 2.00 7.00 1.50 1/2" 0.99 20.79Z-5 (Y) 2.00 7.00 1.50 1/2" 0.99 20.79Z-6 (x) 2.00 5.00 1.00 1/2" 0.99 9.90Z-6 (Y) 2.00 5.00 1.00 1/2" 0.99 9.90

    04.02 VIGAS DE CIMENTACION04.02.01 Concreto F'c=210 kg/cm m3

    VCONEX 1,2,3 (.25 x .40)Entre el Eje 1-2 2.00 5.75 0.25 0.40 1.15Entre el Eje 2-3 2.00 7.50 0.25 0.40 1.50Entre el Eje 3-4 2.00 4.00 0.25 0.40 0.80Entre el Eje 4-5 2.00 4.00 0.25 0.40 0.80VCONEX 3 1.00 4.20 0.25 0.40 0.42

    VCONEX A,B,C,D,E (.25 x .40) 3.00 7.50 0.25 0.40 2.252.00 10.00 0.25 0.40 2.00

    04.02.02 Encofrado y desencofrado m2VCONEX 1,2 (.25 x .40)Entre el Eje 1-2 4.00 5.75 0.40 9.20Entre el Eje 2-3 4.00 7.50 0.40 12.00Entre el Eje 3-4 4.00 4.00 0.40 6.40Entre el Eje 4-5 4.00 4.00 0.40 6.40VCONEX 3 2.00 4.20 0.40 3.36

    VCONEX A,B,C,D,E (.25 x .40) 6.00 7.50 0.40 18.004.00 10.00 0.40 16.00

    Parcial

    04.02.03 Acero Fy=4200 kg/cm2 kgVCONEX 1,2 (.25 x .40)Acero Longitudinal Superior 2.00 3.00 23.05 1/2" 0.99 136.92Acero Longitudinal Inferior 2.00 3.00 23.05 1/2" 0.99 136.92Estribos 2.00 117.00 1.30 3/8" 0.56 170.35

    VCONEX 3Acero Longitudinal Superior 2.00 3.00 5.20 1/2" 0.99 30.89Acero Longitudinal Inferior 2.00 3.00 5.20 1/2" 0.99 30.89Estribos 2.00 24.00 1.30 3/8" 0.56 34.94

    VCONEX A,B,C,D,E (.25 x .40)Acero Longitudinal Superior 3.00 4.00 8.00 1/2" 0.99 95.04Acero Longitudinal Inferior 3.00 4.00 8.00 1/2" 0.99 95.04Estribos 3.00 34.00 1.30 3/8" 0.56 74.26

    Acero Longitudinal Superior 2.00 4.00 11.50 1/2" 0.99 91.08Acero Longitudinal Inferior 2.00 4.00 11.50 1/2" 0.99 91.08Estribos 2.00 45.00 1.30 3/8" 0.56 65.52

    04.03 COLUMNAS04.03.01 Concreto F'c=210 kg/cm m3

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

  • C-1 (Eje A'-A') 2.00 0.25 0.50 4.55 1.14C-1 (Eje A-A) 5.00 0.25 0.50 4.85 3.03C-1 (Eje B-B) 5.00 0.25 0.50 5.70 3.56C-1 (Entre el eje A-B) 5.00 0.25 0.50 5.28 3.30

    04.03.02 Encofrado y desencofrado - columnas normal m2C-1 (Eje A'-A') 2.00 1.50 4.55 13.65C-1 (Eje A-A) 5.00 1.50 4.85 36.38C-1 (Eje B-B) 5.00 1.50 5.70 42.75C-1 (Entre el eje A-B) 5.00 1.50 5.28 39.60

    Parcial

    04.03.04 Acero Fy=4200 kg/cm kgC-1 (Eje A'-A') Acero Longitudinal 2.00 4.00 5.55 5/8" 1.55 68.82

    2.00 2.00 5.55 1/2" 0.99 21.98Estribos 2.00 28.00 1.50 3/8" 0.56 47.04C-1 (Eje A-A) Acero Longitudinal 5.00 4.00 5.85 5/8" 1.55 181.35

    5.00 2.00 5.85 1/2" 0.99 57.92Estribos 5.00 30.00 1.50 3/8" 0.56 126.00C-1 (Eje B-B) Acero Longitudinal 5.00 4.00 6.70 5/8" 1.55 207.70

    5.00 2.00 6.70 1/2" 0.99 66.33Estribos 5.00 35.00 1.50 3/8" 0.56 147.00C-1 (Entre el eje A-B)Acero Longitudinal 5.00 4.00 6.28 5/8" 1.55 194.68

    5.00 2.00 6.28 1/2" 0.99 62.17Estribos 5.00 33.00 1.50 3/8" 0.56 138.60

    04.04 VIGAS04.04.01 Concreto F'c=210 kg/cm m3

    VIGA A,B,C (.25 x .40)Entre el Eje 1-2 2.00 5.75 0.25 0.40 1.15Entre el Eje 2-3 2.00 7.50 0.25 0.40 1.50Entre el Eje 3-4 2.00 4.00 0.25 0.40 0.80Entre el Eje 4-5 2.00 4.00 0.25 0.40 0.80VIGA C 1.00 4.20 0.25 0.40 0.42

    VIGA P 1,2,3,4,5 (.25 x .40) 3.00 7.50 0.25 0.40 2.252.00 10.00 0.25 0.40 2.00

    04.04.02 Encofrado y desencofrado m2VIGA A,B (.25 x .40)Entre el Eje 1-2 4.00 5.75 0.40 9.20

    2.00 5.75 0.25 2.88Entre el Eje 2-3 4.00 7.50 0.40 12.00

    2.00 7.50 0.25 3.75Entre el Eje 3-4 4.00 4.00 0.40 6.40

    2.00 4.00 0.25 2.00Entre el Eje 4-5 4.00 4.00 0.40 6.40

    2.00 4.00 0.25 2.00VIGA C 2.00 4.20 0.40 3.36

    1.00 4.20 0.25 1.05

    VIGA P 1,2,3,4,5 (.25 x .40) 6.00 7.50 0.40 18.003.00 7.50 0.25 5.634.00 10.00 0.40 16.002.00 10.00 0.25 5.00

    Parcial

    04.04.03 Acero Fy=4200 kg/cm2 kgVIGA A,B (.25 x .40)Acero Longitudinal Superior 2.00 3.00 23.05 1/2" 0.99 136.92Acero Longitudinal Inferior 2.00 3.00 23.05 1/2" 0.99 136.92Bastones Extremos 2.00 2.00 2.00 5/8" 1.55 12.40Bastones Medios 2.00 3.00 3.25 5/8" 1.55 30.23Estribos 2.00 117.00 1.30 3/8" 0.56 170.35

    VCONEX A,B,C,D,E (.25 x .40)Acero Longitudinal Superior 3.00 4.00 8.00 1/2" 0.99 95.04Acero Longitudinal Inferior 3.00 4.00 8.00 1/2" 0.99 95.04Estribos 3.00 34.00 1.30 3/8" 0.56 74.26

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

  • Acero Longitudinal Superior 2.00 4.00 11.50 1/2" 0.99 91.08Acero Longitudinal Inferior 2.00 4.00 11.50 1/2" 0.99 91.08Estribos 2.00 45.00 1.30 3/8" 0.56 65.52

    04.05 LOSAS MACIZAS04.05.01 Concreto F'c=210 kg/cm m3

    Taller Industrias 2.00 6.20 0.80 0.10 0.991.00 4.10 0.80 0.10 0.331.00 3.90 1.10 0.10 0.43

    04.05.02 Encofrado y desencofrado m2Taller Industrias 2.00 6.20 0.80 9.92

    1.00 4.10 0.80 3.281.00 3.90 1.10 4.29

    Parcial

    04.05.03 Acero Fy=4200 kg/cm2 kgTaller Industrias 2.00 4.00 6.20 3/8" 0.56 27.78

    2.00 25.00 0.80 3/8" 0.56 22.401.00 4.00 4.20 3/8" 0.56 9.411.00 17.00 0.80 3/8" 0.56 7.621.00 5.00 3.90 3/8" 0.56 10.921.00 15.00 1.00 3/8" 0.56 8.40

