METRADOS EJECUTADOS PROYECTO: SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV. SISTEMA DE AGUA POTABLE CP EL CARMELO PROPIETARIO: GOBIERNO REGIONAL DE LA LIBERTAD UBICACION: CALLE VICTOR RAUL HAYA DE LA TORRE ITEM E S P E C I F I C A C I O N E S Unid. Metrado 1.00 SUMINISTRO DE MATERIALES 1.1 POSTES, MENSULAS Y BARBOTANTE DE C.A. 1.3 POSTE DE C.A.C. DE 13/400 /165/355mm. u 1 1.4 ESTRUCTURA PARA S.A.M. DE C.A. COMPUESTO POR : - (01) POSTE DE C.A.C. DE 13/400 /165/355 mm. - (01) MEDIA LOZA DE C.A.V. DE 1.10m - (01) PALOMILLA DE C.A.V. DE 1.30m - (01) MENSULA DE C.A.V. DE 1.0m u 1 1.5 CRUCETA DE C.A.V. DE 1.30m u 1 1.6 MEDIA LOZA DE C.A.V. DE 1.10m PARA PMI u 1 1.7 PALOMILLA DE C.A.V. DE 1.30m u 1 2.00 AISLADORES 2.1 AISLADOR HIBRIDO TIPO PEDESTAL TAYCO - 24 KV C/ESPIGA u 4 3.00 FERRETERIA Y VARIOS 3.1 CONECTOR BIMETALICO DE DOBLE VIA 35/35mm2 2 PERNOS u 6 3.2 CONECTOR AMPAC 50/35mm2 u 3 3.3 CONECTOR DE COBRE SPLIT BOLT PARA 35mm2 u 6 3.4 TERMINALES A COMPRESION PARA CABLE 35 mm2. Pza 13 3.5 TERMINALES A COMPRESION PARA CABLE 16 mm2. Pza 4 3.6 SOPORTES DE FIJACION DE TRANSFORMADOR Y TRAFOMIX u 8 3.7 PLANCHA DOBLADA DE COBRE TIPO "J" u 8 3.8 CINTA BAND IT 3/4" ML 20 3.9 HEBILLAS PARA CINTA BAND IT u 20 3.10 CINTA VULCANIZANTE N° 2229, 3M Rollo 1.00 3.11 CINTA PLASTICA AISLANTE N°33, 3M 1-1/2" Rollo 5 4.00 CABLES, CONDUCTORES ELECTRICOS Y ACCESORIOS 4.1 CABLE TIPO UNIPOLAR N2XSY - 8,7/15 KV, 25 mm2. m 136 4.2 TERMINAL UNIPOLAR 15 KV, 25 mm2. TIPO EXTERIOR u 6 4.3 CONDUCTOR DE COBRE CPI TEMPLE DURO 35mm2, 7 HILOS m 25 4.4 CONDUCTOR DE COBRE TEMPLE BLANDO 35mm2, 7 HILOS m 50 4.5 CABLE NYY-1 KV 3 - 1 x 16+1x10 mm2. m 25 4.6 TUBO DE A°G° DE 1-1/2"x3.20m Pza 1 4.7 CINTA SEÑALIZADORA PARA M.T. (COLOR ROJO) m 15 4.8 TUBO DE A°G° DE 3"x3.20m Pza 2 4.9 TUBO DE A°G° DE 2"x3.20m Pza 1 4.10 DUCTO DE CONCRETO DE 4 VIAS m 10 4.11 LADRILLO K.K. Und 105 5.00 PUESTA A TIERRA 5.1 VARILLA DE COBRE 16mm (5/8")Øx2.40m u 4 5.2 CONECTOR VARILLA(5/8"Ø)- CABLE(35mm2) u 8 5.3 CONECTOR DE COBRE TIPO PERNO PARTIDO P' COND. 35mm2 u 8 5.4 TIERRA DE CHACRA m3 14 5.5 DOSIS DE THORGEL u 8 5.6 CAJUELA DE C.A.V CON TAPA PARA REGISTRO DE PUESTA A TIERR u 4 6.00 TRANSFORMADOR Y TRAFOMIX 6.1 TRANSFORMADOR TRIFASICO 10/0.398-0.230 KV,37.5 KVA Pza 1 6.2 TRAFOMIX 10/0.230 V, 3 SIST. CLASE 0.2 S, (2)/5A Pza 1

Upload: yenny-belu

Post on 08-Feb-2016

29 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: VALORIZACION N-¦ 02

METRADOS EJECUTADOSPROYECTO: SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV. SISTEMA DE AGUA POTABLE CP EL CARMELOPROPIETARIO: GOBIERNO REGIONAL DE LA LIBERTADUBICACION: CALLE VICTOR RAUL HAYA DE LA TORRE

ITEM E S P E C I F I C A C I O N E SUnid. Metrado

1.00 SUMINISTRO DE MATERIALES1.1 POSTES, MENSULAS Y BARBOTANTE DE C.A.1.3 POSTE DE C.A.C. DE 13/400 /165/355mm. u 11.4 ESTRUCTURA PARA S.A.M. DE C.A. COMPUESTO POR :

- (01) POSTE DE C.A.C. DE 13/400 /165/355 mm.- (01) MEDIA LOZA DE C.A.V. DE 1.10m- (01) PALOMILLA DE C.A.V. DE 1.30m- (01) MENSULA DE C.A.V. DE 1.0m u 1

1.5 CRUCETA DE C.A.V. DE 1.30m u 11.6 MEDIA LOZA DE C.A.V. DE 1.10m PARA PMI u 11.7 PALOMILLA DE C.A.V. DE 1.30m u 1

2.00 AISLADORES 2.1 AISLADOR HIBRIDO TIPO PEDESTAL TAYCO - 24 KV C/ESPIGA u 4

3.00 FERRETERIA Y VARIOS3.1 CONECTOR BIMETALICO DE DOBLE VIA 35/35mm2 2 PERNOS u 63.2 CONECTOR AMPAC 50/35mm2 u 33.3 CONECTOR DE COBRE SPLIT BOLT PARA 35mm2 u 63.4 TERMINALES A COMPRESION PARA CABLE 35 mm2. Pza 133.5 TERMINALES A COMPRESION PARA CABLE 16 mm2. Pza 43.6 SOPORTES DE FIJACION DE TRANSFORMADOR Y TRAFOMIX u 83.7 PLANCHA DOBLADA DE COBRE TIPO "J" u 83.8 CINTA BAND IT 3/4" ML 203.9 HEBILLAS PARA CINTA BAND IT u 203.10 CINTA VULCANIZANTE N° 2229, 3M Rollo 1.003.11 CINTA PLASTICA AISLANTE N°33, 3M 1-1/2" Rollo 5

4.00 CABLES, CONDUCTORES ELECTRICOS Y ACCESORIOS4.1 CABLE TIPO UNIPOLAR N2XSY - 8,7/15 KV, 25 mm2. m 1364.2 TERMINAL UNIPOLAR 15 KV, 25 mm2. TIPO EXTERIOR u 64.3 CONDUCTOR DE COBRE CPI TEMPLE DURO 35mm2, 7 HILOS m 254.4 CONDUCTOR DE COBRE TEMPLE BLANDO 35mm2, 7 HILOS m 504.5 CABLE NYY-1 KV 3 - 1 x 16+1x10 mm2. m 254.6 TUBO DE A°G° DE 1-1/2"x3.20m Pza 14.7 CINTA SEÑALIZADORA PARA M.T. (COLOR ROJO) m 154.8 TUBO DE A°G° DE 3"x3.20m Pza 24.9 TUBO DE A°G° DE 2"x3.20m Pza 14.10 DUCTO DE CONCRETO DE 4 VIAS m 104.11 LADRILLO K.K. Und 105

5.00 PUESTA A TIERRA5.1 VARILLA DE COBRE 16mm (5/8")Øx2.40m u 45.2 CONECTOR VARILLA(5/8"Ø)- CABLE(35mm2) u 85.3 CONECTOR DE COBRE TIPO PERNO PARTIDO P' COND. 35mm2 u 85.4 TIERRA DE CHACRA m3 145.5 DOSIS DE THORGEL u 85.6 CAJUELA DE C.A.V CON TAPA PARA REGISTRO DE PUESTA A TIE u 4

6.00 TRANSFORMADOR Y TRAFOMIX6.1 TRANSFORMADOR TRIFASICO 10/0.398-0.230 KV,37.5 KVA Pza 16.2 TRAFOMIX 10/0.230 V, 3 SIST. CLASE 0.2 S, (2)/5A Pza 1

Page 2: VALORIZACION N-¦ 02

7.00 SECCIONADORES Y EQUIPOS DE PROTECCION7.1 SECCIONADOR UNIPOLAR TIPO CUT-OUT 27KV, 200 A, 150KV BIL Pza 37.2 SECCIONADOR UNIPOLAR TIPO CUT-OUT 27KV, 100 A, 150KV BIL Pza 37.3 FUSIBLES RAPIDOS TIPO CHICOTE 3 A. Pza 37.4 FUSIBLES RAPIDOS TIPO CHICOTE 2 A. Pza 3

