sistema control mix...“sistema control mix express para el control de calidad del concreto de...

44
Jr. Bajada Balta 169, Oficina 801, Miraflores – 15048 - Lima-Perú Teléfonos: 2430414, Celular: 94647-6921, e-mail: [email protected] Rev.16 1 SISTEMA CONTROL MIX EXPEDIENTE TÉCNICO 2019

Upload: others

Post on 14-Mar-2020

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Jr. Bajada Balta 169, Oficina 801, Miraflores – 15048 - Lima-PerúTeléfonos: 2430414, Celular: 94647-6921, e-mail: [email protected]

1

SISTEMA CONTROL MIX

EXPEDIENTE TÉCNICO

2019

Page 2: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Jr. Bajada Balta 169, Oficina 801, Miraflores – 15048 - Lima-PerúTeléfonos: 2430414, Celular: 94647-6921, e-mail: [email protected]

2

SISTEMA CONTROL MIX

EXPEDIENTE TÉCNICO

1. DESCRIPCIÓN GENERAL

A. El Sistema Control Mix está constituido por un círculo de calidad de 6 etapas paragarantizar: 1) el muestreo, 2) moldeo, 3) transporte a laboratorio, 4) curado, 5) ensayo encompresión y 6) remisión de resultados de ensayos en cumplimiento de las normasestándar aplicables.

B. Las normas estándar en su última versión bajo las cuales se ha configurado el SistemaControl Mix son :

ASTM C31/C31M-19 "Standard Practice for Making and Curing Concrete TestSpecimens in the Field".

ASTM C39/C39M-18 "Standard Test Method for Compressive Strength of CylindricalConcrete Specimens".

ASTM C172/C172M-17 "Standard Practice for Sampling Freshly Mixed Concrete".

ASTM C470/C470M-15 "Standard Specification for Molds for Forming Concrete TestCylinders Vertically".

ASTM C511-19 "Standard Specification for Mixing Rooms, Moist Cabinets, MoistRooms, and Water Storage Tanks Used in the Testing of Hydraulic Cements andConcretes".

ASTM C1231/1231M-15 "Standard Practice for Use of Unbonded Caps inDetermination of Compressive Strength of Hardened Concrete Cylinders"

ASTM C1077-17 “Standard Practice for Agencies Testing Concrete and ConcreteAggregates for Use in Construction and Criteria for Testing Agency Evaluation”

C. Las normas peruanas NTP están basadas en las normas ASTM detalladas, sin embargo,se ha decidido emplear la fuente original dado que corresponden a las versionesrevisadas y actualizadas regularmente, y nuestra Norma E 060-2009 define su empleoen vez de las Normas NTP para el caso particular del muestreo y ensayo de concreto.(Acápites 5.6.3.1 y 5.6.3.2)

2. DETALLES TÉCNICOS DEL SISTEMA CONTROL MIX

2.1 ETAPA 1: MUESTREO DEL CONCRETO FRESCO EN OBRA

A. El muestreo del concreto en obra en conformidad con el Sistema Control Mix esejecutado por personal designado por el cliente, quienes recibirán la capacitación,evaluación y certificación a cargo de especialistas de Control Mix Express (CME).

B. En el Anexo I se adjuntan los documentos que habilitan al suscrito, Ing. Enrique Pasquel,la Ing. Mercedes Neyra y el Bach. Fernando Rosales, como instructores certificados parala capacitación en las Normas ASTM incluidas en el Código ACI-318 y los TécnicosRichard Lino y Fortunato Villanueva, como responsables de las capacitaciones prácticasdel personal en obra.

C. La capacitación que imparte CME está basada en el Programa de Certificación paraTécnicos de Control de Concreto Grado I del American Concrete Institute - ACI, en losaspectos de muestreo, moldeo de testigos en campo, determinación del asentamiento

Page 3: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Jr. Bajada Balta 169, Oficina 801, Miraflores – 15048 - Lima-PerúTeléfonos: 2430414, Celular: 94647-6921, e-mail: [email protected]

3

(slump) y medición de temperatura del concreto fresco conforme a las Normas ASTMaplicables. El certificado emitido por CME, tiene una vigencia de 5 años.

D. Al personal que aprueba la evaluación teórica y práctica que considera el Programa deCapacitación se le asigna un código de certificación, siendo el único personal reconocidopor el Sistema Control Mix como habilitado para el muestreo y moldeo de los testigos enobra.

E. El cliente dispone de un periodo de 3 meses para el cumplimiento de la evaluaciónteórica del personal de muestreo, el plazo indicado avala únicamente el periodo decapacitación práctica, bajo la supervisión del personal CME; cumplido el plazo no seaceptará ningún testigo que no haya sido muestreado y moldeado por dicho personalcalificado, en cumplimiento de las Normas ASTM C31. En el Anexo I se adjunta unejemplo de Certificado.

2.2 ETAPA 2: MOLDEO DE TESTIGOS DE CONCRETO

A. Luego de ser efectuado el muestreo del concreto fresco, por parte del personalcertificado del cliente, en la oportunidad y frecuencia que éste considere convenientesegún la norma ASTM C 31, este personal procede al moldeo de los testigos cilíndricos.

B. El Sistema Control Mix considera el suministro y empleo de módulos para testigosconstituidos por una caja de madera para protección y traslado de testigos de diseñooriginal de CME, 6 moldes cilíndricos plásticos de 4" de diámetro x 8"de altura, varillacompactadora, martillo de goma y regla enrasadora previstos por la norma ASTM C31.

C. Los moldes plásticos han sido fabricados para CME cumpliendo los requisitos ytolerancias de la Norma ASTM C470 y constan adicionalmente de una tapa también deplástico de ajuste hermético, para garantizar el mantenimiento de la humedad del testigoluego de moldeado y enrasado.

D. Efectuado el moldeo de los testigos en condición estándar controlada, el personalcertificado coloca cuidadosamente los moldes con tapa dentro de la caja de madera, quetiene la doble función de proteger los testigos de golpes o maltratos durante las 48 horasprevias a su traslado al laboratorio y proveer aislamiento térmico para asegurar que lostestigos se mantengan dentro del rango de temperatura de 16ºC a 27ºC, o curado iniciala ser garantizado en el periodo indicado, en cumplimiento de ASTM C31 para que no seafecte la resistencia a 28 días.

E. El personal responsable del moldeo de los testigos tiene a su cargo la generación de laorden de servicio para CME con todos los detalles relativos al tipo de concreto,procedencia, fechas de ensayo, etc. que deberán figurar en el certificado de ensayoscorrespondiente y que adjuntará a cada módulo de testigos, incluyéndose en el Anexo IIel formato correspondiente.

2.3 ETAPA 3: TRANSPORTE DE MÓDULOS CON TESTIGOS AL LABORATORIO

A. El transporte al laboratorio es efectuado por personal técnico de CME en unidadesmóviles con anaqueles especialmente acondicionados para el traslado de los módulos demadera con los testigos, a fin de garantizar que no sufran golpes ni daños.

B. En conformidad con ASTM C31, el transporte se efectúa no antes de 8 horas deproducido el fraguado final del concreto, ni después de 48 horas de haberse moldeadolos testigos, no debiendo durar el traslado más de 4 horas.

Page 4: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Jr. Bajada Balta 169, Oficina 801, Miraflores – 15048 - Lima-PerúTeléfonos: 2430414, Celular: 94647-6921, e-mail: [email protected]

4

2.4 ETAPA 4: CURADO EN CONDICIONES CONTROLADAS

A. Los testigos son trasladados al Laboratorio de CME en Villa El Salvador donde seingresa y registra cada módulo con su orden de servicio correspondiente en la base dedatos del software original patentado que forma parte del Sistema Control Mix.

B. El software registra también la ubicación matricial única que tendrán los testigos en losanaqueles de las cámaras de curado, emitiendo etiquetas con códigos de barras para suidentificación.