    04.06 PLACAS04.06.01 Concreto F'c=210 kg/cm m3

    P-01 11.00 0.80 0.10 0.90 0.79P-02 3.00 1.10 0.10 0.90 0.30

    04.06.02 Encofrado y desencofrado m2P-01 22.00 0.80 1.30 22.88

    P-02 6.00 1.10 1.30 8.58

    Parcial

    04.06.03 Acero Fy=4200 kg/cm2 kgP-01 (X) 11.00 6.00 0.80 3/8" 0.56 29.57P-01 (Y) 11.00 5.00 0.90 3/8" 0.56 27.72

    P-02 (X) 3.00 6.00 1.10 3/8" 0.56 11.09P-02 (Y) 3.00 5.00 0.90 3/8" 0.56 7.56

    04.07 RAMPAS04.07.01 Concreto F'c = 175 Kg/cm2 M3

    Bloque III 1.00 0.00 0.00

    04.07.02 Encofrado y Desencofrado M2Bloque III 1.00 0.00 0.00

    04.07.03 Acero Fy=4200 kg/cm kgBloque III 1.00 0.00 0.00

    04.08 BANCAS04.08.01 Concreto F'c = 175 Kg/cm2 M3

    Bloque III 1.00 0.00 0.00

    04.08.02 Encofrado y Desencofrado M2Bloque III 1.00 0.00 0.00

    04.08.03 Acero Fy=4200 kg/cm kgBloque III 1.00 0.00 0.00

    04.09 JARDINERAS04.09 Concreto F'c = 175 Kg/cm2 M3

    04.09.01 Bloque III 1.00 0.00 0.00

    04.09.02 Encofrado y Desencofrado M2Bloque III 1.00 0.00 0.00

    04.09.03 Acero Fy=4200 kg/cm kgBloque III 1.00 0.00 0.00

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

  • 04.10 SOBRECIMIENTOS REFORZADOS04.10.01 Concreto F'c=210 kg/cm m3

    Bloque III 1.00 0.00 0.00

    04.10.02 Encofrado y desencofrado m2Bloque III 1.00 0.00 0.00

    04.10.03 Acero Fy=4200 kg/cm2 kgBloque III 1.00 0.00 0.00

    05.00 ESTRUCTURAS METALICAS05.01 COLUMNAS METALICAS

    05.01.01 Pieza para armado- CM1 pzaColumnas Metalica 1 1.00 2.00 2.00

    05.01.02 Pieza para armado- CM2 pzaColumnas Metalica 2 1.00 2.00 2.00

    05.01.03 Pieza para montaje- CM1 pzaColumnas Metalica 1 1.00 2.00 2.00

    05.01.04 Pieza para montaje- CM2 pzaColumnas Metalica 2 1.00 2.00 2.00

    05.02 VIGAS METALICAS

    05.02.01 Viga para armado - VMA mlViga Metalica A 1.00 21.90 21.90

    05.02.02 Viga para armado - VMB mlViga Metalica B 1.00 22.70 22.70

    05.02.03 Viga para armado - VM1, VM11 mlViga Metalica 1 1.00 15.38 15.38Viga Metalica 2 1.00 15.90 15.90Viga Metalica 3 1.00 16.60 16.60Viga Metalica 4 1.00 16.95 16.95Viga Metalica 5 1.00 17.30 17.30

    05.02.04 Viga para montaje - VMA mlViga Metalica A 1.00 21.90 21.90

    05.02.05 Viga para montaje - VMB mlViga Metalica B 1.00 22.70 22.70

    05.02.06 Viga para montaje - VM1, VM11 mlViga Metalica 1 1.00 15.38 15.38Viga Metalica 2 1.00 15.90 15.90Viga Metalica 3 1.00 16.60 16.60Viga Metalica 4 1.00 16.95 16.95Viga Metalica 5 1.00 17.30 17.30

    06.00 OTROS06.01 ROTURA DE PROBETAS

    Cimientos, Columnas, Vigas, Losas, etc. Unid 1.00 15.00 15.0006.02 FLETE

    para materiales y equipo en general est 1.00 0.00 0.0006.03 PLACA RECORDATORIA

    Placa recordatoria Unid 1.00 0.00 0.00

  • HOJA DE METRADOS DE OBRA

    PROPIETARIO: MUNICIPALIDAD DISTRITAL DE MOLINOSDISTRITO: MOLINOSPROVINCIA: JAUJA

    FECHA : ENERO 2012HECHO : MAVV

    TOTAL

    201.52201.52

    0.000.000.000.00

    40.96

    7.66

    9.35

    51.06

    201.52

    20.15

    221.67

    PROYECTO: "MEJORAMIENTO DE LA CALIDAD DEL SERVICIO EDUCATIVO DE LA I.E. SECUNDARIA LEONCIO QUISPE - DISTRITO

  • 315.45

    44.75

    30.65

    4.01

    53.48

    0.00

    0.00

    0.00

    0.00

  • 0.00

    0.00

    26.85

    Total

    667.26

    8.92

    71.36

    Total

    1052.92

    11.03

  • 132.38

    Total

    1319.59

    8.92

    93.66

    Total

    998.83

  • 1.75

    17.49

    Total

    86.53

    1.09

    31.46

    Total

    75.94

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

  • 0.00

    0.00

    0.00

    2.00

    2.00

    2.00

    2.00

    21.90

    22.70

    82.13

    21.90

    22.70

    82.13

    15.00

    0.00

    0.00

  • HOJA DE METRADOS DE OBRA

    PROPIETARIO: MUNICIPALIDAD DISTRITAL DE MOLINOSDISTRITO: MOLINOSPROVINCIA: JAUJAREGION: JUNIN FECHA : ENERO 2012GRUPO: ESTRUCTURAS - BLOQUE IV HECHO : MAVV

    PARTIDA DESCRIPCION UNID. CANT.MEDIDAS

    PARCIALLARGO ANCHO ALTO

    I.- ESTRUCTURAS01.00 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES01.01 Limpieza de terreno m2 1.00 36.00 9.65 347.40

    `01.02 Trazo, Niveles y Replanteo m2 1.00 36.00 9.65 347.4001.03 Cartel de Obra 7.20X3.60 glb 1.00 0.00 0.0001.04 Oficina, Guardiania y Almacen General glb 1.00 0.00 0.0001.05 Obras Preliminares varias (inst. agua, luz, desague) glb 1.00 0.00 0.0001.06 Movilizacin de Equipo est 1.00 0.00 0.00

    02.00 MOVIMIENTO DE TIERRAS02.01 Excavacin de zanjas hasta H=2.00 m.

    02.01.01 Zapatas m3Z-1 10.00 1.50 1.50 0.85 19.13Z-2 4.00 1.50 1.50 0.85 7.65Z-6 7.00 1.00 1.00 1.30 9.10

    02.01.02 Cimientos m3Muros de sogaEje 1-1 1.00 2.65 0.50 1.20 1.59Eje 2-2 1.00 2.65 0.50 1.20 1.59Eje 3-3 1.00 2.65 0.50 1.20 1.59Eje 4-4 1.00 2.65 0.50 1.20 1.59Eje 5-5 1.00 2.65 0.50 1.20 1.59Eje 6-6 1.00 2.65 0.50 1.20 1.59Eje 7-7 1.00 2.65 0.50 1.20 1.59Eje A-A entre Eje 1-2 1.00 3.38 0.50 1.20 2.03Eje A-A entre Eje 2-3 1.00 4.13 0.50 1.20 2.48Eje A-A entre Eje 3-4 1.00 4.23 0.50 1.20 2.54Eje A-A entre Eje 4-5 1.00 4.18 0.50 1.20 2.51Eje A-A entre Eje 5-6 1.00 4.18 0.50 1.20 2.51Eje A-A entre Eje 6-7 1.00 3.40 0.50 1.20 2.04Eje B-B entre Eje 1-2 1.00 3.38 0.50 1.20 2.03Eje B-B entre Eje 2-3 1.00 4.13 0.50 1.20 2.48Eje B-B entre Eje 3-4 1.00 4.23 0.50 1.20 2.54Eje B-B entre Eje 4-5 1.00 4.18 0.50 1.20 2.51Eje B-B entre Eje 5-6 1.00 4.18 0.50 1.20 2.51Eje B-B entre Eje 6-7 1.00 3.40 0.50 1.20 2.04

    02.02 Relleno compactado con material propioZapatas m3Z-1 10.00 1.50 1.50 1.90 42.75Descontando Volumen Zapata(Inc. Solado) -10.00 1.50 1.50 0.70 -15.75Descontando Volumen Columna -10.00 0.50 0.25 1.20 -1.50Descontando Volumen Cimiento -10.00 3.10 0.50 1.00 -15.50Descontando Volumen Sobrecimiento -10.00 3.10 0.15 0.20 -0.93Z-2 4.00 1.50 1.50 1.90 17.10Descontando Volumen Zapata(Inc. Solado) -4.00 1.50 1.50 0.70 -6.30Descontando Volumen Columna -4.00 0.50 0.25 1.20 -0.60Descontando Volumen Cimiento -4.00 2.80 0.50 1.00 -5.60Descontando Volumen Sobrecimiento -4.00 2.80 0.15 0.20 -0.34Z-6 7.00 1.00 1.00 1.30 9.10Descontando Volumen Zapata(Inc. Solado) -7.00 1.00 1.00 0.70 -4.90Descontando Volumen Columna -7.00 0.40 0.20 0.50 -0.28

    02.03 Eliminacion de material excedentePartida 02.01 - 02.02 + 30% esponjamiento m3 1.00 57.93 1.30 75.31

    02.04 Nivelacin interior y Apisonado de Terreno E = 0.15 m. m2Bloque IV 1.00 36.00 9.65 347.40

    02.05 Corte superficial terreno con maquinaria m3Bloque IV 1.00 36.00 9.65 0.10 34.74

    PROYECTO: "MEJORAMIENTO DE LA CALIDAD DEL SERVICIO EDUCATIVO DE LA I.E. SECUNDARIA LEONCIO QUISPE - DISTRITO DE MOLINOS, PROVINCIA DE JAUJA- JUNN"

  • 02.06 Relleno con material seleccionado a maquinaria m3Para alcanzar nivel +1.90 m. 1.00 36.00 9.65 0.80 277.92