8.00 EQUIPOS DE MEDICION Y ACCESORIOS8.1 MEDIDOR ELECTRONICO MODEM CELULAR GSM/GPRS Puerto

RS232 de acuerdo a Especificaciones Tecnicas de Hidrandina S. Pza 18.2 MURETE DE CONCRETO ARMADO 1.40x0.90x0.35m Und 18.3 CAJA METALICA PORTAMEDIDOR ELECTRONICO C/REJILLA Und 18.4 CABLE EXTRAFLEXIBLE TIPO NLT 4x4mm2 Ml 208.5 CINTA BAND IT 3/4" CON HEBILLAS Conj. 16

9.00 TABLERO GENERALCON EQUIPOS 9.1 TABLERO DE DISTRIBUCION, SISTEMA TRIFASICO 380/230 V,

MONTAJE INTERIOR, AUTOSOPORTADO DE 2000x600x600mmPINTURA POLIESTEREPOXI GRIS RAK-7032 TEXTURIZADACON CHAPA Y MANIJA, COMPUESTO DE:- (1) INTERRUP.TERMOMAG. DE 3x40-160 A, 380 V, 25 KA.- (1) ARRANCADOR ESTADO SOLIDO 40A ,380 V,60 Hz.- (1) INTERRUPTOR TERMOMAGNETICO 2x15A 220V- (1) INTERRUPTOR TERMOMAGNETICO 2x20A 220V- (1) VOLTIMETRO 0-500V- (1) AMPERIMETRO 0-200A- (3) BARRAS DE COBRE DE 5 x 30 x 600 mm (FASES)- (9) BARRAS DE COBRE DE 3 x 20 mm (derivaciones s.p.)- (1) BARRA DE COBRE DE 5 x 20 x 200 mm (NEUTRO) AISLADORES, CONECTORES Y CABLEADO Cjto 1.00

ITEM ESPECIFICACIONES UND2.00 TRANSPORTE DE MATERIALES2.1 Postes y Pastorales Tn. 3.0 2.2 Conductores electricos. Tn. 2.0 2.3 Transformador de potencia y Trafomix Est. 1.0 2.4 Varios Est. 1.0 2.5 Puesta en obra de materiales. Est. 1.0

ITEM ESPECIFICACIONES UND3.00 MONTAJE ELECTROMECANICO3.01 Varios

3.01.1 Cartel de obra C/U 13.01.2 Replanteo topografico, ubicación de estructuras Km 0.10

3.02 Postes y accesorios de concreto armado3.01.1 Transporte de poste de c.a.c. de almacen a punto de izaje C/U 23.01.1 Excavacion de hueco para poste en terreno normal M3 1.793.01.1 Izado de poste de c.a.c. de 13/400 C/U 23.01.1 Cimentacion de poste de c.a.c. de 13/400 C/U 23.01.3 Instalacion de mensulas de c.a.v. de 1.0m C/U 13.01.4 Instalacion de media loza de c.a.v. de 1.10m C/U 23.01.5 Instalacion de cruceta simetrica de 1.30m C/U 13.01.5 Instalacion de cruceta asimetrica de 1.30m C/U 2

3.02 AISLADORES3.02.1 Instalacion de aislador hibrido tipo Pin de 25 KV C/U 4.00

3.03 PUESTA A TIERRA3.03.1 Excavacion de hueco para puesta a tierra M3 9.603.03.1 Instalacion de varilla de cobre con relleno y compactado C/U 4.00

3.04 TRANSFORMADOR Y TRAFOMIX3.04.1 Instalacion de transformador trifasico 37.5 KVA C/U 1.00 3.04.2 Instalacion de trafomix C/U 1.00

Page 3: VALORIZACION N-¦ 02

3.05 SECCIONADORES3.05.1 Instalacion de Seccionador Cut Out con fusibles 27 Kv C/U 6

3.06 CABLES Y CONDUCTORES3.06.1 Apertura de zanja e instalacion de cable N2XSY 1x25mm2 Ml 253.05.1 Instalacion de Terminales termocontraibles 15 Kv C/U 6.00 3.06.2 Instalacion de ductos 4 vias Ml 10.00 3.06.3 Aprtura de zanja e instalacion de cable NYY-1Kv 3-1x16mm2 Ml 25.00

3.07 EQUIPOS DE MEDICION Y PRUEBAS ELECTRICAS3.07.1 Pruebas electricas de aislamiento, pozos y puesta en servicio Gbl 1.00

3.08 TABLEROS Y EQUIPOS DE BAJA TENSION3.08.1 Instalacion de tablero de distribucion C/U 1.00

3.09 SEÑALIZACION DE ESTRUCTURAS MT3.01.6 Enumeracion de postes, señalizacion de peligro, co-

dificacion de Subestacion y puesta a tierra Gbl 2.00

3.10 ELABORACION DE EXPEDIENTE FINAL CONFORME A OBRA3.10.1 Elaboracion de expediente de replanteo y tramites conformidad Gbl 1.00

3.11 CONEXIÓN A RED DE HIDRANDINA3.11.1 Comprende las maniobras a realizar para la conexión ya sea en3.11.1 caliente o en frio. Gbl 1.00

Page 4: VALORIZACION N-¦ 02

Presupuesto Referencial

PROYECTO: SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV. SISTEMA DE AGUA POTABLE CP EL CARMELOPROPIETARIO: GOBIERNO REGIONAL DE LA LIBERTADUBICACION: CALLE VICTOR RAUL HAYA DE LA TORRE

METRADO COSTO ITEM E S P E C I F I C A C I O N E S

UND CANT. UNITARIO TOTAL1.00 SUMINISTRO DE MATERIALES1.1 POSTES, MENSULAS Y BARBOTANTE DE C.A.1.3 POSTE DE C.A.C. DE 13/400 /165/355mm. u 1 1,000.00 1,000.00 1.4 ESTRUCTURA PARA S.A.M. DE C.A. COMPUESTO POR :

- (01) POSTE DE C.A.C. DE 13/400 /165/355 mm. 1,000.00 - (01) MEDIA LOZA DE C.A.V. DE 1.10m 1 175.00 - (01) PALOMILLA DE C.A.V. DE 1.30m 1 95.00 - (01) MENSULA DE C.A.V. DE 1.0m u 1 70.00 1,340.00

1.5 CRUCETA DE C.A.V. DE 1.30m u 1 80.00 80.00 1.6 MEDIA LOZA DE C.A.V. DE 1.10m PARA PMI u 1 175.00 175.00 1.7 PALOMILLA DE C.A.V. DE 1.30m u 1 95.00 95.00

SUB-TOTAL 1.100 : 2,690.00 2.00 AISLADORES 2.1 AISLADOR HIBRIDO TIPO PEDESTAL TAYCO - 24 KV C/ESPIGA u 4 178.00 712.00

SUB-TOTAL 2.00 : 712.00 3.00 FERRETERIA Y VARIOS3.1 CONECTOR BIMETALICO DE DOBLE VIA 35/35mm2 2 PERNOS u 6 12.00 72.00 3.2 CONECTOR AMPAC 50/35mm2 u 3 65.00 195.00 3.3 CONECTOR DE COBRE SPLIT BOLT PARA 35mm2 u 6 3.50 21.00 3.4 TERMINALES A COMPRESION PARA CABLE 35 mm2. Pza 13 5.50 71.50 3.5 TERMINALES A COMPRESION PARA CABLE 16 mm2. Pza 4 4.00 16.00 3.6 SOPORTES DE FIJACION DE TRANSFORMADOR Y TRAFOMIX u 8 22.50 180.00 3.7 PLANCHA DOBLADA DE COBRE TIPO "J" u 8 4.50 36.00 3.8 CINTA BAND IT 3/4" ML 20 4.50 90.00 3.9 HEBILLAS PARA CINTA BAND IT u 20 1.50 30.00 3.10 CINTA VULCANIZANTE N° 2229, 3M Rollo 1.00 123.00 123.00 3.11 CINTA PLASTICA AISLANTE N°33, 3M 1-1/2" Rollo 5 28.00 140.00

SUB-TOTAL 3.00 : 974.50 4.00 CABLES, CONDUCTORES ELECTRICOS Y ACCESORIOS4.1 CABLE TIPO UNIPOLAR N2XSY - 8,7/15 KV, 25 mm2. m 136 23.00 3,128.004.2 TERMINAL UNIPOLAR 15 KV, 25 mm2. TIPO EXTERIOR u 6 195.00 1,170.004.3 CONDUCTOR DE COBRE CPI TEMPLE DURO 35mm2, 7 HILOS m 25 14.00 350.004.4 CONDUCTOR DE COBRE TEMPLE BLANDO 35mm2, 7 HILOS m 50 11.50 575.004.5 CABLE NYY-1 KV 3 - 1 x 16+1x10 mm2. m 25 24.00 600.004.6 TUBO DE A°G° DE 1-1/2"x3.20m Pza 1 30.00 30.004.7 CINTA SEÑALIZADORA PARA M.T. (COLOR ROJO) m 15 0.10 1.504.8 TUBO DE A°G° DE 3"x3.20m Pza 2 95.00 190.00 4.9 TUBO DE A°G° DE 2"x3.20m Pza 1 95.00 95.00 4.10 DUCTO DE CONCRETO DE 4 VIAS m 10 27.00 270.004.11 LADRILLO K.K. Und 105 0.30 31.50

SUB-TOTAL 4.00 : 6,441.005.00 PUESTA A TIERRA5.1 VARILLA DE COBRE 16mm (5/8")Øx2.40m u 4 128.00 512.00 5.2 CONECTOR VARILLA(5/8"Ø)- CABLE(35mm2) u 8 4.00 32.00 5.3 CONECTOR DE COBRE TIPO PERNO PARTIDO P' COND. 35mm2 u 8 4.00 32.00 5.4 TIERRA DE CHACRA m3 14 60.00 864.00 5.5 DOSIS DE THORGEL u 8 50.00 400.00 5.6 CAJUELA DE C.A.V CON TAPA PARA REGISTRO DE PUESTA A TIERRA. u 4 25.00 100.00

