p.e. 2017 94014-1235-94 const. 2017 hsip-106 located

29
P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106(33) S-1 SWPPP INDEX OF SHEETS DESCRIPTION SHT. 1. SWPPP REQUIREMENTS (3.0) ................................................................................... 1 2. SITE DESCRIPTION (3.5.1) ......................................................................................... 1 3. ORDER OF CONSTRUCTION ACTIVITIES (3.5.1.b, 3.5.2.a) ...................................... 1 4. STREAM, OUTFALL, WETLAND, TMDL AND ECOLOGY INFORMATION ................. 1 5. EROSION PREVENTION AND SEDIMENT CONTROL (EPSC) MEASURES (3.5.3) .. 2 6. FLOCCULANTS (3.5.3.1.b) .......................................................................................... 3 7. UTILITY RELOCATION ................................................................................................ 3 8. MAINTENANCE AND INSPECTION ............................................................................ 4 9. SITE ASSESSMENTS (3.1.2)....................................................................................... 4 10. STORMWATER MANAGEMENT (3.5.4) ...................................................................... 4 11. NON-STORMWATER DISCHARGES (3.5.9) ............................................................... 5 12. SPILL PREVENTION, MANAGEMENT AND NOTIFICATION (3.5.5.c, 5.1) ................. 5 13. RECORD-KEEPING ..................................................................................................... 6 14. SITE WIDE/PRIMARY PERMITTEE CERTIFICATION (7.7.5)...................................... 7 15. SECONDARY PERMITTEE (OPERATOR) CERTIFICATION (7.7.6) ........................... 7 16. ENVIRONMENTAL PERMITS (9.0) .............................................................................. 7 NOTE: CITATIONS IN PARENTHESIS INDICATE SECTIONS OF THE CURRENT CGP. 1. SWPPP REQUIREMENTS (3.0) 1.1. HAS THE SWPPP TEMPLATE BEEN PREPARED BY AN INDIVIDUAL THAT HAS THE FOLLOWING LICENSING AND/OR CERTIFICATIONS (3.1.1)? YES (CHECK ALL THAT APPLY BELOW) OR NO CERTIFIED PROFESSIONAL IN EROSION AND SEDIMENT CONTROL (CPESC) A TN LICENSED PROFESSIONAL ENGINEER OR LANDSCAPE ARCHITECT HAS SUCCESSFULLY COMPLETED TDEC LEVEL II COURSE 1.2. DO THE EPSC PLANS INVOLVE STRUCTURAL DESIGN, HYDRAULIC, HYDROLOGIC OR OTHER ENGINEERING CALCULATIONS FOR EPSC STRUCTURAL MEASURES (E.G. SEDIMENT BASINS) (3.1.1)? YES NO IF YES, HAVE THE EPSC PLANS BEEN PREPARED, STAMPED AND CERTIFIED BY A TN LICENSED PROFESSIONAL ENGINEER OR LANDSCAPE ARCHITECT? YES NO 1.3. DO THE PROJECT STORMWATER OUTFALLS DIRECTLY DISCHARGE INTO THE FOLLOWING (5.4.1)? YES (CHECK ALL THAT APPLY BELOW) NO WATERS WITH UNAVAILABLE PARAMETERS (303d FOR SILTATION OR HABITAT ALTERATION) EXCEPTIONAL TENNESSEE WATERS IF YES TO SECTION 1.3, HAS THE SWPPP TEMPLATE BEEN PREPARED BY AN INDIVIDUAL THAT HAS THE FOLLOWING LICENSING AND/OR CERTIFICATIONS (5.4.1.b)? YES (CHECK ALL THAT APPLY BELOW) NO CERTIFIED PROFESSIONAL IN EROSION AND SEDIMENT CONTROL (CPESC) A TN LICENSED PROFESSIONAL ENGINEER OR LANDSCAPE ARCHITECT HAS SUCCESSFULLY COMPLETED TDEC LEVEL II COURSE 2. SITE DESCRIPTION (3.5.1) 2.1. PROJECT LIMITS (3.5.1.h): REFER TO TITLE SHEET 2.2. PROJECT DESCRIPTION (3.5.1.a): TITLE: SR-106 INTERSECTION AT CRITZ LANE COUNTY: WILLIAMSON PIN: 119837.00 2.3. SITE MAP(S) (2.6.2.): REFER TO TITLE SHEET 2.4. DESCRIPTION OF EXISTING SITE TOPOGRAPHY (3.5.1.d): REFER TO EXISTING CONTOURS SHEET(S) 9, DRAINAGE MAP SHEET(S) 7, USGS QUAD MAP, AND THE OUTFALL TABLE IN SECTION 4.3. 2.5. MAJOR SOIL DISTURBING ACTIVITIES (3.5.1.b) (CHECK ALL THAT APPLY): CLEARING AND GRUBBING EXCAVATION CUTTING AND FILLING FINAL GRADING AND SHAPING UTILITIES OTHER (DESCRIBE): 2.6. TOTAL PROJECT AREA (3.5.1.c): 5.540 ACRES 2.7. TOTAL AREA TO BE DISTURBED (3.5.1.c): 4.398 ACRES 2.8. NO MORE THAN 50 ACRES OF ACTIVE SOIL DISTURBANCE IS ALLOWED AT ANY TIME DURING THE CONSTRUCTION OF THE PROJECT. 2.9. ARE THERE ANY SEASONAL LIMITATIONS ON WORK? YES NO IF YES, LIST THE CORRESPONDING PLAN SHEET: NA 2.10. WAS ROW FINALIZED PRIOR TO FEBRUARY 1, 2010 (4.1.2.2)? YES (DATE) NO IF ROW WAS FINALIZED PRIOR TO FEBRUARY 1, 2010, THIS PROJECT IS CONSIDERED A PRE-APPROVED SITE (4.1.2.2) 2.11. SOIL PROPERTIES (3.5.1.f) (4.1.1). SOIL PROPERTIES FOR THE PRIMARY SOILS ARE LISTED IN THE TABLE BELOW. SOIL PROPERTIES PRIMARY SOIL NAME HSG % OF SITE ERODIBILITY (k value) ARMOUR SILT LOAM (ArC2) B 12.4 0.43 CULLEOKA SILT LOAM (CkD) A 0.1 0.32 LINDELL SILT LOAM (Lp) B/D 87.5 0.32 2.12. IS ACID PRODUCING ROCK (APR) (i.e. PYRITE) LOCATED WITHIN THE PROJECT LIMITS? YES NO 2.12.1. IF YES TO SECTION 2.13, HAVE APR LOCATIONS BEEN IDENTIFIED WITHIN THE CONSTRUCTION PLANS AND/OR THE GEOTECHNICAL REPORT? YES NO; AND 2.12.2. IF YES TO SECTION 2.12.1, HAS A SPECIAL HANDLING PLAN AND/OR ADAPTIVE MANAGEMENT PLAN (AMP) BEEN PREPARED FOR THE PROJECT? YES NO N/A (TDOT SP107L WILL BE APPLIED.) 2.13. PROJECT RUNOFF COEFFICIENTS AND AREA PERCENTAGES (3.5.1.g). RUNOFF COEFFICIENTS FOR EXISTING CONDITIONS AREA TYPE AREA(AC) PERCENTAGE OF TOTAL AREA (%) RUNOFF CN C FACTOR IMPERVIOUS 1.37 25 0.95 PERVIOUS 4.17 75 0.40 WEIGHTED CURVE NUMBER OR C-FACTOR = 0.54 RUNOFF COEFFICIENTS FOR POST-CONSTRUCTION CONDITIONS AREA TYPE AREA(AC) PERCENTAGE OF TOTAL AREA (%) RUNOFF CN C FACTOR IMPERVIOUS 2.22 40 0.95 PERVIOUS 3.32 60 0.40 WEIGHTED CURVE NUMBER OR C-FACTOR = 0.62 3. ORDER OF CONSTRUCTION ACTIVITIES (3.5.1.b, 3.5.2.a) CONSTRUCTION SHALL BE SEQUENCED AND STAGED TO: MINIMIZE THE EXPOSURE TIME OF GRADED OR DENUDED SOIL AREAS, PRESERVE TOPSOIL, AND MINIMIZE SOIL COMPACTION. NO WORK SHALL BE STARTED UNTIL THE CONTRACTOR'S PLAN FOR THE STAGING OF THEIR OPERATIONS, INCLUDING THE PLAN FOR STAGING OF TEMPORARY AND PERMANENT EPSC MEASURES, HAS BEEN ACCEPTED BY THE ENGINEER. THE CONTRACTOR'S EPSC PLAN SHALL INCORPORATE AND SUPPLEMENT, AS ACCEPTABLE, THE ORDER OF CONSTRUCTION ACTIVITIES AND THE BASIC EPSC DEVICES DEPICTED ON THE EPSC PLAN CONTAINED WITHIN THE APPROVED SWPPP. 3.1. SPECIAL SEQUENCING REQUIREMENTS (SEE SHEETS 2D) 3.2. INSTALL STABILIZED CONSTRUCTION EXITS. 3.3. INSTALL PERIMETER PROTECTION WHERE RUNOFF SHEET FLOWS FROM THE SITE. 3.4. INSTALL INITIAL EPSC MEASURES BEFORE CLEARING, GRUBBING, EXCAVATION, GRADING, CULVERT OR BRIDGE CONSTRUCTION, CUTTING, FILLING, OR ANY OTHER EARTHWORK OCCURS, EXCEPT AS SUCH WORK MAY BE NECESSARY TO INSTALL EPSC MEASURES. 3.5. PERFORM CLEARING AND GRUBBING (NOT MORE THAN 14 DAYS PRIOR TO GRADING OR EARTH-MOVING. REFER TO THE STABILIZATION PRACTICES BELOW.). 3.6. REMOVE AND STORE TOPSOIL. 3.7. STABILIZE DISTURBED AREAS WITHIN 14 DAYS OF COMPLETING ANY STAGE AND/OR PHASE OF ACTIVITY. 3.8. INSTALL, STORM SEWERS AND CULVERTS. 3.9. INSTALL INLET AND CULVERT PROTECTION ONCE STRUCTURES ARE IN PLACE AND CAPABLE OF INTERCEPTING FLOW. 3.10. PERFORM FINAL GRADING AND INSTALL BASE STONE. 3.11. COMPLETE FINAL PAVING AND SEALING OF CONCRETE. 3.12. INSTALL TRAFFIC CONTROL AND PROTECTION DEVICES. 3.13. COMPLETE FINAL STABILIZATION (TOPSOIL, SEEDING, MULCH, EROSION CONTROL BLANKET, SOD, ETC.) 3.14. REMOVE TEMPORARY EROSION CONTROLS AND ACCUMULATED SEDIMENT FROM AREAS THAT HAVE ESTABLISHED AT LEAST 70 PERCENT UNIFORM PERMANENT VEGETATIVE COVER. 3.15. RE-STABILIZE AREAS DISTURBED BY REMOVAL ACTIVITIES. 4. STREAM, OUTFALL, WETLAND, TMDL AND ECOLOGY INFORMATION 4.1. STREAM INFORMATION (3.5.1.j, 3.5.1.k) 4.1.1. WILL CONSTRUCTION AND/OR EROSION PREVENTION AND SEDIMENT CONTROLS IMPACT ANY STREAMS WITHIN THE PROJECT LIMITS? YES NO IF YES, THE IMPACT(S) HAVE BEEN INCLUDED IN THE TOTAL PROJECT IMPACTS AND HAVE BEEN INCLUDED IN THE WATER QUALITY PERMITS. 4.1.2. HAVE ANY OF THE RECEIVING STATE WATERS LESS THAN OR EQUAL TO 1 FLOW MILE DOWN GRADIENT OF THE PROJECT LIMITS BEEN CLASSIFIED BY TDEC AS FOLLOWS (CHECK ALL THAT APPLY): 303d WITH UNAVAILABLE PARAMETERS FOR SILTATION 303d WITH UNAVAILABLE PARAMETERS FOR HABITAT ALTERATION EXCEPTIONAL TENNESSEE WATERS (ETW) 4.1.3. RECEIVING WATERS OF THE STATE (3.5.1.k). RECEIVING WATERS OF THE STATE INFORMATION TDOT STATE WATER LABEL FROM EBR NAME OF RECEIVING STATE WATER 303d WITH UNAVAILABLE PARAMETERS FOR SILTATION OR HABITAT ALTERATION (YES OR NO) ETW (YES OR NO) LOCATED WITHIN PROJECT LIMITS (YES OR NO) LOCATED WITHIN 1 FLOW MILE DOWN GRADIENT OF PROJECT LIMITS (YES OR NO) STR-1 WEST HARPETH RIVER NO NO YES YES STR-2 KENNEDY CREEK YES NO NO YES 4.1.4. ARE THERE ANY WATER QUALITY RIPARIAN BUFFER ZONES REQUIRED FOR WATERS OF THE STATE? (4.1.2, 5.4.2) YES NO

Upload: others

Post on 14-May-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED

P.E.

2

017

9401

4-12

35-9

4

CO

NST

. 2

017

HSI

P-10

6 (33

)

S-

1

SWPP

P IN

DEX

OF

SHEE

TS

DES

CR

IPTI

ON

SHT.

1.

SWPP

P R

EQU

IREM

ENTS

(3.0

) .....

......

......

......

......

......

......

......

......

......

......

......

......

......

12.

SITE

DES

CR

IPTI

ON

(3.5

.1) .

......

......

......

......

......

......

......

......

......

......

......

......

......

......

.... 1

3.O

RD

ER O

F C

ON

STR

UC

TIO

N A

CTI

VITI

ES (3

.5.1

.b, 3

.5.2

.a) .

......

......

......

......

......

......

. 14.

STR

EAM

, OU

TFAL

L, W

ETLA

ND

, TM

DL

AND

EC

OLO

GY

INFO

RM

ATIO

N ..

......

......

... 1

5.ER

OSI

ON

PR

EVEN

TIO

N A

ND

SED

IMEN

T C

ON

TRO

L (E

PSC

) MEA

SUR

ES (3

.5.3

) .. 2

6.FL

OC

CU

LAN

TS (3

.5.3

.1.b

) ....

......

......

......

......

......

......

......

......

......

......

......

......

......

......

.. 3

7.U

TILI

TY R

ELO

CAT

ION

.....

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

. 38.

MAI

NTE

NAN

CE

AND

INSP

ECTI

ON

.....

......

......

......

......

......

......

......

......

......

......

......

.....

49.

SITE

ASS

ESSM

ENTS

(3.1

.2) ..

......

......

......

......

......

......

......

......

......

......

......

......

......

......

. 410

.ST

OR

MW

ATER

MAN

AGEM

ENT

(3.5

.4) .

......

......

......

......

......

......

......

......

......

......

......

... 4

11.

NO

N-S

TOR

MW

ATER

DIS

CH

ARG

ES (3

.5.9

) ....

......

......

......

......

......

......

......

......

......

.....

512

.SP

ILL

PREV

ENTI

ON

, MAN

AGEM

ENT

AND

NO

TIFI

CAT

ION

(3.5

.5.c

, 5.1

) ....

......

......

. 513

.R

ECO

RD

-KEE

PIN

G ..

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

... 6

14.

SITE

WID

E/PR

IMAR

Y PE

RM

ITTE

E C

ERTI

FIC

ATIO

N (7

.7.5

) .....

......

......

......

......

......

... 7

15.

SEC

ON

DAR

Y PE

RM

ITTE

E (O

PER

ATO

R) C

ERTI

FIC

ATIO

N (7

.7.6

) ....

......

......

......

.....

716

.EN

VIR

ON

MEN

TAL

PER

MIT

S (9

.0) .

......

......

......

......

......

......

......

......

......

......

......

......

.....

7

NO

TE:

CIT

ATIO

NS

IN P

AREN

THES

IS IN

DIC

ATE

SEC

TIO

NS

OF

THE

CU

RR

ENT

CG

P.

1.

SWPP

P R

EQUI

REM

ENTS

(3.0

)1.

1.

HAS

TH

E SW

PPP

TEM

PLAT

E BE

EN P

REP

ARED

BY

AN IN

DIV

IDU

AL T

HAT

HAS

TH

E FO

LLO

WIN

G L

ICEN

SIN

G A

ND

/OR

CER

TIFI

CAT

ION

S (3

.1.1

)?

YES

(CH

ECK

ALL

THAT

APP

LY B

ELO

W) O

R

NO

C

ERTI

FIED

PR

OFE

SSIO

NAL

IN E

RO

SIO

N A

ND

SED

IMEN

T C

ON

TRO

L (C

PESC

)

A TN

LI

CEN

SED

PR

OFE

SSIO

NAL

EN

GIN

EER

O

R

LAN

DSC

APE

ARC

HIT

ECT

HAS

SU

CC

ESSF

ULL

Y C

OM

PLET

ED T

DEC

LEV

EL II

CO

UR

SE

1.2.

D

O

THE

EPSC

PL

ANS

INVO

LVE

STR

UC

TUR

AL

DES

IGN

, H

YDR

AULI

C,

HYD

RO

LOG

IC

OR

O

THER

EN

GIN

EER

ING

C

ALC

ULA

TIO

NS

FOR

EP

SC

STR

UC

TUR

AL M

EASU

RES

(E.G

. SED

IMEN

T BA

SIN

S) (3

.1.1

)? Y

ES

NO

IF

YES,

H

AVE

THE

EPSC

PL

ANS

BEEN

PR

EPAR

ED,

STAM

PED

AN

D

CER

TIFI

ED B

Y A

TN L

ICEN

SED

PR

OFE

SSIO

NAL

EN

GIN

EER

OR

LAN

DSC

APE

ARC

HIT

ECT?

Y

ES

NO

1.3.

D

O T

HE

PRO

JEC

T ST

OR

MW

ATER

OU

TFAL

LS D

IREC

TLY

DIS

CH

ARG

E IN

TO

THE

FOLL

OW

ING

(5.4

.1)?

Y

ES (C

HEC

K AL

L TH

AT A

PPLY

BEL

OW

) N

O

W

ATER

S W

ITH

UN

AVAI

LABL

E PA

RAM

ETER

S (3

03d

FOR

SIL

TATI

ON

OR

H

ABIT

AT A

LTER

ATIO

N)

EX

CEP

TIO

NAL

TEN

NES

SEE

WAT

ERS

IF Y

ES T

O S

ECTI

ON

1.3

, HAS

TH

E SW

PPP

TEM

PLAT

E BE

EN P

REP

ARED

BY

AN

IND

IVID

UAL

TH

AT

HAS

TH

E FO

LLO

WIN

G

LIC

ENSI

NG

AN

D/O

R

CER

TIFI

CAT

ION

S (5

.4.1

.b)?

Y

ES (C

HEC

K AL

L TH

AT A

PPLY

BEL

OW

) N

O

CER

TIFI

ED P

RO

FESS

ION

AL IN

ER

OSI

ON

AN

D S

EDIM

ENT

CO

NTR

OL

(CPE

SC)

A

TN

LIC

ENSE

D

PRO

FESS

ION

AL

ENG

INEE

R

OR

LA

ND

SCAP

E AR

CH

ITEC

T H

AS S

UC

CES

SFU

LLY

CO

MPL

ETED

TD

EC L

EVEL

II C

OU

RSE

2.

SITE

DES

CRI

PTIO

N (3

.5.1

)2.

1.

PRO

JEC

T LI

MIT

S (3

.5.1

.h):

REF

ER T

O T

ITLE

SH

EET

2.2.

PR

OJE

CT

DES

CR

IPTI

ON

(3.5

.1.a

): TI

TLE:

SR

-106

INTE

RSE

CTI

ON

AT

CR

ITZ

LAN

E C

OU

NTY

: W

ILLI

AMSO

N

PIN

: 11

9837

.00

2.3.

SI

TE M

AP(S

) (2.

6.2.

): R

EFER

TO

TIT

LE S

HEE

T

2.4.

D

ESC

RIP

TIO

N

OF

EXIS

TIN

G

SITE

TO

POG

RAP

HY

(3.5

.1.d

):

REF

ER

TO

EXIS

TIN

G C

ON

TOU

RS

SHEE

T(S)

9, D

RAI

NAG

E M

AP S

HEE

T(S)

7, U

SGS

QU

AD

MAP

, AN

D T

HE

OU

TFAL

L TA

BLE

IN S

ECTI

ON

4.3

.

2.5.

M

AJO

R S

OIL

DIS

TUR

BIN

G A

CTI

VITI

ES (3

.5.1

.b) (

CH

ECK

ALL

THAT

APP

LY):

CLE

ARIN

G A

ND

GR

UBB

ING

E

XCAV

ATIO

N

CU

TTIN

G A

ND

FIL

LIN

G

FIN

AL G

RAD

ING

AN

D S

HAP

ING

U

TILI

TIES

O

THER

(DES

CR

IBE)

:

2.6.

TO

TAL

PRO

JEC

T AR

EA (3

.5.1

.c):

5.54

0 AC

RES

2.7.

TO

TAL

AREA

TO

BE

DIS

TUR

BED

(3.5

.1.c

): 4.

398

ACR

ES

2.8.

N

O M

OR

E TH

AN 5

0 AC

RES

OF

ACTI

VE S

OIL

DIS

TUR

BAN

CE

IS A

LLO

WED

AT

ANY

TIM

E D

UR

ING

TH

E C

ON

STR

UC

TIO

N O

F TH

E PR

OJE

CT.

2.

9.

ARE

THER

E AN

Y SE

ASO

NAL

LIM

ITAT

ION

S O

N W

OR

K?

YES

N

O

IF Y

ES, L

IST

THE

CO

RR

ESPO

ND

ING

PLA

N S

HEE

T: N

A

2.10

. WAS

RO

W F

INAL

IZED

PR

IOR

TO

FEB

RU

ARY

1, 2

010

(4.1

.2.2

)?

YES

(D

ATE)

N

O

IF R

OW

WAS

FIN

ALIZ

ED P

RIO

R T

O F

EBR

UAR

Y 1,

201

0, T

HIS

PR

OJE

CT

IS

CO

NSI

DER

ED A

PR

E-AP

PRO

VED

SIT

E (4

.1.2

.2)

2.11

. SO

IL P

RO

PER

TIES

(3.5

.1.f)

(4.1

.1).

SO

IL P

RO

PER

TIES

FO

R T

HE

PRIM

ARY

SOIL

S AR

E LI

STED

IN

TH

E TA

BLE

BELO

W.

SOIL

PR

OPE

RTI

ES

PRIM

ARY

SOIL

NAM

E H

SG

% O

F SI

TE

ERO

DIB

ILIT

Y (k

val

ue)

ARM

OU

R S

ILT

LOAM

(ArC

2)

B12

.4

0.43

CU

LLEO

KA S

ILT

LOAM

(CkD

) A

0.1

0.32

LIN

DEL

L SI

LT L

OAM

(Lp)

B

/D

87.5

0.

32

2.12

. IS

ACID

PR

OD

UC

ING

RO

CK

(APR

) (i.

e. P

YRIT

E) L

OC

ATED

WIT

HIN

TH

E PR

OJE

CT

LIM

ITS?