C. Los testigos se desmoldan y de inmediato se le colocan sus etiquetas de identificación,colocándose en grupos de 3 en cajas plásticas de diseño especial numeradas, para sualmacenaje ordenado en los anaqueles de los cuartos de curado.

D. Se cuenta con cajas numeradas de color rojo donde se depositan los testigos aensayarse a edad temprana (normalmente a 7 días o la edad que requiera el cliente) ytambién con cajas de color azul para almacenar los testigos a probarse a 28 días omayor edad si lo requiere el cliente, de tal forma de eliminar cualquier posibilidad deconfusión en almacenaje e identificación de los testigos.

E. En un periodo máximo de 30 minutos luego de ser desmoldados, etiquetados ycolocados en sus cajas plásticas, los testigos se trasladan a su ubicación programada enlas cámaras de curado.

F. Las cámaras de curado cumplen con los requisitos de la Norma ASTM C511 y cuentancon un sistema de circuito cerrado de aspersores aéreos de neblina y un tanque de aguacon bomba recirculante y control de temperatura para garantizar el mantenimiento de lahumedad superficial permanente y la temperatura en el rango de 21ºC a 25ºC previsto enASTM C31.

2.5 ETAPA 5: ENSAYO EN COMPRESIÓN DE LOS TESTIGOS

A. El software del Sistema Control Mix emite diariamente un reporte de los testigosprogramados para ser ensayados en la fecha, con su ubicación matricial en las cámarasde curado, a fin de que sean trasladados al laboratorio de ensayos.

B. Los testigos se trasladan en sus cajas de curado al laboratorio de ensayos paramantener su condición de humedad hasta el momento de ser probados.

C. Se cuenta con dos prensas británicas Marca JV Tech, Nº de Serie 0501503 y Serie16001476 digitales, totalmente automatizadas, controladas por el software del SistemaControl Mix y con certificados de calibración vigentes emitidos por la empresa CeldaEIRL, empleando celda de calibración trazable al NIST (United States National Instituteof Standards & Technology) en conformidad con la Norma ASTM E74, adjuntándose unacopia de los certificados en el Anexo III.

D. Como elemento de distribución de carga en el ensayo de compresión se empleancabezales de acero y pads de neopreno en conformidad con la Norma ASTM C1231.

E. Luego de colocado el testigo en su posición de ensayo en la prensa, se procede aescanear el código de barras para su reconocimiento por el software, y la comprobaciónde que procede el ensayo programado, con lo que el técnico autoriza a través de lacomputadora el inicio de la prueba que se efectúa automáticamente sin intervención deningún personal, con la velocidad de carga programada previamente dentro del rango de0.20 Mpa/seg a 0.30 Mpa/seg establecido en ASTM C39.

Page 5: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Jr. Bajada Balta 169, Oficina 801, Miraflores – 15048 - Lima-PerúTeléfonos: 2430414, Celular: 94647-6921, e-mail: [email protected]

5

F. Conseguida la rotura del testigo y registrada la carga máxima el técnico registra el tipo defalla según ASTM C39 y autoriza que el software grabe la información, con lo que secalcula el esfuerzo máximo sobre la base del diámetro del testigo ingresado previamenteal sistema y el área correspondiente de la sección.

2.6 ETAPA 6: EMISIÓN Y ENVÍO DEL CERTIFICADO DE ENSAYOS

A. Cada vez que se completa la rotura de un grupo de 3 testigos de 4" x 8", (cuyo promedioes considerado por ACI 318 como representativo de la resistencia en compresión de lamuestra), el software procede a generar y emitir en formato pdf, el certificado o reportecorrespondiente acorde con el acápite 9. de ASTM C39, avalado con la firma deIngeniero Civil Colegiado Especialista, Responsable Técnico, tal como lo consideran losdispositivos legales vigentes.

B. El certificado generado y emitido como se menciona anteriormente es almacenado enuna base de datos de uso y acceso exclusivo del cliente, a quién el software le envía deinmediato un correo electrónico a las casillas que haya declarado previamente, con elaviso de la disponibilidad del certificado de ensayos y un enlace para que proceda adescargarlo en formato pdf e imprimirlo a voluntad.

C. En el Anexo IV se incluye un formato de certificado de ensayos.

D. Por razones de seguridad informática y resguardo, toda la información registrada ygenerada por el software es almacenada simultáneamente en un servidor residente enlas Oficinas de CME en Miraflores, un segundo servidor en el Laboratorio en Villa ElSalvador y un tercer servidor dedicado alojado en un servicio por internet contratado enAlemania.

E. Se adjunta como documento gráfico en el Anexo V el link de descarga del videoilustrativo de los procesos del Sistema Control Mix, y en el websitehttps://controlmixexpress.com/ se puede acceder a un demo de los serviciosmencionados.

3. SISTEMA DE GESTIÓN ISO 9001:2015

A. El Sistema Control Mix cuenta con certificación ISO 9001:2015 Nº PE14/175309,“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Limay Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification confecha 04/02/14, que abarca los rubros previamente detallados. (Ver Anexo IX)

4. SERVICIOS COMPLEMENTARIOS DE CONTROL MIX EXPRESS S.A.C.

A. CME pone a disposición gratuita para uso exclusivo de sus clientes el Módulo InformáticoControl Data que evalúa según ACI-318 la estadística generada.

B. Como servicios complementarios Control Mix Express SAC realiza extracción, recorte yensayos de núcleos de concreto con brocas diamantinas de 2", 3" y 4" de diámetro enconformidad con la norma ASTM C 42

C. Se cuenta con 2 perforadoras diamantinas marca Hilti Modelo DD-150 U y una sierracircular con disco diamantado de 20" para acondicionar los testigos dentro de losparámetros de geometría, planitud y verticalidad establecidos por ASTM C 42 y ASTM C39.

Page 6: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Jr. Bajada Balta 169, Oficina 801, Miraflores – 15048 - Lima-PerúTeléfonos: 2430414, Celular: 94647-6921, e-mail: [email protected]

6

D. También provee de servicio de monitoreo de ubicación de acero de refuerzo con equipoProceq Profometer PM-600.

E. Se proporciona adicionalmente el servicio de determinación de Número de ReboteComparativo en estructuras de concreto (esclerometría) con equipo Forney acorde con lanorma ASTM C 805.

5. RESPONSABLES TÉCNICOS

A. El responsable técnico del Sistema Control Mix Express y Gerente General es el Ing.Enrique Pasquel Carbajal con Registro del Colegio de Ingenieros del Perú Nº 19480.

B. La responsable Técnica del Área de Laboratorio y Soporte Técnico es la IngenieraMercedes Neyra Palomino con Registro del Colegio de Ingenieros del Perú Nº 154020.

C. En el Anexo VI se adjunta el Resumen de Hoja de vida del Responsable Técnico queavala la experiencia mínima de 5 años en el ensayo de materiales de construcciónrequerida por ASTM C1077 para dirigir empresas de control de calidad de concreto.

D. En el Anexo VII se incluyen copias de las normas ASTM mencionadas previamente.

E. En el Anexo VIII se puede apreciar un detalle de los clientes atendidos por nuestraempresa.

Lima, 12 de Septiembre del 2019

Responsable TécnicoGerente General

Control Mix Express S.A.C.

Page 7: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Jr. Bajada Balta 169, Oficina 801, Miraflores – 15048 - Lima-PerúTeléfonos: 2430414, Celular: 94647-6921, e-mail: [email protected]

7

ANEXO IDocumento Instructor Certificado ASTM

Documento de Técnicos de Capacitación CME deCampo

yEjemplo de Certificado de Capacitación

Page 8: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

oPtroEoL'gI

]g. o =@{ = EE

-A Y tn I! r E[B E ZEI :E Bib H ;9R U E'b2 I 'Ego E trP5 P .qUCt {= = tr'= E g8FoE'(E(J

a-l+r.E.99tn

C'T?-II

.=GLF

IG?-orI,ooollroL.EdIGIIItr?

