SPECIALIZED INDUSTRIAL SERVICES CO. LTD. (SISCO)
WELCOMES YOUTO THE PRESENTATION ON
CORPORATE PROFILE Re: SABIC General Construction
Services (Global Contract 2014 - 19)
DATE: 07 JAN 2015
![Page 2: SISCO - Presentation SABIC](https://reader036.vdocuments.co/reader036/viewer/2022081417/58d0ee241a28abba558b67c7/html5/thumbnails/2.jpg)
INDEX Introduction / Overview Company at a Glance Area of Business Resources Capability & Clientele Equipment, Vehicles & Facilities Highlights Contract Features Project Organogram & Work Flow Diagram Mobilization Plan Your Feed Back
![Page 3: SISCO - Presentation SABIC](https://reader036.vdocuments.co/reader036/viewer/2022081417/58d0ee241a28abba558b67c7/html5/thumbnails/3.jpg)
INTRODUCTION / OVERVIEW SISCO is a 100% Saudi Owned Limited Liability Company
established in the year 1990, growing with 30% CAGR
Strategically located Offices, Laydown Yards and Camps
An ISO 9000 accredited company, executing projects in Plant Construction, Piping, Pipe Line & Maintenance
With 2000 skilled manpower; 700 light & heavy equipment and vehicles, SISCO operates in CMEI areas in Oil & Gas Sector – Refineries, Petrochemical, Fertilizer and Utility Plants
![Page 4: SISCO - Presentation SABIC](https://reader036.vdocuments.co/reader036/viewer/2022081417/58d0ee241a28abba558b67c7/html5/thumbnails/4.jpg)
COMPANY AT A GLANCE
INDUSTRIAL CONSTRUCTION
SHUTDOWN, OPERATION & MAINTENANCE
CROSS COUNTRY PIPELINE & IN-PLANT PIPING PROJECTS
ENGINEERING & TECHNICAL SUPPORT
![Page 5: SISCO - Presentation SABIC](https://reader036.vdocuments.co/reader036/viewer/2022081417/58d0ee241a28abba558b67c7/html5/thumbnails/5.jpg)
AREA OF BUSINESS / SECTORS Civil, Mechanical, Electrical & Instrumentation on LSTK basis
Cross-country Pipeline, In-Plant Piping & Industrial Construction
Plant - Operation, Maintenance & Turn Around
Refineries, Petrochemical, Fertilizer & GOSPs
Power, Water & Civil Infrastructure
![Page 6: SISCO - Presentation SABIC](https://reader036.vdocuments.co/reader036/viewer/2022081417/58d0ee241a28abba558b67c7/html5/thumbnails/6.jpg)