Y

ES

N

O

2.12

.1.

IF Y

ES T

O S

ECTI

ON

2.1

3, H

AVE

APR

LO

CAT

ION

S BE

EN ID

ENTI

FIED

W

ITH

IN T

HE

CO

NST

RU

CTI

ON

PLA

NS

AND

/OR

TH

E G

EOTE

CH

NIC

AL

REP

OR

T? Y

ES

NO

; AN

D

2.12

.2.

IF Y

ES T

O S

ECTI

ON

2.1

2.1,

HAS

A S

PEC

IAL

HAN

DLI

NG

PLA

N A

ND

/OR

AD

APTI

VE M

ANAG

EMEN

T PL

AN (

AMP)

BEE

N P

REP

ARED

FO

R T

HE

PRO

JEC

T?YE

S

NO

N

/A (T

DO

T SP

107L

WIL

L BE

APP

LIED

.)

2.13

. PR

OJE

CT

RU

NO

FF C

OEF

FIC

IEN

TS A

ND

AR

EA P

ERC

ENTA

GES

(3.5

.1.g

).

RU

NO

FF C

OEF

FIC

IEN

TS F

OR

EXI

STIN

G C

ON

DIT

ION

S

AREA

TYP

E AR

EA(A

C)

PER

CEN

TAG

E O

F TO

TAL

AREA

(%)

RU

NO

FFC

NC

FAC

TOR

IMPE

RVI

OU

S 1.

37

25

0.95

PER

VIO

US

4.17

75

0.

40

WEI

GH

TED

CU

RVE

NU

MBE

R O

R C

-FAC

TOR

=

0.

54

RU

NO

FF C

OEF

FIC

IEN

TS F

OR

PO

ST-C

ONS

TRUC

TIO

N C

ON

DIT

ION

S

AREA

TYP

E AR

EA(A

C)

PER

CEN

TAG

E O

F TO

TAL

AREA

(%)

RU

NO

FFC

NC

FAC

TOR

IMPE

RVI

OU

S 2.

22

40

0.

95

PER

VIO

US

3.32

60

0.40

WEI

GH

TED

CU

RVE

NU

MBE

R O

R C

-FAC

TOR

=

0.

62

3.

OR

DER

OF

CO

NST

RU

CTI

ON

AC

TIVI

TIES

(3.5

.1.b

, 3.5

.2.a

) C

ON

STR

UC

TIO

N S

HAL

L BE

SEQ

UEN

CED

AN

D S

TAG

ED T

O:

MIN

IMIZ

E TH

E EX

POSU

RE

TIM

E O

F G

RAD

ED O

R D

ENU

DED

SO

IL A

REA

S, P

RES

ERVE

TO

PSO

IL,

AND

MIN

IMIZ

E SO

IL C

OM

PAC

TIO

N.

NO

WO

RK

SHAL

L BE

STA

RTE

D U

NTI

L TH

E C

ON

TRAC

TOR

'S P

LAN

FO

R T

HE

STAG

ING

OF

THEI

R O

PER

ATIO

NS,

IN

CLU

DIN

G

THE

PLAN

FO

R S

TAG

ING

OF

TEM

POR

ARY

AND

PER

MAN

ENT

EPSC

MEA

SUR

ES,

HAS

BEE

N A

CC

EPTE

D B

Y TH

E EN

GIN

EER

. TH

E C

ON

TRAC

TOR

'S E

PSC

PLA

N

SHAL

L IN

CO

RPO

RAT

E AN

D S

UPP

LEM

ENT,

AS

ACC

EPTA

BLE,

TH

E O

RD

ER O

F C

ON

STR

UC

TIO

N A

CTI

VITI

ES A

ND

TH

E BA

SIC

EPS

C D

EVIC

ES D

EPIC

TED

ON

TH

E EP

SC P

LAN

CO

NTA

INED

WIT

HIN

TH

E AP

PRO

VED

SW

PPP.

3.1.

SP

ECIA

L SE

QU

ENC

ING

REQ

UIR

EMEN

TS (S

EE S

HEE

TS 2

D)

3.2.

IN

STAL

L ST

ABIL

IZED

CO

NST

RU

CTI

ON

EXI

TS.

3.3.

IN

STAL

L PE

RIM

ETER

PR

OTE

CTI

ON

WH

ERE

RU

NO

FF S

HEE

T FL

OW

S FR

OM

TH

E SI

TE.

3.4.

IN

STAL

L IN

ITIA

L EP

SC

MEA

SUR

ES

BEFO

RE

CLE

ARIN

G,

GR

UBB

ING

, EX

CAV

ATIO

N, G

RAD

ING

, CU

LVER

T O

R B

RID

GE

CO

NST

RU

CTI

ON

, CU

TTIN

G,

FILL

ING

, OR

AN

Y O

THER

EAR

THW

OR

K O

CC

UR

S, E

XCEP

T AS

SU

CH

WO

RK

MAY

BE

NEC

ESSA

RY

TO IN

STAL

L EP

SC M

EASU

RES

. 3.

5.

PER

FOR

M C

LEAR

ING

AN

D G

RU

BBIN

G (N

OT

MO

RE

THAN

14

DAY

S PR

IOR

TO

G

RAD

ING

OR

EAR

TH-M

OVI

NG

. R

EFER

TO

TH

E ST

ABIL

IZAT

ION

PR

ACTI

CES

BE

LOW

.).

3.6.

R

EMO

VE A

ND

STO

RE

TOPS

OIL

.

3.7.

ST

ABIL

IZE

DIS

TUR

BED

AR

EAS

WIT

HIN

14

DAY

S O

F C

OM

PLET

ING

AN

Y ST

AGE

AND

/OR

PH

ASE

OF

ACTI

VITY

. 3.

8.

INST

ALL,

STO

RM

SEW

ERS

AND

CU

LVER

TS.

3.9.

IN

STAL

L IN

LET

AND

CU

LVER

T PR

OTE

CTI

ON

ON

CE

STR

UC

TUR

ES A

RE

IN

PLAC

E AN

D C

APAB

LE O

F IN

TER

CEP

TIN

G F

LOW

. 3.

10. P

ERFO

RM

FIN

AL G

RAD

ING

AN

D IN

STAL

L BA

SE S

TON

E.

3.11

. CO

MPL

ETE

FIN

AL P

AVIN

G A

ND

SEA

LIN

G O

F C

ON

CR

ETE.

3.

12. I

NST

ALL

TRAF

FIC

CO

NTR

OL

AND

PR

OTE

CTI

ON

DEV

ICES

. 3.

13. C

OM

PLET

E FI

NAL

STA

BILI

ZATI

ON

(TO

PSO

IL,

SEED

ING

, M

ULC

H,

ERO

SIO

N

CO

NTR

OL

BLAN

KET,

SO

D, E

TC.)

3.14

. REM

OVE

TE

MPO

RAR

Y ER

OSI

ON

C

ON

TRO

LS

AND

AC

CU

MU

LATE

D

SED

IMEN

T FR

OM

AR

EAS

THAT

HAV

E ES

TABL

ISH

ED A

T LE

AST

70 P

ERC

ENT

UN

IFO

RM

PE

RM

ANEN

T VE

GET

ATIV

E C

OVE

R.

3.15

. RE-

STAB

ILIZ

E AR

EAS

DIS

TUR

BED

BY

REM

OVA

L AC

TIVI

TIES

.

4.

STR

EAM

, OU

TFAL

L, W

ETLA

ND

, TM

DL

AND

EC

OLO

GY

INFO

RMAT

ION

4.

1.

STR

EAM

INFO

RM

ATIO

N (3

.5.1

.j, 3

.5.1

.k)

4.1.

1.

WIL

L C

ON

STR

UC

TIO

N

AND

/OR

ER

OSI

ON

PR

EVEN

TIO

N

AND

SE

DIM

ENT

CO

NTR

OLS

IM

PAC

T AN

Y ST

REA

MS

WIT

HIN

TH

E PR

OJE

CT

LIM

ITS?

Y

ES

N

O

IF Y

ES,

THE

IMPA

CT(

S) H

AVE

BEEN

IN

CLU

DED

IN

TH

E TO

TAL

PRO

JEC

T IM

PAC

TS A

ND

HAV

E BE

EN I

NC

LUD

ED I

N T

HE

WAT

ER

QU

ALIT

Y PE

RM

ITS.

4.1.

2.

HAV

E AN

Y O

F TH

E R

ECEI

VIN

G S

TATE

WAT

ERS

LESS

TH

AN O

R

EQU

AL T

O 1

FLO

W M

ILE

DO

WN

GR

ADIE

NT

OF

THE

PRO

JEC

T LI

MIT

S BE

EN

CLA

SSIF

IED

BY

TD

EC

AS

FOLL

OW

S (C

HEC

K AL

L TH

AT

APPL

Y):

3

03d

WIT

H U

NAV

AILA

BLE

PAR

AMET

ERS

FOR

SIL

TATI

ON

303

d W

ITH

UN

AVAI

LABL

E PA

RAM

ETER

S FO

R H

ABIT

AT

ALTE

RAT

ION

EXC

EPTI

ON

AL T

ENN

ESSE

E W

ATER

S (E

TW)

4.1.

3.

REC

EIVI

NG

WAT

ERS

OF

THE

STAT

E (3

.5.1

.k).

REC

EIVI

NG

WAT

ERS

OF

THE

STAT

E IN

FORM

ATIO

N

TDOT

ST

ATE

WAT

ER

LABE

L FR

OM

EBR

NAME

OF

RECE

IVIN

G ST

ATE

WAT

ER

303d

WIT

H UN

AVAI

LABL

EPA

RAME

TERS

FO

R SI

LTAT

ION

OR H

ABIT

AT

ALTE

RATI

ON

(YES

OR

NO)

ETW

(YES

OR N

O)

LOCA

TED

WIT

HIN

PROJ

ECT

LIMI

TS

(YES

OR

NO)

LOCA

TED

WIT

HIN

1 FL

OW M

ILE

DOW

N GR

ADIE

NT

OF P

ROJE

CT

LIMI

TS

(YES

OR

NO)

STR

-1W

EST

HAR

PETH

RIV

ERN

O

NO

YE

S YE

S

STR

-2KE

NN

EDY

CR

EEK

YES

NO

N

O

YES

4.1.

4.

ARE

THER

E AN

Y W

ATER

Q

UAL

ITY

RIP

ARIA

N

BUFF

ER

ZON

ES

REQ

UIR

ED F

OR

WAT

ERS

OF

THE

STAT

E? (4

.1.2

, 5.4

.2)

Y

ES

NO

Page 2: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED

P.E.

2

017

9401

4-12

35-9

4

CO

NST

. 2

017

HSI

P-10

6 (33

)

S-

2

BU

FFER

ZO

NE

REQ

UIR

EMEN

TS A

RE

NO

T R

EQU

IRED

FO

R P

RE-

APPR

OVE

D S

ITES

(4.1

.2.1

A.)

IF Y

ES, T

HEY

HAV

E BE

EN IN

CLU

DED

ON

PLA

N S

HEE

T(S)

___

.

IF Y

ES,

CH

ECK

THE

APPR

OPR

IATE

BO

X BE

LOW

FO

R S

IZE

OF

BUFF

ER.

60

-FEE

T FO

R W

ATER

S W

ITH

UN

AVAI

LABL

E PA

RAM

ETER

S AN

D

EXC

EPTI

ON

AL T

ENN

ESSE

E W

ATER

S (A

VER

AGE

WID

TH P

ER

SID

E W

ITH

A M

INIM

UM

OF

30-F

EET)

.

A 60

FO

OT

NAT

UR

AL W

ATER

QU

ALIT

Y R

IPAR

IAN

BU

FFER

ZO

NE

ADJA

CEN

T TO

AN

D O

N B

OTH

SID

ES O

F TH

E R

ECEI

VIN

G S

TATE

ST

REA

M W

ITH

TH

IS D

ESIG

NAT

ION

SH

ALL

BE P

RES

ERVE

D T

O

THE

MAX

IMU

M E

XTEN

T PR

ACTI

CAB

LE D

UR

ING

CO

NST

RU

CTI

ON

AC

TIVI

TIES

AT

THE

SITE

. TH

E 60

FO

OT

CR

ITER

ION

FO

R T

HE

WID

TH O

F TH

E BU

FFER

ZO

NE

CAN

BE

ESTA

BLIS

HED

ON

AN

AV

ERAG

E W

IDTH

BAS

IS A

T A

PRO

JEC

T, A

S LO

NG

AS

THE

MIN

IMU

M W

IDTH

OF

THE

BUFF

ER Z

ON

E IS

MO

RE

THAN

30

FEET

AT

AN

Y M

EASU

RED

LO

CAT

ION

. IF

TH

E C

ON

STR

UC

TIO

N S

ITE

ENC

OM

PASS

ES

BOTH

SI

DES

O

F A

STR

EAM

, BU

FFER

AV

ERAG

ING

CAN

BE

APPL

IED

TO

BO

TH S

IDES

, BU

T M

UST

BE

APPL

IED

IND

EPEN

DEN

TLY.

30

-FEE

T FO

R A

LL O

THER

STR

EAM

S (A

VER

AGE

WID

TH P

ER S

IDE

WIT

H A

MIN

IMU

M O

F 15

-FEE

T).

A 30

FO

OT

NAT

UR

AL W

ATER

QU

ALIT

Y R

IPAR

IAN

BU

FFER

ZO

NE

ADJA

CEN

T TO

AN

D O

N B

OTH

SID

ES O

F TH

E R

ECEI

VIN

G S

TATE

ST

REA

M S

HAL

L BE

PR

ESER

VED

TO

TH

E M

AXIM

UM

EXT

ENT

PRAC

TIC

ABLE

DU

RIN

G C

ON

STR

UC

TIO

N A

CTI

VITI

ES A

T TH

E SI

TE. T

HE

30 F

OO

T C

RIT

ERIO

N F

OR

TH

E W

IDTH

OF

THE

BUFF

ER

ZON

E C

AN B

E ES

TABL

ISH

ED O

N A

N A

VER

AGE

WID

TH B

ASIS

AT

A PR

OJE

CT,

AS

LON

G A

S TH

E M

INIM

UM

WID

TH O

F TH

E BU

FFER

ZO

NE

IS M

OR

E TH

AN 1

5 FE

ET A

T AN

Y M

EASU

RED

LO

CAT

ION

. IF

THE

CO

NST

RU

CTI

ON

SIT

E EN

CO

MPA

SSES

BO

TH S

IDES

OF

A ST

REA

M,

BUFF

ER A

VER

AGIN

G C

AN B

E AP

PLIE

D T

O B

OTH

SI

DES

, BU

T M

UST

BE

APPL

IED

IND

EPEN

DEN

TLY.

4.1.

5.

ARE

THER

E AN

Y W

ATER

QU

ALIT

Y R

IPAR

IAN

BU

FFER

ZO

NES

NO

T R

EQU

IRED

FO

R S

TATE

WAT

ERS

DU

E TO

A T

DEC

AR

AP?

(9.0

)

YES

N

O

4.1.

6.

ARE

THER

E W

ATER

Q

UAL

ITY

RIP

ARIA

N

BUFF

ER

ZON

E EX

EMPT

ION

S? (4

.1.2

.1)

YES

N

O

IF Y

ES, E

XIST

ING

CO

ND

ITIO

NS

DES

CR

IPTI

ON

:

4.1.

7.

EVER

Y AT

TEM

PT

SHO

ULD

BE

M

ADE

FOR

C

ON

STR

UC

TIO

N

ACTI

VITI

ES T

O N

OT

TAKE

PLA

CE

WIT

HIN

TH

E W

ATER

QU

ALIT

Y R

IPAR

IAN

BU

FFER

ZO

NE

AND

FO

R E

XIST

ING

FO

RES

TED

AR

EAS

TO

BE P

RES

ERVE

D. (

5.4.

2.)

4.1.

8.

BEC

AUSE

O

F H

EAVY

SE

DIM

ENT

LOAD

AS

SOC

IATE

D

WIT

H

CO

NST

RU

CTI

ON

SI

TE

RU

NO

FF,

WAT

ER

QU

ALIT

Y R

IPAR

IAN

BU

FFER

ZO

NES

AR

E N

OT

SED

IMEN

T C

ON

TRO

L M

EASU

RES

AN

D

SHO

ULD

NO

T BE

REL

IED

UPO

N A

S PR

IMAR

Y SE

DIM

ENT

CO

NTR

OL

MEA

SUR

ES. T

HE

WAT

ER Q

UAL

ITY

RIP

ARIA

N B

UFF

ER Z

ON

E SH

ALL

BE E

STAB

LISH

ED B

ETW

EEN

TH

E TO

P O

F TH

E ST

REA

M B

ANK

AND

TH

E D

ISTU

RBE

D C

ON

STR

UC

TIO

N A

REA

.

4.1.

9.

WH

ERE

IT I

S N

OT

PRAC

TIC

ABLE

TO

MAI

NTA

IN A

FU

LL W

ATER

Q

UAL

ITY

RIP

ARIA

N

BUFF

ER,

BEST

M

ANAG

EMEN

T PR

ACTI

CES

(B

MPS

) PR

OVI

DIN

G E

QU

IVAL

ENT

PRO

TEC

TIO

N A

S TH

E N

ATU

RAL

R

IPAR

IAN

ZO

NE

MU

ST B

E U

SED

. A J

UST

IFIC

ATIO

N F

OR

USE

AN

D

DES

IGN

EQ

UIV

ALEN

CY

SHAL

L BE

D

OC

UM

ENTE

D

WIT

HIN

TH

E SW

PPP.

TH

E EN

VIR

ON

MEN

TAL

AND

RO

ADW

AY D

ESIG

N D

IVIS

ION

S SH

ALL

REV

IEW

AN

D A

PPR

OVE

TH

IS R

EVIS

ION

OF

THE

SWPP

P BE

FOR

E D

ISTU

RBA

NC

E O

F TH

E SI

TE

PRO

CEE

DS,

U

NLE

SS

PREV

IOU

SLY

EXEM

PT

IN

THE

NPD

ES

CG

P.

WH

ERE

ISSU

ED,

ARAP

/401

REQ

UIR

EMEN

TS W

ILL

PREV

AIL

IF I

N C

ON

FLIC

T W

ITH

TH

ESE

BUFF

ER Z

ON

E R

EQU

IREM

ENTS

.

4.2.

R

ECEI

VIN

G W

ATER

S O

F TH

E U

NIT

ED S

TATE

S (W

OTU

S) (E

PHEM

ERAL

)

WIL

L C

ON

STR

UC

TIO

N A

ND

/OR

ER

OSI

ON

AN

D S

EDIM

ENT

CO

NTR

OLS

IM

PAC

T AN

Y W

OTU

S (E

PHEM

ERAL

)?

YES

N

O

REC

EIVI

NG

WO

TUS

(EPH

EMER

AL) I

NFO

RMAT

ION

TDOT

W

OTUS

LA

BEL

LOCA

TED

WIT

HIN

PROJ

ECT

LIMI

TS

(YES

OR

NO)

LOCA

TED

WIT

HIN

15-F

T OF

THE

PR

OJEC

T LI

MITS

(Y

ES O

R NO

)

WW

C-1

YE

S YE

S

4.2.

1.

ARE

WAT

ER Q

UAL

ITY

RIP

ARIA

N B

UFF

ER Z

ON

ES R

EQU

IRED

FO

R

WO

TUS

(4.1

.2)?

Y

ES

NO

IF

YES

, A 1

5 FO

OT

NAT

UR

AL W

ATER

QU

ALIT

Y R

IPAR

IAN

BU

FFER

ZO

NE

ADJA

CEN

T TO

AN

D O

N B

OTH

SID

ES O

F TH

E R

ECEI

VIN

G

EPH

EMER

AL S

TREA

M ID

ENTI

FIED

AS

A W

OTU

S(E

PHEM

ERAL

) BY

TH

E U

.S.

ARM

Y C

OR

PS

OF

ENG

INEE

RS

(USA

CE)

O

R

THE

ENVI

RO

NM

ENTA

L PR

OTE

CTI

ON

AG

ENC

Y SH

ALL

BE P

RES

ERVE

D

TO T

HE

MAX

IMU

M E

XTEN

T PR

ACTI

CAB

LE D

UR

ING

CO

NST

RU

CTI

ON

AC

TIVI

TIES

AT

THE

SITE

. IF

YES

, TH

EY H

AVE

BEEN

INC

LUD

ED O

N P

LAN

SH

EET(

S)

4.2.

2.

ARE

THER

E AN

Y W

ATER

QU

ALIT

Y R

IPAR

IAN

BU

FFER

ZO

NES

NO

T R

EQU

IRED

FO

R W

OTU

S (E

PHEM

ERAL

) DU

E TO

A U

SAC

E PE

RM

IT?

Y

ES

NO

4.3.

O

UTF

ALL

INFO

RM

ATIO

N

4.3.

1.

OU

TFAL

L TA

BLE

(3.5

.1.e

). SE

E SW

PPP

SHEE

T S-

8 FO

R O

UTF

ALL

INFO

RM

ATIO

N.

4.3.

2.

HAV

E AL

L O

UTF

ALLS

BEE

N L

ABEL

ED O

N T

HE

EPSC

PLA

N S

HEE

TS

(3.5

.1.h

)?

YES

N

O

4.3.

3.

HAV

E AL

L O

UTF

ALLS

BEE

N L

ABEL

ED O

N A

USG

S TO

POG

RAP

HIC

M

AP IN

CLU

DED

IN T

HE

“DO

CU

MEN

TATI

ON

AN

D P

ERM

ITS”

BIN

DER

(2

.6.2

)?

YES

N

O

4.3.

4.

WH

ERE

POSS

IBLE

, H

AS N

ON

-PR

OJE

CT

RU

N-O

N B

EEN

DIV

ERTE

D

ARO

UN

D O

R T

HR

OU

GH

TH

E PR

OJE

CT

TO E

LIM

INAT

E C

ON

TAC

T W

ITH

DIS

TUR

BED

AR

EAS

OF

THE

PRO

JEC

T AN

D S

EPAR

ATE

IT

FRO

M P

RO

JEC

T R

UN

-OFF

TH

EREB

Y R

EDU

CIN

G T

HE

DR

AIN

AGE

AREA

OF

TO T

HE

OU

TFAL

LS IN

TH

IS A

REA

?

YES

N

O

N/A

4.3.

5.

ARE

EQU

IVAL

ENT

MEA

SUR

ES

BEIN

G

SUBS

TITU

TED

FO

R

A SE

DIM

ENT

BASI

N(S

)?

YES

N

O

N/A

4.3.

6.

A SE

DIM

ENT

BASI

N

OR

EQ

UIV

ALEN

T M

EASU

RE(

S)

WIL

L BE

PR

OVI

DED

FO

R A

NY

OU

TFAL

L IN

A D

RAI

NAG

E AR

EA:

OF

TEN

AC

RES

OR

MO

RE

FOR

AN

OU

TFAL

L(S)

TH

AT D

OES

NO

T D

ISC

HAR

GE

TO

A ST

ATE

STR

EAM

W

ITH

U

NAV

AILA

BLE

PAR

AMET

ERS

OR

EX

CEP

TIO

NAL

TE

NN

ESSE

E W

ATER

S.