-IoF

Fl

2oFz/rrlH2

Page 9: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification
Page 10: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

CERTIFICADO DE REVALIDACIÓN DE TÉCNICO ACI GRADO I

PARA ENSAYOS DE CONCRETO EN OBRA

OTORGADO A:

RICHARD LINO NUÑEZ

POR HABER APROBADO SATISFACTORIAMENTE LA

EVALUACIÓN DE RE-VALIDACIÓN DE HABILIDAD EN

CONOCIMIENTOS TEÓRICOS Y PRÁCTICOS EN

CONCORDANCIA CON LOS LINEAMIENTOS DEL “PROGRAMA

DE CERTIFICACIÓN PARA TÉCNICOS GRADO I PARA ENSAYOS

DE CONCRETO EN OBRA DEL AMERICAN CONCRETE

INSTITUTE” CERTIFICADA INICIALMENTE CON ID 01164309

EXPEDIDA POR ACI EL 03/04/2009 Y VIGENCIA DE 5 AÑOS.

SE EXTIENDE EL PRESENTE CERTIFICADO CON PERIODO DE

VALIDEZ DEL 03/04/2019 AL 03/04/2024.

____________________________________________________________

ING. ENRIQUE PASQUEL CARBAJAL

REGISTRO CIP: 19480

INSTRUCTOR CERTIFICADO ASTM PARA LATINOAMERICA

FELLOW AMERICAN CONCRETE INSTITUTE

HONORARY MEMBER AMERICAN CONCRETE INSTITUTE

Page 11: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

CERTIFICADO DE CAPACITACIÓN COMO TÉCNICO EN MUESTREO Y ELABORACIÓN DE PROBETAS EN OBRA

OTORGADO A:

FORTUNATO VILLANUEVA HOYLE

POR HABER APROBADO SATISFACTORIAMENTE LA CAPACITACIÓN Y EVALUACIÓN DE CONOCIMIENTOS TEÓRICOS Y PRÁCTICOS PARA EL MUESTREO Y ELABORACIÓN DE PROBETAS EN OBRA EN CONFORMIDAD CON LAS NORMAS ASTM C 39 Y ASTM C 172, CON UNA DURACIÓN DE 24 HORAS DESARROLLADA EL 08/04/2014.

Page 12: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification
Page 13: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

CME-R-067 CERTIFICADO DE CAPACITACIÓN

Rev 02- 15.11.17

Control Mix Express S.A.C. certifica que el Señor:

CERTIFICADO DE CAPACITACIÓN

EDGAR JANAMPA AQUISE

Identificado con DNI 41602144 ha aprobado el "Programa de Capacitación Teórico-Práctico para Muestreo y Moldeo de Testigos de Concreto en Obra", en conformidad con las normas ASTM C 172 y ASTM C 31, por lo que está acreditado para la ejecución de estas labores dentro del Sistema Control Mix con el Código Nº CME 702 con fecha de vigencia al 06/09/2023

________________________________ __________________ Instructor: Ing. CIP Mercedes Neyra Fecha

06/09/2018

Page 14: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Jr. Bajada Balta 169, Oficina 801, Miraflores – 15048 - Lima-PerúTeléfonos: 2430414, Celular: 94647-6921, e-mail: [email protected]

8

ANEXO IIFormato de Orden de Servicio

Page 15: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Muesta

r refer

encia

l

Page 16: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Jr. Bajada Balta 169, Oficina 801, Miraflores – 15048 - Lima-PerúTeléfonos: 2430414, Celular: 94647-6921, e-mail: [email protected]

9

ANEXO IIICertificados de Calibración de Prensas

Page 17: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification
Page 18: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification
Page 19: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification
Page 20: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification
Page 21: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

CERTIFICATE OF CALIBRATIONAS RETURNED

CALIBRATION DATE: 11/05/2018Page: 1 of 4

REPORT NO.: C-8294(ASRET)K0518

MOREHOUSE LOAD CELL MODEL: CALIBRATION SERIAL NO.: C-8294 CALIBRATED TO: 500000 lbf COMPRESSION ASCENDING

With Indicator:MOREHOUSE MODEL: DSCUSB SERIAL NO.: 16810660

Submitted By: CELDA EIRLAV. BRASIL NRO. 1361 INT. 602, FND. OYAGUE JESUS MARIA,LIMA PERU

This Certificate of Calibration is issued in accordance with Morehouse QAM Rev 16 Dated 2/15/18 & ISO/IEC 17025:2005

Calibration after repair or adjustment.

Calibration Procedure: ASTM E74-18 Method B

LOWERLIMIT FACTOR

lbfRESOLUTION

lbf

LOWER FORCE LIMITCLASS A

lbf

UPPER FORCE LIMITCLASS A

lbfCOMPRESSION 69.84 2.00 27936 500000

This calibration was performed using measurement standards traceable to the SI through a National Metrology Institute(NMI) such as the United States National Institute of Standards & Technology (NIST).

TYPE SERIAL NO. CMC NIST NO.CALIBRATED

DATECALIBRATION

DUE DATEPRIMARY FORCE STANDARD M-7471 0.0016% OF APPLIED FORCE (k=2) 822/268391-03 11/5/2003 3/15/2048

SECONDARY FORCE STANDARD 50751(ASC) 11.47 THROUGH 26.17 lbf (k=2) 684/291601-18 6/11/2018 6/11/2020TEMPERATURE STANDARD A21299/A782932 0.2° C (k=2) 01016957 7/24/2018 7/24/2019

Calibrated By:

R. Pfeiffer, Calibration Technician

Reviewed By:

B. Cook, Calibration Lab Manager

Force & Torque Calibration Laboratories1742 Sixth Avenue York, PA 17403

Phone: 717/843-0081 www.mhforce.comTHE MEASUREMENT RESULTS ONLY PERTAIN TO THE INSTRUMENT ON THIS CERTIFICATE.

THIS CERTIFICATE SHALL NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN CONSENT FROM MOREHOUSE INSTRUMENT COMPANY, INC.

Page 22: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

CERTIFICATE OF CALIBRATIONAS RETURNED

CALIBRATION DATE: 11/05/2018Page: 2 of 4

REPORT NO.: C-8294(ASRET)K0518

MOREHOUSE LOAD CELL MODEL: CALIBRATION SERIAL NO.: C-8294 CALIBRATED TO: 500000 lbf COMPRESSION ASCENDING

With Indicator:MOREHOUSE MODEL: DSCUSB SERIAL NO.: 16810660

Calibration Procedure: ASTM E74-18 Method B

Ambient Temperature at Calibration: 22.6° C

COMPRESSION RAW DATA-MEASURED OUTPUT WITH INITIAL & RETURN ZEROS

FORCEAPPLIED

lbf

MEASUREDOUTPUT

RUN 1 - 0° mV/V

MEASUREDOUTPUT

RUN 2 - 120° mV/V

MEASUREDOUTPUT

RUN 3 - 240° mV/V

0 0.00000 0.00000 0.0000026553 0.13258 0.13252 0.1326450000 0.25003 0.24985 0.24996

100000 0.49984 0.49971 0.49968150000 0.74940 0.74935 0.74934200000 0.99875 0.99872 0.99883250000 1.24795 1.24782 1.24770300000 1.49682 1.49672 1.49668350000 1.74549 1.74546 1.74525400000 1.99391 1.99391 1.99357450000 2.24202 2.24227 2.24170500000 2.49000 2.49001 2.48960