SUB-TOTAL 5.00 : 1,940.00 6.00 TRANSFORMADOR Y TRAFOMIX6.1 TRANSFORMADOR TRIFASICO 10/0.398-0.230 KV,37.5 KVA Pza 1 7,300.00 7,300.00 6.2 TRAFOMIX 10/0.230 V, 3 SIST. CLASE 0.2 S, (2)/5A Pza 1 5,400.00 5,400.00

SUB-TOTAL 6.00 : 12,700.00 7.00 SECCIONADORES Y EQUIPOS DE PROTECCION7.1 SECCIONADOR UNIPOLAR TIPO CUT-OUT 27KV, 200 A, 150KV BIL. Pza 3 270.00 810.00

Page 5: VALORIZACION N-¦ 02

7.2 SECCIONADOR UNIPOLAR TIPO CUT-OUT 27KV, 100 A, 150KV BIL. Pza 3 240.00 720.00 7.3 FUSIBLES RAPIDOS TIPO CHICOTE 3 A. Pza 3 5.00 15.00 7.4 FUSIBLES RAPIDOS TIPO CHICOTE 2 A. Pza 3 5.00 15.00

SUB-TOTAL 7.00 : 1,560.00

8.00 EQUIPOS DE MEDICION Y ACCESORIOS8.1 MEDIDOR ELECTRONICO MODEM CELULAR GSM/GPRS Puerto

RS232 de acuerdo a Especificaciones Tecnicas de Hidrandina S.A Pza 1 4,100.00 4,100.008.2 MURETE DE CONCRETO ARMADO 1.40x0.90x0.35m Und 1 200.00 200.00 8.3 CAJA METALICA PORTAMEDIDOR ELECTRONICO C/REJILLA Und 1 72.00 72.00 8.4 CABLE EXTRAFLEXIBLE TIPO NLT 4x4mm2 Ml 20 7.00 140.00 8.5 CINTA BAND IT 3/4" CON HEBILLAS Conj. 16 6.00 96.00

SUB-TOTAL 8.00 : 4,608.00 9.00 TABLERO GENERALCON EQUIPOS 9.1 TABLERO DE DISTRIBUCION, SISTEMA TRIFASICO 380/230 V,

MONTAJE INTERIOR, AUTOSOPORTADO DE 2000x600x600mmPINTURA POLIESTEREPOXI GRIS RAK-7032 TEXTURIZADACON CHAPA Y MANIJA, COMPUESTO DE:- (1) INTERRUP.TERMOMAG. DE 3x40-160 A, 380 V, 25 KA.- (1) ARRANCADOR ESTADO SOLIDO 40A ,380 V,60 Hz.- (1) INTERRUPTOR TERMOMAGNETICO 2x15A 220V- (1) INTERRUPTOR TERMOMAGNETICO 2x20A 220V- (1) VOLTIMETRO 0-500V- (1) AMPERIMETRO 0-200A- (3) BARRAS DE COBRE DE 5 x 30 x 600 mm (FASES)- (9) BARRAS DE COBRE DE 3 x 20 mm (derivaciones s.p.)- (1) BARRA DE COBRE DE 5 x 20 x 200 mm (NEUTRO) AISLADORES, CONECTORES Y CABLEADO Cjto 1 10,712.00 10,712.00

SUB-TOTAL 9.00 : 10,712.00 TOTAL SUMINISTRO DE MATERIALES S/. 42,337.50

METRADO COSTO ITEM ESPECIFICACIONES UND CANT. UNITARIO TOTAL2.00 TRANSPORTE DE MATERIALES2.1 Postes y Pastorales Tn. 3.0 100.00 300.00 2.2 Conductores electricos. Tn. 2.0 100.00 200.00 2.3 Transformador de potencia y Trafomix Est. 200.00 2.4 Varios Est. 50.00 2.5 Puesta en obra de materiales. Est. 200.00

TOTAL TRANSPORTE:------------------------------------------------------------- S/. 950.00

METRADO COSTO ITEM ESPECIFICACIONES UND CANT. UNITARIO TOTAL3.00 MONTAJE ELECTROMECANICO3.01 Varios

3.01.1 Cartel de obra C/U 1 1,144.82 1,144.823.01.2 Replanteo topografico, ubicación de estructuras Km 0.10 847.37 84.74

SUB TOTAL: 1,229.563.02 Postes y accesorios de concreto armado

3.01.1 Transporte de poste de c.a.c. de almacen a punto de izaje C/U 2 39.14 78.283.01.1 Excavacion de hueco para poste en terreno normal M3 1.79 18.74 33.583.01.1 Izado de poste de c.a.c. de 13/400 C/U 2 102.86 205.723.01.1 Cimentacion de poste de c.a.c. de 13/400 C/U 2 71.40 142.803.01.3 Instalacion de mensulas de c.a.v. de 1.0m C/U 1 35.15 35.153.01.4 Instalacion de media loza de c.a.v. de 1.10m C/U 2 72.65 145.303.01.5 Instalacion de cruceta simetrica de 1.30m C/U 1 38.22 38.223.01.5 Instalacion de cruceta asimetrica de 1.30m C/U 2 47.45 94.90

SUB TOTAL: 773.953.02 AISLADORES

3.02.1 Instalacion de aislador hibrido tipo Pin de 25 KV C/U 4 16.08 64.32SUB TOTAL: 64.32

3.03 PUESTA A TIERRA3.03.1 Excavacion de hueco para puesta a tierra M3 9.60 18.74 179.903.03.1 Instalacion de varilla de cobre con relleno y compactado C/U 4 170.10 680.4

SUB TOTAL: 860.303.04 TRANSFORMADOR Y TRAFOMIX

Page 6: VALORIZACION N-¦ 02

3.04.1 Instalacion de transformador trifasico 37.5 KVA C/U 1 252.52 252.523.04.2 Instalacion de trafomix C/U 1 252.52 252.52

SUB TOTAL: 505.043.05 SECCIONADORES

3.05.1 Instalacion de Seccionador Cut Out con fusibles 27 Kv C/U 6 32 192.24SUB TOTAL: 192.24

3.06 CABLES Y CONDUCTORES3.06.1 Apertura de zanja e instalacion de cable N2XSY 1x25mm2 Ml 25 17.05 426.253.05.1 Instalacion de Terminales termocontraibles 15 Kv C/U 6 57.28 343.683.06.2 Instalacion de ductos 4 vias Ml 10 22.14 221.403.06.3 Aprtura de zanja e instalacion de cable NYY-1Kv 3-1x16mm2 Ml 25 13.91 347.75

SUB TOTAL: 1,339.083.07 EQUIPOS DE MEDICION Y PRUEBAS ELECTRICAS

3.07.1 Pruebas electricas de aislamiento, pozos y puesta en servicio Gbl 1 1,340.74 1,340.74SUB TOTAL: 1,340.74

3.08 TABLEROS Y EQUIPOS DE BAJA TENSION3.08.1 Instalacion de tablero de distribucion C/U 1 98.82 98.82

SUB TOTAL: 98.823.09 SEÑALIZACION DE ESTRUCTURAS MT

3.01.6 Enumeracion de postes, señalizacion de peligro, co-dificacion de Subestacion y puesta a tierra Gbl 2 137.90 275.80SUB TOTAL: 275.80

3.10 ELABORACION DE EXPEDIENTE FINAL CONFORME A OBRA3.10.1 Elaboracion de expediente de replanteo y tramites conformidad Gbl 1 1540 1,540

SUB TOTAL: 1,540.003.11 CONEXIÓN A RED DE HIDRANDINA

3.11.1 Comprende las maniobras a realizar para la conexión ya sea en3.11.1 caliente o en frio. Gbl 1 3000 3,000

SUB TOTAL: 3,000.00TOTAL MONTAJE ELECTROMECANICO: S/. 11,219.85

RESUMEN GENERAL:MATERIALES Y EQUIPOS:---------------------------------------------------------------- 42,337.50MONTAJE ELECTROMECANICO:----------------------------------------------------- 11,219.85TRANSPORTE:----------------------------------------------------- 950.00COSTO DIRECTO (CD):----------------------------------------------------- 54,507.35GASTOS GENERALES(10% DEL CD):----------------------------------------------------- 5,450.74 UTILIDAD(5% DEL CD):----------------------------------------------------- 2,725.37 SUB TOTAL PRESUPUESTO:------------------------------------------------------------ 62,683.46 IMPUESTO A LAS VENTAS (18%):--------------------------------------------------- 11,283.02 TOTAL PRESUPUESTO EN 10 KV S/. 73,966.47 FACTOR DE RELACION (0.9) MONTO CONTRATADO S/. 66,569.82

Page 7: VALORIZACION N-¦ 02

D A T O S G E N E R A L E S

Obra :

Ubicación : CENTRO POBLADO EL CARMELO - VIRU, PROVINCIA DE VIRU LA LIBERTAD

Entidad Contratante : GOBIERNO REGIONAL DE LA LIBERTAD

Contratista : CONSTRUCTORA E INMOBILIARIA GARCIA & MEDRANO SAC

Modalidad : A Suma Alzada

Valor Referencial : S/ 73,966.47 ( March-11 ).