    02.07 Demolicin de construcciones existentes m2Bloque IV 1.00 567.70 567.70

    03.00 OBRAS DE CONCRETO SIMPLE03.01 Solado para zapatas, Concreto 1:12 E= 10 cm. m2

    Z-1 10.00 1.50 1.50 22.50Z-2 4.00 1.50 1.50 9.00Z-6 7.00 1.00 1.00 7.00

    03.02 Cimiento corrido, Concreto C:H = 1:10 + 30% P.G. m3Muros de sogaEje 1-1 1.00 5.45 0.50 0.60 1.64Eje 3-3 1.00 5.45 0.50 0.60 1.64Eje 5-5 1.00 5.45 0.50 0.60 1.64Eje 7-7 1.00 5.45 0.50 0.60 1.64Eje A-A entre Eje 1-2 1.00 5.70 0.50 0.60 1.71Eje A-A entre Eje 2-3 1.00 5.68 0.50 0.60 1.70Eje A-A entre Eje 3-4 1.00 5.78 0.50 0.60 1.73Eje A-A entre Eje 4-5 1.00 5.73 0.50 0.60 1.72Eje A-A entre Eje 5-6 1.00 5.73 0.50 0.60 1.72Eje A-A entre Eje 6-7 1.00 5.73 0.50 0.60 1.72Eje B-B entre Eje 1-2 1.00 5.70 0.50 0.60 1.71Eje B-B entre Eje 2-3 1.00 5.68 0.50 0.60 1.70Eje B-B entre Eje 3-4 1.00 5.78 0.50 0.60 1.73Eje B-B entre Eje 4-5 1.00 5.73 0.50 0.60 1.72Eje B-B entre Eje 5-6 1.00 5.73 0.50 0.60 1.72Eje B-B entre Eje 6-7 1.00 5.73 0.50 0.60 1.72

    03.03 Sobrecimientos, concreto C:H = 1:8 + 25% P.M. m3Muros de sogaEje 1-1 1.00 5.45 0.15 0.40 0.33Eje 3-3 1.00 5.45 0.15 0.40 0.33Eje 5-5 1.00 5.45 0.15 0.40 0.33Eje 7-7 1.00 5.45 0.15 0.40 0.33Eje A-A entre Eje 1-2 1.00 5.70 0.15 0.40 0.34Eje A-A entre Eje 2-3 1.00 5.68 0.15 0.40 0.34Eje A-A entre Eje 3-4 1.00 5.78 0.15 0.40 0.35Eje A-A entre Eje 4-5 1.00 5.73 0.15 0.40 0.34Eje A-A entre Eje 5-6 1.00 5.73 0.15 0.40 0.34Eje A-A entre Eje 6-7 1.00 5.73 0.15 0.40 0.34Eje B-B entre Eje 1-2 1.00 5.70 0.15 0.40 0.34Eje B-B entre Eje 2-3 1.00 4.48 0.15 0.40 0.27Eje B-B entre Eje 3-4 1.00 5.78 0.15 0.40 0.35Eje B-B entre Eje 4-5 1.00 4.53 0.15 0.40 0.27Eje B-B entre Eje 5-6 1.00 5.73 0.15 0.40 0.34Eje B-B entre Eje 6-7 1.00 4.53 0.15 0.40 0.27

    03.03.02 Encofrado y desencofrado m2Eje 1-1 2.00 5.45 0.40 4.36Eje 3-3 2.00 5.45 0.40 4.36Eje 5-5 2.00 5.45 0.40 4.36Eje 7-7 2.00 5.45 0.40 4.36Eje A-A entre Eje 1-2 2.00 5.70 0.40 4.56Eje A-A entre Eje 2-3 2.00 5.68 0.40 4.54Eje A-A entre Eje 3-4 2.00 5.78 0.40 4.62Eje A-A entre Eje 4-5 2.00 5.73 0.40 4.58Eje A-A entre Eje 5-6 2.00 5.73 0.40 4.58Eje A-A entre Eje 6-7 2.00 5.73 0.40 4.58Eje B-B entre Eje 1-2 2.00 5.70 0.40 4.56Eje B-B entre Eje 2-3 2.00 4.48 0.40 3.58Eje B-B entre Eje 3-4 2.00 5.78 0.40 4.62Eje B-B entre Eje 4-5 2.00 4.53 0.40 3.62Eje B-B entre Eje 5-6 2.00 5.73 0.40 4.58Eje B-B entre Eje 6-7 2.00 4.53 0.40 3.62

    03.04 Gradas y Rampas03.04.01 Concreto en gradas y rampas, F'c = 140 Kg/m2 m3

    Bloque IV 1.00 0.00 0.00

    03.04.02 Encofrado y desencofrado de gradas m2Bloque IV 1.00 0.00 0.00

  • 03.05 Jardinera Tipo II y III03.05.01 Concreto en jardineras F'c = 140 Kg/m2 m3

    Bloque IV 1.00 0.00 0.00

    03.05.02 Encofrado y desencofrado de jardinera m2Bloque IV 1.00 0.00 0.00

    03.06 Fuente de Agua03.06.01 Concreto en fuente, F'c = 140 Kg/m2 m3

    Bloque IV 1.00 0.00 0.00

    03.06.02 Encofrado y desencofrado de fuente m2Bloque IV 1.00 0.00 0.00

    04.00 OBRAS DE CONCRETO ARMADO04.01 ZAPATAS

    04.01.01 Concreto F'c= 210 Kg/cm m3Z-1 10.00 1.50 1.50 0.60 13.50Z-2 4.00 1.50 1.50 0.60 5.40Z-6 7.00 1.00 1.00 0.60 4.20

    Parcial

    04.01.02 Acero Fy=4200Kg/cm kgZ-1 (x) 10.00 12.00 1.50 1/2" 0.99 178.20Z-1 (Y) 10.00 12.00 1.50 1/2" 0.99 178.20Z-2 (x) 4.00 12.00 1.50 1/2" 0.99 71.28Z-2 (Y) 4.00 12.00 1.50 1/2" 0.99 71.28Z-6 (x) 7.00 5.00 1.00 1/2" 0.99 34.65Z-6 (Y) 7.00 5.00 1.00 1/2" 0.99 34.65

    04.02 VIGAS DE CIMENTACION04.02.01 Concreto F'c=210 kg/cm m3

    VCONEX 1,2 (.25 x .40)Entre el Eje 1-2 2.00 5.70 0.25 0.40 1.14Entre el Eje 2-3 2.00 5.68 0.25 0.40 1.14Entre el Eje 3-4 2.00 5.78 0.25 0.40 1.16Entre el Eje 4-5 2.00 5.73 0.25 0.40 1.15Entre el Eje 5-6 2.00 5.73 0.25 0.40 1.15Entre el Eje 6-7 2.00 5.73 0.25 0.40 1.15

    VCONEX A,B,C,D,E,F,G (.25 x .40) 7.00 5.45 0.25 0.40 3.82

    04.02.02 Encofrado y desencofrado m2VCONEX 1,2 (.25 x .40)Entre el Eje 1-2 4.00 5.70 0.40 9.12Entre el Eje 2-3 4.00 5.68 0.40 9.08Entre el Eje 3-4 4.00 5.78 0.40 9.24Entre el Eje 4-5 4.00 5.73 0.40 9.16Entre el Eje 5-6 4.00 5.73 0.40 9.16Entre el Eje 6-7 4.00 5.73 0.40 9.16

    VCONEX A,B,C,D,E,F,G (.25 x .40) 14.00 5.45 0.40 30.52

    Parcial

    04.02.03 Acero Fy=4200 kg/cm2 kgVCONEX 1,2 (.25 x .40)Acero Longitudinal Superior 2.00 3.00 37.00 1/2" 0.99 219.78Acero Longitudinal Inferior 2.00 3.00 37.00 1/2" 0.99 219.78Estribos 2.00 ### 1.30 3/8" 0.56 215.49

    VCONEX A,B,C,D,E,F,G (.25 x .40)Acero Longitudinal Superior 7.00 4.00 6.05 1/2" 0.99 167.71Acero Longitudinal Inferior 7.00 4.00 6.05 1/2" 0.99 167.71Estribos 7.00 30.00 1.30 3/8" 0.56 152.88

    04.03 COLUMNAS04.03.01 Concreto F'c=210 kg/cm m3

    C-3 (Eje A-A) 7.00 0.25 0.40 5.70 3.99C-3 (Eje B-B) 7.00 0.25 0.40 5.00 3.50

    04.03.02 Encofrado y desencofrado - columnas normal m2C-3 (Eje A-A) 7.00 1.50 5.70 59.85

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

  • C-3 (Eje B-B) 7.00 1.50 5.00 52.50

    Parcial

    04.03.04 Acero Fy=4200 kg/cm kgC-3 (Eje A-A) Acero Longitudinal 7.00 6.00 6.70 1/2" 0.99 278.59Estribos 7.00 35.00 1.50 3/8" 0.56 205.80C-3 (Eje B-B) Acero Longitudinal 7.00 6.00 6.00 1/2" 0.99 249.48Estribos 7.00 30.00 1.50 3/8" 0.56 176.40

