Page 1: PSC REF#:232922

Ex.-Applicants-Tutkowski-1

PSC REF#:232922Public Service Commission of Wisconsin

RECEIVED: 03/06/15, 1:07:36 PM

Page 2: PSC REF#:232922

4949

11

22

22

5858

33

44

44

55

55

66

77

1111

88

5959

2626

2929

1414

5151

5252

4242

4141

3939

4040

4343

1818

6060

1616

3131

99

1010

1212

1515

1919

4444

3232

3434

3535

6565

2222

2323

2121

2424

25252727

2828

3030

3333

3636

3838

4545

4646

4848

5050

5353

5454

5555

5656

5757

6161

6262

6363

6565

6464

66666868

6767

6969

7474

1313

1717

2020

7171

LAKE MICHIGAN

LAKE MICHIGAN

EXISTINGEXISTINGJUNCTIONJUNCTIONHOUSE 7-8HOUSE 7-8

121,000 TON121,000 TONLIMESTONELIMESTONESTORAGE PILESTORAGE PILE2.1 ACRES X 50' HIGH2.1 ACRES X 50' HIGH

227,000 TON227,000 TONGYPSUMGYPSUMSTORAGE PILESTORAGE PILE4 ACRES X 50' HIGH4 ACRES X 50' HIGH

861,000 TON861,000 TONCOAL STORAGE PILE "A"COAL STORAGE PILE "A"13.42 ACRES X 55' HIGH13.42 ACRES X 55' HIGH

911,500 TON911,500 TONCOAL STORAGE PILE "B"COAL STORAGE PILE "B"14.13 ACRES X 55' HIGH14.13 ACRES X 55' HIGH

CONVEYORCONVEYOR0-HL-MH-0020-HL-MH-002

CONVEYORCONVEYOR0-QD-MH-0140-QD-MH-014

CONVEYORCONVEYOR0-HL-MH-0030-HL-MH-003

CONVEYORCONVEYOR0-HL-MH-0040-HL-MH-004

CONVEYORCONVEYOR0-QD-MH-0080-QD-MH-008

CONVEYORCONVEYOR0-QD-MH-0130-QD-MH-013

CONVEYORSCONVEYORS0-HL-MH-007A0-HL-MH-007A& 0-HL-MH-007B& 0-HL-MH-007B

CONVEYORSCONVEYORS0-QD-MH-007A0-QD-MH-007A& 0-QD-MH-007B& 0-QD-MH-007B

CONVEYORCONVEYOR0-QD-MH-0090-QD-MH-009

CONVEYORCONVEYOR0-QD-MH-0100-QD-MH-010

CONVEYORCONVEYOR0-QD-MH-0120-QD-MH-012

CONVEYORSCONVEYORS0-FC-MH-016A0-FC-MH-016A& 0-FC-MH-016B& 0-FC-MH-016B

CONVEYORSCONVEYORS0-FC-MH-014A0-FC-MH-014A& 0-FC-MH-014B& 0-FC-MH-014B

CONVEYORSCONVEYORS0-FC-MH-019A0-FC-MH-019A& 0-FC-MH-019B& 0-FC-MH-019B

CONVEYORSCONVEYORS0-FC-MH-017A0-FC-MH-017A& 0-FC-MH-017B& 0-FC-MH-017B

CONVEYORCONVEYOR0-FC-MH-0120-FC-MH-012

CONVEYORSCONVEYORS0-FC-MH-0060-FC-MH-006& 0-FC-MH-007& 0-FC-MH-007

CONVEYORCONVEYOR0-FC-MH-0080-FC-MH-008

CONVEYORCONVEYOR0-FC-MH-0090-FC-MH-009

CONVEYORCONVEYOR0-FC-MH-0220-FC-MH-022

CONVEYORSCONVEYORS0-FC-MH-015A0-FC-MH-015A& 0-FC-MH-015B& 0-FC-MH-015B

PARKINGPARKING

7171

7272

7373

7373

7070

3737

4747

NAD 83NAD 83COORDINATECOORDINATE

E 2558850E 2558850N 315350N 315350

WISCONSIN NATURALWISCONSIN NATURALGAS COMPANYGAS COMPANY

IGCC ACID GAS REMOVAL UNIT (2ND FLOOR)

IGCC GASIFICATION FACILITY

STORM WATER BASIN (2)

WASTE WATER BASIN74

73

PIPE RACK72

GUARD HOUSE (2)