Presupuesto Contratado : S/ 66,569.83 ( Incluye I.G.V. )

Factor de Relación ( F.R. ) : 0.90

Presupuesto Contratado : S/ 56,415.11 ( Sin I.G.V. )

Plazo de Ejecución : 45.00 ( Días Calendario )

Adelanto Directo : S/ - ( 00/00/2011 ) ( Con I.G.V. )

Adelanto para Materiales : S/ - ( 00/00/2011 ) ( Con I.G.V. )

Fecha de Entrega de terreno : 4-Nov-11

Fecha de Inicio de Obra : 5-Nov-11

Fecha de Término de Obra : 19-Dec-11 5-Feb-00

" SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV DEL PROYECTO SISTEMA DE BOMBEO DEL AGUA POTABLE DEL CENTRO POBLADO EL

CARMELO - VIRU, PROVINCIA DE VIRU - LA LIBERTAD"

Page 8: VALORIZACION N-¦ 02

R E S U M E N D E V A L O R I Z A C I O N D E O B R A No. 02

OBRA :

PROPIETARIO : GOBIERNO REGIONAL DE LA LIBERTAD

UBICACIÓN : CENTRO POBLADO EL CARMELO - VIRU, PROVINCIA DE VIRU

RESIDENTE : INGºCARLO GIOVANNY MUSAYON URBINA

SUPERVISOR : INGº MANUEL ALFONSO ASMAT TERAN

MES DE VALORIZACION: Dec-11

Valorización mes V = 24,854.21 Reintegros y otros R = 0.00

VALORIZACION BRUTA VB = V+R 24,854.21

Intereses ( i ) 0.00

Amortización de Adelantos ( D ) 0.00

VALORIZACION NETA VN = VB + i - D 24,854.21

I.G.V. ( 18.00% ) = VN x 0.18 4,473.76

Monto a Cancelar al Contratista- En Efectivo : VN - Fg - M 24,854.21 - I.G.V. 4,473.76

Calendario de Compromisos a Solicitar = VN + IGV = S/. 29,327.97FACTOR DE RELACION ( 0.9 ) S/. 26,395.16TOTAL A PAGAR AL CONTRATISTA S/. 26,395.16

" SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV DEL PROYECTO SISTEMA DE BOMBEO DEL AGUA POTABLE DEL CENTRO POBLADO EL CARMELO - VIRU, PROVINCIA DE VIRU - LA LIBERTAD"

Page 9: VALORIZACION N-¦ 02

V A L O R I Z A C I O N - V D E O B R A No. 02

OBRA :

PROPIETARIO : GOBIERNO REGIONAL DE LA LIBERTAD

UBICACIÓN : CENTRO POBLADO EL CARMELO - VIRU, PROVINCIA DE VIRU

RESIDENTE : INGºCARLO GIOVANNY MUSAYON URBINA

SUPERVISOR : INGº MANUEL ALFONSO ASMAT TERAN

FECHA : Dec-11

Valorización Del Mes - V = 24,854.21

I.G.V. ( 18.00% ) - V x 0.18 = 4,473.76

Monto a Cancelar Al Contratista

- En Efectivo : V 24,854.21 - I.G.V. 4,473.76

SUB TOTAL AL 100 % = V + IGV = S/. 29,327.97TOTAL AL 90 % S/. 26,395.16

NOTA :

" SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV DEL PROYECTO SISTEMA DE BOMBEO DEL AGUA POTABLE DEL CENTRO POBLADO EL CARMELO - VIRU, PROVINCIA DE VIRU - LA LIBERTAD"

Las valorizaciones tienen el carácter de pagos a cuenta y serán elaboradas el último día de cada período previsto en las Bases o en el contrato, por el inspector o supervisor y el contratista.

En el caso de las obras contratadas bajo el sistema a suma alzada, durante la ejecución de la obra, las valorizaciones se formularán en función de los metrados ejecutados con los precios unitarios del Valor referencial, agregando separadamente los montos proporcionales de gastos generales y utilidad del valor referencial. El subtotal así obtenido se multiplicará por el factor de relación, calculado hasta la quinta cifra decimal; a este monto se agregará, de ser el caso, el porcentaje correspondiente al Impuesto General a las Ventas.

Los metrados de obra ejecutados serán formulados y valorizados conjuntamente por el contratista y el inspector o supervisor, y presentados a la Entidad dentro de los plazos que establezca el contrato.

Page 10: VALORIZACION N-¦ 02

R E I N T E G R O - R D E O B R A No. 02

OBRA :

PROPIETARIO : GOBIERNO REGIONAL DE LA LIBERTAD

UBICACIÓN : CENTRO POBLADO EL CARMELO - VIRU, PROVINCIA DE VIRU

RESIDENTE : INGºCARLO GIOVANNY MUSAYON URBINA

SUPERVISOR : INGº MANUEL ALFONSO ASMAT TERAN

FECHA : Dec-11

Reintegro Del Mes - R = 0.00 (Se calculará en la liquidación de obra)

I.G.V. ( 18.00% ) - R x 0.18 = -

Monto a Cancelar Al Contratista

- En Efectivo : R 0.00 - I.G.V. -

Calendario de Compromisos a Solicitar = K + IGV = S/. 0.00

NOTA :

" SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV DEL PROYECTO SISTEMA DE BOMBEO DEL AGUA POTABLE DEL CENTRO POBLADO EL CARMELO - VIRU, PROVINCIA DE VIRU - LA LIBERTAD"

- Tanto la elaboración como la aplicación de las fórmulas polinómicas se sujetan a lo dispuesto en el Decreto Supremo N 011-79-VC y sus modificatorias,ampliatorias y complementarias.

- Dado que los Índices Unificados de Precios de la Construcción son publicados por el INEI con un mes de atraso, los reintegros se calcularán en base al coeficiente de reajuste «K» conocido a ese momento

- Posteriormente, cuando se conozcan los Índices Unificados de Precios que se deben aplicar, se calculará el monto definitivo de los reintegros que le corresponden y se pagarán con la valorización más cercana posterior o en la liquidación final .

Page 11: VALORIZACION N-¦ 02

VALORIZACION Nº 02 al 31 de Diciembre del 2,011

OBRA: SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV. SISTEMA DE AGUA POTABLE CP EL CARMELO

PROPIETARIO: GOBIERNO REGIONAL DE LA LIBERTADFECHA: 31 de Diciembre DEL 2011 VALOR REFERENCIAL 73,966.47 CONTRATISTA: CONSTRUCTORA E INMOBILIARIA GARCIA & MEDRANO S.A.C. MONTO DEL CONTRATO 66,569.83

Part. DESCRIPCION METRADO COSTO PARCIAL ANTERIOR ACTUAL ACUMULADO SALDONo. Unid. Cantidad Unitario Metrado S/. Metrado S/. Metrado S/. % Metrado S/. %

1.00 SUMINISTRO DE MATERIALES 0.00% 0.00 0.00%1.1 POSTES, MENSULAS Y BARBOTANTE DE C.A.1.3 POSTE DE C.A.C. DE 13/400 /165/355mm. u 1 1,000.00 1,000.00 1 1,000.00 1.00 1,000.00 100.00% 0.00 0.00 0.00%1.4 ESTRUCTURA PARA S.A.M. DE C.A. COMPUESTO POR :

- (01) POSTE DE C.A.C. DE 13/400 /165/355 mm. 1 1,000.00 - (01) MEDIA LOZA DE C.A.V. DE 1.10m 1 175.00 - (01) PALOMILLA DE C.A.V. DE 1.30m 1 95.00 - (01) MENSULA DE C.A.V. DE 1.0m u 1 70.00 1,340.00 1 1,340.00 1.00 1,340.00 100.00% 0.00 0.00 0.00%

1.5 CRUCETA DE C.A.V. DE 1.30m u 1 80.00 80.00 1 80.00 1.00 80.00 100.00% 0.00 0.00 0.00%1.6 MEDIA LOZA DE C.A.V. DE 1.10m PARA PMI u 1 175.00 175.00 1 175.00 1.00 175.00 100.00% 0.00 0.00 0.00%1.7 PALOMILLA DE C.A.V. DE 1.30m u 1 95.00 95.00 1 95.00 1.00 95.00 100.00% 0.00 0.00 0.00%

SUB-TOTAL 1.100 : 2,690.00 2,690.00 0 0.00 2,690.00 100.00%2.00 AISLADORES 2.1 AISLADOR HIBRIDO TIPO PEDESTAL TAYCO - 24 KV C/ESPIGA u 4 178.00 712.00 4 712.00 4.00 712.00 100.00% 0.00 0.00 0.00%

