July 2, 2004
1
Presentación final
Universidad Católica Boliviana “SAN PABLO”
Pieter, Menno, Janet, Jeroen
July 2, 2004 2
Contenido
• Presentación Ingeniería Civil• Ingeniería Civil en Holanda• Universidad TU Delft• Carrera de Ingeniería Civil
• Proyecto de maestría en UCB
July 2, 2004 3
Presentacíon Ingeniería Civil
July 2, 2004 4
Site analysisBig scale to a small scale
Bolivia
Cochabamba
Building plot
Universidad Católica Boliviana
Global information
Specific information
July 2, 2004 5
Universidad Católica Boliviana
July 2, 2004 6
Universidad Católica Boliviana
Functional plan First level
July 2, 2004 7
Universidad Católica Boliviana
Functional plan Second level
July 2, 2004 8
Universidad Católica Boliviana
Functional plan Third level
July 2, 2004 9
Universidad Católica Boliviana
Functional plan Fourth level
July 2, 2004 10
Universidad Católica Boliviana
Main flow plan on campus
July 2, 2004 11
Building plot
Possible site for new buildings
Present building ‘Edificio de Aulas’
Perimeter wall
Fig: 2.5.1 the plot
July 2, 2004 12
Existing buildingProblems:
• Cold in the morning
• Some of the lecture rooms at ground floor are very noisy because of their location near busy walking routes.
•The building is inaccessible for disabled people.
• Insufficient number of toilets. On the ground floor only toilets for females are present, at the first floor the toilets are only for males.
PLANTA BAJA
AULA 1
AULA 2
AULA 3
AULA 4
AULA 5
AULA 6
BAÑO MUJERES
CENTRO DE ESTUDIANTES ING. AMBIENTAL
1ra PLANTA
AULA 7
AULA 8
BAÑO BOMBRES
AULA 9
AULA 10
AULA 11
AULA 12
DEP.
DEP.
2da PLANTA ATERRAZA
Fig: 2.5.2-1 Ground floor Fig: 2.5.2-2 First floor
Fig: 2.5.2-3 Second floor Fig: 2.5.2-4 Third floor / terrace
July 2, 2004 13
SWOT analysis (FODA)
• Strong points: New auditorium, mild weather conditions
• Weak points: Entrance lies far from the plot
• Opportunities: Better accesibility and use existing building
• Threats : Estimated growth of students is too high
July 2, 2004 14
Stakeholders
• Governmental bodies: improval definitive design
• Client: financing: project, making decisions• Committee of Infrastructure UCB
• Operators/ personnel: operate, maintain and manage building
• Users: students and teachers
• External parties: architects, engineers and contractors
July 2, 2004 15
Questionnaire
• The present cafeteria is both too small • The new library must be bigger then the present one• More computers must be available the entire day• More and better toilets are wanted• The present laboratories are outdated • Climate in class rooms are bad ( too cold in winter)
July 2, 2004 16
Problem analysis• Definition problem
• The current campus Tupuraya of the university Católica Boliviana will reach its capacity within a few years and needs expansion to meet its future capacity
• Objectives• The objective of this project is to make a structural design for the
future university building of campus Tupuraya, which will meet the requirements of the Committee of Infrastructure of the UCB.