0 -0.00020 -0.00021 -0.00014

Instrument Company, Inc.Force & Torque Calibration Laboratories

www.mhforce.com

Page 23: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

CERTIFICATE OF CALIBRATIONAS RETURNED

CALIBRATION DATE: 11/05/2018Page: 3 of 4

REPORT NO.: C-8294(ASRET)K0518

MOREHOUSE LOAD CELL MODEL: CALIBRATION SERIAL NO.: C-8294 CALIBRATED TO: 500000 lbf COMPRESSION ASCENDING

With Indicator:MOREHOUSE MODEL: DSCUSB SERIAL NO.: 16810660

COMPRESSION CALIBRATION DATA 2ND-ORDER FIT

FORCEAPPLIED

lbf

MEASUREDOUTPUT

RUN 1 - 0° mV/V

MEASUREDOUTPUT

RUN 2 - 120° mV/V

MEASUREDOUTPUT

RUN 3 - 240° mV/V

FITTEDCURVEmV/V

EXPANDEDUNCERTAINTY

lbf

FORCESTANDARD

USED26553 0.13259 0.13253 0.13265 0.13265 12 50751(ASC)50000 0.25006 0.24988 0.24998 0.24991 12 50751(ASC)

100000 0.49989 0.49976 0.49971 0.49979 13 50751(ASC)150000 0.74946 0.74942 0.74938 0.74942 13 50751(ASC)200000 0.99883 0.99881 0.99889 0.99881 14 50751(ASC)250000 1.24805 1.24793 1.24777 1.24796 15 50751(ASC)300000 1.49694 1.49684 1.49676 1.49686 16 50751(ASC)350000 1.74563 1.74560 1.74535 1.74552 16 50751(ASC)400000 1.99406 1.99407 1.99368 1.99394 17 50751(ASC)450000 2.24219 2.24245 2.24182 2.24212 18 50751(ASC)500000 2.49019 2.49021 2.48973 2.49006 19 50751(ASC)

The Expanded Uncertainty is the aggregate uncertainty of the Morehouse measurement process, which includes repeatability studies done as part ofour CMC, and the resolution of the unit under test. It is stated with a coverage factor of k=2, such that the coverage probability corresponds to

approximately 95%.

POLYNOMIAL EQUATIONSThe following polynomial equation, described in ASTM E74-18, has been fitted to the force and measured outputvalues observed at calibration using the method of least squares

Response (mV/V) = A₀ + A₁F + A₂F² Force (lbf) = B₀ + B₁R + B₂R²where: F = Force (lbf) where: R = Response (mV/V)

A₀ = -2.086526E-04 B₀ = 4.303485E+01A₁ = 5.004793E-06 B₁ = 1.998024E+05A₂ = -4.852783E-14 B₂ = 3.930563E+02

STANDARDDEVIATION

mV/VRESOLUTION

lbf

LOWERLIMIT FACTOR

lbf0.000145 2.00 69.84

Note: The lower limit factor applies only when the calibration equation is used to determine the force.

Instrument Company, Inc.Force and Torque Calibration Laboratories

www.mhforce.com

Page 24: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

CERTIFICATE OF CALIBRATIONAS RETURNED

CALIBRATION DATE: 11/05/2018Page: 4 of 4

REPORT NO.: C-8294(ASRET)K0518

MOREHOUSE LOAD CELL MODEL: CALIBRATION SERIAL NO.: C-8294 CALIBRATED TO: 500000 lbf COMPRESSION ASCENDING

With Indicator:MOREHOUSE MODEL: DSCUSB SERIAL NO.: 16810660

DEVIATIONS FROM FITTED CURVE & CHANGE FROM PREVIOUSFOR EACH COMPRESSION FORCE APPLIED DURING CALIBRATION

FORCEAPPLIED

lbf

DEVIATIONRUN 1 - 0°

mV/V

DEVIATIONRUN 2 - 120°

mV/V

DEVIATIONRUN 3 - 240°

mV/V

CURRENTFITTED CURVE

mV/V

PREVIOUSFITTED CURVE

mV/V

CHANGEFROM PREVIOUS

%26553 -0.00006 -0.00012 0.00000 0.13265 N/A N/A50000 0.00015 -0.00003 0.00007 0.24991 N/A N/A

100000 0.00010 -0.00003 -0.00008 0.49979 N/A N/A150000 0.00004 0.00000 -0.00004 0.74942 N/A N/A200000 0.00002 0.00000 0.00008 0.99881 N/A N/A250000 0.00009 -0.00003 -0.00019 1.24796 N/A N/A300000 0.00008 -0.00002 -0.00010 1.49686 N/A N/A350000 0.00011 0.00008 -0.00017 1.74552 N/A N/A400000 0.00012 0.00013 -0.00026 1.99394 N/A N/A450000 0.00007 0.00033 -0.00030 2.24212 N/A N/A500000 0.00013 0.00015 -0.00033 2.49006 N/A N/A

ANALYSIS & LIMITS OF VERIFIED RANGE OF FORCES

VERIFIED RANGE OF FORCES LOWER LIMIT FITTED CURVE VALUE CHANGE FROMLOWER LIMIT

lbfUPPER LIMIT

lbfCURRENT

mV/VPREVIOUS

mV/VPREVIOUS

%CLASS A 27936 500000 0.13957 N/A N/A

Instrument Company, Inc.Force and Torque Calibration Laboratories

www.mhforce.com

Page 25: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

APPENDIXAS RETURNED

CALIBRATION DATE: 11/05/2018Page: Appendix

REPORT NO.: C-8294(ASRET)K0518

MOREHOUSE LOAD CELL MODEL: CALIBRATION SERIAL NO.: C-8294 CALIBRATED TO: 500000 lbf COMPRESSION ASCENDING

With Indicator:MOREHOUSE MODEL: DSCUSB SERIAL NO.: 16810660

NotesIn accordance with ASTM E74-18 the standard verified range of forces shall not include forces outside the range of forcesapplied during the calibration. The standard lower limits shall be the greater of:

Class AA1. The smallest non-zero force applied at the time of calibration2. 2000 times the resolution for Class AA3. 2000 times the llf

Class AThe smallest non-zero force applied at the time of calibration400 times the resolution for Class A400 times the llf

Per Section 11.3 of ASTM E74-18, a force measuring instrument or multiplying system shall be recalibrated following anyrepairs or modifications that might affect its response, or whenever the calibration of the device might be suspect. Anyinstrument sustaining an overload that produces a permanent shift in the unadjusted zero-force reading amounting to 1 % ormore of the capacity deflection shall be recalibrated before further use.

When the standard lower limit(s), (400 * llf) or (2000 * llf), determined for this force-measuring instrument or systemexceeds the maximum calibrated force the force-measuring instrument or system has no useable loading Class A and/orClass AA verified range of forces. In these cases the Class A and/or Class AA Lower Limit(s) are marked N/A.

The Expanded Uncertainty is the aggregate uncertainty of the Morehouse measurement process and the resolution of theunit under test. It is stated with a coverage factor of k = 2, such that the coverage probability corresponds to approximately95 %. When this Certificate of Calibration is used to further disseminate metrological traceability a complete analysis thatincludes all contributors to the uncertainty when the device is used should be performed by the user.

ASTM E74 uses TAR ratios. A Class AA verified range of forces requires calibration with primary standards which are known towithin 0.005 % or better. The TAR for Class AA devices is always 10:1 or better. A Class A verified range of forces requirescalibration of a secondary standard calibrated by primary standards, a lever system, or by primary standards. The TAR forClass A devices is always 5:1 or better.

Instrument Company, Inc.Force and Torque Calibration Laboratories

www.mhforce.com

Page 26: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

UNCERTAINTY APPENDIXAS RETURNED

CALIBRATION DATE: 11/05/2018Page: Appendix

REPORT NO.: C-8294(ASRET)K0518

MOREHOUSE LOAD CELL MODEL: CALIBRATION SERIAL NO.: C-8294 CALIBRATED TO: 500000 lbf COMPRESSION ASCENDING

With Indicator:MOREHOUSE MODEL: DSCUSB SERIAL NO.: 16810660

MEASUREMENT UNCERTAINTYThe measurement uncertainty for this calibration is given by the quantity expanded uncertainty, U, which is based on anapproach presented in detail by the ISO publication, "Guide to the Expression of Uncertainty in Measurement," JCGM100:2008. The end user may need to evaluate all components of uncertainty and calculate their respective MeasurementUncertainty accordingly. These additional contributors may include stability of the force measuring device, environmentalcontributions, uncertainty of the force indicating system if different from what was used for calibration, repeatability, andreproducibility of the force measuring system, and other error sources.