SUB-TOTAL 2.00 : 712.00 712.00 0 0.00 712.00 100.00%3.00 FERRETERIA Y VARIOS3.1 CONECTOR BIMETALICO DE DOBLE VIA 35/35mm2 2 PERNOS u 6 12.00 72.00 6 72.00 6.00 72.00 100.00% 0.00 0.00 0.00%3.2 CONECTOR AMPAC 50/35mm2 u 3 65.00 195.00 3 195.00 3.00 195.00 100.00% 0.00 0.00 0.00%3.3 CONECTOR DE COBRE SPLIT BOLT PARA 35mm2 u 6 3.50 21.00 6 21.00 6.00 21.00 100.00% 0.00 0.00 0.00%3.4 TERMINALES A COMPRESION PARA CABLE 35 mm2. Pza 13 5.50 71.50 13 71.50 13.00 71.50 100.00% 0.00 0.00 0.00%3.5 TERMINALES A COMPRESION PARA CABLE 16 mm2. Pza 4 4.00 16.00 4 16.00 4.00 16.00 100.00% 0.00 0.00 0.00%3.6 SOPORTES DE FIJACION DE TRANSFORMADOR Y TRAFOMIX u 8 22.50 180.00 8 180.00 8.00 180.00 100.00% 0.00 0.00 0.00%3.7 PLANCHA DOBLADA DE COBRE TIPO "J" u 8 4.50 36.00 8 36.00 8.00 36.00 100.00% 0.00 0.00 0.00%3.8 CINTA BAND IT 3/4" ML 20 4.50 90.00 20 90.00 20.00 90.00 100.00% 0.00 0.00 0.00%3.9 HEBILLAS PARA CINTA BAND IT u 20 1.50 30.00 20 30.00 20.00 30.00 100.00% 0.00 0.00 0.00%3.10 CINTA VULCANIZANTE N° 2229, 3M Rollo 1.00 123.00 123.00 1.00 123.00 1.00 123.00 100.00% 0.00 0.00 0.00%3.11 CINTA PLASTICA AISLANTE N°33, 3M 1-1/2" Rollo 5 28.00 140.00 5 140.00 5.00 140.00 100.00% 0.00 0.00 0.00%

SUB-TOTAL 3.00 : 974.50 974.50 0 0.00 974.50 100.00%4.00 CABLES, CONDUCTORES ELECTRICOS Y ACCESORIOS4.1 CABLE TIPO UNIPOLAR N2XSY - 8,7/15 KV, 25 mm2. m 136 23.00 3,128.00 0 0.00 136 3,128.00 136.00 3,128.00 100.00% 0.00 0.00 0.00%4.2 TERMINAL UNIPOLAR 15 KV, 25 mm2. TIPO EXTERIOR u 6 195.00 1,170.00 6 1,170.00 0 - 6.00 1,170.00 100.00% 0.00 0.00 0.00%4.3 CONDUCTOR DE COBRE CPI TEMPLE DURO 35mm2, 7 HILOS m 25 14.00 350.00 25 350.00 0 - 25.00 350.00 100.00% 0.00 0.00 0.00%4.4 CONDUCTOR DE COBRE TEMPLE BLANDO 35mm2, 7 HILOS m 50 11.50 575.00 50 575.00 0 - 50.00 575.00 100.00% 0.00 0.00 0.00%4.5 CABLE NYY-1 KV 3 - 1 x 16+1x10 mm2. m 25 24.00 600.00 25 600.00 0 - 25.00 600.00 100.00% 0.00 0.00 0.00%4.6 TUBO DE A°G° DE 1-1/2"x3.20m Pza 1 30.00 30.00 1 30.00 0 - 1.00 30.00 100.00% 0.00 0.00 0.00%4.7 CINTA SEÑALIZADORA PARA M.T. (COLOR ROJO) m 15 0.10 1.50 15 1.50 0 - 15.00 1.50 100.00% 0.00 0.00 0.00%4.8 TUBO DE A°G° DE 3"x3.20m Pza 2 95.00 190.00 2 190.00 0 - 2.00 190.00 100.00% 0.00 0.00 0.00%4.9 TUBO DE A°G° DE 2"x3.20m Pza 1 95.00 95.00 1 95.00 0 - 1.00 95.00 100.00% 0.00 0.00 0.00%4.10 DUCTO DE CONCRETO DE 4 VIAS m 10 27.00 270.00 10 270.00 0 - 10.00 270.00 100.00% 0.00 0.00 0.00%4.11 LADRILLO K.K. Und 105 0.30 31.50 105 31.50 0 - 105.00 31.50 100.00% 0.00 0.00 0.00%

SUB-TOTAL 4.00 : 6,441.00 3,313.00 0 3,128.00 6,441.00 100.00% 0.00 0.00%5.00 PUESTA A TIERRA5.1 VARILLA DE COBRE 16mm (5/8")Øx2.40m u 4 128.00 512.00 4 512.00 4.00 512.00 100.00% 0.00 0.00 0.00%5.2 CONECTOR VARILLA(5/8"Ø)- CABLE(35mm2) u 8 4.00 32.00 8 32.00 8.00 32.00 100.00% 0.00 0.00 0.00%5.3 CONECTOR DE COBRE TIPO PERNO PARTIDO P' COND. 35mm2 u 8 4.00 32.00 8 32.00 8.00 32.00 100.00% 0.00 0.00 0.00%5.4 TIERRA DE CHACRA m3 14 60.00 864.00 14 864.00 14.40 864.00 100.00% 0.00 0.00 0.00%5.5 DOSIS DE THORGEL u 8 50.00 400.00 8 400.00 8.00 400.00 100.00% 0.00 0.00 0.00%5.6 CAJUELA DE C.A.V CON TAPA PARA REGISTRO DE PUESTA A TIERRA. u 4 25.00 100.00 4 100.00 4.00 100.00 100.00% 0.00 0.00 0.00%

SUB-TOTAL 5.00 : 1,940.00 1,940.00 0 0.00 1,940.00 100.00% 0.00 0.00 0.00%6.00 TRANSFORMADOR Y TRAFOMIX6.1 TRANSFORMADOR TRIFASICO 10/0.398-0.230 KV,37.5 KVA Pza 1 7,300.00 7,300.00 1 7,300.00 1.00 7,300.00 100.00% 0.00 0.00 0.00%6.2 TRAFOMIX 10/0.230 V, 3 SIST. CLASE 0.2 S, (2)/5A Pza 1 5,400.00 5,400.00 1 5,400.00 1.00 5,400.00 100.00% 0.00 0.00 0.00%

SUB-TOTAL 6.00 : 12,700.00 12,700.00 0 0.00 12,700.00 100.00%7.00 SECCIONADORES Y EQUIPOS DE PROTECCION7.1 SECCIONADOR UNIPOLAR TIPO CUT-OUT 27KV, 200 A, 150KV BIL. Pza 3 270.00 810.00 3 810.00 3.00 810.00 100.00% 0.00 0.00 0.00%

Page 12: VALORIZACION N-¦ 02

VALORIZACION Nº 02 al 31 de Diciembre del 2,011

OBRA: SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV. SISTEMA DE AGUA POTABLE CP EL CARMELO

PROPIETARIO: GOBIERNO REGIONAL DE LA LIBERTADFECHA: 31 de Diciembre DEL 2011 VALOR REFERENCIAL 73,966.47 CONTRATISTA: CONSTRUCTORA E INMOBILIARIA GARCIA & MEDRANO S.A.C. MONTO DEL CONTRATO 66,569.83

Part. DESCRIPCION METRADO COSTO PARCIAL ANTERIOR ACTUAL ACUMULADO SALDONo. Unid. Cantidad Unitario Metrado S/. Metrado S/. Metrado S/. % Metrado S/. %7.2 SECCIONADOR UNIPOLAR TIPO CUT-OUT 27KV, 100 A, 150KV BIL. Pza 3 240.00 720.00 3 720.00 3.00 720.00 100.00% 0.00 0.00 0.00%7.3 FUSIBLES RAPIDOS TIPO CHICOTE 3 A. Pza 3 5.00 15.00 3 15.00 3.00 15.00 100.00% 0.00 0.00 0.00%7.4 FUSIBLES RAPIDOS TIPO CHICOTE 2 A. Pza 3 5.00 15.00 3 15.00 3.00 15.00 100.00% 0.00 0.00 0.00%

SUB-TOTAL 7.00 : 1,560.00 1,560.00 0 0.00 1,560.00 100.00% 0.00 0.00%

8.00 EQUIPOS DE MEDICION Y ACCESORIOS8.1 MEDIDOR ELECTRONICO MODEM CELULAR GSM/GPRS Puerto

RS232 de acuerdo a Especificaciones Tecnicas de Hidrandina S.A Pza 1 4,100.00 4,100.00 1 4,100.00 1.00 4,100.00 100.00% 0.00 0.00 0.00%8.2 MURETE DE CONCRETO ARMADO 1.40x0.90x0.35m Und 1 200.00 200.00 0 0.00 1 200.00 1.00 200.00 100.00% 0.00 0.00 0.00%8.3 CAJA METALICA PORTAMEDIDOR ELECTRONICO C/REJILLA Und 1 72.00 72.00 1 72.00 1.00 72.00 100.00% 0.00 0.00 0.00%8.4 CABLE EXTRAFLEXIBLE TIPO NLT 4x4mm2 Ml 20 7.00 140.00 20 140.00 20.00 140.00 100.00% 0.00 0.00 0.00%8.5 CINTA BAND IT 3/4" CON HEBILLAS Conj. 16 6.00 96.00 16 96.00 16.00 96.00 100.00% 0.00 0.00 0.00%

SUB-TOTAL 8.00 : 4,608.00 4,408.00 0 200.00 4,608.00 100.00% 0.00 0.00%9.00 TABLERO GENERALCON EQUIPOS 9.1 TABLERO DE DISTRIBUCION, SISTEMA TRIFASICO 380/230 V,