    04.04 VIGAS04.04.01 Concreto F'c=210 kg/cm m3

    VIGA C,D (.25 x .40)Entre el Eje 1-2 2.00 5.70 0.25 0.40 1.14Entre el Eje 2-3 2.00 5.68 0.25 0.40 1.14Entre el Eje 3-4 2.00 5.78 0.25 0.40 1.16Entre el Eje 4-5 2.00 5.73 0.25 0.40 1.15Entre el Eje 5-6 2.00 5.73 0.25 0.40 1.15Entre el Eje 6-7 2.00 5.73 0.25 0.40 1.15

    VIGA P 1,2,3,4,5,6,7 (.25 x .40) 7.00 5.45 0.25 0.40 3.82

    04.04.02 Encofrado y desencofrado m2VIGA C,D (.25 x .40)Entre el Eje 1-2 4.00 5.70 0.40 9.12

    2.00 5.70 0.25 2.85Entre el Eje 2-3 4.00 5.68 0.40 9.08

    2.00 5.68 0.25 2.84Entre el Eje 3-4 4.00 5.78 0.40 9.24

    2.00 5.78 0.25 2.89Entre el Eje 4-5 4.00 5.73 0.40 9.16

    2.00 5.73 0.25 2.86Entre el Eje 5-6 2.00 5.73 0.40 4.58

    1.00 5.73 0.25 1.43Entre el Eje 6-7 2.00 5.73 0.40 4.58

    1.00 5.73 0.25 1.43

    VIGA P 1,2,3,4,5,6,7 (.25 x .40) 14.00 5.45 0.40 30.527.00 5.45 0.25 9.54

    Parcial

    04.04.03 Acero Fy=4200 kg/cm2 kgVIGA C,D (.25 x .40)Acero Longitudinal Superior 2.00 3.00 37.00 1/2" 0.99 219.78Acero Longitudinal Inferior 2.00 3.00 37.00 1/2" 0.99 219.78Estribos 2.00 ### 1.30 3/8" 0.56 215.49

    VIGA P 1,2,3,4,5,6,7 (.25 x .40)Acero Longitudinal Superior 7.00 3.00 6.05 1/2" 0.99 125.78Acero Longitudinal Inferior 7.00 3.00 6.05 1/2" 0.99 125.78Estribos 7.00 30.00 1.30 3/8" 0.56 152.88

    04.05 LOSAS MACIZAS04.05.01 Concreto F'c=210 kg/cm m3

    Taller Fisica- Quimica 4.00 10.00 0.80 0.10 3.202.00 4.35 0.80 0.10 0.702.00 4.10 1.10 0.10 0.90

    04.05.02 Encofrado y desencofrado m2Taller Fisica- Quimica 4.00 10.00 0.80 32.00

    2.00 4.35 0.80 6.962.00 4.10 1.10 9.02

    Parcial

    04.05.03 Acero Fy=4200 kg/cm2 kgTaller Fisica- Quimica 4.00 4.00 10.00 3/8" 0.56 89.60

    4.00 40.00 0.80 3/8" 0.56 71.682.00 4.00 5.00 3/8" 0.56 22.402.00 20.00 0.80 3/8" 0.56 17.922.00 5.00 4.10 3/8" 0.56 22.962.00 15.00 1.00 3/8" 0.56 16.80

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

  • 04.06 PLACAS04.06.01 Concreto F'c=210 kg/cm m3

    P-01 26.00 0.80 0.10 0.90 1.87P-02 6.00 1.10 0.10 0.90 0.59

    04.06.02 Encofrado y desencofrado m2P-01 52.00 0.80 1.30 54.08

    P-02 12.00 1.10 1.30 17.16

    Parcial

    04.06.03 Acero Fy=4200 kg/cm2 kgP-01 (X) 26.00 6.00 0.80 3/8" 0.56 69.89P-01 (Y) 26.00 5.00 0.90 3/8" 0.56 65.52

    P-02 (X) 6.00 6.00 1.10 3/8" 0.56 22.18P-02 (Y) 6.00 5.00 0.90 3/8" 0.56 15.12

    04.07 RAMPAS04.07.01 Concreto F'c = 175 Kg/cm2 M3

    Bloque IV 1.00 0.00 0.00

    04.07.02 Encofrado y Desencofrado M2Bloque IV 1.00 0.00 0.00

    04.07.03 Acero Fy=4200 kg/cm kgBloque IV 1.00 0.00 0.00

    04.08 BANCAS04.08.01 Concreto F'c = 175 Kg/cm2 M3

    Bloque IV 1.00 0.00 0.00

    04.08.02 Encofrado y Desencofrado M2Bloque IV 1.00 0.00 0.00

    04.08.03 Acero Fy=4200 kg/cm kgBloque IV 1.00 0.00 0.00

    04.09 JARDINERAS04.09 Concreto F'c = 175 Kg/cm2 M3

    04.09.01 Bloque IV 1.00 0.00 0.00

    04.09.02 Encofrado y Desencofrado M2Bloque IV 1.00 0.00 0.00

    04.09.03 Acero Fy=4200 kg/cm kgBloque IV 1.00 0.00 0.00

    04.10 SOBRECIMIENTOS REFORZADOS04.10.01 Concreto F'c=210 kg/cm m3

    Bloque IV 1.00 0.00 0.00

    04.10.02 Encofrado y desencofrado m2Bloque IV 1.00 0.00 0.00

    04.10.03 Acero Fy=4200 kg/cm2 kgBloque IV 1.00 0.00 0.00

    05.00 ESTRUCTURAS METALICAS05.01 COLUMNAS METALICAS

    05.01.01 Pieza para armado- CM1 pzaColumnas Metalica 1 1.00 0.00 0.00

    05.01.02 Pieza para armado- CM2 pzaColumnas Metalica 2 1.00 7.00 7.00

    05.01.03 Pieza para montaje- CM1 pzaColumnas Metalica 1 1.00 0.00 0.00

    05.01.04 Pieza para montaje- CM2 pzaColumnas Metalica 2 1.00 7.00 7.00

    05.02 VIGAS METALICAS

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

  • 05.02.01 Viga para armado - VMA mlViga Metalica A 1.00 54.20 54.20

    05.02.02 Viga para armado - VMB mlViga Metalica B 1.00 54.20 54.20

    05.02.03 Viga para armado - VM1, VM11 mlViga Metalica 1-11 11.00 8.50 93.50

    05.02.04 Viga para montaje - VMA mlViga Metalica A 1.00 54.20 54.20

    05.02.05 Viga para montaje - VMB mlViga Metalica B 1.00 54.20 54.20

    05.02.06 Viga para montaje - VM1, VM11 mlViga Metalica 1-11 11.00 8.50 93.50

    06.00 OTROS06.01 ROTURA DE PROBETAS

    Cimientos, Columnas, Vigas, Losas, etc. Unid 1.00 15.00 15.0006.02 FLETE

    para materiales y equipo en general est 1.00 0.00 0.0006.03 PLACA RECORDATORIA

    Placa recordatoria Unid 1.00 0.00 0.00

  • HOJA DE METRADOS DE OBRA

    PROPIETARIO: MUNICIPALIDAD DISTRITAL DE MOLINOSDISTRITO: MOLINOSPROVINCIA: JAUJA

    FECHA : ENERO 2012HECHO : MAVV

    TOTAL

    347.40347.40

    0.000.000.000.00

    35.88

    39.31

    17.25

    75.31

    347.40

    34.74

    PROYECTO: "MEJORAMIENTO DE LA CALIDAD DEL SERVICIO EDUCATIVO DE LA I.E. SECUNDARIA LEONCIO QUISPE - DISTRITO

  • 277.92

    567.70

    38.50

    27.14

    5.21

    69.49

    0.00

    0.00

  • 0.00

    0.00

    0.00

    0.00

    23.10

    Total

    568.26

    10.68

    85.44

    Total

    1143.34

    7.49

    112.35

  • Total

    910.27

    10.68

    100.12

    Total

    1059.49

    4.80

    47.98

    Total

    241.36

  • 2.47

    71.24

    Total

    172.71

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    7.00

    0.00

    7.00

  • 54.20

    54.20

    93.50

    54.20

    54.20

    93.50

    15.00

    0.00

    0.00

  • HOJA DE METRADOS DE OBRA

    PROPIETARIO: MUNICIPALIDAD DISTRITAL DE MOLINOSDISTRITO: MOLINOSPROVINCIA: JAUJAREGION: JUNIN FECHA : ENERO 2012GRUPO: ESTRUCTURAS - BLOQUE V HECHO : MAVV

    PARTIDA DESCRIPCION UNID. CANT.MEDIDAS

    PARCIALLARGO ANCHO ALTO

    I.- ESTRUCTURAS01.00 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES01.01 Limpieza de terreno m2 1.00 58.00 58.00

    `01.02 Trazo, Niveles y Replanteo m2 1.00 58.00 58.0001.03 Cartel de Obra 7.20X3.60 glb 1.00 0.00 0.0001.04 Oficina, Guardiania y Almacen General glb 1.00 0.00 0.0001.05 Obras Preliminares varias (inst. agua, luz, desague) glb 1.00 0.00 0.0001.06 Movilizacin de Equipo est 1.00 0.00 0.00