The expanded uncertainty at the time of calibration in this report is as follows:

Compression Loading: U = 0.00031 response units(0.0122 % of response at max. force)

Tension Loading: U = N/A response units(N/A % of response at max. force)

The expanded uncertainty at the time of calibration, U, defines an interval r-U ≤ R ≥ r+U, within which the true response, R,of the force measuring device to a given force can be expected to lie, when the calculated response, r, for that force iscomputed from the calibration coefficients given in this report. The value of U has been calculated by multiplying thecombined standard uncertainty (which represents the estimated standard deviation) by a coverage factor, k, of 2. Thus theconfidence level for the above interval is about 95%. Further analysis using the Welch-Satterthwhite formula may be neededto determine the appropriate degrees of freedom and coverage factor for a confidence interval of 95%.

The combined standard uncertainty, uc, was determined from

uc² = ur² + uw² + ures² + uv², where

ur is the standard deviation calculated from the differences between the individual measured responses and thecorresponding responses computed from the calibration coefficients.

uw is the maximum standard uncertainty for the Calibration and Measurement Capability (CMC) of the force devices used forcalibration. For deadweights uw represent the estimated standard deviation in the forces applied by the deadweightstandards, due to the uncertainties in the determination of the mass, air density, and gravitational acceleration and includescontributions from the measurement process such as repeatability studies, the resolution of the best existing device, andenvironmental factors. For transfer standards, the CMC includes the uncertainties from NIST calibrations, reference standarduncertainty, repeatability studies, the stability of the reference standard, the resolution of the reference and the bestexisting device, environmental factors, and other error sources associated with the Morehouse calibrating machines andmeasurement process

ures is the resolution of the force measuring system at the time of calibration.

uv is the standard uncertainty in the calibration of the voltage-ratio measurement instrumentation used at Morehouse. Thisterm = 0 for an indicator that is supplied with the transducer to be calibrated together as a system.

Instrument Company, Inc.Force and Torque Calibration Laboratories

www.mhforce.com

Page 27: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Jr. Bajada Balta 169, Oficina 801, Miraflores – 15048 - Lima-PerúTeléfonos: 2430414, Celular: 94647-6921, e-mail: [email protected]

10

ANEXO IVFormato de Certificado de Ensayos

Page 28: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

CONTROL MIX EXPRESS S.A.C.Bajada Balta 169, Oficina 801, Miraflores - Lima 18

Central telefónica: 243-0414, email: [email protected]://www.controlmixexpress.com

CERTIFICADO Nº CME-S1219-1000

EMPRESA CONSORCIO PRIVADO Nº ORDEN 012345

OBRA RESIDENCIA GUIA CAMION FP-0321

OBRA DIR. AV. BALTA S/N PROBETERO CME-003

ESTRUCTURA VERTICALES XYZSECTOR ******

f'c (kg/cm²) 280

FECHA/HORAMOLDEO

15/08/201915:55

FECHA/HORARECOJO

16/08/201911:04

FECHA/HORAENSAYO

12/09/201907:44

EDAD ENSAYO(HORAS)

663

RESULTADOS DE ENSAYO DE RESISTENCIA EN COMPRESIÓNDE TESTIGOS CILÍNDRICOS DE CONCRETO

(Norma de Ensayo ASTM C39/C39M-18)

Código Testigo Edad Ensayo Diámetro Promedio Área Sección Carga Máxima Esfuerzo Compresión Esfuerzo Compresión Tipo Falla(días) (mm) cm² (kN) (Mpa) kg/cm² (*)

011-0200642-1 7 101.6 8107.3 229 28.2 288 1

011-0200642-2 7 101.6 8107.3 233 28.7 293 2

011-0200642-3 7 101.6 8107.3 233 28.7 293 1

Promedio 28 291

Código Testigo Edad Ensayo Diámetro Promedio Área Sección Carga Máxima Esfuerzo Compresión Esfuerzo Compresión Tipo Falla(días) (mm) cm² (kN) (Mpa) kg/cm² (*)

011-0200642-4 28 101.6 8107.3 268 33.1 337 2

011-0200642-5 28 101.6 8107.3 289 35.6 364 2

011-0200642-6 28 101.6 8107.3 281 34.7 354 1

Promedio 34 352

NOTAS :

1) El muestreo, moldeo y custodia in-situ de los testigos hasta el recojo, ha sido efectuado bajo responsabilidad del cliente por su personal, que ha sido capacitado ycertificado por CME según las normas ASTM C172/C172M-17 y ASTM C31/C31M-19.

2) El curado de los testigos ha sido efectuado en cámaras acondicionadas con humedad y temperatura controladas en conformidad con la Norma ASTM C511-19,manteniendo las condiciones de curado estandarizadas establecidas por la Norma ASTM C31/C31M-19 hasta el momento de su ensayo.

3) Los ensayos se realizaron en una prensa automatizada Marca Vj Tech Modelo VjT 51-2011 Nº Serie 16/001476 de 2000 kN de capacidad con certificado de calibracióntrazable, aplicando una velocidad de carga de 2.20 kN/s en conformidad con la Norma ASTM C39/C39M-18.

4) Como elementos de distribución de carga en los extremos de los testigos se usaron pads de neopreno en conformidad con la Norma ASTM C1231/C1231M-15.

5) El curado inicial, curado final y edad de ensayo se han adaptado a los días laborables, horario de trabajo y requisitos establecidos por CME en el acuerdo contractual,con conocimiento y aceptación del cliente. La edad de ensayo nominal (días) es la indicada por el cliente en su orden de servicio.

(*) Los gráficos correspondientes a los tipos de falla establecidos por la Norma ASTM C39/C39M-18 pueden descargarse de nuestro website :https://www.controlmixexpress.com/tipo_fallas

Muesta

r refer

encia

l

Page 29: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Jr. Bajada Balta 169, Oficina 801, Miraflores – 15048 - Lima-PerúTeléfonos: 2430414, Celular: 94647-6921, e-mail: [email protected]

11

ANEXO VVideo Sistema Control Mix

Enlace : https://www.youtube.com/watch?v=zjytv9iyKXc

Demo Sistema Control Mix

Enlace : http://www.controlmixexpress.com/interno_demo/home.php

Page 30: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Jr. Bajada Balta 169, Oficina 801, Miraflores – 15048 - Lima-PerúTeléfonos: 2430414, Celular: 94647-6921, e-mail: [email protected]

12

ANEXO VIResumen Hoja de Vida del

Responsable Técnico de Control Mix Express SAC

Page 31: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Jr. Bajada Balta 169 – Oficina 801 - Miraflores - Lima 18 Teléfono : 243-0414, Celular : 946476921, e-mail : [email protected]

RESUMEN HOJA DE VIDA

ING. ENRIQUE PASQUEL CARBAJAL FORMACION PROFESIONAL .- ¨ Ing. Civil, Pontificia Universidad Católica del Perú – PUCP- Promoción 1975 ¨ Especialización en investigación experimental en concreto en la Universidad Tecnológica de

Delft - Holanda. ¨ Cursos de especialización en tecnología de concreto y procesos constructivos especiales en

USA, Colombia, Argentina, Brasil y Suiza. ACTIVIDADES ACADEMICAS.- ¨ Ex Jefe Laboratorio de Ensayo de Materiales PUCP ¨ Ex Jefe Laboratorio Estructuras Antisísmicas PUCP ¨ Profesor en la especialidad de Tecnología del Concreto en la Universidad Católica del Perú

1997 a la fecha ¨ Profesor en la especialidad de Tecnología del Concreto en la Universidad Peruana de Ciencias

Aplicadas 2005 a 2011. ¨ Profesor en la Escuela de Posgrado PUCP, 2005 a 2015 ¨ Profesor en la Escuela de Postgrado UPC, 2006 a 2011. ¨ Profesor en CENTRUM - PUCP en la Maestría de Gestión y Dirección de Empresas

Constructoras e Inmobiliarias, 2012 -2013. ¨ Dictado de Cursos como Instructor certificado ASTM en Perú, Chile, Bolivia, República

Dominicana, 2010 a la fecha. ACTIVIDADES PROFESIONALES.- ¨ Investigador del Departamento de Ingeniería de la PUCP durante 6 años ¨ Jefe de QA/QC, Ingeniero de Servicios Técnicos, Jefe de Oficina Técnica y Director de Obra

de Impresit del Pacífico S.A., empresa constructora del Grupo Italiano Impregilo durante 17 años en obras a nivel nacional, en Bolivia, Colombia y República Dominicana.