A

TEM

POR

ARY

(OR

PE

RM

ANEN

T)

SED

IMEN

T BA

SIN

O

R

EQU

IVAL

ENT

CO

NTR

OL

MEA

SUR

ES T

HAT

PR

OVI

DES

STO

RAG

E FO

R A

CAL

CU

LATE

D V

OLU

ME

OF

RU

NO

FF F

RO

M A

MIN

IMU

M 2

-YE

AR/

24-H

OU

R S

TOR

M E

VEN

T, S

HAL

L BE

PR

OVI

DED

UN

TIL

FIN

AL S

TABI

LIZA

TIO

N O

F TH

E SI

TE. (

3.5.

3.3)

O

R

OF

FIVE

AC

RES

O

R

MO

RE

FOR

AN

O

UTF

ALL(

S)

THAT

D

ISC

HAR

GES

TO

A

STAT

E ST

REA

M

WIT

H

UN

AVAI

LABL

E PA

RAM

ETER

S O

R

EXC

EPTI

ON

AL

TEN

NES

SEE

WAT

ERS.

A TE

MPO

RAR

Y (O

R

PER

MAN

ENT)

SE

DIM

ENT

BASI

N

THAT

PR

OVI

DES

STO

RAG

E FO

R A

CAL

CU

LATE

D V

OLU

ME

OF

RU

NO

FF

FRO

M A

5-Y

EAR

/ 24-

HO

UR

STO

RM

EVE

NT

AND

RU

NO

FF F

RO

M

EAC

H A

CR

E D

RAI

NED

, OR

EQ

UIV

ALEN

T C

ON

TRO

L M

EASU

RES

, SH

ALL

BE P

RO

VID

ED U

NTI

L FI

NAL

STA

BILI

ZATI

ON

OF

THE

SITE

. (5

.4.1

.g).

IN

BOTH

IN

STAN

CES

, TH

E EN

VIR

ON

MEN

TAL

AND

R

OAD

WAY

D

ESIG

N D

IVIS

ION

S M

AY B

E C

ON

TAC

TED

TO

REV

IEW

AN

D C

ON

CU

R

WIT

H A

NY

REV

ISIO

N O

F TH

E SW

PPP

BEFO

RE

DIS

TUR

BAN

CE

OF

THE

OU

TFAL

L PR

OC

EED

S.

4.4.

W

ETLA

ND

INFO

RM

ATIO

N

WIL

L C

ON

STR

UC

TIO

N A

ND

/OR

ER

OSI

ON

AN

D S

EDIM

ENT

CO

NTR

OLS

IM

PAC

T AN

Y W

ETLA

ND

S?

YES

N

O

IF Y

ES, T

HE

STR

UC

TUR

AL E

PSC

MEA

SUR

ES H

AVE

BEEN

INC

LUD

ED IN

TH

E TO

TAL

PRO

JEC

T IM

PAC

TS A

ND

IN T

HE

WAT

ER Q

UAL

ITY

PER

MIT

S.

WET

LAN

D IN

FOR

MAT

ION

TDO

T W

ETLA

ND

LA

BEL

FRO

M S

TATI

ON

LT

OR

RT

TO S

TATI

ON

LT

OR

RT

TEM

POR

ARY

IMPA

CTS

(AC

) PE

RMAN

ENT

IMPA

CTS

(A

C)

WTL

-1

106+

37.0

0 R

T 11

8+76

.00

RT

0.

241

4.5.

TO

TAL

MAX

IMU

M D

AILY

LO

ADS

(TM

DL)

INFO

RM

ATIO

N (3

.5.1

0)

4.5.

1.

IS

THIS

PR

OJE

CT

LOC

ATED

IN

A

HU

C-8

W

ATER

SHED

TH

AT

MAI

NTA

INS

AN E

PA A

PPR

OVE

D T

MD

L FO

R S

ILTA

TIO

N A

ND

HAB

ITAT

AL

TER

ATIO

N?

YE

S

NO

4.5.

2.

IF

YES,

IS

TH

IS

PRO

JEC

T LO

CAT

ED

WIT

HIN

A

HU

C-1

2 SU

BWAT

ERSH

ED W

ITH

A W

ASTE

LO

AD A

LLO

CAT

ION

(WLA

)?

YES

N

O

4.5.

3.

IF Y

ES,

DO

ES T

HE

PRO

JEC

T H

AVE

A D

IREC

T D

ISC

HAR

GE

TO A

30

3(d)

LIS

TED

STR

EAM

FO

R S

ILTA

TIO

N O

R H

ABIT

AT A

LTER

ATIO

N?

Y

ES

NO

4.5.

4.

IF Y

ES,

HAS

A S

UM

MAR

Y O

F TH

E C

ON

SULT

ATIO

N L

ETTE

R B

EEN

SU

BMIT

TED

/REC

EIVE

D?

Y

ES

NO

4.6.

EC

OLO

GY

INFO

RM

ATIO

N (3

.5.5

.e)

DO

ES

THE

TDO

T EN

VIR

ON

MEN

TAL

BOU

ND

ARIE

S R

EPO

RT

SPEC

IFY

SPEC

IAL

NO

TES

TO B

E AD

DED

TO

TH

E PL

AN S

HEE

TS?

Y

ES

NO

IF Y

ES, T

HEY

HAV

E BE

EN IN

CLU

DED

ON

PLA

N S

HEE

T(S)

1B.

4.7.

EN

VIR

ON

MEN

TAL

CO

MM

ITM

ENTS

AR

E TH

ERE

ANY

NO

TES

ON

TH

E EN

VIR

ON

MEN

TAL

CO

MM

ITM

ENT

SHEE

T?

YES

N

O

IF Y

ES, T

HEY

HAV

E BE

EN IN

CLU

DED

ON

PLA

N S

HEE

T(S)

_1B

_.

5.

ERO

SIO

N PR

EVEN

TIO

N A

ND

SED

IMEN

T C

ON

TRO

L (E

PSC

) MEA

SUR

ES (3

.5.3

)5.

1.

EPSC

MEA

SUR

ES M

UST

BE

DES

IGN

ED,

INST

ALLE

D A

ND

MAI

NTA

INED

TO

C

ON

TRO

L ST

OR

MW

ATER

VO

LUM

E AN

D V

ELO

CIT

Y W

ITH

IN T

HE

SITE

TO

M

INIM

IZE

ERO

SIO

N (4

.1.1

).

5.2.

EP

SC

MEA

SUR

ES

MU

ST

CO

NTR

OL

STO

RM

WAT

ER

DIS

CH

ARG

ES,

INC

LUD

ING

BO

TH P

EAK

FLO

WS

AND

TO

TAL

STO

RM

WAT

ER V

OLU

ME,

TO

M

INIM

IZE

ERO

SIO

N

AT

OU

TLET

S,

STR

EAM

C

HAN

NEL

S,

AND

ST

REA

M

BAN

KS. (

4.1.

1)

5.3.

H

AVE

THE

CO

NTR

OL

MEA

SUR

ES B

EEN

DES

IGN

ED P

ER T

HE

SIZE

AN

D

SLO

PE O

F TH

E D

ISTU

RBE

D D

RAI

NAG

E AR

EA (3

.5.3

.3)?

YE

S

NO

5.4.

TH

E C

ON

TRO

L M

EASU

RES

HAV

E, A

T A

MIN

IMU

M, B

EEN

DES

IGN

ED F

OR

TH

E 5-

YEAR

, 24

HO

UR

STO

RM

EVE

NT

(3.5

.3.3

, 5.4

.1.a

).

5.5.

AR

E TH

E LI

MIT

S O

F D

ISTU

RBA

NC

E C

LEAR

LY M

ARKE

D O

N T

HE

EPSC

PLA

NS

(3.5

.1.h

)?

YES

N

O

5.6.

AR

EAS

TO B

E U

ND

ISTU

RBE

D S

HAL

L BE

CLE

ARLY

MAR

KED

IN

TH

E FI

ELD

BE

FOR

E C

ON

STR

UC

TIO

N A

CTI

VITI

ES B

EGIN

.

5.7.

U

NLE

SS O

THER

WIS

E N

OTE

D IN

TH

E PL

ANS,

TH

E C

ON

TRAC

TOR

SH

ALL

NO

T C

LEAR

/DIS

TUR

B AN

Y AR

EA B

EYO

ND

15

FEET

FR

OM

SLO

PE L

INES

OR

RO

W/

EASE

MEN

T LI

NE,

WH

ICH

EVER

IS L

ESSE

R.

5.8.

C

LEAR

ING

, G

RU

BBIN

G,

AND

O

THER

D

ISTU

RBA

NC

E TO

R

IPAR

IAN

VE

GET

ATIO

N S

HAL

L BE

LIM

ITED

TO

TH

E M

INIM

UM

NEC

ESSA

RY

FOR

SLO

PE

CO

NST

RU

CTI

ON

AN

D E

QU

IPM

ENT

OPE

RAT

ION

S. E

XIST

ING

VEG

ETAT

ION

, IN

CLU

DIN

G

STR

EAM

AN

D

WET

LAN

D

BUFF

ERS

(UN

LESS

PE

RM

ITTE

D),

SHO

ULD

BE

PR

ESER

VED

TO

TH

E M

AXIM

UM

EX

TEN

T PO

SSIB

LE.

UN

NEC

ESSA

RY

VEG

ETAT

ION

REM

OVA

L IS

PR

OH

IBIT

ED.

5.9.

H

AVE

STAG

ED E

PSC

PLA

NS

BEEN

PR

EPAR

ED F

OR

TH

E PR

OJE

CT

(3.5

.2)?

YE

S N

O

(IF

YES,

CH

ECK

ON

E BE

LOW

)

5.9.

1.

PRO

JEC

T D

ISTU

RBE

D A

REA

IS T

HAN

LES

S TH

AN 5

AC

RES

(MIN

IMU

M O

F TW

O S

TAG

ES O

F EP

SC P

LAN

S)

5.9.

2.

PRO

JEC

T D

ISTU

RBE

D A

REA

IS G

REA

TER

TH

AN 5

AC

RES

(MIN

IMU

M O

F TH

REE

STA

GES

OF

EPSC

PLA

NS)

5.10

. STE

EP S

LOPE

S AR

E D

EFIN

ED A

S A

NAT

UR

AL O

R C

REA

TED

SLO

PE O

F 35

%

GR

ADE

OR

GR

EATE

R R

EGAR

DLE

SS O

F H

EIG

HT.

HAV

E ST

EEP

SLO

PES

BEEN

M

INIM

ALLY

D

ISTU

RBE

D

AND

/OR

PR

OTE

CTE

D

BY

CO

NVE

YIN

G

RU

NO

FF N

ON

-ER

OSI

VELY

AR

OU

ND

OR

OVE

R T

HE

SLO

PE (

3.5.

3.2)

(10

. “S

TEEP

SLO

PE”)?

Y

ES

NO

N

/A

5.11

. TH

E ST

RU

CTU

RAL

EPS

C M

EASU

RES

HAV

E BE

EN IN

CLU

DED

IN T

HE

TOTA

L PR

OJE

CT

IMPA

CTS

AN

D

HAV

E BE

EN

INC

LUD

ED

IN

THE

AQU

ATIC

R

ESO

UR

CE

ALTE

RAT

ION

(AR

AP) P

ERM

IT O

R S

ECTI

ON

401

CER

TIFI

CAT

ION

(3

.5.1

.j).

REF

ER T

O T

HE

LIST

OF

APPL

ICAB

LE E

NVI

RO

NM

ENTA

L PE

RM

ITS

Page 3: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED

P.E.

2

017

9401

4-12

35-9

4

CO

NST

. 2

017

HSI

P-10

6 (33

)

S-

3

LOC

ATED

ON

SW

PPP

SHEE

T S-

7.

ALL

PER

MIT

S W

ILL

BE M

AIN

TAIN

ED O

N

SITE

WIT

HIN

TH

E “D

OC

UM

ENTA

TIO

N A

ND

PER

MIT

S” B

IND

ER.

5.12

. TH

E EP

SC C

ON

TRO

L M

EASU

RES

LIS

TED

IN

TH

E Q

UAN

TITI

ES T

ABLE

ON

SH

EET

10 H

AVE

BEEN

SEL

ECTE

D IN

AC

CO

RD

ANC

E W

ITH

TD

OT

STAN

DAR

D

DR

AWIN

GS

AND

GO

OD

EN

GIN

EER

ING

PR

ACTI

CES

(3.5

.3.1

.b).

5.13

. EPS

C

MEA

SUR

ES

SHAL

L BE

IN

STAL

LED

PE

R

TDO

T ST

AND

ARD

S (i.

e.

STAN

DAR

D D

RAW

ING

S) A

ND

SH

ALL

BE F

UN

CTI

ON

AL P

RIO

R T

O A

NY

EAR

TH

MO

VIN

G O

PER

ATIO

NS.

5.14

. EPS

C M

EASU

RES

WIL

L N

OT

BE I

NST

ALLE

D W

ITH

IN A

STR

EAM

WIT

HO

UT

FIR

ST O

BTAI

NIN

G A

PPR

OVA

L FR

OM

TH

E PE

RM

ITS

SEC

TIO

N.

5.15

. TEM

POR

ARY

EPSC

MEA

SUR

ES M

AY B

E R

EMO

VED

AT

THE

BEG

INN

ING

OF

THE

WO

RKD

AY,

BUT

MU

ST

BE

REI

NST

ALLE

D

AT

THE

END

O

F TH

E W

OR

KDAY

OR

BEF

OR

E A

PREC

IPIT

ATIO

N E

VEN

T.

5.16

. EPS

C M

EASU

RES

LO

CAT

ED IN

WO

TUS

(EPH

EMER

AL S

TREA

MS)

MU

ST B

E C

ON

SID

ERED

TEM

POR

ARY

AND

SH

ALL

BE R

EMO

VED

AT

THE

END

OF

CO

NST

RU

CTI

ON

.

5.17

. TH

E C

ON

TRAC

TOR

SH

ALL

ESTA

BLIS

H

AND

M

AIN

TAIN

A

PRO

ACTI

VE

MET

HO

D

TO

PREV

ENT

THE

OFF

-SIT

E M

IGR

ATIO

N

OR

D

EPO

SIT

OF

SED

IMEN

T O

FF T

HE

PRO

JEC

T LI

MIT

S (E

.G. R

.O.W

., EA

SEM

ENTS

, ETC

.), IN

TO

WAT

ERS

OF

THE

STAT

E/U

.S.,

OR

ON

TO R

OAD

WAY

S U

SED

BY

THE

PUBL

IC.

IF

SED

IMEN

T ES

CAP

ES

THE

CO

NST

RU

CTI

ON

SI

TE,

OFF

-SIT

E AC

CU

MU

LATI

ON

S O

F SE

DIM

ENT

THAT

HAV

E N

OT

REA

CH

ED A

STR

EAM

M

UST

BE

REM

OVE

D T

O A

LEV

EL S

UFF

ICIE

NT

TO M

INIM

IZE

OFF

-SIT

E IM

PAC

TS

(E.G

., FU

GIT

IVE

SED

IMEN

T TH

AT

HAS

ES

CAP

ED

THE

CO

NST

RU

CTI

ON

SI

TE

AND

H

AS

CO

LLEC

TED

IN

A

STR

EET

MU

ST

BE

REM

OVE

D S

O T

HAT

IT

IS N

OT

SUBS

EQU

ENTL

Y W

ASH

ED I

NTO

STO

RM

SE

WER

S AN

D S

TREA

MS

BY T

HE

NEX

T R

AIN

AN

D/O

R S

O T

HAT

IT D

OES

NO

T PO

SE

A SA

FETY

H

AZAR

D

TO

USE

RS

OF

PUBL

IC

STR

EETS

). AR

RAN

GEM

ENTS

CO

NC

ERN

ING

REM

OVA

L O

F SE

DIM

ENT

ON

AD

JOIN

ING

PR

OPE

RTY

MU

ST B

E SE

TTLE

D W

ITH

TH

E AD

JOIN

ING

PR

OPE

RTY

OW

NER

BE

FOR

E R

EMO

VAL

OF

SED

IMEN

T.

SED

IMEN

T TH

AT

MIG

RAT

ES I

NTO

W

ATER

S O

F TH

E ST

ATE/

US

SHAL

L N

OT

BE R

EMO

VED

WIT

HO

UT

GU

IDAN

CE

FRO

M T

DO

T EN

VIR

ON

MEN

TAL

PER

SON

NEL

.

5.18

. OFF

SITE

VEH

ICLE

TR

ACKI

NG

OF

SED

IMEN

TS A

ND

TH

E G

ENER

ATIO

N O

F D

UST

SH

ALL

BE M

INIM

IZED

. A S

TABI

LIZE

D C

ON

STR

UC

TIO

N E

XIT

(A P

OIN

T O

F EN

TRAN

CE/

EXIT

TO

TH

E C

ON

STR

UC

TIO

N

PRO

JEC

T)

SHAL

L BE

PR

OVI

DED

TO

RED

UC

E TH

E TR

ACKI

NG

OF

MU

D A

ND

DIR

T O

NTO

PU

BLIC

R

OAD

S BY

CO

NST

RU

CTI

ON

VEH

ICLE

S.

5.19

. TH

E Q

UAN

TITI

ES R

EQU

IRED

FO

R S

TABI

LIZE

D C

ON

STR

UC

TIO

N E

XITS

PER

TD

OT

STAN

DAR

DS

HAV

E BE

EN S

PEC

IFIE

D O

N S

HEE

T 2A

(3.5

.3.1

.n).

5.20

. DIS

CH

ARG

ES F

RO

M D

EWAT

ERIN

G A

CTI

VITI

ES A

RE

PRO

HIB

ITED

UN

LESS

M

ANAG

ED B

Y AP

PRO

PRIA

TE C

ON

TRO

LS T

HAT

PR

OVI

DE

THE

LEVE

L O

F TR

EATM

ENT

(FIL

TRAT

ION

) N

ECES

SAR

Y TO

C

OM

PLY

WIT

H

PER

MIT

R

EQU

IREM

ENTS

. (4.

1.4)

.

5.21

. SET

TLIN

G B

ASIN

S AN

D S

EDIM

ENT

TRAP

S SH

ALL

BE P

RO

PER

LY D

ESIG

NED

PE

R T

HE

SIZE

OF

THE

DR

AIN

AGE

AREA

S O

R V

OLU

ME

OF

WAT

ER T

O B

E TR

EATE

D. T

REA

TED

WAT

ER M

UST

BE

DIS

CH

ARG

ED T

HR

OU

GH

A P

IPE

OR

W

ELL

VEG

ETAT

ED O

R L

INED

CH

ANN

EL, S

O T

HAT

TH

E D

ISC

HAR

GE

DO

ES

NO

T C

AUSE

ER

OSI

ON

OR

SED

IMEN

T TR

ANSP

OR

T.

5.22

. DIS

CH

ARG

ES

FRO

M

SED

IMEN

T BA

SIN

S AN

D

IMPO

UN

DM

ENTS

SH

ALL

UTI

LIZE

OU

TLET

STR

UC

TUR

ES T

HAT

ON

LY W

ITH

DR

AW W

ATER

FR

OM

NEA

R

THE

SUR

FAC

E O

F TH

E BA

SIN

OR

IMPO

UN

DM

ENT.

TR

EATE

D W

ATER

MU

ST

BE D

ISC

HAR

GED

TH

RO

UG

H A

PIP

E, W

ELL-

VEG

ETAT

ED A

ND

/OR

LIN

ED

CH

ANN

EL,

SO T

HAT

TH

E D

ISC

HAR

GE

DO

ES N

OT

CAU

SE E

RO

SIO

N O

R

SED

IMEN

T TR

ANSP

OR

T. (4

.1.7

).

5.23

. TH

E D

EWAT

ERIN

G

OF

WO

RK

AREA

S,

TREN

CH

ES,

FOU

ND

ATIO

NS,

EX

CAV

ATIO

NS,

ETC

. TH

AT H

AVE

CO

LLEC

TED

STO

RM

WAT

ER, W

ATER

FR

OM

VE

HIC

LE W

ASH

AR

EAS,

OR

GR

OU

ND

WAT

ER S

HAL

L BE

EIT

HER

HEL

D I

N

SETT

LIN

G

BASI

NS

OR

TR

EATE

D

BY

FILT

RAT

ION

AN

D/O

R

CH

EMIC

AL

TREA

TMEN

T PR

IOR

TO

ITS

DIS

CH

ARG

E. A

LL C

HEM

ICAL

TR

EATM

ENTS

M

UST

BE

APPL

IED

PER

SEC

TIO

N 6

FLO

CC

ULA

NTS

.

5.24

. WAT

ER D

ISC

HAR

GED

FR

OM

DEW

ATER

ING

AC

TIVI

TIES

SH

ALL

NO

T C

AUSE

AN

OBJ

ECTI

ON

ABLE

CO

LOR

CO

NTR

AST

WIT

HIN

TH

E R

ECEI

VIN

G N

ATU

RAL

R

ESO

UR

CE.

WAT

ER M

UST

BE

HEL

D W

ITH

IN S

ETTL

ING

BAS

INS

UN

TIL

IT IS

AT

LEA

ST A

S C

LEAR

AS

THE

REC

EIVI

NG

WAT

ERS.

5.25

. DEW

ATER

ING

STR

UC

TUR

ES, S

EDIM

ENT

FILT

ER B

AGS,

SED

IMEN

T BA

SIN

S AN

D T

RAP

S SH

ALL

NO

T BE

LO

CAT

ED C

LOSE

R T

HAN

30

FEET

(60

FEE

T D

ESIR

ABLE

VE

GET

ATIV

E BU

FFER

) FO

R

WAT

ERS

WIT

H

UN

AVAI

LABL

E PA

RAM

ETER

S AN

D E

XCEP

TIO

NAL

TEN

NES

SEE

WAT

ERS

AND

15

FEET

(30

FE

ET D

ESIR

ABLE

VEG

ETAT

IVE

BUFF

ER) F

OR

ALL

OTH

ER F

EATU

RES

FR

OM

TH

E TO

P BA

NK

OF

A ST

REA

M, W

OTU

S (E

PHEM

ERAL

), W

ETLA

ND

OR

OTH

ER

NAT

UR

AL R

ESO

UR

CE

AND

SH

ALL

BE P

RO

PER

LY D

ESIG

NED

PER

TH

E SI

ZE

OF

THE

DR

AIN

AGE

AREA

S O

R V

OLU

ME

OF

WAT

ER T

O B

E TR

EATE

D.

5.26

. STA

BILI

ZATI

ON

PR

ACTI

CES

: P

RE-

CO

NST

RU

CTI

ON

VEG

ETAT

IVE

CO

VER

W

ILL

NO

T BE

DES

TRO

YED

, REM

OVE

D O

R D

ISTU

RBE

D M

OR

E TH

AN 1

4 D

AYS

PRIO

R T

O G

RAD

ING

OR

EAR

TH M

OVI

NG

UN

LESS

TH

E AR

EA W

ILL

BE

SEED

ED A

ND

/OR

MU

LCH

ED O

R O

THER

TEM

POR

ARY

CO

VER

IS IN

STAL

LED

(3

.5.3

.1.h

).