    02.00 MOVIMIENTO DE TIERRAS02.01 Excavacin de zanjas hasta H=2.00 m.

    02.01.01 Zapatas m3Z-7 8.00 1.00 1.00 1.30 10.40

    02.01.02 Cimientos m3Muros de sogaEje 1-1 1.00 3.21 0.50 0.80 1.29Eje 2-2 1.00 3.03 0.50 0.80 1.21Eje 3-3 1.00 2.82 0.50 0.80 1.13Eje 4-4 1.00 2.68 0.50 0.80 1.07Eje A-A entre Eje 1-2 1.00 2.50 0.50 0.80 1.00Eje A-A entre Eje 2-3 1.00 3.33 0.50 0.80 1.33Eje A-A entre Eje 3-4 1.00 1.73 0.50 0.80 0.69Eje B-B entre Eje 1-2 1.00 2.75 0.50 0.80 1.10Eje B-B entre Eje 2-3 1.00 3.37 0.50 0.80 1.35Eje B-B entre Eje 3-4 1.00 1.68 0.50 0.80 0.67

    02.02 Relleno compactado con material propioZapatas m3Z-7 8.00 1.00 1.00 1.30 10.40Descontando Volumen Zapata(Inc. Solado) -8.00 1.00 1.00 0.70 -5.60Descontando Volumen Columna -8.00 0.25 0.25 0.60 -0.30Descontando Volumen Cimiento -8.00 1.50 0.50 0.60 -3.60Descontando Volumen Sobrecimiento -8.00 1.50 0.15 0.20 -0.36

    02.03 Eliminacion de material excedentePartida 02.01 - 02.02 + 30% esponjamiento m3 1.00 20.70 1.30 26.91

    02.04 Nivelacin interior y Apisonado de Terreno E = 0.15 m. m2Bloque V 1.00 58.00 58.00

    02.05 Corte superficial terreno con maquinaria m3Bloque V 1.00 58.00 0.10 5.80

    02.06 Relleno con material seleccionado a maquinaria m3Bloque V 1.00 0.00 0.80 0.00

    02.07 Demolicin de construcciones existentes m2Bloque V 1.00 58.00 58.00

    03.00 OBRAS DE CONCRETO SIMPLE03.01 Solado para zapatas, Concreto 1:12 E= 10 cm. m2

    Z-7 8.00 1.00 1.00 8.00

    03.02 Cimiento corrido, Concreto C:H = 1:10 + 30% P.G. m3Muros de sogaEje 1-1 1.00 4.75 0.50 0.60 1.43Eje 2-2 1.00 4.00 0.50 0.60 1.20Eje 3-3 1.00 3.85 0.50 0.60 1.16Eje 4-4 1.00 3.70 0.50 0.60 1.11Eje A-A entre Eje 1-2 1.00 4.00 0.50 0.60 1.20Eje A-A entre Eje 2-3 1.00 4.33 0.50 0.60 1.30Eje A-A entre Eje 3-4 1.00 3.23 0.50 0.60 0.97

    PROYECTO: "MEJORAMIENTO DE LA CALIDAD DEL SERVICIO EDUCATIVO DE LA I.E. SECUNDARIA LEONCIO QUISPE - DISTRITO DE MOLINOS, PROVINCIA DE JAUJA- JUNN"

  • Eje B-B entre Eje 1-2 1.00 4.25 0.50 0.60 1.28Eje B-B entre Eje 2-3 1.00 4.33 0.50 0.60 1.30Eje B-B entre Eje 3-4 1.00 3.22 0.50 0.60 0.97

    03.03 Sobrecimientos, concreto C:H = 1:8 + 25% P.M. m3Muros de sogaEje 1-1 1.00 4.75 0.50 0.40 0.95Eje 2-2 1.00 4.00 0.50 0.40 0.80Eje 3-3 1.00 3.85 0.50 0.40 0.77Eje 4-4 1.00 3.70 0.50 0.40 0.74Eje A-A entre Eje 1-2 1.00 4.00 0.50 0.40 0.80Eje A-A entre Eje 2-3 1.00 4.33 0.50 0.40 0.87Eje A-A entre Eje 3-4 1.00 3.23 0.50 0.40 0.65Eje B-B entre Eje 1-2 1.00 3.15 0.50 0.40 0.63Eje B-B entre Eje 2-3 1.00 3.23 0.50 0.40 0.65Eje B-B entre Eje 3-4 1.00 3.12 0.50 0.40 0.62

    03.03.02 Encofrado y desencofrado m2Eje 1-1 2.00 4.75 0.40 3.80Eje 2-2 2.00 4.00 0.40 3.20Eje 3-3 2.00 3.85 0.40 3.08Eje 4-4 2.00 3.70 0.40 2.96Eje A-A entre Eje 1-2 2.00 4.00 0.40 3.20Eje A-A entre Eje 2-3 2.00 4.33 0.40 3.46Eje A-A entre Eje 3-4 2.00 3.23 0.40 2.58Eje B-B entre Eje 1-2 2.00 3.15 0.40 2.52Eje B-B entre Eje 2-3 2.00 3.23 0.40 2.58Eje B-B entre Eje 3-4 2.00 3.12 0.40 2.50

    03.04 Gradas y Rampas03.04.01 Concreto en gradas y rampas, F'c = 140 Kg/m2 m3

    Bloque V 1.00 0.00 0.00

    03.04.02 Encofrado y desencofrado de gradas m2Bloque V 1.00 0.00 0.00

    03.05 Jardinera Tipo II y III03.05.01 Concreto en jardineras F'c = 140 Kg/m2 m3

    Bloque V 1.00 0.00 0.00

    03.05.02 Encofrado y desencofrado de jardinera m2Bloque V 1.00 0.00 0.00

    03.06 Fuente de Agua03.06.01 Concreto en fuente, F'c = 140 Kg/m2 m3

    Bloque V 1.00 0.00 0.00

    03.06.02 Encofrado y desencofrado de fuente m2Bloque V 1.00 0.00 0.00

    04.00 OBRAS DE CONCRETO ARMADO04.01 ZAPATAS

    04.01.01 Concreto F'c= 210 Kg/cm m3Z-7 8.00 1.00 1.00 0.60 4.80

    Parcial

    04.01.02 Acero Fy=4200Kg/cm kgZ-7 (x) 8.00 5.00 1.00 1/2" 0.99 39.60Z-7 (Y) 8.00 5.00 1.00 1/2" 0.99 39.60

    04.02 VIGAS DE CIMENTACION04.02.01 Concreto F'c=210 kg/cm m3

    VCONEX 1,2 (.25 x .25)Entre el Eje 1-2 2.00 3.88 0.25 0.25 0.48Entre el Eje 2-3 2.00 4.00 0.25 0.25 0.50Entre el Eje 3-4 2.00 2.85 0.25 0.25 0.36

    VCONEX A,B,C,D, (.25 x .25) 4.00 4.75 0.25 0.25 1.19

    04.02.02 Encofrado y desencofrado m2VCONEX 1,2 (.25 x .25)Entre el Eje 1-2 4.00 3.88 0.25 3.88Entre el Eje 2-3 4.00 4.00 0.25 4.00Entre el Eje 3-4 4.00 2.85 0.25 2.85

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

  • VCONEX A,B,C,D, (.25 x .25) 4.00 4.75 0.25 4.75

    Parcial

    04.02.03 Acero Fy=4200 kg/cm2 kgVCONEX 1,2 (.25 x .25)Acero Longitudinal Superior 2.00 2.00 12.30 1/2" 0.99 48.71Acero Longitudinal Inferior 2.00 2.00 12.30 1/2" 0.99 48.71Estribos 2.00 60.00 1.00 3/8" 0.56 67.20

    VCONEX A,B,C,D, (.25 x .25)Acero Longitudinal Superior 4.00 2.00 5.80 1/2" 0.99 45.94Acero Longitudinal Inferior 4.00 2.00 5.80 1/2" 0.99 45.94Estribos 4.00 35.00 1.00 3/8" 0.56 78.40

    04.03 COLUMNAS04.03.01 Concreto F'c=210 kg/cm m3

    C-2 8.00 0.25 0.25 4.30 2.15

    04.03.02 Encofrado y desencofrado - columnas normal m2C-2 8.00 1.00 4.30 34.40

    Parcial

    04.03.04 Acero Fy=4200 kg/cm kgC-2Acero Longitudinal 8.00 4.00 5.30 1/2" 0.99 167.90Estribos 8.00 30.00 1.50 3/8" 0.56 201.60

    04.04 VIGAS04.04.01 Concreto F'c=210 kg/cm m3

    VIGA E,F (.25 x .30)Entre el Eje 1-2 2.00 3.88 0.25 0.30 0.58Entre el Eje 2-3 2.00 4.00 0.25 0.30 0.60Entre el Eje 3-4 2.00 2.85 0.25 0.30 0.43

    VIGA P 1,2,3,4 (.25 x .30) 4.00 4.75 0.25 0.30 1.43

    04.04.02 Encofrado y desencofrado m2VIGA E,F (.25 x .30)Entre el Eje 1-2 4.00 3.88 0.30 4.65

    2.00 3.88 0.25 1.94Entre el Eje 2-3 4.00 4.00 0.30 4.80

    2.00 4.00 0.25 2.00Entre el Eje 3-4 4.00 2.85 0.30 3.42

    2.00 2.85 0.25 1.43

    VIGA P 1,2,3,4 (.25 x .30) 8.00 4.75 0.30 11.404.00 4.75 0.25 4.75

    Parcial

    04.04.03 Acero Fy=4200 kg/cm2 kgVIGA E,F (.25 x .30)Acero Longitudinal Superior 2.00 2.00 12.30 1/2" 0.99 48.71Acero Longitudinal Inferior 2.00 2.00 12.30 1/2" 0.99 48.71Estribos 2.00 60.00 1.00 3/8" 0.56 67.20

