PLANIFICACION DE TRABAJO FRENTE No 1 EN PLENA EJECUCION ITEM LOCALIDADES LINEA PRIMARIA RED PRIMARIA KM M 1 0.13 16.00 2 CHINCHIQUIS 0.00 12.00 3 4.13 154.00 4 0.85 38.00 5 5.39 23.00 6 4.52 83.00 TOTAL 15.02 326.00 FRENTE No 2 (SIN EJECUTAR) ITEM LOCALIDADES LINEA PRIMARIA RED PRIMARIA KM M 1 ADANGA 0.00 0.00 2 RUMICHACA 0.00 18.00 3 0.83 27.00 4 1.39 186.00 TOTAL 2.22 231.00 FRENTE No 3 ( SIN EJECUTAR) ITEM LOCALIDADES LINEA PRIMARIA RED PRIMARIA KM M 1 4.91 47.00 2 PIEDRA BLANCA 0.00 41.00 3 TUQUE 0.00 0.00 4 PACCHA 0.00 0.00 5 5.56 16.00 6 3.51 27.00 TOTAL 13.98 131.00 FRENTE No 4 ( SIN EJECUTAR) ITEM LOCALIDADES LINEA PRIMARIA RED PRIMARIA KM M 1 7.16 12.00 2 ACHUCALA 0.00 28.00 3 SAN JUAN DE UNICAN 0.00 17.00 4 EL REJO 0.00 0.00 TOTAL 7.16 57.00 NIEVES ( 3ø ) ANGULACU (2ø) ANGULIS (1ø) HUANABAL (2ø) Y 0.49 (1ø) PUQUIOPAMPA (ø) DERIVACION REJO MINAS ( 1ø ) GUAYABO (1 ø ) SAGANA (LP- 3Ø) TUCTO ( 1ø ) CONGONA (2Ø) Y 0.43 Km ( 1ø ) CALUNGATE ( 1 ø)

Upload: carvits

Post on 08-Jul-2016

223 views

Category:

Documents


0 download

DESCRIPTION

uni

TRANSCRIPT

Page 1: Plan de Activ- Miracosta

PLANIFICACION DE TRABAJOFRENTE No 1 EN PLENA EJECUCION

ITEM LOCALIDADES LINEA PRIMARIA RED PRIMARIAKM M

1 0.13 16.002 CHINCHIQUIS 0.00 12.003 4.13 154.004 0.85 38.005 5.39 23.006 4.52 83.00

TOTAL 15.02 326.00

FRENTE No 2 (SIN EJECUTAR)ITEM LOCALIDADES LINEA PRIMARIA RED PRIMARIA

KM M

1 ADANGA 0.00 0.002 RUMICHACA 0.00 18.003 0.83 27.004 1.39 186.00

TOTAL 2.22 231.00

FRENTE No 3 ( SIN EJECUTAR)ITEM LOCALIDADES LINEA PRIMARIA RED PRIMARIA

KM M1 4.91 47.002 PIEDRA BLANCA 0.00 41.003 TUQUE 0.00 0.004 PACCHA 0.00 0.005 5.56 16.006 3.51 27.00

TOTAL 13.98 131.00

FRENTE No 4 ( SIN EJECUTAR)ITEM LOCALIDADES LINEA PRIMARIA RED PRIMARIA

KM M1 7.16 12.002 ACHUCALA 0.00 28.003 SAN JUAN DE UNICAN 0.00 17.004 EL REJO 0.00 0.00

TOTAL 7.16 57.00

NIEVES ( 3ø )

ANGULACU (2ø)ANGULIS (1ø)HUANABAL (2ø) Y 0.49 (1ø)PUQUIOPAMPA (ø)

DERIVACION REJO MINAS ( 1ø )GUAYABO (1 ø )

SAGANA (LP- 3Ø)

TUCTO ( 1ø )CONGONA (2Ø) Y 0.43 Km ( 1ø )

CALUNGATE ( 1 ø)

Page 2: Plan de Activ- Miracosta

PLANIFICACION DE TRABAJO

RED SECUNDARIA SUB CONTRATSITA# USUARIOS

52.0021.0064.00 HECTOR NINANYA24.0019.0052.00

232.00

RED SECUNDARIA EJECUTOR DE OBRA# USUARIOS

57.00 CONSORCIO INKA27.0034.0034.00

152.00

RED SECUNDARIA EJECUTOR DE OBRA# USUARIOS

85.0021.0029.00 FERMIN YUPANQUI5.00

16.0022.00

178.00

RED SECUNDARIA EJECUTOR DE OBRA# USUARIOS

18.0031.00 CONSORCIO INKA56.0014.00