5.27

. STA

BILI

ZATI

ON

MEA

SUR

ES W

ILL

BE I

NIT

IATE

D A

S SO

ON

AS

POSS

IBLE

W

HER

E C

ON

STR

UC

TIO

N

ACTI

VITI

ES

HAV

E TE

MPO

RAR

ILY

OR

PE

RM

ANEN

TLY

CEA

SED

. T

EMPO

RAR

Y O

R P

ERM

ANEN

T ST

ABIL

IZAT

ION

W

ILL

BE C

OM

PLET

ED W

ITH

IN 1

4 D

AYS

AFTE

R A

CTI

VITY

HAS

TEM

POR

ARIL

Y O

R P

ERM

ANEN

TLY

CEA

SED

IN

TH

AT A

REA

. PE

RM

ANEN

T ST

ABIL

IZAT

ION

W

ILL

REP

LAC

E TE

MPO

RAR

Y M

EASU

RES

AS

SO

ON

AS

PR

ACTI

CAB

LE

(3.5

.3.2

).

5.28

. PR

IOR

ITY

SHAL

L BE

GIV

EN T

O F

INIS

HIN

G O

PER

ATIO

NS

AND

PER

MAN

ENT

EPSC

MEA

SUR

ES O

VER

TEM

POR

ARY

EPSC

MEA

SUR

ES O

N A

LL P

RO

JEC

TS.

UN

PAC

KED

GR

AVEL

CO

NTA

ININ

G F

INES

(SIL

T AN

D C

LAY

SIZE

D P

ARTI

CLE

S)

OR

CR

USH

ER-R

UN

WIL

L N

OT

BE C

ON

SID

ERED

A N

ON

-ER

OD

IBLE

SU

RFA

CE

5.29

. DEL

AYIN

G T

HE

PLAN

TIN

G O

F C

OVE

R V

EGET

ATIO

N U

NTI

L W

INTE

R M

ON

THS

OR

DR

Y M

ON

THS

SHO

ULD

BE

AVO

IDED

, IF

POSS

IBLE

.

5.30

. A S

OIL

AN

ALYS

IS S

HAL

L BE

PER

FOR

MED

PR

IOR

TO

TH

E AP

PLIC

ATIO

N O

F FE

RTI

LIZE

RS

TO A

NY

POR

TIO

N O

F TH

E ST

E. S

OIL

S SH

OU

LD B

E AN

ALYZ

ED

FOR

pH

, BU

FFER

VAL

UE,

PH

OSP

HO

RO

US,

PO

TASS

IUM

, C

ALC

IUM

AN

D

MAG

NES

IUM

. SO

IL S

AMPL

ES S

HO

ULD

BE

REP

RES

ENTA

TIVE

OF

THE

AREA

FO

R W

HIC

H F

ERTI

LIZE

R W

ILL

BE A

PPLI

ED.

SAM

PLE

TYPE

SH

OU

LD B

E C

OLL

ECTE

D A

ND

AN

ALYZ

ED I

N A

CC

OR

DAN

CE

WIT

H T

HE

UT

EXTE

NSI

ON

“S

OIL

TES

TIN

G” B

RO

CH

UR

E PB

1061

. (4.

1.5.

)

5.31

. FER

TILI

ZER

S SH

ALL

BE A

PPLI

ED O

NLY

IN T

HE

AMO

UN

TS S

PEC

IFIE

D F

RO

M

THE

ANAL

YSES

. ON

CE

APPL

IED

, FER

TILI

ZER

S SH

ALL

BE W

OR

KED

INTO

TH

E SO

IL T

O L

IMIT

TH

E EX

POSU

RE

TO S

TOR

MW

ATER

.

5.32

. STE

EP S

LOPE

S SH

ALL

BE T

EMPO

RAR

ILY

STAB

ILIZ

ED N

OT

LATE

R T

HAN

7

DAY

S AF

TER

CO

NST

RU

CTI

ON

AC

TIVI

TY O

N T

HE

SLO

PE H

AS T

EMPO

RAR

ILY

OR

PER

MAN

ENTL

Y C

EASE

D. (

3.5.

3.2)

.

6.

FLO

CC

ULA

NTS

(3.5

.3.1

.b)

IS A

DD

ITIO

NAL

PH

YSIC

AL O

R C

HEM

ICAL

TR

EATM

ENT

OF

STO

RM

WAT

ER R

UN

OFF

N

ECES

SAR

Y (5

.4.1

.a)?

Y

ES

NO

IF Y

ES, T

HE

FOLL

OW

ING

NO

TES

APPL

Y:

6.1.

PO

LYAC

RYL

AMID

ES (

PAM

) SH

ALL

BE O

F TH

E AN

ION

IC O

R N

EUTR

ALLY

C

HAR

GED

TYP

E O

NLY

. PAM

REQ

UIR

EMEN

TS A

RE

AS F

OLL

OW

S:

6.1.

1.

CAT

ION

IC P

AM I

S N

OT

ALLO

WED

BEC

AUSE

OF

ITS

TOXI

CIT

Y TO

FI

SH A

ND

AQ

UAT

IC L

IFE.

6.1.

2.

ANIO

NIC

AN

D N

EUTR

ALLY

CH

ARG

ED P

AM S

HAL

L M

EET

THE

EPA

AND

FD

A AC

RYL

AMID

E M

ON

OM

ER L

IMIT

S O

F EQ

UAL

TO

OR

LES

S TH

AN

0.05

% B

Y W

EIG

HT

ACR

YLAM

IDE

MO

NO

MER

.

6.1.

3.

ANIO

NIC

AN

D N

EUTR

ALLY

CH

ARG

ED P

AM S

HAL

L H

AVE

A D

ENSI

TY

OF

10%

TO

55%

BY

WEI

GH

T AN

D A

MO

LEC

ULA

R W

EIG

HT

OF

16 T

O

24 M

G/M

OLE

S.

6.1.

4.

PAM

MIX

TUR

ES S

HAL

L BE

NO

N-C

OM

BUST

IBLE

.

6.1.

5.

PAM

SH

ALL

CO

NTA

IN

ON

LY

MAN

UFA

CTU

RER

-REC

OM

MEN

DED

AD

DIT

IVES

.

6.2.

AL

L PH

YSIC

AL A

ND

/OR

CH

EMIC

AL T

REA

TMEN

T W

ILL

BE R

ESEA

RC

HED

, AP

PLIE

D IN

AC

CO

RD

ANC

E W

ITH

MAN

UFA

CTU

RE’

S G

UID

ELIN

ES A

ND

FU

LLY

DES

CR

IBED

ON

TH

E EP

SC P

LAN

S (3

.5.3

.1.b

).

6.3.

FL

OC

CU

LAN

TS

SHAL

L BE

H

AND

LED

IN

AC

CO

RD

ANC

E W

ITH

AL

L O

CC

UPA

TIO

NAL

SAF

ETY

AND

HEA

LTH

AD

MIN

ISTR

ATIO

N (O

SHA)

MAT

ERIA

L SA

FETY

DAT

A SH

EET

(MSD

S) R

EQU

IREM

ENTS

AN

D S

HAL

L BE

APP

LIED

IN

ACC

OR

DAN

CE

WIT

H T

HE

MAN

UFA

CTU

RER

’S R

ECO

MM

END

ATIO

NS

FOR

TH

E SP

ECIF

IED

USE

CO

NFO

RM

ING

TO

ALL

FED

ERAL

, STA

TE A

ND

LO

CAL

LA

WS,

RU

LES

AND

REG

ULA

TIO

NS.

6.4.

AL

L VE

ND

OR

S AN

D S

UPP

LIER

S O

F FL

OC

CU

LAN

TS S

HAL

L PR

ESEN

T O

R

SUPP

LY A

WR

ITTE

N T

OXI

CIT

Y R

EPO

RT

FOR

BO

TH A

CU

TE A

ND

CH

RO

NIC

TO

XIC

ITY

TEST

S W

HIC

H V

ERIF

IES

THAT

TH

E FL

OC

CU

LAN

T EX

HIB

ITS

ACC

EPTA

BLE

TOXI

CIT

Y PA

RAM

ETER

S W

HIC

H M

EET

OR

EXC

EED

TH

E EP

A R

EQU

IREM

ENTS

FO

R

THE

STAT

E AN

D

FED

ERAL

W

ATER

Q

UAL

ITY

STAN

DAR

DS.

W

HO

LE

EFFL

UEN

T TE

STIN

G

DO

ES

NO

T M

EET

THIS

R

EQU

IREM

ENT

AS P

RIM

ARY

REA

CTI

ON

S H

AVE

OC

CU

RR

ED A

ND

TO

XIC

PO

TEN

TIAL

S H

AVE

BEEN

RED

UC

ED.

6.5.

D

O N

OT

APPL

Y FL

OC

CU

LAN

TS D

IREC

TLY

TO, O

R W

ITH

IN 6

0 FE

ET, O

F AN

Y ST

REA

MS,

W

ETLA

ND

S,

OR

O

THER

N

ATU

RAL

W

ATER

R

ESO

UR

CE

LOC

ATED

ON

OR

AD

JAC

ENT

TO T

HE

CO

NST

RU

CTI

ON

SIT

E. D

O N

OT

APPL

Y

FLO

CC

ULA

NTS

DIR

ECTL

Y IN

TO W

ATER

S C

ON

TAIN

ED W

ITH

IN S

EDIM

ENT

PON

DS

OR

TO

SLO

PES

THAT

PR

OD

UC

E R

UN

OFF

DIR

ECTL

Y IN

TO A

ST

REA

M,

WET

LAN

D,

OR

OTH

ER N

ATU

RAL

WAT

ER R

ESO

UR

CE.

DO

NO

T AP

PLY

FLO

CC

ULA

NTS

IM

MED

IATE

LY

AT

A ST

OR

MW

ATER

O

UTF

ALL

WH

ERE

RU

NO

FF L

EAVE

S TH

E PR

OJE

CT

LIM

ITS.

6.6.

BE

FOR

E FL

OC

CU

LAN

TS C

AN B

E U

SED

ON

A C

ON

STR

UC

TIO

N P

RO

JEC

T,

SITE

-SPE

CIF

IC S

OIL

SAM

PLES

MU

ST B

E O

BTAI

NED

AN

D T

ESTE

D B

Y TH

E M

ANU

FAC

TUR

ER O

R T

HEI

R R

EPR

ESEN

TATI

VE, T

O ID

ENTI

FY T

HE

OPT

IMU

M

FLO

CC

ULA

NT

TYPE

AN

D

APPL

ICAT

ION

R

ATE.

SIN

CE

FLO

CC

ULA

NT

EFFI

CAC

Y IS

HIG

HLY

DEP

END

ENT

ON

SO

IL T

YPE,

SO

IL S

AMPL

ES W

ILL

NEE

D

TO

BE

OBT

AIN

ED

FRO

M

EAC

H

SOIL

H

OR

IZO

N

THAT

WIL

L BE

AC

CES

SED

DU

RIN

G E

XCAV

ATIO

N. F

LOC

CU

LAN

TS S

HO

ULD

BE

APPL

IED

ON

A

CO

NST

RU

CTI

ON

SIT

E IN

AC

CO

RD

ANC

E W

ITH

TH

E M

ANU

FAC

TUR

ER’S

R

ECO

MM

END

ED A

PPLI

CAT

ION

OR

DO

SAG

E R

ATE.

AP

PLIC

ATIO

N M

ETH

OD

SH

ALL

ENSU

RE

UN

IFO

RM

C

OVE

RAG

E TO

TH

E TA

RG

ET A

REA

. D

O N

OT

APPL

Y EM

ULS

ION

FO

RM

S O

F FL

OC

CU

LAN

TS D

IREC

TLY

TO S

TOR

MW

ATER

R

UN

OFF

OR

TO

STR

EAM

S, W

ETLA

ND

S, O

R O

THER

WAT

ER R

ESO

UR

CES

D

UE

TO S

UR

FAC

TAN

T TO

XIC

ITY.

6.7.

FL

OC

CU

LAN

T PO

WD

ER M

AY B

E AP

PLIE

D B

Y A

HAN

D S

PREA

DER

OR

A

MEC

HAN

ICAL

SP

REA

DER

.

IF

APPR

OVE

D

BY

THE

MAN

UFA

CTU

RER

, FL

OC

CU

LAN

T M

AY B

E M

IXED

WIT

H D

RY

SILI

CA

SAN

D, F

ERTI

LIZE

R, S

EED

, O

R O

THER

SO

IL A

MEN

DM

ENTS

TO

AID

IN S

PREA

DIN

G. F

LOC

CU

LAN

TS M

AY

ALSO

BE

APPL

IED

WIT

H A

WAT

ER T

RU

CK

OR

AS

PAR

T O

F H

YDR

O-

SEED

ING

. AP

PLIC

ATIO

N

MET

HO

D S

HAL

L EN

SUR

E U

NIF

OR

M C

OVE

RAG

E TO

TH

E TA

RG

ET A

REA

.

6.8.

M

ANU

FAC

TUR

ER’S

GU

IDAN

CE

SHO

ULD

BE

FOLL

OW

ED F

OR

BLO

CK,

LO

G

AND

SO

CK

SPAC

ING

CO

NFI

GU

RAT

ION

S. B

EFO

RE

FLO

CC

ULA

NTS

CAN

BE

USE

D O

N A

CO

NST

RU

CTI

ON

PR

OJE

CT,

SIT

E-SP

ECIF

IC S

OIL

SAM

PLES

M

UST

BE

OBT

AIN

ED A

ND

TES

TED

BY

THE

MAN

UFA

CTU

RER

OR

TH

EIR

R

EPR

ESEN

TATI

VE, T

O ID

ENTI

FY T

HE

OPT

IMU

M F

LOC

CU

LAN

T TY

PE A

ND

AP

PLIC

ATIO

N

RAT

E.

SIN

CE

FLO

CC

ULA

NT

EFFI

CAC

Y IS

H

IGH

LY

DEP

END

ENT

ON

SO

IL T

YPE,

SO

IL S

AMPL

ES W

ILL

NEE

D T

O B

E O

BTAI

NED

FR

OM

EA

CH

SO

IL

HO

RIZ

ON

TH

AT

WIL

L BE

AC

CES

SED

D

UR

ING

EX

CAV

ATIO

N. F

LOC

CU

LAN

TS S

HO

ULD

BE

APPL

IED

ON

A C

ON

STR

UC

TIO

N

SITE

IN

AC

CO

RD

ANC

E W

ITH

TH

E M

ANU

FAC

TUR

ER’S

REC

OM

MEN

DED

AP

PLIC

ATIO

N O

R D

OSA

GE

RAT

E.

7.

UTI

LITY

REL

OC

ATIO

N

ARE

UTI

LITI

ES IN

CLU

DED

IN T

HE

CO

NTR

ACT?

Y

ES

NO

IF Y

ES, T

HE

FOLL

OW

ING

APP

LY:

7.1.

ST

OR

MW

ATER

WH

ICH

CO

LLEC

TS I

N T

HE

UTI

LITY

TR

ENC

H S

HAL

L BE

PU

MPE

D IN

TO A

DEW

ATER

ING

STR

UC

TUR

E O

R S

EDIM

ENT

FILT

ER B

AG A

ND

TR

EATE

D P

RIO

R T

O D

ISC

HAR

GE.

7.2.

SI

LT F

ENC

E SH

ALL

BE I

NST

ALLE

D O

N T

HE

DO

WN

GR

ADIE

NT

SID

E O

F ST

OC

KPIL

ED

SOIL

. AN

Y TR

ENC

HIN

G

ACR

OSS

W

ET

WEA

THER

C

ON

VEYA

NC

ES S

HAL

L BE

DO

NE

DU

RIN

G D

RY

CO

ND

ITIO

NS,

REM

OVE

D A

ND

ST

ABIL

IZED

BY

THE

END

OF

THE

WO

RK

DAY

.

7.3.

U

TILI

TY

CR

OSS

ING

S IN

EN

VIR

ON

MEN

TAL

FEAT

UR

ES

SHAL

L BE

C

ON

STR

UC

TED

IN A

CC

OR

DAN

CE

WIT

H T

DO

T ST

AND

ARD

S AN

D N

O W

OR

K SH

ALL

BE C

ON

DU

CTE

D IN

FLO

WIN

G W

ATER

S. E

NVI

RO

NM

ENTA

L PE

RM

ITS

APPL

Y TO

UTI

LITI

ES I

N T

HIS

PR

OJE

CT.

TH

E ST

ATE

CO

NTR

ACTO

R S

HAL

L C

OM

PLY

WIT

H A

LL R

EQU

IREM

ENTS

OF

THE

PER

MIT

S.

7.4.

IT

IS

THE

RES

PON

SIBI

LITY

OF

THE

STAT

E U

TILI

TY C

ON

TRAC

TOR

TO

PR

OTE

CT

EXPO

SED

EA

RTH

FR

OM

ER

OSI

ON

AN

D

TO

PRO

VID

E FO

R

CO

NTA

INM

ENT

OF

SED

IMEN

T TH

AT M

AY R

ESU

LT F

RO

M T

HEI

R W

OR

K.

PRIO

R T

O B

EGIN

NIN

G W

OR

K, A

DEQ

UAT

E EP

SC M

EASU

RES

MU

ST B

E IN

PL

ACE

TO T

RAP

AN

Y SE

DIM

ENT

THAT

MAY

TR

AVEL

OFF

-SIT

E IN

TH

E EV

ENT

OF

RAI

N.

DU

RIN

G T

HE

PRO

GR

ESSI

ON

OF

THEI

R W

OR

K, E

XPO

SED

EAR

TH

AREA

S SH

ALL

BE

STAB

ILIZ

ED

AS

SOO

N

AS

POSS

IBLE

TO

PR

EVEN

T ER

OSI

ON

. AT

NO

TIM

E, S

HAL

L EX

POSE

D E

ARTH

RES

ULT

ING

FR

OM

TH

EIR

O

PER

ATIO

NS

HAV

E U

NPR

OTE

CTE

D A

CC

ESS

TO F

LOW

ING

OFF

-SIT

E AN

D

ENTE

RIN

G W

ATER

S O

F TH

E ST

ATE/

U.S

.

7.5.

FO

R

THE

INST

ALLA

TIO

N

OF

BUR

IED

U

TILI

TIES

(P

IPES

AN

D

CAB

LES)

, TR

ENC

HES

SH

ALL

BE B

ACKF

ILLE

D D

AILY

AS

CO

NST

RU

CTI

ON

PR

OC

EED

S.

BAC

KFIL

LED

TR

ENC

HES

SH

ALL

BE S

EED

ED A

ND

MU

LCH

ED O

R S

OD

DED

D

AILY

IF P

OSS

IBLE

, BU

T N

O L

ATER

TH

AN F

OU

RTE

EN D

AYS

AFTE

R B

EIN

G

BAC

KFIL

LED

. AN

Y TE

MPO

RAR

Y SP

OIL

S O

F EX

CAV

ATED

EAR

TH S

HAL

L BE

LO

CAT

ED W

ITH

IN T

DO

T EP

SC M

EASU

RES

OR

REC

EIVE

SEP

ARAT

E EP

SC

MEA

SUR

ES.

IF

TREN

CH

ES

ARE

NO

T BA

CKF

ILLE

D

OVE

RN

IGH

T,

APPR

OPR

IATE

EP

SC

MEA

SUR

ES

WIL

L BE

IN

STAL

LED

BY

TH

E ST

ATE

UTI

LITY

CO

NTR

ACTO

R U

NTI

L TH

E TR

ENC

H IS

BAC

KFIL

LED

.

7.6.

IN

REG

ARD

S TO

EPS

C, T

DEC

REG

ULA

TIO

NS

APPL

Y TO

TH

E ST

ATE

UTI

LITY

C

ON

TRAC

TOR

S O

N

THIS

PR

OJE

CT.

TH

E ST

ATE

CO

NTR

ACTO

R

IS

RES

PON

SIBL

E FO

R

EPSC

M

EASU

RES

R

ELAT

ED

TO

UTI

LITY

C

ON

STR

UC

TIO

N IN

CLU

DED

IN T

HE

STAT

E C

ON

TRAC

T.

Page 4: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED

P.E.

2

017

9401

4-12

35-9

4

CO

NST

. 2

017

HSI

P-10

6 (33

)

S-

4

7.7.

TR

ENC

HES

FO

RM

ED F

OR

TH

E IN

STAL

LATI

ON

OF

BUR

IED

UTI

LITI

ES M

AY

CAU

SE S

TOR

MW

ATER

RU

NO

FF T

O C

ON

CEN

TRAT

E AT

TH

E TR

ENC

H L

INE.

AD

DIT

ION

AL E

PSC

MEA

SUR

ES M

AY B

E R

EQU

IRED

TO

BE

INST

ALLE

D A

S AP

PRO

VED

BY

THE

TDO

T PR

OJE

CT

ENG

INEE

R.

7.8.

FO

R T

HE

INST

ALLA

TIO

N O

F U

ND

ERG

RO

UN

D U

TILI

TIES

OU

TSID

E O

F TH

E TD

OT

RIG

HT-

OF-

WAY

, EP

SC M

EASU

RES

SH

ALL

BE I

NST

ALLE

D P

RIO

R T

O

CLE

ARIN

G (

TREN

CH

ING

AN

D A

SSO

CIA

TED

BLA

STIN

G)

IN T

HO

SE A

REA

S N

ECES

SAR

Y TO

PR

EVEN

T SE

DIM

ENT

FRO

M L

EAVI

NG

TH

E C

ON

STR

UC

TIO

N

AREA

. TH

ESE

EPSC

MEA

SUR

ES S

HAL

L R

EMAI

N U

NTI

L TH

E BA

CKF

ILLE

D

TREN

CH

IS S

TABI

LIZE

D W

ITH

FIN

AL V

EGET

ATIV

E C

OVE

R.

7.9.

TH

E U

TILI

TY

CO

NTR

ACTO

R

SHAL

L R

ESTO

RE

ALL

AFFE

CTE

D

WET

W

EATH

ER C

ON

VEYA

NC

ES T

O T

HE

EXIS

TIN

G T

OPO

GR

APH

IC C

ON

DIT

ION

S AS

APP

RO

VED

BY

THE

TDO

T R

ESPO

NSI

BLE

PAR

TY.

7.10

. TH

E U

TILI

TY C

ON

TRAC

TOR

WIL

L PR

OVI

DE

APPR

OPR

IATE

EPS

C M

EASU

RES

TO

REP

LAC

E O

NSI

TE E

PSC

MEA

SUR

ES R

EMO

VED

TO

FAC

ILIT

ATE

THE

INST

ALLA

TIO

N O

F U

TILI

TIES

. R

EPLA

CEM

ENT

OF

EPSC

MEA

SUR

ES W

ILL

BE

CO

OR

DIN

ATED

WIT

H T

HE

TDO

T EN

GIN

EER

BEF

OR

E C

OM

MEN

CIN

G W

OR

K.