MONTAJE INTERIOR, AUTOSOPORTADO DE 2000x600x600mmPINTURA POLIESTEREPOXI GRIS RAK-7032 TEXTURIZADACON CHAPA Y MANIJA, COMPUESTO DE:- (1) INTERRUP.TERMOMAG. DE 3x40-160 A, 380 V, 25 KA.- (1) ARRANCADOR ESTADO SOLIDO 40A ,380 V,60 Hz.- (1) INTERRUPTOR TERMOMAGNETICO 2x15A 220V- (1) INTERRUPTOR TERMOMAGNETICO 2x20A 220V- (1) VOLTIMETRO 0-500V- (1) AMPERIMETRO 0-200A- (3) BARRAS DE COBRE DE 5 x 30 x 600 mm (FASES)- (9) BARRAS DE COBRE DE 3 x 20 mm (derivaciones s.p.)- (1) BARRA DE COBRE DE 5 x 20 x 200 mm (NEUTRO) AISLADORES, CONECTORES Y CABLEADO Cjto 1 10,712.00 10,712.00 0.00 0.00 1 10,712.00 1.00 10,712.00 100.00% 0.00 0.00 0.00%

SUB-TOTAL 9.00 : 10,712.00 0.00 0 10,712.00 Err:522 Err:522 Err:522 Err:522 TOTAL SUMINISTRO DE MATERIALES S/. 42,337.50 0

ITEM ESPECIFICACIONES UND CANT.2.00 TRANSPORTE DE MATERIALES2.1 Postes y Pastorales Tn. 3.0 100.00 300.00 3.0 300.00 0 - 3.00 300.00 100.00% 0.00 0.00 0.00%2.2 Conductores electricos. Tn. 2.0 100.00 200.00 1.5 150.00 1 50.00 2.00 200.00 100.00% 0.00 0.00 0.00%2.3 Transformador de potencia y Trafomix Est. 1.0 200.00 200.00 1.0 200.00 0 - 1.00 200.00 100.00% 0.00 0.00 0.00%2.4 Varios Est. 1.0 50.00 50.00 1.0 50.00 0 - 1.00 50.00 100.00% 0.00 0.00 0.00%2.5 Puesta en obra de materiales. Est. 1.0 200.00 200.00 1.0 200.00 0 - 1.00 200.00 100.00% 0.00 0.00 0.00%

TOTAL TRANSPORTE:------------------------------------------------------------- S/. 950.00 900.00 50.00 950.00 100.00% 0.00 0.00%

ITEM ESPECIFICACIONES UND3.00 MONTAJE ELECTROMECANICO3.01 Varios3.01.1 Cartel de obra C/U 1 1,144.82 1,144.82 1 1,144.82 0 - 1.00 1,144.82 100.00% 0.00 0.00 0.00%3.01.2 Replanteo topografico, ubicación de estructuras Km 0.10 847.37 84.74 0.10 84.74 0 - 0.10 84.74 100.00% 0.00 0.00 0.00%

SUB TOTAL: 1,229.56 1,229.56 0 0.00 1,229.56 100.00% 0.00 0.00%3.02 Postes y accesorios de concreto armado 03.01.1 Transporte de poste de c.a.c. de almacen a punto de izaje C/U 2 39.14 78.28 2 78.28 0 - 2.00 78.28 100.00% 0.00 0.00 0.00%3.01.1 Excavacion de hueco para poste en terreno normal M3 1.79 18.74 33.58 1.79 33.58 0 - 1.79 33.58 100.00% 0.00 0.00 0.00%3.01.1 Izado de poste de c.a.c. de 13/400 C/U 2 102.86 205.72 1 102.86 1 102.86 2.00 205.72 100.00% 0.00 0.00 0.00%3.01.1 Cimentacion de poste de c.a.c. de 13/400 C/U 2 71.40 142.80 1 71.40 1 71.40 2.00 142.80 100.00% 0.00 0.00 0.00%3.01.3 Instalacion de mensulas de c.a.v. de 1.0m C/U 1 35.15 35.15 1 35.15 0 - 1.00 35.15 100.00% 0.00 0.00 0.00%

Page 13: VALORIZACION N-¦ 02

VALORIZACION Nº 02 al 31 de Diciembre del 2,011

OBRA: SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV. SISTEMA DE AGUA POTABLE CP EL CARMELO

PROPIETARIO: GOBIERNO REGIONAL DE LA LIBERTADFECHA: 31 de Diciembre DEL 2011 VALOR REFERENCIAL 73,966.47 CONTRATISTA: CONSTRUCTORA E INMOBILIARIA GARCIA & MEDRANO S.A.C. MONTO DEL CONTRATO 66,569.83

Part. DESCRIPCION METRADO COSTO PARCIAL ANTERIOR ACTUAL ACUMULADO SALDONo. Unid. Cantidad Unitario Metrado S/. Metrado S/. Metrado S/. % Metrado S/. %

3.01.4 Instalacion de media loza de c.a.v. de 1.10m C/U 2 72.65 145.30 1 72.65 1 72.65 2.00 145.30 100.00% 0.00 0.00 0.00%3.01.5 Instalacion de cruceta simetrica de 1.30m C/U 1 38.22 38.22 1 38.22 0 - 1.00 38.22 100.00% 0.00 0.00 0.00%3.01.5 Instalacion de cruceta asimetrica de 1.30m C/U 2 47.45 94.90 1 47.45 1 47.45 2.00 94.90 100.00% 0.00 0.00 0.00%

SUB TOTAL: 773.95 479.59 0 294.36 773.95 100.00% 0.00 0.00%3.02 AISLADORES 03.02.1 Instalacion de aislador hibrido tipo Pin de 25 KV C/U 4 16.08 64.32 2.00 32.16 2 32.16 4.00 64.32 100.00% 0.00 0.00 0.00%

SUB TOTAL: 64.32 32.16 0 32.16 64.32 100.00% 0.00 0.00%3.03 PUESTA A TIERRA 03.03.1 Excavacion de hueco para puesta a tierra M3 9.60 18.74 179.90 9.60 179.90 0 - 9.60 179.90 100.00% 0.00 0.00 0.00%3.03.1 Instalacion de varilla de cobre con relleno y compactado C/U 4 170.10 680.40 2.00 340.20 2 340.20 4.00 680.40 100.00% 0.00 0.00 0.00%

SUB TOTAL: 860.30 520.10 0 340.20 860.30 100.00% 0.00 0.00%3.04 TRANSFORMADOR Y TRAFOMIX 03.04.1 Instalacion de transformador trifasico 37.5 KVA C/U 1 252.52 252.52 1.00 252.52 0 - 1.00 252.52 100.00% 0.00 0.00 0.00%3.04.2 Instalacion de trafomix C/U 1 252.52 252.52 0.00 0.00 1 252.52 1.00 252.52 100.00% 0.00 0.00 0.00%

SUB TOTAL: 505.04 252.52 0 252.52 505.04 100.00% 0.00 0.00%3.05 SECCIONADORES 03.05.1 Instalacion de Seccionador Cut Out con fusibles 27 Kv C/U 6 32 192.24 6 192.24 0 6.00 192.24 100.00% 0.00 0.00 0.00%

SUB TOTAL: 192.24 192.24 0 0.00 192.24 100.00% 0.00 0.00%00

3.06 CABLES Y CONDUCTORES 03.06.1 Apertura de zanja e instalacion de cable N2XSY 1x25mm2 Ml 25 17.05 426.25 25 426.25 0 - 25.00 426.25 100.00% 0.00 0.00 0.00%3.05.1 Instalacion de Terminales termocontraibles 15 Kv C/U 6 57.28 343.68 6.00 343.68 0 - 6.00 343.68 100.00% 0.00 0.00 0.00%3.06.2 Instalacion de ductos 4 vias Ml 10 22.14 221.40 10.00 221.40 0 - 10.00 221.40 100.00% 0.00 0.00 0.00%3.06.3 Aprtura de zanja e instalacion de cable NYY-1Kv 3-1x16mm2 Ml 25 13.91 347.75 0.00 0.00 25 347.75 25.00 347.75 100.00% 0.00 0.00 0.00%

SUB TOTAL: 1,339.08 991.33 0 347.75 1,339.08 100.00% 0.00 0.00%3.07 EQUIPOS DE MEDICION Y PRUEBAS ELECTRICAS 03.07.1 Pruebas electricas de aislamiento, pozos y puesta en servicio Gbl 1 1,340.74 1,340.74 0.00 0.00 1 1,340.74 1.00 1,340.74 100.00% 0.00 0.00 0.00%

SUB TOTAL: 1,340.74 0.00 0 1,340.74 1,340.74 100.00% 0.00 0.00%3.08 TABLEROS Y EQUIPOS DE BAJA TENSION 03.08.1 Instalacion de tablero de distribucion C/U 1 98.82 98.82 0.00 0.00 1 98.82 1.00 98.82 100.00% 0.00 0.00 0.00%

SUB TOTAL: 98.82 0.00 0 98.82 98.82 100.00% 0.00 0.00%3.09 SEÑALIZACION DE ESTRUCTURAS MT 03.01.6 Enumeracion de postes, señalizacion de peligro, co- 0

dificacion de Subestacion y puesta a tierra Gbl 2 137.90 275.80 0.00 0.00 2 275.80 2.00 275.80 100.00% 0.00 0.00 0.00%SUB TOTAL: 275.80 0.00 0 275.80 275.80 100.00% 0.00 0.00%

3.10 ELABORACION DE EXPEDIENTE FINAL CONFORME A OBRA 03.10.1 Elaboracion de expediente de replanteo y tramites conformidad Gbl 1 1540 1,540.00 0.00 0.00 1 1,540.00 1.00 1,540.00 100.00% 0.00 0.00 0.00%