¨ Superintendente de Calidad, Gerente de Investigación & Desarrollo y Director Ejecutivo del Centro de Investigación Tecnológica del Cemento y el Concreto – CITEDEC, en Unión de Concreteras S.A. – UNICON durante 15 años.

¨ Director Ejecutivo de Pasquel Consultores SAC – Especialistas en concreto, 2012 a la fecha. ¨ Gerente General de Control Mix Express SAC – Ensayos en Concreto, 2012 a la fecha. ACTIVIDADES INSTITUCIONALES.- ¨ Miembro del American Concrete Institute (ACI) – 1993 a la fecha ¨ Miembro del American Society for Testing and Materials (ASTM) – 1993 a la fecha ¨ Miembro del Consejo Directivo del Colegio de Ingenieros del Perú – Consejo Nacional – 2004-

2005 ¨ Presidente del Capítulo Peruano del ACI (2001 – 2005) ¨ Miembro del Consejo Directivo del ACI-PERU desde 2001 a 2015 ¨ Miembro del Comité Técnico de la Norma NTE E.060 Concreto Armado. ¨ Miembro del Comité ACI 318 0L International Liasson ¨ Miembro del Comité ACI 318 0S Spanish Translation Task Group ¨ Miembro del Comité ACI 318 Structural Concrete Building Code

Page 32: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Jr. Bajada Balta 169 – Oficina 801 - Miraflores - Lima 18 Teléfono : 243-0414, Celular : 946476921, e-mail : [email protected]

¨ Miembro del Comité ACI 237 Self Consolidating Concrete ¨ Miembro del Comité ACI 304 Measuring, Mixing, Transporting and Placing Concrete ¨ Miembro del Comité ACI 305 Hot Weather Concrete ¨ Miembro del Comité ASTM C 09 Concrete and Concrete Aggregates ¨ Líder del Grupo de Trabajo 01 de ASTM para traducción de normas de concreto en el Código

ACI 318. ¨ Instructor Certificado ASTM para dictado de Cursos en Latinoamérica 2010 a la fecha ¨ Conferencista Nacional e Internacional en temas de su especialidad. ¨ Conferencista invitado evento Argos 360º - Colombia 2013 y 2014

PUBLICACIONES.- ¨ Autor del Libro “Tópicos de Tecnología del Concreto” y coautor de 5 libros sobre Tecnología del

Concreto, Supervisión de Obras y Procesos Especiales. Ha publicado alrededor de 70 artículos y trabajos de investigación en revistas especializadas del Perú y el extranjero.

PREMIOS Y DISTINCIONES.- ¨ Distinción Pontificia Universidad Católica del Perú – Departamento de Ingeniería “Destacada Labor

Académica”- Periodo Académico 2001-1 ¨ Premio “Exalumno Distinguido Asociación de Egresados y Graduados de la Pontificia Universidad

Católica del Perú” - 2004 ¨ Premio Universidad Peruana de Ciencias Aplicadas – UPC al mejor Profesor Periodo Académico

2006-1 ¨ Distinción Fellow ACI International – “In Recognition of Oustanding Contributions to the American

Concrete Institute and to Concrete Technology” - 2006 ¨ Medalla Henry C. Turner – ACI International “For Notable Achievement in the Concrete Industry” -

2007 ¨ Premio “Chapter Activities” ACI International – “ For Oustanding Leadership, Promotion and Growth

of the ACI Peru Chapter” - 2007 ¨ Medalla Miembro Distinguido – Colegio de Ingenieros del Perú Consejo Departamental de Lima –

2007 ¨ Orden de la Ingeniería Peruana – Colegio de Ingenieros del Perú – Consejo Nacional - 2012 ¨ Distinción "Honorary Member" ACI International – “For your extraordinary work for concrete in

Peru and for bringing the Peruvian Chapter to the foremost place among overseas Chapters”- 2014

IDIOMAS.- ¨ Inglés Avanzado ¨ Italiano Básico

Lima, Abril 2019

Page 33: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Jr. Bajada Balta 169, Oficina 801, Miraflores – 15048 - Lima-PerúTeléfonos: 2430414, Celular: 94647-6921, e-mail: [email protected]

13

ANEXO VIICopias de Normas ASTM empleadas por el

Sistema Control Mix Express(Acceso exclusivo para clientes a Plataforma CME)

Page 34: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Jr. Bajada Balta 169, Oficina 801, Miraflores – 15048 - Lima-PerúTeléfonos: 2430414, Celular: 94647-6921, e-mail: [email protected]

14

ANEXO VIIIClientes atendidos por Control Mix Express S.A.C.

Page 35: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Jr. Bajada Balta 169, Oficina 801, Miraflores – 15048 - Lima-PerúTeléfonos: 2430414, Celular: 94647-6921, e-mail: [email protected]