7.11

. FO

R

UTI

LITY

C

RO

SSIN

GS

THAT

U

TILI

ZE

HO

RIZ

ON

TAL

DIR

ECTI

ON

AL

DR

ILLI

NG

TH

E FO

LLO

WIN

G S

HAL

L AP

PLY:

7.11

.1.

THE

ENTR

Y AN

D E

XIT

POIN

TS S

HAL

L BE

AT

LEAS

T 50

FEE

T FR

OM

TH

E ST

REA

M B

ANK

OR

WET

LAN

D B

OU

ND

ARY.

7.11

.2.

THE

DEP

TH O

F BO

RE

BELO

W T

HE

STR

EAM

BED

IS S

UFF

ICIE

NT

TO

PREV

ENT

REL

EASE

OF

DR

ILLI

NG

FLU

ID, B

ASED

ON

TH

E PA

REN

T M

ATER

IAL.

7.11

.3.

A SI

TE-S

PEC

IFIC

CO

NTI

NG

ENC

Y AN

D C

ON

TAIN

MEN

T PL

AN F

OR

IN

ADVE

RTE

NT

REL

EASE

O

F D

RIL

LIN

G

FLU

ID

SHAL

L BE

ES

TABL

ISH

ED P

RIO

R T

O C

OM

MEN

CEM

ENT

OF

WO

RK.

TH

IS P

LAN

SH

ALL

BE S

UBM

ITTE

D T

O T

HE

TDO

T PR

OJE

CT

ENG

INEE

R A

ND

TH

E TD

OT

ENVI

RO

NM

ENTA

L D

IVIS

ION

PER

MIT

S AN

D/O

R C

OM

PLIA

NC

E AN

D F

IELD

SER

VIC

ES O

FFIC

E FO

R R

EVIE

W A

ND

APP

RO

VAL.

8.

MAI

NTE

NAN

CE

AND

INSP

ECTI

ON

8.1.

IN

SPEC

TIO

N P

RAC

TIC

ES (3

.5.8

)8.

1.1.

PR

OJE

CT

EPSC

INSP

ECTO

RS

AND

EN

GIN

EER

S (IN

CLU

DIN

G T

DO

T ST

AFF,

CO

NSU

LTAN

TS A

ND

CO

NTR

ACTO

R S

TAFF

) R

ESPO

NSI

BLE

FOR

TH

E IN

SPEC

TIO

N, I

MPL

EMEN

TATI

ON

, MAI

NTE

NAN

CE.

AN

D/O

R

REP

AIR

O

F EP

SC

MEA

SUR

ES

SHAL

L M

EET

ON

E O

F TH

E FO

LLO

WIN

G R

EQU

IREM

ENTS

(3.5

.8.1

.):

8.1.

1.1.

SU

CC

ESSF

ULL

Y C

OM

PLET

ED

THE

TDO

T EP

SC

INSP

ECTI

ON

S TR

AIN

ING

AN

D

ANY

REC

ERTI

FIC

ATIO

N

CO

UR

SE A

S R

EQU

IRED

. 8.

1.1.

2. S

UC

CES

SFU

LLY

CO

MPL

ETED

TH

E TD

EC

“LEV

EL

I -

FUN

DAM

ENTA

LS

OF

ERO

SIO

N

PREV

ENTI

ON

AN

D

SED

IMEN

T C

ON

TRO

L”

CO

UR

SE

AND

AN

Y R

ECER

TIFI

CAT

ION

CO

UR

SES

AS R

EQU

IRED

.

8.1.

1.3.

BE

A C

UR

REN

T TN

LIC

ENSE

D P

RO

FESS

ION

AL E

NG

INEE

R

OR

LAN

DSC

APE

ARC

HIT

ECT.

8.

1.1.

4. B

E A

CU

RR

ENT

CER

TIFI

ED P

RO

FESS

ION

AL I

N E

RO

SIO

N

AND

SED

IMEN

T C

ON

TRO

L (C

PESC

). 8.

1.1.

5. S

UC

CES

SFU

LLY

CO

MPL

ETED

TD

EC “

LEVE

L II

– D

ESIG

N

PRIN

CIP

LES

FOR

ER

OSI

ON

PR

EVEN

TIO

N A

ND

SED

IMEN

T C

ON

TRO

L FO

R C

ON

STR

UC

TIO

N S

ITES

” CO

UR

SE A

ND

AN

Y R

ECER

TIFI

CAT

ION

CO

UR

SE A

S R

EQU

IRED

.

8.1.

2.

THE

TDO

T C

ON

STR

UC

TIO

N

ENG

INEE

R

(OR

TH

EIR

D

ULY

AU

THO

RIZ

ED R

EPR

ESEN

TATI

VE)

AND

TH

E C

ON

TRAC

TOR

’S S

ITE

SUPE

RIN

TEN

DEN

T AR

E R

ESPO

NSI

BLE

FOR

IN

SPEC

TIO

NS.

M

AIN

TEN

ANC

E AN

D R

EPAI

R A

CTI

VITI

ES A

RE

THE

RES

PON

SIBI

LITY

O

F TH

E C

ON

TRAC

TOR

. TH

E TD

OT

CO

NST

RU

CTI

ON

EN

GIN

EER

OR

TH

EIR

DU

LY A

UTH

OR

IZED

REP

RES

ENTA

TIVE

SH

ALL

CO

MPL

ETE

THE

EPSC

IN

SPEC

TIO

N R

EPO

RTS

AN

D D

ISTR

IBU

TE C

OPI

ES P

ER

THE

CO

NTR

ACT.

8.1.

3.

THE

INSP

ECTO

R

SHAL

L C

ON

DU

CT

PRE-

CO

NST

RU

CTI

ON

IN

SPEC

TIO

NS

TO V

ERIF

Y AR

EAS

THAT

AR

E N

OT

TO B

E D

ISTU

RBE

D

HAV

E BE

EN M

ARKE

D I

N T

HE

SWPP

P AN

D I

N T

HE

FIEL

D B

EFO

RE

LAN

D D

ISTU

RBA

NC

E AC

TIVI

TIES

BEG

IN A

ND

IN

ITIA

L M

EASU

RES

H

AVE

BEEN

INST

ALLE

D (1

0 “IN

SPEC

TOR

”) (3

.5.1

.o).

8.1.

4.

EPSC

CO

NTR

OLS

SH

ALL

BE I

NSP

ECTE

D T

O V

ERIF

Y M

EASU

RES

H

AVE

BEEN

IN

STAL

LED

AN

D M

AIN

TAIN

ED I

N A

CC

OR

DAN

CE

WIT

H

TDO

T ST

AND

ARD

D

RAW

ING

S,

SPEC

IFIC

ATIO

NS,

AN

D

GO

OD

EN

GIN

EER

ING

PR

ACTI

CES

. EP

SC

INSP

ECTI

ON

S SH

ALL

BE

DO

CU

MEN

TED

ON

TH

E TD

OT

EPSC

IN

SPEC

TIO

N R

EPO

RT

FOR

M

AND

TH

E TD

EC

CO

NST

RU

CTI

ON

ST

OR

MW

ATER

IN

SPEC

TIO

N

CER

TIFI

CAT

ION

(TW

ICE-

WEE

KLY

INSP

ECTI

ON

S) F

OR

M.

8.1.

5.

OU

TFAL

L PO

INTS

SH

ALL

BE IN

SPEC

TED

TO

ASC

ERTA

IN W

HET

HER

EP

SC M

EASU

RES

AR

E EF

FEC

TIVE

IN P

REV

ENTI

NG

ER

OSI

ON

AN

D

CO

NTR

OLL

ING

SED

IMEN

T IN

CLU

DIN

G S

IGN

IFIC

ANT

IMPA

CTS

TO

SU

RR

OU

ND

ING

ST

ATE

WAT

ERS,

W

OTU

S (E

PHEM

ERAL

), W

ETLA

ND

S,

OTH

ER

NAT

UR

AL

RES

OU

RC

ES

AND

AD

JAC

ENT

PRO

PER

TY

OW

NER

S.

WH

ERE

DIS

CH

ARG

E LO

CAT

ION

S AR

E IN

ACC

ESSI

BLE,

NEA

RBY

DO

WN

GR

ADIE

NT

LOC

ATIO

NS

SHAL

L BE

IN

SPEC

TED

. LO

CAT

ION

S W

HER

E VE

HIC

LES

ENTE

R A

ND

EXI

T TH

E SI

TE

SHAL

L BE

IN

SPEC

TED

FO

R

EVID

ENC

E O

F O

FF-S

ITE

RO

ADW

AY S

EDIM

ENT

TRAC

KIN

G.

8.1.

6.

INSP

ECTI

ON

S W

ILL

BE

CO

ND

UC

TED

AT

LE

AST

TWIC

E EV

ERY

C

ALEN

DAR

WEE

K AN

D A

T LE

AST

72 H

OU

RS

APAR

T (3

.5.8

.2.a

). A

C

ALEN

DAR

WEE

K IS

DEF

INED

AS

SUN

DAY

TH

RO

UG

H S

ATU

RD

AY.

QU

ALIT

Y AS

SUR

ANC

E IN

SPEC

TIO

NS

OF

TDO

T EP

SC,

NPD

ES A

ND

W

ATER

QU

ALIT

Y PE

RM

IT R

EQU

IREM

ENTS

SH

ALL

BE P

ERFO

RM

ED

PER

TH

E TD

OT

ENVI

RO

NM

ENTA

L D

IVIS

ION

C

OM

PLIA

NC

E AN

D

FIEL

D S

ERVI

CES

OFF

ICE.

8.1.

7.

THE

FREQ

UEN

CY

OF

EPSC

IN

SPEC

TIO

NS

MAY

BE

RED

UC

ED T

O

ON

CE

A M

ON

TH W

HER

E SI

TES

OR

PO

RTI

ON

S O

F SI

TES

HAV

E BE

EN

TEM

POR

ARIL

Y ST

ABIL

IZED

U

NTI

L C

ON

STR

UC

TIO

N

ACTI

VITI

ES

RES

UM

E W

ITH

WR

ITTE

N N

OTI

FIC

ATIO

N B

Y TH

E TD

OT

REG

ION

AL

ENG

INEE

R

TO

TDEC

N

ASH

VILL

E C

ENTR

AL

OFF

ICE

AND

SU

BSEQ

UEN

T TD

EC A

PPR

OVA

L. W

RIT

TEN

NO

TIFI

CAT

ION

MU

ST

INC

LUD

E TH

E IN

TEN

T TO

C

HAN

GE

FREQ

UEN

CY

AND

JU

STIF

ICAT

ION

(3.5

.8.2

.a).

8.1.

8.

ALL

DIS

TUR

BED

AR

EAS

OF

THE

SITE

TH

AT H

AVE

NO

T BE

EN

FIN

ALLY

STA

BILI

ZED

, AR

EAS

USE

D F

OR

MAT

ERIA

L ST

OR

AGE

THAT

AR

E EX

POSE

D

TO

PREC

IPIT

ATIO

N,

STR

UC

TUR

AL

CO

NTR

OL

MEA

SUR

ES,

AND

LO

CAT

ION

S W

HER

E VE

HIC

LES

ENTE

R O

R E

XIT

THE

SITE

, AN

D E

ACH

OU

TFAL

L W

ILL

BE IN

SPEC

TED

(3.5

.8.2

.b).

8.1.

9.

THE

INSP

ECTO

R W

ILL

OVE

RSE

E TH

E R

EQU

IREM

ENTS

OF

OTH

ER

CO

NST

RU

CTI

ON

-REL

ATED

WAT

ER Q

UAL

ITY

PER

MIT

S (I.

E. T

DEC

AR

AP, U

SAC

E SE

CTI

ON

404

, AN

D T

VA S

ECTI

ON

26a

PER

MIT

S) F

OR

C

ON

STR

UC

TIO

N A

CTI

VITI

ES A

RO

UN

D W

ATER

S O

F TH

E ST

ATE

(10

“INSP

ECTO

R”).

8.1.

10.

THE

SWPP

P W

ILL

BE R

EVIS

ED A

S N

ECES

SAR

Y BA

SED

ON

TH

E R

ESU

LTS

OF

THE

INSP

ECTI

ON

. R

EVIS

ION

(S)

WIL

L BE

REC

OR

DED

W

ITH

IN

7 D

AYS

OF

THE

INSP

ECTI

ON

.

REV

ISIO

N(S

) W

ILL

BE

IMPL

EMEN

TED

WIT

HIN

14

DAY

S O

F TH

E IN

SPEC

TIO

N (3

.5.8

.2.e

AN

D

3.5.

8.2.

f).

8.1.

11.

DO

CU

MEN

TATI

ON

OF

INSP

ECTI

ON

S W

ILL

BE M

AIN

TAIN

ED O

N S

ITE

IN T

HE

“DO

CU

MEN

TATI

ON

AN

D P

ERM

ITS”

BIN

DER

. R

EPO

RTS

WIL

L BE

SU

BMIT

TED

TO

TH

E TD

OT

PRO

JEC

T EN

GIN

EER

PE

R

THE

CO

NTR

ACT.

8.1.

12.

THES

E IN

SPEC

TIO

N R

EQU

IREM

ENTS

DO

NO

T AP

PLY

TO D

EFIN

ABLE

AR

EAS

OF

THE

SITE

TH

AT

HAV

E M

ET

FIN

AL

STAB

ILIZ

ATIO

N

REQ

UIR

EMEN

TS A

ND

HAV

E BE

EN N

OTE

D IN

TH

E SW

PPP.

8.1.

13.

TRAI

NED

CER

TIFI

ED IN

SPEC

TOR

S SH

ALL

CO

MPL

ETE

INSP

ECTI

ON

TO

TH

E BE

ST

OF

THEI

R

ABIL

ITY.

FA

LSIF

YIN

G

INSP

ECTI

ON

R

ECO

RD

S O

R

OTH

ER

DO

CU

MEN

TATI

ON

O

R

FAIL

UR

E TO

C

OM

PLET

E IN

SPEC

TIO

N D

OC

UM

ENTA

TIO

N S

HAL

L R

ESU

LT I

N A

VI

OLA

TIO

N O

F TH

IS P

ERM

IT A

ND

AN

Y O

THER

APP

LIC

ABLE

AC

TS O

R

RU

LES

(3.5

.8.2

.h).

8.2.

D

ULY

AU

THO

RIZ

ED R

EPR

ESEN

TATI

VE (7

.7.3

)

THE

PRO

JEC

T EN

GIN

EER

M

AY

DEL

EGAT

E AN

IN

DIV

IDU

AL

AND

/OR

C

ON

SULT

ANT

TO S

IGN

EPS

C I

NSP

ECTI

ON

S R

EPO

RTS

. FO

R S

ATIS

FYIN

G

SIG

NAT

OR

Y R

EQU

IREM

ENTS

FO

R

EPSC

IN

SPEC

TIO

N

REP

OR

TS,

THE

PRO

JEC

T EN

GIN

EER

AN

D N

EWLY

AU

THO

RIZ

ED I

ND

IVID

UAL

AC

CEP

TIN

G

RES

PON

SIBI

LITY

MU

ST C

OM

PLET

E AN

D S

IGN

TH

E TD

OT

CO

NST

RU

CTI

ON

D

IVIS

ION

EPS

C D

ELEG

ATIO

N O

F AU

THO

RIT

Y.

8.3.

M

AIN

TEN

ANC

E PR

ACTI

CES

(3.5

.3.1

AN

D 3

.5.7

)

8.3.

1.

ALL

CO

NTR

OLS

WIL

L BE

MAI

NTA

INED

IN

GO

OD

AN

D E

FFEC

TIVE

O

PER

ATIN

G O

RD

ER A

ND

IN A

CC

OR

DAN

CE

WIT

H T

DO

T ST

AND

ARD

D

RAW

ING

S AN

D G

OO

D E

NG

INEE

RIN

G P

RAC

TIC

ES. (

3.5.

3.1.

b)

8.3.

2.

MAI

NTE

NAN

CE

AND

REP

AIR

AC

TIVI

TIES

AR

E TH

E R

ESPO

NSI

BILI

TY

OF

THE

CO

NTR

ACTO

R.

8.3.

3.

UPO

N

CO

NC

LUSI

ON

O

F TH

E IN

SPEC

TIO

NS,

EP

SC

MEA

SUR

ES

FOU

ND

TO

BE

INEF

FEC

TIVE

SH

ALL

BE R

EPAI

RED

, REP

LAC

ED, O

R

MO

DIF

IED

BEF

OR

E TH

E N

EXT

RAI

N E

VEN

T, IF

PO

SSIB

LE, B

UT

IN N

O

CAS

E, M

OR

E TH

AN 2

4 H

OU

RS

AFTE

R T

HE

INSP

ECTI

ON

OR

WH

EN

THE

CO

ND

ITIO

N IS

IDEN

TIFI

ED. I

F TH

E R

EPAI

R, R

EPLA

CEM

ENT

OR

M

OD

IFIC

ATIO

N

IS

NO

T PR

ACTI

CAL

W

ITH

IN

THE

24-H

OU

R

TIM

EFR

AME,

W

RIT

TEN

D

OC

UM

ENTA

TIO

N

PRO

VID

ED

BY

THE

CO

NTR

ACTO

R S

HAL

L BE

PLA

CED

IN T

HE

FIEL

D D

IAR

Y AN

D E

PSC

IN

SPEC

TIO

N R

EPO

RT.

AN

EST

IMAT

ED R

EPAI

R, R

EPLA

CEM

ENT

OR

M

OD

IFIC

ATIO

N S

CH

EDU

LE S

HAL

L BE

DO

CU

MEN

TED

WIT

HIN

24

HO

UR

S AF

TER

IDEN

TIFI

CAT

ION

. (3.

5.8.

2.e)

.

8.3.

4.

SED

IMEN

T SH

ALL

BE

REM

OVE

D

FRO

M

SED

IMEN

T C

ON

TRO

L ST

RU

CTU

RES

(SED

IMEN

T TR

APS,

SIL

T FE

NC

E, S

EDIM

ENT

BASI

NS,

O

THER

CO

NTR

OLS

, ETC

.) W

HEN

TH

E D

ESIG

N C

APAC

ITY

HAS

BEE

N

RED

UC

ED B

Y FI

FTY

PER

CEN

T (5

0%).

(3.5

.3.1

.e).

8.3.

5.

DU

RIN

G S

EDIM

ENT

REM

OVA

L, T

HE

CO

NTR

ACTO

R S

HAL

L TA

KE

STEP

S TO

EN

SUR

E TH

AT S

TRU

CTU

RAL

CO

MPO

NEN

TS O

F EP

SC

MEA

SUR

ES A

RE

NO

T D

AMAG

ED A

ND

TH

US

MAD

E IN

EFFE

CTI

VE. I

F D

AMAG

E D

OES

OC

CU

R,

THE

CO

NTR

ACTO

R S

HAL

L R

EPAI

R T

HE

EPSC

MEA

SUR

ES A

T TH

E C

ON

TRAC

TOR

'S O

WN

EXP

ENSE

.

8.3.

6.

CH

ECK

DAM

S W

ILL

BE IN

SPEC

TED

FO

R S

TABI

LITY

. SED

IMEN

T W

ILL

BE R

EMO

VED

WH

EN D

EPTH

REA

CH

ES O

NE-

HAL

F (½

) TH

E H

EIG

HT

OF

THE

DAM

.

8.3.

7.

SED

IMEN

T R

EMO

VED

FR

OM

SED

IMEN

T C

ON

TRO

L ST

RU

CTU

RES

SH

ALL

BE P

LAC

ED A

ND

TR

EATE

D I

N A

MAN

NER

SO

TH

AT T

HE

SED

IMEN

T IS

CO

NTA

INED

WIT

HIN

TH

E PR

OJE

CT

LIM

ITS,

DO

ES N

OT

MIG

RAT

E IN

TO

FEAT

UR

ES

REM

OVE

D

FRO

M,

AND

D

OES

N

OT

MIG

RAT

E O

NTO

AD

JAC

ENT

PRO

PER

TIES

AN

D/O

R IN

TO W

ATER

S O

F TH

E ST

ATE/

U.S

.

8.3.

8.

LITT

ER,

CO

NST

RU

CTI

ON

D

EBR

IS,

AND

C

ON

STR

UC

TIO

N

CH

EMIC

ALS

EXPO

SED

TO

STO

RM

WAT

ER W

ILL

BE P

ICKE

D U

P AN

D

REM

OVE

D

FRO

M

STO

RM

WAT

ER

EXPO

SUR

E PR

IOR

TO

AN

TIC

IPAT

ED S

TOR

M E

VEN

TS O

R B

EFO

RE

BEIN

G C

ARR

IED

OFF

TH

E SI

TE B

Y W

IND

, OR

OTH

ERW

ISE

PREV

ENTE

D F

RO

M B

ECO

MIN

G

A PO

LLU

TAN

T SO

UR

CE

FOR

STO

RM

WAT

ER D

ISC

HAR

GES

. AF

TER

U

SE, M

ATER

IALS

USE

D F

OR

ER

OSI

ON

CO

NTR

OL

WIL

L BE

REM

OVE

D

(3.5

.3.1

.f).

8.3.

9.

ALL

SEED

ED

AREA

S W

ILL

BE

CH

ECKE

D

FOR

BA

RE

SPO

TS,

ERO

SIO

N

WAS

HO

UTS

, AN

D

VIG

OR

OU

S G

RO

WTH

FR

EE

OF

SIG

NIF

ICAN

T W

EED

INFE

STAT

ION

S.

9.

SITE

ASS

ESSM

ENTS

(3.1

.2)

QU

ALIT

Y AS

SUR

ANC

E SI

TE A

SSES

SMEN

TS O

F ER

OSI

ON

PR

EVEN

TIO

N A

ND

SE

DIM

ENT

CO

NTR

OLS

SH

ALL

BE P

ERFO

RM

ED P

ER T

HE

TDO

T EN

VIR

ON

MEN

TAL

DIV

ISIO

N C

OM

PLIA

NC

E AN

D F

IELD

SER

VIC

ES O

FFIC

E G

UID

ELIN

ES.

10.

STO

RMW

ATER

MAN

AGEM

ENT

(3.5

.4)

10.1

. STO

RM

WAT

ER

MAN

AGEM

ENT

WIL

L BE

H

AND

LED

BY

TE

MPO

RAR

Y C

ON

TRO

LS O

UTL

INED

IN T

HIS

SW

PPP

AND

AN

Y PE

RM

ANEN

T C

ON

TRO

LS

NEE

DED

TO

MEE

T PE

RM

ANEN

T ST

OR

MW

ATER

MAN

AGEM

ENT

NEE

DS

IN

THE

POST

CO

NST

RU

CTI

ON

PER

IOD

. P

ERM

ANEN

T C

ON

TRO

LS W

ILL

BE

DEP

ICTE

D O

N T

HE

PLAN

S AN

D N

OTE

D A

S PE

RM

ANEN

T.