RESOURCES
Employees
Equipment & Vehicles
Laydown Yard
Block Visas
Camp Facilities
Jubail Rahima YanbuKhafji Jeddah Riyadh
Camp & Office Locations
2000 Nos.
700 Nos.
50,000 SqM at Jubail & Ras Tanura
Accommodate Over 4,500 Senior & Junior Staff
400 Nos.
![Page 7: SISCO - Presentation SABIC](https://reader036.vdocuments.co/reader036/viewer/2022081417/58d0ee241a28abba558b67c7/html5/thumbnails/7.jpg)
SAUDI ARAMCO
SABIC
SATORP
SADARA
KJO
CAPABILITIES
Pipe Erection & Welding 35,000 Ø Inch / Month
Steel Fabrication & Erection 300 Ton / Month
Reinforced Concreting 1,500 CM / Month
TASNEE
SAUDI CHEVRON
MA’ADEN
JANA
MARAFIQ
CLIENTELE JESCO
APPC
SIPCHEM
SASREF
SAHARA
![Page 8: SISCO - Presentation SABIC](https://reader036.vdocuments.co/reader036/viewer/2022081417/58d0ee241a28abba558b67c7/html5/thumbnails/8.jpg)
EQUIPMENT & VEHICLES
![Page 9: SISCO - Presentation SABIC](https://reader036.vdocuments.co/reader036/viewer/2022081417/58d0ee241a28abba558b67c7/html5/thumbnails/9.jpg)
FACILITIES
![Page 10: SISCO - Presentation SABIC](https://reader036.vdocuments.co/reader036/viewer/2022081417/58d0ee241a28abba558b67c7/html5/thumbnails/10.jpg)
HIGHLIGHTS SAUDI ARAMCO
1. Northern Area (NAPD) 2005-12 : General Construction Services2. RT Terminal 2011-16 : General Maintanence of Onshore Plants 3. RT Refinery 2006-13 : Mechanical & Civil Maintenance Services4. Riyadh Refinery 2008-12 : Mechanical Pipeline & Plant Maint. Services5. Install Sanitary Waste Water Facilities @ Ras Tanura (12 KM RTR Piping)6. Safaniyah Tank Farm : 9,000 CM Concrete Paving & Dykewall7. Khurzaniya Gas Plant : Slope Protection (65,000 CM Marl) 8. Southern Area : Flare Up-gradation of 29 GOSPs 9. RT Refinery: Replace Control System; Crude Oil & Sulfur Recovery System10. Riyadh Refinery Chlorination & Condensate System Upgrade 11. FCV Piping Replacement Work at Abu-Ali Plant12. Plant-471 Shutdown Activities @ Berri Gas Plant13. Install Fuel Metering Station for AAC Block Factory, Jubail Ind. City14. Demolish/Relocate Loads of MCC-01,9&10 @ Air & Water Plt. Abqaiq15. Various Short Form /Mid Form/Shutdown Project at Northern & Sothern Area
![Page 11: SISCO - Presentation SABIC](https://reader036.vdocuments.co/reader036/viewer/2022081417/58d0ee241a28abba558b67c7/html5/thumbnails/11.jpg)
HIGHLIGHTS SATORP (JV SAUDI ARAMCO & TOTAL)
1. Jubail Export Refinery Package - 8 Piping - Install & Weld 150 KM 6”Ø - 36”Ø CS Pipelines Included 300,000 Ø Inch Welding
2. 150 KM Heat Tubes Installation 3. Repair / Replace 6.5 KM X 36ӯ Crude Oil Pipe Line4. Piping & Structural Works at KFIP Sea-Port, JUBAIL5. 8" & 6" Propylene Line from JERP to APPC & TASNEE6. 6" Benzene Line at Saudi Chevron Site, JUBAIL7. Dismantling of Naphtha/ Diesel Jump Over @ SASREF
SADARA (JV SAUDI ARAMCO & DOW CHEMICALS)1. PE LSPB-1, Train-01, Aboveground Piping Erection Works2. In Plant Work Support Services (2014-2016)3. M E I Construction of RO Plant Facilities (DOW/FLUOR)
SABIC (SAUDI BASIC INDUSTRIES CORPORATION)1. IBN-BAYTAR : Installation & Commissioning of HD Crusher2. SHARQ : Isolation Valve Tie-In for LP De-Ethanizer Reboiler Column3. SHARQ: Gas Cooler Drill 3" & Nozzle Welding (Shutdown) 4. IBN-ZAHR : Demolish & Reconstruct 4 Ea. Culverts & Channel Covers
![Page 12: SISCO - Presentation SABIC](https://reader036.vdocuments.co/reader036/viewer/2022081417/58d0ee241a28abba558b67c7/html5/thumbnails/12.jpg)
HIGHLIGHTS
TASNEE 1. Purging Speed up & Installation of C-2 Bypass Strainers for De-Ethanizer2. Install Duplex Filters & Replace Slice Gate @ SW Return3. Install Ammonia & Water Pumps
JANA1. LSTK Civil & MEI Works for New NACL Incinerator Plant 2. Electrical & Instrumentation work for CCL Plant 3. Piping Works & Supports For Foam & Fire Water Sprinkler Systems -