15

RELACIÓN DE CLIENTES

1 CORPORACION ACEROS AREQUIPA SAC 137 GRUPO INMOBILIARIO INMGENIO S.A.C.

2 ARQUIFICIO S.A.C 138 NEOVIDA CONSTRUCCIONES SAC

3 EDIFICA CONSTRUCTORES S.A.C. 139 RIO BRAVO SAC

4 CONSTRUCTORA HABITAT S.A.C. 140 MINEROS CONTRATISTAS DEL PERU S.A.C.

5 ESPACIO INMOBILIARIO S.A.C. 141 CONSTRUCTORA ARCADIA S.A.C.

6 INMOBILIARIA PERUANA DE EDIFICIOS RESIDENCIALES S.A.C. 142 MS INMOBILIARIA SAC

7 SAN JOSE PERU S.A.C. 143 CONSTRUCTORA MARTE SA

8 VIVIENDAS DEL PERU S.A.C. 144 CHRONOS INGENIEROS SAC

9 NOLT INGENIEROS SAC 145 MULTISERVIS MECHITA E.I.R.L.

10 CONSORCIO JJC - COINSA - HV 146 MASEDI CONTRATISTAS GENERALES SAC

11 PROYECTOS Y CONSTRUCCIONES LUGANO S.A.C. 147 TECNOLOGIA Y LABORATORIO S.A.C.

12 J.F.TOLMOS E.I.R.LTDA CONTRATISTAS GRALS 148 H Y HE CONTRATISTAS GENERALES S.A.C.

13 CONSTRUCTORA AESA S.A.C. 149 THEVA S.A.C.

14 PRELUDIO S.A.C. 150 SBP S.A.C.

15 CONSORCIO GIRSOL 151 LA MAR INVESTMENTS S.A.C.

16 INGENIERIA CONSTRUCTIVA INMOBILIARIA S.A.C. 152 OBRASCON HUARTE LAIN, S.A. SUCURSAL DEL PERU

17 KYLSA INVERSIONES Y PROYECTOS S.A.C. 153 MAPEI PERU S.A.C.

18 CONSORCIO ITALFIP - MOTIVA 154 INVERSIONES INMOBILIARIAS DE LAS CONDES S.A.

19 T & C GRUPO CONSTRUCTOR S.A.C. 155 S & P DESARROLLADORES INMOBILIARIOS S.A.C.

20 MMG S.A. 156 MC METCO SAC

21 SALFA MONTAJES S.A. 157 LIDER INVERSIONES CHICLAYO S.A.

22 JE CONSTRUCCIONES GENERALES S.A. 158 ALMASA S.R.L.

23 ARICSA 159 INMOBILIARIA PMK S.A.C.

24 BINDA Y ASOCIADOS S.A.C. 160 CONSORCIO CONSTRUCTOR MUNA

25 S+S ARQUITECTOS CONSTRUCTORES S.A.C. 161 OACC CONSTRUCTORES S.A.C.

26 SUMAQ EDIFICACIONES S.A.C. 162 O2 CONTRATISTAS EJECUTORES S.A.C.

27 HV CONTRATISTAS S.A. 163 JL VITTERI INGENIEROS S.A.C

28 JCB ESTRUCTURAS EIRL 164 CONSTRUCTORA INARCO PERU S.A.C.

29 V & V BRAVO S.A.C. 165 TRIPLE ARQ. S.A.C.

30 BINDA CONSTRUCTORA S.A.C. 166 CORPORACION VALMEN S.A.C.

31 LIDER INGENIERIA Y CONSTRUCCION S.A. 167 CONSTRUCTORA E INMOBILIARIA OLIVA & TAMAYO S.A.C

32 CONSTRUCTORES INTERAMERICANOS S.A.C. 168 LA MURALLA INVERSIONES INMOBILIARIAS SAC

33 CNA CONSTRUCCIONES S.A.C. 169 PROYECTOS E INVERSIONES TORATTO S.A.C.

34 T & C DESARROLLO INMOBILIARIO S.A.C. 170 GRUPO RAMSAT CONTRATISTAS GENERALES S.A.C.

35 LA MURALLA HPC 2011 S.A.C. 171 MEDCONS GERENCIA DE PROYECTOS S.A.C.

36 RUAG S.R.L 172 PROYECTOS Y EDIFICACIONES INTEGRALES E.I.R.L.

37 INMOBILIARIA SAN MARTIN DE TOURS S.A.C. 173 DE VICENTE CONSTRUCTORA S.A.C.

38 MADRID INGENIEROS S.A.C. 174 MOTIVA SA

39 MOTA-ENGIL PERU S.A. 175 INVESTMENT PROJECT CONSTRUCCIONES S.A.C.

40 DHMONT S.A.C. CONTRATISTAS GENERALES 176 INVERSIONES INMOBILIARIAS DEL MOCHE S.A.

Page 36: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Jr. Bajada Balta 169, Oficina 801, Miraflores – 15048 - Lima-PerúTeléfonos: 2430414, Celular: 94647-6921, e-mail: [email protected]

16

41 INFINITO CONTRATISTAS GENERALES S.A.C. 177 INMOBILIARIA HUANWIL S.A

42 CONSSOLIDA S.A. 178 INCOTEC CIMENTACIONES DEL PERU S.A.C.

43 INMOBILIARIA U-12 S.A.C. 179 ALDESA CONSTRUCCIONES SA SUCURSAL EN PERU

44 GRUPO ASM S.A.C. 180 LEE JOON LIM

45 ESPARTA CONSTRUCTORES S.A. 181 INVERSIONES PADOVA S.A.C.

46 INVERSIONES LA PEDRERA S.A.C. 182 MANT.CONST.Y PROYECTOS GRALES S.A.C.

47 SAN JOSE CONSTRUCTORA PERU S.A. 183 BALLO CONTRATISTAS GENERALES SAC

48 ORION GERENCIA Y CONSTRUCCION S.A.C. 184 M & L CONSTRUCTORA S.A.C.

49 ANDIAMO INVESTMENTS S.A.C. 185 R & M PROYECTOS S.A.C.

50 CONSTRUCTORA TITAN S.A. 186 INVERSIONES INMOBILIARIAS DE LA ATLANTIDA S.A

51ESTREMADOYRO Y FASSIOLI CONTRATISTAS GENERALESS.A.

187 ADVV PERU SAC

52 MOLCORP REALTY CORPORATION S.A.C. 188 G Y G KONTRATA S.A.C.

53 ROBOCON SERVICIOS S.A.C. 189 CONSTRUCTORA KAMANQA S.A.C.

54 DERWASI INGENIERIA Y CONSTRUCCION S.A. 190 PIERINELLI ROSSINI RENATO GIOVANNI

55 LAZO MONTEJO PEDRO CESAR 191 INMOBILIARIA DUBLANC S.A.C.

56 A Y G GRUPO INMOBILIARIO S.A.C. 192 DOÑA MARINA SAC

57 CONSTRUCTORA ITALFIP S.A.C. 193 DEGPRO DESIGN SOLUTIONS S.A.C.

58 SIGNOMED S.A.C. 194 CONSORCIO HOTEL ATTON COSAPI DVC

59 G Y M S.A. 195 T Y H V S.A.C.

60 GLOBAL PACIFIC TRADERS S.A.C. 196 INVERSIONES POZO Y ASOCIADOS S.A.C

61 CONSORCIO VILLA EL SALVADOR 197 INVERSIONES INMOBILIARIAS DE VIZCAYA S.A

62 COSTANERA GRUPO INMOBILIARIO S.A.C. 198 HIRATA ARAMAYO S.A.C.

63 CONSTRUCTORA INNOVARE S.A.C. 199 CONSTRUCTORA E INMOBILIARIA MEDCONS S.A.C.

64 INMOBILIARIA BRICK S.A.C. 200 JCH CONSTRUCCIONES GENERALES S.A.C.

65 ARLIMA CONSTRUCTORA S.A.C 201 CONSTRUCTORA CONTINENTE SA

66 DC CONTRATISTAS S.A.C. 202 EDIFICACIONES INMOBILIARIAS S.A.C.

67 ODEBRECHT PERU INGENIERIA Y CONSTRUCCION S.A.C. 203 CLASEM SAC

68 CASANUEVA GESTION INMOBILIARIA S.A.C. 204 LYNX CONSTRUCTORA S.A.C.

69 E.F. CONTRATISTAS S.A.C. 205 WESCON SUR S.A.C.

70 INMOBILIARIA DANIELA S.A.C. 206 PIRLOTUS SOCIEDAD ANONIMA CERRADA

71 JJC CONTRATISTAS GENERALES S.A. 207 ARMONHY INMOBILIARIA S.A.C.

72 CONSORCIO GRUPO 12 208 PALOMA DE COL DISEÑO SAC

73 JD & CN CONSTRUCCIONES E.I.R.L. 209 CONSORCIO PROGRESO

74 INVERSIONES INMOBILIARIAS DEL OCCIDENTE S.A. 210 INMGENIO PROYECTOS S.A.C.

75 PEZET 561 S.A.C. 211 SEVILLA RODRIGUEZ SRL

76 INVERSIONES NEGUEV S.A.C. 212 LLV CONSULTORES S.A.C.

77 FUAN MENA INGENIERIA & CONSTRUCCION S.A.C. 213 INMOBILIARIA RO & SER S.A.C.

78 ARQUITECTURA & CONTRATISTAS GENERALES S.A.C. 214 CONSTRUCTORA TERRAZUL S.AC

79 MS CONSTRUCTORES S.R.L. 215 BINDA INGENIEROS S.A.

80 FASE DOS S.A.C. 216 MY HOME ORGANIZACION INMOBILIARIA S.A.C.

81 SEVEN INGENIERIA Y CONSTRUCCION S.A.C. 217 CONSORCIO DVC-ORION

82 CONSORCIO LAS PALMAS 218 CONSTRUCTORA RFG S.A.C.

Page 37: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Jr. Bajada Balta 169, Oficina 801, Miraflores – 15048 - Lima-PerúTeléfonos: 2430414, Celular: 94647-6921, e-mail: [email protected]