10.2

. DES

CR

IBE

ANY

SPEC

IFIC

PO

ST-C

ON

STR

UC

TIO

N M

EASU

RES

TH

AT W

ILL

CO

NTR

OL

VELO

CIT

Y,

POLL

UTA

NTS

, AN

D/O

R

ERO

SIO

N

(3.5

.4):

BRU

SH

MAT

TRES

S, R

IP-R

AP, S

OD

10.3

. OTH

ER IT

EMS

NEE

DIN

G C

ON

TRO

L (3

.5.5

) C

ON

STR

UC

TIO

N

MAT

ERIA

LS:

TH

E FO

LLO

WIN

G

MAT

ERIA

LS

OR

SU

BSTA

NC

ES A

RE

EXPE

CTE

D T

O B

E PR

ESEN

T O

N T

HE

SITE

DU

RIN

G T

HE

CO

NST

RU

CTI

ON

PER

IOD

. (C

HEC

K AL

L TH

AT A

PPLY

).

LU

MBE

R, G

UAR

DR

AIL,

TR

AFFI

C C

ON

TRO

L D

EVIC

ES

CO

NC

RET

E W

ASH

OU

T P

IPE

CU

LVER

TS (I

.E. C

ON

CR

ETE,

CO

RR

UG

ATED

MET

AL, H

DPE

, ETC

.) M

INER

AL A

GG

REG

ATES

, ASP

HAL

T E

ARTH

L

IQU

ID T

RAF

FIC

STR

IPIN

G M

ATER

IALS

, PAI

NT

RO

CK

CU

RIN

G C

OM

POU

ND

E

XPLO

SIVE

S O

THER

THES

E M

ATER

IALS

WIL

L BE

HAN

DLE

D A

S N

OTE

D IN

TH

IS S

WPP

P.

10.4

. WAS

TE M

ATER

IALS

(3.5

.5.b

) W

ASTE

M

ATER

IAL

(EAR

TH,

RO

CK,

AS

PHAL

T,

CO

NC

RET

E,

ETC

.) N

OT

REQ

UIR

ED F

OR

TH

E C

ON

STR

UC

TIO

N O

F TH

E PR

OJE

CT

WIL

L BE

DIS

POSE

D

Page 5: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED

P.E.

2

017

9401

4-12

35-9

4

CO

NST

. 2

017

HSI

P-10

6 (33

)

S-

5

OF

BY

THE

CO

NTR

ACTO

R

IN

ACC

OR

DAN

CE

WIT

H

THE

TDO

T C

ON

STR

UC

TIO

N C

ON

TRAC

T AN

D F

EDER

AL A

ND

STA

TE R

EGU

LATI

ON

S.

IMPA

CTS

TO

WAT

ERS

OF

THE

STAT

E/U

.S. S

HAL

L BE

AVO

IDED

IF P

OSS

IBLE

. IF

U

NAV

OID

ABLE

, TH

E C

ON

TRAC

TOR

W

ILL

OBT

AIN

AL

L N

ECES

SAR

Y PE

RM

ITS

INC

LUD

ING

, BU

T N

OT

LIM

ITED

TO

NPD

ES, A

QU

ATIC

RES

OU

RC

ES

ALTE

RAT

ION

PER

MIT

(S)

CO

RPS

OF

ENG

INEE

RS

SEC

TIO

N 4

04 P

ERM

ITS,

AN

D T

VA S

ECTI

ON

26A

PER

MIT

S TO

DIS

POSE

OF

WAS

TE M

ATER

IALS

.

10.5

. HAZ

ARD

OU

S W

ASTE

(3.5

.5.c

) (7.

9)

ALL

HAZ

ARD

OU

S W

ASTE

MAT

ERIA

LS W

ILL

BE D

ISPO

SED

OF

IN A

MAN

NER

W

HIC

H

IS

CO

MPL

IAN

T W

ITH

LO

CAL

O

R

STAT

E R

EGU

LATI

ON

S.

SI

TE

PER

SON

NEL

W

ILL

BE

INST

RU

CTE

D

IN

THES

E PR

ACTI

CES

, AN

D

THE

IND

IVID

UAL

D

ESIG

NAT

ED

AS

THE

CO

NTR

ACTO

R’S

O

N-S

ITE

REP

RES

ENTA

TIVE

W

ILL

BE

RES

PON

SIBL

E FO

R

SEEI

NG

TH

AT

THES

E PR

ACTI

CES

AR

E FO

LLO

WED

. TH

E C

ON

TRAC

TOR

W

ILL

OBT

AIN

AL

L N

ECES

SAR

Y PE

RM

ITS

TO D

ISPO

SE O

F H

AZAR

DO

US

MAT

ERIA

L.

10.6

. SAN

ITAR

Y W

ASTE

(3.5

.5.b

) PO

RTA

BLE

SAN

ITAR

Y FA

CIL

ITIE

S W

ILL

BE

PRO

VID

ED

ON

AL

L C

ON

STR

UC

TIO

N S

ITES

. SAN

ITAR

Y W

ASTE

WIL

L BE

CO

LLEC

TED

FR

OM

TH

E PO

RTA

BLE

UN

ITS

IN

A TI

MEL

Y M

ANN

ER

BY

A LI

CEN

SED

W

ASTE

M

ANAG

EMEN

T C

ON

TRAC

TOR

O

R

AS

REQ

UIR

ED

BY

ANY

LOC

AL

REG

ULA

TIO

NS.

TH

E C

ON

TRAC

TOR

WIL

L O

BTAI

N A

LL N

ECES

SAR

Y PE

RM

ITS

TO D

ISPO

SE O

F SA

NIT

ARY

WAS

TE.

10.7

. OTH

ER M

ATER

IALS

TH

E FO

LLO

WIN

G M

ATER

IALS

OR

SU

BSTA

NC

ES A

RE

EXPE

CTE

D T

O B

E PR

ESEN

T O

N T

HE

SITE

DU

RIN

G T

HE

CO

NST

RU

CTI

ON

PER

IOD

. (C

HEC

K AL

L TH

AT A

PPLY

).

FER

TILI

ZER

S AN

D L

IME

PES

TIC

IDES

AN

D/O

R H

ERBI

CID

ES

DIE

SEL

AND

GAS

OLI

NE

MAC

HIN

ERY

LUBR

ICAN

TS (O

IL A

ND

GR

EASE

)

THES

E M

ATER

IALS

WIL

L BE

HAN

DLE

D A

S N

OTE

D IN

TH

IS S

WPP

P.

11.

NO

N-S

TORM

WAT

ERD

ISC

HAR

GES

(3.5

.9)

11.1

. TH

E FO

LLO

WIN

G

NO

N-S

TOR

MW

ATER

D

ISC

HAR

GES

AR

E AN

TIC

IPAT

ED

DU

RIN

G T

HE

CO

NST

RU

CTI

ON

OF

THIS

PR

OJE

CT

(CH

ECK

ALL

THAT

APP

LY):

D

EWAT

ERIN

G O

F W

OR

K AR

EAS

OF

CO

LLEC

TED

STO

RM

WAT

ER A

ND

G

RO

UN

D W

ATER

.

WAT

ERS

USE

D T

O W

ASH

VEH

ICLE

S (O

F D

UST

AN

D S

OIL

) W

HER

E

D

ETER

GEN

TS A

RE

NO

T U

SED

AN

D D

ETEN

TIO

N A

ND

/OR

FIL

TER

ING

IS

PRO

VID

ED B

EFO

RE

THE

WAT

ER L

EAVE

S TH

E SI

TE.

W

ATER

USE

D T

O C

ON

TRO

L D

UST

. (3.

5.3.

1.n)

POTA

BLE

WAT

ER S

OU

RC

ES IN

CLU

DIN

G W

ATER

LIN

E FL

USH

ING

FR

OM

W

HIC

H C

HLO

RIN

E H

AS B

EEN

REM

OVE

D T

O T

HE

MAX

IMU

M E

XTEN

T PR

ACTI

CAB

LE.

U

NC

ON

TAM

INAT

ED G

RO

UN

DW

ATER

OR

SPR

ING

WAT

ER.

FO

UN

DAT

ION

O

R

FOO

TIN

G

DR

AIN

S W

HER

E FL

OW

S AR

E N

OT

CO

NTA

MIN

ATED

WIT

H P

OLL

UTA

NTS

.

OTH

ER:

11.2

. ALL

ALL

OW

ABLE

NO

N-S

TOR

MW

ATER

DIS

CH

ARG

ES W

ILL

BE D

IREC

TED

TO

ST

ABLE

D

ISC

HAR

GE

STR

UC

TUR

ES

PRIO

R

TO

LEAV

ING

TH

E SI

TE.

FILT

ERIN

G O

R C

HEM

ICAL

TR

EATM

ENT

MAY

BE

NEC

ESSA

RY

PRIO

R T

O

DIS

CH

ARG

E. A

LL C

HEM

ICAL

TR

EATM

ENTS

MU

ST B

E AP

PLIE

D P

ER S

ECTI

ON

6

FLO

CC

ULA

NTS

.

11.3

. TH

E D

ESIG

N O

F AL

L IM

PAC

TED

EPS

C M

EASU

RES

REC

EIVI

NG

FLO

W F

RO

M

ALLO

WAB

LE N

ON

-STO

RM

WAT

ER D

ISC

HAR

GES

MU

ST B

E D

ESIG

NED

TO

H

AND

LE T

HE

VOLU

ME

OF

THE

NO

N-S

TOR

MW

ATER

CO

MPO

NEN

T.

11.4

. WAS

H D

OW

N O

R W

ASTE

DIS

CH

ARG

E O

F C

ON

CR

ETE

TRU

CKS

WIL

L N

OT

BE

PER

MIT

TED

ON

-SIT

E U

NLE

SS P

RO

PER

SET

TLEM

ENT

AREA

S H

AVE

BEEN

PR

OVI

DED

IN

AC

CO

RD

ANC

E W

ITH

BO

TH

STAT

E AN

D

FED

ERAL

R

EGU

LATI

ON

S.

11.5

. AR

E AN

Y D

ISC

HAR

GES

AS

SOC

IATE

D

WIT

H

IND

UST

RIA

L (N

ON

-C

ON

STR

UC

TIO

N S

TOR

MW

ATER

) AC

TIVI

TY E

XPEC

TED

(3.5

.1.i)

?

YES

N

O

IF Y

ES,

SPEC

IFY

THE

LOC

ATIO

N O

F TH

E AC

TIVI

TY A

ND

ITS

PER

MIT

N

UM

BER

:

12.

SPIL

L PR

EVEN

TIO

N, M

ANAG

EMEN

T AN

D N

OTI

FIC

ATIO

N (3

.5.5

.c, 5

.1)

12.1

. SP

ILL

PREV

ENTI

ON

(3.5

.5.c

)

12.1

.1.

CO

NTR

ACTO

R’S

BU

LK

FUEL

AN

D

PETR

OLE

UM

PR

OD

UC

TS

STO

RED

O

N-S

ITE

OR

AD

JAC

ENT

TO

THE

R.O

.W.

IN

ABO

VE

GR

OU

ND

ST

OR

AGE

TAN

KS

WIT

H

AGG

REG

ATE

STO

RAG

E C

APAC

ITY

IN

EXC

ESS

OF

1,32

0 G

ALLO

NS

SHAL

L H

AVE

SEC

ON

DAR

Y C

ON

TAIN

MEN

T.

12.1

.2.

THE

CO

NTR

ACTO

R S

HAL

L BE

RES

PON

SIBL

E FO

R P

REP

ARIN

G A

SP

ILL

PREV

ENTI

ON

CO

NTR

OL

AND

CO

UN

TER

MEA

SUR

E (S

PCC

) PL

AN

AS

REQ

UIR

ED

BY

TDO

T SP

ECIA

L PR

OVI

SIO

N

107F

P (R

EGAR

DIN

G W

ATER

QU

ALIT

Y AN

D S

TOR

M W

ATER

PER

MIT

S) A

ND

TH

E LA

W.

12.1

.3.

THE

CO

NTR

ACTO

R

SHAL

L BE

SO

LELY

R

ESPO

NSI

BLE

FOR

O

BTAI

NIN

G

ANY

NEC

ESSA

RY

LOC

AL,

STAT

E,

AND

FE

DER

AL

PER

MIT

S. T

HE

SPC

C P

LAN

AN

D/O

R P

ERM

ITS

SHAL

L BE

KEP

T O

N-

SITE

AN

D A

CO

PY P

RO

VID

ED T

O T

HE

TDO

T C

ON

STR

UC

TIO

N

ENG

INEE

R.

12.2

. MAT

ERIA

L M

ANAG

EMEN

T 12

.2.1

. H

OU

SEKE

EPIN

G

ON

LY N

EED

ED P

RO

DU

CTS

WIL

L BE

STO

RED

ON

-SIT

E BY

TH

E C

ON

TRAC

TOR

. EX

CEP

T FO

R B

ULK

MAT

ERIA

LS T

HE

CO

NTR

ACTO

R

WIL

L ST

OR

E AL

L M

ATER

IALS

UN

DER

CO

VER

AN

D IN

APP

RO

PRIA

TE

CO

NTA

INER

S.

PR

OD

UC

TS

MU

ST

BE

STO

RED

IN

O

RIG

INAL

C

ON

TAIN

ERS

AND

LA

BELE

D.

M

ATER

IAL

MIX

ING

W

ILL

BE

CO

ND

UC

TED

IN

AC

CO

RD

ANC

E W

ITH

TH

E M

ANU

FAC

TUR

ER’S

R

ECO

MM

END

ATIO

NS.

W

HEN

PO

SSIB

LE, A

LL P

RO

DU

CTS

WIL

L BE

U

SED

C

OM

PLET

ELY

BEFO

RE

PRO

PER

LY

DIS

POSI

NG

O

F TH

E C

ON

TAIN

ER O

FF S

ITE.

TH

E M

ANU

FAC

TUR

ER’S

DIR

ECTI

ON

S FO

R

DIS

POSA

L O

F M

ATER

IALS

AN

D C

ON

TAIN

ERS

WIL

L BE

FO

LLO

WED

. TH

E C

ON

TRAC

TOR

’S

SITE

SU

PER

INTE

ND

ENT

WIL

L IN

SPEC

T M

ATER

IALS

STO

RAG

E AR

EAS

REG

ULA

RLY

TO

EN

SUR

E PR

OPE

R

USE

AN

D D

ISPO

SAL.

DU

ST G

ENER

ATED

WIL

L BE

CO

NTR

OLL

ED IN

AN

EN

VIR

ON

MEN

TALL

Y SA

FE M

ANN

ER.

VEG

ETAT

ION

AR

EAS

NO

T ES

SEN

TIAL

TO

TH

E C

ON

STR

UC

TIO

N

PRO

JEC

T W

ILL

BE

PRES

ERVE

D A

ND

MAI

NTA

INED

AS

NO

TED

ON

TH

E PL

ANS.

12.2

.2.

HAZ

ARD

OU

S M

ATER

IALS

PRO

DU

CTS

WIL

L BE

KEP

T IN

OR

IGIN

AL C

ON

TAIN

ERS

UN

LESS

TH

E C

ON

TAIN

ER

IS

NO

T R

E-SE

ALAB

LE.

OR

IGIN

AL

LABE

LS

AND

M

ATER

IAL

SAFE

TY D

ATA

SHEE

TS W

ILL

BE R

ETAI

NED

IN

A S

AFE

PLAC

E TO

R

ELAY

IM

POR

TAN

T PR

OD

UC

T IN

FOR

MAT

ION

.

IF

SUR

PLU

S PR

OD

UC

T M

UST

BE

DIS

POSE

D O

F, M

ANU

FAC

TUR

ER’S

LA

BEL

DIR

ECTI

ON

S FO

R

DIS

POSA

L W

ILL

BE

FOLL

OW

ED.

MAI

NTE

NAN

CE

AND

REP

AIR

OF

ALL

EQU

IPM

ENT

AND

VEH

ICLE

S IN

VOLV

ING

OIL

CH

ANG

ES, H

YDR

AULI

C S

YSTE

M D

RAI

N D

OW

N, D

E-G

REA

SIN

G O

PER

ATIO

NS,

FU

EL T

ANK

DR

AIN

DO

WN

AN

D R

EMO

VAL,

AN

D O

THER

AC

TIVI

TIES

WH

ICH

MAY

RES

ULT

IN T

HE

ACC

IDEN

TAL

REL

EASE

O

F C

ON

TAM

INAN

TS

WIL

L BE

C

ON

DU

CTE

D

ON

AN

IM

PER

VIO

US

SUR

FAC

E AN

D

UN

DER

C

OVE

R

DU

RIN

G

WET

W

EATH

ER T

O P

REV

ENT

THE

REL

EASE

OF

CO

NTA

MIN

ANTS

ON

TO

THE

GR

OU

ND

. W

HEE

L W

ASH

WAT

ER W

ILL

BE C

OLL

ECTE

D A

ND

AL

LOW

ED

TO

SETT

LE

OU

T SU

SPEN

DED

SO

LID

S PR

IOR

TO

D

ISC

HAR

GE.

W

HEE

L W

ASH

WAT

ER W

ILL

NO

T BE

DIS

CH

ARG

ED

DIR

ECTL

Y IN

TO A

NY

STO

RM

WAT

ER S

YSTE

M O

R S

TOR

MW

ATER

TR

EATM

ENT

SYST

EM.

PO

TEN

TIAL

pH

-MO

DIF

YIN

G

MAT

ERIA

LS

SUC

H A

S:

BULK

CEM

ENT,

CEM

ENT

KILN

DU

ST,

FLY

ASH

, N

EW

CO

NC

RET

E W

ASH

ING

S AN

D

CU

RIN

G

WAT

ERS,

C

ON

CR

ETE

PUM

PIN

G, A

ND

MIX

ER W

ASH

OU

T W

ATER

S W

ILL

BE C

OLL

ECTE

D O

N

SITE

AN

D

MAN

AGED

TO

PR

EVEN

T C

ON

TAM

INAT

ION

O

F ST

OR

MW

ATER

RU

NO

FF.

12.3

. PR

OD

UC

T SP

ECIF

IC P

RAC

TIC

ES

12.3

.1.

PETR

OLE

UM

PR

OD

UC

TS:

ALL

ON

-SIT

E VE

HIC

LES

WIL

L BE

M

ON

ITO

RED

FO

R L

EAKS

AN

D R

ECEI

VE R

EGU

LAR

PR

EVEN

TIVE

M

AIN

TEN

ANC

E TO

R

EDU

CE

THE

CH

ANC

E O

F LE

AKAG

E.

PETR

OLE

UM

PR

OD

UC

TS W

ILL

BE S

TOR

ED I

N T

IGH

TLY

SEAL

ED

CO

NTA

INER

S W

HIC

H A

RE

CLE

ARLY

LAB

ELED

.

12.3

.2.

FER

TILI

ZER

S:

FER

TILI

ZER

S W

ILL

BE

APPL

IED

O

NLY

IN

TH

E AM

OU

NTS

SPE

CIF

IED

BY

THE

SOIL

AN

ALYS

IS O

R T

DO

T.

ON

CE

APPL

IED

, FER

TILI

ZER

S W

ILL

BE W

OR

KED

INTO

TH

E SO

IL T

O L

IMIT

TH

E EX

POSU

RE

TO S

TOR

MW

ATER

. FE

RTI

LIZE

RS

WIL

L BE

STO

RED

IN

AN

EN

CLO

SED

AR

EA

UN

DER

C

OVE

R.

THE

CO

NTE

NTS

O

F PA

RTI

ALLY

USE

D F

ERTI

LIZE

R B

AGS

WIL

L BE

TR

ANSF

ERR

ED T

O

SEAL

ABLE

CO

NTA

INER

S TO

AVO

ID S

PILL

S.

12.3

.3.

PAIN

TS: A

LL C

ON

TAIN

ERS

WIL

L BE

TIG

HTL

Y SE

ALED

AN

D S

TOR

ED

WH

EN N

OT

REQ

UIR

ED F

OR

USE

. TH

E EX

CES

S W

ILL

BE D

ISPO

SED

O

F PE

R T

HE

MAN

UFA

CTU

RER

’S IN

STR

UC

TIO

NS

AND

APP

LIC

ABLE

ST

ATE

AND

LO

CAL

REG

ULA

TIO

NS.

12.3

.4.

CO

NC

RET

E TR

UC

KS: C

ON

TRAC

TOR

S W

ILL

PRO

VID

E D

ESIG

NAT

ED

TRU

CK

WAS

HO

UT

AREA

S O

N T

HE

SITE

. TH

ESE

AREA

S M

UST

BE

SELF

CO

NTA

INED

AN

D N

OT

CO

NN

ECTE

D T

O A

NY

STO

RM

WAT

ER

OU

TLET

OF

THE

SITE

. U

PON

CO

MPL

ETIO

N O

F C

ON

STR

UC

TIO

N

WAS

HO

UT

AREA

S W

ILL

BE P

RO

PER

LY S

TABI

LIZE

D.

12.4

. SPI

LL M

ANAG

EMEN

T IN

AD

DIT

ION

TO

TH

E PR

EVIO

US

HO

USE

KEEP

ING

AN

D

MAN

AGEM

ENT

PRAC

TIC

ES, T

HE

FOLL

OW

ING

PR

ACTI

CES

WIL

L BE

FO

LLO

WED

FO

R S

PILL

PR

EVEN

TIO

N A

ND

CLE

ANU

P IF

NEC

ESSA

RY:

12.4

.1.

FOR

AL

L H

AZAR

DO

US

MAT

ERIA

LS

STO

RED

O

N

SITE

, TH

E M

ANU

FAC

TUR

ER’S

REC

OM

MEN

DED

MET

HO

DS

FOR

SPI

LL C

LEAN

U

P W

ILL

BE C

LEAR

LY P

OST

ED.

SITE

PER

SON

NEL

WIL

L BE

MAD

E AW

ARE

OF

THE

PRO

CED

UR

ES A

ND

TH

E LO

CAT

ION

S O

F TH

E IN

FOR

MAT

ION

AN

D C

LEAN

UP

SUPP

LIES

.

12.4

.2.

APPR

OPR

IATE

CLE

ANU

P M

ATER

IALS

AN

D E

QU

IPM

ENT

WIL

L BE

M

AIN

TAIN

ED B

Y TH

E C

ON

TRAC

TOR

IN T

HE

MAT

ERIA

LS S

TOR

AGE

AREA

O

N-S

ITE

AND

U

ND

ER

CO

VER

.

AS

APPR

OPR

IATE

, EQ

UIP

MEN

T AN

D

MAT

ERIA

LS

MAY

IN

CLU

DE

ITEM

S SU

CH

AS

BO

OM

S, D

UST

PAN

S, M

OPS

, R

AGS,

GLO

VES,

GO

GG

LES,

KIT

TY

LITT

ER,

SAN

D,

SAW

DU

ST,

AND

PL

ASTI

C

AND

M

ETAL

TR

ASH

C

ON

TAIN

ERS

SPEC

IFIC

ALLY

FO

R C

LEAN

UP

PUR

POSE

S.

12.4

.3.