COAL RECLAIM HOPPER

71

DIESEL GENERATOR (2)

345 KV TRANSMISSION AREA (2)

49

IGCC SULFURIC ACID STORAGE TANK (2)

LIMESTONE AREA ELECTRICAL BUILDING

LIMESTONE TRANSFER TOWER NO. 2

LIMESTONE TRANSFER TOWER NO. 1

70

69

68

67

IGCC WATER TREATMENT

COAL TRANSFER TOWER NO. 2

COAL TRANSFER TOWER NO. 1

GYPSUM TRANSFER TOWER NO. 2

GYPSUM TRANSFER TOWER NO. 1

FISHING PIER

66

65

64

63

62

61

60

59

58

57

56

55

TEMPORARY GYPSUM STORAGE

LIMESTONE STORAGE PILE

COAL STORAGE PILE "B"

COAL STORAGE PILE "A"

TEMPORARY GYPSUM LOADING HOPPER

IGCC FUEL OIL STORAGE TANK

OCPP FLY ASH STORAGE BUILDING BAGHOUSE

IGCC WASTE WATER TREATMENT

IGCC SULFUR RECOVERY UNIT

ENERGY INFORMATION CENTER

FIRE WATER PUMP HOUSE

OIL WATER SEPARATOR

AUXILIARY BOILER

IGCC SLAG STORAGE SILO

IGCC FLARE

IGCC COAL PREPARATION

IGCC AIR SEPARATION UNIT

COAL HANDLING CONTROL/SWITCHYARD BUILDING

RAW WATER/WASTE WATER TREATMENT BUILDING

GYPSUM DEWATERING BUILDING

54

53

52

51

50

48

47

46

45

44

43

42

41

40

39

38

37

36

GYPSUM STORAGE BUILDING

IGCC POWER BLOCK

35

345 kV SWITCHYARD

138kV SWITCHYARD

SILO BAY (2)

FUEL OIL PUMP HOUSE & FUEL OIL STORAGE TANK

LIMESTONE SLURRY STORAGE TANK (2)

29

AMMONIA UNLOADING TANKS & AMMONIA PUMPS

CIRCULATING WATER DISCHARGE STRUCTURE

CIRCULATING WATER INTAKE PUMP HOUSE

CIRCULATING WATER INTAKE TUNNEL21

& UNIT AUXILIARY TRANSFORMER (4)MAIN POWER TRANSFORMER (2)

BOTTOM ASH BIN (2)

FLY ASH SILO (2) & FLY ASH VACUUM BLOWER BUILDING

CONDENSATE STORAGE TANK (2)

CONTROL BUILDING - 3RD FLOOR

ADMINISTRATION BUILDING - 2ND FLOOR

MAINTENANCE BUILDING/WAREHOUSE - 1ST FLOOR

MAINTENANCE/WAREHOUSE/

CEMS BUILDING (2)

ABSORBERS/WET ESP'S (2)

BAGHOUSE (4)

BOILER BUILDING (2)

TURBINE GENERATOR BUILDING (2)

LIMESTONE PREP BUILDING

GYPSUM LOADER/LIMESTONE BARGE UNLOADER

COAL YARD MAINTENANCE BUILDING

ASH REBURN BUILDING

COAL CRUSHER HOUSE

34

33

32

31

30

28

27

26

25

24

COAL TRANSFER TOWER NO. 5

COAL TRANSFER TOWER NO. 4

COAL TRANSFER TOWER NO. 3

ROTARY CAR DUMPER HOUSE

3 DAY ACTIVE COAL STORAGE FACILITY

23

22

20

19

18

17

16

15

DEMINERALIZED WATER STORAGE TANK

BULK ACID/CAUSTIC STORAGE TANKS

WATER TREATMENT AREA

ABSORBER PUMP/CONTROL BUILDING

14

13

12

11

10

9

8

7

6

5

4

3

2

EQUIPMENT & FACILITIES ITEM DESCRIPTION

SERVICE/FIRE WATER TANK

CHIMNEY

1

ADMINISTRATION/CONTROL BUILDING

0 500 1,000 1,500 2,000250

Feet

Figure Vol. 2-4Plant Equipment Layout - CUP Option

LegendCoal Handling FacilitiesIGCC FacilitiesRecirculating Water FacilitiesSite Access RoadsSC Plant FacilitiesPierTransmission Lines and SwitchyardProposed Railroad Facilities