    VIGA P 1,2,3,4 (.25 x .30)Acero Longitudinal Superior 4.00 2.00 5.80 1/2" 0.99 45.94Acero Longitudinal Inferior 4.00 2.00 5.80 1/2" 0.99 45.94Estribos 4.00 35.00 1.00 3/8" 0.56 78.40

    04.05 LOSAS MACIZAS04.05.01 Concreto F'c=210 kg/cm m3

    Enrte el Eje 1-2 y el eje A-B 1.00 22.88 0.15 3.43Enrte el Eje 2-3 y el eje A-B 1.00 25.08 0.15 3.76Enrte el Eje 3-4 y el eje A-B 1.00 17.83 0.15 2.67

    04.05.02 Encofrado y desencofrado m2Enrte el Eje 1-2 y el eje A-B 1.00 22.88 22.88Enrte el Eje 2-3 y el eje A-B 1.00 25.08 25.08Enrte el Eje 3-4 y el eje A-B 1.00 17.83 17.83

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

  • Parcial

    04.05.03 Acero Fy=4200 kg/cm2 kgAcero en (X) 1.00 33.00 11.75 1/2" 0.99 383.87Acero en (Y) 1.00 60.00 6.50 1/2" 0.99 386.10

    04.06 PLACAS04.06.01 Concreto F'c=210 kg/cm m3

    Bloque V 1.00 0.00 0.00

    04.06.02 Encofrado y desencofrado m2Bloque V 1.00 0.00 0.00

    04.06.03 Acero Fy=4200 kg/cm2 kgBloque V 1.00 0.00 0.00

    04.07 RAMPAS04.07.01 Concreto F'c = 175 Kg/cm2 M3

    Bloque V 1.00 0.00 0.00

    04.07.02 Encofrado y Desencofrado M2Bloque V 1.00 0.00 0.00

    04.07.03 Acero Fy=4200 kg/cm kgBloque V 1.00 0.00 0.00

    04.08 BANCAS04.08.01 Concreto F'c = 175 Kg/cm2 M3

    Bloque V 1.00 0.00 0.00

    04.08.02 Encofrado y Desencofrado M2Bloque V 1.00 0.00 0.00

    04.08.03 Acero Fy=4200 kg/cm kgBloque V 1.00 0.00 0.00

    04.09 JARDINERAS04.09 Concreto F'c = 175 Kg/cm2 M3

    04.09.01 Bloque V 1.00 0.00 0.00

    04.09.02 Encofrado y Desencofrado M2Bloque V 1.00 0.00 0.00

    04.09.03 Acero Fy=4200 kg/cm kgBloque V 1.00 0.00 0.00

    04.10 SOBRECIMIENTOS REFORZADOS04.10.01 Concreto F'c=210 kg/cm m3

    Bloque V 1.00 0.00 0.00

    04.10.02 Encofrado y desencofrado m2Bloque V 1.00 0.00 0.00

    04.10.03 Acero Fy=4200 kg/cm2 kgBloque V 1.00 0.00 0.00

    05.00 ESTRUCTURAS METALICAS05.01 COLUMNAS METALICAS

    05.01.01 Pieza para armado- CM1 pzaColumnas Metalica 1 1.00 0.00 0.00

    05.01.02 Pieza para armado- CM2 pzaColumnas Metalica 2 1.00 0.00 0.00

    05.01.03 Pieza para montaje- CM1 pzaColumnas Metalica 1 1.00 0.00 0.00

    05.01.04 Pieza para montaje- CM2 pzaColumnas Metalica 2 1.00 0.00 0.00

    05.02 VIGAS METALICAS

    05.02.01 Viga para armado - VMA ml

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

  • Viga Metalica A 1.00 0.00 0.00

    05.02.02 Viga para armado - VMB mlViga Metalica B 1.00 0.00 0.00

    05.02.03 Viga para armado - VM1, VM11 mlViga Metalica 1-11 11.00 0.00 0.00

    05.02.04 Viga para montaje - VMA mlViga Metalica A 1.00 0.00 0.00

    05.02.05 Viga para montaje - VMB mlViga Metalica B 1.00 0.00 0.00

    05.02.06 Viga para montaje - VM1, VM11 mlViga Metalica 1-11 11.00 0.00 0.00

    06.00 OTROS06.01 ROTURA DE PROBETAS

    Cimientos, Columnas, Vigas, Losas, etc. Unid 1.00 5.00 5.0006.02 FLETE

    para materiales y equipo en general est 1.00 0.00 0.0006.03 PLACA RECORDATORIA

    Placa recordatoria Unid 1.00 0.00 0.00

  • HOJA DE METRADOS DE OBRA

    PROPIETARIO: MUNICIPALIDAD DISTRITAL DE MOLINOSDISTRITO: MOLINOSPROVINCIA: JAUJA

    FECHA : ENERO 2012HECHO : MAVV

    TOTAL

    58.0058.00

    0.000.000.000.00

    10.40

    10.84

    0.54

    26.91

    58.00

    5.80

    0.00

    58.00

    8.00

    11.90

    PROYECTO: "MEJORAMIENTO DE LA CALIDAD DEL SERVICIO EDUCATIVO DE LA I.E. SECUNDARIA LEONCIO QUISPE - DISTRITO

  • 7.47

    29.88

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    4.80

    Total

    79.20

    2.53

    15.48

  • Total

    334.89

    2.15

    34.40

    Total

    369.50

    3.03

    34.38

    Total

    334.89

    9.87

    65.79

  • Total

    769.97

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

  • 0.00

    0.00

    0.00

    0.00

    0.00

    5.00

    0.00

    0.00

  • HOJA DE METRADOS DE OBRA

    PROPIETARIO: MUNICIPALIDAD DISTRITAL DE MOLINOSDISTRITO: MOLINOSPROVINCIA: JAUJAREGION: JUNIN FECHA : ENERO 2012GRUPO: ESTRUCTURAS - CERCO PERIMETRICO HECHO : MAVV

    PARTIDA DESCRIPCION UNID. CANT.MEDIDAS

    PARCIALLARGO ANCHO ALTO

    I.- ESTRUCTURAS01.00 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES01.01 Limpieza de terreno m2 1.00 182.35 1.00 182.35

    `01.02 Trazo, Niveles y Replanteo m2 1.00 182.35 1.00 182.3501.03 Cartel de Obra 7.20X3.60 glb 1.00 0.00 0.0001.04 Oficina, Guardiania y Almacen General glb 1.00 0.00 0.0001.05 Obras Preliminares varias (inst. agua, luz, desague) glb 1.00 0.00 0.0001.06 Movilizacin de Equipo est 1.00 0.00 0.00

    02.00 MOVIMIENTO DE TIERRAS02.01 Excavacin de zanjas hasta H=2.00 m.

    02.01.01 Zapatas m3Cerco 1.00 0.00 0.00

    02.01.02 Cimientos m3Cerco 1.00 182.35 0.50 0.60 54.71

    02.02 Relleno compactado con material propioCimiento m3Cerco 1.00 182.35 0.40 0.10 7.29

    02.03 Eliminacion de material excedentePartida 02.01 - 02.02 + 30% esponjamiento m3 1.00 47.41 1.30 61.63

    02.04 Nivelacin interior y Apisonado de Terreno E = 0.15 m. m2Cerco 1.00 0.00 0.00

    02.05 Corte superficial terreno con maquinaria m3Cerco 1.00 0.00 0.00

    02.06 Relleno con material seleccionado a maquinaria m3Cerco 1.00 0.00 0.00

    02.07 Demolicin de construcciones existentes m2Cerco 1.00 182.35 0.50 91.18

    03.00 OBRAS DE CONCRETO SIMPLE03.01 Solado para zapatas, Concreto 1:12 E= 10 cm. m2

    Cerco 1.00 0.00 0.00

    03.02 Cimiento corrido, Concreto C:H = 1:10 + 30% P.G. m3Muros de sogaCerco 1.00 182.35 0.50 0.50 45.59

    03.03 Sobrecimientos, concreto C:H = 1:8 + 25% P.M. m3Muros de sogaCerco 1.00 182.35 0.15 0.40 10.94

    03.03.02 Encofrado y desencofrado m2Cerco 2.00 182.35 0.40 145.88

    03.04 Gradas y Rampas03.04.01 Concreto en gradas y rampas, F'c = 140 Kg/m2 m3

    Cerco 1.00 0.00 0.00

    03.04.02 Encofrado y desencofrado de gradas m2Cerco 1.00 0.00 0.00

    03.05 Jardinera Tipo II y III03.05.01 Concreto en jardineras F'c = 140 Kg/m2 m3

    Cerco 1.00 0.00 0.00

    03.05.02 Encofrado y desencofrado de jardinera m2

    PROYECTO: "MEJORAMIENTO DE LA CALIDAD DEL SERVICIO EDUCATIVO DE LA I.E. SECUNDARIA LEONCIO QUISPE - DISTRITO DE MOLINOS, PROVINCIA DE JAUJA- JUNN"