ALL

SPIL

LS W

ILL

BE C

LEAN

ED I

MM

EDIA

TELY

AFT

ER D

ISC

OVE

RY

AND

TH

E M

ATER

IALS

DIS

POSE

D O

F PR

OPE

RLY

. TH

E SP

ILL

AREA

W

ILL

BE K

EPT

WEL

L VE

NTI

LATE

D A

ND

PER

SON

NEL

WIL

L W

EAR

AP

PRO

PRIA

TE

PRO

TEC

TIVE

C

LOTH

ING

TO

PR

EVEN

T IN

JUR

Y FR

OM

CO

NTA

CT

WIT

H A

HAZ

ARD

OU

S SU

BSTA

NC

E.

12.4

.4.

THE

CO

NTR

ACTO

R’S

RES

PON

SIBL

E PA

RTY

WIL

L BE

TH

E SP

ILL

PREV

ENTI

ON

AN

D C

LEAN

UP

CO

OR

DIN

ATO

R.

THE

CO

NTR

ACTO

R

IS

RES

PON

SIBL

E FO

R

ENSU

RIN

G

THAT

TH

E SI

TE

SUPE

RIN

TEN

DEN

T H

AS

HAD

AP

PRO

PRIA

TE

TRAI

NIN

G

FOR

H

AZAR

DO

US

MAT

ERIA

LS H

AND

LIN

G,

SPIL

L M

ANAG

EMEN

T, A

ND

C

LEAN

UP.

12.4

.5.

IF S

PILL

S R

EPR

ESEN

T AN

IMM

INEN

T TH

REA

T O

F ES

CAP

ING

TH

E SI

TE

AND

EN

TER

ING

R

ECEI

VIN

G

WAT

ERS,

PE

RSO

NN

EL

WIL

L R

ESPO

ND

IMM

EDIA

TELY

TO

CO

NTA

IN T

HE

REL

EASE

AN

D N

OTI

FY

THE

SUPE

RIN

TEN

DEN

T AF

TER

TH

E SI

TUAT

ION

H

AS

BEEN

ST

ABIL

IZED

.

12.4

.6.

IF

AN

OIL

SH

EEN

IS

O

BSER

VED

O

N

SUR

FAC

E W

ATER

(E

.G.

SETT

LIN

G P

ON

DS,

DET

ENTI

ON

PO

ND

S, S

WAL

ES),

ACTI

ON

WIL

L BE

TA

KEN

IM

MED

IATE

LY T

O R

EMO

VE T

HE

MAT

ERIA

L C

AUSI

NG

TH

E SH

EEN

. TH

E C

ON

TRAC

TOR

WIL

L U

SE A

PPR

OPR

IATE

MAT

ERIA

LS

TO C

ON

TAIN

AN

D A

BSO

RB

THE

SPIL

L.

THE

SOU

RC

E O

F TH

E O

IL

SHEE

N W

ILL

ALSO

BE

IDEN

TIFI

ED A

ND

REM

OVE

D O

R R

EPAI

RED

AS

NEC

ESSA

RY

TO P

REV

ENT

FUR

THER

REL

EASE

S.

12.4

.7.

IF A

SPI

LL O

CC

UR

S TH

E C

ON

TRAC

TOR

’S S

ITE

SUPE

RIN

TEN

DEN

T SH

ALL

BE

RES

PON

SIBL

E FO

R

CO

MPL

ETIN

G

THE

SPIL

L R

EPO

RTI

NG

FO

RM

AN

D F

OR

REP

OR

TIN

G T

HE

SPIL

L TO

TH

E TD

OT

CO

NST

RU

CTI

ON

EN

GIN

EER

AN

D/O

R P

RO

JEC

T EN

GIN

EER

. AL

L SP

ILLS

MU

ST B

E R

EPO

RTE

D T

O T

HE

APPR

OPR

IATE

AG

ENC

Y, A

ND

M

EASU

RES

SH

ALL

BE T

AKEN

IM

MED

IATE

LY T

O P

REV

ENT

THE

POLL

UTI

ON

O

F W

ATER

S O

F TH

E ST

ATE/

U.S

., IN

CLU

DIN

G

GR

OU

ND

WAT

ER, S

HO

ULD

A S

PILL

OC

CU

R.

12.4

.8.

APPR

OPR

IATE

CLE

ANU

P M

ATER

IALS

AN

D E

QU

IPM

ENT

SHAL

L BE

M

AIN

TAIN

ED B

Y TH

E C

ON

TRAC

TOR

IN T

HE

MAT

ERIA

LS S

TOR

AGE

AREA

ON

-SIT

E AN

D U

ND

ER C

OVE

R. S

PILL

RES

PON

SE E

QU

IPM

ENT

SHAL

L BE

INSP

ECTE

D A

ND

MAI

NTA

INED

BY

THE

CO

NTR

ACTO

R A

S N

ECES

SAR

Y TO

R

EPLA

CE

ANY

MAT

ERIA

LS

USE

D

IN

SPIL

L R

ESPO

NSE

AC

TIVI

TIES

.

12.5

. SPI

LL N

OTI

FIC

ATIO

N (5

.1)

WH

ERE

A R

ELEA

SE

CO

NTA

ININ

G

A H

AZAR

DO

US

SUBS

TAN

CE

IN

AN

AMO

UN

T EQ

UAL

TO

, O

R

MO

RE

THAN

A

REP

OR

TABL

E Q

UAN

TITY

ES

TABL

ISH

ED U

ND

ER E

ITH

ER 4

0 C

FR 1

17 O

R 4

0 C

FR 3

02 O

CC

UR

S D

UR

ING

A

24 H

OU

R P

ERIO

D:

12.5

.1.

THE

TDO

T PR

OJE

CT

ENG

INEE

R IS

RES

PON

SIBL

E FO

R N

OTI

FYIN

G

THE

REG

ION

AL

PRO

JEC

T D

EVEL

OPM

ENT

OFF

ICE

(E.G

. TR

ANSP

OR

TATI

ON

EN

VIR

ON

MEN

TAL

STU

DIE

S SP

ECIA

LIST

) AS

SO

ON

AS

HE

OR

SH

E H

AS K

NO

WLE

DG

E O

F TH

E D

ISC

HAR

GE.

12.5

.2.

THE

TDO

T R

EGIO

NAL

PR

OJE

CT

DEV

ELO

PMEN

T O

FFIC

E W

ILL

NO

TIFY

TH

E LO

CAL

TD

EC E

NVI

RO

NM

ENTA

L FI

ELD

OFF

ICE

AND

AN

Y O

THER

APP

LIC

ABLE

REG

ULA

TOR

Y AG

ENC

IES

WIT

HIN

24

HO

UR

S O

F TH

E SP

ILL.

12.5

.3.

IN A

DD

ITIO

N T

O A

NY

FOLL

OW

UP

NO

TIFI

CAT

ION

S R

EQU

IRED

BY

FED

ERAL

LAW

, A W

RIT

TEN

DES

CR

IPTI

ON

OF

THE

REL

EASE

, DAT

E

Page 6: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED

P.E.

2

017

9401

4-12

35-9

4

CO

NST

. 2

017

HSI

P-10

6 (33

)

S-

6

OF

REL

EASE

AN

D C

IRC

UM

STAN

CES

LEA

DIN

G T

O T

HE

REL

EASE

, W

HAT

AC

TIO

NS

WER

E TA

KEN

TO

MIT

IGAT

E EF

FEC

TS O

F TH

E R

ELEA

SE,

AND

ST

EPS

TAKE

N

TO

MIN

IMIZ

E TH

E C

HAN

CE

OF

FUTU

RE

OC

CU

RR

ENC

ES

WIL

L BE

SU

BMIT

TED

TO

TH

E AP

PRO

PRIA

TE T

DEC

EN

VIR

ON

MEN

TAL

FIEL

D O

FFIC

E W

ITH

IN 1

4 D

AYS

OF

KNO

WLE

DG

E O

F TH

E R

ELEA

SE.

12.5

.4.

THE

SWPP

P M

UST

BE

MO

DIF

IED

WIT

HIN

14

DAY

S O

F KN

OW

LED

GE

OF

THE

REL

EASE

PR

OVI

DIN

G A

DES

CR

IPTI

ON

OF

THE

REL

EASE

, C

IRC

UM

STAN

CES

LEA

DIN

G T

O T

HE

REL

EASE

, AN

D T

HE

DAT

E O

F R

ELEA

SE.

TH

E SW

PPP

WIL

L BE

REV

IEW

ED A

ND

MO

DIF

IED

AS

NEC

ESSA

RY

TO

IDEN

TIFY

M

EASU

RES

TO

PR

EVEN

T TH

E R

EOC

CU

RR

ENC

E O

F SU

CH

REL

EASE

S AN

D T

O R

ESPO

ND

TO

SU

CH

R

ELEA

SES.

13.

REC

OR

D-K

EEPI

NG

13.1

. R

EQU

IRED

REC

OR

DS

TDO

T O

R T

HEI

R D

ULY

AU

THO

RIZ

ED R

EPR

ESEN

TATI

VE W

ILL

MAI

NTA

IN A

T TH

E SI

TE T

HE

FOLL

OW

ING

REC

OR

DS

OF

CO

NST

RU

CTI

ON

AC

TIVI

TIES

(3

.5.3

.1.m

) (4.

1.5.

) (6.

2.1)

:

13.1

.1.

THE

DAT

ES W

HEN

MAJ

OR

GR

ADIN

G A

CTI

VITI

ES O

CC

UR

.

13.1

.2.

THE

DAT

ES W

HEN

CO

NST

RU

CTI

ON

AC

TIVI

TIES

TEM

POR

ARIL

Y O

R

PER

MAN

ENTL

Y C

EASE

ON

A P

OR

TIO

N O

F TH

E SI

TE.

13.1

.3.

THE

DAT

ES W

HEN

STA

BILI

ZATI

ON

MEA

SUR

ES A

RE

INIT

IATE

D.

13.1

.4.

REC

OR

DS

EPSC

IN

SPEC

TIO

N

REP

OR

TS

AND

C

OR

REC

TIVE

M

EASU

RES

.

13.1

.5.

REC

OR

DS

OF

QU

ALIT

Y AS

SUR

ANC

E SI

TE A

SSES

SMEN

TS.

13.1

.6.

CO

PY

OF

SITE

EP

SC

INSP

ECTO

R’S

C

ERTI

FIC

ATIO

N

AND

/OR

LI

CEN

SIN

G

13.1

.7.

CO

PY O

F R

EQU

IRED

SO

IL A

NAL

YSIS

13.1

.8.

A C

OPY

OF

ANY

REG

ULA

TOR

Y C

OR

RES

PON

DEN

CE

REG

ARD

ING

TH

E EF

FEC

TIVE

NES

S O

F TH

E SW

PPP

OR

EPS

C C

ON

TRO

LS.

13.2

. R

AIN

FALL

MO

NIT

OR

ING

PLA

N (3

.5.3

.1.o

): 13

.2.1

. EQ

UIP

MEN

T AT

A M

INIM

UM

, TH

E C

ON

TRAC

TOR

WIL

L IN

STAL

L A

FEN

CE

POST

TY

PE R

AIN

GAU

GE

TO M

EASU

RE

RAI

NFA

LL.

THE

STAN

DAR

D F

ENC

E PO

ST R

AIN

GAU

GE

WIL

L BE

A W

EDG

E-SH

APED

GAU

GE

THAT

M

EASU

RES

UP

TO 6

IN

CH

ES O

F R

AIN

FALL

. A

N E

NG

LISH

SC

ALE

WIL

L BE

PR

OVI

DED

ON

ON

E FA

CE,

WIT

H A

MET

RIC

SC

ALE

ON

TH

E O

THER

FAC

E.

GR

ADU

ATIO

N W

ILL

BE P

ERM

ANEN

TLY

MO

LDED

IN

D

UR

ABLE

W

EATH

ER-R

ESIS

TAN

T PL

ASTI

C.

TH

E M

INIM

UM

G

RAD

UAT

ION

WIL

L BE

0.0

1 IN

CH

(O

R 0

.1M

M).

AN

ALU

MIN

UM

BR

ACKE

T W

ITH

SC

REW

S M

AY B

E U

SED

TO

MO

UN

T TH

E G

AUG

E O

N

A W

OO

DEN

SU

PPO

RT.

13.2

.2.

LOC

ATIO

N

THE

RAI

N G

AUG

E W

ILL

BE L

OC

ATED

AT

OR

ALO

NG

TH

E PR

OJE

CT

SITE

, AS

DEF

INED

IN T

HE

NO

I OF

THE

NPD

ES P

ERM

IT, I

N A

N O

PEN

AR

EA S

UC

H T

HAT

TH

E M

EASU

REM

ENT

WIL

L N

OT

BE IN

FLU

ENC

ED

BY O

UTS

IDE

FAC

TOR

S (I.

E. O

VER

HAN

GS,

GU

TTER

, TR

EES,

ETC

.).

AT L

EAST

ON

E R

AIN

GAU

GE

PER

LIN

EAR

MIL

E IS

REQ

UIR

ED A

LON

G

(AS

MEA

SUR

ED

ALO

NG

TH

E C

ENTE

RLI

NE

OF

THE

PRIM

ARY

ALIG

NM

ENT)

TH

E PR

OJE

CT

WH

ERE

CLE

ARIN

G,

GR

UBB

ING

, EX

CAV

ATIO

N,

GR

ADIN

G,

CU

TTIN

G

OR

FI

LLIN

G

IS

ACTI

VELY

PE

RFO

RM

ED,

OR

EX

POSE

D

SOIL

H

AS

NO

T YE

T BE

EN

PER

MAN

ENTL

Y ST

ABIL

IZED

.

13.2

.3.

MET

HO

DS

RAI

NFA

LL M

ON

ITO

RIN

G W

ILL

BE I

NIT

IATE

D P

RIO

R T

O C

LEAR

ING

, G

RU

BBIN

G,

EXC

AVAT

ION

, G

RAD

ING

, C

UTT

ING

, O

R

FILL

ING

, EX

CEP

T AS

SU

CH

MIN

IMAL

CLE

ARIN

G M

AY B

E N

ECES

SAR

Y TO

IN

STAL

L A

RAI

N G

AUG

E IN

AN

OPE

N A

REA

. TH

E R

AIN

GAU

GE

WIL

L BE

CH

ECKE

D F

OR

OPE

RAT

ION

AL S

OU

ND

NES

S D

AILY

(D

UR

ING

N

OR

MAL

BU

SIN

ESS

HO

UR

S) I

N W

ET T

IMES

AN

D W

EEKL

Y IN

DR

Y TI

MES

. GAU

GES

WIL

L BE

REP

AIR

ED O

R R

EPLA

CED

ON

TH

E SA

ME

DAY

IF F

OU

ND

TO

BE

NO

N-O

PER

ATIO

NAL

OR

MIS

SIN

G.

13.2

.4.

EAC

H R

AIN

GAU

GE

WIL

L BE

REA

D (

FOR

DET

AILE

D R

ECO

RD

S O

F R

AIN

FALL

) AN

D

EMPT

IED

AF

TER

EV

ERY

RAI

NFA

LL

EVEN

T O

CC

UR

RIN

G O

N T

HE

PRO

JEC

T SI

TE A

T AP

PRO

XIM

ATEL

Y TH

E SA

ME

TIM

E O

F TH

E D

AY (

DU

RIN

G N

OR

MAL

BU

SIN

ESS

HO

UR

S).

DU

RIN

G

PER

IOD

S O

F D

RY

CO

ND

ITIO

NS,

IT

WIL

L N

OT

BE N

ECES

SAR

Y TO

R

EAD

TH

E R

AIN

G

AUG

E EV

ERY

DAY

. IN

LI

EU

OF

THIS

R

EQU

IREM

ENT

ON

WEE

KEN

DS

AND

ON

STA

TE H

OLI

DAY

S, T

HE

RAI

N G

AUG

ES C

AN B

E EM

PTIE

D T

HE

NEX

T BU

SIN

ESS

DAY

AN

D A

R

EFER

ENC

E SI

TE U

SED

FO

R A

REC

OR

D O

F D

AILY

AM

OU

NT

OF

PREC

IPIT

ATIO

N F

OR

TH

OSE

DAY

S. A

REF

EREN

CE

SITE

IS

THE

DO

CU

MEN

TATI

ON

FR

OM

TH

E C

LOSE

ST G

AUG

E W

ITH

IN P

RO

XIM

ITY

OF

THE

PRO

JEC

T FR

OM

A R

ECO

GN

IZED

SO

UR

CE

SUC

H A

S TH

E N

OAA

NAT

ION

AL W

EATH

ER S

ERVI

CE.

13.2

.5.

DET

AILE

D R

ECO

RD

S W

ILL

BE R

ECO

RD

ED O

F R

AIN

FALL

EVE

NTS

IN

CLU

DE

DAT

ES, A

MO

UN

TS O

F R

AIN

FALL

, AN

D T

HE

APPR

OXI

MAT

E D

UR

ATIO

N (O

R T

HE

STAR

TIN

G A

ND

EN

DIN

G T

IMES

). TH

E R

AIN

FALL

R

ECO

RD

S SH

ALL

BE R

ECO

RD

ED O

N T

HE

TDO

T R

AIN

FALL

REC

OR

D

SHEE

T AN

D S

HAL

L BE

MAI

NTA

INED

IN T

HE

“DO

CU

MEN

TATI

ON

AN

D

PER

MIT

S” B

IND

ER.

13.2

.6.

IF T

HE

RAI

NFA

LL E

VEN

T IS

STI

LL I

N P

RO

GR

ESS

AT T

HE

DAI

LY

REC

OR

DIN

G

TIM

E,

THE

GAU

GE

WIL

L BE

EM

PTIE

D

AND

TH

E R

ECO

RD

WIL

L IN

DIC

ATE

THAT

TH

E ST

OR

M E

VEN

T W

AS S

TILL

IN

PR

OG

RES

S.

13.2

.7.

RAI

N G

AUG

E IN

FOR

MAT

ION

(DET

AILE

D R

ECO

RD

S), I

NC

LUD

ING

TH

E LO

CAT

ION

OF

THE

NEA

RES

T O

UTF

ALL,

WIL

L BE

REC

OR

DED

ON

TH

E EP

SC

INSP

ECTI

ON

R

EPO

RT

FOR

MS

AT

THE

TIM

E O

F M

EASU

REM

ENT.

13.3

. KEE

PIN

G P

LAN

S C

UR

REN

T (3

.4)

13.3

.1.

THE

EPSC

PLA

N I

S TO

SER

VE A

S AN

IN

ITIA

L G

UID

E FO

R S

ITE

PER

SON

NEL

AS

THE

CO

NST

RU

CTI

ON

PR

OC

ESS

DEV

ELO

PS.

IT

MU

ST B

E AM

END

ED, M

OD

IFIE

D, A

ND

UPD

ATED

WH

ENEV

ER E

PSC

IN

SPEC

TIO

NS

IND

ICAT

E,

OR

W

HER

E ST

ATE

OR

FE

DER

AL

REG

ULA

TOR

Y O

FFIC

IALS

D

ETER

MIN

E EP

SC

MEA

SUR

ES

ARE

PRO

VIN

G

INEF

FEC

TIVE

IN

EL

IMIN

ATIN

G

OR

SI

GN

IFIC

ANTL

Y M

INIM

IZIN

G

POLL

UTA

NT

SOU

RC

ES

OR

AR

E O

THER

WIS

E N

OT

ACH

IEVI

NG

TH

E G

ENER

AL

OBJ

ECTI

VES

OF

CO

NTR

OLL

ING

PO

LLU

TAN

TS IN

STO

RM

WAT

ER D

ISC

HAR

GES

ASS

OC

IATE

D W

ITH

TH

E C

ON

STR

UC

TIO

N A

CTI

VITY

.

13.3

.2.

THE

STAG

ES

DEP

ICTE

D W

ITH

IN

THE

EPSC

PLA

NS

MAY

N

OT

CO

INC

IDE

WIT

H

THE

ACTU

AL

STAG

ES

OF

CO

NST

RU

CTI

ON

ES

TABL

ISH

ED B

Y TH

E C

ON

TRAC

TOR

DU

RIN

G C

ON

STR

UC

TIO

N,

THU

S M

OD

IFIC

ATIO

NS

WIL

L BE

REQ

UIR

ED T

O E

NSU

RE

THE

EPSC

PL

AN IS

MAI

NTA

INED

TO

DEP

ICT

CU

RR

ENT

SITE

CO

ND

ITIO

NS.

IT

SHO

ULD

BE

MAI

NTA

INED

SU

CH

TH

AT I

T W

ILL

ALW

AYS

REF

LEC

T TH

E M

EASU

RES

TH

AT A

RE

INST

ALLE

D D

UR

ING

TH

E VA

RIO

US

STAG

ES O

F C

ON

STR

UC

TIO

N.

IT I

S IM

PRAC

TIC

AL T

O D

ETER

MIN

E AL

L TH

E IN

TER

MED

IATE

STA

GES

OF

CO

NST

RU

CTI

ON

TH

AT W

ILL

OC

CU

R,

THU

S TH

ESE

DO

CU

MEN

TS

MU

ST

BE

UPD

ATED

TH

RO

UG

HO

UT

THE

LIFE

OF

THE

CO

NST

RU

CTI

ON

PR

OJE

CT.

13.3

.3.