17

83 CONSTRUCTORA E INMOBILIARIA R & T S.A.C. 219 SANTA PATRICIA CONSTRUCCIONES S.A.C

84 CONSTRUCTORA RIEDEL S.A.C. 220 BECAMM INVERSIONES S.A.C.

85 ROLBEC S.A.C. CONTRATISTAS GENERALES 221 CONSORCIO VIRGEN DEL CARMEN

86 CONSORCIO CONDOMINIO LOS GIRASOLES 222 INVERSIONES INMOBILIARIAS DEL INDICO S.A.

87 CORPORACION INMOBILIARIA NERIDA MARIA S.A.C. 223 BUEN VIVIR S.A.C.

88 B Y LL SOC RESP LTDA CONTRATISTAS GRLES 223 BUEN VIVIR S.A.C.

89 CORPORACION EDUCATIVA ARSO S.A. 224 TECNOLOGIA TEXTIL S.A.

90 FT CONSTRUCTORES S.A.C. 225CONSTRUCCION Y DESARROLLO INMOBILIARIO SANTA ROSAS.A.C.

91 INVERSIONES INMOBILIARIAS DEL MAR ROJO S.A. 226 SANTA MARGARITA CONSTRUCCIONES S.A.C.

92 WR S.A. 227 L&L ENCOFRADOS S.R.L.

93 STEEL CONSTRUCTION INNOVA S.A.C. 228 PLM INVERSIONES INMOBILIARIAS S.A.C.

94 INVERSIONES INMOBILIARIAS DEL CAUCASO S.A. 229 QUALITY & COST S.A.C.

95 COPSAC CONTRATISTAS GENERALES S.A.C. 230 INVERSIONES INMOBILIARIAS DEL MANTARO S.A.

96 DESARROLLADORA VALERIA S.A.C. 231 J.C. GALEON CONSTRUCTORA INMOBILIARIA S.A.C

97 COSAPI S.A. 232 URSA CONSTRUCTORA S.A.C.

98 SUNRISE INVESTMENT REDUCTO S.A.C. 233 DECAL PROPERTIES INC SUCURSAL PERU

99 CONSTRUCTORA CYJ-ECHEVERRIA IZQUIERDO S.A.C. 234 CONSORCIO JUDICIAL II

100 OBRAS DE INGENIERIA S.A. 235 FLESAN DEL PERU S.A.C.

101 ENTREPISOS LIMA S.A.C. 236 GL CONSTRUCTORES S.A.C.

102 FREYSSINET TIERRA ARMADA PERU S.A.C 237 PREFABRICADOS DE LIMA S.A.C.

103 SBM GRUPO FINANCIERO S.A.C. 238 INVERSIONES ANZIO S.A.C

104 LIDER INVERSIONES Y PROYECTOS S.A. 239 CODECON INGENIERIA Y CONSTRUCCION S.A.C.

105 INGENIEROS CIVILES Y CONTRATISTAS GENERALES S.A. 240 CONSORCIO PENITENCIARIO MISTI

106 ESPACIOS Y ESTRUCTURAS INMOBILIARIA S.A.C. 241 OACC INSVESTMENT TRUST SAC

107 PROMOBRAS S.A.C. 242 SOLUCIONES ESPECÍFICAS S.A.C

108 WESCON INGENIERIA Y CONSTRUCCION S.A.C. 243 COBRA INSTALACIONES Y SERVICIOS SA

109 VALZA INGENIERIA Y CONSTRUCCION S.A.C. 244 INVERSIONES INMOBILIARIAS DE LA GALICIA S.A.

110 MOPSA-PERU S.A.C. 245 FORCE HOUSE PROMOTORES INMOBILIARIOS S.A.C.

111 GRUPO VALER S.A.C. 246 CONSTRUCTORA HELOSVI S.A.C.

112 LIDER INVERSIONES AREQUIPA S.A. 247 INVERSIONES INMOBILIARIAS VILLA BLANCA S.A.C.

113 GRUPO INMOBILIARIO MEDCONS S.A.C. 248 INMOFAIRMONT S.A.C.

114 CONSORCIO SANTA BEATRIZ 249 URBANIZE INGENIERIA Y CONSTRUCCION S.A.C.

115 M + M CONSTRUCTORES Y CONSULTORES S.A.C. 250 GEOFUNDACIONES DEL PERU S.A.C.

116 CONSORCIO SAN ISIDRO 251 LORUSSO PROYECT S.A.C.

117 NEGOCIACIONES NEVADO S.A.C. 252 CALITE INMOBILIARIA GERENCIA Y CONSTRUCCION S.A.C.

118 CONSORCIO SANTA ANITA I 253 MC.CONSTRUCTORA E.I.R.L.

119 AMAUTA 2272 S.A.C. 254 CONSTRUCTORA WC PERU S.A.C.

120 MACCAFERRI CONSTRUCTION S.A.C. 255 LA INMOBILIARIA MAR DEL SUR S.A.

121 FOSFATOS DEL PACIFICO S.A. 256 SANTA CRUZ ARANA EDGAR TITO

122 INVERSIONES INMOBILIARIAS EL GOLF S.A.C. 257 SOCIEDAD CONSULTORA DE INVERSIONES S.A.

123 INVERSIONES NENA S.A.C. 258 MILANO PROPERTIES S.A.C.

124 CONSORCIO VIAL JAYLLI 259 EDIFICACIONES INTIWASI S.A.C.

Page 38: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Jr. Bajada Balta 169, Oficina 801, Miraflores – 15048 - Lima-PerúTeléfonos: 2430414, Celular: 94647-6921, e-mail: [email protected]

18

125 FERNANDINA REAL ESTATE S.A.C. 260 ALTA PROYECTOS Y CONSTRUCCION S.R.L.

126 CONSORCIO SAN MIGUEL 261 LA MURALLA GERENCIA Y CONSTRUCCION SAC

127 INVERSIONES MIRANO S.A.C. 262 INVERSIONES BRAVOR S.A.C.

128TORRES CAMARA Y CIA DE OBRAS S.A. SUCURSAL DELPERU

263 CARLAMONICA S.A.C.

129 INGENIERIA MEDIOAMBIENTE & CONSTRUCCION S.A.C. 264 BERTOLOTTO INVESTMENTS S.A.C.

130 ESPARQ CIESA CONTRATISTAS GENERALES S.A.C. 265 GRUPO SR INVERSIONES S.A.C.

131 INMOBILIARIA SAN DIEGO DE ALCALA S.A.C. 266 CGRR PROYECTOS GENERALES DE CONSTRUCCION S.A.C.

132 MADRID EDIFICACIONES S.A.C. 267 INVERSIONES RAVENA S.A.C.

133 CONSTRUCTORA CYGNUS SAC 268 INVERSIONES GENERALES VARSOVIA S.A.

134 CORPORACION SAETA SA 269 CONSORCIO CYF - MC METCO

135 GRUPO CARAL 270 CORPORACION INMOBILIARIA SUDAMERICANA SAC

136 CONSTRUCTORA INMOBILIARIA BRITANIA S.A.C.

Page 39: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Jr. Bajada Balta 169, Oficina 801, Miraflores – 15048 - Lima-PerúTeléfonos: 2430414, Celular: 94647-6921, e-mail: [email protected]

19

Page 40: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Jr. Bajada Balta 169, Oficina 801, Miraflores – 15048 - Lima-PerúTeléfonos: 2430414, Celular: 94647-6921, e-mail: [email protected]

20

Page 41: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Jr. Bajada Balta 169, Oficina 801, Miraflores – 15048 - Lima-PerúTeléfonos: 2430414, Celular: 94647-6921, e-mail: [email protected]

21

Empresas Supervisoras que han aprobado nuestro Expediente Técnico yServicios:

Page 42: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification

Jr. Bajada Balta 169, Oficina 801, Miraflores – 15048 - Lima-PerúTeléfonos: 2430414, Celular: 94647-6921, e-mail: [email protected]

22

ANEXO IXCertificación ISO 9001:2015

Page 43: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification
Page 44: SISTEMA CONTROL MIX...“Sistema Control Mix Express para el Control de Calidad del Concreto de obras en Lima y Arequipa”, emitida por SGS United Kingdom Ltd Systems & Services Certification