SUB TOTAL: 1,540.00 0.00 0 1,540.00 1,540.00 100.00% 0.00 0.00%3.11 CONEXIÓN A RED DE HIDRANDINA 03.11.1 Comprende las maniobras a realizar para la conexión ya sea en 03.11.1 caliente o en frio. Gbl 1 3000 3,000.00 0.00 0.00 1 3,000.00 1.00 3,000.00 100.00% 0.00 0.00 0.00%

SUB TOTAL: 3,000.00 0.00 0 3,000.00 3,000.00 100.00% 0.00 0.00%TOTAL MONTAJE ELECTROMECANICO: 11,219.85 0

0COSTO DIRECTO S/. 54,507.35 60.35% 32,895.00 39.65% 21,612.35 54,507.35 0.00% 0.00% 0.00 0.00%GASTOS GENERALES (10%) 10.00% 5,450.74 3,289.50 2,161.24 5,450.74 0.00 0.00UTILIDAD (5.0%) 5.00% 2,725.37 1,644.75 1,080.62 2,725.37 0.00 0.00COSTO TOTAL S/. 62,683.45 37,829.25 24,854.21 62,683.46 0.00 0.00

IGV 18% 11,283.02 6,809.27 4,473.76 11,283.02 0.00 0.00

73,966.47 60.35% 44,638.52 39.65% 29,327.97 73,966.48 0.00% 0.00% 0.00 0.00%TOTAL VALORIZADO PRESUPUESTO CONTRATADO

Page 14: VALORIZACION N-¦ 02

VALORIZACION Nº 02 al 31 de Diciembre del 2,011

OBRA: SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV. SISTEMA DE AGUA POTABLE CP EL CARMELO

PROPIETARIO: GOBIERNO REGIONAL DE LA LIBERTADFECHA: 31 de Diciembre DEL 2011 VALOR REFERENCIAL 73,966.47 CONTRATISTA: CONSTRUCTORA E INMOBILIARIA GARCIA & MEDRANO S.A.C. MONTO DEL CONTRATO 66,569.83

Part. DESCRIPCION METRADO COSTO PARCIAL ANTERIOR ACTUAL ACUMULADO SALDONo. Unid. Cantidad Unitario Metrado S/. Metrado S/. Metrado S/. % Metrado S/. %

FACTOR DE RELACION (0.9) S/. 66,569.83 40,174.67 26,395.16 66,569.83 0.00

Page 15: VALORIZACION N-¦ 02

CALCULO DE LA DEDUCCION POR ADELANTO QUE CORRESPONDE A VALORIZACION UNICA DE OBRA

a) AVANCE EJECUTADO EN VALORIZACION Nº 02

Monto Valorizado 29,327.97 (con I.G.V.)

Monto del Contrato 66,569.83 (con I.G.V.)

% DE AVANCE = 44.06%

ADELANTO OTORGADO

Adelanto otorgado 0.00 (con I.G.V.)Adelanto otorgado 0.00 (sin IGV)

b) DEDUCCION QUE CORRESPONDE EN VALORIZACION No 01 :

DEDUCCION (CON IGV) : 0.00DEDUCCION (SIN IGV) : 0.00

Page 16: VALORIZACION N-¦ 02

C A L C U L O D E L O S C O E F I C I E N T E S D E R E A J U S T E

OBRA : " SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV DEL PROYECTO SISTEMA DE BOMBEO DEL AGUA POTABLE DEL CENTRO POBLADO EL CARMELO - VIRU, PROVINCIA DE VIRU - LA LIBERTAD"

CONSTRUCTORA E INMOBILIARIA GARCIA & MEDRANO SAC

Fecha Presupuesto : marzo 2011

Fórmula PolinómicaK = 0.05 Pr/Po + 0.063 ACFr/ACFo + 0.093 Cr/Co+ 0.30 TRr/TRo + 0.170 EQTr/EQTo + 0.179 Jr/Jo + 0.145 Gur/GUo

Nomen- Indice ELEMENTO REPRESENTATIVO CoeficienteIncidencia Indices Ka

clatura Unificado Incidencia ( % ) Base Dec-11 ReajusteMar-11

P 42 POSTES Y ACCESORIOS DE CONCRETO 0.050 100.00% 227.69 0.00 -

A 11 AISLADORES Y ACCESORIOS 0.063 100.00% 230.11 0.00 - C 8 CONDUCTOR, CABLES Y ACCESORIOS 0.093 100.00% 870.48 0.00 -

TR 12 TRANSFORMADOR, TABLERO DE DISTRIBUCION 0.300 100.00% 279.63 0.00 - EQ 6 EQUIPO PROTECCION Y MEDICION 0.170 100.00% 367.30 0.00 - J 47 MONTAJE ELECTROMECANICO 0.179 100.00% 427.68 0.00 - T 32 TRANSPORTE 0.015 7.81% 423.94 0.00 -

GU 39 GASTOS GENERALES Y UTILIDADES 0.130 92.19% 359.92 0.00 - Suma de Coeficientes ( Comprobación ) 1.000 Factor Mensual De Reajuste : 0.000

NOTA: - Tanto la elaboración como la aplicación de las fórmulas polinómicas se sujetan a lo dispuesto en el Decreto Supremo N 011-79-VC y sus modificatorias,ampliatorias y complementarias.un mes de atraso, los reintegros se calcularán en base al coeficiente de reajuste «K» conocido a ese momentocalculará el monto definitivo de los reintegros que le corresponden y se pagarán con la valorización más cercana posterior o en la liquidación final .

Page 17: VALORIZACION N-¦ 02

CALCULO DE REINTEGROS RECONOCIDOS

OBRA : " SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV DEL PROYECTO SISTEMA DE BOMBEO DEL AGUA POTABLE DEL CENTRO POBLADO EL CARMELO - VIRU, PROVINCIA DE VIRU - LA LIBERTAD"

CONTRATISTA: CONSTRUCTORA E INMOBILIARIA GARCIA & MEDRANO S.A.C.

VALORIZ. MES FORMULA VALORIZACION VALORIZACION K - 1 REAJUSTE REAJUSTE REAJUSTE DEDUCCIONES REINTEGRONº VALORIZ. N° PROGRAMADA REAL PROGRAMADO REAL RECONOCIDO EFECTIVO MATERIALES TOTAL

( 1 ) ( 2 ) ( 3 ) (4) = (1) x (3) (5) = (2) x (3) ( 6 ) ( 7 ) ( 8 ) (9)=(6)-[(7)+(8)]

1.00 Dec-11 01 24,854.21 0.000 0.00 0.00 0.00 0.00 0.00 0.00

0.00

0.00 24,854.21 0.00 0.00 0.00 0.00

TOTALA PAGAR 0.00

CONCLUSION : OBRA NORMAL S/. 24,854.21

NOTA:

- Tanto la elaboración como la aplicación de las fórmulas polinómicas se sujetan a lo dispuesto en el Decreto Supremo N 011-79-VC y sus modificatorias,ampliatorias y complementarias.

- Dado que los Índices Unificados de Precios de la Construcción son publicados por el INEI con un mes de atraso, los reintegros se calcularán en base al coeficiente de reajuste «K» conocido a ese momento

Page 18: VALORIZACION N-¦ 02

- Posteriormente, cuando se conozcan los Índices Unificados de Precios que se deben aplicar, se calculará el monto definitivo de los reintegros que le corresponden y se pagarán con la valorización más cercana posterior o en la liquidación final .

Page 19: VALORIZACION N-¦ 02

CRONOGRAMA DE AVANCE DE OBRA VALORIZADO

PROYECTO: SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV. SISTEMA DE AGUA POTABLE CP EL CARMELOPROPIETARIO: GOBIERNO REGIONAL DE LA LIBERTADUBICACION: CALLE VICTOR RAUL HAYA DE LA TORRE

45 DIAS NATURALES

S/ 73,966.47

Fecha : NOV 2011

30 DIAS 15 DIASITEM E S P E C I F I C A C I O N E S

1.00 SUMINISTRO DE MATERIALES 0.001.1 POSTES, MENSULAS Y BARBOTANTE DE C.A.1.3 POSTE DE C.A.C. DE 13/400 /165/355mm. 1,000.00 0.001.4 ESTRUCTURA PARA S.A.M. DE C.A. COMPUESTO POR :

- (01) POSTE DE C.A.C. DE 13/400 /165/355 mm.- (01) MEDIA LOZA DE C.A.V. DE 1.10m- (01) PALOMILLA DE C.A.V. DE 1.30m- (01) MENSULA DE C.A.V. DE 1.0m 1,340.00 0.00

1.5 CRUCETA DE C.A.V. DE 1.30m 80.00 0.001.6 MEDIA LOZA DE C.A.V. DE 1.10m PARA PMI 175.00 0.001.7 PALOMILLA DE C.A.V. DE 1.30m 95.00 0.00