THE

TDO

T EP

SC

INSP

ECTO

R

OR

TH

EIR

D

ULY

AU

THO

RIZ

ED

REP

RES

ENTA

TIVE

WIL

L M

OD

IFY

AND

UPD

ATE

THE

SWPP

P W

HEN

AN

Y O

F TH

E FO

LLO

WIN

G C

ON

DIT

ION

S AP

PLY:

13.3

.3.1

. W

HEN

EVER

TH

ERE

IS A

CH

ANG

E IN

TH

E SC

OPE

OF

THE

PRO

JEC

T TH

AT

WO

ULD

BE

EX

PEC

TED

TO

H

AVE

A SI

GN

IFIC

ANT

EFFE

CT

ON

TH

E D

ISC

HAR

GE

OF

POLL

UTA

NTS

TO

TH

E W

ATER

S O

F TH

E ST

ATE

AND

WH

ICH

H

AS N

OT

OTH

ERW

ISE

BEEN

AD

DR

ESSE

D IN

TH

E SW

PPP;

13.3

.3.2

. W

HEN

EVER

IN

SPEC

TIO

NS

OR

IN

VEST

IGAT

ION

S BY

SIT

E O

PER

ATO

RS,

LO

CAL

, ST

ATE,

O

R

FED

ERAL

O

FFIC

IALS

IN

DIC

ATE

THE

SWPP

P IS

PR

OVI

NG

IN

EFFE

CTI

VE

IN

ELIM

INAT

ING

OR

SIG

NIF

ICAN

TLY

MIN

IMIZ

ING

PO

LLU

TAN

TS

FRO

M

CO

NST

RU

CTI

ON

AC

TIVI

TY

SOU

RC

ES,

OR

IS

O

THER

WIS

E N

OT

ACH

IEVI

NG

TH

E G

ENER

AL O

BJEC

TIVE

S O

F C

ON

TRO

LLIN

G

POLL

UTA

NTS

IN

ST

OR

MW

ATER

D

ISC

HAR

GES

AS

SOC

IATE

D

WIT

H

CO

NST

RU

CTI

ON

AC

TIVI

TY; W

HER

E LO

CAL

, STA

TE, O

R F

EDER

AL O

FFIC

IALS

D

ETER

MIN

E TH

AT

THE

SWPP

P IS

IN

EFFE

CTI

VE

IN

ELIM

INAT

ING

OR

SIG

NIF

ICAN

TLY

MIN

IMIZ

ING

PO

LLU

TAN

T SO

UR

CES

, A C

OPY

OF

ANY

CO

RR

ESPO

ND

ENC

E TO

TH

AT

EFFE

CT

MU

ST B

E R

ETAI

NED

IN T

HE

SWPP

P;

13.3

.3.3

. W

HEN

AN

Y N

EW O

PER

ATO

R A

ND

/OR

SU

B-O

PER

ATO

R I

S AS

SIG

NED

OR

REL

IEVE

D O

F TH

EIR

RES

PON

SIBI

LITY

TO

IM

PLEM

ENT

A PO

RTI

ON

OF

THE

SWPP

P;

13.3

.3.4

. TO

PR

EVEN

T A

NEG

ATIV

E IM

PAC

T TO

LE

GAL

LY

PRO

TEC

TED

STA

TE O

R F

EDER

ALLY

LIS

TED

OR

PR

OPO

SED

TH

REA

TEN

ED O

R E

ND

ANG

ERED

AQ

UAT

IC F

AUN

A;

13.3

.3.5

. W

HEN

TH

ERE

IS A

CH

ANG

E IN

CH

EMIC

AL T

REA

TMEN

T M

ETH

OD

S IN

CLU

DIN

G:

USE

OF

DIF

FER

ENT

TREA

TMEN

T C

HEM

ICAL

S, D

IFFE

REN

T D

OSA

GE

OR

APP

LIC

ATIO

N R

ATES

O

R A

DIF

FER

ENT

AREA

OF

APPL

ICAT

ION

NO

T SP

ECIF

IED

O

N T

HE

EPSC

PLA

NS.

13.3

.3.6

. AL

L SW

PPP

REV

ISIO

N(S

) SH

ALL

BE R

ECO

RD

ED W

ITH

IN 7

D

AYS

BY T

HE

PRO

JEC

T EP

SC IN

SPEC

TOR

.

13.3

.3.7

. W

HEN

A

TMD

L IS

D

EVEL

OPE

D

FOR

TH

E R

ECEI

VIN

G

WAT

ERS

FOR

A P

OLL

UTA

NT

OF

CO

NC

ERN

(SI

LTAT

ION

AN

D/O

R H

ABIT

AT A

LTER

ATIO

N),

CO

NST

RU

CTI

ON

SH

ALL

NO

TIFY

TH

E PE

RM

ITS

SEC

TIO

N

FOR

PR

OPE

R

CO

OR

DIN

ATIO

N.

13.4

. MAK

ING

PLA

NS

ACC

ESSI

BLE

13.4

.1.

TDO

T W

ILL

RET

AIN

A C

OPY

OF

THIS

SW

PPP

(INC

LUD

ING

A C

OPY

OF

THE

“DO

CU

MEN

TATI

ON

AN

D

PER

MIT

S”

BIN

DER

AT

TH

E C

ON

STR

UC

TIO

N S

ITE

(OR

OTH

ER L

OC

ATIO

N A

CC

ESSI

BLE

TO T

DEC

AN

D T

HE

PUBL

IC) F

RO

M T

HE

DAT

E C

ON

STR

UC

TIO

N C

OM

MEN

CES

TO

TH

E D

ATE

OF

FIN

AL S

TABI

LIZA

TIO

N. T

DO

T W

ILL

HAV

E A

CO

PY

OF

THE

SWPP

P AV

AILA

BLE

AT T

HE

LOC

ATIO

N W

HER

E W

OR

K IS

O

CC

UR

RIN

G O

N-S

ITE

FOR

TH

E U

SE O

F O

PER

ATO

RS

AND

TH

OSE

ID

ENTI

FIED

AS

HAV

ING

RES

PON

SIBI

LITI

ES U

ND

ER T

HE

SWPP

P W

HEN

EVER

TH

EY A

RE

ON

TH

E C

ON

STR

UC

TIO

N S

ITE

(6.2

).

13.4

.2.

PRIO

R T

O T

HE

INIT

IATI

ON

OF

LAN

D D

ISTU

RBI

NG

AC

TIVI

TIES

AN

D

UN

TIL

THE

SITE

HAS

MET

TH

E FI

NAL

STA

BILI

ZATI

ON

CR

ITER

IA,

TDO

T O

R T

HEI

R D

ULY

AU

THO

RIZ

ED R

EPR

ESEN

TATI

VE W

ILL

POST

A

NO

TIC

E N

EAR

TH

E M

AIN

EN

TRAN

CE

OF

THE

CO

NST

RU

CTI

ON

SIT

E W

ITH

TH

E FO

LLO

WIN

G IN

FOR

MAT

ION

(3.3

.3) (

6.2.

1):

13.4

.2.1

. A

CO

PY O

F TH

E N

OTI

CE

OF

CO

VER

AGE

(NO

C)

WIT

H T

HE

NPD

ES P

ERM

IT N

UM

BER

FO

R T

HE

PRO

JEC

T;

13.4

.2.2

. TH

E IN

DIV

IDU

AL N

AME,

CO

MPA

NY

NAM

E, E

-MAI

L AD

DR

ESS

(IF A

PPLI

CAB

LE) A

ND

TEL

EPH

ON

E N

UM

BER

OF

THE

LOC

AL

PRO

JEC

T SI

TE O

WN

ER A

ND

OPE

RAT

OR

CO

NTA

CT;

13.4

.2.3

. A

BRIE

F D

ESC

RIP

TIO

N O

F TH

E PR

OJE

CT;

AN

D

13.4

.2.4

. TH

E LO

CAT

ION

OF

THE

SWPP

P.

13.4

.3.

ALL

INFO

RM

ATIO

N

DES

CR

IBED

IN

SE

CTI

ON

13

.4.2

M

UST

BE

M

AIN

TAIN

ED

IN

LEG

IBLE

C

ON

DIT

ION

. IF

PO

STIN

G

THIS

IN

FOR

MAT

ION

NEA

R A

MAI

N E

NTR

ANC

E IS

IN

FEAS

IBLE

DU

E TO

SA

FETY

CO

NC

ERN

S, T

HE

NO

TIC

E SH

ALL

BE P

OST

ED I

N A

LO

CAL

BU

ILD

ING

. TH

E N

OTI

CE

MU

ST

BE

PLAC

ED

IN

A PU

BLIC

LY

ACC

ESSI

BLE

LOC

ATIO

N

WH

ERE

CO

NST

RU

CTI

ON

IS

AC

TIVE

LY

UN

DER

WAY

AN

D M

OVE

D A

S N

ECES

SAR

Y.

13.5

. NO

TIC

E O

F TE

RM

INAT

ION

(8.0

) 13

.5.1

. W

HEN

ALL

STO

RM

WAT

ER D

ISC

HAR

GES

FR

OM

CO

NST

RU

CTI

ON

AC

TIVI

TIES

TH

AT

ARE

AUTH

OR

IZED

BY

TH

E PE

RM

IT

ARE

ELIM

INAT

ED

BY

FIN

AL

STAB

ILIZ

ATIO

N,

THE

TDO

T R

EGIO

NAL

EN

GIN

EER

WIL

L SU

BMIT

A N

OTI

CE

OF

TER

MIN

ATIO

N (N

OT)

TH

AT IS

SI

GN

ED

IN

ACC

OR

DAN

CE

WIT

H

THE

PER

MIT

TO

TH

E TD

EC

CEN

TRAL

OFF

ICE

IN N

ASH

VILL

E, T

N.

13.5

.2.

FOR

TH

E PU

RPO

SES

OF

THE

CER

TIFI

CAT

ION

REQ

UIR

ED B

Y TH

E N

OT,

TH

E EL

IMIN

ATIO

N

OF

STO

RM

WAT

ER

DIS

CH

ARG

ES

ASSO

CIA

TED

WIT

H T

HE

CO

NST

RU

CTI

ON

AC

TIVI

TY M

EAN

S TH

E

13.5

.2.1

. AL

L EA

RTH

-DIS

TUR

BIN

G A

CTI

VITI

ES O

N T

HE

SITE

AR

E C

OM

PLET

ED A

ND

AL

L D

ISTU

RBE

D S

OIL

S AT

TH

E PO

RTI

ON

O

F TH

E C

ON

STR

UC

TIO

N S

ITE

WH

ERE

THE

OPE

RAT

OR

HAD

C

ON

TRO

L H

AVE

BEEN

FIN

ALLY

STA

BILI

ZED

; AN

D

13.5

.2.2

. AL

L C

ON

STR

UC

TIO

N

MAT

ERIA

LS,

WAS

TE

AND

W

ASTE

H

AND

LIN

G D

EVIC

ES, A

ND

ALL

EQ

UIP

MEN

T, A

ND

VEH

ICLE

S TH

AT W

ERE

USE

D D

UR

ING

CO

NST

RU

CTI

ON

HAV

E BE

EN

REM

OVE

D A

ND

PR

OPE

RLY

DIS

POSE

D; A

ND

13.5

.2.3

. AL

L ST

OR

MW

ATER

CO

NTR

OLS

TH

AT W

ERE

INST

ALLE

D

AND

M

AIN

TAIN

ED

DU

RIN

G

CO

NST

RU

CTI

ON

, EX

CEP

T TH

OSE

TH

AT

ARE

INTE

ND

ED

FOR

LO

NG

-TER

M

USE

FO

LLO

WIN

G T

ERM

INAT

ION

OF

PER

MIT

CO

VER

AGE,

HAV

E BE

EN R

EMO

VED

; AN

D

13.5

.2.4

. AL

L PO

TEN

TIAL

PO

LLU

TAN

TS

AND

PO

LLU

TAN

T G

ENER

ATIN

G

ACTI

VITI

ES

ASSO

CIA

TED

W

ITH

C

ON

STR

UC

TIO

N H

AVE

BEEN

REM

OVE

D; A

ND

13.5

.2.5

. TH

E PE

RM

ITTE

E H

AS I

DEN

TIFI

ED W

HO

IS

RES

PON

SIBL

E FO

R

ON

GO

ING

M

AIN

TEN

ANC

E O

F AN

Y ST

OR

MW

ATER

C

ON

TRO

LS

LEFT

O

N

THE

SITE

FO

R

LON

G-T

ERM

U

SE

FOLL

OW

ING

TER

MIN

ATIO

N O

F PE

RM

IT C

OVE

RAG

E; A

ND

13.5

.2.6

. TE

MPO

RAR

Y EP

SC M

EASU

RES

HAV

E BE

EN O

R W

ILL

BE

REM

OVE

D A

T AN

APP

RO

PRIA

TE T

IME

TO E

NSU

RE

FIN

AL

STAB

ILIZ

ATIO

N IS

MAI

NTA

INED

; AN

D

Page 7: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED

P.E.

2

017

9

4014

-123

5-94

CO

NST

. 2

017

H

SIP-

106(

33)

S-7

13.5

.2.7

. AL

L ST

OR

MW

ATER

D

ISC

HAR

GES

AS

SOC

IATE

D

WIT

H

CO

NST

RU

CTI

ON

AC

TIVI

TIES

FR

OM

TH

E ID

ENTI

FIED

SIT

E TH

AT A

RE

AUTH

OR

IZED

BY

A N

PDES

GEN

ERAL

PER

MIT

H

AVE

OTH

ERW

ISE

BEEN

ELI

MIN

ATED

FR

OM

TH

E PO

RTI

ON

O

F TH

E C

ON

STR

UC

TIO

N S

ITE

WH

ERE

THE

OPE

RAT

OR

HAD

C

ON

TRO

L.

13.6

. R

ETEN

TIO

N O

F R

ECO

RD

S (6

.2)

TDO

T W

ILL

RET

AIN

CO

PIES

OF

THE

SWPP

P, A

LL R

EPO

RTS

REQ

UIR

ED B

Y TH

E PE

RM

IT,

AND

REC

OR

DS

OF

ALL

DAT

A U

SED

TO

CO

MPL

ETE

THE

NO

TIC

E O

F IN

TEN

T FO

R T

HE

PRO

JEC

T FO

R A

PER

IOD

OF

AT L

EAST

TH

REE

(3

)YEA

RS

FRO

M T

HE

DAT

E TH

E N

OT

WAS

FIL

ED.

14.

SITE

WID

E/PR

IMAR

Y PE

RMIT

TEE

CER

TIFI

CAT

ION

(7.7

.5)

I C

ERTI

FY

UN

DER

PE

NAL

TY

OF

LAW

TH

AT

THIS

D

OC

UM

ENT

AND

AL

LAT

TAC

HM

ENTS

W

ERE

PREP

ARED

BY

M

E,

OR

U

ND

ER

MY

DIR

ECTI

ON

O

RSU

PER

VIS I

ON

. TH

E SU

BMIT

TED

IN

FOR

MAT

ION

IS

TO

TH

E BE

ST

OF

MY

KNO

WLE

DG

E AN

D B

ELIE

F, T

RU

E, A

CC

UR

ATE,

AN

D C

OM

PLET

E. I

AM A

WAR

E TH

ATTH

ERE

ARE

SIG

NIF

ICAN

T PE

NAL

TIES

FO

R S

UBM

ITTI

NG

FAL

SE I

NFO

RM

ATIO

N,

INC

LUD

ING

TH

E PO

SSIB

ILIT

Y O

F FI

NE

AND

IM

PRIS

ON

MEN

T. A

S SP

ECIF

IED

IN

TEN

NES

SEE

CO

DE

ANN

OTA

TED

SEC

TIO

N 3

9-16

-702

(a)(4

), TH

IS D

ECLA

RAT

ION

ISM

ADE

UN

DER

PEN

ALTY

OF

PER

J UR

Y.

AUTH

OR

IZED

TD

OT

PER

SON

NEL

SIG

NAT

UR

E (3

.3.1

)

PRIN

TED

NAM

E

TITL

E

DAT

E

15.

SEC

ON

DAR

Y PE

RM

ITTE

E (O

PER

ATO

R) C

ERTI

FIC

ATIO

N (7

.7.6

)

I CER

TIFY

UN

DER

PEN

ALTY

OF

LAW

TH

AT I

HAV

E R

EVIE

WED

TH

IS D

OC

UM

ENT,

ANY

ATTA

CH

MEN

TS,

AND

TH

E SW

PPP

REF

EREN

CED

ABO

VE.

BASE

D O

N M

YI N

QU

IRY

OF

THE

CO

NST

RU

CTI

ON

SIT

E O

WN

ER/D

EVEL

OPE

R ID

ENTI

FIED

ABO

VEAN

D/O

R

MY

INQ

UIR

Y O

F TH

E PE

RSO

N

DIR

ECTL

Y R

ESPO

NSI

BLE

FOR

ASSE

MBL

ING

TH

IS N

OI A

ND

SW

PPP,

I BE

LIEV

E TH

E IN

FOR

MAT

ION

SU

BMIT

TED

ISAC

CU

RAT

E. I

AM

AW

ARE

THAT

TH

IS N

OI,

IF A

PPR

OVE

D,

MAK

ES T

HE

ABO

VE-

DES

CR

IBED

CO

NST

RU

CTI

ON

AC

TIVI

TY S

UBJ

ECT

TO N

PDES

PER

MIT

NU

MBE

RTN

R10

0000

, AN

D T

HAT

CER

TAIN

OF

MY

ACTI

VITI

ES O

NSI

TE A

RE

THER

EBY

REG

ULA

TED

. I

AM

AWAR

E TH

AT

THER

E AR

E SI

GN

IFIC

ANT

PEN

ALTI

ES,

INC

LUD

ING

TH

E PO

SSIB

ILIT

Y O

F FI

NE

AND

IM

PRIS

ON

MEN

T FO

R K

NO

WIN

GVI

OLA

TIO

NS,

AN

D

FOR

FA

ILU

RE

TO

CO

MPL

Y W

ITH

TH

ESE

PER

MIT

REQ

UIR

EMEN

TS.A

S SP

ECIF

IED

IN T

ENN

ESSE

E C

OD

E AN

NO

TATE

D S

ECTI

ON

39-

16-7

02(a

)(4),

THIS

DEC

LAR

ATIO

N IS

MAD

E U

ND

ER P

ENAL

TY O

F PE

RJU

RY.

AUTH

OR

IZED

TD

OT

PER

SON

NEL

SIG

NAT

UR

E (3

.3.1

)

PRIN

TED

NAM

E

TITL

E

DAT

E

16.

ENVI

RO

NMEN

TAL

PERM

ITS

(9.0

)

LIST

ALL

EN

VIR

ON

MEN

TAL

PER

MIT

S AN

D E

XPIR

ATIO

N D

ATES

FO

R P

RO

JEC

T (T

OB

E C

OM

PLET

ED A

T TH

E EN

VIR

ONM

ENTA

L PR

ECO

NST

RU

CTI

ON

MEE

TIN

G B

YTD

OT

CO

NST

RU

CTI

ON

OR

THEI

R D

ULY

AU

THO

RIZ

ED R

EPR

ESEN

TATI

VE):

ENVI

RO

NMEN

TAL

PERM

ITS

PERM

IT

YES

OR

NO

PE

RMIT

O

R T

RAC

KIN

G N

O.

EXPI

RAT

ION

D

ATE*

TDEC

AR

AP

CO

RPS

OF

ENG

INEE

RS

(USA

CE)

TVA

26A

TDEC

CG

P

OTH

ER:

*TH

E TD

OT

ENVI

RO

NM

ENTA

L D

IVIS

ION

MU

ST B

E N

OTI

FIED

SIX

MO

NTH

S PR

IOR

TO P

ERM

IT E

XPIR

ATIO

N D

ATE.

JOH

NH

EWIT

T

CE

MAN

AGER

2

Page 8: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED

P.E.

2

017

CO

NST

. 2

017

S-8

OU

TFAL

L TA

BLE

(3.5

.1.d

, 5.4

.1.g

)

ALL

UN

USE

D F

IELD

S W

ITH

IN T

HE

OU

TFAL

L TA

BLE

ARE

TO B

E SH

ADED

, HAT

CH

ED, O

R R

EMO

VED

TO

IND

ICAT

E TH

EIR

NO

N-U

SAG

E.

EPSC

STA

GE

OU

TFAL

L LA

BEL

SU

B

OU

T-FA

LL

STAT

ION

C

L, L

T O

R R

T

SLO

PEW

ITH

INR

OW

(%)

STAG

E 1

D

RAI

NAG

E AR

EA

(AC

)

STAG

E 2

D

RAI

NAG

E AR

EA

(AC

)

STAG

E 3

D

RAI

NAG

E AR

EA

(AC

)

SED

IMEN

T B

ASIN

OR

EQ

UIV

ALEN

T M

EASU

RE(

S)

(YES

, NO

OR

N/A

)

REC

EIVI

NG

R

ESO

UR

CE

(TD

OT

EBR

LAB

EL)

OR

OTH

ER

CO

MM

ENTS

1O

UT-

110

7+25

.38

LT

3.0

6.1

N/A

STR

-1

1O

UT-

217

+23.

56LT

9.0

1.7

N/A

STR

-1

1O

UT-

317

+26.

92R

T8.

00.

3N

/AST

R-1

1O

UT-

417

+72.

72LT

4.0

0.5

N/A

STR

-1

1O

UT-

517

+77.

27R

T4.

00.

2N

/AST

R-1

1O

UT-

611

9+72

.74

RT

1.

0 18

.6 (1

6.1

UN

DIS

TUR

BED

) YE

SST

R-2

SILT

FEN

CE

WIL

L BE

INST

ALLE

D B

ETW

EEN

EXI

STIN

G D

ITC

H

AND

STA

BILI

ZED

PR

OPO

SED

DIT

CH

TO

DIV

ERT

CLE

AN W

ATER

(1

6.1

ACR

ES) F

RO

M T

HE

TOTA

L 18

.6 A

CR

E D

RAI

NAG

EAR

E A1

TEM

P O

UT-

717

+29.

41LT

12

.00.

4N

/AST

R-1

2O

UT-

110

7 +

25.3

8 LT

3.

0 6.

1N

/AST

R-1

2O

UT-

217

+23.

56LT

9.0

1.7

N/A

STR

-1

2O

UT-

317

+26.

92R

T9.

00.

3N

/AST

R-1

2O

UT-

417

+72.

72LT

4.0

0.4

N/A

STR

-1

2O

UT-

517

+77.

27R

T3.

00.

3N

/AST

R-1

2O

UT-

611

9+72

.74

RT

1.0

18.6

(16.

1 U

ND

ISTU

RBE

D)

YES

STR

-2SI

LT F

ENC

E W

ILL

BE IN

STAL

LED

BET

WEE

N E

XIST

ING

DIT

CH

AN

D S

TABI

LIZE

D P

RO

POSE

D D

ITC

H T

O D

IVER

T C

LEAN

WAT

ER

(16.

1 AC

RES

) FR

OM

TH

E TO

TAL

18.6

AC

RE

DR

AIN

AGE

AREA

3O

UT-

110

7 +

25.3

8 LT

3.

0 6.

1N

/AST

R-1

3O

UT-

217

+23.

56LT

9.0

1.7

N/A

STR

-1

3O

UT-

317

+26.

92R

T9.

00.

3N

/AST

R-1

3O

UT-

417

+72.

72LT

4.0

0.4

N/A

STR

-1

3O

UT-

517

+77.

27R

T3.

00.

3N

/AST

R-1

3O

UT-

611

9+72

.74

RT

1.0

18.6

(16.

1 U

ND

ISTU

RBE

D)

Y ES

STR

-2SI

LT F

ENC

E W

ILL

BE IN

STAL

LED

BET

WEE

N E

XIST

ING

DIT

CH

AN

D S

TABI

LIZE

D P

RO

POSE

D D

ITC

H T

O D

IVER

T C

LEAN

WAT

ER

(16.

1 AC

RES

) FR

OM

TH

E TO

TAL

18.6

AC

RE

DR

AIN

AGE

ARE A

Page 9: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED

09/2

1/20

17

Page 10: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED

09/2

1/20

17

Page 11: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED

09/2

1/20

17

Page 12: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED
Page 13: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED

09/2

1/20

17

Page 14: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED

09/2

1/20

17

Page 15: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED

09/2

1/20

17

Page 16: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED

09/2

1/20

17

Page 17: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED

09/2

1/20

17

Page 18: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED

09/2

1/20

17

Page 19: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED

09/2

1/20

17

Page 20: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED

09/2

1/20

17

Page 21: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED

09/2

1/20

17

Page 22: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED

09/2

1/20

17

Page 23: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED
Page 24: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED
Page 25: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED
Page 26: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED
Page 27: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED
Page 28: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED

09/2

1/20

17

Page 29: P.E. 2017 94014-1235-94 CONST. 2017 HSIP-106 LOCATED