SABIC (Contin’d…)5. SAFCO: M Port Deducting System Modification in truck unloading Section 6. SAUDI KAYAN: Structural & Deluge Sys. for Tanks & Piping for U&O Nest7. AR-RAZI & IBN-ZAHR: Utilities & Yard Development8. HADEED : Mech Maint, FMT / BMT (2009, 2010, 2011, 2013)9. IBN-ZAHR : Repairs of MTBE-1 & 2 Catofin Reactor Header (2007, 2009)10. SHARQ Shipping & Logistics Support (1996-2014)11. Global Contract Mobile Workforce (2007-14)12. UNITED Golden Sand Housing Maint (2007-14)
![Page 13: SISCO - Presentation SABIC](https://reader036.vdocuments.co/reader036/viewer/2022081417/58d0ee241a28abba558b67c7/html5/thumbnails/13.jpg)
ISO CERTIFICATE
![Page 14: SISCO - Presentation SABIC](https://reader036.vdocuments.co/reader036/viewer/2022081417/58d0ee241a28abba558b67c7/html5/thumbnails/14.jpg)
CREDENTIALS
![Page 15: SISCO - Presentation SABIC](https://reader036.vdocuments.co/reader036/viewer/2022081417/58d0ee241a28abba558b67c7/html5/thumbnails/15.jpg)
CREDENTIALS
![Page 16: SISCO - Presentation SABIC](https://reader036.vdocuments.co/reader036/viewer/2022081417/58d0ee241a28abba558b67c7/html5/thumbnails/16.jpg)
CREDENTIALS
![Page 17: SISCO - Presentation SABIC](https://reader036.vdocuments.co/reader036/viewer/2022081417/58d0ee241a28abba558b67c7/html5/thumbnails/17.jpg)
CREDENTIALS
![Page 18: SISCO - Presentation SABIC](https://reader036.vdocuments.co/reader036/viewer/2022081417/58d0ee241a28abba558b67c7/html5/thumbnails/18.jpg)
CREDENTIALS
![Page 19: SISCO - Presentation SABIC](https://reader036.vdocuments.co/reader036/viewer/2022081417/58d0ee241a28abba558b67c7/html5/thumbnails/19.jpg)
Contract Title : SABIC General Construction Services (Global Contract)
Client : All SABIC Affiliates
Project Duration : 5 Years (From 22 July 2014 To 21 July 2019)
Scope of Work : Civil, Structural, Mechanical, Piping, Static & Rotating Equipment, Electrical, Instrumentation
Painting & Insulation including Material supply.
Mode of Contract : Work Unit Rates, Material, Time Unit Rates and Equipment Rates for undertaking construction activities in all SABIC affiliates.
Other : Special Material & Services as may be required
CONTRACT FEATURES
![Page 20: SISCO - Presentation SABIC](https://reader036.vdocuments.co/reader036/viewer/2022081417/58d0ee241a28abba558b67c7/html5/thumbnails/20.jpg)
PROJECT ORGANOGRAM
Project Manager
Construction Manager
(Civil)
Proj. Engr. (Civil) Nos. to Depend on
the Workload
Supervisor Civil
Work Permit Receiver
Surveyor
Mason-1Carpenter-1Steel Fixer-1Plumber-1Helper-1
Supervisor Structural
Work permit Receiver
Structural Fabricator-1
Erector-1Fitter-1
Helper-2
Construction Manger (Mech.)
Proj. Engr. (Mech.) Nos. to Depend
on Workload
Supervisor Piping
Work permit Receiver
Pipe Fabricator-1 Welder-4 (CS/ SS/AS/Monel)Pipe Fitter-1RTR Fitter-1
RTR Bonder-1Rigger-1Helper-2
Supervisor Static Eqpt.
Work permit Receiver
Millwright-1Helpers-2
Supervisor Rotat’g Eqpt
Work Permit Receiver
Millwright-1Helpers-2
Supervisor Paint/Insul’n
Work Permit Receiver
Sand Blaster-2
Spray Painter-1
Brush Painter-1
Insulators-2Helpers-2
Construction Manager
(E&I)
Proj. Engr. (E&I) Nos. to Depend on
Workload
Supervisor Electrical
Work Permit Receiver
Industrial Elctrician-2Electrical
Technician-2Fitter-1
Helpers-2
Supervisor Instrument’n
Work Permit Receiver
Instrument Technician-2Instr. Fitter-2
Splicers-2Helpers-2
QC Manager
Civil & Structural
Inspectors - 2
Mech. QC – 2 Piping QC – 2
Welding QC - 2
E & I Inspectors - 2
HSE Manager
Safety Supervisor -2
Safety Officer - 6
Fire Watch /Flag man
Planning & Coordination
Planning Engineer
Documentation/ Document
Controller - 2
Quantity Surveyor
PRO ID Coordinator
Procurement Manager
Procurement Coordination
Material Coordinator
Store Keeper
![Page 21: SISCO - Presentation SABIC](https://reader036.vdocuments.co/reader036/viewer/2022081417/58d0ee241a28abba558b67c7/html5/thumbnails/21.jpg)
WORK FLOW DIAGRAM
Introduction/Marketing(BD/PM)
Assignment in Estimation Dept.