• Limiting conditions/starting points/assumptions• Functional, technical, legal, financial, environmental, social,
construction
July 2, 2004 17
Functional analysis
Determination growth area of functions
Expected growth of the number of students
Growth factors
July 2, 2004 18
Expected growth of studentsCampus Tupuraya
0
500
1000
1500
2000
2500
3000
3500
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
Semester
Num
ber o
f stu
dent
s
Total Departament DCSTotal Departament DAEFTotal Departament DCEI
July 2, 2004 19
Variables and growth factors
Variables Actual 5 years 10 years Actual 5 years 10 years Actual 5 years 10 years Actual 5 years 10 yearsStudents 996 1257 1610 864 1200 1500 863 1050 1300 2723 3507 4410
Laboratories offered per semester 36 45 58 0 0 0 0 0 0 36 45 58Studies level pregraduated 6 7 8 3 4 5 5 6 8 14 17 21postgraduated programs 2 4 5 3 5 7 0 4 5 5 13 17
Fulltime teachers 5 9 10 2 4 6 4 7 10 11 20 26Courses that require computer laboratories 16 20 26 10 15 20 8 10 12 34 45 58
Administrative personel 8 10 11 2 4 6 5 7 8 15 21 25
DCEI DAEF DCS Total
Infrastructure 0- 5 years 0- 10 yearsLecture rooms 1,29 1,62Students laboratories 1,25 1,50Research laboratories no current area 1,50Teacher rooms 1,82 2,36Offices administrative personel 1,18 1,41Work spaces 1,29 1,62Internet spaces 1,29 1,62Computer laboratories 1,32 1,70Control room no current area 1,00Library 1,29 1,62Auditorium no current area 1,00Cafetaria 1,29 1,62Toilets 1,29 1,62 based on growth total number of studentsSECRAD no growth defined no growth definedChapel 1,29 1,62 based on growth total number of students
Growth factors
Variables
July 2, 2004 20
Determination growth of functions (m2)
Total UCB (our calculation based on measurements and our growth factors)
Needed expansion over 10 yearsInfrastructure Actual 5 years 10 years new sectionLecture rooms 2155 2775 3490 1335Students laboratories 622 778 933 933 Relocation and expansionResearch laboratories 0 136 204 204Teacher rooms 783 940 1253 470 Adjusted growth factorOffices administrative personel 1047 1232 1478 431Work spaces 168 216 271 104Internet spaces 120 192 240 120 Adjusted growth factorComputer laboratories 381 457 610 229 Adjusted growth factorControl room 45 115 115 70Library 282 363 457 457 Relocation and expansionAuditorium 0 570 570 570Cafetaria 209 269 338 338 Relocation and expansionToilets 355 457 575 220SECRAD 252 252 252 252 RelocationChapel 70 90 113 113 Relocation and expansionTotal functions 6489 8842 10900 5846With 30% infrastructure 8435 11495 14169 7600
Requiered area in m2
July 2, 2004 21
Interaction matrix
12 11 10 9 8 7 6 5 4 3 2 1
cafetaria
auditorium
library
control room
computer laboratories
internet rooms
work spaces
administrative offices
teachers rooms
research labs
student labs
lecture rooms
1 lecture rooms 1 0 1 0 1 1 1 0 0 0 1 X2 student labs 0 0 0 0 0 0 2 0 0 3 X3 research labs 0 0 1 0 0 0 1 0 0 X4 teachers rooms 0 0 0 0 0 0 0 2 X5 administrative offices 0 0 0 1 0 0 0 X6 work spaces 1 0 2 0 1 2 X7 internet rooms 2 0 2 3 2 X8 computer laboratories 0 0 1 2 X9 control room 0 0 0 X10 library 0 0 X11 auditorium 1 X12 cafetaria X
July 2, 2004 22
Functional synthesis
Circle diagram
Bubble diagram
Square diagram
Flow diagram
Mapping on plot
Basis circle diagram
Enhanced circle diagram
Circle diagram with areas of functions
July 2, 2004 23
Circle diagram
Basis circle diagram
July 2, 2004 24
Circle diagramEnhanced circle diagram
July 2, 2004 25
Circle diagramCircle diagram with areas of functions
July 2, 2004 26
Bubble diagram
July 2, 2004 27
Square diagram
July 2, 2004 28
Flow Diagram
July 2, 2004 29
Mapping on plot
July 2, 2004 30
First level
July 2, 2004 31
Second level
July 2, 2004 32
Third level
+35% Infrastucture
July 2, 2004 33
Recommendations
•Area for students laboratories has to be increased
•Internet rooms should be at the ground level
•Control room has to be located near the internet rooms
•Connection with existing building (slope)
•Toilets more evenly spread
July 2, 2004 34
Spatial design
Mock up
Auditorium
Existing block
Laboratories
Main new building
July 2, 2004 35
Spatial design• Facades
July 2, 2004 36
Spatial design• Floor plans
July 2, 2004 37
Spatial design• Floor plan: level 1
July 2, 2004 38
Spatial design• Floor plan: level 2
July 2, 2004 39
Spatial design• Floor plan: Level 3, 4, 5
July 2, 2004 40
Spatial design• Floor plan: Level 6
July 2, 2004 41
Structural design process