  • Cerco 1.00 0.00 0.00

    03.06 Fuente de Agua03.06.01 Concreto en fuente, F'c = 140 Kg/m2 m3

    Cerco 1.00 0.00 0.00

    03.06.02 Encofrado y desencofrado de fuente m2Cerco 1.00 0.00 0.00

    04.00 OBRAS DE CONCRETO ARMADO04.01 ZAPATAS

    04.01.01 Concreto F'c= 210 Kg/cm m3Cerco 1.00 0.00 0.00

    04.01.02 Acero Fy=4200Kg/cm kgCerco 1.00 0.00 0.00

    04.02 VIGAS DE CIMENTACION04.02.01 Concreto F'c=210 kg/cm m3

    Cerco 1.00 0.00 0.00

    04.02.02 Encofrado y desencofrado m2Cerco 1.00 0.00 0.00

    04.02.03 Acero Fy=4200 kg/cm2 kgCerco 1.00 0.00 0.00

    04.03 COLUMNAS04.03.01 Concreto F'c=210 kg/cm m3

    Cerco ### 0.15 0.15 3.10 8.51

    04.03.02 Encofrado y desencofrado - columnas normal m2Cerco ### 0.60 3.10 226.92

    Parcial

    04.03.04 Acero Fy=4200 kg/cm kgCercoAcero Longitudinal ### 2.00 3.30 1/2" 0.99 797.15Estribos ### 17.00 0.20 1/4" 0.25 103.70

    04.04 VIGAS04.04.01 Concreto F'c=210 kg/cm m3

    Cerco 61.00 0.15 0.15 2.70 3.71

    04.04.02 Encofrado y desencofrado m2Cerco ### 0.45 2.70 148.23

    Parcial

    04.04.03 Acero Fy=4200 kg/cm2 kgCercoAcero Longitudinal 61.00 2.00 3.10 1/2" 0.99 374.42Estribos 61.00 15.00 0.20 1/4" 0.25 45.75

    04.05 LOSAS MACIZAS04.05.01 Concreto F'c=210 kg/cm m3

    Cerco 1.00 0.00 0.00

    04.05.02 Encofrado y desencofrado m2Cerco 1.00 0.00 0.00

    04.05.03 Acero Fy=4200 kg/cm2 kgCerco 1.00 0.00 0.00

    04.06 PLACAS04.06.01 Concreto F'c=210 kg/cm m3

    Cerco 1.00 0.00 0.00

    04.06.02 Encofrado y desencofrado m2Cerco 1.00 0.00 0.00

    04.06.03 Acero Fy=4200 kg/cm2 kgCerco 1.00 0.00 0.00

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

    Cant. Fierro

    Largo (ml)

    Dimetro ()

    Peso kg/ml

  • 04.07 RAMPAS04.07.01 Concreto F'c = 175 Kg/cm2 M3

    Cerco 1.00 0.00 0.00

    04.07.02 Encofrado y Desencofrado M2Cerco 1.00 0.00 0.00

    04.07.03 Acero Fy=4200 kg/cm kgCerco 1.00 0.00 0.00

    04.08 BANCAS04.08.01 Concreto F'c = 175 Kg/cm2 M3

    Cerco 1.00 0.00 0.00

    04.08.02 Encofrado y Desencofrado M2Cerco 1.00 0.00 0.00

    04.08.03 Acero Fy=4200 kg/cm kgCerco 1.00 0.00 0.00

    04.09 JARDINERAS04.09 Concreto F'c = 175 Kg/cm2 M3

    04.09.01 Cerco 1.00 0.00 0.00

    04.09.02 Encofrado y Desencofrado M2Cerco 1.00 0.00 0.00

    04.09.03 Acero Fy=4200 kg/cm kgCerco 1.00 0.00 0.00

    04.10 SOBRECIMIENTOS REFORZADOS04.10.01 Concreto F'c=210 kg/cm m3

    Cerco 1.00 0.00 0.00

    04.10.02 Encofrado y desencofrado m2Cerco 1.00 0.00 0.00

    04.10.03 Acero Fy=4200 kg/cm2 kgCerco 1.00 0.00 0.00

    05.00 ESTRUCTURAS METALICAS05.01 COLUMNAS METALICAS

    05.01.01 Pieza para armado- CM1 pzaCerco 1.00 0.00 0.00

    05.01.02 Pieza para armado- CM2 pzaCerco 1.00 0.00 0.00

    05.01.03 Pieza para montaje- CM1 pzaCerco 1.00 0.00 0.00

    05.01.04 Pieza para montaje- CM2 pzaCerco 1.00 0.00 0.00

    05.02 VIGAS METALICAS

    05.02.01 Viga para armado - VMA mlCerco 1.00 0.00 0.00

    05.02.02 Viga para armado - VMB mlCerco 1.00 0.00 0.00

    05.02.03 Viga para armado - VM1, VM11 mlCerco 1.00 0.00 0.00

    05.02.04 Viga para montaje - VMA mlCerco 1.00 0.00 0.00

    05.02.05 Viga para montaje - VMB mlCerco 1.00 0.00 0.00

    05.02.06 Viga para montaje - VM1, VM11 mlCerco 1.00 0.00 0.00

    06.00 OTROS

  • 06.01 ROTURA DE PROBETASCimientos, Columnas, Vigas, Losas, etc. Unid 1.00 8.00 8.00

    06.02 FLETEpara materiales y equipo en general est 1.00 0.00 0.00

    06.03 PLACA RECORDATORIAPlaca recordatoria Unid 1.00 0.00 0.00

  • HOJA DE METRADOS DE OBRA

    PROPIETARIO: MUNICIPALIDAD DISTRITAL DE MOLINOSDISTRITO: MOLINOSPROVINCIA: JAUJA

    FECHA : ENERO 2012HECHO : MAVV

    TOTAL

    182.35182.35

    0.000.000.000.00

    0.00

    54.71

    7.29

    61.63

    0.00

    0.00

    0.00

    91.18

    0.00

    45.59

    10.94

    145.88

    0.00

    0.00

    0.00

    0.00

    PROYECTO: "MEJORAMIENTO DE LA CALIDAD DEL SERVICIO EDUCATIVO DE LA I.E. SECUNDARIA LEONCIO QUISPE - DISTRITO

  • 0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    8.51

    226.92

    Total

    900.85

    3.71

    148.23

    Total

    420.17

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

  • 0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

  • 8.00

    0.00

    0.00

  • HOJA DE METRADOS DE OBRA

    PROPIETARIO: MUNICIPALIDAD DISTRITAL DE MOLINOSDISTRITO: MOLINOSPROVINCIA: JAUJAREGION: JUNIN FECHA : ENERO 2012GRUPO: ESTRUCTURAS - TRATAMIENTO EXTERIOR HECHO : MAVV

    PARTIDA DESCRIPCION UNID. CANT.MEDIDAS

    PARCIAL TOTALLARGO ANCHO ALTO

    I.- ESTRUCTURAS01.00 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES01.01 Limpieza de terreno m2 869.70

    Ingreso principal 1.00 344.74 344.74Atrio Auditorio 1.00 147.30 147.30Pasadizo Interior 1.00 193.34 193.34Pasadizo Laboratorios 1.00 184.32 184.32

    `01.02 Trazo, Niveles y Replanteo m2 869.70Ingreso principal 1.00 344.74 344.74Atrio Auditorio 1.00 147.30 147.30Pasadizo Interior 1.00 193.34 193.34Pasadizo Laboratorios 1.00 184.32 184.32

    01.03 Cartel de Obra 7.20X3.60 glb 1.00 1.00 1.00 1.0001.04 Oficina, Guardiania y Almacen General glb 1.00 1.00 1.00 1.0001.05 Obras Preliminares varias (inst. agua, luz, desague) glb 1.00 1.00 1.00 1.0001.06 Movilizacin de Equipo est 1.00 1.00 1.00 1.00

    02.00 MOVIMIENTO DE TIERRAS02.01 Excavacin de zanjas hasta H=2.00 m. 0.00

    02.01.01 Zapatas m3Tratamiento Exterior 1.00 0.00 0.00

    02.01.02 Cimientos m3 0.00Muros de sogaTratamiento Exterior 1.00 0.00 0.00

    02.02 Relleno compactado con material propioTratamiento Exterior 1.00 0.00 0.00 0.00

    02.03 Eliminacion de material excedentePartida 02.01 - 02.02 + 30% esponjamiento m3 1.00 0.00 1.30 0.00 0.00

    02.04 Nivelacin interior y Apisonado de Terreno E = 0.15 m. m2 869.70Ingreso principal 1.00 344.74 344.74Atrio Auditorio 1.00 147.30 147.30Pasadizo Interior 1.00 193.34 193.34Pasadizo Laboratorios 1.00 184.32 184.32

    02.05 Corte superficial terreno con maquinaria m3 0.00Tratamiento Exterior 1.00 0.00 0.00

    02.06 Relleno con material seleccionado a maquinaria m3 77.36Ingreso principal 1.00 137.50 0.40 55.00Atrio Auditorio 1.00 44.72 0.50 22.36

