plan de activ- miracosta
DESCRIPTION
uniTRANSCRIPT
PLANIFICACION DE TRABAJOFRENTE No 1 EN PLENA EJECUCION
ITEM LOCALIDADES LINEA PRIMARIA RED PRIMARIAKM M
1 0.13 16.002 CHINCHIQUIS 0.00 12.003 4.13 154.004 0.85 38.005 5.39 23.006 4.52 83.00
TOTAL 15.02 326.00
FRENTE No 2 (SIN EJECUTAR)ITEM LOCALIDADES LINEA PRIMARIA RED PRIMARIA
KM M
1 ADANGA 0.00 0.002 RUMICHACA 0.00 18.003 0.83 27.004 1.39 186.00
TOTAL 2.22 231.00
FRENTE No 3 ( SIN EJECUTAR)ITEM LOCALIDADES LINEA PRIMARIA RED PRIMARIA
KM M1 4.91 47.002 PIEDRA BLANCA 0.00 41.003 TUQUE 0.00 0.004 PACCHA 0.00 0.005 5.56 16.006 3.51 27.00
TOTAL 13.98 131.00
FRENTE No 4 ( SIN EJECUTAR)ITEM LOCALIDADES LINEA PRIMARIA RED PRIMARIA
KM M1 7.16 12.002 ACHUCALA 0.00 28.003 SAN JUAN DE UNICAN 0.00 17.004 EL REJO 0.00 0.00
TOTAL 7.16 57.00
NIEVES ( 3ø )
ANGULACU (2ø)ANGULIS (1ø)HUANABAL (2ø) Y 0.49 (1ø)PUQUIOPAMPA (ø)
DERIVACION REJO MINAS ( 1ø )GUAYABO (1 ø )
SAGANA (LP- 3Ø)
TUCTO ( 1ø )CONGONA (2Ø) Y 0.43 Km ( 1ø )
CALUNGATE ( 1 ø)
PLANIFICACION DE TRABAJO
RED SECUNDARIA SUB CONTRATSITA# USUARIOS
52.0021.0064.00 HECTOR NINANYA24.0019.0052.00
232.00
RED SECUNDARIA EJECUTOR DE OBRA# USUARIOS
57.00 CONSORCIO INKA27.0034.0034.00
152.00
RED SECUNDARIA EJECUTOR DE OBRA# USUARIOS
85.0021.0029.00 FERMIN YUPANQUI5.00
16.0022.00
178.00
RED SECUNDARIA EJECUTOR DE OBRA# USUARIOS
18.0031.00 CONSORCIO INKA56.0014.00
119.00