2.00 AISLADORES 2.1 AISLADOR HIBRIDO TIPO PEDESTAL TAYCO - 24 KV C/ESPIGA 712.00 0.00

3.00 FERRETERIA Y VARIOS3.1 CONECTOR BIMETALICO DE DOBLE VIA 35/35mm2 2 PERNOS 72.00 0.003.2 CONECTOR AMPAC 50/35mm2 195.00 0.003.3 CONECTOR DE COBRE SPLIT BOLT PARA 35mm2 21.00 0.003.4 TERMINALES A COMPRESION PARA CABLE 35 mm2. 71.50 0.003.5 TERMINALES A COMPRESION PARA CABLE 16 mm2. 16.00 0.003.6 SOPORTES DE FIJACION DE TRANSFORMADOR Y TRAFOMIX 180.00 0.003.7 PLANCHA DOBLADA DE COBRE TIPO "J" 36.00 0.003.8 CINTA BAND IT 3/4" 90.00 0.003.9 HEBILLAS PARA CINTA BAND IT 30.00 0.003.10 CINTA VULCANIZANTE N° 2229, 3M 123.00 0.003.11 CINTA PLASTICA AISLANTE N°33, 3M 1-1/2" 140.00 0.00

4.00 CABLES, CONDUCTORES ELECTRICOS Y ACCESORIOS4.1 CABLE TIPO UNIPOLAR N2XSY - 8,7/15 KV, 25 mm2. - 3,128.004.2 TERMINAL UNIPOLAR 15 KV, 25 mm2. TIPO EXTERIOR 1,170.00 0.004.3 CONDUCTOR DE COBRE CPI TEMPLE DURO 35mm2, 7 HILOS 350.00 0.004.4 CONDUCTOR DE COBRE TEMPLE BLANDO 35mm2, 7 HILOS 575.00 0.004.5 CABLE NYY-1 KV 3 - 1 x 16+1x10 mm2. 600.00 0.004.6 TUBO DE A°G° DE 1-1/2"x3.20m 30.00 0.004.7 CINTA SEÑALIZADORA PARA M.T. (COLOR ROJO) 1.50 0.004.8 TUBO DE A°G° DE 3"x3.20m 190.00 0.004.9 TUBO DE A°G° DE 2"x3.20m 95.00 0.004.10 DUCTO DE CONCRETO DE 4 VIAS 270.00 0.00

Plazo de ejecucion :

Valor referencial :

Page 20: VALORIZACION N-¦ 02

4.11 LADRILLO K.K. 31.50 0.00

5.00 PUESTA A TIERRA5.1 VARILLA DE COBRE 16mm (5/8")Øx2.40m 512.00 0.005.2 CONECTOR VARILLA(5/8"Ø)- CABLE(35mm2) 32.00 0.005.3 CONECTOR DE COBRE TIPO PERNO PARTIDO P' COND. 35mm2 32.00 0.005.4 TIERRA DE CHACRA 864.00 0.005.5 DOSIS DE THORGEL 400.00 0.005.6 CAJUELA DE C.A.V CON TAPA PARA REGISTRO DE PUESTA A TIERRA. 100.00 0.00

0.006.00 TRANSFORMADOR Y TRAFOMIX6.1 TRANSFORMADOR TRIFASICO 10/0.398-0.230 KV,37.5 KVA 7,300.00 0.006.2 TRAFOMIX 10/0.230 V, 3 SIST. CLASE 0.2 S, (2)/5A 5,400.00 0.00

7.00 SECCIONADORES Y EQUIPOS DE PROTECCION7.1 SECCIONADOR UNIPOLAR TIPO CUT-OUT 27KV, 200 A, 150KV BIL. 810.00 0.007.2 SECCIONADOR UNIPOLAR TIPO CUT-OUT 27KV, 100 A, 150KV BIL. 720.00 0.007.3 FUSIBLES RAPIDOS TIPO CHICOTE 3 A. 15.00 0.007.4 FUSIBLES RAPIDOS TIPO CHICOTE 2 A. 15.00 0.00

0.00

8.00 EQUIPOS DE MEDICION Y ACCESORIOS8.1 MEDIDOR ELECTRONICO MODEM CELULAR GSM/GPRS Puerto

RS232 de acuerdo a Especificaciones Tecnicas de Hidrandina S.A 4,100.00 0.008.2 MURETE DE CONCRETO ARMADO 1.40x0.90x0.35m - 200.008.3 CAJA METALICA PORTAMEDIDOR ELECTRONICO C/REJILLA 72.00 0.008.4 CABLE EXTRAFLEXIBLE TIPO NLT 4x4mm2 140.00 0.008.5 CINTA BAND IT 3/4" CON HEBILLAS 96.00 0.00

9.00 TABLERO GENERALCON EQUIPOS 9.1 TABLERO DE DISTRIBUCION, SISTEMA TRIFASICO 380/230 V,

MONTAJE INTERIOR, AUTOSOPORTADO DE 2000x600x600mmPINTURA POLIESTEREPOXI GRIS RAK-7032 TEXTURIZADACON CHAPA Y MANIJA, COMPUESTO DE:- (1) INTERRUP.TERMOMAG. DE 3x40-160 A, 380 V, 25 KA.- (1) ARRANCADOR ESTADO SOLIDO 40A ,380 V,60 Hz.- (1) INTERRUPTOR TERMOMAGNETICO 2x15A 220V- (1) INTERRUPTOR TERMOMAGNETICO 2x20A 220V- (1) VOLTIMETRO 0-500V- (1) AMPERIMETRO 0-200A- (3) BARRAS DE COBRE DE 5 x 30 x 600 mm (FASES)- (9) BARRAS DE COBRE DE 3 x 20 mm (derivaciones s.p.)- (1) BARRA DE COBRE DE 5 x 20 x 200 mm (NEUTRO) AISLADORES, CONECTORES Y CABLEADO - 10,712.00

-

ITEM ESPECIFICACIONES2.00 TRANSPORTE DE MATERIALES2.1 Postes y Pastorales 300.00 0.002.2 Conductores electricos. 150.00 50.002.3 Transformador de potencia y Trafomix 200.00 0.002.4 Varios 50.00 0.002.5 Puesta en obra de materiales. 200.00 0.00

Page 21: VALORIZACION N-¦ 02

ITEM ESPECIFICACIONES3.00 MONTAJE ELECTROMECANICO3.01 Varios

3.01.1 Cartel de obra 1,144.82 0.003.01.2 Replanteo topografico, ubicación de estructuras 84.74 0.00

3.02 Postes y accesorios de concreto armado3.01.1 Transporte de poste de c.a.c. de almacen a punto de izaje 78.28 0.003.01.1 Excavacion de hueco para poste en terreno normal 33.58 0.003.01.1 Izado de poste de c.a.c. de 13/400 102.86 102.863.01.1 Cimentacion de poste de c.a.c. de 13/400 71.40 71.403.01.3 Instalacion de mensulas de c.a.v. de 1.0m 35.15 0.003.01.4 Instalacion de media loza de c.a.v. de 1.10m 72.65 72.653.01.5 Instalacion de cruceta simetrica de 1.30m 38.22 0.003.01.5 Instalacion de cruceta asimetrica de 1.30m 47.45 47.45

3.02 AISLADORES3.02.1 Instalacion de aislador hibrido tipo Pin de 25 KV 32.16 32.16

3.03 PUESTA A TIERRA3.03.1 Excavacion de hueco para puesta a tierra 179.90 0.003.03.1 Instalacion de varilla de cobre con relleno y compactado 340.20 340.20

3.04 TRANSFORMADOR Y TRAFOMIX3.04.1 Instalacion de transformador trifasico 37.5 KVA 252.52 0.003.04.2 Instalacion de trafomix - 252.52

3.05 SECCIONADORES3.05.1 Instalacion de Seccionador Cut Out con fusibles 27 Kv 192.24 0.00

0.00

3.06 CABLES Y CONDUCTORES3.06.1 Apertura de zanja e instalacion de cable N2XSY 1x25mm2 426.25 0.003.05.1 Instalacion de Terminales termocontraibles 15 Kv 343.68 0.003.06.2 Instalacion de ductos 4 vias 221.40 0.003.06.3 Aprtura de zanja e instalacion de cable NYY-1Kv 3-1x16mm2 - 347.75

3.07 EQUIPOS DE MEDICION Y PRUEBAS ELECTRICAS3.07.1 Pruebas electricas de aislamiento, pozos y puesta en servicio - 1,340.74

- 3.08 TABLEROS Y EQUIPOS DE BAJA TENSION

3.08.1 Instalacion de tablero de distribucion - 98.82

- 3.09 SEÑALIZACION DE ESTRUCTURAS MT

3.01.6 Enumeracion de postes, señalizacion de peligro, co-dificacion de Subestacion y puesta a tierra - 275.80

- 3.10 ELABORACION DE EXPEDIENTE FINAL CONFORME A OBRA

3.10.1 Elaboracion de expediente de replanteo y tramites conformidad - 1,540.00

- 3.11 CONEXIÓN A RED DE HIDRANDINA

3.11.1 Comprende las maniobras a realizar para la conexión ya sea en3.11.1 caliente o en frio. - 3,000.00

- COSTO DIRECTO 32,895.00 21,612.35 GASTOS GENERALES (10%) 3,289.50 2,161.24 UTILIDAD (5.0 %) 1,644.75 1,080.62

Page 22: VALORIZACION N-¦ 02

SUB TOTAL 37,829.25 24,854.20 IMPUESTO IGV (18%) 6,809.27 4,473.76 TOTAL PRESUPUESTO 44,638.52 29,327.96 FACTOR DE RELACION (0.9) 40,174.67 26,395.16 AVANCE PARCIAL (%) 60.35% 39.65%AVANCE ACUMULADO (%) 60.35% 100.00

Page 23: VALORIZACION N-¦ 02

PROYECTO: SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV. SISTEMA DE AGUA POTABLE CP EL CARMELO