(Biju/John)
Recieve Scope(PM/CM/CD)
Job Ex / Site Visit(Est./Exec. Dept.)
Preparation of BOQ
Approval From
Client (SABIC)
Sub-Contracts Rates/
Quotations Recieving
Budget Preparation &Manpower &
Equip. Finalzation
If Not Approved By Client the process
will repeat
Preparation Tech. Documents & Mobilization
Activites
Specific Project Quality
Plan
SHE Documentation
Qualifying SHE Personnel
Planning & Scheduling
Direct & Indirect
Manpower Allocation
Equipment Inspection &
Approval
Material Approval & Placing P.O
Materials Store in
Central Store
ID Processing
Approved & Service Order
Release
Mobilization
Hand Over of Site & QC Dossier Submission &
Approval
Execution of Works as per Scope
QC Inspections
Punch List Clearence &
Approval of Work
Invoicing(Incl.Retention &
Warranty)
End of Work Flow and repeats for every S.O
BASIC WORK FLOW CHART FOR SABIC GLOBAL GENERAL CONTRUCTION CONTRACT
Variations & Change orders
(If Any)
![Page 22: SISCO - Presentation SABIC](https://reader036.vdocuments.co/reader036/viewer/2022081417/58d0ee241a28abba558b67c7/html5/thumbnails/22.jpg)
G C S PROJECTS IN PROGRESSAffiliate AF # Project Title Value (SR)HADEED AF-1221089 Upgrade Power Stack Fan for DR
Module A/B 17,950,000.00
KEMYA AF-1215004 Alkyl Waste Handling Project 3,318,751.93
AF-1315021 Install Higher Capacity Fuel Gas Knock-Out Drum (TD-12A)
1,626,752.06
AF-1315032 Medium Pressue Steam to Condensate Pump
95,404.79
SHARQ AF-1112020 AF-1212057
Replace Drip Vessels in EG 1&3 1,650,693.08
AF-1112033 SHARQ Ethylene Sulfur Guard Bed in EG-4
2,650,000.00
SAUDI KAYAN
AF-1219022 Spare Guard Dryer Tie-In Installation 716,861.70
AF-1319001 Butane Line (Mercury bed) Tie-in 169,547.75
AF-1219038 Offload/Preserve Cold Box 160,171.60
![Page 23: SISCO - Presentation SABIC](https://reader036.vdocuments.co/reader036/viewer/2022081417/58d0ee241a28abba558b67c7/html5/thumbnails/23.jpg)
Current Manpower : 2000 Nos. Engineers 500, Skilled 700
Block Visa Availability : 400 Nos.
Mobilization Phase-1 : 350 Employees Currently Working
Phase-2 : 150 Employees throgh Demobilization
Phase-3 : 200 Employees by 01 February 2015
Phase-4 : Fresh Recruits depending on Additional Visa Recommendation from SABIC
Equipment : Adequate Vehicles & Equipment available for mobilization (Phase1 & 2).
We are capable to meet any additional Requirements as and when required.
MOBILIZATION PLAN
![Page 24: SISCO - Presentation SABIC](https://reader036.vdocuments.co/reader036/viewer/2022081417/58d0ee241a28abba558b67c7/html5/thumbnails/24.jpg)
How will the Affiliate utilize this Contract?
Affiliates Planned Work Load for Next Two (2) Years
Provision for Office, Laydown & Fabrication Facility
Suggestions for effective utilization of this Contract
Any Comments / Recommendations !
YOUR FEED BACK
![Page 25: SISCO - Presentation SABIC](https://reader036.vdocuments.co/reader036/viewer/2022081417/58d0ee241a28abba558b67c7/html5/thumbnails/25.jpg)
We Continually Strive to Improve our Performance
for the Betterment of all the Stakeholders.
Thank You!