xxi congreso latinoamericano de puertos guatemala · products combined wall pipe+az az24-700 (24...
TRANSCRIPT
![Page 1: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/1.jpg)
AM Projects-SA
Skyline Steel
Foundation solutions
XXI CONGRESO
LATINOAMERICANO DE
PUERTOS
GUATEMALA
![Page 2: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/2.jpg)
1
Productos de Skyline Pilotes H
Tubos con costura
helicoidal
Perfiles
estructurales Micropilotes
Tubo soldado &
laminado
Tablestacas de
acero
Accesorios
Barras helicoidales
![Page 3: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/3.jpg)
AM Misión de Soluciones de Fundación
• Involucrado directamente con usuarios finales en
términos de apoyo técnico, optimización del
proyecto y servicio postventa
• Desarrollar productos y aplicaciones nuevas
para soluciones rentables en colaboración con
instituciones externas
• Actuando como proveedor de soluciones para el
negocio de construcción (paquete completo)
• Equipos de ventas regionales dedicados y
calificados / satisfacción del cliente
LIDERAZGO mundial de ArcelorMittal para la tecnología SSP
![Page 4: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/4.jpg)
Tablestacado de ArcelorMittal Soluciones de Fundación
• Grupo extenso de ingeniería & equipo de
asistencia técnica para intervenciones externas
• Proporcionar capacitación interna de manera
regular para el equipo técnico interno y externo de
ventas
• Elaborar un software de diseño adecuado &
actualizar la documentación técnica (PHB,…)
• proporcionar programas de capacitación
educacional para ingenieros en universidades,
consultores y contratistas
![Page 5: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/5.jpg)
Pipe Mill
![Page 6: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/6.jpg)
Anclajes para obras maritimas tirantes M 36 – M 170
longitud hasta 27 meters en una parte
Longitud tipico de 30 – 50 meters
![Page 7: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/7.jpg)
PROYECTOS A NIVEL MUNDIAL
![Page 8: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/8.jpg)
Reconstruction Itajaí Port Itajaí, Brazil
Puerto de Itajai
![Page 9: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/9.jpg)
Itajaí, SC
![Page 10: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/10.jpg)
Reconstruccion del Puerto Itajai, Brazil
![Page 11: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/11.jpg)
Contractor
Consortium Triunfo, Serveng ,
Constremac
Project type
Port reconstruction
Products
• AZ26
• AZ18
• Pipe 48” x 0,630
• Pipe 32” x 0,500
Quantity
• 15000 t of foundation products
Specials & Services
1st PAZ wall done in South
America, complete package of
foundation products.
![Page 12: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/12.jpg)
Pecem Port Ceara, Brazil
Puerto de Pecem
![Page 13: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/13.jpg)
Pecem Port Ceara, Brazil
![Page 14: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/14.jpg)
Customer
Consortium Marquise-Ivaí
Project type
Harbor foundation
Products
Combined Wall Pipe+AZ
AZ24-700 (24 meters long)
•Pipe 50” x 0,562
•Pipe 32” x 0,500
•Anchorage System
Quantity
9000 t of foundation products.
Specials & Services
100% delivered in a Taylor-made
with connectr welded and pipe
delivered with 28 m.
![Page 15: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/15.jpg)
Masonville Marine Terminal Baltimore, MD
Terminal Marino - Baltimore
![Page 16: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/16.jpg)
Chicago Spire Chicago, IL
![Page 17: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/17.jpg)
General Contractor
Case Foundation/ Hayward Baker
End customer
Shelbourne Development, Inc.
Project type
High rise building foundation
Products
• PZ doubles x 80’
• W33 x 130# x 80’
• W36 x 170# x 80’
Specials & Services
3 million square feet, 150 story
tower that sits on a foot print of
less than 20,000 square feet
The cell was excavated down to 70
feet deep. It will be the tallest
residential building in the world
![Page 18: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/18.jpg)
Tug-boat quay | Paraíso | Panama Canal (2004)
AS 500-12.0
20 circular cells
f = 15.0 m, L = 18.5 – 20.0 m
3000 t
![Page 19: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/19.jpg)
Mamonal, CO
Puerto mamonal,Colombia
![Page 20: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/20.jpg)
Gallan, CO
Puerto Gallan, colombia
![Page 21: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/21.jpg)
M.O.S.E’, Venecia, Italia
≈ 100 000 t de productos de
acero AM CRPS:
• HZ / AZ
• tubos / AZ
• tubos / PU
• longitudes hasta 49 m
• S 355 GP
![Page 22: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/22.jpg)
Muelle Banda A Manzanillo, Mexico
Profundidad de -14.5 m
Nueva pared anclada a la
estructura existente
500 m de muelle
3000t de HZ975D-14/AZ18
L=25.6/22.0 m
Zona de alta actividad sismica
![Page 23: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/23.jpg)
Port of Ushuaia,
Argentina, (2007)
![Page 24: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/24.jpg)
Dique seco – Rio Grande, Brasil
AU 14 / CAU 14, Lmax = 25 m
350 m x 133 m
15m de profundidad
presión hidráulica de 12 m
4 niveles de anclajes
inyectados
la tablestaca resiste a las
cargas verticales de la grúa
![Page 25: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/25.jpg)
Puerto de Mejillones , Chile (2002)
Rompeolas (zona sismica)
AS 500-12.7
8 celdas circulares
Diameter 24.7 m
Length 31.0 m, 2300 t
![Page 26: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/26.jpg)
Puerto de Mejillones, Chile (2002)
Posición de las celdas
Vista aérea
![Page 27: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/27.jpg)
Resumen
Soluciones para estructuras temporales y permanentes:
• Producto prefabricado con alto control de calidad
• Ejecución rápida
• Vida útil de 50 años o mas
• reuso / extracción posible
• Tablestacas metálicas AM son productos reciclados y fáciles de reciclar
• Apoyo técnico y comercial de ArcelorMittal:
– Diseños preliminares
– Planos de hinca, perfiles especiales, revestimientos
– Recomendaciones de hinca (método, equipo)
– Asistencia técnica en el sitio de obra (si necesario)
![Page 28: XXI CONGRESO LATINOAMERICANO DE PUERTOS GUATEMALA · Products Combined Wall Pipe+AZ AZ24-700 (24 meters long) •Pipe 50” x 0,562 •Pipe 32” x 0,500 •Anchorage System Quantity](https://reader034.vdocuments.co/reader034/viewer/2022043003/5f84a818fdc35227d50934d8/html5/thumbnails/28.jpg)
Muchas gracias por su amable atención
http://www.arcelormittal.com/sheetpiling
http://www.arcelormittal.com/projects