    02.07 Demolicin de construcciones existentes m2 58.85S.S.H.H. 1.00 58.85 58.85

    03.00 OBRAS DE CONCRETO SIMPLE03.01 Solado para zapatas, Concreto 1:12 E= 10 cm. m2 0.00

    Tratamiento Exterior 1.00 0.00 0.00

    03.02 Cimiento corrido, Concreto C:H = 1:10 + 30% P.G. m3 0.00Muros de sogaTratamiento Exterior 1.00 0.00 0.00

    PROYECTO: "MEJORAMIENTO DE LA CALIDAD DEL SERVICIO EDUCATIVO DE LA I.E. SECUNDARIA LEONCIO QUISPE - DISTRITO DE MOLINOS, PROVINCIA DE JAUJA- JUNN"

  • 03.03 Sobrecimientos, concreto C:H = 1:8 + 25% P.M. m3 0.00Muros de sogaTratamiento Exterior 1.00 0.00 0.00

    03.03.02 Encofrado y desencofrado m2 0.00Tratamiento Exterior 1.00 0.00 0.00

    03.04 Gradas y Rampas03.04.01 Concreto en gradas y rampas, F'c = 140 Kg/m2 m3 25.10

    Ingreso principal 1.00 18.25 0.15 2.741.00 17.25 0.15 2.591.00 53.31 0.15 8.001.00 11.82 0.15 1.771.00 10.75 0.15 1.611.00 26.25 0.15 3.94

    Atrio Auditorio 5.00 3.33 0.16 2.66Pasadizo Interior 5.00 0.72 0.15 0.54Pasadizo Laboratorios 12.00 0.70 0.15 1.26

    03.04.02 Encofrado y desencofrado de gradas m2 63.65Ingreso principal 1.00 74.00 0.15 11.10

    1.00 69.80 0.15 10.471.00 63.90 0.15 9.591.00 48.00 0.15 7.201.00 43.98 0.15 6.601.00 38.00 0.15 5.70

    Atrio Auditorio 5.00 9.50 0.16 7.60Pasadizo Interior 5.00 2.40 0.15 1.80Pasadizo Laboratorios 12.00 2.00 0.15 3.60

    03.05 Jardinera Tipo II y III03.05.01 Concreto en jardineras F'c = 140 Kg/m2 m3 19.87

    Jardinera Tipo II 10.00 14.00 0.06 8.408.00 6.00 0.09 4.32

    Jardinera Tipo IIIPasadizo Interior 2.00 25.00 0.05 2.25

    2.00 6.15 0.05 0.55Pasadizo Laboratorios 2.00 18.30 0.05 1.65

    2.00 10.00 0.05 0.902.00 10.00 0.05 0.902.00 10.00 0.05 0.90

    03.05.02 Encofrado y desencofrado de jardinera m2 150.25Jardinera Tipo II 10.00 14.00 0.30 42.00

    16.00 6.00 0.30 28.80

    Jardinera Tipo IIIPasadizo Interior 4.00 25.00 0.25 25.00

    4.00 6.15 0.25 6.15Pasadizo Laboratorios 4.00 18.30 0.25 18.30

    4.00 10.00 0.25 10.004.00 10.00 0.25 10.004.00 10.00 0.25 10.00

    03.06 Fuente de Agua03.06.01 Concreto en fuente, F'c = 140 Kg/m2 m3 3.78

    Tratamiento Exterior 2.00 6.00 1.50 0.10 1.801.00 18.00 0.11 1.98

    03.06.02 Encofrado y desencofrado de fuente m2 14.40Tratamiento Exterior 2.00 18.00 0.40 14.40

    04.00 OBRAS DE CONCRETO ARMADO04.01 ZAPATAS

    04.01.01 Concreto F'c= 210 Kg/cm m3 0.00Tratamiento Exterior 1.00 0.00 0.00

  • 04.01.02 Acero Fy=4200Kg/cm kg 0.00Tratamiento Exterior 1.00 0.00 0.00

    04.02 VIGAS DE CIMENTACION04.02.01 Concreto F'c=210 kg/cm m3 0.00

    Tratamiento Exterior 1.00 0.00 0.00

    04.02.02 Encofrado y desencofrado m2 0.00Tratamiento Exterior 1.00 0.00 0.00

    04.02.03 Acero Fy=4200 kg/cm2 kg 0.00Tratamiento Exterior 1.00 0.00 0.00

    04.03 COLUMNAS04.03.01 Concreto F'c=210 kg/cm m3 0.00

    Tratamiento Exterior 1.00 0.00 0.00

    04.03.02 Encofrado y desencofrado - columnas normal m2 0.00Tratamiento Exterior 1.00 0.00 0.00

    04.03.04 Acero Fy=4200 kg/cm kg 0.00Tratamiento Exterior 1.00 0.00 0.00

    04.04 VIGAS04.04.01 Concreto F'c=210 kg/cm m3 0.00

    Tratamiento Exterior 1.00 0.00 0.00

    04.04.02 Encofrado y desencofrado m2 0.00Tratamiento Exterior 1.00 0.00 0.00

    04.04.03 Acero Fy=4200 kg/cm2 kg 0.00Tratamiento Exterior 1.00 0.00 0.00

    04.05 LOSAS MACIZAS04.05.01 Concreto F'c=210 kg/cm m3 0.00

    Tratamiento Exterior 1.00 0.00 0.00

    04.05.02 Encofrado y desencofrado m2 0.00Tratamiento Exterior 1.00 0.00 0.00

    04.05.03 Acero Fy=4200 kg/cm2 kg 0.00Tratamiento Exterior 1.00 0.00 0.00

    04.06 PLACAS04.06.01 Concreto F'c=210 kg/cm m3 0.00

    Tratamiento Exterior 1.00 0.00 0.00

    04.06.02 Encofrado y desencofrado m2 0.00Tratamiento Exterior 1.00 0.00 0.00

    04.06.03 Acero Fy=4200 kg/cm2 kg 0.00Tratamiento Exterior 1.00 0.00 0.00

    04.07 RAMPAS04.07.01 Concreto F'c = 175 Kg/cm2 M3 10.23

    Rampa I 2.00 6.45 0.40 0.50 2.582.00 8.00 0.10 1.601.00 6.23 1.10 0.10 0.69

    Rampa II 2.00 6.45 0.40 0.50 2.582.00 10.56 0.10 2.111.00 6.15 1.10 0.10 0.68

    04.07.02 Encofrado y Desencofrado M2 100.02Rampa I 4.00 6.45 0.50 12.90

    4.00 8.00 31.98

    Rampa II 4.00 6.45 0.50 12.904.00 10.56 42.24

  • Parcial Total

    04.07.03 Acero Fy=4200 kg/cm kg 111.79Rampa I 1.00 25.00 1.80 3/8" 0.56 25.20

    1.00 9.00 5.50 3/8" 0.56 27.72

    Rampa II 1.00 25.00 2.23 3/8" 0.56 31.151.00 9.00 5.50 3/8" 0.56 27.72

    04.08 BANCAS04.08.01 Concreto F'c = 175 Kg/cm2 M3 2.86

    Banca Tipo I 3.00 0.70 0.25 0.30 0.163.00 0.50 0.50 0.05 0.043.00 1.15 0.45 0.30 0.473.00 0.44 0.25 0.333.00 2.25 0.50 0.08 0.271.00 0.03 6.50 0.18

    Banca Tipo II 2.00 0.70 0.25 0.30 0.112.00 0.50 0.50 0.05 0.032.00 1.15 0.45 0.30 0.312.00 0.44 0.25 0.222.00 2.25 0.50 0.08 0.18

    Banquetas 25.00 0.80 0.35 0.08 0.56

    04.08.02 Encofrado y Desencofrado M2 15.16Banca Tipo I 6.00 0.50 0.50 1.50

    3.00 1.15 0.45 0.30 0.476.00 0.44 2.616.00 0.50 0.25 0.753.00 2.25 0.50 3.381.00 0.10 6.50 0.65

    Banca Tipo II 4.00 0.50 0.50 1.002.00 1.15 0.45 0.30 0.314.00 0.44 1.744.00 0.50 0.25 0.502.00 2.25 0.50 2.25

    Parcial Total

    04.08.03 Acero Fy=4200 kg/cm kg 49.28Banca Tipo I 3.00 2.00 0.85 3/8" 0.56 2.86

    3.00 5.00 0.50 3/8" 0.56 4.203.00 4.00 0.85 3/8" 0.56 5.713.00 5.00 1.10 3/8" 0.56 9.243.00 9.00 0.50 3/8" 0.56 7.56

    Banca Tipo II 2.00 2.00 0.85 3/8" 0.56 1.902.00 5.00 0.50 3/8" 0.56 2.802.00 4.00 0.85 3/8" 0.56 3.812.00 5.00 1.10 3/8" 0.56 6.162.00 9.00 0.50 3/8" 0.56 5.04

    04.09 JARDINERAS04.09.01 Concreto F'c = 175 Kg/cm2 M3 9.81

    Jardinera Tipo I 10.00 1.80 0.35 0.35 2.2110.00 1.70 0.35 0.35 2.0810.00 1.80 0.15 1.05 2.8410.00 1.70 0.15 1.05 2.68

    04.09.02 Encofra